Loading...
HomeMy WebLinkAboutReport 1UP2019 . 00059 16200 S)1 Pact C/c c H'6 /J 3 COM check Software Version 4.1.1.0 Mechanical Compliance Certificate RECEIVED Section 1 : Project Information MAR 7 2019 Energy Code:2014 Oregon Energy Efficiency Specialty Code Cil TIGARD Project Title: Tigard Towne Square-Tigard, OR Project Type:Alteration BUILDING DIVISION Construction Site: Owner/Agent: Designer/Contractor: 16200 SW Pacific Hwy Starbucks Coffee Company GPD Engineering and Architecture Suite#Z-3 2401 Utah Avenue South Professional Corporation Tigard,OR 97224 Seattle,WA 98134 520 South Main St (206)318-1575 Suite 2351 Akron,OH 44311 330.572.2100 Section 2: General Information Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Section 3: Mechanical Systems List Quantity System Type&Description 1 RTU-1 (Single Zone): Heating: 1 each-Duct Furnace,Gas,Capacity= 120 kBtu/h Proposed Efficiency=80.00%Ec,Required Efficiency: 80.00%Ec Cooling: 1 each-Single Package DX Unit,Capacity=92 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency= 12.60 EER, Required Efficiency: 11.00 EER +11.2 IEER Fan System: FAN SYSTEM 1 I RTU-1 --Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Constant Volume,3000 CFM,2.8 motor nameplate hp 1 RTU-2(Single Zone) Heating: 1 each-Duct Furnace,Gas,Capacity= 120 kBtu/h Proposed Efficiency=80.00%Ec,Required Efficiency: 80.00%Ec Cooling: 1 each-Single Package DX Unit,Capacity=92 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency= 12.60 EER, Required Efficiency: 11.00 EER +11.2 IEER Fan System: FAN SYSTEM 2 I RTU-2--Compliance(Motor nameplate HP method): Passes Fans: FAN 2 Supply,Constant Volume,3000 CFM,2.8 motor nameplate hp 1 Water Heater 1: Gas Storage Water Heater,Capacity:50 gallons, Input Rating:40 kBtu/h Proposed Efficiency:0.67 EF,Required Efficiency:0.58 EF Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Requirements Specific To: RTU-1 : 7 1. Equipment meets minimum efficiency: Duct Furnace(Gas): 80.00%Ec ✓ 2. Equipment meets minimum efficiency: Single Package Unit: 11.00 EER +11.2 IEER ✓ 3. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Project Title:Tigard Towne Square-Tigard, OR Report date: 02/12/19 Data filename:O:\2016\2016355\42_Tigard Town Square_Tigard OR\COMcheck\2016355.42 Tigard Towne Square- Tigard.cck Page 1 of 5 Plans reference page/section: ✓ 4. Hot Gas Bypass Limitation.Cooling systems does not use hot gas bypass or other evaporator pressure control unless the equipment is designed with multiple steps(or continuous)capacity modulation. Plans reference page/section: • 5. Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air,even if additional mechanical cooling is required to meet the cooling load of the building.Systems provide a means to relieve excess outdoor air during economizer operation to prevent overpressurizing the building. Plans reference page/section: Requirements Specific To: RTU-2 : • 1. Equipment meets minimum efficiency: Duct Furnace(Gas): 80.00%Ec • 2. Equipment meets minimum efficiency: Single Package Unit: 11.00 EER +11.2 IEER ✓ 3. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Plans reference page/section: ✓ 4. Hot Gas Bypass Limitation.Cooling systems does not use hot gas bypass or other evaporator pressure control unless the equipment is designed with multiple steps(or continuous)capacity modulation. Plans reference page/section: ✓ 5. Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air,even if additional mechanical cooling is required to meet the cooling load of the building.Systems provide a means to relieve excess outdoor air during economizer operation to prevent overpressurizing the building. Plans reference page/section: Requirements Specific To: Water Heater 1 : • 1. Newly purchased equipment meets the efficiency requirements. Gas Storage Water Heater efficiency: 0.58 EF ✓ 2. Service water-heating equipment performance efficiency.Water heating equipment efficiency has been verified through data furnished by the manufacturer or through certification under an approved certification program. ✓ 3. Temperature controls.Service water-heating equipment have controls to allow a setpoint of 110°F for equipment serving dwelling units and 90°F for equipment serving other occupancies.The outlet temperature of lavatories in public facility rest rooms is limited to 110°F. Plans reference page/section: ✓ 4. Heat traps.Water-heating equipment not supplied with integral heat traps and serving noncirculating systems have heat traps on the supply and discharge piping associated with the equipment. Plans reference page/section: ✓ 5. Pipe Insulation.For automatic-circulating hot water and externally heated(such as heat trace or impedance heating)systems,piping is insulated in accordance with the specifications of this section. ✓ 6. Hot Water System Controls.Systems designed to maintain usage temperatures in hot water pipes is turned off automatically when the hot water system is not in operation and has demand sensing controls that turn off the system when there is no demand when the system is operational.A check valve or similar device is installed per requirement details. Plans reference page/section: Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. ✓ 2. Packaged Electric Equipment.Specified packaged electrical equipment has a heat pump as the primary heating source. Requirement is not applicable. Plans reference page/section: ✓ 3. Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance with Section 503.2.1. Plans reference page/section: ✓ 4. HVAC Equipment Performance Requirements. Reported efficiencies have been tested and rated in accordance with the applicable test procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. Project Title:Tigard Towne Square-Tigard, OR Report date: 02/12/19 Data filename:O:\2016\2016355\42_Tigard Town Square_Tigard OR\COMcheck\2016355.42 Tigard Towne Square- Tigard.cck Page 2 of 5 ✓ 5. Thermostatic Controls.The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that respond to temperature within the zone. Plans reference page/section: 1 6. Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except during defrost, prevent supplementary heat operation when the heat pump can meet the heating load. Plans reference page/section: • 7. Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a temperature range or deadband of at least 5°F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or reduced to a minimum. Plans reference page/section: • 8. Optimum Start Controls. Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set point at time of occupancy. Plans reference page/section: ✓ 9. Off-hour controls.Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or programmable control system. Plans reference page/section: ✓ 10.Shutoff damper controls. Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. Plans reference page/section: ✓ 11.Freeze Protection and Snow melt system controls. Freeze protection systems,such as heat tracing of outdoor piping and heat exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air temperatures meet code criteria. Plans reference page/section: ✓ 12.Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by separate air distribution systems from those serving zones requiring only comfort conditions;or shall include supplementary control provisions so that the primary systems may be specifically controlled for comfort purposes only. Plans reference page/section: ✓ 13.Humidity control. If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a zone or zones,a humidity control device is provided. Plans reference page/section: ✓ 14.Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of fossil fuel or electricity to reduce relative humidity below 60 percent. Plans reference page/section: • 15.Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where no active humidification or dehumidification takes place. Plans reference page/section: ✓ 16.Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code. Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by Chapter 4 of the International Mechanical Code. Plans reference page/section: • 17.Demand controlled ventilation(DCV). DCV is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2 for multiple zone systems. Plans reference page/section: ✓ 18.Kitchen hoods. Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. Plans reference page/section: • 19.Enclosed parking garage ventilation controls. In Group S-2,enclosed parking garages used for storing or handling automobiles employs automatic carbon monoxide sensing devices. Plans reference page/section: ✓ 20.Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified insulation.When located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt Project Title:Tigard Towne Square-Tigard, OR Report date: 02/12/19 Data filename:O:\2016\2016355\42_Tigard Town Square_Tigard OR\COMcheck\2016355.42 Tigard Towne Square- Tigard.cck Page 3 of 5 • spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9 of the International Mechanical Code. ✓ 21.Low-pressure duct systems.All longitudinal and transverse joints,seams and connections of low-pressure supply and return ducts are securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in accordance with the manufacturer's installation instructions. Plans reference page/section: 22.Medium-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents. Plans reference page/section: • 23.High-pressure duct systems.Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7. In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. Plans reference page/section: • 24.Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the requirements of IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable volume fans with motors 10 horsepower. Plans reference page/section: • 25.Manuals.The construction documents require that an operating and maintenance manual be provided to the building owner by the mechanical contractor.See long description for specifications. Plans reference page/section: 26.Air System Design and Control. Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions of Sections 503.2.10.1 through 503.2.10.2. Plans reference page/section: • 27.Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motor nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details. Plans reference page/section: ✓ 28.Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake horsepower(bhp). Plans reference page/section: ✓ 29.Large Volume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical Code,whichever is greater. Plans reference page/section: • 30.AII air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. Plans reference page/section: • 31.Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronically-commutated motors and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating conditions. Plans reference page/section: ✓ 32.Hot Gas Bypass Limitation. For cooling systems<=240 kBtu/h,maximum hot gas bypass capacity is no more than 50%total cooling capacity. Plans reference page/section: • 33.All service water heating requirements are listed in requirements section specific to the system. Section 5: Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed mechanical alteration project has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code,Chapter 8,requirements in COMcheck Version 4.1.1.0 and to comply with the mandatory requirements in the Requirements Checklist. Project Title: Tigard Towne Square -Tigard, OR Report date: 02/12/19 Data filename:O:\2016\2016355\42_Tigard Town Square_Tigard OR\COMcheck\2016355.42 Tigard Towne Square- Tigard.cck Page 4 of 5 Name-Title Signature Date Section 6: Post Construction Compliance Statement HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment provided to the owner. HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. Li Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been mpleted �os�,vA Fat^rs r''`' /,/a 6 l 9 Principal Mechanical Designer-Name Signi Date Project Title:Tigard Towne Square-Tigard, OR Report date:02/12/19 Data filename:O:\2016\2016355\42_Tigard Town Square Tigard OR\COMcheck\2016355.42 Tigard Towne Square-Tigard.cck Page 5 of 5 r COMcheck Software Version 4.1.1.0 Interior Lighting Compliance RECEIVED Certificate MAR 7 2019 Section 1: Project InformationCITY OF TIGART9 BUILDING DIVISION Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title:Tigard Towne Square-Tigard, OR Project Type:Alteration Construction Site: Owner/Agent: Designer/Contractor: 16200 SW Pacific Hwy Starbucks Coffee Company GPD Engineering and Architecture Suite#Z-3 2401 Utah Avenue South Professional Corporation Tigard,OR 97224 Seattle,WA 98134 520 South Main St (206)318-1575 Suite 2351 Akron,OH 44311 330.572.2100 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Common Space Types:Dining Area-Bar Lounge/Leisure(Ceiling Height 0 ft.) 1835 1.31 2404 Total Allowed Watts= 2404 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Common Space Types:Dining Area-Bar Lounge/Leisure(1835 sq.ft.) LED 1:Can Lights:Other: 1 99 11 1089 LED 2: 100W PP:Other: 1 2 100 200 LED 3:sconces/lamp:Other: 1 3 20 60 Total Proposed Watts= 1349 Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: • 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage:2404 Proposed Wattage: 1349 Complies:YES Mandatory Requirements: ✓ 2. Exit signs. Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page/section: E-1104 • 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone. In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control, while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east, south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Plans reference page/section: Project Title: Tigard Towne Square-Tigard, OR Report date: 02/12/19 Data filename:\\AKRN04-2016.gpdco.com\DATA\2016\2016355\42_Tigard Town Square_Tigard OR\COMcheck\2016355.42 Tigard Towne Square - Tigard.cck Page 1 of 3 1 'L - • 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Plans reference page/section: • 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section: ti 6. Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Exception applies: Building exits as defined in Section 1002 of the Oregon Structural Specialty Code. Plans reference page/section: • 7. Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: • 8. Light reduction controls.Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. Plans reference page/section: • 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either: 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Plans reference page/section: • 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: E-1104 • 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section: • 12.Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: • 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that: 1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Plans reference page/section: • 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Plans reference page/section: • 15.Exterior lighting controls. Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: ✓ 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. 2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge-to-edge of each other. Exception applies:Where electronic high-frequency ballasts are used. Project Title:Tigard Towne Square-Tigard, OR Report date: 02/12/19 Data filename:\\AKRN04-2016.gpdco.com\DATA\2016\2016355\42_Tigard Town Square_Tigard OR\COMcheck\2016355.42 Tigard Towne Square - Tigard.cck Page 2 of 3 Plans reference page/section: 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: 18.Each dwelling unit in a building is metered separately. Plans reference page/section: E-1001 Interior Lighting PASSES Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.1.1.0 and to comply with the mandatory requirements in the Requirements Checklist. Steven P. Schaub, P.E. _.` 02/28/19 Name-Title Si Date P k. 44/ 1NE s'o cc 88390PE OREGON \`'D c'S'T SOT 10.2Q Jq) 'SEN P. SGNP EXPIRES: • Project Title: Tigard Towne Square-Tigard, OR Report date: 02/12/19 Data filename:\\AKRN04-2016.gpdco.com\DATA\2016\2016355\42_Tigard Town Square_Tigard OR\COMcheck\2016355.42 Tigard Towne Square - Tigard.cck Page 3 of 3 N1'52919-0(.2)59 I IwZOosvl! Pee, fiAii 23 I STARBUCKS COFFEE COMPANY I UCTUçq GUIDE SPECIFICATIONS PR Op. .. , 'T's . OFFS �es0 PROFFS I -57 I C.) ��INE s°ti (.. V- N�F� °� TIGARD TOWN SQUARE �g9 p8PE ak86692PE 16200 SW PACIFIC HWY #Z3 i TIGARD, OR 97224 - 411. ( � G _ ` i • 46 `!REGON c -44-13,2c)‘tk STORE # 418 .9/�p 9'2°1 ckV 1 J�yN N KP�P� 02/28/19 cio ,M.MP : 12/31/02/28/19 1 EXPIRES: 06/30/19 I ���,D P_op I ����DAkC, «N ��G ��� °� 7 ' , �� ` 8:390 C MARh S.SAI,OPEK Cn I AKRON. OH C 1.R' 40 • NO. 6036 • S \� �i'T 10.2 JO ��"f 6'2' i)7.. P. SGNP 1 iii t ! �y 62/28/19 C y`- fYN IA EXPIRES:06/30/2020 I 02/28/19 IRECEIVED I MAR 7 2019 TY OF TIGARD BUILDING DIVISION 1 I GPD Engineering and Architecture 111 Professional Corporation I I ' 2016355.42 TIGARD TOWN SQUARE STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 000010—TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS ' 011000 - Summary 012300 -Alternates 013113- Project Coordination 013119- Project Meetings 013233 - Photographic Documentation 013300 - Submittal Procedures 013544 - Construction Indoor Air Quality Management ' 013546 - Sustainable Design Requirements 014500- Quality Control 015000 -Temporary Facilities And Controls 016000- Product Requirements 017329 - Cutting and Patching 017421 - Construction Waste Management and Disposal 017700- Closeout Procedures ' DIVISION 02 - EXISTING CONDITIONS 024119 - Selective Demolition DIVISION 03 -CONCRETE ' 030100- Concrete Slab Repair and Resurfacing 033000- Cast-In-Place Concrete 033015- Concrete Slabs on Grade DIVISION 04 - MASONRY 042113 - Brick Masonry 042200 - Concrete Masonry Units DIVISION 05- METALS 051200 - Structural Steel Framing 053100 - Steel Decking 055000 - Metal Fabrications DIVISION 06 -WOOD, PLASTICS AND COMPOSITES 061000- Rough Carpentry(Wood Framed) 064000-Architectural Woodwork ' DIVISION 07 -THERMAL AND MOISTURE PROTECTION 072100 -Thermal Insulation 072700 -Weather Resistive Barriers ' 075423 -Thermoplastic Membrane (TPO) Roofing 076200 - Sheet Metal Flashing and Trim TEMPLATE 000010-1 10/12/18 I 2016355.42 TIGARD TOWN SQUARE STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 000010—TABLE OF CONTENTS 077200 - Roof Accessories 079200 - Joint Sealants DIVISION 08 -OPENINGS ' 081113- Hollow Metal Doors And Frames 081400-Wood Doors 084000-Aluminum-Framed Entrances, Storefronts and Windows 087100- Door Hardware 087300- Door and Hardware Installation 088000- Glazing DIVISION 09 - FINISHES 092200 - Lightgage Metal Support Framing 092843 - Gypsum Sheathing 092900 - Gypsum Board 111093000-Tiling 095113-Acoustical Panel Ceilings 097200-Wall Coverings 097733- Reinforced Plastic Panel Wall Coverings 098100—Acoustic Insulation 099013- Exterior Painting 099023- Interior Painting ' DIVISION 10-SPECIALTIES 104400- Fire Protection Specialties , DIVISION 22- PLUMBING 220500-Common Work Results for Plumbing ' 220503-Submittals for Plumbing 220523-General Duty Valves 220529- Hangers and Supports for Plumbing Piping and Equipment 220548 -Vibration and Seismic Controls for Plumbing Piping and Equipment 220719 - Plumbing System Insulation 220800- Plumbing Commissioning Specification 221116- Domestic Water Piping 221119- Domestic Water Piping Specialties 221123- Recirculation Domestic Water Pump 221316-Sanitary, Waste and Vent Piping System 221319 -Sanitary Waste Interceptors 221319- Sanitary Waste Piping Specialties 221613- Natural Gas Piping Systems 223000-Commercial Water Heaters 223001 - Point of Use Thermostatic Mixing Valves 224000- Plumbing Fixtures TEMPLATE 000010-2 10/12/18 1I I I 2016355.42 TIGARD TOWN SQUARE STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 000010—TABLE OF CONTENTS DIVISION 23- HVAC I 230501 -Common Work Results for HVAC 230503- Submittals for HVAC Systems 230529- Hangers and Supports for HVAC Piping and Ducts I 230548-Seismic Control For HVAC 230593-Testing,Adjusting and Balancing for HVAC 230713- Duct Insulation 230719- HVAC Piping Insulation I 230800-Commissioning of HVAC Systems 230993-Sequence of Operations for HVAC Controls 232113-Aboveground Hydronic Piping and Specialties I 232123- Hydronic Pumps 233113- Metal Ducts 233423- HVAC Power Ventilators 233433-Air Curtains I 233713- Diffusers, Registers and Louvers 237200 -Air-to-Air Energy Recovery Equipment 237433- Packaged Unit HVAC I 238126-Split System HVAC 238129-Ductless Split System HVAC 238239- Unit Heaters Il DIVISION 26- ELECTRICAL 260501 -Common Work Results for Electric I 260502-Common Electrical Materials and Methods 260503- Submittals for Electrical Systems 260519- Low-Voltage Electrical Power Conductors and Cables 260526 - Grounding and Bonding for Electrical Systems I 260529 - Hangers and Supports for Electrical Systems 260533- Raceways and Boxes for Electrical Systems 260537-J-Hook Pathways for Electrical Systems I 260543- Underground Ducts and Raceways for Electrical Systems 260544-Sleeves and Sleeve Seals for Electrical Raceways and Cabling 260548-Vibration and Seismic Controls for Electrical Systems 260553- Identification for Electrical Systems I 260584 - Mechanical Equipment 260590- Electrical Specialties 260800-Commissioning of Electrical Systems I 260919- Enclosed Contactors 260923- Lighting Control Devices 262113- Low-Voltage Overhead Electrical Service Entrance 262116- Low-Voltage Underground Electrical Service Entrance I 262200- Low-Voltage Transformers 262416- Panelboards 262713- Electricity Metering I 262726-Wiring Devices 262813- Fuses TEMPLATE 000010-3 10/12/18 I 1 2016355.42 TIGARD TOWN SQUARE STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 000010—TABLE OF CONTENTS 262816 - Enclosed Switches 1 264313 - Surge Protection for Low-Voltage Electrical Power Circuits 265100 - Lighting 1 1 1 1 i 1 1 1 1 1 1 1 1 1 TEMPLATE 000010-4 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 011000 -SUMMARY PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Sustainability requirements. 2. Special work requirements. 3. Owner-furnished Contractor installed products. 4. Coordination. 5. Reference standards. t 6. Applicable codes. 7. Field engineering. 8. Applications for payment 9. Request for information B. This Section applies to all Technical Specification Sections, and supplements the General and Supplemental Conditions. 1.2 SUSTAINABILITY REQUIREMENTS A. This Project has been designated to achieve sustainability goals set forth by the Owner. Provide services, documentation, and materials to obtain the required rating. Refer to Owner-requirements for further requirements. 1.3 SPECIAL WORK REQUIREMENTS A. Limit use of premises to allow for construction operations, and to allow for Owner occupancy and Work by other Contractors. B. Smoking is prohibited on site, except for areas designated by the Contractor. No smoking is allowed within enclosed areas. ' C. Owner Occupancy: 1. Coordinate use of premises under direction of Construction Manager. 2. Perform no utility shutdowns unless approved by the Construction Manager. D. Noise Producing Activities: 1. Unless approved otherwise, limit excessive noise producing activities to daylight hours. Coordinate with local jurisdictional authorities. 2. Comply with Section 015000 requirements for sound levels and noise control. ' E. Select materials, utilize personnel, perform preparatory work, and sequence work in an area as required so that the work may be completed in the least amount of time possible. F. All work shall be performed in a manner to maintain a normal business environment to the greatest ' extent possible. 1.4 OWNER-FURNISHED CONTRACTOR INSTALLED PRODUCTS ' A. Coordinate work to facilitate installation of products furnished by the Owner for Installation by the Contractor, as directed, and as indicated "FOIC," on the Drawings. B. Owner's Responsibilities: ' 1. Arrange for and deliver shop drawings, product data, and samples, to Contractor. 2. Arrange and pay for product delivery to site. 3. Upon delivery, inspect products jointly with Contractor. 4. Submit claims for transportation damage. 5. Arrange for replacement of damaged, defective, or missing items. 6. Arrange for manufacturers'warranties, inspections, and service. C. Contractor's Responsibilities: ' 1. Provide quantity take-offs to Owner allowing sufficient time for ordering, delivery and handling. 2. Indicate submittal and delivery dates for each product in the Progress Schedule. 111 TEMPLATE 011000-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 011000 -SUMMARY ' 3. Review shop drawings, product data, and samples. 4. Receive and unload products at site; inspect for completeness, for damage,jointly with Construction Manager. 5. Handle, store, install and finish products. 6. Repair or replace items damaged by Work of this Contract. 1.5 COORDINATION A. Coordinate work of the various Sections of Specifications to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later. B. Verify characteristics of elements of interrelated operating equipment are compatible; coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment. C. Coordinate space requirements and installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduits, as closely as practical; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. D. In finished areas, except as otherwise shown, conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements. E. Execute cutting and patching to integrate elements of Work, uncover ill-timed, defective, and non- conforming work, provide openings for penetrations of existing surfaces, and provide samples for testing. Seal penetrations through floors, walls, and ceilings. 1.6 REFERENCE STANDARDS A. For products specified by association or trade standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B. The date of the standard is that in effect as of the Bid date, or date of Owner-Contractor Agreement when there are no bids, except when a specific date is specified, or when a specific date is required under the applicable building code. C. Obtain copies of standards when required by Contract Documents. Maintain copy at jobsite during progress of the specific work. 1.7 APPLICABLE CODES 1 A. Conform to the codes listed on the Drawings. 1.8 FIELD ENGINEERING A. Provide field engineering services; establish grades, lines, and levels, by use of recognized engineering survey practices. B. Control points are those shown on Drawings. Locate and protect control and reference points. Notify the Construction Manager if reference points cannot be located. 1.9 APPLICATIONS FOR PAYMENT A. Complete and submit Applications for Payment in compliance with General Contractor Contract Administration Handbook 1.10 REQUEST FOR INTERPRETATION A. A Request for Interpretation (RFI) is a request from the Contractor directed to the Construction Manager for clarification, interpretation, or direction regarding the Work as described by Contract Documents. B. Coordinate and submit in timely manner so as not to impede delivery, work, and other conditions that I may be detrimental to construction progress C. Use "Request for Interpretation"form as approved by the Construction Manager. D. Allow sufficient time in construction schedule for Architect's response to the RFIs. TEMPLATE 011000-2 10/12/18 1 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 011000 -SUMMARY ' END OF SECTION 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ITEMPLATE 011000-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 012300 -ALTERNATES PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: Identification and description of Alternate work. B. Related Sections: 1. Owner-Contractor Agreement: Alternates accepted by Owner for incorporation into the Work. 2. Sections of Specifications identified in each Alternate. C. This Section supplements the General and Supplementary Conditions. 1.2 PROCEDURES , A. Alternates will be exercised at the option of Owner. B. Coordinate related work and modify surrounding work as required to complete the Work, including changes under each Alternate, when acceptance is designated in Owner-Contractor Agreement. 1.3 ALTERNATE DESCRIPTIONS A. ALTERNATE NO. 1 — FLOOR TREATMENT 1. Under Basic Bid: Floor tile#18113 ("Grey Textured Stripe" 12x24)throughout store totaling approximately 2,052 square feet. 2. Under Alternate: Polyvinyl Floor Tile#19794 ("Eco-Grip" Slate)throughout backbar and back of house, totaling approximately 801 square feet, thereby reducing floor tile#18113 to approximately 1,251 square feet. B. ALTERNATE NO. 2—DRIVE THRU LANE PAVING 1. Under Basic Bid: (2) 216 square foot 6"thick concrete pads at order point and pickup window, with approximately 1,850 square feet full depth asphalt paving between per civil drawings. 2. Under Alternate: Replace 1,850 square feet of full depth asphalt paving with 6"thick concrete paving, for a total of 2,282 square feet of concrete paving. END OF SECTION 1 I TEMPLATE 012300-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013113 -PROJECT COORDINATION PART 1 -GENERAL t 1.1 SUMMARY A. Section Includes: 1. General coordination provisions. 2. Requirements for coordination of space. 3. Use of coordination drawings. B. This Section applies to all Technical Specification Sections, and supplements the General and Supplementary Conditions. 1.2 GENERAL COORDINATION PROVISIONS A. Coordinate work of various specification sections to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later. B. Carefully study and compare Contract Documents before proceeding with fabrication and installation of work. Promptly advise Construction Representative of any error, inconsistency, omission, or apparent discrepancy discovered. C. Allot time in construction scheduling for liaison with Construction Representative and Architect. Establish procedures for handling queries and clarifications. Use Contractor's standard "Request for ' Information"form to initiate clarifications. Allow sufficient time in construction schedule for Architect's response to the request. D. In addition to meetings specified in Section 013119, hold coordination meetings and conferences with personnel and subcontractors to assure coordination of the work. E. Coordinate scheduling, submittals, and work of various specification sections to ensure efficient and orderly sequence of installation of independent construction elements. ' F. Verify that characteristics of operating equipment are compatible with building utilities and services. G. Verify characteristics of elements of interrelated operating equipment are compatible; coordinate work of various specification sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment. H. In finished areas, except as otherwise indicated, conceal pipes, conduit and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements. ' I. Execute cutting and patching to integrate elements of work, uncover ill-timed, defective, and non- conforming work, provide openings for penetrations of existing surfaces, and provide samples for testing. Seal penetrations through floors, walls, and ceilings. 1.3 COORDINATION OF SPACE A. The Contractor shall be responsible for coordinating the actual layout of plumbing, fire protection, HVAC, electrical, and other similar elements, as necessary to avoid interference, maintain the configurations of architectural elements, maintain minimum ceiling and clearance heights as required ' by code, and accommodate existing obstructions which are to remain. B. Layouts shown on the Drawings are diagrammatic. Follow routings shown for pipes, ducts, and conduit as closely as practical. Where routing changes are required in exposed locations within public t spaces, or will affect architectural elements, verify modifications with the Construction Representative prior to proceeding. C. Develop coordination drawings, and other preinstallation coordination methods as necessary to ' coordinate layouts prior to installation. Coordination drawings shall be based on the approved structural steel framing shop drawings, and shall consist of overlay drawings, or other similar methods to graphically indicate plumbing, fire protection, HVAC, electrical, and other similar elements in a single location in order to identify conflicts. 1 TEMPLATE 013113-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013113 - PROJECT COORDINATION 1 D. Where coordination drawings, or other preinstallation coordination methods show that available space is inadequate or that modifications will affect architectural elements, request information from the Construction Representative before proceeding with work. No additional payment will be made for installation conflicts which could have been identified by coordination drawings or other preinstallation coordination methods. E. Provide clear access to control points, clean-outs, valves, strainers, control devices, and specialty items of every nature to such systems and equipment to obtain maximum head room. Provide adequate clearances as necessary for operation and maintenance. F. Make runs parallel with lines of building. Utilize space efficiently to maximize accessibility for other installations, for maintenance, and for repairs. PART 2 -PRODUCTS A. Not Used. PART 3 - EXECUTION A. Not Used. END OF SECTION 1 1 1 1 1 1 1 1 1 1 TEMPLATE 013113-2 10/12/18 STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 013119 - PROJECT MEETINGS PART 1 -GENERAL ' 1.1 SUMMARY A. Section Includes: 1. Contractor participation in pre-construction conferences. ' 2. Contractor administration of progress meetings and pre-installation conferences. B. This Section applies to all Technical Specification Sections, and supplements the General and Supplemental Conditions. 1.2 GENERAL MEETING REQUIREMENTS A. Make physical arrangements for meetings; notify participants, prepare agenda with copies for each attendee. B. Take meeting minutes, and distribute copies within 2 days to the Construction Manager, Architect, and all attendees. Distribute copies to other parties as appropriate. C. All representatives attending meetings shall be authorized to act on behalf of the entity each represents. 1.3 PRECONSTRUCTION CONFERENCES A. The Construction Manager will administer pre-construction conference for execution of Owner- Contractor Agreement and exchange of preliminary submittals. B. The Construction Manager will administer site mobilization conference at Project site for clarification of Owner and Contractor responsibilities in use of site and for review of administrative procedures. 1.4 SUSTAINABLE PRACTICES INTRODUCTION MEETING A. Prior to commencing construction, schedule and administer a meeting to review the sustainable design and construction requirements for the project as specified in Section 013543—Sustainable Design Requirements. B. Attendance: Job superintendent, subcontractors and suppliers responsible for construction and ' submittals related to sustainability requirements, Owner's Construction Manager, Owner's consultant, and others as appropriate to the meeting agenda. C. Agenda: 1. Review goals targeted for the Project 2. Review submittal requirements related to sustainable practices. 3. Substitution limitations sustainable practices. 4. Request suggestions for construction practices or materials in keeping with Contract requirements which would lessen the environmental impact of the Project. D. Additional Sustainable Practices Meetings: 1. Schedule additional sustainable practices meetings for subcontractors and suppliers responsible for sustainability goals, which are added to the construction team after the initial sustainable practices meeting. Additional meetings shall include the Job superintendent, Owner's Construction Manager, Owner's consultant, and others as appropriate to the meeting agenda. 2. Schedule meetings prior to construction or ordering of materials by the additional subcontractors and suppliers. 3. Coordinate and subcontract the work so there are a maximum of 2 additional meetings. 1.5 PROGRESS MEETINGS I A. Schedule and administer progress meetings throughout the Work at interval determined by Owner's Construction Manager. B. Attendance: Job superintendent, major subcontractors and suppliers, Construction Manager, and others as appropriate to the meeting agenda. C. Suggested Agenda: TEMPLATE 013119-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013119 - PROJECT MEETINGS 1. Review of Work progress. 2. Status of progress schedule and adjustments. 3. Delivery schedules. 4. Submittals. 5. Maintenance of quality standards. 6. Pending changes and substitutions 7. Status of sustainable practices. 8. Other items affecting progress of Work. 1.6 PRE-INSTALLATION CONFERENCES A. Where required in a specification Section, schedule and administer a pre-installation conference prior to commencing work of the Section. B. Unless otherwise required, notify the Construction Manager a minimum of 7 calendar days prior to each scheduled meeting. C. Require the attendance of entities directly affecting, or affected by, the work of the Section. t D. Review conditions of installation, preparation and installation procedures, and coordination with related work. END OF SECTION I 1 I r 1 1 i TEMPLATE 013119-2 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 013233 - PHOTOGRAPHIC DOCUMENTATION I PART 1 -GENERAL I 1.1 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Preconstruction photographs. I 2. Periodic construction photographs. B. Related Requirements: 1. 017700 -Closeout Procedures: Submitting photographic documentation as Project Record Documents at Project closeout. I1.2 SUBMITTALS A. Digital Photographs: Submit unaltered, original, full-size image files. I 1. Digital Camera: Minimum sensor resolution of 8 megapixels. 2. Identification: Provide the following information with each image description in file metadata tag: a. Name of Project. b. Name and contact information for photographer. I c. Date photograph was taken. d. Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction. I 1.3 USAGE RIGHTS A. Obtain and transfer copyright usage rights from photographer to Owner for unlimited reproduction of photographic documentation. PART 2 - PRODUCTS 2.1 PHOTOGRAPHIC MEDIA IA. Digital Images: Provide images in JPG format, with minimum size of 8 megapixels. PART 3 - EXECUTION I3.1 CONSTRUCTION PHOTOGRAPHS A. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted. B. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software. I 1. Date and Time: Include date and time in file name for each image. 2. Field Office Images: Maintain one set of images accessible in the field office at Project site, available at all times for reference. Identify images in the same manner as those submitted to Construction Representative. I C. Periodic Construction Photographs: Take 20 photographs weekly, with timing adjusted to coincide with the progress meetings specified in Section 013119. Select vantage points to show status of construction and progress since last photographs were taken. I D. Final Completion Construction Photographs: Take minimum 20 color photographs after date of Substantial Completion for submission as Project Record Documents. Construction Representative will inform photographer of desired vantage points. I E. Additional Photographs: Construction Representative may request photographs in addition to periodic photographs specified. 1. Three days' notice will be given, where feasible. 2. Circumstances that could require additional photographs include, but are not limited to, the I following: a. Immediate follow-up when on-site events result in construction damage or losses. IlTEMPLATE 013233-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013233 -PHOTOGRAPHIC DOCUMENTATION ' b. Photographs to be taken at fabrication locations away from Project site. c. Substantial Completion of a major phase or component of the Work. d. Extra record photographs at time of final acceptance. I END OF SECTION I 1 1 1 I I r w 1 I I TEMPLATE 013233-2 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013300 -SUBMITTAL PROCEDURES PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Submittal form requirements. ' 2. Submittal schedule. 3. Contractor responsibilities. 4. Requirements for each type of submittal. B. Related Sections: 1. 007200 - General Conditions of the Contract: Additional submittal requirements. 2. 013546—Sustainable Design Requirements: Sustainability submittals. 3. 016000 - Product Requirements: Substitution submittals. 4. 017700 - Closeout Procedures: Closeout submittals. C. This Section applies to all Technical Specification Sections, and supplements the General and Supplementary Conditions. ' 1.2 SUBMITTAL FORM REQUIREMENTS A. Provide the following, as applicable, on each submittal: 1. The Project name and number. 2. Present and Previous submittal dates. 3. Contractor's submittal number. 4. Subcontract identification. 5. The names of: a. Contractor. b. Supplier. c. Manufacturer. 6. Identification of revisions on resubmittals. 7. For each product, reference corresponding specification section and paragraph number. 8. A 3 x 2 inch blank space for Contractor and Architect stamps. B. Deliver submittals to the Construction Manager. Include name of contact person identified at the time of Agreement. C. Transmit submittals under AIA form G810 or other transmittal form as accepted by the Construction Manager. D. Submittals in graphic form shall be clear readable copies with Contractor's original stamp. Facsimile submittals will not be accepted. 1.3 SUBMITTAL SCHEDULE A. Make submittals to the Construction Manager as required, causing no delay in the work. B. Allow a minimum of 3 working days from receipt, for the Construction Manager to review each submittal. Allow additional time for large and complex submittals representing major portions of the Work, such as fire protection, structural steel, or curtain wall. C. Schedule submittals to allow sufficient time for possible revision and resubmittal of the rejected submittals, without affecting the construction schedule. D. Make the following submittals to the Construction Manager prior to starting construction and within 10 working days of the Notice to Proceed: 1. Certificates of insurance. 2. List of subcontractors and suppliers. 3. Construction schedule. 4. Submittal log/schedule. 5. Products list. E. Submit Schedule of Values prior to first application for payment. TEMPLATE 013300-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013300 -SUBMITTAL PROCEDURES 1.4 GENERAL REQUIREMENTS FOR SUBMITTALS ' A. Make submittals to the Construction Manager with 3 copies directly to the Architect, unless otherwise directed. B. Review submittals prior to submittal to the Construction Manager. Verify specified requirements for products, field measurements, and field construction requirements. C. Stamp and sign each submittal as certification that the submittal has been reviewed by the Contractor. Submittals not stamped and signed by the Contractor will be returned by the Construction Manager without review for resubmittal. D. Notify the Construction Manager in writing, at time of submission, of all deviations in the submittals from requirements of the Contract Documents. I E. Make additional copies of approved submittals as necessary to implement the Work. F. Review and approval of a submittal by the either the Construction Manager or the Architect shall not relieve the Contractor from responsibility for the proper fitting, finishing, quantities, and erection of the work in strict accordance with the Contract requirements. G. Review and approval of a submittal by the Construction Manager or the Architect shall not relieve the Contractor from the responsibility for providing work not indicated on the submittal, but otherwise required for the completion of the work. H. Do not fabricate or erect work prior to approval of the submittals. I. Should discrepancies become evident, immediately notify Construction Manager for resolution before I proceeding with shop work. J. Incorporation of substitutions into submittals will be considered cause for rejection of the submittal. K. Submittals will be reviewed by the Architect for conformance to the design concept, only. Architect's review of vendor designed items shall not relieve the Contractor of responsibility for compliance with specified performance requirements. L. If the Contractor fails to review Shop Drawings, Product Data, or Samples to determine their responsiveness to the Contract Documents, or fails to substantially respond to Architect's review comments prior to resubmittal, or if the Contractor makes submittals which substantially alter the Contract Documents, the Contractor shall reimburse the Owner for the charges of the Architect for extra services required to review such submittals. 1.5 SUSTAINABILITY SUBMITTALS A. Make sustainability submittals to the Construction Manager with 3 copies directly to the Architect. , B. Sustainability submittals are specified in Section 013546 and in the various technical sections. 1.6 CONSTRUCTION SCHEDULE A. Prepare schedule in the form of a network planning system (CPM)for scheduling and controlling the work. Note the critical path. B. Show commencement and completion dates proposed for each subdivision of work. C. Update and submit monthly. Indicate actual start and completion of all completed activities. Graphically indicate changes from previously issued schedule. D. Incorporate remedial construction into schedule when remedial work is required. 1 E. Show submittal dates required for shop drawings, product data, and samples, and product delivery dates, including those furnished by Owner. F. Coordinate with the Owner's schedule, showing all Contract activities to be performed by the Owner I including their start, duration, completion, float and critical path. 1 TEMPLATE 013300-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013300 -SUBMITTAL PROCEDURES 111 1.7 SUBMITTAL LOG/SCHEDULE A. List each type of submittal, and the date that the submittal will be made. Indicate Architect review time proposed. r1.8 PRODUCTS LIST A. Complete list of major products proposed for use, with name of manufacturer, trade name, and model number of each product. 1.9 SCHEDULE OF VALUES A. Submit Schedule of Values prior to first Application for payment. B. Submit schedule on AIA Form G703. Contractor's standard form or media-driven printout will be considered on request. C. Format: Table of Contents of this Project Manual. Identify each line item with number and title of the major Specification Sections. D. Include in each line item a directly proportional amount of Contractor's overhead and profit. E. Revise schedule to list change orders, for each application for payment. 1.10 SHOP DRAWINGS A. Submit Shop Drawings required by individual Sections of the Specifications, and as otherwise required for proper performance of the work. B. Illustrate fully the requirements of the Specifications and the Contract Drawings, and accurately show quantities, kinds of materials, methods of assembly, and all data required for fabrication, erection, and installation. C. Show the relationship of adjoining work, relevant field conditions and dimensions; coordinate with affected subcontractors and suppliers if in conflict. Where specific items such as field dimensions, clearances, adjacent construction, mounting configurations, access requirements, structural calculations, etc. are required by the technical specification Sections, failure to provide such information on the shop drawings may be cause for rejection without review. D. Submit to the Construction Manager with a direct copy to the Architect one electronic copy for review. E. Shop drawings will be reviewed for conformance to the design concept, only. F. The Construction Manager will return an electronic copy to Contractor with corrections, notations and I reviews stamp indicating action to be taken. G. In the case of rejected Shop Drawings, the Construction Manager will return the electronic copy to the Contractor for his use in the preparation of revised drawings for resubmittal. H. Should discrepancies become evident, immediately notify Construction Manager for resolution before proceeding with shop work. I. CADD generated drawings may be obtained from the Owner only for use in preparation of shop ' drawings for this Project. 1. Release of CADD information will be restricted to the following categories: a. Architectural floor plans. b. RCP's. c. Casework drawings. 2. The CADD drawings will contain only the background information; reference symbols, and other similar data will not be included. 3. The CADD files are generated on PC hardware with AUTOCAD software. Architect and Owner have the capability to develop CADD output of the following file formats: a. AutoCAD (.dwg) b. Drawing Interchange Format(.dxf) c. Revit (.rvt) 4. When requesting CADD drawings, specify the output form required. TEMPLATE 013300-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013300 -SUBMITTAL PROCEDURES ' 5. Request documents by submitting an executed copy of the Architect's "Agreement Concerning Use Of Electronic Media." Example of the form is bound in this manual following this Section. Use of such documents implies Contractor's and subcontractors' agreement to the terms described on the form. Fully describe requirements for each request. 6. CADD exchange shall only occur one time and will include the architectural floor and ceiling plans. 7. Contractor shall maintain a log of requests and shall submit the final log for review at Project Closeout. 1.11 PRODUCT DATA A. Mark each copy to identify applicable products, models, options, and other data. Include manufacturer's printed installation instructions. B. Number of copies: One electronic copy. The Construction Manager will return an electronic copy to Contractor with corrections, notations and review stamp indicating action to be taken. C. Modify product data and installation instructions to delete information which is not applicable to the work. D. Supplement standard information to provide information specifically applicable to the work. 1.12 SAMPLES A. Submit samples as specified in the technical Sections. B. Include identification on each sample, giving full information. C. Submit the number of samples specified in the technical Sections. Where quantity is not specified, submit 3 samples. One will be retained by the Construction Manager and one by the Architect. D. Unless specified otherwise, submit full range of manufacturers' standard colors, textures, and patterns for Owner's selection. E. Submit samples to illustrate functional characteristics of the product, with integral parts and attachment devices. Coordinate submittal of different categories for interfacing work. END OF SECTION I I 1I 1 1 1 TEMPLATE 013300-4 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013544—CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PART 1 -GENERAL 1.1 SUMMARY A. Section includes: 1. Description of the Construction Indoor Air Quality(IAQ) Management Plan 2. IAQ Construction Requirements to meet the sustainability requirements for the Project. B. Related sections: 1. 013300—Submittals 2. 013546—Sustainable Design Requirements: Sustainable practices requirements. C. Construction Indoor Air Quality Requirements: 1. The Owner has set indoor air quality goals for job site operations on project, within the limits of the construction schedule, contract sum, and available materials, equipment, products and services. These goals include: a. Protect workers on the site from undue health risks during construction. b. Install low-VOC materials as specified in Part 2— Products. c. Prevent residual problems with indoor air quality in the completed building. D. This Section applies to all Technical Specification Sections, and supplements the General and Supplementary Conditions. E. Substitutions: Substitutions will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES ' A. Sheet Metal and Air Conditioning National Contractors Association (SMACNA): 1. IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3. 1.3 SUSTAINABILITY SUBMITTALS A. Submit the following in accordance with Section 013300—Submittals. B. Indoor Air Quality Management Plan: 1. Develop and submit a written construction indoor air quality management plan to meet the sustainability goals of the Project. 2. Submit within fourteen days after receipt of Notice to Proceed and prior to beginning any work on the site. 3. The IAQ management plan shall comply with the five requirements of SMACNA IAQ Guideline for Occupied Buildings under Construction, 1995, Chapter 3: HVAC protection, source control, pathway interruption, housekeeping, and scheduling and shall include: a. List of IAQ protective measures to be instituted on the site: 1) HVAC system protection during construction. 2) Source control through specification and installation of low-toxic or non-toxic materials. 3) Pathway interruption to isolate work areas where emitting materials are being installed. 4) Housekeeping to protect materials that are stored before installation and to avoid spreading contamination through the Project. 5) Sequencing installation of materials to avoid contaminating absorptive materials during construction. b. Schedule for inspection and maintenance of IAQ measures. C. IAQ Documentation: Provide letter declaring that the requirements of IAQ Plan have been met. See Section 013546 for these submittal requirements. ' PART 2 - PRODUCTS 2.1 MATERIALS AND PRODUCTS A. Low emitting products have been specified in appropriate sections. TEMPLATE 013544-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013544—CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT B. If air handlers must be used during construction, filtration media with a Minimum Efficiency Reporting Value (MERV) of 8, as determined by ASHRAE 52.5-1999, must be used at each return air grille. PART 3 - EXECUTION 3.1 ALL PHASES A. Meet or exceed the minimum requirements of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guidelines for Occupied Buildings Under Construction, 1995, as applicable to new buildings. As a minimum, this means: 1. Protect the ventilation system components from contamination: a. Store HVAC equipment in a clean, dry location. b. Seal all HVAC inlets and outlets. c. Seal HVAC components during installation. d. Use a temporary ventilation system during construction. e. Use temporary filtration media. 1) Filtration media shall have a Minimum Efficiency Reporting Value [MERV] of 8 as determined by ASHRAE 52.2-1999) on any return air systems operational during construction. For air intakes into rooms that are very sensitive to dust contamination, such as computer rooms, filtration media should be the best that the HVAC systems fans can handle, up to an MERV rating of 17. 2) Replace all filtration media immediately prior to occupancy. f. Clean air plenums before closing them in. g. Inspect filters regularly. 2. Provide pollution source control: a. Protect on-site stored and installed absorptive materials (such as insulation, drywall, and wood)from moisture damage and from contamination by construction dust, debris, and fumes during all phases of construction, both before and after installation. b. Do not install moisture-damaged materials. c. Ensure that construction detailing will not result in moisture intrusion. d. Use low-emitting products (specified in appropriate sections). e. Provide strategies to avoid tracking pollutants into the work areas. f. Allow high-VOC materials to off-gas prior to installation. For example, all dry furnishing and materials (such as carpet, floor tile, acoustical tile, textiles, office furniture, wood shelving, etc.)shall be allowed to"air-out" in clean environments prior to installation in a building. g. Use the least amount of"wet" materials (such as adhesives, sealants, glazes, caulks, paints, etc.)during construction and product applications while still maintaining installation protocol required to meeting for manufacturer's warrantee requirements. 3. Provide interruption of pollutant pathways: 4. Use an air barrier or pressure differential to isolate areas at different stages of completion. 5. Practice healthy housekeeping. a. Minimize accumulation of dust and other contaminants. 111b. Confine dust-generating activities. c. Suppress dust. 1) Use wet sanding for gypsum board assemblies. Exception: Dry sanding allowed subject to Construction Representative approval of the following measures: a) Full isolation of space under finishing b) Plastic protection sheeting is installed to provide air sealing during the sanding c) Closure of all air system devices and ductwork d) Sequencing of construction precludes the possibility of contamination of other spaces with gypsum dust e) Worker protection is provided d. Clean up dust. e. Clean up spills. f. Keep work area dry. g. Seal containers of volatile liquids. 6. Schedule construction activities to reduce exposure to VOCs. a. Install porous materials only after closing in the building. TEMPLATE 013544-2 10/12/18 1 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 013544—CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT I b. Account for curing time and off-gassing when scheduling construction activities. c. Allow wet-spray cellulose to dry before covering. d. Install carpeting, acoustical panels, and furnishings after interior finishes have been allowed I time to cure/dry in accordance with other good building practices. e. Provide adequate ventilation during curing period. 1) Provide supplemental (spot)ventilation for at least 72 hours after work is completed. Preferred HVAC system operation uses supply air fans and ducts only; exhaust I provided through windows. Use exhaust fans to pull exhaust air from deep interior locations. Stair towers and other paths to exterior can be useful during this process. B. Use safety meetings, signage, and subcontractor agreements to communicate the goals of the I construction indoor air quality management construction plan. C. Conduct regular inspection and maintenance of indoor air quality measures including ventilation system protection, and ventilation rate. D. Require VOC-safe masks for interior and exterior workers installing VOC-emitting products (products that contain 150 g/L or more VOCs). E. Use low-toxic cleaning supplies for surfaces, equipment, and worker's personal use. Options include I several soybean-based solvents and cleaning options and citrus-based cleaners. (SoySolv provides several soy-based solvents and cleaning options. Phone 1-800-231-4274 or www.soysolv.com.) F. Smoking is prohibited inside the building once the building is closed in by any means or absorptive Imaterials are located within the structure. END OF SECTION I I I I I I I I I ITEMPLATE 013544-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 013546 -SUSTAINABLE DESIGN REQUIREMENTS 111 I PART 1 -GENERAL 1.1 SUMMARY A. This section includes general requirements and procedures for compliance with the sustainable design and construction practices required by this Project. B. Related sections: 1. General Conditions and other Division 1 Specification Sections apply to this Section. 2. Related Sections include the following: a. 013119 - Project Meetings b. 013300- Submittal Procedures111 c. 013544- Construction Indoor Air Quality Management d. 016000—Product Requirements: Product options and substitution procedures e. 017421 - Construction Waste Management and Disposal f. Sustainable criteria as noted in Division 2 through 48, including but not limited to other Sections listed in this Section. 1.2 DEFINITIONS A. Certificates of Chain-of-Custody: Certificates signed by manufacturers certifying that all tropical woods used to make products was obtained from forests certified by an FSC-Accredited certification body to comply with FSC 1.2, "Principles and Criteria." Certificates shall include evidence that mill is certified for chain-of-custody by an FSC-Accredited certification body. 1.3 SUBMITTALS A. Sustainability Action Plans: Provide preliminary submittals within 14 days of date established for the notice to proceed indicating how the following requirements will be met. 1. Construction Waste Management: Waste management plan complying with Division 01 section "Construction Waste Management." 2. Construction IAQ Management Plan, During Construction: Proposed revisions to the construction IAQ Plan Template complying with SMACNA IAQ Guidelines for Occupied Buildings Under Construction, 1995. B. Sustainability Documentation Submittals: 111 1. Construction Waste Management: Comply with Division 01 section "Construction Waste Management." 2. Construction IAQ Management Plan, During Construction: a. Product data for temporary filtration media. b. Product data for filtration media used during occupancy. c. Construction documentation: six photographs at three different occasions during construction along with a brief description of the SMACNA approach employed, documenting implementation of the IAQ management measures, such as protection of ducts and on-site stored or installed absorptive materials. 3. Low-Emitting Materials, Adhesives and Sealants: Product data for adhesives and sealants used inside the weatherproofing system indicating VOC content of each product used. Indicate VOC content in g/I calculated according to 40 CFR 59, Subpart D. 4. Low-Emitting Materials, Paints and Coatings: Product data for paints and coatings used inside the weatherproofing system indicating [chemical composition and] VOC content of each product used. indicate VOC content in g/I calculated according to 40 CFR 59, Subpart D. 5. Low-Emitting Materials, Composite Wood: Product data for products containing composite wood or agrifiber products or wood glues indicating that they do not contain urea-formaldehyde resin. 6. Low-Emitting Materials, Ceiling and Wall Systems: Product data for all gypsum board, insulation, acoustical ceiling systems and wall coverings installed in the building interior showing low emitting certification. 7. Low-Emitting Materials, Flooring Materials: Product data for the following flooring materials indicating that products comply with the California Department of Public Health Standard Method TEMPLATE 013546-1 10/12/18 STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 013546-SUSTAINABLE DESIGN REQUIREMENTS v1.1-2010, using CA Section 01350, Appendix B. Compliance is indicated by certification under the following third-party certification programs: a. Resilient flooring— FloorScore b. Carpet systems—CRI Green Label Plus. C. Certified Tropical Wood: 1. Submit a copy of a letter provided to all wood products suppliers containing the following: a. A statement that the builder's preference is to purchase products containing tropical wood ONLY if it is Forest Stewardship Council (FSC)certified or USGBC-approved equivalent; b. A request for the country of manufacture of each wood product supplied; c. A request for a list of the FSC-certified tropical wood products the vendor can supply 2. If tropical wood is intentionally used (i.e. specified in the construction documents), submit FSC Chain of Custody declaration for any tropical wood products. Reused or reclaimed materials are exempt. 3. Provide FSC Chain of Custody and other documentation to demonstrate that any tropical woods (other than reused or reclaimed) are FSC certified. 1.4 CONTRACTOR REQUIREMENTS A. Coordinate and assist with sustainability documentation. B. Coordinate with all subcontractors per Section 017421. 1. Coordination shall include review of this Section 013546 and related sections. 2. Include subcontractors in related meetings per Section 013119. C. Designate a Sustainability Representative, responsible for: 1. Implementation, coordination, and documentation of specified sustainability requirements. 2. Attend sustainability related meetings during construction. 3. Be present on site during times that sustainability related work is in progress. D. Submit sustainability information and Final Submittal in electronic format. PART 2 - PRODUCTS 2.1 GENERAL A. Comply with sustainability requirements as noted in Technical Sections. Any Substitution requests must state whether or not proposed change impacts sustainability requirements. PART 3 - EXECUTION 3.1 SUSTAINABILITY COMPLIANCE -GENERAL A. Meet sustainability requirements as identified in the Contract Documents. B. Prior to beginning Work of this Contract, verify construction conditions as acceptable to achieve sustainability goals. 1. Do not proceed with Work until unsatisfactory conditions are corrected in a manner acceptable to Sustainability Consultant, Construction Representative, and Architect. C. Correct non-conforming work failing to meet sustainability requirements at Contractor's expense. 1. Submit documentation as necessary to show conformance of corrected work. END OF SECTION I I TEMPLATE 013546-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS 1 SECTION 014500 -QUALITY CONTROL 1 PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. General requirements. 2. Workmanship. 3. Special installation procedures 4. Manufacturer's instructions. 5. Manufacturer's certificates. 6. Mock-ups. 7. Manufacturers'field services. 8. Testing laboratory services. 9. Contractor tests and inspections. B. Related Sections: 1 1. 011000 - Summary: Applicability of specified reference standards. 2. 013300- Submittal Procedures: Submittal of manufacturer's instructions. 3. 017421 - Construction Waste Management And Disposal: Mock-Ups. C. This Section applies to all Technical Specification Sections, and supplements the General and Supplemental Conditions. 1.2 GENERAL QUALITY CONTROL A. Maintain quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality. 1.3 WORKMANSHIP 1 A. Comply with industry standards, except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship. B. Perform work with persons qualified to produce workmanship of specified quality. 1 C. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking. 1.4 SPECIAL INSTALLATION PROCEDURES A. Make no attachment to structural concrete or steel members in the building in such a way as to overload or impair the structural integrity of the member. B. Steel Decking: 1. Where fastening into bottom of steel decking is required, fasten only into lower flutes. 2. Do not use fasteners in steel deck which penetrate more than 1 inch. 3. Do not use powder driven fasteners into steel roof deck. Where anchorage to structural framing members is impractical, supports for items such as suspended ceiling systems, ductwork, and aluminum conduit 1-1/2 inches or less may be supported from steel roof decking by sheet metal screws, screwed into the bottom flute of the roof deck, and in sufficient quantity to adequately support the load. Equipment supports, hangers for mechanical piping and other items requiring more than incidental support, shall not be secured to the roof decking. 1.5 MANUFACTURERS' INSTRUCTIONS A. Unless specified otherwise, comply with instructions in full detail, including each step in sequence. Should instructions conflict with Contract Documents, request clarification from Construction Manager before proceeding. 1.6 MANUFACTURERS' CERTIFICATES A. When required by individual Specifications Section, submit, in duplicate, manufacturer's certification that products meet or exceed specified requirements. TEMPLATE 014500-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 014500 -QUALITY CONTROL 1.7 MOCK-UPS A. Provide mock-ups as specified in the individual specification sections. When the initial mock-up is unacceptable to the Construction Manager, provide additional mock-ups until approval is obtained. IB. Unless specified or approved otherwise, schedule mock-ups for completion a minimum of 10 working days prior to actual commencement of the work represented by the mock-up. C. Notify the Architect and Construction Manager a minimum of 5 working days prior to mock-up. D. For each mock-up, provide conditions which will replicate the conditions of the actual installation, including lighting, to the greatest reasonable extent. E. Approved mock-up shall be the standard of workmanship and materials for the remainder of the r related work. F. Contractor may proceed with the work upon Construction Manager's approval of the mock-up G. Obtain Construction Manager's written approval for each mock-up. 1. Allow access to the mock-up for Architect's and Construction Manager's review and for review by manufacturer and trade representatives as the Construction Manager deems appropriate. 2. Proceed with the work upon Construction Manager's approval of the mock-up. Each approved mock-up shall represent the standard of workmanship and materials for the remainder of the related work. 3. Modify and correct mock-up as necessary to obtain Construction Manager's approval; allow time in construction schedule for adjustment or reconstruction of mock-up to obtain approval. Claims for delays due to unacceptable field samples will not be considered. H. Maintain mock-up in approved condition, until directed otherwise. I. Disposition of Mock-Ups: 1. Rejected mock-ups shall be selectively demolished to accommodate new mock-ups, or completely removed as appropriate. 2. Mock-ups constructed as part of the proposed work, and which have been approved by the Construction Manager, may be incorporated into the work. 3. Unless specified or directed otherwise, approved mock-ups which are not incorporated into the work shall be removed upon project completion. 1.8 MANUFACTURERS' FIELD SERVICES A. When specified, require product manufacturer to furnish qualified personnel to observe field conditions and quality of workmanship, and to provide recommendations, certifications, and other specified services. B. Representative shall submit written report to Construction Manager listing observations and recommendations. 1.9 TESTING LABORATORY SERVICES A. The Construction Manager will arrange for the services of an Independent Testing Laboratory to inspect and test the Work in accordance with regulatory requirements and to verify compliance with the contract documents. B. Contractor's Responsibilities: 1. Cooperate with Testing Laboratory personnel, and furnish access, tools, samples, certifications, test reports, design mixes, equipment, storage, and assistance as requested by the Testing Laboratory. 2. Notify Construction Manager and Testing Laboratory 48 hours prior to expected time for operations requiring inspection and testing. When tests or inspections cannot be performed, through the fault of the Contractor, reimburse the Owner for the additional costs incurred. 3. Remove and replace all work found not complying with the Contract Documents. Remedies shall be in accordance with the Contract Documents and code requirements. 4. If initial tests and inspections indicate deficient work, the Contractor shall reimburse the Owner for the costs of all subsequent tests and inspections related to the deficiency. TEMPLATE 014500-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 014500 -QUALITY CONTROL 1 5. All damage which may occur to the work as a result of normal testing operations shall be repaired to match surrounding surfaces. 6. Schedule testing and inspection so that the work of testing and inspection personnel will be as continuous and brief as possible. 7. Reimburse the Owner for travel and lodging expenses incurred for testing and inspection services performed outside a radius of 100 miles of the site. C. The Owner may have the tests and inspections performed as listed below: I 1. Water testing. 2. HVAC balancing and controls. 3. D. Tests and inspections shall be in accordance with code requirements and as otherwise required to verify conformance to Contract requirements. 1.10 CONTRACTOR TESTS AND INSPECTIONS A. Contractor's Convenience Testing: Inspection and testing performed exclusively for the Contractor's convenience shall be the sole responsibility of the Contractor. END OF SECTION 1 I I I I I I I I I TEMPLATE 014500-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS rSECTION 015000 -TEMPORARY FACILITIES AND CONTROLS PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. General requirements. 2. Electricity, lighting. 3. Heat, ventilation, cooling. 4. Telephone service. 5. Water. 6. Sanitary facilities. 7. Barriers. 8. Closures. 9. Protection of installed work. 10. Security. 11. Safety. 12. Site water control. 13. Cleaning during construction. 14. Project identification. 15. Field offices and sheds. 16. Removal. B. Related Sections: 1. 011000- Summary: Work sequence. Contractor use of premises. 2. 013544 - Construction Indoor Air Quality Management: Indoor air quality management plan and post construction flush-out. 3. 013546—Sustainable Design Requirements: LEED certification requirements.) 4. 017421 —Construction Waste Management and Disposal: Construction waste management plan. 5. 017700 - Closeout Procedures: Final cleaning. C. This Section applies to all Technical Specification Sections, and supplements the General and Supplemental Conditions. 1.2 GENERAL REQUIREMENTS A. Temporary facilities and controls shall conform to the requirements of the jurisdictional code authorities. 1.3 ELECTRICITY, LIGHTING Use the next 3 paragraphs for New Construction A. Provide service required for construction operations, with branch wiring and distribution boxes located to allow service and lighting by means of construction-type power cords. B. Provide lighting for construction operations. C. Permanent lighting may be used during construction. Maintain lighting and make routine repairs. 1.4 HEAT,VENTILATION Use the next 7 paragraphs for New Construction A. Provide temporary heating and cooling as necessary to maintain specified conditions for Construction operations, to protect materials and finishes from damage due to temperature or humidity. B. Provide temporary ventilation of enclosed areas to cure materials, disperse humidity, and prevent accumulations of dust, fumes, vapors, or gases in accordance with the Construction Indoor Air Quality Management requirements specified in Section 013544.. C. Prior to operation of permanent facilities for temporary purposes, verify that installation is approved for operation, and that filters are in place. TEMPLATE 015000-1 10/12/18 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 015000 -TEMPORARY FACILITIES AND CONTROLS r D. For any piece of HVAC equipment used during construction, clean or replace system filters in compliance with Section 013544 immediately prior to Substantial Completion. E. Owner will pay costs of energy used. Provide and pay for maintenance costs during life of construction contract. F. Take measures to conserve energy. 1.5 WATER Use the next paragraph for New Construction A. Provide service required for construction operations. Extend branch piping with outlets located so that water is available by use of hoses. B. The Owner will pay the costs for all water used. Conserve water use whenever possible. 1.6 SANITARY FACILITIES A. Provide and maintain required portable facilities and enclosures. I 1.7 BARRIERS A. Provide as required to prevent public entry to construction areas to provide for Owner's use of site, and to protect existing facilities and adjacent properties from damage from construction operations. B. Provide 6 foot high fence around construction site; equip with vehicular and pedestrian gates with locks. Construction: Commercial grade chain link fence. C. Provide barricades and covered walkways as required by governing authorities for public rights-of-way and for public access to existing building. D. Provide barriers around trees and plants designated to remain. Protect against vehicular traffic, stored materials, dumping, chemically injurious materials, and puddling or continuous running water. 111 E. Provide barricades around openings in floors and roof decks. 1.8 CLOSURES A. Exterior Closures: 1. Provide temporary weather-tight closures as necessary to create proper interior environmental conditions, protection of materials, and to prevent entry of unauthorized persons. 2. Where doors are necessary for access by construction personnel, provide self-closing hardware and locks. 3. Except as necessary for construction access, do not remove exterior closures until permanent construction is ready to be installed and made weathertight. 4. Enclosures shall be constructed to prevent blow off during inclement weather, and shall be sealed to prevent water penetration and excessive air infiltration. 5. Conform to Construction Indoor Air Quality Management requirements specified in Section 013544. B. Interior Closures: 1. Provide temporary closures to prevent penetration of dust and moisture into occupied areas separate from work areas, damage to operating systems and components, and to create environmental conditions necessary for the proper installation of materials and systems. The following subparagraph is written for remodels in mall or other multiple tenant settings. Revise for stand-alone construction. 2. Construction: Framing and sheet materials with closed joints and sealed edges at intersections with existing surfaces; STC rating 35 in accordance with ASTM E90; Flame Spread Rating of 25 in accordance with ASTM E84; paint surfaces exposed to view from Owner occupied areas. 3. Conform to Construction Indoor Air Quality Management requirements specified in Section 013544. C. Installed construction which has been damaged due to lack of protection shall be replaced or restored to original or new condition. This includes construction required to be protected under Construction Indoor Air Quality Management requirements specified in Section 013544. TEMPLATE 015000-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 015000 -TEMPORARY FACILITIES AND CONTROLS 1.9 PROTECTION OF INSTALLED WORK A. Provide temporary protection for installed work, including protection from impact, water, dust contamination, overspray, and similar damage. Conform to Construction Indoor Air Quality Management requirements specified in Section 013544. B. Secure temporary protections as necessary to prevent blow off during inclement weather. C. Provide protective coverings at exposed exterior walls and horizontal surfaces, projections, and window and door openings. D. Protect finished surfaces from damage caused by traffic, movement of heavy objects, and storage of materials. Where necessary, control traffic in immediate area as necessary to minimize the risk of impact damage. E. Prohibit traffic and storage on waterproofed and roofed surfaces, on lawn and landscaped areas. F. Installed construction which has been damaged due to lack of protection shall be replaced or restored to original or new condition. 1.10 SECURITY A. Provide security program and facilities to protect Work, materials stored off-site, existing facilities, and Owner's operations from unauthorized entry, vandalism, and theft. Coordinate with Owner's security program. 1.11 SAFETY A. Furnish safety program and facilities to protect the safety of workers and other persons affected by the Work. The following article is for New Construction. 1.12 SITE WATER CONTROL A. Grade site to drain. Maintain excavations free of water. Provide and operate pumping equipment. 1.13 TEMPORARY CONTROLS A. Fire Sprinkler Supervision/Control: 1. Prior to the time of installation of finish materials such as carpet, wall panels, delivery of case work to the site, and other similar conditions, provide temporary tamper and water flow supervision monitoring of the fire sprinkler system. 2. System shall be monitored, via temporary telephone lines, by a UL listed central station. Contractor shall be responsible to make arrangements for monitoring the system. 3. Perform temporary monitoring up to time of building acceptance by the Owner, or building turn- over, whichever is later. B. Dust Control: 1. Provide positive methods and apply dust control materials to minimize raising dust from construction operations, and provide positive means to prevent airborne dust from dispersing into the atmosphere. 2. Provide temporary dust-proof partitions to protect public areas, occupied spaces, and adjacent mall areas. C. Water Control: I1. Comply with applicable jurisdictional requirements regarding water usage, conservation, detention, pollution, and permits. 2. Provide methods to control surface water to prevent damage to the Project, the site, or adjoining properties. 3. Control fill, grading and ditching to direct surface drainage away from excavations, pits, tunnels and other construction areas; and to direct drainage to proper runoff. 4. Provide, operate and maintain pumping equipment of adequate capacity to control surface water, including water accumulated during excavation operations, below grade. 5. Dispose of drainage water in a manner to prevent flooding, erosion, or other damage to any portion of the site or to adjoining areas. TEMPLATE 015000-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 015000 -TEMPORARY FACILITIES AND CONTROLS D. Construction Waste Control: 1. Maintain all areas under Contractor's control free of debris. 2. Initiate and maintain a specific program to prevent accumulation of debris at construction site, storage and parking areas, or along access roads and haul routes. 3. Schedule periodic collection and disposal of debris to a legal off-site location. 4. Provide additional collections and disposals of debris whenever the periodic schedule is inadequate to prevent excessive accumulation. 5. Clean interior areas prior to start of the finish work. Maintain the areas free of dust and other contaminants during finishing operations. 6. Construction Waste Management: In compliance with Section 017421. E. Pollution Control: Provide methods, means and facilities required by law to prevent contamination of soil, water or atmosphere by the discharge of noxious substances from construction operations. F. Noise Control: 1. Construction operations must be performed in accordance with local regulations, ordinances, and jurisdictional Code authorities. 2. Use of private radios and other similar portable sound equipment is prohibited. G. Smoking, Eating, and Drinking: These activities shall be permitted only in designated locations selected by the Contractor; these activities are not permitted in interior spaces after carpeting and fixtures arrive on site. 1.14 CLEANING DURING CONSTRUCTION A. Control accumulation of waste materials and rubbish on a daily basis, and dispose of off-site or in a designated container on site. Conform to Construction Waste Management and Disposal requirements specified in Section 017421. B. Clean interior areas prior to start of finish work, maintain areas free of dust and other contaminants during finishing operations. C. Remove excess debris from cavities which are to be concealed in the finished Work. D. Work areas to remain accessible to the public shall have tools, materials, and construction debris removed, broom cleaned, and prepared to receive floor mopping or other cleaning performed by the Owner's maintenance personnel. 1.15 PROJECT IDENTIFICATION Coordinate with Project Construction Manager for signage requirements. Delete either Paragraph A or B below as applicable. A. [No project identification signs are allowed.] B. [Provide project signage only as allowed by Construction Manager.] C. Allow no other signs to be displayed. 1.16 FIELD OFFICES AND SHEDS The following paragraph is for New Construction or very large remodels A. Field Office: 1. Office: Weather-tight, with lighting, electrical outlets, heating, cooling, and ventilating equipment, and equipped with furniture. Provide, in addition, space for Project meetings, with table and chairs to accommodate 6 persons. 2. Equipment: 111 a. Copier: Contractor's option; 11 x 17 inch size capability. b. Communication Service 1) Minimum one dedicated telephone line with instrument. 2) Minimum one dedicated telephone line for facsimile machine. 3) An Internet Service Provider(ISP) account. 4) Corn ISDN LAN modem or Office Connect 5) Remote Dual Analog Router(analog or ISDN depending on telephone company service), or approved, for use and communication with Internet Service Provider(ISP). TEMPLATE 015000-4 10/12/18111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 015000 -TEMPORARY FACILITIES AND CONTROLS c. Computer: Minimum one dual core processor with minimum 8 GB of RAM, including the following. 1) Windows Vista and Microsoft Office 2010, or later; Internet Explorer V6.0 or later. 2) Adobe Acrobat Exchange 6.0, or later, at least one station for initiating documents. 3) Adobe Acrobat Reader. d. Printer: Minimum one with 11x17 inch graphics capability. e. Sheet-feed or flatbed scanner and related software. B. Storage Sheds for Tools, Materials, and Equipment: Weather-tight, [with heat and ventilation for Products requiring controlled conditions,]with adequate space for organized storage and access, and lighting for inspection of stored materials. 1.17 CONTRACTOR DESIGNATED AREAS A. The Construction Representative will designate interior and exterior areas of the site which will be available to the Contractor for staging and storage of materials. Exterior storage areas shall be enclosed by a construction chain link fence with a vision barrier. B. The Construction Representative will designate areas of the Site for Contractor and employee parking. C. Exterior Storage Sheds for Tools, Materials, and Equipment: Weather-tight, with adequate space for organized storage and access, and lighting for inspection of stored materials. 1.18 REMOVAL A. Completely remove temporary materials and equipment when their use is no longer required. Conform to Construction Waste Management and Disposal requirements specified in Section 017421. B. Clean and repair damage caused by installation or use of temporary facilities. Remove underground installations to a depth of 2 feet; grade site as indicated. Restore existing facilities used during construction to specified, or to original, condition. END OF SECTION I I I I I I r I TEMPLATE 015000-5 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 016000 -PRODUCT REQUIREMENTS PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Products. 2. Transportation and handling. 3. Storage and protection. 4. General installation requirements. 5. Product options. 6. Substitutions. B. Related Sections: 1. 011000 - Summary: Owner-furnished products. 2. 013546 - Sustainable Design Requirements 3. 014500 -Quality Control: Submittal of manufacturers' certificates. 4. 017700 - Closeout Procedures: Systems demonstration, operation and maintenance data, warranties and guarantees, spare parts and maintenance materials. C. This Section applies to all Technical Specification Sections, and supplements the General and Supplementary Conditions. 1.2 PRODUCTS A. Products include material, equipment, and systems. I B. Comply with size, make, type, and quality specified, unless otherwise approved in writing by the Construction Manager. Specifications and referenced standards are minimum requirements. C. All components required to be supplied in quantity shall be identical, whether furnished under one or several Sections of the specifications. D. Unless specified or indicated otherwise, materials employed for construction purposes, such as formwork, scaffolding, and temporary lighting, shall not be incorporated into the work. E. Unless indicated or specified otherwise, all products incorporated into the Work shall be of the most suitable grade of their respective kinds for the intended use. F. Do not use materials and equipment removed from existing structure, except as specifically required, or allowed, by Contract Documents. 1.3 TRANSPORTATION AND HANDLING A. Transport by methods to avoid product damage. B. Deliver products in manufacturer's original containers or packaging, with identifying labels intact and legible. Where options exist, select container or packaging systems that can be recycled or reused. I C. Furnish equipment and personnel to handle products by methods to prevent soiling or damage. D. Promptly inspect shipments to assure that products comply with requirements, quantities are correct, and products are undamaged. E. Immediately replace non-conforming products with new conforming products, at no additional cost to the Owner. 1.4 STORAGE AND PROTECTION A. Store products in accordance with manufacturer's instructions, with seals and labels intact and legible. B. Store sensitive products in weather-tight enclosures. Maintain within temperature and humidity ranges required by manufacturer's instructions, and as otherwise required to prevent damage. C. For exterior storage of fabricated products, place on sloped supports above ground. Protect from soiling or staining through ground contact. Cover products subject to deterioration with impervious sheet covering; provide ventilation to avoid condensation. TEMPLATE 016000-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 016000 -PRODUCT REQUIREMENTS D. Store loose granular materials on solid surfaces in a well-drained area; prevent mixing with foreign matter. E. Arrange storage of products to furnish convenient access for inspection and inventory. 1.5 GENERAL INSTALLATION REQUIREMENTS A. Unless indicated or specified otherwise, install each product in accordance with the product manufacturer's instructions. B. Distribute copies of manufacturer's instructions to parties involved in the installation. C. Maintain one set of complete instructions at the job site during installation and until completion. 1.6 PRODUCT OPTIONS A. Product Specified by Reference Standards or by Description Only: Provide product meeting those standards. B. Product Specified by Naming One or More Manufacturers with an "or approved" provision: Use specified product or submit a request for substitution in accordance with the specified substitution requirements. When approved a substitute product may be used. C. Product Specified by Naming One or More Manufacturers, without a provisions for Substitution: No substitution will be allowed, except as specified under the Article on Substitutions. 1.7 SUBSTITUTIONS A. Timing: Substitution requests will be considered by the Construction Manager until 10 working days prior to bid opening. Substitution requests received less than 10 days prior to bid opening will be considered at the Construction Manager's option. Subsequent substitutions will be considered only for the following reasons: 1. A product becomes unavailable due to no fault of the Contractor. 2. Subsequent information or changes indicate that the specified product will not perform as I intended. 3. A substitute product will be in the Owner's best interest. 4. A substitute product will improve the likelihood of meeting the sustainability requirements for the Project. B. Substitution requests shall be submitted only through the General Contractor. C. Documentation: 1. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. 2. Requests for substitution shall be made on a form acceptable to the Construction Manager. 3. Limit each request to one proposed product or system. 4. For substitutions prior to Agreement, signature and projected cost data are not required. 5. Submit product data and other supporting documentation necessary to verify that the proposed product meets the sustainability requirements for the Project. 6. Submit Substitution Request to Construction Manager with direct copy to the Architect. M D. Request for substitution constitutes a representation that the proposer: 1. Certifies that the proposed substitute item has been fully investigated and has been determined to be equal or superior to that specified in all respects. 2. Certifies that the same or greater warranty will be furnished 3. Certifies that required maintenance service and source for replacement parts are available 4. Certifies that incorporation of the proposed substitute item will not affect functional clearances. 5. Warrants that coordination, installation, and changes to the project as necessary to 1 accommodate the proposed substitution shall be the Contractor's responsibility, that use of the substitute item(s)will not delay project completion 6. Warrants that claims for additional costs related to its incorporation which may become subsequently apparent will be borne by the Contractor. 7. Has verified that the specified product will not adversely affect the LEED rating requirements for the Project. TEMPLATE 016000-2 10/12/18 STARBUCKS1111 COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 016000 - PRODUCT REQUIREMENTS E. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals. F. Review: The Owner will be the judge of the acceptability of the proposed substitution; in the judgment of Owner the product shall meet the following criteria: 1. It is equal or superior in quality and serviceability to the specified product. 2. Its use will not entail unacceptable changes in details and construction of related work. 3. Its design and artistic effect complies with design concept. G. The Construction Manager will review requests for substitutions with reasonable promptness, and request additional information, documentation, or samples, as necessary for evaluation of the request. Within two weeks of receipt of the completed request, the Construction Manager will take one of the following actions. 1. If the substitution is allowed by the Owner prior to the cutoff date, an Addendum to the Bid Documents will be issued by the Construction Manager. 2. If the substitution is allowed by the Owner after the cutoff date, the Construction Manager will notify the General Contractor and issue the appropriate Construction Change Authorization, Supplemental Instruction, or Proposal Request. 3. If the request for substitution is denied, the proposer will be notified of the rejection. If a decision on the substitution request cannot be made or obtained within the time allocated, use the specified product. END OF SECTION I I I I I I I I I TEMPLATE 016000-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 017329—CUTTING AND PATCHING 1 PART 1 -GENERAL I 1.1 SUMMARY A. Section Includes: Patching of existing construction. B. Related Sections: I 1. 011000 -Summary: Cutting and patching to remove ill-timed, defective, or non-conforming work. 2. 015000 -Temporary Facilities and Controls: Temporary enclosures, protection of installed work; cleaning during construction. 3. 024119- Selective Demolition: Removal and storage of products to be reinstalled. IC. Drawings, the provisions of the Agreement, including bonds and certificates, the General Conditions, and Division 1 specification sections apply to all work of this Section. I 1.2 QUALITY ASSURANCE A. Unless indicated otherwise, patching, extending, or matching shall be performed as necessary to make the Work complete, with all components matching and consistent. IB. Patching materials shall meet the requirements of the jurisdictional code authorities. C. Major patching procedures shall be reviewed with the Construction Representative, prior to proceeding. IPART 2 - PRODUCTS 2.1 MATERIALS A. Patching Materials: Match the existing construction, unless approved otherwise. I PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that demolition is complete and that existing surfaces are ready for patching. IIB. Coordinate installation of new materials with the patching and repair of existing construction. C. Beginning of restoration work constitutes acceptance of existing conditions. I D. Determine type and quality of existing products by inspection or non-destructive testing. Destructive testing may be performed when approved by the Construction Representative. Patch all test locations. 3.2 PREPARATION I A. Cut, move, or remove items as necessary for access to alterations and renovations work; replace and restore at completion. B. Contact the Construction Representative when unsuitable materials not marked for removal -such as Irotted wood, rusted metals, and deteriorated concrete and masonry are discovered. C. Provide additional construction and materials as required to support patching. I D. Remove debris and abandoned items from area and from concealed spaces. E. Prepare surfaces and remove surface finishes to provide for proper installation of new work and new finishes. I 3.3 PATCHING A. Patch and refinish existing surfaces which are damaged, lifted, discolored, missing, or showing other localized imperfections directly or indirectly caused by work under this contract. Patched work shall Imatch existing adjacent work in texture and appearance. 1 TEMPLATE 017329-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 017329—CUTTING AND PATCHING B. When existing finish cannot be matched, refinish entire surface to nearest intersections. Finish patches to produce uniform finish and texture over entire area. C. Provide a neat and smooth transition to new construction. Where finished surfaces are cut so that smooth transition to new work is not possible, terminate existing surface along a straight line at a natural line of division. Review condition with the Construction Representative. D. Trim existing doors as necessary to clear new floor finishes; refinish trimmed areas. E. Where existing items are indicated as cut or reconfigured, cap and finish all exposed edges to match the existing construction to remain. Provide new or relocated supports spaced to be consistent with the installation. F. Patching of Concrete Slabs on Grade: In accordance with Section 030100. 1 END OF SECTION I 1 I I I I I 1 I I I I TEMPLATE 017329-2 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 017421 —CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL I PART 1 - GENERAL I 1.1 SUMMARY A. Section Includes: Construction waste management requirements. B. Incorporate the work of this section into the Project when the construction waste handlers in the I Project area have sufficient capability to implement the specified requirements for the Project. Confirm construction waste management goals with the Construction Manager. C. Related Sections: I 1. 013546—Sustainable Design Requirements. 2. 015000—Construction Facilities and Controls. D. This Section applies to all Technical Specification Sections, and supplements the General and I Supplementary Conditions. 1.2 DEFINITIONS A. Commingled or Off-site Separation: Collecting all material types into a single bin or mixed collection I system and separating the waste materials into recyclable material types in an off-site facility. B. Construction, Demolition and Land Clearing Waste (CDL): For purpose of this section, includes all non-hazardous solid wastes such as building materials, packaging, rubbish, debris and rubble I resulting from construction, remodeling, alterations, repair, deconstruction, demolition and land clearing. C. Deconstruction; The process of removing existing building materials from renovation and demolition I projects for the purposes of reuse, and recycling, in as efficient and safe manner as possible. D. Hazardous Waste: As defined by the state where the Project is located. E. Proper Disposal: As defined by the jurisdiction receiving the waste. I F. Recyclable Materials: Products and materials that can be recovered and remanufactured into new products. G. Recycling: The process of sorting, cleaning, treating and reconstituting materials for the purpose of I using the material in the manufacture of a new product. Can be conducted on site (as in the grinding of concrete for reuse on site). H. Recycling Facility: An operation that can legally accept materials for the purpose of processing the I materials into an altered form for the manufacture of a new product. Recycling facilities have their own specifications for accepting materials. I. Salvage and Reuse: Existing usable product or material that can be saved and reused in some I manner on the project site. Materials that can be salvaged and reused on site must comply with the applicable technical specifications. J. Salvage for Resale: Existing usable product or material that can be saved and removed intact (as is) I from the project site to another site for resale to others without remanufacturing. K. Source-Separated Materials: Materials that are sorted at the site for the purpose of reuse or recycling. L. Sources Separation: Sorting the recovered materials into specific material types with no or a minimum I amount of contamination on site. M. Time-Based Separation: Collecting waste during each phase of construction or deconstruction that results in primarily one major type of recovered material. The material is removed before it becomes I mixed with the material from the next phase of construction. N. Trash: Product or material unable to be salvaged for resale, salvaged and reused, returned, or recycled. I O. Waste: Excess materials generated by the construction and demolition operations of the Project that are produced on site or brought to the site. Waste includes, without limitation, packaging materials ITEMPLATE 017421-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 017421 —CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL such as banding, crates, pallets, plastic film, polystyrene, and cardboard. Waste does not include excavated soils, rocks, vegetation, and hazardous waste removed from the site 1.3 WASTE MANAGEMENT REQUIREMENTS A. Salvage, recycle, and reuse a minimum of[75] [501% of construction and demolition waste material I generated by the Project. B. Minimize the creation of construction and demolition waste on the job site. Minimize factors that contribute to waste, such as excess packaging, improper storage, ordering errors, poor planning, breakage, mishandling, and unnecessary contamination. C. Targeted Salvage Materials: The following existing materials shall be reused in the Project: 1. Existing concrete foundations and masonry shall be broken up and reused as compactible fill material. 2. [Edit for the project]. D. The following waste materials may be diverted from landfill to the greatest extent possible to meet the specified requirements: 1. Clean dimensional wood, pallet wood, plywood, OSB, and particleboard 2. Asphalt. 3. Concrete 4. Concrete masonry units 5. Brick 6. Ferrous and non-ferrous metals 7. Gypsum products. 8. Acoustical ceiling tile. 9. Glass, both window and bottle. 10. Plastics, including plastic film. 11. Carpet and pad. 12. Cardboard, paper, paper-based packaging 13. Insulation 14. Batteries. 15. Doors, windows frames, relites, hardware, millwork. 16. Equipment and appliances] 17. Non-asbestos roofing] 18. Paint. E. Hazardous materials such as paints, solvents, adhesives, batteries, and fluorescent light bulbs and ballasts which cannot be reused shall be disposed of at authorized hazardous waste outlets. 1.4 CONSTRUCTION WASTE MANAGEMENT PLAN I A. Develop and submit to the Construction Manager a Construction Waste Management Plan narrative in accordance with the sustainability requirements for the Project. Revise and resubmit the Plan until approval is obtained. B. Unless approved otherwise, no waste generating construction work may proceed until the Construction Waste Management Plan is approved. Approval of the Contractor's Construction Waste Management Plan will not relieve the Contractor of responsibility for meeting the waste management goals specified. C. The Construction Waste Management Plan shall include the following: 1. A list of waste materials that will be salvaged for resale, salvaged for reuse, recycled, and disposed. 2. Estimated quantities of each waste material. 3. Description of waste handling methods to be used, including one or more of the following: a. Requiring subcontractors to take their waste to a recycling facility. b. Contracting with diversion/recycling hauler to haul recyclable waste to an approved recycling or material recovery facility. c. Processing and reusing materials on-site. d. Self hauling to a recycling or material recovery facility. TEMPLATE 017421-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 017421 —CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 4. Name, address and phone number and qualifications of each proposed diversion/recycling hauler that will be used in the Project. 5. Identification of each recycling or material recovery facility to be utilized. 6. Description of the method to be employed in collecting, and handling, waste materials, including a description of the methods that will be used to protect recycled materials from contamination. 7. Description of the means of transportation of waste materials. 8. Description of methods to communicate waste management plan to personnel and subcontractors. D. Calculation shall be done by weight(tons)or by volume (cubic yards) but shall be consistent throughout. E. Include the Construction Waste Management Plan with the Submittal Template to obtain the LEED credits specified below. F. Implement procedures to communicate the construction waste management plan to personnel and subcontractors. 1.5 CONSTRUCTION WASTE MANAGEMENT PROGRESS REPORTS A. Submit a Construction Waste Management Progress Report with each Application for Payment. Failure to submit this report renders the Application for Payment incomplete and is grounds for delaying the Progress Payment. B. Use the Construction Waste Management Progress Report Form attached at the end of this Section. C. The Waste Management Progress Report shall list the following for the time period covered by the Application for Payment: 1. Each waste material recycled, salvaged, or reused from the Project. 2. Quantities for each waste material. 3. Total quantity of waste removed from the site. 4. Name of each diversion/recycling hauler or the location and name of each recycling or material recovery facility as appropriate. D. Calculations shall be done by weight (tons) or by volume (cubic yards) but shall be consistent throughout. E. Attached manifests, weight tickets, receipts or invoices which validate the calculations. 1.6 SUSTAINABILITY SUBMITTALS A. Make sustainability submittals as specified in Section 013300. B. Construction Waste Management Letter: 1. Submit a final accounting of activities and procedures taken, as necessary to support successful compliance with construction waste management goals specified. 2. Include copies of all manifests, weight tickets, receipts or invoices which validate the percentage calculations for waste management. C. Submit specified Construction Waste Management Plan. 1.7 QUALITY ASSURANCE A. Regulatory Requirements: Comply with applicable requirements of the jurisdictional authorities, local ordinances and regulations concerning management of construction waste, clearing, and inert materials. B. Preconstruction Meeting: 1. Prior to beginning work at the site, schedule and conduct a meeting to review the Waste Management Plan and discuss procedures, schedules, coordination and specific requirements for waste materials recycling and disposal. 2. Discuss coordination and interface between Contractor, sub-contractors, architect, engineers, project manager, Construction Manager, and other C&D activities. Identify and resolve problems of compliance with requirements. TEMPLATE 017421-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 017421 —CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL I 3. Record minutes of the meeting, identifying conclusions reached and matters requiring further resolution. Maintain waste management as an agenda item at future construction meetings. 4. Attendees: Contractor and related contractor personnel associated with work of this section, including personnel in charge of the waste management program; C&D Quality Manager; architect; engineers; material and equipment suppliers where appropriate; Construction Manager and such additional Owner personnel as Owner deems appropriate. 5. Plan Revision: Make revisions to C&D Waste Management Plan agreed upon during the meeting and incorporate resolutions agreed to be made subsequent to the meeting. Submit revised plan to the Construction Manager. C. Progress Meetings: Waste management goals and issues shall be discussed at regularly scheduled progress meetings as specified in Section 013119 Project Meetings. D. Disposal Site, Recyclers and Waste Materials Processors: Use only facilities properly permitted in the State where the Project is located, and/or by local authorities where applicable. PART 2 - PRODUCTS 2.1 WASTE CONTAINERS A. Durable, covered, secured, reusable container for each category or waste. I B. All recycling containers shall be clearly marked and shall list the materials which can be recycled as well as appropriate materials which cannot. PART 3 - EXECUTION 3.1 PROJECT/SITE CONDITIONS A. Use construction methods that reduce construction waste. When possible: 1. Order materials precut to required size. 2. Order exact quantity required. 3. Use temporary materials and facilities that will be reused at other projects. B. Field Measurements: Contractor is to verify that field measurements are as indicated on construction and/or shop drawings before confirming product orders or proceeding with work, in order to minimize waste due to excessive materials. C. Protect products from damage during storage, installation and in-place. Materials that become wet, damp or unusable for any reason due to improper storage shall be replaced at the Contractor's expense. D. Request or require products delivered to the Site with packing materials that can be returned to sender, reused by others, or easily recycled. E. Use detailed take-offs to identify location and uses in structure to reduce risk of unplanned and potentially wasteful cuts. 3.2 PACKING AND SHIPPING A. Shipping: Coordinate the schedule of product delivery to designated prepared areas in order to I minimize site storage time and potential damage to stored materials. B. Packing: Arrange for the return of packing materials, such as wood pallets, where economically feasible. 3.3 CUTTING AND PATCHING A. Use on-site waste as primers, sealers, underlayments, supports, backing, blocking, furring, suspension systems, and accessories as required for any purpose in patching existing work. B. Provide environmentally benign non-hazardous or recycled content materials for cutting and patching. 1 TEMPLATE 017421-4 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 017421 -CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL END OF SECTION I 1 I I I I I i I t I I I I TEMPLATE 017421-5 10/12/18 STARBUC KSCOFFEE COMPANY GUIDE SPECIFICATIONS SECTION 017700 -CLOSEOUT PROCEDURES PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Closeout procedures. 2. Final cleaning. 3. Project record documents. 4. Operation and maintenance data. 5. Operation instruction. 6. Manufacturer's warranties. 7. Guaranties. 8. Spare parts and maintenance materials. 9. Closeout sustainability documentation. B. Related Sections: 1 1. 011000 -Summary: Partial Owner occupancy. 2. 013544 -Construction Indoor Air Quality Management: Indoor air quality management plan and post construction flush-out. 3. 013546—Sustainable Design Requirements: Sustainable practices goals for the Project. 4. 015000 -Temporary Facilities and Controls: Cleaning during construction. 5. 017421 - Construction Waste Management and Disposal: Construction waste management plan. 6. Division 23 and 26 for special closeout requirements for mechanical and electrical systems. C. This Section applies to all Technical Specification Sections, and supplements the General and Supplemental Conditions. 1.2 CLOSEOUT PROCEDURES I A. Comply with procedures stated in General Conditions of the Contract for Substantial and Final Completion. B. Certain areas may be subject to partial occupancy or use as specified in Section 011000. I C. Submit all certificates of approval issued by the governing authorities, including, without limitation, the following: 1. Certificate of occupancy. D. Prior to final payment, submit the following affidavits using the forms listed below: 1. Contractor's Affidavit of Payment of Debts and Claims AIA Document G706. 2. Consent of Surety to Final Payment AIA Document G707. 3. Contractor's lien release, and lien releases from each subcontractor; Contractor's Affidavit of Release of Liens AIA Document G706A E. Submit final Application for Payment identifying total adjusted contract sum, previous payments, and sum remaining due. F. Submit building permit documents and building inspection signoff sheets to the Construction Manager. 1.3 FINAL CLEANING 1 A. Execute prior to final inspection. B. Clean interior and exterior surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces. C. Clean equipment and fixtures to a sanitary condition. D. Clean or replace filters of mechanical equipment. E. Clean roofs, gutters, downspouts, and drainage systems. F. Clean site; sweep paved areas, rake clean other surfaces. G. Power wash hard surfaces and trash enclosure. TEMPLATE 017700-1 10/12/18 1 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 017700 -CLOSEOUT PROCEDURES I H. Remove waste and surplus materials, rubbish, and construction facilities from the Project and from the site. Conform to Construction Waste Management and Disposal requirements specified in Section 017421. 1 I. Cleaning procedures shall be in accordance with Indoor Air Quality Management Plan specified in Section 013544. 1.4 PROJECT RECORD DOCUMENTS I A. Maintain a complete set of record documents which clearly and neatly indicate all changes from the Contract Documents, and all uncovered existing conditions which will be subsequently concealed. B. Record documents shall include: I 1. Contract drawings. 2. Specifications. 3. Reviewed shop drawings, product data, and samples I C. Record documents shall be used for no other purpose and shall be stored separate from those used for construction. D. Keep documents current; do not permanently conceal any work until required information has been I recorded. E. Mark specifications legibly and record at each Product section a description of actual products installed. Include the manufacturer's name and product model and number. I F. Drawings shall indicate exact installed locations and dimensions of all concealed work, including, without limitation, conduit, piping, ducts, mechanical and electrical equipment, and foundations. Indicate all changes to details which involve concealed construction. I G. Prior to approving each Payment Request, the Construction Manager reserves the right to inspect the Record Documents. The Payment Request may not be approved until the record documents are current to the Date of the Payment Request. I H. At Contract Closeout, submit documents with transmittal letter containing date, Project title, Contractor's name and address, list of documents, and signature of Contractor. 1.5 OPERATION AND MAINTENANCE DATA I A. Furnish published operation and maintenance (O&M) information covering all equipment and finish materials installed on the project. Whether specified or not, furnish published information whenever special maintenance procedures are required to assure the proper operation and durability of project material, equipment, and finishes. IB. Organize O&M information into sections that correspond to the applicable specification sections. Include a Table of Contents summarizing O&M information listed in CSI order. I C. Number of copies: Unless otherwise specified, submit four of each at time of project substantial completion. D. Submit operation data and maintenance data bound in a three ring binder. Include divider tabs to separate data for each component. Include name of Project, Contractor, and the Construction IManager. E. Information shall be submitted by the General Contractor to the Construction Manager. I 1.6 OPERATION INSTRUCTION A. Prior to Final Completion, instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment and systems. Provide instruction at mutually agreed upon times. I B. Use experienced personnel trained and experienced in the operation and maintenance of the building equipment or system involved. C. Use operation and maintenance manuals for each piece of equipment or system as the basis of Iinstruction. Review contents in detail to explain all aspects of operation and maintenance. ITEMPLATE 017700-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 017700 -CLOSEOUT PROCEDURES I D. Refer to the individual technical Sections for additional requirements for instruction of Owner's personnel. 1.7 MANUFACTURER'S WARRANTIES A. Furnish original and duplicate copies of each manufacturer warranty executed to the Owner. I B. Execute Contractor's submittals to the manufacturers, and assemble documents executed by the manufacturers. C. Provide table of contents and assemble in binder with durable plastic cover. D. Submit material prior to final application for payment in accordance with Section 013300. For equipment put into use with Construction Manager's permission during construction, submit warranty within 10 days after first operation. For items of Work delayed materially beyond Date of Substantial Completion, furnish warranty within ten days after acceptance, listing date of acceptance as start of warranty period. 1.8 GUARANTIES I A. Furnish written guaranty, executed to the Construction Manager, from each subcontractor performing work covered by the additional guaranty requirements specified in the technical sections. The guaranty shall commence on the date of Substantial Completion or the Owner's acceptance of that portion of the work whichever is first. B. Transmit through the Construction Manager in accordance with Section 013300. 1.9 SPARE PARTS AND MAINTENANCE MATERIALS I A. Furnish products, spare parts, and maintenance materials in quantities specified in each Section, in addition to that used for construction of Work. Coordinate with Construction Manager, deliver to Project site and obtain receipt prior to final payment. B. Unless specified otherwise, deliver materials in manufacturer's original factory cartons or containers. C. Materials shall be clearly labeled, and shall include designations used in the Contract Documents. 1.10 KEYS A. Deliver properly identified and tagged keys and hardware maintenance tools to the Construction Manager, including those specified in Sections other than 087100. B. Obtain itemized receipt for all keys and tools. 1.11 CLOSEOUT LEED DOCUMENTATION A. Submit all required sustainability documentation prior to Final Payment. Allow sufficient time for review and approval of documentation. Incomplete documentation is grounds for delay of Final Payment. B. Obtain required sustainability documentation submittals from each subcontractor prior to final payment to each subcontractor. END OF SECTION I I I TEMPLATE 017700-3 10/12/18 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 024119 -SELECTIVE DEMOLITION I PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Demolition and removal from the site of existing construction to accommodate the new construction. 2. Removal of existing components for reinstallation. 3. Salvaging of existing materials. 4. Capping and identification of utility lines. 5. Contractor design of shoring and bracing. B. Related Sections: 1. 011000 - Summary: Contractor's use of the site; Owner occupancy requirements; Special work requirements. 2. 015000 -Temporary Facilities and Controls: Temporary enclosures, guardrails, barriers, barricades, lighting and dust control. 3. 017329 - Cutting and Patching. 4. 017700 -Closeout Procedures: Project record documents. 5. [312000 - Earth Moving: Backfilling and grading of site. ] C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 SUBMITTALS A. Make submittals in accordance with Section 013300, unless specified otherwise. B. Submit certification that temporary shoring, support, and restraining systems have been designed by a structural engineer licensed to practice in the State of the Project. 1.3 QUALITY ASSURANCE A. Comply with the applicable health and safety regulations of the jurisdictional authorities. B. Obtain and pay for all permits required for the demolition work. C. Obtain approval of demolition procedures which affect the normal operation of Owner occupied spaces. D. The design of shorings, temporary supports, and restraining systems shall be the responsibility of the Contractor. Such elements shall be designed and stamped by a Structural Engineer licensed to practice in the State of the Project. E. Pre-bid Inspection: Visit the Site to determine existing conditions, and as much as possible to determine the extent of demolition required. PART 2 - PRODUCTS 2.1 MATERIALS NOT USED PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect existing conditions and verify that the work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. TEMPLATE 024119 -1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 024119 -SELECTIVE DEMOLITION I B. Do not begin demolition until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective demolition caused by prior observable conditions. C. When unanticipated mechanical, electrical, structural or other elements that conflict with intended function or design are encountered, investigate and ascertain the nature and extent of conflict. Promptly submit a written report to Architect. Perform no further demolition in such areas, unless approved by the Architect. 3.2 PREPARATION I A. Provide and maintain all temporary barriers and security devices necessary for the demolition work. Conform to requirements of Section 015000. B. Provide protection to all surrounding public spaces. Perform work and provide temporary construction as approved by the local jurisdictional code authorities. C. Protect existing construction which will not be subject to demolition. 3.3 DEMOLITION A. Perform demolition as indicated and as required to accommodate the new work. Demolish in an orderly and careful manner. Where demolition exceeds that indicated, verify such demolition with the Architect prior to proceeding. B. Protect existing structural members. Contact the Architect prior to modifying structural members beyond the extent indicated. Cease operations and notify the Architect immediately if continued demolition operations might endanger the existing structure. C. Notify the Owner of hazardous materials discovered during demolition operations. D. Provide Contractor designed temporary shoring as required to support existing construction against movement or overload during demolition operations, until permanent supports are in place. E. Except where noted or specified otherwise, take possession of materials being demolished, and immediately remove from site. Do not overload existing construction to remain with demolished materials. Demolished materials which cannot be recycled or reused shall be disposed of at a legal dump site. F. If relics, antiques, corner stones and their contents, commemorative plaques and tablets, or other similar items are discovered, they shall remain the property of the Owner. Notify the Architect prior to removal, and obtain approval on method of removal. G. Carefully remove, store, and protect all materials and components to be reused. H. Where removal of materials indicated to remain is necessary to facilitate new construction, carefully remove, store, and protect such materials for future reinstallation. I. Carefully remove, protect, and turn over as directed, materials and components claimed by the Owner for salvage. Prior to demolition, contact the Owner to determine which items will be claimed. J. Where cut edges of the existing construction will be visible in the completed work, cut in uniform straight lines. Concrete and masonry shall be sawcut or coredrilled. K. Coring into post-tensioned beams or slabs is not allowed unless x-ray surveying, scanning, or another submitted and approved method has been performed to accurately locate post-tensioned tendons. X-ray surveying at coring locations may be performed by the testing and inspection agency or by another testing agency under the General Contractor's direction. Trades requesting the coring shall pay surveying costs. No coring operations shall commence without the prior written approval of the Structural Engineer of Record. L. Repair all demolition performed in excess of that required, at no additional cost to the Owner. I M. Remove all disconnected utility lines. Cap remaining ends. Place markers to indicate location of disconnected utilities. Indicate location of disconnected utilities on the Project Record drawings as specified in Section 017700. TEMPLATE 024119 -2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 024119 -SELECTIVE DEMOLITION N. Pay for and coordinate the work performed by public utilities. Notify the affected utility company well in advance of the scheduled work. O. Dust producing demolition operations shall be sprinkled in areas not subject to water damage. Provide other approved means of controlling dusting in areas subject to water damage. P. Electrical Demolition Requirements: 1. Remove electrical system components as indicated on the electrical drawings Q. Plumbing Demolition Requirements: 1. Abandoned underslab piping shall be cut off flush with the floor line and sealed. Patch flush with the floor. 2. Abandoned piping which is exposed and readily accessible shall be removed. 3. Leave abandoned piping which is concealed in existing construction to remain. R. Leave site in a condition acceptable to the Owner at all times. Remove demolished materials from site daily as work progresses. Do not overload existing structure with demolished materials. 3.4 CLEANUP A. After each demolition phase, leave the area broom clean and ready for the work of other Sections. B. Occupied spaces which receive demolition work shall be thoroughly and completely cleaned prior to Owner's daily operations. Cleaning shall include: vacuuming, dusting, stain and dirt removal. END OF SECTION I I I I I I I TEMPLATE 024119 -3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATION SECTION 030100 -CONCRETE SLAB REPAIR AND RESURFACING PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: I 1. Repairing of existing slab surfaces. 2. Sanding or grinding of existing concrete slab. 3. Application of cementitious underlayments. 4. Application of concrete sealer. B. Drawings, the provisions of the Agreement, including bonds and certificates, the General Conditions, and Division 1 specification sections apply to all work of this Section. 1.2 RELATED SECTIONS A. 033015-Concrete Slabs on Grade: Replacement of portions of existing concrete slab. B. 033514— Polished Concrete Flooring System 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. I B. Product Data: Submit manufacturer's literature for each product listed. C. Sustainability Submittals: 1. Make submittals in accordance with Section 013546. 2. Low Emitting Paints and Coatings: Submit product data for interior concrete sealers and curing compounds. Include MSDS sheets. 1.4 QUALITY ASSURANCE A. Provide materials for system produced by one manufacturer. I B. Materials and methods used in patching, repair or resurfacing of concrete slab shall be approved by manufacturer of polished flooring system. 1.5 DELIVERY, STORAGE, AND HANDLING I A. Deliver material to the jobsite in the manufacturer's original, new, unopened packages and containers bearing manufacturer's name and label in good condition. B. Store materials not in actual use in tightly covered containers at ambient air temperature range of 40 to 90 degrees F. Storage area should be clean, free of contamination, and in accordance with Data Sheet compliance. 1.6 PROJECT CONDITIONS A. Environmental Conditions: Where ambient air temperature does not fall within the range of 40 to 90 degrees Fahrenheit, or in conditions with extremely high relative humidity, special application products and methods may be required. Contact manufacturer for specific job conditions and technical support. B. Installer is required to visit site and verify conditions prior to bidding. C. Permanent lighting shall be in place and operational prior to commencement of the work of this Section. D. Variations in conditions may require modification to preparation and installation requirements; failure to verify modifications may result in an unacceptable finish. I TEMPLATE 030100-1 10/12/18 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATION SECTION 030100 -CONCRETE SLAB REPAIR AND RESURFACING ' 1.7 WARRANTY A. Furnish manufacturer's two-year warranty against failure of the concrete stain system by use of a defective product, in accordance with Section 017700. 1.8 SUBCONTRACTOR GUARANTEE A. Furnish Subcontractor Guarantees in accordance with Section 017700. PART 2 - PRODUCTS 2.1 MATERIALS A. Concrete Patching Compounds: 1. Ardex Inc. "SD-P" Fast-Setting Underlayment. 2. Laticrete International, Inc. "Laticrete 220 Medium Bed Mortar mixed with "Laticrete 3701 Latex ' Mortar Admix." 3. Mapei Corporation "Mapacem 100"or"Planitop 10". 4. CTS Cement Manufacturing Corp. (Garden Grove, CA; 800-929-3030)"Rapid Set Cement All" or "CR Concrete Resurfacer" depending on color desired; fast-setting, high-strength, multi-purpose, non-shrink grout. B. Self Leveling Underlayment System: Self-leveling, pourable, cement based material, minimum 28 day compressive strength 2,000 psi; minimum bond strength 200 psi; one of the following. ' 1. Ardex Inc. "K-15" Self-Leveling Underlayment Concrete 2. Laticrete International, Inc. "Laticrete 86 LatiLevel Thin Pour Underlayment." 3. Mapei Corporation "Ultraplan 1". 4. CTS Cement Manufacturing Corp. "TRU Self-Levelling"fast-setting, high-strength underlayment. C. Trowelable Underlayment System: 1. Ardex Inc. "SD-P" Fast-Setting Underlayment. 2. Laticrete International, Inc. "Laticrete 220 Medium Bed Mortar mixed with "Laticrete 3701 Latex I Mortar Admix." 3. Mapei Corporation "Mapacem 100"or"Planitop 10". 4. CTS Cement Manufacturing Corp. "CR Concrete Resurfacer"fast-setting, high-strength trowelable underlayment. D. Primers: As recommended by cement materials manufacturer for conditions. E. Penetrating Sealer: Water-based penetrating sealer meeting VOC limits of 100g/L or less. 1. "Consolideck Concrete Protector WB" by Prosoco Inc. (Lawrence, KS; 800-255-4255). PART 3 - EXECUTION ' 3.1 EXAMINATION A. Examine substrates and conditions under which concrete resurfacing will be performed for compliance with requirements for applications of flooring materials. Do not proceed with application until unsatisfactory conditions have been corrected. Start of any of the resurfacing work will be construed as the Applicator's acceptance of the floor and environment conditions. B. Condition of Substrate: Verify that all jobsite conditions are within the sealer product manufacturer's Data Sheet parameters. Report discrepancies to the Architect. 1. Surface temperature of slab must be at least 40 degrees F. and no more than 90 degrees F. for crack and joint fillers and coating. ' 2. If there are any indications of a moisture problem, contact the Architect. 3.2 PREPARATION A. Comply with the concrete coating manufacturer recommendations and as follows: Prepared surface ' shall be smooth and free of ridges and irregularities including those occurring in concrete and from mastics. TEMPLATE 030100-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATION SECTION 030100 -CONCRETE SLAB REPAIR AND RESURFACING B. Initial Concrete Slab Preparation: Provide initial preparation of concrete surface as follows. 1. Remove dirt, oil, soap, grease, mastic, and other bond-breaking contaminants. 2. Surface shall be smooth and free of unwanted ridges from by either mastics or concrete. C. Surface Repair: Fill holes, spalls, cracks, voids and joints as recommended by the system manufacturer with minimal residue on surrounding surface and as required to provide a smooth, level and even substrate. 1. Spalls 1 to 3 inches in diameter shall be struck flush with patching compound. 2. Spalls larger than 3 inches in diameter and areas requiring leveling or resurfacing shall be filled with trowelable or self-leveling compound. 3. Fill cracks of 3/16 inch in width or wider with patching compound. Strike flush. 4. Cracks between 1/16 to 3/16 inch in width shall be filled with joint sealant specified in Section 079200 following the completion of the Work of this Section. 5. Cracks less than 1/16 inch in width will not be filled. D. Final Preparation: Surfaces to be treated shall be clean, dry and absorbent. Confirm surface absorbency with a light water spray. If surface does not wet uniformly, use the appropriate surface preparation method from approved mock-up to remove remaining surface contaminants. 3.3 SANDING/GRINDING A. At slabs with glass fiber reinforcing, prepare slab as follows: 1. Prepare slab with a three-step grind process. a. Step 1: Use 150-grit metal or 100-grit puck resin tooling. b. Step 2: Use 200-grit resin pads. 1 B. At slabs not glass-fiber reinforced: 1. Sand concrete using an orbital sander with 220-grit. C. Remove extraneous materials which could become unbonded during normal traffic, such as gypsum I board compound, and other similar materials. D. Clean subfloor and ensure that surfaces are dry, hard, and sound. E. Provide 2 sanding/grinding passes with each grit, perpendicular to each other. F. Sand entire area including inside corners an around columns where trowel-applied or self-levelling underlayments are indicated. Use hand sanders/grinders where necessary to access all areas. G. The finished surface shall be clean and porous with abraded roughness of light grit sandpaper. H. The sanded floor shall be swept using a fine-bristled push broom. After brooming, vacuum entire floor to remove all dust and debris. I. Damp mop and/or wet vacuum as necessary to attain a properly cleaned surface. J. Maintain slab free of traffic between sanding and application of concrete coatings. 3.4 APPLICATION OF REPAIR AND RESURFACING MATERIALS A. Install trowelable underlayment at locations where slopes are indicated and at other locations as appropriate to installation conditions; install self leveling underlayment at other locations as necessary to correct slab flatness and levelness. B. Set screeds, markers, and reference blocks. Set screeds at all construction and control joints to establish weakened plane joints in underlayment. C. Install patching compounds in accordance with the manufacturer's recommendations. Where subsequent finishing of the material is required, float to level surface. Do not trowel. D. Apply primer to all areas to receive underlayment; repeat application if necessary to achieve proper ' build. TEMPLATE 030100-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATION SECTION 030100 -CONCRETE SLAB REPAIR AND RESURFACING i E. Mix materials and pour or pump and squeegee into place to achieve appropriate thickness. At areas to receive cork tile flooring, provide fill thickness as necessary to align cork flooring with adjacent floor surfaces. ' F. Finish to a smooth level surface within tolerances specified for concrete floors. G. Cure in accordance with the manufacturer's instructions. H. Tolerances: As specified in Section 033000. ' 3.5 APPLICATION OF SEALER A. Do not apply sealer to slabs or portions of slabs indicated to receive polishing system or a finished ' flooring material. B. Remove all dirt, debris, or curing compounds using surface preparation cleaners as recommended by manufacturer for conditions. Allow cleaning waters used in surface preparation to dry. ' C. Application: 1. Apply a single coat of sealer using a low pressure sprayer fitted with a 0.5 gpm spray tip. 2. On most surfaces, apply in a single saturating application. 3. Even out puddles with a microfiber applicator before material has a chance to fully dry. i 4. If needed, an additional coat can be applied after material has dried for at least 1 hour. The second coat will require less material. 5. For optimum stain repellency on porous surfaces, apply a saturating coat and allow to dry ' thoroughly before applying a second saturating coat. Less material will be required on the second application. Over-application may change surface appearance. D. Allow treated surfaces to dry. E. Remove any dried powder residue using stiff broom, power sweeper or floor scrubbing machine. F. Do no subsequent buffing or burnishing of slab. 3.6 CLEAN-UP A. During progress of work, remove from site discarded materials, rubbish, cans and rags at end of each work day. ' B. Upon completion of work, clean spattered surfaces. Remove spattered coating by proper method of washing and scraping, using care not to scratch or otherwise damage finished surfaces. 3.7 PROTECTION A. Protect completed concrete coating work against damage. B. Close application area after completion of each stage for a minimum of 48 hours and longer if required by the manufacturer. C. Protect coatings from general construction when tack-free with 1/4 inch tempered hardboard, smooth side down. Remove prior to completion of Project. D. Correct damage by cleaning, repairing or replacing, and refinishing, as acceptable to the Architect. END OF SECTION i i i ' TEMPLATE 030100-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033000 -CAST-IN-PLACE CONCRETE PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Cast-in-place concrete. 2. Concrete accessories. 3. Formwork, shoring, bracing, and anchorage. 4. Concrete reinforcement. 5. Underslab vapor retarder. 6. Concrete sealer. B. Related Sections: 1. 003152 -Testing and Inspection Services: Owner paid testing and inspections. 2. 013546-Sustainable Design Requirements: 3. 079200 -Joint Sealants: Expansion joint fillers. 4. 312000 - Earth Moving: Fill under slabs on grade. 5. 321313-Concrete Paving C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 DEFINITIONS A. Architectural Concrete: Formed Concrete elements which are exposed to view as an exterior or interior surface in the completed structure. Areas indicated on the Drawings. 1.3 REFERENCES A. American Concrete Institute (ACI): I 1. 117-Standard Specification for Tolerances for Concrete Construction and Materials. 2. 301-05- Specifications for Structural Concrete. 3. 315- Details and Detailing of Concrete Reinforcement. B. American Society for Testing and Materials (ASTM): 1. A615 - Deformed and Plain Billet-Steel for Concrete Reinforcement. 2. C33- Specifications for Concrete Aggregates. 3. C94 - Specifications for Ready Mixed Concrete. 4. C132-Test for Slump of Portland Cement Concrete. 5. C150 - Specification for Portland Cement. 6. C156-Test Method for Water Retention by Concrete Curing Materials. 7. C171 -Specification for Sheet Materials for Curing Concrete. 8. C260 - Specifications for Air-Entraining Admixtures for Concrete. 9. C309- Specification for Liquid Membrane Forming Compounds for Curing Compounds. 10. C494- Specifications for Chemical Admixtures for Concrete. 11. C618 - Specification for Fly Ash and Raw or Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete. 12. C939 -Test Method for Flow of Grout for Preplaced-Aggregate Concrete 13. C1107 -Specification for Packaged Dry, Hydraulic-Cement Grout (Non-shrink) 14. C1315 - Specification for Liquid Membrane-Forming Compounds Having Special Properties for Curing and Sealing Concrete. 15. D1751 - Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction. 16. E1155 - Standard Test Method for Determining Floor Flatness and Levelness Using the "F Number" System. C. U.S. Army Corps of Engineers: CRD-C-621-83 - Specifications for Non-Shrink Grout. TEMPLATE 033000-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ' SECTION 033000 -CAST-IN-PLACE CONCRETE ' 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. ' B. Product Data: Submit data for each accessory, admixture, and curing material proposed for the work. C. Quality Control Submittals: 1. Mix Designs: Prior to concrete work, submit mix designs for approval. 2. Test Results: Submit test results per ASTM C311 performed less than 6 months prior to use for approval by Architect. 3. Certifications: Submit mill certificates for cement, aggregates, and reinforcing. D. Sustainability Submittals: ' 1. Make submittals in accordance with Section 013546. 2. Low Emitting Paints and Coatings: Submit product data for interior concrete sealers and curing compounds. Include MSDS sheets. ' 1.5 QUALITY ASSURANCE A. Perform work in accordance with ACI 301. B. Concrete work is subject to special testing and inspection as specified in 003152. Notify Architect at ' least 48 hours before concrete is poured. PART 2 - PRODUCTS ' 2.1 FORM MATERIALS A. Unless specified otherwise, conform to ACI 301. B. Plywood: 1. Architectural Concrete: APA rated High Density Overlay or Medium Density Overlay, Plyform ' Class 1. EXT. 2. Other Concrete: APA B-B Plyform Class 1, EXT C. Form Ties: 1. Concrete not exposed to public view: Snap-off metal; t 2. Concrete exposed to public view: Cone ends or metal washer ends; coordinate with drawings. D. Chamfers and Rustication Strips: Wood or plastic; fabricate to the shapes indicated. ' 2.2 REINFORCING A. Reinforcing Steel: 1. Types as indicated on the structural drawings. 2. ASTM A615, grade 60], unless indicated otherwise. ' B. Chairs, Bolsters, Bar Supports, and Spacers: Sized and shaped for strength and support of reinforcement during installation and placement of concrete. ' C. Fibrous Reinforcing: 1. Reinforcing Fibers: Virgin polypropylene reinforcing fibers, designed and manufactured specifically for use in concrete; one of the following. a. Forta Corporation "FORTA CR" ' b. Fibermesh, Inc. "Fibermesh Fibers" 2. Furnish fibers in lengths as approved for the application. 2.3 CONCRETE MATERIALS A. Cement: ASTM C150, normal -Type 1 Portland, grey color. B. Fly Ash: ASTM C618, Class C or F; loss on ignition (LOI) not to exceed 1 percent. Use fly ash from one single source for the whole Project. ' C. Normal Weight Fine and Coarse Aggregates: ASTM C33; severe weather exposure. ' TEMPLATE 033000-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033000 -CAST-IN-PLACE CONCRETE D. Water: ASTM C94, para. 5.1.3 2.4 ADMIXTURES A. Air-Entrainment: ASTM C 260; Master Builders Inc. "Micro-Air"or"MBVR", Euclid Chemical Co. "Air Mix,"or approved. B. Water Reducer Normal: ASTM C 494, Type A; Master Builders Inc. "Pozzolith/Polyheed," Euclid Chemical Co. "Eucon WR 75," or approved. C. High Range Water Reducer(Superplasticizer): ASTM C 494, Type F or G and shall be of the second or third generation type. Shall be batch plant added, extend plasticity time, reduce water 20 to 30 percent. Master Builders Inc. "Rheobuild," Euclid Chemical "Eucon 37," or approved. D. Accelerator: ASTM C 494, Type C or E, non-corrosive, non-chloride; Master Builders "Pozzutech 20," Euclid Chemical Co. "Accelgard 90," or approved. E. Set Retarder: ASTM C494, Type B. F. Shrinkage Reducing Admixture: Eclipse by W.R. Grace Company. 2.5 ACCESSORIES A. Bonding Agent: Acrylic type; Sonneborn "Sonnocrete", W.R. Grace "Duraweld C", Euclid Chemical Co. "Flex-con", or approved. B. Non-Shrink Grouts: ASTM C1107, Grade B; non-shrink non-catalyzed natural aggregate grout; minimum compressive strength of 7000 PSI at 28 days; 25 to 30 second flow when tested in accordance with ASTM C939 at 45 to 90 degrees F; cement gray in color; Master Builders Inc. "Masterflow 928," Euclid Chemical Co. "HiFlow Grout,"or approved. C. Form Release Coating: Water based type; VOC <150g/I; Nox-Crete "Utility Release," Cresset Chemical Company"Crete-Lease 20-VOC," or approved; non staining. D. Curing Materials: 1. Waterproof Sheet Material: Waterproof paper in accordance with ASTM C171; reinforced waterproof kraft paper; white color at exterior applications; Burke Kraft Curing Paper Type I-SK- 30, or approved. 2. Mats and Burlap: Fabric covering composed of quilted polyethylene sheeting laminated to outer covering of burlap, cotton, or other approved fabric; outer covering shall weigh not less than 6 1 ounces per square yard. 3. Curing Compound: ASTM C309; clear or translucent with fugitive dye; moisture loss not more than 0.055 gr./sq.cm. when tested in accordance with ASTM C156 and applied in a single coat at the manufacturers recommended rate; maximum VOC content 100 g/L Curing compounds shall be proven compatible with subsequently applied floor finishing systems including waterproof membranes or removed in its entirety prior to flooring installation. 4. Curing/Sealing Compound: ASTM C309; water based curing compound; maximum VOC content 100 g/L. W. R. Meadows, Inc., Hampshire IL (800/342-5976); "Sealtight 100-Clear" or approved. E. Underslab Vapor Retarder: ASTM E1745, Class A; one of the following: 1. "Stego Wrap 15 Mil Vapor Barrier" by Stego Industries, LLC (877-464-7834). 2. "Vapor Block 15" by Raven Industries (800-635-3456). 3. "Griffolyn 15 Mil Green" by Reef Industries, Inc. (800-231-6074). 4. "Perminator 15 Mil" by WR Meadows, Inc. (847-214-2100) 5. "Florprufe 120" by WR Grace (866-333-3726). F. Prefabricated Slab Construction Joints: Burke by Edoco "Keyed Kold Joint,"with splice plates, stakes, and driving accessories, or approved; depth 1/2 inch less than slab thickness, galvanized sheet metal tongue and groove joint form, with knockouts for passing reinforcing bars through. G. Preformed Joint Fillers: 1. Non-extruding type; ASTM D1751; Sonneborn "Expansion Joint Filler," WR Meadows "Sealtight Fiber", " Burke by Edoco "Fiber expansion Joint," or approved. 2. Joint Cap: Strippable plastic type; W.R. Meadows "SealTight Snap-Cap", Burke by Edoco"Joint Cap", or approved; width to match expansion joint filler material. TEMPLATE 033000-3 10/12/18 ISTARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 033000 -CAST-IN-PLACE CONCRETE I H. Finishing Aid: Evaporation retardant for preventing rapid drying during hot windy weather, Master Builders "Confilm." 2.6 CONCRETE MIX I A. Mix concrete in accordance with ASTM C94, and in accordance with the requirements indicated on the structural drawings. B. Admixtures: I 1. All concrete shall contain the specified water reducing or high range water reducing admixture, except[architectural concrete, jand concrete with a required water/cement ratio of 0.45 or lower shall contain a high range water reducing admixture. I 2. All concrete required to be air entrained shall contain air entraining admixture to produce 4% to 6% air. 3. All concrete placed in ambient temperatures from 40 degrees F to 20 degrees F, and all slab concrete placed in ambient temperatures below 50 degrees F, shall contain an accelerator at the I manufacturer's required dosage. 4. All concrete placed in ambient temperatures of 90 degrees F or above, shall contain a set retarder at the manufacturer's required dosage. I C. Provide 28 day compressive strengths as indicated on the Structural Drawings. Where not indicated on the Structural Drawings, provide minimum 3000 psi compressive strength unless indicated otherwise. I D. Fly Ash: A maximum of 50 percent by weight of cementitious materials. E. Fibrous Reinforcing: 1. Add fibrous reinforcing in concrete for installation in locations as indicated on the Structural Drawings. I 2. Add fibers at the rate recommended by the manufacturer for the application indicated, but not less than lbs per cu. yard of concrete. 3. Mix in accordance with manufacturer's instructions. I 2.7 REINFORCEMENT FABRICATION A. Fabricate as indicated and in accordance with ACI 315. IPART 3 - EXECUTION 3.1 EXAMINATION I A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. I B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 FORMWORK ERECTION IA. Verify lines, levels, and measurement before proceeding with formwork. Align form joints. B. Use plywood forms, unless other systems are approved by the Architect. I C. Use form coating on forms in accordance with the manufacturer's recommendations. Verify that form coatings will not affect the bond of subsequent concrete surface treatments. D. Coordinate with work of other Sections in forming and setting openings, slots, recesses, chases, I sleeves, bolts, anchors, and other inserts. E. Tolerances: Comply with ACI 117. I ITEMPLATE 033000-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033000 -CAST-IN-PLACE CONCRETE F. Architectural Concrete Forms: 1. Construct forms of high density overlay plywood. 2. Use coned form ties at an even spacing as approved by the Architect. 3. Additional Tolerance Requirements: In accordance with the additional requirements of ACI 301. Form surfaces at the joints between each panel shall be flush within a tolerance of plus or minus 1/16 inch. 4. Form Joint Seal for"Architectural" Concrete: Apply double face tape, not more than 1/16th inch thick to edges of form panels holding back from form surface at least 1/16 inch; apply continuous bead of silicone sealant for the length of the joint; tool sealant smooth and flush with adjoining contact surfaces. Wipe off all excess sealant. Fill flush all holes and imperfections in forming surface with sealant. 5. Rustication Strips: Glue or nail to form surfaces; set and fill nail holes; seal to surface of forms. 6. Form Reuse: Clean forms and repair all holes and damage; obtain approval of form for each reuse; formwork with patches and repairs affecting the appearance of concrete surfaces will not be accepted. G. Where earth forms are used, hand trim sides and bottoms of earth forms. Remove loose dirt. 3.3 UNDERSLAB VAPOR RETARDER A. Place, protect, and repair vapor-retarder sheets according to ASTM E 1643 and manufacturer's written instructions under all interior slabs-on-grade. B. Lap and seal all seams a minimum of 6 inches, seal around all penetrations, lap and seal against foundation walls and footings with manufacturer's recommended sealing tape or mastic. 3.4 REINFORCEMENT A. Place, support, and secure reinforcement against displacement. B. Locate reinforcing splices not indicated on the drawings at points of minimum stress. 1 C. Provide laps and concrete cover as indicated in the Drawings. 3.5 PLACING CONCRETE A. In accordance with ACI 301. B. Bonding Agent: Mix thoroughly and apply strictly in accord with the manufacturer's instructions; do not use when ambient temperature is below 45 degrees F. Place concrete in contact immediately while bonding agent is still tacky. 3.6 SUBSEQUENT TREATMENT FOR FORMED SURFACES A. Provide smooth form finish for concrete to remain exposed in the finished work; rough form finish for concrete to remain concealed in the finished work. B. Sandblast architectural concrete surfaces. Remove surface mortar only for paint adherence. Exact degree of bite shall be determined by the Architect. C. Where waterproofing or dampproofing is scheduled or indicated, grout fill all rock pockets, tie holes, and other surface imperfections to create a smooth surface ready to receive the membrane. Grind concrete fins and other surface projections flat with adjacent surfaces. 3.7 SLABS A. Expansion Joints for Slabs on Grade: 1. Place expansion joints at locations indicated and where exterior slabs abut concrete walls, the building perimeter, and other fixed objects abutting or within the slab area. 2. Form joints 1/2 inch wide x full depth of slab. 3. Form expansion joints with preformed joint filler. Install strippable joint at joints to receive sealant specified in Section 079200. 4. Tool expansion joints to 1/4 inch radius. 5. Discontinue reinforcing at the expansion joint or use sleeved dowels in accordance with the Structural Drawings. ' TEMPLATE 033000-5 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033000 -CAST-IN-PLACE CONCRETE ' B. Control Joints for Slabs on Grade: 1. Make joints straight; perpendicular or parallel to building lines and slab edges, as appropriate. 2. Control joints shall be saw cut, or tooled, unless indicated otherwise. ' 3. Radius tooled control joints to match expansion joints. 4. Control joints shall penetrate the slab a minimum of 1/4 the thickness of the slab and shall be 3/16 inch in width minimum. 5. Space control joints at the locations indicated, except when not indicated locate in at 32 times the slab thickness. 6. Align joints with column lines when ever possible. Joints shall form rectangular panels with the long side less than 1-1/2 times the length of the short side. Provide circular or diamond shaped joint lines around columns. Locate control joints at reentrant corners. Coordinate with placement ' of joints in tile flooring. C. Tooled Joints for Slabs on Grade: Provide tooled joints to match control joints. Tooled joints shall to penetrate the slab no more than 1/4 the depth of the slab. D. Construction Joints: Place at either expansion or control joint locations for slab on grade construction. E. Curing: 1. Moisture cure all concrete for a minimum of 7 days, unless approved or specified otherwise. 2. Use curing/sealing compound on concrete slabs scheduled to receive sealer. 3. Use waterproof sheet material or mats and burlap at surfaces to receive subsequent bonded finish materials. A curing compound may be used on surfaces to receive subsequent bonded finish materials, provided the curing compound is approved in writing by the manufacturer of the adhesive or the bonding finish material. Curing compound may also be used on surfaces to receive subsequent bonded finish materials, provided the curing compound is removed with shot blasting or other approved method prior to installation of bonded materials. ' 4. Apply curing compounds and curing/sealing compounds in accordance with the manufacturer's recommendations. 5. Maintain concrete temperatures above 50 degrees F. F. Finishes: 1. Full Trowel finish interior floor slab surfaces, unless specified otherwise. 2. Light steel trowel finish interior floor slab surfaces scheduled to receive tile or other similar bonded materials. ' G. Curing/Sealing Compound: Apply a second coat of curing/sealing compound to concrete slabs scheduled to receive sealer. Clean floor and apply just prior to substantial completion. Apply in accordance with the manufacturer's recommendations. H. Slab Tolerances: Provide Random Traffic floor tolerances as follows, when measured in accordance with ASTM E1155, including those floors to receive subsequent finishes. 1. Slab on Grade at Exposed Architectural Slabs: FF 40, FL 30, over test area; FF 30, FL 24, ' minimum local value. 2. Slabs on Grade to receive thinset flooring and resilient floor covering : FF 35, FL 25, over test area; FF 24, FL 17, minimum local value. 3. Slabs on Grade to receive carpet : FF 25, FL 20, over test area; FF 17, FL 15, minimum local ' value. 4. Slabs on Grade at non-public areas, subfloors under concrete topping, and thickset: FF 20, FL 15, over test area; FF 15, FL 10, minimum local value. ' 5. Slopes And Pitches To Drain: FF 15, minimum local value at each discreet plane as indicated on the Drawings; free from areas subject to puddling. ' END OF SECTION I TEMPLATE 033000-6 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033015-CONCRETE SLABS ON GRADE PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Cast-in-place concrete slabs on grade 2. Concrete accessories. 3. Formwork, shoring, bracing, and anchorage. 4. Concrete reinforcement. 5. Underslab vapor retarder. 6. Concrete sealer. B. Related Sections: 1. 003152 -Testing and Inspection Services: Owner paid testing and inspections. 2. 018100-Sustainable Design Requirements: LEED requirements. 3. 033514-Polished Concrete Flooring System 4. 079200-Joint Sealants: Expansion joint fillers. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Concrete Institute (ACI): 1. 117 - Standard Specification for Tolerances for Concrete Construction and Materials. 2. 301-10- Specifications for Structural Concrete. 3. 315 - Details and Detailing of Concrete Reinforcement. B. American Society for Testing and Materials (ASTM): 1. A615- Deformed and Plain Billet-Steel for Concrete Reinforcement. 2. C33- Specifications for Concrete Aggregates. 3. C94-Specifications for Ready Mixed Concrete. 4. C132-Test for Slump of Portland Cement Concrete. 5. C150- Specification for Portland Cement. 6. C156-Test Method for Water Retention by Concrete Curing Materials. 7. C171 - Specification for Sheet Materials for Curing Concrete. 8. C260 -Specifications for Air-Entraining Admixtures for Concrete. 9. C309-Specification for Liquid Membrane Forming Compounds for Curing Compounds. 10. C494 - Specifications for Chemical Admixtures for Concrete. 11. C618 - Specification for Fly Ash and Raw or Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete. 12. C939 -Test Method for Flow of Grout for Preplaced-Aggregate Concrete 13. C1107- Specification for Packaged Dry, Hydraulic-Cement Grout (Non-shrink) 14. C1315- Specification for Liquid Membrane-Forming Compounds Having Special Properties for Curing and Sealing Concrete. 15. D1751 - Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction. 16. E1155- Standard Test Method for Determining Floor Flatness and Levelness Using the "F Number" System. C. U.S. Army Corps of Engineers: CRD-C-621-83 - Specifications for Non-Shrink Grout. 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: Submit data for each accessory, admixture, and curing material proposed for the work. TEMPLATE 033015-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ' SECTION 033015—CONCRETE SLABS ON GRADE C. Shop Drawings: 1. Reinforcing: a. Detail reinforcing in accordance with ACI 315. Indicate reinforcement sizes, spacings, locations and quantities of reinforcing, bending and cutting schedules, splicing, and supporting and spacing devices. b. Indicate embedded items. 2. Slab Layouts: Dimension locations of control, expansion, and construction joints. Relate to ' building grid lines. D. Quality Control Submittals: 1. Mix Designs: Prior to concrete work, submit mix designs for approval. ' 2. Test Results: Submit test results per ASTM C311 performed less than 6 months prior to use for approval by Architect. 3. Certifications: Submit mill certificates for cement, aggregates, and reinforcing. 1.4 QUALITY ASSURANCE A. Perform work in accordance with ACI 301. B. Concrete work is subject to special testing and inspection as specified in 003152. Notify Architect at least 48 hours before concrete is poured. C. Pre-Installation Conference: 1. At least 35 days prior to start of concrete work the Contractor shall hold, in accordance with Section 013119, a meeting to review the detailed requirements of the concrete design mixes and to determine the procedures for producing proper concrete construction. 2. Required in attendance: a. Contractor's superintendent. b. Owner's construction manager c. Testing Laboratory representative. d. Concrete subcontractor. e. Ready-mix producer. f. Admixtures manufacturer's representative. g. Architect/Engineer h. All subcontractors with work to be installed in, or affected by, concrete work. 3. Notify Architect 10 days prior to the scheduled date of the meeting. ' 4. Agenda: Include the following. a. Installation scheduling and coordination; scheduling of mock-up construction and review. b. Classes of concrete required; mix designs; applicable references. ' c. Formwork. d. Reinforcement and placement. e. Climatic conditions; hot and/or cold weather concreting procedures (as appropriate); unusual placing conditions. f. Substrate preparation; placement methods; construction joints. g. Flatwork; flatness and levelness requirements; finishing; criteria for acceptance; remedies. h. Curing and protection procedures i. Site quality control; inspection and testing requirements. j. Sealers; locations and coverage rates. PART 2 - PRODUCTS ' 2.1 FORM MATERIALS A. Unless specified otherwise, conform to ACI 301. ' B. Plywood: APA B-B Plyform Class 1, EXT 2.2 REINFORCING A. Reinforcing Steel: 1. Types as indicated on the structural drawings. TEMPLATE 033015-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033015—CONCRETE SLABS ON GRADE B. Chairs, Bolsters, Bar Supports, and Spacers: Sized and shaped for strength and support of reinforcement during installation and placement of concrete. 2.3 CONCRETE MATERIALS A. Cement: ASTM C150, normal -Type 1 Portland, grey color. B. Fly Ash: ASTM C618, Class C or F; loss on ignition (LOI) not to exceed 1 percent. Use fly ash from one single source for the whole Project. C. Normal Weight Fine and Coarse Aggregates: ASTM C33; severe weather exposure. D. Water: ASTM C94, para. 5.1.3 2.4 ADMIXTURES A. Air-Entrainment: ASTM C 260; Master Builders Inc. "Micro-Air"or"MBVR", Euclid Chemical Co. "Air Mix,"or approved.• B. Water Reducer Normal: ASTM C 494, Type A; Master Builders Inc. "Pozzolith/Polyheed," Euclid Chemical Co. "Eucon WR 75," or approved. C. High Range Water Reducer(Superplasticizer): ASTM C 494, Type F or G and shall be of the second or third generation type. Shall be batch plant added, extend plasticity time, reduce water 20 to 30 percent. Master Builders Inc. "Rheobuild," Euclid Chemical "Eucon 37,"or approved. D. Accelerator: ASTM C 494, Type C or E, non-corrosive, non-chloride; Master Builders "Pozzutech 20," Euclid Chemical Co. "Accelgard 90," or approved. E. Set Retarder: ASTM C494, Type B. F. Shrinkage Reducing Admixture: Eclipse by W.R. Grace Company. ' 2.5 ACCESSORIES A. Bonding Agent: Acrylic type; Sonneborn "Sonnocrete", W.R. Grace "Duraweld C", Euclid Chemical Co. 1 "Flex-con", or approved. B. Non-Shrink Grouts: ASTM C1107, Grade B; non-shrink non-catalyzed natural aggregate grout; minimum compressive strength of 7000 PSI at 28 days; 25 to 30 second flow when tested in accordance with ASTM C939 at 45 to 90 degrees F; cement gray in color; Master Builders Inc. "Masterflow 928," Euclid Chemical Co. "HiFlow Grout," or approved. C. Form Release Coating: Water based type; VOC <150g/I; Nox-Crete "Utility Release," Cresset Chemical Company"Crete-Lease 20-VOC,"or approved; non staining. D. Curing Materials: 1. Waterproof Sheet Material: Waterproof paper in accordance with ASTM C171; reinforced waterproof kraft paper; white color at exterior applications; Burke Kraft Curing Paper Type I-SK- 30, or approved. 2. Mats and Burlap: Fabric covering composed of quilted polyethylene sheeting laminated to outer covering of burlap, cotton, or other approved fabric; outer covering shall weigh not less than 6 ounces per square yard. 3. Curing Compound: ASTM C309; clear or translucent with fugitive dye; moisture loss not more than 0.055 gr./sq.cm. when tested in accordance with ASTM C156 and applied in a single coat at the manufacturers recommended rate; maximum VOC content 100 g/L Curing compounds shall 111be proven compatible with subsequently applied floor finishing systems including waterproof membranes or removed in its entirety prior to flooring installation. 4. Curing/Sealing Compound: ASTM C309; water based curing compound; maximum VOC content 100 g/L. W. R. Meadows, Inc., Hampshire IL (800/342-5976); "Sealtight 100-Clear" or approved. E. Underslab Vapor Retarder: ASTM E1745, Class A; one of the following: 1. "Stego Wrap 15 Mil Vapor Barrier" by Stego Industries, LLC (877-464-7834). 2. "Vapor Block 15" by Raven Industries (800-635-3456). 3. "Griffolyn 15 Mil Green" by Reef Industries, Inc. (800-231-6074). TEMPLATE 033015-3 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033015—CONCRETE SLABS ON GRADE ' 4. "Perminator 15 Mil" by WR Meadows, Inc. (847-214-2100) 5. "Florprufe 120" by WR Grace (866-333-3726). F. Prefabricated Slab Construction Joints: Burke by Edoco"Keyed Kold Joint,"with splice plates, stakes, ' and driving accessories, or approved; depth 1/2 inch less than slab thickness, galvanized sheet metal tongue and groove joint form, with knockouts for passing reinforcing bars through. G. Preformed Joint Fillers: ' 1. Non-extruding type; ASTM D1751; Sonneborn "Expansion Joint Filler," WR Meadows"Sealtight Fiber", " Burke by Edoco "Fiber expansion Joint," or approved. 2. Joint Cap: Strippable plastic type; W.R. Meadows "SealTight Snap-Cap", Burke by Edoco "Joint Cap", or approved; width to match expansion joint filler material. H. Finishing Aid: Evaporation retardant for preventing rapid drying during hot windy weather, Master Builders "Confilm." 2.6 CONCRETE MIX A. Mix concrete in accordance with ASTM C94, and in accordance with the requirements indicated on the structural drawings. ' B. Concrete at slabs on grade shall have a maximum water/cement ration of 0.45. C. Admixtures: 1. All concrete shall contain the specified water reducing or high range water reducing admixture, except concrete with a required water/cement ratio of 0.45 or lower shall contain a high range water reducing admixture. 2. Provide air entraining admixture to produce air entrainment percentage specified in the structural drawings where required. ' 3. All concrete placed in ambient temperatures from 40 degrees F to 20 degrees F, and all slab concrete placed in ambient temperatures below 50 degrees F, shall contain an accelerator at the manufacturer's required dosage. 4. All concrete placed in ambient temperatures of 90 degrees F or above, shall contain a set ' retarder at the manufacturer's required dosage. D. Provide 28 day compressive strengths as indicated on the Structural Drawings. Where not indicated on the Structural Drawings, provide minimum compressive strength specified in the structural drawings ' unless indicated otherwise. E. Fly Ash: Maximum of 20 percent by weight of cementitious materials. t 2.7 REINFORCEMENT FABRICATION A. Fabricate as indicated and in accordance with ACI 315. PART 3 -EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. ' B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 FORMWORK ERECTION A. Verify lines, levels, and measurement before proceeding with formwork. Align form joints. B. Use plywood forms, unless other systems are approved by the Architect. TEMPLATE 033015-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 033015—CONCRETE SLABS ON GRADE C. Use form coating on forms in accordance with the manufacturer's recommendations. Verify that form coatings will not affect the bond of subsequent concrete surface treatments. D. Coordinate with work of other Sections in forming and setting openings, slots, recesses, chases, sleeves, bolts, anchors, and other inserts. E. Tolerances: Comply with ACI 117. F. Where earth forms are used, hand trim sides and bottoms of earth forms. Remove loose dirt. 3.3 UNDERSLAB VAPOR RETARDER A. Place, protect, and repair vapor-retarder sheets according to ASTM E 1643 and manufacturer's written instructions under all interior slabs-on-grade. B. Lap and seal all seams a minimum of 6 inches, seal around all penetrations, lap and seal against foundation walls and footings with manufacturer's recommended sealing tape or mastic. 3.4 REINFORCEMENT A. Place, support, and secure reinforcement against displacement. B. Locate reinforcing splices not indicated on the drawings at points of minimum stress. C. Provide laps and concrete cover as indicated in the Drawings. 3.5 PLACING CONCRETE A. In accordance with ACI 301. 1 B. Bonding Agent: Mix thoroughly and apply strictly in accord with the manufacturer's instructions; do not use when ambient temperature is below 45 degrees F. Place concrete in contact immediately while bonding agent is still tacky. 3.6 SLABS A. Expansion Joints for Slabs on Grade: 1. Place expansion joints at locations indicated and where exterior slabs abut concrete walls, the building perimeter, and other fixed objects abutting or within the slab area. 2. Form joints 1/2 inch wide x full depth of slab. 3. Form expansion joints with preformed joint filler. Install strippable joint at joints to receive sealant specified in Section 079200. 4. Tool expansion joints to 1/4 inch radius. 5. Discontinue reinforcing at the expansion joint or use sleeved dowels in accordance with the Structural Drawings. B. Control Joints for Slabs on Grade: 1. Make joints straight; perpendicular or parallel to building lines and slab edges, as appropriate. 2. Control joints shall be saw cut or tooled, unless indicated otherwise. 3. Radius tooled control joints to match expansion joints. 4. Control joints shall penetrate the slab a minimum of 1/4 the thickness of the slab and shall be 3/16 inch in width minimum. 5. Space control joints at the locations indicated, except when not indicated locate in at 32 times the slab thickness. 6. Align joints with column lines when ever possible. Joints shall form rectangular panels with the long side less than 1-1/2 times the length of the short side. Provide circular or diamond shaped joint lines around columns. Locate control joints at reentrant corners. Coordinate with placement of joints in tile flooring. C. Tooled Joints for Slabs on Grade: Provide tooled joints to match control joints. Tooled joints shall to penetrate the slab no more than 1/4 the depth of the slab. D. Construction Joints: Place at either expansion or control joint locations for slab on grade construction. TEMPLATE 033015-5 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 033015—CONCRETE SLABS ON GRADE I E. Curing: 1. Preferred: Moisture cure all concrete for a minimum of 7 days, unless approved or specified otherwise. l 2. Alternate: Curing/sealing compound on concrete slabs may be used where specified finish is polished concrete, provided the product is compatible with the polishing process. When required by the manufacturer, remove curing compound with shot blasting or other approved method prior to polishing. I 3. Use waterproof sheet material or mats and burlap at surfaces to receive subsequent bonded finish materials.. 4. Apply curing compounds and curing/sealing compounds in accordance with the manufacturer's recommendations. I 5. Maintain concrete temperatures above 50 degrees F. F. Finishes: Full Trowel finish interior floor slab surfaces, unless specified otherwise. I1. G. Curing/Sealing Compound: In accordance with specification section 033514. H. Slab Tolerances: Slabs: Class B in accordance with ACI 301. I I. Tolerance: Provide Random Traffic floor tolerances as follows, when measured in accordance with ASTM E1155, including those floors to receive subsequent finishes. 1. Slab on Grade at Exposed Architectural Slabs: FE 40, FL 30, over test area; FF 30, FL 24, I minimum local value. 2. Slabs on Grade to receive thinset flooring and resilient floor covering : FF 35, FL 25, over test area; FE 24, FL 17, minimum local value. I 3. Slabs on Grade to receive carpet : FF 25, FL 20, over test area; FF 17, FL 15, minimum local value. 4. Slabs on Grade at non-public areas, subfloors under concrete topping, and thickset: FE 20, I FL 15, over test area; FF 15, FL 10, minimum local value. END OF SECTION END OF SECTION I I I I I I I ITEMPLATE 033015-6 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 042113— BRICK MASONRY PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Face brick. 2. Reinforcement, anchorages, and accessories. 3. Related flashing. B. Related Sections: 1. 033000- Cast-In-Place Concrete: Structural backing. 1112. 042200 - Concrete Masonry Units: CMU, coordination of installation with exterior brick veneer. 3. 051200 - Structural Steel Framing: Relieving angles. 4. 054000 - Cold-Formed Metal Framing: Structural stud supports. 5. [071900 -Water Repellents: Requirement for cleaning and installation of coatings under brick masonry subcontract.] 6. 072700—Weather Resistive Barriers: Air barriers; wall underlayment; flexible flashing. 7. 076200 - Sheet Metal Flashings and Trim: Sheet metal receivers furnished for installation under this Section; requirements for metal flashing provided under this Section. 8. 079200-Joint Sealants: Backer rod and sealant at control and expansion joints. 9. 081113 - Hollow Metal Doors and Frames: Metal frames to be built in. 10. 092843 - Gypsum Sheathing 11. Division 22 - Plumbing: Pipe penetrations. 12. Division 26- Electrical: Conduit penetrations. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. Requests for substitution of brick/manufacturer shall be accompanied by samples representative of proposed color, listing of projects of type and scope similar to that of this project, and production schedule information sufficient to demonstrate plant capacity to meet project scheduling requirements. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C91 - Masonry Cement. 2. C216 - Facing Brick. 3. C270 - Mortar for Unit Masonry. 4. C476 - Grout for Reinforced and Non-reinforced Masonry. B. International Masonry Industry All-Weather Council (IMIAWC): Recommended Practices and Guide Specifications for Cold Weather Masonry Construction. ' 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: 1. Submit for all accessory components, mortar mixes, and additives. 2. Submit for attachment system, anchorage devices, fasteners, and reinforcing wire. C. Shop Drawings: As necessary to completely describe shapes and configurations of brick veneer system, including the following: 1. Brick schedule, including special shapes not indicated on the Drawings 2. Complete facade elevations, minimum 1/8" = 1'-0" scale, showing coursing patterns and locations, and referenced and annotated as necessary to identify locations of special conditions. 3. Elevations of openings and special conditions, minimum 1/4" = 1-0" scale, as necessary to describe coursing details at edges and terminations. TEMPLATE 042113-1 10/12/18 ' STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 042113— BRICK MASONRY I 4. Section, minimum 3/4" = 1.-0"scale, of typical relieving angle, support provisions for flashing, special brick, sealant, weep holes, back-up and anchorage. 5. Sections through brick veneer, minimum 3/4" = 1'-0" scale, to completely describe the following. I a. Locations and configurations of sealant joints. b. Special conditions at relieving angles. c. Corners and changes in plane. d. Opening head jamb and sill details. I e. Anchorage (including special tie configurations and orientations) at soldier courses,jambs, control joints, and atypical wall cavity conditions. f. Expansion joint covers at brick veneer. 6. Requirements for field cuts. D. Samples: 1. Bricks: Minimum 6 samples of each brick type and color proposed for the work. a. Furnish samples from proposed supply source. I b. Submit quantity of bricks as required to represent extreme range of color and finish of brick to be furnished. c. Maintain approved samples which have been returned to the Contractor at the site for comparison purposes. I 2. Mortar a. Three cured samples of mortar proposed for the work. b. Furnish cured sample of approved exterior masonry veneer mortar to Section 079200 for I color matching. E. Quality Control Submittals: 1. Certifications: I a. Concurrent with initial sample submittals, submit manufacturer's certificate that masonry, and reinforcing, meet or exceed specified requirements. b. Submit manufacturer's certification that mortar and grout meet the specified requirements. c. Certification that blast furnace slag, if proposed for use under this Section, is free from I unacceptable content of hazardous materials. 2. Mortar and Grout Mix Designs: Submit mix designs; include 28 day compressive strength for grout. I 1.4 QUALITY ASSURANCE A. Comply with applicable Building Code and recommendations of IMIAWC for cold weather masonry construction. I B. Work of this Section is subject to testing and inspection as specified in Section 003153. C. Pre-Installation Conference: 1. In accordance with Section 013119, schedule and administer a pre-installation meeting minimum I of 7 calendar days prior to commencement of work of this Section. 2. Require in attendance the following parties: a. Owner's representative. b. Architect. I c. Contractor's superintendent. d. Masonry installer. e. Water repellent installer. Other parties as appropriate or affected by work of this Section. If. 3. Agenda: a. Review composite masonry mock-up. b. Review climatic conditions, including procedures and protection for wet weather, cold I weather, and hot weather construction. c. Review coordination, sequence, and installation procedures with adjacent work. d. Review masonry tolerances, rough openings,joint sizes,joint tooling, and clearances to adjacent components. I e. Review relieving angle placement and layout. f. Review layout and locations of anchorage/tie systems and associated gaskets. ITEMPLATE 042113-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 042113— BRICK MASONRY ' g. Review masonry flashing requirements, including proper installation of flexible flashings and metal receiver/flashing systems furnished from Section 076200. h. Review methods and procedures to keep cavities free of mortar droppings. i. Review control joint locations and construction. j. Review installation procedures for building paper, including sealing of penetrations and sealing of rips, tears, and other similar defects. k. Review cleaning procedures and application of water repellent treatment. I. Review quality control and mixing procedures for mortar and grout. m. Review testing and inspection procedures. 1.5 SUBCONTRACTOR GUARANTEE A. Furnish Subcontractor Guarantees in accordance with Section 017700. 1.6 DELIVERY, STORAGE, AND HANDLING A. In accordance with Section 016000. B. As bricks are unloaded and made ready for use, compare units with job samples for appearance and quality. Reject and return broken, damaged, battered or non-conforming brick. C. Store masonry units off ground to prevent contamination by mud, dust, or materials likely to cause staining or other defects. 1.7 ENVIRONMENTAL CONDITIONS A. Wet Weather: Provide suitable cover over work exposed to weather, protect materials. Maintain cover over finished work for 48 hours after completion. B. Cold Weather: When outside temperature is below 40 degrees F, or is expected to fall below freezing within 48 hours (Weather Bureau forecast), heat materials and provide suitable enclosures to maintain temperatures above 40 degrees F for masonry work in-place and for 48 hours after completion. Obtain approval of methods of protection before proceeding. PART 2 - PRODUCTS 2.1 EXTERIOR FACE BRICK A. Approved Manufacturers, subject to the specified requirements: 1. Glen Gery Corp., Wyomissing, PA; 610-374-4011. 2. Mutual Materials Company, Bellevue WA; 206-455-2869. 3. The Belden Brick Company, Canton OH; 216-456-0031. 4. Acme Brick Company, Fort Worth TX; 800-792-1234. B. Standard: Conform to ASTM C216 Type FBS, Grade SW. C. Sizes: 1. Furnish 3-1/2"x 3-1/2"x 11-1/2" (4"x12" nominal face size), 3-5/8"x 3-5/8"x 11-5/8' not acceptable. 2. Furnish special shapes as indicated. D. Color and Finish: Match color and finish listed in the Exterior Finish Schedule. E. Fabricate each brick type in one continuous operation with the exact same materials, equipment, and conditions to assure uniformly matching brick. 2.2 ACCESSORIES A. Mortar: One of the following: 1. ASTM C270, Type M unless indicated otherwise; portland cement-lime type with pigments B. Coloring Pigments: As manufactured by Davis Colors (Los Angeles, CA; 800-356-4848), LM Scofield Co. (Los Angeles, CA; 800-800-9900), Solomon Grind-Chem Service Inc. (SGS) (Springfield, IL; 800- 624-0261), or approved; color match as selected by the Architect from approved manufacturer's standard line. TEMPLATE 042113-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 042113— BRICK MASONRY C. Grout: In accordance with ASTM C476; 2000 psi compressive strength. D. Attachment System: 1. Basis of Design: a. For Attachment to Steel Framed Walls: Hohmann & Barnard, Inc. "DW-10 Seismiclip Interlock System," including 12 gage "X-Seal" attachment anchor with "X-Seal Tape" gasket, 3/16 inch "Byna-Tie," "Seismiclip," and 9 gage wire; hot dip galvanized. b. For Attachment to Concrete Walls: Hohmann & Barnard, Inc. "305 Dovetail Slot"for embedment in concrete walls; or"315-BT Flexible Dovetail," and "Seismiclip," and 9 gage reinforcing wire; hot-dip galvanized. Furnish dovetail slot to Section 033000 for embedment. E. Reinforcing Wire: Continuous 9 gage wire. F. Fasteners: 1. For Steel Framed Walls: No. 12 minimum galvanized self drilling type with neoprene washers, for attachment of anchors through sheathing into metal framing. ' 2. For Concrete Walls: Hilti Fastening Systems Item No. 661397 "Metal Hit," Rawlplug Co. "Rawl Zamac Nailin" or approved; 1/4 inch diameter x length required for minimum 3/4" embedment; galvanized. 3. Finishes: Hot dip galvanized. G. Plastic Weeps: Rectangular type; 3/8 inch width x brick height; louvered or honeycombed. H. Cavity Drainage Insert: Hohmann & Barnard, Inc.; castellated "Mortar Net;"thickness equal to depth ' of cavity. I. Flashing: 1. Concealed Flashing: Bonded copper; minimum 3 oz/sf copper sheet, bonded on both sides by asphalt to heavy waterproofed creped kraft paper; York Manufacturing, Inc. "Cop-R-Tex Duplex," or Afco Products, Inc. "Cop-A-Bond Duplex." 2. Embedded Flashing/Receivers, Partially Exposed: Stainless steel, as furnished from Section 076200. PART 3 -EXECUTION 3.1 PREPARATION A. Verify adjacent work is ready to accept the work of this Section; verify that items provided by other Sections are properly sized and located. Commencement of masonry work constitutes acceptance of adjacent and underlying construction. Immediately notify Architect of all deficiencies. B. Verify that weather resistive barrier and flashings are installed correctly and ready to receive masonry work. C. Establish lines, levels, and coursing. Protect from disturbance. D. Provide temporary bracing during erection of masonry work. Maintain in place until building structure provides permanent bracing. 3.2 MORTAR AND GROUT MIXING A. Thoroughly mix mortar and grout ingredients in quantities needed for immediate use in accordance with the referenced standards. B. Add approved admixtures in accordance with manufacturer's instructions. Provide uniformity of mix and coloration. C. Do not use alcohol or chloride-based anti-freeze compounds to lower the freezing point of mortar or grout. D. If water is lost by evaporation, retemper mortar within 2 hours of mixing. Do not retemper mortar after 2 hours of mixing. E. Use no lime in grout. TEMPLATE 042113-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 042113— BRICK MASONRY I 3.3 INSTALLATION ' A. Anchorage System: 1. Coordinate with installation of flashing materials and relieving angles. 2. Install attachment system as indicated. Where not indicated, place each attachment anchor at 16 inches on center vertically along each stud for steel studs at 16 inches on center. 3. Steel Stud Framed Walls: a. Install gasket over sheathing and building paper in continuous vertical strips at each stud location to receive anchors. b. For steel studs 16 inches o.c., place each attachment anchor at maximum 18 inches o.c. vertically along each stud, as necessary to correspond to masonry coursing, and to special conditions, as indicated. Space anchors for support of maximum 2 sf veneer area per anchor. Where anchor channel is used in lieu of individual anchors, fasten channels to studs, maximum 16 inches o.c., with self drilling fasteners at maximum 12 inches o.c. 4. CMU Back-Up: As specified in Section 042200. 5. Relieving Angles: Install anchors as necessary to permit placement of tie in mortar joint between second and third courses above relieving angles and other veneer support structures, and in first joint below each angle, regardless of distribution otherwise required. 6. Furnish additional anchors at top courses, openings, corners, at each side of expansion joints, and at other special conditions, as necessary to provide secure anchorage of the veneer. Install anchors at Anchors at openings and at expansion joints shall be installed in horizontal joints at 8 inches on center vertically at brick running bond and maximum vertical spacing of 12 inches on center at soldier courses, at horizontal spacing of 16 inches on center in vertical joints at soldier courses not stabilized by mortar set masonry above (immediately below relieving angles and copings). 7. Dovetail anchors which are not embedded in concrete shall be spaced 16 inches on center horizontally, attached to concrete with 1/4 inch galvanized expansion anchors at 12 inches o.c. maximum. B. Placing and Bonding: 1. Lay masonry elements in full bed of mortar, properly jointed with other work. Buttering corners of joints, and deep or excessive furrowing of mortar joints are not permitted. 2. Do not use units which are allowed under ASTM C216 to exceed chippage, distortion, or size variation limits for brick type specified, except in areas where such defects are concealed from view. 3. Select brick to maintain a uniform distribution of colors across the veneer surface, without obvious patterns, repeats, or color concentration in any area. 4. Do not shift or tap masonry units after mortar has taken initial set. Where adjustment must be made, remove mortar and replace. 5. Remove excess mortar. 6. Bonding fresh masonry to set, or partially set, masonry: a. Remove loose mortar. Keep drainage cavity free of mortar droppings. b. Clean and lightly wet exposed surface of set masonry prior to laying fresh masonry. 7. Except as otherwise indicated, tool mortar joints to a uniform concave profile where exposed in the finished work; cut joints flush at concealed locations, including joints concealed in the cavities. C. Ties: 1. Install ties and anchorage clips in sequence with masonry installation. 2. Provide continuous 9 gage reinforcing wire engaged into the anchorage clips. Lap 9 gage wire as recommended by the anchorage system manufacturer. 3. Set ties and reinforcing wire in a bed of mortar and cover with mortar for secure and complete embedment. D. Coursing: 1. Place masonry to lines and levels indicated. 2. Maintain masonry courses to uniform height. 3. Lay brick masonry units in patterns indicated on the Drawings to modular dimensions indicated. TEMPLATE 042113-5 10/12/18 ISTARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 042113— BRICK MASONRY IE. Provide cleanouts at each course support as necessary to maintain cavities free of droppings. F. Cutting and Fitting: 1. Cut and fit masonry units to form the configurations indicated, and as required to fit the work of I other sections. Saw masonry units requiring cutting with a masonry saw. Coordinate fully with other sections of work to ensure correct size, shape and location. 2. Cut or block out chases for other trades as directed by other trades at time of masonry work. I 3. Obtain Architect's review prior to cutting or fitting any area which is not indicated on drawings, or which may impair appearance or strength of masonry work. 4. Do not cut faces exposed to weather. G. Flashing: I 1. Coordinate with requirements of Sections 072700 and 076200. 2. Clean contact surfaces of masonry smooth and free from projections which might puncture or otherwise damage flashing material. I 3. Install sheet metal flashing at locations where daylighted through-wall flashing is indicated. Position flashing accurately to within 1/8 to 1/4 inch of face of brick. 4. Metal Flashing: a. Lap flashing a minimum of 4 inches; interlock joints in deformed flashing to the greatest I reasonable extent. Use lap sealant at lap joints. b. Punch flashing neatly and seal at all penetrations. c. Dam flashing at expansion and control joints and at ends of lintels, by turning up the flashing a minimum of 4 inches. I d. Set masonry over flashing in a thin bed of mortar. 5. Flexible Flashing: a. Prior to installation of flashing, apply manufacturer's primer over gypsum sheathing, I concrete, masonry and all other substrates as recommended by manufacturer and in accordance with manufacturer's recommendations. b. Except where metal flashing is required, install flexible flashing at relieving angles by adhering flashing toe edge 1/4 to 3/8 inch from the face of the brick in order to expose I sufficient brick surface for adherence of sealants specified in Section 079200. Extend flashing back to adhere to relieving angle and up onto substrate a minimum of 1-1/2 inches above top of relieving angle vertical leg. Extend under"building paper" at steel stud framed walls. At dampproofed walls, adhere directly to dampproofing and terminate top edge of I flashing with a troweled bead of mastic. c. Where relieving angles are bolted in place, form flashing over bolts. d. Dam flashing at expansion and control joints and at ends of lintels, by turning up the flashing a minimum of 4 inches. I e. Set brick over flashing in thin a bed of mortar. Do not bridge joint between bricks above and below the relieving angle. H. Weepholes: I 1. Provide weep openings in head joints in first course immediately above all flashing. 2. Install plastic weeps at locations indicated. 3. Maximum spacing: 2'-0" o.c. 4. Keep weepholes and area above flashing free of mortar droppings. II. Mortar Net: After installation of first course of brick above flashing, fill cavity above flashing with cavity drainage insert. I J. Expansion/Control Joints: 1. Provide expansion/control joints as indicated. 2. Keep joints clear of mortar. 3. Provide expansion joints directly below relieving angles; clean joints in sequence with I construction to prevent mortar bridges between angle and top of brick. 4. Provide vertical joints at all inside corners in brick veneer and at other locations as indicated on the Drawings. 5. Joint Width: Match typical mortar joint. 1 6. Installation of backer rod and sealant are specified in Section 079200. ITEMPLATE 042113-6 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 042113— BRICK MASONRY I 7. Do not continue masonry reinforcing across expansion/control joints. I K. Masonry Lintels: Contractor shall have the option to prefab units and hoist into place, of fabricate in- place. Refer to the Structural Drawings for steel reinforcing and concrete fill requirements. L. Double-Wythe Grouted Walls: Install ladder ties at every third course. ' M. Build-in Work: 1. As work progresses, build-in hollow metal frames, window frames, steel lintels, shelf angles, nailing strips, anchor bolts, plates, and other similar items supplied by other trades. 2. Build-in items plumb and true. 3. Bed anchors of hollow metal frames in mortar joints. Fill frame voids solid with mortar. Fill masonry cores with grout minimum 12 inches from framed openings. N. At the end of each days work, stop off horizontal runs by stepping back each course; toothing is not permitted, except at toothed control joints where indicated. O. Tolerances: 1. Maximum Variation From Plumb: a. In lines and surfaces of columns, walls and arrises: 1) 1/4 in. in 10 ft. 2) 3/8 in. in any story or 20 ft. maximum. 3) 1/2 in. in 40 ft. b. For external corners, expansion and control joints and other conspicuous lines: 1) 1/4 in. in any story or 20 ft. maximum. 2) 1/2 in. in 40 ft. 2. Maximum variation from level or grades for exposed lintels, sills, parapets, horizontal grooves, and other conspicuous lines: 1/4 in. in any bay or 20 ft. 3. Maximum variation of linear building line from an established position in plan and related portions of columns, walls and partitions: a. 1/2 in. in any bay or 20 ft. maximum. b. 3/4 inch in 40 ft. 4. Head Joints: Plus or minus 1/8 inch. 3.4 POINTING AND CLEANING A. Cut out defective joints and holes in exposed masonry and repoint with mortar. B. Dry brush masonry surface after mortar has set at end of each day's work and after final pointing. C. Final cleaning is specified in Section 071900. D. Leave work area and surrounding surfaces clean and free of mortar spots, droppings, and broken masonry. 3.5 PROTECTION A. Protect finished installation under provisions of Section 015000. 1 B. Protect face materials, sills, ledges, and offsets from mortar drippings or other damage during construction. C. Maintain protective boards at exposed external corners which may be damaged by construction activities. D. At day's end, cover unfinished walls to prevent moisture infiltration. 3.6 Delete the following Article of water repellant coating is not used. 3.7 WEATHERPROOFING A. Water repellent coating is specified under Section 071900. 1 END OF SECTION TEMPLATE 042113-7 10/12/18 1 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 051200 -STRUCTURAL STEEL FRAMING I PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: I1. Elements indicated on the Structural Drawings, including the following: a. Structural steel. b. Structural welding. c. Baseplate grouting. 2. Priming of structural steel. B. Related Sections: 1. 014500 - Quality Control: Requirements for testing and inspection. 2. 033000-Cast-In-Place Concrete: Placement of structural steel to be embedded in concrete. 3. 053100 -Steel Decking. 4. 055000 - Metal Fabrications: Steel fabrications not indicated on the Structural Drawings. 5. 099000 - Painting: Field painting of structural steel elements. C. Drawings, the provisions of the Agreement Conditions of the Contract, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Institute of Steel Construction (AISC): 1. Specification for Structural Steel Buildings, 2010. 2. Code of Standard Practice for Steel Buildings and Bridges, 2010. 3. Manual of Steel Construction, 14th Edition 2010. 4. Specifications for Structural Joints Using ASTM A325 or A490 Bolts, 2014. B. American Society for Testing and Materials (ASTM): 1. A36-Structural Steel. I 2. A108- Steel Bars, Carbon, Cold-Finished, Standard Quality. 3. A569 - Steel, Carbon (0.15 Maximum, Percent), Hot-Rolled Sheet and Strip, Commercial Quality. 4. A572 - High-Strength Low-Alloy Columbium-Vanadium Steels of Structural Quality. 5. A992 - Standard Specification for Steel for Structural Shapes For Use in Building Framing 1 6. A1085-Standard Specification for Cold-Formed Welded Carbon Steel Hollow Structural Sections (HSS) 7. C1107 - Packaged Dry, Hydraulic-Cement Grout (Nonshrink). C. American Welding Society(AWS): D1.1 - Structural Welding Code - Steel. D. Steel Structures Painting Council (SSPC): "Steel Structures Painting Manual, Volume 2, Systems and Specifications." M 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: I1. Shop applied primers. 2. Non-shrink grout. C. Shop Drawings: ' 1. Indicate profiles, sizes, spacing, and locations of structural members, connections, attachments, fasteners, cambers, loads. 2. Indicate welded connections using standard AWS welding symbols. Indicate net weld lengths. 3. Indicate types and locations of field welds. 4. Indicate members to be shop primed. TEMPLATE 051200-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 051200 -STRUCTURAL STEEL FRAMING D. Quality Control Submittals: 1. Certifications: Submit certification of materials with copies of mill reports for each heat of steel used. 1.4 QUALITY ASSURANCE A. The work of this Section is subject to testing and inspection as specified in Section 014500. B. Use only certified welders approved by the jurisdictional code authorities. C. Unless specified or indicated otherwise, work shall comply with AWS and AISC Standards. PART 2 - PRODUCTS 2.1 STRUCTURAL STEEL 111 A. Types as indicated on the Structural Drawings. 2.2 ACCESSORIES I A. Non-Shrink Grout: BASF "Masterflow 713 Plus," Sonneborn "Sonogrout,"or approved; non-shrink, non-metallic grout in compliance with ASTM C1107; minimum compressive strength 5,000 psi. 111B. Welding Electrodes: E-70 series, low hydrogen, appropriate for use. C. Interior Primer: Modified alkyd type; lead and chromate free; gray or white color; one of the following unless approved otherwise. 1. "Azeron Primer Series 88HS" by Tnemec Company Inc. (Kansas City, MO; 816-483-3400). 2. "Amercoat 5105" by Ameron Protective Coatings (Brea, CA; 714-529-1951). 3. "Carbocoat 150HG" by Carboline Company(St. Louis, MO; 314-644-1000; 800-848-4645). D. Exterior Primers: Two-coat priming for exterior structural steel exposed in the finish work: I 1. First Primer: One of the following; provide product from same manufacturer selected for finish systems specified in Section 099000. a. "Series 394 PerimePrime" by Tnemec Company Inc. (Kansas City, MO; 816-483-3400). b. "Carbozinc 859" by Carboline Company(St. Louis, MO; 314-644-1000; 800-848-4645); 111 organic zinc-rich epoxy primer. c. "68HS" by Ameron Protective Coatings (Brea, CA; 714-529-1951); organic zinc-rich epoxy primer. d. "Catha-Coat 302H" by ICI Devoe; "reinforced" inorganic zinc-rich epoxy primer. 2. Epoxy Tie-Coat Primer: One of the following; provide product from same manufacturer selected for first primer specified above: a. "Hi-Build Epoxoline II" Series N69 by Tnemec Company Inc. (Kansas City, MO; 816-483- 3400). b. "Carboline 888 " by Carboline Company(St. Louis, MO; 314-644-1000; 800-848-4645); organic zinc-rich epoxy primer. ' c. "Amercoat 385." by Ameron Protective Coatings (Brea, CA; 714-529-1951); organic zinc-rich epoxy primer. d. "Devran 224HS," "Bar-Rust 231,"or"Bar-Rust 233H." by ICI Devoe; "reinforced" inorganic zinc-rich epoxy primer. 2.3 FABRICATION A. Fabricate structural steel items in accordance with AISC and AWS Standards and in accordance with approved shop drawings. Properly mark and match-mark all materials for field assembly. Fabricate for delivery sequence that will expedite erection and minimize field handling. B. Shop Assembly: Fabricate units in as large a part or section as practicable. C. Standard Shop Primer Application: 1. Preparation: Remove rust and scale by wire brushing, scraping, and sanding down to bare metal in accordance with SSPC-SP2 and SP3. Where SP2 and SP3 measures are insufficient, provide commercial blast cleaning in accordance with SSPC-SP6. TEMPLATE 051200-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 051200 -STRUCTURAL STEEL FRAMING II 2. Application: Spray apply primer in accordance with manufacturer's recommendations, mil minimum dry film thickness. 3. Shop Primer: Shop prime all steel except: a. Steel encased in concrete. b. Surfaces to be field welded. c. Contact surfaces at high-strength bolts. d. Members which will be concealed by interior finishes. e. Surfaces to receive other special shop primers. D. Special Shop Primer Application: 1. Prepare surfaces in accordance with the manufacturer's recommendations, and as specified below. 2. Solvent clean in accordance with SSPC SP-1; near white blast ungalvanized ferrous metal surfaces in accordance with SSPC SP-10. 3. Spray apply one coat organic zinc primer and one intermediate coat epoxy primer in accordance with the manufacturer's recommendations. Apply primers to receive field application of finish coats as specified in Section 099000. 4. Both primer coats shall be mill or shop applied. 5. Maintain condition of primers at all times during installation. Immediately patch damaged coatings. PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 ERECTION ' A. Embedded Items: Provide anchor bolts and templates, and other items as indicated, to other Sections for installation prior to placement of cast-in concrete. B. Temporary Shoring and Bracing: Provide as required with connections of sufficient strength to bear imposed loads. Remove temporary members when permanent members are in place and final connections are made. C. Erect structural steel in accordance with approved shop drawings and AISC "Code of Standard Practice," Section 7. D. Welds shall be in accordance with AWS D1.1. E. Cut holes by drilling only. F. Tolerances: Maximum deviation from plumb, level, and alignment shall not exceed 1 to 500. G. Base Plate Grouting: Set on leveling nuts to accurate elevations and grout solid with non-shrink grout. H. Cleaning and Touch-Up: 1. Clean steel of oil or other contaminants as specified under Fabrication. 2. Columns, beams, girders, and other members which are to receive sprayed-on fireproofing shall be cleaned free of loose rust, heavy mill scale, oil, dirt or other foreign substances prior to application of fireproofing materials. I TEMPLATE 051200-3 10/12/18 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 051200 -STRUCTURAL STEEL FRAMING I 3. Immediately after erection, clean field welds, bolted connections, and abraded areas and touch- up factory primed surfaces with same primer as used in shop; touch-up galvanized surfaces with zinc-rich primer. END OF SECTION 1 1 1 1 1 I 1 I 1 1 I 1 1 I TEMPLATE 051200-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 053100 -STEEL DECKING PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Steel deck and accessories. B. Related Sections 1. 051200 -Structural Steel Framing: Support framing. 2. Division 22 - Plumbing: Sleeves for conduit and pipe penetrations. 3. Division 26- Electrical: Sleeves for conduit and pipe penetrations. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. A653 - Specification for Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Galvanized Process, Structural (Physical Quality). 2. A780 - Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings. B. American Welding Society(AWS): D1.3- Structural Welding Code Sheet Steel. C. Steel Deck Institute (SDI): Design Manual for Composite Decks, Form Decks, Roof Decks. D. International Code Council (ICC) 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: Product literature and recommended installation instructions for metal decking, including verification of gravity load and shear capacities. C. ICC-ES report, confirming compliance of metal deck with regulatory fire-resistance requirements. 1.4 QUALITY ASSURANCE A. Work of this Section is subject to testing and inspection as specified in Section 014500. B. Erector Qualifications: Minimum of 5 years experience on comparable steel deck installations. C. Requirements of Regulatory Agencies: Metal deck shall be fabricated and installed to meet requirements of the International Building Code as amended by the local jurisdiction. D. Roof deck system shall be capable of resisting shear loads noted on the structural drawings. E. Welders: Approved by the local jurisdictional authorities. F. Refer to Structural Drawings for loads and additional requirements. 1.5 PRODUCT HANDLING A. In accordance with Section 016000, and as follows: 1. Store off ground with one end elevated for drainage. 2. For storage over extended periods of time, cover deck with waterproof material. r I TEMPLATE 053100-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 053100 -STEEL DECKING PRODUCTS 1 1.6 COMPONENTS A. Steel Deck: 1. Unless otherwise specified on the Structural Drawings, provide, as a minimum, ASTM A653, SS Grade 33. Galvanized coatings as follows a. Concealed locations: A40 or G60, minimum. b. Deck with surfaces to be permanently exposed to view in exterior locations (surfaces to be painted): A60, minimum. 2. Fabricate deck in accordance with SDI Design Manual. 3. Furnish deck of depth and profile indicated on the structural drawings. Where gage of deck is not shown, furnish deck capable of supporting design loads indicated on the structural drawings with detailed support conditions. Maximum deflection L/360, unless otherwise indicated.] B. Accessories: 1. Cover Plates and Closures: Fabricate from same material as metal deck. Configure to match contour of deck units, for tight fitting closure of sides and ends of decks. 2. Weld Washers: Per manufacturer's recommendations. C. Galvanizing Touch-up Paint: 1. Meeting the Green Seal GS-11 requirements and compatible with subsequent field applied paint coating systems. 2. Approved ZRC Chemical Products Company"ZRC Zero VOC," or approved. PART 2 - EXECUTION 2.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of conditions as satisfactory. 2.2 INSTALLATION A. Install metal deck units as indicated, and in accordance with the deck manufacturer's instructions. B. Install deck with minimum 2 inch bearing unless indicated otherwise. Install roof deck with minimum end laps of 2 inches, centered over the supports. C. Place deck units flat and square; secure to framing without warp or deflection. D. Perform welding in accordance with AWS D1.3. 1 E. Cutting and Fitting: Cut deck units for all penetrations. Make cuts neat, square, and trim. F. Install closures at open ends and sides of deck units as indicated, and as required to retain concrete fill. G. Touch-up Painting: Retouch field welds and scratched or damaged galvanizing with galvanizing repair paint, in accordance with ASTM A780 and the paint manufacturer's recommendations. END OF SECTION I I TEMPLATE 053100-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 055000 - METAL FABRICATIONS I PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Fabricated metal items indicated on the Architectural Drawings. B. Related Sections: 1. 033000 -Cast-In-Place Concrete:: Embedment of metal fabrications; fill at pipe bollards. 2. 042000 - Concrete Unit Masonry: Building in of metal fabrications. 3. 099000 - Painting: Field painting of metal fabrications shop primed in this section. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. ' D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. A36- Specification for Structural Steel. 2. A53- Specification for Welded and Seamless Steel Pipe. 3. A123- Specification for Zinc(Hot-Dip Galvanized) Coatings on Iron and Steel Products. 4. A143- Safeguarding Against Embrittlement of Hot Dipped Galvanized Structural Steel Products and Procedures for Detecting Embrittlement. 5. A153- Specification for Zinc Coating (Hot Dip)on Iron and Steel Hardware. 6. A167- Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip. 7. A269- Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service. 8. A307 - Specification for Carbon Steel Externally Threaded Standard Fasteners. 9. A312 - Specification for Seamless and Welded Austenitic Stainless Steel Pipe. 10. A366 - Specification for Carbon Steel Cold Rolled Sheet. 11. A384 -Safeguarding Against Warpage and Distortion During Hot Dip Galvanizing of Steel Assemblies. 12. A385- Providing High Quality Zinc Coatings (Hot Dip). 13. A500 - Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes. 14. A501 - Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing. 15. A569- Specification for Commercial Quality Hot Rolled Sheet and Strip Carbon (0.15 Maximum Percent) Steel. 16. A570- Specification for Hot-Rolled Carbon Steel Sheet and Strip, Structural Quality. ' 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Literature: Submit product literature for all prefabricated products. C. Shop Drawings: 1. Show details of fabrication and installation; indicate materials, thicknesses, dimensions, methods of reinforcement and embedment, attachments, shop finishes, provisions for work of other trades, and other pertinent information as requested by Architect. 2. Indicate sizes and locations of holes or lifting lugs and air vent holes required for hot dip galvanizing. ' D. Closeout Submittal: 1. In accordance with Section 017700. 1.4 QUALITY ASSURANCE ' A. Fabricator Qualifications: Experienced and regularly engaged in producing metal fabrications of the type specified; must employ only skilled personnel using proper equipment to produce work. TEMPLATE 055000-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 055000 - METAL FABRICATIONS PART 2 - PRODUCTS $ 2.1 MATERIALS A. Carbon Steel: 1. Structural Shapes, Plates, and Bars: ASTM A36. 2. Sheet: ASTM A366. 3. Pipe: ASTM A53, seamless, Type S, plain end; schedule 40 unless indicated otherwise. 4. Tubing: ASTM A500 or A501, seamless. B. Stainless Steel: ASTM A167 Type 302 or 304. C. Fasteners: Types as indicated, specified, or required for the assembly and installation of fabricated items. 1. Bolts: ASTM A307, unless indicated otherwise; include nuts and plain hardened washers. 2. Drilled-In Concrete Anchors: Ramset"Trubolt Stud Anchor," Hilti Fastening Systems "Kwikbolt," or approved. D. Interior Shop-Applied Primer: Modified alkyd type (VOC compliant); lead and chromate free; gray or white color; one of the following unless approved otherwise. 1. "Azeron Primer Series 88HS" by Tnemec Company Inc. (Kansas City, MO; 816-483-3400). 2. "Amercoat 5105" by Ameron Protective Coatings (Brea, CA; 714-529-1951). 3. "Carbocoat 150HG" by Carboline Company(St. Louis, MO; 314-644-1000; 800-848-4645). E. Exterior Special Shop-Applied Primer: 1. "Hi-Build Epoxoline II" Series N69 by Tnemec Company Inc. (Kansas City, MO; 816-483-3400). 2. "Carboline 888 " by Carboline Company(St. Louis, MO; 314-644-1000; 800-848-4645); organic zinc-rich epoxy primer. 3. "Amercoat 385." by Ameron Protective Coatings (Brea, CA; 714-529-1951); organic zinc-rich epoxy primer. 4. "Devran 224HS," "Bar-Rust 231,"or"Bar-Rust 233H." by ICI Devoe; "reinforced" inorganic zinc- rich epoxy primer. F. Powder Coating: Polyester-urethane resin. G. Galvanizing Touch-up Paint: 1. Meeting the Green Seal GS-11 requirements and compatible with subsequent field applied paint coating systems. 2. Approved ZRC Chemical Products Company"ZRC Zero VOC,"or approved. H. Miscellaneous Materials: Furnish incidental accessory materials, tools, and equipment as necessary for fabrication and installation of miscellaneous metal items as indicated on the Drawings. 1. Non-Shrink Grout: Master Builder's "Master Flow 713," Sonneborn "Sonogrout," or approved. 2.2 PREFABRICATED COMPONENTS A. Unistrut: Unistrut Corporation (Wayne, MI), or approved. Furnish manufacturer's standard components corresponding to "P" numbers indicated on the drawing. Include 1/4 inch thick steel connecting hardware, and 1/2" diameter bolts, nuts, and lock washers. 2.3 FABRICATION - FERROUS METAL FABRICATIONS A. General Fabrication Requirements: Fabricate as follows, unless specified or indicated otherwise. 1. Verify all dimensions and fabricate to detail with accurate sizes and shapes, straight lines, smooth curves, and sharp angles. 2. Welds shall have sufficient strength to withstand the loads applied. 3. For items exposed to view or subject to contact, grind welds smooth and level with adjacent surfaces; remove all burrs from cut edges. Fill imperfections with body putty at painted or powder-coated fabrications as necessary for a smooth even finish. 4. Bend curved sections to a smooth radius free from buckles and twists. 5. Fabrications in exterior locations shall be fabricated to shed water. B. Fabrication of Elements to Receive Galvanized Coatings: 1. Fabricate in accordance with the applicable requirements of ASTM A143, A384, and A385. TEMPLATE 055000-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 055000 - METAL FABRICATIONS 2. Remove welding slag and burrs prior to galvanizing. 3. Avoid fabrication techniques which could cause distortion or embrittlement of the steel. 2.4 SHOP FINISHES 111 A. Hot Dip Galvanizing: 1. Steel fabrications shall be galvanized in accordance with ASTM A123. Bolts, nuts, washers, and other hardware shall be galvanized in accordance with A153. 2. Surface Finish: The galvanized coatings shall be continuous, firmly adhered, smooth, and free from defects. 3. Locations: Provide hot dip galvanizing for all metal fabrications in exterior or moist conditions, unless otherwise indicated. Unless otherwise approved by the Architect, plug and cold galvanize ventilation and lifting holes which will be exposed to moisture penetration in the finished work. B. Interior Primed finish: 1. Preparation: Solvent clean in accordance with SSPC-SP1. Remove rust and scale by wire 1 brushing, scraping, and sanding down to bare metal in accordance with SSPC-SP2 and SP3. Where SP2 and SP3 measures are insufficient, provide commercial blast cleaning in accordance with SSPC-SP6. Immediately apply specified prime coat. 2. Shop-apply interior primer in accordance with manufacturer's recommendations. 3. Locations: Provide at all interior metal fabrication exposed to view, unless otherwise indicated. Do not prime surfaces to be embedded in concrete, and surfaces to be field welded. A. Clear Steel Finish: 1. Use handling methods to preserve hot rolled mill scale texture and blue-gray patina. 2. Do not cut steel with a torch; cut steel with a blade. 3. If the metal is scratched or has a poor patina do the following: a. Heat metal to 150° F to eliminate any water. b. Allow to cool. Remove any surface rust with a Scotch Brite pad or steel wool. 4. Apply two coats of clear urethane. B. Blackened Steel Finish: 1. Materials: a. Blackening Agent: Electrochemical Products Inc, (New Berlin WI; 262-786-9330) "Insta-Blak 333" (available through Chemithon, Seattle, WA; 206-937-9954). b. Urethane: Clear satin sheen urethane. 2. Finishing Process: a. Clean steel with denatured alcohol. b. Sandblast the steel. c. Use rubber gloves (clean)to handle steel after sandblasting. d. Heat metal to 150° F to eliminate water. e. With a plastic spray bottle, evenly spray on blackening agent (slightly diluted with water). Do not brush on. f. Allow blackening agent to sit a couple of hours, then rinse/wash the metal with a sponge. g. Allow to dry. Remove surface rust with a Scotch Brite pad or steel wool. h. For surfaces with low surface touching, apply two coats of clear urethane. i. For surfaces with high surface touching and abuse, heat metal slightly to allow wax to melt, and rub wax on with a clean cloth. To reduce wax build-up, slightly rub with steel wool or Scotch Brite pad. j. Blacken exposed fasteners as specified for other steel members. C. Exterior Special Primed Finish: 1. Prepare surfaces in accordance with the finish coat manufacturer's recommendations, and as specified below. 2. Galvanized Surfaces: Clean per SSPC SP1; abrade galvanized surfaces with a metal preparation pad.. 3. Spray apply epoxy primer in accordance with the manufacturer's recommendations. Apply primer to receive field application of finish coats as specified in Section 099000. 4. Except for surfaces indicated to be field welded, coat all surfaces of fabrication, whether or not exposed to view in installed position. TEMPLATE 055000-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 055000 -METAL FABRICATIONS111 5. Maintain at least one coat of primer at all times during installation. Immediately patch damaged coatings. 6. Finish coat shall be free of dirt, flow lines, sags, blisters, pinholes, and other surface imperfections. 7. Locations: Provide at all exterior galvanized steel fabrications exposed to view, and other111 fabrications as scheduled. Do not prime surfaces to be field welded. D. Powder Coated Steel: 1. Prepare steel by solvent cleaning in accordance with SSPC-SP1. Remove rust and scale by wire brushing, scraping, and sanding down to bare metal in accordance with SSPC-SP2 and SP3. Where SP2 and SP3 measures are insufficient, provide commercial blast cleaning in accordance with SSPC-SP6. 2. Spray apply powder coating and cure in accordance with manufacturer's instructions. E. Stainless Steel: #4 finish in accordance with the NAAMM "Metal Finishes Manual." 2.5 PROTECTION A. For metal in contact with concrete, masonry, and other dissimilar materials, coat contact surfaces with zinc-rich primer. PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is 1 complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of conditions as satisfactory. 3.2 INSTALLATION A. Install metal fabrications in accurate locations shown. Unless indicated otherwise, fabrications shall be installed plumb and level. B. Provide all anchorage devices as indicated and required for a secure installation. C. Touch-up all surfaces damaged during installation. Patch all welds and damage marks with matching primer. D. Coordinate with Section 033000 for foundations, installation, and concrete fill at pipe bollards. 3.3 SCHEDULE A. The following list includes, without limitation, the principal metal fabrications and finishes in the Work. 1. Steel Corner Guards: Stainless steel; #4 finish. 2. Steel Bollards; Galvanized finish with special exterior primer for field finishing under 099000. END OF SECTION I I I TEMPLATE 055000-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 061000 - ROUGH CARPENTRY PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Miscellaneous sheathing. 2. Blocking, nailers, and curbing. 3. Plywood terminal back boards. B. Related Sections: 1. 054000 - Cold-Formed Metal Framing: Structural lightgage metal framing. 2. 075423—Thermoplastic Membrane (TPO) Roofing 3. 076200 -Sheet Metal Flashing and Trim. 4. 092200—Lightgage Metal Support Framing: Support framing; metal backing. 5. 092900 -Gypsum Board: C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitutions will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Plywood Association (APA) B. American Society for Testing and Materials (ASTM): 1. D2898 -Test Method for Accelerated Weathering of Fire-Retardant Treated Wood for Fire Testing. 2. E84 -Test Method for Surface Burning Characteristics of Building Materials. C. American Wood Preservers'Association: Book of Standards (AWPA). D. National Lumber Grading Authority of Canada (NLGA). E. Product Standard (PS): PS-20 -American Softwood Lumber Standard, F. Southern Pine Inspection Bureau (SPIB). G. West Coast Lumber Inspection Bureau (WCLB): Standard Grading Rules for West Coast Lumber. H. Western Wood Products Association (WWPA). 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: Submit complete technical and product data on the following: 1. Preservative and fire retardant wood treatments. 1.4 QUALITY ASSURANCE A. Regulatory Requirements: Work shall conform to the requirements of the currently enforced International Building Code as adopted by the jurisdiction. 1.5 DELIVERY, STORAGE,AND HANDLING A. Store and protect products under provisions of Section 016000. PART 2 - PRODUCTS 2.1 DIMENSION LUMBER A. Lumber shall be manufactured in accordance with PS 20, and shall be stamped and graded in accordance with WWPA, WCLB, NLGA, or SPIB grading rules. I TEMPLATE 061000-1 10/12/18 STARBUCKSCO FFEE COMPANY GUIDE SPECIFICATIONS SECTION 061000 -ROUGH CARPENTRY B. Moisture Content: Kiln dried to 19% maximum moisture content, except for material whose least dimension is 4 inches thick or greater. C. Species: Hem-Fir, Spruce-Pine-Fir(SPF), or Douglas Fir Larch, unless indicated or specified otherwise. D. Structural Lumber Grades: As indicated on the Structural Drawings. E. Architectural Lumber Grades: Unexposed non-structural wood framing and blocking indicated on the Architectural Drawings shall be graded as follows: 111 1. Blocking and Nailers: "Utility- Light Framing,"or better. 2.2 PANEL MATERIALS A. Miscellaneous Sheathing: APA Rated Sheathing; Structural I; CD grade; Exterior; unless approved r otherwise; thicknesses as indicated. B. Terminal Backboards: APA AC grade exterior; fire retardant treated. 2.3 ACCESSORIES A. Fasteners: 1. Hot-dipped galvanized steel for exterior, high humidity, and fire treated wood locations. 2. For Use With Preservative Treated Wood: 300 Series stainless steel. 3. Screws: Self tapping; countersunk or low profile head. 2.4 WOOD TREATMENT A. Wood Preservative (Pressure Treatment): 1. Preservative treat all exterior lumber, including roofing nailers, curbs and other wood in contact with concrete, masonry, and moist conditions. 2. For above ground use, use AWPA certified Ammonium Copper Quaternium (ACQ)or Copper Hydroxide Sodium Dimethyldithiocarbamate (CDDC)waterborne preservative with 0.25 pounds per cubic foot of wood retention. 3. Treated lumber shall be kiln dried to a maximum moisture content of 19%; treated plywood shall be kiln dried to a maximum moisture content of 15%. 4. Treated lumber shall bear the quality stamp of an inspection agency approved by the jurisdictional code authorities. B. Fire Retardant Treatment: 1. Fire retardant treat all interior concealed lumber and plywood, and other wood as indicated or specified. Provide exterior fireproofing at rooftop blocking, nailers, curbs, sheathing, and other locations subject to wetting during construction operations. 2. All fire retardant treated wood materials shall bear a UL"FR-S" label, or a label from an approved inspection agency certifying that the material meets the requirements of AWPA C-20 Type A for lumber and AWPA C-27 Type A for plywood. 3. Treated lumber shall be kiln dried to a maximum moisture content of 19%; treated plywood shall be kiln dried to a maximum moisture content of 15%. 4. Exterior fire retardant treated wood shall be treated by means of a system which has been demonstrated to exhibit no increase in fire hazard classification in accordance with ASTM E84 test after having been subjected to accelerated weather conditioning in accordance with ASTM D2898. PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. TEMPLATE 061000-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 061000 -ROUGH CARPENTRY 3.2 SHEATHING A. Install sheathing as indicated. B. Secure sheathing with edges on firm bearing. Provide solid edge blocking between sheets. 3.3 BLOCKING, NAILERS, AND CURBS A. Provide blocking, nailers, and curbs for sheathing, roof construction, metal flashing, and other construction as indicated, and as necessary for firm support. Unless otherwise indicated, solid wood backing shall be minimum 2 inch nominal thickness; plywood shall be minimum 3/4 inch thick, except that sloped parapet caps may be 1/2 inch thick. t B. Blocking: Install wood blocking to receive mechanical fasteners for support of plumbing and electrical fixtures and equipment, shelving, cabinets, door stop plates, millwork, wainscots, coat hooks, toilet and bath accessories, kitchen equipment, and all other wall and ceiling mounted components. C. Screw fasten wood components to metal framing and support elements. D. For attachment of plywood backing, kerf plywood 1/4" (3/8", maximum if required for heavy gage studs)to receive flange return (or crimp the return closed); provide supplementary sheet metal angle attached to back of stud where necessary to support backing. Screws into edge of plywood are unacceptable. 3.4 PLYWOOD TERMINAL BACKBOARDS A. Provide a fire retardant treated plywood terminal backboard for telephone systems and data racks where indicated on the drawings. B. Mechanically apply directly over gypsum backing board. END OF SECTION r I I I r I TEMPLATE 061000-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 064000 -ARCHITECTURAL WOODWORK 1 PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Installation of Owner furnished casework and millwork. 2. Statements of required quantities of Owner-furnished millwork. 3. Transportation of casework and millwork from warehouse to jobsite. 4. Substrate preparation. 5. Coordination and installation of carpeted base to display casework. 6. Accessories. B. Related Sections: 1. 061000- Rough Carpentry: Blocking for finish carpentry. 2. 081400-Wood Doors: Flush doors. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 111 1.2 REFERENCES A. American National Standards (ANSI) 1. ANSI A208.1 - Standard for Particleboard 2. ANSI A208.2- Standard for Medium Density Fiberboard (MDF) B. American Society for Testing and Materials (ASTM) 1. C1036 Standard Specification for Flat Glass 2. E84 Test Method for Surface Burning Characteristics of Building Materials C. American Plywood Association (APA) D. Architectural Woodwork Institute (AWI): Architectural Woodwork Quality Standards, Guide Specifications and Quality Certification Program (Current Edition). E. Business Institutional Furniture Manufacturer's Association (BIFMA) I F. West Coast Lumber Inspection Bureau (WCLB): Standard Grading Rules No. 16. G. U.S. Product Standard (PS) PS 1 Product Standard for Construction and Industrial Plywood. 1.3 QUANTITY STATEMENTS A. Casework and millwork, including pertinent installation information will be furnished by Owner. B. Quantities of millwork purchased will be based on the approved Quantity Statement furnished by the I Contractor for the exact amount required for the installation. Overage quantities will be added separately by the Owner for each type of millwork. C. Types and locations of each type of casework and millwork shall be as scheduled and indicated on the111 Owner's Purchase Order; base bid on special requirements for each woodwork type, including requirements for special veneer and pattern matching. D. Contractor shall be responsible for accuracy of quantity statements. In the event that insufficient quantity is discovered after order has been placed, proceed as follows: 1. Immediately notify the Owner in writing of the additional quantities required, whereupon the Owner will, at his cost, obtain the additional quantities. 2. Install additional quantities at no additional cost to the Owner. 3. Pay for unusual transportation costs incurred in obtaining additional materials. I TEMPLATE 064000-1 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 064000 -ARCHITECTURAL WOODWORK 1.4 DEFINITIONS A. Exposed Portions of Casework: Those surfaces visible when doors and drawers are closed, including edges of doors and drawers, edges of cabinet boxes visible between doors and drawers, backs of hinged doors, interiors behind glass doors, and interiors in open cabinets. B. Semi-Exposed Portions of Casework: Those areas not defined as exposed, but visible when solid (not glazed)doors and drawers are opened. C. Concealed Portions of Casework: All remaining areas not defined as exposed or semi-exposed. 1.5 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Submittals Prior to Sub-bid: 1. List of proposed bidders. 2. For each proposed bidder, include evidence of compliance with installer qualification requirements. C. Submittal With Sub-Bid: 1. Submit preliminary quantity statements for millwork from each prospective subcontractor. Base quantity statements on Drawings. Do not include overages in Quantity Statement. 2. Architect will return acceptable quantity statements to the Contractor. Only sub-bidders with acceptable quantity statements shall be considered for subcontract. D. Submit following within 30 days after award of architectural woodwork subcontract: 1. Quantity statements indicating proposed adjustments. E. Guarantee Drafts: Concurrent with initial product data submittal, submit draft of installers guarantee for Architect's review. 1.6 QUALITY ASSURANCE A. Fabricator: A minimum of 5 years experience in the fabrication of custom architectural woodwork of the type specified. B. All Architectural Woodwork shall be under the responsibility of a single fabricator. C. Qualifications of Installers: Use only journeyman finish carpenters who are thoroughly trained and skilled in the work, and who are completely familiar with the materials and quality standards specified. No allowance will be made for lack of skill on the part of workmen. D. Conform to AW I Custom grade standards except use premium grade standards for clearances and tolerances, unless specified or indicated otherwise. E. Solid Surfacing Fabricator Qualifications: Certified by the solid surfacing materials manufacturer. 1.7 DELIVERY, STORAGE AND HANDLING A. Comply with provisions of Section 016000. B. Owner furnished materials will be delivered to the Owner's warehouse facility; refer to Section 015000. Transport materials from the warehouse to the site. PART 2 - PRODUCTS 2.1 MATERIALS A. Finished Millwork Lumber: Furnished by Owner. B. Panel Products: 1. Finished Millwork Paneling: Furnished by Owner. 2. Accessory Panel Products: a. Softwood Plywood: DOC PS 1; 3/4 inch thick AC exterior grade unless indicated or specified otherwise; touch sanded where plastic laminate veneers are to be applied TEMPLATE 064000-2 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 064000 -ARCHITECTURAL WOODWORK b. Veneer-Faced Panel Products (Hardwood Plywood): 1) HPVA HP-1, made with adhesive containing no urea formaldehyde. 2) Wood Veneer Flitches: AWI Grade AA; American Black Walnut; plain sliced; hand selected for limited sapwood. C. Pre-finished Board: Low pressure melamine over particle board, MDF, or hardboard core; formaldehyde free; colors as selected from manufacturer's standard. D. Plastic Laminate: 1. Brands and colors as scheduled on Drawings. 2. Exposed: NEMA LD-3; general and vertical grade, 3. Backing Sheets: NEMA LD-3; backing grade; undecorated. E. Solid Surfacing: 1. Product as listed in the Finish Legend. 2. Fabricate solid surface elements to the configurations indicated in accordance with the manufacturer's recommendations. 2.2 ACCESSORY MATERIALS A. Cabinet Hardware: As scheduled on the Drawings. B. Closet Hardware: 1. Closet Rod: Knape&Vogt#770 5; 1-5/16 inch diameter; chrome finish. 2. End Flanges: Knape &Vogt#764/766; chrome finish. C. Wall Shelf Hardware: 1. Brackets: Knape &Vogt# 185 Anochrome finish; length as appropriate for shelving indicated. 2. Standards: Knape&Vogt#85 Anochrome finish. D. Counter Support Brackets: 1. Manufacturer/Source a. Oodles of Parts Plus (Patchogue, NY; 800-286-5471) b. A&M Hardware Inc. (Manheim PA; 888-647-0200) c. Steelcase d. Herman Miller 2. Bracket: "Work Station Bracket"; 1/8" steel; 24"x 24" size unless otherwise indicated;prime paint finish. E. Hanging Hardware: Brooklyn Hardware LLC (Portland OR; 888-232-1151) "Panelclip," Doug Mockett and Company(Manhattan Beach CA.; 800-523-1269)ZC3 "Z-Clips,"or approved; interlocking aluminum clip. F. Contact Bond Adhesive: Water based low VOC. G. Plastic Laminate Faced Countertops: 1. Fabricate to AWI Custom grade. 2. Fabricate countertops from particle board and general purpose grade plastic laminate in the shapes indicated. 3. Where countertops are indicated with sinks, use moisture resistant MDF in lieu of particle board. H. Wall and Closet Shelf Fabrication: 1. Fabricate from prefinished board; edge banded with matching PVC edging unless indicated otherwise. 2. Provide minimum 3/4 inch thick shelves, except provide thicker shelves as required to support the loads and spans indicated without significant deflection. I. Hardware: 1. Unless otherwise shown or specified, all drawers shall be equipped with standard full extension slides. 2. Install hardware straight and true and in perfect alignment horizontally and vertically with adjacent casework and hardware. TEMPLATE 064000-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 064000 -ARCHITECTURAL WOODWORK 3. Carefully fit and securely attach cabinet hardware in accordance with manufacturers' printed instructions, and exercise caution not to mar or injure finish surfaces. PART 3 -EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 PREPARATION 111 A. Coordinate the installation of blocking and other supports required for the installation of architectural woodwork elements. 3.3 STANDING AND RUNNING TRIM INSTALLATION A. Jointing: Make all joints to conceal shrinkage; miter all exterior corners; cope all interior corners, miter or scarf all end-to-end joints; install all trim pieces as long as possible,jointing only where solid support is obtained. Make no joints closer than 4 feet to corners. B. Lengths of Material: Use random lengths and show typical joint locations on shop drawings. The minimum length shall be 8 feet, except where short lengths are required by installation conditions. C. Fastening: 1. Install all items straight, true, level, plumb, and firmly anchored in place; where blocking or backing is required, coordinate as necessary with other trades to ensure placement of all required backing and blocking in a timely manner. 2. Fasten trim with finish nails or screws of proper dimension to hold the member firmly in place without splitting the wood. 3. On exposed finish work, set all nails and screws. 4. Align exposed fasteners for uniform pattern; random or"shotgun" patterns will not be accepted. D. Select and arrange standing and running trim so that abutting members have a similar grain and color match to the greatest extent possible 3.4 VENEER PANELING A. Install paneling as indicated in accordance with AWI Section 500C Premium grade standards. B. Install wood paneling over wall surfaces by concealed clips, hangers, or blind fasteners, unless approved otherwise. C. Cut and fit each panel to it particular position including cutting around items which cannot be remounted to panel face, and predrilling for holes for wire access for electrical devices to be mounted on the panel face. 3.5 CASEWORK INSTALLATION A. Coordinate casework installation with work of other trades for final electrical and mechanical connections. B. Install all casework accurately, plumb, square, and level, and permanently secured in precise position as indicated on the Drawings. Casework shall be scribed to adjacent surfaces as follows: I1. Countertops and splashes to wall surfaces. 2. Cabinet endwalls and other exposed surfaces to walls. 3. Cabinet bases to floors. 1 C. The casework installation shall be made complete with all required fastenings, clip angles, braces, anchors, and other fittings as required to render the work rigid and secure. TEMPLATE 064000-4 10/12/18 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 064000 -ARCHITECTURAL WOODWORK D. All fasteners securing casework shall be in concealed or semi-concealed locations, unless approved otherwise. E. Avoid damaging finished surfaces. Repair or replace all damaged materials and surfaces in a manner approved by the Architect. 1� F. Upon completion of work, demonstrate hardware to work freely as intended. 3.6 CLEANING UP A. Keep the premises in a neat, safe, and orderly condition at all times during execution of this portion of the work, free from accumulation of sawdust, cut-ends, and debris. B. At the end of each working day, or more often if necessary, thoroughly sweep and/or vacuum surfaces. Remove the refuse to the area of the job site set aside for its storage. END OF SECTION I I I 1 I I I 1 I I I TEMPLATE 064000-5 10/12/18 1 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 072100 -THERMAL INSULATION PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Thermal batt insulation with separate vapor barrier. 2. Rigid board wall insulation. 3. Rigid board perimeter insulation. 4. Continuous cavity insulation. B. Related Sections: 1. 098100-Acoustic Insulation. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C518-Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by means of the Heat Flow Meter Apparatus. 2. C578 - Rigid, Cellular Polystyrene Thermal Insulation. 3. C612 - Specification for Mineral Fiber Block and Board Thermal Insulation. 4. C665 - Mineral Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured I Housing. 5. D1621 -Test Method for Compressive Properties of Rigid Cellular Plastics. 6. E84-Test Method for Surface Burning Characteristics of Building Materials. 1.3 SUBMITTALS A. Make submittals under provisions of Section 013300. B. Product Data: Submit manufacturer's product data and installation instructions for each type of insulation. PART 2 - PRODUCTS 2.1 MATERIALS A. Unfaced Batt and Blanket Insulation: ASTM C665, Type I; preformed unfaced glass fiber roll; flame spread of 25 or less and smoke developed of 50 or less when tested in accordance with ASTM E84; formaldehyde free, Johns Manville Corp. "Unfaced Formaldehyde-free Thermal and Acoustical Fiber Glass Insulation;" or approved; oversize widths for friction-fit between metal framing. B. Rigid Extruded Polystyrene Board: 1. Standard: ASTM C578, Type IV; extruded cellular polystyrene. 2. Thermal Resistance: Minimum "R" per inch of 5 when tested in accordance with ASTM C518 at 75 degrees F. mean temperature. 3. Compressive Strength: Minimum 25 psi when tested in accordance with ASTM D1621. 4. Water Absorption: 0.10 to 0.15 percent when tested in accordance with ASTM C272. 5. Thickness/R-value: 1 inch, R-5. 6. Size: 24 inch width, 96 inch length, with square edges. 7. Approved Products: a. Styrofoam by The Dow Chemical Company(Midland, MI; 800-441-4369) b. Foamular 250 by Owens Corning, (Toledo, OH; 800-438-7465). C. Continuous Cavity Insulation: Ii. Standard: ASTM C612, Types I through IV as applicable; preformed mineral fiber batt; unfaced; minimum 4 lbs/cf density. TEMPLATE 072100-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 072100 -THERMAL INSULATION 2. Width and Thickness: As required for application indicated. 3. Installation Accessories: Installation "Z" Clips; size and spacing as recommended by insulation manufacturer. 4. Approved Products: One of the following: a. Thermafiber"Rain Barrier HD" by Owens Corning (Wabash, IN; 888-834-2371). b. "Cavity Rock" by Roxul (Milton, ON; 800-265-6878) 2.2 ACCESSORIES A. Separate Vapor Barrier for Batt Insulation: Foil scrim kraft FSK 25; flame spread of 25 or less and a smoke developed of 50 or less when tested in accordance with ASTM E84. B. Tape: To match foil scrim kraft face of vapor barrier; 2 inch minimum width. C. Impaling Pins: 12 gage pins; length as required with mounting plates for welding or adhesive mounting; include retainer shields. D. Screw and Washer Fasteners: 1. Polymer coated self-tapping screws; lengths as required to penetrate through metal support framing members. 2. Plastic or Metal Washers: Minimum diameter 2 inches. 3. Ramset"Insulfast" or similar; type as approved by insulation manufacturer. E. Adhesive: 1. Type recommended by insulation manufacturer for application; compatible with insulation and substrate. 2. For interior applications, adhesives shall meet the requirements of the Southern California South 111 Coast Air Quality Management District(SCAQMD) Rule 1168 using the method of dividing the weight of the solvent in the adhesive by the volume of the material, less water). F. Related Accessories: Provide other accessories, not specifically described, as required for a complete installation. PART 3 - EXECUTION I 3.1 EXAMINATION A. Verify adjacent materials are secure, properly spaced, dry, and ready to receive installation. B. Verify mechanical and electrical services within spaces to insulated have been installed and tested. C. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. D. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 INSTALLATION - BATT INSULATION A. Install batt insulation in accordance with manufacturer's instructions.Install insulation without gaps or I voids. B. Trim insulation neatly to fit spaces. Use batts free of damage. C. At metal stud framing, insert the insulation edges tightly into the stud channels for a friction fit. Provide additional supports as necessary to prevent sliding of batts in the stud cavity. D. Mechanical Fastening: 1. At locations where no support framing is present, provide metal impaling pins and retainers. 2. Mechanically or adhesively bond the retaining pins to the substrate in accordance with the manufacturer's recommendations. 3. Space pins at maximum 24 inches on center along the edges and within the field of the batt. Place edge pins within 6 inches from the edge of the batt. TEMPLATE 072100-2 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 072100 -THERMAL INSULATION E. Pack batt insulation in shim spaces at perimeter of window assembly to maintain continuity of thermal barrier. F. Separate Vapor Barrier Installation: 1. Install separate vapor barrier over unfaced insulation. 2. Install vapor barrier toward warm side of building spaces. 3. Vapor barrier shall be continuous. 4. At locations where insulation is mechanically fastened by impaling pins, place vapor retarder over impaling pins and hold in position with additional retainers. The installation shall present a tight, continuous, and wrinkle free appearance. 5. At lightgage support framing, secure to studs with double stick tape or spray adhesive. 6. Lap joints in vapor barrier 2 inches, except provide tape sealed joints at locations where vapor barrier will remain exposed in the finished work. 7. Tape seal vapor barrier to adjacent construction at perimeter edges. 8. Tape and seal tears or cuts in vapor barrier. G. R value Schedule: 1. Provide batt insulation in sufficient thickness to provide the following minimum R-values: a. Walls and Floors: R-11. b. Ceilings: R-19. 3.3 RIGID BOARD INSULATION AT WALLS, SOFFITS, AND UNDER SLABS A. Install rigid extruded polystyrene insulation where rigid board insulation is indicated at walls. B. Except as otherwise indicated or specified, install all insulation in accordance with the manufacturer's current installation instructions. C. Trim insulation to tightly fit between the furring and framing and to fit around penetrations. 3.4 CONTINUOUS CAVITY INSULATION A. Install insulation boards horizontally. Fasten evenly to support framing with approved fasteners at fastener spacing recommended by insulation manufacturer but in no case less than 5 fasteners per board. B. Conform to requirements of UL System No. CW-S-2001 Firespan. Coordinate with fire rated construction joint assembly components provided in Section 078500. C. Coordinate with ork of Section 072700. END OF SECTION I I I I TEMPLATE 072100-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 072700-WEATHER RESISTIVE BARRIERS PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 111 1. Sheet air, moisture and weather barrier systems at framed walls. 2. Filler and membrane systems required to seal joints and penetrations to form a continuous weather-resistive barrier assembly. 3. Related weather-resistive barrier accessories and components. B. Related Sections: 1. 061000— Rough Carpentry: Plywood sheathing. 2. 076200- Sheet Metal Flashing and Trim: Flexible flashing provided with separate sheet metal flashing systems. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 DEFINITIONS A. Weather-Resistive Barrier: A weather-resistive barrier is an assembly of interconnected components within the exterior envelope of a building which prevents air flow across the assembly, and which is intended to prevent excess moisture transfer across the assembly driven by air pressure differentials. 1.3 SYSTEM DESCRIPTION A. All voids within weather-resistive barrier systems shall be closed to prevent air flow across the assembly. B. The following elements provided under the work of other Sections shall be considered integral parts of the weather-resistive barrier assembly: 1. Concrete foundation. 2. Roof membrane. Plumbing vents and roof drains shall not be considered penetrations. 3. Exterior windows and doors. C. For the work of this Section, weather-resistive barrier systems shall consist of the following: 1. Weather-resistive sheet membrane over solid substrates on the exterior building enclosure. 2. Connective seal from foundation wall to the weather-resistive sheet membrane layer. 3. Connective seal of weather-resistive sheet membrane to roof membrane. 4. Sealing of penetrations in the building envelope, including windows, doors, plumbing elements, electrical elements, and mechanical components, including duct penetrations at rooftop mechanical unit. 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: Catalog cuts and installation instructions for specified manufactured products. I 1.5 QUALITY ASSURANCE A. Applicator: Work of this section shall be performed by a single applicator, unless specifically approved otherwise by the Architect. B. Pre-Installation Conference: 1. Administer pre-installation conference in accordance with Section 013119. 2. Schedule meeting prior to installation of weather-resistive barrier components. 3. Discuss weather-resistive barrier components and sequence of installation. 4. Discuss all joints and penetrations and proposed methods for sealing. 5. Identify and discuss all special conditions. TEMPLATE 072700-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 072700 -WEATHER RESISTIVE BARRIERS I 1.6 DELIVERY, STORAGE, AND HANDLING A. In accordance with Section 015000. IPART 2 - PRODUCTS 2.1 MATERIALS I A. Air/Moisture Barrier System: Vaproshield, LLC (Gig Harbor, WA; 866-731-7663); 1. Weather Resistive Barrier: "Wrapshield SA". 2. Flashing: a. Liquid Flashing: "VaproLiqui-Flash". I b. Sheet Flashing: VaproFlashing 3. Alternative Self-Adhered Flexible Flashing (SAF): a. DuPont Company"Tyvek FlexWrap" b. W.R. Grace "Vycor Plus.". c. Henry Company"Blueskin"40 mil thickness. 4. Tape: VaproShield "VaproTape," single or double sided, as applicable. 5. Adhesive: VaproShield "VaproAdhesive." I 6. Manufacturer and product are specified for construction, quality, performance and/or appearance. Provide specified product or approved equal. Alternate products shall meet or exceed the following requirements: Construction Triple layer spunbond polypropylene IWater Vapor Transmission 308.9 grams/m2/24hrs (50 perms) Air Permeability 0.0095 L/s/m2 or 0.0019 cmf/ft2 I B. Flexible Seal: Ethylene Propylene Diene Terpolymer( EPDM ) black membrane, reinforced or non- reinforced, nominal 0.045 inch thick; complete with manufacturer's recommended splicing materials. C. Weather-Resistive Barrier Sealant: Single component urethane gun grade sealant. I D. SPF (Sprayed Polyurethane Foam) Sealant: Furnish one-or two-component, foamed-in-place, polyurethane foam sealant with the following characteristics: 1. Density: 1.5 to 2.0 pcf. I 2. Flame Spread (ASTM E162): 25 or less. 3. Acceptable Materials: Flexible Products. E. Sheet Metal Closures: 1. Minimum 24 gage prefinished galvanized steel. 2. Custom fabricated to fit the conditions. F. Accessories: Provide surface conditioners, primers, mastic, tape, and other accessories as specified by or acceptable to the manufacturer of each product. IG. Fasteners: Copolymer coated galvanized steel, or stainless steel. I PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is I complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes I acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. I ITEMPLATE 072700-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 072700 -WEATHER RESISTIVE BARRIERS 3.2 INSTALLATION A. Coordinate work with other trades as necessary to form a continuous weather-resistive barrier envelope for the building. B. Weather-resistive Barrier Installation: 1. Apply single layer of weather-resistive barrier over solid exterior substrates in accordance with the manufacturer's recommendations. 2. Tape seal all joints and penetrations with manufacturer's recommended tape. 3. Coordinate installation of windows, metal head and subsilll flashings lapped into flexible flashings, and other wall penetrations with the installation of flexible flashing and weather-resistive barrier. 4. Secure with staples as recommended by manufacturer. 5. Sequence with installation of flexible flashing and metal flashing elements as shown and as necessary to form a continuous air and moisture barrier. 111 C. Flexible Flashing: 1. Install flexible flashing as indicated and as specified below. 2. Trim flexible flashing so that it will not be exposed in the finished work. 3. Coordinate installation of flexible flashing with installation of building weather-resistive barrier and sheet metal flashing elements. 4. Install in accordance with the manufacturer's recommendations for each condition. 5. Provide flexible flashing as indicated and in the following locations to seal joints and penetrations between building weather-resistive barrier base layer and the following: a. Concrete foundation walls. b. Roof membrane. c. Pipe, conduit, and electrical box penetrations. d. Window and door frames. 6. Provide flexible flashing at parapet tops as necessary to link to the weather-resistive sheet membrane layers on both sides of the parapet walls. 7. Provide flexible flashing to seal the joint between sheet metal closure angles and building weather-resistive barrier base layer. 8. Provide materials separation where required and do not lap or place flexible flashing in direct contact with roofing membrane. 111 D. Foam Sealant: 1. Seal holes in electrical boxes, including around wire openings. 2. Seal penetrations which cannot be sealed with flexible flashing. 3. Provide lightgage sheet metal angle edge trim at gypsum board edges to receive sealant. E. Special Construction: 1. Provide custom fabricated sheet metal enclosures around recessed light fixtures and similar elements which penetrate building weather-resistive barrier weather-resistive barrier assemblies. 2. Mechanical Curbs: a. Rigid insulation boards at equipment curbs are installed as a part of the roofing subcontract. b. Foam seal joints between rigid insulation boards. Cut boards as necessary to allow foam penetration between the boards. c. Foam seal joints between rigid insulation board and adjacent curb construction. d. After installation of rooftop mechanical unit and ducts, foam seal the joint between the rigid insulation boards and the ducts. END OF SECTION I I TEMPLATE 072700-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 075423—THERMOPLASTIC MEMBRANE (TPO) ROOFING I PART 1 -GENERAL I 1.1 SUMMARY A. Section includes: 1. Mechanically fastened thermoplastic membrane roofing system. I 2. Roof insulation and cover board. B. Related Sections: 1. 076200 - Sheet Metal Flashing and Trim: Non-coated flashings. I C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 DEFINITIONS A. Roofing Terminology: Refer to ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual"for definition of terms related to roofing work in this Section. 1.3 PERFORMANCE REQUIREMENTS Provide installed roofing membrane and base flashings that remain watertight; do not permit the IA. passage of water; and resist specified uplift pressures, thermally induced movement, and exposure to weather without failure. B. Material Compatibility: Provide roofing materials that are compatible with one another under I conditions of service and application required, as demonstrated by roofing membrane manufacturer based on testing and field experience. C. Performance: Roofing system shall conform to the following: I 1. Wind Uplift For Mechanically Anchored Roof System: Equivalent to Factory Mutual 1-90. 2. Fire: Minimum Underwriter's Laboratory Class B. 3. Thermal: System shall have a maximum thermal conductance of C = .026 Btuh, averaged over all surfaces to which it is applied. Use averaged C value, not averaged R value. ID. Roofing membrane system shall be an "Energy Star" roofing system as listed by the Environmental Protection Agency. I 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: For each type of product and component proposed, including membrane, insulation, I fasteners, and accessories. C. Shop Drawings: 1. Details for base flashings, membrane terminations, and penetration details. I 2. Tapered insulation patterns, including slopes, insulation thickness, cricket layouts. 3. Insulation fastening patterns for mechanically anchored roof assembly. 4. Layouts for flexible traffic walkways and traffic pavers. D. Quality Control Submittals: 1. Installer Certificates: Signed by roofing system manufacturer certifying that Installer is approved, authorized, or licensed by manufacturer to install roofing system. 2. Guarantee Draft: Concurrent with initial product data submittal, submit a draft of roof warranties. I 3. Manufacturer's installation specifications. E. Contract Closeout Submittals: 1. Maintenance Data: For roofing system to include in maintenance manuals. 2. Warranties: Submit specified warranties. ITEMPLATE 075423-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 075423—THERMOPLASTIC MEMBRANE (TPO) ROOFINGI 3. Inspection Report: Copy of roofing system manufacturer's inspection report of completed roofing 1 installation. 1.5 QUALITY ASSURANCE A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system I manufacturer to install manufacturer's product and that is eligible to receive manufacturer's warranty. B. Source Limitations: Obtain components for membrane roofing system from or approved by roofing membrane manufacturer. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, and directions for storing and mixing with other components. B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life. C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation. D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck. 1.7 PROJECT CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements. 1.8 WARRANTY 1 A. Manufacturer's Guarantee: Prior to acceptance of work, furnish manufacturer's written 10 year no dollar limit guarantee executed to the Owner. Guarantee shall include workmanship and materials, and shall cover roofing, flashing, and insulation. I PART 2 - PRODUCTS 2.1 THERMOPLASTIC ROOFING MEMBRANE I A. Approved Membrane Manufacturers: 1. Carlisle SynTec Incorporated. 2. Firestone Building Products Company. 3. Johns Manville (800) 654-3103. 4. GAF Materials Corporation (973)628-3000. 5. Stevens Roofing Systems; Div. of JPS Elastomerics. B. Membrane Description: Thermoplastic polyolefin (TPO)or ethylene propylene (EP) sheet; uniform thickness; flexible; fabric or scrim reinforced. C. Thickness: 60 mils nominal thickness. D. Exposed Face Color: White. E. Physical Properties: 1. Breaking Strength: 225 lbf(1 kN); ASTM D 751, grab method. 2. Elongation at Break: 15 percent; ASTM D 751. 3. Tearing Strength: 55 lbf(245 N) minimum; ASTM D 751, Procedure B. 4. Brittleness Point: Minus 22 deg F (30 deg C). I TEMPLATE 075423-2 10/12/18 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 075423—THERMOPLASTIC MEMBRANE (TPO) ROOFING 5. Ozone Resistance: No cracks after sample, wrapped around a 3-inch- (75-mm-) diameter mandrel, is exposed for 166 hours to a temperature of 104 deg F (40 deg C) and an ozone level of 100 pphm (100 mPa); ASTM D 1149. 6. Resistance to Heat Aging: 90 percent minimum retention of breaking strength, elongation at break, and tearing strength after 166 hours at 240 deg F (116 deg C); ASTM D 573. 7. Water Absorption: Less than 4 percent mass change after 166 hours' immersion at 158 deg F (70 deg C); ASTM D 471. 8. Linear Dimension Change: Plus or minus 2 percent; ASTM D 1204. 2.2 ACCESSORY MATERIALS A. General: Ii. Accessory materials recommended by roofing system manufacturer for intended use and compatible with membrane roofing. 2. Liquid-type accessory materials shall meet VOC limits of authorities having jurisdiction. B. Sheet Flashing: Manufacturer's standard unreinforced thermoplastic polyolefin or ethylene propylene sheet flashing, 55 mils thick, minimum, of same color as sheet membrane. C. Bonding Adhesive: Manufacturer's standard solvent based bonding adhesive for membrane, and solvent-based bonding adhesive for base flashings. D. Cut Edge Sealant: Manufacturer's standard solvent based caulk to seal cut edges. E. Slip Sheet: Manufacturer's recommended slip sheet, of type required for application. F. Metal Termination Bars: Manufacturer's standard predrilled stainless-steel or aluminum bars, approximately 1 by 1/8 inch thick; with anchors. G. Metal Battens: Manufacturer's standard aluminum-zinc-alloy-coated or zinc-coated steel sheet, approximately 1 inch (25 mm)wide by 0.05 inch thick, prepunched. H. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FMG 4470, designed for fastening membrane to substrate, and acceptable to membrane roofing system manufacturer. I. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-joint covers, termination reglets, cover strips, 1 seam cleaners, and other accessories. 2.3 ROOF INSULATION A. Underlayment Board: ASTM C79; 1/2 inch and 5/8 inch type X; maximum permissible lengths; ends square cut; square edges; water resistant core; water repellent paper faces. B. Foam Board Insulation: One of the following. 1. Polyisocyanurate Board Insulation: Closed-cell polyisocyanurate foam core with a hydrocarbon blowing agent; integrally laminated to heavy coated glass fiber facers; conform to ASTM C 1289, Type II; FS HH-I- 1972/2, Class 1; UL 790 (ASTM E 108) Class A; FM 4450/4470 Class 1 fire rating. ' C. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope of 1/4 inch per 12 inches, unless otherwise indicated. D. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated. 2.4 INSULATION ACCESSORIES A. Provide roof insulation accessories recommended by insulation manufacturer for intended use and ' compatible with membrane roofing. B. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FMG 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer. TEMPLATE 075423-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 075423—THERMOPLASTIC MEMBRANE (TPO) ROOFING C. Cover Board: One of the following: 1. Gypsum Cover Board: ASTM C1177; glass-mat; water-resistant gypsum substrate; 1/4 inch thick; "Dens-Deck" by Georgia-Pacific Corporation. 2. HP Recovery Board: 1/2 inch thick; type as approved by the roofing manufacturer. 2.5 FLEXIBLE WALKWAYS A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, solid-rubber, slip-resisting, surface- textured walkway rolls, approximately 3/16 inch thick, and acceptable to membrane roofing system manufacturer. PART 3 -EXECUTION 3.1 EXAMINATION A. Carefully examine substrate and adjacent construction, and verify that conditions are suitable for installation of the work as indicated and specified. Inspection shall ascertain that: 1. All surfaces to be covered by roofing are properly pitched to drain, suitable for installation of roofing system free from susceptibility to puddling. 2. Work of other trades is complete, including installation of blocking and grounds, vents, drains, curbs, and other projections. 3. Substrate surface is clean and free from lumps, foreign matter, surface spalling or flaking, and excessive amounts of dust. 4. Penetrations through the roof deck are properly configured and are a minimum of 16 inches between their closest edges. 5. Verify that roof openings and penetrations are in place and set and braced and that roof drains are securely clamped in place. 6. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations. 3.2 PREPARATION A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections. B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast. C. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. Remove and ' discard temporary seals before beginning work on adjoining roofing. 3.3 UNDERLAYMENT BOARD INSTALLATION A. Install underlayment board with edges tightly butted. Arrange the boards perpendicular to the direction of the roof deck. B. Install with facing paper towards the exterior. C. Use sufficient fasteners to hold each layer of underlayment firmly in position. Fasten sheathing as required to meet the fire rating and wind uplift requirements for the roof assembly. 3.4 INSULATION INSTALLATION A. Coordinate installing membrane roofing system components so insulation is not exposed to precipitation or left exposed at the end of the workday. B. Comply with membrane roofing system manufacturer's written instructions for installing roof insulation. C. Install tapered insulation under area of roofing to conform to slopes indicated. D. Install one or more layers of insulation under area of roofing to achieve required thickness. Where overall insulation thickness is 2 inches or greater, install 2 or more layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches in each direction. TEMPLATE 075423-4 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 075423—THERMOPLASTIC MEMBRANE (TPO) ROOFING I E. Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water. F. Install insulation with long joints of insulation in a continuous straight line with end joints staggered I between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch with insulation. G. Cut and fit insulation within 1/4 inch of nailers, projections, and penetrations. I H. Mechanically Fastened Insulation: Install each layer of insulation and secure to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type. Fasten insulation to resist uplift pressure at corners, perimeter, and field of roof. I. Install cover boards over insulation with long joints in continuous straight lines with end joints I staggered between rows. Stagger joints from joints in insulation below a minimum of 6 inches in each direction. Loosely butt cover boards together and fasten to roof deck. Fasten to resist uplift pressure at corners, perimeter, and field of roof. I 3.5 MECHANICALLY FASTENED ROOFING MEMBRANE INSTALLATION A. Install roofing membrane over area to receive roofing according to roofing system manufacturer's written instructions. Unroll roofing membrane and allow to relax before installing. I B. Accurately align roofing membranes and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps. C. Mechanically or adhesively fasten roofing membrane securely at terminations, penetrations, and I perimeter of roofing. D. Apply roofing membrane with side laps shingled with slope of roof deck where possible. E. Seams: I 1. Clean seam areas, overlap roofing membrane, and hot-air weld side and end laps of roofing membrane according to manufacturer's written instructions to ensure a watertight seam installation. I 2. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of roofing membrane. 3. Verify field strength of seams a minimum of twice daily and repair seam sample areas. 4. Repair tears, voids, and lapped seams in roofing membrane that does not meet requirements. I F. Spread sealant or mastic bed over deck drain flange at deck drains and securely seal roofing membrane in place with clamping ring. G. In-Splice Attachment: Secure one edge of roofing membrane using fastening plates or metal battens I centered within membrane splice and mechanically fasten roofing membrane to roof deck. Field- splice seam. H. Install roofing membrane and accessory materials to tie in to existing roofing. I3.6 BASE FLASHING INSTALLATION A. Install sheet flashings and preformed flashing accessories and adhere to substrates according to membrane roofing system manufacturer's written instructions. IB. Apply solvent-based bonding adhesive to substrate and underside of sheet flashing at required rate and allow to partially dry. Do not apply bonding adhesive to seam area of flashing. I C. Flash penetrations and field-formed inside and outside corners with sheet flashing. D. Clean seam areas and overlap and firmly roll sheet flashings into the adhesive. Weld side and end laps to ensure a watertight seam installation. IE. Run membrane up and over parapets to form a watertight barrier under copings. U ITEMPLATE 075423-5 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 075423—THERMOPLASTIC MEMBRANE (TPO) ROOFING , 3.7 WALKWAY INSTALLATION 1 A. Flexible Walkways at Mechanically Anchored Roof: Install walkway products in locations indicated. Heat weld to substrate or adhere walkway products to substrate with compatible adhesive according to roofing system manufacturer's written instructions. 3.8 FIELD QUALITY CONTROL A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform roof tests and inspections and to prepare test reports. B. Final Roof Inspection: 1. Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion and submit report to Architect. 2. Notify Architect or Owner 48 hours in advance of date and time of inspection. C. Repair or remove and replace components of membrane roofing system where test results or inspections indicate that they do not comply with specified requirements. D. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 3.9 PROTECTING AND CLEANING I A. Protect membrane roofing system from damage and wear during remainder of construction period. When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner. B. Correct deficiencies in or remove membrane roofing system that does not comply with requirements, repair substrates, and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements. END OF SECTION I I I I I I I I TEMPLATE 075423-6 10/12/18 1 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 076200 -SHEET METAL FLASHING AND TRIM PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Sheet metal flashing and trim. 1 2. Requirements for flashing and sheet metal provided in other Sections. B. Related Sections: 1. 042113- Brick Masonry: Flashing provided as part of the masonry system; installation of receivers furnished in this Section. 2. 061000- Rough Carpentry: Wood blocking, nailers, and grounds. 3. 075423—Thermoplastic Polyolefin (TPO) Roofing: Coordination. 4. 084313 -Aluminum-Framed Storefronts and Windows: Flashing provided as part of the window and storefront system. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. ' D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. t2 REFERENCES A. American Society for Testing and Materials (ASTM) 1. A167- Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip. 2. A653- Steel Sheet, Zinc Coated, (Galvanized), or Zinc-Iron Alloy Coated by the Hot Dip Process. 3. B32 - Solder Metal 4. B209 -Aluminum and Aluminum-Alloy Sheet and Plate. B. Federal Specifications (FS): FS SS-C-153- Cement, Bituminous, Plastic. C. Sheet Metal and Air Conditioning Contractors National Association (SMACNA): Architectural Sheet Metal Manual, Sixth Edition 2003. 1.3 SYSTEM DESCRIPTION 1 A. Provide flashing and trim systems to prevent water leakage to the building interior. B. Fastening systems shall allow for the thermal movement of the materials without buckling, loosening, and leakage. 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. ' B. Product Data: Catalog cuts and installation instructions for manufactured products. C. Shop Drawings: Indicate materials, gages, profiles,jointing patterns,jointing details, fastening methods, and installation details. Include schedule of each type and profile of flashing to be furnished ' for instillation under Section 042113. D. Samples: Submit three samples representative of finish and color of prefinished flashing materials. 1.5 QUALITY ASSURANCE A. Applicator: Company specializing in sheet metal flashing work with 5 years minimum experience. B. Unless indicated or specified otherwise, perform work in accordance with the recommendations of SMACNA. C. Pre-Installation Conference: Attend pre-installation conference as specified in Division 07 Roofing section. 1.6 DELIVERY, STORAGE, AND HANDLING A. In accordance with Section 016000. TEMPLATE 076200-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 076200 -SHEET METAL FLASHING AND TRIM B. Stack material to prevent twisting, bending, and abrasion, and to provide ventilation. C. Prevent contact with materials during storage which may cause discoloration, staining, or damage. 1.7 GUARANTEE A. Submit in accordance with Section 017700. B. Furnish guarantee from the installer of each system that metal flashings will properly shed water to the roof or to the building exterior, under all weather conditions, for a minimum period of two years from the date of Substantial Completion. Leaks due to failure of flashing materials, and due to improper installation shall be promptly repaired at no expense to the Owner, and that watertightness of the repair will be demonstrated to the Owner. C. For coil-coated sheet metal materials, furnish from the coatings installer non-prorated 20-year warranty against failure of film integrity, and against fade and chalking. PART 2 - PRODUCTS I 2.1 SHEET MATERIALS A. Prefinished Galvanized Steel Sheet: 1. ASTM A653 steel sheet with G90 galvanized coating or ASTM A792 steel sheet with AZ60 aluminum/zinc coating; 24 gage unless noted otherwise; factory prefinished with 70 percent resin Following manufacturers have coil coated steel (PVDF) steel in 20 gage as well as 24 gage: 2. Manufacturers: a. AEP-Span, Dallas TX; (214-827-1740; 800-527-2503). b. Centria, Moon Township PA(800-759-7474). c. Copper Sales, Inc., Minneapolis, MN (612-545-1604; 800-426-7737). B. Stainless Steel: ASTM A167; Type 302 or 304. 2.2 ACCESSORIES A. Curbs: 1. One of the following: a. Roof Products and Systems Corporation (RPS) (Bensenville, IL; 800-624-8642)."EC-2A." b. ThyCurb (Farmers Branch, TX; 800-777-2872) "TC-3." 2. Description: a. Box section design, constructed using minimum 18 gauge galvanized steel, with fully mitered and welded corners. b. Internally reinforced on any side longer than 3'-0"with factory internal base plate. c. Curbs shall be insulated with 1 1/2"thick 31b. density fiberglass insulation, and shall have factory installed wood nailers fastened from underside. Height to be 8" above the finished roof or as detailed. 3. Flashing, Packing And Sealant: Provided under Division 23. B. Fasteners: 1. Furnish bonded stainless steel/neoprene sealing washers for exposed applications. 2. Finish exposed fasteners to match material being fastened. 3. Material: a. Galvanized Steel Sheet: Use galvanized steel or stainless steel. b. Aluminum Sheet and Stainless Steel: Stainless Steel. 4. Use screws when fastening into wood or sheet metal. 5. Use expansion anchors or drive pins when fastening into concrete or masonry. C. Sealants: 1. Bedding Sealant: Butyl Rubber Type- One of the Following: a. "Butyl Sealant" by Tremco, Inc. Sealant/Weatherproofing Division; Beachwood, OH; 800-321-7906; 216-292-5000) b. "BP-400" by Adco Global, Inc. (800-248-4010). I TEMPLATE 076200-2 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 076200 -SHEET METAL FLASHING AND TRIM 2. Lap and Joint Sealant: Polyurethane Sealant- One of the Following: a. "Chem-Calk 900" by Bostik Construction Products (Huntington Valley, PA; 800-221-8726; 215-674-5600). b. "Dynatrol I" by Pecora Corp. (Harleysville, PA; 800-664-7903; 215-799-7528). c. "Sonolastic NP I" by Sonneborn/ChemRex (Shakopee, MN; 800-433-9517; 952-496-6000). D. Reglets: ' 1. Fry Reglet Co or approved; configurations as indicated. 2. Galvanized steel with factory applied Kynar coating. 3. For reglets to be embedded in concrete provide covered ends to prevent infiltration. E. Solder: ASTM B32. F. Cold Galvanizing Compound: ZRC Worldwide, "ZRC Cold Galvanizing Compound," or approved product meeting the requirements of FS DOD-P-21035. 1 G. Flexible Boot Pipe Flashing: Portals Plus (708/766-5240; 800/774-5240) "Alumi-Flash"with EPDM boots, or approved; sized to match pipe diameter; split type with sealing hardware where necessary for installation at penetrating items which cannot be disconnected for top access. Furnish stainless steel draw bands, adapters, connection hardware, and sealants as necessary for a complete and weather tight installation. H. Flexible Flashing: "Grace Ultra," by W.R. Grace (800-354-5414), or approved. I. Slip Sheet: Rosin sized building paper. J. Plastic Cement: FS SS-C-153, Type I-asphaltic base cement. 2.3 FABRICATION A. General Requirements: 1. Field measure site conditions prior to fabricating work. 2. Form sections true to shape, accurate in size, square, and free from distortion or defects. 3. Fabricate cleats and starter strips of same material as sheet; interlockable with sheet. ' 4. Form pieces in longest practical lengths, except as limited by expansion joint requirements. 5. Non-Moving Joints: Shop fabricate to the greatest practical extent. a. Solder all non-moving shop fabricated joints in steel and stainless steel flashing; ' b. Prefinished Galvanized Steel: Lap joints 1 inch, minimum; accurately cut and fit as necessary to maintain profile; embed contact surfaces in sealant; rivet with stainless steel or color matched coated steel pop rivets at 3 to 4 inches o.c. 6. Hem exposed edges on underside 1/2 inch; miter and seam corners. ' 7. Shop fabricate corner sections with non-moving corner joints and 18 inch long legs. 8. Fabricate vertical faces with bottom edge formed outward 1/4 inch and hemmed to form drip. 9. Form seams lapped in the direction of water flow. B. Fabricate all flashing to detail, in accordance with referenced SMACNA Architectural Sheet Metal Manual details, and as specified below. Use minimum 24 gage prefinished galvanized steel sheet unless indicated or specified otherwise. 1. Parapet Caps (Copings): Fabricate with slotted holes at 24 inches on center for fastening at the ' back; standing seam (design J8);joints per Table 3-1; 22 gage for copings wider than 18 inches. 2. Counterflashing and Receivers: Removable type; SMACNA Fig 4-4 snaplock or screw-retained configuration; shop fabricated corners; crimped ends to permit lapping at end-to-end joints; 1 Inch at receivers; 3 inches at counterflashing. ' 3. Gutters: Prefinished galvanized steel; SMACNA Figure 1-2, Style A or F; 4 inch width unless indicated otherwise; provide straps or ferrules at 36 inches on center per Fig 1-14; expansion joints at maximum 50 feet in accordance with Figure 1-5. 4. Downspouts: Prefinished galvanized steel; SMACNA Figure 1-32; 3"x 4" rectangular(Figure 1- 132B). 5. Lead Drain Flashing: Dimension for minimum 12 inches between edge of drain and edge of flashing, all around; furnish in one continuous piece, including at drain/overflow locations. Furnish to roofer for installation in the roofing system at the drains. TEMPLATE 076200-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 076200 -SHEET METAL FLASHING AND TRIM 1 6. Pipe Penetrations: SMACNA plate Fig 4-15, B or C as applicable; provide two piece flashing at 4- 15B. Provide flexible boot pipe flashing at the locations indicated. Furnish to roofer for installation in the roofing system. 7. Embedded Flashing: Fabricate embedded flashing with provisions for removable counter flashing (SMACNA Figure 4-4 snaplock or screw-retained configuration; shop fabricated corners). Fabricate all receivers and flashings which are built into brick veneer, precast concrete, cement plaster, and other similar construction, of 24 gage stainless steel. Fully exposed and removable counter flashing which is connected to embedded flashing may be 24 gage prefinished galvanized sheet. Supply embedded flashing to the appropriate installers for installation as a part of their Work. PART 3 - EXECUTION ' 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 INSTALLATION A. Coordinate and sequence flashing installation with the work of other Sections. Furnish flashing to other trades as necessary for installation as a part of the work of other Sections. B. Use flexible flashing in locations indicated, and under all copings and curb flashings. C. Install starter and edge strips, and continuous cleats before starting installation. D. Fastening: 1. Secure flashings using continuous cleats whenever possible. Use exposed fasteners only at the backside of copings, and at other locations not exposed to public view, unless otherwise approved by the Architect. 2. Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles. 3. Insert counterflashings into receivers to form tight fit; where snap fit is not provided, secure in place with stainless steel sheet metal screws, 16" o.c., maximum. Stagger counterflashing joints with receiver joints 4. Insert flashings into reglets to form tight fit; secure in place. E. Make watertight connections between scuppers and adjacent roofs, walls, and flashings. Seal all laps. F. Joints: 1. Install metal flashings (including embedded flashings and reglets)with provision for plus or minus 1/16 inch thermal movement at each end; provide expansion joints at 12'-0"o.c., maximum. 2. Seal concealed lap joints in with two parallel beads of butyl sealant; use butyl sealant where bedding sealant is indicated or required. , 3.3 FIELD TESTING A. Upon request of the Architect, demonstrate that installation is completely watertight by hosing with water as directed. END OF SECTION ' TEMPLATE 076200-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 077200 - ROOF ACCESSORIES PART 1 -GENERAL ' 1.1 SUMMARY A. Section Includes: 1. Roof access hatches. ' 2. Retractable safety post. 3. Safety railing system. B. Related Section: ' 1. 055000 - Metal Fabrications: Access ladders. 2. 075423SB THERMOPLASTIC MEMBRANE (TPO) ROOFING: Coordination. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. ' 1.2 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product data. PART 2 -PRODUCTS ' PART 3 - EXECUTION 3.1 INSPECTION ' A. Verify that deck openings, supports, and other items affecting the work of this Section are complete and positioned correctly. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 INSTALLATION ' A. Install components in accordance with manufacturer's instructions, and as indicated. Coordinate with installation of metal deck and concrete fill, roofing, flashing, and other trades as necessary to ensure secure and watertight installation. B. Mount safety post to access ladder beneath roof hatch in accordance with manufacturer's recommendations. C. Mount safety railing system to roof hatch in accordance with manufacturer's recommendations. ' END OF SECTION 1 TEMPLATE 077200-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 079200 -JOINT SEALANTS PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Cleaning and preparation of joint surfaces. 2. Sealant and backing materials. 3. Sustainable design requirements. B. Related Sections: 1. 013546 - Sustainable Design Requirements. 2. 076200 - Sheet Metal Flashing and Trim: Sealants, furnished and installed as part of flashing and sheet metal work. 3. 078400 - Firestopping: Fire penetration sealants. 4. 088000 - Glazing: Glazing sealants. 5. 093000-Tiling: Grout color samples; mock-up. 6. 098100 -Acoustic Insulation: Acoustical sealant. 7. 321313 - Concrete Paving: Expansion joint fillers. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C1193 - Guide for Use of Joint Sealants. 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: Submit for each sealant material used. Include manufacturer's surface preparation, priming, and installation instructions for each proposed sealant. C. Samples: 1. Submit cured samples of each sealant type and color proposed for the work. 2. For each sealant type indicated for"color as selected," or for which no color is indicated, submit color card indicating available stock colors from manufacturer's complete line of pre-formulated colors for each type of sealant. 3. For custom colors, request color selection from the Architect prior to sample submittal. Custom colors to match grout joints in tile shall match the sample submitted from the tile installer as specified in Section 093000. D. Quality Control Submittals: 1. Schedule of sealant types, colors and respective locations. E. Sustainable Design Submittal: 1. MSDS Sheets: Submit MSDS sheets for interior sealant systems to meet submittal sustainable design requirements. 1.4 QUALITY ASSURANCE A. Installers: 1. Use only skilled workmen specially trained in the techniques of sealing, and familiar with the published recommendations of the manufacturers of the sealants being used. B. Verify that sealants are compatible with the substrates and accessory materials provided under other Sections. TEMPLATE 079200-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 079200 -JOINT SEALANTS ' 1.5 ENVIRONMENTAL CONDITIONS A. Unless recommended otherwise by the manufacturer, install sealant systems as follows: 1. Do not apply sealant when ambient temperatures are below 40 degrees F, or expected to fall ' below 40 degrees F before sealant cure is complete. 2. Do not apply sealant to substrates or accessories that are moist. 1.6 GUARANTEE A. Furnish guarantees in accordance with Section 017700. B. Furnish a 2 year installer's guarantee covering defects in installation. C. Furnish Type S sealant manufacturer's 20 year material guarantee. PART 2 - PRODUCTS 2.1 SEALANTS A. Type S - Neutral Cure Silicone Sealants: 1. Dow Corning, 790 Silicone Building Sealant, or"795 Silicone Structural Glazing and ' Weatherproofing Sealant." 2. Pecora "890 Architectural Silicone Sealant." 3. Spectrem 3 by Tremco Incorporated. ' B. Type P: ASTM C920, Type M, grade NS, Class 25; Tremco "Dymeric," Chem-Calk 500, Pecora "Dynatrol II," Sonneborn "Sonalastic NP-II", PRC "Permapol RC-2," or approved. C. Type PT: ASTM C920, Type M, Grade P, class 25; Tremco "THC 900", Sonneborn/ChemRex "Sonolastic SL 2", Pecora "Urexpan NR-200", or approved; standard colors as selected. D. Type PTNS: ASTM C920, Type M, grade NS, Class 25, Use T; Pecora "Dynatred,"Tremco "THC901,"Sika "Sikaflex-2c NS TG," or approved; custom colors to match the Architect's samples. ' E. Type A: 1. Sealants shall meet the requirements of the Southern California South Coast Air Quality Management District (SCAQMD) Rule 1168. (maximum VOC content of 250 grams/liter) ' 2. "AC2O+Silicone" by Pecora (800-523-6688). Select standard color to match adjacent finishes as close as possible. F. Type SM: Mildew Resistant Silicone Sealant: 1. Sealants shall meet the requirements of the Southern California South Coast Air Quality ' Management District(SCAQMD) Rule 1168. (maximum VOC content of 250 grams/liter) 2. "898 Silicone" by Pecora (800-523-6688), or approved. Select standard color to match adjacent finishes as close as possible; clear color, except use white at white fixtures. ' 2.2 COMPRESSIBLE FOAM TAPE A. Precompressed self-adhesive open cell polyurethane foam tape; grey or black color; "Greyflex" by Emseal Joint Systems, Ltd., "Will-Seal" by Illbruck., or approved. ' B. Furnish tape in thickness recommended by the manufacturer for widths of joints to be filled. 2.3 ACCESSORY MATERIALS A. Primer: 1. Non-staining type, recommended by sealant manufacturer to suit application. 2. Primers for interior sealants shall meet the requirements of the Southern California South Coast Air Quality Management District(SCAQMD) Rule 1168. (maximum VOC content of 250 ' grams/liter for non-porous surfaces; 750 grams/liter for other surfaces) B. Joint Cleaner: Non-corrosive and non-staining type, recommended by sealant manufacturer; compatible with joint forming materials. ' C. Backer Rod: Closed or open cell foam as recommended by the sealant manufacturer for the application; round profile; thickness approximately 130 percent of joint width. TEMPLATE 079200-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 079200 -JOINT SEALANTS D. Bond Breaker: Pressure sensitive tape recommended by sealant manufacturer to suit application. ' PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. C. Verify joint dimensions and conditions are acceptable to receive the work of this Section. 3.2 PREPARATION A. Clean and prepare joints in accordance with manufacturer's instructions. Remove any loose materials and other foreign matter which might impair adhesion of sealant. B. Apply masking tightly around joints to protect adjacent surfaces from excess sealant. C. Prime as required for proper bond to substrate materials. D. Backing Materials: 1. Place backer rod to achieve proper sealant width/depth ratios and to prevent sealant sag. 2. Use bond breaker where there is insufficient depth to use joint filler. 3. Do not use backer rod and bond breaker at joints to receive Type PTNS sealant. 3.3 COMPRESSIBLE FOAM TAPE INSTALLATION A. Install in accordance with manufacturer's recommendations. B. Install sufficiently deep to accommodate the installation of the Type S sealant. 3.4 INSTALLATION A. Perform work in accordance with ASTM C1193, unless specified otherwise or recommended otherwise by the sealant manufacturer. B. Apply sealant within recommended temperature ranges. C. Joint Profile: 1. Sealant beads shall have a sectional width to depth ratio of 2 to 1, unless specified otherwise or recommended otherwise by the sealant manufacturer. 2. Install Type PTNS sealant full depth in tile expansion joints with no backer rod. D. Tooling: 1. Tool joints concave, unless indicated or specified otherwise. Finish to uniform profile and depth, free of air pockets, embedded matter, ridges, and sags. 2. Tool type PTNS sealant to match grout joint profile. 3.5 CLEANUP A. Clean adjacent surfaces free of excess sealant as the work progresses. Use cleaning agents recommended by the sealant manufacturer. B. Upon completion, remove and dispose of masking. 3.6 PROTECTION A. Protect sealant in joints subject to dirt, moisture, and traffic during the sealant curing process. Protection shall be able to resist traffic while remaining securely in position. t TEMPLATE 079200-3 10/12/18 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 079200 -JOINT SEALANTS 3.7 SCHEDULE A. Type S: Provide at all exterior joints, unless specified otherwise; colors as selected from manufacturer's complete line for each type of sealant. IB. Type P: Provide at all exterior joints in concrete or masonry, unless specified otherwise; standard colors as selected from manufacturer's complete line of pre-formulated colors. I C. Type PT: Provide at all exterior and interior horizontal joints subject to traffic and abrasion, unless specified otherwise; standard colors as selected from manufacturer's complete line of pre-formulated colors. D. Type PTNS: Provide at all expansion joints in tile; custom colors to match grout samples submitted by Ithe tile installer. E. Type A: Provide at all interior joints, unless specified otherwise. F. Type SM: Provide at joints around countertops in kitchen or coffee areas. END OF SECTION I I I I I I I I I I I ITEMPLATE 079200-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 081113 - HOLLOW METAL DOORS AND FRAMES ' PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Rolled steel doors and frames. 2. Accessories. B. Related Sections: 1. 081400-Wood Doors: Doors for metal frames. 2. 087100 - Door Hardware. 3. 087300- Door and Hardware Installation: Installation of doors and related hardware. 4. 088000- Glazing: Glazing in doors and frames. 5. 092200 - Lightgage Metal Support Framing: Bracing for frame installation. 6. 099013— Exterior Painting and Coating: Field painting of doors and frames. 7. 099023— Interior Painting and Coating: Field painting of doors and frames. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American National Standards Institute (ANSI): A250.8 - SDI-100 Recommended Specifications for Standard Steel Doors and Frames. B. American Society for Testing and Materials (ASTM) 1. A167 - Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip. 2. A366 - Specification for Steel, Carbon, Cold Rolled Sheet, Commercial Quality. 3. A569- Specification for Steel, Carbon (0.15 Maximum Percent), Hot Rolled Sheet and Strip, Commercial Quality. 4. A653 - Specification for Steel Sheet, Zinc-coated (Galvanized)or Zinc-Iron Alloy-Coated (Galvannealed) by Hot-Dip Process. C. International Building Code (IBC) D. National Fire Protection Association (NFPA): NFPA 80 - Fire Doors and Windows. E. Steel Door Institute (SDI): SDI-105- Recommended Erection Instructions for Steel Frames. 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Literature: Submit manufacturer's published literature for doors and frames. ' C. Shop Drawings: 1. Frames: Indicate configuration, anchor types and spacings, location of cutouts for hardware, reinforcement, and finish. 2. Doors: Indicate elevations, internal reinforcement, closure method, and cutouts for hardware, glazing and louvers. 1.4 QUALITY ASSURANCE A. Conform to requirements of ANSI A250.8. B. Regulatory Requirements: 1. Installed frame and door assembly shall conform to NFPA 80 for fire rated class indicated. 2. Where doors are noted with an hourly fire resistance rating, provide door and frame assemblies labeled by Underwriter's Laboratory, or any other testing laboratory approved by the local code authorities, to meet the hourly fire rating noted. Assemblies shall meet IBC requirements for positive pressure. TEMPLATE 081113-1 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 081113 -HOLLOW METAL DOORS AND FRAMES I 3. Where a hollow metal frame is used as a glazed opening in an interior fire rated wall assembly, the frame shall be labeled to match the fire rating required for a door assembly in the fire rated wall, except in a 1 hour rated exit corridor wall assembly, the glazed frame shall be labeled to a 45 minute rating. In a 1 hour fire rated corridor wall assembly, where the door frame is integral with the glazed frame, the frame shall have a 45 minute rating. 4. Include "S" label on fire rated door assemblies which are located at 1 hour rated exit corridors. 5. Fire rated assemblies shall comply with local jurisdictional requirements. I 1.5 DELIVERY, STORAGE AND HANDLING A. In accordance with Section 016000. I B. Protect doors and frames with factory installed protective packaging. Maintain protective packaging until installation commences. I PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. Members of the Steel Door Institute and of the National Association of Architectural Metal I Manufacturers, subject to compliance with the specified requirements. 2.2 MATERIALS A. Steel Sheet: Cold rolled ASTM A366, or hot rolled pickled and oiled sheet conforming to ASTM A569, Iexcept ASTM A167, Type 304 stainless steel at locations scheduled. 2.3 DOORS I A. ANSI A250.8; Seamless. B. Minimum 18 gage face sheets for interior doors; minimum 16 gage face sheets for exterior doors. C. Core: I 1. Interior Doors: Vertical steel stiffeners with sound deadening fill between stiffeners, or resin impregnated kraft paper honey comb core. 2. Exterior Doors: Polystyrene or polyurethane foam core. D. Provide continuously welded seamless edges. E. Close top edges of exterior doors flush with steel filler cap; seal joints watertight. F. Cut mortises for butts using appropriate templates; universal non-handed preparation of doors is not I acceptable. 2.4 FRAMES I A. Design: Double rabbet, unless indicated otherwise; fully welded. Fabricate frames with throat dimensions as indicated. Provide 1 inch returns at exterior frames as detailed. B. Gages: 1. Exterior Frames: Minimum 14 gage. 2. Interior Frames: Minimum 16 gage for frames of door openings up to and including 4 feet in width; 14 gage for frames greater than 4 feet in width. C. Provide mortar guard boxes at masonry construction. I2.5 ACCESSORIES A. Glazing Stops: Rolled steel channel shape, butted corners; prepared for countersink style I tamperproof screws. 2.6 FINISH A. Exterior Units: I 1. A60 hot dip galvannealed coating conforming to ASTM A653; factory un-primed. 2. Include reinforcing and other internal components. TEMPLATE 081113-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 081113 - HOLLOW METAL DOORS AND FRAMES ' 3. Use zinc rich primer to touch-up galvanized coatings damaged during fabrication or handling. 4. Shop prime galvanized surfaces with Sherwin Williams "DTM Wash Primer B71Y00001 "; self- crosslinking acrylic primer; color similar but not identical to finish coat. One coat in compliance with manufacturer's instructions for surface preparation and application. 5. Shop finish primed surfaces with Sherwin Williams "Acrolon 218 HS Acrylic Polyurethane"; 2 coats in compliance with manufacturer's instructions B. Interior Units: Manufacturer's standard rust inhibitive primer. C. Stainless Steel Frames: No. 4 satin finish. 1 PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 INSTALLATION OF FRAMES A. Install frames in accordance with SDI-105 and in accordance with labeling requirements. B. Coordinate with wall construction for anchor placement. C. Coordinate installation of glass and glazing. D. Install accessories. E. Install roll formed steel reinforcement channels between two abutting frames. Anchor to structure and floor. F. Installation Tolerances; Maximum Diagonal Distortion: 1/16 inch measured with straight edge, corner to corner. G. Door and hardware installation is specified in Section 087300. 1 END OF SECTION 1 I TEMPLATE 081113-3 10/12/18 STARBUCKS COFFEE COMPANY e GUIDE SPECIFICATIONS SECTION 081400 -WOOD DOORS PART 1 -GENERAL ' 1.1 SUMMARY A. Section Includes: 1. Wood doors. 2. Door accessories. B. Related Sections: 1. 081113- Hollow Metal Doors and Frames: Steel frames. 2. 087100 - Door Hardware. 3. 088000 -Glazing: Vision lites. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. Architectural Woodwork Institute (AWI): Architectural Woodwork Quality Standards, Guide Specifications, and Quality Certification Program; current edition. B. International Building Code (IBC) C. NFPA 80- Fire Doors and windows. D. Window and Door Manufacturing Association (WDMA): Industry Standard I.S.1-A current edition. I1.3 SUBMITTALS A. In accordance with Section 013300. ' B. Product Data: Submit manufacturer's product literature for each type of door. C. Shop Drawings: Indicate door sizes and thickness, materials, stile and rail reinforcement, internal blocking for hardware attachment, cutouts for glazing and louvers, louver details and glazing stops. D. Samples: Submit two 8 x 10 inch samples of each transparent finish species and finish combination proposed. 1.4 QUALITY ASSURANCE A. Regulatory Requirements: 1. Installed frame and door assembly shall conform to NFPA 80 for fire rated class indicated. 2. Where doors are noted with an hourly fire resistance rating, provide door and frame assemblies ' labeled by Underwriter's Laboratory, or any other testing laboratory approved by the local code authorities, to meet the hourly fire rating noted. Assemblies shall meet IBC requirements for positive pressure. 3. Include "S" label on fire rated door assemblies which are located at 1 hour rated exit corridors. B. Urea-Formaldehyde Free: All materials used to manufacture the door shall be urea-formaldehyde free. ' 1.5 DELIVERY, STORAGE, AND PROTECTION A. In accordance with Section 016000. B. Package, deliver, and store doors in accordance with AWI requirements. 1.6 WARRANTY A. Furnish manufacturer's standard warranty under provisions of Section 017700. I TEMPLATE 081400-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 081400 -WOOD DOORS 1 PART 2 - PRODUCTS 2.1 DOORS A. Solid Core Flush Doors: 1. Approved Manufacturers: One of the following. a. Algoma Hardwoods, Inc. (Algoma, WI; 920-487-5221; 800-678-8910). b. Marshfield Door Systems (Marshfield,WI 800-869-3667). c. Eggers Industries (Two Rivers, WI; 920-793-1351). 2. AWI Section 1300, PC-5 or PC-7 (5 or 7 ply construction; bonded core); Premium grade. 3. Core: Solid particleboard, unless required otherwise for fire labeling requirements; formaldehyde free. 4. Furnish labeled doors as required to meet the hourly fire rating indicated. 5. Face Veneer: a. For Transparent Finish: AWI Grade AA; Yellow Birch, Select White; rotary cut; minimum 1/50"thickness for panels; minimum 1/8 inch thick at stiles and rails; slip matched at panels. b. Paint Grade Veneer: Medium density overlay or paint grade birch. . 6. 1-3/4 inch thick, unless scheduled otherwise. 7. Where intumescent seals are required to meet positive pressure labeling requirements, provide concealed edge sealing system built into the door edge. 8. At transparent finish doors, edges shall be wood to match face veneer; no finger joints will be permitted except at paint grade doors. 2.2 ACCESSORIES A. Glass Stops: Wood type, except as required to conform to labeling requirements; finished to match I door finish. 2.3 FABRICATION A. Fabricate doors to the configurations indicated, in accordance with the AWI standards specified, and to fire rated labeling requirements. Attach fire and smoke rating labels. B. Bevel lock and hinge edges 1/8 inch in 2 inches on single acting doors. ' C. Bond edge banding to solid core with hot melt or RF cured adhesive. D. Prefit and premachine doors in accordance with AWI 1300-S-6. Premachine for hardware specified in Section 087100. E. Doors shall be factory prefinished as scheduled to match Architect's sample; AWI Premium Grade U- V Cured Polyurethane. F. Factory pre-glaze doors. G. Flush Door Blocking: For flush doors, provide solid lock blocks and special blocking as required for the hardware components specified elsewhere. Blocking for fire rated doors shall meet the door manufacturer's labeling requirements. PART 3 - EXECUTION 3.1 INSTALLATION A. Door and hardware installation is specified in Section 087300. B. Install doors in accordance with manufacturer's instructions, and the fire rated labeling requirements. ' 3.2 INSTALLATION TOLERANCES A. Maximum Diagonal Distortion: 1/16 inch measured with straight edge, corner to corner. TEMPLATE 081400-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 081400 -WOOD DOORS 3.3 ADJUSTING AND CLEANING A. Adjust for smooth and balanced door movement. ' END OF SECTION I I I r 1 I 0 I I ' TEMPLATE 081400-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 084000—ALUMINUM-FRAMED ENTRANCES, STOREFRONTS AND WINDOWS 1 PART 1 -GENERAL I 1.1 SUMMARY A. Section Includes: 1. Stick framed exterior aluminum storefront system. 2. Aluminum and glass entrances. 3. Aluminum and glass windows. 4. Stick-framed interior storefront system B. Related Sections: 1. 079200-Joint Sealants: Perimeter sealants. 2. 088000- Glazing: Glass and glazing. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES I A. American Society for Testing and Materials (ASTM): 1. A123-Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products. 2. B209 -Aluminum and Aluminum Alloy Sheet and Plate. 3. B221 -Aluminum Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes. 4. E283 - Rate of Air Leakage through Exterior Windows, Curtain Walls, and Doors. 5. E330 -Structural Performance of Exterior Windows, Curtain Walls, and Doors by Uniform Static Air Pressure Difference. 6. E331 -Test Method for Water Penetration of Exterior Windows, Curtainwalls, and Doors by Uniform Static Air Pressure Difference. B. American Architectural Manufacturers Association (AAMA) 1. 2605-02 -Voluntary Specification, Performance Requirements and Test Procedures for Superior Performing Organic Coatings on Aluminum Extrusions and Panels. 1.3 SYSTEM DESCRIPTION A. Performance: 1. System shall provide for expansion and contraction caused by a cycling temperature range of- 20°F to +160°F without causing detrimental effects to components, sealing systems, and surrounding construction. 2. Design system with provisions to drain moisture to the exterior of the system. 3. Air Infiltration: a. Fixed Glazing: Limit air infiltration through assembly to 0.06 cfm/sf of assembly surface area, measured at a reference differential pressure across assembly of 6.24 psf as b. Swing Door: Limit to 1 cfm/ft of perimeter crack around pair of doors, measured at a reference differential pressure across assembly of 1.57 psf, as measured in accordance with ANSI/ASTM E283. 4. Water Infiltration; Storefront System: No water penetration at a test pressure of 6.24 lb/sf when measured in accordance with ASTM E331. B. Thermal Transmittance (Exterior Storefront): Maximum U=0.38 when tested in accordance with NFRC requirements. Provide curtain wall systems with certification stating that they have been tested in accordance with NFRC to meet the specified requirements using glass which matches the glass to be used in the Project. C. System Structural Design: 1. Design and size members and anchorages to withstand positive and negative wind loads as required by the jurisdictional code authorities, and to resist pivot and closer reaction forces. TEMPLATE 084000-1 10/12/18 STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 084000—ALUMINUM-FRAMED ENTRANCES, STOREFRONTS AND WINDOWS 2. Limit mullion deflection to 1/175, or flexure limit of glass with full recovery of glazing materials, whichever is less. D. Dynamic Movement: System shall accommodate the following without damage to system ' components or performance. 1. Movement within the system. 2. Application and release of design live loads. ' 3. ±5/8" maximum deflection of structural support framing between head and sill. E. Profiles: Framing member profiles, as indicated in the Drawings, indicate proportions and intent. Minor variations in profiles, assemblies, and connections which are indicated on the shop drawings will be accepted, provided that, in the opinion of the Architect, they do not substantially alter the ' intended appearance. 1.4 SUBMITTALS ' A. Make submittals in accordance with Section 013300. B. Shop Drawings: 1. Include wall opening dimensions, component dimensions, tolerances required, anchorages and ' fasteners, operator and electrical coordination requirements, relationship to adjacent construction, threshold configurations, installation details, flashings, and sealant locations. C. Samples: 1. Finish Sample: Submit three samples, minimum 2"x4", of aluminum finished with system and ' color proposed for the finished work. D. Quality Control Submittals: 1. Submit either of the following to verify that the proposed systems meet the structural performance requirements specified. a. Shop drawings signed and sealed by a Professional Engineer registered in the State where the Project is located. b. Certified test report data verifying structural compliance of systems similar to those to be provided. 2. Test Reports: Submit copies of test reports which verify that each aluminum framed glazing system meets the air and water infiltration performance requirements specified. E. Closeout Submittal 1. In accordance with Section 017700. 2. Submit designing engineer's certification that products and installation comply with design requirements. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Company authorized by system manufacturer, one installer for total system. B. Structural design of framing system and anchorages shall be performed under the supervision of a professional structural engineer, licensed to practice in the State where the Project is located. 1.6 DELIVERY, STORAGE, AND HANDLING A. In accordance with Section 016000. 1.7 GUARANTEE AND WARRANTY A. Furnish in accordance with Section 017700. B. Manufacturer's Warranty: Furnish three year written warranties executed to the Owner, from the manufacturers of the storefront and aluminum window systems, against defects in materials and ' workmanship. C. Installer's Guarantee: Furnish three year written guarantee against defects in installation. TEMPLATE 084000-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 084000—ALUMINUM-FRAMED ENTRANCES, STOREFRONTS AND WINDOWS PART 2 - PRODUCTS 2.1 STOREFRONT SYSTEMS A. Acceptable Manufacturers: Kawneer Co. Inc, Arcadia, Vistawall, US Aluminum Corporation, or approved. B. Exterior Framing System: Storefront Framing: Kawneer VG 451T, Arcadia AG451T, Vistwall Series FG-3000T, US Aluminum Corporation IT 451, or approved; 2 x 4-1/2 inch extruded aluminum section; center set; flush design; thermally broken. C. Framing System: Storefront Framing: Kawneer Trifab 450, Arcadia A450, Vistwall Series FG-2000, US Aluminum Corporation 450, or approved; 2 x 4-1/2 inch extruded aluminum section; center set; flush design. r D. Furnish spacers and adapters as necessary for a complete installation. 2.2 DOORS A. Swinging Entry Doors: Kawneer Company, Inc. "350 Heavy Wall Door"; Heavy duty aluminum/glass type; outswinging. 1. As Specified: Kawneer Company, Inc. "350 Heavy Wall Door"; aluminum door system. 2. Acceptable Substitution: United States Aluminum Corporation "Durafront Series 800"door; aluminum door system. 3. Configure with 10 inch high bottom rail. 2.3 MATERIALS A. Extruded Aluminum: ANSI/ASTM B221; 6063-T5 Alloy and Temper. B. Sheet Aluminum: ASTM B209, minimum .019 inch thickness for flashings, minimum .062 inch thick for brake formed trim applications. C. Fasteners: Stainless steel, or zinc-plated in accordance with ASTM A164. D. Glazing: Furnished under Section 088000. Provide shop glazed units at Contractor's option. E. Miscellaneous Accessories: Furnish reinforcing, attachment hardware, aluminum flashings, and other items as necessary. 2.4 DOOR HARDWARE I A. Door Hardware: Manufacturer's standard, and as follows. 1. Weatherstripping: Hard-backed poly pile in door and/or frame. Meeting stile of each leaf shall have a double line of hard-backed poly-pile astragal. 2. Threshold: Extruded aluminum with ribbed surface 3. Sill Sweeps: Brush strip, concealed. 4. Pivoting/Hinging: Offset pivot; top and intermediate. 5. Closers: Dorma BTS 80 NHO; concealed floor closer; single acting; offset pivot. 6. Latches/Strike: Adams-Rite MS1830 with provisions for keyed cylinders on interior face only; mount to bottom rail. Furnish keyed cylinders as directed by the Owner. 7. Push/Pulls: Arcadia Radius Push-Pull Set; straight pull option; clear finish. 8. Cylinder Guard. 9. Exit Indicator. 10. Transom Decal: ("THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS" ) B. Low Energy Operator: 1. The following manufacturer's are approved, subject to the specified requirements: a. Horton Automatics Division of Overhead Door Corporation. b. Stanley. c. Dor-O-matic. 2. Operator: Low energy electro-mechanical swing operator; overhead concealed transom mount door configurations as indicated on the Drawings; aluminum housing with clear anodized aluminum finish. 3. Pushbutton Switches: TEMPLATE 084000-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 084000—ALUMINUM-FRAMED ENTRANCES, STOREFRONTS AND WINDOWS a. Jamb Mounted Pushbutton Switches: Recessed configuration for mounting in cutout in adjacent jamb; narrow profile black cover plate with handicap logo, red push button, and text to read PRESS TO OPEN; white enamel paint filled engraving. b. Wall Mounted Pushbutton Switches: Recessed configuration in 4x4 junction box; 6" diameter stainless steel push plate with engraved handicap logo and message "PRESS TO OPEN." Provide blue enamel filled engraving. c. Provide 2 switches per opening. d. Provide weatherproof design for exterior installations. 4. Remote Power Switches: a. Model 1200MC (maintained contact)with key operated switch, labeled ON and OFF by Folger Adam Security, Lemont, IL (630/739-3900). ' b. Bronze cover plate with oil rubbed finish similar to US10B. c. Keyed cylinders are furnished under Section 087100 for installation by this Section. 5. Low energy doors shall conform to the currently enforced edition of ANSI A156.19. C. Threshold for Swinging Doors: Rixson 4x800 or approved; extruded aluminum, modified as necessary to suit conditions; mill finish aluminum; undrilled, furnish stainless steel Phillips flathead screws and shields or expansion anchors as appropriate for attachment of threshold. Machine minimum openings as required to receive deadlock bolt. ' D. Locks, Pulls, and Indicators: Furnished under Section 087100. 2.5 FABRICATION ' A. Field verify openings prior to fabrication. B. Fabricate frames allowing for shim spacing around perimeter of assembly, yet enabling installation. C. Rigidly fit joints and corners. Accurately fit and secure corners tight. Make corner joints flush, hairline, and weatherproof. Seal joints with sealant. D. Provide drainage holes to allow water to flow to exterior. ' E. Prepare components to receive anchorage devices. Fabricate anchorage items. F. Form bent components accurately to line, without deformation of component profiles. Fabricate in lengths consistent with finisher's capacity to handle bent shapes. Prefit all clips and mating ' components to ensure secure fit at time of assembly. G. Provide internal reinforcement in mullions with members to maintain rigidity. Provide reinforcing at all door strike jambs. ' H. Fabricate storefront system to accommodate hardware using templates furnished from Section 087100. I. Furnish thermally broken backing plates at head and jambs to receive sealant and backing rod; provide partial closures at ends of jambs and mullions to receive sealant. J. Fabricate custom extrusions, closures, and sheet materials to the shapes indicated; fabricate for attachment with concealed fasteners to the greatest possible extent. 2.6 FINISHES A. Finish for Exposed Aluminum Surfaces: Minimum 70 percent resin Kynar 500 or Hylar 5000 PVDF system complying with AAMA 2605; custom non-exotic color as scheduled on the Drawings. B. Concealed Steel Items: Galvanized in accordance with ANSI/ASTM A123 to minimum 1.7 oz/sf. C. Apply two coats of bituminous paint to concealed aluminum and steel surfaces in contact with cementitious or dissimilar materials. PART 3 - EXECUTION 3.1 INSPECTION A. Verify wall openings are ready to receive work of this Section. TEMPLATE 084000-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 084000—ALUMINUM-FRAMED ENTRANCES, STOREFRONTS AND WINDOWS I B. Notify Architect of unacceptable conditions, prior to installation. Do not install window units until such conditions have been corrected. 3.2 INSTALLATION A. Install frames and hardware in accordance with manufacturer's instructions. 1 B. Storefront Framing: 1. Sill Flashing: a. Provide color matching aluminum back angle and drip flashings in the configuration indicated. b. Provide continuous flexible flashing seal of the rough opening sill. Adhere the flexible flashing up the back of the angle and up the jamb at the end dams. Seal all joints. Do not expose the flexible flashing. c. Install under-sill aluminum drip flashings. Seal all frame joints, and penetrations in flashings. Coordinate with other Section when drip flashing is furnished under separate section. Provide canted solid blocking or shims to ensure that the sill pan is sloped to drain. d. Prepare for installation of the sub-sill assembly over. 2. Sub-Sills: a. Provide extruded aluminum sub-sills in accordance with manufacturer's installation instructions and as specified below. b. Provide manufacturer's standard end dams and splice plates sealed into position. End dams and splice plates shall match the height of the sub-sill back. c. Seal joint between end dam and jamb. d. Fasten the sub-sill securely to the sill construction. Cap seal tops of fasteners. e. Fasten the storefront framing into the sub-sill. Use manufacturer's standard interlocking anchors which engage the sub-sill and allow fastening of the storefront without penetrating the horizontal pan of the sub-sill. 3. Install water diverters. 4. Compensation Heads: a. Provide compensation channels at head conditions in accordance with manufacturer's installation instructions and as specified below. b. Provide manufacturer's standard end caps sealed into position. End caps shall match the height of the compensation channel and shall be pre-finished to match the framing at exposed locations. 1 c. Provide interlocking mullion anchors at vertical tubes. C. Where compensating head channels are used, screw channels to structure with center of channel fixed and other fasteners through slotted holes. D. Screw attach end dams to sub-sill ends; seal joints between dam and sub-sill. Fasten the sub-sill , securely into the openings. Cap seal tops of fasteners. E. Install sealant to vertical leg of sub-sill and to end dams and set framing into sealant. Fasten the storefront framing into the sub-sill. Use manufacturer's standard interlocking anchors which engage the sub-sill and allow fastening of the storefront without penetrating the horizontal pan of the sub-sill. F. Install preformed gasket at top of sub-sill against back of storefront sill. G. Align frames plumb and level, free of warp or twist. Maintain dimensional tolerances, aligning with adjacent work. H. Install under sill aluminum flashings and water diverters. Seal all frame joints, and penetrations in flashings. I. Doors: 1. Install closers and doors for uniform clearances and smooth operation. 2. Coordinate with Division 16, and other trades as necessary for installation of barrier free entrance operators. J. Low Energy Operators: TEMPLATE 084000-5 10/12/18 ' 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 084000—ALUMINUM-FRAMED ENTRANCES, STOREFRONTS AND WINDOWS I 1. Install operators and controls in accordance with manufacturer's instructions and ANSI requirements. 2. Coordinate electrical service, wiring and connections with work of Division 26- Electrical. IK. Perimeter sealant is provided under Section 079200. 3.3 ADJUSTING I A. Set clearances and adjust operating hardware for smooth operation. B. Closers: 1. Set manual closers at exterior entrances to pounds spring tension at the pull handles. I 2. Set initial opening force to 5 pounds and time delay at barrier free entrances to 15 seconds, unless otherwise directed. 3.4 FIELD QUALITY CONTROL I A. The aluminum framing manufacturer's design engineer or his authorized representative shall visit the site to inspect the work. Verity and certify that framing sizes and materials are as required, that connections are properly executed, and that reinforcing, where required, has been properly installed. I B. After completion of all glazing and sealing work, hose test all exterior glazed storefront and window systems. Notify Architect a minimum of 72 hours prior to hose testing. C. All areas which exhibit water penetration to the inside of the building shall be repaired, resealed, and l retested until watertightness can be demonstrated. 3.5 CLEANING A. Remove protective material from prefinished aluminum surfaces. I B. Wash down exposed surfaces using a solution of mild detergent in warm water, applied with soft, clean wiping cloths. Take care to remove dirt from corners. Wipe surfaces clean. C. Retouch damage to PVDF finish with matching air-dry material as recommended by the finish coating I manufacturer. 3.6 FIELD QUALITY CONTROL I A. The structural design engineer or an authorized representative shall visit the site to inspect the work. Verity and certify that the installation has been installed in accordance with the structural requirements. I END OF SECTION I I I 1 I ITEMPLATE 084000-6 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 087100 -DOOR HARDWARE 1 PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Finish hardware requirements. 2. Requirements for bidder-supplied hardware schedule. B. General Requirements: 1. Contractor shall provide complete hardware schedule including all pieces of hardware required at each opening as specified herein and indicated in the Drawings. 2. Allowed hardware manufacturers shall be as directed by Owner. Where specific model numbers are provided, it is for the purpose of establishing basis for quality and design only. Contractor shall provide alternate products or functions as necessary to meet requirements of Drawings and specifications. 3. Manufacturer substitutions are not permitted. 4. Obtain each type of hardware from single manufacturer. 5. Review Drawings, Door Schedule, and requirements of this Section thoroughly and provide required hardware for all openings, including openings which may have been inadvertently omitted from Door Schedule. 6. Should an opening be omitted or an opening not indicated in Door Schedule, provide hardware of same quality, design and function as specified for similar openings. 7. Furnish hardware complete with brackets, plates, fittings, and other accessories required for installation. 8. Provide screws, nuts, bolts, through-bolts, washers, grommets, and other fastening devices necessary for proper installation of hardware; match finish of hardware being attached. Non- ferrous or corrosion resistant type required where exposed to exterior atmosphere. C. Related Sections: 1. 017700 - Closeout Procedures: Submittal of keys. 2. 081113- Hollow Metal Frames. 3. 081400-Wood Doors. 4. 083100—Access Doors and Panels 5. 084228—All-Glass Partition Systems 6. 087300 - Door and Hardware Installation. D. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to work of this Section. E. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 SUBMITTALS I A. Make submittals in accordance with Section 013300. B. Manufacturer's Data: Submit 3 copies of manufacturer's data for each item of finish hardware. C. Samples: Within 35 days after award of the Contract, submit 3 samples each of Push Plates and Kick Plates in colors as selected for approval. D. Schedules: Upon award of hardware contract, submit 3 copies of the finish hardware schedule, organized into"hardware sets"and indicating complete designation of every item required for each door or opening. List in vertical form. Review of hardware schedules does not fulfill project requirements in accordance with Contract Documents. E. Templates: Furnish hardware templates to door and frame fabricators, and hardware installers. Upon request, check shop drawings of such other work to confirm that adequate provisions were made for the proper installation of hardware. I TEMPLATE 087100-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 087100 - DOOR HARDWARE 1.3 QUALITY ASSURANCE A. Supplier Qualifications: Finish hardware shall be supplied by recognized builders' hardware supplier who has been furnishing hardware in the same area as the project for a period of not less than two years. The supplier's organization shall include a member of the American Society of Architectural Hardware Consultants who is available at all reasonable times during the course of the work to meet with the Owner, Architect or Contractor for project hardware consultation. B. Regulatory Requirements: 1. Conform to requirements of the jurisdictional code authorities. 2. Where openings are noted with an hourly fire resistance rating, provide hardware components labeled by Underwriter's Laboratory, or other testing laboratory approved by the local code authorities, to meet the hourly fire rating noted. 3. Hardware shall conform to NFPA 80 for fire rated class indicated. 4. Comply with provisions of Americans with Disabilities Act (ADA), including ADA Accessibility Guidelines and ANSI A117.1, and additional accessibility requirements of the jurisdictional code authorities. 1.4 DELIVERY, STORAGE AND HANDLING A. Delivery: Deliver all hardware in manufacturers' original unopened undamaged packages, clearly identifying manufacturer, brand name, and contents. B. Replacements: In the event of damage, immediately make all repairs and replacements necessary. ' C. Mark each item of hardware as to description and location of installation in accordance with approved hardware schedule. D. Protection: Use all means necessary to protect the finish on hardware before, during and after installation. 1.5 GUARANTEES A. Furnish 5-year unconditional guarantees for all door closers, under provisions of Section 017700. 1.6 MAINTENANCE A. Factory representatives for door closers, exit bolts, and locksets shall be available during the construction to instruct the Contractor on the proper method of installation of their materials. They shall inspect and adjust their materials at the completion of the work, and supply proper maintenance manuals to the Owner. B. Furnish two (2) sets of special tools for installation and maintenance of hardware. Tools for maintenance and adjustments are to be delivered to the Owner upon completion of the work. PART 2 - PRODUCTS 2.1 HARDWARE A. Furnish hardware items as scheduled in approved bidder-supplied hardware schedule. B. Except as listed in the following paragraphs, no substitutions of materials will be allowed unless approved by the Architect. 2.2 HARDWARE MATERIALS AND FABRICATION A. Furnish fasteners for installation with each hardware item. Furnish Phillips head fasteners, countersunk oval, flat head, or undercut head as appropriate for material to be installed. Furnish door closers and exit devices applied to wood composite or mineral core doors with sex bolts sized to the ' thickness of the door. B. Compatibility: Provide fasteners which are compatible with both unit fastened and substrate, and which will not cause corrosion or deterioration of hardware, base material, or fastener. TEMPLATE 087100-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 087100 -DOOR HARDWARE 2.3 HARDWARE FINISHES A. General: Unless specifically indicated otherwise in the Landlord's "Tenant's Design and Construction Manual", provide architectural hardware in the following finishes. 1. General: US26D, Satin Chrome Plated, except: 2. Push Plates, Door Pulls, Kickplates: US32D, Satin Stainless Steel 3. Door Closers: 689/Sprayed Aluminum. 2.4 KEYING A. All locksets and deadbolts shall be keyed as directed by the Owner. B. Construction master-key all locksets and cylinder items; provide 12 construction masterkeys. C. Locksets, exit devices, deadlocks, padlocks, and cylinders (all standard cylinder items)shall be: 1. Grand masterkeyed and/or masterkeyed in sets as required. 2. Individually keyed in strict accordance with Owner's instructions. 3. Keying shall be established specifically for the Owner by the manufacturer. 2.5 HARDWARE GROUPS A. As indicated on Drawings. PART 3 - EXECUTION 3.1 INSTALLATION A. Installation of doors and hardware is specified in Section 087300. END OF SECTION 1 I I r i I t . 1 1 TEMPLATE 087100-3 10/12/18 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 087300 - DOOR AND HARDWARE INSTALLATION PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Installation of hardware specified in Section 087100. 2. Installation of wood doors. 3. Installation of hollow metal doors. B. Related Sections: ' 1. 081113- Hollow Metal Doors and Frames. 2. 081400 -Wood Doors. 3. 083100 -Access Doors and Panels. 4. 083326- Overhead Coiling Grilles. 5. 084000-Aluminum-Framed Entrances, Storefronts and Windows. 6. 087100- Door Hardware. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. • 1.2 REFERENCES A. Hollow Metal Manufacturer's Association (HMMA): 840 - Installation and Storage of Hollow Metal Doors and Frames. B. National Fire Protection Association (NFPA): 80 - Fire Doors and Windows. C. American National Standards Institute (ANSI): A250.8 - SDI-100 Recommended Specifications for Standard Steel Doors and Frames. D. The Door and Hardware Institute (DHI): Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames. E. The Door and Hardware Institute (DHI): Recommended Locations for Architectural Hardware for Wood Flush Doors. 1.3 QUALITY ASSURANCE A. Installers of doors and finish hardware shall be skilled mechanics experienced in this type of work. B. Fire rated doors and hardware shall be installed in accordance with the labeling requirements. 1.4 ENVIRONMENTAL CONDITIONS A. Do not subject wood doors to abnormal heat, dryness, or humidity, or sudden changes thereof. Condition doors to average prevailing humidity prior to hanging. PART 2 - PRODUCTS 2.1 DOORS, FRAMES, AND HARDWARE A. Doors, frames and hardware are specified in other sections. PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. TEMPLATE 087300-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 087300 -DOOR AND HARDWARE INSTALLATION 3.2 DOOR INSTALLATION ' A. Install doors in accordance with the door manufacturer's printed instructions. B. Install doors plumb and square in associated frames maintaining specified clearances. C. Except where specified otherwise in the respective door sections, maintain clearances of 1/8 inch at jambs and heads, 1/8 inch at meeting stiles for pairs of doors, and 1/2 inch from bottom of door to top of decorative floor finish or covering, except where threshold is shown or scheduled provide 1/4-inch clearance from bottom of door to top of threshold. D. Install hollow metal doors in accordance with ANSI A250.8 and HMMA 840. E. Install fire rated doors in accordance with NFPA 80. F. Install doors to operate freely, but not loosely, free from hinge bound conditions, sticking or binding. Do not install in frames which would hinder operation of doors. G. Ensure doors are free from rattling when in latched position. I 3.3 FINISH HARDWARE INSTALLATION A. Install hardware plumb, level and true to line in accordance with manufacturer's templates, printed instructions and Project conditions. B. Install fire rated hardware in accordance with NFPA 80. C. Where cutting and fitting is required on substrates to be field painted or similarly finished, install, fit, remove and store hardware prior to finishing. Reinstall hardware after finishing operations are completed. D. Do not install surface mounted items until finishes have been completed on the substrate. E. For substrates which are not factory prepared for hardware: 1. Mortise work to correct size and location without gouging, splintering or causing irregularities in exposed finish work. 2. Fit faces of mortised components snug and flush without excessive clearance. F. Coordinate installation of electronic hardware with electrical service and fire alarm system as applicable. G. Hardware Locations: The following is a general listing and may contain items which do not apply to this Project. 1. Butt Hinges: a. Top: 5 inches from inside head of frame down to top of hinge. b. Bottom: 10 inches from finish floor to bottom of hinge. c. Intermediate: Equally spaced between top and bottom hinges. 2. Pivots: a. Top and Bottom: According to manufacturer's templates. b. Intermediate: Equally spaced between top and bottom pivots. 3. Locksets and Latchsets: 38 inches from finish floor to centerline of knob or lever. 4. Dummy Trim: Backset and height to match locks and latches. 5. Deadlocks and Deadlatches: 48 inches from finish floor to centerline of cylinder. 6. Push/Pull Latches: 45 inches from finish floor to centerline of latchbolt. 7. Exit Devices: 38 inches from finish floor to centerline of cross bar or touch bar. 8. Emergency Access Door Stops: 60 inches from finish floor to centerline to stop. 9. Door Closers: a. Degree of door swing as indicated in Hardware Schedule approved by Architect, or if not indicated, locate to permit maximum door swing. b. Locate on interior side of exterior doors. c. Locate on stair side of doors at stairways. d. Locate on room side for doors in public areas, corridors and other similar areas. 1 TEMPLATE 087300-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 087300 -DOOR AND HARDWARE INSTALLATION 10. Push/Pull Bar Sets: a. Horizontal push bar centered at 42 inches above finish floor, extending full width from centerline to centerline of door stiles. b. Vertical pull bar centered on door stile centerline at 4 inches from door edge with top mounting at 45 inches above finish floor and equipped with stud to pass through door for concealed set screw mounting of push bar on opposite side. 11. Push Plates and Pulls (Back to Back): Centerline 42 inches above finish floor. Center plate between door edge and glazed opening, or 2 inches from plate edge to door edge if door is not glazed. Pull centered in relationship to plate size. 12. Door Pulls (Mounted Independently): Centerline of grip at 42 inches above finish floor, centered between door edge and glazed opening, or centerline of pull 3 inches from door edge if door is ' not glazed. 13. Push Plates (Mounted Independently): Centerline 45 inches above finish floor, centered between door edge and glazed opening, or 2 inches from plate edge to door edge if door is not I glazed. 14. Combination Push/Pull Plates: Bottom edge 40 inches above finish floor, centered between door edge and glazed opening, or 2 inches from plate edge to door edge if door is not glazed. 15. Wall Stops: Place on adjacent wall at height to contact knob, lever or pull. 16. Wall Stop/Holders: Place on adjacent wall immediately above base materials positioned such that door will strike bumper and prevent door hardware from hitting wall. Place within 3 inches of latch edge of door. 17. Floor Stops and Floor Stop/Holders: Place to permit maximum swing of door and to prevent door hardware from hitting wall. Place within 3 inches of latch edge of door, and out of foot traffic. 18. Kick Plates and Armor Places: Mount on push side, 1/8 inch above bottom edge and centered. 19. Stretcher Plates: Mount on push side, top edge 36 inches above finish floor and centered. 20. Mop Plates: Mount on pull side, 1/8 inch above bottom edge and centered. 21. Existing Frames: Hardware locations to match existing conditions where new doors are installed in existing frames. 3.4 ADJUSTMENT AND CLEANING A. Adjust and check each operating item of hardware and each door to ensure proper operation of function of every unit. B. Lubricate moving parts with graphite type lubricant unless otherwise recommended by the hardware manufacturer. C. Ensure weather-stripping and seals do not inhibit closing and positive latching of door. D. Replace defective materials or units which cannot be adjusted to operate as intended. Reinstall items found improperly installed. E. Replace or re-hang doors which are hinge bound and do not swing or operate freely. F. Remove and replace doors which are warped, twisted or which are not in true planes. G. Replace factory finished doors damaged during installation. H. Prior to date of Substantial Completion, readjust and relubricate hardware items as necessary. 3.5 FINAL ADJUSTMENT A. Wherever hardware installation is made more than 30 calendar days prior to date of Substantial Completion of a space or area, return to the work during the week prior to acceptance or occupancy and make a final check and adjustment of all hardware items in such space or area. Clean and lubricate operating items as necessary to restore proper function and finish of hardware and doors. Adjust door control devices to compensate for final operation of heating and ventilating equipment, spring power, back check, closing and latching speeds, and handicap requirements. B. Instruct Owner's personnel in proper adjustment of hardware during the final adjustment of hardware. END OF SECTION 1 TEMPLATE 087300-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 088000 -GLAZING PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Glass and glazing for aluminum entrances, storefronts, and windows. 2. Glass for wood and hollow steel doors. 3. Glazing schedule at the end of the Section. B. Related Sections: 1. 084000- Entrances, Storefronts, and Windows,: Metal framing and glazing materials. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American National Standard (ANSI): Z97.1 - Performance Specifications and Test Methods for Safety Glazing Materials in Buildings. B. American Society for Testing and Materials (ASTM): 1. C1036- Standard Specification for Flat Glass. 2. C1048- Standard Specification for Heat Treated Flat Glass, Kind HS, Kind FT (Coated and Uncoated). 3. E773-Test Method for Seal Durability of Sealed Insulating Glass Units. 4. E774 - Specifications for Sealed Insulating Glass Units. C. Glass Association of North America (GANA): Glazing Manual. D. National Fire Protection Association (NFPA): NFPA 80- "Standard for Fire Doors and Windows, 1999 Edition." E. National Fenestration Rating Council Inc. (NFRC). 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Submittals specified in this Section may be incorporated into submittal specified in other Sections, where glass is to be provided in those Sections. C. Product Data: Submit product data on glass, glazing materials, and insulating glass system. D. Shop Drawings: Show size and thicknesses of glass, proposed "bites" in frames, sizes and locations of blocking, spacers, beads, stops, and edge treatments. Note quality, type, and strength of each light. E. Warranty: Submit draft of manufacturer's and fabricator's warranty for Architect's review. 1.4 QUALITY ASSURANCE A. Comply with pertinent recommendations in the GANA"Manual of Glazing." B. Safety Glass Standard: Comply with code applicable IBC requirements. C. Qualifications of Glass Manufacturer: Provide glass produced by a nationally recognized manufacturer of high efficiency glass. D. Qualifications of Glazers: Provide personnel thoroughly trained and experienced in the skills required, and at least one person completely familiar with the referenced standards and the requirements of this Work, who shall personally direct installation of glazing materials. 1 TEMPLATE 088000-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 088000 -GLAZING 1.5 DELIVERY, STORAGE, AND HANDLING A. Comply with applicable provisions of Section 016000. B. Provide cushions at edges of glass to prevent impact damage during shipment and storage. C. Keep vacuum cups free from foreign material that could scratch glass. D. Comply with insulating unit fabricators requirements for limits on exposure to reduced barometric pressure during shipment. 1.6 WARRANTY A. Submit warranties under provisions of Section 017700. B. Replacement Guarantee: 1. Provide new conforming glass units to replace glass units which break for a period of one year. 2. Units broken by impact, fire, earthquake, or similar events which exceed the design loads and conditions are not subject to this requirement. 3. Include all labor and materials for replacement of failed unit(s). Replacement shall include coordination with the Owner, immediate provision for maintaining openings secure and weathertight, timely ordering and fabrication of replacement items as required, installation, and cleaning. C. Reflective Coating Warranty: Furnish ten year warranty from the glass manufacturer agreeing to ' replace glass units which have defective reflective coating. Defective coating is defined as peeling, discoloration, or other forms of deterioration to the reflective coating. D. Insulating Glass Unit Warranty: 1. Furnish ten year manufacturer's warranty, including coverage of units for seal failure, interpane dusting or misting, and replacement of same, under provisions of Section 017700. 2. Furnish manufacturer's warranty, including coverage of units against seal failure, or interpane dusting or misting; term of warranty as follows. a. Vertical Applications: Ten years. PART 2 -PRODUCTS 2.1 GLASS A. Furnish the following glass in combinations as scheduled at the end of this Section: 1. Clear Glass: ASTM C1036, Type I, class 1 (clear), quality Q3 glazing select. 2. Low Iron Glass: Guardian Industries Corp. "UltraWhite,"or PPG Industries "Starphire." 3. Fire Rated Laminated Glass: 5/16 inch thick laminated fire-rated and impact safety-rated glazing material; one of the following. a. Technical Glass Products (Kirkland, WA; 800-426-0279) "FireLite Plus." b. Vetrotech Saint-Gobain North America, Inc. (Auburn WA; 253-333-0660; 888-803-9533) "SGG Keralite FR-L." 2.2 ACCESSORIES A. Setting Blocks: Neoprene; 70-90 Shore A durometer hardness; 4 inches long x 1/4 high x width as required for application indicated. B. Weather Glazing Sealant: Compatible with insulating glass seal. 111 C. Glazing Tape (Interior): Norton "V-980," PTI "303," or approved. Size: 1/8 inch by 1/2 inch. . D. Glazing Gaskets for Existing Storefronts: "Santoprene,"silicone, or EPDM glazing beads, for a complete weatherproof seal; premolded or welded corners; Furnish shapes compatible with existing storefront systems. 2.3 FABRICATION A. Insulating Glass Units: 1. Dual lite units fabricated from glass as scheduled; 1/2 inch nominal airspace; dual seal system. TEMPLATE 088000-2 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 088000 -GLAZING 2. Twin seals; polyisobutylene primary seal and silicone secondary seal. Outer seal shall be compatible with glazing system. 3. Spacer Bar: Mill finish aluminum; fill with desiccant; corners shall be partially miter cut and bent (not cut through), or formed with corner keys ultrasonically soldered in place. 4. Certified through the Insulating Glass Certification Council (IGCC) in accordance with ASTM E773 and E774; certified to level CBA. 5. Each piece shall bear certification number, date, and manufacturer's identification mark. 6. Assembly of insulating units shall be by a fabricator approved by the glass materials manufacturer. B. Tempered and Heat Strengthened Glass: 1. Tempered Glass: ASTM C1048, FT; glass which has been heat treated to strengthen glass in bending to not less than 4 times the annealed strength; certified safety glass in accordance with ANSI Z97.1. 2. Heat Strengthened Glass: ASTM C1048, HS ; glass which has been heat treated to strengthen glass in bending to not less than 2 times annealed strength. 3. Fabricate tempered and heat strengthened glass units so that principle distortion will be in the horizontal direction in the finished installation. 4. Unless otherwise approved by the building official, provide manufacturer's label on each light, indicating type and thickness of glass. 5. Comply with IBC requirements for identification and labeling of safety-glazing materials in hazardous locations subject to human impact loads. 6. Fabrication Process: Horizontal (roller-hearth) process with roll-wave distortion parallel to bottom edge of glass as installed, unless otherwise indicated. C. Laminated Glass (PVB): 1. Two layers of glass as scheduled with a minimum .030 inch thick vinyl interlayer. 2. Film: a. Manufacturer: Solutia Inc. (St. Louis, MO; 877-674-1233; 314-674-1000). b. Type: Polyvinyl butyral sheets, uniform in color, specifically manufactured for use in fabrication of laminated glass sheets, ultraviolet stabilized, uniform thickness as specified. D. Low E Coating: High performance type; applied by using sputtered deposition technology. 1. Basis of Design: PPG (Pittsburgh PA; 412-434-2858) "Solarban 60." 2. Acceptable Substitution: Viracon (Otawana MN; 800-533-2080) "Solarscreen 2000." PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. C. Verify surfaces of glazing channels or recesses are clean, free of obstructions, and ready for work of this Section. 3.2 PREPARATION A. Clean contact surfaces and wipe dry. B. Seal frame corner joints, and other leakage points with sealant. At insulating glass units the sealant shall be compatible with the seal of the unit. Do not plug weep holes. C. Prime surfaces scheduled to receive sealant, unless otherwise recommended by the sealant manufacturer. I TEMPLATE 088000-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 088000 -GLAZING 111 3.3 INSTALLATION A. Setting Blocks: Place setting blocks in frames for support of glass. Place at quarter points unless approved otherwise. IB. Set glass tightly in position with proper clearances in accordance with the referenced standards. C. Perimeter glass clearances within setting frame shall be in accordance with GANA recommendations, I and as required by the glass manufacturer to provide for wind, earthquake drift, and thermal expansion. D. Unless specified otherwise, glaze units with gaskets furnished with the framing systems specified in I other sections. E. Glazing for Interior Non-Rated Doors and Windows, Where Gaskets Are Not Furnished: 1. Glaze with glazing tape. 2. Pre-measure and cut tapes to required lengths; adhere to fixed stops, setting horizontal tape at I heads and sills before vertical tape. 3. Install tape with tight butt joints; no overlaps will be accepted. Set tape with straight lines level with frame sight line. 4. Position glass, uniformly sealing against tape. Install inside removable stops and place tape in stops forming a uniform seal against glass, level with sight lines. F. Glazing for Fire Rated Doors and Windows: Glaze in accordance with NFPA 80, unless required 1 G. otherwise by the labeling requirement of the frame. Adjust glazing materials to form a uniform sight line. 3.4 CLEANING IA. Clean excess glazing materials from adjacent finished surfaces. B. Remove labels after work is completed. I 3.5 GLASS TYPE SCHEDULE A. The following are the glass types as indicated on the Drawings: 1. GL-1: a. Insulating glass unit with 1/2 inch air space between two panes of glass as follows: I 1) Exterior Pane: 1/4 inch clear glass with low e coating on#2 surface. 2) Interior Pane: 1/4 inch clear glass. b. Performance as follows: I 1) Visible Light Transmittance: 70% 2) Winter U value: .29 3) Shading Coefficient: .44. 4) SHGC: .38 I 2. GL-2: Minimum 1/4 inch thick clear glass. 3. GL-3: Minimum 5/16 inch thick fire-rated laminated glass. 4. GL-4: Minimum 1/4 inch thick laminated clear glass. I B. Provide tempered glass in hazardous locations to meet the requirements of the jurisdictional code authorities. 3.6 GLASS LOCATION SCHEDULE I A. GL-1: All exterior glazing unless scheduled otherwise. B. GL-2: All interior glazing, unless scheduled otherwise. 1 C. GL-3: Interior glazing at fire rated openings. D. GL-4: Interior glazing at locations indicated. IEND OF SECTION ITEMPLATE 088000-4 10/12/18 r STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092200— LIGHTGAGE METAL SUPPORT FRAMING PART 1 -GENERAL I 1.1 SUMMARY A. Section Includes: 1. Interior partition framing. 2. Steel backing. 3. Ceiling and soffit framing. 4. Furring and resilient channels. B. Related Sections: 1. 055000 - Metal Fabrications: Partial height wall bracing. 2. 061000 - Rough Carpentry: Wood blocking; [framing and sheathing]. 3. 072100-Thermal Insulation: Insulation between framing members. 4. 095113—Acoustical Panel Ceilings: Proprietary overhead framing system. 5. 098100 -Acoustic Insulation: Insulation between framing members. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. A641 -Zinc-Coated Galvanized) Carbon Steel Wire. 2. C635 - Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings. 3. C645 - Non-Loadbearing Steel Studs, Runners, and Rigid Furring Channels. 4. C754 - Installation of Steel Framing Members to Receive Screw-Attached Gypsum Wallboard, Backing Board, or Water-Resistant Backing Board. B. Underwriters Laboratories (UL): Standard 2079 -Tests for Fire Resistance of Building Joint Systems. I 1.3 SYSTEM DESCRIPTION A. Structural Design: 1. Select framing systems, gages, supports, bracing, and connections as necessary to meet the structural requirements specified. 2. Partition framing shall conform to the widths indicated, unless approved otherwise. Provide thicker gages and decreased stud spacing as necessary to meet the design requirements. 3. Select framing members based on the manufacturer's published span tables. B. Design Loads: 1. Interior Ceiling Assemblies: 5 pounds per square foot uniform live load, plus dead loads. 2. Exterior Soffit Assemblies: 30 psf positive and negative uniform live load, plus dead loads. 3. Interior Partitions without Wall Mounted Casework: 5 pounds per square foot uniform live lateral load. 4. Interior Partitions with Wall Mounted Casework: 5 pounds per square foot uniform live lateral load, casework dead load, and casework live load of 25 PSF of shelf area. 5. Seismic Loads: Conform to the requirements of currently enforced edition of the jurisdictional code authorities. C. Deflection Requirements: 1. Maximum deflection of 1/240 for flexible finish materials such as gypsum board and veneer plaster. 2. Maximum deflection of 1/360 for rigid finish materials including gypsum plaster, cement plaster, ceramic tile, maximum 3/8"thick stone tile, or mirrors. 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. 1 TEMPLATE 092200-1 10/12/18111 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 092200—LIGHTGAGE METAL SUPPORT FRAMING B. Shop Drawings: 1. Indicate typical and special framing sections and details. Indicate fastening systems, gages, framing spacing, bracing configurations and locations, anchorage to acoustical ceiling grid, metal I backing, attachment to overhead structure, and similar conditions. 1.5 QUALITY ASSURANCE A. Unless indicated or specified otherwise, perform work in accordance with ASTM C754. B. Code Requirements: 1. Provide assemblies meeting the hourly fire ratings indicated and specified. Assemblies shall been tested in accordance with ASTM E119, and shall be approved by the local jurisdictional I code authorities. Coordinate installation of other materials which are a part each assembly. 2. Fire rating requirements take precedence over the construction requirements indicated. In the event of conflict, notify the Architect, and do not begin construction in the area of conflict until the conflict has been resolved. 3. Provide calculations, drawings, product data, and other verification as required by the I jurisdictional code authority to obtain approval of the lightgage metal framing installation. C. The work of this Section is subject to special fire rated construction joint assembly requirements I specified in Section 078500. D. System components shall be in compliance with requirements of local jurisdictional authorities for lightgage metal support framing and ceiling suspension systems, as applicable 11 PART 2 - PRODUCTS 2.1 NON-LOAD BEARING LIGHT GAGE METAL FRAMING: IA. Base Steel (all stud types): 1. ASTM C645; G40 galvanized; non-compliant materials will not be accepted. I B. General: 1. Furnish "C" shaped studs, depth as scheduled, with return lip and not less than 1-1/4 inch flanges; prepunched openings for the installation of stiffening channels and mechanical and electrical items. I 2. Furnish U shaped tracks (runners), hat and "Z" shaped furring channels, and other sizes and shapes as indicated on the Drawings, and required by the referenced standards. 3. Minimum 25 gage unless indicated or specified otherwise; and as follows: a. Furnish gages as necessary to meet deflection requirements, unless indicated or specified I otherwise. b. Top runner for partitions extending only to the acoustical ceiling grid shall be 20 gage. c. Provide minimum 20 gage for full height partition framing extending from structure to structure. I d. Provide minimum 20 gage studs at jambs of doors and interior relites. 4. Fire Rated Track: As specified in Section 078500. 5. Partition Head Compensating Channel (Non-Fire Rated): Design for minimum ±1/2 inch I deflection. Profiles as indicated; one of the following. a. 20 gage deep leg track; 2 inch legs. b. Proprietary compensating channel system; Contractor's option. C. Standard Gage Metal Framing: 1. Formed from minimum 36 KSI steel. D. "EQ Stud"Type Metal Framing: 1. Formed from minimum 50 KSI steel. I2.2 OTHER FRAMING SYSTEMS A. Channels: Hot or cold rolled channels; rust inhibitive paint coating; sizes in accordance with IASTM C754. ITEMPLATE 092200-2 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092200— LIGHTGAGE METAL SUPPORT FRAMING B. Proprietary Ceiling Suspension System: 1. Manufacturer: a. As specified: Chicago Metallic (Los Angeles CA; 800-323-7164). b. Acceptable Substitutions: 1) USG Interiors, Inc. (Chicago, IL; 800-874-4968). 2) Armstrong (800-207-2321). 2. Suspension System: Similar to System 650, or 670; ASTM C635 heavy duty classification. a. Furring Runners: Manufactured from 0.020 inch thick steel 1-3/8 inch wide with knurled face by 1-1/2 inches high; factory punched cross tee slots, hanger holes, and non-directional bayonet end tab couplings. b. Furring Tees: Manufactured from 0.020 inch thick 1-3/8 inch wide with knurled face by 1-1/2 inches high; factory punched cross tee slots and hanger holes. c. Furring Cross Channel: 0.020 inch thick steel; 1-3/8 Inch wide with knurled face by 7/8 inches high by 48 inches long with straight locking end tabs. d. Cross Tees: 0.020 inch thick steel 15/16 inch wide by 1-1/2 inches high; with staked-on dip end tab couplings, factory punched cross tee slots. e. Moldings: Manufacturer's standard. f. Channel beam splice clip: Manufacturer's standard. C. Accessories: 1. Screws: Self tapping; low profile head; galvanized. 2. Hanger wire: ASTM A641; Class 1 zinc coating; soft temper; prestretched; 12 gage. 3. Resilient Channels: USG "RC-1," or approved. 4. Special Proprietary Backing: Dietrich Industries (Pittsburgh PA; 412-281-2805; Renton, WA; 425-251-1497) "Danback Flexible Wood Backing Plate;" model in accordance with stud spacing; fire treated. 5. Partition Clips (for attachment of head channel to acoustical ceiling suspension system): "The Revoe Clip" by Revoe Manufacturing Ltd. (Calgary, AB; 403-225-2170; 800-665-9419); "Donn Partition Attachment Clip" by USG Corporation (Chicago IL; 877-874-4200), or approved; style to accommodate edge design of acoustical tile specified in Section 095113. D. Other Framing Materials: Provide other framing materials in accordance with ASTM C754. I PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in 1111 writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin work until unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 GENERAL INSTALLATION REQUIREMENTS A. Steel Decking: 1. Where fastening into bottom of steel decking is required, fasten only into lower flutes. 2. Do not use fasteners in steel deck which penetrate more than 1 inch. B. Verify location of conduit in poured concrete construction before making attachments. 3.3 INTERIOR PARTITION FRAMING A. Runners: 1. Secure runners with fasteners at maximum 24 inches oc. 2. At concrete floors, use powder driven fasteners or drilled in concrete anchors. 3. [Where indicated, attach top track to acoustical ceiling grid with two staggered #12-14 screws at 24 inches on center. Provide spacer strip between runner and ceiling suspension system to allow tegular or reveal edge acoustical panels to clear partition. Use minimum 20 gage top track.] 111 TEMPLATE 092200-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092200—LIGHTGAGE METAL SUPPORT FRAMING 4. [Where indicated, attach top track to acoustical ceiling grid using specified partition clip at 24 inches on center. Provide spacer strip between runner and ceiling suspension system to allow tegular or reveal edge acoustical panels to clear partition. Use minimum 20 gage top track.] 5. Top Runner: Secure head track to structure with allowance for structural deflection. a. Non Rated Partitions: Use proprietary compensating channel or deep leg track at Contractor's option, as necessary to accommodate building deflection. 6. Unless approved otherwise, at fire rated partition assemblies, use fire rated tracks, furnished from Section 078500. Install fire rated tracks in accordance with the fire rated assembly requirements. B. Unless indicated otherwise, install studs vertically at 16 inches oc, and not more than 2 inches from abutting construction, at each side of openings, and at corners. C. Fit runners under and above openings; secure intermediate studs at spacing of wall studs. D. Brace partition framing system and make rigid. Provide diagonal stud bracing at maximum 8 ft on center at framing which does not extend to structure. At partitions attached to acoustical ceiling grid with partition clip, screw attach bracing to clip. Brace shall allow placement of acoustical tile without cutting. E. Install double studs continuous from floor to ceiling track at the jamb of each door frame and cased opening. Studs shall be no less than 20 gage. Provide diagonal steel stud bracing to structure at each jamb at partitions which do not extent to structure. F. Install minimum 20 gage studs at partitions indicated for support of modular wall-mounted casework and counter support brackets. Install double studs and wood blocking at counter support brackets. G. Where control joints are indicated in fire rated partitions, provide double stud and gypsum board backing or other tested assembly in accordance with manufacturer's recommendations or Warnock- Hersey WHI-651-0318-1. Coordinate with Section 092900. H. Coordinate erection of studs with installation of service utilities. Align stud web openings. I. Coordinate installation of bucks, anchors, blocking, electrical, and mechanical work to be placed in or behind stud framing. J. Coordinate erection of stud system with requirements of door and window frames, fire extinguisher cabinets, recessed toilet accessories, access doors, acoustical insulation, and other construction within partition. K. Coordinate the installation of framing with the gypsum board installer to ensure support at board edges. Provide framing immediately either side of expansion joints. L. Stud splicing not permissible. M. At non-load bearing full height partitions subject to compression caused by overhead structural deflection, and where proprietary compensating channel system is not used, cut studs 1/2 inch short from full height. Do not rigidly connect stud to top runner. N. Stud Bridging: 1. At interior partitions greater than 4 feet in length, and with rigid facing material on one stud flange only, provide 3/4" bridging channels in horizontal rows at a maximum of 5'-0"on center for the full height of the partition. 2. Interior full height partitions (studs extending from the floor to the structure above)with rigid facing material stopping 3'-0"or more below top of studs - Provide one row 3/4" bridging channel horizontally at termination of gypsum board material, and one additional row for each 5'-0" of exposed studs. 3. Install stud bridging channels in long lengths, wire tying and lapping the joints a minimum of 12I inches. Attach bridging channel to each stud as shown in manufacturer's printed instructions. 3.4 BACKING A. Provide steel or fire treated wood backing, unless indicated otherwise, for the support of wall mounted items, including wood trim, casework, and toilet accessories. TEMPLATE 092200-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092200— LIGHTGAGE METAL SUPPORT FRAMING B. Unless indicated otherwise, steel backing shall consist of minimum 4 inch wide 16 gage steel plate screwed rigidly to the studs. C. Provide only wood blocking at handrails, guardrails and grab bars. 3.5 CEILING, SOFFIT, AND FASCIA FRAMING I A. Coordinate locations of hangers and supports with the work of other Sections. B. Ceiling framing shall consist of stud and runner framing or suspended framing, unless indicated or specified otherwise. C. Stud and Runner Framing: 1. Secure runners to structure above with fasteners at a maximum of 24 inches on center. Size fasteners and use reinforcements as necessary to support the dead loads applied. 2. Screw fasten framing at each flange joint. 3. Space studs at 16 inches on center at horizontal locations. 4. Select members to meet the structural requirements specified. D. Lightgage Suspended Framing: 1. Install in accordance with ASTM C754, unless indicated or specified otherwise. 2. Suspend ceiling from overhead structural elements only. Do not support from any electrical, HVAC, plumbing, or sprinkler system components. 3. Space carrying channels 4 feet on center with splices lapped 12 inches and tied. 4. Support cold rolled carrying channels with hanger wires spaced at 3 feet on center for lath and plaster ceilings and 4 feet on center for gypsum board ceilings. Loop hanger wire around support element and tightly wrap around vertical wire 3 times; cut off neatly. 5. Space furring channels 16" o.c. with splices lapped 12", minimum and tied; clip or saddle tie to runner channels with 16-gage tie wire. 6. Where overhead obstructions prevent the regular spacing of hangers, provide secondary carrying members for indirect support of the suspension system, or reinforce the nearest adjacent hangers and related framing components as required to span the required distance. E. Proprietary Suspended Framing: Install in accordance with manufacturer's recommendations. I F. Stabilize suspended ceiling, soffit, and fascia framing against lateral movement by means of diagonal bracing. At locations where partitions extend to ceiling, only, install supplementary bracing at maximum 8'-0" o.c. along length of partition, and above each door hinge and strike jamb. G. Form openings in ceilings and frame openings for recessed light fixtures, air diffusers, access doors, hatches, etc. H. Install supplementary hanger wires for support of ceiling mounted equipment, such as speaker111 support bracket, as required and as detailed. 3.6 TOLERANCES A. Install members to provide surface plane with maximum variation of 1/8 inch in 10 feet in any I direction. B. Locate assemblies within 1/4 inch of required locations. C. Locate framing on the center of the joint between gypsum board panels, within a tolerance of 1/4 inch. END OF SECTION I I TEMPLATE 092200-5 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092843 - GYPSUM SHEATHING PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: Gypsum sheathing. B. Related Sections: 1. 042113- Brick Masonry: Brick masonry finish; building paper underlayment. 2. 054000 - Cold-Formed Metal Framing: Support framing. 3. 072700—Weather Resistive Barriers 4. 092900 - Gypsum Board: Interior gypsum products. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C1177- Specification for Glass Mat Gypsum Substrate for Use as Sheathing. 2. C1278- Standard Specification for Fiber Reinforced Gypsum Panel 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: Product literature on gypsum sheathing and screw fasteners. PART 2 - PRODUCTS 2.1 MATERIALS A. Gypsum Sheathing: One of the following: 1. G-P Gypsum Corporation "Dens-Glass Gold"; glass mat faced; ASTM C1177; 5/8 inch thickness. 2. Certainteed. "GlasRoc"; glass mat faced; ASTM C1177; 5/8 inch thickness. 3. USG "FIBEROCK®Brand Sheathing with Aqua-ToughTM"; ASTM C1278; 5/8 inch thickness. B. Exterior Sheathing Screws: Complying with ASTM C1002, C954, and the following: 1. Self-drilling, self-tapping, Type S-12, bugle head, minimum length of 1-1/4 inch for 1/2 inch and 5/8 inch boards. 2. Organic-polymer, ceramic, or other corrosion-protective coating having a salt-spray resistance of more than 800 hours according to ASTM B 117. 3. Approved Product: Hilti (www.us.hilti.com)6 x 1-1/4 inch "PSH SD HCR Sheathing Screws", item No. 00413489. C. Joint and Penetration Sealant: Dow Corning 795 Building Sealant. PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. C. Verify that framing is ready for installation of sheathing. TEMPLATE 092843-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092843 -GYPSUM SHEATHING 3.2 GYPSUM SHEATHING INSTALLATION A. Install sheathing boards parallel or perpendicular to framing. Install parallel to framing at fire rated walls. Apply sheathing with vertical joints staggered. All edges shall be supported as follows: 1. Maximum span: 24 inches. 2. Maximum cantilever: 2 inches. B. Install sheathing with coating towards exterior. C. Screw to framing. Space fasteners 8 inches o.c. in field and 4 inches o.c. at ends along each framing member. D. Do not bridge expansion or seismic joints. E. Coordinate with Division 26 work for cutouts for electrical penetrations. I F. If sheathing is not to be covered by finish material within 6 months after purchase, cover the material as necessary to maintain the manufacturer's warranty. END OF SECTION I I I I I I I I I 1 I TEMPLATE 092843-2 10/12/18 STARBUCKS K COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092900 -GYPSUM BOARD PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Interior gypsum board. 2. Gypsum soffit board. B. Related Sections: 1. 054000- Cold-Formed Metal Framing: Exterior support framing. 2. 061000- Rough Carpentry: Wood framing. 3. 072100—Thermal Insulation. 4. 092200—Light gage Metal Support Framing: Support framing for gypsum board; tolerance requirements. 5. 092843 - Gypsum Sheathing. 6. 093000 -Tiling: Finish materials; tile backer board. 7. 098100 -Acoustic Insulation. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to work of this Section. D. Substitutions: Substitutions will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C475 - Joint Treatment Materials for Gypsum Wallboard Construction. 2. C557 -Adhesives for Fastening Gypsum Wallboard to Wood Framing. 3. C931 - Standard Specification for Exterior Gypsum Soffit Board 4. C1002 -Steel Drill Screws for the Application of Gypsum Board. 5. C1177 Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing 6. C1278-Specification for Fiber Reinforced Gypsum Panels. 7. C1395- Specification for Gypsum Ceiling Board 8. C1396- Specification for Gypsum Board 9. D3273 Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber B. Gypsum Association (GA): Ii. GA-214 - Recommended Levels of Gypsum Board Finish 2. GA-216- Recommended Specifications for the Application and Finishing of Gypsum Board. 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Submit complete manufacturer's product literature and installation instructions for each of the materials used. 1.4 QUALITY ASSURANCE A. Perform work in accordance with GA 216, unless specified otherwise, or required otherwise to meet fire rating requirements. B. Regulatory Requirements: 1. Provide assemblies meeting the hourly fire ratings indicated and specified. Assemblies shall be approved by the local jurisdictional authorities. 2. Fire rating requirements take precedence over the construction requirements indicated. In the event of conflict, notify the Architect, and do not begin construction in the area of conflict until the conflict has been resolved. I TEMPLATE 092900-1 10/12/18 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092900 -GYPSUM BOARD I C. Assembly Instructions: Contractor shall keep at the site and make available to installers a copy of the following: 1. Installation requirements for each fire rated assembly. 2. GA 216. D. The work of this Section is subject to special fire rated construction joint assembly requirements specified in Section 078500. PART 2 - PRODUCTS 2.1 GYPSUM BOARD MATERIALS A. Furnish boards of maximum permissible length for type of installation indicated, tapered edge for boards to be exposed, taped and finished; square edge for boards in concealed applications; 5/8 inch thick unless noted or specified otherwise; furnish type X for fire rated partitions. B. Types: 1. Standard Board, Backing Board, Exterior Water Resistant Soffit Board: ASTM C1396; 5/8 inch thickness unless otherwise indicated. 2. Water Resistant Board: ASTM C1396. 3. Ceiling Board: ASTM C1395; sag resistant. 4. Abuse Resistant/ Mold Resistant Board: ASTM C1278; USG Corporation "Fiberock Aqua- Tough Interior Panels"; Georgia Pacific "DensArmor Fireguard Interior Guard", National Gypsum Co. "Gold Bond Brand XP Fire-Shield Wallboard,"or approved;5/8 inch thickness; Type X; surfaces shall be resistant to mold and mildew growth; score of 10 when tested in accordance with ASTM D3273. 2.2 ACCESSORIES A. Interior Gypsum Trim: 1. Conform to GA 216, unless indicated or specified otherwise. 2. Concealed flange crimp-on or tape-on type; metal or PVC at Contractor's option. 3. Control Joint Trim: USG 093 or approved. 4. Reveal Moldings: Fry Reglet Co., Pittcon Industries, Inc., Gordon Inc, or approved; aluminum extrusions with taping flanges; shapes as indicated. B. Joint Compound, Tape, and Finishing Compound: ASTM C475; furnish setting type joint compound for use at water resistant and exterior soffit board. 1. Typical: USG "SHEETROCK Brand Taping, All-Purpose, and/or Topping Compound," or approved. 2. Setting Type: USG "SHEETROCK Brand Easy Sand Setting-Type Joint Compound," or approved. C. Screws: ASTM C1002; galvanized or polymer coated at exterior locations. D. Fire Rated Joint Compound: As specified in Section 078500. 1 PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin work until unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 GYPSUM BOARD INSTALLATION A. Install gypsum board in accordance with GA 216, and fire rated assembly requirements. I TEMPLATE 092900-2 10/12/18 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 092900 -GYPSUM BOARD B. Erect wallboard so that edges and corners are firmly supported. C. Use screws to fasten gypsum board to metal furring or framing. Adhesive application of gypsum board may be used if it is in accordance with the manufacturer's recommendations and meets fire rating requirements. D. Double Layer Applications: 1. Use backing board or standard board for first layer. 2. Offset joints of second layer from joints of first layer. E. Trim: 1. Use longest practical lengths, with no piece less than 2 feet long for continuous runs greater than 8 feet. Securely fasten and align trim ends at joints. 2. Place concealed flange corner beads at external corners. At angles other than 90 degrees, bend the flange to conform to the angle. 3. Place concealed flange type L trim where gypsum board abuts dissimilar materials. 4. Use J trim at exposed gypsum board edges, and at joints where sealant is indicated. F. Allow a 1/2 inch gap where gypsum board extends to overhead structure and deflection provisions are incorporated into lightgage metal framing. Do not fasten gypsum board to top runner. Where the ceiling is exposed in the finished work, finish top edge with a casing bead, and caulk with acrylic sealant as specified in Section 079200. G. Sealant Joints: 1. Coordinate installation of firestopping and sealants at concealed joints between partitions and structure at fire rated and acoustically insulated partitions. 2. Where sealant joints are indicated at ends or edges of wallboard, install for uniform 1/8 inch joint, unless otherwise indicated. Installation of sealant in exposed locations is specified in Section 079200. H. Provide water resistant gypsum board as a substrate where tile is indicated to be installed over gypsum board surfaces. Cement board backing for tile surfaces is specified in Section 093000. 111 I. Provide water resistant gypsum board at walls in restrooms, toilets, shower rooms,janitor closets and other areas subject to similar damp conditions, unless cement board backing is indicated. J. Install required number of layers of wallboard behind panel boards, fire extinguisher cabinets, and other recessed elements as necessary to maintain fire rating of walls. K. Fire Rated Construction: 1. At heads of fire rated metal stud and gypsum board partitions, install gypsum board in accordance with the fire rated assemblies specified in Section 078500. 2. Fill joints between gypsum board surfaces and adjacent construction with fire rated joint compound in accordance with the requirements of the fire rated construction joint assembly manufacturer. 3. Provide continuous fire rated assemblies. Where adjacent construction interrupts fire rated assemblies, provide additional construction as necessary to maintain the continuity of fire rated assemblies. 3.3 CONTROL JOINTS A. Discontinue gypsum board and use control joint trim at control joints. B. Coordinate with the framing installer to ensure that framing is installed immediately on either side of each control joint. C. Space control joints as indicated. When not indicated, locate as follows: 1. At maximum 30 foot intervals along continuous wall planes. 2. At maximum 50 foot intervals at continuous ceilings with perimeter relief. 3. At maximum 30 foot intervals at continuous ceilings without perimeter relief. 4. At locations where expansion or control joints occur in the building structure. 5. Locate control joints to form rectangular or square sections, in "L," "U," "T," or other irregularly shaped areas. TEMPLATE 092900-3 10/12/18 TAR K COFFEE BUC S COF EE COMPANY GUIDE SPECIFICATIONS SECTION 092900 -GYPSUM BOARD 6. Position control joints to intersect light fixtures, air diffusers, door openings, and other areas of stress concentration. 7. Coordinate with Section 092200 for special requirements at fire rated assemblies. D. Verify location with the Architect prior to installation. Give the Architect a minimum of 48 hours notice. 3.4 FINISHING A. Provide finishing in accordance with GA 214. B. Where necessary to sand, do so without damaging the face of the gypsum board. C. Levels of Finish: 1. Level 5: Provide at the following locations: a. Surfaces perpendicular and adjacent to or near(within 24 inches of) exterior windows and surface mounted light fixtures. b. Surfaces to receive deep tone colors. 2. Level 4: Typical, unless indicated or specified otherwise. 3. Level 3: Provide at the following locations: III a. Surfaces to receive fabric wall covering. 4. Level 2: Provide at the following locations: a. Storage rooms. b. Mechanical rooms. c. Janitor's closets. d. Surfaces to receive tile or other thick finish materials applied to gypsum board surfaces. 5. Level 1: Provide at the following locations: II a. Surfaces of fire rated assemblies concealed from view in the finished work ("fire-taping"). b. Surfaces of acoustical assemblies concealed form view in the finished work 6. Level 0: Provide at surfaces of non-fire rated assemblies concealed from view in the finished work, including surfaces to be covered by casework, wood paneling, D. Level 4 and 5 finishes: Return to the site after primer is applied, and touch-up surface defects. E. Proprietary skim coat material may be used in lieu of joint compound as skim coat at surfaces indicated for Level 5 finish. F. Patch and finish existing gypsum board surfaces to match new surfaces. Finish to nearest joint, corner, or other break line. 3.5 TOLERANCES A. Install gypsum board with 1/8 inch in 10 feet maximum variation from plane in any direction. END OF SECTION I I I I I TEMPLATE 092900-4 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 093000 -TILING I PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Interior wall tile. 2. Interior floor tile. 3. Crack isolation membranes. 4. Tile backing board. 5. Screeds. B. Related Sections: 1. 024119 - Selective Demolition: Preparation of existing substrates. 2. 079200 -Joint Sealants: Expansion joint fillers. 3. 092900 - Gypsum Board: Substrate. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American National Standards Institute (ANSI): 1. A108.1 - Ceramic Tile Installed with Portland Cement Mortar. 2. A108.5 - Installation of Ceramic Tile With Dry-Set Portland Cement Mortar or Latex-Portland Cement Mortar. 3. A108.6 - Installation of Ceramic Tile With Chemical-Resistant, Water Cleanable Tile-Setting and Grouting Epoxy. 4. A108.10- Installation of Grout in Tilework. 5. A108.13- Installation of Load Bearing, Bonded, Waterproof Membranes for Thin-Set Ceramic Tile and Dimension Stone. 6. A118.3- Chemical Resistant Water Cleanable Tile-Setting and Grouting Epoxy. 7. A118.4- Latex-Portland Cement Mortar. 8. A118.10 - Standard for Load Bearing, Bonded, Waterproof Membranes for Thin-set Ceramic Tile and Dimension Stone Installation. 9. A137.1 - Ceramic Tile 10. B101.3 -Test Method for Measuring Wet DCOF of Common Hard-Surface Floor Materials. B. American Society for Testing and Materials (ASTM): 1. C144-Aggregate for Masonry Mortar. 2. C150 - Portland Cement. 3. C206 - Finishing Hydrated Lime. 4. C207 - Hydrated Lime for Masonry Purposes. C. Tile Council of North America (TCNA): 1. Handbook of for Ceramic Tile Installation, current edition. 2. 137.1- Recommended Standard Specifications for Ceramic Tile. 1.3 DEFINITIONS A. Expansion Joints: Unless otherwise detailed, expansion joints in tile fields are sealant-filled joints to accommodate expansion and contraction of tile and possible substrate movement at slab control and construction joints. B. Reinforced Waterproofing Membrane: Proprietary waterproofing membrane system installed in combination with tile application, as part of the ceramic tile work. 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. TEMPLATE 093000-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 093000 -TILING B. Product Data: Submit for each type of tile, grout, adhesive, additive, accessory, and membrane specified. C. Samples: 1. Tile: Submit samples of each type and color of tile. Include representative range of colors and finishes to be expected. D. Certifications: 1. For each type of tile indicated, submit master grade certificates prior to the arrival of the shipment to the job site. 2. For each type of tile indicated, submit certification that tile has successfully passed ANSI B101.3. 3. Where required by jurisdictional authorities, for each type of tile indicated, submit certification that tile has successfully passed ANSI 137.1 test method for measuring dynamic coefficient of friction. I 1.5 QUALITY ASSURANCE A. Conform to ANSI Standard Specifications for the Installation of Ceramic Tile. B. Pre-Installation Conference: 111 1. In accordance with Section 013119, schedule and administer a meeting to review and discuss the tile installation a minimum of one week (7 calendar days) prior to start of setting tile. 2. Require in attendance, the tile installer, and other parties affected by work of this Section. 3. Agenda: Address installation scheduling and procedures, coordination, preparation and protection requirements, grout and expansion joint locations, tile quantities required, material and installation tolerances, overage required for waste, overage for maintenance stock, sealant joint locations. C. Tile backing board shall be in compliance with requirements of local jurisdictional authorities. D. Finished tile floor shall meet the dynamic coefficient of friction requirements specified. 1.6 DELIVERY, STORAGE,AND HANDLING A. In accordance with Section 016000. 1.7 GUARANTY A. In accordance with Section 017700, furnish from the tile installer, a two year written guaranty, executed to the Owner, against defects in workmanship and materials. 1.8 MAINTENANCE A. Extra Stock: Furnish extra stock as required by Construction Manager. PART 2 - PRODUCTS 2.1 TILE A. Tile Types: 1. Furnish tile manufactured in accordance with ANSI A137.1. 2. Dynamic Coefficient of Friction: Not less than 0.42 in accordance with ASNI B101.3. 3. Types as indicated on the drawings. B. Special Shapes: Unless otherwise indicated or specified, furnish special shapes as standard with the tile manufacturer for uniform transitions and concealed edges in the finished installation. Special shapes include bullnoses, double bullnoses, corner bullnoses, and cove assemblies. 2.2 ACCESSORY MATERIALS A. Setting Materials: 1. Thinset Mortar: Latex modified; "Kerabond"with "Universal Keralastic" by Mapei Corp., "211 Crete Filler Powder"with "4237 Latex Thin-set Mortar Additive," by Laticrete International, Inc., Hydroment"Tile-Mate Premium"with "447 Flex-a-lastic" by Bostik, or approved. 1 TEMPLATE 093000-2 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 093000 -TILING I 2. Rapid-Set Thin Bed Mortar: Latex modified; "Grani/Rapid"with "KER 318" Flexible Admixture" by Mapei Corp., Hydroment"Single Flex FS," by Bostik, or"211 Crete Filler Powder"with "4237 Latex Thin-set Mortar Additive" and "101 Rapid Set Latex"(proportions as recommended by the I manufacturer for the setting time required)," by Laticrete International, Inc.. 3. Medium Bed Mortar: "Grani/Rapid" by Mapei Corp., Hydroment"Medium Bed Mortar" by Bostik, or"226 Thick Bed Mortar Mix"with "3701 Latex Mortar Admix," by Laticrete International, Inc., or approved. I 4. Rapid Set Medium Bed Mortar: "Grani/Rapid" by Mapei Corp., or"211 Crete Filler Powder"with "3701 Latex Mortar Admix" and "101 Rapid Set Latex"(proportions as recommended by the manufacturer for the setting time required), by Laticrete International, Inc., or approved. I B. Cementitious Sanded Grout: 1. Fast Setting: "Ultra/Color" by Mapei Corp., "Floor Joint and Grout Filler"with "3701 Latex Mortar Admixture"and "101 Rapid Set Latex", by Laticrete International, Inc. (proportions as recommended by the manufacturer for the setting time required); sanded, except unsanded at I joints scheduled at 1/16 inch wide. 2. Standard Grout: "Keracolor S" by Mapei Corp., or"1500 Series Sanded Grout"with "1776 Grout Admix Plus;" "101 Rapid Set Latex", by Laticrete International, Inc., Hydroment"Ceramic Tile Grout/Joint Filler"with "425 Flexible Grout Admixture" by Bostik; sanded, except unsanded at I joints scheduled at 1/16 inch wide. 3. Colors: As selected by the Architect from the manufacturer's standard line. C. Cementitious Unsanded Grout: I 1. Standard Grout: "Keracolor U" by Mapei Corp., or"1600 Series Unsanded Grout"with "1776 Grout Admix Plus" or"101 Rapid Set Latex", by Laticrete International, Inc., Hydroment"Ceramic Tile Grout/Joint Filler"with "425 Flexible Grout Admixture" by Bostik. 2. Colors: As selected by the Architect from the manufacturer's standard line. it. D. Epoxy Grout: Mapei "Kerapoxy," Bostik Hydroment"100% Solids Epoxy Grout," Laticrete International Inc. "Latapoxy SP100,"or approved. Colors as selected from manufacturer's standard. I E. Crack Isolation Membrane: One of the following. 1. "NobleSeal CIS," by The Noble Company; reinforced CPE sheet membrane; 36"width; NobleBond 21 adhesive. 2. "Dal-Seal CIS." By Dal-Tile Corp. I 3. "ECB Membrane," by N.A.C. Products Inc.; self bonding reinforced modified asphalt sheet membrane; 36"width. 4. "Mapelastic SM" by the Mapei Corp. I F. Tile Backing Board and Accessories: 1. Cementitious Backing Board: a. 1/2 inch nominal thickness aggregated portland cement panel, reinforced with glass fiber mesh; Rb. "Durock Brand Cement Board" by USG (800-874-8968, "Wonderboard" by Custom Building Products (800-272-8786), or approved. 2. Gypsum Backing Board: Georgia Pacific (800-225-6119) "DensShield,"or approved; 5/8 inch thickness. I 3. Joint Tape: Open weave glass mesh joint tape, self-adhesive; 2-1/2 inches wide. 4. Fasteners: As recommended by the backing board manufacturer; thread forming self-drilling wafer head screws; polymer coated or zinc plated; USG "Durock Screws,""Rock-On,"or approved. G. Grout Release: High-performance water-soluble; one of the following or approved: 1. "Ultra Care Grout Release" by Mapei. 2. "aqua Mix Grout Release" by Custom Building Products. I H. Metal Screed: As manufactured by Schluter Systems, Inc. (800/225-8902), Ceramic Tool Company, (800/236-5230), or Blanke Corporation (800/787-5055); anodized aluminum tile edging trim; sizes as required for installation of top of screed flush with top of tile, as detailed. RI. Curing Paper: Fortifiber"All Purpose Building Paper,"or approved; do not use polyethylene or products containing bituminous materials. ITEMPLATE 093000-3 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 093000 -TILING PART 3 - EXECUTION I 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. C. Verify that locations of expansion joints, control joints, and construction joints in substrate correspond to tile expansion joint locations. 111 D. Where cementitious backing board is indicated as substrate for wainscot, shim as necessary to align with gypsum board above. 3.2 PREPARATION I A. Clean substrate surfaces free of grease, dirt, dust, organic impurities, and other materials which would impair bond. Where curing agents have been used mechanically abrade or shotblast substrate surface. 3.3 TILE BACKING BOARD INSTALLATION A. Use cementitious backing board, except where gypsum backing board is indicated. B. Install in accordance with the manufacturer's installation instructions. C. Install units with edges firmly supported. D. Screw attach units with 1 inch long drywall screws spaced 6 inches on center along framing. E. Install fiberglass reinforcing tape at joints between panels. Completely embed in a thin set mortar bed. Trowel mortar smooth with adjacent surfaces. 3.4 SLAB LEVELING A. Prior to installation of thinset floor tile, where local irregularities in the substrate surface would prevent level installation of the tile, the substrate shall be brought to plane surface with variations not to exceed 1/8 inch in 4 feet(cumulative) and 1/4 inch in 10 feet(non-cumulative). Smooth abrupt changes in plane. B. Use thinset mortar or other cementitious filler for slab leveling. Other fillers are subject to endorsement by the setting mortar manufacturer. Submit manufacturer's letter of approval to the Architect, and the Owner's Representative. C. Screed or float to appropriate thickness and specified surface tolerance. Allow to set prior to proceeding with installation. Do not exceed the maximum thicknesses for thin bed mortar as recommended by the manufacturer. 3.5 CRACK ISOLATION MEMBRANE A. Install crack isolation membrane in accordance with the manufacturer's instructions, unless indicated I or specified otherwise. B. Provide crack isolation membrane at following locations: 1. At control and construction joints in concrete floors. 2. At changes in substrate materials. 3. On each side of building floor joint cover assemblies installed in grouted pockets; extend a minimum of 12 inches beyond grouted pocket. 4. Shrinkage cracks 1/16 inch or larger in slabs. C. Extend a minimum of 12 inches each side of crack or joint. D. Do not apply crack isolation membrane at joints which will be reflected as expansion joints in the tile. TEMPLATE 093000-4 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 093000 -TILING E. Omit crack isolation at floors indicated for waterproof membrane. F. Substrate Examination: 1. Substrates are subject to examination by the Owner and the Architect prior to installation of tile or slab leveling materials. Furnish a minimum of 7 days notice. 2. The examination will determine the need for additional crack isolation membrane at shrinkage cracks and other special conditions. 3. Provide additional crack isolation membrane in locations as directed, in accordance with provisions of Section 012200. 3.6 TILE WATERPROOF MEMBRANE INSTALLATION A. Install waterproof membranes in strict accordance with manufacturer's installation instructions and in accordance with ANSI A108.13. B. Install waterproof membranes at all locations with occupied space below, or when required by landlord in a leased property. C. At slab on grade locations, install waterproof membranes only along the perimeter of tile areas. Extend the membrane up the wall and a minimum of 12 inches out onto the floor surface. D. At above grade locations, install waterproof membrane completely over floor surfaces indicated, and up the wall. E. Where the waterproof membrane is extended up the wall, extend to one tile height. Do not expose the waterproof membrane to view. F. Protect waterproof membrane from damage until after tile installation is complete. G. Install waterproof membrane into clamping ring of floor drain when applicable. 3.7 INSTALLATION OF TILE A. Interior Floor Application -Thinset over Concrete Substrate and Concrete Substrates with Waterproof or Crack Isolation Membrane. 1. TCNA System: F113 or F122 at Waterproof Membranes. 2. Installation Standard: ANSI A108.5. 3. Setting Materials: Thinset mortar; 3/32 inch minimum thickness. 4. Use cementitious sanded grout unless indicated otherwise. 5. Use epoxy grout at service areas behind counters. B. Interior Floor Application -Thickset Over Concrete Substrate: 1. TCNA System: F112. 2. Installation Standard: ANSI A108.1. 3. Bond Coat: Thinset mortar over thickset mortar bed; 3/32 inch minimum thickness. 4. Slope the mortar bed evenly to the floor drains. 5. Use cementitious sanded grout unless specified otherwise. 6. Use epoxy grout at service areas behind counters. C. Wall Application - Gypsum Board Substrate: 1. TCNA System: Similar to W243. 2. Installation Standard: ANSI A108.5. 3. Setting Materials: Thinset mortar. 4. Use cementitious sanded grout unless indicated otherwise. D. Wall Application -Tile Backing Board: 1. TCNA System: Similar to W244. 2. Installation Standard: ANSI A108.5. 3. Setting Materials: Thinset mortar. 1 4. Use cementitious sanded grout unless indicated otherwise. E. Joint Pattern: 1. Lay out tile pattern prior to commencing tile installation. 2. Accurately locate grout joints on lines indicated; where not indicated, adjust grout joints within specified tolerances to minimize use of cut tiles at field edges. TEMPLATE 093000-5 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 093000 -TILING 3. Where cut tiles are necessary, position tile such that cut tile at each edge of each rectilinear field is not less than half of a full size unit, unless indicated otherwise. F. Tiles which exhibit directional patterns shall be set with grain direction as indicated on the shop drawings, or, if not indicated, as directed by the Architect. G. Install tiles aligned with adjacent finishes, where indicated. Provide mortar fill as necessary for proper alignment. H. Clean joints of mortar to minimum depth of 1/4 inch to allow subsequent grout installation. I I. Provide temporary setting buttons and shims as necessary to maintain wall tiles in position until setting mortar has set. J. Tolerances: I 1. Joint Width Variation: Plus or minus 25% of the proposed joint width. 2. Taper: Plus or minus 25 percent from one end to the other. 3. No portion of a tile surface shall vary more than 1/16 inch above or below an adjacent tile surface. 4. Install tile fields level to within tolerance specified for finished substrate. K. Special Requirements for Large Format Tiles (8 x 8 inch size or larger): 1. Wash backs of each tile to remove dust and soil that would compromise adhesion. 2. Dampen substrate as necessary to prevent excessive suction. 3. Key the mortar into the substrate with the flat side of the trowel. 4. Comb mortar over the previously keyed substrate in one direction using the notch side of the trowel. 5. Firmly press each tile into the mortar. Press down and move the tile back and forth 111 perpendicularly across the ridges approximately 1/8 to 1/4 inch to flatten the ridges and fill in the valleys of the combed mortar. 6. Set tiles in accurate alignment. L. Screed Installation: 1. Install screeds at tile field edges at the locations indicated. 2. Accurately cut to length for flush tightly butted joints. Provide miter cut angle joints. Remove burrs at field cuts. 3. Install in longest possible lengths, except that no screed section shall be longer than 12 feet or shorter than 4 feet in length for continuous runs greater than 16 feet. 4. Install screeds free from waves and variations in height, flush with top of adjacent tile surfaces. 5. Set screeds directly in setting bed as the tile installation proceeds. Comply with screed manufacturer's instructions to achieve mortar tightly compacted between screed and tile edge. 6. Grind screed joints as necessary to correct minor misalignment and to ease sharp outside corners. 3.8 EXPANSION JOINTS A. Place expansion joints at maximum 30 foot intervals for interior installations. B. Place expansion joints at control and expansion joints in concrete slabs, and at intersections with walls and columns. C. Joint Sizes: Set to match width of typical grouted joint; but in no case less than 1/4". D. Leave expansion joints free of mortar. E. Sealant materials and installation are specified in Section 079200. 3.9 GROUTING A. Comply with provisions of ANSI A108.10. B. Apply grout release to tiles prior to grouting. Use on all natural stone, non-glazed porcelain/ceramic tiles, masonry and quarry tiles. Use also at rough, textured and other difficult-to-grout surfaces. Use at all epoxy grout installations. C. Mix grouts in accordance with manufacturer's instructions. TEMPLATE 093000-6 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 093000 -TILING I D. Grout joints, except expansion joints, in accordance with the manufacturer's recommendations. Float joints to a slightly concave profile. E. Remove excess grout from tile surfaces in accordance with the grout and tile manufacturer's I recommendations. Do not use excess amounts of water. F. Protect adjacent surfaces from damage caused by cleaning agents. Do not use cleaners which would damage tile or grout surfaces. I G. Do not grout joints indicated to receive sealants, including inside right angle corner joints between floors and walls of column bases. Grout joints perpendicular to expansion joints shall be finished flush with tile edges. IH. Remove grout release from affected tiles in accordance with manufacturer's instructions. I. Cured grout joints shall be made free of efflorescence, prior to sealing. I J. Only use epoxy grout behind counters in service areas. 3.10 CURING A. Cure installation in accordance with the grout manufacturer's recommendations. Protect tile and grout I during curing operations. B. Protect tile surfaces during curing. Keep traffic off tile surfaces for a minimum of 4 days, unless I recommended otherwise by the grout or mortar manufacturer. I C. Do not allow the operation of walk-in coolers and freezers for a minimum of 14 days after tile installation in these areas. 3.11 PROTECTION I� A. Protect tile installations from damage, in accordance with Section 015000. B. Replace damaged tiles. I 3.12 CLEANING A. In accordance with Section 015000 and Section 017700. B. Coordinate final cleaning with work of Section 079200. Do not begin cleaning operations until tile Iexpansion joints sealants are fully cured. C. Where grout staining has occurred, clean tile in accordance with manufacturer's instructions. ID. Prior to substantial completion, wash and thoroughly rinse tile. Leave tile surfaces clean. END OF SECTION I I I I I ITEMPLATE 093000-7 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 095113 -ACOUSTICAL PANEL CEILINGS I PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Suspended acoustical ceilings. B. Related Sections: 1. 092200—Lightgage Metal Support Framing: Adjacent overhead structure. 2. 092900- Gypsum Board: Adjacent wall and ceiling surfaces. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. Requests for substitution of ceiling panels shall be accompanied by samples of each proposed panel. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. A641-98 Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire 2. E84 -Test Method for Surface Burning Characteristics of Building Materials. B. International Building Code (IBC) C. Ceilings & Interior Systems Construction Association (CISCA) 1. Recommendations for Direct Hung Acoustical Tile and Lay-in Panel Ceilings—Seismic Zones 0-2. 2. Guidelines for Seismic Restraint Direct Hung Acoustical Tile and Lay-in Panel Ceilings—Seismic Zones 3&4. 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. 1.4 QUALITY ASSURANCE A. Conform to the requirements of IBC, seismic design category as stated on construction documents and the requirements of the jurisdictional code authorities. B. Suspension system components shall be in compliance with requirements of local jurisdictional authorities for ceiling suspension systems, as applicable 1.5 ENVIRONMENTAL REQUIREMENTS A. Maintain temperature of 60 degrees F, minimum, and humidity of 70 percent, maximum, prior to, during, and after installation. 1.6 SEQUENCING/SCHEDULING A. Do not install acoustical ceilings until building is enclosed, sufficient heat is provided, dust generating activities have terminated, and overhead work is completed, tested, and approved. B. Schedule installation of acoustic units after interior wet work is dry. 1.7 EXTRA STOCK A. Furnish 5 percent extra quantity of acoustical panel units under provisions of Section 017700. B. Store above ceiling in Workroom. I TEMPLATE 095113-1 10/12/18 ISTARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS 1,; SECTION 095113 -ACOUSTICAL PANEL CEILINGS IPART 2 - PRODUCTS 2.1 SUSPENSION SYSTEMS A. Exposed T System: ASTM C635, heavy duty classification; direct hung; exposed "T" design; factory baked on finish to match acoustical panels. Furnish stabilizer bars, splices, edge and wall moldings, and other items as necessary to complete suspended ceiling grid system. 1. Wall Moldings: 2 inch flange. I 2. Furnish stabilizer bars, splices, edge moldings, and other items as necessary to complete suspended ceiling grid system. 2.2 ACOUSTICAL PANELS 111 A. Acoustic panels are scheduled on the Drawings. B. Panels shall meet a flame spread of 25 or less when tested in accordance with ASTM E84. I 2.3 ACCESSORIES A. Suspension Accessories: 1. Hanger Wire: ASTM A641; soft temper; prestretched; 12 gage; zinc coated. I2. Carrying Channels: 16 ga x 1-1/2" cold rolled steel; galvanized. PART 3 - EXECUTION I 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. J B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable I conditions. 3.2 PREPARATION A. Coordinate the location of hangers with other work. Ensure hangers are located to accommodate I fittings and units of equipment which are to be placed after the installation of ceiling grid system. 3.3 INSTALLATION OF SUSPENDED CEILING SYSTEMS A. Install after major above-ceiling work is complete. I B. Install system in accordance with IBC as amended by local jurisdictional authorities, as stated on the construction documents, the manufacturer's instructions, and as supplemented in this Section. C. Install grid to produce finished ceiling true to lines and levels indicated,within the specified tolerances. ID. Install suspension systems in a manner to support all superimposed loads,with maximum permissible deflection of 1/270 of span. At locations where partitions extend to ceiling, only, install supplementary diagonal bracing to structure at maximum 8'-0"o.c. along length of partition, and above each door I hinge and strike jamb E. Hang system independent of walls, columns, ducts, pipes and conduit. Where ducts or other equipment prevent the regular spacing of hangers, provide secondary carrying members for indirect I support of the suspension system, or reinforce the nearest adjacent hangers and related carrying channels as required to span the required distance. F. Center system on room axis according to reflected ceiling plans. I G. Anchorage: 1. Provide all anchors required for the installation of the ceiling system. 2. Do not fasten to the upper flutes of metal decking. Do not use fasteners in steel deck which I penetrate more than 1 inch. 3. Verify location of all conduit in poured concrete construction before making attachments. 1 TEMPLATE 095113-2 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 095113 -ACOUSTICAL PANEL CEILINGS H. Install edge molding at intersection of ceiling and vertical surfaces, using longest practical lengths. Miter corners. Provide edge moldings at junctions with other interruptions. Fabricate edge moldings toII fit the surfaces encountered. I. Form expansion joints as detailed. Maintain visual closure. J. Fit acoustic lay-in panels in place, free from damaged edges or other defects detrimental to appearance and function. Fit border units neatly against abutting surfaces. Scribe and mill recessed tegular edge into partial border units supported at edge by wall molding. K. Adjust sags or twists which develop in the ceiling system and replace parts which are damaged or defective. L. Install hold-down clips to retain panels tight to grid system within 20 ft of an exterior door. M. Tolerances: 1. Variation from Flat and Level Surface: 1/8 inch in 12 ft. 2. Variation from Plumb of Grid Members Caused by Eccentric Loads: Two degrees maximum. 3.4 CLEAN-UP A. Remove fingerprints and soil from ceiling materials. Use cleaning materials recommended by the manufacturer of the ceiling materials. I END OF SECTION I I I I I 1 I I I I TEMPLATE 095113-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 097200 -WALL COVERINGS PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: Wall coverings. B. Related Sections: 1. 092900- Gypsum Board: Substrate. 2. 099023— Interior Painting and Coating: Primer for substrates to receive wall covering. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitutions will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): E84-Test Method for Surface Burning Characteristics of Building Materials. 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300, unless specified otherwise. B. Product Data: 1. Submit product data on proposed adhesives and accessories. 2. Provide MSDS sheets or other evidence that shows compliance to sustainability requirements for adhesives. C. Samples: Submit minimum 12 x 12 inch samples of each wall covering proposed. D. Quality Control Submittals: 1. Certification: Submit certification that all fabric which does not meet flame spread requirements has been fire retardant treated to meet the requirements specified. E. Contract Closeout Submittals: Submit product information and maintenance instructions as a part of Operation and Maintenance Data submittals specified in Section 017700. 1.4 QUALITY CONTROL A. Wall Covering Installer: Minimum of 3 years experience in wall covering installations of similar size and scope. Able to show evidence of experience when requested by the Architect. B. Pre-installation Meeting: 1. In accordance with Section 013119. 2. Schedule a conference a minimum of 10 calendar days prior to the installation of the wall covering. 3. Review installation, including locations of each fabric type, substrate requirements, installation procedures and methods, and scheduling. Address all conditions and situations which would adversely affect the wall covering application. 4. Attendance: Contractor, wall covering installer, and all other parties affected by the work of this section. 1.5 DELIVERY, STORAGE, AND HANDLING A. In accordance with Section 016000. B. Store wall covering materials flat, not upright, in a dry area. Maintain temperature of storage area at a minimum of 45 degrees F., unless a higher temperature is recommended by wall covering manufacturer. TEMPLATE 097200-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 097200 -WALL COVERINGS I 1.6 ENVIRONMENTAL CONDITIONS I A. Temperature: 1. Do no wall covering work until surfaces and materials have been maintained at 60 degrees F. minimum, or higher if recommended by wall covering manufacturer, for 3 days before work begins. 2. Maintain minimum or above temperatures during the entire installing time and until adhesives have fully dried or cured. B. Lighting: During installation, maintain minimum lighting level of 15 foot-candles on the surfaces to receive wall covering. Use temporary lighting, if necessary, to attain specified level. C. Ventilation: Provide adequate continuous ventilation during the work and until adhesives have fully dried or cured. 1.7 MAINTENANCE A. Maintenance Materials: Furnish extra stock as required by the Construction Manager. PART 2 - PRODUCTS 2.1 WALL COVERING I A. Types as scheduled on the Drawings. B. All wall coverings shall have a maximum flame spread of 75 or less when tested in accordance with ASTM E84. Fire retardant treat all nonconforming wall covering. Treatment shall not alter the appearance of the fabric. 2.2 ACCESSORIES A. Adhesives: 1. Use adhesives as recommended by the wall covering manufacturer for the application. 2. Sustainability Requirements: Adhesives shall meet the requirements of the Southern California South Coast Air Quality Management District (SCAQMD) Rule 1168. (maximum VOC content of 250 grams/liter, using the method of dividing the weight of the solvent in the adhesive by the volume of the material, less water). PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrate and notify the Architect of unacceptable conditions which would prevent a 1 satisfactory installation. Unacceptable conditions include, without limitation, cracks, voids, ridges, oils, grease, moisture, porosity, indelible and water soluble crayon, ball or felt tip pen marks, and foreign materials. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. C. Ensure that surfaces to receive wall covering have received a coat of wall size as specified in Section 099023. 3.2 PREPARATION A. Schedule work such that the subsequent work of other sections will not damage the work of this section. B. Verify the type, pattern, color, and quantity of each type wall covering for each location scheduled to receive wall covering. C. Remove electrical outlet and switch plates, mechanical diffusers, escutcheons, registers, surface hardware, fittings, and fastenings prior to starting work; store during and replace after work. TEMPLATE 097200-2 10/12/18 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 097200 -WALL COVERINGS I D. Protection: Provide sufficient drop cloths, shields, and protective equipment to prevent wall covering materials from fouling adjacent surfaces, and in particular at storage and preparation areas. E. At existing painted surfaces, evenly roughen with a medium grit garnet paper, wash with well-diluted Ihousehold detergent, wipe clear water, allow to dry, and size with wall covering adhesive. 3.3 WALL COVERING INSTALLATION I A. Mix and apply adhesives in strict accordance with the adhesive manufacturer's directions for the type of material being applied. B. Install wall covering secure, smooth, clean, and without wrinkles, gaps or overlaps. IC. Extend wall covering continuously behind such items as mirrors, and other items which are close to but not touching walls. D. Install wall covering where scheduled in strict accordance with the wall covering manufacturer's I recommendations. E. Provide double-cut seams on nonmatch patterns; butt seams on match patterns. F. Install wall covering oriented vertically, unless otherwise indicated. Horizontal seams are not Ipermitted. G. Corner Seams: Make no seams within 6 inches of an inside or outside corner, except where a color or pattern change is indicated. Lap wall coverings at inside corner seams to prevent substrate show Ithrough. H. Fabrics: 1. Use fabric rolls in consecutive numerical sequence of manufacture. 2. Place fabric sections consecutively in exact order in which they are cut from the roll including Ifilling all spaces above or below windows, doors, or similar penetrations. 3. Trim patterned fabrics which are not factory pretrimmed on a work table with a straight edge and an industrial razor blade for exact pattern match. 3.4 CLEANUP A. Remove all adhesives, and other contaminants in a manner which will not damage the surface from which it is removed. IB. Remove debris and leave areas neat and clean. C. Replace all removed wall plates and other accessories. I D. Repair to like-new condition, or replace as directed by the Construction Manager, all surfaces damaged by work of this Section. 3.5 EXCESS YARDAGE I A. Notify the Construction Manager prior to removing excess yardage from the job. The Construction Manager will select the materials which are to be retained by the Owner. B. Carefully wrap the excess yardage selected to be retained. Deliver to a location as directed by the IConstruction Manager. Remove remainder from the site and dispose of legally. END OF SECTION I I I IlTEMPLATE 097200-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 097733—REINFORCED PLASTIC PANEL WALL COVERINGS PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Reinforced plastic panel wall covering. 2. Adhesives, sealants, and related accessories. B. Related Sections: 1. 064000—Architectural Woodwork: Honeycombed resin panels 2. 092900- Gypsum Board: Substrate. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): E84-Test Method for Surface Burning Characteristics of Building Materials 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. 1 B. Product Data: 1. Product literature on adhesives and sealants to be used in conjunction with panel system installation. 2. Manufacturer's product literature for system components. C. Samples: 1. Three samples of wall paneling material proposed for the work; 3 x 4 inch minimum size. 2. One each of each cap, corner, and division molding proposed for the work; minimum 4 inches in length. 1.4 QUALITY ASSURANCE A. Panel system shall be USDA approved for use in food preparation and service areas. 1.5 SUBCONTRACTOR GUARANTEE A. Furnish Subcontractor Guarantees in accordance with Section 017700. 1 1.6 DELIVERY, STORAGE AND HANDLING A. Comply with requirements of Section 016000. 1.7 ENVIRONMENTAL CONDITIONS A. Maintain a minimum temperature of 60 degrees F and relative humidity as prescribed by the adhesive manufacturer, during installation, and until installed adhesive is fully cured. B. Allow no containers of adhesive to be opened until all potential sources of flame or spark have been shut down or extinguished and until warnings against their ignition during adhesive application have been posted. I C. Provide ventilation to disperse fumes during application of solvent based adhesive. I I TEMPLATE 097733-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 097733— REINFORCED PLASTIC PANEL WALL COVERINGS PART 2 - PRODUCTS 2.1 PANEL SYSTEM COMPONENTS A. Panel Material: 1. Manufacturer/Type: a. Marlite Brand Class I/A Fire Rated FRP by Marlite (Dover, OH 330/343-6621); color as scheduled in the Finish Legend. b. Fire-X Glasbord with Surfaseal, by Kemlite Company(Joliet, IL 800/435-0080); color as scheduled in the Finish Legend. 2. Panel Type: Fiberglass reinforced polyester panels, with embossed textured face. 3. Thickness: 3/32 inch. 4. Size: 48 inches x length required for conditions indicated. 5. Fire Rating: Maximum 25/450 flame spread/smoke developed in accordance with ASTM E84. B. Moldings: Manufacturer's standard PVC cap, corner, and division moldings; color to match panels. C. Adhesive: 1. Sustainability Requirements: Adhesives shall meet the requirements of the Southern California South Coast Air Quality Management District(SCAQMD) Rule 1168. (maximum VOC content of 250 grams/liter, using the method of dividing the weight of the solvent in the adhesive by the volume of the material, less water). 2. For Panel Installation: Marlite Brand C-375 or C-551 Construction Adhesive by Marlite, or 444 Non-Flammable F.R.P. Panel Adhesive by W. W. Henry Company, 3. For Molding Installation: Marlite Brand C-375 C-551 Adhesive by Marlite, or 444 Non-Flammable F.R.P. Panel Adhesive by W. W. Henry Company. 4. Furnish adhesive spreaders with 3/16 inch V-notches, 5/16 inch apart for application of adhesive to panels. 1 D. Sealant: Flexible waterproof sealant for bedding panel edges, Marlite Brand Silicone Sealant MS-251 by Marlite, or Silicone Sealant S255C by Kemlite Company. PART 3 - EXECUTION 3.1 CONDITION OF SURFACES A. Substrate: Verify that drywall substrate is clean, dry, solid, straight, and free from projections. B. Where conditions require installation of paneling prior to installation of flooring, coordinate with other trades to establish accurate location of top of base. C. Do not start work until other work requiring penetration of wall covering has been completed, or accurately located. D. Commencement of plastic paneling wall covering work constitutes installer's acceptance of the substrate. 3.2 CUTTING AND FITTING A. Cut panels accurately to size with proper allowance for expansion and moldings. B. Sand or file all edges smooth without chipping. C. Cut openings for penetrations in accurate location with approximate 1/8 inch clearance around penetrations. 3.3 INSTALLATION A. Install base molding to wall at proper elevation, in solid bed of adhesive. Allow adhesive to set thoroughly prior to installation of paneling. B. Seal base molding to top of wall base. I TEMPLATE 097733-2 10/12/18 STARBUCKS COFFEE COMPANY 1 GUIDE SPECIFICATIONS SECTION 097733—REINFORCED PLASTIC PANEL WALL COVERINGS 1 C. Establish centerline of each distinct flat area to be covered. Trim division moldings to mate with base moldings; install in solid bed of adhesive, either on centerline, or offset 24inches from center, as necessary to maximize panel widths at corners. Molding shall be installed straight and plumb. D. Cut top cap and division or corner moldings to shape, with edges trimmed to fit to adjacent moldings. E. Apply sealant into installed moldings in sequence with panel installation. F. Apply adhesive to backs of panels in accordance with the manufacturer's recommendations. G. Maintain lines and levels of panel edges and moldings. I H. Allow 1/8 inch gap between top cap, corner, or division molding posts, and panel edge; all edges shall be firmly bedded to the moldings in sealant. I. Promptly remove sealant squeeze out with a damp cloth, as work progresses; remove adhesive with appropriate solvent. J. Install sealant behind flanges and at penetrations through paneling, and between top cap of panel and substrate. 3.4 CLEANING A. Inspect surfaces of paneling and remove excess adhesive from face of laminate using solvent recommended by manufacturer. B. Promptly remove unused cut pieces from the site. C. Prior to substantial completion of each area where reinforced plastic panel wall covering is installed, I clean all surfaces of plastic panels, using procedures recommended by the manufacturer. END OF SECTION I I I I I I I 1 TEMPLATE 097733-3 10/12/18 1 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 098100 -ACOUSTIC INSULATION PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Acoustical insulation in walls. 2. Acoustical sealant. B. Related Sections: 1. 072100 -Thermal Insulation: Thermal batt and blanket insulation. 2. 078400 - Firestopping: Fire rated penetration seals. 3. 078500 - Fire Rated Joint Assemblies: Fire rated joint assemblies at acoustical construction. 4. 092200—Lightgage Metal Support Framing: Support framing. 5. 095123—Acoustical Panel Ceilings. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C665- Mineral Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing. 2. E84-Test Method for Surface Burning Characteristics of Building Materials. 1.3 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product data for each product. 1.4 QUALITY ASSURANCE A. Acoustical insulation shall be in compliance with local jurisdictional authorities as applicable. PART 2 - PRODUCTS 2.1 MATERIALS A. Acoustical Insulation: ASTM C665, Type I; unfaced glass fiber batts, blankets, or rolls; minimum fire hazard classification rating of 25/50 per ASTM E84; minimum 3-1/2-inch thick, unless required otherwise to meet the STC requirements indicated or specified; formaldehyde free. 1. For Installation in Stud Walls: Widths to friction-fit between studs B. Acoustical Sealant: Non-hardening, low-shrinkage; for use in conjunction with gypsum board; similar to USG "Sheetrock Brand Acoustical Sealant,"Tremco "Acoustical Sealant 30CTG," Quiet Solution (Sunnyvale CA; ; 408-541-8000) "QuietSeal QS-350,"or approved; maximum VOC content 250g/L. C. Accessories: Furnish other accessories such as fasteners and retainers, not specifically described, but required for a complete installation. PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. B. Notify the Construction Manager in writing of conditions detrimental to the proper and timely completion of the work. TEMPLATE 098100-1 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 098100 -ACOUSTIC INSULATION I C. Do not begin work until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 PREPARATION A. Verify that adjacent materials are secure, properly spaced, dry, and ready to receive installation. B. Verify that mechanical and electrical services within spaces to be insulated have been installed and tested. I C. Furnish acoustical insulation to hollow metal installer for installation in hollow metal frames in acoustical partitions. 3.3 INSTALLATION i A. Install insulation in stud cavities in accordance with manufacturer's instructions, and as indicated. Coordinate with other trades as necessary to complete acoustical barriers at wall penetrations. B. Install insulation without gaps or voids. C. Trim insulation neatly to fit spaces. Use insulation materials free of damage. D. Sealant: 1. Install acoustical sealant continuously around perimeter of all acoustically insulated partitions; one continuous bead at each side of framing member interface with substrate. 2. Except for penetrations in fire rated construction to receive firestopping or fire rated construction joint assemblies, seal all penetrations through acoustical assemblies, including cutouts for lighting fixtures, cabinets, pipes and plumbing, HVAC ducts, and electrical boxes. END OF SECTION I I I I I I I 1 TEMPLATE 098100-2 10/12/18 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 099013—EXTERIOR PAINTING AND COATING II PART 1 -GENERAL I 1.1 SUMMARY A. Section Includes: Site applied exterior paint coatings. B. Related Sections: I 1. 055000- Metal Fabrications: Pre-primed metal surfaces. 2. 064000 -Architectural Woodwork: Shop finished materials. 3. 081113 - Hollow Metal Doors and Frames: Preprimed metal surfaces. 4. 099023 - Interior Painting And Coating IC. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. I D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES I A. Master Painters Institute (MPI): Architectural Painting Specification Manual B. Steel Structures Painting Council (SSPC). 1.3 DEFINITIONS: IA. Sheen: Degree of luster of the dried paint film. Where terms such as "gloss," "semi-gloss," "low- gloss," "matte," "satin," "eggshell,"or"flat," are used, it shall be subject to the Architect's interpretation, regardless of manufacturer's nomenclature for any particular sheen level. The Architect reserves the I right to select from any of manufacturer's published sheen levels for each paint system, if sheen of initial paint finish sample is not approved. 1.4 SUBMITTALS IA. Make submittals in accordance with Section 013300. B. Contract Closeout Submittals: Record Paint Samples: In accordance with Section 017700, submit three 8"x10" samples of each paint and color used, indicating paint manufacturer and formula number; Ibind in identical sets. Deliver to on site location as directed. C. Sustainability Submittals: 1. Make submittals in accordance with Section 013546. I 2. Low-Emitting Materials—Paints and Coatings: a. Submit a list of paints and coatings used inside the building. Include product name, manufacturer, and VOC content. b. For each product submit cut sheets, MSDS sheets, or letters from product manufacturers Iclearly indicating VOC content. 1.5 QUALITY ASSURANCE I A. Applicator: Company specializing in commercial painting and finishing with a minimum of three years documented experience. B. Environmental Requirements for Solvent Based Paints: Comply with the Environmental Protection Agency(EPA) requirements for volatile solvents content limitations, as applicable to each classification Iof coating. C. Visual Standards: Each distinct area of the finished work shall be free of variations in color and sheen, orange peel, runs, sags, blistering, checking, cracking, scratches, dust, dirt, bugs, and other Icontaminants. 1.6 DELIVERY, STORAGE,AND HANDLING IA. In accordance with Section 016000. ITEMPLATE 099013-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099013— EXTERIOR PAINTING AND COATING t B. Delivery: Deliver paint materials to the jobsite in sealed, original, labeled containers, each bearing manufacturer's name, type of paint, brand name, color designation, and instructions for mixing and/or reducing. C. Storage: Store paint materials at a minimum ambient temperature of 45 degrees F. in a well ventilated area. [Adequate storage facilities will be made available at the jobsite. ] D. Toxic, acidic, and combustible materials: Take all necessary precautionary safety measures as recommended by the material manufacturers and governing regulations. E. Place cotton waste, cloths, and material which may constitute a fire hazard in closed metal containers and daily remove from the site. 1.7 SITE CONDITIONS A. Weather Conditions: 1. Do no exterior work on unprotected surfaces when raining, or other moisture is present or expected, or before applied paints can dry or attain proper cure. 2. Allow wetted surfaces to dry and attain temperatures and condition specified hereinafter before 3 proceeding with previously started work. B. Temperature: 1. Do not perform painting work when surface and air temperatures are below 40 degrees F or below those temperatures recommended by the manufacturer for the material type used. 2. Minimum temperatures for latex finishes: 45 degrees F for interior work and 50 degrees F. for exterior work, unless approved otherwise. C. Lighting: Maintain a lighting level of minimum 50 foot-candles on the surfaces to be painted or finished. D. Ventilation: Provide adequate continuous ventilation. I PART 2 - PRODUCTS 2.1 PRODUCTS I A. Unless specified otherwise, furnish manufacturer's highest grade coating systems by one of the following manufacturers: 1. Benjamin Moore Paint Company. 2. Pittsburgh Paints. 3. Pratt& Lambert. 4. The Sherwin-Williams Company 5. ICI Paints North America. 2.2 EXTERIOR PAINT SYSTEMS A. Exterior CMU Substrate: 1. Manufacturer: Benjamin Moore Paint Company a. Block Filler: Super SpecMasonry Int/Ext Hi-Build Block Filler(206) b. Finish: Ultra Spec Exterior Flat Finish (N447) 2. Manufacturer: ICI Dulux a. Block Filler: "Bloxfil 4000 Interior/Exterior Heavy Duty Acrylic Block Filler" (52901) b. Finish: "#2200 Dulux Professional Exterior 100% Acrylic Flat Finish 3. Manufacturer: Sherwin-Williams a. Block Filler: "Heavy Duty Block Filler" B42W46 b. Finish: "A-100 Exterior Latex Flat." B. Exterior Concrete Substrate: 1. Manufacturer: Benjamin Moore Paint Company a. Primer: Moorcraft Super Spec Latex Exterior Primer(169) b. Finish: Ultra Spec Exterior Flat Finish (N447) 2. Manufacturer: ICI Dulux a. Primer: #3030 Ultra-Hide Bond Prep, pigmentent bonding primer 1 TEMPLATE 099013-2 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099013—EXTERIOR PAINTING AND COATING I b. Finish: "#2200 Dulux Professional Exterior 100%Acrylic Flat Finish 3. Manufacturer: Sherwin-Williams a. Primer: "Loxon Exterior Acrylic Masonry Primer,"A24W300 I b. Finish: "A-100 Exterior Latex Flat." C. Exterior Wood Substrate (Opaque only) 1. Manufacturer: Benjamin Moore Paint Company a. Primer: Super Spec Latex Exterior Primer(169) I b. Finish: Ultra Spec Exterior Flat Finish (N447) 2. Manufacturer: ICI Dulux a. Primer: "#2000 Dulux Professional Exterior 100%Acrylic Wood Primer." I b. Finish: "#2200 Dulux Professional Exterior 100%Acrylic Flat Finish 3. Manufacturer: Sherwin-Williams a. Primer: "A-100 Exterior Latex Wood Primer." b. Finish: "A-100 Exterior Latex Flat." I D. Cement Plaster or EIFS Substrate 1. Manufacturer: Benjamin Moore Paint Company a. Primer: Super Spec Latex Exterior Primer(169) I b. Finish: Ultra Spec Exterior Flat Finish (N447) 2. Manufacturer: ICI Dulux a. Primer: #3030 Ultra-Hide Bond Prep, pigmentent bonding primer b. Finish: "#2200 Dulux Professional Exterior 100%Acrylic Flat Finish I 3. Manufacturer: Sherwin-Williams a. Primer: "Loxon Exterior Acrylic Masonry Primer,"A24W300 b. Finish: "A-100 Exterior Latex Flat." I E. Galvanized Ferrous Metal - Epoxy/Polyurethane System: One of the following 1. Manufacturer: Tnemec Company Inc. (Kansas City, MO; 816-483-3400). a. Epoxy Primer: "Hi-Build Epoxoline II" Series N69. b. Polyurethane Finish Coats: Series 1075 "Endura-Shield II"; Acrylic Polyurethane Enamel; I semi-gloss or satin sheen. 2. Manufacturer: Carboline Company(St. Louis, MO; 314-644-1000; 800-848-4645). a. Epoxy Primer: "Carbolise 888 " b. Polyurethane Finish Coats: Carboline 133 HB; semi-gloss or satin sheen. I 3. Manufacturer: Ameron Protective Coatings (Brea, CA; 714-529-1951). a. Epoxy Primer: "Amercoat 385." b. Polyurethane Finish Coats: Amercoat 450SA"; semi-gloss or satin sheen. I F. Materials not specifically noted and otherwise required for the work, such as linseed oil, shellac, thinners and the like shall be of a quality not less than that required by manufacturers of the finish materials used in the work. 1 G. Products for each general purpose shall be compatible. Each system shall be products of one manufacturer where ever possible. PART 3 - EXECUTION I3.1 EXAMINATION A. Prior to starting work, inspect installed work of other trades and verify that such work is complete to U the point where work of this Section may properly commence. Perform adhesion tests on factory primed items. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. I B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. I ITEMPLATE 099013-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099013—EXTERIOR PAINTING AND COATING 3.2 MOISTURE CHECK I A. Check for excess moisture using an electronic moisture meter. Do not paint materials with moisture levels which would impair the bonding of finish coatings. 3.3 PROTECTION ' A. Adequately protect surfaces not to be painted, from spills, drips, over painting, and other damage caused by this work. Include surfaces within the paint storage and preparation areas. B. Hardware and Miscellaneous Items: 1. Remove electrical outlet and switch plates, mechanical diffusers, escutcheons, surface hardware, and fittings prior to starting work. 2. Store, clean and reinstall these items upon completion of work in each area. Use materials and techniques as necessary to prevent damage to finishes on such items. 3.4 SURFACE PREPARATION A. Prepare surfaces by removing dirt, dust, grease, oil, moisture, and other contaminants which would I impair finish adhesion. B. Ferrous Metal Shop Primed under other Sections: 1. Solvent clean to remove oil and grease. Remove loose rust, and blistered and peeling paint to bare metal by scraping, sanding, and wire brushing in accordance with SSPC-SP2 and SP3. Immediately retouch damaged or abraded surfaces with compatible primers. Lightly sand all shop prime painted surfaces to receive paint finish. 2. Zinc primer or epoxy tie-coat primer may be omitted from field application when same shop-or mill-applied primer is in good condition and well-bonded. C. Galvanized Ferrous Metal: 1. Undamaged Surfaces: Solvent clean in accordance with SSPC-SP1; abrade surfaces with metal preparation pad. 2. Damaged Surfaces: Remove loose rust to bare metal by scraping, sanding, and wire brushing in accordance with SSPC-SP2 and SP3. Touch up damaged surfaces with zinc rich primer followed by epoxy tie-coat. 3. Epoxy primer may be omitted from field application when same shop-or mill-applied primer is in good condition and well-bonded. D. Unprimed Ferrous Metal: 1. Solvent clean in accordance with SSPC SP-1. 2. Commercial blast per SSPC SP6. E. Wood - Opaque paint finish: 1. Spot coat knots, pitch streaks, and sappy sections with sealer. 2. Fill all nail holes and cracks. Sand filler smooth and level with wood surface. F. Concrete and Concrete Masonry Units: Remove all contaminants by washing and wire brushing. Sandblast if necessary. G. Concrete to Receive Exterior Concrete Coating System: 1. Remove all traces of efflorescence, oil, dirt, curing compounds, bond breakers, form release agents, and other materials which would inhibit paint bond. 2. Power wash exterior concrete with non-sudsing bio-degradable detergent at a minimum 1500 psi pressure, unless recommended otherwise by the coating system manufacturer. 3. Mask concrete panel surfaces to receive sealant. H. Existing Finished Surfaces To Be Repainted: 1. Remove loose, blistered, scaled, or crazed finishes to bare substrate; feather new work into existing work. Prepare surfaces to the nearest break line if necessary to blend new finishes with old finishes. 2. Wash and rinse surfaces with trisodium phosphate and water or other solution required to remove remaining film, wax, oil, grease, or foreign matter which would impair bond or cause bleed through. TEMPLATE 099013-4 10/12/18 ISTARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ISECTION 099013— EXTERIOR PAINTING AND COATING I 3. Lightly sand, or apply a liquid deglosser on existing semi-gloss and high-gloss finishes before refinishing. 3.5 GENERAL APPLICATION REQUIREMENTS IA. Unless specified or indicated otherwise, follow paint manufacturer's label directions for general application procedures and coverage rates. B. Do not apply finishes on surfaces that are not sufficiently dry. Make sure each coat of finish is dry and Ihard before a following coat is applied unless the manufacturer's directions state otherwise. C. Tint filler to match stain when clear finishes are specified; work filler well into grain and, before it has set, working perpendicularly to the grain, wipe the excess from the surface. ID. Opaque Finishes: 1. Apply number of coats scheduled for each application, except that additional finish coats shall be applied as necessary for complete hiding of substrate colors. I 2. Apply primer coats untinted. Where more than one coat of paint is required, tint each succeeding coat up to the final coat similar in tint, but slightly lighter in value (shade). 3. Sand lightly between coats if necessary to achieve required finish. I E. Rollers for application and backrolling of latex paints shall have a nap of 3/8 inch or less. F. Factory Primed Surfaces: Apply scheduled finish system, less primer coat, except as necessary for patching damage to factory prime coating. 1 I G. Epoxy/Urethane Systems: Brush or roller apply, except spray apply at small-dimensioned high- visibility components such as railings. 3.6 EXTERIOR PAINTING SYSTEMS I A. Concrete - Latex System: 1. System: Two coats: first coat acrylic primer, second coat 100% acrylic exterior latex paint. 2. Sheen: Flat sheen, unless indicated otherwise. I 3. Application: Exterior concrete surfaces. B. Concrete Masonry Units - Latex System: 1. System: Two coats: first coat acrylic primer or block filler, second coat 100% acrylic exterior latex I paint. 2. Sheen: Flat, unless indicated otherwise. 3. Application: Exterior concrete masonry surfaces. C. Repainting of Cement Plaster and EIFS - Latex System: I 1. System: Two coats: first coat acrylic primer, second coat exterior latex paint. 2. Sheen: Flat unless indicated otherwise. 3. Application: Repainting of existing exterior cement plaster or EIFS surfaces. I D. Concrete - Exterior Concrete Coating System: 1. System: Install in accordance with the manufacturer's recommendations; first coat Tnemec concrete primer at 8 to 10 mils; second coat concrete finish coat at 3 mils thickness; spray application. I 2. Sheen: Flat, unless indicated otherwise. 3. Application: Exterior concrete surfaces as indicated. E. Non-Galvanized Ferrous Metal -Zinc/Epoxy/Urethane System: I 1. System: Shop apply one coat of zinc-rich primer; shop-or field apply one coat of epoxy primer to 3 mil minimum thickness; field-apply one coat urethane finish in accordance with the manufacturer's recommendations. Verify compatibility with shop applied primer. 2. Sheen: Semi-gloss or satin, unless indicated otherwise. I3. Application: Use on all exterior non-galvanized ferrous metal surfaces. F. Galvanized Ferrous Metal - Epoxy/Urethane System: 1. System: Retouch welds and damaged galvanized coatings with zinc primer; apply one coat Iepoxy primer, and two urethane finish coats in accordance with the manufacturer's ITEMPLATE 099013-5 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099013— EXTERIOR PAINTING AND COATING ' recommendations. Verify compatibility with shop applied primer. Apply epoxy primer over all shop applied primers, unless the specified primer was shop applied. 2. Sheen: Semi-gloss or satin, unless indicated otherwise. 3. Application: Use on all exterior galvanized ferrous metal surfaces. G. Wood - Latex System: 1. System: Three coats; first coat exterior latex primer, second and third coats exterior latex. 2. Sheen: Semi-gloss, unless indicated otherwise. 3. Application: Exterior wood trim and other exterior wood surfaces where opaque coating is indicated. 3.7 CLEANUP A. As the work proceeds and on completion of the work, promptly remove all sealers, primers, paints and finishes where spilled, splashed or splattered in a manner not to damage the surface from which it is removed. B. Remove masking. 1 C. Clean, or replace with new, all lamps and electrical fixtures damaged by overspray; replace with new identical components all lighting fixture louvers and reflectors damaged by overspray. 3.8 COLOR SCHEDULE A. Provide paint colors to match those indicated on the drawings. Where a paint color is listed from a specific manufacturer, paint products from other approved manufacturers may be used, provided the color exactly matches the specified color, and the paint system meets the specified requirements. Where no paint color is indicated, provide color and sheen as selected by the Architect. END OF SECTION TEMPLATE 099013-6 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS ' SECTION 099023—INTERIOR PAINTING AND COATING PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: Site applied interior paint coatings. B. Related Sections: ' 1. 055000 - Metal Fabrications: Pre-primed metal surfaces. 2. 064000 -Architectural Woodwork: Shop finished materials. 3. 081113 - Hollow Metal Doors and Frames: Preprimed metal surfaces. ' 4. 081400-Wood Doors: Prefinished doors. 5. 097200-Wall Coverings: Finish material over primed surfaces. 6. 099013- Exterior Painting And Coating C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification ' sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. Master Painters Institute (MPI): Architectural Painting Specification Manual B. Steel Structures Painting Council (SSPC). 1.3 DEFINITIONS: A. Sheen: Degree of luster of the dried paint film. Where terms such as "gloss," "semi-gloss,""low- gloss," "matte," "satin," "eggshell," or"flat," are used, it shall be subject to the Architect's interpretation, regardless of manufacturer's nomenclature for any particular sheen level. The Architect reserves the right to select from any of manufacturer's published sheen levels for each paint system, if sheen of initial paint finish sample is not approved. 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. ' B. Contract Closeout Submittals: Record Paint Samples: In accordance with Section 017700, submit three 8"x10" samples of each paint and color used, indicating paint manufacturer and formula number; bind in identical sets. Deliver to on site location as directed. C. Sustainability Submittals: 1. Make submittals in accordance with Section 013546. 2. Low-Emitting Materials— Paints and Coatings: a. Submit a list of paints and coatings used inside the building. Include product name, ' manufacturer, and VOC content. b. For each product submit cut sheets, MSDS sheets, or letters from product manufacturers clearly indicating VOC content. ' 1.5 QUALITY ASSURANCE A. Applicator: Company specializing in commercial painting and finishing with a minimum of three years documented experience. ' B. Environmental Requirements for Solvent Based Paints: Comply with the Environmental Protection Agency(EPA) requirements for volatile solvents content limitations, as applicable to each classification of coating. C. Visual Standards: Each distinct area of the finished work shall be free of variations in color and sheen, orange peel, runs, sags, blistering, checking, cracking, scratches, dust, dirt, bugs, and other contaminants. TEMPLATE 099023-1 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099023—INTERIOR PAINTING AND COATING ' 1.6 DELIVERY, STORAGE, AND HANDLING I A. In accordance with Section 016000. B. Delivery: Deliver paint materials to the jobsite in sealed, original, labeled containers, each bearing manufacturer's name, type of paint, brand name, color designation, and instructions for mixing and/or reducing. C. Storage: Store paint materials at a minimum ambient temperature of 45 degrees F. in a well ventilated area. D. Toxic, acidic, and combustible materials: Take all necessary precautionary safety measures as recommended by the material manufacturers and governing regulations. E. Place cotton waste, cloths, and material which may constitute a fire hazard in closed metal containers , and daily remove from the site. 1.7 SITE CONDITIONS A. Temperature: 1. Do no painting work when surface and air temperatures are below 40 degrees F or below those temperatures recommended by the manufacturer for the material type used. 2. Minimum temperatures for latex finishes: 45 degrees F for interior work and 50 degrees F. for exterior work, unless approved otherwise. B. Lighting: Maintain a lighting level of minimum 50 foot-candles on the surfaces to be painted or finished. C. Ventilation: Provide adequate continuous ventilation. PART 2 - PRODUCTS I I 2.1 PRODUCTS A. Unless specified otherwise, furnish manufacturer's highest grade coating systems by one of the following nationally available manufacturers: 1. Benjamin Moore Paint Company. 2. Pittsburgh Paints. 3. Pratt& Lam bert. 4. The Sherwin-Williams Company. 5. ICI Paints North America. 2.2 INTERIOR PAINT SYSTEMS A. Interior CMU Substrate-One of the following; colors as scheduled on the Drawings. 1. Manufacturer: Benjamin Moore Paint Company a. Block Filler: Super SpecMasonry Int/Ext Hi-Build Block Filler(206) b. Finish: Ultra Spec 500 Zero VOC Interior Eggshell Finish (N538) 2. Manufacturer: ICI Dulux a. Block Filler: "Bloxfil 4000 Interior/Exterior Heavy Duty Acrylic Block Filler" (52901) b. Finish: LM9300 "Lifemaster 2000" Eggshell. 3. Manufacturer: Sherwin-Williams a. Block Filler: "Heavy Duty Block Filler" B42W46 b. Finish: " Harmony 0 VOC B9 Series" B. Interior Gypsum Board Substrate: One of the following; colors as scheduled on the Drawings. ' 1. Manufacturer: ICI Devoe a. Primer: DR3160 "Wonderpure Primer." b. Finish: DR3249 "Wonderpure Eggshell." 2. Manufacturer: ICI Dulux a. Primer: LM9116 "Lifemaster 2000" primer." b. Finish: LM9300 "Lifemaster 2000" Eggshell." 3. Manufacturer: Sherwin-Williams a. Primer: Harmony Primer 0 VOC B11 W900 TEMPLATE 099023-2 10/12/18 STARBUCKS COFFEE COMPANY O GUIDE SPECIFICATIONS SECTION 099023—INTERIOR PAINTING AND COATING ' b. Finish: Harmony 0 VOC B9 Series; Eggshell sheen 4. Manufacturer: Benjamin Moore Paint Company a. Primer: Ultra Spec 500 Zero VOC Interior Latex Primer(N534) b. Finish: Ultra Spec 500 Zero VOC Interior Eggshell Finish (N538) C. Interior Trim Systems—Metal Substrate: One of the following. 1. Manufacturer: ICI Devoe a. Metal Primer: "Mirrolac" DP 8502 WB; DTM waterborne primer. b. Finish: DR3349 "Wonderpure SG." 2. Manufacturer: ICI Dulux a. Metal Primer: "Devflex"4020 DTM waterborne primer. b. Finish: LM9200 "Lifemaster 2000" S.G. 3. Manufacturer: Sherwin-Williams a. Metal Primer: "Pro Industrial Pro-Cryl B66" Universal Acrylic Primer; 2.5—5.0 mils dft 138 g/I VOC ' b. Finish: Pro Classic Waterborne Semi-gloss dft 157 g/I VOC c. Metal Primer: (DTM waterborne). Super Spec HP D.T.M. Acrylic Semi-Gloss Enamel (P29) d. Finish: (Semi-Gloss) Super Spec HP D.T.M. Acrylic Semi-Gloss Enamel (P29) 4. Manufacturer: Ameron International. ' a. Metal Primer: "Amercoat 148,"Waterborne Acrylic Primer. b. Finish: "Amercoat 220,"Waterborne Acrylic Topcoat; semigloss. D. Acrylic Wall Size: One of the following. ' 1. ICI Devoe "Wonderprime" DR51701 vapor barrier primer/sealer. 2. ICI Dulux"Ultra-Hide" 1060 vapor barrier primer/sealer. 3. Sherwin-Williams "Harmony Primer 0 VOC" B11 W900 . 4. Benjamin Moore Paint Company Super Spec Latex vapor Barrier Primer Sealer(0260) 5. Parker Paint Mfg. Co., Inc. "Perm Gard" Interior Latex Vapor Barrier. 6. Zinsser Co, Inc. (Somerset NJ; (732)469-8100) "Shieldz Universal Pre-Wall Covering Primer"; acrylic primer/sealer ' E. Interior Waterborne Epoxy Systems: One of the following. 1. Manufacturer: Tnemec Company, Inc. a. Gypsum Board Primer: "Series "151 Elasto-Grip" b. Metal Primer: "Series 115 Unibond DF" c. Finish Coat: "Series 113 Tnemec-Tufcoat". 2. Manufacturer: ICI Dulux a. Gypsum Board Primer: "Ultra-Hide Aquacrylic Gripper Stain Killer Primer-Sealer 3210- 1200." ' b. Metal Primer: "Tru-Glaze-WB 4030 Waterborne Epoxy Primer" c. Finish Coat: "Tru-glaze 4406 Waterborne Acrylic Epoxy Semi-Gloss." 3. Manufacturer: Sherwin-Williams a. Gypsum Board Primer: "Preprite Classic Primer." b. Metal Primer: "Procryl Primer" c. Finish Coat: "Epo-plex Multi-mil WB Epoxy". 2.3 SPECIAL INTERIOR COATINGS A. Materials not specifically noted and otherwise required for the work, such as linseed oil, shellac, thinners and the like shall be of a quality not less than that required by manufacturers of the finish materials used in the work. ' B. Products for each general purpose shall be compatible. Each system shall be products of one manufacturer where ever possible. ' PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to starting work, inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Perform adhesion tests on factory ' TEMPLATE 099023-3 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099023—INTERIOR PAINTING AND COATING primed items. Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of site conditions and responsibility for defective installation caused by prior observable conditions. 3.2 MOISTURE CHECK A. Check for excess moisture using an electronic moisture meter. Do not paint materials with moisture levels which would impair the bonding of finish coatings. 3.3 PROTECTION A. Adequately protect surfaces not to be painted, from spills, drips, over painting, and other damage I caused by this work. Include surfaces within the paint storage and preparation areas. B. Hardware and Miscellaneous Items: 1. Remove electrical outlet and switch plates, mechanical diffusers, escutcheons, surface hardware, and fittings prior to starting work. 2. Store, clean and reinstall these items upon completion of work in each area. Use materials and techniques as necessary to prevent damage to finishes on such items. 3.4 SURFACE PREPARATION A. Prepare surfaces by removing dirt, dust, grease, oil, moisture, and other contaminants which would impair finish adhesion. B. Ferrous Metal Shop Primed under other Sections: Solvent clean to remove oil and grease. Remove loose rust, and blistered and peeling paint to bare metal by scraping, sanding, and wire brushing in accordance with SSPC-SP2 and SP3. Immediately retouch damaged or abraded surfaces with compatible primer. Lightly sand all shop prime painted surfaces to receive paint finish. C. Wood -Transparent Finish: In accordance with Section 099300. D. Concrete and Concrete Masonry Units: Remove all contaminants by washing and wire brushing. Sandblast if necessary. E. Existing Finished Surfaces To Be Repainted: 1. Remove loose, blistered, scaled, or crazed finishes to bare substrate; feather new work into existing work. Prepare surfaces to the nearest break line if necessary to blend new finishes with old finishes. 2. Wash and rinse surfaces with trisodium phosphate and water or other solution required to remove remaining film, wax, oil, grease, or foreign matter which would impair bond or cause bleed through. 3. Lightly sand, or apply a liquid deglosser on existing semi-gloss and high-gloss finishes before refinishing. 3.5 GENERAL APPLICATION REQUIREMENTS A. Unless specified or indicated otherwise, follow paint manufacturer's label directions for general application procedures and coverage rates. B. Do not apply finishes on surfaces that are not sufficiently dry. Make sure each coat of finish is dry and hard before a following coat is applied unless the manufacturer's directions state otherwise. C. Tint filler to match stain when clear finishes are specified; work filler well into grain and, before it has set, working perpendicularly to the grain, wipe the excess from the surface. D. Opaque Finishes: 1. Apply number of coats scheduled for each application, except that additional finish coats shall be applied as necessary for complete hiding of substrate colors. 2. Apply primer coats untinted. Where more than one coat of paint is required, tint each succeeding coat up to the final coat similar in tint, but slightly lighter in value (shade). TEMPLATE 099023-4 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099023— INTERIOR PAINTING AND COATING 3. Sand lightly between coats if necessary to achieve required finish. E. Rollers for application and backrolling of latex paints shall have a nap of 3/8 inch or less. F. Where roller texture is scheduled for application to gypsum board surfaces, finish coats may be roller- applied, or spray applied and backrolled at Contractor's option. G. Factory Primed Surfaces: Apply scheduled finish system, less primer coat, except at metal ' fabrications scheduled for low VOC Acrylic/Polyurethane System or as necessary for patching damage to factory prime coating. 3.6 INTERIOR PAINTING AND FINISHING SYSTEMS A. Gypsum Board, Gypsum Plaster, and GFRG - Latex System: 1. System: Three coats -first coat latex primer sealer(untinted), second and third coat latex paint. 2. Sheen: Roller texture, satin sheen, except provide flat sheen at light coves, ceilings, skylight areas, clerestory areas, interior fascias, and other light sensitive surfaces. Verify locations of ' each sheen with Architect before proceeding with work. 3. Application: a. Use on all exposed gypsum board, plaster, and GFRG surfaces, including the exposed portions of wall surfaces between adjacent fabric covered panels and mirrors. ' b. Provide prime coat only behind permanently mounted mechanically anchored mirrors, fabric panels, and similar elements. c. Do not apply primer or paint coatings to surfaces to receive adhesively mounted mirrors or tile. B. Gypsum Board -Surfaces to Receive Wall covering: Apply one coat of acrylic wall size. C. Gypsum Wall Board - Epoxy System: I1. System: Three coats -first coat manufacturer's recommended primer sealer, and second and third coats epoxy coating. 2. Sheen: Semi-Gloss, unless indicated otherwise. 3. Application: Gypsum board wall surfaces as scheduled on the Drawings. D. Ferrous Metal and Galvanized -Acrylic System: 1. System: Three coats; first coat acrylic DTM primer; second and third coats latex finish. The primer may be omitted at factory primed surfaces unless otherwise indicated, except as ' necessary to recoat damaged or abraded preprimed surfaces. 2. Sheen: Semi-gloss, unless indicated otherwise. 3. Application: Interior ferrous metal surfaces including hollow steel metal doors and frames, overhead doors and frames, access doors and panels, and fire extinguisher cabinets. E. Ferrous Metal and Galvanized -Acrylic System: 1. System: Three coats; first coat acrylic DTM primer; second and third coats latex finish. The primer may be omitted at factory primed surfaces, except as necessary to recoat damaged or abraded preprimed surfaces. 2. Sheen: Semi-gloss, unless indicated otherwise. 3. Application: Interior ferrous metal surfaces including hollow steel metal doors and frames, overhead doors and frames, access doors and panels, and fire extinguisher cabinets. F. Concrete Masonry Units- Latex System: 1. System: 2 coats-first coat alkyd or latex primer or block filler, second coat exterior latex. 2. Sheen: Semi-gloss sheen, unless indicated otherwise. 3. Application: Interior exposed CMU walls, except as specified otherwise. 3.7 CLEANUP A. As the work proceeds and on completion of the work, promptly remove all sealers, primers, paints and ' finishes where spilled, splashed or splattered in a manner not to damage the surface from which it is removed. B. Remove masking. TEMPLATE 099023-5 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 099023—INTERIOR PAINTING AND COATING C. Clean, or replace with new, all lamps and electrical fixtures damaged by overspray; replace with new identical components all lighting fixture louvers and reflectors damaged by overspray. 3.8 COLOR SCHEDULE A. Provide paint colors to match those indicated on the drawings. Where a paint color is listed from a ' specific manufacturer, paint products from other approved manufacturers may be used, provided the color exactly matches the specified color, and the paint system meets the specified requirements. Where no paint color is indicated, provide color and sheen as selected by the Architect. END OF SECTION 1 t TEMPLATE 099023-6 10/12/18 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 104400 - FIRE PROTECTION SPECIALTIES PART 1 -GENERAL 1.1 SUMMARY A. Section Includes: 1. Fire extinguishers. 2. Cabinets. B. Related Sections: 1. 092200—Lightgage Metal Support Framing: Rough framing. 2. 092900 - Gypsum Board: Adjacent finishes. 3. 099023— Interior Painting and Coating: Field paint finish. C. Drawings, the provisions of the Agreement, the General Conditions, and Division 1 specification sections apply to all work of this Section. D. Substitutions: Substitute products will be considered only under the terms and conditions of Section 016000. 1.2 REFERENCES A. National Fire Protection Association (NFPA): NFPA 10 - Portable Fire Extinguishers. B. Underwriter's Laboratory(UL). 1.3 QUALITY ASSURANCE A. Conform to NFPA 10 requirements for extinguishers. B. Extinguishers shall be Factory Mutual approved and UL listed. C. Provide fire extinguishers, cabinets, and accessories from a single manufacturer. 1.4 SUBMITTALS A. Make submittals in accordance with Section 013300. B. Product Data: Submit product literature for fire extinguisher brackets, fire extinguisher cabinets, and each type of extinguisher proposed for the work. Indicate valve and standpipe sizes and configurations as appropriate for valve cabinets. C. Contract Closeout Submittal: Submit manufacturer's operation and maintenance data under provisions of Section 017700. Include test, refill or recharge schedules, procedures, and re- certification requirements. PART 2 - PRODUCTS 2.1 APPROVED MANUFACTURERS A. Larsen's Manufacturing Company(Minneapolis, MN; 612-571-1181). B. J.L. Industries Inc. (Commerce, CA; 323-726-9070). C. Potter Roemer(Santa Ana, CA; 714-430-5300, 800-366-3473). D. Williams Brothers Corporation (Scarborough, Ontario; 540-636-4444; 800-255-5515). 2.2 EXTINGUISHERS A. Multi-Purpose Dry Chemical Type (FE): Heavy Duty DOT Steel tank; UL rating 2A-10B: C, 5 lb capacity, with pressure gage; red enamel finish; metal valves and siphon tubes. 2.3 TYPICAL INTERIOR CABINETS A. Semi-recessed models in locations as indicated on the Drawings. All cabinets shall be semi-recessed unless otherwise indicated. TEMPLATE 104400-1 10/12/18 111 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 104400 - FIRE PROTECTION SPECIALTIES 1 B. Furnish sizes as necessary to accommodate extinguishers, at locations indicated on the Drawings. , C. Trim: Formed Sheet Steel, minimum 20 gage; 1-1/4 to 1-3/4 inches wide face; square edge configuration. D. Door: Formed Sheet Steel, minimum 20 gage; reinforced for flatness and rigidity; satin zinc or aluminum pull, roller catch, and continuous hinge; clear glass vision panel. E. Cabinet Finishes: 1. Cabinet Trim and Door: Manufacturer's standard primed finish to receive paint coatings as specified in Section 099000. 2. Cabinet Interior: Manufacturer's standard white epoxy or white baked enamel. F. Signage: Pressure sensitive letters "FIRE EXTINGUISHER"; red; font as directed by the Architect; vertical ascending. G. Fire Extinguisher Brackets: Wall mount type, appropriate to the size of the extinguisher, equipped with strap and quick release clip. PART 3 - EXECUTION 3.1 EXAMINATION ' A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this section may properly commence. Notify the Architect, in writing of conditions detrimental to the proper and timely completion of the work. B. Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes acceptance of conditions as satisfactory. 3.2 INSTALLATION ' A. Install cabinets plumb and level in wall openings and secured to framing in locations as indicated. Unless otherwise indicated, install 30 inches from finished floor to inside bottom of cabinet. B. Coordinate with Section 099000 for installation of signage on cabinets. C. Install fire extinguisher in each fire extinguisher cabinet by brackets mounted at back of cabinet. D. Where fire extinguishers are indicated for wall mounting, secure bracket to wall through finish to framing or blocking. E. Fire extinguishers shall be installed, charged, tagged, and dated, not more than 30 days prior to Substantial Completion. 111 END OF SECTION 1 TEMPLATE 104400-2 10/12/18 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 0500 -COMMON WORK RESULTS FOR PLUMBING PART 1 -GENERAL 1.1 GENERAL A. The general conditions, supplementary conditions and instructions to bidders shall apply to and be part of this specification. B. Contractor shall comply with all applicable codes, rules and regulations. C. Contractor shall obtain and pay for all permits, certificates of inspection and approvals required. D. The base bid shall include furnishing all materials, labor, tools, equipment and installation of all work required to provide complete plumbing systems as outlined in Division-22. ' E. Examine the drawings, specifications, and visit the site prior to submitting a bid. 1.2 APPLICABLE STANDARDS A. The applicable provisions of the following standards shall govern: B. American Society for Test Materials (ASTM); C. American Standards Association (ASA); ' D. Underwriters Laboratories (UL); E. National Fire Protection Association (NFPA); F. State Building Code. ' G. State Plumbing Code. H. The installation of all plumbing work shall conform to the applicable local plumbing codes and ' 1.3 statutes. PLANS A. Plans are diagrammatic indicating required size, points of termination of piping and suggested ' routes. However, it is not intended that drawings indicate all necessary offsets. Install piping in such manner as to conform to the structure, avoid obstructions and preserve headroom. All piping shall be run as straight as possible and symmetrical with architectural items. Piping shall ' be concealed in pipe shafts, pipe spaces, and furring wherever possible. Piping fabricated before coordination with the other trades will be done at contractors' own risk. B. In the event of inconsistencies or conflict within or between the Contract Documents, provide the better quality, more costly or greater quantity of work and comply with the more stringent ' requirements. Seek the direction of the Engineer of Record for clarification of conflicts as soon as a conflict is identified. (Prior to installation) ' PART 2 -PRODUCTS (NOT USED) PART 3 - EXECUTION ' 3.1 CUTTING, PATCHING AND DEMOLITION A. Contractor shall include all necessary cutting and patching required to perform their work. B. Care shall be taken when working in existing spaces so as not to damage existing walls and ceilings where work is being performed. C. Provide non-destructive concrete structural scanning or concrete x-ray prior to drilling, cutting or coring. i TEMPLATE 22 0500 - 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 0500 -COMMON WORK RESULTS FOR PLUMBING D. Saw cut all slab penetrations.Seal around all wall, floor and ceiling pipe penetrations with NFPA approved sealant material to maintain the fire resistant and watertight integrity of the assembly. E. Disconnect, demolish, and remove from site all plumbing systems, equipment, and components 1 indicated to be removed and as necessary to perform the described scope of work. No unused plumbing systems, equipment, and components shall be abandoned. F. No means of demolition shall be used that would result in damage to structures, materials, equipment or components indicated to remain or endanger the health, safety and welfare of the general public. 3.2 EXCAVATION AND BACKFILL ' A. Perform all excavation and backfilling required for this work. Contractor shall consult with utility company prior to beginning excavation. B. At a minimum, all piping shall be laid on a bed of sand, 6" deep, well tamped into place and properly graded to permit the pipe to have an even bearing throughout its entire length. Sand shall be installed around the piping and to a point 6" above the piping. 3.3 PIPE JOINTS AND CONNECTIONS A. Any minor adjustment in location of alignment of new work or connection to existing utilities shall be performed as directed by the engineer without additional cost to the owner. B. The contractor shall be responsible for damages to the grounds, walks, road, building, piping systems, electrical systems, and their equipment and contents, caused by leaks in the piping systems being installed or having been installed by him. The contractor shall repair at his expense all damaged so caused. All repair work shall be done as directed by and in such manner as satisfactory to the architect. C. Owner reserves the right to make emergency repairs as required to keep equipment in operation without voiding the contractor's guarantee bond nor relieving the contractor of his responsibilities during the bonding period. 3.4 PROJECT CONDITIONS A. Where new plumbing systems are required to be connected to existing plumbing systems, it is the contractor's responsibility to verify the location, size, invert elevation, pressure, condition, and they shall verify that the existing plumbing system is indeed the correct and appropriate plumbing system before any work is done. Provide all necessary camera scoping and dye testing as necessary. If there is any need for concern, if it is determined that the existing plumbing system is not a correct or appropriate plumbing system or not connected to a correct or appropriate plumbing system, if the condition of the existing plumbing system is not viable for re-use, or any other condition that would not allow the proper functioning of the new plumbing system, the contractor shall notify the engineer in writing immediately via RFI and wait for direction before proceeding. B. Interruption of Existing Plumbing Services: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated: C. Notify, Architect, Construction Manager, and Owner no fewer than seven days in advance of proposed interruption of service. D. Do not proceed with interruption of service without Architect's written permission. 1 TEMPLATE 22 0500 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 0500 -COMMON WORK RESULTS FOR PLUMBING 3.5 WARRANTY A. This contractor shall warrant that all work under this section shall be free of defective work, materials and parts for a period of one year after acceptance of the work and shall repair, revise, and replace, at no cost to the owner, any such defects occurring within the warranty period. ' END OF SECTION I 1 I I 1 TEMPLATE 22 0500 -3 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 0503 -SUBMITTALS FOR PLUMBING I PART 1 -GENERAL 1.1 REQUIREMENTS 1 A. Where submittals are required by the Contract Documents, they shall be prepared and supplied in accordance with the Contract Documents. In addition to Division 01, the Contractor is advised to review and comply with the requirements articulated within each Division and within each section of that Division. B. The contractor is not relieved of responsibility for providing specified or drawn scope of work should any errors or omissions in submittal information not be noted by the Design Professional during submittal reviews or site observations. C. Some Divisions may include a division-specific"Submittal Requirements for ...." section. Where this section exists, it articulates additional requirements for submittals that apply to the work of that Division. D. The submittal requirements help to identify, track and keep the project organized for all parties involved. They are necessary to ensure a timely turnaround and an appropriate technical review. Submittals that do not conform to the administrative requirements are rejected and returned, without technical review. PART 2 - PRODUCTS (NOT USED) ' PART 3 - EXECUTION 3.1 GENERAL DIRECTION ' A. Reference Specification Section 01 33 00.00 for a full list of submittal procedures and required formats. 3.2 USE OF ELECTRONIC DRAWINGS FROM THE OWNER'S DESIGN TEAM A. Plan drawings for the Project were created with Revit. B. If expressly permitted by the Owner and the terms of the Contract, editable electronic versions of standard-scale, AutoCAD-based plan drawings may be made available for the creation of shop and as-built drawings. C. Upon request, when available, electronic versions of standard-scale, Navisworks (.dwf) and (.nwc)or AutoCAD 360 (.dwg)files may be made available for coordination purposes. D. Due to the proprietary nature of internal design systems, editable native-software versions of some drawings, including but not limited to system diagrams and details, will not be made available in an editable form. In these cases, electronic versions of the drawings may be made available only in PDF, JPG, or similar non-editable electronic form, at the sole discretion of the Design Professional. END OF SECTION 1 TEMPLATE 22 0503 - 1 2/28/19 1 STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 22 0523 -GENERAL DUTY VALVES PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: I1. For each type of product indicated. PART 2 - PRODUCTS 2.1 GENERAL A. Valves on domestic water piping shall be ball valves. B. Ball valves -2 inch and smaller: Lead-Free, 2-piece body, 600 psi CWP, 100 psi at 300OF, cast ' bronze body, full port, Teflon seats, blowout-proof stem, adjustable packing gland, chrome plated bronze ball, and vinyl-covered steel handle. Provide solder ends. Provide extended valve stems for valves used on insulated lines. Provide equal to Nibco series 585-80-LF. C. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: American Valve, Inc., Conbraco Industries, Inc.; Apollo Valves., Crane Co.; Crane Valve Group; Crane Valves., Hammond Valve., Milwaukee Valve Company., NIBCO INC., Red-White Valve Corporation., IWatts Regulator Co.; a division of Watts Water Technologies, Inc 2.2 CHECK VALVES A. Spring check valves - class 125, cast bronze body and cap, horizontal swing, y-pattern, with a bronze disc, and having threaded or solder ends. Provide solder ends for domestic hot and cold water service. Provide equal to Nibco T-480-Y-LF. PART 3 - EXECUTION 3.1 GENERAL DIRECTION ' A. Provide stops or isolation valves on domestic water supplies to isolate hot and cold water to each fixture, including all equipment and equipment provided by others. B. Fixtures, item or units furnished by the manufacturer with integral stops or stops specified with the fixture are considered to be properly valved at the fixtures. C. Access shall be provided to all valves. END OF SECTION TEMPLATE 22 0523 - 1 2/28/19 i STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 0529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT i PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS 1 A. Product Data: 1. For each type of product indicated. B. General 1. Support all piping and equipment by hangers or brackets. Provide structural steel members where required to support piping and equipment. No portion of piping or valves shall be supported by equipment. C. Delegated Design 1. For equipment supports, this contractor shall retain a qualified professional engineer to provide support calculations of static and dynamic loading due to operating equipment weight, seismic and wind forces. The signed and sealed calculations and details shall be submitted by the retained professional engineer. PART 2 - PRODUCTS I 2.1 PIPING A. Individual pipe hangers to be Anvil International Clevis Hanger Fig. 260, Elcen, or approved equal. B. Rod sizes to conform to the following: 3/8" rods for 3/4"to 2" pipe; 1/2" rods for 2-1/2" to 3" pipe; 5/8" rods for 4"to 5" pipe; 3/4" rods for 6" pipe. C. Hangers shall be sized to allow insulation to pass through unobstructed, provide saddle support for insulation at all hangers. D. Hanger spacing for steel piping unless otherwise noted is to be as follows: 1-1/4" or smaller to be 8' on center; 1-1/2" to 2" to be 10' on center; 2-1/2" and larger to be 12' on center and at each change of direction. E. Hanger spacing for copper pipe to be as follows: 1" or smaller 6' on center; 1-1/4" or larger 8' on center. F. Hanger spacing for cast iron piping shall be 5'-0" on center. G. Hanger space for CPVC and PVC pipe to be as follows: 1" and smaller to be 3' on center; 1-1/4" or larger to be 4' on center. PART 3 -EXECUTION I 3.1 GENERAL DIRECTION A. Provide hangers, supports, clamps and attachments to support piping properly from building structure. Support from the decking above is prohibited. Arrange for grouping of parallel runs of horizontal piping supported together on field-fabricated, heavy-duty trapeze hangers where possible. Where piping of various sizes is supported together by trapeze hangers, space hangers for smallest pipe size or provide intermediate supports for smaller diameter pipe as specified above for individual pipe hangers. B. Piping shall also be supported at each change in direction, valves and equipment. END OF SECTION 1 TEMPLATE 22 0529 - 1 2/28/19 1 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 22 0548 -VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT I I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Shop Drawings 1. Provide performance requirements and design criteria, including analysis data signed and sealed by the qualified engineer responsible for their preparation. PART 2 - PRODUCTS I2.1 SEISMIC BRACING A. Provide seismic bracing of equipment and components where required by code. I2.2 QUALITY ASSURANCE A. The contractor shall provide seismic restraint systems to meet total design lateral force requirements for support and restraint of piping, ductwork, equipment and other similar systems Iand equipment where required by the applicable building code. B. Seismic Bracing and Support of Systems and Components C. Seismic restraint designer shall coordinate all attachments with the structural engineer of record. Provide engineered stamped and signed drawings of seismic design. D. Seismic restraint designer shall provide visual inspection after installation and approve installation of seismic design components. E. Design analysis shall include calculated dead loads, static seismic loads, and capacity of materials utilized for the connection of the equipment or system to the structure. I F. Analysis shall detail anchoring methods, bolt diameter, and embedment depth. G. All seismic restraint devices shall be designed to accept without failure the forces calculated per the applicable building code. IH. Friction from gravity loads shall not be considered resistance to seismic forces. I. Fire protection systems shall meet the requirements of NFPA-13 and NFPA-14 for the building seismic requirements. IPART 3 - EXECUTION 3.1 GENERAL IA. The contractor shall subcontract a licensed structural engineer for the design of all seismic restraint systems required by the presiding jurisdiction. The structural engineer shall provide engineered stamped and signed drawings of seismic design and submit as deferred submittal to 111 supplement the permit drawings. 3.2 QUALITY ASSURANCE A. The contractor shall provide seismic restraint systems to meet total design lateral force requirements for support and restraint of piping, conduit, cable trays and other similar systems and equipment where required by the applicable building code. ' END OF SECTION I TEMPLATE 22 0548 - 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 0719 - PLUMBING SYSTEM INSULATION PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS ' A. Product Data: For each type of product indicated. 1.2 GENERAL A. Insulation shall be listed and labeled per ASTM E 84 for plenum installations employing slip on techniques. PART 2 - PRODUCTS I 2.1 PIPING SYSTEMS REQUIRING INSULATION A. Insulate domestic cold water piping, associated fittings and valves with flexible elastomeric 1/2" wall thickness insulation. B. Insulate domestic hot water piping, associated fittings and valves with 1" thick flexible elastomeric, 1-1/2"thick fiberglass insulation or per local energy code, whichever greater. I C. Insulate domestic hot water return piping, associated fittings and valves with 1" wall thickness insulation or per local energy code, whichever greater. D. Insulate waste piping above ceilings that receive condensate with 1/2"wall thickness insulation. I E. Insulate exposed sanitary drains, domestic water, domestic hot water, and stops for plumbing fixtures for people with disabilities. 2.2 FLEXIBLE ELASTOMERIC INSULATION A. Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Type I for tubular materials and Type II for sheet materials. B. Adhesives, Sealers, and Protective Finishes: As recommended by insulation manufacturer for applications indicated. C. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: Aeroflex USA, Inc.; Aerocel., Armacell LLC; AP Armaflex., K-Flex USA; Insul-Lock, Insul-Tube, and K-FLEX LS. 2.3 FIBERGLASS INSULATION111 A. Fiberglass piping insulation: ASTM C 547, Class 1 B. Encase pipe fittings insulation with one-piece pre-molded PVC fitting covers. C. Vapor Barrier Material: Paper-backed aluminum foil, except as otherwise indicated, strength and permeability rating equivalent to adjoining pipe insulation jacketing. D. Staples, Bands, Wires, and Cement: As recommended by insulation manufacturer for applications indicated. E. Adhesives, Sealers, and Protective Finishes: As recommended by insulation manufacturer for applications indicated. F. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: Armstrong World Industries, Inc., Owens-Corning Fiberglass Corp., Keene Corp., CertainTeed., Johns Manville. I TEMPLATE 22 0719 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 0719 -PLUMBING SYSTEM INSULATION 2.4 ADHESIVES ' A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated, unless otherwise indicated. B. Insulation for handicap accessible fixtures ' C. All handicap lavatory p-trap and angle stop assemblies shall be insulated with trap wrap protective kit manufactured by Proflo model PF202WH or equal. Abrasion resistant, anti- microbial vinyl exterior cover shall be smooth. For traps, the insulation shall have a cleanout nut cap to allow service to the trap without disassembly. For stops, the insulation shall have a lock lid that prevents tampering but allows access without removal of the insulation. Fasteners shall remain substantially out of sight. D. Manufacturers: subject to compliance with requirements: Proflo, Truebro, Plumberex PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Provide insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of piping including fittings, valves, and specialties. B. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application. END OF SECTION I I 1 r 1 I TEMPLATE 22 0719 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 220800 - PLUMBING COMMISSIONING SPECIFICATION PART 1 -GENERAL 1.1 GENERAL REQUIREMENTS ' A. The requirements of this Section apply to all sections of Division 22. B. This project will have selected building systems commissioned including all scope of work outlined in Division 22 specifications including but not limited to, plumbing systems and equipment, controls and piping distribution. A Commissioning Agent (CxA) appointed by the owner will manage the commissioning process. 1.2 SUMMARY 1 A. This Section includes requirements for commissioning the plumbing systems, subsystems and equipment. B. The commissioning activities have been developed to support code & LEED outlined delivery of an efficient project in accordance with the Contract Documents developed by the design team evolved from the Owner's Project Requirements (OPR). 1.3 SYSTEMS AND EQUIPMENT TO BE COMMISSIONED A. Commissioning of a system or systems specified in this Division is part of the construction process and required by OPR and/or code (IECC). The commissioning process for these systems is required in cooperation with the Owner, Construction Manager and the Commissioning Agent. B. The following systems, components, and equipment are the focus of the commissioning process on the Project: 1. Domestic Water Heating System and Controls a. New domestic water heating equipment b. Relocated existing domestic water heating equipment c. Modified existing domestic water heating equipment d. Associated domestic water heating controls 1.4 SUBMITTALS A. The commissioning process requires review of Submittals for equipment and systems that are part of the commissioning scope of work. The Construction Manager will be responsible for delivering these submittals to the CxA for their review. B. The commissioning process requires Submittal review simultaneously with engineering review. 1.5 COMMISSIONING TEAM A. The commissioning team shall consist of members appointed by the Owner, including members of the design team, and members appointed by Contractor(s). Each individual shall have the authority to act on behalf of the represented entity and shall be organized to implement the commissioning process through coordinated actions and be dedicated to remain involved in the Project until completion. 1. Members Appointed by Owner: a. CxA: The designated person, company or entity that plans, schedules and coordinates the commissioning team to implement the commissioning process. Owner will engage the CxA under a separate contract. b. Representatives of the facility user and operation and maintenance personnel. c. Architect and engineering design professionals (i.e., design team). 2. Members Appointed by Contractor(s): a. Individuals, each having the authority to act on behalf of the entity he or she represents, explicitly organized to implement the commissioning process through TEMPLATE 220800 - 1 2/28/19 I 1 STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 220800 -PLUMBING COMMISSIONING SPECIFICATION Icoordinated action. The commissioning team shall consist of, but not be limited to, representatives of each Contractor, including Project superintendent and I subcontractors, installers, suppliers and specialists deemed appropriate by the CxA. 1.6 COMMISSIONING PLAN Prior to permit issuance a commissioning plan shall be completed to document how the project IA. will be commissioned and shall be started during the design phase of the building project. PART 2 -PRODUCTS (NOT USED) PART 3 -EXECUTION 3.1 CONTRACTOR RESPONSIBILITY I Contractor shall provide support and work as specified, needed and required to conduct and facilitate Starbucks staff building commissioning efforts. This work will be comprised of three distinct efforts: I 1. Support Starbucks commissioning agent (CxA) during installation verification and correct disclosed deficiencies. 2. Perform testing, adjusting, balancing and system startup and support functional performance testing by Starbucks CxA; I3. Correct deficiencies disclosed by functional performance testing and submit reports. A. Systems subject to commissioning may include, but are not limited to domestic hot water generation. I B. Contractor shall provide written responses to all CxA's reviews and comments. Responses shall be provided in a timely manner. I C. Contractor shall include commissioning activities in project schedule and show intervals for performance of work for which contractor is responsible and intervals for work performed by Starbucks CxA. Contractor shall show resources for performing all work related to commissioning activities on a line item in the schedule of values. I D. Contractor shall install equipment in accordance with the manufacturer's requirements and all contract documents. Ensure that all equipment is installed totally complete and accessible to Starbucks CxA for installation verification and functional performance testing prior to the I scheduled start of installation verification. E. Contractor shall complete manufacturer's startup procedures prior to commissioning coordination with CxA. I F. Contractor shall be readily available during installation verification to correct any deficiencies or defects is closed by the installation verification process. Corrections shall be made in a timely manner without disruption of the construction schedule. I G. Provide a list of all factory and field settings that have been programmed into the equipment(such as setpoints, schedules, dip switch settings, condenser and evaporator operating pressure/temperature, etc...). I H. Contractor shall inform Starbucks CxA when equipment is ready for functional performance testing. All equipment shall be ready for functional performance testing prior to starting testing. This includes rehearsing all functional performance tests before demonstrating to the CxA. Contractor shall operate equipment for Starbucks CxA and verify by demonstrating the correct I operation of equipment, sensor calibration, temperature, sound and control response. Provide any security access, hardware, software or other support as needed for the Starbucks CxA to efficiently witness and document all equipment testing. Starbucks CxA will record the equipment I TEMPLATE 220800 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 220800 -PLUMBING COMMISSIONING SPECIFICATION operation and response to testing sequences and prepare a list of any deficiencies disclosed by the functional performance tests for correction by the contractor. Equipment includes, but is not limited to, domestic water heating systems, etc... Deliverables: provide completed copies of all start up reports, filled out on the manufacturer's forms, to the Starbucks CxA. Contractor is responsible for correcting any issues or deficiencies disclosed during the functional performance testing process. Corrections should be made in a timely manner without disruption to the system and construction schedule. J. Contractor shall be readily available for any re-testing of equipment deemed necessary by Starbucks CxA during installation verification and functional performance testing. Contractor is responsible for correcting any issues or deficiencies found in the system during any and all re- testing. Corrections should be made in a timely manner without disruption to the system and construction schedule. Deliverables: final balance report, deficiencies list noting corrective actions performed by contractor in response to installation verification and functional performance test results. K. Construction and post construction testing: additional testing may be required by LEED and other processes that may occur out of sequence with commissioning service. Contractor shall conduct. Document, support and schedule this testing as directed by Starbucks CxA. L. Contractor shall provide a training plan for each trade (mechanical, electrical, plumbing, renewable systems)for the CxA's approval. The training plan shall outline all the topics that are 111 to be covered along with the time duration for each topic. It shall also include the instructor's name, qualifications and company logo. M. The contractor is responsible for recording attendance for each training session. Copies of these shall be submitted to the CxA. N. Contractor shall submit O&M manuals for all pieces of equipment at least 6 weeks in advance of the training sessions. 3.2 GENERAL DIRECTION A. Equipment Verification Checklists (EVC'S) 1. The Contractor shall complete EVC's to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems start-up and Functional Performance Testing. The Commissioning Agent will prepare all EVC's to be used by the installing contractors to document equipment verification and installation. 2. The installing personnel shall complete the checklists. Completed checklists shall be submitted to the CM. The CM is responsible for sending all completed copies to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists for completion and accuracy. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate,the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all checklists for that type of equipment will be returned to the Contractor for correction and resubmission. B. Functional performance testing: 1. Contractor tests as required by other sections of Division 22 shall be scheduled and documented in accordance with the applicable sections. The Commissioning Agent will work with the CM to incorporate the Functional Performance Testing schedule into the master construction schedule. The CxA will conduct and witness all Functional Performance Testing performed by the Contractors. The commissioning process includes I TEMPLATE 220800 -3 2/28/19 I I STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 220800 - PLUMBING COMMISSIONING SPECIFICATION 111 Functional Performance Testing that is intended to test systems functional performance under steady state conditions, reactions to changes in operating conditions and performance under emergency conditions. The contractors shall review and comment on the functional performance tests prior to testing. C. Training Of Operations And Maintenance Personnel 1 1. Training operations and maintenance personnel on the proper operation, maintenance and any emergency situations is required. Provide competent, factory authorized personnel to provide instructions to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems.The instruction shall be scheduled in coordination with the CxA after submission and approval of formal training plans. The CxA will review the training plans and observe the training performed by the factory personnel and installing contractors. D. Final Commissioning Report 1. A complete report of commissioning process activities from design through post- construction phases of the building project shall be completed by the CxA and provided to I 2. the Owner. The final commissioning report shall include the following: a. Executive summary of process and results of commissioning program — including observations, conclusions and any outstanding items. b. A history of all deficiencies and issues and how they were resolved 1) Includes outstanding issues and a plan for resolution 2) Include plans for seasonal testing schedule for a later date c. Functional performance test results and evaluations d. Summary of training process e. Cx Process Documents 1) Cx Plan 2) OPR 3) BOD 4) Equipment Verification Checklists/Installation Checklists 5) Functional Performance Test Checklists 1 6) Recommendations for end-of-warranty review activities END OF SECTION I I I I I TEMPLATE 220800 -4 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1116 - DOMESTIC WATER PIPING I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS 1 A. Product Data: For each type of product indicated. PART 2 - PRODUCTS I A. Domestic Water Piping Above Ground: 1. Hard copper tube, ASTM B 88, Type L; wrought-copper, solder-joint fittings; and soldered joints. 2. Solder Filler Metals: ASTM B 32, lead-free alloys. 3. Flux: ASTM B 813, water flushable. 4. PEX and CPVC is approved for interior water piping. Type "L"; copper pressure-seal joint; and pressure-seal joint systems. B. Cathodic Protection 1. Provide dielectric insulation at points where copper or brass pipe comes in contact with ferrous piping, reinforcing steel or other dissimilar metal in structure. PART 3 -EXECUTION 3.1 GENERAL DIRECTION I A. Install piping concealed from view unless noted otherwise, free of sags and bends. Do not enclose, cover, or put piping into operation until it has been inspected and approved by authorities having jurisdiction. Clean and disinfect potable domestic water piping using approved procedures by authorities having jurisdiction. B. Install at right angles; diagonal runs are prohibited unless otherwise shown. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal. Coordinate all piping with all other trades. C. Provide water pressure regulators where necessary to limit the incoming water pressure to 80 psi inside the building. END OF SECTION 111 1 1 I I TEMPLATE 22 1116 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1119 -DOMESTIC WATER PIPING SPECIALTIES 1 PART 1 - GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: For each type of product indicated. 1 PART 2 - PRODUCTS 2.1 REDUCED PRESSURE BACKFLOW PREVENTERS A. Backflow preventer(2"and smaller) - Provide a reduced pressure backflow preventer on water service main where the water service enters the building. Reduced pressure backflow preventer shall be sized equal to the size of the water service and conform to ASSE 1013. Pipe backflow I 2.2 preventer discharge to approved place of disposal. DOUBLE CHECK VALVE ASSEMBLY BACKFLOW PREVENTERS A. Backflow preventer (2" and smaller) — Provide a double check valve assembly backflow ' preventer on tenant water service downstream of main building reduced pressure zone backflow preventer. Double check valve assembly backflow preventer shall be sized equal to the size of the tenant water service and conform to ASSE 1015. RB. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: Ames Fire & Waterworks; a division of Watts Water Technologies, Inc., Conbraco Industries, Inc., Watts; a division of Watts Water Technologies, Inc.; Watts Regulator Company., Zurn Industries, LLC; Plumbing Products I Group; Wilkins Water Control Products. 2.3 BEVERAGE DISPENSING EQUIPMENT BACKFLOW PREVENTER A. Provide a continuous pressure backflow preventer with stainless steel body, threaded connections and complies with ASSE 1022. B. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: Ames Fire & Waterworks; a division of Watts Water Technologies, Inc., Conbraco Industries, Inc., Watts; a division of Watts Water Technologies, Inc.; Watts Regulator Company., Zurn Industries, LLC; Plumbing Products Group; Wilkins Water Control Products. 2.4 CARBONATED BEVERAGE DISPENSER BACKFLOW PREVENTER A. Provide a continuous pressure dual check valve backflow preventer with stainless steel body, threaded connections and complies with ASSE 1032. B. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: Cash Acme, a division of Reliance Worldwide Corporation, Lancer Corporation, Watts; a division of Watts Water I Technologies, Inc.; Watts Regulator Company. 2.5 DUAL CHECK VALVE BACKFLOW PREVENTER A. Provide a dual check valve backflow preventer that complies with ASSE 1022 at connection of domestic water supply to any permanently connected potable water dispensing equipment such as ice makers, coffee machines, and beverage dispensers or where indicated in the contract documents. B. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following:Ames Fire & Waterworks; a division of Watts Water Technologies, Inc., Conbraco Industries, Inc. I TEMPLATE 22 1119 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1119 - DOMESTIC WATER PIPING SPECIALTIES C. FEBCO;a division of Watts Water Technologies, Inc., Flomatic Corporation., Watts;a division of Watts Water Technologies, Inc.; Watts Regulator Company., Zurn Industries, LLC; Plumbing Products Group; Wilkins Water Control Products. 2.6 BALANCING VALVES A. Provide balancing valves where required for proper balancing of water systems as shown on the contract documents. B. Balancing valves shall be equal to Red-White Valve Corporation model 9517AB (NPT) or model 9519 (solder). Valve shall have brass body, globe valve regulation and isolation properties, fixed orifice design for precise measurement, integral memory stop to ensure repeatable setting, 111 full shutoff without affecting memory settings, high and low pressure metering points, precision indicator windows, rugged top set hand-wheel assembly, pressure rating of 300 psi, and temperature rating of 15 deg. F to 260 deg. F. C. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, and are limited to, the following: Crane Co.; Crane Valve Group; Crane Valves., Hammond Valve. D. Milwaukee Valve Company., NIBCO Inc., Watts, Red-White Valve Corp. 2.7 VACUUM BREAKERS A. Vacuum breakers shall be equal to Watts model LF288A for piping connections or Watts LF8 1 series for hose connections. Vacuum breakers shall comply with ASSE 1001 for piped connections, ASSE 1011 for hose connections, bronze body and threaded connections with rough bronze finish. B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and limited to, the following: MIFAB, Inc., Prier Products, Inc., Watts; a division of Watts Water Technologies, Inc.; Watts Regulator Company., Zurn Industries, LLC; Plumbing Products Group; Light Commercial Products., Zurn Industries, LLC;Plumbing Products Group; Wilkins Water Control Products 2.8 PRESSURE REDUCING VALVES A. Provide pressure reducing valve to regulate incoming domestic water pressure in excessive of 111 80 psig. Pressure reducing valve shall be equal to Watts model LF223S, comply with ASSE 1003, initial working pressure of 300 psig, integral strainer, lead-free brass body with threaded connections. B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and limited to, the following: Cash Acme; a division of Reliance Worldwide Corporation., Conbraco Industries, Inc., Honeywell International Inc., Watts; a division of Watts Water Technologies, Inc.; Watts Regulator Company, Zurn Industries, LLC;Plumbing Products Group; Wilkins Water Control Products 2.9 STRAINERS U A. Provide lead-free wye-pattern strainer equal to Watts model LFS777S rated for 125 psig minimum, bronze body, threaded connections, stainless steel screen with round perforations of 0.020 inch and pipe plug drain. Provide strainers on supply side of each pressure reducing valve, solenoid valve and pump. B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and limited to, the following:, MIFAB, Inc., Prier Products, Inc., Watts; a division of Watts Water Technologies, Inc.; Watts Regulator 1 TEMPLATE 22 1119 -2 2/28/19 I I STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 22 1119 -DOMESTIC WATER PIPING SPECIALTIES Company., Zurn Industries, LLC; Plumbing Products Group; Light Commercial Products., Zurn Industries, LLC; Plumbing Products Group; Wilkins Water Control Products 2.10 HOSE B/BBS A. Where applicable and possible, install all hose bibs 24"-30" above finished floor to facilitate filling of mop bucket without a hose. Furnish to owner with receipt one valve key for each key operated hose bob installed. B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and limited to, the following: Josam Company, MIFAB, Inc., Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc., Tyler Pipe; Wade Div., Watts Drainage Products., Woodford Manufacturing Company; a division of WCM Industries, Inc., Zurn Industries, LLC; Plumbing Products Group; Light Commercial Products., I 2.11 Zurn Industries, LLC; Plumbing Products Group; Specification Drainage Products. WALL HYDRANTS A. Provide non freeze wall hydrants equal to Woodford model 8-67 with chrome finish on brass casting with box and hinged door. Conceal within interior partitions. Furnish to owner with receipt one valve key for each key operated wall hydrant installed. B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and limited to, the following: Josam Company, MIFAB, Inc., Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc., Tyler Pipe; Wade Div., Watts Drainage Products., Woodford Manufacturing Company; a division of WCM Industries, Inc., Zurn Industries, LLC; Plumbing Products Group; Light Commercial Products., Zurn Industries, LLC; Plumbing Products Group; Specification Drainage Products. 2.12 TRAP-SEAL PRIMER DEVICE A. The plumbing contractor shall provide trap primers for all floor drains and floor sinks that do not regularly receive waste water. Trap primer shall be equal to Mifab MR-500 trap primer valve. Provide access panel in wall or ceiling for all concealed trap primers. Install trap seal primer valves with outlet piping pitched down toward drain trap a minimum of 1% and connect to floor drain body, trap or inlet fitting. Coordinate exact location with architect prior to installation. B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, and limited to, the following:, MIFAB, Inc., Precision Plumbing Products, Inc., Sioux Chief Manufacturing Company, Inc., Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc., Watts; a division of Watts Water Technologies, Inc.; Watts Regulator Company. ' 2.13 WATER TAB METERS A. Displacement-Type Water Meters: B. Plumbing contractor to coordinate with[landlord]owner for exact model and manufacturer. C. Description:Displacement-Type Water Meter complying with AWWA C700. D. Remote Registration System: Direct-reading type complying with AWWA C706; modified with signal-transmitting assembly, low-voltage connecting wiring, and remote register assembly as required by landlord or owner. Mount reader in an accessible location. 2.14 WATER HAMMER ARRESTERS 1 A. Provide water-hammer arresters in water piping according to PDI-WH 201. B. Standard: ASSE 1010 or PDI-WH 201. TEMPLATE 22 1119 -3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1119 -DOMESTIC WATER PIPING SPECIALTIES C. Type: Metal bellows or copper tube with piston. D. Size: ASSE 1010, sizes AA and A through F, or PDI-WH 201, sizes a through F. E. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and are limited to, the following: Amtrol, Inc., Josam Company., Precision Plumbing Products, Inc., Sioux Chief Manufacturing Company, Inc., Smith, Jay R. Mfg. Co.;Division of Smith Industries, Inc., Watts Drainage PART 3 - EXECUTION 3.1 GENERAL DIRECTION I A. Installation: Install per manufacturer's published installation and operation manual. END OF SECTION 1 I I I 1 I I I I I 1 TEMPLATE 22 1119 -4 2/28/19 I I STARBUCKS COFFEE COMPANY IGUIDE SPECIFICATIONS SECTION 22 1123 -RECIRCULATION DOMESTIC WATER PUMP I PART 1 -GENERAL I1.1 SUBMITTAL REQUIREMENTS A. Product Data: 1 1. For each type of product indicated. PART 2 -PRODUCTS I 2.1 GENERAL A. Pump shall be an in-line, seal-less, and centrifugal type. Factory-assembled and tested, close- coupled, canned motor, overhung-impeller centrifugal pump. I B. Pump and motor assembly to be hermetically sealed, replaceable-cartridge type with motor and impeller on common shaft and designed for installation with pump and motor shaft horizontal. C. Pump casing to be bronze with threaded or companion-flange connections. ID. Pump impeller to be plastic in material. E. Pump motor to be single speed unless noted otherwise. I F. Pump working pressure to be a minimum 125 psig with a maximum continuous operating temperature of 220 degree F temperature. G. Manufacturers: Subject to compliance with requirements, available manufacturers offering I products that may be incorporated into the work include, and are limited to, the following: Armstrong Pumps Inc., Barnes; Crane Pumps & Systems, Bell & Gossett; ITT Corporation, Grundfos, Peerless Pump Inc., TACO Incorporated IPART 3 - EXECUTION 3.1 GENERAL DIRECTION I A. Pump control to be Thermostat and Time Clock. 1. During occupied mode, the pump shall run based on return water temperature. When the return water temperature drops below setpoint, the pump shall energize. Return water setpoint shall be 135 deg. F (adjustable) During unoccupied mode, the pump shall be off. I 2. Thermostat: Electric; adjustable for control of hot-water circulation. Water immersion type temperature sensor for installation in piping. 3. Timer: Electric; for control of hot-water circulation. Programmable type, seven day, I twenty-four hour clock with manual override on-off switch. Program up to two on-off cycles each day for seven days. 3.2 CONNECTIONS A. Install recirculation pump on hot water return piping at the end of the hot water loop back to the water heating system as detailed. B. Install piping adjacent to pump to allow service and maintenance. Provide unions and shutoff I valves on each side of pump. Provide check and balancing valves. Provide strainer upstream of pump and downstream of shutoff valve. Install pressure and temperature gage connectors at suction and discharge of each pump. I C. Interlock pump between water heater and hot-water storage tank with water heater burner and time-delay relay. IEND OF SECTION TEMPLATE 22 1123 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1316 -SANITARY,WASTE AND VENT PIPING SYSTEM PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: 1. For each type of product indicated. 1.2 GENERAL A. Provide a complete soil, waste and vent system in the building and on the site as indicated on the drawings and as specified herein. B. Above ground soil, waste and vent piping within buildings including soil stacks, vent stacks, horizontal branches, traps, and connections to fixtures and drains. C. Underground building drain piping including mains, branches, traps, connections to fixtures and drains, and connections to stacks, terminating at connection to existing sanitary sewer. PART 2 - PRODUCTS 2.1 INTERIOR PIPING A. No-Hub cast iron soil, waste, and vent piping and fittings 1-1/2" and larger shall conform to ASTM A-888. B. Hub and Spigot cast iron soil, waste, and vent piping and fittings 2" and larger shall conform to ASTM A-74 with ASTM C-564 gasketed joints. C. Soil, waste and vent piping smaller than 1-1/2" shall be Type "M" copper and conform to ASTM B-306. D. No-hub cast iron pipe and fittings may be used aboveground for soil, waste, and vent piping. E. Hub and spigot cast iron pipe may be used underground for soil, waste, and vent piping. F. Piping alignment shall be as indicated on the drawings using approved wye branches or eight bands for direction changes and shall be surely supported or secured to maintain such alignment. 2.2 EXTERIOR PIPING A. Poly (vinyl chloride) pipe (PVCPP): ANSI/ASTM D 3033, Type PSP or ASTM D 3034, Type 1 PSM SDR-35. B. Contech construction products a-2000 PVC sewer pipe C. Install top of cleanout and cap 6" above finished grade. PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Piping alignment shall be as indicated on the drawings using approved wye branches or eighth bends for direction changes and shall be surely supported or secured to maintain such alignment. B. Pitch of sanitary piping shall be uniform at a minimum of 1/8" per foot for building drains, drainage piping greater than 2" and as indicated on the drawings. Pitch of sanitary piping shall be uniform at a minimum of 1/4" per foot for drainage piping 2" and smaller and as indicated on the drawings. I TEMPLATE 22 1316 - 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1316 -SANITARY,WASTE AND VENT PIPING SYSTEM C. Protection shall be given all footings, other structural elements during underground work adjacent to such items. Refer to architectural and/or structural drawings for locations. D. Vent all fixtures, connect branch vents to main vent risers at least six inches above flood rim of fixtures. Pitch vent lines back to soil or waste pipe, free of drops and sags. E. Cleanouts shall be full size of pipe up to 4", and 4" for larger sizes. For underground and concealed lines, provide cleanouts in accessible positions at each right angle turn and at intervals not to exceed fifty feet. In floors, install flush with finish floor with extension pipe from cleanout wye. END OF SECTION I I I I I I I I I I I I TEMPLATE 22 1316 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1319.13 -SANITARY WASTE INTERCEPTORS 1 PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS I A. Product Data: 1. For each type of product indicated. PART 2 -PRODUCTS 2.1 FOG (FATS/OILS/GREASE) INTERCEPTORS A. Fog Interceptors Standards: 1. ASME A112.14.3 Appendix A and/or PDIG101 for interior interceptors intercepting and retaining fats, oils and greases from food-preparation or food-processing wastewater; IAPMO/ANSI Z1001 for gravity interceptors located outdoors with a volume of 500 gallons or greater. The FOG Interceptor shall be of size and capacity as indicated on the Drawings. B. Polyethylene Interceptor(Hydromechanical): 1. The FOG Interceptor shall be constructed using seamless, rotationally-molded High Density Polyethylene with minimum 1/2" uniform wall thickness. Interceptor shall be furnished for above or below grade installation. Interceptor shall be built in accordance to ASME A112.14.3 (type C), with internal flow control, built-in test caps, and three outlet options. Interceptor grease capacity shall be at least four times its rated flow. Cover shall be gasketed and have minimum H2O load capacity. Provide with cleanout on inlet and outlet. Where installed outside, provide an extension collar and frame and cover to allow access for removal of FOG. Product shall include a minimum 30-year warranty against leakage and structural failure. The interceptor shall be installed per the manufacturer's recommendations. FOG interceptors shall be provided with a vent connection sized per the plumbing code. 2. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and are limited to, the following: Canplas Endura., MIFAB, Inc., Schier Products Company. C. Steel Interceptor: 1. The solids interceptor shall be large capacity, acid-resistant coated interior and exterior fabricated steel for on-floor installation. Furnished with a removable acid resistant coated fabricated steel bucket having removable primary (3/8 inch diameter holes) and secondary (3/32 inch diameter holes) flow diffusing/intercepting brass screens and complete with a top access gasketed secured cover. 2. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and are limited to, the following: Josam Company, MIFAB, Inc., Jay R. Smith Mfg. Co., Wade., Watts Drainage Products Inc., Zurn Plumbing Products. D. Concrete Interceptor: 1. The FOG Interceptor shall be of size and capacity as indicated on the Drawings, Class 'C' concrete, 5000 psig minimum at 28 days, cast iron man way, bolted and gasketed, grade adjusting rings as required, Poly-Lock II pipe seal, all interior corners grouted and concave and epoxy coating on all exposed interior and exterior surfaces. FOG interceptors shall be provided with a vent connection sized per the plumbing code. 2. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and are limited to, the following:E.C. Babbert, O.C. Adams, Jensen Precast. I TEMPLATE 22 1319.13 - 1 2/28/19 S STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1319.13 -SANITARY WASTE INTERCEPTORS 1 PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Installation: Install interceptors per manufacturer's published installation and operation manual. END OF SECTION I I I I I I I r I 1 I r I TEMPLATE 22 1319.13 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1319 -SANITARY WASTE PIPING SPECIALTIES I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS I A. Product Data: 1. For each type of product indicated. PART 2 -PRODUCTS 2.1 CLEANOUTS A. Floor cleanout equal to Zurn Z-1400 adjustable floor cleanout. B. Wall cleanout equal to Zurn Z-1443 with smooth nickel bronze square wall access panel and frame. C. Grade cleanout equal to Zurn Z-1400 adjustable cleanout. D. Provide a sanitary tee and threaded cap cleanout plug in suspended waste piping. E. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: Josam, Jay R Smith, Watts Regulator Co.; a division of Watts Water Technologies, Inc, Mifab, Zurn 2.2 FLOOR DRAINS A. Provide floor drains in compliance with ASME A112.6.3. Provide floor drains with trap-seal primer fitting. All floor drains located in rooms with tile floors shall be provided with manufacturer's standard square grate, unless noted otherwise. B. Refer to plumbing drain schedule for project specific floor drain manufacturers and models. C. Manufacturers: Subject to compliance with requirements, available products that may be incorporated into the work include, and are limited to, the following: Jay R Smith MFG. Co., Josam, Mifab, Watts Drainage Products Inc., Zurn Plumbing Products Group 2.3 FLOOR SINKS A. Install floor sinks in compliance with ASME A112.6.7. All floor sinks shall have a cast iron body unless noted otherwise. All floor sinks located in a commercial kitchen to have a half grate cover unless noted otherwise. 111 B. Refer to plumbing drain schedule for project specific floor drain manufacturers and models. PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Installation Instructions: 1. Install per manufacturer's published installation and operation manual. 1 END OF SECTION I I 1 TEMPLATE 22 1319 - 1 2/28/19 S I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1613 - NATURAL GAS PIPING SYSTEMS 1 PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: I1. For each type of product indicated. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT 2.2 BUILDING DISTRIBUTION PIPING: A. All piping from meter/regulator to gas fired equipment connections shall be black steel. B. Steel Pipe: ASTM A 53/A 53M, black steel, Schedule 40, Type E or S, Grade B. C. Pipe size 2" and smaller: Malleable-Iron Threaded Fittings D. Malleable-Iron Threaded Fittings: ASME B16.3, Class 150, standard pattern. E. Pipe size 2-1/2" and larger:Wrought-Steel Welding Fittings for butt welding and socket welding. F. Wrought-Steel Welding Fittings: ASTM A 234/A 234M for butt welding and socket welding. 2.3 GENERAL DUTY VALVES: A. Metallic valves 2 inches and smaller shall comply with ASME B16.33, cold working pressure of I 125 psig. B. Metallic valves larger than 2 inches shall comply with ASME B16.38, cold working pressure of 125 psig. C. Provide one-piece ball valves with bronze body, chrome-plated brass ball, blowout proof stem and seat, and bronze trim complying with MSS SP-110. D. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, and limited to, the following: BrassCraft Manufacturing Company; a Masco company, Conbraco Industries, Inc.; Apollo Div., Lyall, R. W. & Company, Inc., McDonald, A. Y. Mfg. Co., Perfection Corporation; a subsidiary of American Meter Company. 2.4 PRESSURE REGULATORS: A. Provide pressure regulators to conform with ANSI Z21.80, cast iron or die-cast aluminum body, 1 interchangeable zinc-plated steel springs and diaphragm plate, single port, self-contained regulator with orifice no larger than required at maximum pressure inlet and no pressure sensing piping external to the regulator. B. Pressure regulator shall maintain discharge pressure setting downstream, and not exceed 150 percent of design discharge pressure at shutoff. C. Overpressure Protection Device: Factory mounted on pressure regulator. D. Regulator shall include vent limiting device, instead of vent connection and piping, if approved by authorities having jurisdiction. 2.5 NATURAL GAS METERS: IA. Service meters shall comply with the requirements of the utility supplying gas to the facility. I TEMPLATE 22 1613 - 1 2/28/19 1 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 1613 - NATURAL GAS PIPING SYSTEMS 2.6 FLEXIBLE CONNECTORS FOR GAS APPLIANCES A. Provide indoor, fixed-appliance flexible connector that complies with ANSI Z21.24. B. Provide indoor, movable-appliance flexible connector that complies with ANSI Z21.69. C. Flexible connector shall be corrugated stainless steel tubing with yellow polymer coating, operating pressure of 0.5 psig and zinc coated threaded steel connections complying with ASME B1.20.1. Maximum length shall be 72 inches. PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Plumbing contractor shall be responsible for installing gas piping run-outs to all gas-fired equipment, including equipment supplied by the HVAC and electric contractors. Piping shall be installed full-size (as indicated on the drawings) to each units' gas inlet connection, burner, 111 regulator, etc. Plumbing subcontractor shall provide gas cock and make final connections. Connections to each gas-fired equipment item shall include a drip leg and shutoff gas cock. Comply with equipment manufacturer's instruction. For connections to gas-fired rooftop equipment, plumbing contractor shall be responsible for the roof penetration and shall install the gas piping through the roof in a location that has been coordinated with the HVAC contractor. Contractor shall be responsible for all the costs associated with work provided by the utility company, including tap fees, installation costs, materials, equipment, road cuts, and bores if applicable. B. Field prepare and paint exterior natural gas piping, fittings, etc... with alkyd anticorrosive metal primer and topcoat with exterior alkyd enamel flat. Color to match building exterior and111 approved by the architect END OF SECTION 1 I 1 1 I I 1 TEMPLATE 22 1613 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 3000 -COMMERCIAL WATER HEATERS 1 PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: For each type of product indicated. PART 2 - PRODUCTS 2.1 NATURAL GAS TANK TYPE A. Provide commercial fuel-fired tank type water heater as scheduled. Comply with UL 2523 Standard. B. Provide corrosion resistant metal drain pan with raised edge sized not less than the base of the water heater and include drain outlet not less than NPS 3/4 with ASME B1.20.1 pipe threads. C. Provide field fabricated piping heat trap arrangement according to ASHRAE/IESNA 90.1. D. Provide combination temperature and pressure relief valve, ASME rated and stamped with relieving capacity at least as great as heat input and pressure setting less than water heater's rated operating pressure. E. Provide water heater stands or mounting brackets with manufacturer's factory fabricated steel capable of supporting water heater and water. F. Provide steel pressure-rated expansion tank constructed with welded joints and factory-installed butyl rubber diaphragm, pre-charged to minimum system operating pressure at tank. G. Provide field-fabricated piping-type heat traps in accordance with ASHRAE/IESNA 90.1 H. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and are limited to, the following: AO Smith, Bock Water Heaters, Bradford White Corporation., Lochinvar Corporation., State Industries. PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Installation: Install per manufacturer's published installation and operation manual. END OF SECTION I I I I I TEMPLATE 22 3000 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 3001 - POINT OF USE THERMOSTATIC MIXING VALVES I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS I A. Product Data: 1. For each type of product indicated. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT A. Thermostatic mixing valves shall be provided for all public hand washing sinks and lavatories and shall be ASSE 1070 listed, lead free, sweat connections, 125 psi operating pressure. B. Point-of use thermostatic mixing valves shall be equal to Powers LFG480. C. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and are limited to, the following: Symmons, Lawler, Leonard, Powers, Bradley PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Mount under sink or lavatory. Set outlet temperature of thermostatic mixing valve to 105 degrees F. Route tempered water to hot water side of sink and lavatories. END OF SECTION I I I I I I I I TEMPLATE 22 3001 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 22 4000 - PLUMBING FIXTURES 1 PART 1 - GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: For each type of product indicated. PART 2 - PRODUCTS 2.1 PLUMBING FIXTURES A. [Flush Valve Water Closets: 1. Provide floor mounted single cast, flush valve, elongated bowl with open front seat less cover. 2. Electronic or Non-Electric Single-flush valve; 1.28 gal (4.8 L) per flush max. ' B. If using a non-standard fixtured i.e. Starbucks sourced and warehoused) include the following in the Specification for the specific non-standard fixture(s):>NON-STANDARD FIXTURES: 1. DIPPERWELL 2.2 GPM/METERED 2. PRE-RINSE VALVE.65 GPM MANUAL 3. RESTROOM HAND SINK 0.5 GPM/MANUAL 4. BACKLINE HAND SINK 0.5 GPM/MANUAL] 5. WORKROOM HANDSINK 0.5 GPM/MANUAL 2.2 MATERIALS AND EQUIPMENT A. Manufacturers: Refer to plumbing fixture schedule for basis of design. Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the work include, and are limited to, the following: American Standard America., Crane Plumbing, LLC., Kohler Co., Toto USA, inc., Zurn Industries, LLC; Commercial Brass and Fixtures., Sterling; a Kohler Company., Eljer Inc PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Install per manufacturer's published installation and operation manual. END OF SECTION I I I r TEMPLATE 22 4000 - 1 2/28/19 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230501 -COMMON WORK RESULTS FOR HVAC I PART 1 -GENERAL 1.1 GENERAL I A. General Provisions of the Contract including General and Supplementary Conditions and General Requirements apply to work of this section. 1.2 SCOPE A. The base bid includes furnishing all materials, labor, tools, and equipment and the performance of all work required to install a complete heating and air conditioning system as outlined herein. 1.3 GUARANTEE A. The contractor shall provide a guarantee in written form stating that all work under this section shall be free of defective work, materials, or parts for a period of one year from the date of owner's final acceptance and shall repair, revise or replace at no cost to the owner any such defects occurring within the guarantee period. Contractor shall also state in written form that any items or occurrences arising during the guarantee period will be attended to in a timely manner and will in no case exceed four(4)working days from date of notification by owner. PART 2 - PRODUCTS (NOT USED) PART 3 -EXECUTION I 3.1 WORK IN EXISTING SPACES A. General: I 1. Care shall be taken when working in existing spaces so as not to damage existing walls and ceilings where work is being performed. B. Ceilings: I 1. Where work is being performed above ceilings, and the architectural drawings do not indicate ceiling modifications by the general contractor, it shall be the responsibility of this contractor to remove and replace existing ceilings where work is being performed. In those instances, all repair and installation of new grid, ceiling panels, etc shall be the responsibility of this contractor. Match existing finishes. C. Walls & Floors: 1. It shall be the responsibility of this contractor to patch existing walls and floors and match existing finishes where work is being removed or installed and patching is being performed, unless noted otherwise on the architectural drawings. 3.2 DEMOLITION I A. Any Equipment to be demolished shall also include the demolition of any and all ductwork, piping etc serving or served by the equipment, all accessories, air devices, wiring, gas piping, venting, control wiring and power wiring associated with the equipment. B. Demolition shall be coordinated with all trades. All materials shall be turned over to the owner or disposed at the owner's direction. C. Contractor is responsible for reclaiming any refrigerant in association with the demolition in accordance with all local, state and federal regulations. D. Any roof or wall penetration shall be patched watertight to the satisfaction of the architect. I TEMPLATE 230501 - 1 2/28/19 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 230501 -COMMON WORK RESULTS FOR HVAC I3.3 TESTS AND ADJUSTMENTS I A. No ducts, piping, fixtures or equipment shall be concealed or covered until they have been inspected and approved by the Architect and the inspector who shall be notified by the contractor when the work is ready for inspection. B. Work shall be completely installed, tested and leak tight before inspection is required. All tests Ishall be repeated to the satisfaction of those making the inspection. 3.4 ARCHITECTURAL COORDINATION ITEMS I A. Cutting and Patching: 1. Cut and drill all openings in walls and floors required for the installation. Secure approval of Engineer before cutting and drilling. Neatly patch all openings cut. I B. Fire Caulking: 1. Patching through fire rated walls and enclosures shall not diminish the rating of that wall or enclosure. Patch shall be equal to rockwool, firestop, caulk or approved "rated" patch. I C. Access Panels and Pathways: 1. Furnish all access panels required for proper servicing of equipment. Provide access panels for all concealed valves, vents, controls, cleanout doors, and sprinkler devices required by NFPA. Provide access panels for all fire and/or fire & smoke dampers. I Provide frame as required for finish. Furnish panels to General Contractor. Exact locations to be approved by the Architect. Minimum size to be 12" x 12", units to be 16 gauge steel, locking device shall be screwdriver cam locks. I 3.5 PROJECT EXISTING CONDITIONS A. Where new HVAC systems are required to be connected to existing HVAC systems, it is the contractor's responsibility to verify the location, size, pressure, condition, and they shall verify I that the existing HVAC system is indeed the correct and appropriate HVAC system before any work is done. Provide all necessary camera scoping and dye testing as necessary. If there is any need for concern, if it is determined that the existing HVAC system is not a correct or appropriate HVAC system or not connected to a correct or appropriate HVAC system, if the I condition of the existing HVAC system is not viable for re-use, or any other condition that would not allow the proper functioning of the new HVAC system, the contractor shall notify the engineer in writing immediately via RFI and wait for direction before proceeding. I B. Interruption of Existing HVAC Services: 1. Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service I according to requirements indicated: 2. Notify, Architect, Construction Manager, and Owner no fewer than seven days in advance of proposed interruption of service. 3. Do not proceed with interruption of service without Architect's written permission. IEND OF SECTION I I I TEMPLATE 230501 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230503 -SUBMITTALS FOR HVAC SYSTEMS I PART 1 -GENERAL 1.1 REQUIREMENTS I A. Where submittals are required by the Contract Documents, they shall be prepared and supplied in accordance with the Contract Documents. In addition to Division 01, the Contractor is advised to review and comply with the requirements articulated within each Division and within each section of that Division. B. The contractor is not relieved of responsibility for providing specified or drawn scope of work should any errors or omissions in submittal information not be noted by the Design Professional during submittal reviews or site observations. C. Some Divisions may include a division-specific"Submittal Requirements for ...." section. Where this section exists, it articulates additional requirements for submittals that apply to the work of that Division. D. The submittal requirements help to identify, track and keep the project organized for all parties involved. They are necessary to ensure a timely turnaround and an appropriate technical review. Submittals that do not conform to the administrative requirements are rejected and 111 returned, without technical review. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 GENERAL DIRECTION I A. Reference Specification Section 01 33 00.00 for a full list of submittal procedures and required formats. 3.2 USE OF ELECTRONIC DRAWINGS FROM THE OWNER'S DESIGN TEAM A. Plan drawings for the Project were created with Revit. B. If expressly permitted by the Owner and the terms of the Contract, editable electronic versions of standard-scale, AutoCAD-based plan drawings may be made available for the creation of shop and as-built drawings. C. Upon request, when available, electronic versions of standard-scale, Navisworks (.dwf) and (.nwc) or AutoCAD 360 (.dwg)files may be made available for coordination purposes. D. Due to the proprietary nature of internal design systems, editable native-software versions of some drawings, including but not limited to system diagrams and details, will not be made available in an editable form. In these cases, electronic versions of the drawings may be made available only in PDF, JPG, or similar non-editable electronic form, at the sole discretion of the Design Professional. END OF SECTION I I TEMPLATE 230503 - 1 2/28/19 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND DUCTWORK I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Submittal Requirements I 1. 2. Product Data: For each type of product indicated. Shop Drawings: Fabrication and installation details. PART 2 - PRODUCTS (COMBINED WITH PART 3 -EXECUTION) PART 3 - EXECUTION 3.1 GENERAL A. Support all piping, ductwork and equipment by hangers or brackets properly from the building structure. Support from decking above is prohibited. Furnish structural steel members where required to support piping and equipment. No portion of piping or valves shall be supported by equipment. B. Ductwork- Support by means of hangers as follows: Duct Width Hanger Size and Type Max. Spacing 30 or less (#16 gage) 8 31 to 60 (#14 gage) 8 61 to 90 3/8"dia. Rod 8 C. A pair of hangers shall be located at every transverse joint and elsewhere according to the table. 3.2 PIPING A. Install hangers, supports, clamps and attachments to support piping properly from building structure. Arrange for grouping of parallel runs of horizontal piping supported together on field- fabricated, heavy-duty trapeze hangers where possible. Where piping of various sizes is supported together by trapeze hangers, space hangers for smallest pipe size or install intermediate supports for smaller diameter pipe as specified above for individual pipe hangers. B. Individual pipe hangers to be Anvil International Clevis Hanger Fig. 260, Elcen, or approved I equal. C. Rod sizes to conform to the following: 3/8" rods for 3/4"-2"pipe; 1/2" rods for 2-1/2"-3"pipe; 5/8"for 4"-5"pipe and 3/4"for 6"pipe. D. Hangers shall be sized to allow insulation to pass through unobstructed, provide saddle support for insulation at all hanger. E. Hanger spacing for steel piping unless otherwise noted is to be as follows: 1-1/4"or smaller to be 8'on center; 1-1/2"-2"to be 10'on center; 2-1/2"and larger to be 12'on center and at each change of direction. Hanger spacing for copper pipe to be as follows: 1" or smaller 6' on center; 1-1/4"or larger 8'on center. F. Piping shall be also supported at each change in direction, at valves, and at equipment. END OF SECTION I TEMPLATE 230529 -1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230548 -SEISMIC CONTROL FOR HVAC I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS I A. Shop Drawings 1. Provide performance requirements and design criteria, including analysis data signed and sealed by the qualified engineer responsible for their preparation. PART 2 - PRODUCTS (NOT USED) PART 3 -EXECUTION I 3.1 GENERAL A. The contractor shall subcontract a licensed structural engineer for the design of all seismic restraint systems required by the presiding jurisdiction. The structural engineer shall provide engineered stamped and signed drawings of seismic design and submit as deferred submittal to supplement the permit drawings. 3.2 SEISMIC BRACING A. Provide seismic bracing of electrical components where required by code. 3.3 QUALITY ASSURANCE I A. The contractor shall provide seismic restraint systems to meet total design lateral force requirements for support and restraint of conduit, cable trays, equipment, and other similar systems and equipment where required by the applicable building code. 3.4 DELEGATED DESIGN A. Seismic restraint designer shall coordinate all attachments with the structural engineer of record. Provide engineered stamped and signed drawings of seismic design. B. Seismic restraint designer shall provide visual inspection after installation and approve installation of seismic design components. C. Design analysis shall include calculated dead loads, static seismic loads, and capacity of materials utilized for the connection of the equipment or system to the structure. D. Analysis shall detail anchoring methods, bolt diameter, and embedment depth. I E. All seismic restraint devices shall be designed to accept without failure the forces calculated per the applicable building code. F. Friction from gravity loads shall not be considered resistance to seismic forces. 1 END OF SECTION I I I TEMPLATE 230548 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY IGUIDE SPECIFICATIONS SECTION 230593 -TESTING, ADJUSTING AND BALANCING FOR HVAC I PART 1 -GENERAL I1.1 SUBMITTAL REQUIREMENTS A. Shop Drawings: 1. Certified Reports: Submit testing, adjusting, and balancing reports bearing the seal and signature of the Test and Balance Engineer. The reports shall be certified proof that the systems have been tested, adjusted, and balanced in accordance with the referenced standards; are an accurate representation of how the systems have been installed; are a I true representation of how the systems are operating at the completion of the testing, adjusting, and balancing procedures; and are an accurate record of all final quantities measured, to establish normal operating values of the systems. Final Report: Upon verification and approval prepare final reports, type written, and organized and formatted Ias specified below. Submit 2 complete sets of final report to the owner. PART 2 - PRODUCTS (NOT USED) IPART 3 - EXECUTION 3.1 GENERAL I1. Test, adjust, and balance the following mechanical systems: 2. Supply air systems, all pressure ranges. 3. Return air systems. 4. Exhaust air systems. 1 5. Verify temperature control system operation. 6. Test systems for proper sound and vibration levels. 3.2 QUALITY ASSURANCE I A. Codes and Standards: 1. AABC: "National Standards for Total System Balance". 2. ASHRAE: ASHRAE Handbook, 2011 Applications, Chapter 38, Testing, Adjusting, and I Balancing. 3.3 QUALIFICATIONS A. The contractor shall procure the services of an independent Balance and Testing Agency, I approved by the Engineer, and a member of Associated Air Balance Council (AABC) or NEBB, which specializes in the balancing and testing of heating, ventilating and air conditioning systems, to balance, adjust and test all air and water systems and equipment as herein I specified. All work by this agency shall be done under direct supervision of a qualified heating and ventilating Engineer employed by this agency. All instruments used by this agency shall be accurately calibrated and maintained in good working order. 3.4 SEQUENCING AND SCHEDULING IA. General: 1. Test, adjust and balance air conditioning systems during summer season and heating systems during winter season, including at least a period of operation at outside I conditions within 5 deg F wet bulb temperature of maximum summer design condition, and within 10 deg F dry bulb temperature of minimum winter design condition. Take final temperature readings during seasonal operation. I 2. Check all filters for cleanliness, provide new as required. Check dampers (volume and fire) for correct and locked position, and temperature control for completeness of installation before starting fans. Place outlet dampers in full open position. Lubricate all motors and bearings. Check fan belt tension. Check fan rotation. I TESTING,ADJUSTING AND BALANCING FOR HVAC 230593 - 1 2/28/19 1 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230593 -TESTING, ADJUSTING AND BALANCING FOR HVAC 111 3. Air balance and testing shall not begin until the system has been completed and is in full working order. The Contractor shall put all heating, ventilating and air conditioning systems and equipment into full operation and shall continue the operation of same during each working day of testing and balancing. The contractor shall submit within 30 days after receipt of contract, 8 copies of submittal data for the testing and balancing of the air conditioning, heating, and ventilating systems. The Air Balance and Testing Agency shall provide proof of having successfully completed at least five projects of similar size and scope. 4. The air balancing contractor shall include the additional cost to change every fan factory installed sheave, pulley and/or belt of in order to obtain the design air flows. 3.5 Performing testing, adjusting and balancing A. Perform testing and balancing procedures on each system identified, in accordance with the detailed procedures outlined in the referenced standards. I B. Cut insulation, ductwork, and piping for installation of test probes to the minimum extent necessary to allow adequate performance of procedures. C. Patch insulation, ductwork, and housings, using materials identical to those removed. I D. Seal ducts and piping, and test for and repair leaks. E. Seal insulation to re-establish integrity of the vapor barrier. F. Mark equipment settings, including damper control positions; valve indicators, fan speed control levers, and similar controls and devices, to show final settings. Mark with paint or other suitable, permanent identification materials. G. Retest, adjust, and balance systems subsequent to significant system modifications, and resubmit test results. END OF SECTION I I f I I I 1 TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230713 -DUCT INSULATION PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: ' 1. For each product indicated. B. Shop Drawings: 1. Include plans, elevations, sections, details and attachments to other work. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT 1 A. All liners, insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. Insulation shall have a minimum installed thermal resistance value of(R6](R8]or code minimum, whichever higher. B. Rigid Fiberglass Ductwork Insulation: Glass fibers bonded with a thermosetting resin. Comply with ASTM C 612, Type IB, without facing and with vapor barrier all-service jacket manufactured from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. C. Flexible Fiberglass Ductwork Insulation: Glass fibers bonded with a thermosetting resin. Comply with ASTM C 553, Type II, without facing and with vapor barrier all-service jacket manufactured from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. D. Vapor Barrier Material for Ductwork: Paper-backed aluminum-foil, except as otherwise indicated; strength and permeability rating equivalent to factory-applied vapor barriers on adjoining ductwork insulation, where available; with following additional construction characteristics: E. High Puncture Resistance: Low vapor transmission (for ducts in exposed areas: Mech. Rooms, etc.) F. Moderate Puncture Resistance: Medium vapor transmission (for ducts in concealed areas). PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. All ductwork shall be insulated except: 1. Double wall ductwork 2. Fabric ductwork 3. Metal ducts with duct liner of sufficient thickness to comply with energy code. 4. Factory insulated flexible ductwork 5. Factory insulated plenums and casings 6. Flexible connectors 7. Vibration control devices 8. Factory insulated access panels and doors 9. Supply ductwork exposed in conditioned spaces excluding mechanical rooms, server rooms and electric equipment rooms 10. Toilet exhaust, general exhaust and return ductwork in an insulated joist or attic space. B. Installation: Install per manufacturer's published installation manual. END OF SECTION I TEMPLATE 230713 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230719 - HVAC PIPING INSULATION I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: 1. For each type of product indicated. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT A. Provide 3/4"armaflex on refrigerant piping. I B. Provide 1"fiberglass insulation on concealed condensate drain piping. C. Insulation shall have a minimum thickness as required by Code. 1 D. All insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. PART 3 - EXECUTION 3.1 GENERAL DIRECTION A. Provide insulation materials, accessories, and finishes with smooth, straight, and even surfaces; I free of voids throughout the length of piping including fittings, valves, and specialties. B. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application. END OF SECTION I I I I I I I TEMPLATE 230719 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 230800 -COMMISSIONING OF HVAC SYSTEMS 1 PART 1 -GENERAL 1.1 GENERAL REQUIREMENTS A. The requirements of this Section apply to all sections of Division 23. ' B. This project will have selected building systems commissioned including all scope of work outlined in Division 23 specifications including but not limited to, HVAC systems and equipment, ductwork distribution and controls. A Commissioning Agent (CxA) appointed by the owner will manage the commissioning process. 1.2 SUMMARY A. This Section includes requirements for commissioning the HVAC systems, subsystems and U equipment. . The commissioning activities have been developed to support code & LEED outlined delivery of an efficient project in accordance with the Contract Documents developed by the design team evolved from the Owner's Project Requirements (OPR). 1.3 SYSTEMS AND EQUIPMENT TO BE COMMISSIONED A. Commissioning of a system or systems specified in this Division is part of the construction process and required by OPR and/or code (IECC). The commissioning process for these systems is required in cooperation with the Owner, Construction Manager and the ' Commissioning Agent. B. The following systems, components, and equipment are the focus of the commissioning ' process on the Project: 1. Air Handling Systems - Roof Top Units 2. Fans - Exhaust Fans, Fan Motors, Variable Speed Drives, Controls and Safeties 1.4 SUBMITTALS A. The commissioning process requires review of Submittals for equipment and systems that are part of the commissioning scope of work. The Construction Manager will be responsible for delivering these submittals to the CxA for their review. B. The commissioning process requires Submittal review simultaneously with engineering review. 1.5 COMMISSIONING TEAM A. The commissioning team shall consist of members appointed by the Owner, including members of the design team, and members appointed by Contractor(s). Each individual shall have the authority to act on behalf of the represented entity and shall be organized to implement the commissioning process through coordinated actions and be dedicated to remain involved in the Project until completion. 1. Members Appointed by Owner: a. CxA: The designated person, company or entity that plans, schedules and coordinates the commissioning team to implement the commissioning process. 1 b. Owner will engage the CxA under a separate contract. Representatives of the facility user and operation and maintenance personnel. c. Architect and engineering design professionals (i.e., design team). 2. Members Appointed by Contractor(s): TEMPLATE 230800 - 1 2/28/19 111 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230800 -COMMISSIONING OF HVAC SYSTEMS a. Individuals, each having the authority to act on behalf of the entity he or she represents, explicitly organized to implement the commissioning process through coordinated action. The commissioning team shall consist of, but not be limited to, representatives of each Contractor, including Project superintendent and subcontractors, installers, suppliers and specialists deemed appropriate by the CxA. 1.6 COMMISSIONING PLAN A. Prior to permit issuance a commissioning plan shall be completed to document how the project I will be commissioned and shall be started during the design phase of the building project. PART 2 - PRODUCTS (NOT USED) 1 PART 3 - EXECUTION 3.1 CONTRACTOR RESPONSIBILITY Contractor shall provide support and work as specified, needed and required to conduct and facilitate Starbucks staff building commissioning efforts. This work will be comprised of three distinct efforts: 1. Support Starbucks commissioning agent (CxA) during installation verification and correct disclosed deficiencies. 2. Perform testing, adjusting, balancing and system startup and support functional performance testing by Starbucks CxA; 3. Correct deficiencies disclosed by functional performance testing and submit reports. A. Systems subject to commissioning may include, but are not limited to domestic hot water generation, HVAC systems, rooftop units, exhaust fans, HVAC controls, lighting controls, air curtains, built-in refrigeration, equipment and renewable energy systems. B. Contractor shall provide written responses to all CxA's reviews and comments. Responses shall be provided in a timely manner. C. Contractor shall include commissioning activities in project schedule and show intervals for performance of work for which contractor is responsible and intervals for work performed by Starbucks CxA. Contractor shall show resources for performing all work related to commissioning activities on a line item in the schedule of values. D. Contractor shall install equipment in accordance with the manufacturer's requirements and all contract documents. Ensure that all equipment is installed totally complete and accessible to Starbucks CxA for installation verification and functional performance testing prior to the scheduled start of installation verification. E. Contractor shall complete manufacturer's startup procedures prior to commissioning coordination with CxA. F. Contractor shall be readily available during installation verification to correct any deficiencies or defects is closed by the installation verification process. Corrections shall be made in a timely manner without disruption of the construction schedule. G. All HVAC exhaust fan and air curtain equipment shall be tested, adjusted and balanced by the contractor's testing, adjusting and balance agent (see testing adjusting and balancing) after the system is verified to be complete and correct by Starbucks CxA, in accordance with the requirements of these documents. All HVAC control systems shall be tested to ensure that control devices, components, equipment and systems are calibrated, adjusted and operate in TEMPLATE 230800 -2 2/28/19 1 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230800 -COMMISSIONING OF HVAC SYSTEMS accordance with these plans and specifications. Sequences of operation shall be tested to ensure that they operate in accordance with the contract requirements. Deliverables: ' preliminary, written testing and air balance report conforming to the requirements specified herein, documenting the information specified, etc... To the Starbucks CxA immediately upon completion of the work. ' H. Provide a list of all factory and field settings that have been programmed into the equipment (such as setpoints, schedules, dip switch settings, condenser and evaporator operating pressure/temperature, etc...). Contractor shall inform Starbucks CxA when equipment is ready for functional performance testing. All equipment shall be ready for functional performance testing prior to starting testing. This includes rehearsing all functional performance tests before demonstrating to the CxA. Contractor shall operate equipment for Starbucks CxA and verify by demonstrating the correct ' operation of equipment, sensor calibration, response of actuators and proper execution of HVAC control and lighting sequences, including but not limited to air movement, temperature, sound and control response. Provide any security access, hardware, software or other support as needed for the Starbucks CxA to efficiently witness and document all equipment testing. Starbucks CxA will record the equipment operation and response to testing sequences and prepare a list of any deficiencies disclosed by the functional performance tests for correction by the contractor. Equipment includes, but is not limited to, air handling units, rooftop and split type, condensing units, exhaust fans, lighting controls, etc... Deliverables: provide completed copies of all start up reports, filled out on the manufacturer's forms, to the Starbucks CxA. J. Contractor is responsible for correcting any issues or deficiencies disclosed during the ' functional performance testing process. Corrections should be made in a timely manner without disruption to the system and construction schedule. K. Contractor shall be readily available for any re-testing of equipment deemed necessary by ' Starbucks CxA during installation verification and functional performance testing. Contractor is responsible for correcting any issues or deficiencies found in the system during any and all re- testing. Corrections should be made in a timely manner without disruption to the system and construction schedule. Deliverables: final balance report, deficiencies list noting corrective ' actions performed by contractor in response to installation verification and functional performance test results. L. Construction and post construction testing: additional testing may be required by LEED and ' other processes that may occur out of sequence with commissioning service. Contractor shall conduct. Document, support and schedule this testing as directed by Starbucks CxA. M. Contractor shall provide a training plan for each trade (mechanical, electrical, plumbing, ' renewable systems)for the CxA's approval. The training plan shall outline all the topics that are to be covered along with the time duration for each topic. It shall also include the instructor's name, qualifications and company logo. ' N. The contractor is responsible for recording attendance for each training session. Copies of these shall be submitted to the CxA. O. Contractor shall submit O&M manuals for all pieces of equipment at least 6 weeks in advance of ' 3.2 the training sessions. GENERAL DIRECTION A. Equipment Verification Checklists (EVC'S) ' 1. The Contractor shall complete EVC's to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems start-up and Functional Performance Testing. The Commissioning Agent will prepare all EVC's to be used by the installing contractors to document equipment verification and installation. TEMPLATE 230800 -3 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230800 -COMMISSIONING OF HVAC SYSTEMS 2. The installing personnel shall complete the checklists. Completed checklists shall be submitted to the CM. The CM is responsible for sending all completed copies to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists for completion and accuracy. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all checklists for that type of equipment will be returned to the Contractor for correction and resubmission. B. Functional performance testing: 1. Contractor tests as required by other sections of Division 23 shall be scheduled and documented in accordance with the applicable sections. The Commissioning Agent will work with the CM to incorporate the Functional Performance Testing schedule into the master construction schedule. The CxA will conduct and witness all Functional Performance Testing performed by the Contractors. The commissioning process includes Functional Performance Testing that is intended to test systems functional performance under steady state conditions, reactions to changes in operating conditions and performance under emergency conditions. The contractors shall review and comment on the functional performance tests prior to testing. C. Training Of Operations And Maintenance Personnel 1. Training operations and maintenance personnel on the proper operation, maintenance and any emergency situations is required. Provide competent, factory authorized personnel to provide instructions to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. The instruction shall be scheduled in coordination with the CxA after submission and approval of formal training plans. The CxA will review the training plans and observe the training performed by the factory personnel and installing contractors. D. Final Commissioning Report ' 1. A complete report of commissioning process activities from design through post- construction phases of the building project shall be completed by the CxA and provided to the Owner. 2. The final commissioning report shall include the following: a. Executive summary of process and results of commissioning program — including observations, conclusions and any outstanding items. b. A history of all deficiencies and issues and how they were resolved 1) Includes outstanding issues and a plan for resolution 2) Include plans for seasonal testing schedule for a later date c. Functional performance test results and evaluations d. Summary of training process e. Cx Process Documents 1) Cx Plan 2) OPR 3) BOD 4) Equipment Verification Checklists/Installation Checklists 5) Functional Performance Test Checklists 6) Recommendations for end-of-warranty review activities END OF SECTION TEMPLATE 230800 -4 2/28/19 STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 230993 -SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: 1. Provide written sequences of operation for each controlled system and piece of equipment. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT PART 3 - EXECUTION 3.1 PACKAGED ROOFTOP UNIT A. All setpoints listed in this section are adjustable through the Energy Management System (EMS). Control& Monitoring points shall include but not be limited to the following: ' 1. Startup a. The unit shall operate on an occupied/unoccupied cycle as controlled from the EMS. Occupancy shall be predetermined by the owner and programmed into the 1 b. EMS. During startup, the fan shall run with the dampers in the full recirculation position. Provide occupied changeover sequence with optimum start function. When the return air temperature reaches occupied setpoint (adjustable), the minimum ' outside air damper shall open to the controlled minimum outdoor air position. Supply 2. Fan Control a. The supply fan speed shall be constant, run continuously during occupied mode ' and set to the required CFM. 3. Space Temperature Control a. Space temperature sensor furnished by EMS vendor. 4. Minimum Outside Air Control ' a. During occupied mode the minimum outside air damper shall be open. Provide motorized outdoor air damper. b. Provide carbon dioxide sensors in the space to measure carbon dioxide levels. Outside air damper shall modulate to maintain maximum carbon dioxide level ' setpoint at all times during occupied mode. CO2 levels shall be held below 1000 ppm (adjustable). When CO2 levels are below setpoint, outside air damper shall be at a minimum position, which equates to the sum of the "OA SQFT" multiplied by the room areas of each room in the "HVAC Ventilation Schedule" during occupied mode. 5. by Control a. Provide dual enthalpy economizer control. Economizer control shall be enabled ' whenever the outside air enthalpy is lower than the return air enthalpy. Enthalpy shall be calculated from sensors which are tied to the same controller for accuracy. During economizer mode, the outside air damper shall modulate to 100% open. ' The economizer damper shall modulate open on a call for cooling and modulate closed on a call for heating. The return damper shall modulate inversely with the economizer damper. 6. Cooling Control a. Cooling shall be controlled to maintain space temperature setpoint. On a call for cooling, the heating shall be off. On a further call for cooling, enable the economizer mode. On a further call for cooling, the mechanical cooling shall be staged on. Provide Low Ambient Controls for operation down to-20 degrees F. TEMPLATE 230993 - 1 2/28/19 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230993 -SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 7. Heating Control ' a. Heating shall be controlled to maintain space temperature setpoint. On a call for heating, the mechanical cooling shall be off. On a further call for heating, the economizer mode shall be disabled. On a further call for heating the gas heating shall be staged on. 8. Dehumidification a. Provide a hot gas reheat coil or duct mounted electric reheat coil for dehumidification. Provide space humidity sensor. When the space humidity rises above 60% (adjustable), provide full cooling and modulate the hot gas reheat coil to maintain space temperature setpoint. When the space humidity reaches setpoint, resume with normal heating &cooling operation. 9. Smoke Detector a. When the smoke detector is alarmed, the system shall be alarmed and the air handler shall fail safe with manual reset. 10. Unoccupied Mode a. During the unoccupied mode of operation, the RTU shall go into night setback mode. 11. Night Setback/Shutdown a. At night setback/shutdown the RTU shall go to fail safe position. Fail safe position is defined by the following: The supply fan is off, the outdoor air intake damper is closed, the heating is off and the mechanical cooling is off. The supply fan shall cycle in conjunction with either the heating or cooling system to maintain a minimum/maximum space temperature depending on the season. 3.2 TOILET EXHAUST FANS (EMS) A. Exhaust fan operation shall be controlled by the Energy Management System. During occupied mode the exhaust fan motor damper shall open and fan shall start. During unoccupied mode the exhaust fan motor damper shall be closed and fan shall be off. A current transducer shall indicate status thru the EMS. 3.3 CONTROLS A. Electrical contractor will provide power wiring. HVAC contractor shall provide all the low voltage wiring of HVAC units and controls, thermostats and controllers. Coordinate controls requirements with EMS vendor. Provide plastic protective cover for all thermostats. Replace controls on existing unit, adjust and calibrate controls. 3.4 TEMPERATURE SENSORS TIED TO EMS A. Sensors shall be furnished, installed and wired by the Temperature Control Contractor. The electrical contractor shall provide 4" square x 1- 1/2" deep wall outlet boxes at 54" above finished floor (with single-gang rings)for all thermostats/sensors. The electrical contractor shall provide one 3/4" empty conduit from each thermostat/sensor location, turned out above accessible ceilings (in joist space or against overhead slab/deck). The Temperature Control Contractor shall provide all other necessary conduit, raceway and wiring related work. Conduit shall be identified in ceiling cavity and shall be provided with sweep bends, bushings and dragline. B. The HVAC/Temperature Control Contractor shall coordinate with the General Contractor to ensure thermal envelope is maintained at these locations. 3.5 CARBON DIOXIDE SENSORS A. Carbon dioxide sensors shall be non-dispersive infrared (NIDR)type with a measurement range of 0-2000 ppm, repeatability of+/- 20 ppm and a measurement accuracy of+/- 75 ppm. B. The recommended calibration interval shall be a minimum of 5 years. TEMPLATE 230993 -2 2/28/19 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 230993 -SEQUENCE OF OPERATIONS FOR HVAC CONTROLS C. Space mounted applications shall utilize diffusion through an attractive, satin finish, high impact housing. 3.6 GENERAL CONTROL WIRING REQUIREMENTS AND INSTALLATION METHODS A. Except where specifically indicated otherwise above, the HVAC/Temperature Control Contractor shall provide all electrical work as required for all temperature control related wiring (i.e. conduit, raceway, outlet boxes, junction boxes, wiring, etc.) in accordance with Electrical Specifications requirements. All conduit shall be 3/4" minimum. B. Coordinate all thermostat/sensor locations in field (case by case) with Architect, Owner and Electrical Contractor to ensure that they are placed in locations that will not interfere with furniture, equipment, artwork, wall-hung specialties, room finishes, etc. All thermostat/sensor wall locations indicated on HVAC drawings are schematic only and must be verified case-by- ' case prior to rough-in. C. All electrical work as described in this specification shall be per the latest edition of the National Electrical Code (NEC) and per applicable state and local codes. D. Where "free-air" installation methods (either exposed above the ceilings, in bridle rings or in cable trays) are permitted under Electrical Specifications above ceilings, provide plenum-rated cables wherever plenum ceilings (if any) exist and install as defined under Electrical ' Specifications. Install low voltage circuits, located in concrete slabs and masonry walls, in inaccessible locations, or exposed in occupied areas, in electrical conduit regardless of what wiring methods are permitted under Electrical Specifications. E. Where cable trays or bridle rings are provided by the electrical contractor for low voltage cables, these raceways may be utilized for control wiring by this contractor (provide special color coded jackets, label cable jackets per Electrical Specifications and group control wiring cables together). Provide conduit drops from cable tray/bridle ring paths to wall outlet boxes and ' equipment unless directed otherwise under Electrical Specifications. F. Regardless of permitted methods in Electrical Specifications, all cables/wiring installed concealed by gypsum board, masonry or other inaccessible materials in walls or above ceilings shall be installed in conduit, 3/4" minimum. G. All conduit, bridle rings, raceway, outlet boxes, etc. necessary for complete operational installation of control wiring shall be provided (furnished and installed) by the temperature ' control contractor in strict compliance with Electrical Specifications documents. Coordinate all work with all other applicable trades including the electrical contractor. H. Provide all required conduit work to and between equipment in a manner compliant with that ' described above (i.e. between VAV boxes, to boilers, starters, condensing units, etc. as applicable). I. Install control wiring without splices between terminal points, color-coded. Install in neat ' workmanlike manner, securely fastened. Install in accordance with National Electrical Code and per Electrical Specifications. J. Install circuits over 25 volt with color-coded No. 12 wire in electrical metallic tubing, per ' Electrical Specifications. Install circuits under 25 volt with color-coded No. 18 wire with 0.031" high temperature (105 degs. F) plastic insulation on each conductor and plastic sheath over all. Install electronic circuits with color-coded No. 22 wire with 0.023" polyethylene insulation on each conductor with plastic-jacketed copper shield over all. TEMPLATE 230993 -3 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS I SECTION 230993 -SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 3.7 SMOKE DETECTOR I A. All duct smoke detectors will be furnished by electrical contractor, installed by the HVAC I contractor, and wired by the electrical contractor per local codes. HVAC contractor will interlock fan with smoke detector. END OF SECTION 1 I I I I I I I 1 I I I I I TEMPLATE 230993 -4 2/28/19 I STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 233113 - METAL DUCTS PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Submittal Requirements ' 1. Product Data: For liners, adhesives, sealants and gaskets. 2. Shop Drawings: Sheet metal thickness, reinforcing details, duct layouts indicating sizes, configuration, liner material, elevation and static pressure class. PART 2 - PRODUCTS 2.1 DUCTWORK MATERIALS A. Exposed Ductwork Materials: 1. Where ductwork is indicated to be exposed to view in occupied spaces, provide materials which are free from visual imperfections including pitting, seam marks, roller marks, stains and discolorations, and other imperfections, including those which would impair painting. Exposed ductwork which is to be painted shall have paint grip applied. B. Sheet Metal: 1. Except as otherwise indicated, fabricate ductwork from galvanized sheet steel, lock t forming quality; with G 90 zinc coating and mill phosphatized for exposed locations. Minimum gauge shall be 24. 2.2 MISCELLANEOUS DUCTWORK MATERIALS A. Volume Dampers: 1. Provide volume dampers in all branch ducts or as required for balancing to required air flows. ' B. Fittings: 1. Provide radius type fittings fabricated of multiple sections with maximum 15 deg. change of direction per section. Unless specifically detailed otherwise, use 45 deg. laterals and ' 45 deg. elbows for branch takeoff connections. Where 90 deg. branches are indicated, provide conical type tees. C. Duct Sealant: 1. Non-hardening, non-migrating mastic or liquid elastic sealant, type applicable for fabrication/installation detail, as compounded and recommended by manufacturer specifically for sealing joints and seams in ductwork. D. Duct Cement: ' 1. Non-hardening migrating mastic or liquid neoprene based cement, type applicable for fabrication/installation detail, as compounded and recommended by manufacturer specifically for cementing fitting components, or longitudinal seams in ductwork. ' E. Ductwork Support Materials: 1. Except as otherwise indicated, provide hot-dipped galvanized steel fasteners, anchors, rods, straps, trim and angles for support of ductwork. 2. For exposed stainless steel ductwork, provide matching stainless steel support materials. 3. For aluminum ductwork, provide aluminum support materials except where materials are electrolytically separated from ductwork. t 2.3 FLEXIBLE DUCTS A. Either spiral-wound spring steel with flameproof vinyl sheathing, or corrugated aluminum. Unless specifically mentioned, the maximum length of flex duct on the supply equals 5 feet. Flex is not allowed for return, relief or exhaust applications. The flexible ducts indicated for use in the TEMPLATE 233113 - 1 2/28/19 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233113 - METAL DUCTS H.V.A.C. system shall conform to the requirements of UL 181 for Class 0 or Class 1 flexible air 111 ducts and shall be so identified. B. Where installed in unconditioned spaces other than return air plenums, provide 1" thick 1-1/2 lb. continuous flexible fiberglass sheath with vinyl vapor barrier jacket. C. Installation is not permitted above drywall ceilings and inaccessible ceilings. 2.4 FABRICATION A. Shop fabricate ductwork in 4, 8, 10 or 12-ft lengths, unless otherwise indicated or required to complete runs. All ductwork shall be Pittsburgh Construction with a minimum of thickness of 24 gauge. In addition, ductwork used in systems over 3" W.G. shall have cold sealant applied. Shop fabricate ductwork of gauges and reinforcement complying with SMACNA "HVAC Duct Construction Standards". 2.5 LINED DUCT I A. The following ductwork shall be lined with duct liner: Return ductwork in ducted return systems 10 feet downstream of HVAC unit. Exhaust ductwork 10 feet upstream and downstream of fans. Transfer air ducts. B. Fabricate ductwork with duct liner in each section of duct where indicated. Laminate liner to internal surfaces of duct in accordance with instructions by manufacturers of lining and adhesive, and fasten with mechanical fasteners. Duct liner to be 3-lb density for acoustic requirements 1" thick or as noted. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. C. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. D. Duct Liner: Fibrous glass of thickness indicated. 3-lb density. All liners, insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. E. Duct Liner Adhesive: As recommended by insulation manufacturer and complying with NFPA 90A or NFPA 90B. F. Duct Liner Fasteners: Comply with SMACNA HVAC Duct Construction Standards. 2.6 DOUBLE WALL DUCTS 1 A. Exposed round and rectangular ductwork and fittings shall be manufactured or shop-fabricated double wall a minimum G-90 galvanized steel ductwork with 1"fiberglass insulation between the solid outer shell and perforated inner liner. All ducts and fittings shall be construction for SMACNA's latest standards. All gaskets shall be UL listed to conform to ASTM E84-91a and NFPA 90A. B. Manufacturers: Subject to compliance with requirements, provide ductwork of one of the following: United-McGills K-27, Lindab Safe, Semco or approved equal. PART 3 - EXECUTION 3.1 INSTALLATION OF METAL DUCTWORK A. General: 1. Assemble and install ductwork in accordance with recognized industry practices which will achieve air-tight (5% leakage for systems rated 3" and under; 1% for systems rated over 3") and noiseless (no objectionable noise) systems, capable of performing each TEMPLATE 233113 -2 2/28/19 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233113 -METAL DUCTS indicated service. Install each run with minimum number of joints. Align ductwork accurately at connections, within 1/8" misalignment tolerance and with internal surfaces ' smooth. Support ducts rigidly with suitable ties, braces, hangers and anchors of type which will hold ducts true-to-shape and to prevent buckling. Support vertical ducts at every floor. ' B. Sealing: 1. Seal all longitudinal seams, S's and drives and all joints with mastic or cement. Install according to SMACNA standards. ' C. Balancing Dampers: 1. The sheet metal contractor shall be fully responsible for installing balancing dampers in the ductwork, (whether shown on the drawing or not) in order to arrive at the intended air flow. The balancing sub-contractor shall provide direction and assistance in determining locations where dampers are required. Additional dampers, if required shall be installed at no additional cost to the owner. D. Wall Penetrations: I1. Seal and pack around all ducts and piping sleeves which pass through walls that extend to bottom side of structure and rated walls. E. Field Fabrication: ' 1. Complete fabrication of work at project as necessary to match shop-fabricated work and accommodate installation requirements. F. Routing: ' 1. Locate ductwork runs, except as otherwise indicated, vertically and horizontally and avoid diagonal runs wherever possible. Run ductwork in shortest route which does not obstruct useable space or block access for servicing building and its equipment. Hold ducts close ' to walls, overhead construction, columns, and other structural and permanent enclosure elements of building. Limit clearance to 1/2" where furring is shown for enclosure or concealment of ducts, but allow for insulation thickness, if any. Where possible, locate insulated ductwork for 1" clearance outside of insulation. Wherever possible in finished ' and occupied spaces, conceal ductwork from view, by locating in mechanical shafts, hollow wall construction or above suspended ceilings. Do not encase horizontal runs in solid partitions, except as specifically shown. 2. Coordinate layout with suspended ceiling and lighting layouts and similar finished work. G. Electrical Equipment Spaces: 1. Do not route ductwork through transformer vaults and their electrical equipment spaces and enclosures. ' H. Penetrations: 1. Where ducts pass through interior partitions and exterior walls, and are exposed to view, conceal space between construction opening and duct or duct insulation with sheet metal ' flanges of same gage as duct. Overlap opening on 4 sides by at least 1-1/2". Fasten to duct and substrate. 2. Where ducts pass through fire-rated floors, walls, or partitions, provide fire dampers and firestopping between duct and substrate, in accordance with requirements of Division-7 ' Section "Firestopping". 3. All dampers integral to or utilized as part of an engineered smoke control system shall be listed and comply with UL 555S. 4. All fire dampers shall be listed and comply with UL 555. 5. All dampers shall be low leakage with edge and blade seals. Damper manufacturers are subject to specification compliance. Provide products by one of the following: Greenheck Fan Corporation, Nailor Industries, Ruskin Company, Young Regulator Company TEMPLATE 233113 -3 2/28/19 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233113 - METAL DUCTS Coordination: 1. Coordinate duct installations with installation of accessories, dampers, coil frames, equipment, controls and other associated work of ductwork system. 3.2 INSTALLATION OF DUCT LINER A. General: 1. Install duct liner in accordance with SMACNA HVAC Duct Construction Standards. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. 2. Store internally lined ductwork up off of the floor. Protect internally lined ductwork from water and dust. "Butter the leading edge of all internal duct lining with the manufacturer's recommended adhesive. 3. Inspect and repair all damaged lining prior to installation of ductwork. 3.3 INSTALLATION OF FLEXIBLE DUCTS A. Maximum Length: 1. For any duct run using flexible ductwork, do not exceed 5' - 0" extended length. Installation shall have smooth full radius turns down to diffuser. 2. Installation not permitted above inaccessible ceilings. 3.4 ACCESS PANELS 1. Furnish all access panels required for proper servicing of equipment. Provide access panels for all concealed valves, vents, controls and cleanout doors, and sprinkler devices required by NFPA. Provide frame as required for finish. Furnish panels to General Contractor. Exact locations to be approved by the Architect. Minimum size to be 12" x 12", units to be 16 gauge steel, locking device shall be screwdriver cam locks. END OF SECTION 1 1 1 1 1 1 TEMPLATE 233113 -4 2/28/19 1 STARBUCKS COFFEE COMPANY t GUIDE SPECIFICATIONS SECTION 233423 - HVAC POWER VENTILATORS 1 PART 1 - GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: For each type of product indicated. PART 2 - PRODUCTS 2.1 CENTRIFUGAL ROOF VENTILATORS A. Provide centrifugal roof type, curb mounted, power ventilators of type, size, and capacity as scheduled, and as specified herein. B. Type: Centrifugal fan, direct or belt driven as scheduled. Provide aluminum, galvanized steel, ' or fiberglass weatherproof housings as scheduled. Provide square base to suit roof curb. Provide permanent split-capacitor type motor for direct driven fans; capacitor-start, induction-run type motor for belt driven fans. ' C. Provide the Following Types of Housing Design: Hooded dome type. D. Electrical: Provide factory-wired non-fusible type disconnect switch at motor in fan housing. Provide thermal overload protection in fan motor. Provide conduit chase within unit for electrical ' connection. E. Provide NEMA 1 disconnect factory mounted. For single phase fractional HP fans use a toggle type disconnect switch. On three phase integral HP fans use a NEMA 1 safety switch. F. Bird Screens: Provide removable bird screens, 1/2" mesh, 16-ga aluminum or brass wire. G. Dampers: Provide motor-actuated louvered dampers in curb bases. Damper motor shall be 120V/ 1 phase unless otherwise noted. Provide local disconnect switch. ' H. All dampers integral to or utilized as part of an engineered smoke control system shall be listed and comply with UL 555S. I. Duct Lining: Provide 1"thick, 3-lb density duct liner a minimum of 10' (ten feet) up stream of fan. J. Manufacturer: Subject to compliance with requirements, provide centrifugal roof ventilators of one of the following: Acme, Cook (Loren) Co., Greenheck., Twin City Fan & Blower 2.2 PREFABRICATED ROOF CURBS A. General: Provide manufacturer's standard shop-fabricated units, modified if necessary to comply with requirements. Roof curb to be insulated. B. Fabricate structural framing for units of structural quality sheet steel, formed to manufacturer's standard profiles for coordination with roofing, insulation and deck construction. Include 45 deg. cant strips and deck flanges with offsets to accommodate roof insulation. Weld corners and seams to form watertight units. C. Clean and paint units with manufacturer's standard rust-inhibitive metal primer paint. D. Reinforce continuous runs of over 3'-0" length, by inserting welded stiffeners of heavy gage with ' flanges as required to provide sufficient rigidity and strength to withstand maximum lateral forces in addition to superimposed vertical loads. E. Sloping Roof Decks: For deck slopes of 1/4" per foot and more, fabricate support units to form ' level top edge. 1. Gage and Height: Fabricate units of metal gage and to height above roof surface as indicated. 1 TEMPLATE 233423 - 1 2/28/19 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233423 - HVAC POWER VENTILATORS 2. Where gage or height are not indicated, fabricate units of 14-ga metal, and nominal height of 14". 3. Provide pressure treated wood nailer, not less than 1-5/8" thick and of width indicated, but not less than width of support wall assembly. Anchor nailer securely to top of metal frame unit. 4. Provide lumber pressure treated with water-borne preservatives for"above ground" use. 5. Insulate units inside structural support wall with rigid glass fiber insulation board of approximately 3-lb. density and 1-1/2" minimum thickness, except as otherwise indicated. 6. Manufacturer: Subject to compliance with requirements, provide prefabricated roof curbs of one of the following: Custom Curb, Inc., Equipment Manufacturer., MicroMetl, Pate Co., Shipman., Thycurb. PART 3 - EXECUTION 3.1 INSPECTION , A. General: 1. Examine areas and conditions under which power and gravity ventilators are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Coordinate ventilator work with work of roofing, walls, and ceilings, as necessary for proper interfacing. B. Provide access door in duct below ventilator to service damper. C. Solder bottom joints and up 2" of side joints of duct under roof ventilator to retain any moisture entering ventilator. D. Access: Provide access and service space around and over fans as indicated, but in no case less than that recommended by manufacturer. E. Roof Curbs: Furnish roof curbs to roofing Installer for installation. Install according to roofing manufacturer's recommendation and specifications. F. Electrical Wiring: Install electrical devices furnished by manufacturer but not specified to be factory-mounted. Furnish copy of manufacturer's wiring diagram submittal to Electrical Installer. G. Verify that electrical wiring installation is in accordance with manufacturer's submittal and installation requirements of Division 26 sections. Ensure that rotation is in direction indicated and intended for proper performance. Do not proceed with centrifugal fan start-up until wiring installation is acceptable to fan Installer. 3.3 FIELD QUALITY CONTROL 1 A. Testing: 1. After installation of ventilators has been completed, test each ventilator to demonstrate proper operation of units at performance requirements specified. When possible, field correct malfunctioning units, then retest to demonstrate compliance. Replace units, which cannot be satisfactorily corrected. 3.4 ADJUSTING AND CLEANING A. Cleaning: 1. Clean factory-finished surfaces. Repair any marred or scratched surfaces with manufacturer's touch-up paint. ' TEMPLATE 233423 -2 2/28/19 I STARBUCKS COFFEE COMPANY t GUIDE SPECIFICATIONS SECTION 233423 - HVAC POWER VENTILATORS 3.5 SPARE PARTS 1 A. General: 1. Furnish to Owner, with receipt, one spare set of belts for each belt drive power ventilator. ' END OF SECTION I 1 1 t I 1 TEMPLATE 233423 -3 2/28/19 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233433 -AIR CURTAINS I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS ' A. Product Data: 1. For each type of product indicated. PART 2 -PRODUCTS 2.1 GENERAL A. General: Provide air doors of size and capacity as noted on drawings. Air doors shall operate at a low sound level and meet OSHA standards. 1. Construction: 2. Wheels: Talc-filled polypropylene or aluminum. 3. Housing: Galvanized steel. 4. Motorboard: Galvanized steel. B. Velocity Control: Provide adjustable louver damper controls for regulating rate of air flow. When louvers are completely closed air velocity shall reduce to sixty percent. C. Directional Control: Provide adjustable vanes at outlet nozzle for directing air where needed and readily set to compensate for possible draft conditions through door openings. Vanes shall have a forty percent girth sweep front to back. D. Motors: Provide totally enclosed shaded-pole, or permanent-split capacitor motors, Class "B" insulation, resiliently mounted, tap wound with built-in thermal overload protection, and with permanently lubricated type sleeve or ball bearings. Select motors with the voltage as scheduled. E. Extended Motor Oilers: Provide plastic tubes for lubricating motor bearings which are installed beneath grille. F. Motor Controls: Provide multi-speed motor control switch with OFF position, mounted behind access door. G. Fans: Provide double width, double inlet centrifugal fans, which are balanced statically and dynamically, of indicated capacity. Select fans with single or double extended motor shaft, with fan housing and motor fastened as an integral assembly to a motorboard. 2.2 ELECTRIC AIR CURTAINS A. Heating Elements: Except as otherwise indicated, provide manufacturer's standard heating elements of types, sizes, capacities and ratings for duty indicated; consisting of resistance elements enclosed in steel sheath with extended fins, or with spirally finned sheath. B. Electric Heating Capacity: Size elements for indicated fan speed, CFM, room heating load (BTUH), entering air temperature, and electric input(watts, voltage, phase). C. Internal Electrical Wiring: Provide units with high temperature, electrical heat-resistant wiring in flexible metal conduit from terminal junction box to electrical devices. Provide fusing for motor and control circuit wiring. Provide all required control transformers. D. Devices: Provide air doors with the following devices: 1. Thermally activated fan switch to keep fan motor operating until residual heat is dissipated. 2. Disconnect switch. 3. Automatic reset, high limit cut-out switch located in discharge air stream. 4. Manual "Summer-OFF-Winter" switch. I TEMPLATE 233433 - 1 2/28/19 I STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 233433-AIR CURTAINS 5. Unit-mounted line voltage thermostat 6. Remote-mounted line voltage thermostat ' 7. Automatic door switch: Plunger type installed in door area to activate air curtain when doo opens and to deactivate air curtain when door closes. 8. Control Power Transformer ' 9. Magnetic Contactor(Relay Kit) 10. Manufacturers: Subject to compliance with requirements, provide electric air doors of one of the following:, Mars Sales Company, Inc., King National, Raywall PART 3 -EXECUTION 3.1 INSPECTION A. Examine areas and conditions under which air curtains are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer. 3.2 INSTALLATION ' A. General: 1. Install air doors as indicated, and in accordance with manufacturer's installation instructions. 2. Locate air doors as indicated, coordinate with other trades to assure correct recess size ' 3. for recessed units. Install piping as indicated. 4. Provide disconnect at side or unit for installation in recessed ceiling. 5. Provide trim piece to finish linear slot supply in ceiling for recessed units. 6. Protect units with protective covers during balance of construction. 7. Install electric heating terminal units including components as indicated, in accordance with equipment manufacturer's written instructions, and with recognized industry ' practices; complying with applicable installation requirements of NEC and NECA's "Standard of Installation". 8. Coordinate with other electrical work, including wiring/cabling, as necessary to properly interface installation of heating terminal units with other work. 9. Clean dust and debris from each heating terminal as it is installed to ensure cleanliness. 10. Comb out damaged fins where bent or crushed before covering elements with enclosures. 11. Touch-up scratched or marred heating terminal enclosure surfaces to match original finishes. 12. Tighten connectors and terminals, including screws and bolts, in accordance with equipment manufacturer's published torque tightening values for equipment connectors. ' Where manufacturer's torquing requirements are not indicated, tighten connectors and terminals to comply with tightening torques specified in UL Std 486A. 3.3 GROUNDING A. Provide equipment grounding connections for electric heating terminals as indicated. Tighten connections to comply with tightening torque values specified in UL Std 486A to assure permanent and effective grounding. 1 3.4 FIELD QUALITY CONTROL A. Upon completion of installation of electric heating terminals, and after building circuitry has been energized, test heating terminals to demonstrate capability and compliance with requirements. B. Where possible, field correct malfunctioning units, then retest to demonstrate compliance; otherwise, remove and replace with new units and proceed with retesting. I TEMPLATE 233433 -2 2/28/19 p STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233433 -AIR CURTAINS C. Replace electric heating terminals and accessories which are damaged and remove damaged items from construction site. 3.5 ELECTRICAL WIRING ' A. General: 1. Install electrical devices furnished by manufacturer but not specified to be factory- mounted. Furnish copy of manufacturer's wiring diagram submittal to Electrical Installer. 2. Verify that electrical wiring installation is in accordance with manufacturer's submittal and installation requirements of the electrical specifications. Do not proceed with equipment start-up until wiring installation is acceptable to equipment installer. 3.6 ADJUSTING AND CLEANING A. General: 1. After construction is completed, including painting, clean unit exposed surfaces, vacuum clean terminal coils and inside of cabinets. 2. Retouch any marred or scratched surfaces of factory-finished cabinets, using finish materials furnished by manufacturer. 3. Install new filter units for terminals requiring same. END OF SECTION I I I 1 1 1 I I TEMPLATE 233433 -3 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233713 - DIFFUSERS, REGISTERS AND LOUVERS I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data I1. Product Data: For each type of product indicated. PART 2 - PRODUCTS 2.1 MANUFACTURERS: A. Subject to compliance with requirements, provide products by one of the following: 1. Anemostat Products; a Mestek company, Carnes, Metalaire, Inc., Nailor Industries Inc., Price Industries, Titus, Tuttle & Bailey, Warren Technologies. 2.2 CEILING DIFFUSERS, GRILLES AND REGISTERS A. Refer to schedules for basis of design. PART 3 - EXECUTION 3.1 INSTALLATION A. Ceiling-Mounted Outlets and Inlets: Drawings indicate general arrangement of ducts,fittings,and accessories. Make final locations where indicated, as much as practical. For units installed in lay-in ceiling panels, locate units in the center of panel. Where architectural features or other items conflict with installation, notify Architect for a determination of final location. I r I 1 1 I 1 TEMPLATE 233713 - 1 2/28/19 t I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 233713 - DIFFUSERS, REGISTERS AND LOUVERS B. Install diffusers, registers, and grilles with airtight connections to ducts and to allow service and I maintenance of dampers and air extractors. END OF SECTION 1 I 1 I I I I I 1 I 1 1 1 1 TEMPLATE 233713 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 237433— ROOFTOP PACKAGED UNIT HVAC r PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data: I1. For each type of product indicated. 1.2 WARRANTY A. Warranty on Compressor and Heat Exchanger: Ii. Provide written warranty, signed by manufacturer, agreeing to replace/repair, within warranty period, compressors and heat exchangers with inadequate and defective materials and workmanship, including leakage, breakage, improper assembly, or failure to perform as required; provided manufacturer's instructions for handling, installing, protecting, and maintaining units have been adhered to during warranty period. Replacement is limited to component replacement only, and does not include labor for removal and reinstallation. B. Warranty Period: 10 years from date of owner acceptance. PART 2 - PRODUCTS 2.1 ROOFTOP CONSTANT VOLUME PACKAGED UNIT HVAC A. General: Rooftop unit shall be factory-assembled and tested, designed for roof or slab installation and, consisting of compressors, condensers, evaporator coils, condenser and evaporator fans, refrigeration and temperature controls, filters, and dampers. Capacities and electrical characteristics are scheduled. Casing manufacturer's standard casing construction, having corrosion protection coating, and exterior finish. Casings shall have removable panels or access doors for inspection and access to internal parts, a minimum of 1" thick thermal insulation, knockouts for electrical and piping connections, and an exterior condensate drain connection, and lifting lugs. 1. Unit casing shall have double wall construction with foam injected panels. 2. Roof Curbs: Manufacturer's standard construction, insulated and having corrosive protective coating, complete with factory-installed wood nailer and drain nipple. Construction shall be in accordance with NRCA Standards. 3. Evaporator Fans: Forward-curved, centrifugal, belt-driven fans with adjustable sheaves; and permanently lubricated motor bearings. 4. Condenser fans: Propeller-type, direct-driven fans with permanently lubricated bearings. 5. Coils: Aluminum plate fin and seamless copper tube type. Fins shall have collars drawn, belled and firmly bonded to the tubes by means of mechanical expansion of the tubes. No soldering or tinning shall be used in the bonding process. Coils shall have a galvanized steel casing. Coils shall be mounted in the coil casing with same end connections accessible for service. Coils shall be removable from the unit through the roof or through the piping enclosure. Coil section shall be completely insulated. 6. Phenolic Coating (Recommended for locations within 10 miles from coastline) — Finned tube coils shall be protected with a pure phenolic thermosetting resinous coating. The coating shall withstand dry heat up to 205 degrees Celsius (400 degress Fahrenheit), and show no sign of attack after 3,000 hours of salt spray test to A.S.T.M. Specification 8117. 7. Refrigerant cooling coils: have an equalizing type vertical distributor to ensure each coil circuit receives the same amount of refrigerant. Coils shall be proof (450 psig) and leak (300 psig) tested with air pressure under water, then cleaned, dehydrated, and sealed with a holding charge of nitrogen. I TEMPLATE 237433 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 237433— ROOFTOP PACKAGED UNIT HVAC 8. Condensate Pan: Provide IAQ stainless steel, double sloping drain pain. Provide high condensate in primary condensate pan to de-energize unit upon detection of high condensate levels. 9. Compressors: Serviceable, semi-hermetic, or hermetic compressors with integral vibration isolators, and crankcase heaters, which de-energize during compressor operation. Units shall also have: 11110. Hot gas reheat coil: Coil shall have copper tubes with maximum 12 corrugated aluminum fins per inch. The multiple coil circuits shall be interlaced. Coil shall have 18 gauge galvanized casing and end plates. Coil shall be factory leak tested at pressures not less than 400 psig in a water bath. Coil shall be UL listed. 11. Thermal expansion valves, filter dryers, sight glasses, compressor isolation service valves, liquid line service valves; minimum of 2 refrigerant circuits for units having 2 or more compressors; suction line accumulators and fan-cycling control for low ambient control to 0 deg F (-18 deg C). 12. Lead compressor shall be 2-stage. 13. Safety Controls: low pressure cutout, manual reset; high pressure cutout, manual reset; compressor motor overload protection, manual reset; anti-recycling timing device; adjustable low-ambient lockout; oil pressure switch. 14. Features: redundant gas valves; electronic spark ignition system; high limit cutout; forced draft proving switch; flame roll-out switch. 15. Economizer: Enthalpy Controlled Economizer: Provide return and outside air dampers, outside air filter, fully modulating electric control system with dry control, and adjustable mixed-air thermostat. System shall be capable of driving 100% closed for unoccupied mode, minimum outside air position and modulation to 100 percent open outside air capability. Provide automatic changeover through adjustable control device. 16. Economizer Fault Detection and Diagnostics — Provide fault detection and diagnostics to monitor outside airflow temperature, return airflow temperature, supply airflow temperature, refrigerant gas and liquid pressures. Unit controller shall provide status of available free cooling, enabled economizer, enabled compressor(s), enabled heating, mixed air low limit cycle and current value of all sensors. Provide manual override of each operating mode (occupied and unoccupied heating and cooling, economizer and shutdown) for testing and verification. System shall be able to detect air temperature sensor failure, not economizing when unit should be or shouldn't be, dampers not modulating and excessive outside air. Temperature sensors shall have an accuracy of+/- 2 deg. F across the range of 40. deg F to 80 deg. F. Refrigerant pressure sensors shall have an accuracy of+/-3%. Faults shall be annunciated at unit's thermostat. 17. Heating Types: a. Heat exchangers: Provide manufacturer's construction of aluminized steel gas- fired heat exchangers and burners, designed for minimum of 2-stage operation. Provide single gas connection. 18. Temperature Controls: Provide controls interface with EMS. 19. Relief: a. [Barometric Relief - Shall include relief damper section with mist eliminator. Dampers open to relieve positive pressure within the building. Available only with economizer.] b. [Power Exhaust Fan — Shall be factory installed for units larger than 5 tons. Shall include relief damper section with mist eliminator. Dampers open to relieve positive pressure within the building. Available only with economizer.] 20. Filters: 21. Provide air filters to fit in filter box, with a Maximum filter face velocity of 500 fpm, of the following type: 22. Disposable Type: 30% efficient disposable pleated filters (ASHRAE Standard 52.1) TEMPLATE 237433 -2 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 237433— ROOFTOP PACKAGED UNIT HVAC or MERV 8 filters (ASHRAE 52.2), consisting of viscous coated fibers with filtering media encased in fiberboard cell sides having perforated metal grids on each side to provide ' media support. 23. Provide filters with clean resistance not exceeding 0.10" w.g. at face velocity of 300 fpm, and ASHRAE weight arrestance efficiency of 70-82%, based on final operating resistance I of0.5"w.g. Options: 24. Low Ambient Control - Shall allow compressor operation for cooling down to 0 F outside air temperature. 25. Hail Guards: Provide hail guards around the condenser coil to protect the condenser fins against hail. 26. National Account Information: Owner has engaged Trane and Carrier national account agreements. GC shall purchase, receive and install equipment. Purchasing will be through the national account agreement only. Coordinate with owner construction manager for additional information. Manufacturer: Subject to compliance with requirements, provide rooftop units of one of the following: Carrier Air Conditioning; Div. ' of Carrier Corp., Trane Co., PART 3 - EXECUTION ' 3.1 EXAMINATION A. Examine areas and conditions under which rooftop units are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer. 3.2 INSTALLATION A. General: Install rooftop units in accordance with manufacturer's installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer's recommended clearances. B. The rooftop unit(s) shall be installed a minimum of 10'-0" from any roof edge regardless of location indicated on plans, unless a screen wall or railing is installed per the local building ' code. See the architectural plans for coordination. C. Support: Install and secure roof curb to roof structure, in accordance with National Roofing Contractor's Association (NRCA) installation recommendations and shop drawings. Install and ' secure rooftop units on curbs and coordinate roof penetrations and flashing. D. Condensate Piping: Provide Type L copper condensate piping with trap. E. Electrical Connections: Refer to Electrical Specifications- Electrical Connections for Equipment I for final connections to equipment and installation of loose shipped electrical components. 3.3 DEMONSTRATION ' A. Start-Up Services: 1. Provide the services of a factory-authorized service representative to start-up rooftop units, in accordance with manufacturer's written start-up instructions. Test controls and demonstrate compliance with requirements. Replace damaged or malfunctioning I controls and equipment. . ING OF OWNER'S PERSONNEL ' A. Provide services of manufacturer's service representative to instruct Owner's personnel in operation and maintenance of rooftop units. Training shall include start-up and shut-down, servicing and preventative maintenance schedule and procedures, and troubleshooting procedures plus procedures for obtaining repair parts and technical assistance. Review I TEMPLATE 237433 -3 2/28/19 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 237433— ROOFTOP PACKAGED UNIT HVAC operating and maintenance data contained in the Operating and Maintenance Manuals ' specified in Division One. B. Schedule training with Owner, provide at least 7-day prior notice to the Architect/Engineer. ' END OF SECTION 1 I I r 1 I I 1 1 I 1 I 1 TEMPLATE 237433 -4 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260501 -COMMON WORK RESULTS FOR ELECTRIC I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Closeout 1. Operation and Maintenance Manual: For equipment and systems to include in operation and maintenance manuals. B. Shop Drawings Ii.1.2 As-Built Drawings: For recording installed conditions that deviate from design documents. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to all sections. B. Obtain the latest Design and Construction Standards document(s) from the Owner. Comply with all Owner-specific requirements in addition to requirements set forth in these specifications and accompanying drawings. Should there be a conflict, the Owner's standards shall take precedence, unless prevailing codes and regulations mandate otherwise. 1.3 GENERAL DIRECTION A. Submittal of a bid indicates that the contractor has examined the drawings, specifications, and had an opportunity to visit the site to be able to provide a comprehensive complete bid. B. The intent of these specifications and the accompanying drawings is to provide complete and workable systems as shown, specified and required by applicable codes. Interpret these specifications in conjunction with the drawings and provide all work described. If work is shown on drawings and not mentioned in the specifications, or vice versa, it is to be included in the work the same as though clearly set forth by both. Should there be a conflict between the specifications and drawings, provide the greater quantity or better quality. Immediately notify owner's representative and design professional of such conflicts. C. Provide all labor and material, tools and equipment necessary to render all systems complete ' and operational, and ready for turnover to Owner. Work defined within this section applies for all Division 26 work, including work of Division 26 that is provided in support of work of other divisions. Unless specifically indicated otherwise in documents of other construction divisions, products to be installed shall also be furnished under Division 26. D. During mobilization or construction, if an abnormal condition is uncovered either with existing conditions, equipment loads, submittal data, etc. bring these to the attention of the Design Professional for review. E. Phasing -Where the scope of work dictates that the project shall be constructed in phases, all costs shall be incurred by this contractor for any temporary work required so that previous I 1.4 phases can be operational while construction is being done to adjacent spaces. GENERAL STANDARDS A. Provide work in compliance with applicable provisions of the following standards. Provide listing and labeling for all electrical materials, marked for respective intended uses, from UL or other Nationally Recognized Testing Laboratory (NRTL) that is acceptable to applicable Authorities Having Jurisdiction (AHJs). B. Provide materials, installation methods, workmanship, testing, etc., in strict accordance with the latest adopted edition of applicable national standards and local adopted codes. I TEMPLATE 2605011 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260501 -COMMON WORK RESULTS FOR ELECTRIC 1.5 PERMITS AND REGULATIONS A. Obtain and pay for permits, fees, certificates of inspection and approval, etc. required for this branch of the work. Furnish Owner with certificates of final inspection and approval prior to final acceptance of this branch of the work. B. Laws and regulations which bear upon or affect the various branches of this work shall be complied with by this contractor and are hereby made a part of this contract. 1.6 DEFINITIONS A. Furnish - Procure, supply and deliver to project site, ready for installation, install and warrant (unless indicated otherwise on documents). Include warranty expenses. B. Install - Assemble, wire and connect loose-shipped components on site. Place in position for service or use, including material, labor, accessories, services, and testing. Wire, connect, and render fully operational for intended use. C. Provide - Furnish and Install. Similar Terms: "include", "shall", "equip with", "consisting of" PART 2 - PRODUCTS I 2.1 MATERIALS AND EQUIPMENT A. Should deviation from basis of design equipment impact other contractors scope of work it shall be the responsibility of this contractor to coordinate with and cover these costs in addition to their own. PART 3 -EXECUTION I 3.1 GENERAL DIRECTION A. Unless specifically indicated, provide all specified and drawn work as required to render all equipment and systems fully operational, including all ancillary, accessory, and support work. 3.2 UTILITY VERIFICATION REQUIREMENTS A. Field verify locations of underground and aboveground utilities, or those otherwise obscured from view, in the vicinity of work prior to commencing work. Utilize "811" call before you dig and hire locating service to identify, locate and mark remaining utilities and private lines. Obtain on- site approval from local utility prior to connecting services. Failure to perform the above shall result in contractor proceeding at their risk and accepting full responsibility for incorrect connections. 3.3 INTERRUPTION OF SERVICES A. Interruption of Existing Electric Service: Do not interrupt electric service to facilities occupied by Owner or others without notification to Owner's Representative and written permission. Arrange for and provide temporary electric service meeting requirements of owner. Notify Owner's Representative no fewer than fourteen days in advance of proposed interruption of electric service. 3.4 TEMPORARY SERVICE A. Where required, provide temporary electrical service. Make necessary arrangements with local utility companies for temporary electrical service and pay associated fees for inspections, connections, initiation, etc. END OF SECTION TEMPLATE 2605011 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260502 -COMMON ELECTRIC MATERIALS AND METHODS I PART 1 -GENERAL 1.1 GENERAL A. Mounting Heights: Outlet mounting heights as indicated on the plans are approximate. Determine ' the exact mounting heights(and locations)of outlets in the field with relation to architectural detail and equipment being served. Coordinate outlet location with equipment, with furniture plans and with architectural elevation plans. Where mounting heights are not detailed or dimensioned, contact the Owner's Representative for direction. Prior to rough-in, coordinate final mounting heights of system outlet boxes in field with Owner's Representative. Install boxes at heights as follows, to center of box, unless directed otherwise in field or otherwise noted on E-series drawings or architectural plans. In cases where using center of box for measurement would result ' in a switch-height device having an operable component higher than 48 inches above finished floor, install boxes lower as needed so that uppermost part of operable component is no higher than 48 inches. Height of boxes dimensioned from ceiling apply to rooms having ceilings 9' or less; in rooms having higher ceilings, locate these as directed in the field. Switches—Counters: 44" (field verify& match recept. heights) Switches— Elsewhere: 46" Occupancy Sensors, Wallbox: 46" Occupancy Sensors, Elsewhere: As recommended by manufacturer Receptacles—Counters: 44" (field verify) Receptacles— Elsewhere: 18" Starters: 46" Disconnects: 46" Circuit Breaker Panelboards: 72" to top unless code dictates otherwise Wall Mounted Luminaires: As noted on plans or directed by Design Prof. Control Stations: 46" Communication Outlets: 18" Fire Alarm Manual Pull Stations: 46"to top of operating handle Fire Alarm NV Annunciators: 80"to bottom of outlet box Fire Alarm Door Holders: 84" Other Outlets/Fixtures/Equipment: As directed by Design Professional B. Lock-Out Tag-Out Devices: Provide permanently installed lock-out tag-out devices compliant with NFPA 70 and OSHA, with padlocking provisions, at source overcurrent devices for the following applications. 1. Where the normal NFPA 70-compliant location of the disconnecting means is impracticable or introduces additional or increased hazards to persons or property. ' 2. Where required by NFPA 70. 3. Where required by OSHA. 4. Where required by any other authority having jurisdiction. C. Electrical Installations: 1. Install conduit, wiring, outlet box and junction box type work in finished areas concealed. Such work installed in unfinished areas may be exposed only at the discretion of the Owner's Representative. 2. All new electrically related work shall be supported directly from building structural members. New electrically related work shall not be supported from ductwork, ductwork hangers, ceiling supports, existing conduit supports, etc. All conduits (and cable assemblies, where applicable) shall be routed parallel to building structural members. Noncompliant work installed by the electrical contractor shall be removed and reinstalled to the satisfaction of the Owner's Representative and the Design Professionals, at the expense of the electrical contractor. I TEMPLATE 2605022 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260502 -COMMON ELECTRIC MATERIALS AND METHODS 3. Provide systems, materials, and equipment to conform with approved submittal data, including coordination drawings,to greatest extent possible. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and architectural/structural components. Provide factory-furnished filler plates in unused spaces of manufactured equipment. 4. Install electrical equipment to facilitate servicing, maintenance, and repair and replacement of equipment components. Install equipment for ease of disconnecting, with minimum of interference with other installations. Install systems, materials, and equipment giving right- of-way priority to systems required to be installed at a specified slope. Protect the structure, furnishings, finishes, and adjacent materials. 5. Verify dimensions by field measurements. Take measurements and be responsible for exact size and locations of openings required for the installation of work. Where detailed method of installation is not indicated or where variations exist between described work and approved practice, follow direction of the Owner's Representative. 6. Do not install device wall outlets directly back to back, where located on opposite sides of common walls. Offset outlets by at least two feet for applications in fire rated walls and smoke rated walls and applications in acoustically treated walls. Offset outlets by at least one foot for other applications. 7. Provide wires continuous from outlet to outlet and properly splice joints. Provide insulation value for joints 100% greater than that of the wire. Mechanical wire splicers may be used. Where friction and rubber tape is used, provide tape conforming to Federal Specifications HH-T-11 and HH-T-111. Where plastic electrical tape is used, provide Scotch #33, or approved equal. Provide minimum 8" tail for conductors terminating at each wired outlet at their outlet fittings to facilitate installment of devices, luminaires, etc. 8. Use of synthetic or plastic "tie-wraps", "zip ties", "wire ties" and similar products are not permitted as a permanent means of anchoring, securing, supporting or otherwise installing any cables, conductors, conduits, raceways, devices, equipment or other electrical work. 9. If during construction it becomes apparent that some specific minor changes in layout will result in a neater job or better arrangement, make such alterations without additional compensation and without having to offer credit. Obtain Design Professional's review before making such changes. Provide workmanship throughout that conforms to the standards of best practice. Marks, dents and finish scratches are prohibited on exposed materials, luminaires, fittings, etc. Clean inside of panels and equipment boxes. D. Connectors and Connections: 1. Provide complete assembly of materials for each type of required electrical connection, including but not limited to, pressure connectors,terminals(lugs), electrical insulating tape, heat-shrinkable insulating tubing, solderless wire-nuts, and other items and accessories as needed to complete splices and terminations of types indicated. 2. Unless otherwise indicated, provide wires/cables (conductors) for electrical connections that match, including sizes and ratings, of wires/cables that are supplying electrical power. Provide electrical connectors and terminals that mate and match, including sizes and ratings, with equipment terminals, and that are recommended by equipment manufacturer for intended applications. Provide connectors that are specifically UL listed and labeled for the exact splicing/termination application, including for instances where solid conductors are spliced/connected to stranded conductors. Provide electrical insulating tape, heat- shrinkable insulating tubing and boots, wirenuts, cable ties, etc. as recommended for use by accessories manufacturers for intended applications. 3. Connect electrical power supply conductors to equipment conductors in accordance with equipment manufacturer's written instructions and wiring diagrams. Mate and match conductors of electrical connections for proper interface between electrical power supplies and installed equipment. Cover splices with electrical insulating material to achieve insulation at least 100 percent in excess of electrical insulation rating of those conductors I TEMPLATE 2605022 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260502 -COMMON ELECTRIC MATERIALS AND METHODS beingspliced. Prepare cables and wires, bycuttingand strippingcovering armor, jacket, and insulation properly to ensure uniform and neat appearance where cables and wires are terminated. Exercise care to avoid cutting through tapes which will remain on conductors. Do not"ring"copper conductors while skinning wire. 4. Ground metal frames of portable and stationary direct-wired electrically operated equipment by connecting frames to the circuit equipment grounding conductor and to grounded metal raceway. Provide necessary electrical connections between the specified equipment and junction boxes, disconnect switches, and starters near equipment with flexible metallic conduit and matched connectors. Do not expose flexible conduit in finished I 5. areas. Wire and connect electrical equipment furnished under this branch of work, other branches of work and by the Owner. Review documents of other trades to identify electrically operated/controlled equipment that is furnished or installed by the Owner, or by other trades. Provide power connections and local disconnects for same. Provide control wiring (including relays, starters, etc.), as required to render equipment fully operable unless indicated otherwise on drawings or in project manual. Determine exact requirements in field from respective equipment installer. END OF SECTION 1 I I I 1 1 M 1 I TEMPLATE 2605022 -3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260503 -SUBMITTALS FOR ELECTRICAL SYSTEMS I PART 1 -GENERAL 1.1 GENERAL I A. Where submittals are required by the Contract Documents, they shall be prepared and supplied in accordance with the Contract Documents. In addition to Division 01, the Contractor is advised to review and comply with the requirements articulated within each Division and within each section of that Division. B. The contractor is not relieved of responsibility for providing specified or drawn scope of work should any errors or omissions in submittal information not be noted by the Design Professional during submittal reviews or site observations. C. Some Divisions may include a division-specific"Submittal Requirements for ...." section. Where this section exists, it articulates additional requirements for submittals that apply to the work of that Division. D. The submittal requirements help to identify, track and keep the project organized for all parties involved. They are necessary to ensure a timely turnaround and an appropriate technical review. Submittals that do not conform to the administrative requirements are rejected and returned, without technical review. PART 2 - PRODUCTS (NOT USED) I PART 3 - EXECUTION 3.1 GENERAL DIRECTION I A. Reference Specification Section 01 33 00.00 for a full list of submittal procedures and required formats. 3.2 USE OF ELECTRONIC DRAWINGS FROM THE OWNER'S DESIGN TEAM A. Plan drawings for the Project were created with Revit. B. If expressly permitted by the Owner and the terms of the Contract, editable electronic versions of standard-scale, AutoCAD-based plan drawings may be made available for the creation of shop and as-built drawings. C. Upon request, when available, electronic versions of standard-scale, Navisworks (.dwf) and (.nwc)or AutoCAD 360 (.dwg)files may be made available for coordination purposes. D. Due to the proprietary nature of internal design systems, editable native-software versions of some drawings, including but not limited to system diagrams and details, will not be made available in an editable form. In these cases, electronic versions of the drawings may be made available only in PDF, JPG, or similar non-editable electronic form, at the sole discretion of the Design Professional. ' END OF SECTION 1 I SUBMITTALS FOR ELECTRICAL SYSTEMS 260503 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES I PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data 1. For each type of conductor and cable. PART 2 - PRODUCTS • 2.1 CONDUCTORS AND CABLES A. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with requirements, provide product by one of the manufacturers listed below, or by an NRTL listed equivalent manufacturer. 1. Alcan Products Corporation; Alcan Cable Division. 2. Alpha Wire. 3. Belden Inc. 4. Encore Wire Corporation. 5. General Cable Technologies Corporation. 6. Southwire Incorporated. 7. American Insulated Wire Corp 8. Republic Wire B. Conductor Insulation and Multiconductor Cables: Comply with NEMA WC 70/ICEA S-95-658. Refer to Part 3 of this section for allowable types specific to this project. C. MC Cable (Metal-Clad): 1. Provide Type MC Cables that are minimum 90 degrees C rated, with components and fittings listed for grounding, compliant with NEC Articles 250 and 330. 2. Provide cable formed from continuous length of spirally wound, interlocked zinc coated or galvanized (inside and outside) strip steel or aluminum jacket. Provide cables with full parity insulated equipment ground conductor. 3. Provide compatible steel fittings with integral red plastic insulated throat bushings, compliant with NEC 330. 2.2 CONNECTORS AND SPLICES A. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with requirements, provide products by one of the manufacturers listed below, or by an NRTL listed equivalent manufacturer. 1. AFC Cable Systems, Inc. 2. Gardner Bender. 3. Hubbell Power Systems, Inc. 4. Ideal Industries, Inc. 5. Ilsco; a branch of Bardes Corporation. 6. NSi Industries LLC. 7. O-Z/Gedney; a brand of the EGS Electrical Group. 8. 3M; Electrical Markets Division. 9. Tyco Electronics. 10. Square D, a Schnieder Electric Company 11. Thomas & Betts 12. Arrow-Hart Div, Crouse-Hinds Co B. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated. Use connectors with temperature ratings equal to or greater than those of the wires upon which used. LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 3 - EXECUTION II 3.1 APPLICATIONS AND INSTALLATION A. Feeders: Stranded copper conductors. B. Branch Circuits: Stranded copper conductors. C. Provide conductor insulation rated at 600VAC and 90 degrees C. Provide wire, cable and I connectors suitable for the temperature, conditions and location where installed. Provide THHN/THWN-2 insulation for conductors for wiring indoors, above grade, and in dry locations. Provide XHHW-2 insulation for wiring below grade and for wiring subject to moisture conditions. D. Grounded ("Neutral") Conductors: Provide dedicated parity sized grounded ("neutral") conductor for each branch circuit phase conductor. Provide grounded ("neutral") conductor in all lighting control device(switch, dimmer, occupancy sensor, etc.)wall outlet boxes, even if not immediately used. Provide grounded ("neutral") conductor for all multi-pole feeders. Provide grounded ("neutral") conductor(s) for all multi-pole feeders and branch circuits unless this contractor determines in field that the affected load(s) will never have need for a grounded ("neutral") conductor and NEC does not mandate otherwise. E. Complete raceway installation between conductor and cable termination points prior to pulling conductors and cables. Use manufacturer UL approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway. F. Install wire in raceway unless specifically permitted otherwise in this specification section, under other Division 26 sections, or on electrical drawings. Identify each spare conductor at each end with identity number and location of other end of conductor, and identify as spare conductor. Conceal cables in finished walls, ceilings, and floors unless otherwise indicated. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible. G. Do not pull wire until raceways are complete, plastering is complete, and raceways are free of moisture. Install joints and splices only at NEC approved panels, accessible junction boxes, or accessible outlet boxes. Pull conductors simultaneously where more than one is being installed in same raceway. Use UL listed pulling compound or lubricant, where necessary to prevent damage to conductors. Use pulling means, including fish tape, cable, rope, and basket weave wire/cable grips that will not damage cables and raceways. Do not use rope hitches for pulling attachment to wire or cable. Conceal work in finished spaces. H. Support cables according to Section 260529"Hangers and Supports for Electrical Systems." Use of synthetic or plastic "tie-wraps", "zip ties", "wire ties" and similar products are not permitted as a permanent means of anchoring, securing, supporting or otherwise installing any cables, conductors, conduits, raceways, devices, equipment or other electrical work. Neatly dress work. Install work parallel and perpendicular to surfaces and exposed structural members, and follow surface contours where possible. Keep conductor splices to minimum. Install splice and tap connectors that possess equivalent, or better, mechanical strength and insulation rating than conductors being spliced. Use splice and tap connectors that are compatible with conductor material. Install wires continuous from outlet to outlet. Provide insulation value of joints at least 100 percent more than that of the wire insulation. Provide adequate length of conductors within electrical enclosures,and train the conductors to terminal points with no excess. Bundle multiple conductors, with conductors larger than #10 AWG cabled in individual circuits. Make terminations so there is no bare conductor at the terminal. LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 2 2/28/19 I I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES IJ. De-rate cables per NFPA 70 where bundled, where passing through insulation, and where otherwise required to be compliant with NFPA 70 based on field conditions and/or means and I methods that will be used. De-rate conductors per NFPA 70 where required based on quantities of conductors within raceways, and where otherwise required to be compliant with NFPA 70 based on field conditions and/or means and methods that will be used. I K. Type MC cable may be utilized only if NEC approved and if approved by local authority having jurisdiction and if included in the limited applications defined below. 1. Provide for final connections to luminaires that are installed in accessible tile ceiling systems (limited to "whips" from building electrical system junction boxes down to luminaires). Do not install Type MC cable from fixture to fixture unless a special properly listed and labeled UL approved system is specifically indicated. 2. Type MC cable may be utilized for new concealed 15 through 60 ampere branchnch circuit I work 3. Provide only where concealed (install wiring for exposed applications in raceway). 4. Route cables perpendicular and parallel to the building architectural lines, surfaces, and structural members, keeping offsets to a minimum and following surface contours where I possible. Maintain a uniform elevation for cable runs wherever possible. Support and anchor cables at maximum 4-foot intervals and within 12" of box or outlet in a manner that prevents sagging. Install cables in a manner that prevents overheating. Fasten cables I directly to the structure using factory clamps and clips specifically designed for the respective cable (Caddy or equal). 3.2 CONNECTIONS I A. Tighten electrical connectors and terminals according to manufacturer's published torque- tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A-486B. Make splices, terminations, and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than Iun-spliced conductors. Install conductor at each outlet with at least 8 inches of slack. B. Provide complete assembly of materials for each type of required electrical connection, including but not limited to, pressure connectors, terminal (lugs), electrical insulating tape, heat shrinkable I insulating tubing, cable ties, solderless wire-nuts, and other items and accessories as needed to complete splices and terminations of types indicated. C. Unless otherwise indicated, provide wires/cables (conductors) for electrical connections that I match, including sizes and ratings, of wires/cables that are supplying electrical power. Provide copper conductors with conductivity of not less than 98% at 90 degrees. Provide factory splice kits (U.L. approved for submersion in water and direct burial) for wire splicing in outdoor grade, I or slab on grade,junction boxes and for all other wet locations. D. Provide electrical connectors and terminals that mate and match, including sizes and ratings,with equipment terminals, and that are recommended by equipment manufacturer for intended applications. Connect wires #6 AWG and larger to panels and apparatus by means of approved lugs or connectors large enough to enclose all strands of the conductors. Provide solderless type connectors E. Connect electrical power supply conductors to equipment conductors in accordance with I equipment manufacturer's written instructions and wiring diagrams. Mate and match conductors of electrical connections for proper interface between electrical power supplies and installed equipment. Cover splices with electrical insulating material to achieve insulation at least 100 I percent in excess of electrical insulation rating of those conductors being spliced. Prepare cables and wires, by cutting and stripping covering armor, jacket, and insulation properly to ensure uniform and neat appearance where cables and wires are terminated. Exercise care to avoid III LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 111 cutting through tapes which will remain on conductors. Do not "ring" copper conductors while skinning wire. F. There may be cases where circuit or feeder conductor sizes are too large or too small to fit into I the lugs normally supplied with the power distribution equipment or end-use equipment, due to circumstances such as increasing conductor sizes to offset voltage drop, unusual breaker frame sizes, type of conductors used, etc. In such cases provide appropriate factory lug kits for affected equipment if recommended by manufacturer; elsewhere provide insulated butt-splices with tails sized to fit respective lugs. G. Ground metal frames of portable and stationary direct-wired electrically operated equipment by connecting frames to the circuit equipment grounding conductor and to grounded metal raceway. Provide necessary electrical connections between the specified equipment and junction boxes, disconnect switches, and starters near equipment with flexible metallic conduit and matched connectors. Do not expose flexible conduit in finished areas. I 3.3 CONDUCTOR SIZING A. Conductor sizes indicated in Division 26 documents are based on copper unless specifically indicated otherwise on single-line diagram on drawings. B. Unless specifically indicated otherwise on drawings, provide grounded ("neutral")conductors that are at least parity-sized with corresponding phase/line conductors for all applications. END OF SECTION I I I I I I 1 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 4 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260526 -GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS I PART 1 -GENERAL 1.1 QUALITY ASSURANCE A. Provide Electrical Components, Devices, and Accessories listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. Comply with UL 467 for grounding and bonding materials and equipment. Comply with ANSI/TIA/EIA-607, "Commercial Building Grounding and Bonding Requirements for Telecommunications. Comply with NFPA 70. PART 2 - PRODUCTS 2.1 MATERIALS A. General: Except as otherwise indicated, provide copper electrical grounding and bonding systems and materials with assembly of materials including but not limited to cables/wires, connectors, solderless lug terminals, grounding electrodes and plate electrodes, bonding jumper braid, and additional accessories needed for a complete installation. Where materials or components are not indicated, provide products that comply with NEC, UL, and IEEE requirements, and with established industry standards for those applications indicated. Utilize compatible metallic materials throughout system to eliminate galvanic action. B. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with requirements, provide conductors and connectors as specified in Section 260519. Subject to being equivalent and subject to compliance with requirements, provide other grounding related materials by Erico (as a standard of quality), or other equivalent available manufacturers where not otherwise specified in Division 26. 2.2 CONDUCTORS AND CONNECTORS AND ELECTRODES A. For insulated conductors, provide copper or tinned-copper wire or cable insulated (green- colored) conductors, insulated for 600 V unless otherwise required by applicable Code or authorities having jurisdiction. For bare copper conductors, provide: Solid Conductors, ASTM B 3; Stranded Conductors, ASTM B 8; Tinned Conductors, ASTM B 33. B. Provide connectors listed and labeled by an NRTL acceptable to authorities having jurisdiction for applications in which used and for specific types, sizes, and combinations of conductors and other items connected. Provide copper or copper alloy bolted connectors for conductors and pipes, pressure type with at least two bolts. Provide clamp type pipe connectors, sized for pipe. Use exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions. C. Provide copper-clad steel (copper molecularly bonded to nickel-sealed high-strength steel core) ground rods, 3/4 inch in diameter by 10 feet in length (sectional rods may be used when rods are longer than 10 feet). Provide sheet copper plate electrodes that are 20-gage by 36" by 36", made from high-conductivity sheet, with cable attachments (minimum quantity of 2), sized for cables as necessary to fulfill project grounding requirements, where ground rods cannot or should not be used. PART 3 - EXECUTION 3.1 APPLICATIONS A. Provide green-colored insulation, unless indicated otherwise. Provide solid conductors for No. 8 AWG and smaller, and stranded conductors for No. 6 AWG and larger unless otherwise indicated. Provide bare copper conductors below grade, No. 2/0 AWG minimum. Provide tinned TEMPLATE 260526 - 1 2/28/19 r I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260526 -GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS conductors in corrosive areas.Where to be installed underground, bury at least 36 inches below grade. 3.2 EQUIPMENT GROUNDING A. Install insulated equipment grounding conductors as required by NFPA 70 and as otherwise required. Install insulated equipment grounding conductors with the following items, in addition to those required by NFPA 70: all feeders; all branch circuits; expansion couplings; flexible raceway runs. B. Air-Duct Equipment Circuits: Install insulated equipment grounding conductor to duct-mounted electrical devices operating at 120 V and more, including air cleaners, heaters, dampers, humidifiers, and other duct electrical equipment. Bond conductor to each unit and to air duct and connected metallic piping. C. Water Heaters: Install a separate insulated equipment grounding conductor to each water I heater. Bond conductor to heater units, piping, connected equipment, and components. D. Heat-Tracing Cables: Install a separate insulated equipment grounding conductor for bonding to each heat-tracing cable. I E. Signal and Communication Equipment: In addition to grounding and bonding required by NFPA 70, provide a separate grounding system complying with requirements in TIA/ATIS J-STD-607- A. For telephone, alarm, voice and data, and other communication equipment, provide No. 4 AWG minimum insulated grounding conductor in raceway from grounding electrode system to each service location, terminal cabinet, wiring closet, and central equipment location. Terminate grounding conductors on grounding busses or cabinet grounding terminals as applicable. F. Lighting Poles and Standards Supporting Outdoor Lighting Fixtures: Provide grounding electrode and a separate insulated equipment grounding conductor in addition to grounding conductor installed with branch-circuit conductors. 3.3 INSTALLATION A. Grounding Conductors: Route along shortest and straightest paths possible unless otherwise indicated or required by Code. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage. B. Bonding Straps and Jumpers: Install in locations accessible for inspection and maintenance except where routed through short lengths of conduit. Bond straps directly to basic structure, taking care not to penetrate any adjacent parts. Install bonding so vibration is not transmitted to rigidly mounted equipment. Use exothermic-welded connectors for outdoor locations; if a disconnect-type connection is required, use a bolted clamp. C. Ground Rods: Drive rods until tops are at least 2 inches (50 mm) below finished floor or final I grade unless otherwise indicated. Interconnect ground rods with grounding electrode conductor below grade and as otherwise indicated. Make connections without exposing steel or damaging coating if any. For grounding electrode system, install at least three rods spaced at least one- rod length from each other and located at least the same distance from other grounding electrodes, and connect to the service grounding electrode conductor. Use driving sleeves or couplings when driving ground rods into the earth. D. Conductor Terminations and Connections: 1. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors. 2. Underground Connections: Welded connectors except if otherwise indicated. 3. Connections to Structural Steel: Welded connectors. I E. Grounding and Bonding for Piping: TEMPLATE 260526 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260526 -GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 1. Metal Water Service Pipe: Install insulated copper grounding conductors, in conduit, from building's main service equipment, or grounding bus, to main metal water service entrances to building. Connect grounding conductors to main metal water service pipes; use a bolted clamp connector or bolt a lug-type connector to a pipe flange using one of the lug bolts of the flange. Where a dielectric main water fitting is installed, connect grounding conductor on street side of fitting. Bond metal grounding conductor conduit or sleeve to conductor at each end. 2. Water Meter Piping: Use braided-type bonding jumpers to electrically bypass water meters. Connect to pipe with a bolted connector. 3. Gas Piping: Bond each above ground portion of gas piping system downstream from equipment shutoff valve. F. Bonding Interior Metal Ducts: Bond metal air ducts to equipment grounding conductors of associated fans, blowers, electric heaters, and air cleaners. Install bonding jumper to bond across flexible duct connections to achieve continuity. G. Service Entrance Grounding Requirements 1. Provide a parity sized insulated grounded conductor (neutral) for each set of service entrance feeder phase/line conductors, terminated and bonded to service equipment (i.e. to each and every service disconnect where applicable). This applies whether or not downstream loads require a neutral conductor. Install these neutral conductors unspliced I 2. and unbroken. Ground and bond service entrance neutrals to room ground busbar, to effectively grounded structural steel member, to effectively grounded metallic water pipe, and to I 3. grounding electrode system as required per NFPA 70 and as applicable. Provide an enclosed single ground busbar at electrical service entrance locations, bonded to the enclosure, and bonded to service ground with full parity sized green insulated ground conductor (sized same as service ground conductor). Provide quantity and sizes of lugs on busbars as required to accommodate bonding to service grounding electrode system, service neutrals, structural steel, effectively grounded metallic water pipe, and other grounding requirements set forth in project manual and in NFPA 70. Provide UL listed lugs for use with copper and aluminum conductors. 4. Connect grounding electrode conductors to 1-inch diameter, or greater, metallic Cold- water pipe at service entrance using a suitably sized ground clamp. Provide connections to flanged piping at street side of flange. Ground electrical service system neutral at service entrance equipment to grounding electrodes. Install braided type bonding jumpers with code-sized ground clamps on water meter piping to electrically bypass water meters and water service entrance valves. 5. Contact AHJ electrical inspector in advance of installing service grounding work. Determine locally approved methods that must be used for re-bar grounding that the AHJ considers compliant with NFPA 70 Article 250.52. H. Telecommunications Grounding Requirements 1. At minimum, bond together telecommunications racks, cabinets, tray, ladder rack, and risers at telecommunications equipment to the ground busbar in the nearest electric panel. Bond additional points where indicated in the drawings and where required by NFPA 70. 2. Bond the Main telecommunication service entrances to the electrical service equipment ground using the most direct route possible to minimize conductor length. 3. Provide copper grounding conductor from main building grounding electrode system at I 4. service entrance to ground bus at the Telecommunications Entrance Facility. Provide copper bus bars on plywood backboard. See Division 27, Section 270526.00 for bus bar specifications. TEMPLATE 260526 -3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 5. Provide isolation for grounding busbars from the structure support with a 2 inch minimum I separation using manufacturer's recommended insulating stand-offs and hardware. END OF SECTION 1 I I I I I I I I I I I I I TEMPLATE 260526 -4 2/28/19 1 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS I PART 1 - PRODUCTS 1.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS A. Steel Slotted Support Systems: Comply with MFMA-4, factory-fabricated components for field assembly. Construct with 9/16" dia. holes, nominal 2" o.c. on top surface, with standard factory finish, and with the all necessary fittings which mate and match with U-channel. Select channel dimensions for applicable load criteria. Metallic Coatings shall be hot-dip galvanized after fabrication and threading, and applied according to MFMA-4. Manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Allied Tube &Conduit 2. Caddy 3. Cooper B-Line, Inc.; a division of Cooper Industries 4. ERICO International Corporation 5. GS Metals Corporation 6. Hilti 7. Powers 8. Thomas & Betts Corporation 9. Unistrut; Tyco International, Ltd. 10. Wesanco, Inc. 11. Perma-Cote B. Raceway and Cable Supports: As described in NECA 1 and NECA 101. C. Conduit and Cable Support Devices: Steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported. 1. Riser clamps for supporting rigid metal conduit; galvanized steel;with 2 bolts and nuts, and 4" ears. 2. Clevis hangers: For supporting rigid metal conduit; galvanized steel;with 1/2"dia. hole for round steel rod. 3. Galvanized steel clamps; 1/2" rod size. 4. Galvanized steel clamps, 1-1/4"x 3/16"stock; 3/8" cross bolt; flange width 2". 5. One-hole conduit straps for supporting 3/4" rigid metal conduit; galvanized steel. 6. Two-hole conduit straps for supporting 3/4"rigid metal conduit, galvanized steel; 3/4"strap width; and 2-1/8" between center of screw holes. 7. Offset conduit clamps for supporting rigid metal conduit; galvanized steel. D. Support for Conductors in Vertical Conduit: Factory-fabricated assembly consisting of threaded body and insulating wedging plug or plugs for non-armored electrical conductors or cables in riser conduits. Plugs shall have number, size, and shape of conductor gripping pieces as required to suit individual conductors or cables supported. Body shall be malleable iron. E. Structural Steel for Fabricated Supports and Restraints: ASTM A 36/A 36M,steel plates, shapes, and bars; black and galvanized. F. Mounting, Anchoring, and Attachment Components: Items for fastening electrical items or their supports to building surfaces include the following. 1. Products: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Cooper B-Line, Inc.; a division of Cooper Industries. b. Empire Tool and Manufacturing Co., Inc. I c. Hilti, Inc. d. ITW Ramset/Red Head; a division of Illinois Tool Works, Inc. e. MKT Fastening, LLC. f. Simpson Strong-Tie Co., Inc. HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 2. Capacities: Provide materials and installed systems with tension, shear, and pullout capacities appropriate for supported loads and building materials in which used, plus 100% safety factor. 111 3. Adverse and/or Corrosive Environment Areas: Provide stainless steel anchors. Provide hot-dipped galvanized (after fabrication) product and material versions of what is specified in this section for steel hangers, supports, systems, etc. (supported from stainless steel anchors), unless stainless steel is specified or otherwise indicated. Such applications and areas include, but are not limited to: a. Outdoors. b. Unconditioned Areas. c. Coolers/Freezers. d. Miscellaneous high-humidity or otherwise corrosive environments. 4. Mechanical-Expansion Anchors in Dry Conditioned Areas: Insert-wedge-type, zinc-coated steel, for use in hardened Portland cement Provide stainless steel anchors where located in areas subject to moisture or corrosion. 5. Drop-In Anchors: AISI Type 303 stainless steel, drop-in, shell or flush type, equivalent to Hilti HDI series. 6. Concrete Inserts: Steel or malleable-iron, slotted support system units similar to MSS Type 18; complying with MFMA-4 or MSS SP-58. 7. Clamps for Attachment to Steel Structural Elements: MSS SP-58, type suitable for attached structural element. 8. Through Bolts: Steel structural type, hex head, and high strength. Comply with ASTM A 325. 9. Toggle Bolts: All-steel galvanized springhead type, minimum 3/16"x 4". 10. Hanger Rods: Threaded steel, Galvanized steel rods; 1/2" minimum diameter. 11. Clevis hangers: For supporting rigid metal conduit; galvanized steel; with 1/2" minimum diameter hole for round steel rod. 12. Galvanized steel rod reducing couplings: 1/2"x 5/8" minimum. 13. Galvanized steel clamps: 1/2" minimum rod size; Galvanized steel clamps: Minimum 1- 1/4"x 3/16" stock; minimum 3/8"cross bolt; minimum flange width 2". 14. Hexagon nuts: Galvanized steel. 15. Expansion anchors: Minimum 1/2". 1 PART 2 - EXECUTION 2.1 APPLICATIONS AND INSTALLATION A. Provide supports, anchors, sleeves and seals furnished as part of factory-fabricated equipment as required. B. Coordinate layout and installation of equipment and components with other construction that penetrates walls or is supported by them, including electrical and other types of equipment, raceways, piping, encumbrances to workspace clearance requirements, and adjacent surfaces. Maintain required workspace clearances and required clearances for equipment access doors and panels. C. Provide supports for multiple raceways capable of supporting combined weight of supported systems and its contents, plus minimum 100% factor of safety. Provide equipment supports111 capable of supporting combined operating weight of supported equipment and connected systems and components. Provide rated strengths adequate in tension, shear, and pullout force to resist maximum loads calculated or imposed for this project, with a minimum structural safety factor of five times the applied force. HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260529 -HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS D. Contractor is responsible for repairing all damage to structural elements resulting from the scope of this work. Anchor hole dimensions shall be per manufacturer recommendations. Select and apply anchor products based on collective weight being supported, plus 100%factor of safety. E. Comply with NECA 1 and NECA 101 for application and installation requirements of hangers and supports for electrical equipment and systems except if requirements in this Section are stricter. I Field Welding: Comply with AWS D1.1/D1.1 M. F. Install equipment and enclosures on walls with tops at uniform height unless otherwise indicated, and by bolting units to structural wall or mounting on structural-steel channels bolted to wall. For equipment and enclosures not at walls, provide freestanding structural-steel channel racks that are anchored to floor structure and overhead structure. G. Use of synthetic or plastic"tie-wraps", "zip ties", "wire ties" and similar products are not permitted as a permanent means of anchoring, securing, supporting or otherwise installing any cables, conductors, conduits, raceways, devices, equipment or other electrical work. Provide metal clamps, clips, etc.that are manufactured for use for respective applications where they are used. Use of perforated straps is not permitted. H. Route all conduits, raceways and cables (where applicable)parallel and perpendicular to building structural members. Any and all noncompliant work installed by the electrical contractor shall be removed and reinstalled by the electrical contractor to the satisfaction of the Owner's Representative and the Design Professionals, at the expense of the electrical contractor. I. Fasteners shall be zinc-coated, type, grade, and class as required for a neat finished installation. J. Coordinate with installation of roof curbs, equipment supports, and roof penetrations as applicable. Install work so that no raceway or cable is within six inches below roof deck(s). Suspend and support overhead electrical work from roof trusses and joists/joist girders only at panel points, at top chord only, unless otherwise indicated. K. Do not suspend overhead hangers, or support any other overhead electrical work, from non- poured-concrete roof decks. L. Support overhead hangers supported from poured-concrete decks using stainless steel threaded inserts.. M. Field-verify lengths of stems, pendants, cables, suspensions, etc. for all suspended luminaires with Owner's Representative. N. Strength of Support Assemblies: Minimum static design load used for strength determination shall be weight of supported components plus 200 lb. or 100 percent factor of safety, whichever is greater. O. Mounting and Anchorage of Surface-Mounted Equipment and Components: Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. Install anchor bolts to elevations required for proper attachment to supported equipment. Provide female expansion anchors, and install studs and nuts after equipment is positioned. Torque bolts and nuts on studs to values recommended by equipment manufacturer. Provide anchor bolt bushing assemblies for wall-mounted equipment to allow for resilient media where equipment and equipment-mounting channels are attached to wall. 1. To Wood: Fasten with lag screws or through-bolts. Number 3 Common or Standard Grade boards complying with WCLIB or AWPA rules, or Number 3 boards complying with SPIB rules. Lumber shall be preservative treated in accordance with AWPB LP-2, and kiln dried to a moisture content of not more than 19 percent. Provide marine grade products where subject to moisture conditions. Provide Simpson Strong Tie (or equal) expansion screw HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS anchors. Make tight connections between members. Install fasteners without splitting wood members. Attach to substrates as required to support applied loads. 2. To Wood Structural Members: Provide bolts installed through members. 3. To New Concrete: Provide channel-type concrete inserts and bolt to inserts, or provide expansion anchors for applications where inserts are not practical. 4. To Existing Concrete: Expansion anchor fasteners. 5. Holes for Expansion Anchors in Concrete: Drill at locations and to depths that avoid reinforcing bars and other structural elements. Review proposed means, methods, locations, etc. in advance with Owner and Design Professionals. 6. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units. 7. To Steel: Welded threaded steel studs complying with AWS D1.1/D1.1M, with lock washers and nuts, or beam clamps (MSS Type 19, 21, 23, 25, or 27) complying with MSS SP-69, clamped to flanges of beams or on upper truss chords of bar joists. 8. To Light Steel: Sheet metal screws. 9. Items Mounted on Hollow Walls and Nonstructural Building Surfaces in finished areas: Provide blocking between studs behind finished wall surface. Mount equipment, devices and boxes with backs of enclosures flush to front of finished wall surface. 10. Items Mounted on Hollow Walls and Nonstructural Building Surfaces in unfinished areas: Mount equipment on slotted-channel racks attached to substrate. 11. Do not use powder/gas-actuated driven methods. P. Coordinate all work with all other trades prior to commencement of the work. 2.2 [CONCRETE BASES A. Provide dowel rods to connect concrete bases to concrete floors/slabs/substrates. Unless 111 otherwise indicated, install dowel rods on maximum 18-inch centers around the full perimeter of concrete base. B. Provide epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete floor/slab/substrate. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. C. Construct concrete bases of dimensions indicated but not less than 4 inches larger in both directions than supported unit, and so anchors will be a minimum of 10 bolt diameters from edge of the base. Coordinate sizes and locations of concrete bases with actual equipment provided. Cast galvanized or stainless-steel anchor-bolt inserts into bases. D. Indoor bases shall be at least 4" thick. Reinforcing steel bars shall be placed in both directions of the bases. E. Outdoor bases shall be at least 6"thick. Perimeter of pads shall extend down below the frostline. Reinforcing steel bars shall be placed in both directions of the bases and a mesh overlay shall be provided. F. Unless indicated otherwise in specifications or on drawings, use minimum 3000-psi, 28-day compressive-strength concrete. Size and provide concrete bases so expansion anchors will be a minimum of 10 bolt diameters from the edge of the concrete base. 2.3 PLYWOOD EQUIPMENT BOARDS A. Plywood Equipment Boards: Lumber shall be preservative treated in accordance with AWPB LP- 2, and kiln dried to a moisture content of not more than 19 percent. Provide plywood panels;APA C-D PLUGGED INT, with exterior glue; thickness as indicated, or if not indicated, not less than 3/4 inches deep. Provide marine grade plywood where subject to moisture conditions. Provide Simpson Strong Tie (or equal)expansion screw anchors. HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 4 2/28/19 r I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS B. Unless otherwise noted, boards shall be painted with two coats of good grade weatherproof flat gray non-conductive fire-retardant paint on all sides and edges (prior to mounting) and plumbed in a true vertical position. Provide nominal 1/2" rustproof spacers between back of plywood and wall. Maintain at least 4 inches from bottom of plywood equipment boards and the finished floor surface. C. Unless directed otherwise in field, plywood equipment boards shall be 8 feet high by 3/4 inches deep by length shown on drawings (as dimensioned or as scaled) or length as required to accommodate equipment if not indicated on drawings. Unless directed otherwise in field, provide plywood equipment boards for all indoor surface mounted panelboards and systems "head-end" equipment for all applications where located in mechanical or electrical rooms/areas and only where specifically shown on drawings for all other applications END OF SECTION I I I I I I I I r HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 5 2/28/19 r I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS I PART 1 - PRODUCTS 1.1 MANUFACTURERS I A. Products: Metal conduits, tubing, boxes and fittings shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 1.2 METAL CONDUITS, TUBING, AND FITTINGS A. EMT: Comply with FS WW-C-563, ANSI C80.3 and UL 797. B. GRC/RMC: Comply with ANSI C80.1 and UL 6. Provide steel conduit, galvanized/fused to inside and outside walls of conduit and fittings after fabrication and after threading. C. LFMC: Flexible steel conduit with PVC jacket and complying with UL 360. 1. Provide liquid-tight flexible metal conduit formed from continuous length of spirally wound, interlocked, double-wrapped hot-dipped zinc-galvanized (inside & outside) steel core. Provide liquid-tight jacket of flexible polyvinyl chloride (PVC) that is fully weatherproof, flame-retardant, heat resistant, oil resistant, sunlight resistant and that resists heat, oil and chemical breakdown. 2. Provide smooth-wall type jackets (not a corrugated look) for furniture whip (and similar) applications in indoor finished areas. II 3. Provide Liquid-Tight Flexible Metal Conduit Fittings compliant with FS W-F-406, Type 1, Class 3, Style G. Provide cadmium plated, malleable iron fittings with compression type steel ferrule and neoprene gasket sealing rings, with insulated throat. 4. Provide full parity size green insulated ground wire for all applications, regardless of length. 5. Provide installed LFMC systems using materials and installation methods that result in IP67 compliance. D. Fittings for Metal Conduit: Comply with NEMA FB 1 and UL 514B. 111 1. EMT: Provide steel, galvanized or zinc-coated water/concrete-tight fittings; do not use die-cast fittings. Provide Compression type for outdoor applications, and applications in other wet locations. Provide Compression or set screw type for indoor applications. 2. GRC/RMC: Zinc-Galvanized Steel (after fabrication/factory-threading), threaded (fused- galvanized after threading.) 3. Expansion Fittings: Material to match conduit type, complying with UL 651, rated for environmental conditions where installed, and including flexible external bonding jumper. 4. Provide locknuts for securing conduit to metal enclosure with sharp edge for digging into metal, and ridged outside circumference for proper fastening. Provide screw type grounding terminal for metal bushings of standard or insulated type. E. Joint Compound for Threaded Conduit: Approved, as defined in NFPA 70, by authorities having jurisdiction for use in conduit assemblies, and compounded for use to lubricate and protect threaded conduit joints from corrosion and to enhance their conductivity. 1.3 [NONMETALLIC CONDUITS AND FITTINGS A. RNC: Type EPC-40-PVC, complying with NEMA TC 2 and UL 651 unless otherwise indicated. Comply with NEMA TC 3 for fittings; match to conduit or tubing type and material. 1. Provide electrical plastic conduit equal to Carlon Plus 40. Provide heavy wall electrical plastic conduit that is Schedule 40, 90 degrees C rated, constructed of polyvinyl chloride, in conformity with NEMA TC-2, in conformity with NFPA 70 Article 354, and is UL listed and labeled for direct burial, concrete encasement, and above ground use. 2. Provide horizontal elbows for service entrance conduits that are maximum 45-degree. Provide minimum 24-inch radius. Provide larger minimum radius where indicated on I RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 1 2/28/19 r I STARBUCKS COFFEE COMPANY IGUIDE SPECIFICATIONS ETION260533 - RAEWAYS AND BOXES FOR ELECTRICAL SYSTEMS drawings, or if directed in field. Provide multiple units as necessary to obtain required offset (i.e. provide two 45-degree elbows to obtain a 90-degree offset where needed). Provide 90-degree maximum elbows. 3. Provide couplers, adapters, "O" rings, sealing, and other accessory components as required for a complete installation. Provide miscellaneous fittings that have been specifically designed and manufactured for their particular application. 1.4 [SURFACE RACEWAYS A. Surface Metal Raceways: Galvanized steel with snap-on covers complying with UL 5. Manufacturer's standard enamel finish in color selected by the Design Professional or Prime coated, ready for field painting, Design Professional's choice. Provide factory fittings, dividers, clips, and other accessories as required for a neatly installed complete and operable installation. Provide factory-applied finish in color(s) and texture(s) as directed by Design professionals. 1. Plugmold: Provide "plugmold" equal to Legrand #2000 series with single NEMA 5-15R receptacles on nominal 9-inch centers.] 1.5 BOXES, ENCLOSURES, AND CABINETS A. General Requirements for Boxes, Enclosures, and Cabinets: Boxes, enclosures, and cabinets installed in wet locations shall be UL listed and labeled for use in wet locations, including cover plates and doors. Boxes, enclosures, and cabinets installed in damp and areas subject to moisture shall be UL listed and labeled for use in damp locations, including cover plates and doors. All other applications shall be UL listed and labeled for the location in which they are installed. Provide galvanized (after fabrication and after threading) boxes with galvanized or stainless-steel accessories, hardware and cover plates. B. Sheet Metal Outlet and Device Boxes: Comply with NEMA OS 1 and UL 514A. Provide galvanized-coated flat rolled code-gage non-gangable sheet-steel outlet/junction/pull boxes, of shapes, cubic inch capacities, and sizes, including box depths as indicated, suitable for installation at respective locations. Construct outlet boxes with mounting holes and with cable and conduit-size knockout openings in bottom and sides where applicable. Provide boxes with threaded screw holes, with corrosion-resistant cover and grounding screws for fastening surface and device type box covers, and for equipment type grounding. Provide outlet box accessories as required for each installation, including box supports, mounting ears and brackets, wallboard hangers, box extension rings, fixture studs, cable clamps, and metal straps for supporting outlet boxes, which are compatible with outlet boxes being used to fulfill installation requirements for individual wiring situations. Provide with stainless steel nuts, bolts, screws and washers. C. Cast-Metal Outlet and Device Boxes: Comply with NEMA FB 1, ferrous alloy, Type FD, with gasketed cover. Only use for special applications with prior case-by-case approval from Design Professionals. D. Luminaire Outlet Boxes: Comply with outlet box specifications above; nonadjustable, designed for attachment of luminaire weight (50 lb, minimum) plus 100 percent factor of safety. Outlet boxes designed for attachment of luminaires weighing more than 50 lb shall be listed and marked for the maximum allowable weight, including 100 percent factor of safety. E. Floor Boxes: See Drawings and Section 262726"Wiring Devices". F. Bushings, knockout closures and locknuts: Provide corrosion-resistant box knockout closures, conduit locknuts and malleable iron conduit bushings, offset connectors, of types and sizes, to suit respective installation requirements and applications. G. Device Box Dimensions: 4 inches square by 1-1/2 inches deep or 4 inches square by 2-1/8 inches deep, depending on device depths and wiring fill, with single-gang plaster/"mud" rings where only one device is being installed. Provide wider boxes for applications where more than RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 -RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS two devices will be installed. Provide internal metal dividers where required under NFPA 70 for varying voltages, multiple circuits, etc. Gangable boxes (using multiple single-gang boxes to assemble multi-gang boxes) are prohibited. H. Weathertight outlet boxes and covers: 1. Provide corrosion-resistant weathertight/raintight outlet wiring boxes, of types, shapes and sizes, including depth of boxes, with threaded conduit holes for fastening electrical conduit, suitably configured for each application, including face plate gaskets and corrosion-resistant plugs and fasteners. Provide weathertight outlets for interior and exterior locations exposed to weather or moisture. 2. Provide weatherproof covers that mount on a single gang horizontal or vertical (depending on application) junction box to ensure weather protection for a standard outlet. 3. Provide minimal profile assemblies that are rated NEMA 3R While In Use and that employ recessed box and cover design, equal to Thomas & Betts "Red Dot" series. Provide trim color(s)to match surrounding finished wall surface. 1.6 HANDHOLES AND BOXES FOR EXTERIOR UNDERGROUND WIRING A. General Requirements for Handholes and Boxes: Boxes and handholes for use in underground systems shall be designed and identified as defined in NFPA 70, for intended location and application. Boxes installed in wet areas shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. Provide weatherproof cover, secured by tamper-resistant locking devices and having structural load rating consistent with enclosure and handhole location. Provide nonskid cover finish, with a minimum coefficient of friction of 0.50, and with molded or embossed lettering to indicate contents. B. Polymer-Concrete Handholes/Boxes with Polymer-Concrete Cover: Molded of sand and aggregate, bound together with polymer resin, and reinforced with steel, fiberglass, or a combination of the two. Design for flush burial with open bottom unless otherwise indicated. 111 1. Outdoor junction and pull boxes for branch-circuit-scale applications: Provide flush grade-mounted junction/pull box assemblies, equal to Quazite #PG1212-BG-12, 12 inches deep, with bolted cover and open bottom. Provide larger sizes where required by NFPA 70 based on conduit quantities/sizes and wire fill. 2. Outdoor handhole/pull boxes for feeder-scale applications: Provide flush grade mounted junction/pull box assemblies, equal to Quazite #PG2436-BG-24, 24" deep with bolted cover and open bottom. Provide larger sizes where required by NFPA 70 based on conduit quantities/sizes and wire fill. Provide larger sizes where required by NFPA 70 or field conditions. PART 2 - EXECUTION I 2.1 RACEWAY APPLICATION A. Outdoors: Apply raceway products as specified below unless otherwise indicated: 1. Exposed: GRC/RMC. 2. Concealed Conduit, Aboveground in Dry and Noncorrosive Locations Not Subject to Physical Damage: EMT. 3. Concealed Conduit, Aboveground in Damp Locations, Wet Locations, Corrosive Locations: GRC/RMC. 4. Underground Conduit For Services, Feeders, branch circuits, and Similar Scale Work : RNC, Type EPC-40-PVC. See details and/or notes on drawings for applications where concrete or other encasement is required. 5. Connection to Vibrating Equipment or equipment that is subject to any degree of motion in its normal operation (Including But Not Limited To Transformers, Electric Solenoids, RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 -RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS and Motor-Driven Equipment): LFMC. Leave sufficient slack in flexible conduit to permit movement from vibration without adversely affecting conduits and connections. 6. Boxes and Enclosures, Aboveground: NEMA 250, Type 3R. B. Indoors: Apply raceway products as specified below unless otherwise indicated: 1. Exposed: EMT. 2. Exposed and Subject to Physical Damage: GRC/RMC. 3. Concealed in Cavities of Ceilings and Interior Walls and Partitions: EMT. 4. Above-Grade Damp or Wet Locations: GRC/RMC. 5. Below-Grade (and for special conditions if so noted on drawings or other Division Sections): RNC. 6. Vertical Risers from Below-Grade: GRC/RMC. 7. Cells of Precast Concrete Panels and/or within Movable Partitions: LFMC (Leave sufficient slack in flexible conduit to permit movement from expansion and contraction.) 8. Connections From Outlet Boxes/Raceways to Systems Furniture: LFMC. 9. Embedded in Concrete or Masonry: GRC/RMC. 10. Final 72 inches from accessible outlet/junction boxes to recessed luminaires that are located in accessible ceiling systems: Type MC cable. 11. Final 24-72 Inches at Connections to Vibrating Equipment or equipment that is subject to any degree of motion in its normal operation (Including But Not Limited To Transformers, Electric Solenoids, and Motor-Driven Equipment): LFMC. Leave sufficient slack in flexible conduit to permit movement from vibration without adversely affecting conduits and connections. C. Raceway Fittings: Compatible with (Listed accordingly) raceways and suitable for use and location. 1. EMT: Comply with NEMA FB 2.10 and with requirements of these specifications. 2. GRC/RMC and IMC: Use threaded rigid steel conduit fittings unless otherwise indicated. I 3. Comply with NEMA FB 2.10. Flexible Conduit: Use only fittings listed for use with flexible conduit. Comply with NEMA FB 2.20. 2.2 INSTALLATION A. General Installation. 1. Minimum Raceway Size: 3/4-inch trade size. 2. Maximum Support Spacing and Minimum Hanger Rod Size for Raceway: Space supports for Conduits and raceways required by NFPA 70 as a minimum. 3. Rigid and Intermediate Steel Conduit: Use threaded rigid steel conduit fittings unless otherwise indicated. Comply with NEMA FB 2.10. 4. Do not install aluminum products in contact with, or near proximity to, concrete or earth. 5. Do not install nonmetallic conduit where ambient temperature exceeds 120 deg F. 6. Comply with NECA 1 and NECA 101 for installation requirements except where requirements on Drawings or in this article are stricter. 7. Comply with NFPA 70 limitations for types of raceways allowed in specific occupancies and number of floors. 8. Locate all structural elements within concrete prior to pre-drilling anchors. Contractor is responsible for repairing all damage to structural elements resulting from the scope of this work. 9. Provide fittings as needed for a complete installation. 10. Provide flexible connections or expansion fittings where all conduits cross building expansion joints. Coordinate exact quantity & location with Architectural plans prior to installation of work. 11. Do not install boxes back-to-back in walls. Provide not less than 6" (150 mm) separation in general, not less than 16" separation for acoustically rated walls and not less than 24" RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -4 2/28/19 1 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 -RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS separation for the following applications: fire walls, fire barriers, smoke barrier walls, and fire partitions. Where outlet boxes are shown back-to-back on common walls, offset accordingly when installed. 12. Install firestopping at penetrations of fire-rated floor and wall assemblies. 13. Neatly cut openings for boxes so that standard size (not "midway" or "jumbo") cover plates will cover all parts of the opening. Position recessed outlet boxes accurately to allow for surface finish thickness. Do not use round boxes. 14. Fasten electrical boxes firmly and rigidly to substrates and structural surfaces to which attached, or solidly embed electrical boxes in concrete or masonry as applicable. Provide box supports that are independent of conduit. Protect boxes from construction debris and damage subsequent to installation of boxes. 15. Use of synthetic or plastic "tie-wraps", "zip ties", "wire ties" and similar products are not permitted as a permanent means of anchoring, securing, supporting or otherwise installing any cables, conductors, conduits, raceways, devices, equipment or other electrical work. Do not use perforated straps. 16. Consider the outlet, junction, and pull box locations indicated on drawings approximate unless there are prevailing codes that require specific spacings or locations. Study the general construction with relation to spaces and equipment surrounding each outlet, and neatly install outlets accordingly. 17. Install wiring for different power voltages in raceway systems separate from each other. Install wiring for the various electrical systems in raceway systems that are separate from each other. 18. Provide steel conduit and steel fittings for indoor above-slab applications, as specified in this section. 19. Provide maximum of 40 percent fill for raceways, or a threshold of less if required by NFPA 70 or project conditions. 20. Keep raceways at least 12 inches away from parallel runs of flues, hot-water pipes, and other sources of heat. Install horizontal raceway runs above liquid and steam piping. Where the lines are not insulated, the clearances shall be increased until the temperature of the conduit, with no live conductors enclosed, does not rise above the ambient temperature of the installation area. 21. Level and square raceway runs, and install at proper elevations and heights. 22. Arrange stub-ups so curved portions of bends are not visible above finished grade or slab. 23. Install no more than the equivalent of three 90-degree bends in any conduit run. Support within 12 inches of changes in direction. 24. Support conduit within 12 inches of enclosures to which attached. Properly support and anchor raceways for their entire length using structural materials. Do not span any space unsupported. 25. Conceal conduit and tubing within finished walls, ceilings, and floor cavities unless otherwise indicated. Install conduits parallel or perpendicular to building lines. 26. Install exposed conduits, and extensions from concealed conduit systems, neatly parallel and perpendicular to walls, and plumb on walls. Secure to walls at intervals not exceeding six feet, supported by approved straps and fasteners. Secure to overhead structure at intervals not exceeding six feet. Support conduit by approved straps, fasteners and hangers. Provide hangers suspended from rods. Space wall brackets supporting conduits not more than 4 feet 6 inches on center. Install exposed conduit work so there is no interference with ceiling inserts, lights, or ventilation ducts or outlets. 1I !I RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -5 2/28/19 !I i STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 -RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 27. Install pull wires in empty raceways. Use polypropylene or monofilament plastic line with not less than 200-lb tensile strength. Leave at least 12 inches of slack at each end of pull wire. Cap underground raceways designated as spare above grade alongside raceways in use, using properly selected and attached manufactured cap (tape of any sort is not permissible). Provide finished wall/cover plate on unused outlet boxes. 28. Install raceway sealing fittings at accessible locations according to NFPA 70 and fill them with listed sealing compound. For concealed raceways, install each fitting in a flush steel box with a blank cover plate having a finish similar to that of adjacent plates or surfaces. Install raceway sealing fittings according to NFPA 70. 29. Mount boxes at heights indicated on Drawings and elsewhere in Division 26 specifications. If mounting heights of boxes are not individually indicated, give priority to ADA requirements. Install boxes with height measured to center of box unless otherwise indicated. In cases where using center of box for measurement would result in a switch- height device having an operable component higher than 48 inches above finished floor, install boxes lower as needed so that uppermost part of operable component is no higher than 48 inches. 30. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center of cell of masonry block (do not over-cut), and install box flush with surface of wall. Prepare block surfaces to provide a flat surface for a raintight connection between box and cover plate or supported equipment and box. 31. Horizontally separate boxes mounted on opposite sides of walls so they are not in the same vertical channel. Coordinate all such separations with Design Professional in advance to ensure boxes are located properly for each application. 32. Locate boxes so that cover or plate will not span different building finishes. 33. Support boxes from more than one side by spanning two framing members or mounting on brackets specifically designed for the purpose. 34. Fasten junction and pull boxes to, or support from, building structure. Do not support boxes by conduits. 35. Do not use dissimilar metals throughout the systems to eliminate possibility of electrolysis. Where dissimilar metals will be unavoidably in contact, coat surfaces with corrosion inhibiting compound before assembling. 36. Do not use electrical "handy/handee" boxes. 37. Where moisture conditions within conduits are encountered above grade, drill a hole at the lowest point in the conduit run so that drainage will not interfere with conditions I below. 38. Where conduit is capped at wall for future additions, do not extend more than threads- length past wall (maximum of 3/4-inch past wall for EMT). 39. Where conduits for outlets on waterproof walls must be installed exposed, set anchors for supporting conduit on waterproof wall in waterproof cement. 40. Requirements for exposed conduits also apply to conduits installed in space above hung ceilings, and in crawl spaces. 41. Provide a 4-inch reinforced casing of concrete (3000-PSI minimum) around conduits that are installed in cinders or cinder concrete, to protect them. 42. Support raceway components directly from structural building systems, not from ceiling suspensions systems. Provide supplemental supports for junction or pull boxes. 43. Conduit Routing: If specific routing information appears on the Drawings, route and maintain conduits as shown. Should interference or a conflict arise, consult the Design Professional before proceeding with the Work. If specific routing information does not appear on the Drawings, or if routing shown on Drawings is schematic in nature, determine the best route for the conduit in accordance with code and other project guidelines. I RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -6 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 -RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 44. Conduit bends: Bends shall be made so that the conduit will not be flattened or kinked I and so that the internal diameter of the conduit is not reduced. The radius of the curve of the inner edge of any bend shall not be less than indicated by the National Electrical Code and TIA/EIA-569 Commercial Building Standard for Telecommunications Pathways and Spaces. Constructing an outside entrance to a building from buried conduit to penetrate above the ceiling line will allow an exception for a 4 inches LB fitting at one end to allow placement of the conduit flat to the building outside wall; apply this only if conduit could not be concelaed. 45. Install above-ceiling conduits as high as possible, with a minimum of 8 inches above ceiling tiles so as to permit ceiling tile removal. 46. Install each branch of power in separate raceways from each other. 111 B. Stub-ups To Above Accessible Ceilings (TAAC): 1. Use EMT, or GRC/RMC for raceways as applicable for respective locations. 2. Provide sweep bends and drag line for each application. 3. Use a conduit bushing or insulated-throat fitting to terminate stub-ups. 4. Extend conduits to joist space above an accessible ceiling system. 5. Permanently identify the purpose of the conduit stub at the end of the conduit above the ceiling. C. Pull Boxes and Junction Boxes: 1. Provide each pull box indicated on the Drawings. 2. Provide additional pull boxes: Every 180 degrees of raceway bend; Every 100 feet of raceway; As additionally required by Code. 3. Provide pull and junction boxes in areas that will be accessible after installation. Accessible areas include spaces above removable tile ceilings and behind access doors that are installed expressly for this purpose. Do not install pull-boxes in locations that will not be accessible after construction is complete and is not accessible after permanently installed work is complete. 4. Size boxes in accordance with the NFPA 70 (NEC). Use larger boxes where so specified. 5. Support boxes rigidly. Land conduits on the boxes so that conduits enter and exit across from each other on opposite sides of the box so as to facilitate straight line pulling of cable through the box. Do not use pull boxes in lieu of conduit bends, except as necessary by design or to meet constructability constraints. 6. When directional transition of the cables is necessary through a box, land conduits on the box so that they permit the largest possible bending radius for those cables that will pass through the box. 7. Coordinate all work with all other trades prior to commencement of the work. Do not use access doors unless special prior written permission is granted from the Owner's Representative. Install pull boxes, junction boxes, etc. in areas that are accessible after construction. Do not install pull boxes or junction boxes above gypsum board, plaster or similar ceiling systems, nor above ductwork or equipment that renders them inaccessible. 8. Record junction and pull boxes on record drawings. Permanently mark and label (using methods approved by Owner's Representative) junction/pullboxes as to which types of electrical services are within. D. Repair and Patching: Holes and other penetrations into building surfaces or structure that are created to facilitate pathway installation but that are not ultimately used shall be filled, repaired, and restored to their original strength, appearance and integrity. Damage to building or property that occurs during the course of pathway installation shall be repaired and restored to its original I condition prior to damage. Obtain review and approval of penetration sizes, means and methods from Design Professional and Owner's Representative for all proposed penetrations of structural elements prior to commencing with any related work. I RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -7 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS E. Seals for Common Conduit and Raceways in Dissimilar Environments: Install devices to seal raceway interiors at accessible locations. Locate seals so no fittings or boxes are between the seal and the following changes of environments. Seal the interior of all raceways at the following points: Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces; Where an underground service raceway enters a building or structure; Where otherwise required by NFPA 70. F. Insulation for Common Conduit and Raceways in Dissimilar Environments: Provide insulation on the exterior of conduit on the warm side of penetrations between dissimilar environments to prevent condensation from forming. Insulate with 1.5-inch polyisocyanurate closed cell pipe insulation with an overall PVC jacket for a minimum distance of 48" from the penetration. Applications include, but are not limited to, the following: Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces; Where otherwise required by NFPA 70. G. Flexible Conduit Connections: Comply with NEMA RV 3. Use a maximum of 72 inches of flexible conduit for recessed and semi-recessed luminaires, for equipment subject to vibration, ' noise transmission, or movement, and for transformers and motors. Use LFMC in damp or wet locations. 2.3 INSTALLATION OF EXPOSED CONDUIT/RACEWAY SYSTEMS 1 A. General: 1. Review proposed installation materials, methods, routing, etc. case-by-case and area-by- area for each application with the Design Professional and Owner prior to installation. Accordingly, prepare installation drawings and submit to Design Professionals for review and comment. Revise and resubmit as required based on comments from Design Professionals. Coordinate with all trades while preparing the installation drawings. Show elevations and routes relative to adjacent work of all trades. 2. Group conduits together in tight banks when routed in the same direction in a given space. Coordinate with mechanical trades and route the conduit banks along common paths wherever possible, and at common elevations unless the conduit banks can be installed directly above or below the mechanical work. Review proposed routes and I 3. elevations with Design Professionals prior to installation. Install conduits that peel off from banks in a manner that results in the conduits being progressively taken off from the sides of the banks, one at a time without crossing over or I under other conduits in the bank. Rise and drop conduits at the same elevation in areas with common visibility. 4. Provide clean, tight and uniform bends and offsets for all conduits and conduit banks. 5. Route overhead work perpendicular and parallel to architectural and structural building lines in the respective surrounding space. Do not install work below skylight assemblies or in front of clerestory window assemblies. 6. Provide surface conduit and raceway for wall-mounted applications only where it is impossible to fish or cut/patch, or only where specifically indicated on drawings, or only where specifically directed by Design Professional. Improper sequencing of work at walls shall not be used as a reason to surface-mount conduit, boxes or raceways; install all such work concealed as the walls are constructed. Provide conduit in areas that are exclusively utilitarian, such as dedicated mechanical or electrical rooms. Provide finished surface raceway systems for applications in all other areas. Consult with Design Professionals in advance of any installation for final direction on where to use conduit versus surface raceway systems. 7. Install conduits and raceways in a manner that minimizes detrimental effects on room aesthetics. For instance, as applicable, rise from below for wall switches, general receptacle outlets and communications wall outlets; drop from above for wall mounted I RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -8 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS lights, and other system outlets that are installed high on wall; make drops near corners, window casings, door casings, etc.). 8. Install conduits and raceways as out-of-site as reasonably possible. For instance if an receptacle outlet needs to be installed at the center of a wall and there is no possibility of feeding from below the floor, route the drop in a corner of the room then transition and run horizontally to the outlet location. 9. Install conduit and raceway with a minimum 2-inch radius control at bend points. 10. Secure conduit and raceway with screws or other anchor-type devices at intervals not exceeding 48 inches and with no less than two supports per straight section. Support according to manufacturer's written instructions. 11. Utilize supports for wall-mounted applications that cleanly conform to the shape of the conduit or raceway and do not in any way protrude out past the outer contours of the conduit or raceway. As an example, install wall-mounted conduit using two-hole straps instead of conduit hangers. Tape, glue, tie-wraps, clips, wedges, etc. are not acceptable support methods. 12. Review all proposed mounting means and methods with Design Professionals for luminaires, devices, outlets, equipment, etc. that will be suspended overhead. 13. Do not use "trapeze" mounting methods for suspensions unless case-by-case permission is granted by Design Professionals. 2.4 INSTALLATION OF EXPOSED CONDUIT OUTDOORS A. Only install conduit exposed outdoors when it is impossible to do otherwise, or only if specifically indicated for such installation case-by-case elsewhere in documents. Installation convenience, financial considerations, lack of coordination with other trades and similar rationale are not sufficient reasons for doing so. In cases where conduits must be installed at outdoor locations, de-rate conductors and modify conduit sizes per NFPA 70 (National Electrical Code, NEC). Provide expansion fittings, which are Listed and labeled for the respective applications, at all building expansion joints and at maximum distances of 100 feet. Paint all such conduits with at least two coats of UV-resistant weatherproof paint. Provide colors to match respective surrounding surfaces; submit colors to Design Professional for review in advance of procuring paint. 2.5 INSTALLATION OF EXPOSED CONDUIT ON ROOFS I A. Only install conduit exposed on rooftops when it is impossible to do otherwise, or only if specifically indicated for such installation case-by-case elsewhere in documents. Installation convenience, financial considerations, lack of coordination with other trades and similar rationale are not sufficient reasons for doing so. In cases where conduits must be installed on rooftops, de-rate conductors and modify conduit sizes per NFPA 70 (National Electrical Code, NEC). Provide expansion fittings, which are Listed and labeled for the respective applications, at all building expansion joints and at maximum distances of 100 feet. Paint all such conduits with at least two coats of UV-resistant weatherproof paint. Provide white paint on flat rooftops that have finishes white in color, and for otherwise-colored roof finishes that are not visible from the building interior or from the ground outdoors. Elsewhere select colors to match surrounding surfaces; submit colors to Design Professional for review in advance of procuring paint. 2.6 INSTALLATION OF UNDERGROUND CONDUIT A. Direct-Buried Conduit: 1. Coordinate trench locations in reference to other underground utilities. Ensure no other utilities are placed directly above or below, when parallel to conduits. 2. Comply with manufacturer's written instructions for solvent welding RNC and fittings. 3. Excavate trench bottom to provide firm and uniform support for conduit. Also see details and/or notes on drawings for additional trench-related information and for applications where concrete (or other) encasement is required. RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 -9 2/28/19 I I STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 4. After installing conduit, backfill and compact. Start at tie-in point, and work toward end of conduit run, leaving conduit at end of run free to move with expansion and contraction as temperature changes during this process. Firmly hand tamp backfill around conduit to provide maximum supporting strength. After placing controlled backfill to within 12 inches of finished grade, make final conduit connection at end of run and complete backfilling ' 5. with normal compaction. Install manufactured RNC duct elbows for stub-ups at poles and equipment and at building entrances through floor unless otherwise indicated. Provide GRC/RMC for risers, beginning below grade or slab and excluding the 90 degree fittings that connect to horizontal conduits below grade or slab, to above grade and slab except where terminating at utility poles, in utility pad-mounted transformer enclosures and cable pits, and in utility company pedestals. Couple GRC/RMC conduits to RNC ducts with adapters designed for this purpose. 6. Underground Warning Tape: Comply with requirements in Section 260553 "Identification for Electrical Systems." 7. Provide underground conduits at minimum of 24" below grade, slab or pavement as applicable (deeper where required by local utility company or prevailing codes and regulations), securely mounted on chairs when banked, with base in newly disturbed earth. Properly align ducts on chairs before backfilling. Provide heavy nylon pull- cord/drag-line (200 pound minimum strength) in empty conduits. Do not embed in slabs I 8. or pavement. Do not"scratch-in"just below slab or pavement. Properly support and anchor raceways for their entire length with factory bases and intermediate spacers. Provide spacers at each coupling location, at each termination 1 location, and at maximum five foot intervals between. Do not span any space unsupported. Provide end bells with rounded pulling surfaces at manholes, pull boxes and other end points of underground raceways. 9. Apply corrosion inhibiting compound before couplings are assembled for applications ' where metallic raceways are installed underground, in floors below grade, or outside. Draw up couplings and conduits sufficiently tight to ensure water-tightness. Provide steel rigid metallic conduit for applications where metallic conduits are installed below grade or slab. ' 10. Extend underground conduits that are capped at wall for future additions five feet beyond building. 11. Arrange excavation for exterior conduits so that: a. The lines are straight and true b. Grades required for drainage are maintained c. The tops of buried raceways are not less than 24" below finished grade 12. Seal PVC joints with product equivalent to Carlon Cement. Make solvent cemented joints in accordance with recommendations of manufacturer. 13. Install work in accordance with NFPA 70 and in compliance with local utility practices. 14. Provide full parity size green insulated ground wire in PVC runs, except for those used ' exclusively for optical fiber cables. 15. Encasement: See details and/or notes on drawings for applications where encasement is required. 16. Pressure or vacuum test below-grade conduits before and after concealing the conduits ' to ensure resistance to moisture ingress. 2.7 INSTALLATION OF UNDERGROUND HANDHOLES AND BOXES A. Install handholes and boxes level and plumb and with orientation and depth coordinated with ' connecting conduits to minimize bends and deflections required for proper entrances. Unless otherwise indicated, support units on a level bed of crushed stone or gravel, graded from 1/2- inch sieve to No. 4 sieve and compacted to same density as adjacent undisturbed earth. Install so cover surfaces will be flush with finished grade or pavement as applicable. Install RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 10 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS service/feeder scale handholes with bottom below frost line below grade. Field-cut openings for conduits in closed-bottom units and in walls of units according to enclosure manufacturer's written instructions. Cut enclosure with a tool designed for material to be cut. Size holes for terminating fittings to be used, and seal around penetrations after fittings are installed. END OF SECTION 1 1 1 1 1 1 1 1 1 i 1 1 1 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 11 2/28/19 1 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260537 -J-HOOK PATHWAYS FOR ELECTRICAL SYSTEMS I PART 1 -GENERAL I1.1 GENERAL A. Conduit/Raceway/Pathway: "Conduit", "raceway", "pathway" and similar terms shall be taken I to mean "conduit" unless specifically indicated otherwise in project manual documents, or unless specifically directed otherwise in field by Owner or Design Professionals. All such terms shall be considered synonymous for the general purposes of installation means and methods. I B. Provide J-Hook pathway systems only for the following limited applications: Class 2 ("low- voltage") control wiring, except for fire alarm system wiring. PART 2 - PRODUCTS I2.1 J-HOOK PATHWAYS A. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with I requirements, provide product by one of the manufacturers listed below, or equivalent NRTL listed and labeled equivalent. 1. Cooper B-Line (basis of design, model numbers as specified further below) 2. Mono-Systems, Inc. I B. Materials Description: 1. Provide J-Hook system components that are plenum-rated (regardless of whether air plenum ceilings exist on the project). Provide J-Hooks, not Cable Fasteners, and not I Bridle Rings. Provide open-top hooks, so cables can be laid into the J-Hooks rather than threaded through. Provide tool-less cable retainer clips (do not use cable ties). Provide hooks sized for maximum 40% fill (in cross section) based on outside diameter of cables. Accordingly, provide multiple sets of J-Hooks along any given pathway as applicable. I 2. Provide necessary factory hooks, cable retainers, fasteners, attachment kits, etc. as required for complete installations, including and equal to the following: Part Cooper B-Line, Inc.# 1-5/16" Hooks BCH21 (30 4-pair UTP) I 2" Hooks BCH32. (70 4-pair UTP) 4" Hooks BCH64 (280 4-pair UTP) 1-5/16" Cable Retainers BCHR21 2" Cable Retainers BCHR32 4" Cable Retainers BCHR64 J-Hook to Beam Fasteners (spring-clip) BCH -U (select hook size, flange thickness) J-Hook to Beam Fasteners (spring-clip) BCH_-E (select hook size, flange thickness) I J-Hook to Beam Fasteners (set-screw) BCH -C (select hook size, flange thickness) J-Hook to Flange Fasteners (spring-clip) BCH -F (select hook size, flange thickness) J-Hook to Strut Fasteners BCH -SM series I J-Hook to ATR (all-thread rod) Fasteners BCH -AB series J-Hook Angle Bracket Fasteners BCH RB series J-Hook to Floor Support Fasteners BCH_-L1410 series (select for hook size) Multi-Tier Attachment Kits BCHK series I Double-Sided Multi-Tier Fasteners BCH -1D or BCH_2D series as required Single Sided Multi Tier Fasteners BCH -2S3S/4S/5S/6S series as required 2.2 MATERIALS AND FINISHES IA. Provide steel units with rolled hook edges to prevent damage to cable jackets and insulation I J-HOOK PATHWAYS FOR ELECTRICAL SYSTEMS 260537 - 1 2/28/19 I i STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260537 -J-HOOK PATHWAYS FOR ELECTRICAL SYSTEMS B. Cable hooks for non-corrosive areas shall be pre-galvanized steel, ASTM A653. Where additional strength is required, cable hooks shall be spring steel with a zinc-plated finish, ASTM B633, SC3. C. Cable hooks for corrosive areas shall be stainless steel, AISI Type 304. PART 3 -EXECUTION 3.1 INSTALLATION A. Provide J-Hook support along "free-air" cable pathway routes. Provide J-Hooks at four-foot intervals and at offsets. Route J-Hooks above ceilings through corridors and similar open areas wherever possible to minimize above-ceiling wall penetrations. B. Layout and install all electrical work in strict compliance with Chapter 1, Part B, Section 110.26 of the latest adopted edition of NFPA 70. C. Keep pathways at least 24 inches away from parallel runs of flues and steam or hot-water pipes. Install horizontal runs above liquid and steam piping. Level and square runs, and install at proper elevations and heights. Do not begin installation of cables until J-Hook pathway installations are complete and until installation locations (end to end) are in a weatherproof environment. Install pathways so that they are accessible for cable installation after construction is complete. Install pathways with enough workspace to permit access for installing cables. Strictly adhere to factory load capacities and fill capacity. Provide factory cable retainers, fasteners, attachment kits, and other accessories as required for a complete installation. D. Securely anchor (mechanical, not adhesive) J-Hooks directly to structural components of the building. Do not anchor J-Hooks to ductwork, conduit, piping, fixtures, equipment, ceiling supports (rods, wires, t-bars), etc. Comply with requirements in Section 260529 and related sections for hangers and supports. Support using factory-approved methods. Fasten cables on horizontal runs with factory cable clamps, retainers, fasteners, attachment kits or flexible Velcro- secured wraps compliant with to NEMA VE 2. Tighten clamps/wraps only enough to secure the cable, without indenting the cable jacket. Use of synthetic or plastic "tie-wraps", "zip ties", "wire ties" and similar products are not permitted as a permanent means of anchoring, securing, supporting or otherwise installing any cables, conductors, conduits, raceways, devices, equipment or other electrical work. Do not use perforated strap. E. Coordinate work prior to rough-in with respective equipment and cable installers, and with Owner's Representative. Carefully coordinate proposed routing, including elevations, with affected installers and entities prior to rough-in. Neatly route paths parallel and perpendicular to building architectural lines, plumb on walls, and at a consistent elevation wherever possible. Install paths in a uniform plane/elevation wherever possible. Keep horizontal and vertical offsets to an absolute minimum. Route paths so that a minimum of 24 inches exists between cables and potential EMI sources such as lighting ballasts, motors, power wiring, dimmer circuits, etc. F. Provide a minimum of two (2) 4-inch bushed conduit sleeves where pathway is routed above inaccessible ceilings, and at penetrations of floors, masonry walls, fire rated walls, smoke-tight partitions, smoke-rated partitions, and similar elements. Provide smoke and fire stopping at such penetrations as applicable in (see Section 260502). Provide EMT conduit for "drops" from paths to outlets and equipment, with sweep bends, insulated throat fittings and 200-pound pull string. END OF SECTION , J-HOOK PATHWAYS FOR ELECTRICAL SYSTEMS 260537 -2 2/28/19 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS I PART 1 - PRODUCTS I1.1 MISCELLANEOUS MATERIALS A. Backfill and Fill Materials: Use excavated or borrowed material for backfill. Prior to backfilling, remove rock and gravel larger than 2 inches in any dimension, debris, waste, frozen materials, I vegetable matter, and other deleterious matter. Use gravel or stone where so specified on details on drawings, or otherwise included in specifications. I B. Non-shrink, Nonmetallic Grout: Provide premixed,factory-packaged, non-staining, non-corrosive, nongaseous grout, recommended for interior and exterior applications. C. Subbase: Subbase refers to the compacted layer used in pavement systems between the subgrade and the pavement base course material. Provide subbase consisting of graded mixture I of crushed gravel, crushed stone, crushed slag, or sand. 1.2 CONTROLLED LOW STRENGTH MATERIAL (CLSM —"FLOWABLE BACKFILL") I A. Description: Controlled-Low-Strength-Material (CLSM) is a material that has a specified compressive strength of 1200 pounds per square inch (PSI) at 28 days. This material is not concrete and is in a flowable state at the time of placement. I B. Materials: Provide CLSM mixture consisting of water, Portland Cement (Type I or II conforming to ASTM C-150, Type "F"fly ash, and fine aggregate. If fly ash is not used, provide CLSM using high dosages of an air entraining admixture to help flowability and lower strength for removability. Non-standard materials may be used only after receiving special permission from Owner's I Representative. Provide water used in mixing and curing that is as clean and free of oil, salt, acid, alkali, sugar, vegetable, and other substances injurious to the finished product as possible. Test water in accordance with the requirements to AASHTO T 26.Water known to be of potable quality may be used without testing. Use fine aggregates conforming to ASTM C 33 in CLSM. IC. Mix Design: Provide proportion of materials used in CLSM as follows. 1. Cement: 50-100 pounds (lbs) per cubic yard (cy) 2. Type "F", Fly Ash: 250-300 lbs/cy I 3. Sand: 2700-2800 lbs/cy 4. Water: 400-500Ibs/cy 5. Other proportions may be used only after receiving special permission from Owner's I Representative. 6. Conform to the following flowability test: Fill a 3-inch diameter by 6-inch long open-ended cylinder with the mixture, then strike off to level. Remove the cylinder by pulling straight up and ensure the diameter of the CLSM, after spreading, is a minimum of 8-inches. 1.3 CONCRETE MATERIAL A. Reinforcement: Provide the following where reinforcement is specified or if reinforcement is I deemed necessary by Owner's Representative due to special field conditions. 1. Welded Wire Mesh: Welded plain cold-drawn steel wire fabric, ASTM A 185. 2. Reinforcing Bars: Deformed steel bars, ASTM A 615, Grade 40. 3. Joint Dowel Bars: Plain steel bars, ASTM A 615, Grade 40. I B. Concrete Mix, Design and Testing: Design mix to produce normal-weight concrete consisting of Portland Cement, aggregate, air-entraining admixture, and water to produce the following properties. I 1. Aggregate: 3/8" 2. Compressive Strength: 3000 PSI, minimum at 28 days. 3. Slump Range: 7" to 8" (provide just enough slump to flow to the bottom of the formation and yet not be so wet as to cause the ducts to float). IUNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 4. Air Content: 5% to 8%. I 5. Portland Cement: ANSI/ASTM C 150, Type I. PART 2 - EXECUTION ' 2.1 INSTALLATION A. Subsurface conditions may have been investigated during the design of the project. If so, review reports of these investigations. Follow recommendations of these reports. Locate existing underground utilities in excavation areas, which are to remain. Support and protect these services during excavation operations. Contact utility owner immediately for instructions if unchartered or incorrectly charted utilities are encountered. B. General Installation. 1. Coordinate trench locations in reference to other underground utilities. Ensure no other utilities are placed directly above or below, when parallel to conduits. 2. Locate junction and pull boxes so they remain accessible after all construction work is complete. Coordinate all work with all other trades prior to commencement of the work. 3. Layout and install all electrical work in strict compliance with Chapter 1, Part B, Section 110.26 of the latest adopted edition of NFPA 70. Locations and routing that may be shown on plans are schematic and diagrammatic in nature. 4. Use of synthetic or plastic "tie-wraps", "zip ties", "wire ties" and similar products are not permitted as a permanent means of anchoring, securing, supporting or otherwise installing any cables, conductors, conduits, raceways, devices, equipment or other electrical work. C. Pathway Evacuation and Protection: Seal and protect raceways and boxes from moisture infiltration. Provide watertight fittings. Pressure or vacuum test below-grade conduits before and after concealing the conduits to ensure resistance to moisture ingress. D. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by excavation operations. Properly restore streets, sidewalks, concrete and blacktop surfaces that were broken for installing piping. E. Comply with codes in jurisdiction. I F. Where subsidence occurs at electrical installation excavations during a period of 12 months after Substantial Completion, remove surface treatment (i.e., pavement, lawn, or other finish), add backfill material, compact to specified conditions, and replace surface treatment. Restore appearance, quality, and condition of surface or finish to match adjacent areas. 2.2 EXCAVATION A. Protection: Protect excavated openings with substantial railings, fencing, signage, shoring, and I steel roadway plates in strict compliance with OSHA/NIOSH, with local Department of Transportation (DOT) standards, with authorities having jurisdiction, and as directed by Owner's Representative in field. Provide traffic detours per DOT standards during active construction work shift time periods. Provide related barricades, signage, portable flashing lights, etc. (per DOT standards) at specific locations as determined in field. Provide steel roadway plates, properly installed and anchored per DOT standards, over roadway cuts during inactive periods (i.e. between construction work shifts, while concrete is curing, and while flowable backfill is curing). Finish work affecting the roadways, and restore/pave roadway cuts, as quickly as possible after starting those segments of work. Carefully coordinate scheduling for roadway related work to allow adequate time for inspections and curing, while keeping overall related time to a minimum. B. Shoring and Bracing: Establish requirements for trench shoring and bracing to comply with local codes and authorities. Maintain shoring and bracing in excavations regardless of time period UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 2 2/28/19 1 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS Iexcavations will be open. Slope sides of excavations to comply with local codes and ordinances. Shore and brace as required for stability of excavation. Remove shoring and bracing when no I longer required. Install sediment and erosion control measures in accordance with local codes and ordinances. C. Dewatering: Prevent surface water, subsurface water, and ground water from flowing into I excavations and from flooding project site and surrounding area. Do not allow water to accumulate in excavations. Remove water to prevent softening of bearing materials. Provide and maintain dewatering system components necessary to convey water away from excavations. Establish and maintain temporary drainage ditches and other diversions outside excavation limits I to convey surface water to collecting/run-off areas. Do not use trench excavations as temporary drainage ditches. D. Material Storage: Stockpile satisfactory excavated materials where directed, until required for I backfill or fill. Place, grade, and shape stockpiles for proper drainage. Locate and retain soil materials away from edge of excavations. Do not store within drip-line of trees. Remove from site, and legally dispose of, excess excavated materials and materials not acceptable for use as Ibackfill or fill. E. Trenching: Excavate trenches to the uniform width, sufficiently wide to provide ample working room. Excavate trenches to depth indicated or otherwise necessary to full project requirements. I All trench widths indicated on drawings are minimum required widths. F. Cold Weather Protection: Protect excavation bottoms against freezing when atmospheric temperature is less than 35 degrees Fahrenheit. I G. Backfilling and Filling: Place soil materials in layers to required elevations for each area classification listed below, using materials specified in Part 2 of this Section. Backfill excavations as promptly as work permits. H. Placement and Compaction: Place backfill and fill materials in layers of not more than 8 inches in loose depth for material compacted by heavy equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers. Before compaction, moisten or aerate each layer as necessary to provide optimum moisture content. Compact each layer to required I percentage of maximum dry density or relative dry density for each area classification specified below. Do not place backfill or fill material on surfaces that are muddy, that are frozen, that contain frost, or that contain ice. Compact each layer of backfill or fill material to 95 percent standard compaction. I I. Moisture Control: Where subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water. Apply water in minimum quantity necessary to achieve required moisture content and to prevent water appearing on surface during, or subsequent to, Icompaction operations. J. Separately stockpile excavated topsoil adjacent to the excavated areas and trenches and utilize it in the final stage of backfilling operation. Grade exposed earth and other erodible areas to a Ireasonably uniform, and satisfactory, cross section and slope, as soon as practicable. K. Excavation for Underground Electrical Structures: Conform to elevations and dimensions shown within a tolerance of plus or minus 0.10 foot, plus a sufficient distance to permit placing and I removal of concrete formwork, installation of services, other construction, and inspections. Excavate by hand areas within drip-line of large trees. Protect the root system from damage and dry-out. Maintain moist conditions for root system and cover exposed roots with burlap. Paint root I cuts of 1 inch in diameter and larger with emulsified asphalt tree paint. Take care not to disturb bottom of excavation. Excavate by hand to final grade just before concrete reinforcement is placed. ' UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 3 2/28/19 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 2.3 INSTALLATION OF CLSM AND CONCRETE A. General: See details and/or notes on drawings for applications where encasement is required for underground conduits/duct banks. Transport product by mixer truck. Provide continuous agitation from mixing to placement. Retain records of all mixes, tests, etc. and include in Operation and Maintenance Manuals. Submit copies during construction if requested. B. Forms: In general, unless directed otherwise in field or required otherwise by OSHA and/or other prevailing codes, regulations and standards,the sides of the excavated trenches may be used as forms for encasement. Otherwise, provide forms made of steel, wood, or other suitable material of size and strength to resist movement during encasement product placement, and to retain horizontal and vertical alignment until removal. Do not remove forms for at least 48 hours after encasement product has been placed. C. Expansion Joints: Provide pre-molded joint filler for expansion joints abutting any structure, and as otherwise recommended by concrete supplier. D. Placement: Remove loose material from subbase surface immediately before placing concrete. Check subbase and forms for line and grade before placing concrete. Moisten subbase if required to provide a uniform dampened condition at time concrete is placed. Place product directly from the truck chute or pump it. Place product using methods that prevent segregation of mix. Use splash boards to divert the flow of product away from the trench sides, and to avoid dislodging soil and stones. Do not backfill until a minimum of 48 hours have passed. Exclude traffic over affected areas for at least 14 days after placement. END OF SECTION I t UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 4 2/28/19 STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 260544 -SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING PART 1 - EXECUTION 1.1 GENERAL DIRECTION A. Cutting and Patching: 1 1. Hold cutting and patching to a minimum by arranging with other trades for sleeves and openings before construction is started. 2. Cut and drill all openings in roofs, walls, and floors required to perform the work. Neatly patch all openings cut. Hold cutting and patching to a minimum by arranging with other ' contractors for all sleeves and openings before construction is started. When drilling / cutting concrete slabs, utilize ground penetrating radar (GPR) and/or X-ray scanning equipment to verify the location is free from obstruction, including but not limited to: structural rebar / strands / tendons and electrical conduit / wiring. Repair all damage to structural elements that may occur. Provide temporary partitions, dust barriers, vacuums to keep all dust to a minimum. Allow inspection by owner's rep and inspection by authority having jurisdiction prior to concealing any work or uncover and restore work to allow for observation. B. Fire Caulking: 1. Fire stopping requirements/locations are not indicated on electrical drawings. Review architectural and other drawings to determine where there will be fire/smoke rated walls, floors, membranes, etc. and rating requirements of same. Provide required fire stopping work associated with electrically related penetrations. Patching through fire rated walls and enclosures shall not diminish the rating of wall or enclosure. Patch shall be equal to rockwool, firestop, caulk or approved "rated" patch / sealant / pillow / grommet / compound / etc. Clean affected surfaces, joints, etc. immediately before applying fire stopping and only apply under recommended temperature and humidity. Apply primer as required by manufacturer. Properly tool sealants for clean look. Subject to compliance with requirements, provide products by one of the following: a. Fire Stop Pillows: Nelson PLW, STI, Hilti, 3M b. Fire Stop Putty: Nelson FSP, STI, Hilti, 3M ' c. d. Latex Intumescent Sealant: Nelson LBS3, STI, Hilti, 3M Outlet boxes: Nelson FSP, STI, Hilti, 3M C. Access Panels: 1. Provide all access panels required for proper servicing of equipment or access to junction boxes as a last resort after first searching out locations for equipment and junction boxes in accessible areas. All access panel locations and sizes must be coordinated with and approved by design team and owner's representative. Provide fire rated and smoke rated ' access panels where required. Provide frame as required for finish. Coordinate installation with General Contractor as they may elect to install access panel. Exact location(s) must be approved by the Architect. Minimum size to be 12" x 12" for junction ' boxes and 22" x 22" for equipment, units to be 16-gauge steel, primed for paint, door opens beyond 90 degrees and locking device shall be screwdriver cam locks. 2. For equipment or junction boxes above gypsum board or "hard ceilings", provide equipment access panels sized to permit complete holistic removal of the unit in its entirety. Access panel shall also be sized to accommodate removal of the largest piece of equipment in the case where such access panel is used as a removal pathway for multiple pieces of equipment. Subject to compliance with requirements, provide products by one of the following: ' a. b. Bar-Co., Inc. J.L. Industries. c. Karp Associates, Inc. d. Milcor Div. Inryco, Inc. TEMPLATE 260544- 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260544 -SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING e. Nystrom, Inc. , D. Conduit Sleeves: 1. Aboveground, exterior wall penetrations: rigid steel pipe sleeve. 2. Below grade, exterior wall and floor penetrations: schedule 40 cast iron pipe sleeve 3. PVC Pipe Sleeves where allowed: ASTM D 1785, Gray, Schedule 40. 4. Rectangular opening sleeves: Galvanized Sheet Steel, thickness min 0.1 inches. 5. Sleeve Seal Systems: Provide modular sealing device designed for field assembly, EPDM, Nitrile or Silicone based on installation environment with stainless steel bolts and polymer pressure plates. Install type and number recommended by manufacturer for a water tight seal. Provide by one of the following: a. Advance Products & Systems, Inc. b. CALPICO, Inc. c. Metraflex Company(The). d. Pipeline Seal and Insulator, Inc. e. Proco Products, Inc. f. OZ/Gedney g. Link-Seal 6. Sleeve Seal Fittings: Provide manufactured plastic, sleeve-type, waterstop assembly made for embedding in concrete slab or wall. Install in wall or slab as constructed and grout area around fitting. Provide by one of the following: a. Presealed Systems b. Bio FireShied c. MetaCaulk 7. Sleeves shall be cut flush with both faces of wall. Deburr all sleeves. Floor sleeves shall extend one inch above floor top elevation. Maintain all fire ratings. Use joint compound for around gypsum sleeves. Roof penetrations shall be with flexible boot-type flashing unit or within a pipe curb assembly equal to Pate Co. Curb and flashing per roofing manufacturer's requirements to maintain warranty. ' E. Grout: 1. Provide non-shrink grout, recommended for sealing openings in non-fire-rated walls or floors, ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout. Provide 5000-psi strength design mix, premixed and factory packaged. F. Silicone Sealants: 1. Provide single-component, silicone-based, neutral-curing elastomeric sealant for exterior work. Provide pourable (self-leveling) grade formulation for openings in non-fire rated floors and other horizontal surfaces. Install only in temperature and humidity as 111recommended by manufacturer. Colors of all visible sealants to be clear or color approved by owner's rep or design team. G. Acrylic Sealants: 1. Provide one-part, non-sag, mildew-resistant, paintable recommended for exposed applications of interior and protected exterior locations END OF SECTION I t TEMPLATE 260544 -2 2/28/19 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260548 -VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS I PART 1 -GENERAL I1.1 SUBMITTAL REQUIREMENTS A. Shop Drawings 1. Provide performance requirements and design criteria, including analysis data signed and sealed by the qualified engineer responsible for their preparation. PART 2 - PRODUCTS (NOT USED) IPART 3 - EXECUTION 3.1 GENERAL I A. The contractor shall subcontract a licensed structural engineer for the design of all seismic restraint systems required by the presiding jurisdiction. The structural engineer shall provide engineered stamped and signed drawings of seismic design and submit as deferred submittal to I supplement the permit drawings. 3.2 SEISMIC BRACING A. Provide seismic bracing of electrical components where required by code. I3.3 QUALITY ASSURANCE A. The contractor shall provide seismic restraint systems to meet total design lateral force I requirements for support and restraint of conduit, cable trays, equipment, and other similar systems and equipment where required by the applicable building code. 3.4 DELEGATED DESIGN I A. Seismic restraint designer shall coordinate all attachments with the structural engineer of record. Provide engineered stamped and signed drawings of seismic design. B. Seismic restraint designer shall provide visual inspection after installation and approve I installation of seismic design components. C. Design analysis shall include calculated dead loads, static seismic loads, and capacity of materials utilized for the connection of the equipment or system to the structure. ID. Analysis shall detail anchoring methods, bolt diameter, and embedment depth. E. All seismic restraint devices shall be designed to accept without failure the forces calculated per the applicable building code. IF. Friction from gravity loads shall not be considered resistance to seismic forces. END OF SECTION I I I TEMPLATE 260548 - 1 2/28/19 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260553 -IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 -GENERAL 1.1 QUALITY ASSURANCE , A. Comply with ANSI A13.1(and IEEE C2 as or if applicable). Comply with NFPA 70. Comply with 29 CFR 1910.144 and 29 CFR 1910.145. Comply with ANSI Z535.4 for safety signs and labels. Adhesive-attached labeling materials, including label stocks, laminating adhesives, and inks used by label printers, shall comply with UL 969. B. Comply with ANSI A13.1 for minimum size of letters for legend and for minimum length of color field for each raceway and cable size. PART 2 - PRODUCTS 2.1 RACEWAY AND METAL-CLAD CABLE IDENTIFICATION MATERIALS 1 A. Vinyl Labels for Raceways Carrying Circuits at 600 V or Less: Preprinted, flexible label laminated with a clear, weather- and chemical-resistant coating and matching wraparound clear adhesive tape for securing ends of legend label. Provide black letters on an orange field, and indicate voltage and system or service type. 2.2 CABLE IDENTIFICATION MATERIALS A. Self-Adhesive, Self-Laminating Polyester Labels: Preprinted, 3-mil thick flexible label with I acrylic pressure-sensitive adhesive that provides a clear, weather- and chemical-resistant, self- laminating, protective shield over the legend. Labels sized to fit the cable diameter such that the clear shield overlaps the entire printed legend. 2.3 CONDUCTOR IDENTIFICATION MATERIALS A. Color-Coding Conductor Tape: Colored, self-adhesive vinyl tape not less than 3 mils thick by 1 to 2 inches wide (where permitted by NEC for large feeder and sub-feeder conductors). 111 B. Self-Adhesive, Self-Laminating Polyester Labels: Preprinted, 3-mil thick flexible label with acrylic pressure-sensitive adhesive that provides a clear, weather- and chemical-resistant, self- laminating, protective shield over the legend. Labels sized to fit the conductor diameter such that the clear shield overlaps the entire printed legend. C. Marker Tapes: Vinyl or vinyl-cloth, self-adhesive wraparound type, with circuit identification legend machine printed using indelible process. ' 2.4 [UNDERGROUND-LINE WARNING TAPE A. Tape: 1. Recommended by manufacturer for the method of installation and suitable to identify and locate underground electrical and communications utility lines. 2. Printing on tape shall be permanent and shall not be damaged by burial operations. 3. Tape material and ink shall be chemically inert, and not subject to degrading when exposed to acids, alkalis, and other destructive substances commonly found in soils. 4. Provide tape with printing that most accurately indicates respective type of service of buried cable. B. Color and Printing: 1. Comply with ANSI Z535.1 through ANSI Z535.5. 2. Inscriptions for Red-Colored Tapes: ELECTRIC LINE, HIGH VOLTAGE. 3. Inscriptions for Orange-Colored Tapes: TELEPHONE CABLE, CATV CABLE, COMMUNICATIONS CABLE, OPTICAL FIBER CABLE.] I TEMPLATE 260553 - 1 2/28/19 STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 260553 -IDENTIFICATION FOR ELECTRICAL SYSTEMS I2.5 SELF-ADHESIVE LABELS A. Self-Adhesive Warning Labels: Factory-printed, multicolor, pressure-sensitive adhesive labels, configured for display on front cover, door, or other access to equipment unless otherwise indicated, installed level and plumb. 2.6 INSTRUCTION SIGNS A. Engraved, laminated acrylic or melamine plastic, minimum 1/16 inch thick for signs up to 20 sq. inches and 1/8 inch thick for larger sizes, installed level and plumb. ' 1. Engraved legend with black letters on white face. 2. Punched or drilled for mechanical fasteners. 3. Framed with mitered acrylic molding and arranged for attachment at applicable equipment. ' 2.7 EQUIPMENT AND FIELD NAMEPLATE IDENTIFICATION LABELS A. Engraved, Laminated Acrylic or Melamine Label: Punched or drilled for screw mounting, black ' letters on a white background for normal applications, minimum letter height shall be 3/8 inch, installed level and plumb. Provide 1/16" thickness for units up to 20 sq. in. or 8" length; provide 1/8"thickness for larger units. B. Provide white letters on a black background for normal power distribution system equipment. 2.8 WARNING LABELS AND SIGNS A. Comply with NFPA 70 and 29 CFR 1910.145. ' B. Arc-Flash Hazard Warning Labels: Provide pre-printed "as-built" labels on power distribution and like equipment to warn of potential electric arc flash hazard. Provide in compliance with Article 110.16 of NFPA 70. C. Warning labels and signs shall also include, but are not limited to, the following legends: 1. Multiple Power Source Warning: "DANGER - ELECTRICAL SHOCK HAZARD - EQUIPMENT HAS MULTIPLE POWER SOURCES." 11112. Workspace Clearance Warning for 0-150 volts to ground equipment: "WARNING - OSHA REGULATION - AREA IN FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 36 INCHES." 3. Workspace Clearance Warning for 151-600 volts to ground equipment: "WARNING - ' OSHA REGULATION - AREA IN FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 48 INCHES." 2.9 FIELD IDENTIFICATION LABELS A. Identification of Disconnecting Means: Provide pre-printed "as-built" nameplate identification labels at all service equipment, power distribution equipment, and each disconnecting means to indicate the maximum available fault current and exact source of the power supply that serves ' the respective equipment. Provide in compliance with Articles 408.4 (B), 110.22(A) and 110.24 (A)of NFPA 70. B. Circuit Directory/Identification: Provide pre-printed "as-built" identification at circuit sources, ' using directory cards intended for the purpose, for all circuits. Provide in compliance with Article 408.4 (A)of NFPA 70. C. In addition to other labelling required herein or by NFPA 70, provide pre-printed "as-built" ' identification of the following at all service entrance equipment. 1. Potential Electric Arc Flash Hazards compliant with Article 110.16(A) of NFPA 70. 2. Nominal System Voltage. 3. Single-Phase, Three-Phase/Three-Wire or Three-Phase/Four-Wire as applicable. TEMPLATE 260553 -2 2/28/19 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS 4. Available fault Current at Overcurrent Protective Devices. 5. The Clearing Time of Service Overcurrent Protective Devices based on the available fault current at the service equipment. 6. The Date that the label was applied. 2.10 CABLE TIES A. UV-Stabilized Cable Ties 1. Fungus inert, designed for continuous exposure to exterior sunlight, self extinguishing, one piece, self locking, Type 6/6 nylon. 2. Minimum Width: 3/16 inch. 3. Tensile Strength at 73 deg F, According to ASTM D 638: 12,000 psi. 4. Temperature Range: Minus 40 to plus 185 deg F. 5. Color: Black. B. Plenum-Rated Cable Ties 1. Self-extinguishing, UV stabilized, one piece, self locking. 2. Minimum Width: 3/16 inch. 3. Tensile Strength at 73 deg F, According to ASTM D 638: 7000 psi. 4. UL 94 Flame Rating: 94V-0. 5. Temperature Range: Minus 50 to plus 284 deg F. 6. Color: Black. 2.11 MISCELLANEOUS IDENTIFICATION PRODUCTS A. Fasteners for Labels and Signs: Self-tapping, stainless-steel screws or stainless-steel machine screws with nuts and flat lock washers. ' PART 3 - EXECUTION 3.1 INSTALLATION 111 A. All equipment & system identification nomenclature shown on drawings and listed herein may be shown for general design and installation reference only. Field-verify the actual nomenclature prior to fabrication. Prepare record documents accordingly. B. Coordinate identification names, abbreviations, colors, and other features with requirements in other Sections requiring identification applications, Drawings, Shop Drawings, manufacturer's wiring diagrams, and the Operation and Maintenance Manual; and with those required by codes, standards, and 29 CFR 1910.145. Use consistent designations throughout Project. C. System Identification Color-Coding Bands for Raceways and Cables: Locate bands at changes in direction, at penetrations of walls and floors, at 50-foot maximum intervals in straight runs, and at 25-foot maximum intervals in congested areas. D. Cable Ties: For attaching tags. Cut off excess lengths after installing ties. Use general-purpose type, except the following: Outdoors, UV-stabilized nylon; Indoors: Plenum rated. E. Underground-Line Warning Tape: During backfilling of trenches install continuous underground-line warning tape directly above line at 8 inches below finished grade. Use multiple tapes where width of multiple lines installed in a common trench or envelope/encasement exceeds 16 inches overall. Install line marker for every buried cable, regardless of whether direct-buried or installed in conduit. F. In accessible ceiling spaces and where exposed in unfinished areas, label conduit with panel and circuit numbers of conductors routed through the conduit. Label conduit at all wall penetrations and connections to all panels,junction boxes, and equipment served. I TEMPLATE 260553 -3 2/28/19 1 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS 1 3.2 IDENTIFICATION DEFINITION IA. Accessible Raceways and Metal-Clad Cables, 600 V or Less: Identify with self-adhesive vinyl label. Locate at changes in direction, at penetrations of walls and floors, at 50-foot maximum intervals in straight runs, and at 25-foot maximum intervals in congested areas. Do not install in finished occupied areas. I B. Accessible Raceways and Cables within Buildings: Identify raceways, cables. junction and pull boxes of the following systems with self-adhesive vinyl labels with the wiring system legend and system voltage. System legends shall be as follows: Power. IC. Power-Circuit Conductor Identification, 600 V or Less: For conductors in pull and junction boxes, and handholes, use color-coding to identify the phase. Color shall be factory applied to conductor insulation or field applied for sizes No. 4 AWG and larger, if authorities having I jurisdiction permit. These colors apply for factory-assembled cables as well as for individual insulated conductors. Use colors listed below for conductors. 1. Colors for 208/120-V Circuits: a. Phase A: Black I b. c. Phase B: Red Phase C: Blue d. Neutral: White 2. Color for Equipment Grounding: Green D. Auxiliary Electrical Systems Conductor Identification: Identify field-installed alarm, control, and signal connections. Identify conductors, cables, and terminals in enclosures and at junctions, terminals, and pull points. Identify by system and circuit designation. Use system of marker I tape designations that is uniform and consistent with system used by manufacturer for factory- installed connections. Coordinate identification with Project Drawings, manufacturer's wiring diagrams, and the Operation and Maintenance Manual. 1 E. Locations of Underground Lines: Identify with underground-line warning tape. Install underground-line warning tape for both direct-buried cables and cables in raceway. Install detectable tape at trenches containing empty conduits and conduits containing optical fiber I cable. F. Warning Labels for Indoor Cabinets, Boxes, and Enclosures for Power and Lighting: Self- adhesive warning labels. Comply with 29 CFR 1910.145. Identify system voltage with black I letters on an orange background. Apply to exterior of door, cover, or other access. For equipment with multiple power or control sources, apply to door or cover of equipment including. G. Operating and Warning Instruction Signs: Provide pre-manufactured operating and warning I signage if indicated on drawings and where required by NEC or local authority having jurisdiction. Install instruction signs to facilitate proper operation and maintenance of electrical systems and items to which they connect. Install instruction signs with approved legend where instructions are needed for system or equipment operation. I H. Equipment Identification Labels: On each unit of equipment, install unique designation label that is consistent with wiring diagrams, schedules, and the Operation and Maintenance Manual. I. Fire Alarm Systems: Provide permanent identification for boxes, enclosures, etc. that are associated with fire alarm system work. Paint and identify fire alarm system pull boxes,junction boxes, and other access/pull points (boxes and covers) in accordance with NEC/NFPA. Provide red color on jacket of all fire alarm cables associated with the fire alarm system. I Provide red-colored breaker handle and red-colored lock-on device at source circuit breakers that feed fire alarm related equipment. Provide red coloring for all fire alarm system junction boxes, along with identification. I TEMPLATE 260553 -4 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS 111 SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS END OF SECTION ' 1 I I r f I I 1 I 1 I I TEMPLATE 260553 - 5 2/28/19 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260584 -MECHANICAL EQUIPMENT I PART 1 -GENERAL I 1.1 RELATED DOCUMENTS A. Refer to documents of other divisions for further requirements associated with equipment and I devices that are addressed in this section. This section includes supplemental information related to electrical work associated with mechanical equipment and other equipment furnished and/or installed under all other divisions or by others. Information included in this section applies not only to traditional mechanical equipment, but also to equipment of any kind that is furnished Iand/or installed by any supplier or installer. PART 3 - EXECUTION I 3.1 GENERAL A. Common Requirements: 1. Provide all necessary electrically related work as required to render all mechanical I equipment (including plumbing, heating, ventilating and air conditioning equipment) fully operational and fully compliant with NEC. 2. Refer to Coordination Schedules on drawings. Provide disconnects, controllers, starters, accessories, wiring, connections, services, etc. where defined as "EC" in the schedule. I Information in this section supplements the information in the HECS. 3. Provide power wiring and connections for all equipment (including motor dampers, accessories, etc. as applicable) as required to render equipment fully operational. I 4. Install local disconnects and/or controllers at 48 inches to top of outlet box or enclosure as applicable above finished floor/slab/grade; provide flush mounted units in finished areas. Provide key operated controllers where accessible to general staff and/or general public. I 5. Drawn locations of equipment and devices are shown only for schematic indication of wiring requirements. Coordinate with locations and rough-in requirements as required to determine actual locations and termination requirements. Refer to all contract documents for additional electrical requirements and concerns, and for further representation of this work. 6. Provide disconnect switch ahead of all equipment, including controls, unless the mechanical equipment comes with integral NEC-compliant disconnect(s). Provide NEMA 3R enclosures where installed outdoors and where installed indoors in areas subject to moisture. Where mechanical equipment lugs cannot accommodate conductor sizes shown on drawings, provide ILSCO ClearTap Insulated Multi-Tap Connectors. 7. Sizes, electrical ratings, etc. of equipment and wiring shown on drawings are based on I the respective equipment design base manufacturers. If different manufacturer(s) or model(s) are actually supplied, provide necessary coordination in field (prior to ordering materials and prior to rough-in) and provide the necessary size of related electrical I equipment, wiring, conduit, etc. 8. Coordinate in field with the respective trades and determine case by case, which equipment is factory listed for use with Heating and Air Conditioning Rated (HACR) breakers. In an effort to minimize requirements for stocking of fuses by the Owner, utilize I HACR breakers at the source panelboards as the NEC required overcurrent protection wherever possible (in lieu of fusing local disconnect switches). 9. Disconnect Switch and/or Starter Locations: Locations shown on drawings are indicated for schematic purposes only. Determine exact locations in field so that they are compliant I with NEC Article 110.26. 10. Supplemental Work for Aluminum Conductor Electrical Equipment Connections (regardless of who furnishes the equipment): Provide local disconnect at or near I equipment (external to the equipment) and terminate aluminum conductors to the line- TEM PLATE 260584- 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260584 -MECHANICAL EQUIPMENT side lugs/terminals of the disconnect switch. Provide copper conductors from load-side lugs/terminals of the disconnect switch to the respective equipment factory disconnect or lugs/terminals as applicable. Coordinate all related work with all affected installers. B. Maintenance Receptacles for Equipment: Provide duplex receptacle within 25 feet of all electrically operated equipment of any nature that requires periodic testing or maintenance. Provide Type WR duplex GFCI weatherproof receptacle for outdoor applications (including rooftops) and for applications subject to high humidity or moisture. C. Equipment and Systems: 1. Variable-Frequency Motor Controllers (VFC) / Variable Frequency Drives (VFD): Install VFD in coordinated location. Provide power, wiring, and connections. Provide local non-fused disconnect switch at each VFCNFD, wired ahead of the VFCNFD. Provide local non-fused disconnect at respective controlled mechanical equipment for all applications where the VFCNFD and its disconnect are not within sight of the respective equipment, or where not within 50 feet of the equipment, or where not readily accessible. Provide these local disconnect switches with electrical interlock kits, with (2)#14 interlock wiring from interlock kit to respective VFCNFD so that VFC's/VFD's are automatically de- energized when the respective equipment disconnect switch is opened. 2. Control Wiring: a. General: Unless specifically indicated as empty conduit on drawings or herein, provide electrical control and interlock work as shown on drawings. Provide additional control work as specifically indicated herein. Coordinate HVAC thermostat and sensor locations in field (case by case) with Design Professionals, Owner's Representative and equipment installer to ensure that they are placed in locations that will not interfere with furniture, equipment, artwork, wall-hung specialties, room finishes, etc. Field-verify these wall locations case by case, prior to rough-in, since locations shown on drawings are schematic only. b. Schematic Thermostat and Sensor Locations: Refer to HVAC drawings and documents to determine locations and quantities if locations are not shown on electrical drawings, and to confirm locations and quantities even if locations are shown on electrical drawings. c. Low Voltage Thermostats and Sensors: Provide 4-inch square by 2-1/8 inch deep wall outlet boxes at 46 inches above finished floor to center of outlet box (with single-gang rings) for each unit. Provide one 3/4-inch empty conduit from each location, turned out above accessible ceilings (in joist space or against overhead slab/deck). Identify conduit in ceiling cavity; provide sweep bends, bushings and drag line. d. Line Voltage Thermostats and Sensors: Provide 4-inch square by 2-1/8 inch deep wall outlet boxes at 46 inches above finished floor to center of outlet box (with single-gang rings) for each unit. Provide line voltage power wiring, in 3/4-inch conduit, and connections from thermostats and sensors to respective equipment that is to be controlled by same. Install thermostats and sensors. e. Motor Operated Dampers: Provide wiring associated with interlock of motors to associated motor dampers for exhaust fans. Provide local disconnect at each motor damper if fan is not furnished with one. Where HVAC equipment or exhaust fans are controlled by VFC/VFD units, wire motor operated dampers (MOD's) back to the respective VFC/VFD unit separately from the respective exhaust fan power wiring, with (2) #12 AWG in 3/4 inch conduit. Provide local disconnect for each such MOD. 3. Domestic Water Heaters (Gas): Provide electrical 120VAC power connection. Provide interlock wiring with circulating pumps, flow switches and aquastat controls as applicable. Refer to wiring diagrams on drawings for further definition where applicable. TEMPLATE 260584 -2 2/28/19 I STARBUCKS COFFEE COMPANY ' GUIDE SPECIFICATIONS SECTION 260584- MECHANICAL EQUIPMENT 4. Domestic Water Heaters (Electric): Provide local disconnect switch, and power wiring and connections. Provide interlock wiring with circulating pumps, flow switches and aquastat controls as applicable. Refer to wiring diagrams on drawings for further definition where applicable. 5. Domestic Hot Water Circulating Pumps (Return Line): Provide manual starter with pilot I light, and wire pump to operate through the aquastat. Refer to wiring diagrams on drawings for further definition. 6. Electric Water Coolers (Surface): Provide 120V duplex receptacle. Provide GFCI circuit breaker to feed the circuit that serves electric water coolers, even if not indicated on panelboard schedule. Install at height and location as directed by water cooler installer. Conceal outlet within water cooler enclosure if enclosure is designed for such an installation. Assemble and connect cord if needed. Coordinate all specifics with water cooler installing contractor prior to rough-in of related work. 7. Electronic Plumbing Fixture Valves: Provide electrical wiring and connections as required for full automatic operation of direct-wired electronic sensor operated lavatory, urinal and water closet valves. Install and wire 120VAC/24VAC remote box mounted transformers. ' Install above nearby accessible acoustical tile ceiling and provide local single-pole switch above ceiling at the transformer to switch primary power. Provide secondary fusing if not integral to the transformer (verify in field). Provide required 24VAC wiring (#14 AWG "MC" Cable with ground), concealed. Field coordinate work carefully prior to rough-in. 8. Heat Trace: a. Review documents of all mechanical trades to determine extent and specifics related to heat trace requirements for the project. Any loads, quantities, circuits, connection locations, etc. that may be indicated on electrical drawings are shown for design-phase schematic representation only. Coordinate with all installers that may have heat trace for their piping or equipment to determine loads, quantities, required circuits, connection locations, etc. for each application. Provide such coordination prior to furnishing submittals and prior to commencing with any rough- in work. Provide power wiring and connections as required to render all heat trace fully operational. b. Receptacle-Fed Heat Trace: Provide dedicated circuit(s) and dedicated receptacle(s) as required. Provide receptacles that are ground fault equipment protection circuit interrupter type (GFEPCI, per NEC Article 427-22). Provide cover plate for each receptacle that is weatherproof type, rated NEMA 3R While In Use. I Provide this special type cover plate whether installed outdoor or indoor (to help deter personnel from inadvertently unplugging the heat trace). . Direct-Connected Heat Trace: Provide power wiring (ground fault protected per NEC). Provide identified local weatherproof non-disconnect and related field wiring/connections. Provide Type XHHW-2, low-leakage, branch circuit conductors. Keep branch circuit wire splices to an absolute minimum and properly insulated to prevent leakage. Provide Ground Fault Equipment Protection (GFEP) ' type circuit breakers at source panelboards for these branch circuits, per NEC Article 427, even if not shown as such on schedules. END OF SECTION TEMPLATE 260584 -3 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260590 - ELECTRICAL SPECIALTIES 1 PART 1 - PRODUCTS 1.1 ELECTRICAL SPECIALTIES I A. Door Bell System 1. Provide Edwards#660 flush strap-mounted bells,or equivalent by Federal Signal, Jenkins, NuTone or others, 8-10VAC, 15 VA. Provide 2-1/8 inch deep wall outlet back-boxes. 2. Provide Edwards #852 pushbuttons, or equivalent by Federal Signal, Jenkins, NuTone or others, flush "panel" mounted type rated at 10A at 12VAC/24VAC. Provide descriptive instructional engraving as directed by Design Professional. Provide 3-1/2 inch deep wall outlet back-boxes. 3. Provide Edwards #88-250 transformer, or equivalent by Federal Signal, Jenkins, NuTone or others, rated 120V primary and 4/8/12/16/20/24V secondary (40/80/125/160/200/250 VA). Install accessible (concealed in finished areas) per NFPA 70 and in a manner which permits proper cooling of the transformer. Provide power VA rating of the transformer as required for the loads plus 100% spare capacity for future addition of audible devices. Provide local primary switch at the transformer as a local disconnect and provide secondary fusing. Provide low voltage cable that is#16 AWG minimum. B. Commercial/Institutional Kitchen Equipment 1. Provide a complete wiring system to kitchen equipment. Refer to food service series drawings and specifications for further definition of work required. Determine exact location, mounting height and termination requirements from the kitchen equipment contract drawings and from manufacturer's equipment submittals. Provide either direct connections or cord & plug connections (including cords, plugs and receptacles) as determined in field; verify case by case prior to rough-in. Verify electrical ratings in field prior to rough-in. Make final connections to equipment. 2. Provide disconnect switches for direct-wired equipment and receptacles for cord & plug equipment. 3. Provide wiring and connections to equipment, controls, defrosters, condensers, compressors, lights, fans, heaters, heating elements, etc., which may not be detailed on plans, as applicable. 4. Refer to kitchen equipment drawings for additional details and provide related electrical work as required to render equipment fully operational. 5. Provide GFCI protection receptacles throughout the kitchen in compliance with NFPA 70. Utilize GFCI receptacles for all accessible receptacles and GFCI branch circuit breakers for all inaccessible receptacles. END OF SECTION 1 r TEMPLATE 260590 - 1 2/28/19 I STARBUCKS COFFEE COMPANY IGUIDE SPECIFICATIONS SECTION 260800 -COMMISSIONING OF ELECTRICAL SYSTEMS I PART 1 -GENERAL I1.1 SUMMARY A. The requirements of this Section apply to all sections of Division 26. I B. Copies of all commissioning documentation shall be given to the Owner and made available to the code official upon request in accordance with the Preliminary Commissioning Report and Documentation Requirements. I 1.2 DESCRIPTION A. As a quality process, commissioning provides tools to the Owner and to the Code Official to verify that building systems meet the design and code Requirements and that the systems, I components, and equipment to be commissioned have been installed and operate within the performance guidelines identified in the design documents and applicable energy codes. B. The commissioning process shall not remove or reduce the responsibility of the design team, I 1.3 contractors, subcontractors, vendors, manufacturers, or suppliers to provide a finished product. SYSTEMS AND EQUIPMENT TO BE COMMISSIONED A. The following systems, components, and equipment are the focus of the commissioning process I for the Project: 1. Electrical Lighting and Controls 1.4 COMMISSIONING PLAN IA. The Commissioning Plan is developed by the Commissioning Agent (CxA) and includes the following: 1. A narrative description of the activities that will be accomplished during each phase of I commissioning, including the personnel intended to accomplish each of the activities. 2. Lists the specific equipment and systems to be tested and a description of the tests. 3. Functions to be tested. 4. Conditions under which the test will be performed. I5. Measurable criteria for performance. 1.5 SUBMITTALS I A. The commissioning process requires review of Submittals for equipment and systems that are part of the commissioning scope of work. The Construction Manager will be responsible for delivering these submittals to the CxA for their review. IB. The commissioning process requires Submittal review simultaneously with engineering review. PART 3 - EXECUTION I 3.1 FUNCTIONAL PERFORMANCE TESTING A. The systems and equipment to be commissioned shall be tested through different modes of operation to verify that the systems function within the performance criteria identified in the I Contract Documents. B. Before functional performance test procedures are finalized, the contractors shall provide to the CxA all requested documentation and a current list of changes affecting equipment or systems. The CxA will provide the Commissioning Team members and others, as required, the functional I performance testing checklists electronically. The functional performance testing provides all team members with documentation to verify the operation of the systems and equipment at I COMMISSIONING OF ELECTRICAL SYSTEMS260800 - 1 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260800 -COMMISSIONING OF ELECTRICAL SYSTEMS turnover. This testing process will be documented utilizing functional performance testing checklists. 1. Equipment functional performance testing will demonstrate the installations and operation of components, systems, and system to system interfacing relationships such that operation, function and maintenance serviceability for each of the commissioned systems is confirmed. 2. Testing will include all modes, sequences of operation, and emergency conditions. C. Prior to passing final inspection, the registered design professional shall provide evidence that the lighting control systems have been tested to ensure that control hardware and software are calibrated, adjusted, programmed and in proper working condition in accordance with the construction documents and manufacturer's instructions. Functional testing shall be in accordance with adopted energy code for the applicable control type. D. Where occupant sensor controls are provided, the following procedures shall be performed: 1. Certify that the occupant sensor has been located and aimed in accordance with manufacturer recommendations. E. For occupant sensor controls to be tested, verify the following: 1. Where occupant sensor controls include status indicators, verify correct operation. 2. The controlled lights turn off or down to the permitted level within the requested time. 3. For auto-on occupant sensor controls, the lights turn on to the permitted level when an occupant enters the space. 4. For manual-on occupant sensor controls, the lights turn on only when manually activated. 5. The lights are not incorrectly turned on by movement in adjacent areas or by HVAC operation. ' F. Where time-switch controls are provided, the following procedures shall be performed: 1. Confirm that the time-switch control is programmed with accurate weekday, weekend and holiday schedules. 2. Provide documentation to the owner of time-switch controls programming including weekday, weekend, holiday schedules, and set-up and preference program settings. 3. Verify the correct time and date in the time switch. 4. Verify that any battery back-up is installed and energized. 5. Verify that the override time limit is set to not more than 2 hours. 6. Simulate occupied condition. Verify and document the following: a. All lights can be turned on and off by their respective area controls switch. b. The switch only operates lighting in the enclosed space in which the switch is located. 7. Simulate unoccupied condition. Verify and document the following: a. Nonexempt lighting turns off. b. Manual override switch allows only the lights in the enclosed space where the override switch is located to turn on or remain on until the next scheduled shutoff occurs. 8. Additional testing as specified by the registered design professional. G. Where daylight responsive controls are provided, the following shall be verified: 1. Controls devices have been properly located,field calibrated and set for accurate set points and threshold light levels. 2. Daylight controlled lighting loads adjust to light level set points in response to available daylight 3. The locations of calibration adjustment equipment are readily accessible only to authorized personnel. H. Contractors shall provide 2 weeks' notice to the CxA regarding the completion of equipment and system installation to schedule installation verification and functional performance testing. The COMMISSIONING OF ELECTRICAL SYSTEMS260800 -2 2/28/19 I I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260800 -COMMISSIONING OF ELECTRICAL SYSTEMS Icommissioning team shall oversee, direct,witness, and document the performance of equipment and systems to be commissioned. Functional performance testing shall be conducted after startup I of all equipment and systems have been satisfactorily completed and Controls have been completed. I. Contractors are required to provide the CxA with a signed equipment/system readiness form I before the CxA will visit the site to perform Functional Performance Testing (FPT). All time and expenses for FPT visits when equipment or systems are not ready to be tested will be invoiced to the responsible party. I J. Skilled technicians shall be provided by the appropriate contractors familiar with the system, components, equipment, and the facility in order to execute the functional performance testing of the system,subsystems,associated systems, components,and equipment. Each contractor shall be responsible to operate the systems to be commissioned and assist the CxA who will be Iverifying the functional performance testing procedures. K. During the functional performance testing, each responsible contractor or subcontractor, at the discretion of the CxA, may address minor problems discovered as may be necessary in order to I successfully complete the testing procedure. In such cases, the deficiency and resolution shall be documented on the procedure form or an attached sheet. L. Contractors are responsible to resolve, correct, and retest deficiencies or other issues discovered I during functional performance testing. 3.2 DOCUMENTATION REQUIREMENTS I A. The documents below specifying that the installed lighting controls meet documented performance criteria shall be provided to the building owner within 90 days of the date of receipt of the certificated of occupancy. B. Manuals I 1. The commissioning process requires detailed operations and maintenance manuals and shall include the following information: a. Submittal data stating equipment size and selected options for each piece of I equipment requiring maintenance. Manufacturer's operation manuals and maintenance manuals for each piece of equipment requiring maintenance, except equipment not furnished as part of the project. Required routine maintenance actions shall be clearly identified. c. Name and address of at least one service agency. d. A narrative of how each system is intended to operate, including recommended set points. e. Submittal data indicating all selected options for each piece of lighting equipment and lighting controls. f. Operation and maintenance manuals for each piece of lighting equipment. Required routine maintenance actions, cleaning and recommended relamping shall be clearly I identified. g. A schedule for inspecting and recalibrating all lighting controls 2. For equipment and systems in the commissioning scope of work, operation and maintenance manual information shall be submitted to the CxA in electronic format by the Icontractor responsible for the respective equipment and systems. C. A report of test procedures and results identified as "Final Commissioning Report" shall be delivered to the building owner and shall include: I1. 2. Results of functional performance tests. Disposition of deficiencies found during testing, including details of corrective measures used or proposed. I COMMISSIONING OF ELECTRICAL SYSTEMS260800 -3 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260800 -COMMISSIONING OF ELECTRICAL SYSTEMS 3. Functional performance test procedures used during the commissioning process including , measurable criteria for test acceptance, provided herein for repeatability. a. Exception: Deferred tests that cannot be performed at the time of report preparation due to climatic conditions. END OF SECTION ' r r I I 1 r I I I I I COMMISSIONING OF ELECTRICAL SYSTEMS260800 -4 2/28/19 I I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260919 - ENCLOSED CONTACTORS I PART 1 - PRODUCTS I1.1 ENCLOSED CONTACTORS A. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with I requirements, provide product by one of the manufacturers listed below. 1. Allen-Bradley Co. 2. Eaton Electrical Inc.; Cutler-Hammer Business Unit. 3. General Electric Company; GE Consumer& Industrial - Electrical Distribution. I 4. Siemens Energy&Automation, Inc. 5. Square D; a brand of Schneider Electric. B. Enclosed Contactors: II. Provide NEMA standard equipment, rating as indicated on drawings or application dependent, including those incorporated as an integral part of a factory/shop pre- fabricated piece of equipment. Do not use IEC standards for equipment. 2. Provide units as indicated on drawings and as indicated under Division 26 sections. I 3. Provide contactors equipped with externally-visible pilot lights and externally-operated Hand-Off-Automatic (HOA)selector switches in front cover of enclosure. 4. Wire contactors for lighting applications so that the "AUTO" position is the normal I activated condition (i.e. photocell controlled, photocell/time-clock controlled, remote switch controlled, BAS controlled, etc.); so that the "OFF" position is manual override to turn lighting off; and so that the "HAND" position is manual override to turn lighting on. 5. Provide contactors with field convertible N.O./N.C. contacts and descriptive nameplates. I 6. Provide lugs, lug kits and related accessory work as required to accommodate the conductor sizes and quantities needed for each application. Coordinate with associated installers, single-line diagram, field conditions, etc. 7. Electrically Held Contactors I a. Provide contactors equal to Square D Class 8903 (or Allen-Bradley Bul. 500L- BA*94 series) for small resistance heating loads. Provide contactors that are electrically operated and electrically held (EOEH). Provide contactors in factory I NEMA 1 minimum enclosures, with 120V coils (unless indicated otherwise elsewhere or otherwise required to render controls fully operable). b. Provide "dry" contacts rated at 30A, unless otherwise indicated on drawings, minimum 250V (600V if required by application). Provide number of poles I (minimum of three poles) and number of contactors as required for each application or as indicated on drawing, whichever is larger. Determine coil voltage ratings in field. I 8. Mechanically Held Contactors a. Provide magnetic (mechanically latched) contactors equal to Square D Class 8502 (or Allen-Bradley Bul. 500-BA*930 series) for heating loads, capacitor loads, transformer loads, motor loads, and similar loads. Provide contactors with factory I enclosures, with 120V coils (unless indicated otherwise elsewhere or otherwise required to render controls fully operable). Provide starters with holding circuit contacts (provide related interlock wiring). Provide magnetic contactors in enclosures that are NEMA Size 1 minimum. I b. Provide "dry" contacts rated at 30A, unless otherwise indicated on drawings, minimum 250V (600V if required by application). Provide number of poles (minimum of three poles) and number of contactors as required for each I application or as indicated on drawing, whichever is larger. Determine coil voltage ratings in field. I TEMPLATE 260919 - 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260919 - ENCLOSED CONTACTORS PART 2 - EXECUTION 2.1 INSTALLATION A. Provide units with horsepower ratings suitable to the loads. Size units according to load being served or as noted on drawings, whichever requirement is larger. B. Provide NEMA 3R enclosures for units that are installed outdoors, in moist areas, and in other atmospheres subject to similar moisture or exposure. Provide other NEMA enclosure types if indicated on drawings. END OF SECTION I I I r I I 1 I t r I I TEMPLATE 260919 -2 2/28/19 I I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 260923 - LIGHTING CONTROL DEVICES I PART 1 - PRODUCTS I1.1 MANUAL LIGHTING CONTROL DEVICES—SEE SECTION 262726.00 1.2 AUTOMATED LIGHTING CONTROL - EMS I A. EMS System 1. Venstar Surveyor system including a lighting control board, lighting contactors, push- button controls, photosensors, motion detectors, security interface, and dial timer. Refer to EMS installation guide for more information.] 1.3 AUTOMATED LIGHTING CONTROL—STAND-ALONE (NO EMS) A. Photocells Ii. Provide Tork #2107 (for 120/277 volt applications) and Tork #2104 (for 208/277 volt applications) photocells or equal by Intermatic, 2000W tungsten rated, 1800VA ballast rated, -40 to 140 degree F rated, fail-on, with contacts that remain closed from dusk to dawn (on at 1 to 5fc, off at 3 to 15fc). Provide delay of up to two minutes to prevent false I switching due to vehicular lights or lightning. Provide mobile light level selector. Provide gasketed heavy duty die cast zinc housing and base. Determine exact mounting locations and adjustment requirements in field relative to structural and site conditions. I Aim northward wherever not conflicting with artificial light sources. 2. Provide Sensor Switch #CM-PC-ADC or equal. Provide all required low voltage wiring and necessary power packs, relays, etc. for a complete system. Coordinate installation location and setting with manufacturer recommendations for daylight harvesting. I B. Digital Timer Switches: Provide Standard of Quality equal to WattStopper TS-400. Provide time range as indicated on drawings or as directed in field based on specific applications. Provide wall plates and finish colors to match color and style specified in section 262726 "Wiring I Devices." C. Multi-Purpose Time Clock (365 Day): Provide Intermatic #ET90415CR series Multi-Purpose Time Clock (or equal by Tork), which is programmable 365-day/24-hour with override controls. I Provide four-channel unit. Provide required external contactors, relays, etc. to render the control systems fully operational. Verify zone control requirements in field prior to rough-in. Provide 100-hour carryover carryover. Provide Ethernet module. I 1.4 OCCUPANCY SENSORS A. General 1. Provide labor, materials, tools, appliances, control hardware, sensor, wire, junction boxes I and equipment necessary for and incidental to the delivery, installation and furnishing of completely operational occupancy sensor lighting controls, as described herein. 2. Provide products supplied from a single manufacturer that has been continuously involved in manufacturing of occupancy sensors for a minimum of five (5) years. I 3. Provide occupancy sensors for entire project that are all made by the same manufacturer, regardless of where the materials are specified in Division 26 documents. Provide components that are all made by the same manufacturer in cases where occupancy sensor components are also connected to a building lighting control system, I regardless of where the materials are specified in Division 26 documents. 4. Provide components that are U.L. listed, offer a five (5) year warranty and meet state and local applicable code requirements. I 5. Provide products manufactured by an ISO 9002 certified manufacturing facility with a defect rate of less than one-third of one percent. 1 TEMPLATE 260923 -1 2/28/19 I 1 STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260923 - LIGHTING CONTROL DEVICES 6. Provide sensors with coverage that remains constant after sensitivity control has been set. Automatic reduction in coverage due to the cycling of air conditioner or heating fans is not permitted. 7. Provide sensors with readily accessible, user adjustable settings for time delay and sensitivity. Locate settings on the sensor (not the control unit) and recess to limit tampering. 8. Provide bypass manual override on each sensor to accommodate failures. Configure so111 that when bypass is utilized, lighting remains on constantly or control diverts to a wall switch until sensor is replaced. Recess this control to prevent tampering. 9. Provide sensors with an LED as a visual means of indication at all times to verify that motion is being detected during both testing and normal operation. 10. Where specified, provide sensor with internal additional isolated relay with Normally Open, Normally Closed and Common outputs for use with HVAC control, Data Logging and other control options. Do not use sensors that utilize separate components or specially modified units to achieve this function. 11. Provide sensors with UL rated, 94V-0 plastic enclosures. B. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with requirements, provide product by one of the manufacturers listed below. If not listed, submit as substitution. 1. Cooper Greengate CA 2. Hubbell 3. LC&D 4. Leviton 5. Lutron 6. Sensor Switch 7. Phillips 8. Wattstopper C. Ceiling Sensors: Provide Standard of Quality equal to WattStopper: DT-300, DT-305, or DT- 355, series. D. Wall Switch Sensors: Provide Standard of Quality equal to WattStopper: PW-100, PW-100-24, PW-200, DW-100, DW-100-24 or DW-200 series. Provide wall switch products that utilize Zero Crossing Circuitry to increase relay life, protect from the effects of inrush current, and increase sensor's longevity. Provide wall switch sensors that have no leakage current to load, in manual or in Auto/Off mode for safety purposes, and that have voltage drop protection. Where specified, provide wall switch sensors with field selectable option to convert sensor operation from automatic-ON to manual-ON. Where specified, provide vandal resistant wall switch sensors that utilize hard lens with minimum 1.0mm thickness. Do not provide products that utilize a soft lens. E. Power and Auxiliary Packs: Provide Standard of Quality equal to WattStopper: B120E-P, B277E-P, or BZ-100 series. F. Momentary-Contact Toggle Switches: Provide Standard of Quality equal to Legrand: LVS-1, 3 Amp, 24 VAC/VDC, single-pole, double-throw with center rest, designed to fit conventional toggle switch openings. PART 2 - EXECUTION 111 2.1 GENERAL A. Installation: Provide grounded ("neutral") conductor in all lighting control device (switch, dimmer, , occupancy sensor, etc.)wall outlet boxes, even if not immediately used. B. Occupancy Sensors TEMPLATE 260923 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 260923 - LIGHTING CONTROL DEVICES 1. Locate and aim sensors in the correct location required for complete and proper volumetric coverage within the range of coverage(s) of controlled areas per the manufacturer's recommendations. Provide ninety (90) to one hundred (100) percent coverage in rooms to completely cover the controlled area to accommodate all occupancy habits of single or multiple occupants at any location within the rooms. The locations and quantities of sensors shown on the drawings are diagrammatic and indicate only the rooms which are to be provided with sensors. Provide additional sensors if required to properly and completely cover the respective room. 2. Arrange a pre-installation meeting with manufacturer's factory authorized representative, 1 3. at Owner's facility, to verify placement of sensors and installation criteria. Exercise proper judgment in executing the installation to ensure the best possible installation in the available space and to overcome local difficulties due to space limitations or interference of structural components. 4. Provide, at the Owner's facility, the training necessary to familiarize the Owner's personnel with the operation, use, adjustment, and problem solving diagnosis of the occupancy sensing controls. 5. Upon completion of the installation, provide complete commissioning for controls by the manufacturer's factory authorized technician who will verify adjustments and sensor placement to ensure trouble-free occupancy-based lighting controls. Provide the Owner and Design Professionals with ten working days written notice of the scheduled commissioning date. Upon completion of related work, including fine tuning, provide factory authorized technician training to the Owner's personnel in the adjustment and maintenance of the sensors. END OF SECTION I I I I I I TEMPLATE 260923 -3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262113 - LOW-VOLTAGE OVERHEAD ELECTRICAL SERVICE ENTRANCE I PART 1 -GENERAL 1.1 ELECTRICAL POWER SERVICE I A. The electric service includes utility company transformer as indicated on drawings, furnished by local utility company, with secondary voltage as indicated on drawings. B. Furnish and install all work in strict compliance with all requirements set forth by the utility company providing electrical service for the project. Procure all needed details and information directly from the utility company as required for complete operational installations. Furnish and install all electrical work accordingly. Such work includes, but is not limited to: Insulators, weatherheads, metering, supports, conduit, wiring, connections, maintaining clearances, testing, inspections and ancillary work as applicable. C. Determine available fault current from electric utility company and provide appropriately rated electrical service and distribution equipment to accommodate not only the initial transformer proposed by the utility company, but also a future larger transformer if applicable to allow for full usage of the electrical service capacity. D. Where indicated in project manual, or where indicated on drawings, or where required by NEC, install ground-fault protection devices complying with electrical winding polarities indicated. Set field-adjustable GFP devices and circuit breakers for pickup and time-current sensitivity ranges as indicated, after installation of devices and CB's. E. Provide secondary conduit(s) and wiring from outdoor weatherhead to service disconnect(s). Coordinate insulator locations, weatherhead locations and conductor tail lengths with utility company prior to commencing with any related work. Provide meter base, associated conduit(s), and current transformer cabinet if required. Provide all work per utility company requirements and standards. Utility company will furnish and install the transformer and the overhead drop, and will make final overhead connections. Coordinate with drawings for number of spans, poles, special conditions, etc. 1.2 TELECOMMUNICATIONS SERVICE(S) A. Provide conduit(s) and wiring from outdoor weatherhead to demarcation point. Coordinate insulator locations, conduit sizes, conduit quantities, weatherhead locations, etc. with utility company prior to commencing with any related work. B. Provide minimum of one #6 AWG green-insulated ground conductor (in 3/4 inch EMT) from electrical power service entrance ground to each plywood equipment board. Terminate as directed by utility provider that is providing service. C. Provide related work in compliance with state building codes, with local building codes, with National Electrical Code, with National Electric Safety Code, with EIA/TIA 569 (Commercial Buildings Standard for Telecommunications Pathways and Spaces), and with other codes and authorities having jurisdiction. 1 PART 3 - EXECUTION 3.1 INSTALLATION A. Coordinate with other electrical work, including utility company wiring, as necessary to interface installation of service entrance equipment work with other work. Provide service entrance conduits with sweep L's. Properly seal conduits, immediately upon installation, to prevent water, moisture, dirt, rodents, insects, etc. from entering ducts. 1 TEMPLATE 262113 - 1 2/28/19 M r STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262113 - LOW-VOLTAGE OVERHEAD ELECTRICAL SERVICE ENTRANCE B. Prior to commencing with any service entrance related work, carefully coordinate installation of service work with affected utility companies, with Owner's Representative, with other trades, with affected entities, and with authorities having jurisdiction. C. Provide tight system and equipment grounding and bonding connections for service-entrance equipment, and wiring. END OF SECTION I I I I I I I I I I I TEMPLATE 262113 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262116 - LOW-VOLTAGE UNDERGROUND ELECTRICAL SERVICE ENTRANCE PART 1 -GENERAL 1.1 ELECTRICAL POWER SERVICE I A. The electric service includes utility company transformer as indicated on drawings, furnished by local utility company, with secondary voltage as indicated on drawings. B. Furnish and install all work in strict compliance with all requirements set forth by the utility company providing electrical service for the project. Procure all needed details and information directly from the utility company as required for complete operational installations. Furnish and install all electrical work accordingly. Such work includes, but is not limited to: Pads, bases, vaults, pits, manholes, metering, supports, conduit, wiring, connections, maintaining clearances, testing, inspections and ancillary work as applicable. C. Determine available fault current from electric utility company and provide appropriately rated electrical service and distribution equipment to accommodate not only the initial transformer proposed by the utility company, but also a future larger transformer if applicable to allow for full usage of the electrical service capacity. D. Where indicated in project manual, or where indicated on drawings, or where required by NEC, install ground-fault protection devices complying with electrical winding polarities indicated. Set field-adjustable GFP devices and circuit breakers for pickup and time-current sensitivity ranges as indicated, subsequent to installation of devices and CB's. E. Provide minimum of two 4-inch empty primary conduits from utility distribution source to the pad. Provide concrete pad. Provide secondary ducts and cable. Provide a minimum of one spare secondary duct. Provide meter base, associated conduit(s), and current transformer cabinet if required. Provide all work per utility company requirements and standards. Utility company will furnish and install the transformer and the primary cables, and will make service transformer connections. 1.2 TELECOMMUNICATIONS SERVICE(S) A. Provide two (2) 4" empty conduits (privately owned) per service (field-verify quantities and sizes with respective utility company), with drag lines, from the building plywood equipment board demarcation location(s) to the outdoor utility pole(s), as otherwise directed by utility operating company for service entrance(s) to building. Extend conduits at utility pole(s) 4 inches above final grade. B. Provide a minimum of 12 inches of earth separation between telephone related conduits and other conduits, or minimum of 4" separation where encased in concrete. Provide minimum 200- pound test pull line in conduits. Install conduit at a minimum depth of 24 inches, and a maximum depth of 36 inches. Provide record documentation. Provide long sweeping bends for offsets, with radii not less than ten times the internal diameter of conduit, and with a maximum of 270 degrees of bends between pulling points. Provide flush grade mounted pull box (approved by local telephone company) if required bends exceed 270 degrees. Extend conduit entering the building interior 4 inches above finished floor elevation. Provide one (1) 3-cell fabric innerduct assembly, equal to MaxCell Style 4G, in each conduit. Provide pre-lubricated incrementally marked lengths, and integral 1,250-pound pull tape (incrementally marked and color coded). C. Provide minimum of one #6 AWG green-insulated ground conductor (in 3/4 inch EMT) from electrical power service entrance ground to each plywood equipment board. Terminate as directed by utility provider that is providing service. D. Provide related work in compliance with state building codes, with local building codes, with National Electrical Code, with National Electric Safety Code, with EIA/TIA 569 (Commercial I TEMPLATE 262116 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262116 - LOW-VOLTAGE UNDERGROUND ELECTRICAL SERVICE ENTRANCE 111 Buildings Standard for Telecommunications Pathways and Spaces), and with other codes and authorities having jurisdiction. PART 3 - EXECUTION 3.1 INSTALLATION A. Coordinate with other electrical work, including utility company wiring, as necessary to interface installation of service entrance equipment work with other work. Provide service entrance conduits with sweep L's. Properly seal conduits, immediately upon installation, to prevent water, moisture, dirt, rodents, insects, etc. from entering ducts. B. Prior to commencing with any service entrance related work, carefully coordinate installation of service work with affected utility companies, with Owner's Representative, with other trades, with affected entities, and with authorities having jurisdiction. C. Provide tight system and equipment grounding and bonding connections for service-entrance equipment, and wiring. END OF SECTION I I I I I I I I I I TEMPLATE 262116 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS I SECTION 262200 - LOW-VOLTAGE TRANSFORMERS 1 PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data 1. For each type and size include rated nameplate data, capacities, weights, dimensions, minimum clearances, location and size of each connection, performance, etc. PART 2 - PRODUCTS 2.1 MANUFACTURERS 1 A. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with requirements, provide product by one of the manufacturers listed below. If not listed, submit as substitution. 1. Eaton Electrical Inc.; Cutler-Hammer Business Unit. 2. General Electric Company; GE Consumer& Industrial - Electrical Distribution. 3. Siemens Energy&Automation, Inc. 4. Square D; a brand of Schneider Electric. 2.2 GENERAL TRANSFORMER REQUIREMENTS A. Provide terminal enclosure, with cover, to accommodate primary and secondary coil wiring connections, and to accommodate electrical supply raceway terminal connectors. Provide terminal leads with connectors installed. Provide wiring connectors suitable for copper or aluminum wiring. Cushion-mount transformers with external vibration isolation supports. B. Coils: Continuous windings without splices except for taps, one leg per phase, with brazed or pressure type internal coil connections. Provide Aluminum coils. 2.3 DISTRIBUTION TRANSFORMERS A. Comply with NEMA ST 20, and list and label as complying with UL 1561. B. Taps for Transformers: Two 2.5 percent taps above and four 2.5 percent taps below normal full capacity. C. Features: 1. Insulation Class: 220 deg C, UL-component-recognized insulation system with a maximum of 150-degree C rise above 40 degree C ambient temperature. 2. Provide transformers with 10kV BIL ratings. 3. Energy Efficiency for Transformers: Complying with DOE 2016 Efficiency standard, and tested according to DOE 10 CFR Part 431: 2016, including Appendix A. 4. Enclosure: Ventilated, NEMA 250 Type 1 for indoor applications and Type 3R for exterior applications. Finish Color: Gray. D. Wall Brackets: Manufacturer's standard brackets. E. Low-Sound-Level Requirements: Maximum sound levels, when factory tested according to IEEE C57.12.91, as follows: 1. 9 kVA and Less: 45 dB 2. 30 to 50 kVA: 45 dB 3. 51 to 150 kVA: 50 dB 4. 151 to 300 kVA: 55 dB 5. 301 to 500 kVA: 60 dB 6. 501 to 750 kVA: 62 dB 7. 751 to 1000 kVA: 64 dB I TEMPLATE 262200 - 1 2/28/19 I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 262200 - LOW-VOLTAGE TRANSFORMERS IPART 3 -EXECUTION S 3.1 INSTALLATION A. Install wall-mounting and overhead-mounting transformers level and plumb with brackets fabricated by transformer manufacturer, or other means and methods specifically approved by I or recommended by transformer manufacturer for the affected transformer, and install as recommended by transformer manufacturer. Also, provide companion vibration isolators procured from transformer manufacturer. Submit specific proposed installation means, methods, weights, sketches, details, etc. to Design Professionals for review and comment prior to commencing with any related work. B. Maximum ground resistance shall be 5 ohms at location of transformer. C. Construct concrete housekeeping pad bases, and anchor floor-mounting transformers I according to manufacturer's written instructions, requirements in Section 26 05 29.00 "Hangers and Supports for Electrical Systems", and other related sections. Cushion-mount transformers with external vibration isolation supports. D. Transformers locations are shown for schematic purposes. Determine exact location in field based on surrounding building conditions, work of other trades, factory recommendations, ventilation requirements, maintenance access, and requirements of the NFPA 70 (including I working clearance requirements). E. From the time of manufacture, through shipping/storage phases, keep transformers dry, free of condensation, and free of rapid temperature fluctuations. Do not store transformers outdoors. I Maintain transformers at temperatures above ambient while in storage. F. Provide local primary disconnect switch for each transformer, and local secondary overcurrent protection. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems." and in accordance with NFPA 250. Provide flexible metal grounding strap I for grounding of core and coils. Provide final connections with an accurate torque wrench, and tighten to factory published torque values, and submit written documentation showing factory recommendations and actual values. Provide final connections to primary and secondary taps I 3.2 as necessary to fulfill project voltage requirements. FIELD QUALITY CONTROL A. Tests and Inspections: Provide testing and keep written and dated log for the following I 1. 2. "Hi-Pot" or"Megger", at factory at time of shipping. "Megger", at job site, immediately prior to final connections. 3. Secondary voltage under no load, after installation. I 4. Secondary voltage under full load, after installation. 3.3 ADJUSTING A. Record transformer secondary voltage at each unit for at least 48 hours of typical occupancy I period. Adjust transformer taps to provide optimum voltage conditions at secondary terminals. Optimum is defined as not exceeding nameplate voltage plus 10 percent and not being lower than nameplate voltage minus 3 percent at maximum load conditions. Submit recording and tap settings as test results. I END OF SECTION I I TEMPLATE 262200 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262416 - PANELBOARDS r PART 1 -GENERAL 1.1 SUBMITTAL REQUIREMENTS A. Product Data 1. For each provide bus configuration, current ratings, voltage ratings, SCCR Ratings, overcurrent protective device(s),surge suppression device(s),accessory, and components indicated. Include dimensions and manufacturers' technical data on features, performance, electrical characteristics, ratings, accessories, and finishes. PART 2 - PRODUCTS 1 2.1 GENERAL REQUIREMENTS FOR PANELBOARDS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Eaton Electrical Inc.; Cutler-Hammer Business Unit 2. General Electric Company; GE Consumer& Industrial - Electrical Distribution 3. Siemens Industry, Inc. 4. Square D; a brand of Schneider Electric B. Enclosures: Refer to electrical drawings and coordinate with field conditions for cabinet mounting types (i.e. flush, surface, flush and surface). 1. Rate for environmental conditions at installed location. 2. Hinged Front Cover: Entire front trim hinged to box, and with standard door within hinged trim cover. Provide concealed hinges, secured with flush latch with tumbler lock and keyed alike. 3. Panel, Back Box and Trim Finish: Galvanized steel, factory finished immediately after cleaning and pretreating with manufacturer's standard two-coat, baked-on finish consisting of prime coat and thermosetting topcoat. 4. Directory Card: Provide neatly typewritten circuit directory card for each panelboard upon completion of installation work. Include the actual room names/numbers that are selected for interior signage/designation. C. Incoming Mains Location: Provide incoming main locations (top or bottom, or top and bottom) based on means and methods and conduit/raceway layouts that are planned for installation. D. Phase, Neutral, and Ground Buses: Refer to electrical drawings, single line diagram and schedules for additional information on requirements for buses, as applicable. 1. Material: Tin-plated copper or aluminum. 2. Grounded ("Neutral") Bus: Provide 100% rated bus with sufficient lugs to accommodate grounded conductors for all circuits and pole spaces. 3. Equipment Grounding Bus: Adequate for feeder and branch-circuit equipment grounding conductors; bonded to box; minimum 50 percent rated. Bond to grounded ("neutral") bus for service entrance applications only. E. Conductor Connectors: Suitable for use with conductor material and sizes. 1. Material: Tin-plated aluminum 2. Main, Neutral, and Ground Lugs and Bus-Configured Terminators: Mechanical type. 3. Feed-Through Lugs and Sub-feed (Double) Lugs: Mechanical type, suitable for use with conductor material F. Service Equipment Label: NRTL/ULSE labeled for use as service equipment for units with one or more main service disconnecting and overcurrent protective devices. G. Fault Current Ratings I TEMPLATE 262416 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 262416 - PANELBOARDS 1. Provide electrical distribution related equipment with appropriately braced bussing and properly rated breakers, fuses, etc. for the available fault currents. I 2. In existing buildings where fault current values are not indicated on drawings, coordinate with existing "upstream" distribution equipment, and provide equipment AIC ratings that meet or exceed same. I H. Provide panelboard branches as scheduled on the drawings. Provide circuit breaker panelboard bus assemblies with distributed (sequence) type bussing throughout, so that any two adjacent single-pole breakers, or spaces, are replaceable by a two-pole internal common trip breaker, and I so that any three adjacent single-pole breakers, or spaces, are replaceable by a three-pole internal common trip breaker. This applies for branch breakers sized 15-amp through 70-amp inclusive, without disturbing any other breaker. I. Provide dead-front safety type panelboards as indicated. Provide with lug connectors approved for use with copper or aluminum conductors. Provide lugs, lug kits and related accessory work as required to accommodate the conductor sizes and quantities needed for each application. Coordinate with single-line diagram, schedules, field conditions, etc. I2.2 PANELBOARDS A. Provide Distribution Panel construction for panelboard applications where indicated on drawings or where otherwise required based on power distribution requirements. Provide Panelboard Iconstruction for branch panelboards. B. Provide circuit breaker panelboards unless indicated otherwise on drawings. 1. Circuit Breaker Branch Overcurrent Protective Devices: Bolt-on type, replaceable without I disturbing adjacent units. 2.3 DISCONNECTING AND OVERCURRENT PROTECTIVE DEVICES II A. Molded-Case Circuit Breakers (MCCB): Comply with UL 489, with interrupting capacity to meet available fault currents. 1. Thermal Magnetic Circuit Breakers: Inverse time-current element for low-level overloads, and instantaneous magnetic trip element for short circuits. Adjustable magnetic trip setting I for circuit-breaker frame sizes 250 A and larger. 2. GFCI Circuit Breakers: Class A ground-fault protection (6-mA trip). 3. Ground-Fault Equipment Protection (GFEP) Circuit Breakers: Class B ground-fault protection (30-mA trip). 1 I 4. Molded-Case Circuit-Breaker(MCCB) Features and Accessories: a. Lugs: Mechanical style, suitable for number, size, trip ratings, and conductor materials. I b. Application Listing: Appropriate for application;Type SWD for switching fluorescent lighting loads; Type HID for feeding fluorescent and high-intensity discharge (HID) lighting circuits. c. Shunt Trip: Trip coil voltage as required to achieve intended control scheme with I coil clearing contacts (or equivalent configuration), energized from separate circuit d. Multipole units enclosed in a single housing or factory assembled to operate as a single unit. e. Handle Padlocking "Lock-Out/Tag-Out" Device: Fixed attachment, for locking I circuit-breaker handle in off position. f. Handle Clamp: Loose attachment, for holding circuit-breaker handle in on position. g. Mounting: Designed to be mounted and operated in any physical position, and to be I operated in a minimum ambient temperature of 40 degrees C.; with mechanical screw type removable connector lugs, AL/CU rated. h. Size: Full size, no "tandem"or"split" breakers. I TEMPLATE 262416 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262416 - PANELBOARDS i. Common Trip: Common trip for multi pole breakers so overload on one pole will trip all poles simultaneously. Provide multi-pole breakers with common trip (or with handle-ties, only if needed because breakers are existing) for applications where it is determined that a common disconnecting means is required for multi-wire branch circuits serving, or within, the same enclosure, outlet box, equipment, or device. j. SWD Type: Provide for 15 and 20 ampere branch circuit breakers (UL Listed). k. HACR Type: Provide for HVAC, motor, and Refrigeration loads I. Spares: Place all spare circuit breakers in the 'OFF' position, provide with breaker locks, and schedule them as "Spare"on directory card. PART 3 - EXECUTION 1 3.1 INSTALLATION A. Mount top of trim 90 inches above finished floor unless top-most breaker handle would end up being above 78 inches in which case the top of trim shall be mounted so that the top-most breaker handle will be below 78 inches. Install overcurrent protective devices and controllers not already factory installed. Set field-adjustable, circuit-breaker trip ranges and other applicable settings. Arrange conductors in gutters into groups. Install filler plates in unused spaces. B. Provide neatly computer-typed/printed circuit directory card for each panel upon completion of installation work. Include the actual room names/numbers that are selected for interior signage and/or designation. Scheduling shown on drawings is shown to indicate feeder and branch circuiting requirements. Determine exact numbering sequence of circuits in field after performing final balancing. C. Stub four 1-inch empty conduits from recessed branch panelboards into accessible ceiling space or overhead structural space in areas with no finished ceilings. END OF SECTION I I I I I I I TEMPLATE 262416 -3 2/28/19 I I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 262713 -ELECTRICITY METERING I PART 1 - PRODUCTS I1.1 EQUIPMENT FOR ELECTRICITY METERING BY UTILITY COMPANY A. General 1. Furnish and install all work in strict compliance with all requirements set forth by the utility I company providing electrical service for the project. Furnish and install all electrical work accordingly. Such work includes, but is not limited to: CT cabinets (bussed if necessary), meter bases/sockets, supports, conduit, wiring, connections, maintaining clearances, I testing and inspections. Coordinate installation and connection of utilities and services. Locate and position meters in locations approved by the utility company, Design Professionals and Owner. 2. Provide lugs, lug kits and related accessory work as required to accommodate the i conductor sizes and quantities needed for each application. Meter will be furnished and installed by utility company. Provide metering-related work in strict accordance with utility company requirements. I 3. Current-Transformer Cabinets: Provide current-transformer cabinets. Comply with requirements of electrical-power utility company, including providing bussed cabinets for large services if required. I B. Metering at Building or Structure 1. Where applicable for projects requiring metering current transformer cabinets ("CT cabinets"), provide in strict compliance with utility company requirements. Provide bussed CT cabinets, constructed per utility company requirements, wherever more than three I sets of paralleled service entrance conductors exist, or will exist based on provisions indicated for future growth. Provide (1) 2" empty conduit with 200-lb pull string from CT Cabinet to the meter enclosure. Provide supports for CT cabinet and meter base. Do not exceed 25 feet in length for the conduit between the CT cabinet and the meter base. I1.2 EQUIPMENT FOR ELECTRICITY METERING BY OWNER("SUB OR TAB METERING") A. Acceptable Manufacturers: Provide all meters on this project by the same manufacturer to ensure commonality and ease of Owner maintenance. Subject to being equivalent and subject to compliance with requirements, provide product by one of the manufacturers listed below. 1. E-Mon; a division of Hunt Power(basis of design). 2. Electro Industries/GaugeTech (Shark series) I 3. National Meter Industries. 4. Osaki Meter Sales, Inc. 5. Eaton Electrical Inc.; Cutler-Hammer Business Unit. I 6. General Electric Company; GE Consumer& Industrial - Electrical Distribution. 7. Siemens Industry, Inc. 8. Square D; a brand of Schneider Electric. B. General Requirements and Specifications for Owner's Meters: I 1. Provide E-Mon D-Mon Class 3000 Series metering systems and equipment. Provide digital meter and current transformers (CT's), rated at amperes and voltages as necessary for each particular application. Provide conduit, wiring and connections 1 between CT's and meters per manufacturer's instructions as required to render the metering fully functional. 2. Provide Demand (kW) reading, which shows and records the highest peak demand and date and time peak occurred. I 3. Meters used for billing shall have an accuracy of 0.5 percent of reading, complying with requirements in ANSI C12.20. I TEMPLATE 262713 -1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262713 - ELECTRICITY METERING 4. Provide meter that is UL listed and labeled, CSA Approved and certified by a nationally recognized independent test facility to ANSI C12.1 and C12.16 specifications with split- core current sensors. 5. Enclosure: Provide heavy-duty JIC steel enclosure suitable for indoor installation and Nema type 4X enclosures with hasp for padlocking or sealing for exterior installations (exterior installation is preferred). 6. Memory Backup: Self-contained, non-volatile, to maintain memory throughout power111 outages of 72 hours, minimum. 7. Sensors: Allow for paralleling of sensors and/or mounting up to 500 feet from the meter. Provide sensors of split-core configuration to allow installation without powering down, with sensors available from 25 amp to 4,000 amp. 8. Power Factor: 0.5 leading or lagging. 9. Accuracy: Certified to ANSI C12.1 and C12.16 National Accuracy Standards. 10. Temperature Range: -20 degrees C to +50 degrees C. 11. Current Overload: Can be overloaded 100% without damaging meter. C. Provide the following features. 1. Easy-to-read cycling 4-line by 20-character backlit LCD display that shows kWh, kW (with peak date and time), power factor per phase, real-time load in kW, amps per phase, and volts per phase. 2. Records kWh and kVARh data for two channels. Data stored in 15-minute intervals for up to 36 days or 5-minute intervals for up to 12 days. PART 2 - EXECUTION 2.1 INSTALLATION A. Provide Series Combination Warning Labels, if applicable: Self-adhesive type, with text as required by NFPA 70. END OF SECTION I I I I I I 1 TEMPLATE 262713 -2 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262726 -WIRING DEVICES I PART 1 -PRODUCTS 1.1 GENERAL A. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with requirements, provide product by one of the manufacturers listed below. 1. Cooper Wiring Devices; Division of Cooper Industries, Inc. (Cooper) 2. FSR Inc. (FSR) 3. Hubbell Incorporated (Hubbell) 4. Hubbell Incorporated; Wiring Device-Kellems (Hubbell) 5. Hubbell Incorporated; Wiring Device-Bryant(Hubbell) 6. Legrand 7. Leviton Mfg. Company Inc. (Leviton) 8. Lutron Electronics, Inc. (Lutron) 9. Pass & Seymour/Legrand (Pass & Seymour) 10. Wiremold/Legrand (Wiremold) B. For receptacle circuits protected with 15A breakers, provide NEMA 5-15R equivalents for the devices specified in this section. C. Provide equivalent quality devices by manufacturers listed in subparagraphs hereafter for cases where voltage, amperage and/or NEMA configurations that are indicated on drawings or, are otherwise required based on project conditions, differ from those specified herein. D. Provide Weather-Resistant Receptacles with UL "WR" marking, compliant with NEC 406.8, for all applications in wet or damp locations. E. Where GFI protected receptacles are shown on drawings, provide a separate GFI receptacle for each one shown. Do not feed downstream receptacles from load-side (GFI-protected)terminals I of upstream receptacles. F. Provide corrosion-resistant versions of receptacles specified below for industrial applications and applications in corrosive or potentially-corrosive environments. G. Devices that are manufactured for use with modular plug-in connectors may be substituted under the following conditions: Connectors shall comply with UL 2459 and shall be made with stranding building wire; connectors are NRTL listed for intended use; connectors comply with I 1.2 the requirements in this Section; connectors are permitted by Authorities Having Jurisdiction. STRAIGHT-BLADE RECEPTACLES A. Convenience Receptacles, 125 V, 20 A: Comply with NEMA WD 1, NEMA WD 6 Configuration 5-20R (20A) or 5-15R (15A), UL 498, and FS W-C-596. Provide duplex and single specification grade receptacles, 2-pole, 3-wire grounding, self-grounding, green grounding screw, ground terminals and poles internally connected to mounting yoke, color coded base, 20- amperes, 125-volts, with metal plaster ears, back & side wiring, NEMA configuration 5-20R. Subject to compliance with requirements, provide one of the following (catalog numbers in subparagraphs below are for 20-A, heavy-duty, specification-grade, nylon-face devices; revise catalog numbers to require other configurations and ratings): I 1. 2. Cooper; 5351 (single), CR5362 (duplex) Hubbell; HBL5351 (single), HBL5352 (duplex) 3. Bryant; 5351 (single), 5352A(duplex) 4. Leviton; 5351 (single), 5362 (duplex) ' 5. Pass & Seymour; 5351 (single), 5362 (duplex) I TEMPLATE 262726 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262726 -WIRING DEVICES B. GFCI Receptacles, 125V, 20A: Straight blade, feed-through or non-feed-through type depending on application. Comply with NEMA WD 1, NEMA WD 6, UL 498, UL 943 Class A, and FS W-C-596. Subject to compliance with requirements, provide one of the following: 1. Cooper; VGF20 2. Hubbell; GF20#LA 3. Bryant; GF20#LA 4. Pass & Seymour; 2097 5. Leviton; 6490 C. [Combination USB Type A Charger, USB Type C Charger and Tamper-Resistant Convenience Receptacles: Square/rectangular face, 125 V, 20 A; comply with NEMA WD 1, NEMA WD 6 Configuration 5-20R, UL 498, and UL 943 Class A, and UL 1310. Provide one 20 Amp, 125 Volt, Decora Tamper-Resistant Receptacle, NEMA 5-20R. Provide one Type A USB Charger, and one Type C USB Charger, minimum 15.5W 5VDC power supply. Provide grounding, and Side-Wired and Back-Wired features. Provide integral smart chip that recognizes and optimizes the charging power of the plugged-in device. Label to comply with NFPA 70, "Receptacles, Cord Connectors, and Attachment Plugs (Caps)" Article, "Tamper-Resistant Receptacles in Dwelling Units" Section. Subject to compliance with requirements, available products that may be incorporated into the work include, but are not limited to, the following. 1. Legrand; PTTR20ACUSB series 2. Leviton equivalent 3. Hubbell equivalent] 1.3 CORD AND PLUG SETS 11 A. Description: Match voltage and current ratings and number of conductors to requirements of equipment being connected; Rubber-insulated cord with stranded-copper conductors, Type SOW-A jacket, green-insulated grounding conductor and ampacity of at least 130 percent of the equipment rating; Nylon body plug with integral cable-clamping jaws (match cord and receptacle type for connection). 1.4 TOGGLE SWITCHES A. General: Comply with NEMA WD 1, UL 20, and FS W-S-896. I B. Switches, 120/277 V, 20 A: Subject to compliance with requirements, provide one of the following: 1. Single Pole: a. Cooper; AH 1221. b. Hubbell; HBL1221. c. Bryant; 1121. d. Leviton; 1221-2. e. Pass & Seymour; CSB20AC1. 2. Three Way: a. Cooper; AH 1223. b. Hubbell; HBL1223. c. Bryant; 4903. d. Leviton; 1223-2. e. Pass & Seymour; CSB20AC3. 1.5 WALL-BOX DIMMERS A. Dimmer Switches: Modular, full-wave, solid-state units with integral, quiet on-off switches, with audible frequency and EMI/RFI suppression filters. Provide continuously adjustable slider control, with single-pole or three-way switching equal to Lutron "Diva" series. Comply with UL 1472. Do not break off side heat-sink sections when ganging. Provide dimmer and wall plate TEMPLATE 262726 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262726 -WIRING DEVICES colors that match other wiring devices in the respective room. Multiple wall-box dimmers may be used sporadically throughout the project on common circuits; provide compatible dimmers accordingly. Provide dedicated neutrals for circuits serving loads controlled by dimmers. Subject to compliance with requirements, provide one of the following manufacturers': 1. Lutron I 2. Cooper 3. Hubbell 4. Leviton 5. Wattstopper B. Install dimmers within terms of their listing. Verify that dimmers used for fan speed control are listed for that application. Install unshared neutral conductors on line and load side of dimmers according to manufacturers' device listing conditions in the written instructions. Provide low- voltage control wiring, where applicable, as required to render all dimming functionality fully operational. C. LED Dimmer Switches: Specification grade; modular; thin profile; compatible with dimming drivers; dimmer-driver combination capable of consistent full-range dimming. Provide low- voltage control wiring, in addition to branch circuit wiring, as required to render dimming fully operational. 1.6 COMMUNICATION, INFORMATION TECHNOLOGY AND SIMILAR OUTLETS A. Provide the following for communication, information technology and similar outlets that are shown on electrical drawings. 1. Provide 4-inch square by minimum 2-1/8 inch deep outlet box with single-gang ring. 2. Provide single-gang blank wall plate of material and color to match wiring devices in the respective room/area. 3. Provide at least one 3/4" empty conduit from outlet box to accessible ceiling cavity, or to overhead joist/structure space in areas with no finished ceilings. Provide sweep bends and insulated throat fittings (or plastic bushings) at each end of the conduit 4. Provide 200-pound pull string within conduits, easily accessible at both ends. 5. Provide neat permanent marking at the end of the overhead stub that clearly states the purpose of the conduit and the room where the respective outlet is located. 6. Coordinate all locations, heights and other specifics with the respective device/system installers and provide all work accordingly. 1.7 WALL PLATES A. Single and combination types shall match corresponding wiring devices. Provide metal plate- securing screws with head color to match plate finish. Provide factory markings on faces of I receptacles that are controlled for energy management or building automation that are compliant with Article 406.3(E), including symbol and the word "Controlled". Provide engraved wall plates where required by prevailing codes, indicated on drawings or indicated in Division 26 specifications. 1. Material for Finished Spaces: Smooth, high-impact thermoplastic 2. Material for Unfinished Spaces with surface-mounted outlet boxes: Galvanized steel 3. Material for Indoor Kitchens, Bar Areas, Damp Locations: Gasketed satin finish stainless steel, equal to Leviton Type 430 series, with spring-loaded lift cover, and listed and labeled for use in wet and damp locations. B. Wet-Location, Weatherproof Cover Plates: NEMA 250, complying with Type 3R, weather- !' 1.8 resistant. Refer to Section 26 05 33.00. FLOOR OUTLETS A. Refer to"FLOOR OUTLET DEVICE SCHEDULE" on drawings for specifications for floor boxes. I TEMPLATE 262726 -3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262726 -WIRING DEVICES B. Products: Floor boxes shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. Comply with UL 514 and NFPA 70 scrub water exclusion requirements. Provide UL listed and labeled rating(s) for fire and smoke rating of floor(and ceiling-below where applicable) assembly. 1.9 PREFABRICATED MULTIOUTLET ASSEMBLIES ("PLUGSTRIPS") A. Provide two-piece surface metal raceway, with factory-wired multioutlet harness. Components shall be products from single manufacturer designed for use as a NRTL listed complete, matching assembly of raceways and receptacles. Provide metal construction, with manufacturer's standard finish. Subject to compliance with requirements, provide products by one of the following: 1. Hubbell Incorporated; Wiring Device-Kellems 2. Wiremold/Legrand B. Multioutlet Harness: I 1. Receptacles: 15-A, 125-V, NEMA WD 6 Configuration 5-15R receptacles complying with NEMA WD 1, UL 498, and FS W-C-596. 2. Receptacle Spacing: 6 inches. 1.10 FINISHES AND INDICATORS A. Device Color(unless otherwise indicated or required by NFPA 70 or device listing): 1. General Wiring Devices Connected to Normal-Utility Branch of Power System: Verify with Architect and Owner . B. Wall Plate Color: For plastic covers, match device color. C. Illuminated Indication: Provide illuminated face or indicator light versions of wiring devices specified herein where indicated as such on drawings and/or where required by prevailing code(s), to indicate that there is power to the device. PART 2 - EXECUTION 2.1 INSTALLATION A. Coordination with Other Trades: Keep outlet boxes free of plaster, drywall joint compound, I mortar, cement, concrete, dust, paint, and other material that may contaminate the raceway system, conductors, and cables. Install device boxes in brick or block walls so that the cover plate does not cross a joint unless the joint is troweled flush with the face of the wall. Install wiring devices after all wall preparation, including painting, is complete. B. Conductors: Provide grounded ("neutral") conductor in all lighting control device (switch, dimmer, occupancy sensor, etc.)wall outlet boxes, even if not immediately used. Strip insulation evenly around the conductor using tools designed for the purpose. Avoid scoring or nicking of solid wire or cutting strands from stranded wire. The length of free conductors at outlets for devices shall meet provisions of NFPA 70, Article 300, without pigtails. Pig-tailing existing conductors is permitted, provided the outlet box is large enough. C. Device Installation: 1. Keep each wiring device in its package or otherwise protected until it is time to connect conductors. 111 2. Connect devices to branch circuits using pigtails that are not less than 6 inches in length. 3. Use side wiring with binding-head screw terminals. Wrap solid conductor tightly clockwise, two-thirds to three-fourths of the way around terminal screw. 4. Use a torque screwdriver when a torque is recommended or required by manufacturer. 5. When conductors larger than No. 12 AWG are installed on 15- or 20-A circuits, splice No. 12 AWG pigtails for device connections. I TEMPLATE 262726 -4 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262726 -WIRING DEVICES 6. Tighten unused terminal screws on the device. 7. When mounting into metal boxes, remove the fiber or plastic washers used to hold I 8. device-mounting screws in yokes, allowing metal-to-metal contact. Consider locations indicated on the drawings to be approximate (unless specifically dimensioned on drawings, or unless spacings must comply with prevailing codes). Study the general construction with relation to spaces and equipment surrounding each outlet. 9. Fasten electrical boxes firmly and rigidly to substrates, or structural surfaces to which attached, or solidly embed electrical boxes in concrete or masonry. Support boxes independent of conduit. 10. Provide feed-through-type GFCI receptacles where downstream receptacles are fed from the line side of the GFCI receptacle. 11. Adjust locations of outlets, devices, etc. to suit arrangement of partitions and furnishings. 12. Arrangement of Devices: Group adjacent switches under single, multigang wall plates. Unless otherwise indicated, mount flush, with long dimension vertical. Install receptacles so that the ground pin is oriented in a consistent manner throughout the facility, so that the orientation is compliant with all prevailing codes and regulations, and so that the orientation is acceptable to the electrical inspector. Where there is no existing building standard or other project requirement, install receptacles with ground pin up. Where receptacles are installed horizontally, install so that neutral connection faces up. 13. Device Plates: Do not use oversized or extra-deep plates. Repair wall finishes and remount outlet boxes when standard device plates do not fit flush or do not cover rough wall opening. END OF SECTION I I I I I 1 I I TEMPLATE 262726 -5 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262813 -FUSES I PART 1 -GENERAL 1.1 EXTRA MATERIALS I A. Fuses: Furnish fuses equal to 10% of project quantity not exceeding (10)for each fuse size and type. Furnish no fewer than (2) for single phase applications and (3) for three phase applications. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following available manufacturers offering products that may be incorporated into the Work: 1. Cooper Bussmann, Inc. 2. Edison Fuse, Inc. 3. Mersen, Inc. 4. Littelfuse, Inc. 2.2 GENERAL REQUIREMENTS A. Characteristics: 1. 50 through 60 Hz., with 200,000 RMS symmetrical interrupting current rating. 2. Voltage: Rate based on voltage of protected feeders, circuits and loads. 3. Provide rejection type fuses for fuses 1 ampere through 600 amperes. 4. Provide Hi-Cap, bolt type fuses for fuses 601 amperes through 6000 amperes. 1 5. Cartridge Fuses: NEMA FU 1, nonrenewable cartridge fuses with voltage ratings consistent with circuit voltages. 6. Provide each fuse with clear factory markings indicating classification, characteristics, ampere ratings, voltage ratings, etc. PART 3 - EXECUTION 3.1 FUSE APPLICATIONS I A. For protecting service entrances, and distribution feeders 600 amperes and below: Provide UL Class RK-1 Current-Limiting/Time-Delay fuses. Provide fuses that are current-limiting, time- delay, dual-element type (with pure silver links), equal to Bussman #LPS-RK1 (600V) or Bussman #LPN-RK-1 (250V) as applicable. B. [For protecting general duty motors: Provide UL Class RK-5 Current-Limiting/Time-Delay fuses. Provide fuses that are time-delay, dual-element type (with pure silver links), equal to Bussman #LPS-RK5 (600V) or Bussman #LPN-RK-5 (250V) as applicable. Provide fuses that are rated 60 Hz, with 200,000 RMS symmetrical interrupting current rating.] I I I I TEMPLATE 262813 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262813 -FUSES I 3.2 INSTALLATION A. Install labels complying with requirements for identification specified in Section 260553 "Identification for Electrical Systems" and indicating fuse replacement information on inside door of each fused switch and adjacent to each fuse block, socket, and holder. END OF SECTION r I I I I I r I 1 1 I I TEMPLATE 262813 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 262816.16 - ENCLOSED SWITCHES PART 1 - PRODUCTS 1.1 SWITCHES I A. Acceptable Manufacturers: Subject to being equivalent and subject to compliance with requirements, provide product by one of the manufacturers listed below. If not listed, submit as substitution. 1. Eaton Electrical Inc.; Cutler-Hammer Business Unit. 2. General Electric Company; GE Consumer& Industrial - Electrical Distribution. 3. Siemens Industry, Inc. 11 4. Square D; a brand of Schneider Electric. B. Characteristics: 1. 50 through 60 Hz., with 200,000 RMS symmetrical interrupting current rating. 2. 250VAC rated, for projects with service-entrance line to line voltage not exceeding 240V. 3. 600VAC rated, for projects with service-entrance line to line voltage not exceeding 600V. C. Type HD, Heavy Duty: UL 98 and NEMA KS 1, horsepower rated, with clips or bolt pads to accommodate required fuses where applicable, lockable handle with capability to accept three padlocks, interlocked with cover in closed position, single or double throw as indicated on drawings. D. Accessories: I 1. Equipment Ground Kit: Internally mounted and labeled for copper and aluminum ground conductors. 2. Neutral Kit: Internally mounted; insulated, capable of being grounded and bonded; labeled for copper and aluminum neutral conductors. 3. Class R Fuse Kit: Provides rejection of other fuse types when Class R fuses are specified. 4. Lugs: Mechanical type, suitable for number, size, and conductor material. 5. Service-Rated Switches: Labeled for use as service equipment. 1.2 ENCLOSURES A. Enclosed Switches: NEMA AB 1, NEMA KS 1, NEMA 250, and UL 50, to comply with environmental conditions at installed location. Refer to drawings for NEMA type. Provide the following enclosure types if not noted on drawings, or if not noted otherwise on drawings. 1. Indoor, Dry and Clean Locations: NEMA 250, Type 1. 2. Outdoor Locations: NEMA 250, Type 3R. 111 3. Commercial Kitchen Areas: NEMA 250, Type 4X, Stainless Steel. 4. Other Wet or Damp, Indoor Locations: Type 3R. 5. Indoor Locations Subject to Dust, Falling Dirt, and Dripping Noncorrosive Liquids: NEMA 250, Type 12. PART 2 -EXECUTION 2.1 INSTALLATION I A. Install individual wall-mounted units with tops at uniform height unless otherwise indicated, or unless units must be stacked vertically, or unless field conditions otherwise dictate. B. Temporary Lifting Provisions: Remove temporary lifting eyes, channels, and brackets and temporary blocking of moving parts from enclosures and components. C. Install fuses in fusible devices. D. Comply with NECA 1. E. Install disconnect switches within sight of controller position unless otherwise indicated. I TEMPLATE 262816.16 - 1 2/28/19 r I STARBUCKS COFFEE COMPANY I GUIDE SPECIFICATIONS SECTION 262816.16 -ENCLOSED SWITCHES F. Size units according to load being served or as noted on drawings, whichever requirement is larger. Provide units with horsepower ratings suitable to the loads where applicable. Install fuses I and accessories as necessary to fulfill requirements of each application as applicable. G. Subsequent to completion of installation of equipment, energize circuits and demonstrate capability and compliance with requirements. Begin by demonstrating switch operation through I six opening/closing cycles with circuit unloaded. Open each switch enclosure and inspect interiors, inspect mechanical and electrical connections, inspect fuse installations, and verify accuracy of type and rating of fuses installed. Correct deficiencies then retest to demonstrate compliance. Remove and replace defective units with new units and retest. H. Provide fuses of types specified in Section 262813.00, and of ratings as indicated on drawings. IEND OF SECTION I I I I I I 1 I I I I TEMPLATE 262816.16 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 264313 -SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS I PART 1 - GENERAL 1.1 SUBMITTAL REQUIREMENTS I A. Product Data 1. For each type include rated capacities, operating characteristics, electrical characteristics, maximum continuous operating voltage, weights and dimensions, wiring requirements, tested values, required OCPD and accessories, warranty, etc. 1.2 DEFINITIONS: A. SPD: Surge protective/protection device. B. SPD Type: Used to describe the intended application location of the SPD, either upstream or downstream of the main overcurrent protective device of the facility. 1. Type 1 SPD — Permanently connected SPDs intended for installation between the secondary of the service transformer and the line side of the service equipment overcurrent device, as well as the load side, including watt-hour meter socket enclosures and intended to be installed without an external overcurrent protective device. 2. Type 2 SPD — Permanently connected SPDs intended for installation on the load side of the service equipment overcurrent device; including SPDs located at a branch panel. 3. Type 4 SPD — Recognized Component SPDs, including discrete components as well as component assemblies, which bear specific conditions of acceptability. C. Enhanced EMI/RFI Filtering: The performance of filtering circuitry is defined by the level to which it mitigates Ring Wave transients and can be demonstrated in the test results of IEEE C62.41.2-2002, Category A Ring Wave (2kV). D. VPR (Voltage Protection Rating): A rating selected from a list of preferred values as detailed in the latest edition of UL 1449 and assigned to each mode of protection. The value of VPR is determined as the nearest highest value taken from a list of preferred values as detailed in the latest edition of UL 1449 to the measured limiting voltage determined during the transient- voltage surge suppression test using the combination wave generator at a setting of 6 kV, 3 kA. E. MCOV(Maximum Continuous Operating Voltage): The maximum designated root mean-square (rms) value of the power frequency voltage that may be continuously applied to the mode of protection of an SPD. F. Nominal Discharge Current (In): Peak value of the current, selected by the manufacturer from a list of values specified in the latest edition of UL 1449, through the SPD having a current wave shape of 8/20 where the SPD remains functional after 15 surges using the test procedure described in the latest edition of UL 1449. G. Modes of Protection: Electrical paths where the SPD offers defense against transient overvoltages. e.g. Each Line to Neutral (L-N), Line to Ground (L-G), Line to Line (L-L) and Neutral to Ground (N-G). H. Per Phase Ratings: `Per-Phase' ratings for a three-phase Wye-connected SPD is the total surge current capacity connected to a given phase (Line to Neutral mode plus Line to Ground mode). I. MOV: Metal-oxide varistor; an electronic component with a significant non-ohmic current- voltage characteristic. 1.3 COORDINATION A. Coordinate location of field installed SPDs to allow adequate clearances for maintenance and proximity to electrical bus in protected power distribution equipment. SPDs shall be rated for the I TEMPLATE 264313 - 1 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 264313 -SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS 111 I ss and category of service necessaryfor the application. Preferred location is on the wall ca g y directly above the main panel. 1.4 MANUFACTURER'S WARRANTY A. Manufacturer agrees to repair or replace SPDs that fail in materials or workmanship within specified warranty period. Warranty Period: Minimum five (5) years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Provide all SPDs on this project by the same SPD manufacturer to ensure commonality and ease of Owner maintenance. Provide products manufactured by Emerson Surge Protection. Subject to being equivalent and subject to compliance with requirements, provide product by one of the manufacturers listed below. 1. Emerson Surge Protection 2. Advanced Protection Technologies Inc. (APT) 3. ASCO Power Technologies (APT) 4. Current Technology 5. Eaton Corporation 6. General Electric 7. LEA International 8. Leviton Manufacturing Co., Inc. 9. Siemens Industry, Inc. 10. Square D 11. Surge Suppression Incorporated 2.2 GENERAL SPD REQUIREMENTS A. SPD with Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. Comply with latest editions of NFPA 70 and I UL 1449. 2.3 SERVICE ENTRANCE SPD'S A. Basis of Design: 1. Surge Suppression Incorporated, Advantage Series 2. Emerson Surge Protection, 400 Series 3. Current Technology, Current Guard Plus Series B. SPDs: Listed and labeled UL acceptable to authorities having jurisdiction as complying with UL 1449 Type 1. Comply with UL 1283. C. Peak Surge Current Rating: The minimum single-pulse surge current withstand rating per mode shall not be less than 200 kA. This value shall be independently tested by a 3rd party testing agency. D. SPD shall have a Nominal Discharge Current Rating of 20 kA per mode for all modes. The Maximum Continuous Operating Voltage (MCOV)shall be at a minimum as follows: 1. 120/208 Wye shall be 150V E. The SPD shall have Voltage Protection Ratings (VPRs)for modes shown above as follows: 1. 120/208 Wye a. L-N: 700V b. L-L: 1,200V c. L-G: 700V I TEMPLATE 264313 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS i SECTION 264313 -SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS d. N-G: 700V 1 F. SPDs shall be or have the following features and accessories: 1. Indicator light display for power to device and protection status. 2. Form-C contacts rated at 5 A and 250-V ac, one normally open and one normally closed, for remote monitoring of protection status. 3. Surge counter. 4. Permanently-mounted, parallel connected. 5. Solid-state clamping components to limit the surge voltage and divert the surge current. SPD components that "crowbar" (e.g. spark gaps, gas tubes, SCR's, etc.) are not allowed. 6. Capable of sustaining 115% of nominal RMS voltage continuously without degrading. 7. The SPD shall be tested and listed by an UL as a complete assembly to a symmetrical fault current rating greater than or equal to the available fault current at the location of installation at the protected power distribution equipment, in accordance with NEC Article 285 and shall be marked with the short circuit current rating (SCCR). If the available fault current is unknown, then the SCCR of the SPD shall be 200 kAIC. 8. SPD system shall provide protection for all modes for a three-phase Wye-connected SPD. 2.4 ENCLOSURES A. Indoor Enclosures: NEMA 1 or better; Outdoor Enclosures: NEMA 4 or better. 1 B. Wire SPDs to a disconnecting switch or breaker, rated for minimum 30 amps (higher if/as recommended by equipment manufacturer), in the protected power distribution equipment per manufacturer's installation instructions to ensure a means of disconnecting the SPD from the power source without de-energizing the protected power distribution equipment or the connected loads. Size circuit breaker rating so that breaker does not open prematurely when removing surge suppression from the circuit. The use of direct bus bar connected SPDs is expressly prohibited and will be rejected unless integral means is included to disconnect and remove SPD without having to de-energize respective protected equipment or upstream equipment. C. Service Entrance Equipment: Provide externally-mounted. Install SPD components to the service entrance equipment as near as possible to the interior connection points; position the related branch breakers accordingly. Provide dual shielded, triple insulated multi-core power conductor from connection lug to SPD to minimize cable impedance. I PART 3 - EXECUTION 3.1 INSTALLATION A. Install SPDs in strict accordance with manufacturer's instructions and the NEC. Comply with NECA 1. B. Externally Mounted Units and Similar Applicable Installations: Install SPDs with conductorsII between suppressor and points of attachment as short and straight as possible, and adjust circuit-breaker positions to achieve shortest and straightest leads. Do not splice and extend SPD leads unless specifically permitted by manufacturer in writing. Do not bond neutral and ground. Install conductors with direct paths to and from SPD devices avoiding sharp bends, loops and excessive lengths. Install externally mounted SPD components to the boxes of protected equipment as near as possible to the interior connection points; position or reposition the related branch breakers accordingly. Cut factory and field leads as required to minimize cable lengths for externally mounted units. C. Wiring: I TEMPLATE 264313 -3 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 264313 -SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS 1. Install SPDs at service entrance on load side, with ground lead bonded to service entrance ground. 2. Use crimped connectors and splices only. Wire nuts are unacceptable. 3. Power Wiring: Comply with wiring methods in Section 260519 "Low-Voltage Electrical Power Conductors and Cables." 4. Controls: Comply with wiring methods in Section 260519 "Low-Voltage Electrical Power Conductors and Cables." 5. Provide overcurrent protection (OCP) compliant with NFPA 70 for each SPD. Such OCP's that may be shown on drawings are shown for schematic purposes. Provide OCP's at ratings as recommended by SPD manufacturer for each application. D. Do not perform insulation-resistance tests of the distribution wiring equipment with SPDs installed. Disconnect SPDs before conducting insulation-resistance tests, and reconnect them immediately after the testing is over. Energize SPDs after power system has been energized, stabilized, and tested. E. The SPD installation shall be certified by a licensed electrician that the installation is in accordance with the manufacturer's recommendations, NEC requirements and the requirements of the specification above. Any deficiencies noted shall be corrected by the Contractor. Provide written documentation of this inspection as part of the closeout documents/manual. END OF SECTION I I I I I I I I I TEMPLATE 264313 -4 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 265100 - LIGHTING I 1.1 GENERAL A. Provide all labor, materials, equipment, equipment, programming, services, etc. as required for complete and fully operational lighting and lighting control systems. B. Definitions: 1. BF: Ballast factor. 2. CCT: Correlated color temperature. 3. CRI: Color-rendering index. 4. LER: Luminaire efficacy rating. 5. Lumen: Measured output of lighting source, luminaire, or both. 6. Luminaire: Complete lighting unit consisting of lighting source or sources, and some or all of the following components: optical control devices, contacts, mechanical components to support or attach the luminaire, and electrical and electronic components to start, operate, dim or control and maintain the operation of lighting source, and driving and transformation components. 7. Lighting Source: LED boards or equivalent LED assembly or, lamp ('bulb") for insertion into compatible socket, etc. 8. THD: Total harmonic distortion 1.2 QUALITY ASSURANCE A. Special Warranty for Emergency Lighting Batteries: Manufacturer's standard form in which I manufacturer of battery-powered emergency lighting unit agrees to repair or replace components of rechargeable batteries that fail in materials or workmanship within specified warranty period. 1. Warranty Period for all Emergency Lighting Batteries: five years from date of Substantial Completion. Full warranty shall apply for first year, and prorated warranty for the remaining years. PART 2 -PRODUCTS 2.1 GENERAL REQUIREMENTS FOR LUMINAIRES AND COMPONENTS A. Products: Subject to compliance with requirements, provide products indicated on Drawings. I Provide products of one of the manufacturers listed in this section for products that are not defined on the Luminaire Schedule. Provide specification grade luminaires that comply with minimum requirements as stated therein. If a particular"type" does not include basis of design manufacturer or model number, provide "pre-approved equivalent" manufacturer's and model numbers compliant with, and equivalent to: quality, performance, dimensions, and aesthetics as the respective basis of design for Design Professional review no less than five business days prior to bid due date. B. Luminaires designated by letters are defined as indicated on the Luminaire Schedule. C. Provide luminaires, of sizes, types and ratings indicated; complete with, but not limited to, housings, energy-efficient light sources, contacts, reflectors, wiring, etc.. Ship luminaires factory-assembled, with components required for a complete operating installation. D. Recessed Luminaires: 1. Comply with NEMA LE 4 for ceiling compatibility for recessed luminaires. 2. Provide recessed luminaires with necessary gypsum board, plaster frames, and surface trim. 3. Provide recessed luminaires that are constructed without rolled edges and that are post- painted. 4. Provide door frames on troffer style luminaires with spring latches on door frames. I TEMPLATE 265100 - 1 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 265100 - LIGHTING 5. Provide static air function for luminaires unless otherwise noted. 6. Provide luminaires that are non-IC constructed unless otherwise noted. 7. Provide junction boxes and serviceable components (driving and transformation component types, thermal protection devices, fuses, etc.)for recessed luminaires that are accessible for service and replacement from below the ceiling, without removing ceiling I 8. components. Where plaster frames are inferred for luminaires (either by narrative, or by catalog number, or by application) interpret the actual function to mean for mounting within gypsum board, wet plaster or similar type inaccessible ceiling system. Field verify related I 9. requirements and provide required accessories, such as frames, accordingly. Provide UL approved (listed and labeled) thermal protection per latest edition of NFPA/NEC for recess mounted luminaires. E. Surface Luminaires: Install surface mounted luminaires with air spaces between luminaire and surface per latest edition of NFPA/NEC. Provide factory luminaire wiring that is per NEC, #16 AWG minimum. Wire luminaires having medium base and mogul base sockets with not smaller than No. 16 or No. 14 wire respectively in accordance with the latest requirements of the National Electric Code. F. Review drawings and specifications of other trades to verify ceiling types, modules, and suspension systems appropriate to installation. G. Luminaires: Comply with UL 1598. Where LER is specified, test according to NEMA LE 5, 5A, 5B, etc. as applicable. H. Metal Parts: Free of burrs and sharp corners and edges. I. Sheet Metal Components: Steel unless otherwise indicated. Form and support to prevent warping and sagging. J. Doors, Frames, and Other Internal Access: Smooth operating, free of light leakage under operating conditions, and designed to permit replacing lighting source(s) without use of tools. Design to prevent doors, frames, lenses, diffusers, and other components from falling accidentally during servicing and when secured in operating position. Fabricate luminaires with concealed hinges and catches, with metal parts grounded as common unit, and so constructed as to dampen generated noise. K. Diffusers and Globes: Acrylic Lighting Diffusers: 100 percent virgin acrylic plastic. High resistance to yellowing and other changes due to aging, exposure to heat, and UV radiation, UV stabilized. Provide at least 0.125 inch minimum lens thickness unless otherwise indicated. Glass: Annealed crystal glass unless otherwise indicated. L. Factory-Applied Labels: Comply with UL 1598. Include recommended lighting sources, and driving and transformation components. Labels shall be located where they will be readily visible to service personnel, but not seen from normal viewing angles when lighting sources are in place. 1. Label shall include the following characteristics: a. "USE ONLY" and include specific lamp type. 2.2 EXIT SIGNS A. General Requirements for Exit Signs: Comply with UL 924; for sign colors, visibility, luminance, and lettering size, comply with authorities having jurisdiction. B. Internally Lighted Signs: 1. Lamps for AC Operation: LEDs, 50,000 hours minimum rated lamp life. 2. Self-Powered Exit Signs (Battery Type): Integral automatic charger in a self-contained power pack. TEMPLATE 265100 -2 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 265100 - LIGHTING a. Battery: Sealed, maintenance-free, nickel-cadmium type. b. Charger: Fully automatic, solid-state type with sealed transfer relay. c. Operation: Relay automatically energizes lamp from battery when circuit voltage drops to 80 percent of nominal voltage or below. When normal voltage is restored, relay disconnects lamps from battery, and battery is automatically recharged and floated on charger. d. Test Push Button: Push-to-test type, in unit housing, simulates loss of normal power and demonstrates unit operability. e. LED Indicator Light: Indicates normal power on. Normal glow indicates trickle charge; bright glow indicates charging at end of discharge cycle. 2.3 EMERGENCY LIGHTING UNITS A. General Requirements for Emergency Lighting Units: 1. Self-contained units complying with UL 924. 2. Battery: Sealed, maintenance-free, lead-acid type. 3. Charger: Fully automatic, solid-state type with sealed transfer relay. 4. Operation: Relay automatically turns lamp on when power-supply circuit voltage drops to 80 percent of nominal voltage or below. Lamp automatically disconnects from battery when voltage approaches deep-discharge level. When normal voltage is restored, relay disconnects lamps from battery, and battery is automatically recharged and floated on charger. 5. Test Push Button: Push-to-test type, in unit housing, simulates loss of normal power and demonstrates unit operability. 6. LED Indicator Light: Indicates normal power on. Normal glow indicates trickle charge; bright glow indicates charging at end of discharge cycle. 2.4 LIGHT EMITTING DIODE (LED) SYSTEMS A. Light Emitting Diode (LED) Systems 1. LED Sources: Provide factory installed LED modules that are specifically designed for, and matched and mated to, the respective luminaire in which they are used. Provide LED modules that can easily be replaced in the field and are readily accessible for replacement. Provide color temperature as indicated in Luminaire Schedule. 2. LED Drivers; Provide factory installed driver(s) for the LED source utilized that are specifically coordinated to the LED source and luminaire in which they are used. Provide driver(s) having specific operating characteristics defined in the Luminaire Schedule. Provide driver(s) that can easily be replaced in the field and are readily accessible for replacement. Provide specification sheet for the specific driver as part of the Luminaire Submittal. 3. Total Harmonic Distortion (THD) Rating: Less than 20 percent. Provide factory-installed I integral filtering system to ensure THD does not exceed 20 percent regardless of quantities and/or mixes with other manufactured LED systems. 2.5 LUMINAIRE SUPPORT COMPONENTS A. Support fixtures in compliance with NEC. Comply with Section 260529 "Hangers and Supports for Electrical Systems" for channel- and angle-iron supports and nonmetallic channel and angle supports. B. Single-Stem Hangers: 1/2-inch steel tubing with swivel ball fittings and ceiling canopy. Finish same as luminaire. Twin-Stem Hangers: Two, 1/2-inch steel tubes with single canopy designed to mount a single luminaire. Finish same as luminaire. C. Wires: ASTM A 641/A 641M, Class 3, soft temper, zinc-coated steel, 12 gage. Wires for Humid 1 Spaces: ASTM A 580/A 580M, Composition 302 or 304, annealed stainless steel, 12 gage. I TEMPLATE 265100 -3 2/28/19 I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 265100 -LIGHTING D. Rod Hangers: 3/16-inch minimum diameter, cadmium-plated, threaded steel rod. Hook Hangers: Integrated assembly matched to luminaire and line voltage and equipped with threaded attachment, cord, and locking-type plug. E. For open ceiling spaces where fixtures are suspended and subject to damage or impact, provide an additional air craft cable support securely fastened to luminaire and structure to act as a safety chain providing a redundant support. Select cable based on manufacturer's recommendations, accounting for weight of luminaire assembly, external forces that could be applied, minimum 200% factor of safety, etc. Decorative pendants in finished spaces are exempt from this requirement. PART 3 - EXECUTION 3.1 INSTALLATION A. Luminaires: Set level, plumb, and square with ceilings and walls unless otherwise indicated. Install lighting sources in each luminaire. B. Temporary Lighting: If it is deemed necessary, and permitted by Owner's Representative and Design Professionals, to use permanent luminaires for temporary lighting, install and energize the minimum number of luminaires necessary. When construction is substantially complete, remove the temporary luminaires, disassemble, clean thoroughly, install new lamps, and reinstall. C. Remote Mounting of Driving and Transformation Components: Distance between the driving and transformation components and luminaire shall not exceed that recommended by the luminaire and driving and transformation components manufacturer. Verify, with manufacturers, maximum distance between driving and transformation components and luminaire. D. Lay-in Ceiling Luminaires Supports: Unless required otherwise under other sections or unless project requirements and conditions require otherwise, grid may be used as a support element, subject to coordinating installations with ceiling system installer to ensure the ceiling system installer accounts for the weights of each luminaire and of all luminaires collectively, and installs specially marked and designated ceiling support components. 1. Install ceiling support system rods or wires, independent of the ceiling suspension devices, for each luminaire. Locate not more than 6 inches from luminaire corners. 2. Support Clips: Fasten to luminaires and to ceiling grid members at or near each I 3. luminaire corner with clips that are UL listed for the application. Luminaires of Sizes Less Than Ceiling Grid: Install as indicated on reflected ceiling plans or center in acoustical panel, and support luminaires independently with at least two 3/4- inch metal channels spanning and secured to ceiling tees. E. Suspended Luminaire Support: 1. Pendants and Rods: Where longer than 48 inches brace to limit swinging. 2. Stem-Mounted, Single-Unit Luminaires: Suspend with twin-stem hangers. 3. Continuous Rows: Use tubing or stem for wiring at one point and tubing or rod for suspension for each unit length of luminaire chassis, including one at each end. 4. Do not use grid as support for pendant luminaires. Connect support wires or rods to building structure. F. Install surface and recessed ceiling luminaires on grid and tile ceilings to agree with module of ceiling either displacing a tile, or unit on center of tile, or centered on grid lines. Install flush mounted luminaires properly to eliminate light leakage between luminaire frame and finished surface. I TEMPLATE 265100 -4 2/28/19 i I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 265100 - LIGHTING G. Do not locate splice or tap within an arm, stem, or chain. Provide wiring continuous from splice in outlet box of the building wiring system to driving and transformation component terminals in luminaires. H. Provide Type MC Cable or wiring in minimum 1/2" diameter flexible metal conduit (with full parity sized green insulated equipment ground wire) for "drops" from building wiring system junction boxes to suspended ceiling mounted luminaires. Limit the length of these "drops" to 72". Install "drops"to luminaires in gypsum board, and similar inaccessible ceiling systems, from identified accessible junction boxes. I. Connect luminaires utilized for emergency egress lighting and exit signage ahead of switching and other controls. The only exceptions to this are photocell-only controls for outdoor emergency egress luminaires. J. Provide luminaires and luminaire outlet boxes with hangers to properly support luminaire weight. Submit design of hangers, method of fastening, other than indicated or specified herein, for review by Owner's Representative and review by ceiling installer. Anchor luminaires installed in, or on, suspended ceiling systems in strict compliance with NEC, including advance coordination with the ceiling installer. Support surface mounted luminaires greater than 2 feet in length at a point in addition to the outlet box luminaire stud. Fasten electrical luminaires and brackets securely to structural supports. Install luminaires level and plumb. K. Where special mounting conditions are encountered, such as mounting to rounded columns or similar special circumstances, provide special custom factory-fabricated mounting means (i.e., brackets designed to conform with curvature of rounded columns, or to conform with similar special surfaces). L. Provide stems and chains for luminaires as designated by the Owner's Representative where deemed necessary by the Owner's Representative to achieve a functional and neat installation. Contact Owner's Representative to determine pendant, stem, and chain lengths if mounting height is not indicated. M. Provide plaster frames, or gypsum board frames, or similar kits for recessed luminaires installed in other than suspended grid type acoustical ceiling systems. Brace frames temporarily to prevent distortion during handling. N. Wear clean white cotton gloves when handling the luminaires reflective and diffusing surfaces. Clean surfaces including dust, finger prints, paint, etc. with a clean dry cheesecloth after interior work has been completed. Remove plastic shipping bags from luminaires only after work in the respective area is complete. O. Where applicable, verify that measured illuminance values comply with respective isolux (or equivalent) plot diagram values. P. Provide full assembly for luminaires that are shipped with any loose components, regardless of who furnishes the luminaires. Q. Test for Emergency Lighting: Interrupt power supply to demonstrate proper operation. Verify transfer from normal power to emergency source and retransfer to normal. R. Burn-in all light sources that require specific aging period to operate properly, prior to occupancy by Owner. S. Make adjustments and perform settings/programming to lighting controls and control systems so that all luminaires are fully operational compliant with design requirements and to the satisfaction of the Owner and Design Professionals. I I TEMPLATE 265100 -5 2/28/19 I I STARBUCKS COFFEE COMPANY GUIDE SPECIFICATIONS SECTION 265100 - LIGHTING T. Train Owner's maintenance personnel to adjust, operate, clean, re-lamp and maintain equipment, devices, controls, instrumentation, and accessories, and to use and reprogram lighting control systems as applicable. END OF SECTION I I I 1 I I I I I I I I I I TEMPLATE 265100 -6 2/28/19 I