HomeMy WebLinkAboutPlans (3) RECEIVED
PROJECT MANUAL JAN 31 2013
CITY OF TIGARD
FOR BUILDING DIVISION
COMCAST
TECHNICAL OPERATIONS CENTER
Tigard, Oregon
`60P2.0(3.- A.
City of Tigard
Owner AY p.�rove'd Plans
�,r
By Date 1124 1?)
Comcast Cable Communications, Inc. (� 6 —
One Comcast Center
1701 John F. Kennedy Blvd. OFFICE COPY
Philadelphia, PA 19103-2838
Architect ��1) flfeC1rr
Gromatzky Dupree & Associates ~�
3090 Olive Street, Suite 500 K ITH RABUSL r
Dallas,Texas 75219
2141871-9078 o
LIC. NC?. 61t
% JI GDA#12018.00 I'+/tk'
Issue for Permit
OF OR
December 14, 2012
PROJECT MANUAL
FOR
C 0 M CAST
TECHNICAL OPERATIONS CENTER
Tigard, Oregon
Owner
Comcast Cable Communications, Inc.
One Comcast Center
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103-2838
Architect
Gromatzky Dupree&Associates
3090 Olive Street, Suite 500
Dallas, Texas 75219
214/871-9078
GDA#12018.00
Issue for Permit
December 14, 2012
GDA#12018.00 December 14,2012
Issue for Permit
1 DOCUMENT 00010-PROJECT MANUAL TABLE OF CONTENTS
2
3 DIVISION 00- BIDDING REQUIREMENTS; CONTRACT FORMS; CONTRACT CONDITIONS
4
5 SECTION 00420- LIST OF SUBCONTRACTORS
6 SECTION 00999— CAD RELEASE FORM AND AGREEMENT
7 CAD RELEASE FORM AND AGREEMENT
8
9
10 DIVISION 01 -GENERAL REQUIREMENTS
11
12 SECTION 01010- SUMMARY OF THE WORK
13 SECTION 01027- APPLICATIONS FOR PAYMENT
14 SECTION 01030- ALTERNATES
15 SECTION 01035- MODIFICATION PROCEDURES
16 SECTION 01040- PROJECT COORDINATION
17 SECTION 01045- CUTTING AND PATCHING
18 SECTION 01050- FIELD ENGINEERING
19 SECTION 01092- ABBREVIATIONS
20 SECTION 01095- REFERENCE STANDARDS AND DEFINITIONS
21 SECTION 01310- SCHEDULES, REPORTS, PAYMENTS
22 SECTION 01340- SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
23 SECTION 01400- QUALITY CONTROL SERVICES
24 SECTION 01505- TEMPORARY FACILITIES
25 SECTION 01600- MATERIALS AND EQUIPMENT
26 SECTION 01631 - PRODUCTS AND SUBSTITUTIONS
27 SUBSTITUTION REQUEST FORM
28 SECTION 01700- PROJECT CLOSEOUT
29 SECTION 01740- WARRANTIES
30
31
32 DIVISION 02-SITEWORK
33
34 SECTION 02070- SELECTIVE DEMOLITION
35 SECTION 02580- TRAFFIC MARKING PAINT
36 SECTION 02820- CHAIN-LINK FENCES AND GATES
37 SECTION 02825- GATE OPERATOR
38 SECTION 02848- CONCRETE PARKING BUMPERS
39
40
41 DIVISION 03-CONCRETE
42
43 SECTION 03301 - CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS)
44 SECTION 03355- CONCRETE SEALER
45
46
47 DIVISION 04- MASONRY
48
49
50 NONE ISSUED �� $D Re��
0 KEIT RAI3USE r1,
DALLAS, TL AS •
•,� LIC. NU. 6184
CP
PROJECT MANUAL TABLE OF CONTENTS 12 OF OV
GDA 00010-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 DIVISION 05—METALS
2
3 SECTION 05500- METAL FABRICATIONS
4 SECTION 05521 - PIPE RAILINGS
5
6
7 DIVISION 06-WOOD AND PLASTICS
8
9 SECTION 06100- ROUGH CARPENTRY
10 SECTION 06402- INTERIOR ARCHITECTURAL WOODWORK
11 SECTION 06640- FIBERGLASS REINFORCED POLYESTER PANELS
12
13
14 DIVISION 07-THERMAL AND MOISTURE PROTECTION
15
16 SECTION 07270- FIRESTOPS AND SMOKESEALS
17 SECTION 07901 - JOINT SEALANTS
18
19
20 DIVISION 08- DOORS AND WINDOWS
21
22 SECTION 08110- STEEL DOORS AND FRAMES
23 SECTION 08120- INTERIOR ALUMINUM DOOR AND WINDOW FRAMES AND TRIM
24 SECTION 08121 - INTERIOR ALUMINUM DOORS
25 SECTION 08125- PREFINISHED STEEL DOOR FRAMES
26 SECTION 08212- FLUSH WOOD DOORS
27 SECTION 08360- SERVICE COUNTER DOORS
28 SECTION 08415- ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR
29 APPLICATION
30 SECTION 08386- SAFETY ALL GLASS SIDELIGHTS
31 SECTION 08710- FINISH HARDWARE
32 SECTION 08800- GLASS AND GLAZING
33 SECTION 08830- MIRRORS
34 SECTION 08842- DECORATIVE PLASTIC GLAZING
35 SECTION 08871 - SOLAR CONTROL FILM
36
37
38 DIVISION 09- FINISHES
39
40 SECTION 09250- GYPSUM DRYWALL
41 SECTION 09300- CERAMIC TILE
42 SECTION 09512- ACOUSTICAL TILE CEILINGS
43 SECTION 09650- RESILIENT FLOORING
44 SECTION 09681 - CARPET TILE t�
45 SECTION 09900- PAINTING �L�%1J Ake
ke
46 ��
( KH RABUSE
DALLEITA S,T E XAS
NM LIC. o' `;�4 '{ 1
OF O
PROJECT MANUAL TABLE OF CONTENTS
GDA 00010-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 DIVISION 10-SPECIALTIES
2
3 SECTION 10155- TOILET COMPARTMENTS
4 SECTION 10260- WALL SURFACE PROTECTION
5 SECTION 10425- SIGNAGE
6 SECTION 10505- METAL LOCKERS
7 SECTION 10522- FIRE EXTINGUISHERS, CABINETS, and ACCESSORIES
8 SECTION 10530- EXTRUDED ALUMINUM WALKWAY COVERS
9 SECTION 10800- TOILET ACCESSORIES
10 SECTION 10990- MISCELLANEOUS SPECIALTIES
11
12
13 DIVISION 11 - EQUIPMENT
14
15 NONE ISSUED
16
17
18 DIVISION 12- FURNISHINGS
19
20 SECTION 12500- HORIZONTAL LOUVER BLINDS
21
22
23 DIVISION 13-SPECIAL CONSTRUCTION
24
25 NONE ISSUED
26
27
28 DIVISION 14-CONVEYING SYSTEMS
29
30 NONE ISSUED
31
32
33 END OF DOCUMENT 00010
\-D " R04.
KEI H RABUSE ti
DALLAS, EXAS •
•
LIC. NO. 61i0j4t.
lo I Oft
4oroV-
PROJECT MANUAL TABLE OF CONTENTS
GDA 00010-3
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 00420- LIST OF SUBCONTRACTORS
2
3 The GENERAL CONTRACTOR indicated herein, should his Guaranteed Maximum Price be accepted
4 by the Owner, intends to employ the services of the Sub-Contractors on this Project that are listed by
5 the General Contractor on a supplemental list(unless unacceptable to Owner). If a category listed will
6 have no sub-contractor, indicate "General Contractor" for the category. If the General Contractor
7 believes that the category is not applicable to this Project, indicate"Not Applicable"for the category.
8
9 GENERAL CONTRACTOR
10
11 Name:
12
13 Mailing Address:
14
15 Physical Address:
16
17 Phone: ( ) Fax: ( )
18
19 Contact:
20
21 Provide the following information for each Sub-Contractor for each category listed:
22
23 Name of Company
24 Mailing Address of Company, including zip code
25 Physical Address of Company, including zip code
26 Phone and Fax Number of Company, including area code
27 Contact person for the Company for this Project
28 Email Address(optional)
29 Sub-Contractor License Number
30 Bonding Company
31
32 LIST OF SUB-CONTRACTOR CATEGORIES
33
34 CONCRETE
35 STRUCTURAL STEEL
36 INTERIOR ARCHITECTURAL WOODWORK
37 BUILDING INSULATION
38 FIRESTOPPING
39 CAULKING&SEALANTS
40 HOLLOW METAL DOORS& FRAMES
41 WOOD DOORS
42 SERVICE DOORS
43 ALUMINUM STOREFRONTS AND ENTRANCES
44 FINISH HARDWARE
45 GLAZING
46 GYPSUM DRYWALL
47 ACOUSTICAL CEILINGS
48 FLOORING
49 PAINTING
50 TOILET COMPARTMENTS
51 TOILET ACCESSORIES
52 HVAC
53 PLUMBING
54 ELECTRICAL
55 OTHER(As deemed appropriate by General Contractor or as requested by Owner)
56
57 END OF SECTION 00420
LIST OF SUBCONTRACTORS
GDA 00420- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 00999— CAD RELEASE FORM AND AGREEMENT
2
3 PART 1 - GENERAL
4
5 SUMMARY
6
7 The CAD Release Form and Agreement is included in its entirety, following this page.
8
9
10 PART 2 - PRODUCTS (NOT USED)
11
12
13 PART 3— EXECUTION (NOT USED)
14
15 END OF SECTION 00999
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
CAD RELEASE FORM AND AGREEMENT
GDA 00999- 1
GDA#12018.00 December 14,2012
Issue for Permit
1 CAD Disk Release
2
3 Agreement: The Contractor desires to have Gromatzky Dupree & Associates supply the
4 Subcontractor electronic media (compact disk) containing floor/site plans for Comcast Technical
5 Operations Center, Tigard, Oregon, (GDA project number 12018.00), for use by subcontractor in
6 providing services for
7
8
9 In accordance with [your] [you- subconttracto,s] request for electronic copies of our CADD files,
10 Gromatzky Dupree and Associates (GDA) will furnish diskettes of the drawings listed above for a
11 nominal preparation fee of $75.00/sheet. The information contained on the diskettes has not been
12 updated with Addenda or other revisions issued prior to the date of the Construction Contract.
13
14 Therefore, the Contractor agrees as follows:
15 1. Due to the potential that the information set forth on the electronic media can be modified by
16 the Contractor, Subcontractor, or other parties, unintentionally or otherwise, Gromatzky
17 Dupree & Associates reserves the right to remove all indices of its ownership, professional
18 corporation name, and/or involvement from each electronic medium not in its possession.
19 2. For documentation purposes, one set of an original electronic media will be prepared and sent
20 via electronic mail (email). The Subcontractor has requested
21
22 3. Contractor has requested that Gromatzky Dupree Associates send the requested electronic
23 media directly to the Subcontractor.
24 4. The Contractor/Subcontractor recognizes that use of such electronic media (disk) will be at
25 Contractor/Subcontractor's sole risk and without any liability risk or legal exposure by
26 Gromatzky Dupree & Associates. Furthermore, Contractor/Subcontractor shall, to the fullest
27 extent permitted by law, defend, indemnify and hold harmless Gromatzky Dupree &
28 Associates from all claims, damages, losses, and expenses including attorney fees arising out
29 of or resulting from the use of such electronic media.
30 5. The use of this electronic media is restricted to the original site for which it was prepared.
31 Material shall not be transferred to any other party for use in other projects. Reuse or
32 reproduction of the documents (whole or in part) for any other purpose for which the material
33 was not strictly intended is prohibited. Title to these documents is prima fade evidence of the
34 acceptance of these restrictions.
35 6. Contractor/Subcontractor recognizes that information stored on electronic media including, but
36 not limited to computer disk may not be 100% compatible with his system, therefore
37 Contractor/Subcontractor agrees Gromatzky Dupree & Associates shall not be liable for the
38 completeness or accuracy of any materials provided due to difference in computer and
39 software.
40 7. Contractor/Subcontractor recognizes that designs, plans, and data sent via electronic mail
41 including, but not limited to computer disk may be subject to undetectable alteration and/or
42 uncontrollable deterioration. Contractor/Subcontractor therefore agrees that Gromatzky
43 Dupree & Associates shall not be liable for the completeness or accuracy of any materials
44 provided via electronic mail.
45
46 Agreed to this (date) .
47
48 Subcontractor:
49
50
51
52 Signature/Title
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01010-SUMMARY OF THE WORK
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification section, apply to work of this section.
10
11 PROJECT/WORK IDENTIFICATION:
12
13 General: Project name is "Comcast Technical Operations Center" located in Tigard, Oregon, as
14 shown on Contract Documents prepared by Gromatzky Dupree and Associates. Drawings and
15 specifications are dated December 14, 2012.
16
17 Contract Documents: Indicate the work of the Contract and related requirements and conditions that
18 have an impact on the project. Related requirements and conditions that are indicated on the
19 Contract Documents include, but are not necessarily limited to the following:
20
21 Existing site conditions and restrictions on use of the site.
22
23 Requirements for partial Owner occupancy prior to substantial completion of the Contract
24 Work.
25
26 Summary by References: Work of the Contract can be summarized by references to the Contract,
27 General Conditions, Specification Sections, Drawings, Schedules, addenda and modifications to the
28 contract documents issued subsequent to the initial printing of this project manual and including but
29 not necessarily limited to printed material referenced by any of these. It is recognized that work of the
30 Contract is also unavoidably affected or influenced by governing regulations, natural phenomenon
31 including weather conditions and other forces outside the contract documents.
32
33 Abbreviated Written Summary: Briefly and without force and effect upon the contract documents, the
34 work of the Contract can be summarized as follows:
35
36 The work includes remodeling construction of a shell building and tenant installation on site as
37 shown.
38
39 The work includes, but is not limited to, some site paving modifications, site fencing and
40 automated gates, interior architectural woodwork, insulation, firestops and smokeseals,
41 exterior hollow metal doors and frames, aluminum doors and frames, flush wood doors, door
42 and sidelight framing, coiling service counter shutters, interior aluminum storefront and
43 entrances, finish hardware, glass and glazing, mirrors, window films, steel stud and gypsum
44 wallboard partitions, common interior finishes, toilet compartments and accessories, fire
45 extinguishers and cabinets, walkway covers and canopies, window blinds, and other work as
46 detailed in the contract documents.
47
48 The work also includes certain items of equipment, including electrical, telephone systems,
49 mechanical and plumbing systems.
50
51 The Work shall include all work on public right of ways necessary for the completion of the site
52 utility work.
53
54 The Work shall include acquisition of and payment for all permits required by controlling
55 government authorities for the construction and final occupancy of the work.
56
57 The Work shall include civil and landscape work.
SUMMARY OF THE WORK
GDA 01010- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 CONTRACTOR USE OF PREMISES:
3
4 General: The Contractor shall limit his use of the premises to the work indicated, so as to allow for
5 Owner occupancy and use by the public.
6
7 Use of the Site: Confine operations at the site to the areas permitted under the Contract.
8 Portions of the site beyond areas on which work is indicated are not to be disturbed. Conform
9 to site rules and regulations affecting the work while engaged in project construction.
10
11 Keep driveways and entrances serving the premises clear and available to the Owner
12 and his employees at all times. Do not use these areas for parking or storage of
13 materials.
14
15 Do not unreasonably encumber the site with materials or equipment. Confine
16 stockpiling of materials and location of storage sheds to the areas previously
17 approved by the owner. If additional storage is necessary obtain and pay for such
18 storage off site.
19
20 Lock automotive type vehicles, such as passenger cars and trucks and other
21 mechanized or motorized construction equipment, when parked and unattended, so
22 as to prevent unauthorized use. Do not leave such vehicles or equipment unattended
23 with the motor running or the ignition key in place.
24
25 OWNER-FURNISHED PRODUCTS
26
27 Owner will furnish products indicated. The Work includes receiving, unloading, handling, storing,
28 protecting, and installing Owner-furnished products and making building services connections.
29
30 Owner-Furnished Products:
31
32 Refer to Equipment Legend on the Drawings.
33
34 OWNER OCCUPANCY:
35
36 Partial Owner Occupancy: The Owner reserves the right to place and install equipment as necessary
37 in completed areas of the building and to occupy such completed areas prior to substantial
38 completion, provided that such occupancy does not substantially interfere with completion of the work.
39 Such placing of equipment and partial occupancy shall not constitute acceptance of the work or any
40 part of the work.
41
42 ALTERATIONS AND COORDINATION:
43
44 General: The work of this Contract includes coordination of the entire work of the project, including
45 preparation of general coordination drawings, diagrams and schedules, and control of site utilization,
46 from beginning of construction activity through project close-out and warranty periods.
47
48 Mechanical/Electrical Requirements of General Work:
49
50 General: Except as otherwise indicated, comply with applicable requirements of Division-15 sections
51 for mechanical provisions within units of general (Division 2-14)Work. Except as otherwise indicated,
52 comply with applicable requirements of Division-16 sections for electrical provisions within units of
53 general (Division 2-14)Work.
54
55 Electrical Requirements: Except as otherwise indicated, comply with applicable provisions of The
56 National Electrical Code (NEC) and standards by National Electrical Manufacturer's Association
57 (NEMA), for electrical components of general work. Provide Underwriters Laboratories listed and
SUMMARY OF THE WORK
GDA 01010-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 labeled products where applicable.
2
3 Performance Requirements for Completed Work:
4
5 General: The Contract Documents indicate the intended occupancy and utilization of the building and
6 its individual systems and facilities. Compliance with governing regulations is intended and required
7 for the work and for the Owner's occupancy and utilization. In addition to the requirement that every
8 element of the work comply with applicable requirements of the contract documents, it is also required
9 that the work as a whole comply with all applicable national, state, and local codes and ordinances .
10
11
12 PART 2 - PRODUCTS (Not applicable).
13
14
15 PART 3 - EXECUTION (Not applicable)
16
17
18 END OF SECTION 01010
SUMMARY OF THE WORK
GDA 01010- 3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01027-APPLICATIONS FOR PAYMENT
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 other Division-1 Specification Sections, apply to this Section.
11
12 SUMMARY
13
14 This Section specifies administrative and procedural requirements governing the Contractor's
15 Applications for Payment.
16
17 The Contractor's Construction Schedule and Submittal Schedule are included in Section 01300
18 "Submittals".
19
20 SCHEDULE OF VALUES
21
22 Coordinate preparation of the Schedule of Values with preparation of the Contractor's Construction
23 Schedule.
24
25 Correlate line items in the Schedule of Values with other required administrative schedules
26 and forms, including:
27
28 Contractor's construction schedule.
29 Application for Payment form.
30 List of subcontractors.
31 Schedule of allowances.
32 List of products.
33 List of principal suppliers and fabricators.
34 Schedule of submittals.
35
36 Submit the Schedule of Values to the Architect at the earliest feasible date, but in no case
37 later than 7 days before the date scheduled for submittal of the initial Application for Payment.
38
39 Format and Content: Use the Project Manual Table of Contents as a guide to establish the format for
40 the Schedule of Values.
41
42 Identification: Include the following Project identification on the Schedule of Values:
43
44 Project name and location.
45 Name of the Architect.
46 Project number.
47 Contractor's name and address.
48 Date of submittal.
49
50 Arrange the Schedule of Values in a tabular form with separate columns to indicate the following for
51 each item listed:
52
53 Generic name.
54 Related Specification Section.
55 Name of subcontractor.
56 Name of manufacturer or fabricator.
57 Name of supplier.
APPLICATIONS FOR PAYMENT
GDA 01027-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Change Orders (numbers)that have affected value.
2 Dollar value.
3 Percentage of Contract Sum to the nearest one-hundredth percent, adjusted to total
4 100 percent.
5
6 Provide a breakdown of the Contract Sum in sufficient detail to facilitate continued evaluation
7 of Applications for Payment and progress reports. Break principal subcontract amounts down
8 into several line items.
9
10 Round amounts off to the nearest whole dollar; the total shall equal the Contract Sum.
11
12 For each part of the Work where an Application for Payment may include materials or
13 equipment, purchased or fabricated and stored, but not yet installed, provide separate line
14 items on the Schedule of Values for initial cost of the materials, for each subsequent stage of
15 completion, and for total installed value of that part of the Work.
16
17 Unit-Cost Allowances: Show line item value of unit cost allowances as a product of unit cost
18 times measured quantity as estimated from the best indication in the Contract Documents.
19
20 Margins of Cost: Show line items for indirect costs, and margins on actual costs, only to the
21 extent that such items will be listed individually in Applications for Payment. Each item in the
22 Schedule of Values and Applications for Payment shall be complete including its total cost and
23 proportionate share of general overhead and profit margin.
24
25 At the Contractor's option, temporary facilities and other major cost items that are not
26 direct cost of actual work-in-place may be shown as separate line items in the
27 Schedule of Values or distributed as general overhead expense.
28
29 Schedule Updating: Update and resubmit the Schedule of Values when Change Orders or
30 Construction Change Directives result in a change in the Contract Sum.
31
32 APPLICATIONS FOR PAYMENT
33
34 Each Application for Payment shall be consistent with previous applications and payments as certified
35 by the Architect and paid for by the Owner.
36
37 The initial Application for Payment, the Application for Payment at time of Substantial
38 Completion, and the final Application for Payment involve additional requirements.
39
40 Payment Application Times: Each progress payment date is as indicated in the Agreement. The
41 period of construction Work covered by each Application or Payment is the period indicated in the
42 Agreement.
43
44 Payment Application Forms: Use forms provided by the Owner for Applications for Payment; sample
45 copies may be obtained from Owner.
46
47 Application Preparation: Complete every entry on the form, including notarization and execution by
48 person authorized to sign legal documents on behalf of the Owner. Incomplete applications will be
49 returned without action.
50
51 Entries shall match data on the Schedule of Values and Contractor's Construction Schedule.
52 Use updated schedules if revisions have been made.
53
54 Include amounts of Change Orders and Construction Change Directives issued prior to the
55 last day of the construction period covered by the application.
56
57 Transmittal: Submit 3 executed copies of each Application for Payment to the Architect by means
APPLICATIONS FOR PAYMENT
GDA 01027-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 ensuring receipt within 24 hours; one copy shall be complete, including waivers of lien and similar
2 attachments,when required.
3
4 Transmit each copy with a transmittal form listing attachments, and recording appropriate
5 information related to the application in a manner acceptable to the Architect.
6
7 Waivers of Mechanics Lien: Prepare liens and submit as directed by the Owner.
8
9 Initial Application for Payment: Administrative actions and submittals that must precede or coincide
10 with submittal of the first Application for Payment include the following:
11
12 List of subcontractors.
13 List of principal suppliers and fabricators.
14 Schedule of Values.
15 Contractor's Construction Schedule (preliminary if not final).
16 Schedule of principal products.
17 Schedule of unit prices.
18 Submittal Schedule (preliminary if not final).
19 List of Contractor's staff assignments.
20 List of Contractor's principal consultants.
21 Copies of building permits.
22 Copies of authorizations and licenses from governing authorities for performance of the Work.
23 Initial progress report.
24 Report of pre-construction meeting.
25 Certificates of insurance and insurance policies.
26
27 Application for Payment at Substantial Completion: Following issuance of the Certificate of
28 Substantial Completion, submit an Application for Payment; this application shall reflect any
29 Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated
30 portions of the Work.
31
32 Administrative actions and submittals that shall proceed or coincide with this application include:
33
34 Occupancy permits and similar approvals.
35 Warranties(guarantees)and maintenance agreements.
36 Test/adjust/balance records.
37 Maintenance instructions.
38 Meter readings.
39 Start-up performance reports.
40 Change-over information related to Owner's occupancy, use, operation and maintenance.
41 Final cleaning.
42 Application for reduction of retainage, and consent of surety.
43 Advice on shifting insurance coverages.
44 Final progress photographs.
45 List of incomplete Work, recognized as exceptions to Architect's Certificate of Substantial
46 Completion.
47
48 Final Payment Application: Administrative actions and submittals which must precede or coincide with
49 submittal of the final payment Application for Payment include the following:
50
51 Completion of Project closeout requirements.
52 Completion of items specified for completion after Substantial Completion.
53 Assurance that unsettled claims will be settled.
54 Assurance that Work not complete and accepted will be completed without undue delay.
55 Transmittal of required Project construction records to Owner.
56 Certified property survey.
57 Proof that taxes, fees and similar obligations have been paid.
APPLICATIONS FOR PAYMENT
GDA 01027-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Removal of temporary facilities and services.
2 Removal of surplus materials, rubbish and similar elements.
3 Change of door locks to Owner's access.
4
5
6 PART 2- PRODUCTS (Not Applicable).
7
8
9 PART 3- EXECUTION (Not Applicable).
10
11
12 END OF SECTION 01027
APPLICATIONS FOR PAYMENT
GDA 01027-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01030-ALTERNATES
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 other Division-1 Specification Sections, apply to this Section.
11
12 SUMMARY
13
14 This Section specifies administrative and procedural requirements for Alternates.
15
16 Definition: An Alternate is an amount proposed by Bidders and stated on the Bid Form for certain
17 construction activities defined in the Bidding Requirements that may be added to or deducted from
18 Base Bid amount if the Owner decides to accept a corresponding change in either the amount of
19 construction to be completed, or in the products, materials, equipment, systems or installation
20 methods described in Contract Documents.
21
22 Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary to ensure
23 that Work affected by each accepted Alternate is complete and fully integrated into the project.
24
25 Notification: Immediately following the award of the Contract, prepare and distribute to each party
26 involved, notification of the status of each Alternate. Indicate whether Alternates have been accepted,
27 rejected or deferred for consideration at a later date. Include a complete description of negotiated
28 modifications to Alternates.
29
30 Schedule: A "Schedule of Alternates" is included at the end of this Section. Specification Sections
31 referenced in the Schedule contain requirements for materials and methods necessary to achieve the
32 Work described under each Alternate.
33
34 Include as part of each Alternate, miscellaneous devices, accessory objects and similar items
35 incidental to or required for a complete installation whether or not mentioned as part of the
36 Alternate.
37
38
39 PART 2-PRODUCTS (Not Applicable).
40
41
42 PART 3- EXECUTION (Not Applicable)
43
ALTERNATES
GDA 01030- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 SCHEDULE OF ALTERNATES
2
3 Alternate No.1: Delete the fence grounding requirements indicated in Section 02820, "Chain-
4 Link Fences and Gates".
5
6 Alternate No.2: Provide 7-gage tension wire in lieu of the bottom rail requirements indicated in
7 Section 02820, "Chain-Link Fences and Gates". Provide bottom rail each side
8 at corners and fence direction changes only.
9
10 Alternate No.3: Provide interior door and window frames as indicated in Section 08125,
11 "Prefinished Steel Door and Window Frames," in lieu of aluminum frames
12 indicated in Sections 08120 and 08121.
13
14 Alternate N_o.4: Provide Armstrong Commercial Flooring, 4" x 36" vinyl wood planks, TP 047,
15 "rite wood coal," in Second Floor Break Room, Rm 299, in lieu of Armstrong
16 "Striations" 12 x 24 VCT.
17
18 Alternate No.5: Provide Armstrong Commercial Flooring, 4" x 36" vinyl wood planks, TP 047,
19 "rite wood coal," and TP 052, "american walnut sienna," in Second Floor
20 Coffee Room, Rm 258, in pattern indicated on the Drawings, in lieu of
21 Armstrong"Striations" 12 x 24 VCT.
22
23 Alternate No.6: Provide Armstrong #2758 ceiling tile and 4" Axiom trim in lieu of the #1761
24 ceiling tile indicated on the Drawings Finishes Legend.
25
26 Alternate No.7: Provide vapor retarder system as indicated in Section 09681, "Carpet Tile."
27 Provide all work to fully install system under all carpet tile locations.
28
29 Alternate No.8: Provide power poles in lieu of floor boxes.
30
31 Alternate No.9: Provide existing 2 x 4 parabolic light fixtures in Open Office in lieu of
32 suspended indirect light fixtures. Relamp all fixtures.
33
34
35 END OF SECTION 01030
ALTERNATES
GDA 01030-2
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 01035-MODIFICATION PROCEDURES
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division 1 Specification sections, apply to this section.
10
11 SUMMARY
12
13 This section specifies administrative and procedural requirements for handling and processing
14 Contract modifications.
15
16 Related Sections: The following sections contain requirements that relate to this section:
17
18 Division 1 Section "Submittals"for requirements for the Contractor's Construction Schedule.
19
20 Division 1 Section "Application for Payment" for administrative procedures governing
21 applications for payment.
22
23 Division 1 Section "Product Substitutions"for administrative procedures for handling requests
24 for substitutions made after award of the Contract.
25
26 MINOR CHANGES IN THE WORK
27
28 Supplemental instructions authorizing minor changes in the Work, not involving an adjustment to the
29 Contract Sum or Contract Time, will be issued by the Architect/Owner on AIA form G710, Architect's
30 Supplemental Instructions.
31
32 CHANGE ORDER PROPOSAL REQUESTS
33
34 Owner-Initiated Proposal Requests: Proposed changes in the Work that will require adjustment to the
35 Contract Sum or Contract Time will be issued by the Architect/Owner, with a detailed description of
36 the proposed change and supplemental or revised Drawings and Specifications, if necessary.
37
38 Proposal requests issued by the Architect/Owner are for information only. Do not consider
39 them an instruction either to stop work in progress, or to execute the proposed change.
40
41 Unless otherwise indicated in the proposal request, within 10 days of receipt of the proposal
42 request, submit to the Architect for the Owner's review an estimate of cost necessary to
43 execute the proposed change.
44
45 Include a list of exact quantities of products to be purchased and unit costs, along with
46 the total amount of purchases to be made , and a complete labor cost breakdown.
47 Where requested, furnish survey data to substantiate quantities.
48
49 Include a complete labor cost breakdown.
50
51 Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade
52 discounts.
53
54 Include a statement indicating the effect the proposed change in the Work will have
55 on the Contract Time.
56
57 Proposal Request Form: Use AIA Document G 709 for Change Order Proposal Requests.
MODIFICATION PROCEDURES
GDA 01035- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Contractor-Initiated Change Order Proposal Requests: When latent or other unforseen conditions
3 require modifications to the Contract,the Contractor may propose changes by submitting a request for
4 a change to the Architect/Owner.
5
6 Include a statement outlining the reasons for the change and the effect of the change on the
7 Work. Provide a complete description of the proposed change. Indicate the effect of the
8 proposed change on the Contract Sum and Contract Time.
9
10 Include a list of quantities of products to be purchased and unit costs along with the total
11 amount of purchases to be made. Where requested, furnish survey data to substantiate
12 quantities.
13
14 Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade
15 discounts.
16
17 Comply with requirements in Section "Product Substitutions" if the proposed change in the
18 Work requires the substitution of one product or system for a product or system specified.
19
20 Proposal Request Form: Use AIA Document G 709 for Change Order Proposal Requests.
21
22 ALLOWANCES
23
24 Allowance Adjustment: Base each Change Order Proposal Request for an allowance cost
25 adjustment solely on the difference between the actual purchase amount and the allowance,
26 multiplied by the final measurement of work-in-place, with reasonable allowances, where applicable,
27 for cutting losses,tolerances, mixing wastes, normal product imperfections, and similar margins.
28
29 Include installation costs in the purchase amount only where indicated as part of the
30 allowance.
31
32 When requested, prepare explanations and documentation to substantiate the margins
33 claimed.
34
35 Submit substantiation of a change in scope of work claimed in the Change Orders related to
36 unit-cost allowances.
37
38 The Owner reserves the right to establish the actual quantity of work-in-place by independent
39 quantity survey, measure, or count.
40
41 Submit claims for increased costs because of a change in scope or nature of the allowance described
42 in the Contract Documents, whether for the purchase order amount or Contractor's handling, labor,
43 installation, overhead, and profit, within 20 days of receipt of the change order or construction change
44 directive authorizing work to proceed. Claims submitted later than 20 days will be rejected.
45
46 The Change Order cost amount shall not include the Contractor's or Subcontractor's indirect
47 expense except when it is clearly demonstrated that either the nature or scope of work
48 required was changed from that which could have been foreseen from the description of the
49 allowance and other information in Contract Documents.
50
51 No change to the Contractor's indirect expense is permitted for selection of higher or lower
52 priced materials or systems of the same scope and nature as originally indicated.
53
54 CONSTRUCTION CHANGE DIRECTIVE
55
56 Construction Change Directive: When the Owner and Contractor are not in total agreement on the
57 terms of a Change Order Proposal Request, the Architect may issue a Construction Change Directive
MODIFICATION PROCEDURES
GDA 01035-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 on AIA Form G714, instructing the Contractor to proceed with a change in the Work, for subsequent
2 inclusion in a Change Order.
3
4 The Construction Change Directive will contain a complete description of the change in the
5 Work and designate the method to be followed to determine change in the Contract Sum or
6 Contract Time.
7
8 Documentation: Maintain detailed records on a time and material basis of work required by the
9 Construction Change Directive.
10
11 After completion of the change, submit an itemized account and supporting data necessary to
12 substantiate cost and time adjustments to the Contract.
13
14 CHANGE ORDER PROCEDURES
15
16 Upon the Owner's approval of a Change Order Proposal Request, the Owner will issue a Change
17 Order for signatures of the Owner and Contractor on the Owner's Change Order Form, as provided in
18 the Conditions of the Contract.
19
20
21 Chancre Order Form: Use forms provided by the Owner for Change Order Proposals; sample copies
22 are included as part of the Construction Agreement..
23
24 PART 2- PRODUCTS (Not Applicable)
25
26
27 PART 3- EXECUTION (Not Applicable)
28
29
30 END OF SECTION 01035
31
MODIFICATION PROCEDURES
GDA 01035-3
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 01040- PROJECT COORDINATION
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification sections, apply to work of this section.
10
11 DESCRIPTION OF WORK:
12
13 Minimum administrative and supervisory requirements necessary for coordination of work on the
14 project include but are not necessarily limited to the following:
15
16 Coordination and meetings.
17
18 Administrative and supervisory personnel.
19
20 Surveys and records or reports.
21
22 Limitations for use of site.
23
24 Special reports.
25
26 General installation provisions.
27
28 Cleaning and protection.
29
30 Conservation and salvage.
31
32 COORDINATION AND MEETINGS:
33
34 Coordination Drawings: Prepare coordination drawings where work by separate entities requires
35 fabrication off-site of products and materials which must accurately interface. Coordination drawings
36 shall indicate how work shown by separate shop drawings will interface, and shall indicate sequence
37 for installation. Comply with all requirements of the "submittals"section.
38
39 Monthly Coordination Meetings: Hold monthly general project coordination meetings at regularly
40 scheduled times convenient for all parties involved. These meetings are in addition to specific
41 meetings held for other purposes, such as regular project meetings and special preinstallation
42 meetings. Request representation at each meeting by every party currently involved in coordination or
43 planning for the work of the entire project. Conduct meetings in a manner which will resolve
44 coordination problems. Record results of the meeting and distribute copies to everyone in attendance
45 and to others affected by decisions or actions resulting from each meeting.
46
47 At Contractor's option, monthly coordination meetings can be held integrally with monthly
48 progress meetings as specified in section "Schedules, Reports, Payments".
49
50 SURVEYS AND RECORDS/REPORTS:
51
52 General: Working from lines and levels established by the property survey, establish and maintain
53 bench marks and other dependable markers. Establish bench marks and markers to set lines and
54 levels for work at each story of construction and elsewhere as needed to properly locate each element
55 of the project. Calculate and measure required dimensions as shown within recognized tolerances.
56 Drawings shall not be scaled to determine dimensions. Advise entities performing work, of marked
57 lines and levels provided for their use.
PROJECT COORDINATION
GDA 01040- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Surveyor: Engage a Land Surveyor or Professional Engineer experienced and specializing in land
3 survey work, who is registered in the State where the project is located, to perform those services
4 specified in this article. The Surveyor for this project will be Carter and Burgess, Inc.
5
6 Survey Procedures: Before proceeding with the layout of actual work, verify the layout information
7 shown on the drawings, in relation to the property survey and existing benchmarks. As work
8 proceeds, check every major element for line, level and plumb. Maintain a surveyor's log or record
9 book of such checks; make this log or record book available for the Architect or Engineer's reference.
10 Record deviations from required lines and levels, and advise the Architect or Engineer promptly upon
11 detection of deviations that exceed indicated or recognized tolerances. Record deviations which are
12 accepted, and not corrected, on record drawings.
13
14 LIMITATIONS ON USE OF THE SITE:
15
16 General: Limitations on site usage as well as specific requirements that impact site utilization are
17 indicated on the drawings and by other contract documents. In addition to these limitations and
18 requirements administer allocation of available space equitably among entities needing both access
19 and space so as to produce the best overall efficiency in performance of the total work of the project.
20 Schedule deliveries so as to minimize space and time requirements for storage of materials and
21 equipment on site.
22
23 SPECIAL REPORTS:
24
25 General: Submit special reports directly to the Owner within one day of an occurrence. Submit a
26 copy of the report to the Architect/Engineer and other entities that are affected by the occurence.
27
28 Reporting Unusual Events: When an event of an unusual and significant nature occurs at the site,
29 prepare and submit a special report. List chain of events, persons participating, response by the
30 Contractor's personnel, an evaluation of the results or effects and similar pertinent information. Advise
31 the Owner in advance when such events are known or predictable.
32
33
34 PART 2- PRODUCTS (Not Applicable).
35
36
37 PART 3- EXECUTION
38
39 GENERAL INSTALLATION PROVISIONS:
40
41 Pre-Installation Conferences: Hold a pre-installation meeting at the project site well before installation
42 of each unit of work which requires coordination with other work. Verify with local building officials if
43 there are any local conferences required by the code. Installer and representatives of the
44 manufacturers and fabricators who are involved in or affected by that unit of work, and with its
45 coordination or integration with other work that has preceded or will follow shall attend this meeting.
46 Advise the Owner, Architect/Engineer and any required local officials of scheduled meeting dates.
47
48 At each meeting review progress of other work and preparations for the particular work under
49 consideration including specific requirements for the following:
50
51 Contract documents.
52 Options.
53 Related change orders.
54 Purchases.
55 Deliveries.
56 Shop drawings, product data and quality control samples.
57 Possible conflicts and compatibility problems.
PROJECT COORDINATION
GDA 01040-2
GDA#12018.00 December 14,2012
Issue for Permit
1 Time schedules.
2 Weather limitations.
3 Manufacturer's recommendations.
4 Compatibility of materials.
5 Acceptability of substrates.
6 Temporary facilities.
7 Space and access limitations.
8 Governing regulations.
9 Safety.
10 Inspection and testing requirements.
11 Required performance results.
12 Recording requirements.
13 Protection.
14
15 Record significant discussions of each conference, and record agreements and
16 disagreements, along with the final plan of action. Distribute the record of meeting promptly to
17 everyone concerned, including the Owner and Architect/Engineer.
18
19 Do not proceed with the work if the pre-installation conference cannot be successfully
20 concluded. Initiate whatever actions are necessary to resolve impediments to performance of
21 the work and reconvene pre-installation at the earliest feasible date.
22
23 Installer's Inspection of Conditions: Require the Installer of each major unit of work to inspect the
24 substrate to receive the work and conditions under which the work is to be performed. The Installer
25 shall report all unsatisfactory conditions in writing to the Contractor. Do not proceed with the work
26 until unsatisfactory conditions have been corrected in a manner acceptable to the Installer.
27
28 Manufacturer's Instructions: Where installations include manufactured products, comply with the
29 manufacturer's applicable instructions and recommendations for installation, to the extent that these
30 instructions and recommendations are more explicit or more stringent than requirements indicated in
31 the contract documents.
32
33 Inspect each item of materials or equipment immediately prior to installation. Reject damaged and
34 defective items.
35
36 Provide attachment and connection devices and methods for securing work. Secure work true to line
37 and level, and within recognized industry tolerances. Allow expansion and building movement.
38 Provide uniform joint width in exposed work. Arrange joints in exposed work to obtain the best visual
39 effect. Refer questionable visual-effect choices to the Architect/Engineer for final decision.
40
41 Recheck measurements and dimensions of the work, as an integral step of starting each installation.
42
43 Install each unit-of-work during weather conditions and project status which will ensure the best
44 possible results in coordination with the entire work. Isolate each unit of work from incompatible work
45 as necessary to prevent deterioration.
46
47 Coordinate enclosure of the work with required inspections and tests, so as to minimize the necessity
48 of uncovering the work for that purpose.
49
50 Mounting Heights: Where mounting heights are not indicated, mount individual units of work at
51 industry recognized standard mounting heights for the particular application indicated. Refer
52 questionable mounting height choices to the Architect/Engineer for final decision.
53
54 CLEANING AND PROTECTION:
55
56 General: During handling and installation of work at the project site, clean and protect work in
57 progress and adjoining work at the basis of continuous maintenance. Apply protective covering on
PROJECT COORDINATION
GDA 01040-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 installed work where it is required to ensure freedom from damage or deterioration at time of
2 substantial completion.
3
4 Clean and perform maintenance on installed work as frequently as necessary through the remainder
5 of the construction period. Adjust and lubricate operable components to ensure operability without
6 damaging effects.
7
8 Limiting Exposures of Work: To the extent possible through reasonable control and protection
9 methods, supervise performance of the work in such a manner and by such means which will ensure
10 that none of the work, whether completed or in progress, will be subjected to harmful, dangerous,
11 damaging or otherwise deleterious exposure during the construction period. Such exposures include,
12 where applicable, but not by way of limitation the following:
13
14 Excessive static or dynamic loading.
15 Excessive internal or external pressures.
16 Excessively high or low temperatures.
17 Thermal shock.
18 Excessively high or low humidity.
19 Air contamination or pollution.
20 Water or ice.
21 Solvents.
22 Chemicals.
23 Light.
24 Radiation.
25 Puncture.
26 Abrasion.
27 Heavy traffic.
28 Soiling.
29 Bacteria.
30 Insect infestation.
31 Combustion.
32 Electrical current.
33 High speed operation, improper lubrication, unusual wear or other misuse.
34 Incompatible interface.
35 Destructive testing.
36 Misalignment.
37 Excessive weathering.
38 Unprotected storage.
39 Improper shipping or handling.
40 Theft.
41 Vandalism.
42
43 C_ ONSERVATION AND SALVAGE:
44
45 General: It is a requirement for supervision and administration of the work that construction
46 operations be carried out with the maximum possible consideration given to conservation of energy,
47 water and materials. In addition maximum consideration shall be given to salvaging materials and
48 equipment involved in performance of the work but not incorporated therein. Refer to other sections
49 for required disposition of salvage materials which are the Owner's property.
50
51
52 END OF SECTION 01040
PROJECT COORDINATION
GDA 01040-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01045-CUTTING AND PATCHING
2
3 PART 1 -GENERAL
4
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification sections, apply to work of this section.
10
11 DESCRIPTION OF REQUIREMENTS:
12
13 Definition: "Cutting and patching" includes cutting into existing construction to provide for the
14 installation or performance of other work and subsequent fitting and patching required to restore
15 surfaces to their original condition.
16
17 "Cutting and patching" is performed for coordination of the work, to uncover work for access
18 or inspection, to obtain samples for testing, to permit alterations to be performed or for other
19 similar purposes.
20
21 Cutting and patching performed during the manufacture of products, or during the initial
22 fabrication, erection or installation processes is not considered to be "cutting and patching"
23 under this definition. Drilling of holes to install fasteners and similar operations are also not
24 considered to"cutting and patching".
25
26 "Demolition" and "Selective Demolition" are recognized as related-but-separate categories of
27 work, which may or may not require cutting and patching as defined in this section; refer to
28 "Demolition"and "Selective Demolition"sections of Division 2.
29
30 Refer to other sections of these specifications for specific cutting and patching requirements and
31 limitations applicable to individual units of work.
32
33 Unless otherwise specified requirements of this section apply to mechanical and electrical
34 work. Refer to Division-15 and Division-16 sections for additional requirements and limitations
35 on cutting and patching of mechanical and electrical work.
36
37 QUALITY ASSURANCE:
38
39 Requirements for Structural Work: Do not cut and patch structural work in a manner that would result
40 in a reduction of load-carrying capacity or of load-deflection ratio.
41
42 Before cutting and patching the following categories of work, obtain the Architect/Engineer's approval
43 to proceed with cutting and patching as described in the procedural proposal for cutting and patching.
44
45 Structural steel.
46
47 Miscellaneous structural metals, including lintels, equipment supports, stair systems and
48 similar categories of work.
49
50 Structural concrete.
51
52 Foundation construction.
53
54 Bearing and retaining walls.
55
56 Structural decking.
57
CUTTING AND PATCHING
GDA 01045-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Exterior curtain wall construction.
2
3 Piping, ductwork, vessels and equipment.
4
5 Operational and Safety Limitations: Do not cut and patch operational elements or safety related
6 components in a manner that would result in a reduction of their capacity to perform in the manner
7 intended, including energy performance, or that would result in increased maintenance, or decreased
8 operational life or decreased safety.
9
10 Visual Requirements: Do not cut and patch work exposed on the building's exterior or in it's occupied
11 spaces, in a manner that would, in the Architect/Engineer's opinion, result in lessening the building's
12 aesthetic qualities. Do not cut and patch work in a manner that would result in substantial visual
13 evidence of cut and patch work. Remove and replace work judged by the Architect/Engineer to be cut
14 and patched in a visually unsatisfactory manner.
15
16 If possible retain the original installer or fabricator, or another recognized experienced and specialized
17 firm to cut and patch the following categories of exposed work.
18
19 Processed concrete finishes.
20
21 Colored concrete work.
22
23 Ornamental metal.
24
25 Stone work
26
27 Roofing.
28
29 Window wall system.
30
31 Brick work.
32
33 SUBMITTALS:
34
35 Procedural Proposal for Cutting and Patching: Where prior approval of cutting and patching is
36 required, submit proposed procedures for this work well in advance of the time work will be performed
37 and request approval to proceed. Include the following information, as applicable, in the submittal:
38
39 Describe nature of the work and how it is to be performed, indicating why cutting and patching
40 cannot be avoided. Describe anticipated results of the work in terms of changes to existing
41 work, including structural, operational and visual changes as well as other significant
42 elements.
43
44 List products to be used and firms that will perform work.
45
46 Give dates when work is expected to be performed.
47
48 List utilities that will be disturbed or otherwise be affected by work, including those that will be
49 relocated and those that will be out-of-service temporarily. Indicate how long utility service will
50 be disrupted.
51
52 Where cutting and patching of structural work involves the addition of reinforcement, submit
53 details and engineering calculations to show how that reinforcement is integrated with original
54 structure to satisfy requirements.
55
56 Approval by the Architect/Engineer to proceed with cutting and patching work does not waive
57 the Architect/Engineer's right to later require complete removal and replacement of work found
CUTTING AND PATCHING
GDA 01045-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 to be cut and patched in an unsatisfactory manner.
2
3 PART 2- PRODUCTS
4
5
6 MATERIALS:
7
8 General: Except as otherwise indicated, or as directed by the Architect/Engineer, use materials for
9 cutting and patching that are identical to existing materials. If identical materials are not available, or
10 cannot be used, use materials that match existing adjacent surfaces to the fullest extent possible with
11 regard to visual effect. Use materials for cutting and patching that will result in equal-or-better
12 performance characteristics
13
14
15 PART 3- EXECUTION
16
17
18 INSPECTION:
19
20 Before cutting, examine the surfaces to be cut and patched and the conditions under which the work is
21 to be performed. If unsafe or otherwise unsatisfactory conditions are encountered, take corrective
22 action before proceeding with the work.
23
24 PREPARATION:
25
26 Temporary Support: To prevent failure provide temporary support of work to be cut.
27
28 Protection: Protect other work during cutting and patching to prevent damage. Provide protection
29 from adverse weather conditions for that part of the project that may be exposed during cutting and
30 patching operations.
31
32 Avoid interference with use of adjoining areas or interruption of free passage to adjoining
33 areas.
34
35 Take precautions not to cut existing pipe, conduit or duct serving the building but scheduled to be
36 relocated until provisions have been made to bypass them.
37
38 PERFORMANCE:
39
40 General: Employ skilled workmen to perform cutting and patching work. Except as otherwise
41 indicated or as approved by the Architect/Engineer, proceed with cutting and patching at the earliest
42 feasible time and complete work without delay.
43
44 Cutting: Cut the work using methods that are least likely to damage work to be retained or adjoining
45 work. Where possible review proposed procedures with the original installer; comply with original
46 installer's recommendations.
47
48 In general, where cutting is required use hand of small power tools designed for sawing or
49 grinding, not hammering and chopping. Cut through concrete and masonry using a cutting
50 machine such as a carborundum saw or core drill to insure s neat hole. Cut holes and slots
51 neatly to size required with minimum disturbance of adjacent work. To avoid marring existing
52 finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.
53 Temporarily cover openings when not in use.
54
55 Comply with requirements of applicable sections of Division 2 where cutting and patching
56 requires excavating and backfilling.
57
CUTTING AND PATCHING
GDA 01045-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 By-pass utility services such as pipe and conduit, before cutting, where such utility services
2 are shown or required to be removed, relocated or abandoned. Cut-off conduit and pipe in
3 walls or partitions to be removed. After by-pass and cutting, cap, valve or plug and seal tight
4 remaining portion of pipe and conduit to prevent entrance of moisture or other foreign matter.
5
6 Patching: Patch with seams which are durable and as invisible as possible. Comply with specified
7 tolerances for the work.
8
9 Where feasible, inspect and test patched areas to demonstrate integrity of work.
10
11 Restore exposed finishes of patched areas and where necessary extend finish restoration into
12 retained adjoining work in a manner which will eliminate evidence of patching and refinishing.
13
14 Where removal of walls or partitions extends one finished area into another finished area,
15 patch and repair floor and wall surfaces in the new space to provide an even surface of
16 uniform color and appearance. If necessary to achieve uniform color and appearance,
17 remove existing floor and wall coverings and replace with new materials.
18
19 Where patch occurs in a smooth painted surface, extend final paint coat over entire
20 unbroken surface containing patch, after patched area has received prime and base
21 coat.
22
23 Patch, repair or rehang existing ceilings as necessary to provide an even plane surface of
24 uniform appearance.
25
26 CLEANING:
27
28 Thoroughly clean areas and spaces where work is performed or used as access to work. Remove
29 completely point, mortar, oils, putty and items of similar nature. Thoroughly clean piping, conduit and
30 similar features before painting or other finishing is applied. Restore damaged pipe covering to its
31 original condition.
32
33 END OF SECTION 01045
CUTTING AND PATCHING
GDA 01045-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01050- FIELD ENGINEERING
2
3 PART 1 - GENERAL
4
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of the Contract, including General and Supplementary Conditions
9 and other Division-1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 General: This Section specifies administrative and procedural requirements for field engineering
14 services, including, but not necessarily limited to, the following:
15
16 Land survey Work.
17 Civil engineering services.
18 Structural engineering services.
19
20 SUBMITTALS
21
22 Certificates: Submit a certificate signed by the Land Surveyor or Professional Engineer certifying that
23 the location and elevation of improvements comply with the Contract Documents.
24 Final Property Survey: Submit 10 copies of the final property survey.
25
26 Project Record Documents: Submit a record of Work performed and record survey data as required
27 under provisions of Sections"Submittals" and "Project Closeout".
28
29 QUALITY ASSURANCE
30 Surveyor: Engage a Registered Land Surveyor registered in the State where the project is located, to
31 perform land surveying services required.
32 Engineer: Engage a Professional Engineer of the discipline required, registered in the state in which
33 the Project is located, to perform required engineering services.
34
35
36 PART 2 - PRODUCTS (Not Applicable)
37
38
39 PART 3- EXECUTION
40
41
42 EXAMINATION
43 The Owner will furnish a survey describing the physical characteristics of the site, legal limitations,
44 utility locations, and other information needed to perform the Work..
45
46 Verify layout information shown on the Drawings, in relation to the property survey and existing
47 benchmarks before proceeding to layout the Work. Locate and protect existing benchmarks and
48 control points. Preserve permanent reference points during construction.
49
50 Do not change or relocate benchmarks or control points without prior written approval.
51 Promptly report lost or destroyed reference points, or requirements to relocate reference
52 points because of necessary changes in grades or locations.
53
54 Promptly replace lost or destroyed project control points. Base replacements on the original
55 survey control points.
56
57 Establish and maintain a minimum of two permanent benchmarks on the site, referenced to data
FIELD ENGINEERING
GDA 01050 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 established by survey control points.
2
3 Record benchmark locations, with horizontal and vertical data, on Project Record Documents.
4
5 Existing utilities and equipment: The existence and location of underground and other utilities and
6 construction indicated as existing are not guaranteed. Before beginning sitework, investigate and
7 verify the existence and location of underground utilities and other construction.
8
9 Prior to construction, verify the location and invert elevation at points of connection of sanitary
10 sewer, storm sewer and water service piping.
11
12 PERFORMANCE
13
14 Working from lines and levels established by the property survey, establish benchmarks and markers
15 to set lines and levels at each story of construction and elsewhere as needed to properly locate each
16 element of the Project. Calculate and measure required dimensions within indicated or recognized
17 tolerances. Do not scale Drawings to determine dimensions.
18
19 Advise entities engaged in construction activities, of marked lines and levels provided for their
20 use.
21
22 As construction proceeds, check every major element for line, level and plumb.
23
24 Surveyor's Loq: Maintain a surveyor's log of control and other survey Work. Make this log available
25 for reference.
26
27 Record deviations from required lines and levels, and advise the Architect when deviations
28 that exceed indicated or recognized tolerances are detected. On Project Record Drawings,
29 record deviations that are accepted and not corrected.
30
31 On completion of foundation walls, major site improvements, and other Work requiring field
32 engineering services, prepare a certified survey showing dimensions, locations, angles and
33 elevations of construction and sitework.
34
35 Site Improvements: Locate and lay out site improvements, including pavements, stakes for grading,
36 fill and topsoil placement, utility slopes and invert elevations by instrumentation and similar
37 appropriate means.
38
39 Building Lines and Levels: Locate and lay out batter boards for structures, building foundations,
40 column grids and locations, floor levels and control lines and levels required for mechanical and
41 electrical Work.
42
43 Existing Utilities: Furnish information necessary to adjust, move or relocate existing structures, utility
44 poles, lines, services or other appurtenances located in, or affected by construction. Coordinate with
45 local authorities having jurisdiction.
46
47 Final Property Survey: Before Substantial Completion, prepare a final property survey showing
48 significant features (real property)for the Project. Include on the survey a certification, signed by the
49 Surveyor, to the effect that principal metes, bounds, lines and levels of the Project are accurately
50 positioned as shown on the survey.
51
52 Recording: At Substantial Completion, have the final property survey recorded by or with local
53 governing authorities as the official "property survey".
54 END OF SECTION 01050
FIELD ENGINEERING
GDA 01050-2
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 01092-ABBREVIATIONS 61 ANN ANNUNCIATOR
2 62 ANOD ANODIZED *
3 PART 1 -GENERAL 63 ANT ANTENNA
4 64 AP ACCESS PANEL
5 65 APPAR APPARATUS
6 GENERAL 66 APPX APPENDIX
7 67 ARCH ARCHITECT(URAL)
8 The following schedule of abbreviations represent 68 ARF ABOVE RAISED FLOOR *
9 a list of potential abbreviations that may be used 69 ASC ABOVE SUSPENDED CEILING *
10 in this Project Manual or on the Drawings. Not all 70 ASD AUTOMATIC SPRINKLER DRAIN *
11 abbreviations in this list will be used on any 71 ASL ABOVE SEA LEVEL *
12 particular project. 72 ASPH ASPHALT
13 73 ASSN ASSOCIATION
14 This list shall not be used as a bill of materials, 74 ASSY ASSEMBLY
15 products or conditions for this Project. 75 ASU AIR SUPPLY UNIT *
16 76 ASYM ASYMMETRICAL
17 77 AT AIR TIGHT
18 SCHEDULE OF ABBREVIATIONS 78 ATCH ATTACHMENT
19 79 ATM ATMOSPHERE
20 80 AV AIR VENT *
21 3/C CONDUCTORS, NUMBER OF(3) 81 AV AUDIO VISUAL *
22 NE ARCHITECT/ENGINEER * 82 AVE AVENUE
23 AAP ALARM ANNUNCIATOR PANEL * 83 AWG AMERICAN WIRE GAGE
24 AB ANCHOR BOLT 84 AZ AZIMUTH
25 ABAN ABANDON * 85 B BATHROOM *
26 ABC AGGREGATE BASE COURSE * 86 B/B BACK TO BACK *
27 ABV ABOVE 87 BA BURGLAR ALARM *
28 AC AIR CONDITIONING * 88 BAF BAFFLE
29 AC ALTERNATING CURRENT 89 BAL BALANCE
30 AC ASPHALTIC CONCRETE * 90 BAT BATTERY
31 ACOUS PNL ACOUSTICAL PANEL * 91 BB BASEBOARD *
32 ACOUS TILE ACOUSTICAL TILE * 92 BB BULLETIN BOARD
33 ACP ASPHALTIC CONCRETE PAVING * 93 BBRG BALL BEARING
34 ACR PL ACRYLIC PLASTIC * 94 BBS BOTTOM OF BACKSLOPE *
35 ACU AIR CONDITIONING UNIT * 95 BC BACK OF CURB *
36 ACWT ACOUSTICAL WALL TREATMENT * 96 BD BOARD
37 AD ACCESS DOOR * 97 BETW BETWEEN
38 AD AREA DRAIN 98 BEV BEVEL
39 ADC AUTOMATIC DOOR CLOSER * 99 BF BOTH FACES *
40 ADDL ADDITIONAL * 100 BF BOTTOM FACE
41 ADDM ADDENDUM * 101 BFP BACKFLOW PREVENTER *
42 ADH ADHESIVE 102 BFS BOTTOM OF FORESLOPE *
43 ADJ ADJUSTABLE 103 BI BLACK IRON
44 ADJC ADJACENT * 104 BITUM BITUMINOUS
45 ADS AUTOMATIC DOOR SEAL 105 BJT BED JOINT *
46 AF ACCESS FLOOR * 106 BL BASE LINE
47 AFF ABOVE FINISH FLOOR * 107 BLDG BUILDING
48 AFG ABOVE FINISH GRADE * 108 BLK BLOCK
49 AFS ABOVE FINISH SLAB * 109 BLKG BLOCKING
50 AGGR AGGREGATE 110 BLKHD BULKHEAD *
51 AHR ANCHOR 111 BLR BOILER
52 AHU AIR HANDLING UNIT * 112 BLST BALLAST
53 AL ALUMINUM 113 BLVD BOULEVARD *
54 ALM ALARM 114 BLW BELOW
55 ALT ALTERNATE * 115 BLW CLG BELOW CEILING *
56 ALT NO ALTERNATE NUMBER * 116 BLW FFLR BELOW FINISH FLOOR *
57 ALUM ALUMINUM 117 BM BEAM
58 AMB AMBIENT 118 BM BENCH MARK
59 AMP AMPERE 119 BOT BOTTOM
60 AMT AMOUNT 120 BO BOTTOM OF
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-1
GDA#12018.00 December 14,2012
Issue for Permit
1 BP BASE PLATE 61 CL CENTER LINE
2 BP BOILING POINT 62 CLG CEILING
3 BR BEDROOM 63 CLG DIFF CEILING DIFFUSER *
4 BR BEND RADIUS 64 CLG HT CEILING HEIGHT *
5 BRCG BRACING * 65 CLG REG CEILING REGISTER *
6 BRDG BRIDGING * 66 CLJ CONTROL JOINT
7 BRDG JST BRIDGING JOIST * 67 CLL COLUMN LINE *
8 BRG BEARING 68 CLL CONTRACT LIMIT LINE *
9 BRG PL BEARING PLATE * 69 CLO CLOSET
10 BRK BRICK 70 CLOS CLOSURE
11 BRKR BREAKER 71 CLP CLAMP
12 BRKT BRACKET 72 CLR CLEAR
13 BRS BRASS 73 CMP CORRUGATED METAL PIPE
14 BRZ BRONZE 74 CMPST COMPOSITE
15 BS BOTH SIDES 75 CMU CONCRETE MASONRY UNIT *
16 BSHG BUSHING 76 CND CONDUIT
17 BSMT BASEMENT 77 CNR CORNER *
18 BSP BLACK STEEL PIPE * 78 CNTR COUNTER
19 BTU BRITISH THERMAL UNIT 79 CO CAPPED OUTLET *
20 BTUH BRITISH THERMAL UNITS PER HOUR * 80 CO CASED OPENING *
21 BU BUILT-UP * 81 CO CLEANOUT
22 BUR BUILT-UP ROOFING * 82 COAX COAXIAL CABLE *
23 BW BOTH WAYS 83 COEF COEFFICIENT
24 C&G CURB AND GUTTER * 84 COL COLUMN
25 C/C CENTER TO CENTER * 85 COM COMMON
26 CAB CABINET 86 COMB COMBINATION
27 CAD CADMIUM * 87 COMM COMMUNICATION
28 CAL CALIBRATE 88 COMPL COMPLETE
29 CAP CAPACITY 89 COMPT COMPARTMENT
30 CARP CARPET 90 CONC CONCRETE
31 CAV CAVITY 91 CONC FL CONCRETE FLOOR *
32 CB CATCH BASIN 92 CONF CONFERENCE *
33 CB CORNER BEAD * 93 CONN CONNECTION
34 CBORE COUNTERBORE 94 CONSTR CONSTRUCTION
35 CCTV CLOSED CIRCUIT TELEVISION 95 CONT CONTINUOUS(ATION)
36 CCW COUNTER CLOCKWISE 96 CONTR CONTRACT(OR)
37 CEB CONCRETE EQUIPMENT BASE * 97 COORD COORDINATE
38 CEM CEMENT 98 CORR CORRIDOR *
39 CEM PLAS CEMENT PLASTER * 99 COV COVER
40 CER CERAMIC 100 COV PL COVER PLATE *
41 CER TILE CERAMIC TILE * 101 CP CONCRETE PIPE *
42 CFE CONTRACTOR FURNISHED EQUIPMENT * 102 CP CONTROL PANEL *
43 CFLG COUNTER FLASHING 103 CPLG COUPLING
44 CG CORNER GUARD* 104 CPRS COMPRESSIBLE
45 CH CHILLER * 105 CRCMF CIRCUMFERENCE
46 CH BD CHALKBOARD * 106 CRN CROWN
47 CHAN CHANNEL 107 CRS COLD ROLLED STEEL
48 CHEM CHEMICAL 108 CS CAST STONE
49 CHFR CHAMFER * 109 CS CONTROL SWITCH *
50 CHK CHECK 110 CSB CASING BEAD *
51 CHK V CHECK VALVE * 111 CSB CONCRETE SPLASH BLOCK
52 CHR PL CHROME PLATED * 112 CSG CASING
53 CI CAST IRON 113 CSK COUNTERSUNK *
54 CIP CAST IRON PIPE 114 CSMT CASEMENT *
55 CIR CIRCLE 115 CSP CONCRETE SEWER PIPE *
56 CIRC CIRCULAR 116 CSWK CASEWORK *
57 CISP CAST IRON SOIL PIPE * 117 CT COOLING TOWER *
58 CJ CONSTRUCTION JOINT 118 CT CURRENT TRANSFORMER
59 CKT CIRCUIT 119 CTC CURRENT TRANSFORMER CABINET *
60 CKT BRKR CIRCUIT BREAKERS 120 CTD&R COMBINATION TOWEL DISPENSER&
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-2
GDA#12018.00 December 14,2012
Issue for Permit
1 RECEPTACLE * 61 DWH DOMESTIC WATER HEATER '
2 CTR COOLING TOWER RETURN * 62 DWL DOWEL
3 CTS COOLING TOWER SUPPLY • 63 DWR DRAWER
4 CTV CABLE TELEVISION * 64 DWV DRAIN WASTE&VENT *
5 CUB CUBICLE 65 DX DUPLEX
6 CU FT CUBIC FOOT * 66 E EAST
7 CUH CABINET UNIT HEATER * 67 EA EACH
8 CUR CURRENT 68 ECAB ELECTRICAL CABINET *
9 CV CONTROL VALVE * 69 EDR EQUIPMENT DRAIN *
10 CW CLOCKWISE 70 EF EACH FACE
11 CW COLD WATER 71 EHD ELECTRICAL HAND DRYER *
12 CWP CIRCULATING WATER PUMP 72 EL EASEMENT LINE *
13 CY CYCLE 73 EL/ELEV ELEVATION
14 CYL CYLINDER 74 ELAST ELASTOMERIC •
15 CYL L CYLINDER LOCK 75 ELB ELBOW
16 D DEEP,DEPTH 76 ELEC ELECTRIC(AL)
17 DA DRAINAGE AREA * 77 ELEV ELEVATOR
18 DAT DATUM 78 EMER EMERGENCY
19 DBC DIAMETER BOLT CIRCLE 79 EMT ELECTRICAL METALIC TUBING
20 DBL ACT DOUBLE ACTING 80 ENAM ENAMEL
21 DBL GLZ DOUBLE GLAZING * 81 ENCL ENCLOSURE
22 DC DIRECT CURRENT 82 ENG ENGINE
23 DCI DUCT COVERING INSULATION • 83 ENGR ENGINEER
24 DCL DOOR CLOSURE 84 ENTR ENTRANCE
25 DEG DEGREE * 85 EO ELECTRICAL OUTLET *
26 DEMO DEMOLITION ' 86 EP EDGE OF PAVEMENT *
27 DET DETAIL 87 EP ELECTRICAL PANEL *
28 DF DRINKING FOUNTAIN 88 EPDM ETHYLENE PROPYLENE DIENE
29 DFR DOOR FRAME • 89 MONOMER *
30 DH DOUBLE HUNG * 90 EQL SP EQUALLY SPACED
31 DIA DIAMETER 91 EQUIP EQUIPMENT *
32 DIFF DIFFERENCE 92 EQUIV EQUIVALENT
33 DIFF DIFFUSER * 93 ERECT ERECTION
34 DIM DIMENSION 94 ESCAL ESCALATOR •
35 DIP DUCTILE IRON PIPE 95 ESMT EASEMENT *
36 DISP DISPENSER 96 EST ESTIMATE
37 DIST DISTANCE 97 EW EACH WAY
38 DISTR DISTRIBUTE (ION) 98 EWC ELECTRICAL WATER COOLER
39 DISTR PNL DISTRIBUTION PANEL • 99 EWH ELECTRICAL WATER HEATER *
40 DIV DIVIDER • 100 EXC EXCAVATE
41 DIV DIVISION 101 EXCH EXCHANGER
42 DJ DOUBLE JOIST ' 102 EXH EXHAUST
43 DL DEAD LOAD 103 EXH A EXHAUST AIR *
44 DLI DUCT LINER INSULATION ' 104 EXH DT EXHAUST DUCT *
45 DLV DOOR LOUVER ' 105 EXH FN EXHAUST FAN •
46 DMPF DAMPPROOFING ' 106 EXH GR EXHAUST GRILLE •
47 DMPR DAMPER 107 EXH HD EXHAUST HOOD *
48 DN DOWN 108 EXH RG EXHAUST REGISTER *
49 DO DITTO 109 EXP EXPANSION
50 DOP DOOR OPENING * 110 EXP BT EXPANSION BOLT *
51 DP DEW POINT 111 EXP JT EXPANSION JOINT
52 DR DRAIN 112 EXST EXISTING
53 DS DOWNSPOUT 113 EXST GR EXISTING GRADE *
54 DSP DRY STANDPIPE * 114 EXT EXTERIOR
55 DST DOOR STOP 115 EXTN EXTENSION •
56 DT DRAIN TILE 116 EXTR EXTRUSION *
57 DUPL DUPLICATE * 117 F/F FACE TO FACE •
58 DVTL DOVETAIL 118 FA FIRE ALARM •
59 DW DISHWASHER 119 FACP FIRE ALARM CONTROL PANEL *
60 DWG DRAWING 120 FB FIRE BLANKET *
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-3
GDA#12018.00 December 14,2012
Issue for Permit
1 FB FLAT BAR 61 FREQ FREQENCY
2 FBD FIBERBOARD * 62 FRT FRONT *
3 FBM FEET BOARD MEASURE * 63 FRTW FIRE RETARDENT TREATED WOOD *
4 FC FOOTCANDLE 64 FS FAR SIDE
5 FCO FLOOR CLEANOUT * 65 FSH FIRE SPRINKLER HEAD *
6 FCU FAN COIL UNIT 66 FSP FIRE STANDPIPE *
7 FD FLOOR DRAIN 67 FSTNR FASTENER
8 FDC FIRE DEPARTMENT CONNECTION 68 FT FEET OR FOOT *
9 FDCC FIRE DEPARTMENT CONNECTION 69 FTG FITTING
10 CABINET * 70 FU FUSE
11 FDMPR FIRE DAMPER * 71 FUR FURNACE
12 FDN FOUNDATION 72 FURN FURNITURE
13 FDV FIRE DEPARTMENT VALVE * 73 FURR FURRING *
14 FEC FIRE EXTINGUISHER CABINET * 74 FUT FUTURE
15 FEM FEMALE 75 FWC FABRIC WALL COVERING *
16 FEXT FIRE EXTINGUISHER 76 FWP FIRE WATER PUMP *
17 FF FAR FACE * 77 FXTR FIXTURE
18 FFA FROM FLOOR ABOVE * 78 G GAS *
19 FFB FROM FLOOR BELOW * 79 G1S GOOD ONE SIDE *
20 FFE FINISH FLOOR ELEVATION 80 G2S GOOD TWO SIDES *
21 FGL FIBERGLASS * 81 G3S GOOD THREE SIDES *
22 FH FIRE HYDRANT 82 G4S GOOD FOUR SIDES *
23 FHC FIRE HOSE CABINET 83 GA GAGE
24 FHMS FLAT HEAD MACHINE SCREW * 84 GAL GALLON
25 FHP FULL HEIGHT PARTITION * 85 GALV GALVANIZED
26 FHR FIRE HOSE RACK 86 GALVI GALVANIZED IRON
27 FHWS FLAT HEAD WOOD SCREW * 87 GALVS GALVANIZED STEEL
28 FHY FIRE HYDRANT 88 GSS GALVANIZED SHEET STEEL
29 FIN FINISH * 89 GB GRAB BAR *
30 FIN FL FINISH FLOOR * 90 GD GUTTER DRAIN *
31 FIN GR FINISH GRADE * 91 GDR GUARD RAIL
32 FL FLASHING 92 GEN GENERATOR
33 FLD FLUID * 93 GENL GENERAL
34 FLDG FOLDING 94 GENL CONTR GENERAL CONTRACT
35 FLG FLANGE 95 GFI GROUND FAULT INTERRUPTER *
36 FLR FLOOR(ING) * 96 GIP GALVANIZED IRON PIPE *
37 FLR FIN FLOOR FINISH * 97 GL GLASS
38 FLR PL FLOOR PLATE * 98 GL BLK GLASS BLOCK *
39 FLR SK FLOOR SINK * 99 GLU LAM GLUE LAMINATED *
40 FLRD FLARED 100 GLZ GLAZING
41 FLT GL FLOAT GLASS * 101 GLZ CMU GLAZED CONCRETE MASONRY UNIT *
42 FLTR FILTER 102 GND GROUND
43 FLUOR FLUORESCENT 103 GOVT GOVERNMENT
44 FMBD FORMBOARD * 104 GPD GALLONS PER DAY *
45 FN FENCE * 105 GPH GALLONS PER HOUR
46 FOB FACE OF BUILDING 106 GPM GALLONS PER MINUTE
47 FOC FACE OF CONCRETE ' 107 GPS GALLONS PER SECOND
48 FOF FACE OF FINISH * 108 GR GRAD(E)(ING)
49 FOM FACE OF MASONRY * 109 GR BM GRADE BEAM *
50 FOS FACE OF STUDS * 110 GR LN GRADE LINE *
51 FPL FIREPLACE * 111 GRL GRILLE
52 FPM FEET PER MINUTE * 112 GRTG GRATING
53 FPRF FIREPROOFING 113 GSKT GASKET
54 FPS FEET PER SECOND * 114 GSNK GOOSENECK *
55 FPT FEMALE PIPE THREAD 115 GT GREASE TRAP
56 FPW FIRE PROTECTION WATER SUPPLY * 116 GT GROUT *
57 FR FIRE RATING * 117 GUT GUTTER
58 FR FRAME 118 GVL GRAVEL
59 FR MIR FRAMED MIRROR * 119 GVTR GAS VENT THROUGH ROOF *
60 FR MIR/SHF FRAMED MIRROR AND SHELF * 120 GWH GAS WATER HEATER *
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 GYP GYPSUM 61 INV EL INVERT ELEVATION '
2 GYP BD GYPSUM BOARD * 62 IP IRON PIPE
3 GYP PLASTER GYPSUM PLASTER * 63 IPS INSIDE PIPE SIZE *
4 H HIGH, HEIGHT 64 IPS INTERNATIONAL PIPE STANDARD
5 H PLAM HIGH PRESSURE LAMINATE * 65 IPS IRON PIPE SIZE
6 H&CW HOT AND COLD WATER * 66 IPT IRON PIPE THREAD
7 HB HOSE BIBB 67 ISO ISOMETRIC
8 HC HANDICAP ACCESSIBLE 68 ITC INTERIOR TELEPHONE CABINET *
9 HC HOLLOW CORE * 69 ITTB INTERIOR TELEPHONE TERMINAL BOARD '
10 HC HOSE CABINET * 70 IW IRRIGATION WATER *
11 HD HEAD 71 JAN JANITOR *
12 HD HEAVY DUTY 72 JB/J-BOX JUNCTION BOX
13 HD JT HEAD JOINT ' 73 JC JANITOR'S CLOSET
14 HDBD HARDBOARD * 74 JCT JUNCTION
15 HDR HEADER 75 JST JOIST *
16 HDWD HARDWOOD * 76 JT JOINT
17 HDWE HARDWARE * 77 K KIP(1000 LB) *
18 HDWL HEADWALL * 78 KB KNEE BRACE
19 HEX HEXAGONAL 79 KD KILN DRIED
20 HGR HANGER 80 KD KNOCK DOWN
21 HGT HEIGHT 81 KIP FT ONE THOUSAND FOOT POUNDS '
22 HID HIGH INTENSITY DISCHARGE * 82 KIT KITCHEN *
23 HM HOLLOW METAL 83 KLF KIPS PER LINEAR FOOT *
24 HMD HOLLOW METAL DOOR * 84 KO KNOCKOUT
25 HMF HOLLOW METAL FRAME * 85 KOP KNOCKOUT PANEL *
26 HNDRL HANDRAIL 86 KPL KICK PLATE
27 HORIZ HORIZONTAL/HORIZONTALLY 87 KSF KIPS PER SQUARE FOOT *
28 HP HIGH PRESSURE 88 KSI KIPS PER SQUARE INCH *
29 HP HORSEPOWER 89 KV KILOVOLT *
30 HPG HIGH PRESSURE GAS * 90 KVA KILOVOLT AMPERE *
31 HPT HIGH POINT 91 KW KILOWATT *
32 HR HOUR 92 KWH KILOWATT HOUR *
33 HS HIGH STRENGTH * 93 KWY KEYWAY
34 HSB HIGH STRENGTH BOLT * 94 L LEFT
35 HT HEAT 95 LB POUND
36 HTG HEATING 96 L-B LINE-BUS
37 HTR HEATER 97 LAB LABORATORY '
38 HVAC HEATING,VENTILATION,AIR 98 LAD LADDER
39 CONDITIONING * 99 LAM LAMINATION
40 HVY HEAVY 100 LATL LATERAL
41 HW HOT WATER 101 LAV LAVATORY
42 HWY HIGHWAY 102 LB POUND
43 HYD HYDRANT * 103 LBL LABEL
44 HYDR HYDRAULIC 104 LBR LUMBER
45 ID IDENTIFICATION * 105 LCD LINEAR CEILING DIFFUSER *
46 ID INSIDE DIAMETER 106 LCMU LIGHTWEIGHT
47 IF INSIDE FACE * 107 CONCRETE MASONRY UNIT *
48 IGN IGNITION 108 LD BRG LOAD BEARING *
49 ILLUM ILLUMINATION 109 LDG LANDING
50 IN INCH * 110 LDR LEADER
51 INCAND INCANDESCENT 111 LF LINEAR FOOT *
52 INDL INDUSTRIAL 112 LG LENGTH, LONG
53 INL INLET 113 LH LEFT HAND
54 INSTL INSTALLATION 114 LHR LEFT HAND REVERSE *
55 INSTR INSTRUMENT 115 LIN LINEAR
56 INSUL INSULATION 116 LIQ LIQUID
57 INTERCOM INTERCOMMUNICATION 117 LKR LOCKER
58 INTLK INTERLOCK 118 LKR RM LOCKER ROOM *
59 INTR INTERIOR 119 LL LIVE LOAD
60 INV INVERT * 120 LLH LONG LEG HORIZONTAL *
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-5
GDA#12018.00 December 14,2012
Issue for Permit
1 LLV LONG LEG VERTICAL * 61 MLDG MOLDING
2 LNTL LINTEL 62 MLWK MILLWORK *
3 LOC LOCATION * 63 MM MILLIMETER *
4 LONG LONGITUDINAL 64 MO MASONRY OPENING
5 LP LIGHT POLE * 65 MOD MODULE(AR)
6 LP LIGHTPROOF * 66 MON MONUMENT
7 LP LIQUEFIED PETROLEUM * 67 MOT MOTOR
8 LP LOW PRESSURE 68 MPT MALE PIPE THREAD
9 LPG LIQUIFIED PETROLEUM GAS * 69 MTD MOUNTED
10 LPT LOW POINT * 70 MTG MOUNTING
11 LRG LARGE * 71 MTL METAL
12 LRV LOUVERED ROOF VENT * 72 MULL MULLION *
13 LS LAWN SPRINKLING * 73 MULT MULTIPLE
14 LS LOUDSPEAKER 74 MVBL MOVABLE
15 LS LUMP SUM * 75 MZ MULTI-ZONE *
16 LT LIGHT 76 N NORTH
17 LT WT LIGHTWEIGHT * 77 NA NOT APPLICABLE
18 LTG LIGHTING 78 NAT NATURAL
19 LTG PNL LIGHTING PANEL * 79 NEC NATIONAL ELECTRIC CODE
20 LUB LUBRICATE * 80 NEG NEGATIVE
21 LV LOW VOLTAGE 81 NF NEAR FACE
22 LVL LEVEL(ER) 82 NFIPA NATIONAL FIRE PROTECTION ASSN.
23 LVR LOUVER 83 NIC NOT IN CONTRACT
24 LWC LIGHTWEIGHT CONCRETE 84 NO NUMBER
25 M METER * 85 NOM NOMINAL
26 MACH MACHINE 86 NP NO PAINT *
27 MACH RM MACHINE ROOM * 87 NPF NATIONAL PIPE THREAD *
28 MAINT MAINTENANCE 88 NPL NAMEPLATE
29 MAN MANUAL * 89 NPT NATIONAL TAPER PIPE(THREAD)
30 MANUF MANUFACTURER 90 NR NOISE REDUCTION *
31 MARB MARBLE * 91 NRC NOISE REDUCTION COEFFICIENT *
32 MAS MASONRY * 92 NS NEAR SIDE
33 MAIL MATERIAL 93 NTS NOT TO SCALE
34 MAU MAKE-UP AIR UNIT * 94 0/0 OUT TO OUT *
35 MAX MAXIMUM 95 OA OVERALL
36 MBF THOUSAND BOARD FEET * 96 OC ON CENTER
37 MBH MOP/BROOM HOLDER * 97 OD OUTSIDE DIAMETER
38 MBR MEMBER 98 OD OUTSIDE DIMENSION *
39 MBTU BRITISH THERMAL UNIT(1,000) * 99 OF OUTSIDE FACE
40 MC MEDICINE CABINET 100 OFCI OWNER FURNISHED-CONTRACTOR
41 MCF THOUSAND CUBIC FEET ' 101 INSTALLED *
42 MD MANUAL DAMPER * 102 OFF OFFICE *
43 MDO MEDIUM DENSITY OVERLAID * 103 OFOI OWNER FURNISHED-OWNER INSTALLED *
44 MECH MECHANICAL 104 OPNG OPENING
45 MED MEDIUM * 105 OPP OPPOSITE
46 MEMB MEMBRANE 106 ORD OVERFLOW ROOF DRAIN *
47 MEP MECHANICAL, ELECTRICAL, PLUMBING 107 OVFL OVERFLOW
48 MTL METAL 108 OH/OVHD OVERHEAD
49 METB METAL BASE 109 OPP. HAND OPPOSITE HAND
50 MEZZ MEZZANINE 110 OZ OUNCE
51 MFG MANUFACTURING 111 P POLE
52 MH MANHOLE 112 PA PIPE ANCHOR *
53 MI MILE 113 PAR PARALLEL *
54 MIN MINIMUM 114 PARG PARGING *
55 MIN MINUTE * 115 PB PANIC BAR *
56 MIR MIRROR 116 PB PUSHBUTTON
57 MISC MISCELLANEOUS 117 PBD PARTICLEBOARD *
58 MK MARK 118 PC PIECE
59 MKR MARKER 119 PC PORTLAND CEMENT *
60 ML METAL LATH * 120 PCD PAPER CUP DISPENSER *
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-6
GDA#12018.00 December 14,2012
Issue for Permit
1 PCF POUNDS PER CUBIC FOOT 61 RA GR RETURN AIR GRILLE *
2 PCP PORTLAND CEMENT PLASTER * 62 RAD RADIUS
3 PED PEDESTAL 63 RBR RUBBER
4 PERF PERFORATED 64 RC REINFORCED CONCRETE
5 PERIM PERIMETER * 65 RC REMOTE CONTROL
6 PERM PERMANENT 66 RCB REINFORCED CONCRETE BOX *
7 PERP PERPENDICUALR 67 RCP REINFORCED CONCRETE PIPE
8 PGBD PEGBOARD * 68 RCVR RECEIVER
9 PH PHASE 69 RD ROAD/ROOF DRAIN
10 PHOTO PHOTOGRAPH 70 RDC REDUCER *
11 PHS PHILLIP'S HEAD SCREW * 71 RDL ROOF DRAIN LEADER
12 PI POINT OF INTERSECTION 72 REC RECESSED
13 PIV POST INDICATOR VALVE 73 RECD RECEIVED
14 PL PLATE 74 RECPT RECEPTACLE
15 PPL PROPERTY LINE 75 RECT RECTANGULAR
16 PLAM PLASTIC LAMINATE ' 76 REF REFERENCE/REFER TO
17 PLAS PLASTER 77 REFR REFRIGERATION *
18 PLAT PLATFORM ' 78 REG REGISTER *
19 PLBG PLUMBING ' 79 REINF REINFORCE(D)(ING)(MENT)
20 PLF POUNDS PER LINEAR FOOT * 80 REM REMOVABLE
21 PLYWD PLYWOOD 81 REPRO REPRODUCE
22 PNEU PNEUMATIC 82 REQD REQUIRED
23 PNL PANEL 83 RESIL RESILIENT
24 PNT PAINT 84 RET RETURN *
25 POL POLISHED 85 RF RAISED FACE
26 POLY POLYETHYLENE * 86 RFG ROOFING
27 PORT PORTABLE 87 RH RIGHT HAND
28 POS POSITIVE 88 RHB RECESSED HOSE BIBB *
29 PP POWER PANEL * 89 RHMS ROUND HEAD MACHINE SCREW *
30 PR PAIR 90 RHR RIGHT HAND REVERSE '
31 PRCST PRECAST 91 RHWS ROUND HEAD WOOD SCREW *
32 PREFAB PREFABRICATED 92 RLF RELIEF
33 PREFIN PREFINISHED * 93 RLG RAILING
34 PRELIM PRELIMINARY 94 RM ROOM
35 PREP PREPARATION 95 RND ROUND
36 PRI PRIMARY 96 RO ROUGH OPENING
37 PRKG PARKING * 97 ROD ROOF OVERFLOW DRAIN
38 PROJ PROJECT 98 ROW RIGHT OF WAY *
39 PROP PROPERTY 99 RPM REVOLUTIONS PER MINUTE
40 PRTR PRESERVATIVE TREATED * 100 RPS REVOLUTIONS PER SECOND
41 PS CONC PRESTRESSED CONCRETE * 101 RR RAILROAD
42 PSF POUNDS PER SQUARE FOOT 102 RV RELIEF VALVE
43 PSH PURSE SHELF * 103 RV ROOF VENT *
44 PSI POUNDS PER SQUARE INCH 104 RV ROOF VENTILATOR *
45 PTD PAINTED/PAPER TOWEL DISPENSER /* 105 RVS REVERSE
46 PTN PARTITION 106 RVT RIVETED
47 PTR PAPER TOWEL RECEPTACLE * 107 RWC RAIN WATER CONDUCTOR
48 PVD PAVED * 108 RWL RAIN WATER LEADER *
49 PVC POLYVINYL CHLORIDE 109 S SOUTH
50 PVF POLYVINYLIDINE FLUORIDE * 110 SA SUPPLY AIR *
51 PVG PAVING * 111 SAG SUPPLY AIR GRILLE *
52 PVMT PAVEMENT * 112 SALV SALVAGE
53 PWR POWER 113 SAN SANITARY
54 QT QUARRY TILE * 114 SB SPLASH BLOCK
55 QTR QUARTER 115 SC SOLID CORE '
56 QTY QUANTITY 116 SCHED SCHEDULE
57 QUAL QUALITY 117 SCMU SOLID CONCRETE MASONRY UNIT '
58 R RISER 118 SCRN SCREEN
59 R THERMAL RESISTANCE * 119 SCT STRUCTURAL CLAY TILE
60 RA RETURN AIR * 120 SD SOAP DISPENSER *
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-7
GDA#12018.00 December 14,2012
Issue for Permit
1 SD STORM DRAIN * 61 STR STRAIGHT
2 SD SUPPLY DIFFUSER * 62 STRUCT STRUCTURAL *
3 SDL SADDLE 63 STRUCT STL STRUCTURAL STEEL *
4 SDMH STORM DRAIN MANHOLE * 64 SUH SUSPENDED UNIT HEATER *
5 SMDPR SMOKE DAMPER * 65 SUPPL SUPPLEMENT
6 SEC SECOND 66 SURF SURFACE
7 SECT SECTION 67 SURV SURVEY
8 SEG SEGMENT 68 SUSP SUSPENDED
9 SFT STRUCTURAL FACING TILE * 69 SUSP CLG SUSPENDED CEILING *
10 SGL SINGLE 70 SVCE SERVICE
11 SHLDR SHOULDER 71 SW SIDEWALK *
12 SHR SHOWER * 72 SWBD SWITCHBOARD
13 SHT SHEET(ING) * 73 SWGR SWITCHGEAR
14 SHTHG SHEATHING 74 SWR SEWER *
15 SHV SHELVES(ING) * 75 SYM SYMBOL
16 SIG SIGNAL 76 SYMM SYMMETRICAL
17 SIM SIMILAR 77 SYNTH SYNTHETIC
18 SJ SCORED JOINT * 78 SYS SYSTEM
19 SJ SLIP JOINT 79 T TEE *
20 SK SINK 80 T THERMOSTAT *
21 SL SLIDE(ING) 81 T TREAD *
22 SLP SLOPE 82 T&B TOP AND BOTTOM
23 SLV SLEEVE 83 T&G TONGUE AND GROOVE
24 SM SHEET METAL * 84 TAN TANGENT
25 SM SMOOTH * 85 TB TOP OF BEAM *
26 SMLS SEAMLESS 86 TB TOWEL BAR *
27 SND SANITARY NAPKIN DISPENSER * 87 TB-xx TEST BORING-xx(e.g.TB-1) *
28 SNR SANITARY NAPKIN RECEPTACLE * 88 TBE THREADED BOTH ENDS
29 SP SINGLE POLE/SOIL PIPE 89 TBM TEMPORARY BENCH MARK *
30 SP SPACE(ING)/STANDPIPE 90 TC TOP OF CONCRETE *
31 SP GR SPECIFIC GRAVITY 91 TD TOWEL DISPENSER *
32 SPCL SPECIAL 92 TD TRENCH DRAIN *
33 SPEC SPECIFICATION 93 TDR TOWEL DISPENSER/RECEPTACLE *
34 SPKLR SPRINKLER * 94 TE TOP ELEVATION *
35 SPKR SPEAKER 95 TEL TELEPHONE
36 SPLY SUPPLY 96 TEMP TEMPORARY/TEMPERED
37 SPRT SUPPORT 97 TER TERRAZZO
38 SQ SQUARE 98 TERM TERMINAL
39 SQ FT SQUARE FOOT 99 TF TOP OF FOOTING *
40 SQ IN SQUARE INCH 100 TFA TO FLOOR ABOVE *
41 SQ KM SQUARE KILOMETER 101 TFB TO FLOOR BELOW *
42 SQ M SQUARE METER * 102 TFF TOP OF FINISH FLOOR *
43 SQ MM SQUARE MILLIMETER * 103 TH THICK
44 SQ YD SQUARE YARD * 104 THD THREAD(ED)
45 SS SANITARY SEWER * 105 THERM THERMAL
46 SSD SUB-SOIL DRAIN 106 THK THICKNESS *
47 SSK SERVICE SINK * 107 THRES THRESHOLD *
48 SST STAINLESS STEEL 108 THRU THROUGH
49 ST STREET 109 TJ TOP OF JOIST *
50 STA STATION 110 TMPD TEMPERED
51 STAG STAGGERED * 111 TMPD GL TEMPERED GLASS *
52 STC SOUND TRANSMISSION CLASS * 112 TO TOP OF
53 STD STANDARD 113 TOE THREADED ONE END
54 STIF STIFFENER 114 TOL TOLERANCE
55 STIR STIRRUP 115 TOT TOTAL
56 STK STAKE * 116 TP TOP OF PAVEMENT *
57 STL STEEL 117 TPH TOILET PAPER HOLDER *
58 STL JST STEEL JOIST * 118 TR TOP OF RIM *
59 STL PL STEEL PLATE * 119 TRANS TRANSPARENT
60 STOR STORAGE 120 TRNBKL TURNBUCKLE
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-8
GDA#12018.00 December 14, 2012
Issue for Permit
1 TS TUBE STEEL/TENSILE STRENGTH 61 WH WALL HUNG
2 TSL TOP OF SLAB • 62 WH WALL HYDRANT
3 TST TOP OF STEEL . 63 WHSE WAREHOUSE
4 TTB TELEPHONE TERMINAL BOARD * 64 WTHR WATER HEATER *
5 TV TELEVISION 65 WI WROUGHT IRON
6 TW TOP OF WALL • 66 WL WIND LOAD
7 TYP TYPICAL 67 WLD WELDED
8 U HEAT TRANSFER COEFFICIENT 68 WLS WALL LOUVER AND SCREEN
9 UBC UNIFORM BUILDING CODE 69 WOLM WOLMANIZED/SEE PRTR
10 UFC UNIFORM FIRE CODE 70 W/O WITH OUT
11 UFD UNDER FLOOR DUCT * 71 WR WASTE RECEPTACLE
12 UGND UNDERGROUND 72 WR WATER RESISTANT
13 UH UNIT HEATER 73 WS WEATHERSTRIPPING
14 UMC UNIFORM MECHANICAL CODE 74 WSCT WAINSCOT
15 UN UNION 75 WSP WET STAND PIPE
16 UNEX UNEXCAVATED * 76 WT WEIGHT
17 UNFIN UNFINISHED 77 WTR WATER
18 UNIF UNIFORM 78 WTRPRF WATERPROOFING
19 UNO UNLESS NOTED OTHERWISE 79 WW WASTEWATER
20 UON UNLESS OTHERWISE NOTED * 80 WWF WELDED WIRE FABRIC
21 UPC UNIFORM PLUMBING CODE 81 XFMR TRANSFORMER
22 UR URINAL 82 YB YARD BOX
23 UTIL UTILITY 83 YCO YARD CLEANOUT
24 UV ULTRAVIOLET 84 YD YARD DRAIN *
25 V SANITARY VENT * 85 YH YARD HYDRANT *
26 V VALVE 86 ZCS ZINC COATED STEEL *
27 V VOLT 87 ZCSS ZINC COATED SHEET STEEL •
28 VA VOLT AMPERE • 88
29 VAC VACUUM 89
30 VAP VAPOR * 90 PART 2- PRODUCTS Not Applicable
31 VAP PRF VAPOR PROOF 91
32 VAV VARIABLE AIR VOLUME * 92
33 VB VACUUM BREAKER * 93 PART 3- EXECUTION Not Applicable
34 VB VALVE BOX 94
35 VB VINYL BASE • 95
36 VCT VINYL COMPOSITION TILE 96 END OF SECTION 01092
37 VEL VELOCITY
38 VENT VENTILATOR
39 VERT VERTICAL
40 VEST VESTIBULE
41 VFAT VINYL FACED ACOUSTIC TILE
42 VIB VIBRATION
43 VIN VINYL
44 VNR VENEER
45 VOL VOLUME
46 VR VAPOR RETARDER *
47 VT VINYL TILE
48 VTR VENT THROUGH ROOF
49 VWC VINYL WALL COVERING *
50 W WASTE/WATT/WEST/WIDE,WIDTH
51 W/ WITH
52 W/O WITHOUT
53 W/W WALL TO WALL
54 WC WATER CLOSET
55 WD WIDTH
56 WD WOOD
57 WDSP WASTE DISPOSER *
58 WDW WINDOW *
59 WF WIDE FLANGE •
60 WGL WIRE GLASS
Note: An asterisk (*) indicates the term is not in ANSI Y1.1 or that the abbreviation shown is not in compliance with
the one shown in ANSI Y1.1. The absence of an asterisk(*)indicates the abbreviation agrees with ANSI Y1.1.
ABBREVIATIONS
GDA 01092-9
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01095- REFERENCE STANDARDS AND DEFINITIONS
2
3 PART 1 -GENERAL
4
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division 1 Specification Sections, apply to this Section.
10
11 DEFINITIONS
12
13 General: Basic Contract definitions are included in the General Conditions.
14
15 Indicated: The term "indicated" refers to graphic representations, notes, or schedules on the
16 Drawings, other paragraphs or schedules in the Specifications, and similar requirements in the
17 Contract Documents. Where terms such as"shown,""noted," "scheduled,"and"specified"are used, it
18 is to help the reader locate the reference; no limitation on location is intended.
19
20 Directed: Terms such as "directed," "requested," "authorized," "selected," "approved," "required," and
21 "permitted" mean "directed by the Architect,""requested by the Architect,"and similar phrases.
22
23 Approve: The term "approved," where used in conjunction with the Architect's action on the
24 Contractor's submittals, applications, and requests, is limited to the Architect's duties and
25 responsibilities as stated in General and Supplementary Conditions.
26
27 Regulation: The term "Regulations" includes laws, ordinances, statutes, and lawful orders issued by
28 authorities having jurisdiction, as well as rules, conventions, and agreements within the construction
29 industry that control performance of the Work.
30 Furnish: The term "furnish" is used to mean "supply and deliver to the Project site, ready for
31 unloading, unpacking, assembly, installation, and similar operations."
32
33 Install: The term "install" is used to describe operations at project site including the actual "unloading,
34 unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing,
35 protecting, cleaning, and similar operations."
36
37 Provide: The term "provide" means"to furnish and install, complete and ready for the intended use."
38
39 Installer: An "Installer" is the Contractor or an entity engaged by the Contractor, either as an
40 employee, subcontractor, or sub-subcontractor, for performance of a particular construction activity,
41 including installation, erection, application, and similar operations. Installers are required to be
42 experienced in the operations they are engaged to perform.
43 The term "experienced" when used with the term "Installer" means having a minimum of 5
44 previous Projects similar in size and scope to this Project, being familiar with the precautions
45 required, and having complied with requirements of the authority having jurisdiction.
46
47 Trades: Use of titles such as "carpentry" is not intended to imply that certain construction activities
48 must be performed by accredited or unionized individuals of a corresponding generic name, such as
49 "carpenter." It also does not imply that requirements specified apply exclusively to tradespersons of
50 the corresponding generic name.
51
52 Protect Site is the space available to the Contractor for performance of construction activities, either
53 exclusively or in conjunction with others performing other work as part of the Project. The extent of
54 the Project Site is shown on the Drawings and may or may not be identical with the description of the
55 land upon which the Project is to be built.
56
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Testing Laboratories: A "testing laboratory" is an independent entity engaged to perform specific
2 inspections or tests, either at the Project Site or elsewhere, and to report on and, if required, to
3 interpret results of those inspections or tests.
4
5 ORGANIZATION AND SOCIETY ABBREVIATIONS
6
7 Publications of organizations and societies are referred in Contract Documents by following
8 abbreviated designations:
9
10 American Concrete Institute ACI
11 American Institute of Steel Construction AISC
12 American Iron and Steel Institute AISI
13 American National Standards Institute ANSI
14 American Plywood Association APA
15 American Society for Testing and Materials ASTM
16 American Society of Civil Engineers ASCE
17 American Welding Society AWS
18 American Wood Preserver's Association AWPA
19 Anti-Friction Bearing ManufacturersAssociation, Inc. AFBMA
20 Brick Institute of America BIA
21 California Redwood Association CRA
22 Concrete Reinforcing Steel Institute CRSI
23 Factory Mutual FM
24 Federal Specifications FS
25 International Masonry Industry All-Weather Council IMIAWC
26 National Ready-Mixed Concrete Association NRMCA
27 Portland Cement Association PCA
28 Prestressed Concrete Institute PCI
29 Southern Pine Inspection Bureau SPIB
30 Steel Deck Institute SDI
31 Steel Joist Institute SJI
32 Steel Structures Painting Council SSPC
33 Underwriters Laboratories UL
34 Uniform Building Code UBC
35
36 SPECIFICATION FORMAT AND CONTENT EXPLANATION
37
38 Specification Format: These Specifications are organized into Divisions and Sections based on the
39 Construction Specifications Institute's 16-Division format and MASTERFORMAT numbering system.
40
41 Specification Content: This Specification uses certain conventions in the use of language and the
42 intended meaning of certain terms, words, and phrases when used in particular situations or
43 circumstances. These conventions are explained as follows:
44
45 Abbreviated Language: Language used in Specifications and other Contract Documents is
46 the abbreviated type. Implied words and meanings will be appropriately interpreted. Singular
47 words will be interpreted as plural and plural words interpreted as singular where applicable
48 and the full context of the Contract Documents so indicates.
49
50 Imperative and streamlined language is used generally in the Specifications. Requirements
51 expressed in the imperative mood are to be performed by the Contractor. At certain locations
52 in the text, for clarity, subjective language is used to describe responsibilities that must be
53 fulfilled indirectly by the Contractor, or by others when so noted.
54
55 The words"shall be"shall be included by inference wherever a colon (:) is used within
56 a sentence or phrase.
57
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095-2
GDA#12018.00 December 14,2012
Issue for Permit
1 INDUSTRY/REFERENCE STANDARDS
2
3 Applicability of Standards: Except where the Contract Documents include more stringent
4 requirements, applicable construction industry standards have the same force and effect as if bound
5 or copied directly into the Contract Documents. Such standards are made a part of the Contract
6 Documents by reference.
7
8 Publication Dates: Where the date of issue of a referenced standard is not specified, comply with the
9 standard in effect as of date of Contract Documents.
10
11 Conflicting Requirements: Where compliance with two or more standards is specified, and the
12 standards establish different or conflicting requirements for minimum quantities or quality levels, refer
13 requirements that are different, but apparently equal, and uncertainties to the Architect for a decision
14 before proceeding.
15
16 Copies of Standards: Each entity engaged in construction on the Project is required to be familiar with
17 industry standards applicable to that entity's construction activity. Copies of applicable standards are
18 not bound with the Contract Documents.
19
20 Where copies of standards are needed for performance of a required construction activity, the
21 Contractor shall obtain copies directly from the publication source.
22
23 Following listings include full title and applicable revision date:
24
25 American Concrete Institute (ACI):
26
27 211.1-91 Standard Practice for Selecting Proportions for Normal, Heavyweight and
28 Mass Concrete.
29 211.2-91 Standard Practice for Selecting Proportions for Structural Lightweight
30 Concrete.
31 211.3-(87)(92) Standard Practice for Selecting Proportions for No-Slump Concrete.
32 301-89 Specification for Structural Concrete for Buildings.
33 304R-89 Guide for Measuring, Mixing, Transporting, and Placing Concrete.
34 305R-91 Hot Weather Concreting.
35 306R-88 Cold Weather Concreting.
36 308-92 Standard Practice for Curing Concrete.
37 309R-87 Guide for Consolidation of Concrete.
38 315-80(86) Details and Detailing of Reinforced Concrete(included in SP-66).
39 318-89 (Rev.1992) Building Code Requirements for Reinforced Concrete.
40 347R-94 Guide to Formwork for Concrete.
41 SP-66 (94) ACI Detailing Manual (1994 Edition).
42
43 American Institute of Steel Construction (AISC):
44
45 Code of Standard Practice for Steel Buildings and Bridges(with Commentary), June 10, 1992.
46 Manual of Steel Construction-Allowable Stress Design, Ninth Edition.
47 Specification for Structural Steel Buildings - Allowable Stress Design (with Commentary), June 1,
48 1989.
49 Manual of Steel Construction -Load and Resistance Factor Design, Second Edition.
50 Load and Resistance Factor Design Specifications for Structural Steel Buildings, December 1, 1994.
51 Specification for Structural Joints Using ASTM A325 or A490 Bolts, November 13, 1985.
52
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 American Society for Testing and Materials (ASTM):
3
4 A 36/A 36M-93a Specification for Structural Steel.
5 A 47-90 Specification for Ferritic Malleable Iron Castings.
6 A 53-90b Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and
7 Seamless.
8 A 82-90a Specification for Steel Wire, Plain, for Concrete Reinforcement.
9 A 108-90a Specification for Steel Bars, Carbon, Cold-Finished, Standard Quality.
10 A 123-89a Specification for Zinc (Hot-Dip-Galvanized) Coatings on Iron and Steel
11 Products.
12 A 153-82 (1987) Specification for Zinc Coating (Hot-Dip)on Iron and Steel Hardware.
13 A 185-90a Specification for Steel Welded Wire, Fabric, Plain, for Concrete
14 Reinforcement.
15 A 242/A 242M-93 Specification for High-Strength Low-Alloy Structural Steel.
16 A 307-93a Specification for Carbon Steel Bolts and Studs, 60,000tpsi Tensile Strength.
17 A 325-93 Specification for Structural Bolts, Steel, Heat-Treated, 120/105 KSI Minimum
18 Tensile Strength.
19 A 325M-93 Specification for High-Strength Bolts for Structural Steel Joints (Metric).
20 A 370-92 Test Methods and Definitions for Mechanical Testing of Steel Products.
21 A 416-93 Specification for Steel Strand, Uncoated Seven-Wire for Prestressed
22 Concrete.
23 A 421-91 Specification for Uncoated Stress-Relieved Steel Wire for Prestressed
24 Concrete.
25 A 446/A 446M-93 Specification for Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip
26 Process, Structural (Physical)Quality.
27 A 475-89 Specification for Zinc-Coated Steel Wire Strand.
28 A 490-93 Specification for Heat-Treated Steel Structural Bolts, 150 KSI Minimum
29 Tensile Strength.
30 A 490M-93 Specification for High-Strength Steel Bolts, Classes 10.9 and 10.9.3, for
31 Structural Steel Joints(Metric).
32 A 500-93 Specification for Cold-Formed Welded and Seamless Carbon Steel Structural
33 Tubing in Rounds and Shapes.
34 A 501-93 Specification for Hot-Formed Welded and Seamless Carbon Steel Structural
35 Tubing.
36 A 514/A 514M-93a Specification for High-Yield Strength, Quenched and Tempered Alloy Steel
37 Plate, Suitable for Welding.
38 A 525-93 Specification for General Requirements for Steel Sheet, Zinc-Coated
39 (Galvanized) by the Hot-Dip Process.
40 A 525M-91b Specification for General Requirements for Steel Sheet, Zinc-Coated
41 (Galvanized) by the Hot-Dip Process(Metric).
42 A 572-92a tSpecification for High-Strength Low-Alloy Columbium-Vanadium Steel of
43 Structural Quality.
44 A 576-90b Specification for Steel Bars, Carbon, Hot-Wrought, Special Quality.
45 A 588-91a Specification for High-Strength Low-Alloy Structural Steel with 50,000 psi
46 Minimum Yield Point to 4 in. Thick.
47 A 611-92 Specification for Steel, Sheet, Carbon,Cold-Rolled Structural Quality.
48 A 615-92b Specification for Deformed and Plain Billet-Steel Bars for Concrete
49 Reinforcement.
50 A 706-92b Specification for Low-Alloy Steel Deformed Bars for Concrete Reinforcement.
51 A 775-92 Specification for Epoxy-Coated Reinforcing Steel Bars.
52 B 633-85, Specification for Electrodeposited Coatings of Zinc on Iron and Steel.
53 C 31-91, Method for Making and Curing Concrete Test Specimens in the Field.
54 C 33-92a Specification for Concrete Aggregates.
55 C 39-86 Test for Compressive Strength of Cylindrical Concrete Specimens.
56 C 42-90 Methods for Obtaining and Testing Drilled Cores and Sawed Beams of
57 Concrete.
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 C 90-92b Specification for Hollow Load-Bearing Concrete Masonry Units.
2 C 91-93 Specification for Masonry Cement.
3 C 94-92a Specification for Ready-Mixed Concrete.
4 C 109-92 Test Method for Compressive Strength of Hydraulic Cement Mortars.
5 C 138-92 Test Method for Unit Weight, Yield and Air Content(Gravimetric)of Concrete.
6 C 140-91 Method of Sampling and Testing Concrete Masonry Units.
7 C 143-90a Test Method for Slump of Portland Cement Concrete.
8 C 144-91 Specification for Aggregate for Masonry Mortar.
9 C 150-92 Specification for Portland Cement.
10 C 171-92 Specification for Sheet Materials for Curing Concrete.
11 C 172-90 Method of Sampling Freshly Mixed Concrete.
12 C 173-78 Test Method for Air Content of Freshly Mixed Concrete by the Volumetric
13 Method.
14 C 207-91 (1992) Specification for Hydrated Lime for Masonry Purposes.
15 C 231-91b Test Method for Air Content of Freshly Mixed Concrete by the Pressure
16 Method.
17 C 260-86 tSpecification for Air-Entraining Admixtures for Concrete.
18 C 270-92a Specification for Mortar for Unit Masonry.
19 C 309-93 Specification for Liquid Membrane-Forming Compounds for Curing Concrete.
20 C 311-93 Method for Sampling and Testing Fly Ash or Natural Pozzolans for Use as a
21 Mineral Admixture in Portland Cement Concrete.
22 C 330-89 Specification for Lightweight Aggregates for Structural Concrete.
23 C 404-93 Specification for Aggregates for Masonry Grout.
24 C 476-91 tSpecification for Grout and Masonry.
25 C 494-90 Specification for Chemical Admixtures for Concrete.
26 C 567-91 Test Method for Unit Weight of Structural Lightweight Concrete.
27 C 595-93 Specification for Blended Hydraulic Cements.
28 C 618-93 Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use as a
29 Mineral Admixture in Portland Cement.
30 C 780-91 Method for Preconstruction and Construction Evaluation of Mortars for Plain
31 and Reinforced Unit Masonry.
32 C 827-87 Test Method for Early Volume Change of Cementitious Mixtures.
33 C 938-80 (1991) Practice for Proportioning Grout Mixtures for Preplaced-Aggregate Concrete.
34 C 942-86 (1991) Test Method for Compresssive Strength of Grouts for Preplaced-Aggregate
35 Concrete in the Laboratory.
36 C 989-89 Specification for Ground Iron Blast-Furnace Slag for Use in Concrete and
37 Mortars.
38 D 98-87 Specification for Calcium Chloride.
39 D 994-71(Reaf1982) Standard Specification for Preformed Expansion Joint Filler for Concrete
40 (Bituminous Type).
41 D 1751-83 (1991) Specification for Preformed Expansion Joint Filler for Concrete Paving and
42 Structural Construction (Nonextruding and Resilient Bituminous Types).
43 D 1752-84 (1992) Specification for Preformed Sponge Rubber and Cork Expansion Joint Fillers
44 for Concrete Paving and Structural Construction.
45 D 2092-86 Recommended Practices for Preparation of Zinc-Coated Galvanized Steel
46 Surfaces for Painting.
47 D 2240-91 Test for Rubber Property-Durometer Hardness.
48 E 164-92a Practice for Ultrasonic Contact Examination of Weldments.
49 E 329-93b Recommended Practice for Inspection and Testing Agencies for Concrete,
50 Steel, and Bituminous Materials as Used in Construction.
51 E 447-92b Test Methods for Compressive Strength of Masonry Prisms.
52
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095-5
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 American Welding Society (AWS):
3
4 A5.1-91 Specification for Carbon Steel Covered Arc-Welding Electrodes.
5 A5.5-81 Specification for Low-Alloy Steel Covered Arc-Welding Electrodes.
6 A5.17-89 Specification for Carbon Steel Electrodes and Fluxes for Submerged Arc-
7 Welding.
8 A5.20-79 Specification for Carbon Steel Electrodes for Flux Cored Arc-Welding.
9 B2.1-84 Welding Procedure and Performance Qualification.
10 D1.1-94 Structural Welding Code- Steel.
11 D1.3-89 Specification for Welding of Sheet Metal in Structures.
12 D1.4-92 Structural Welding Code- Reinforcing Steel.
13 QC-1-88 Standard for Qualification and Certification of Welding Inspectors.
14
15 Prestressed Concrete Institute (PCI):
16
17 MNL 116-85 Manual for Quality Control for Plants and Production of Precast Prestressed
18 Concrete Products.
19 MNL 117-77 Manual for Quality Control for Plants and Production of Architectural Precast
20 Concrete Products.
21
22 Steel Deck Institute (SDI):
23
24 Specification for Composite Steel Floor Deck, 1992.
25 Specification for Non-Composite Steel Form Deck, 1992.
26 Specification for Steel Roof Deck, 1992.
27
28 Steel Joist Institute (SJI):
29
30 Recommended Code of Standard Practice for Steel Joists and Joist Girders, November, 1994.
31 Standard Specification for Joist Girders, November, 1994.
32 Standard Specification for Longspan Steel Joists, LH-Series and Deep Longspan Steel Joists, DLH-
33 Series, November, 1994.
34 Standard Specification for Open Web Steel Joists, K-Series, November, 1994.
35
36 TRADE ASSOCIATIONS
37
38 Abbreviations and Names: Trade association names and titles of general standards are frequently
39 abbreviated. The following acronyms or abbreviations as referenced in Contract Documents are
40 defined to mean the associated names. Names and addresses are subject to change and are
41 believed to be but are not assured to be accurate and up to date as of date of Contract Documents.
42 AA Aluminum Association
43 900 19th St., NW, Suite 300
44 Washington, DC 20006 (202)862-5100
45
46 AABC Associated Air Balance Council
47 1518 K St., NW, Suite 503
48 Washington, DC 20005 (202) 737-0202
49
50 AAMA American Architectural Manufacturer's Association
51 2700 River Rd., Suite 118
52 Des Plaines, IL 60018 (312)699-7310
53
54 AAN American Association of Nurserymen
55 1250 Eye St., NW, Suite 500
56 Washington, DC 20005 202) 789-2900
57
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095-6
GDA#12018.00 December 14, 2012
Issue for Permit
1 AASHTO American Association of State Highway
2 and Transportation Officials
3 444 North Capitol St., Suite 225
4 Washington, DC 20001 (202)624-5800
5
6 AATCC American Association of Textile Chemists
7 and Colorists
8 P.O. Box 12215
9 Research Triangle Park, NC 27709 (919) 549-8141
10
11 ACI American Concrete Institute
12 P.O. Box 19150
13 Detroit, MI 48219 (313)532-2600
14
15 ACIL American Council of Independent Laboratories
16 1725 K St., NW
17 Washington, DC 20006 (202) 887-5872
18
19 ACPA American Concrete Pipe Association
20 8320 Old Courthouse Rd.
21 Vienna, VA 22180 (703)821-1990
22
23 ADC Air Diffusion Council
24 230 N. Michigan Ave., Suite 1200
25 Chicago, IL 60601 (312)372-9800
26
27 AFBMA Anti-Friction Bearing Manufacturers Association
28 1101 Connecticut Ave., NW, Suite 700
29 Washington, DC 20036 (202)429-5155
30
31 AGA American Gas Association
32 1515 Wilson Blvd.
33 Arlington, VA 22209 (703)841-8400
34
35 AHA American Hardboard Association
36 520 N. Hicks Rd.
37 Palatine, IL 60067 (312) 934-8800
38
39 AHAM Association of Home Appliance Manufacturers
40 20 N. Wacker Drive
41 Chicago, IL 60606 (312) 984-5800
42
43 Al Asphalt Institute
44 Research Park Drive
45 P.O. Box 14052
46 Lexington, KY 40512-4052 (606)288-4960
47
48 AIA American Institute of Architects
49 1735 New York Ave., NW
50 Washington, DC 20006 (202)626-7300
51
52 A.I.A. American Insurance Association
53 1130 Connecticut Avenue, NW
54 Washington, DC 20036 (202)828-7100
55
56 Al HA American Industrial Hygiene Association
57 475 Wolf Ledges Parkway
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095 - 7
GDA#12018.00 December 14, 2012
Issue for Permit
1 Akron, OH 44311 (216)762-7294
2
3 AISC American Institute of Steel Construction
4 400 N. Michigan Ave., 8th Floor
5 Chicago, IL 60611 (312)670-2400
6
7 AISI American Iron and Steel Institute
8 1133 Fifteenth St., NW
9 Washington, DC 20005 (202)452-7100
10
11 AITC American Institute of Timber Construction
12 11818 SE Mill Plain Blvd., Suite 415
13 Vancouver,WA 98684 (206)254-9132
14
15 ALI Associated Laboratories
16 641 S. Vermont St.
17 Palatine, IL 60067 (312)358-7400
18
19 ALSC American Lumber Standards Committee
20 P.O. Box 210
21 Germantown, MD 20874 (301)972-1700
22
23 AMCA Air Movement and Control Association
24 30 W. University Drive
25 Arlington Heights, IL 60004 (312)394-0150
26
27 ANSI American National Standards Institute
28 1430 Broadway
29 New York, NY 10018 (212)354-3300
30
31 AOAC Association of Official Analytical Chemists
32 1111 19th Street North, Suite 210
33 Arlington, VA 22209 (703)522-3032
34
35 AOSA Association of Official Seed Analysts
36 do Jim Lair
37 Illinois Department of Agriculture Seed Lab.
38 Box 19281
39 Springfield, IL 62794 (217)782-7655
40
41 APA American Plywood Association
42 P.O. Box 11700
43 Tacoma, WA 98411 (206)565-6600
44
45 A.P.A. American Parquet Association
46 2900 First Commercial Building
47 Little Rock,AR 72201 (501)375-5561
48
49 API American Petroleum Institute
50 1220 L St., NW
51 Washington, DC 20005 (202)682-8000
52
53 ARI Air Conditioning and Refrigeration Institute
54 1501 Wilson Blvd., 6th Floor
55 Arlington,VA 22209 (703)524-8800
56
57 ARMA Asphalt Roofing Manufacturers Association
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095-8
GDA#12018.00 December 14, 2012
Issue for Permit
1 6288 Montrose Rd.
2 Rockville, MD 20852 (301) 231-9050
3
4 ASA Acoustical Society of America
5 500 Sunnyside Blvd.
6 Woodbury, NY 1 1797 (516)349-7800
7
8 ASC Adhesive and Sealant Council
9 1627 K Street, NW., Suite 1000
10 Washington, DC 20006 (202)452-1500
11
12 ASHRAE American Society of Heating, Refrigerating
13 and Air-Conditioning Engineers
14 1791 Tullie Circle, NE
15 Atlanta, GA 30329 (404) 636-8400
16
17 ASME American Society of Mechanical Engineers
18 345 East 47th St.
19 New York, NY 10017 (212)705-7722
20
21 ASPE American Society of Plumbing Engineers
22 3617 Thousand Oaks Blvd., Suite 210
23 Westlake, CA 91362 (805)495-7120
24
25 ASSE American Society of Sanitary Engineering
26 P.O. Box 40362
27 Bay Village, OH 44140 (216)835-3040
28
29 ASTM American Society for Testing and Materials
30 1916 Race St.
31 Philadelphia, PA 19103 (215)299-5400
32
33 AWI Architectural Woodwork Institute
34 2310 S. Walter Reed Drive
35 Arlington, VA 22206 (703)671-9100
36
37 AWPA American Wood Preservers Association
38 P.O. Box 849
39 Stevensville, MD 21666 (301)643-4163
40
41 AWPB American Wood Preservers Bureau
42 P.O. Box 5283
43 Springfield, VA 22150 (703) 339-6660
44
45 AWS American Welding Society
46 P.O. Box 351040
47 550 LeJeune Road, NW
48 Miami, FL 33135 (305)443-9353
49
50 AWWA American Water Works Association
51 6666 W. Quincy Ave. .
52 Denver, CO 80235 (303) 794-7711
53
54 BANC Brick Association of North Carolina
55 P.O. Box 13290
56 Greensboro, NC 27415 (919)273-5566
57
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095 -9
GDA#12018.00 December 14, 2012
Issue for Permit
1 BHMA Builders Hardware Manufacturers Association
2 355 Lexington Ave., 17th Floor
3 New York, NY 10017 (212)661-4261
4
5 BIA Brick Institute of America
6 11490 Commerce Park Drive, Suite 300
7 Reston, VA 22091 (703)620-0010
8
9 BIFMA Business and Institutional Furniture
10 Manufacturers Association
11 2335 Burton St., SE
12 Grand Rapids, MI 49506 (616)243-1681
13
14 CAUS Color Association of the United States
15 343 Lexington Ave.
16 New York, NY 10016 (212)683-9531
17
18 CAGI Compressed Air and Gas Institute
19 c/o Thomas Associates, Inc.
20 1230 Keith Building
21 Cleveland, OH 44115 (216)241-7333
22
23 CBM Certified Ballast Manufacturers Association
24 1422 Euclid Ave.
25 Hanna Building, Suite 772
26 Cleveland, OH 44115 (216)241-0711
27
28 CDA Copper Development Association
29 Box 1840, Greenwich Office Park 2
30 Greenwich, CT 06836 (203)625-8210
31
32 CGA Compressed Gas Association
33 Crystal Gateway#1, Suite 501
34 1235 Jefferson Davis Highway
35 Arlington, VA 22202 (703)979-0900
36
37 CISCA Ceiling and Interior Systems
38 Construction Association
39 104 Wilmot Road, Suite 201
40 Deerfield, IL 60015 (312)940-8800
41
42 CISPI Cast Iron Soil Pipe Institute
43 5959 Shallowford Road, Suite 419
44 Chattanooga, TN 37421 (615)892-0137
45
46 CRI Carpet and Rug Institute
47 Box 2048
48 Dalton, GA 30722 (404)278-3176
49
50 CRSI Concrete Reinforcing Steel Institute
51 933 Plum Grove Rd.
52 Schaumburg, IL 60195 (312) 517-1200
53
54 CTI Ceramic Tile Institute of America
55 700 N. Virgil Ave.
56 Los Angeles, CA 90029 (213)660-1911
57
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095 - 10
GDA#12018.00 December 14, 2012
Issue for Permit
1 DHI Door and Hardware Institute
2 7711 Old Springhouse Rd.
3 McLean, VA 22102 (703)556-3990
4
5 DLPA Decorative Laminate Products Association
6 600 S. Federal St., Suite 400
7 Chicago, IL 60605 (312)922-6222
8
9 ECSA Exchange Carriers Standards Association
10 5430 Grosvenor Lane, Suite 200
11 Bethesda, MD 20814 (301)564-4505
12
13 EIA Electronic Industries Association
14 1722 Eye Street, NW, Suite 300
15 Washington, DC 20006 (202)457-4900
16
17 EIMA Exterior Insulation Manufacturers Association
18 30 Holley St.
19 Wakefield, RI 02879 (401) 782-3687
20
21 EJMA Expansion Joint Manufacturers Association
22 25 N. Broadway
23 Tarrytown, NY 10591 (914) 332-0040
24
25 ETL ETLTesting Laboratories, Inc.
26 P.O. Box 2040
27 Route 11, Industrial Park
28 Cortland, NY 13045 (607) 753-6711
29
30 FCI Fluid Controls Institute
31 P.O. Box 9036
32 Morristown, NJ 07960 (201)829-0990
33
34 FGMA Flat Glass Marketing Association
35 White Lakes Professional Bldg.
36 3310 Harrison
37 Topeka, KS 66611 (913)266-7013
38
39 FM Factory Mutual Engineering and Research Organization
40 1151 Boston -Providence Turnpike
41 Norwood, MA 02062 (617) 762-4300
42
43 FTI Facing Tile Institute
44 P.O. Box 8880
45 Canton, OH 44711 (216)488-1211
46
47 GA Gypsum Association
48 1603 Orrington Ave.
49 Evanston, IL 60201 (312)491-1744
50
51 HEI Heat Exchange Institute
52 do Thomas Associates, Inc.
53 1230 Keith Building
54 Cleveland, OH 44115 (216)241-7333
55
56 HI Hydronics Institute
57 P.O. Box 218
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095 - 11
GDA#12018.00 December 14, 2012
Issue for Permit
1 35 Russo Place
2 Berkeley Heights, NJ 07922 (201)464-8200
3
4 H.I. Hydraulic Institute
5 712 Lakewood Center North
6 14600 Detroit Avenue
7 Cleveland, OH 44107 (216)226-7700
8
9 HMA Hardwood Manufacturers Association
10 2831 Airways Blvd., Suite 205, Bldg. B
11 Memphis, TN 38132 (901)346-2222
12
13 HPMA Hardwood Plywood Manufacturers Association
14 1825 Michael Farraday Drive
15 P.O. Box 2789
16 Reston, VA 22090 (703)435-2900
17
18 IBD Institute of Business Designers
19 341 Merchandise Mart
20 Chicago, IL 60654 (312)647-1950
21
22 ICEA Insulated Cable Engineers Association Inc.
23 P.O. Box 440
24 South Yarmouth, MA 02664 (617)394-4424
25
26 IEC International Electrotechnical Commission
27 (Available from ANSI)
28 1430 Broadway
29 New York, NY 10018 (212)354-3300
30
31 IEEE Institute of Electrical and Electronic
32 Engineers
33 345 E. 47th St.
34 New York, NY 10017 (212)705-7900
35
36 IESNA Illuminating Engineering Society of North America
37 345 E.47th St.
38 New York, NY 10017 (212)705-7926
39
40 IGCC Insulating Glass Certification Council
41 Route 11, Industrial Park
42 Cortland, NY 13045 (607)753-6711
43
44 ILI Indiana Limestone Institute of America
45 Stone City Bank Building, Suite 400
46 Bedford, IN 47421 (812)275-4426
47
48 IMSA International Municipal Signal Association
49 P.O. Box 539
50 1115 N. Main St.
51 Newark, NY 14513 (315)331-2182
52
53 IRI Industrial Risk Insurers
54 85 Woodland St.
55 Hartford, CT 06102 (203)520-7300
56
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095- 12
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 ISA Instrument Society of America
3 67 Alexander Drive
4 P.O. Box 12277
5 Research Triangle Park, NC 27709 (919) 549-8411
6
7 LIA Lead Industries Association, Inc.
8 292 Madison Avenue
9 New York, NY 10017 (212) 578-4750
10
11 LPI Lightning Protection Institute
12 P.O. Box 1029
13 Woodstock, IL 60098 (815) 337-0277
14
15 MBMA Metal Building Manufacturers Association
16 1230 Keith Building
17 Cleveland, OH 44115 (216)241-7333
18
19 MCAA Mechanical Contractors Association of America
20 5410 Grosvenor Lane, Suite 120
21 Bethesda, MD 20814 (301)897-0770
22
23 MFMA Maple Flooring Manufacturers Association
24 60 Revere Dr., Suite 500
25 Northbrook, IL 60062 (312)480-9138
26
27 MIA Marble Institute of America
28 33505 State St.
29 Farmington, MI 48024 (313)476-5558
30
31 MUSFA Metal Lath/Steel Framing Association
32 (A Division of the National Association
33 of Architectural Metal Manufacturers)
34 600 S. Federal St.,Suite 400
35 Chicago, IL 60605 (312)922-6222
36
37 MSS Manufacturers Standardization Society of
38 the Valve and Fittings Industry
39 127 Park St., NE
40 Vienna, VA 22180 (703)281-6613
41
42 NAAMM National Association of Architectural
43 Metal Manufacturers
44 600 S. Federal St.,Suite 400
45 Chicago, IL 60605 (312) 922-6222
46
47 NAPA National Asphalt Pavement Association
48 Calvert Building, Suite 620
49 6811 Kenilworth Ave.
50 Riverdale, MD 20737 (301)779-4880
51
52 NAPF National Association of Plastic
53 Fabricators (Now DLPA)
54
55 NBGQA National Building Granite Quarries Association
56 P.O. Box 482
57 Barre, VT 05641 (802)476-3115
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095 - 13
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 NBHA National Builders Hardware Association
3 (Now DHI)
4
5 NCMA National Concrete Masonry Association
6 P.O. Box 781
7 Herndon, VA 22070 (703)435-4900
8
9 NCRPM National Council on Radiation Protection
10 and Measurement
11 7910 Woodmont Ave., Suite 800
12 Bethesda, MD 20814 (301)657-2652
13
14 NEC National Electric Code (Now NFPA)
15
16 NECA National Electrical Contractors Association
17 7315 Wisconsin Ave.
18 Bethesda, MD 20814 (301)657-3110
19
20 NEII National Elevator Industry, Inc.
21 630 Third Ave.
22 New York, NY 10017 (212)986-1545
23
24 NEMA National Electrical Manufacturers Association
25 2101 L St., NW, Suite 300
26 Washington, DC 20037 (202)457-8400
27
28 NFPA National Fire Protection Association
29 Batterymarch Park
30 Quincy, MA 02169 (617)770-3000
31
32 N.F.P.A. National Forest Products Association
33 1250 Connecticut Ave., NW, Suite 200
34 Washington, DC 20036 (202)463-2700
35
36 NHLA National Hardwood Lumber Association
37 P.O. Box 34518
38 Memphis,TN 38184 (901)377-1818
39
40 NKCA National Kitchen Cabinet Association
41 P.O. Box 6830
42 Falls Church,VA 22046 (703)237-7580
43
44 NLGA National Lumber Grades Authority
45 1055 W. Hastings St., Suite 260
46 Vancouver, British Columbia
47 Canada V6E 2H1 (604)687-2171
48
49 NOFMA National Oak Flooring Manufacturers Association
50 P.O. Box 3009
51 Memphis,TN 38173 (901)526-5016
52
53 NPA National Particleboard Association
54 18928 Premiere Court
55 Gaithersburg, MD 20879 (301)670-0604
56
57 NPCA National Paint and Coatings Association
REFERENCE STANDARDS AND DEFINITIONS
GDA01095-14
GDA#12018.00 December 14, 2012
Issue for Permit
1 1500 Rhode Island Ave., NW
2 Washington, DC 20005 (202)462-6272
3
4 NRCA National Roofing Contractors Association
5 6250 River Rd.
6 Rosemont, IL 60018 (312)318-6722
7
8 NSF National Sanitation Foundation
9 P.O. Box 1468
10 3475 Plymouth Rd.
11 Ann Arbor, MI 48106 (313) 769-8010
12
13 NSSEA National School Supply and Equipment Association
14 2020 Fourteenth St. North, Suite 400
15 Arlington, VA 22201 (703)524-8819
16
17 NTMA National Terrazzo and Mosaic Association
18 3166 Des Plaines Ave., Suite 132
19 Des Plaines, IL 60018 (312)635-7744
20
21 NWMA National Woodwork Manufacturers
22 Association (Now NWWDA)
23
24 NWWDA National Wood Window and Door Association
25 (Formerly NWMA)
26 1400 E. Touhy Ave., #G54
27 Des Plaines, IL 60018 (312)299-5200
28
29 PCA Portland Cement Association
30 5420 Old Orchard Road
31 Skokie, IL 60077 (312) 966-6200
32
33 PCI Prestressed Concrete Institute
34 175 W. Jackson Blvd.
35 Chicago, IL 60604 (312) 786-0300
36
37 PDI Plumbing and Drainage Institute
38 (c/o Saul Baker)
39 1106 W. 77th St., South Dr.
40 Indianapolis, IN 46260 (317)251-6970
41
42 PEI Porcelain Enamel Institute
43 1101 Connecticut Ave., NW, Suite 700
44 Washington, DC 20036 (202)857-1134
45
46 RFC! Resilient Floor Covering Institute
47 966 Hungerford Drive, Suite 12-B
48 Rockville, MD 20805 (301)340-8580
49
50 RIS Redwood Inspection Service
51 405 Enfrente Drive, Suite 300
52 Novato, CA 94949 (415) 382-0662
53
54 RMA Rubber Manufacturers Association
55 1400 K St., NW
56 Washington, DC 20005 (202)682-4800
57
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095- 15
GDA#12018.00 December 14, 2012
Issue for Permit
1 SAMA Scientific Apparatus Makers Association
2 1101 Sixteenth St., NW
3 Washington, DC 20036 (202)223-1360
4
5 SDI Steel Deck Institute
6 P.O. Box 9506
7 Canton, OH 44711 (216)493-7886
8
9 S.D.I. Steel Door Institute
10 (do A.P. Wherry and Associates, Inc.)
11 712 Lakewood Center North
12 14600 Detroit Ave.
13 Cleveland, OH 44107 (216)226-7700
14
15 SGCC Safety Glazing Certification Council
16 (do ETL Testing Laboratories)
17 Route 11, Industrial Park
18 Cortland, NY 13045 (607)753-6711
19
20 SHLMA Southern Hardwood Lumber Manufacturers
21 Association (Now HMA)
22
23 SIGMA Sealed Insulating Glass Manufacturers Association
24 111 E. Wacker Drive
25 Chicago, IL 60601 (312)644-6610
26
27 SJI Steel Joist Institute
28 1205 48th Street North
29 Suite A
30 Myrtle Beach, SC 29577 (803)449-0487
31
32 SMACNA Sheet Metal and Air Conditioning
33 Contractors National Association
34 P.O. Box 70
35 Merrifield, VA 22116 (703)790-9890
36
37 SPIB Southern Pine Inspection Bureau
38 4709 Scenic Highway
39 Pensacola, FL 32504 (904)434-2611
40
41 SPRI Single Ply Roofing Institute
42 104 Wilmot Rd., Suite 201
43 Deerfield, IL 60015 (312)940-8800
44
45 SSPC Steel Structures Painting Council
46 4400 Fifth Ave.
47 Pittsburgh, PA 15213 (412)268-3327
48
49 SSPMASump and Sewage Pump Manufacturers
50 Association
51 560 W. Washington Street, Suite 301
52 Chicago, IL 60606 (312)332-4146
53
54 SWI Steel Window Institute
55 (do Thomas Associates, Inc.)
56 1230 Keith Building
57 Cleveland, OH 44115 (216)241-7333
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095-16
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 SWPA Submersible Wastewater Pump Association
3 600 S. Federal Street, Suite 400
4 Chicago, IL 60605 (312)922-6222
5
6 TCA Tile Council of America
7 P.O. Box 326
8 Princeton, NJ 08542 (609) 921-7050
9
10 TIMA Thermal Insulation Manufacturers Association
11 29 Bank Street
12 Stamford, CT 06901 (203)324-7533
13
14 TPI Truss Plate Institute
15 583 D'Onofrio Drive, Suite 200
16 Madison, WI 53719 (608)833-5900
17
18 UL Underwriters Laboratories
19 333 Pfingsten Rd.
20 Northbrook, IL 60062 (312)272-8800
21
22 WCLIB West Coast Lumber Inspection Bureau
23 P.O. Box 23145
24 Portland, OR 97223 (503)639-0651
25
26 WCMA Wallcovering Manufacturers Association
27 355 Lexington Ave.
28 New York, NY 10017 (212)661-4261
29
30 WIC Woodwork Institute of California
31 P.O. Box 11428
32 Fresno, CA 93773 (209)233-9035
33
34 WLPDIA Western Lath Plaster Drywall Industries Association
35 (Formerly California Lath & Plaster Association)
36 8635 Navajo Road
37 San Diego, CA 92119 (619)466-9070
38
39 WRI Wire Reinforcement Institute
40 8361-A Greensboro Drive
41 McLean, VA 22102 (703) 790-9790
42
43 WSC Water Systems Council
44 600 S. Federal St., Suite 400
45 Chicago, IL 60605 (312)922-6222
46
47 WSFI Wood and Synthetic Flooring Institute
48 4415 W. Harrison St., Suite 242 C
49 Hillside, IL 60162 (312)449-2933
50
51 WWPA Western Wood Products Association
52 522 SW. 5th Avenue, Yeon Building
53 Portland, OR 97204-2122 (503)224-3930
54
55 W.W.P.A. Woven Wire Products Association
56 2515 N. Nordica Ave.
57 Chicago, IL 60635 (312)637-1359
REFERENCE STANDARDS AND DEFINITIONS
GDA01095- 17
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 GOVERNING REGULATIONS/AUTHORITIES
3
4 The Architect has contacted authorities having jurisdiction where necessary to obtain information
5 necessary for preparation of Contract Documents; that information may or may not be of significance
6 to the Contractor. Contact authorities having jurisdiction directly for information and decisions having
7 a bearing on the Work.
8
9 SUBMITTALS
10
11 Permits, Licenses, and Certificates: For the Owner's records, submit copies of permits, licenses,
12 certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee
13 payments, judgments, and similar documents, correspondence, and records established in
14 conjunction with compliance with standards and regulations bearing upon performance of the Work.
15
16
17 PART 2 - PRODUCTS (Not Applicable)
18
19
20 PART 3- EXECUTION (Not Applicable)
21
22
23 END OF SECTION 01095
REFERENCE STANDARDS AND DEFINITIONS
GDA 01095- 18
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01310-SCHEDULES, REPORTS, PAYMENTS
2
3
4 PART 1 -GENERAL:
5
6 RELATED DOCUMENTS_:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification sections, apply to work of this section.
10
11 COORDINATION:
12
13 Coordinate both the listing and timing of reports and other activities required by provisions of section
14 and other sections, so as to provide consistency and logical coordination between the reports.
15 Maintain coordination and correlation between separate reports by updating at monthly or shorter time
16 intervals. Make appropriate distribution of each report and updated report to all parties involved in the
17 work including the Architect/Engineer and Owner. In particular provide close coordination of the
18 progress schedule, schedule of values, listing of subcontracts, schedule of submittals, progress
19 reports, and payment requests.
20
21 FULLY-DEVELOPED PROGRESS SCHEDULE:
22
23 Bar-Chart Schedule: Based on preliminary development of the progress schedule if any, and on
24 whatever updating and feedback may have occurred during project start-up, secure critical time
25 commitments for performing major elements of the work. Within 30 days of the date of execution of
26 the Owner/Contractor Agreement, submit a comprehensive bar-chart type progress schedule
27 indicating, by stage-coded symbols,a time bar for each major category or unit of work to be performed
28 at site; include minor elements of work which are, nevertheless, involved in overall sequencing of the
29 work. Arrange schedule to show graphically the major sequences of work necessary for the
30 completion of related elements of work. Arrange the schedule to show how substantial completion is
31 scheduled to allow for Architect's/Engineer's procedure for certification of substantial completion.
32 Prepare and maintain the schedule on either a sheet of sufficient width (or else a series of sheets)to
33 show the required data clearly for the entire Construction Time. Prepare the schedule on sheets of
34 stable transparency, or other reproducible material, to permit reproduction for the required distribution.
35
36 Phasing: Arrange schedule with notations to show how sequence of work is affected by
37 requirements for phased completion, work by separate contractors, work by Owner, pre-
38 purchased materials, coordination with existing work, limitations of continued occupancies,
39 non-interruptable services, partial occupancy prior to substantial completion, site restrictions,
40 provisions for future work, seasonal variations, environmental control, and similar provisions
41 of total project. Refer to other sections of Division 1 and other contract documents for
42 requirements.
43
44 Area Separations: Arrange the schedule with an individual time bar for each major area of
45 construction of each major category or unit of work. Show where each major category or unit
46 of work must be sequenced or integrated with other work as necessary for structural
47 completion, permanent space enclosure, completion of mechanical/electrical work or
48 completion of some other recognized stage of completion for overall work in that area. Except
49 as otherwise indicated, or subsequently agreed upon with Architect/Engineer, a "major area"
50 is defined for the purpose of this article to mean a story of construction or similar major
51 separation.
52
53 Cost Correlation: Immediately below the date line at the heading of the bar-chart, provide a
54 two-item cost correlation line, indicating both "precalculated" and "actual" costs. This cost
55 correlation line shall show dollar-volume of work performed as of same dates used for
56 preparation of payment requests. Refer to subsequent article for cost reporting and payment
57 procedures. In so far as it is practical to do so, use the same units of work in progress
SCHEDULES, REPORTS, PAYMENTS
GDA 01310- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 schedule as indicated in the "schedule of values" required by General Conditions and further
2 specified herein.
3
4 Superimpose an S-curve on the schedule (only first sheet for multiple-sheet schedule)
5 to show the "precalculated dollar-volume against time at any point during Contract
6 Time. Provide a double column of figures in left hand margin; one column shall
7 indicate a range from zero dollars to the Contract Sum, the other column shall indicate
8 a percentage from zero to 100 percent. As the work progresses and on each date
9 used in payment requests, plot a second S-curve showing actual dollar-volume of
10 work performed.
11
12 Distribution: Following the initial submittal to and response by the Architect/Engineer, print
13 and distribute progress schedules to Architect/Engineer (3 copies), Owner, separate
14 contractors, the principal subcontractors and suppliers or fabricators, and others with a need-
15 to-know schedule-compliance requirement. Post copies in the project meeting room and
16 temporary field office. When revisions are made, distribute updated issues to the same
17 entities and post updated issues in the same locations. Delete entities from distribution when
18 they have completed their assigned work and are no longer involved in performance of
19 scheduled work.
20
21 PROGRESS MEETINGS, REPORTING:
22
23 General: In addition to specific coordination and pre-installation meetings for each element of work,
24 and other regular project meetings held for other purposes, hold general progress meeting each
25 month with time coordinated with preparation of payment request. Require each entity then involved
26 in planning, coordination or performance of work to be properly represented at each meeting. Review
27 each entity's present and future needs including interface requirements, time, sequences, deliveries,
28 access, site utilization, temporary facilities and services, hours of work, hazards and risks,
29 housekeeping, change orders, and documentation of information for payment requests. Discuss
30 whether each element of current work is ahead of schedule, on time, or behind schedule in relation
31 with updated progress schedule. Determine how behind-schedule work will be expedited, and secure
32 commitments from entities involved in doing so. Discuss whether schedule revisions are required to
33 ensure that current work and subsequent work will be completed within Contract Time. Review
34 everything of significance which could affect progress of the work.
35
36 Initial Progress Meeting: Schedule initial progress meeting, recognized as "Pre-Construction
37 Meeting", for a date not more than 15 days after date of commencement of the work. Use it as
38 an organizational meeting, and review reponsibilities and personnel assignments.
39
40 Reporting: Within 3 days after each progress meeting date, distribute copies of minutes-of-
41 the-meeting to each entity present and to others who should have been present. Include a
42 brief summary(in narrative form)of progress of the work since previous meeting and report.
43
44 Schedule Updating: Immediately following each progress meeting, where revisions to
45 progress schedule have been made or recognized, revise progress schedule. Reissue
46 revised schedule concurrently with report of each meeting.
47
48 SCHEDULE OF VALUES:
49
50 General: Prepare the schedule of values, as required by the General Conditions, in conjunction with
51 the preparation of the progress schedule. Correlate preparation of schedule of values and progress
52 schedule. Correlate line items with other administrative schedules and forms required for the work,
53 including the progress schedule, payment request form, listing of subcontractors, schedule of
54 allowances, schedule of alternates, listing of products and principal suppliers and fabricators, and
55 schedule of submittals. Provide breakdown of the Contract Sum in sufficient detail to facilitate
56 continued evaluation of payment requests and progress reports. Break down principal subcontract
57 amounts into several line items. Round off to nearest whole dollar, but with the total equal to Contract
SCHEDULES, REPORTS, PAYMENTS
GDA 01310-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Sum.
2
3
4 Material/Fabrication Values: For each unit of work where payment requests will be made on
5 account of materials or equipment purchased, fabricated, delivered, but not yet installed,
6 show "initial value" for payment request and "value added" for subsequent stage or stages of
7 completion on that unit of work.
8
9 Unit Cost Allowances: Show the line item value as a product of the unit cost x measured
10 quantity as estimated from the best indication in the contract documents.
11
12 Time Coordination: In coordination of initial submittals and other administrative "start-up"
13 activities, submit the schedule of values to the Architect/Engineer at the earliest feasible date,
14 but in no case later than 7 days before initial payment request is to be submitted.
15
16 Listing: Arrange the schedule with columns to indicate the generic name of item, related
17 specification sections, the subcontractor, the supplier, manufacturer or fabricator, change
18 orders (numbers) which have affected the value, the dollar value of the item, and the
19 percentage of the Contract Sum to the nearest one-hundredth percent and adjusted to total
20 100 percent.
21
22 Margins of Cost: Show line items of indirect costs, and margins on actual costs, only to extent
23 such items will be individually listed in payment requests. In general, each item in the
24 schedule of values and in payment requests shall be established to be complete with its total
25 expenses and proportionate share of the general overhead and profit margin. Except as
26 otherwise indicated, those major cost items that are not directly the cost of actual work-in-
27 place, such as distinct temporary facilities, may be either shown as line items in the schedule
28 of values or may be distributed as general overhead expense, at Contractor's option.
29
30 Schedule Updating: Update and resubmit schedule of values when change orders affect
31 listing and when actual performance of the the work involves necessary changes of substance
32 to the values previously listed.
33
34 PAYMENT REQUESTS:
35
36 General: Except as otherwise indicated, the progress payment cycle is to be regular. Each
37 application must be consistent with previous applications and payments. Certain applications for
38 payment, such as the initial application, the application at substantial completion, and the final
39 payment application involve additional requirements.
40
41 Payment Application Times: The "date" for each progress payment is as indicated in Owner-
42 Contractor Agreement or, if none is indicated therein, it is the 1st day of each month. The period of
43 construction work covered by each payment request is period indicated in Owner-Contractor
44 Agreement or, if none is indicated therein, it is period ending 15 days prior to date for each progress
45 payment, and starting day following end of preceding period.
46
47 Payment Application Forms: Use Owner prepared forms. Copies of these forms may be obtained
48 from the Owner.
49
50 Application Preparation: Except as otherwise indicated, complete every entry provided for on the
51 form, including notarization and execution by authorized persons. Incomplete applications will be
52 returned by Architect/Engineer without action. Entries must match current data of schedule of values
53 and progress schedule and report. Listing must include amounts of change orders issued prior to last
54 day of the"period of construction" covered by application.
55
56 Waivers of Mechanics Lien: With each Application for Payment, submit waivers of mechanics lien
57 from every entity who is lawfully entitled to file a mechanics lien arising out of the Contract and related
SCHEDULES, REPORTS, PAYMENTS
GDA 01310-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 to the Work covered by the payment.
2
3 Initial Payment Application: The principal administrative actions and submittals which must precede or
4 coincide with submittal of Contractor's first payment application can be summarized as follows, but not
5 necessarily by way of limitation:
6
7 List of subcontractors.
8
9 List of principal suppliers and fabricators.
10
11 Schedule of Values.
12
13 Contractor's Construction Schedule (preliminary if not final).
14
15 Schedule of principal products.
16
17 Schedule of unit prices.
18
19 Submittal Schedule (preliminary if not final).
20
21 List of Contractor's staff assignments.
22
23 List of Contractor's principal consultants.
24
25 Copies of building permits.
26
27 Copies of authorizations and licenses from governing authorities for performance of the Work.
28
29 Initial progress report.
30
31 Report of pre-construction meeting.
32
33 Certificates of insurance and insurance policies.
34
35 Performance and/or payment bonds (if required).
36
37 Payment will not be released until items listed above are accomplished.
38
39 Application at Time of Substantial Completion: Following issuance of Architect's or Engineer's final
40 "certificate of substantial completion," and also in part as applicable to prior certificates on portions of
41 completed work as designated, a "special" payment application may be prepared and submitted by
42 Contractor. The principal administrative actions and submittals which must proceed or coincide with
43 such special applications can be summarized as follows, but not necessarily by way of limitation:
44
45 Occupancy permits and similar approvals or certifications by governing authoby governing
46 authorities and franchised services, assuring Owners's full access and use of completed work.
47
48 Warranties (guarantees), maintenance agreements and similar provisions of contract
49 documents.
50
51 Test/adjust/balance records, maintenance instructions, meter readings, start-up performance
52 reports, and similar change-over information germane to Owner's occupancy, use, operation
53 and maintenance of completed work.
54
55 Final cleaning of the work.
56
57 Application for reduction (if any)of retainage, and consent of surety.
SCHEDULES, REPORTS, PAYMENTS
GDA 01310- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Advice to Owner on coordination of shifting insurance coverages, including proof of extended
3 coverages as required.
4
5 Listing of Contractor's incomplete work, recognized as exceptions to Architect's/Engineer's
6 certificate of substantial completion.
7
8 Final Payment Application: The administrative actions and submittals which must precede or coincide
9 with submittal of contractor's final payment application can be summarized as follows, but not
10 necessarily by way of limitation.
11
12 Completion of project closeout requirements.
13
14 Completion of items specified for completion beyond time of substantial completion
15 (regardless of whether special payment application was previously made).
16
17 Assurance, satisfactory to Owner, that unsettled claims will be settled and that work not
18 actually completed and accepted will be completed without undue delay.
19 Transmittal of required project construction records to Owner.
20
21 Certified property survey.
22
23 Proof, satisfactory to Owner, that taxes, fees and similar obligations of Contractor have been
24 paid.
25
26 Removal of temporary facilities, services, surplus materials, rubbish and similar elements.
27
28 Change over of door locks and other Contractor's access provisions to Owner's property.
29
30 Consent of surety for final payment.
31
32 Payment will not be released until items listed above are accomplished.
33
34 Application Transmittal: Submit 5 executed copies of each payment application, one copy of which is
35 completed with waivers of lien and similar attachments. Transmit each copy with a transmittal form
36 listing those attachments, and recording appropriate information related to application in a manner
37 acceptable to Owner. Transmit to Owner by means ensuring receipt within 24 hours.
38
39
40 PART 2-PRODUCTS (Not Applicable)
41
42
43 PART 3- EXECUTION (Not Applicable)
44
45
46 END OF SECTION 01310
SCHEDULES, REPORTS, PAYMENTS
GDA 01310-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01340- SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
2
3
4 PART 1 - GENERAL
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification sections, apply to work of this section.
10
11 DESCRIPTION OF REQUIREMENTS:
12
13 General: This section specifies procedural requirements for non-administrative submittals including
14 shop drawings, product data, samples and other miscellaneous work-related submittals. Shop
15 drawings, product data, samples and other work-related submittals are required to amplify, expand
16 and coordinate the information contained in the Contract Documents.
17
18 Refer to other Division-1 sections and other contract documents for specifications on
19 administrative, non-work-related submittals. Such submittals include, but are not limited to the
20 following items:
21
22 Permits.
23 Payment applications.
24 Performance and payment bonds.
25 Insurance certificates.
26 Inspection and test reports.
27 Schedule of values.
28 Progress reports.
29 Listing of subcontractors.
30
31 Shop drawings are technical drawings and data that have been specially prepared for this project,
32 including but not limited to the following items:
33
34 Fabrication and installation drawings.
35 Setting diagrams.
36 Shopwork manufacturing instructions.
37 Templates.
38 Patterns.
39 Coordination drawings(for use on-site).
40 Schedules.
41 Design mix formulas.
42 Contractor's engineering calculations.
43
44 Standard information prepared without specific reference to a project is not considered to be
45 shop drawings.
46
47 Product data includes standard printed information on manufactured products that has not been
48 specially-prepared for this project, including but not limited to the following items:
49
50 Manufacturer's product specifications and installation instructions.
51 Standard color charts.
52 Catalog cuts.
53 Roughing-in diagram and templates.
54 Standard wiring diagrams.
55 Printed performance curves.
56 Operational range diagrams.
57 Mill reports.
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
GDA 01340- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Standard product operating and maintenance manuals.
2
3 Samples are physical examples of work, including but not limited to the following items:
4
5 Partial sections of manufactured or fabricated work.
6 Small cuts or containers of materials.
7 Complete units of repetitively-used materials.
8 Swatches showing color, texture and pattern.
9 Color range sets.
10 Units of work to be used for independent inspection and testing.
11
12 Mock-ups are special forms of samples, which are too large or otherwise inconvenient for
13 handling in the manner specified for transmittal of sample submittals.
14
15 Miscellaneous submittals are work-related, non-administrative submittals that do not fit in the three
16 previous categories, including, but not limited to the following:
17
18 Specially-prepared and standard printed warranties.
19 Maintenance agreements.
20 Workmanship bonds.
21 Survey data and reports.
22 Project photographs.
23 Testing and certification reports.
24 Record drawings.
25 Field measurement data.
26 Operating and maintenance manuals.
27 Keys and other security protection devices.
28 Maintenance tools and spare parts.
29 Overrun stock.
30
31 SUBMITTAL PROCEDURES:
32
33 General: Refer to the General Conditions for basic procedures for submittal handling:
34
35 Coordination: Coordinate the preparation and processing of submittals with the performance of the
36 work. Coordinate each separate submittal with other submittals and related activities such as testing,
37 purchasing, fabrication, delivery and similar activities that require sequential activity.
38
39 Coordinate the submittal of different units of interrelated work so that one submittal will not be
40 delayed by the Architect/Engineer's need to review a related submittal. The
41 Architect/Engineer reserves the right to withhold action on any submittal requiring coordination
42 with other submittals until related submittals are forthcoming.
43
44 Scheduling: In each appropriate administrative submittal, such as the progress schedule, show the
45 principal work-related submittals and time requirements for coordination of submittal activity with
46 related work.
47
48 Listing: Prepare a separate listing showing principal work-related submittals and their initial
49 submittal dates as required for coordination of the work. Organize the listing by the related
50 specification number sequence. Submit the listing within 45 days of the date of
51 commencement of the work.
52
53 Coordination of Submittal Times: Prepare and transmit each submittal to the Architect/Engineer
54 sufficiently in advance of the scheduled performance of related work and other applicable activities.
55 Transmit different kinds of submittals for the same unit of work so that processing will not be delayed
56 by the Architect/Engineer's need to review submittals concurrently for coordination.
57
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
GDA 01340- 2
GDA#12018.00 December 14,2012
Issue for Permit
1 Review Time: Allow sufficient time so that the installation will not be delayed as a result of the
2 time required to properly process submittals, including time for resubmittal, if necessary.
3 Advise the Architect/Engineer on each submittal, as to whether processing time is critical to
4 the progress of the work, and if the work would be expedited if processing time could be
5 shortened.
6
7 Allow two weeks for the Architect/Engineer's initial processing of each submittal.
8 Allow a longer time period where processing must be delayed for coordination with
9 subsequent submittals. The Architect/Engineer will advise the Contractor promptly
10 when it is determined that a submittal being processed must be delayed for
11 coordination.
12
13 Allow one week for reprocessing each submittal.
14
15 No extension of time will be authorized because of the Contractor's failure to transmit
16 submittals to the Architect/Engineer sufficiently in advance of the work.
17
18 Submittal Preparation: Mark each submittal with a permanent label for identification. Provide the
19 following information on the label for proper processing and recording of action taken.
20
21 Project name.
22 Date.
23 Name and address of Architect/Engineer.
24 Name and address of Contractor.
25 Name and address of subcontractor.
26 Name and address of supplier.
27 Name of manufacturer.
28 Number and title of appropriate specification section.
29 Drawing number and detail references, as appropriate.
30 Similar definitive information as necessary.
31
32 Provide a space on the label for the Contractor review and approval markings, and a space
33 for the Architect/Engineer's"Action" marking.
34
35 Submittal Transmittal: Package each submittal appropriately for transmittal and handling. Transmit
36 each submittal from the Contractor to the Architect/Engineer, and to other destinations as indicated,
37 by use of a transmittal form. Submittals received from sources other than the Contractor will be
38 returned to the sender"without action".
39
40 Transmittal Form Prepare a draft of a transmittal form and submit it to the Architect/Engineer
41 for acceptance. Provide on the form places for the following information:
42
43 Project name.
44 Date.
45 To:
46 From:
47 Names of subcontractor, manufacturer and supplier.
48 References.
49 Category and type of submittal.
50 Submittal purpose and description.
51 Submittal and transmittal distribution records.
52 Signature of transmitter.
53 Contractor's certification stating that the information submitted complies with the
54 requirements of the Contract Documents,with a place for the Contractor's signature.
55 Record relevant information and requests for data on the transmittal form. On the
56 transmittal form, or on a separate sheet attached to the form, record deviations from
57 the requirements of the Contract Documents, if any, including minor variations and
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
GDA 01340- 3
GDA#12018.00 December 14, 2012
Issue for Permit
1 limitations.
2
3 SPECIFIC SUBMITTAL REQUIREMENTS:
4
5 General: Specific submittal requirements for individual units of work are specified in the applicable
6 specification section. Except as otherwise indicated in the individual specification sections, comply
7 with the requirements specified herein for each type of submittal.
8
9 Where it is necessary to provide intermediate submittals between the initial and final
10 submittals, provide and process intermediate submittals in the same manner as for initial
11 submittals.
12
13 Shop Drawings: Information required on shop drawings includes, dimensions, identification of specific
14 products and materials which are included in the work, compliance with specified standards and
15 notations of coordination requirements with other work. Provide special notation of dimensions that
16 have been established by field measurement. Highlight, encircle or otherwise indicate deviations from
17 the contract documents on the shop drawings.
18
19 Coordination Drawings: Provide continuous drawings where required for the integration of the
20 work, including work first shown in detail on shop drawings or product data. Show sequencing
21 and relationship of separate units of work which must interface in a restricted manner to fitin
22 the space provided, or function as indicated. Coordination drawings are considered shop
23 drawings and must be definitive in nature.
24
25 Refer to Division-15 and Division-16 sections for additional general requirements
26 applicable to shop drawings for mechanical and electrical work, respectively.
27
28 Do not permit shop drawings copies without an appropriate final "Action" marking by the
29 Architect/Engineer to be used in connection with the work.
30
31 Preparation: Submit newly prepared information, drawn to accurate scale on sheets not
32 less than 8-1/2" x 11"; except for actual pattern or template type drawings, the maximum
33 sheet size shall not exceed 30" x 42". Indicate the name of the firm that prepared each shop
34 drawing and provide appropriate project identification in the title block. Provide a space not
35 less than 20 sq. in. beside the title block for marking the record of the review process and the
36 Architect/Engineer's "Action" marking.
37
38 Do not reproduce contract documents or copy standard printed information as
39 the basis of shop drawings.
40
41 Submittal: Except as otherwise indicated in individual sections of these specifications, provide
42 5 prints plus 2 additional prints where they are required for maintenance manuals. 2 prints will
43 be retained; the remainder will be returned. One of the prints returned will be marked-up and
44 maintained by the Contractor as a "Record Document".
45
46 Product Data: General information required specifically as product data includes manufacturer's
47 standard printed recommendations for application and use, compliance with recognized standards of
48 trade associations and testing agencies, and the application of their labels and seals (if any), special
49 notation of dimensions which have been verified by way of field measurement, and special
50 coordination requirements for interfacing the material, product or system with other work.
51
52 In semiproprietary specifications (see Section 01600 for definition), where Architect has indicated
53 products by specific model number designation, but allowed various manufacturers to provide
54 equivalent products by inclusion in Part 2 of the individual specification, provide product data for
55 products intended to be included in the Work, as well as the products indicated by model number in
56 that same individual specification. Clearly mark each product that is to be included in the Work.
57
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
GDA 01340- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1 Refer to Division-15 and Division-16 sections for additional general requirements applicable to product
2 data for mechanical and electrical work respectively.
3
4 Preparation: Collect required product data into a single submittal for each units of work or system.
5 Mark each copy to show which choices and options are applicable to the project. Where project data
6 has been printed to include information on several similar products, some of which are not required for
7 use on the project, or are not included on this submittal, mark the copies to show clearly that such
8 information is not applicable.
9
10 Where product data must be specially prepared for required products, materials or systems,
11 because standard printed data is not suitable for use, submit data as "shop drawings" and not
12 as "product data".
13
14 Submittals: Product data submittal is required for information and record and to determine that the
15 products, materials and systems comply with the provisions of the contract documents. Therefore,the
16 initial submittal is also the final submittal, except where the Architect/Engineer observes that there is
17 non-compliance with the provisions of the contract documents and returns the submittal promptly to
18 the Contractor marked with the appropriate "Action".
19
20 Provide a preliminary single-copy submittal where required, for selection of options by the
21 Architect/Engineer.
22
23 Submittal: Except as otherwise indicated in individual sections of these specifications, submit
24 3 copies of each required product data submittal, plus 2 additional copies where required for
25 maintenance manuals. The Architect/Engineer will retain one copy, and will return the other
26 marked with"Action"and corrections or modifications as required.
27
28 Do not submit product data or allow its use on the project, until compliance with the
29 requirements of the contract documents has been confirmed by the Contractor.
30
31 Final Distribution: Furnish copies of product data to subcontractors, suppliers, fabricators,
32 manufacturers, installers, governing authorities and others as required for proper performance
33 of the work. Show distribution on transmittal form.
34
35 Installation Copy: Do not proceed with installation of materials, products and systems until a
36 copy of product data applicable to the installation is in the possession of the installer. Do not
37 permit the use of unmarked copies of product data in connection with the performance of the
38 work.
39
40 Samples: Submit samples for the Architect/Engineer's visual review of general generic kind, color,
41 pattern, and texture, and for a final check of the coordination of these characteristics with other related
42 elements of the work. Samples are also submitted for quality control comparison of these
43 characteristics between the final sample submittal and the actual work as it is delivered and installed.
44
45 Refer to individual work sections of these specifications for additional sample requirements,
46 which may be intended for examination or testing of additional characteristics. Compliance
47 with other required characteristics is the exclusive responsibility of the Contractor; such
48 compliance is not considered in the Architect/Engineer's review and "Action" indication on
49 sample submittals.
50
51 Documentation required specifically for sample submittals includes a generic description of
52 the sample, the sample source or the product name or manufacturer, compliance with
53 governing regulations and recognized standards. In addition, indicate limitations in terms of
54 availability, sizes, delivery time, and similar limiting characteristics.
55
56 Refer to Division-15 and Division-16 sections for additional general reqirements applicable to
57 samples for mechanical and electrical work, respectively.
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
GDA 01340-5
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Preparation: Where possible provide samples that are physically identical with the proposed
3 material or product to be incorporated in the work; provide full scale, fully fabricated samples
4 cured and finished in the manner specified. Where variations in color, pattern, or texture are
5 inherent in the material or product represented by the sample, submit multiple units of the
6 sample (not less than 3 units), which show the approximate limits of variations. Where
7 samples are specified in the Architect/Engineer's selection of color, texture or pattern, submit
8 a full set of available choices for the material or product. Mount, display, or package samples
9 in the manner specified to facilitate the review of indicated quantities. Prepare samples to
10 match the Architect/Engineer's sample where so indicated.
11
12 Submittal: At the Contractor's option, and depending upon the nature of the anticipated response from
13 the Architect/Engineer, the initial submittal of samples may be either a preliminary submittal or a final
14 submittal.
15
16 Preliminary submittal,of a single set of samples, is required where requirements
17 indicate the Architect/Engineer's selection of color, pattern, texture or similar
18 characteristics from a manufacturer's range of standard choices is necessary.
19 Preliminary submittals will be reviewed and returned with the Architect/Engineer's
20 "Action" marking.
21
22 Final Submittals: Submit 3 sets of samples in the final submittal, one set will be
23 returned.
24
25 Distribution of Samples: Maintain the final submittal sets of samples, as returned by
26 the Architect/Engineer, at the project site, available for quality control comparisons
27 throughout the course of performing the work. In addition, throughout the final
28 submittal sets may be used to obtain final acceptance of the work associated with
29 each set. Prepare and distribute additional sets of samples to subcontractors,
30 suppliers, fabricators, manufacturers, installers, governing authorities, and others as
31 required for proper performance of the work. Show final distribution on transmittal
32 forms.
33
34 Mock-Ups are similar samples specified in individual work sections are special types of
35 samples. Comply with sample submittal requirements to the fullest extent possible. Process
36 transmittal forms to provide a record of activity.
37
38 Miscellaneous Submittals:
39
40 Inspection and Test Reports: Classify each inspection and test report as being either "shop
41 drawings" or "product data" depending on whether the report is specially prepared for the
42 project, or a standard publication of workmanship control testing at the point of production.
43 Process inspection and test reports accordingly.
44
45 Warranties: Refer to section "Products and Substitutions" for specific general requirements
46 on warranties, product bonds, workmanship bonds and maintenance agreement. In addition
47 to copies desired for the Contractor's use, furnish 2 executed copies of such warranties,
48 bonds or agreements. Provide 2 additional copies where required for maintenance manuals.
49
50 Survey Data: Refer to section "Project Coordination" for specific general requirements on
51 property surveys, field measurements, quantitative records of actual work, damage surveys
52 and similar data required by the individual sections of these specifications. None of the
53 specified copies will be returned.
54
55 Survey Copies: Furnish 2 copies of general survey data. Provide 10 copies of the
56 final property survey.
57
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
GDA 01340-6
GDA#12018.00 December 14,2012
Issue for Permit
1 Records of Actual Work: Furnish 4 copies of records of actual work, one of which will
2 be returned for inclusion in the record documents as specified in section "Project
3 Closeout".
4
5 Standards: Where submittal of a copy of standards is indicated, and except where copies of
6 standards are specified as an integral part of a "Product Data" submittal, submit a single copy
7 of standards for the Architect/Engineer's use. Where workmanship,whether at the project site
8 or elsewhere is governed by a standard, furnish additional copies of the standard to
9 fabricators, installers and others involved in the performance of the work.
10
11 Closeout Submittals: Refer to section "Project Closeout" and to individual sections of these
12 specifications for specific submittal requirements of project closeout information, materials,
13 tools, and similar items.
14
15 Record Documents: Furnish set of original documents as maintained on the project
16 site.
17
18 Operating and Maintenance Data: Furnish 2 bound copies of operating data and
19 maintenance manuals.
20
21 Materials and Tools: Refer to individual sections of these specifications for required
22 quantities of spare parts, extra and overrun stock, maintenance tools and devices,
23 keys, and similar physical units to be submitted.
24
25 General Distribution: Provide additional distribution of submittals to contractors, suppliers,
26 fabricators, installers, governing authorities, and others as necessary for the proper
27 performance of the work. Include such additional copies of submittals in the transmittal to the
28 Architect/Engineer where the submittals are required to receive "Action" marking before final
29 distribution. Record distributions on transmittal forms.
30
31 ARCHITECT/ENGINEER'S ACTION:
32
33 General: Except for submittals for the record and similar purposes, where action and return on
34 submittals is required or requested, the Architect/Engineer will review each submittal, mark with
35 appropriate "Action", and here possible return within 2 weeks of receipt. Where the submittal must be
36 held for coordination the Architect/Engineer will so advise the Contractor without delay.
37
38 Action Stamp: The Architect/Engineer will stamp each submittal to be returned with a uniform,
39 self explanatory action stamp, appropriately marked and executed to indicate whether the
40 submittal returned is for unrestricted use, final-but-restricted use (as marked), must be revised
41 and resubmitted(use not permitted)or without action (as explained on the transmittal form).
42
43 No action will be taken by Architect/Engineer on any submittal without Contractor's review/approval
44 stamp accompanied by signature of Contractor's disignated individual.
45
46
47 PART 2- PRODUCTS(Not Applicable),
48
49
50 PART 3-EXECUTION(Not Applicable).
51
52
53 END OF SECTION 01340
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
GDA 01340-7
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01400-QUALITY CONTROL SERVICES
2
3 PART 1 - GENERAL
4
5 RELATED DOCUMENTS:
6
7 Drawings and general provisions of Contract, including General and Supplementary Conditions and
8 other Division-1 Specification sections, apply to work of this section.
9
10 DESCRIPTION OF REQUIREMENTS:
11
12 General: Required inspection and testing services are intended to assist in the determination of
13 probable compliance of the work with requirements specified or indicated. These required services do
14 not relieve the Contractor of responsibility for compliance with these requirements or for compliance
15 with requirements of the contract documents.
16
17 Definitions: The requirements of this section relate primarily to customized fabrication and installation
18 procedures, not to the production of standard products. Quality control services include inspections
19 and tests and related actions including reports, performed by independent agencies and governing
20 authorities, as well as directly by the Contractor. These services do not include Contract enforcement
21 activities performed directly by the Architect or Engineer.
22
23 Specific quality control requirements for individual units of work are specified in the section of
24 these specifications that specify the individual element of the work. These requirements,
25 including inspections and tests, cover both production of standard products, and fabrication of
26 customized work. These requirements also cover quality control of the installation
27 procedures.
28
29 Inspections, tests and related actions specified in this section and elsewhere in the contract
30 documents are not intended to limit the Contractor's own quality control procedures which
31 facilitate overall compliance with requirements of the contract documents.
32
33 Requirements for the Contractor to provide quality control services as required by the
34 Architect/Engineer, the Owner, governing authorities or other authorized entities are not
35 limited by the provisions of this section.
36
37 Geotchnical Consultant and Consultant: Where used shall mean and refer to Owner's officially
38 designated and accredited geotechnical consultant.
39
40 Inspector, Testing Laboratory or Inspection Laboratory: Where used shall mean and refer to Owner's
41 officially designated and accredited testing laboratory.
42
43 RESPONSIBILITIES:
44
45 Contractor Responsibilities: Except where they are specifically indicated as being the Owner's
46 responsibility, or where they are to be provided by another identified entity, inspections, tests and
47 similar quality control services are the Contractor's responsibility; these services also include those
48 specified to be performed by an independent agency and not directly by the Contractor. Costs for
49 these services shall be included in the Contract Sum. The Contractor shall employ and pay an
50 independent agency, testing laboratory or other qualified firm to perform quality control services
51 specified, including but not limited to the services indicated below:
52
53 Provide design preliminary mix for use for portland cement concrete and other material mixes
54 which require control by a testing laboratory.
55
56 Retest Responsibility: Where results of required inspections, tests or similar services prove
57 unsatisfactory and do not indicate compliance of related work with the requirements of the contract
QUALITY CONTROL SERVICES
GDA 01400- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 documents, then cost for retests are the responsibility of the Contractor, regardless of whether the
2 original test was the Owner's responsibility. Payment for retest of work revised or replaced by the
3 Contractor is the Contractor's responsibility,where required tests were performed on original work.
4
5 Responsibility for Associated Services: The Contractor is required to cooperate with the independent
6 agencies performing required inspections, tests and similar services. Provide such auxiliary services
7 as are reasonably requested. Notify the testing agency sufficiently in advance of operations to permit
8 assignment of personnel. These auxiliary services include but are not necessarily limited to the
9 following:
10
11 Providing access to the work.
12 Taking samples or assistance with taking samples.
13 Delivery of samples to test laboratories.
14 Security and protection of samples and test equipment at the project site.
15 Furnish copies of product tests or mill test reports as required.
16 Furnish incidental labor and facilities to:
17
18 Provide access to work to be tested.
19 Obtain and handle samples at Project site or at source of product to be tested.
20 Facilitate inspections and tests.
21 Store and cure test samples.
22
23 Owner Responsibilities: The Owner will provide inspections, tests and similar quality control services
24 specified to be performed by independent agencies and not by the Contractor, except where they are
25 specifically indicated as the Contractor's responsibility or are provided by another identified entity.
26 Costs for these services are not included in the Contract Sum.
27
28 The Owner will engage and pay for the services of an independent agency to perform
29 inspections and tests that are specified as the Owner's responsibility. Costs for these
30 services shall not be included in the Contract Sum.
31
32 Duties of the Testing Agency: The independent testing agency engaged to perform inspections,
33 sampling and testing of materials and construction specified in individual Specification Sections shall
34 cooperate with the Architect and Contractor in performance of its duties, and shall provide qualified
35 personnel to perform required inspections and tests.
36
37 The agency shall notify the Architect and Contractor promptly of irregularities or deficiencies
38 observed in the Work during performance of its services.
39
40 The agency is not authorized to release, revoke, alter or enlarge requirements of the Contract
41 Documents, or approve or accept any portion of the Work.
42
43 The agency shall not perform any duties of the Contractor.
44
45 Coordination: The Contractor and each independent agency engaged to perform inspections, tests
46 and similar services for the project shall coordinate the sequence of their activities so as to
47 accommodate required services with a minimum of delay in the progress of the work. In addition to
48 Contractor and each independent testing agency shall coordinate their work so as to avoid the
49 necessity of removing the replacing work to accommodate inspections and tests. The Contractor is
50 responsible for scheduling times for inspections,tests, taking of samples and similar activities.
51
52 QUALITY ASSURANCE:
53
54 Qualification for Service Agencies: Except as otherwise indicated, engage inspection and test service
55 agencies, including independent testing laboratories, which are prequalified as complying with
56 "Recommended Requirements for Independent Laboratory Qualification" by the American Council of
57 Independent Laboratories, and which are recognized in the industry as specialized in the types of
QUALITY CONTROL SERVICES
GDA 01400-2
GDA#12018.00 December 14,2012
Issue for Permit
1 inspections and tests to be performed.
2
3 Testing laboratories shall meet basic requirements of ASTM E 329.
4
5 Testing laboratories shall be authorized in the state in which the Project is located.
6
7 Testing equipment shall be calibrated at mximum twelve (12) month intervals by devices of accuracy
8 traceable to either National Bureau of Standards or accepted values of natural physical constants.
9
10 SUBMITTALS:
11
12 General: Refer to Division-1 section on "Submittals" for the general requirements on submittals.
13 Submit six copies of certified written report of each inspection, test or similar service, directly to the
14 Architect/Engineer, in duplicate, unless the Contractor is responsible for the service. If the Contractor
15 is responsible for the service, submit six copies of certified written report of each inspection, test or
16 similar service through the Contractor. Submit additional copies of each written report directly to the
17 governing authority,when the authority so directs.
18
19 Report Data: Written reports of each inspection, test or similar service shall include, but not
20 be limited to the following:
21
22 Date report issued.
23 Project title, location, and number.
24 Name of testing agency or test laboratory, address, and telephone number.
25 Dates and locations of samples and tests or inspections.
26 Location of sample or test in Project.
27 Names of individuals making the inspection or test.
28 Designation of the work and test method.
29 Identification of product and specification section.
30 Complete inspection or test data.
31 Test results.
32 Interpretations of test results.
33 Notation of significant ambient conditions at the time of sample-taking and testing.
34 Comments or professional opinion as to whether inspected or tested work complies
35 with requirements of the contract documents.
36 Recommendations on retesting, if applicable.
37
38 Testing Laboratory: Submit report of inspection of facilities made by Materials Reference Laboratory of
39 Nationl Bureau of Standards during most recent tour. Submit memorandum of remedies of any
40 deficiencies reported by inspection.
41
42 PART 2- PRODUCTS (Not Applicable).
43
44 PART 3- EXECUTION
45
46 REPAIR AND PROTECTION:
47
48 General: Upon completion of inspection, testing, sample-taking and similar services performed on the
49 work, repair damaged work and restore substrates and finishes to eliminate deficiencies, including
50 deficiencies in the visual qualities of exposed finishes. Comply with the contract document
51 requirements for "Cutting and Patching". Protect work exposed by or for quality control service
52 activities, and protect repaired work. Repair and protection is the Contractor's responsibility,
53 regardless of the assignment of responsibility for inspection,testing or similar services.
54
55 END OF SECTION 01400
QUALITY CONTROL SERVICES
GDA 01400-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01505-TEMPORARY FACILITIES
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification sections, apply to work of this section.
10
11 DESCRIPTION OF REQUIREMENTS:
12
13 Definitions: Specific administrative and procedural minimum actions are specified in this section, as
14 extensions of provisions in General Conditions and other contract documents. These requirements
15 have been included for special purposes as indicated. Nothing in this section is intended to limit types
16 and amounts of temporary work required, and no omission from this section will be recognized as an
17 indication by Architect or Engineer that such temporary activity is not required for successful
18 completion of the work and compliance with requirements of contract documents. Provisions of this
19 section are applicable to, but not by way of limitation, utility services, construction facilities,
20 security/protection provisions, and supprt facilities.
21
22 QUALITY ASSURANCE:
23
24 General: In addition to compliance with governing regulations and rules/recommendations of
25 franchised utility companies, comply with specific requirements indicated and with applicable local
26 industry standards for construction work (published recommendations by local consensus "building
27 councils").
28
29 ANSI Standards: Comply with applicable provisions of ANSI A10- Series standards on construction
30 safety, including A10.3, A10.4, A10.5, A10.6, A10.7, A10.8, A10.9, A10.10, A10.11, A10.12, A10.13,
31 A10.14, A10.15,A10.17,A10.18,A10.20, and A10.22.
32
33 NFPA Code: Comply with NFPA Code 241 "Building Construction and Demolition Operations."
34
35 Conservation: In compliance with Owner's policy on energy/ materials conservation, install and
36 operate temporary facilities and perform construction activities in manner which reasonably will be
37 conservative and avoid waste of energy and materials including water.
38
39 JOB CONDITIONS:
40
41 General: Establish and initiate use of each temporary facility at time first reasonably required for
42 proper performance of the work. Terminate use and remove facilities at earliest reasonable time,
43 when no longer needed or when permanent facilities have, with authorized use, replaced the need.
44
45 Conditions of Use: Install, operate, maintain and protect temporary facilities in a manner and at
46 locations which will be safe, non-hazardous, sanitary and protective of persons and property, and free
47 of deleterious effects.
48
49
50 PARTS 2 and 3- PRODUCTS AND EXECUTION
51
52 TEMPORARY UTILITY SERVICES:
53
54 The types of services required include, but not by way of limitation, water, sewerage, surface
55 drainage, electrical power and telephones. Where possible and reasonable, connect to existing
56 franchised utilities for required services; and comply with service companies' recommendations on
57 materials and methods, or engage service companies to install services. Locate and relocate services
TEMPORARY FACILITIES
GDA 01505- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 (as necessary)to minimize interference with construction operations.
2
3 Non-potable Water: Where nonpotable water is used, mark each outlet with adequate health-hazard
4 warning signs.
5
6 Temporary Power: Provide service with ground-fault circuit interrupter features, activated from each
7 circuit of 20-amp or less rating.
8
9 Metering: Provide meters for water and electrical power services.
10
11 TEMPORARY CONSTRUCTION FACILITIES:
12
13 The types of temporary construction facilities required include, but not by way of limitation, water
14 distribution, drainage, dewatering equipment, enclosure of work, heat, ventilation, electrical power
15 distribution, lighting, hoisting facilities, stairs, ladders, and roads. Provide facilities reasonably
16 required to perform construction operations properly and adequately.
17
18 Lighting: Provide sufficent temporary lighting to ensure proper workmanship everywhere; by
19 combined use of daylight, general lighting, and portable plug-in task lighting. Provide general lighting
20 with local switching which will enable energy conservation during periods of varying activity (work-in-
21 progress, traffic only, security check, lock-up, etc.).
22
23 Access Provisions: Provide ramps, stairs, ladders and similar temporary access elements as
24 reasonably required to perform the work and facilitate its inspection during installation. Comply with
25 reasonable requests of governing authorities performing inspections. When permanent stairs are
26 available for access during construction, cover finished surfaces with sufficient protection to ensure
27 freedom from damage and deterioriation at time of substantial completion.
28
29 Roads: Except as otherwise indicated, develop subgrade and subbase of permanent roadways at
30 earliest possible date, and provide temporary surfacing to serve as temporary roads during
31 construction. Surface sufficiently to provide all-weather, uninterrupted access to construction area, for
32 every form of transportation which can be reasonably expected. Maintain temporary roads during
33 construction. Extend temporary roadway development and surfacing in and around construction site
34 as reasonably required to accommodate construction activities. When no longer needed as temporary
35 roadways, remove temporary surfacing and restore subbases to conditions required by contract
36 documents for permanent development.
37
38 SECURITY/PROTECTION PROVISIONS:
39
40 The types of temporary security and protection provisons required include, but not by way of limitation,
41 fire protection, barricades, warning signs/lights, sidewalk bridges, building enclosure/lockup,
42 watchman service, personnel secuity program (theft prevention), environmental protection, and similar
43 provisions intended to minimize property losses, personal injuries and claims for damages at project
44 site.
45
46 Building Enclosure and Lockup: At earliest possible date, secure building against unauthorized
47 entrance at times when personnel are not working. Provide secure temporary enclosures at ground
48 floor and other locations of possible entry, with locked entrances.
49
50 Environmental Protection Procedures: Provide facilities, establish procedures, and conduct
51 construction activities in a manner which will ensure compliance with regulations controlling
52 construction activities at project site. Designate one person, the Construction Superintendent or other,
53 to enforce strict discipline on activities related to generation of wastes, pollution of air/water/soil,
54 erosion control, generation of noise, and similar harmful or deleterious effects which might violate
55 regulations or reasonably irritate persons at or in vicinity of project site.
56
57 Collection and Disposal of Waste: Collect waste from construction areas, entrances and off-site
TEMPORARY FACILITIES
GDA 01505- 2
GDA#12018.00 December 14,2012
Issue for Permit
1 streets and elsewhere daily. Comply with requirements of NFPA 241 for removal of combustible
2 waste material and debris. Enforce requirements strictly. Do not hold materials more than 7 days
3 during normal weather or 3 days when the temperature is expected to rise above 80 deg F(27 deg C).
4 Handle hazardous, dangerous, or unsanitary waste materials separately from other waste by
5 containerizing properly. Dispose of material in a lawful manner.
6
7 TEMPORARY SUPPORT FACILITIES:
8
9 The types of temporary support facilities required include, but not by way of limitation, field offices,
10 storage sheds, fabrication sheds, sanitary facilities, drinking water, first aid facilities, bulletin board,
11 private and public telephones, clocks, thermometer, project identification signs, clean-up facilities,
12 waste disposal service, rodent/pest control and similar miscellaneous general services, all as may be
13 reasonably required for proficient performance of the work and accommodation of personnel at the
14 site. Discontinue and remove temporary support facilities, and make incidental similar use of
15 permanent work of the project, only when and in manner authorized by Architect/ Engineer; and, if not
16 otherwise indicated, immediately before time of substantial completion. Locate temporary support
17 facilities for convenience of users, and for minimum interference with construction activities.
18
19 Contractor's Field Office: Provide adequate office space for field office personnel plus one spare work
20 station for incidental use by subcontractor's personnel, suitably finished, furnished, equipped and
21 conditioned.
22
23 Sanitary Facilities: At Contractor's option, provide either piped (wet) toilet facilities or self-contained
24 toilet units of type acceptable to governing authorities, adequate (at all stages of construction)for use
25 of personnel at project site. Provide separate facilities for male and female personnel when both
26 sexes are working (in any capacity) at project site. Provide wash facilities; except, during time when
27 only earthwork and foundation work are in progress.
28
29 Drinking Water: Provide dispenser-type, electrical-power-cooled drinking water units, either piped with
30 potable water or supplied with bottled water, or portable water containers, adequate in number and
31 locations for personnel at project site. Furnish paper cups and waste receptacles.
32
33 END OF SECTION 01505
TEMPORARY FACILITIES
GDA 01505-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01600- MATERIALS AND EQUIPMENT
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section specifies administrative and procedural requirements governing the Contractor's
14 selection of products for use in the Project.
15
16 The Contractor's Construction Schedule and the Schedule of Submittals are included under Section
17 "Submittals."
18
19 Standards: Refer to Section "Definitions and Standards" for applicability of industry standards to
20 products specified.
21
22 Administrative procedures for handling requests for substitutions made after award of the Contract are
23 included under Section "Product Substitutions."
24
25 DEFINITIONS
26
27 Definitions used in this Article are not intended to change the meaning of other terms used in the
28 Contract Documents, such as "specialties," "systems," "structure," "finishes," "accessories," and
29 similar terms. Such terms such are self-explanatory and have well recognized meanings in the
30 construction industry.
31
32 "Products" are items purchased for incorporation in the Work, whether purchased for the
33 Project or taken from previously purchased stock. The term "product" includes the terms
34 "material,""equipment,""system,"and terms of similar intent.
35
36 "Named Products" are items identified by manufacturer's product name, including
37 make or model designation, indicated in the manufacturer's published product
38 literature, that is current as of the date of the Contract Documents.
39
40 "Foreign Products", as distinguished from"domestic products," are items substantially
41 manufactured (50 percent or more of value) outside of the United States and its
42 possessions; or produced or supplied by entities substantially owned (more than 50
43 percent) by persons who are not citizens of nor living within the United States and its
44 possessions.
45
46 "Materials" are products that are substantially shaped, cut, worked, mixed, finished, refined or
47 otherwise fabricated, processed, or installed to form a part of the Work.
48
49 "Equipment", is a product with operational parts, whether motorized or manually operated, that
50 requires service connections such as wiring or piping.
51
52 SUBMITTALS
53
54 Product List Schedule: Prepare a schedule showing products specified in a tabular form acceptable to
55 the Architect. Include generic names of products required. Include the manufacturer's name and
56 proprietary product names for each item listed.
57
MATERIALS AND EQUIPMENT
GDA 01600- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Coordinate the product list schedule with the Contractor's Construction Schedule and the
2 Schedule of Submittals.
3
4 Form: Prepare the product listing schedule with information on each item tabulated under the
5 following column headings:
6
7 Related Specification Section number.
8 Generic name used in Contract Documents.
9 Proprietary name, model number and similar designations.
10 Manufacturer's name and address.
11 Supplier's name and address.
12 Installer's name and address.
13 Projected delivery date, or time span of delivery period.
14
15 Initial Submittal: Within 30 days after date of commencement of the Work, submit 3 copies of
16 an initial product list schedule. Provide a written explanation for omissions of data, and for
17 known variations from Contract requirements.
18
19 Completed Schedule: Within 60 days after date of commencement of the Work, submit 3
20 copies of the completed product list schedule. Provide a written explanation for omissions of
21 data, and for known variations from Contract requirements.
22
23 Architect's Action: The Architect will respond in writing to the Contractor within 2 weeks of
24 receipt of the completed product list schedule. No response within this time period constitutes
25 no objection to listed manufacturers or products, but does not constitute a waiver of the
26 requirement that products comply with Contract Documents. The Architect's response will
27 include the following:
28
29 A list of unacceptable product selections, containig a brief explanation of reasons for
30 this action.
31
32 QUALITY ASSURANCE
33
34 Source Limitations: To the fullest extent possible, provide products of the same kind, from a single
35 source.
36
37 Foreign Product Limitations: Except under one or more of the following conditions, provide domestic
38 products, not foreign products, for inclusion in the Work:
39
40 No available domestic product complies with the Contract Documents.
41
42 Domestic products that comply with the Contract Documents are available only at prices or terms
43 substantially higher than foreign products that comply with the Contract Documents.
44
45 Nameplates: Except for required labels and operating data, do not attach or imprint manufacturer's or
46 producer's nameplates or trademarks on exposed surfaces of products which will be exposed to view
47 in occupied spaces or on the exterior.
48
49 Labels: Locate required product labels and stamps on a concealed surface or, where
50 required for observation after installation, on an accessible surface that is not conspicuous.
51
52 Equipment Nameplates: Provide a permanent nameplate on each item of service-connected
53 or power-operated equipment. Locate on an easily accessible surface which is inconspicuous
54 in occupied spaces. The nameplate shall contain the following information and other essential
55 operating data:
56
57 Name of product and manufacturer.
MATERIALS AND EQUIPMENT
GDA 01600- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Model and serial number.
2 Capacity.
3 Speed.
4 Ratings.
5
6 PRODUCT DELIVERY, STORAGE, AND HANDLING
7
8 Deliver, store and handle products in accordance with the manufacturer's recommendations, using
9 means and methods that will prevent damage, deterioration and loss, including theft.
10
11 Schedule delivery to minimize long-term storage at the site and to prevent overcrowding of
12 construction spaces.
13
14 Coordinate delivery with installation time to ensure minimum holding time for items that are
15 flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other losses.
16
17 Deliver products to the site in the manufacturer's original sealed container or other packaging
18 system, complete with labels and instructions for handling, storing, unpacking, protecting and
19 installing.
20
21 Inspect products upon delivery to ensure compliance with the Contract Documents, and to
22 ensure that products are undamaged and properly protected.
23
24 Store products at the site in a manner that will facilitate inspection and measurement of
25 quantity or counting of units.
26
27 Store heavy materials away from the Project structure in a manner that will not endanger the
28 supporting construction.
29
30 Store products subject to damage by the elements above ground, under cover in a
31 weathertight enclosure, with ventilation adequate to prevent condensation. Maintain
32 temperature and humidity within range required by manufacturer's instructions.
33
34
35 PART 2 - PRODUCTS
36
37
38 PRODUCT SELECTION
39
40 General Product Requirements: Provide products that comply with the Contract Documents, that are
41 undamaged and, unless otherwise indicated, unused at the time of installation.
42
43 Provide products complete with all accessories, trim, finish, safety guards and other devices
44 and details needed for a complete installation and for the intended use and effect.
45
46 Standard Products: Where available, provide standard products of types that have been
47 produced and used successfully in similar situations on other projects.
48
49 Product Selection Procedures: Product selection is governed by the Contract Documents and
50 governing regulations, not by previous Project experience. Procedures governing product selection
51 include the following:
52
53 Proprietary Specification Requirements: Where only a single product or manufacturer is
54 named, provide the product indicated. No substitutions will be permitted.
55
56 Semiproprietary Specification Requirements: Where two or more products or manufacturers
57 are named, provide one of the products indicated. No substitutions will be permitted.
MATERIALS AND EQUIPMENT
GDA 01600- 3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Where products or manufacturers are specified by name, accompanied by the term
3 "or equal," or "or approved equal" comply with the Contract Document provisions
4 - concerning "substitutions"to obtain approval for use of an unnamed product.
5
6 Descriptive Specification Requirements: Where Specifications describe a product or
7 assembly, listing exact characteristics required, with or without use of a brand or trade name,
8 provide a product or assembly that provides the characteristics and otherwise complies with
9 Contract requirements.
10
11 Performance Specification Requirements: Where Specifications require compliance with
12 performance requirements, provide products that comply with these requirements, and are
13 recommended by the manufacturer for the application indicated. General overall performance
14 of a product is implied where the product is specified for a specific application.
15
16 Manufacturer's recommendations may be contained in published product literature, or
17 by the manufacturer's certification of performance.
18
19 Compliance with Standards, Codes and Regulations: Where the Specifications only require
20 compliance with an imposed code, standard or regulation, select a product that complies with
21 the standards, codes or regulations specified.
22
23 Visual Matching: Where Specifications require matching an established Sample, the
24 Architect's decision will be final on whether a proposed product matches satisfactorily.
25
26 Where no product available within the specified category matches satisfactorily and
27 also complies with other specified requirements, comply with provisions of the
28 Contract Documents concerning "substitutions" for selection of a matching product in
29 another product category, or for noncompliance with specified requirements.
30
31 Visual Selection: Where specified product requirements include the phrase "...as selected
32 from manufacturer's standard colors, patterns, textures..."or a similar phrase, select a product
33 and manufacturer that complies with other specified requirements. The Architect will select
34 the color, pattern and texture from the product line selected.
35
36 Allowances: Refer to individual Specification Sections and "Allowance" provisions in Division-
37 1 for allowances that control product selection, and for procedures required for processing
38 such selections.
39
40
41 PART 3-EXECUTION
42
43
44 INSTALLATION OF PRODUCTS
45
46 Comply with manufacturer's instructions and recommendations for installation of products in the
47 applications indicated. Anchor each product securely in place, accurately located and aligned with
48 other Work.
49
50 Clean exposed surfaces and protect as necessary to ensure freedom from damage and
51 deterioration at time of Substantial Completion.
52
53 END OF SECTION 01600
MATERIALS AND EQUIPMENT
GDA 01600-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SUBSTITUTION REQUEST FORM
2 Project: Substitution Request Number:
3 From:
4 To: Date:
5 NE Project Number:
6 RE: Contract For:
7
8 Specification Title:
9 Section Number _ Page: Article/Line Number:
10
11 Proposed Substitution:
12 Manufacturer: Address: Phone#:
13 Trade Name: Model#:
14 Installer: Address: Phone#:
15 History: H] New Product [ ]2-5 years old [ ] 5-10 years old [ ] More than 10 years old
16 Differences between proposed substitutions and specified product:
17
18
19
20
21 [ ] Point-by-point comparison data attached- REQUIRED BY NE
22
23 Reason for Not Providing Specified Item:
24
25 Similar Installation:
26 Project: Architect:
27 Address: Owner:
28 Date Installed:
29 Proposed substitution affects other parts of Work: [ ] No [ ]Yes; explain
30
31
32
33
34 Savings to Owner for accepting substitution: ($
35 Proposed substitution changes Contract Time: [ ] No [ ]Yes;Add/Deduct days.
36
37 Supporting Data Attached
38 [ ] Product Data [ ] Drawings [ ]Tests [ ] Reports [ ] Samples [ ]
39
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Undersigned certifies:
3 • Proposed substitution has been fully investigated and determined to be equal or
4 superior in all respects to specified product.
5 • Same warranty will be furnished for proposed substitution as for specified product.
6 • Same maintenance service and source of replacement parts, as applicable is available.
7 • Proposed substitution will not affect or delay Progress Schedule.
8 • Cost data as stated above is complete. Claims for additional costs related to accepted substitution
9 which may subsequently become apparent are to be waived.
10 • Proposed substitution does not affect dimensions and functional clearances.
11 • Payment will be made for changes to building design, including architectural or engineering
12 design, detailing, and construction costs caused by the requested substitution.
13 • Coordination, installation, and changes in the Work as necessary for accepted substitution will be
14 complete in all respects.
15
16 Submitted by:
17 Signature:
18 Firm:
19 Address:
20
21
22 Telephone:
23 Attachments:
24
25
26
27
28 ARCHITECT'S REVIEW AND ACTION
29 [ ] Substitution approved - Make submittals in accordance with Specification Section 01300
30 [ ] Substitution approved as noted- Make submittals in accordance with Specification Section 01300
31 [ ] Substitution rejected - Use specified materials
32 [ ] Substitution Request received too late - Use specified materials
33 Signed by: Date:
34
35
36 Additional Comments: [ ] Contractor [ ] Subcontractor [ ] Supplier [ ] Manufacturer [ ] A/E [ ] _
37
38
39
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01631 -PRODUCTS AND SUBSTITUTIONS
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification sections, apply to work of this section.
10
11 DESCRIPTION OF REQUIREMENTS:
12
13 Definitions: Definitions used in this paragraph are not intended to negate the meaning of other terms
14 used in the contract documents, including such terms as, "specialties", "systems", "structure",
15 "finishes", "accessories", "furnishings", "special construction" and similar terms. Such terms are self-
16 explanatory and have recognized meanings in the construction industry.
17
18 "Products" are items purchased for incorporation in the Work, regardless of whether they were
19 specifically purchased for the project or taken from the Contractor's previously purchased
20 stock. The term "product" as used herein includes the terms"material", "equipment", "system"
21 and other terms of similar intent.
22
23 "Named Products" are products identified by use of the manufacturer's name for a
24 product, including such items as a make or model designation, as recorded in
25 published product literature, of the latest issue as of the date of the contract
26 documents.
27
28 "Materials" are products that must be substantially cut, shaped, worked, mixed, finished,
29 refined or otherwise fabricated, processed, or installed to form units of work.
30
31 "Equipment"is defined as a product with operational parts, regardless of whether motorized or
32 manually operated, and in particular, a product that requires service connections such as
33 wiring or piping.
34
35 "Commencement of the Work" for the purposes of this Section only shall be defined as the
36 date of signing of the Owner/Contractor Agreement.
37
38 Substitutions: The Contractor's requests for changes in the products, materials, equipment and
39 methods of construction required by the contract documents are considered requests for
40 "substitutions", and are subject to the requirements specified herein. The following are not considered
41 as substitutions:
42
43 Revisions to the contract documents, where requested by the Owner, Architect or Engineer
44 are considered as"changes" not substitutions.
45
46 Substitutions requested during the bidding period, which have been accepted prior to the
47 Contract Date,are included in the contract documents and are not subject to the requirements
48 for substitutions as herein specified.
49
50 Specified Contractor options on products and construction methods included in the contract
51 documents are choices available to the Contractor and are not subject to the requirements for
52 substitutions as herein specified.
53
54 Except as otherwise provided in the contract documents, the Contractor's determination of
55 and compliance with governing regulations and orders as issued by governing authorities do
56 not constitute "substitutions"and do not constitute a basis for change orders.
57
PRODUCTS AND SUBSTITUTIONS
GDA 01631 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Standards: Refer to Division-1 section "Definitions and Standards" for the applicability of industry
2 standards to the products specified for the project, and for the acronyms used in the text of the
3 specification sections
4
5 QUALITY ASSURANCE:
6
7 Source Limitations: To the fullest extent possible, provide products of the same generic kind, from a
8 single source, for each unit of work.
9
10 When it is discovered that specified products are available only from sources that do not or
11 cannot produce an adequate quantity to complete project requirements in a timely manner,
12 consult with the Architect/Engineer for a determination of what product qualities are most
13 important before proceeding. The Architect/Engineer will designate those qualities, such as
14 visual, structural, durability, or compatibility, that are most important. When the
15 Architect/Engineer's determination has been made, select products from those sources that
16 produce products that possess the most important qualities, to the fullest extent possible.
17
18 Compatibility of Options: Compatibility of products is a basic requirement of product selection. When
19 the Contractor is given the option of selecting between two or more products for use on the project,
20 the product selected must be compatible with other products previously selected, even if the products
21 previously selected were also Contractor options. The complete compatibility between the various
22 choices available to the Contractor is not assured by the various requirements of the Contract
23 documents, but must be provided by the Contractor.
24
25 SUBMITTAL S:
26
27 Product Listing Submittal:
28
29 General: Prepare a product-listing schedule in a form acceptable to the Architect/Engineer.
30 Show names of the principal products required for the work, by generic name. Show
31 proprietary product names and the name of the manufacturer for each item listed that is to be
32 purchased and incorporated into the Work.
33
34 Form: Prepare the product-listing schedule with information on each item tabulated under
35 the following scheduled column headings:
36
37 Generic name as used in contract documents.
38
39 Proprietary name, model number and similar product designation.
40
41 Manufacturer's and supplier's name and city/state addresses.
42
43 Related unit-of-work specification section number.
44
45 Installer's name and primary trade of workmen.
46
47 Projected delivery date, or time span of delivery period.
48
49 Submittal: Submit 3 copies of the product-listing schedule within 30 days after the date of
50 commencement of the Work. Provide a written explanation for omissions of data, and for
51 known variations from contract requirements.
52
53
54 At the Contractor's option, the initial submittal of the product-listing schedule may be
55 limited to product selections and product designations that must be established early
56 in the Contract Time. Submit the completed product-listing schedule within 60 days
57 after commencement of the Work.
PRODUCTS AND SUBSTITUTIONS
GDA 01631 - 2
GDA#12018.00 December 14,2012
Issue for Permit
1
2 Architect/Engineer's Action: The Architect/Engineer will respond to the Contractor in writing within 2
3 weeks of receipt of the product-listing schedule. No response by the Architect/Engineer within the 2
4 week time period constitutes no objection to the listed products or manufacturers, but does not
5 constitute a waiver of the requirement that products comply with the requirements of the contract
6 documents. The Architect/Engineer's response will include the following:
7
8 The Architect/Engineer's listing of unacceptable product selection, if any, containing
9 an explanation of the reasons for this action.
10
11 A request for additional data necessary for the review and possible acceptance of the
12 products and manufacturer's listed.
13
14 SUBMITTALS
15
16 Substitution Request Submittal: The Architect will consider requests for substitution if received within
17 60 days after commencement of the Work. Requests received more than 60 days after
18 commencement of the Work may be considered or rejected at the discretion of the Architect.
19
20 Submit 3 copies of each request for substitution for consideration. Submit requests in the
21 form at the end of this Section and according to procedures required for change-order
22 proposals. Include a change order Proposal Request Form with each substitution request.
23
24 Identify the product or the fabrication or installation method to be replaced in each request.
25 Include related Specification Section and Drawing numbers.
26
27 Provide complete documentation showing compliance with the requirements for substitutions,
28 and the following information, as appropriate:
29
30 Coordination information, including a list of changes or modifications needed to other
31 parts of the Work and to construction performed by the Owner and separate contractors,
32 that will be necessary to accommodate the proposed substitution.
33
34 A detailed comparison of significant qualities of the proposed substitution with those of the
35 Work specified. Significant qualities may include elements, such as performance, weight,
36 size, durability, and visual effect.
37
38 Product Data, including Drawings and descriptions of products and fabrication and
39 installation procedures.
40
41 Samples,where applicable or requested.
42
43 A statement indicating the substitution's effect on the Contractor's Construction Schedule
44 compared to the schedule without approval of the substitution. Indicate the effect of the
45 proposed substitution on overall Contract Time.
46
47 Cost information, including a proposal of the net change, if any in the Contract Sum.
48
49 The Contractor's certification that the proposed substitution conforms to requirements in
50 the Contract Documents in every respect and is appropriate for the applications indicated.
51
52 The Contractor's waiver of rights to additional payment or time that may subsequently
53 become necessary because of the failure of the substitution to perform adequately.
54
55 Architect's Action: If necessary, the Architect will request additional information or
56 documentation for evaluation within one week of receipt of a request for substitution. The
57 Architect will notify the Contractor of acceptance or rejection of the substitution within 2 weeks
PRODUCTS AND SUBSTITUTIONS
GDA 01631 -3
GDA#12018.00 December 14, 2012
Issue for Permit
1 of receipt of the request, or one week of receipt of additional information or documentation,
2 whichever is later. Acceptance will be in the form of a change order.
3
4 Acceptance will be in the form of a change order.
5
6 Rejection will include a statement giving reasons for the rejection.
7
8 Use the product specified if the Architect cannot make a decision on the use of a
9 proposed substitute within the time allocated.
10
11 PRODUCT DELIVERY, STORAGE, AND HANDLING:
12
13 General: Deliver, store, and handle products in accordance with manufacturer's recommendations,
14 using means and methods that will prevent damage, deterioration and loss, including theft. Control to
15 prevent overcrowding of construction spaces. In particular coordinate delivery and installation to
16 ensure minimum holding or storage times for items known or recognized to be flammable, hazardous,
17 easily damaged, or sensitive to deterioration, theft and other sources of loss.
18
19 Deliver products to the site in the manufacturer's sealed container or other packaging system,
20 complete with labels and instructions for handling, storage, unpacking, protecting and
21 installing.
22
23 Store products at the site in a manner that will facilitate inspection and measurement of
24 quantity or counting of units.
25
26 Store heavy materials away from the project structure in a manner that will not endanger the
27 supporting construction.
28
29
30 PART 2 - PRODUCTS
31
32 GENERAL PRODUCT COMPLIANCE:
33
34 General: Requirements for individual products are indicated in the contract documents; compliance
35 with these requirements is in itself a contract requirement. These requirements may be specified in
36 any one of several different specifying methods, or in any combination of these methods. These
37 methods include the following:
38
39 Proprietary.
40 Descriptive.
41 Performance.
42 Compliance with Reference Standards.
43
44 Compliance with codes, compliance with graphic details, allowances, and similar provisions of
45 the contract documents also have a bearing on the selection process.
46
47 Procedures for Selecting Products: The Contractor's options in selecting products are limited by
48 requirements of the contract documents and governing regulations. They are not controlled by
49 industry traditions or procedures experienced by the Contractor on previous construction projects.
50 Required procedures include but are mot limited to the following for the various indicated methods of
51 specifying:
52
53 Proprietary and Semiproprietary Specification Requirements:
54
55 Single Product Name: Where only a single product or manufacturer is named,
56 provide the product indicated, unless the specification indicates the possible
57 consideration of other products. Advise the Architect/Engineer before proceeding,
PRODUCTS AND SUBSTITUTIONS
GDA 01631 -4
GDA#12018.00 December 14, 2012
Issue for Permit
1 when it is discovered that the named product is not a reasonable or a feasible
2 solution.
3
4 Two or More Product Names: Where two or more products or manufacturers are
5 named, provide one of the products named, at the Contractor's option. Exclude
6 products that do not comply with specification requirements. Do not provide or offer
7 to provide an unnamed product, unless the specification indicates possible
8 consideration of other products. Advise the Architect/Engineer before proceeding
9 where none of the named products comply with specification requirements. or are
10 feasible for use.
11
12 Where products or manufacturers are specified by name, accompanied by the term
13 "or-equal" or similar language, comply with the contract document provisions
14 concerning "substitutions" to obtain approval from the Architect/Engineer for the use
15 of an unnamed product.
16
17 Non-Proprietary Specification Requirements: Where the specifications name products or
18 manufacturers that are available and may be incorporated in the Work, but do not restrict the
19 Contractor to the use of these products only,the Contractor may, at his option, use any
20 available product that complies with contract requirements.
21
22 Descriptive Specification Requirements: Where the specifications describe a product or
23 assembly generically, in detail, listing the exact characteristics required, but without use of a
24 brand or trade name, provide products or assemblies that provide the characteristics indicated
25 and otherwise comply with contract requirements.
26
27 Performance Specification Requirements: Where the specifications require compliance with
28 indicated performance requirements, provide products that comply with the specific
29 performance requirements indicated, and that are recommended by the manufacturer for the
30 application indicated. The manufacturer's recommendations may be contained in published
31 product literature, or by the manufacturer's individual certification of performance. General
32 overall performance of a product is implied where the product is specified for specific
33 performances.
34
35 Compliance with Standards, Codes, and Regulations: Where the specifications require only
36 compliance with an imposed standard, code or regulation, the Contractor has the option of
37 selecting a product that complies with specification requirements, including standards, codes,
38 and regulations.
39
40 Visual Matching: Where matching an established sample is required, the final judgement of
41 whether a product proposed by the Contractor matches the sample satisfactorily will be
42 determined by the Architect. Where there is no product available within the specified product
43 category that matches the sample satisfactorily and also complies with other specified
44 requirements, comply with the provisions of the contract documents concerning "substitutions"
45 and "change orders"for the selection of a matching product in another product category, or for
46 non-compliance with specified requirements.
47
48 Visual Selection: Except as otherwise indicated, where specified product requirements
49 include the phrase "++.as selected from the manufacturer's standard colors, patterns,
50 textures++." or similar phrases, the Contractor has the option of selecting the product and
51 manufacturer, provided the selection complies with other specified requirements. The
52 Architect is subsequently responsible for selecting the color, pattern and texture from the
53 product line selected by the Contractor.
54
55 Allowances: Refer to individual sections of the specifications and "Allowances" provisions in
56 Division-1 sections for an indication of product selections that are controlled by established
57 allowances, and for the procedures required for processing such selections.
PRODUCTS AND SUBSTITUTIONS
GDA 01631 -5
■
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Producer's Statement of Applicability: Where individual specification sections indicate products that
3 require a "Statement of Applicability" from the manufacturer or other producer, submit a written-
4 certified statement from the producer stating that the producer has reviewed the proposed application
5 of the product on the project. This statement shall state that the producer agrees with or does not
6 object to the Architect/Engineer's specification and the Contractor's selection of the product for use in
7 the Work. The statement shall also state that the proposed application of the product on the project is
8 suitable and proper.
9
10 SUBSTITUTIONS:
11
12 Conditions: The Contractor's request for a substitution will be received and considered when
13 extensive revisions to the contract documents are not required, when the proposed changes are in
14 keeping with the general intent of the contract documents, when the requests are timely,fully
15 documented and properly submitted, and when one or more of the following conditions is satisfied, all
16 as judged by the Architect/Engineer ; otherwise the requests will be returned without action except to
17 record non-compliance with these requirements.
18
19 The Architect/Engineer will consider a request for substitution where the request is directly
20 related to an "or equal"clause or similar language in the contract documents.
21
22 The Architect/Engineer will consider a request for substitution where the specified product or
23 method cannot be provided within the Contract Time. However, the request will not be
24 considered if the product or method cannot be provided as a result of the Contractor's failure
25 to pursue the work promptly or to coordinate the various activities properly.
26
27 The Architect/Engineer will consider a request for substitution where the specified product or
28 method cannot receive necessary approval by a governing authority, and the requested
29 substitution can be approved.
30
31 The Architect/Engineer will consider a request for a substitution where a substantial
32 advantage is offered the Owner, in terms of cost, time, energy conservation or other
33 considerations of merit, after deducting of offsetting responsibilities the Owner may be
34 required to bear. These additional responsibilities may include such considerations as
35 additional compensation to the Architect/Engineer for redesign and evaluation services, the
36 increased cost of other work by the Owner or separate contractors, and similar
37 considerations.
38
39 The Architect/Engineer will consider a request for substitution when the specified product or
40 method cannot be provided in a manner which is compatible with other materials of the work,
41 and where the Contractor certifies that the
42 the substitution will overcome the incompatibility.
43
44 The Architect/Engineer will consider a request for substitution when the specified product or
45 method cannot be properly coordinated with other materials in the work, and where the
46 Contractor certifies that the proposed substitution can be properly coordinated.
47
48 The Architect/Engineer will consider a request for substitution when the specified product or
49 method cannot receive a warranty as required by the contract documents and where the
50 contractor certifies that the proposed substitution receive the required warranty.
51
52
53 Work-Related Submittals: The Contractor's submittal of and the Architect/Engineer's acceptance of
54 shop drawings, product data or samples which related to work not complying with requirements of the
55 contract documents, does not constitute an acceptable or valid request for a substitution, nor approval
56 thereof.
57
PRODUCTS AND SUBSTITUTIONS
GDA 01631 - 6
A
GDA#12018.00 December 14, 2012
Issue for Permit
1 GENERAL PRODUCT REQUIREMENTS:
2
3 General: Provide products that comply with the requirements of the contract documents that are
4 undamaged and, unless otherwise indicated, unused at the time of installation. Provide products that
5 are complete with all accessories, trim, finish, safety guards and other devices and details needed for
6 a complete installation and for the intended use and effect.
7
8 Standard Products: Where they are available, provide standard products of types that have
9 been produced and used successfully in similar situations on other projects.
10
11 Continued Availability: Where, because of the nature of its application, the Owner is likely to
12 need replacement parts or additional amounts of a product at a later date, either for
13 maintenance and repair or replacement, provide standard, domestically produced products for
14 which the manufacturer has published assurances that the products and its parts are likely to
15 be available to the Owner at a later date.
16
17 Nameplates: Except as otherwise indicated for required labels and operating data, do not
18 permanently attach or imprint manufacturer's or producer's nameplates or trademarks on exposed
19 surfaces of products which will be exposed to view either in occupied spaces or on the exterior of the
20 completed project.
21
22 Labels: Locate required product labels and stamps on a concealed surface or, where
23 required for observation after installation, on an accessible surface which, in occupied spaces,
24 is not conspicuous.
25
26 Equipment Nameplates: Provide a permanent nameplate on each item of service-connected
27 or power-operated equipment. Locate the nameplate on an easily accessible surface which is
28 inconspicuous in occupied spaces. The nameplate shall contain the following information and
29 other essential operating data.
30
31 Name of manufacturer
32 Name of product
33 Model number
34 Serial number
35 Capacity
36 Speed
37 Ratings
38
39
40 PART 3- EXECUTION
41
42 INSTALLATION OF PRODUCTS:
43
44
45 General: Except as otherwise indicated in individual sections of these specifications, comply with the
46 manufacturer's instructions and recommendations for installation of the products in the applications
47 indicated. Anchor each product securely in place, accurately located and aligned with other work.
48 Clean exposed surfaces and protect surfaces as necessary to ensure freedom from damage and
49 deterioration at time of acceptance.
50
51 END OF SECTION 01631
PRODUCTS AND SUBSTITUTIONS
GDA 01631 - 7
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01700- PROJECT CLOSEOUT
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 other Division-1 Specification sections, apply to work of this section.
10
11 DESCRIPTION OF REQUIREMENTS:
12
13 Definitions: Project closeout is the term used to describe certain collective project requirements,
14 indicating completion of the Work that are to be fulfilled near the end of the Contract time in
15 preparation for final acceptance and occupancy of the Work by the Owner, as well as final payment to
16 the Contractor and the normal termination of the Contract.
17
18 Specific requirements for individual units of work are included in the appropriate sections in Divisions
19 2 through 16.
20
21 Time of closeout is directly related to "Substantial Completion"; therefore, the time of closeout may be
22 either a single time period for the entire Work or a series of time periods for individual elements of the
23 Work that have been certified as substantially complete at different dates. This time variation, if any,
24 shall be applicable to the other provisions of this section.
25
26 PREREQUISITES TO SUBSTANTIAL COMPLETION:
27
28 General: Complete the following before requesting the Architect/Engineer's inspection for certification
29 of substantial completion, either for the entire Work or for portions of the Work. List known exceptions
30 in the request.
31
32 In the progress payment request that coincides with, or is the first request following, the date
33 substantial completion is claimed, show either 100% completion for the portion of the Work claimed as
34 "substantially complete", or list incomplete items, the value of incomplete work, and reasons for the
35 Work being incomplete.
36
37 Include supporting documentation for completion as indicated in these contract documents.
38
39 Submit a statement showing an accounting of changes to the Contract Sum.
40
41 Advise Owner of pending insurance change-over requirements.
42
43 Submit specific warranties, workmanship/maintenance bonds, maintenance agreements, final
44 certifications and similar documents.
45
46 Obtain and submit releases enabling Owner's full, unrestricted use of the Work and access to services
47 and utilities. Where required, include occupancy permits, operating certificates and similar releases.
48
49 Deliver tools, spare parts,extra stocks of material and similar physical items to the Owner.
50
51 Make the final change-over of locks and transmit the keys to the Owner. Advise the Owner's
52 personnel of the change-over in security provisions.
53
54 Complete start-up testing of systems, and instruction of the Owner's operating and maintenance
55 personnel. Discontinue or change over and remove temporary facilities and services from the project
56 site, along with construction tools and facilities, mock-ups, and similar elements.
57
PROJECT CLOSEOUT
GDA 01700- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Complete final cleaning up requirements, including touch-up painting of marred surfaces.
2
3 Touch-up and otherwise repair and restore marred exposed finishes.
4
5 Inspection Procedures: Upon receipt of Contractor's request for inspection, the Architect/Engineer will
6 either proceed with inspection or advise Contractor of unfulfilled prerequisites.
7
8 Following the initial inspection, the Architect/Engineer will either prepare the certificate of substantial
9 completion, or will advise Contractor of work which must be performed before the certificate will be
10 issued. The Architect/Engineer will repeat the inspection when requested and when assured that the
11 Work has been substantially completed.
12
13 Results of the completed inspection will form the initial "punch-list"for final acceptance.
14
15 PREREQUISITES TO FINAL ACCEPTANCE:
16
17 General: Complete the following before requesting the Architect/Engineer's final inspection for
18 certification of final acceptance, and final payment as required by the General Conditions. List known
19 exceptions, if any, in request:
20
21 Submit the final payment request with final releases and supporting documentation not previously
22 submitted and accepted. Include certificates of insurance for products and completed operations
23 where required.
24
25 Submit an updated final statement, accounting for final additional changes to the Contract Sum.
26
27 Submit a certified copy of the Architect/Engineer's final punch-list of itemized work to be completed or
28 corrected, stating that each item has been completed or otherwise resolved for acceptance and has
29 been endorsed and dated by the Architect/Engineer.
30
31 Submit final meter readings for utilities, a measured record of stored fuel, and similar data as of the
32 date of substantial completion, or else when the Owner took possession of and responsibility for
33 corresponding elements of the Work.
34
35 Submit consent of surety.
36
37 Submita final liquidated damages settlement statement,acceptable to Owner.
38
39 Submit evidence of final, continuing insurance coverage complying with insurance requirements.
40
41 Reinspection Procedure: The Architect/Engineer will reinspect the Work upon receipt of the
42 Contractor's notice that the work, including punch-list items resulting from earlier inspections, has
43 been completed, except for these items whose completion has been delayed because of
44 circumstances that are acceptable to the Architect/Engineer.
45
46 Upon completion of reinspection, the Architect/Engineer will either prepare a certificate of final
47 acceptance, or will advise the Contractor of work that is incomplete or of obligations that have not
48 been fulfilled, but are required for final acceptance.
49
50 If necessary, the reinspection procedure will be repeated.
51
52 RECORD DOCUMENT SUBMITTALS:
53
54 General: Specific requirements for record documents are indicated in the individual sections of these
55 specifications. Other requirements are indicated in the General Conditions. General submittal
56 requirements are indicated in "submittals"sections.
57
PROJECT CLOSEOUT
GDA 01700-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Do not use record documents for construction purposes; protect from deterioration and loss in a
2 secure, fire-resistive location; provide access to record documents for the Architect/Engineer's
3 reference during normal working hours.
4
5 Record Drawings: Maintain a record set of blue or black line white-prints of contract drawings and
6 shop drawings in a clean, undamaged condition. Mark-up the set of record documents to show the
7 actual installation where the installed work varies substantially from the work as originally shown.
8 Mark whichever drawing is most capable of showing the actual "field" condition fully and accurately;
9 however, where shop drawings are used for mark-up, record a cross-reference at the corresponding
10 location on the working drawings. Give particular attention to concealed work that would be difficult to
11 measure and record at a later date.
12
13 Mark record sets with red erasable pencil and, where feasible, use other colors to distinguish between
14 variations in separate categories of work.
15
16 Mark-up new information which is known to be important to the Owner, but for some reason was not
17 shown on either contract drawings or shop drawings.
18
19 Note related change-order number where applicable.
20
21 Organize record drawing sheets into manageable sets, bind with durable paper cover sheets, and
22 print suitable titles, dates and other identification on cover of each set.
23
24 Record Specifications: Maintain one complete copy of the Project Manual, including specifications
25 and addenda, and one copy of other written construction documents such as change orders and
26 similar modifications issued in printed form during construction. Mark these documents to show
27 substantial variations in the actual work performed in comparison with the text of the specifications
28 and modifications as issued. Give particular attention to substitutions, selection of options and similar
29 information on work where it is concealed or cannot otherwise be readily discerned at a later date by
30 direct observation. Note related record drawing information and product data,where applicable.
31
32 Upon completion of the Work, submit record specifications to the Architect/Engineer for the Owner's
33 records.
34
35 Record Product Data: Maintain one copy of each product data submittal. Mark these documents to
36 show significant variations in the actual Work performed in comparison with the submitted information.
37 Include both variations in the products as delivered to the site, and variations from the manufacturer's
38 instructions and recommendations for installation. Give particular attention to concealed products and
39 portions of the Work which cannot otherwise be readily discerned at a later date by direct observation.
40 Note related change orders and mark-up of record drawings and specifications.
41
42 Upon Completion of mark-up, submit complete set of record product data to the Architect/Engineer for
43 the Owner's records.
44
45 Record Sample Submittal: Immediately prior to date or dates of substantial completion,the Contractor
46 will meet at the site with the Architect/Engineer and the Owner's personnel, if desired, to determine
47 which, if any, of the submitted samples that have been maintained by the Contractor during progress
48 of the Work, are to be transmitted to the Owner for record purposes. Comply with delivery to the
49 Owner's sample storage space.
50
51 Miscellaneous Record Submittals: Refer to other sections of these specifications for requirements of
52 miscellaneous record-keeping and submittals in connection with the actual performance of the Work.
53 Immediately prior to the date or dates of substantial completion, complete miscellaneous records and
54 place in good order, properly identified and bound or filed, ready for continued use and reference.
55 Submit to the Architect/Engineer for the Owner's records.
56
57 Maintenance Manuals: Organize operating and maintenance data into suitable sets of manageable
PROJECT CLOSEOUT
GDA 01700- 3
GDA#12018.00 December 14, 2012
Issue for Permit
1 size. Bind data into individual binders properly identified and indexed. Bind each set of data in a
2 heavy-duty 2-inch, 3-ring vinyl-covered binder, with pocket folders for folded sheet information. Mark
3 the appropriate identification on both front and spine of each binder.
4
5 Include the following types of information in operation and maintenance manuals:
6
7 Emergency instructions.
8 Spare parts listing.
9 Copies of warranties.
10 Wiring diagrams.
11 Recommended "turn-around"cycles.
12 Inspection procedures.
13 Shop drawings and product data.
14
15
16 PART 2 - PRODUCTS (Not Applicable)
17
18 PART 3- EXECUTION
19
20 CLOSEOUT PROCEDURES:
21
22 General Operating and Maintenance Instructions: Arrange for each installer of operating equipment
23 and other work that requires regular or continuing maintenance, to meet at the site with the Owners
24 personnel to provide necessary basic instruction in the proper operation and maintenance of the entire
25 Work. Where installers are not experienced in the required procedures, include instruction by the
26 manufacturer's representatives.
27
28 As part of this instruction provide a detailed review of the following items:
29
30 Maintenance manuals
31 Record documents
32 Spare parts and materials
33 Tools
34 Lubricants
35 Fuels
36 Identification systems
37 Control sequences
38 Hazards
39 Cleaning
40 Warranties, bonds, maintenance agreements and similar continuing committments.
41
42 As part of this instruction for operating equipment demonstrate the following procedures:
43
44 Start-up
45 Shut-down
46 Emergency operations
47 Noise and vibration adjustments
48 Safety procedures
49 Economy and efficiency adjustments
50 Effective and energy utilization
51
52 FINAL CLEANING:
53
54 General: Special cleaning requirements for specific units of Work are included in the appropriate
55 sections of Divisions 2 through 16. General Cleaning during the regular progress of the Work is
56 required by the General Conditions and is included under section "Temporary Facilities".
57
PROJECT CLOSEOUT
GDA 01700-4
GDA#12018.00 December 14,2012
Issue for Permit
1 Cleaning: Provide final cleaning of the Work at the time indicated. Employ experienced workers or
2 professional cleaners for final cleaning. Clean each surface or unit of work to the condition expected
3 from a normal, commercial building cleaning and maintenance program. Comply with the
4 manufacturer's instructions for operations.
5
6 Complete the following cleaning operations before requesting the Architect/Engineer's inspection for
7 certification of substantial completion.
8
9 Remove labels which are not required as permanent labels.
10
11 Clean transparent materials, including mirrors and glass in doors and windows, to a polished
12 condition. Remove putty and other substances which are noticeable as vision-obscuring materials.
13 Replace chipped or broken glass and other damaged transparent materials.
14
15 Clean exposed exterior and interim hard-surfaced finishes to a dust-free condition, free of dust, stains,
16 films and similar noticeable distracting substances. Restore reflective surfaces to their original
17 reflective condition. Leave concrete floors broom clean. Vacuum carpeted surfaces.
18
19 Wipe surfaces of mechanical and electrical equipment clean. Remove excess lubrication and other
20 substances. Clean plumbing fixtures to a sanitary condition. Clean light fixtures and lamps.
21
22 Clean the project site, including landscape development areas and adjacent off-site public streets, of
23 rubbish, litter and foreign substances. Sweep paved areas to a broom-clean condition; remove stains,
24 spills, and other foreign deposits. Rake grounds that are neither paved not planted, to a smooth,
25 even-textured surface.
26
27 Removal of Protection: Except as otherwise indicated or requested by the Architect/Engineer, remove
28 temporary protection devices and facilities which were installed during the course of the work to
29 protect previously completed work during the remainder of the construction period.
30
31 Compliances: Comply with safety standards and governing regulations for cleaning operations. Do
32 not burn waste materials at the site. Do not bury debris or excess materials on the Owner's property.
33 Do not discharge volatile or other harmful or dangerous materials into drainage systems. Remove
34 waste materials from the site and dispose of in a lawful manner.
35
36 Where extra materials of value remaining after completion of associated work have become the
37 Owner's property, dispose of these to the Owner's best advantage as directed.
38
39 END OF SECTION 01700
PROJECT CLOSEOUT
GDA 01700-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 01740-WARRANTIES
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 other Division-1 Specification Sections, apply to this Section.
11
12 SUMMARY
13 This Section specifies general administrative and procedural requirements for warranties required by
14 the Contract Documents, including manufacturer's standard warranties on products and special
15 warranties.
16
17 Refer to the General Conditions for terms of the Contractor's special warranty of workmanship
18 and materials.
19
20 General closeout requirements are included in "Supplementary Conditions."
21
22 Specific requirements for warranties for the Work and products and installation that are
23 specified to be warranted, are included in the individual Sections of Divisions-2 through-16.
24
25 Certifications and other commitments and agreements for continuing services to Owner are
26 specified elsewhere in the Contract Documents.
27
28 Disclaimers and Limitations: Manufacturer's disclaimers and limitations on product warranties do not
29 relieve the Contractor of the warranty on the Work that incorporates the products, nor does it relieve
30 suppliers, manufacturers, and subcontractors required to countersign special warranties with the
31 Contractor.
32
33 Separate Prime Contracts: Each prime Contractor is responsible for warranties related to its own
34 Contract.
35
36 WARRANTY REQUIREMENTS
37
38 Related Damages and Losses: When correcting warranted Work that has failed, remove and replace
39 other Work that has been damaged as a result of such failure or that must be removed and replaced
40 to provide access for correction of warranted Work.
41
42 Reinstatement of Warranty: When Work covered by a warranty has failed and been corrected by
43 replacement or rebuilding, reinstate the warranty by written endorsement. The reinstated warranty
44 shall be equal to the original warranty with an equitable adjustment for depreciation.
45
46 Replacement Cost: Upon determination that Work covered by a warranty has failed, replace or
47 rebuild the Work to an acceptable condition complying with requirements of Contract Documents. The
48 Contractor is responsible for the cost of replacing or rebuilding defective Work regardless of whether
49 the Owner has benefited from use of the Work through a portion of its anticipated useful service life.
50
51 Owner's Recourse: Written warranties made to the Owner Developer are in addition to implied
52 warranties, and shall not limit the duties, obligations, right and remedies otherwise available under the
53 law, nor shall warranty periods be interpreted as limitations on time in which the Owner can enforce
54 such other duties, obligations, rights,or remedies.
55
56 Rejection of Warranties: The Developer reserves the right to reject warranties and to limit
57 selections to products with warranties not in conflict with requirements of the Contract
WARRANTIES
GDA 01740- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Documents.
2
3 The Developer reserves the right to refuse to accept Work for the Project where a special warranty,
4 certification, or similar commitment is required on such Work or part of the Work, until evidence is
5 presented that entities required to countersign such commitments are willing to do so.
6
7 SUBMITTALS
8
9 Submit written warranties to the Architect thirty working days prior to the date certified for Substantial
10 Completion. If the Architect's Certificate of Substantial Completion designates a commencement date
11 for warranties other than the date of Substantial Completion for the Work, or a designated portion of
12 the Work, submit written warranties upon request of the Architect.
13
14 When a designated portion of the Work is completed and occupied or used by the Owner, by
15 separate agreement with the Contractor during the construction period, submit properly
16 executed warranties to the Architect within fifteen days of completion of that designated
17 portion of the Work.
18
19 When a special warranty is required to be executed by the Contractor, or the Contractor and a
20 subcontractor, supplier or manufacturer, prepare a written document that contains appropriate terms
21 and identification, ready for execution by the required parties. Submit a draft to the Developer through
22 the Architect for approval prior to final execution.
23
24 Refer to individual Sections of Divisions-2 through -16 for specific content requirements, and
25 particular requirements for submittal of special warranties.
26
27 Form of Submittal: At Final Completion compile two copies of each required warranty and bond
28 properly executed by the Contractor, or by the Contractor, subcontractor, supplier, or manufacturer.
29 Organize the warranty documents into an orderly sequence based on the table of contents of the
30 Project Manual.
31
32 Bind warranties in heavy-duty, commercial quality, durable 3-ring vinyl covered loose-leaf binders,
33 thickness as necessary to accommodate contents, and sized to receive 8-1/2" by 11" paper.
34
35 Provide heavy paper dividers with celluloid covered tabs for each separate warranty.
36 Mark the tab to identify the product or installation. Provide an index and a typed
37 description of the product or installation, including the name of the product, and the
38 name, address and telephone number of the installer.
39
40 Identify each binder on the front and the spine with the typed or printed title
41 "WARRANTIES,"the Project title or name, and the name of the Contractor.
42
43 When operating and maintenance manuals are required for warranted construction, provide
44 additional copies of each required warranty, as necessary, for inclusion in each required
45 manual.
46
47
48 PART 2 - PRODUCTS (not applicable).
49
50
51 PART 3- EXECUTION (not applicable).
52
53
54 SCHEDULE OF WARRANTIES
55
56 Schedule: Provide warranties and bonds on products and installations as specified in, but not limited
57 to the following Sections:
WARRANTIES
GDA 01740- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Hollow Metal Doors: Section 08110
3
4 Flush Wood Doors: Section 08211
5
6 Counter Shutters Section 08360
7
8 Aluminum Storefront: Section 08410
9
10 Finish Hardware Section 08710
11
12 Glass: Section 08800
13
14 Mirrors: Section 08830
15
16 Carpet Tile Section 09681
17
18 Toilet Accessories Section 10800
19
20 HVAC Units: Division 16
21
22
23 END OF SECTION 01740
WARRANTIES
GDA 01740-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 02070-SELECTIVE DEMOLITION
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of the Contract, including General and Supplementary Conditions
9 and Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section includes the following:
14
15 Demolition and removal of selected building and site elements where applicable.
16 Patching and repairs.
17
18 Related Sections: The following Sections contain requirements that relate to this Section:
19
20 Division 1 Section "Summary of Work"for use of the building and phasing requirements.
21 Division 1 Section "Cutting and Patching" for cutting and patching procedures for selective
22 demolition operations.
23 Division 1 Section "Contract Closeout"for record document requirements.
24 Division 6 Section "Rough Carpentry" for material and construction requirements for
25 temporary enclosures.
26
27 DEFINITIONS
28
29 Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged,
30 or to remain the Owner's property.
31
32 Remove and Salvage: Items indicated to be removed and salvaged remain the Owner's property.
33 Remove, clean, and pack or crate items to protect against damage. Identify contents of containers
34 and deliver to Owner's designated storage area.
35
36 Remove and Reinstall: Remove items indicated; clean, service, and otherwise prepare them for
37 reuse; store and protect against damage. Reinstall items in the same locations or in locations
38 indicated.
39
40 Existing to Remain: Protect construction indicated to remain against damage and soiling during
41 selective demolition. When permitted by the Architect, items may be removed to a suitable,
42 protected storage location during selective demolition and then cleaned and reinstalled in their
43 original locations.
44
45 MATERIALS OWNERSHIP
46
47 Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated
48 to remain the Owner's property, demolished materials shall become the Contractor's property and
49 shall be removed from the site with further disposition at the Contractor's option.
50
51 SUBMITTALS
52
53 General: Submit each item in this Article according to the Conditions of the Contract and
54 Division 1 Specification Sections,for information only, unless otherwise indicated.
55
56 Schedule of selective demolition activities indicating the following:
57
SELECTIVE DEMOLITION
GDA 02070- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Detailed sequence of selective demolition and removal work, with starting and ending dates
2 for each activity.
3 Interruption of utility services.
4 Coordination for shutoff, capping, and continuation of utility services.
5 Use of elevator and stairs.
6
7 Photographs or videotape, sufficiently detailed, of existing conditions of adjoining construction and
8 site improvements that might be misconstrued as damage caused by selective demolition
9 operations.
10
11 Record drawings at Project closeout according to Division 1 Section "Contract Closeout."
12
13 Identify and accurately locate capped utilities and other subsurface structural, electrical, or
14 mechanical conditions.
15
16 QUALITY ASSURANCE
17
18 Demolition Firm Qualifications: Engage an experienced firm that has successfully completed
19 selective demolition Work similar to that indicated for this Project.
20
21 Regulatory Requirements: Comply with governing EPA notification regulations before starting
22 selective demolition. Comply with hauling and disposal regulations of authorities having
23 jurisdiction.
24
25 Predemolition Conference: Conduct conference at Project site to comply with preinstallation
26 conference requirements of Division 1 Section "Project Meetings."
27
28 PROJECT CONDITIONS
29
30 Owner assumes no responsibility for actual condition of buildings to be selectively demolished.
31
32 Conditions existing at time of inspection for bidding purpose will be maintained by Owner as
33 far as practical.
34
35 Asbestos: It is not expected that asbestos will be encountered in the Work. If any materials
36 suspected of containing asbestos are encountered, do not disturb the materials. Immediately
37 notify the Architect and the Owner.
38
39 Asbestos will be removed by Owner before start of Work.
40
41 Storage or sale of removed items or materials on-site will not be permitted.
42
43 SCHEDULING
44
45 Arrange selective demolition schedule so as not to interfere with Owner's on-site operations.
46
47 WARRANTY
48
49 Existing Special Warranty: Remove, replace, patch, and repair materials and surfaces cut or
50 damaged during selective demolition, by methods and with materials so as not to void existing
51 warranties.
52
53
54 PART 2- PRODUCTS (Not Applicable)
55
56
57 REPAIR MATERIALS
SELECTIVE DEMOLITION
GDA 02070-2
GDA#12018.00 December 14,2012
Issue for Permit
1
2 Use repair materials identical to existing materials.
3
4 Where identical materials are unavailable or cannot be used for exposed surfaces, use
5 materials that visually match existing adjacent surfaces to the fullest extent possible.
6 Use materials whose installed performance equals or surpasses that of existing materials.
7
8
9 PART 3-EXECUTION
10
11
12 EXAMINATION
13
14 Verify that utilities have been disconnected and capped.
15
16 Survey existing conditions and correlate with requirements indicated to determine extent of
17 selective demolition required.
18
19 Inventory and record the condition of items to be removed and reinstalled and items to be removed
20 and salvaged.
21
22 When unanticipated mechanical, electrical, or structural elements that conflict with the intended
23 function or design are encountered, investigate and measure the nature and extent of the conflict.
24 Promptly submit a written report to the Architect.
25
26 Survey the condition of the building to determine whether removing any element might result in
27 structural deficiency or unplanned collapse of any portion of the structure or adjacent structures
28 during selective demolition.
29
30 Perform surveys as the Work progresses to detect hazards resulting from selective demolition
31 activities.
32
33 UTILITY SERVICES
34
35 Maintain existing utilities indicated to remain in service and protect them against damage during
36 selective demolition operations.
37
38 Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services
39 serving building to be selectively demolished.
40
41 Owner will arrange to shut off indicated utilities when requested by Contractor.
42 Arrange to shut off indicated utilities with utility companies.
43 Where utility services are required to be removed, relocated, or abandoned, provide bypass
44 connections to maintain continuity of service to other parts of the building before proceeding
45 with selective demolition.
46 Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal the
47 remaining portion of pipe or conduit after bypassing.
48
49 Utility Requirements: Refer to Division 15 and 16 Sections for shutting off, disconnecting,
50 removing, and sealing or capping utility services. Do not start selective demolition work until utility
51 disconnecting and sealing have been completed and verified in writing.
52
53 PREPARATION
54
55 Drain, purge, or otherwise remove, collect, and dispose of chemicals, gases, explosives, acids,
56 flammables, or other dangerous materials before proceeding with selective demolition operations.
57
SELECTIVE DEMOLITION
GDA 02070-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Employ a certified, licensed exterminator to treat building and to control rodents and vermin before
2 and during selective demolition operations.
3
4 Conduct demolition operations and remove debris to ensure minimum interference with roads,
5 streets,walks, and other adjacent occupied and used facilities.
6
7 Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without
8 permission from Owner and authorities having jurisdiction. Provide alternate routes around
9 closed or obstructed traffic ways if required by governing regulations.
10
11 Conduct demolition operations to prevent injury to people and damage to adjacent buildings and
12 facilities to remain. Ensure safe passage of people around selective demolition area.
13
14 Erect temporary protection, such as walks, fences, railings, canopies, and covered
15 passageways,where required by authorities having jurisdiction.
16 Protect existing site improvements, appurtenances, and landscaping to remain.
17 Provide temporary weather protection, during interval between demolition and removal of
18 existing construction, on exterior surfaces and new construction to ensure that no water
19 leakage or damage occurs to structure or interior areas.
20 Protect walls, ceilings, floors, and other existing finish work that are to remain and are
21 exposed during selective demolition operations.
22
23 Provide and maintain interior and exterior shoring, bracing, or structural support to preserve
24 stability and prevent movement, settlement, or collapse of building to be selectively demolished.
25
26 Strengthen or add new supports when required during progress of selective demolition.
27
28 POLLUTION CONTROLS
29
30 Use water mist, temporary enclosures, and other suitable methods to limit the spread of dust and
31 dirt. Comply with governing environmental protection regulations.
32
33 Do not use water when it may damage existing construction or create hazardous or
34 objectionable conditions, such as ice,flooding, and pollution.
35
36 Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and
37 areas.
38
39 Remove debris from elevated portions of building by chute, hoist, or other device that will
40 convey debris to grade level.
41
42 Clean adjacent structures and improvements of dust, dirt, and debris caused by selective
43 demolition operations. Return adjacent areas to condition existing before start of selective
44 demolition.
45
46 SELECTIVE DEMOLITION
47
48 Demolish and remove existing construction only to the extent required by new construction and as
49 indicated. Use methods required to complete Work within limitations of governing regulations and
50 as follows:
51
52 Proceed with selective demolition systematically, from higher to lower level. Complete
53 selective demolition work above each floor or tier before disturbing supporting members on
54 lower levels.
55 Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting
56 methods least likely to damage construction to remain or adjoining construction. To
SELECTIVE DEMOLITION
GDA 02070-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 minimize disturbance of adjacent surfaces, use hand or small power tools designed for
2 sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3
4 Cut or drill from the exposed or finished side into concealed surfaces to avoid marring
5 existing finished surfaces.
6
7 Do not use cutting torches until work area is cleared of flammable materials. At concealed
8 spaces, such as duct and pipe interiors, verify condition and contents of hidden space
9 before starting flame-cutting operations. Maintain portable fire-suppression devices during
10 flame-cutting operations.
11
12 Maintain adequate ventilation when using cutting torches.
13
14 Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and
15 promptly dispose of off-site.
16
17 Remove structural framing members and lower to ground by method suitable to avoid free
18 fall and to prevent ground impact or dust generation.
19
20 Locate selective demolition equipment throughout the structure and remove debris and
21 materials so as not to impose excessive loads on supporting walls, floors, or framing.
22
23 Dispose of demolished items and materials promptly. On-site storage or sale of removed
24 items is prohibited.
25
26 Return elements of construction and surfaces to remain to condition existing before start of
27 selective demolition operations.
28
29 Demolish concrete and masonry in small sections. Cut concrete and masonry at junctures with
30 construction to remain, using power-driven masonry saw or hand tools; do not use power-driven
31 impact tools.
32
33 Remove no more existing roofing than can be covered in one day by new roofing work. See
34 applicable Division 7 Section for new roofing requirements.
35
36 Remove existing walls as indicated on the Drawings.
37
38 Cut and trench existing concrete floor as indicated on the Drawings or as required for new
39 electrical wiring and communication cabling.
40
41 PATCHING AND REPAIRS
42
43 Promptly patch and repair holes and damaged surfaces caused to adjacent construction by
44 selective demolition operations.
45
46 Patching is specified in Division 1 Section "Cutting and Patching."
47
48 Where repairs to existing surfaces are required, patch to produce surfaces suitable for new
49 materials.
50
51 Completely fill holes and depressions in existing masonry walls to remain with an approved
52 masonry patching material, applied according to manufacturer's printed recommendations.
53
54 Restore exposed finishes of patched areas and extend finish restoration into adjoining construction
55 to remain in a manner that eliminates evidence of patching and refinishing.
56
SELECTIVE DEMOLITION
GDA 02070-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 Patch and repair floor and wall surfaces in the new space where demolished walls or partitions
2 extend one finished area into another. Provide a flush and even surface of uniform color and
3 appearance.
4
5 Closely match texture and finish of existing adjacent surface.
6 Patch with durable seams that are as invisible as possible. Comply with specified
7 tolerances.
8 Where patching smooth painted surfaces, extend final paint coat over entire unbroken
9 surface containing the patch after the surface has received primer and second coat.
10 Remove existing floor and wall coverings and replace with new materials, if necessary, to
11 achieve uniform color and appearance.
12 Inspect and test patched areas to demonstrate integrity of the installation, where feasible.
13
14 DISPOSAL OF DEMOLISHED MATERIALS
15
16 General: Promptly dispose of demolished materials. Do not allow demolished materials to
17 accumulate on-site.
18
19 Burning: Do not burn demolished materials.
20
21 Disposal: Transport demolished materials off Owner's property and legally dispose of them.
22
23 CLEANING
24
25 Sweep the building broom clean on completion of selective demolition operation.
26
27 Change filters on air-handling equipment on completion of selective demolition operations.
28
29
30 END OF SECTION 02070
31
SELECTIVE DEMOLITION
GDA 02070- 6
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 02580-TRAFFIC MARKING PAINT
2
3
4 PART 1 -GENERAL
5
6 WORK INCLUDED:
7
8 Pavement marking over exterior pavement.
9
10 RELATED WORK:
11
12 Concrete- Division 3
13
14 SUBMITTALS:
15
16 Submit manufacturer's product specification and installation instructions for marking paint in
17 accordance with Section 01300.
18
19 JOB CONDITIONS:
20
21 Do not apply marking paint when weather is foggy or rainy, or ambient or pavement temperatures are
22 below 40 degrees F., nor when such conditions are anticipated during eight hours after application.
23
24
25 PART 2- PRODUCTS
26
27
28 MARKING PAINT:
29
30 Non-bleeding pigmented copolymer latex emulsion traffic marking paint with non-volatiles by weight of
31 not less than: 49%-White, 50%-Yellow, 42%- Red.
32
33 Fire Lanes Red
34 Parking Spaces White
35 Handicapped Parking Symbol White
36
37 EQUIPMENT:
38
39 Exterior Pavements:
40
41 Pressurized, self-contained paint machine capable of applying a straight line from 2 in. to 6 in. wide,
42 with consistent coverage of a minimum of 150 sq. ft. per gallon.
43
44
45 PART 3- EXECUTION
46
47
48 INSPECTION AND PREPARTION:
49
50 Locate markings as shown on Drawings. Provide qualified technician to supervise equipment and
51 application of markings. Lay out markings using guide lines, templates, and forms.
52
53 Thoroughly clean surfaces free of dirt, sand, gravel, oil and other foreign materials.
54
55 Allow concrete to cure before painting as recommended by manufacturer of marking paint.
56
57 APPLICATION:
TRAFFIC MARKING PAINT
GDA 02580- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Apply marking paint at rate of one gallon per 200 sq. ft. (equivalent to approximately one gallon for
3 450 lineal feet of 4 in. wide stripe).
4
5 Apply marking paint straight and uniform.
6
7 END OF SECTION 02580
TRAFFIC MARKING PAINT
GDA 02580-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 02820 - CHAIN-LINK FENCES AND GATES
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of the Contract, including General and Supplementary Conditions
9 and Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section includes the following:
14
15 Galvanized steel chain-link fabric.
16 Galvanized steel framework and accessories.
17 Gates: Manual swing gate.
18 Motor operated, horizontal cantilever slide.
19
20 RELATED SECTIONS
21
22 Section 02825- Gate Operator
23 Section 02515 - Portland Cement Concrete Pavement
24 Section 03300 -Cast-in-Place Concrete
25
26 DEFINITIONS
27
28 CLFMI: Chain Link Fence Manufacturers Institute.
29
30 PERFORMANCE REQUIREMENTS
31
32 Structural Performance: Provide chain-link fences and gates capable of withstanding the effects of
33 gravity loads and the following loads and stresses within limits and under conditions indicated:
34
35 Minimum Post Size and Maximum Spacing for Wind Velocity Pressure: Determine based on
36 mesh size and pattern specified, and on the following minimum design wind pressures and
37 according to CLFMI WLG 2445:
38
39 Wind Speed: a0 mpn.
40
41 Fence Height: 8-feet.
42
43 Line Post Group: IA, ASTM F 1043, Schedule 40 steel pipe.
44
45 Wind Exposure Category: C.
46
47 Post spacing not to exceed 10 feet(3 m).
48
49 Lightning Protection System: Maximum grounding-resistance value of 25 ohms under normal dry
50 conditions, unless local power utility company requirements specify differently.
51
52 All local power utility requirements must be performed.
53
54 SUBMITTALS
55
56 Product Data: Material descriptions, construction details, dimensions of individual components and
57 profiles, and finishes for the following:
CHAIN-LINK FENCES AND GATES
GDA 02820 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Fence and gate posts, rails, and fittings.
3 Chain-link fabric, reinforcements, and attachments.
4 Gates and hardware.
5
6 Shop Drawings: Show locations of fence, each gate, posts, rails, and tension wires and details of
7 extended posts, extension arms, gate swing, or other operation, hardware, and accessories. Include
8 plans, elevations. Indicate materials, dimensions, sizes, weights, and finishes of components,
9 sections, gate swing and other required installation and operational clearances, and details of post
10 anchorage and attachment and bracing.
11
12 Lightning Protection System: Include all grounding rod locations, bonding details and all related
13 conditions.
14
15 Include local power utility grounding requirements.
16
17 Samples for Verification: For the following products, in sizes indicated, showing the full range of
18 color, texture, and pattern variations expected. Prepare Samples from the same material to be used
19 for the Work.
20
21 Product Certificates: Signed by manufacturers of chain-link fences and gates certifying that products
22 furnished comply with requirements.
23
24 Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate
25 their capabilities and experience. Include lists of completed projects with project names and
26 addresses, names and addresses of architects and owners, and other information specified.
27
28 Field Test Reports: Indicate and interpret test results for compliance of chain-link fence and gate
29 grounding and bonding with performance requirements.
30
31 QUALITY ASSURANCE
32
33 Installer Qualifications: An experienced installer who has completed chain-link fences and gates
34 similar in material, design, and extent to those indicated for this Project and whose work has resulted
35 in construction with a record of successful in-service performance.
36
37 Source Limitations for Chain-Link Fences and Gates: Obtain each color, grade, finish, type, and
38 variety of component for chain-link fences and gates from one source with resources to provide
39 chain-link fences and gates of consistent quality in appearance and physical properties.
40
41 PROJECT CONDITIONS
42
43 Field Measurements: Verify layout information for chain-link fences and gates shown on Drawings in
44 relation to property survey and existing structures. Verify dimensions by field measurements.
45
46
47 PART 2-PRODUCTS
48
49 MANUFACTURERS
50
51 Manufacturers: Subject to compliance with requirements, provide products by one of the following:
52
53 Master Halco
54 Merchant Metals
55 Security Fence Mfg.
56
CHAIN-LINK FENCES AND GATES
GDA 02820-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 CHAIN-LINK FENCE FABRIC
2
3 Steel Chain-Link Fence Fabric: Provide fabric fabricated in one-piece widths for fencing in height to
4 underside of structure above at location shown on Architectural Plans and height indicated for site
5 fencing. Comply with CLFMI's "Product Manual" and with requirements indicated below:
6
7 Mesh and Wire Size: 2-inch (50-mm) mesh, 0 192-inch (4.88-mm) diameter.
8
9 Zinc-Coated Fabric: ASTM A 392, with zinc coating applied to steel wire before weaving
10 according to ASTM A 817, Type II, zinc coated (galvanized) with the following minimum
11 coating weight:
12
13 Class 1: Not less than 1 2 oz./sq. ft. (366 g/sq. of uncoated wire surface.
14
15 Selvage: Twisted top and knuckled bottom.
16
17 FENCE FRAMING
18
19 Round Steel Pipe: Standard weight, Schedule 40, galvanized steel pipe complying with
20 ASTM F 1083. Comply with ASTM F 1043, Material Design Group IA, external and internal coating
21 Type A, consisting of not less than 1.8-oz./sq. ft. zinc; and the following strength and stiffness
22 requirements:
23
24 Line, End, Corner, and Pull Posts and Top Rail: Per requirements for Light Industrial Fence.
25
26 Coatings: Type A, consisting of not less than minimum 2.0-oz./sq. ft. (0.61-kg/sq. m)
27 average zinc coating per ASTM A 123/A 123M or 4.0-oz./sq. ft. (1.22-kg/sq. m) zinc coating
28 per ASTM A 653/A 653M.
29
30 Post Brace Rails: Match top rail for coating and strength and stiffness requirements. Provide brace
31 rail with truss rod assembly for each gate, end, and pull post. Provide two brace rails extending in
32 opposing directions, each with truss rod assembly, for each corner post and for pull posts. Provide
33 rail ends and clamps for attaching rails to posts.
34
35 Top Rails: Fabricate top rail from lengths 21 feet or longer, with swedged-end or fabricated for
36 expansion-type coupling, forming a continuous rail along top of chain-link fabric. Match top rail for
37 coating and strength and stiffness requirements
38
39 Intermediate Rails: Match top rail for coating and strength and stiffness requirements.
40
41 Bottom Rails: Match top rail for coating and strength and stiffness requirements.
42
43 TENSION WIRE
44
45 Metallic-Coated Steel Wire: 0.177-inch- (4.5-mm-) diameter, marcelled tension wire complying with
46 ASTM A 817 and ASTM A 824, with the following metallic coating:
47
48 Type II, zinc coated (galvanized) by [hot-dip] [electrolytic] process, with the following
49 minimum coating weight:
50
51 Matching chain-link fabric coating weight.
52
53 SWING GATES
54
55 General: Comply with ASTM F 900 for the following swing-gate types:
56
57 Single gate.
CHAIN-LINK FENCES AND GATES
GDA 02820- 3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Double gate
3
4 Metal Pipe and Tubing: Galvanized steel. Comply with ASTM F 1083 and ASTM F 1043 for
5 materials and protective coatings.
6
7 Frames and Bracing: Fabricate members from round, galvanized steel tubing with outside
8 dimension and weight according to ASTM F 900 for the following gate fabric height:
9
10 Gate Fabric Height: 8-feet.
11
12 Frame Corner Construction: As follows:
13
14 Welded or assembled with corner fittings and 5/16-inch- diameter, adjustable truss rods for
15 panels 5 feet wide or wider.
16
17 Gate Posts: Fabricate members from round galvanized steel pipe with outside dimension and
18 weight according to ASTM F 900 for the following gate fabric heights and leaf widths:
19
20 Gate Fabric Height by Leaf Width: 6 feet by not over 15 feet.
21
22 Extended Gate Frame Members: Extend gate frame end members above top of chain-link fabric at
23 both ends of gate frame 12 inches(300 mm)as required to attach barbed wire assemblies.
24
25 Hardware: Latches permitting operation from both sides of gate, and hinges. Fabricate latches with
26 integral eye openings for padlocking; padlock accessible from both sides of gate. Cane bolts for
27 double gates.
28
29 HORIZONTAL—CANTILEVER SLIDE GATE S
30
31 General: Comply with ASTM F 1184 for gate posts and single sliding gate types. Provide automated
32 vehicular gates that comply with ASTM F 2200.
33
34 Classification: Type II Cantilever Slide, Class 1 with external roller assemblies.
35
36 Gate Frame Width and Height: As indicated on the Drawings
37
38 Pipe and Tubing:
39
40 Zinc-Coated Steel: Protective coating and finish to match fence framing.
41
42 Gate Posts: Comply with ASTM F 1184. Provide round tubular steel posts.
43
44 Gate Frames and Bracing: Round tubular steel.
45
46 Frame Corner Construction: Welded.
47
48 Hardware:
49
50 Hangers, roller assemblies, and stops fabricated from galvanized steel.
51
52 HORIZONTAL—OVERHEAD RAIL SLIDE GATES
53
54 General: Comply with ASTM F 1184 for gate posts and single sliding gate types.
55
56 Classification: Type I Overhead Slide.
57
CHAIN-LINK FENCES AND GATES
GDA 02820-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 Gate Leaf Width: As indicated.
2
3 Gate Frame Width and Height: As indicated on the Drawings
4
5 Pipe and Tubing:
6
7 Zinc-Coated Steel: Protective coating and finish to match fence framing.
8
9 Gate Posts: Comply with ASTM F 1184. Provide round tubular steel posts.
10
11 Gate Frames and Bracing: Round tubular steel.
12
13 Frame Corner Construction: Welded.
14
15 Hardware:
16
17 Hangers, roller assemblies, and stops fabricated from galvanized steel.
18
19 FITTINGS
20
21 General: Provide fittings for a complete fence installation, including special fittings for corners.
22 Comply with ASTM F 626.
23
24 Galvanized coating.
25
26 Post and Line Caps: Hot-dip galvanized pressed steel. Provide weathertight closure cap for each
27 post.
28
29 Rail and Brace Ends: Hot-dip galvanized pressed steel. Provide rail ends or other means for
30 attaching rails securely to each gate, corner, pull, and end post.
31
32 Rail Fittings: Provide the following:
33
34 Top Rail Sleeves: Hot-dip galvanized pressed steel. Not less than 6 inches long.
35
36 Rail Clamps: Hot-dip galvanized pressed steel. Provide line and corner boulevard clamps
37 for connecting intermediate and bottom rails in the fence line to line posts.
38
39 Tie Wires, Clips, and Fasteners: According to ASTM F 626.
40
41 Standard Round Wire Ties: For attaching chain-link fabric to posts, rails, and frames,
42 complying with the following:
43
44 Hot-Dip Galvanized Steel: 148-inch- (3 76-mm-) diameter wire; galvanized
45 coating thickness matching coating thickness of chain-link fence fabric.
46
47 FENCE GROUNDING
48
49 Conductors: Bare, solid wire for No. 6 AWG and smaller; stranded wire for No. 4 AWG and larger.
50
51 Material above Finished Grade: Copper.
52
53 Material on or below Finished Grade: Copper.
54
55 Bonding Jumpers: Braided copper tape, 1 inch (25 mm) wide, woven of No. 30 AWG bare copper
56 wire, terminated with copper ferrules.
57
CHAIN-LINK FENCES AND GATES
GDA 02820- 5
GDA#12018.00 December 14, 2012
Issue for Permit
1 Connectors and Grounding Rods: Comply with UL 467.
2
3 Connectors for Below-Grade Use: Exothermic welded type.
4
5 Grounding Rods: Copper-clad steel.
6
7 Size: `='8 by 96 inches (16 by 2440 mm).
8
9 GROUT AND ANCHORING CEMENT
10
11 Nonshrink, Nonmetallic Grout: Premixed, factory-packaged, nonstaining, noncorrosive, nongaseous
12 grout complying with ASTM C 1107. Provide grout, recommended in writing by manufacturer, for
13 exterior applications.
14
15
16 PART 3 - EXECUTION
17
18 EXAMINATION
19
20 Examine areas and conditions and other conditions affecting performance.
21
22 Proceed with installation only after unsatisfactory conditions have been corrected.
23
24 PREPARATION
25
26 Stake locations of fence lines, gates, and terminal posts.
27
28 INSTALLATION, GENERAL
29
30 General: Install chain-link fencing to comply with ASTM F 567 and more stringent requirements
31 specified.
32
33 Interior Posts Set into Concrete in Voids: Form or core drill holes not less than 5 deep and
34 3/4 inch larger than OD of post. Clean holes of loose material, insert posts, and fill annular
35 space between post and concrete with nonshrink, nonmetallic grout mixed and placed to
36 comply with anchoring material manufacturer's written instructions, and finished sloped to
37 drain water away from post.
38
39 Exterior Post Setting: Set posts in concrete at indicated spacing into firm, undisturbed soil.
40
41 Verify that posts are set plumb, aligned, and at correct height and spacing, and hold
42 in position during setting with concrete.
43
44 Concrete Fill: Place concrete around posts to dimensions indicated and vibrate or
45 tamp for consolidation. Protect aboveground portion of posts from concrete splatter.
46
47 Exposed Concrete: Extend 2 inches (50 mm) above grade; shape and
48 smooth to shed water.
49
50 CHAIN-LINK FENCE INSTALLATION
51
52 Post Excavation: Drill or hand-excavate holes for posts to diameters and spacings indicated, in firm,
53 undisturbed soil.
54
55 Terminal Posts: Locate terminal end, corner, and gate posts per ASTM F 567 and terminal pull
56 posts at changes in horizontal or vertical alignment.
57
CHAIN-LINK FENCES AND GATES
GDA 02820-6
GDA#12018.00 December 14,2012
Issue for Permit
1 Line Posts: Space line posts uniformly per manufactures recommendations.
2
3 Post Bracing Assemblies: Install according to ASTM F 567, maintaining plumb position and
4 alignment of fencing. Install braces at end and gate posts and at both sides of corner and pull posts.
5 Locate horizontal braces at mid-height of fabric on fences with top rail and at two-thirds fabric height
6 on fences without top rail. Install so posts are plumb when diagonal rod is under proper tension.
7
8 Top Rail: Install according to ASTM F 567, maintaining plumb position and alignment of fencing.
9 Run rail continuously through line post caps, bending to radius for curved runs and terminating into
10 rail end attached to posts or post caps fabricated to receive rail at terminal posts. Provide expansion
11 couplings as recommended by fencing manufacturer.
12
13 Intermediate Rails: Install in one piece at post-height center span, spanning between posts, using
14 fittings, special offset fittings, and accessories.
15
16 Bottom Rails(Base Bid): Install, spanning between posts, using fittings and accessories.
17
18 Tension Wire (Alternate Bid): Install according to ASTM F 567, maintaining plumb position and
19 alignment of fencing. Pull wire taut, without sags. Fasten fabric to tension wire with 0.120-inch-
20 (3.05-mm-) diameter hog rings of same material and finish as fabric wire, spaced a maximum of 24
21 inches (610 mm) o.c. Install tension wire in locations indicated before stretching fabric. Provide
22 horizontal tension wire at the following locations:
23
24 Extended along bottom of fence fabric. Install bottom tension wire within 6 inches (152 mm)
25 of bottom of fabric and tie to each post with not less than same diameter and type of wire.
26
27 Chain-Link Fabric: Apply fabric to outside of enclosing framework. Leave 1 inch between finish
28 grade or surface and bottom selvage, unless otherwise indicated. Pull fabric taut and tie to posts,
29 rails, and tension wires. Anchor to framework so fabric remains under tension after pulling force is
30 released.
31
32 Tension or Stretcher Bars: Thread through fabric and secure to end, corner, pull, and gate posts
33 with tension bands spaced not more than 15 inches(380 mm)o.c.
34
35 Fasteners: Install nuts for tension bands and carriage bolts on the side of the fence opposite the
36 fabric side. Peen ends of bolts or score threads to prevent removal of nuts.
37
38 GATE INSTALLATION
39
40 General: Install gates according to manufacturer's written instructions, level, plumb, and secure for
41 full opening without interference. Attach fabric as for fencing. Attach hardware using tamper-
42 resistant or concealed means. Install ground-set items in concrete for anchorage. Adjust hardware
43 for smooth operation and lubricate where necessary.
44
45 GATE OPERATORS
46
47 General: Provide factory-assembled automatic operating system designed for gate size, type,
48 weight, and operation frequency. Provide operation control system with characteristics suitable for
49 Project conditions, with remote-control stations, safety devices, and weatherproof enclosures;
50 coordinate electrical requirements with building electrical system.
51
52 Refer to Division 2 Section "Gate Operators."
53
54 GROUNDING AND BONDING
55
56 Fence Grounding: Install at maximum intervals of 1500 feet(450 m)except as follows:
57
CHAIN-LINK FENCES AND GATES
GDA 02820-7
GDA#12018.00 December 14, 2012
Issue for Permit
1 Fences within 100 Feet (30 m) of Buildings, Structures, Walkways, and Roadways: Ground
2 at maximum intervals of 750 feet(225 m).
3
4 Gates and Other Fence Openings: Ground fence on each side of opening.
5
6 Bond metal gates to gate posts.
7
8 Bond across openings, with and without gates, except openings indicated
9 as intentional fence discontinuities. Use No. 2 AWG wire and bury it at least
10 18 inches (460 mm) below finished grade.
11
12 Protection at Crossings of Overhead Electrical Power Lines: Ground fence at location of crossing
13 and at a maximum distance of 150 feet (45 m)on each side of crossing.
14
15 All local power utility requirements must be performed.
16
17 Fences Enclosing Electrical Power Distribution Equipment: Ground as required by IEEE C2, unless
18 otherwise indicated.
19
20 All local power utility requirements must be performed.
21
22 Grounding Method: At each grounding location, drive a grounding rod vertically until the top is 6
23 inches (150 mm) below finished grade. Connect rod to fence with No. 6 AWG conductor. Connect
24 conductor to each fence component at the grounding location, including the following:
25
26 Bonding Method for Gates: Connect bonding jumper between gate post and gate frame.
27
28 Connections: Make connections so possibility of galvanic action or electrolysis is minimized. Select
29 connectors, connection hardware, conductors, and connection methods so metals in direct contact
30 will be galvanically compatible.
31
32 Use electroplated or hot-tin-coated materials to ensure high conductivity and to make
33 contact points closer in order of galvanic series.
34
35 Make connections with clean, bare metal at points of contact.
36
37 Coat and seal connections having dissimilar metals with inert material to prevent future
38 penetration of moisture to contact surfaces.
39
40 Bonding to Lightning Protection System: If fence terminates at lightning-protected building or
41 structure, ground the fence and bond the fence grounding conductor to lightning protection down
42 conductor or lightning protection grounding conductor complying with NFPA 780.
43
44 FIELD QUALITY CONTROL
45
46 Grounding-Resistance Testing: Owner will engage a qualified independent testing and inspecting
47 agency to perform field quality-control testing.
48
49 Grounding-Resistance Tests: Subject completed grounding system to a megger test at each
50 grounding location. Measure grounding resistance not less than two full days after last trace
51 of precipitation, without soil having been moistened by any means other than natural drainage
52 or seepage and without chemical treatment or other artificial means of reducing natural
53 grounding resistance. Perform tests by two-point method according to IEEE 81.
54
55 Excessive Grounding Resistance: If resistance to grounding exceeds specified value, notify
56 Architect promptly. Include recommendations for reducing grounding resistance and a
57 proposal to accomplish recommended work.
CHAIN-LINK FENCES AND GATES
GDA 02820 -8
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Report: Prepare test reports certified by a testing agency of grounding resistance at each test
3 location. Include observations of weather and other phenomena that may affect test results.
4
5 ADJUSTING
6
7 Gate: Adjust gate to operate smoothly, easily, and quietly, free from binding, warp, excessive
8 deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire
9 operational range. Confirm that latches and locks engage accurately and securely without forcing or
10 binding.
11
12
13 END OF SECTION 02820
CHAIN-LINK FENCES AND GATES
GDA 02820-9
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 02825—GATE OPERATOR
2
3
4 PART 1 -GENERAL
5
6
7 INCLUDED IN THIS SECTION
8
9 Electric gate operator for gates, including all selected attachments and accessory equipment.
10
11 RELATED WORK SPECIFIED ELSEWHERE
12
13 Section 02751 -Concrete Paving
14 Section 02821 -Ornamental Metal Fencing System
15 Section 02822-Ornamental Metal Fencing Gate
16 Section 03300-Cast-in-Place Concrete
17 Section 10990- Miscellaneous Specialties for access control device pedestals
18 Electrical service and connections: See Division 16
19
20 SUBMITTALS
21
22 Shop drawings: Submit shop drawings under the provisions of Section 01300. Submit drawings
23 showing connections to adjacent construction, range of travel, and all electrical and mechanical
24 connections to the operator. Drawings shall also show the size and location of the concrete
25 mounting pad.
26
27 Installation instructions: Submit two copies of manufacturer's installation instructions for this specific
28 project.
29
30 QUALITY ASSURANCE
31
32 Manufacturer: A company specializing in the manufacture of security gate operators of the type
33 specified, with a minimum of 10 years experience.
34
35 Installer: A minimum of three years experience installing similar equipment.
36
37 CODES AND REGULATORY REQUIREMENTS
38
39 Operators shall be built to standards of the Electronic Testing Laboratory and shall bear the "ETL
40 listed" label. Complete all electrical work according to local codes and National Electrical code. All
41 field work shall be performed in a neat and professional manner, completed to journeyman
42 standards.
43
44 PRODUCT DELIVERY AND STORAGE
45
46 Comply with 01600
47
48 Store products upright in the original shipping containers, covered, ventilated and protected from all
49 weather conditions.
50
51 WARRANTY
52
53 There shall be a warranty of 1 year after installation. The warranty does not limit the number of gate
54 cycles per hour.
55
56
GATE OPERATOR
GDA 02825- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 PART 2 - PRODUCTS
2
3
4 GATE OPERATORS
5
6 Basis of Design: Door King 9150 or equal.
7
8 Gate Operators: Equipment base/pad and Pedestal post mounted and as follows:
9
10 FEATURES
11
12 • Self-adjusting, no maintenance magnetic limits.
13 • Partial-open feature.
14 • Anti-tailgating feature.
15 • Gate tracker reporting output.
16 • Ports for plug-in loop detectors.
17 • Two convenience outlets.
18 • Fail-safe release.
19 • Programming switches.
20 • Built-in reset switch.
21 • Built-in power On/Off switch.
22 • Nickel plated chain.
23 • Plug-in loop detectors.
24 • Surge suppressors.
25
26 SPECIFICATIONS
27
28 • Maximum gate length 45-feet.
29 • Maximum gate weight 1500 pounds*.
30 • 1 HP continuous-duty motor.
31 • 230*VAC
32 • Operator is shipped with chain brackets and required length of#40 chain.
33 • Class I, II, Ill and IV applications.
34 • Compliant with UL 325 and 991. ETL listed.
35 • Dimensions: 15"W x 24"H x 16.5"D
36
37 Control Devices: Provide interface with card reader (by Owner's Contractor) for entry, vehicle
38 detectors (induction loops) for exiting and closing gates at entering and exiting. Operation shall be
39 coordinated into security system. Provide remote open/close push button switches where indicated
40
41 Safety Devices: For reversing the gate travel, provide photo-cell beams. Shall be coordinated into
42 security system.
43
44 OPERATION
45
46 Provide complete gate system to match with site fencing system.
47
48 Each type electric operator shall be built into a compact unit consisting of an instantly reversing
49 motor.
50
51 NEMA rated starter.
52
53 An emergency release.
54
55 A weather resistant cover.
56
GATE OPERATOR
GDA 02825-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Minimum standard electrical components:
2
3 Motor: Shall be a catalog standard 1 (or 1/2 hp, if gate weight does not exceed 1000 pounds) horse
4 power.
5
6 All components shall have overload protection.
7
8 Controls: Industrial grade relays and, hard-wired. Shall be coordinated into security system.
9
10 Control devices: Provide interface with card reader/intercom (by Owner's Contractor) for entry,
11 vehicle detectors (induction loops) for exiting and closing gates at entering and exiting. Operation
12 shall be coordinated into security system.
13
14 Remote Controls: Electric controls separated from gate and motor and drive mechanism,
15 with NEMA ICS 6, Type 1 enclosure for recessed or flush mounting and with space for
16 additional optional equipment. Provide the following remote-control device(s):
17
18 Control Station: Momentary-contact, three-button-operated; located remotely from
19 gate. Key switch to lock out open and close buttons.
20
21 Function: Open, stop, and close.
22
23 Card Reader: Functions only when authorized card is presented.
24
25 Reader and Box Hood: By Others.
26
27 Vehicle Loop Detector: System including automatic closing timer with adjustable
28 time delay before closing and loop detector designed to close gate. Provide
29 electronic detector with adjustable detection patterns, adjustable sensitivity and
30 frequency settings,and panel indicator light designed to detect presence or transit of
31 a vehicle over an embedded loop of wire and to emit a signal activating the gate
32 operator. Provide number of loops consisting of multiple strands of wire, number of
33 turns, loop size, and method of placement as recommended in writing by detection
34 system manufacturer for function indicated.
35
36 Loop: Wire, in size indicated for field assembly, for pave-over or saw-cut
37 with epoxy-grouted installation.
38
39 Safety Devices: for reversing the gate travel, provide photo-cell beams. Shall be coordinated into
40 security system.
41
42 Power:
43
44 208/230/460 VAC three phase for 1 HP. (50 or 60 Hertz)
45 115/208/230 VAC single phase for 1/2 HP, if provided
46
47 Accessories:
48 Instructional, Safety, and Warning Labels and Skins: According to UL 325.
49
50 Equipment Bases/Pads: Cast-in-place or precast concrete, depth not less than 12 inches (300 mm)
51 dimensioned and reinforced according to gate-operator component manufacturer's written
52 instructions and as indicated on Drawings.
53
54 Equipment Posts: Steel, either pad mounted or embedded in concrete footing according to gate-
55 operator component manufacturer's written instructions and as indicated on Drawings.
56
GATE OPERATOR
GDA 02825-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Card Reader Posts: Steel, mounted to concrete pad as indicated on Drawings.
2
3 Manufacturer: Model 72-9C-D, The Pedestal Company
4 Color: Powdercoat finish, black.
5
6 FACTORY TESTING
7
8 The electric gate operator is supplied with the internal wiring of the electrical components completed
9 at the factory. Terminal strip provision is supplied for site wiring of the operator to external power
10 supply and control system.
11
12 Check all mechanical connections for tightness and alignment. Check all welds for completeness
13 and continuity. Check welded corners and edges to assure they are square and straight.
14
15 Inspect painted finish for completeness and gloss. Touch up any imperfections prior to shipment.
16
17
18 PART 3-EXECUTION
19
20
21 SITE EXAMINATION
22
23 Locate concrete mounting pad in accordance with approved shop drawings.
24
25 Make sure that gate is operating smoothly under manual conditions before installation of gate
26 operators. Do not proceed until gate panel is aligned and operates without binding
27
28 INSTALLATION
29
30 Excavation for Support Posts, Pedestals and Equipment Bases/Pads: Hand-excavate holes for
31 bases/pads, in firm, undisturbed soil to dimensions and depths and at locations as required by gate-
32 operator component manufacturer's written instructions and as indicated.
33
34 Install gate operator in accordance with the manufacturer's printed instructions, current at the time of
35 installation. Coordinate locations of operators with contract drawings, other trades and shop
36 drawings.
37
38 Vehicle Loop Detector System: Cut grooves in pavement and bury or Bury and seal wire loop
39 according to manufacturer's written instructions. Connect to equipment operated by detector.
40
41 Comply with NFPA 70 and manufacturer's written instructions for grounding of electric-powered
42 motors, controls, and other devices.
43
44 FIELD QUALITY CONTROL
45
46 Test gate operator through ten full cycles and adjust for operation without binding, scraping or
47 uneven motion. Test limit switches for proper at rest gate position.
48
49 CONTINUED SERVICE AND DOCUMENTATION
50
51 Provide one copy of installation, operation, maintenance, and parts manual for Gate Model for
52 owner's use. Manuals will identify parts of the equipment for future procurement.
53
54
55 END OF SECTION
GATE OPERATOR
GDA 02825-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 02848-CONCRETE PARKING BUMPERS
2
3
4 PART 1 - GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Provisions established within the General Conditions of the Contract, Division 1 - General
10 Requirements, and the Drawings are collectively applicable to this Section.
11
12 SECTION INCLUDES
13
14 Precast concrete parking bumpers.
15
16 QUALITY ASSURANCE
17
18 Verify that concrete paving and pavement marking is completed and ready for installation of wheel
19 stops.
20
21 Coordinate installation of concrete wheel stops with pavement marking layout.
22
23
24 PART 2-PRODUCTS
25
26
27 PRECAST CONCRETE PARKING BUMPERS (WHEEL STOPS1
28
29 Qualities: Reinforced precast concrete, with pre-drilled holes and anchor pins.
30
31 Concrete: Normal weight, minimum 4000-psi 28-day compressive strength.
32
33 Reinforcing: 2 continuous No. 3 deformed reinforcement bars.
34
35 Size: 8-1/2 inch wide x 6 inch high x 72-inch length.
36
37 Anchor Pins: 5/8 inch deformed bar, 2 for each wheel stop, extending a minimum of 6 inches
38 below bottom of wheel stop.
39
40 Standards
41
42 Concrete: ASTM C94.
43
44 Reinforcing: ASTM A615, Grade 40.
45
46
47 PART 3- EXECUTION
48
49
50 INSTALLATION
51
52 Verify layout of wheel stop locations with pavement marking layout.
53
54 Thoroughly clean surfaces to receive wheel stops free of dirt, sand, oil, grease or other foreign matter.
55
56 Install a precast wheel stop at each parking space where wheel stops are indicated on drawings.
57
CONCRETE PARKING BUMPERS
GDA 02848- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Install wheel stops with anchors in accordance with manufacturer's instructions.
2
3 Leave wheel stops securely anchored and in proper alignment.
4
5
6 END OF SECTION 02848
CONCRETE PARKING BUMPERS
GDA 02848-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 03301 -CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS)
2 PART 1 -GENERAL
3 RELATED DOCUMENTS
4 Drawings and general provisions of the Contract, including General and Supplementary Conditions
5 and Division 1 Specification Sections, apply to this Section.
6 SUMMARY
7 This Section specifies cast-in-place concrete, including reinforcement, concrete materials, mixture
8 design, placement procedures, and finishes, for noncritical applications of concrete and for projects
9 using small quantities of concrete. The Work includes, but is not limited to:
10 Concrete ramps and stairs.
11 Concrete pavement in Trash Container Area.
12 Exterior concrete patio, sidewalks, and curb ramps.
13 Slab-on-grade infill after utility trenching operations.
14 Other areas as indicated on the Drawings
15 SUBMITTALS
16 General: In addition to the following, comply with submittal requirements in ACI 301.
17 Product Data: For each type of product indicated.
18 Design Mixtures: For each concrete mixture.
19 QUALITY ASSURANCE
20 Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and
21 that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
22 Source Limitations: Obtain each type of cement of the same brand from the same manufacturer's
23 plant, obtain aggregate from one source, and obtain admixtures through one source from a single
24 manufacturer.
25 Comply with ACI 301, "Specification for Structural Concrete," including the following sections, unless
26 modified by requirements in the Contract Documents:
27 "General Requirements."
28 "Formwork and Formwork Accessories."
29 "Reinforcement and Reinforcement Supports."
30 "Concrete Mixtures."
31 "Handling, Placing, and Constructing."
32 "Lightweight Concrete."
33 Comply with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."
34 PART 2- PRODUCTS
35 FORMWORK
36 Furnish formwork and formwork accessories according to ACI 301.
37 STEEL REINFORCEMENT
38 Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.
CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS1
GDA 03301 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 CONCRETE MATERIALS
2 Cementitious Material: Use the following cementitious materials, of the same type, brand, and source
3 throughout Project:
4 Portland Cement: ASTM C 150, Type I/II.
5 Normal-Weight Aggregate: ASTM C 33, graded, 1-1/2-inch (38-mm) nominal maximum aggregate
6 size.
7 Water: ASTM C 94/C 94M; potable.
8 ADMIXTURES
9 Air-Entraining Admixture: ASTM C 260.
10 RELATED MATERIALS
11 Vapor Retarder: Polyethylene sheet,ASTM E 1745, Class A, not less than 10 mils (0.25 mm)thick.
12 CURING MATERIALS
13 Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309,Type 1, Class B.
14 CONCRETE MIXTURES
15 Comply with ACI 301 requirements for concrete mixtures.
16 Normal-Weight Concrete: Prepare design mixes, proportioned according to ACI 301, as follows:
17 Minimum Compressive Strength: 3000 psi (20.7 MPa)at 28 days.
18 Maximum Water-Cementitious Materials Ratio: 0.50.
19 Slump Limit: inches (125 mm), plus or minus ' inch (25 mm).
20 Air Content: Maintain within range permitted by ACI 301.
21 CONCRETE MIXING
22 Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M,
23 and furnish batch ticket information.
24 When air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60
25 minutes.
26 PART 3-EXECUTION
27 FORMWORK
28 Design, construct, erect, brace, and maintain formwork according to ACI 301.
29 VAPOR RETARDERS
30 Install, protect, and repair vapor retarders according to ASTM E 1643; place sheets in position with
31 longest dimension parallel with direction of pour.
32 STEEL REINFORCEMENT
33 Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting
34 reinforcement.
35 Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before
36 placing concrete.
37 CONCRETE PLACEMENT
38 Comply with ACI 301 for measuring, batching, mixing, transporting, and placing concrete.
CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS)
GDA 03301 -2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Before test sampling and placing concrete,water may be added at Project site, subject to limitations of
2 ACI 301.
3 Do not add water to concrete during delivery, at Project site,or during placement.
4 Consolidate concrete with mechanical vibrating equipment.
5 FINISHING UNFORMED SURFACES
6 General: Comply with ACI 302.1R for screeding, restraightening, and finishing operations for concrete
7 surfaces. Do not wet concrete surfaces.
8 Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or darbies to
9 form a uniform and open-textured surface plane before excess moisture or bleedwater appears on
10 surface.
11 Do not further disturb surfaces before starting finishing operations.
12 Trowel Finish: Apply a hard trowel finish to surfaces indicated and to floor and slab surfaces exposed
13 to view or to be covered with resilient flooring, carpet, ceramic or quarry tile set over a cleavage
14 membrane, paint, or another thin film-finish coating system.
15 CONCRETE PROTECTING AND CURING
16 General: Protect freshly placed concrete from premature drying and excessive cold or hot
17 temperatures. Comply with ACI 306.1 for cold-weather protection and with ACI 301 for hot-weather
18 protection during curing.
19 Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
20 Curing Methods: Cure formed and unformed concrete for at least seven days by one or a combination
21 of the following methods:
22
23 Curing Compound: Apply uniformly in continuous operation by power spray or roller according
24 to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three
25 hours after initial application. Maintain continuity of coating and repair damage during curing
26 period.
27 REPAIRS
28 Remove and replace concrete that does not comply with requirements in this Section.
29 END OF SECTION 03301
CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS)
GDA 03301 -3
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 03355-CONCRETE SEALER
2
3
4 PART 1 - GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections, apply to work of this section.
11
12 SUMMARY:
13
14 Extent of concrete sealer work is on schedule at the end of this Section or as shown on drawings.
15
16 Concrete work is specified in Division 3.
17
18 QUALITY ASSURANCE
19
20 General: Comply with provisions of the manufacturer's application instructions, except where more
21 stringent requirements are shown or specified.
22
23 SUBMITTALS:
24
25 Product Data: Submit data for proprietary materials and items.
26
27 Material Certificates: Provide materials certificates in lieu of materials laboratory test reports when
28 permitted by Architect. Material certificates shall be signed by manufacturer and Contractor, certifying
29 that each material item complies with, or exceeds, specified requirements.
30
31 PROJECT CONDITIONS:
32
33 Apply when temperatures are 40 degrees and rising.
34
35 Protect adjacent finish materials against spatter during placement.
36
37
38 PART 2-PRODUCTS
39
40
41 MATERIALS:
42
43 Sealer: Clear, non-yellowing 100 percent silicate based solution.
44
45 Products: Subject to compliance with requirements, provide the following:
46
47 Diamond Hard; Euclid Chemical Company.
48 Seal Hard; L& M Construction Chemicals.
49 Day-Chem Sure Hard (J-17); Dayton Superior Corp.
50
51 Alternate products and methods will be considered. All proposals shall be submitted at time
52 of bid for written acceptance of the Architect and Owner.
53
54 PART 3- EXECUTION
55
56
57 APPLICATION
CONCRETE SEALER
GDA 03355-1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Apply specified sealer to scheduled floor surfaces. Follow application procedures of sealer
3 manufacturer for existing concrete. Flush surface with water and squeegee the surface totally dry.
4
5 Proceed with application of curing compound when surface is sufficiently dry to receive materials.
6
7
8 END OF SECTION 03310
CONCRETE SEALER
GDA 03355-2
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 05500- METAL FABRICATIONS
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections,apply to work of this section.
11
12 Division 3—Concrete
13
14 DESCRIPTION OF WORK:
15
16 Definition: Metal fabrications include items made from iron and steel shapes, plates, bars, strips,
17 tubes, pipes and castings which are not a part of structural steel or other metal systems specified
18 elsewhere.
19
20 Extent of metal fabrications is indicated on drawings and schedules.
21
22 Types of work in this section include metal fabrications for:
23
24 Rough hardware.
25
26 Miscellaneous framing and supports.
27
28 Miscellaneous steel trim.
29
30 Concrete filled pipe bollards
31
32 QUALITY ASSURANCE:
33
34 Shop Assembly: Preassemble items in shop to greatest extent possible to minimize field splicing and
35 assembly. Disassemble units only as necessary for shipping and handling limitations. Clearly mark
36 units for reassembly and coordinated installation.
37
38 SUBMITTALS:
39
40 Product Data: Submit manufacturer's specifications, anchor details and installation instructions for
41 products used in miscellaneous metal fabrications, including paint products and grout.
42
43 Shop Drawings: Submit shop drawings for fabrication and erection of miscellaneous metal
44 fabrications. Include plans, elevations and details of sections and connections. Show anchorage and
45 accessory items. Provide templates for anchor and bolt installation by others.
46
47 Where materials or fabrications are indicated to comply with certain requirements for design
48 loadings include structural computations, material properties and other information needed
49 for structural analysis.
50
51
52 PART 2- PRODUCTS:
53
54
55 MATERIALS:
56
57 FERROUS METALS:
METAL FABRICATIONS
GDA 05500- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Metal Surfaces, General: For fabrication of miscellaneous metal work which will be exposed to view,
3 use only materials which are smooth and free of surface blemishes including pitting, seam marks,
4 roller marks, rolled trade names and roughness.
5
6 Steel Plates, Shapes and Bars: ASTM A 36.
7
8 Steel Tubing: Cold formed, ASTM A 500; or hot rolled, ASTM A 501.
9
10 Structural Steel Sheet: Hot-rolled, ASTM A 570; or cold-rolled ASTM A 611, Class 1; of grade
11 required for design loading.
12
13 Galvanized Structural Steel Sheet: ASTM A 446, of grade required for design loading. Coating
14 designation as indicated, or if not indicated, G90.
15
16 Steel Pipe: ASTM A 53; Type and grade (if applicable) as selected by fabricator and as required for
17 design loading; black finish unless for exterior use: galvanize where indicated and at all exterior uses;
18 standard weight (schedule 40), unless otherwise indicated.
19
20 Brackets, Flanges and Anchors: Cast or formed metal of the same type material and finish as
21 supported rails, unless otherwise indicated.
22
23 Concrete Inserts: Threaded or wedge type; galvanized ferrous castings, either malleable iron, ASTM A
24 47, or cast steel, ASTM A 27. Provide bolts, washers and shims as required, hot-dip galvanized,
25 ASTM A 153.
26
27 Grout:
28
29 Non-Shrink Non-Metallic Grout: Pre-mixed, factory-packaged, non-staining, non-corrosive, non-
30 gaseous grout complying with CE CRD-C621. Provide grout specifically recommended by
31 manufacturer for interior and exterior applications of type specified in this section.
32
33 FASTENERS:
34
35 General: Provide zinc-coated fasteners for exterior use or where built into exterior walls. Select
36 fasteners for the type, grade and class required.
37
38 Bolts and Nuts: Regular hexagon head type, ASTM A 307, Grade A.
39
40 Machine Screws: Cadmium plated steel, FS FF-S-92.
41
42 Wood Screw s: Flat head carbon steel, FS FF-S-111.
43
44 Plain Washers: Round, carbon steel, FS FF-W-92.
45
46 Masonry Anchorage Devices: Expansion shields, FS FF-S-325.
47
48 Toggle Bolts: Tumble-wing type, FS FF-B-588, type, class and style as required.
49
50 Lock Washers: Helical spring type carbon steel, FS FF-W-84.
51
52 MISCELLANEOUS FRAMING AND SUPPORTS
53
54 General: Provide steel framing and supports not specified in other Sections as needed to complete
55 the Work.
56
57 FINISHES, GENERAL
METAL FABRICATIONS
GDA 05500- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Comply with NAAMM "Metal Finishes Manual" for recommendations relative to applying and
3 designating finishes.
4
5 Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary
6 protective covering prior to shipment.
7
8 Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable
9 if they are within one half of the range of approved samples. Noticeable variations in the same piece
10 are not acceptable. Variations in appearance of other components are acceptable if they are within
11 the range of approved samples and they are assembled or installed to minimize contrast.
12
13 Paint:
14
15 Shop Primer for Ferrous Metal:
16
17 Manufacturer's or Fabricator's standard, gray, fast-curing, lead-free, "universal" primer; selected for
18 good resistance to normal atmospheric corrosion, for compatibility with finish paint systems indicated
19 and for compatibility to provide a sound foundation for field-applied topcoats despite prolonged
20 exposure; complying with performance requirements of FS TT-P-645.
21
22 FABRICATION, GENERAL:
23
24 Workmanship: Use materials of size and thickness indicated or, if not indicated, as required to
25 produce strength and durability in finished product for use intended. Work to dimensions indicated or
26 accepted on shop drawings, using proven details of fabrication and support. Use type of materials
27 indicated or specified for various components of work.
28
29 Form exposed work true to line and level with accurate angles and surfaces and straight sharp edges.
30 Ease exposed edges to a radius of approximately 1/32" unless otherwise indicated. Form bent-metal
31 corners to smallest radius possible without causing grain separation or otherwise impairing work.
32
33 Weld corners and seams continuously, complying with AWS recommendations. At exposed
34 connections, grind exposed welds smooth and flush to match and blend with adjoining surfaces.
35
36 Form exposed connections with hairline joints, flush and smooth, using concealed fasteners wherever
37 possible. Use exposed fasteners of type indicated or, if not indicated, Phillips flat-head (countersunk)
38 screws or bolts.
39
40 Provide for anchorage of type indicated, coordinated with supporting structure. Fabricate and space
41 anchoring devices to provide adequate support for intended use.
42
43 Cut, reinforce, drill and tap miscellaneous metal work as indicated to receive finish hardware and
44 similar items.
45
46 Galvanizing: Galvanize all ferrous metals which are exposed to view on the exterior of the building, all
47 steel lintels and shelf angles and where otherwise indicated. Provide a zinc coating for those items
48 indicated or specified to be galvanized, as follows:
49
50 ASTM A 153 for galvanizing iron and steel hardware.
51
52 ASTM A 123 for galvanizing rolled, pressed and forged steel shapes, plates, bars and strip
53 1/8"thick and heavier.
54
55 ASTM A 386 for galvanizing assembled steel products.
56
57 Fabricate joints which will be exposed to weather in a manner to exclude water or provide weep holes
METAL FABRICATIONS
GDA 05500-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 where water may accumulate.
2
3 Shop Painting:
4
5 Apply shop primer to surfaces of metal fabrications except those which are galvanized or as indicated
6 to be embedded in concrete or masonry, unless otherwise indicated, and in compliance with
7 requirements of SSPC-PA1 "Paint Application Specification No. 1"for shop painting.
8
9 Surface Preparation: Prepare ferrous metal surfaces to comply with minimum requirements indicated
10 below for SSPC surface preparation specifications and environmental exposure conditions of installed
11 metal fabrications:
12
13 Exteriors (SSPC Zone 1B): SSPC-SP6"Commercial Blast Cleaning".
14
15 Interiors (SSPC Zone 1A): SSPC-SP3 "Power Tool Cleaning".
16
17 ROUGH HARDWARE:
18
19 Furnish bent or otherwise custom fabricated bolts, plates, anchors, hangers, dowels and other
20 miscellaneous steel and iron shapes as required for framing and supporting woodwork, and for
21 anchoring or securing woodwork to concrete or other structures. Straight bolts and other stock rough
22 hardware items are specified in Division-6 sections.
23
24 Fabricate items to sizes, shapes and dimensions required. Furnish malleable iron washers for heads
25 and nuts which bear on wood structural connections; elsewhere, furnish steel washers.
26
27 MISCELLANEOUS FRAMING AND SUPPORTS:
28
29 Provide miscellaneous steel framing and supports which are not a part of structural steel framework,
30 as required to complete work.
31
32 Fabricate miscellaneous units to sizes, shapes and profiles indicated or, if not indicated, of required
33 dimensions to receive adjacent other work to be retained by framing. Except as otherwise indicated,
34 fabricate from structural steel shapes, plates and steel bars, of welded construction using mitered
35 joints for field connection. Cut, drill and tap units to receive hardware and similar items.
36
37 Equip units with integrally welded anchors for casting into concrete or building into masonry. Furnish
38 inserts if units must be installed after concrete is placed.
39
40 Except as otherwise indicated, space anchors 24" o.c. and provide minimum anchor units of
41 1-1/4"x 1/4" x 8"steel straps.
42
43 Galvanize exterior miscellaneous frames and supports.
44
45 MISCELLANEOUS STEEL TRIM:
46
47 Provide shapes and sizes for profiles shown. Unless otherwise indicated, fabricate units from
48 structural steel shapes, plates and steel bars, with continuously welded joints and smooth exposed
49 edges. Use concealed field splices wherever possible. Provide cutouts, fittings and anchorages as
50 required for coordination of assembly and installation with other work.
51
52 Galvanize exterior miscellaneous steel trim.
53
54
55 Galvanize exterior steel railings, including pipe, fittings, brackets, fasteners, and other ferrous
56 components. Provide black steel pipe for interior railings.
57
METAL FABRICATIONS
GDA 05500- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1 METAL BOLLARDS
2
3 Fabricate metal bollards from Schedule 40 steel pipe.
4
5 Prime bollards with zinc-rich primer.
6
7
8 PART 3 - EXECUTION
9
10
11 PREPARATION:
12
13 Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication,
14 where possible. Do not delay job progress; allow for trimming and fitting where taking field
15 measurements before fabrication might delay work.
16
17 Coordinate and furnish anchorages, setting drawings, diagrams, templates, instructions, and
18 directions for installation of anchorages, such as concrete inserts, sleeves, anchor bolts and
19 miscellaneous items having integral anchors, which are to be embedded in concrete or masonry
20 construction. Coordinate delivery of such items to project site.
21
22 INSTALLATION:
23
24 General:
25
26 Fastening to In-Place Construction: Provide anchorage devices and fasteners where necessary for
27 securing miscellaneous metal fabrications to in-place construction; including threaded fasteners for
28 concrete and masonry inserts, toggle bolts, through-bolts, lag bolts, wood screws and other
29 connectors as required.
30
31 Cutting, Fitting and Placement: Perform cutting, drilling and fitting required for installation of
32 miscellaneous metal fabrications. Set work accurately in location, alignment and elevation, plumb,
33 level, true and free of rack, measured from established lines and levels. Provide temporary bracing or
34 anchors in formwork for items which are to be built into concrete, masonry or similar construction.
35
36 Fit exposed connections accurately together to form tight hairline joints. Weld connections which are
37 not to be left as exposed joints, but cannot be shop welded because of shipping size limitations. Grind
38 exposed joints smooth and touch-up shop paint coat. Do not weld, cut or abrade the surfaces of
39 exterior units which have been hot-dip galvanized after fabrication, and are intended for bolted or
40 screwed field connections.
41
42 Field Welding: Comply with AWS Code for procedures of manual shielded metal-arc welding,
43 appearance and quality of welds made, and methods used in correcting welding work.
44
45 INSTALLING MISCELLANEOUS FRAMING AND SUPPORTS
46
47 General: Install framing and supports to comply with requirements of items being supported, including
48 manufacturers'written instructions and requirements indicated on Shop Drawings.
49
50 Anchor supports for operable partitions securely to and rigidly brace from building structure.
51
52 INSTALLING METAL BOLLARDS
53
54 Anchor bollards in place with concrete footings. Center and align bollards in holes 3 inches (75 mm)
55 above bottom of excavation. Place concrete and vibrate or tamp for consolidation. Support and brace
56 bollards in position until concrete has cured.
57
METAL FABRICATIONS
GDA 05500- 5
GDA#12018.00 December 14, 2012
Issue for Permit
1 Fill bollards solidly with concrete, mounding top surface to shed water.
2
3 ADJUSTING AND CLEANING
4
5 Touch-Up Painting: Immediately after erection, clean field welds, bolted connections, and abraded
6 areas of shop paint, and paint exposed areas with same material as used for shop painting.
7
8 Apply by brush or spray to provide a minimum dry film thickness of 2.0 mils.
9
10 For galvanized surfaces: Clean field welds, bolted connections and abraded areas and apply
11 galvanizing repair paint to comply with ASTM A 780.
12
13
14 END OF SECTION 05500
METAL FABRICATIONS
GDA 05500- 6
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 05521 - PIPE RAILINGS
2 PART 1 -GENERAL
3 RELATED DOCUMENTS
4 Drawings and general provisions of the Contract, including General and Supplementary Conditions
5 and Division 1 Specification Sections, apply to this Section.
6 SUMMARY
7 Section Includes:
8 Steel pipe railings.
9 PERFORMANCE REQUIREMENTS
10 General: In engineering railings to withstand structural loads indicated, determine allowable design
11 working stresses of railing materials based on the following:
12 Steel: 72 percent of minimum yield strength.
13 Structural Performance: Railings shall withstand the effects of gravity loads and the following loads
14 and stresses within limits and under conditions indicated:
15 Handrails and Top Rails of Guards:
16 Uniform load of 5" of/ft. (0.73 kN/m)applied in any direction.
17 Concentrated load of 200 .;;^s(0.89 kN)applied in any direction.
18 Uniform and concentrated loads need not be assumed to act concurrently.
19 Infill of Guards:
20 Concentrated load of J I;; (0.22 kN) applied horizontally on an area of 1 sq. ft. (0.093
21 sq. m).
22 Infill load and other loads need not be assumed to act concurrently.
23 Thermal Movements: Allow for thermal movements from ambient and surface temperature changes
24 acting on exterior metal fabrications by preventing buckling, opening of joints, overstressing of
25 components, failure of connections,and other detrimental effects.
26 Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material
27 surfaces.
28 Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and
29 other materials from direct contact with incompatible materials.
30 SUBMITTALS
31 Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
PIPE RAILINGS
GDA 05521 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 PROJECT CONDITIONS
2 Field Measurements: Verify actual locations of walls and other construction contiguous with metal
3 fabrications by field measurements before fabrication.
4 COORDINATION AND SCHEDULING
5 Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and
6 coating manufacturers' written recommendations to ensure that shop primers and topcoats are
7 compatible with one another.
8 Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions
9 for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral
10 anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time
11 for installation.
12 PART 2 - PRODUCTS
13 METALS, GENERAL
14 Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks,
15 rolled trade names, stains, discolorations, or blemishes.
16 STEEL AND IRON
17 Pipe: ASTM A 53/A 53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another
18 grade and weight are required by structural loads.
19 Plates, Shapes, and Bars: ASTM A 36/A 36M.
20 MISCELLANEOUS MATERIALS
21 Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.
22 Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer
23 complying with MPI#79 and compatible with topcoat.
24 Use primer containing pigments that make it easily distinguishable from zinc-rich primer.
25 Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout
26 complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for interior
27 and exterior applications.
28 FABRICATION
29 General: Fabricate railings to comply with requirements indicated for design, dimensions, member
30 sizes and spacing, details, finish, and anchorage, but not less than that required to support structural
31 loads.
32 Assemble railings in the shop to greatest extent possible to minimize field splicing and assembly.
33 Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for
34 reassembly and coordinated installation. Use connections that maintain structural value of joined
35 pieces.
PIPE RAILINGS
GDA 05521 - 2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of
2 approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp or rough areas on
3 exposed surfaces.
4 Form work true to line and level with accurate angles and surfaces.
5 Fabricate connections that will be exposed to weather in a manner to exclude water. Provide weep
6 holes where water may accumulate.
7 Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items.
8 Connections: Fabricate railings with welded connections.
9 Welded Connections: Cope components at connections to provide close fit, or use fittings designed
10 for this purpose. Weld all around at connections, including at fittings.
11 Use materials and methods that minimize distortion and develop strength and corrosion
12 resistance of base metals.
13 Obtain fusion without undercut or overlap.
14 Remove flux immediately.
15 At exposed connections, finish exposed surfaces smooth and blended so no roughness shows
16 after finishing and welded surface matches contours of adjoining surfaces.
17 Form changes in direction as follows:
18 As detailed.
19 By bending.
20 Bend members in jigs to produce uniform curvature for each configuration required; maintain cross
21 section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming
22 exposed surfaces of components.
23 Close exposed ends of railing members with prefabricated end fittings.
24 FINISHES, GENERAL
25 Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
26 recommendations for applying and designating finishes.
27 Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary
28 protective covering before shipping.
29 Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable
30 if they are within one-half of the range of approved Samples. Noticeable variations in the same piece
31 are not acceptable. Variations in appearance of other components are acceptable if they are within
32 the range of approved Samples and are assembled or installed to minimize contrast.
33 Provide exposed fasteners with finish matching appearance, including color and texture, of railings.
PIPE RAILINGS
GDA 05521 -3
GDA#12018.00 December 14, 2012
Issue for Permit
1 STEEL AND IRON FINISHES
2 For nongalvanized steel railings, provide nongalvanized ferrous-metal fittings, brackets, fasteners, and
3 sleeves, except galvanize anchors to be embedded in exterior concrete or masonry.
4 Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with SSPC- SSPC-
5 SP 3, "Power Tool Cleaning."
6 Primer Application: Apply shop primer to prepared surfaces of railings unless otherwise indicated.
7 Comply with requirements in SSPC-PA 1, "Paint Application Specification No. 1: Shop, Field, and
8 Maintenance Painting of Steel," for shop painting. Primer need not be applied to surfaces to be
9 embedded in concrete or masonry.
10 Shop prime uncoated railings with universal shop primer indicated.
11 PART 3 - EXECUTION
12 EXAMINATION
13 Examine plaster and gypsum board assemblies, where reinforced to receive anchors, to verify that
14 locations of concealed reinforcements have been clearly marked for Installer. Locate reinforcements
15 and mark locations if not already done.
16 INSTALLATION, GENERAL
17 Fit exposed connections together to form tight, hairline joints.
18 Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location,
19 alignment, and elevation; measured from established lines and levels and free of rack.
20 Do not weld, cut, or abrade surfaces of railing components that have been coated or finished
21 after fabrication and that are intended for field connection by mechanical or other means
22 without further cutting or fitting.
23 Set posts plumb within a tolerance of 1/16 inch in 3 feet(2 mm in 1 m).
24 Align rails so variations from level for horizontal members and variations from parallel with
25 rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet (5 mm in 3 m).
26 Corrosion Protection: Coat concealed surfaces of aluminum that will be in contact with grout,
27 concrete, masonry, wood, or dissimilar metals, with a heavy coat of bituminous paint.
28 Adjust railings before anchoring to ensure matching alignment at abutting joints.
29 Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for
30 securing railings and for properly transferring loads to in-place construction.
31 ANCHORING POSTS
32 Form or core-drill holes not less than 5 inches (125 mm) deep and 3/4 inch (20 mm) larger
33 than OD of post for installing posts in concrete. Clean holes of loose material, insert posts,
34 and fill annular space between post and concrete with nonshrink, nonmetallic grout, mixed and
35 placed
PIPE RAILINGS
GDA 05521 -4
GDA#12018.00 December 14, 2012
Issue for Permit
1 ADJUSTING AND CLEANING
2 Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded
3 areas of shop paint, and paint exposed areas with the same material as used for shop painting to
4 comply with SSPC-PA 1 for touching up shop-painted surfaces.
5 Apply by brush or spray to provide a minimum 2.0-mil (0.05-mm)dry film thickness.
6 PROTECTION
7 Protect finishes of railings from damage during construction period with temporary protective coverings
8 approved by railing manufacturer. Remove protective coverings at time of Substantial Completion.
9 END OF SECTION 05521
PIPE RAILINGS
GDA 05521 -5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 06100- ROUGH CARPENTRY
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 Division-1 Specification sections, apply to work of this section.
10
11 DESCRIPTION OF WORK:
12
13 Definition: Rough carpentry includes carpentry work not specified as part of other sections and which
14 is generally not exposed, except as otherwise indicated.
15
16 Types of work in this section include rough carpentry for:
17
18 Wood grounds, nailers, blocking and sleepers
19
20 Backing panels
21
22 SUBMITTALS:
23
24 Wood Treatment Data: Submit chemical treatment manufacturer's instructions for proper use of each
25 type of treated material.
26
27 Preservative Treatment: For each type specified, include certification by treating plant stating
28 type of preservative retained and conformance with applicable standards.
29
30 PRODUCT HANDLING:
31
32 Delivery and Storage: Keep materials dry at all times. Protect against exposure to weather and
33 contact with damp or wet surfaces. Stack lumber as well as plywood and other panels; provide for air
34 circulation within and around stacks and under temporary coverings including polyethylene and similar
35 material stacks.
36
37 PROJECT CONDITIONS:
38
39 Coordination: Fit carpentry work to other work; scribe and cope as required for accurate fit. Correlate
40 location of furring, nailers, blocking, grounds and similar supports to allow attachment of other work.
41
42
43 PART 2- PRODUCTS
44
45 LUMBER, GENERAL:
46
47 Lumber Standards: Manufacture lumber to comply with PS 20 "American Softwood Lumber Standard"
48 and with applicable grading rules of inspection agencies certified by American Lumber Standards
49 Committee's (ALSC) Board of Review.
50
51 Inspection Agencies: Inspection agencies and the abbreviations used to reference with lumber grades
52 and species include the following:
53
54 NLGA -National Lumber Grades Authority.
55 SPIB -Southern Pine Inspection Bureau.
56 WCLIB-West Coast Lumber Inspection Bureau.
57 WWPA -Western Wood Products Association.
ROUGH CARPENTRY
GDA 06100- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Grade Stamps: Factory-mark each piece of lumber with grade stamp of inspection agency evidencing
3 compliance with grading rule requirements and identifying grading agency, grade, species, moisture
4 content at time of surfacing, and mill.
5
6 Nominal sizes are indicated, except as shown by detail dimensions. Provide actual sizes as required
7 by PS 20, for moisture content specified for each use.
8
9 Provide dressed lumber, S4S, unless otherwise indicated.
10
11 Provide seasoned lumber with 15% maximum moisture content at time of dressing shipment
12 for sizes 2"or less in nominal thickness, unless otherwise indicated.
13
14 MISCELLANEOUS LUMBER:
15
16 Provide wood for support or attachment of other work including cant strips, flashing, coping, bucks,
17 nailers, blocking, furring, grounds, stripping and similar members. Provide lumber of sizes indicated,
18 worked into shapes shown, and as follows:
19
20 Moisture content: 15% maximum for lumber items specified to receive wood preservative
21 treatment.
22
23 Grade: Construction Grade light framing size lumber of any species or board size lumber as required.
24 No. 3 Common or Standard grade boards per WCLIB or WWPA rules or No. 3 boards per SPIB rules.
25
26 WOOD-BASED STRUCTURAL-USE PANELS, GENERAL
27
28 Construction Panel Standards: Comply with PS 1 "U.S. Product Standard for Construction and
29 Industrial Plywood" for plywood panels and, for products not manufactured under PS 1 provisions,
30 with American Plywood Associates (APA) "Performance Standard and Policies for Structural-Use
31 Panels", Form No. E445.
32
33 Trademark: Factory mark structural-use panels with APA trademark evidencing compliance with
34 grade requirements.
35
36 STRUCTURAL-USE PANELS FOR BACKING
37
38 Plywood Backing Panels: For mounting electrical or telephone equipment, provide fire-retardant
39 treated plywood panels with grade designation, APA C-D PLUGGED INT with exterior glue, in
40 thickness indicated, or, if not otherwise indicated, not less than 15/32".
41
42 MISCELLANEOUS MATERIALS:
43
44 Fasteners and Anchorages: Provide size, type, material and finish as indicated and as recommended
45 by applicable standards, complying with applicable Federal Specifications for nails, staples, screws,
46 bolts, nuts, washers and anchoring devices. Provide metal hangers and framing anchors of the size
47 and type recommended by the manufacturer for each use including recommended nails.
48
49 Where rough carpentry work is exposed to weather, in ground contact, or in area of high
50 relative humidity, provide fasteners and anchorages with a hot-dip zinc coating (ASTM A
51 153).
52
53 WOOD TREATMENT BY PRESSURE PROCESS:
54
55 Preservative Treatment: All lumber and plywood shall comply with applicable requirements of AWPA
56 Standards C2 (Lumber) and C9 (Plywood) and of AWPB Standards listed below. Mark each treated
57 item with the AWPB Quality Mark Requirements.
ROUGH CARPENTRY
GDA 06100-2
GDA#12018.00 December 14,2012
Issue for Permit
1
2 Pressure-treat above-ground items with water-borne preservatives complying with AWPB LP-
3 2. After treatment, kiln-dry lumber to a maximum moisture content of 19%. Treat indicated
4 items and the following:
5
6 Wood sills, sleepers, blocking, furring, stripping and similar concealed members in
7 contact with masonry or concrete.
8
9 Complete fabrication of treated items prior to treatment, where possible. If cut after treatment,
10 coat cut surfaces with heavy brush coat of same chemical used for treatment and to comply
11 with AWPA M4. Inspect each piece of lumber or plywood after drying and discard damaged or
12 defective pieces.
13
14
15 PART 3- EXECUTION
16
17 INSTALLATION, GENERAL:
18
19 Discard units of material with defects which might impair quality of work, and units which are too small
20 to use in fabricating work with minimum joints or optimum joint arrangement.
21
22 Set carpentry work to required levels and lines, with members plumb and true to line and cut and
23 fitted.
24
25 Securely attach carpentry work to substrate by anchoring and fastening as shown and as required by
26 recognized standards. Countersink nail heads on exposed carpentry work and fill holes.
27
28 Use common wire nails, except as otherwise indicated. Use finishing nails for finish work. Select
29 fasteners of size that will not penetrate members where opposite side will be exposed to view or will
30 receive finish materials. Make tight connections between members. Install fasteners without splitting
31 of wood; predrill as required.
32
33 WOOD GROUNDS, NAILERS, BLOCKING AND SLEEPERS:
34
35 Provide wherever shown and where required for screeding or attachment of other work. Form to
36 shapes as shown and cut as required for true line and level of work to be attached. Coordinate
37 location with other work involved.
38
39 Provide wood blocking in the following areas, but not limited to these areas:
40
41 Board paneling
42 Toilet accessories.
43 Wall mounted finish hardware (wall stops).
44 Cabinetry.
45 Grab Bars
46 Areas indicated to have equipment installed by Owner or"others."
47
48 Attach to substrates as required to support applied loading. Countersink bolts and nuts flush with
49 surfaces, unless otherwise indicated. Build into masonry during installation of masonry work. Where
50 possible, anchor to formwork before concrete placement.
51
52 Provide permanent grounds of dressed, preservative treated, key-bevelled lumber not less than 1-1/2"
53 wide and of thickness required to bring face of ground to exact thickness of finish material involved.
54 Remove temporary grounds when no longer required.
55
56
57 END OF SECTION 06100
ROUGH CARPENTRY
GDA 06100-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 06402- INTERIOR ARCHITECTURAL WOODWORK
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section includes the following:
14
15 Standing and running trim
16 Laminate clad cabinets(plastic-covered casework)
17 Cabinet and vanity tops(countertops)
18 Board paneling
19 Glass
20
21 Related Sections: The following sections contain requirements that relate to this section:
22
23 Division 6 Section "Rough Carpentry"for furring, blocking, and other carpentry work that is not
24 exposed to view.
25
26 Division 8 Section "Flush Wood Doors" for doors specified by reference to architectural
27 woodwork standards.
28
29 SUBMITTALS
30
31 General: Submit the following in accordance with Conditions of Contract and Division 1 Specification
32 Sections.
33
34 Product data for each type of product and process specified in this section and incorporated into items
35 of architectural woodwork during fabrication, finishing, and installation.
36
37 Shop drawings showing location of each item, dimensioned plans and elevations, large-scale details,
38 attachment devices, and other components.
39
40 Samples for initial selection purposes of the following in form of manufacturer's color charts consisting
41 of actual units or sections of units showing full range of colors, textures, and patterns available for
42 each type of material indicated.
43
44 Samples for verification purposes of the following:
45
46 Laminate clad panel products, 8-1/2 inches, by 11 inches for each type, color, pattern, and
47 surface finish,with separate samples of unfaced panel product used for core.
48
49 Exposed hardware, one unit of each type and finish.
50
51 Thermoset decorative-overlay surfaced panel products, 8 by 10 inches (200 by 250 mm), for
52 each type, color, pattern, and surface finish, with separate samples of unfaced panel product
53 used for core.
54
55 For each type of board paneling and accessory, with finish required, 5 pieces, approximately
56 2 iriches (300 mm) long and of same thickness and material indicated for the Work and
57 showing the full range of normal color and texture variations expected.
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Product certificates signed by woodwork manufacturer certifying that products comply with specified
3 requirements.
4
5 Qualification data for firms and persons specified in "Quality Assurance" article to demonstrate their
6 capabilities and experience. Include list of completed projects with project names, addresses, names
7 of Architects and Owners, and other information specified.
8
9 QUALITY ASSURANCE
10
11 Manufacturer Qualifications: Firm experienced in successfully producing architectural woodwork
12 similar to that indicated for this Project, with sufficient production capacity to produce required units
13 without causing delay in the Work.
14
15 Single-Source Manufacturing and Installation Responsibility: Engage a qualified Manufacturer to
16 assume undivided responsibility for woodwork specified in this section, including fabrication, finishing,
17 and installation.
18
19 AWI Quality Standard: Comply with applicable requirements of "Architectural Woodwork Quality
20 Standards"published by the Architectural Woodwork Institute (AWI)except as otherwise indicated.
21
22 DELIVERY, STORAGE,AND HANDLING
23
24 Protect woodwork during transit, delivery, storage, and handling to prevent damage, soilage, and
25 deterioration.
26
27 Do not deliver woodwork until painting, wet work, grinding, and similar operations that could damage,
28 soil, or deteriorate woodwork have been completed in installation areas. If woodwork must be stored
29 in other than installation areas, store only in areas whose environmental conditions meet requirements
30 specified in "Project Conditions."
31
32 PROJECT CONDITIONS
33
34 Environmental Conditions: Obtain and comply with Woodwork Manufacturer's and Installer's
35 coordinated advice for optimum temperature and humidity conditions for woodwork during its storage
36 and installation. Do not install woodwork until these conditions have been attained and stabilized so
37 that woodwork is within plus or minus 1.0 percent of optimum moisture content from date of
38 installation through remainder of construction period.
39
40 Field Measurements: Where woodwork is indicated to be fitted to other construction, check actual
41 dimensions of other construction by accurate field measurements before manufacturing woodwork;
42 show recorded measurements on final shop drawings. Coordinate manufacturing schedule with
43 construction progress to avoid delay of Work.
44 Where field measurements cannot be made without delaying the Work, guarantee dimensions
45 and proceed with manufacture of woodwork without field measurements. Coordinate other
46 construction to ensure that actual dimensions correspond to guarantee dimensions.
47
48
49 PART 2-PRODUCTS
50
51
52 MATERIALS
53
54 General: Provide materials that comply with requirements of the AWI woodworking standard for each
55 type of woodwork and quality grade indicated and,where the following products are part of woodwork,
56 with requirements of the referenced product standards, that apply to product characteristics indicated:
57
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-2
GDA#12018.00 December 14,2012
Issue for Permit
1 Medium-Density Fiberboard: ANSI A208.2.
2
3 Particleboard: ANSI A208.1, Grade M-2.
4
5 Formaldehyde Emission Levels: Comply with formaldehyde emission requirements of each voluntary
6 standard referenced below:
7
8 Particleboard: NPA 8.
9
10 Medium Density Fiberboard: NPA 9.
11
12 High-Pressure Decorative Laminate: NEMA LD 3, grades as indicated, or if not indicated, as required
13 by woodwork quality standard.
14
15 Manufacturer: Subject to compliance with requirements, provide high-pressure decorative
16 laminates by one of the following:
17
18 As indicated on the Drawings
19
20 Thermoset Decorative Overlay: Decorative surface of thermally fused polyester or melamine-
21 impregnated web, bonded to specified substrate and complying with ALA 1992.
22 Substrate: Medium-density particleboard, or medium-density fiberboard.
23
24 Tempered Float Glass for Countertop: ASTM C 1048, Kind FT, Condition A, Type I, Class 1 (clear),
25 Quality-Q3; with exposed edges seamed before tempering,
26
27 Thickness: %", 12 mm thick.
28
29 Edge: Pencil Polish
30
31 FABRICATION, GENERAL
32
33 Wood Moisture Content: Comply with requirements of referenced quality standard for moisture
34 content of lumber in relation to relative humidity conditions existing during time of fabrication and in
35 installation areas.
36
37 Fabricate woodwork to dimensions, profiles, and details indicated. Ease edges to radius indicated for
38 the following:
39
40 Corners of cabinets and edges of solid wood (lumber) members less than 1 inch in nominal
41 thickness: 1/16 inch.
42
43 Edges of rails and similar members more than 1 inch in nominal thickness: 1/8 inch.
44
45 Complete fabrication, including assembly, finishing, and hardware application, before shipment to
46 project site to maximum extent possible. Disassemble components only as necessary for shipment
47 and installation. Where necessary for fitting at site, provide ample allowance for scribing, trimming,
48 and fitting.
49
50 Factory-cut openings, to maximum extent possible, to receive plumbing fixtures, electrical work, and
51 similar items. Locate openings accurately and use templates or roughing-in diagrams to produce
52 accurately sized and shaped openings. Smooth edges of cutouts and, where located in countertops
53 and similar exposures, seal edges of cutouts with a water-resistant coating.
54
55 INTERIOR STANDING AND RUNNING TRIM FOR TRANSPARENT FINISH
56
57 Grade: Premium, clear.
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Wood Species and Cut: Douglas Fir.
3
4 For trim items wider than available lumber, use veneered construction. Do not glue for width.
5
6 For rails wider or thicker than available lumber, use veneered construction. Do not glue for width or
7 thickness.
8
9 Backout or groove backs of flat trim members and kerf backs of other wide, flat members, except for
10 members with ends exposed in finished work.
11
12 LAMINATE CLAD CABINETS (PLASTIC-COVERED CASEWORK)
13
14 Quality Standard: Comply with AWI Section 400 and its Division 400B "Laminate Clad Cabinets."
15
16 Grade: Custom.
17
18 AWI Type of Cabinet Construction: Flush overlay.
19
20 Laminate Cladding: High pressure decorative laminate complying with the following requirements:
21
22 Colors, Patterns, and Finishes: Provide materials and products that result in colors and
23 textures of exposed laminate surfaces complying with the following requirements:
24
25 Provide selections made by Architect from laminate manufacturer's full range of
26 standard colors and finishes.
27
28 Laminate Cladding for Exposed Surfaces: High-pressure decorative laminate complying with the
29 following requirements:
30
31 Horizontal Surfaces Other than Tops: GP-50, 0.050-inch (1.270-mm) nominal thickness.
32
33 Vertical Surfaces: GP-50, 0.050-inch (1.270-mm)nominal thickness.
34
35 Provide for front sides, top, bottom and back surfaces of cabinet doors.
36
37 Edges: GP-50, 0.050-inch (1.270-mm)nominal thickness.
38
39 Materials for Semiexposed Surfaces: Provide surface materials indicated below:
40
41 Converter Storage Cabinet and Equipment Lockers
42
43 All Surfaces: GP-50, 0.050-inch (1.270-mm)nominal thickness.
44
45 Color: As indicated on Drawings and Schedules.
46
47 All other cabinets
48
49 Surfaces Other than Drawer Bodies: Thermoset decorative overlay.
50
51 Drawer Sides and Backs: Thermoset decorative overlay.
52
53 Drawer Bottoms: Thermoset decorative overlay.
54
55 Color: White.
56
57 CABINET HARDWARE AND ACCESSORY MATERIALS
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 General: Provide hardware and accessory materials associated with architectural woodwork, except
3 for items specified in Division 8 Section"Finish Hardware."
4
5 Cabinet Hardware Schedule: Refer to schedule at end of this section for cabinet hardware required
6 for architectural cabinets.
7
8 Hardware Standard: Comply with ANSI/BHMA A156.9 "American National Standard for Cabinet
9 Hardware"for items indicated by reference to BHMA numbers or referenced to this standard.
10
11 Exposed Hardware Finishes: For exposed hardware, provide finish indicated.
12
13 US 26D
14
15 For concealed hardware provide manufacturer's standard finish that complies with product class
16 requirements of ANSI/BHMA A156.9.
17
18 ARCHITECTURAL CABINET TOPS(COUNTERTOP
19
20 Quality Standard: Comply with AWI Section 400 and its Division 400C.
21
22 Type of Top: High pressure decorative laminate complying with the following:
23
24 Grade: Custom.
25
26 Colors, Patterns, and Finishes: Provide materials and products that result in colors and
27 textures of exposed laminate surfaces complying with the following requirements:
28
29 Provide Architect's selections from manufacturer's full range of colors and finishes in the
30 following categories:
31
32 Solid colors, wood grains, or patterns.
33
34 Grain Direction: Parallel to cabinet fronts.
35
36 Edge Treatment: Same as laminate cladding on horizontal surfaces.
37
38 Core Material: Medium-density particleboard, phenolic resin, medium-density particleboard.
39
40 PANELING
41
42 Board Paneling:
43
44 Source:
45
46 TerraMai
47 8400 Agate Road
48 White City, OR 97503
49 Tel: 541.973.2301
50 Tel: 800.220.9062
51 Fax: 541.973.2308
52
53 Board Paneling No. 1 (indicated as BP-1 on the Drawings):
54
55 Application: Paneling.
56
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-5
GDA#12018.00 December 14,2012
Issue for Permit
1 Species and Grade: Pseudotsuga menziesii, 100% Clear Douglas Fir — Mixed grain.
2 Reclaimed from gymnasium bleachers.
3
4 Bolt holes plugged with matching Douglas Fir plugs.
5
6 Maximum Moisture Content: 6-9 percent.
7
8 Pattern: Tongue&groove, back-relieved, solid length.
9
10 Thickness: 5/8-inch
11
12 Net Coverage Width: Not less than 6-inches(140 mm), actual.
13
14 Lengths: Random, 4'to 12'long.
15
16 Finish: Water-based polyurethane.
17
18 MISCELLANEOUS:
19
20 Closet Rod Supports: For supporting closet rods where rod does not terminate into wall, provide 3/4"
21 particleboard or medium density fiberboard overlaid with thermoset decorative overlay (melamine) on
22 all exposed edges.
23
24 FASTENERS AND ANCHORS
25
26 Screws: Select material, type, size, and finish required for each use. Comply with FS FF-S-111 for
27 applicable requirements.
28
29 For metal framing supports, provide screws as recommended by metal framing manufacturer.
30
31 Nails: Select material, type, size, and finish required for each use. Comply with FS FF-N-105 for
32 applicable requirements.
33
34 Anchors: Select material, type, size, and finish required by each substrate for secure anchorage.
35 Provide nonferrous metal or hot-dip galvanized anchors and inserts on inside face of exterior walls
36 and elsewhere as required for corrosion resistance. Provide toothed steel or lead expansion bolt
37 devices for drilled-in-place anchors. Furnish inserts and anchors, as required, to be set into concrete
38 or masonry work for subsequent woodwork anchorage.
39
40 PART 3- EXECUTION
41
42
43 PREPARATION
44
45 Condition woodwork to average prevailing humidity conditions in installation areas before installing.
46
47 Deliver concrete inserts and similar anchoring devices to be built into substrates well in advance of
48 time substrates are to be built.
49
50 Before installing architectural woodwork, examine shop-fabricated work for completion and complete
51 work as required, including back priming and removal of packing.
52
53 INSTALLATION
54
55 Quality Standard: Install woodwork to comply with AWI Section 1700 for it grade specified in Part 2 of
56 this section for type of woodwork involved.
57
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-6
GDA#12018.00 December 14, 2012
Issue for Permit
1 Install woodwork plumb, level, true, and straight with no distortions. Shim as required with concealed
2 shims. Install to a tolerance of 1/8 inch in 8'-0" for plumb and level (including tops) and with no
3 variations in flushness of adjoining surfaces.
4
5 Scribe and cut woodwork to fit adjoining work and refinish cut surfaces or repair damaged finish at
6 cuts.
7
8 Anchor woodwork to anchors or blocking built in or directly attached to substrates. Secure to grounds,
9 stripping and blocking with countersunk, concealed fasteners and blind nailing as required for a
10 complete installation. Except where prefinished matching fastener heads are required, use fine
11 finishing nails for exposed nailing, countersunk and filled flush with woodwork and matching final finish
12 where transparent finish is indicated.
13
14 STANDING AND RUNNING TRIM:
15
16 Standing and Running Trim: Install with minimum number of joints possible, using full-length pieces
17 (from maximum length of lumber available) to greatest extent possible. Do not use pieces less than
18 60 inches (1500 mm) long, except where shorter single-length pieces are necessary. Scarf running
19 joints and stagger in adjacent and related members.
20
21 Install standing and running trim with no more variation from a straight line than 1/8 inch in 96
22 inches(3 mm in 2400 mm).
23
24 CABINETS:
25
26 Cabinets: Install without distortion so doors and drawers fit openings properly and are accurately
27 aligned. Adjust hardware to center doors and drawers in openings and to provide unencumbered
28 operation. Complete installation of hardware and accessory items as indicated.
29
30 Install cabinets with no more than 1/8 inch in 96-inch (3 mm in 2400-mm) sag, bow, or other
31 variation from a straight line.
32
33 Fasten wall cabinets through back, near top and bottom, at ends and not more than 16 inches
34 (400 mm) o.c. with No. 10 wafer-head screws sized for 1-inch (25-mm) penetration into wood
35 framing, blocking, or hanging strips.
36
37 COUNTERTOPS:
38
39 Countertops: Anchor securely by screwing through corner blocks of base cabinets or other supports
40 into underside of countertop.
41
42 Align adjacent solid-surfacing-material countertops and form seams to comply with
43 manufacturer's written recommendations using adhesive in color to match countertop.
44 Carefully dress joints smooth, remove surface scratches, and clean entire surface.
45
46 Install countertops with no more than 1/8 inch in 96-inch (3 mm in 2400-mm) sag, bow, or
47 other variation from a straight line.
48
49 Secure backsplashes to tops with concealed metal brackets at 16 inches(400 mm)o.c. and to
50 walls with adhesive.
51
52 Caulk space between backsplash and wall with sealant specified in Division 7 Section "Joint
53 Sealants."
54
55 PANELING INSTALLATION
56
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-7
GDA#12018.00 December 14,2012
Issue for Permit
1 Board Paneling: Arrange in random-width pattern suggested by manufacturer unless boards or planks
2 are of uniform width.
3
4 Comply with manufacturer's written installation instructions, but not less than applicable
5 recommendations in NWFA's"Installation Guidelines: Wood Flooring."
6
7 Wood Sleepers: Install according to requirements in Division 6 Section "Rough Carpentry."
8
9 Board Paneling: Blind nail or staple paneling to substrate.
10
11 ADJUSTMENT AND CLEANING
12
13 Repair damaged and defective woodwork where possible to eliminate defects functionally and
14 visually;where not possible to repair, replace woodwork. Adjust joinery for uniform appearance.
15
16 Clean, lubricate, and adjust hardware.
17
18 Clean woodwork on exposed and semi-exposed surfaces. Touch up factory-applied finishes to
19 restore damaged or soiled areas.
20
21 PROTECTION
22
23 Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer,
24 that ensures that woodwork is being without damage or deterioration at time of Substantial
25 Completion.
26
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-8
GDA#12018.00 December 14, 2012
Issue for Permit
1 HARDWARE SCHEDULE
2
3 1. Shelf Supports: K&V No. 80 standards with NO. 180 brackets, depths to fit shelf size
4 indicated.
5
6 2. Closet Rods: K&V No. KV-2 with bright nickel finish, lengths as required on Drawings.
7
8 3. Cabinet Wire Pull/per each door and drawer: Stanley 4483-1/2 Alum.
9
10 4. Concealed Casework Hinges: Stanley, Blum or equal. (Provide continuous piano
11 hinges at wood lockers)
12
13 5. Door Locks: C8053 lock with C7014 cam; National Cabinet Lock. Keyed alike.
14
15 Equipment Lockers and Converter Storage
16
17 Hardware Standard: Comply with BHMA A156.9 for items indicated by referencing BHMA numbers or
18 items referenced to this standard.
19
20 1. Cabinet Door Hinges: Cabinet hinge for 3/4" overlay doors. Provide #1592; Stanley
21 Hardware. Provide 2 hinges for doors up to 40"tall, 3 hinges for doors over 40"tall.
22
23 2. Wire Pulls: Back mounted, 7•' arches (89 mm) long, . !I-2 (33.4 mm)deep,
24 and 5,18 inches (8 mm) in diameter. Provide#4483-1/2; Stanley Hardware.
25
26 3. Door Locks: C8053 lock with C7014 cam; National Cabinet Lock. Keyed differently.
27
28 4. Shelf Standards: KV 255 shelf standards, adjustable at 1/2" centers. Provide 4 No
29 256 shelf supports for each shelf.
30
31 Exposed Hardware Finishes: For exposed hardware, provide finish that complies with BHMA A156.18
32 for BHMA finish number indicated.
33
34 Aluminum: 628 for pulls.
35
36 Plated Brass: 626 for locks and hinges.
37
38 Shelf Standards: Zinc.
39
40
41 END OF SECTION 06402
INTERIOR ARCHITECTURAL WOODWORK
GDA 06402-9
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 06640- FIBERGLASS REINFORCED POLYESTER PANELS
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 Division-1 Specification sections, apply to work of this section.
10
11 SCOPE
12
13 Furnish and install:
14
15 Fiberglass wall panel.
16
17 Miscellaneous specialties scheduled.
18
19 Supplemental items necessary to complete work indicated.
20
21 SHOP DRAWINGS
22
23 Show dimensions, materials, construction details, assembly methods and other pertinent information.
24
25
26 PART TWO-PRODUCTS
27
28
29 GENERAL
30
31 As per approved Shop Drawings
32
33 Provide materials in colors, and finishes as scheduled or shown on Drawings.
34
35 Acceptable Manufacturer
36
37 Product: Subject to compliance with requirements provide FRP by Panolam.
38
39 Sizes: Provide size of panels for walls as indicated on the Drawings.
40
41 Colors: Silver, typical, White in Janitor's Room.
42
43 Texture: Embossed.
44
45 Surface Burning: Class C,ASTM E84.
46
47 Moldings: PVC cap, corner, and edges, color to match panel.
48
49 Adhesive:
50
51 Per manufacturers recommendations.
52
53
54 PART THREE -EXECUTION
55
56 General
57
FIBERGLASS REINFORCED POLYESTER PANELS
GDA 06640- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 At locations indicated on the drawings and schedules, provide fiber reinforced polyester panels. Set
2 items level, plumb, square, and at proper elevations.
3
4 Comply with manufacturer's recommendations for installation.
5
6 Installation
7
8 Use all necessary moldings and sealants for proper installation according to manufacturer's
9 recommendations. Colors shall match panel color.
10
11 Laminate fiberglass panels to gypsum board with adhesive as per manufacturer's recommendations.
12
13 There are to be no horizontal joints in the FRP panels.
14
15
16 END OF SECTION 09985
FIBERGLASS REINFORCED POLYESTER PANELS
GDA 06640- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 06651 -SOLID SURFACE FABRICATIONS
2
3
4 PART 1 —GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of the contract, including general and supplementary conditions and
10 Division 1 Specification Sections, apply to this Section.
11
12 SUMMARY
13
14 This Section includes the following horizontal and trim solid surface product types:
15
16 Countertops, skirts and splashes.
17
18 Related Sections include the following:
19
20 DEFINITION
21
22 Solid surface (quartz) is defined as nonporous, homogeneous material maintaining the same
23 composition throughout the part with a composition of approximately 93% crystalline silica which is
24 bound in polymer.
25
26 SUBMITTALS
27
28 Product data:
29
30 For each type of product indicated.
31
32 Shop drawings: Show location of each item, dimensioned plans and elevations, large-scale details,
33 attachment devices and other components.
34
35 Show full-size details, edge details,thermoforming requirements, attachments, etc.
36 Show locations and sizes of furring, blocking, including concealed blocking and reinforcement
37 specified in other Sections.
38 Show locations and sizes of cutouts and holes for plumbing fixtures, faucets, soap dispensers,
39 waste receptacle and other items installed in solid surface.
40
41 Samples: For each type of product indicated.
42
43 Submit minimum 6-inch by 6-inch sample in specified gloss.
44 Cut sample and seam together for representation of inconspicuous seam.
45 Indicate full range of color and pattern variation.
46
47 Approved samples will be retained as a standard for work.
48
49 Product data: Indicate product description, fabrication information and compliance with specified
50 performance requirements.
51
52 Product certificates: For each type of product, signed by product manufacturer.
53
54 Manufacturer certificates: Signed by manufacturers certifying that they comply with requirements.
55
SOLID SURFACE FABRICATIONS
GDA 06651 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Maintenance data: Submit manufacturer's care and maintenance data, including repair and cleaning
2 instructions.
3
4 Maintenance kit for finishes shall be submitted.
5
6 Include in project closeout documents.
7
8 QUALITY ASSURANCE
9
10 Qualifications: Shop that employs skilled workers who custom fabricate products similar to those
11 required for this project and whose products have a record of successful in-service performance.
12
13 Fabricator/installer qualifications: Work of this section shall be by a certified fabricator/installer,
14 certified in writing by the manufacturer.
15
16 Applicable standards: Standards of the following, as referenced herein:
17
18 American National Standards Institute (ANSI)
19 American Society for Testing and Materials (ASTM)
20 National Electrical Manufacturers Association (NEMA)
21
22 Fire test response characteristics: Provide with the following Class A (Class I) surface burning
23 characteristics as determined by testing identical products per UL 723 (ASTM E84) or another testing
24 and inspecting agency acceptable to authorities having jurisdiction:
25
26 Flame Spread Index: 25 or less.
27 Smoke Developed Index: 450 or less.
28
29 Job mock-up: Prior to fabrication of architectural millwork, erect sample unit to further verify selections
30 made under sample submittals and to demonstrate the quality of materials and execution.
31
32 Mock-up shall be full scale by 5-feet long.
33
34 Build the mock-up to comply with the contract documents and install in a location as directed
35 by the architect.
36
37 Notify the architect two weeks in advance of the date of when the mock-up will be delivered.
38
39 Should mock-up not be approved, re-fabricate and reinstall until approval is secured.
40
41 Remove rejected units from project site.
42
43 After approval, the mock-up may become a part of the project.
44
45 This mock-up, once approved, shall serve as a standard for judging quality of all completed
46 units of work.
47
48 Pre-installation conference: Conduct conference at project site to comply with requirements in Division
49 1.
50
51 DELIVERY, STORAGE AND HANDLING
52
53 Deliver no components to project site until areas are ready for installation.
54
55 Store components indoors prior to installation.
56
SOLID SURFACE FABRICATIONS
GDA 06651 - 2
GDA#12018.00 December 14,2012
Issue for Permit
1 Handle materials to prevent damage to finished surfaces.
2
3 Provide protective coverings to prevent physical damage or staining following installation for
4 duration of project.
5
6 WARRANTY
7
8 Provide manufacturer's warranty against defects in materials.
9
10 Warranty shall provide material and labor to repair or replace defective materials.
11
12 Damage caused by physical or chemical abuse or damage from excessive heat will not be
13 warranted.
14
15 Installed Warranty: To qualify for the optional Installed Warranty, fabrication and installation must be
16 performed by a DuPont Certified Fabrication/Installation source who will provide a brand plate for the
17 application.
18
19 This warranty covers all fabrication and installation performed by the certified/approved source subject
20 to the specific wording contained in the Installed Warranty Card.
21
22 Manufacturer's warranty period: Ten years from date of substantial completion.
23
24 MAINTENANCE
25
26 Provide maintenance instructions as specified by the manufacturer.
27
28
29 PART 2—PRODUCTS
30
31
32 ACRYLIC SOLID SURFACE MATERIAL
33
34 Product: Studio Class I
35
36 Description: Non-porous, homogeneous material maintaining the same composition throughout the
37 part with a composition of polyester or acrylic polymer, aluminum trihydrate filler and pigment.
38
39 Thickness: As indicated on the Drawings.
40
41 Color: Silver Comet, K3-8585
42
43 Gloss: 05/08
44
45 Sheet Size: As required for fabrication of units indicated.
46
47 Manufacturer: Subject to compliance with requirements, provide products by the following:
48
49 Avonite Surfaces® by Aristech Acrylics LLC
50 7350 Empire Drive
51 Florence, KY 41042, USA
52 Phone 1.800.354.9858 or 859.283.1501
53 Fax 859.283.7378
54 Website www.avonitesurfaces.com.
55
56
SOLID SURFACE FABRICATIONS
GDA 06651 -3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2
3 QUARTZ SOLID SURFACE MATERIAL
4
5 MATERIALS
6
7 Natural Quartz and Resin Composite Countertops and Splashes: Non-porous blend of natural quartz,
8 93 percent, and polyester resin, 7 percent, formed into flat slabs over continuous substrate.
9
10 Flat Sheet Thickness: 13/16 inch (20mm).
11
12 Edge Detail: Flat, eased edge.
13
14 Surface Finish: Polished (Standard).
15
16 Color: 1625 Bianco Regina.
17
18 Seam width: <1/8"unless otherwise specified.
19
20 Backsplash: Applied.
21
22 Manufacturer: Subject to compliance with requirements,provide products by the following:
23
24 OKITE
25 12227 FM 529, Suite K
26 Houston, TX 77041.
27 Phone: (713)849-3800, Toll Free: (866)654-8397.
28 Fax: (713)849-3835.
29 Website: www.okite.us.
30 Email: info @okite.us.
31
32 ACCESSORIES
33
34 Joint adhesive: Manufacturer's standard one- or two-part adhesive kit to create inconspicuous,
35 nonporous joints.
36
37 Sealant: Manufacturer's standard mildew-resistant, FDA-compliant, NSF 51-compliant (food zone —
38 any type), UL-listed silicone sealant in colors matching components.
39
40 FACTORY FABRICATION
41
42 Shop assembly: Fabricate components to greatest extent practical to sizes and shapes indicated, in
43 accordance with approved shop drawings and manufacturer's printed instructions and technical
44 bulletins.
45
46 Form joints between components using manufacturer's standard joint adhesive without conspicuous
47 joints.
48
49 Reinforce with strip of solid polymer material, 2"wide.
50
51 Provide factory cutouts for plumbing fittings and bath accessories as indicated on the
52 drawings.
53
54 Rout and finish component edges with clean, sharp returns.
55
56 Rout cutouts, radii and contours to template.
SOLID SURFACE FABRICATIONS
GDA 06651 -4
GDA#12018.00 December 14, 2012
Issue for Permit
1 Smooth edges.
2 Repair or reject defective and inaccurate work.
3
4 FINISHES
5
6 Color: As indicated on the Drawings.
7
8 Finish: Provide surfaces with a uniform finish.
9
10 As indicated on the Drawings.
11
12
13 PART 3—EXECUTION
14
15
16 EXAMINATION
17
18 Examine substrates and conditions, with fabricator present for compliance with requirements for
19 installation tolerances and other conditions affecting performance of work.
20
21 Proceed with installation only after unsatisfactory conditions have been corrected.
22
23 INSTALLATION
24
25 Install components plumb, level and rigid, scribed to adjacent finishes, in accordance with approved
26 shop drawings and product data.
27
28 Provide product in the largest pieces available.
29
30 Form field joints using manufacturer's recommended adhesive, with joints inconspicuous in
31 finished work.
32
33 Cut and finish component edges with clean, sharp returns.
34
35 Rout radii and contours to template.
36
37 Anchor securely to partition or other supports.
38
39 Align adjacent copings and form seams to comply with manufacturer's written
40 recommendations using adhesive in color to match countertop.
41
42 Carefully dress joints smooth, remove surface scratches and clean entire surface.
43
44 Install copings with no more than 1/8-inch (3 mm)in 10-feet sag, or bow from a straight line.
45
46
47 REPAIR
48
49 Repair or replace damaged work which cannot be repaired to architect's satisfaction.
50
51 CLEANING AND PROTECTION
52
53 Keep components clean during installation.
54
55 Remove adhesives, sealants and other stains.
56
SOLID SURFACE FABRICATIONS
GDA 06651 -5
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 End of Section
SOLID SURFACE FABRICATIONS
GDA 06651 -6
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 07270- FIRESTOPS AND SMOKESEALS
2
3
4 PART 1 -GENERAL
5
6 SCOPE
7
8 The work of this Section consists of furnishing and installing firestops and smokeseals, and related
9 items, as indicated on the Drawings and/or specified herein, and includes, but is not limited to, the
10 following:
11
12 Single component, non-combustible, silicone firestop sealant or putty for the following uses:
13
14 At penetrations subject to movement, including conduit, cable, bundles, bus duct, and
15 non-combustible pipe.
16
17 At control joints of fire-rated floor assemblies, at tops of fire-rated walls (to overhead
18 construction), at voids between slab edges and curtain wall construction, etc.
19
20 As a sealant for smoke barrier construction, at fire and smoke dampers, at fire door
21 frames in fire-rated walls, etc.
22
23 Cementitious firestopping mortars for the following uses:
24
25 At non-moving penetrations such as cable trays, electrical and communication cable
26 bundles, conduit, and non-combustible sleeves and pipers.
27
28 At cavities (flute spaces) between upper beam flanges, masonry wall tops, partition track,
29 etc., and metal decks directly above.
30
31 Firestop collars for use with through penetrations involving combustible PVC/ABS pipe or
32 conduit.
33
34 Firestop pillows for use for temporary sealing of openings and penetrations of any kind which
35 need to be re-opened and re-sealed in a fast and safe manner.
36
37 Mineral fiber/ceramic fiber, non--combustible, safing insulation for use as damming material
38 for tested and rated firestop system per manufacturer's requirements.
39
40 Clips and closures as required for support and containment of dams and insulation materials.
41
42 Carefully review the Drawings to determine the many and varied conditions where fire-stopping
43 and smoke-sealing are required.
44
45 Related work:
46
47 Documents affecting work of this Section include, but are not necessarily limited to, General
48 Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications.
49
50 Examine all Drawings and all other Sections of the Specifications for requirements therein
51 affecting the work of this trade.
52
53 Section 09260, Gypsum Wallboard System.
54
55 Section 07200, Insulation, for fire safing at the edge of elevated slabs and exterior walls.
56
57 Divisions 15 and 16.
FIRESTOPS AND SMOKESEALS
GDA 07270-1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 QUALITY ASSURANCE
3
4 Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the
5 necessary crafts and who are completely familiar with the specified requirements and the methods
6 needed for proper performance of the work of this Section.
7
8 Work of this Section shall comply with all applicable provisions of all codes, regulations and
9 ordinances having jurisdiction.
10
11 SUBMITTALS
12
13 Product Data: Submit complete manufacturer's product data covering each type of firestop and
14 smokeseal material proposed for use. Product data shall show product characteristics, typical
15 uses, performance and limitation criteria, and test data. Include also:
16
17 Manufacturer's installation procedures for each type of product, construction,and fire
18 resistance required for the project.
19
20 Fire test reports from recognized, independent testing agent(s)indicating the following:
21
22 Fire test report of firestop material applied to substrate and penetration materials similar to
23 project conditions. Test to indicate both Flame (F)and Temperature(T) Ratings.
24
25 Test reports of products to be used shall indicate conformance to ASTM E-814.
26
27 SITE SAMPLES
28
29 Install at the site, on the work, a sample of appropriate firestopping of each different type and for
30 each different penetration and fire rating required for the work. Sample installations shall comply
31 with thickness, fire resistance ratings, and finished appearance requirements of the project and
32 the governing laws and codes. Replace as necessary until Architect's approval has been
33 obtained. Upon Architect's approval, the sample installations shall thereupon become the
34 standard of acceptance for method of application, thickness, and finished appearance of
35 subsequent firestopping and smokesealing applications, and shall remain visible at the site during
36 and until completion of the work.
37
38 PERFORMANCE CRITERIA
39
40 All materials and work shall conform to requirements of the governing laws and codes with
41 respect to fire resistant wall and floor assemblies.
42
43 Testing Requirements: All firestopping and smokesealing materials shall be tested by a
44 recognized, independent testing agency and shall conform to both Flame (F)and Temperature (T)
45 requirements of ASTM E-814, and shall:
46
47 Conform to U.L. Fire hazard Classification Requirements.
48
49 Classified non-combustible in accordance with ASTM E84.
50
51 Firestopping and smokesealing in place shall be of sufficient thickness, width, and density to
52 provide a fire resistance rating at least equal to the floor,wall, or partition construction into which it
53 is installed.
54
55 Non-combustible dams shall be constructed:
56
57 As necessary to achieve fire rating as tested and rated.
FIRESTOPS AND SMOKESEALS
GDA 07270-2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 In conformance with installation requirements for type of floor, wall, and partition construction.
3
4 As recommended by firestop manufacturer.
5
6 Combustible damming material,if used, must be removed after proper curing.
7
8 COORDINATION
9
10 The work of this Section shall be coordinated with that of other trades affecting, or affected by,this
11 work, as necessary to assure the steady progress of all work under the contract.
12
13 Closely coordinate the delivery and installation of this work with the Contractor's schedule.
14
15 PRODUCT DELIVERY, STORAGE AND HANDLING
16
17 Comply with pertinent provisions of Section 01640.
18
19 Deliver firestopping materials to project site in manufacturer's original, unopened containers
20 bearing proper U.L. labeling.
21
22 Store materials off the ground in an area protected from weather, moisture, an freezing, and as
23 recommended by the manufacturer.
24
25 Assure that all firestopping materials are installed prior to the expiration of shelf life.
26
27
28 PART 2- PRODUCTS
29
30
31 FIRESTOP SEALANT AND PUTTY:
32
33 Shall be single component, non-combustible, silicone elastomer firestop sealant equal to "Fire
34 Barrier Caulk CP 25N/S" and Fire Barrier Caulk CP 25S/L" (as applicable), as manufactured by
35 3M Contractor Products, , or equivalent products from Rectorseal, STI, and Hilti.
36
37 or
38
39 Shall be single component, non-combustible, water-based elastomer firestop sealant equal to
40 "Fire Barrier Caulk CP 25WB" as manufactured by 3M Contractor Products, or equivalent
41 products from Rectorseal, STI, and Hilti.
42
43 Sealant shall have U.L. Classification as a "Fill, Void, or Cavity Material" for through penetration
44 firestop system when tested in accordance with ASTM E814 and UL1479.
45
46 CEMENTITIOUS FIRESTOP MORTAR
47
48 Shall be cementitious firestop mortar equal to "Bio K-10 Mortar" as manufactured by
49 Rectorseal/Bio Fireshield Inc., or equivalent by Hilti, STI, Tremco, Rectorseal, or 3M Contractor
50 Products.
51
52 Firestop mortar shall have U.L. Classification as a "Fill, Void, or Cavity Material" for through
53 penetration firestop system when tested in accordance with ASTM E814 and UL1479.
54
55 Cementitious mortar shall be asbestos free.
56
57 FIRESTOP COLLARS (FOR USE WITH PLASTIC PIPE)
FIRESTOPS AND SMOKESEALS
GDA 07270-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Shall be pre-manufactured fire protective pipe sleeve equal to "Bio Stop Collar" as manufactured
3 by Rectorseal/Bio Fireshield Inc., or equivalent by Hilti, STI, Tremco or 3M Contractor Products.
4
5 Provide separated, two-piece, firestop collar for application when plastic pipe system is already in
6 place. Provide non-separated firestop collar for application prior to installation of plastic pipe
7 system.
8
9 Firestop Collars shall have U.L. Classification as "Fill, Void, or Cavity Material" for through
10 penetration firestop system when tested in accordance with ASTM E814 and UL1479.
11
12 FIRESTOP PILLOWS
13
14 Shall be "Firestop Pillows", equal to "Bio Fireshield Firestop Pillows" as manufactured by
15 Rectorseal/Bio Fireshield Inc., or equivalent by Hilti, STI, Tremco or 3M Contractor Products.
16
17 Firestop pillows shall have U.L. Classification as "Fill, Void, or Cavity Material" for through
18 penetration firestop system when tested in accordance with ASTM E-814 and UL1479.
19
20 FIRE SAFING AND ACCESSORIES
21
22 Slag-Wool-Fiber Board Safinq Insulation: Semirigid boards designed for use as fire stop at openings
23 between edge of slab and exterior wall panels, produced by combining slag-wool fibers with
24 thermosetting resin binders to comply with ASTM C 612, Type IA and IB; nominal density of 4 lb/cu. ft.
25 (64 kg/cu. m); passing ASTM E 136 for combustion characteristics; thermal resistivity of 4 deg F x h x
26 sq. ft./Btu x in. at 75 deg F (27.7 K x m/W at 24 deg C).
27
28 Material shall be classified non-combustible per ASTM E-814.
29
30 Calking Compound: Material approved by manufacturer of safing insulation for sealing joint between
31 foil backing of safing insulation and edge of concrete floor slab against penetration of smoke.
32
33 Safing Clips: Galvanized steel safing clips approved by manufacturer of safing insulation for holding
34 safing insulation in place.
35
36 Manufacturers: Subject to compliance with requirements, provide fire safing products of one of the
37 following:
38
39 Slag-Wool-/Rock-Wool-Fiber Insulation:
40
41 FBX Safing Insulation; Fibrex Inc.
42 Partek Insulations, Inc.
43 Thermafiber; USG Interiors, Inc.
44 Firemaster Blanket; Thermal Ceramics
45
46
47 PART 3 - EXECUTION
48
49
50 INSPECTION
51
52 Examine the areas and conditions where firestops and smokeseals are to be installed and notify
53 the Architect of conditions detrimental to the proper and timely completion of the work. Do not
54 proceed with the work until unsatisfactory conditions have been corrected by the Contractor in an
55 acceptable manner.
56
57 PREPARATION
FIRESTOPS AND SMOKESEALS
GDA 07270-4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Surfaces to receive firestops and smokeseals shall be free of dirt, dust, grease, oil, form release
3 agents, or other matter that would impair the bond of the firestop or smokeseal material to the
4 substrate or penetrating items.
5
6 Voids and cracks in substrate shall be filled and unnecessary projections removed prior to
7 installation of firestops and smokeseals.
8
9 All penetrating items shall be permanently installed prior to firestop and smokeseal installation.
10
11 Substrate shall be front free and, when applicable, dry.
12
13 INSTALLATION
14
15 General:
16
17 Installation of firestops and smokeseals shall be performed by applicators/installers qualified
18 and trained by the manufacturer. Installation shall be performed in strict accordance with
19 manufacturer's detailed installation procedures and Code requirements.
20
21 Apply firestops and smokeseals in accordance with fire test reports, fire resistance
22 requirements, acceptable sample installation, and manufacturer's recommendations.
23
24 Coordinate with plumbing, mechanical, electrical, and other trades to assure that all pipe,
25 conduit, cable and other items which penetrate fire rated construction have been permanently
26 installed prior to installation of firestops and smokeseals. Schedule an sequence the work to
27 assure that partitions and other construction which would conceal penetrations are not
28 erected prior to the installation of firestops and smokeseals.
29
30 Dam Construction:
31
32 Install dams when required to properly contain firestop and smokeseal materials within
33 openings and as required to achieve required fire resistance rating. Combustible damming
34 material must be removed after appropriate curing. Incombustible damming material may be
35 left as a permanent component of the firestop and smokeseal system.
36
37 Placement of dams shall not interfere with function or adversely affect the appearance of
38 adjacent construction.
39
40 Installation of Single Component Silicone Firestop:
41
42 Apply with manual or powered caulking gun.
43
44 Apply to total thickness required for the respective hour rating involved. Apply to both sides of
45 wall penetrations; one side only in floor penetrations, as per manufacturer's instructions.
46
47 Use incombustible insulation as required to achieve fire resistance rating.
48
49 Surface of gun grade silicone firestop may be tooled using clean, potable water(as allowed by
50 manufacturer's instructions).
51
52 Clean excess material off of adjacent surfaces and tools within 10 minutes using either water
53 or XYLOL, as per manufacturer's instructions.
54
55 Installation of Cementitious Firestop Mortar:
56
FIRESTOPS AND SMOKESEALS
GDA 07270-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 Add dry powder to water and mix with mechanical mixer or hand mixing tools. All mixing
2 operations shall be in strict accordance with manufacturer's instructions, using clean, potable
3 water. Average wet density to be per manufacturer's specifications.
4
5 Do not apply if ambient or substrate temperature is less than 35 degrees F. during 24 hours
6 after application.
7
8 Wet all surfaces prior to application of firestop mortar, as required.
9
10 Mortar may be hand applied or pumped into the opening.
11
12 Exposed surfaces shall be finished using conventional plastering tools prior to curing.
13
14 When installing around layered cables, increase the fluidity of the firestop mortar per
15 manufacturer's instructions to provide a better fill around the cables. Vibrate or hand trowel at
16 the cables slightly to prevent voids from forming between the cables.
17
18 Allow 48 hours for initial cure prior to form removal. For full cure allow 28 days.
19
20 Wet material shall be cleaned per manufacturer's instructions. Dry material may require
21 scraping or chipping.
22
23 Installation of Firestop Collars (Plastic Pipe Only):
24
25 Firestop collars shall be mounted at slab or wall per manufacturer's instructions.
26
27 For wall penetrations with ABS pipe, firestop collars must be installed on both sides of the
28 penetration to provide the necessary F and T Rating. All other applications may require
29 installation on one side only to provide the necessary F and T Rating. Verify all such
30 installation requirements with collar manufacturer, to make sure results achieve the required
31 firestop rating.
32
33 FIRE STOPPING JOINT SEALERS SCHEDULE:
34
35 (FSS1) Foamed-in-place fire-stopping sealant Through penetrations in fire-resistance-
36 rated floor and wall assemblies involving
37 multiple pipes, conduits and other items.
38
39 (FSS2) One-part fire-stopping sealant Through penetrations in fire-resistance-
40 rated floor and wall assemblies involving
41 single pipes, conduits where joints widths
42 are narrow and of uniforms width.
43
44 END OF SECTION 07270
FIRESTOPS AND SMOKESEALS
GDA 07270-6
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 07901 -JOINT SEALANTS
2
3 PART 1 - GENERAL
4
5 RELATED DOCUMENTS
6
7 Drawings and general provisions of Contract, including General and Supplementary Conditions and
8 Division 1 Specification Sections, apply to this Section.
9
10 SUMMARY
11
12 This Section includes joint sealants for the following locations:
13
14 Interior joints in vertical surfaces and horizontal nontraffic surfaces as indicated below:
15
16 Tile control and expansion joints.
17
18 Perimeter joints between interior wall surfaces and frames of interior doors, windows.
19
20 Perimeter joints of toilet fixtures.
21
22 Other joints as indicated.
23
24 Interior joints in horizontal traffic surfaces as indicated below:
25
26 Control joints in tile flooring.
27
28 Other joints as indicated.
29
30 Related Sections: The following Sections contain requirements that relate to this Section:
31
32 Division 7 Section "Firestops and Smokeseals"for through-penetration firestopping systems.
33
34 Division 8"Glass and Glazing"for sealants used in glazing.
35
36 Division 9 Section "Gypsum Drywall" for sealing concealed perimeter joints of gypsum board
37 partitions to reduce sound transmission.
38
39 Division 9 Section "Acoustical Tile Ceilings" for sealing edge moldings at perimeter of acoustical
40 ceilings.
41
42 Division 9 Section "Tile"for sealing tile joints.
43
44 SYSTEM PERFORMANCE REQUIREMENTS
45
46 Provide elastomeric joint sealants that have been produced and installed to establish and to maintain
47 watertight and airtight continuous seals without causing staining or deterioration of joint substrates.
48
49 SUBMITTALS
50
51 General: Submit the following in accordance with Conditions of Contract and Division 1 Specification
52 Sections.
53
54 Product data from manufacturers for each joint sealant product required.
55
JOINT SEALANTS
GDA 07901 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Certification by joint sealant manufacturer that sealants plus the primers and cleaners required
2 for sealant installation comply with local regulations controlling use of volatile organic
3 compounds.
4
5 Samples for initial selection purposes in form of manufacturer's standard bead samples, consisting of
6 strips of actual products showing full range of colors available, for each product exposed to view.
7
8 Samples for verification purposes of each type and color of joint sealant required. Install joint sealant
9 samples in 1/2-inch-wide joints formed between two 6-inch-long strips of material matching the
10 appearance of exposed surfaces adjacent to joint sealants.
11
12 Certificates from manufacturers of joint sealants attesting that their products comply with specification
13 requirements and are suitable for the use indicated.
14
15 Qualification data complying with requirements specified in "Quality Assurance" article. Include list of
16 completed projects with project names addresses, names of Architects and Owners, plus other
17 information specified.
18
19 Compatibility and adhesion test reports from elastomeric sealant manufacturer indicating that
20 materials forming joint substrates and joint sealant backings have been tested for compatibility and
21 adhesion with joint sealants. Include sealant manufacturer's interpretation of test results relative to
22 sealant performance and recommendations for primers and substrate preparation needed to obtain
23 adhesion.
24
25 Product test reports for each type of joint sealants indicated, evidencing compliance with requirements
26 specified.
27
28 Preconstruction field test reports indicating which products and joint preparation methods demonstrate
29 acceptable adhesion to joint substrates.
30
31 QUALITY ASSURANCE
32
33 Installer Qualifications: Engage an experienced Installer who has completed joint sealant applications
34 similar in material, design, and extent to that indicated for Project that have resulted in construction
35 with a record of successful in-service performance.
36
37 Testing Laboratory Qualifications: To qualify for acceptance, an independent testing laboratory must
38 demonstrate to Architect's satisfaction, based on evaluation of laboratory-submitted criteria
39 conforming to ASTM E 699, that it has the experience and capability to conduct satisfactorily the
40 testing indicated without delaying progress of the Work.
41
42 Single Source Responsibility for Joint Sealant Materials: Obtain joint sealant materials from a single
43 manufacturer for each different product required.
44
45 Preconstruction Compatibility and Adhesion Testing: Submit to joint sealant manufacturers samples
46 of materials that will contact or affect joint sealants for compatibility and adhesion testing as indicated
47 below:
48
49 Use test methods standard with manufacturer to determine if priming and other specific joint
50 preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint
51 substrates.
52
53 Perform tests under normal environmental conditions that will exist during actual installation.
54
55 Submit not less than 9 pieces of each type of material, including joint substrates, shims, joint
56 sealant backings, secondary seals, and miscellaneous materials.
57
JOINT SEALANTS
GDA 07901 - 2
GDA#12018.00 December 14,2012
Issue for Permit
1 Schedule sufficient time for testing and analysis of results to prevent delay in the progress of the
2 Work.
3
4 Investigate materials failing compatibility or adhesion tests and obtain joint sealant
5 manufacturer's written recommendations for corrective measures, including use of specially
6 formulated primers.
7
8 Testing will not be required when joint sealant manufacturer is able to submit joint preparation
9 data required above that are acceptable to Architect and are based on previous testing of current
10 sealant products for adhesion to, and compatibility with, joint substrates and other materials
11 matching those submitted.
12
13 Product Testing: Provide comprehensive test data for each type of joint sealant based on tests
14 conducted by a qualified independent testing laboratory on current product formulations within a 24-
15 month period preceding date of Contractor's submittal of test results to Architect.
16
17 Test elastomeric sealants for compliance with requirements specified by reference to
18 ASTM C 920. Include test results for hardness, stain resistance, adhesion and cohesion under
19 cyclic movement (per ASTM C 719), low-temperature flexibility, modulus of elasticity at 100
20 percent strain, effects of heat aging, and effects of accelerated weathering.
21
22 Include test results performed on joint sealants after they have cured for 1 year.
23
24 Preconstruction Field Testing: Prior to installation of joint sealants, field-test their adhesion to joint
25 substrates as follows:
26
27 Locate test joints where indicated or, if not indicated, as directed by Architect.
28
29 Conduct field tests for each application indicated below:
30
31 Each type of elastomeric sealant and joint substrate indicated.
32
33 Each type of non-elastomeric sealant and joint substrate indicated.
34
35 Notify Architect one week in advance of the dates and times when mock-ups will be erected.
36
37 Arrange for tests to take place with joint sealant manufacturer's technical representative present.
38
39 Test Method: Test joint sealants by hand pull method described below:
40
41 Install joint sealants in 5-feet joint lengths using same materials and methods for joint
42 preparation and joint sealant installation required for completed Work. Allow sealants to
43 cure fully before testing.
44
45 Make knife cuts horizontally from one side of joint to the other followed by 2 vertical cuts
46 approximately 2 inches long at side of joint and meeting horizontal cut at top of 2-inch cuts.
47 Place a mark 1 inch from top of 2-inch piece.
48
49 Use fingers to grasp 2-inch piece of sealant just above 1-inch mark; pull firmly down at a 90-
50 degree angle or more while holding a ruler along side of sealant. Pull sealant out of joint to
51 the distance recommended by sealant manufacturer for testing adhesive capability, but not
52 less than that equaling specified maximum movement capability in extension; hold this
53 position for 10 seconds.
54
55 Report whether or not sealant in joint connected to pulled-out portion failed to adhere to joint
56 substrates or tore cohesively. Include data on pull distance used to test each type of product and
57 joint substrate.
JOINT SEALANTS
GDA 07901 -3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Evaluation of Field Test Results: Sealants not evidencing adhesive failure from testing, in
3 absence of other indications of noncompliance with requirements, will be considered satisfactory.
4 Do not use sealants that fail to adhere to joint substrates during testing.
5
6 Field-Constructed Mock-Ups: Prior to installation of joint sealants, apply elastomeric sealants as
7 follows to verify selections made under sample submittals and to demonstrate aesthetic effects as well
8 as qualities of materials and execution:
9
10 Joints in field-constructed mock-ups of assemblies specified in other Sections that are indicated
11 to receive elastomeric joint sealants specified in this Section.
12
13 Pre-Installation Conference: Conduct conference at Project site to comply with requirements of the
14 Division 1 Section covering this activity.
15
16 DELIVERY, STORAGE,AND HANDLING
17
18 Deliver materials to Project site in original unopened containers or bundles with labels indicating
19 manufacturer, product name and designation, color, expiration period for use, pot life, curing time, and
20 mixing instructions for multicomponent materials.
21
22 Store and handle materials in compliance with manufacturer's recommendations to prevent their
23 deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.
24
25 PROJECT CONDITIONS
26
27 Environmental Conditions: Do not proceed with installation of joint sealants under the following
28 conditions:
29
30 When ambient and substrate temperature conditions are outside the limits permitted by joint
31 sealant manufacturer.
32
33 When ambient and substrate temperature conditions are outside the limits permitted by joint
34 sealant manufacturer or below 40 deg F (4.4 deg C).
35
36 When joint substrates are wet.
37
38 Joint Width Conditions: Do not proceed with installation of joint sealants where joint widths are less
39 than allowed by joint sealant manufacturer for application indicated.
40
41 Joint Substrate Conditions: Do not proceed with installation of joint sealants until contaminants
42 capable of interfering with their adhesion are removed from joint substrates.
43
44 SEQUENCING AND SCHEDULING
45
46 Sequence installation of joint sealants to occur not less than 21 nor more than 30 days after
47 completion of waterproofing, unless otherwise indicated.
48
49
50 PART 2-PRODUCTS
51
52 MATERIALS, GENERAL
53
54 Compatibility: Provide joint sealants, joint fillers, and other related materials that are compatible with
55 one another and with joint substrates under conditions of service and application, as demonstrated by
56 sealant manufacturer based on testing and field experience.
57
JOINT SEALANTS
GDA 07901 -4
GDA#12018.00 December 14, 2012
Issue for Permit
1 Colors: Provide color of exposed joint sealants to comply with the following:
2
3 Provide custom colors to match Architect's samples.
4
5 Match colors indicated by reference to manufacturer's standard designations.
6
7 Provide selections made by Architect from manufacturer's full range of standard colors for
8 products of type indicated.
9
10 ELASTOMERIC JOINT SEALANTS
11
12 Elastomeric Sealant Standard: Provide manufacturer's standard chemically curing elastomeric
13 sealants that comply with ASTM C 920 and other requirements indicated on each Elastomeric Joint
14 Sealant Data Sheet at end of this Section, including those requirements referencing ASTM C 920
15 classifications for Type, Grade, Class, and Uses.
16
17 Additional Movement Capability: Where additional movement capability is specified in
18 Elastomeric Joint Sealant Data Sheet, provide products with the capability, when tested for
19 adhesion and cohesion under maximum cyclic movement per ASTM C 719, to withstand the
20 specified percentage change in the joint width existing at time of installation and remain in
21 compliance with other requirements of ASTM C 920 for Uses indicated.
22
23 Products: Subject to compliance with requirements, provide one of the products specified in each
24 Elastomeric Joint Sealant Data Sheet.
25
26 SOLVENT-RELEASE-CURING JOINT SEALANTS
27
28 Acrylic Sealant: Manufacturer's standard one-part, nonsag, solvent-release-curing acrylic terpolymer
29 sealant complying with AAMA 808.3 or FS TT-S-00230 or both, with capability when tested for
30 adhesion and cohesion under maximum cyclic movement per ASTM C 719, to withstand the following
31 percentage change in joint width existing at time of application and remain adhered to joint substrates
32 indicated for Project without failing cohesively:
33
34 12-1/2 percent movement in both extension and compression for a total of 25 percent.
35
36 Butyl Sealant: Manufacturer's standard one-part, nonsag, solvent-release-curing, polymerized butyl
37 sealant complying with ASTM C 1085 and formulated with minimum of 75 percent solids to be
38 nonstaining, paintable, and have a tack-free time of 24 hours or less.
39
40 Pigmented Narrow Joint Sealant: Manufacturer's standard, solvent-release-curing, pigmented
41 synthetic rubber sealant complying with AAMA 803.3 and formulated for sealing joints 3/16 inch or
42 smaller in width.
43
44 Products: Subject to compliance with requirements, provide one of the following:
45
46 Acrylic Sealant:
47
48 "60+Unicrylic," Pecora Corp.
49 "PTI 738," Protective Treatments, Inc.
50 "PTI 767," Protective Treatments, Inc.
51 "Mono,"Tremco, Inc.
52
53 Butyl Sealant:
54
55 "BC-158," Pecora Corp.
56 "PTI 757," Protective Treatments, Inc.
57 "Sonneborn Multi-Purpose Sealant," Sonneborn Building Products Div., ChemRex, Inc.
JOINT SEALANTS
GDA 07901 -5
GDA#12018.00 December 14, 2012
Issue for Permit
1 "Tremco Butyl Sealant,"Tremco, Inc.
2
3 Pigmented Narrow Joint Sealant:
4
5 "PTI 200," Protective Treatments, Inc.
6
7 LATEX JOINT SEALANTS
8
9 General: Provide manufacturer's standard one-part, nonsag, mildew-resistant, paintable latex sealant
10 of formulation indicated that is recommended for exposed applications on interior and protected
11 exterior locations and that accommodates indicated percentage change in joint width existing at time
12 of installation without failing either adhesively or cohesively.
13
14 Acrylic-Emulsion Sealant: Provide product complying with ASTM C 834 that accommodates joint
15 movement of not more than 5 percent in both extension and compression for a total of 10 percent.
16
17 Silicone Emulsion Sealant: Provide product complying with ASTM C 834 and, except for weight loss
18 measured per ASTM C 792, with ASTM C 920 that accommodates joint movement of not more than
19 25 percent in both extension and compression for a total of 50 percent.
20
21 Products: Subject to compliance with requirements, provide one of the following:
22
23 Acrylic-Emulsion Sealant:
24
25 "AC-20," Pecora Corp.
26 "Sonolac," Sonneborn Building Products Div., ChemRex, Inc.
27 "Tremco Acrylic Latex 834," Tremco, Inc.
28
29 Silicone-Emulsion Sealant:
30
31 "Trade Mate Paintable Glazing Sealant," Dow Corning Corp.
32
33 ACOUSTICAL JOINT SEALANTS
34
35 Acoustical Sealant: Manufacturer's standard nonsag, paintable, nonstaining latex sealant complying
36 with ASTM C 834 and the following requirements:
37
38 Product is effective in reducing airborne sound transmission through perimeter joints and
39 openings in building construction as demonstrated by testing representative assemblies per
40 ASTM E 90.
41
42 Acoustical Sealant for Concealed Joints: Manufacturer's standard, nondrying, nonhardening,
43 nonskinning, nonstaining, gunnable, synthetic rubber sealant recommended for sealing interior
44 concealed joints to reduce transmission of airborne sound.
45
46 Products: Subject to compliance with requirements, provide one of the following:
47
48 Acoustical Sealant:
49
50 "SHEETROCK Acoustical Sealant," United States Gypsum Co.
51 "AC-20 FTR Acoustical and Insulation Sealant," Pecora Corp.
52
53 Acoustical Sealant for Concealed Joints:
54
55 "BA-98," Pecora Corp.
56 "Tremco Acoustical Sealant,"Tremco, Inc.
57
JOINT SEALANTS
GDA 07901 -6
GDA#12018.00 December 14, 2012
Issue for Permit
1 TAPE SEALANTS
2
3 Tape Sealant: Manufacturer's standard, solvent-free, butyl-based tape sealant with a solids content of
4 100 percent formulated to be nonstaining, paintable, and nonmigrating in contact with nonporous
5 surfaces with or without reinforcement thread to prevent stretch and packaged on rolls with a release
6 paper on one side.
7
8 Products: Subject to compliance with requirements, provide one of the following:
9
10 "Extru-Seal Tape,"Pecora Corp.
11 "Shim-Seal Tape," Pecora Corp.
12 "PTI 606," Protective Treatments, Inc.
13 "Tremco 440 Tape,"Tremco, Inc.
14 "MBT-35,"Tremco, Inc.
15
16 PREFORMED FOAM SEALANTS
17
18 Preformed Foam Sealants: Manufacturer's standard preformed, precompressed, impregnated open-
19 cell foam sealant manufactured from high-density urethane foam impregnated with a nondrying, water
20 repellent agent; factory-produced in precompressed sizes and in roll or stick form to fit joint widths
21 indicated and to develop a watertight and airtight seal when compressed to the degree specified by
22 manufacturer; and complying with the following requirements:
23
24 Properties: Permanently elastic, mildew-resistant, nonmigratory, nonstaining, and compatible
25 with joint substrates and other joint sealants.
26
27 Impregnating Agent: Manufacturer's standard.
28
29 Density: Manufacturer's standard.
30
31 Backing: Pressure-sensitive adhesive factory applied to one side with protective wrapping.
32
33 Products: Subject to compliance with requirements, provide one of the following:
34
35 "Emseal," Emseal Corp.
36 "Emseal Greyflex," Emseal Corp.
37 "Wil-Seal 150,"Wil-Seal Construction Foams Div., Illbruck.
38 "Wil-Seal 250,"Wil-Seal Construction Foams Div., Illbruck.
39
40 JOINT SEALANT BACKING
41
42 General: Provide sealant backings of material and type that are nonstaining; are compatible with joint
43 substrates, sealants, primers and other joint fillers; and are approved for applications indicated by
44 sealant manufacturer based on field experience and laboratory testing.
45
46 Plastic Foam Joint Fillers: Preformed, compressible, resilient, nonstaining, nonwaxing, nonextruding
47 strips of flexible plastic foam of material indicated below and of size, shape, and density to control
48 sealant depth and otherwise contribute to producing optimum sealant performance:
49
50 Open-cell polyurethane foam.
51
52 Closed-cell polyethylene foam, nonabsorbent to liquid water and gas, nonoutgassing in
53 unruptured state.
54
55 Proprietary, reticulated, closed-cell polymeric foam, nonoutgassing, with a density of 2.5 pcf and
56 tensile strength of 35 psi per ASTM D 1623, and with water absorption less than 0.02 gms/cc per
57 ASTM C 1083.
JOINT SEALANTS
GDA 07901 -7
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Any material indicated above.
3
4 Elastomeric Tubing Joint Fillers: Neoprene, butyl, EPDM, or silicone tubing complying with
5 ASTM D 1056, nonabsorbent to water and gas, capable of remaining resilient at temperatures down to
6 -26 deg F (-32 deg C). Provide products with low compression set and of size and shape to provide a
7 secondary seal, to control sealant depth, and otherwise contribute to optimum sealant performance.
8
9 Bond-Breaker Tape: Polyethylene tape or other plastic tape as recommended by sealant
10 manufacturer for preventing sealant from adhering to rigid, inflexible joint filler materials or joint
11 surfaces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive
12 tape where applicable.
13
14 MISCELLANEOUS MATERIALS
15
16 Primer: Material recommended by joint sealant manufacturer where required for adhesion of sealant
17 to joint substrates indicated, as determined from preconstruction joint sealant-substrate tests and field
18 tests.
19
20 Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and
21 sealant backing materials, free of oily residues or other substances capable of staining or harming in
22 any way joint substrates and adjacent nonporous surfaces, and formulated to promote optimum
23 adhesion of sealants with joint substrates.
24
25 Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces
26 adjacent to joints.
27
28
29 PART 3 - EXECUTION
30
31
32 EXAMINATION
33
34 Examine joints indicated to receive joint sealants, with Installer present, for compliance with
35 requirements for joint configuration, installation tolerances, and other conditions affecting joint sealant
36 performance. Do not proceed with installation of joint sealants until unsatisfactory conditions have
37 been corrected.
38
39 PREPARATION
40
41 Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with
42 recommendations of joint sealant manufacturer and the following requirements:
43
44 Remove all foreign material from joint substrates that could interfere with adhesion of joint
45 sealant, including dust, paints (except for permanent, protective coatings tested and approved for
46 sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease,
47 waterproofing, water repellents, water, surface dirt,and frost.
48
49 Clean concrete, masonry, unglazed surfaces of ceramic tile, and similar porous joint substrate
50 surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these
51 methods to produce a clean, sound substrate capable of developing optimum bond with joint
52 sealants. Remove loose particles remaining from above cleaning operations by vacuuming or
53 blowing out joints with oil-free compressed air.
54
55 Remove laitance and form release agents from concrete.
56
JOINT SEALANTS
GDA 07901 -8
GDA#12018.00 December 14, 2012
Issue for Permit
1 Clean metal, glass, porcelain enamel, glazed surfaces of ceramic tile, and other nonporous
2 surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave
3 residues capable of interfering with adhesion of joint sealants.
4
5 Joint Priming: Prime joint substrates where indicated or where recommended by joint sealant
6 manufacturer based on preconstruction joint sealant-substrate tests or prior experience. Apply primer
7 to comply with joint sealant manufacturer's recommendations. Confine primers to areas of joint
8 sealant bond; do not allow spillage or migration onto adjoining surfaces.
9 Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining
10 surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning
11 methods required to remove sealant smears. Remove tape immediately after tooling without
12 disturbing joint seal.
13
14 INSTALLATION OF JOINT SEALANTS
15
16 General: Comply with joint sealant manufacturer's printed installation instructions applicable to
17 products and applications indicated,except where more stringent requirements apply.
18
19 Sealant Installation Standard: Comply with recommendations of ASTM C 1193 for use of joint
20 sealants as applicable to materials,applications, and conditions indicated.
21
22 Acoustical Sealant Application Standard: Comply with recommendations of ASTM C 919 for use of
23 joint sealants in acoustical applications as applicable to materials, applications, and conditions
24 indicated.
25
26 Installation of Sealant Backings: Install sealant backings to comply with the following requirements:
27 Install joint fillers of type indicated to provide support of sealants during application and at
28 position required to produce the cross-sectional shapes and depths of installed sealants relative
29 to joint widths that allow optimum sealant movement capability.
30
31 Do not leave gaps between ends of joint fillers.
32
33 Do not stretch,twist, puncture, or tear joint fillers.
34
35 Remove absorbent joint fillers that have become wet prior to sealant application and replace
36 with dry material.
37 Install bond breaker tape between sealants where backer rods are not used between sealants
38 and joint fillers or back of joints.
39
40 Installation of Sealants: Install sealants by proven techniques that result in sealants directly
41 contacting and fully wetting joint substrates, completely filling recesses provided for each joint
42 configuration, and providing uniform, cross-sectional shapes and depths relative to joint widths that
43 allow optimum sealant movement capability. Install sealants at the same time sealant backings are
44 installed.
45
46 Tooling of Nonsag Sealants: Immediately after sealant application and prior to time skinning or curing
47 begins, tool sealants to form smooth, uniform beads of configuration indicated, to eliminate air
48 pockets, and to ensure contact and adhesion of sealant with sides of joint. Remove excess sealants
49 from surfaces adjacent to joint. Do not use tooling agents that discolor sealants or adjacent surfaces
50 or are not approved by sealant manufacturer.
51
52 Provide concave ioint configuration per Figure 5A in ASTM C 1193, unless otherwise indicated.
53 Provide flush ioint configuration, per Figure 5B in ASTM C 1193, where indicated.
54
55 Use masking tape to protect adjacent surfaces of recessed tooled joints.
56
JOINT SEALANTS
GDA 07901 -9
GDA#12018.00 December 14, 2012
Issue for Permit
1 Installation of Preformed Foam Sealants: Install each length of sealant immediately after removing
2 protective wrapping, taking care not to pull or stretch material, and to comply with sealant
3 manufacturer's directions for installation methods, materials, and tools that produce seal continuity at
4 ends, turns, and intersections of joints. For applications at low ambient temperatures where
5 expansion of sealant requires acceleration to produce seal, apply heat to sealant in conformance with
6 sealant manufacturer's recommendations.
7
8 CLEANING
9
10 Clean off excess sealants or sealant smears adjacent to joints as work progresses by methods and
11 with cleaning materials approved by manufacturers of joint sealants and of products in which joints
12 occur.
13
14 PROTECTION
15
16 Protect Joint sealants during and after curing period from contact with contaminating substances or
17 from damage resulting from construction operations or other causes so that they are without
18 deterioration or damage at time of Substantial Completion. If, despite such protection, damage or
19 deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so that
20 and installations with repaired areas are indistinguishable from original work.
JOINT SEALANTS
GDA 07901 - 10
GDA#12018.00 December 14, 2012
Issue for Permit
1 JOINT SEALERS SCHEDULE:
2
3 Mark Description Location
4
5
6 (ES-2) Multi-part nonsag urethane sealant. Interior joints in vertical surfaces;
7 between metal and concrete, or mortar;
8 interior and exterior perimeter joints of
9 metal frames in exterior walls; and
10 exterior overhead joints.
11
12 (LS) Acrylic-emulsion sealant Interior joints in field-painted vertical and
13 overhead surfaces at perimeter of hollow
14 metal door frames; in gypsum drywall,
15 plaster and concrete or concrete
16 masonry; and all other interior joints not
17 indicated otherwise.
18
19 NOTE: Install joint sealer indicated in joints fitting descriptions and locations listed as well as in
20 locations identified on Drawings by Drawing designations indicated above.
21
JOINT SEALANTS
GDA 07901 - 11
GDA#12018.00 December 14, 2012
Issue for Permit
1 ELASTOMERIC JOINT SEALANT DATA SHEET
2
3 Elastomeric Joint Sealant Designation: ES-1
4
5 Base Polymer: Neutral-curing silicone.
6
7 Type: S (single component).
8
9 Grade: NS (nonsag).
10
11 Class: 25.
12
13 Use(sI Related to Exposure: NT (nontraffic).
14
15 Uses Related to Joint Substrates: M, G, A, and, as applicable to joint substrates indicated, O.
16
17 Use 0 Joint Substrates: Coated glass, anodized aluminum, galvanized steel, and ceramic tile.
18 Products: Subject to compliance with requirements, provide one of the following:
19
20 One-Part Nonacid-Curing Silicone Sealant:
21
22 "Silpruf SCS 2000"; General Electric Co.
23 "864"; Pecora Corp.
24 "Spectrum 2"; Tremco, Inc.
25 "Dow Corning 795'; Dow Corning Corp.
26 "Omniseal"; Sonneborn Building Products Div., Rexnord Chemical Products Inc.
27
28 Elastomeric Joint Sealant Designation: ES-2.
29
30 Base Polymer: Urethane.
31
32 Type: M (multicomponent).
33
34 Grade: NS (nonsag).
35
36 Class: 25.
37
38 Usefsl Related to Exposure: NT (nontraffic).
39
40 Uses Related to Joint Substrates: M, A, and, as applicable to joint substrates indicated, O.
41
42 Use 0 Joint Substrates: Anodized aluminum, and galvanized steel.
43
44 Multi-Part Nonsaq Urethane Sealant:
45
46 "Vulkem 227"; Mameco International, Inc.
47 "Dualthane"; W.R. Meadows.
48 "Dynatrol II"; Pecora Corp.
49 "Sikaflex-2c NS"; Sika Corp.
50 "Sonolastic NP 2"; Sonneborn Building Products Div., Rexnord Chemical Products Inc.
51 "Dymeric"; Tremco Inc.
52
JOINT SEALANTS
GDA 07901 - 12
GDA#12018.00 December 14, 2012
Issue for Permit
1 Elastomeric Joint Sealant Designation: ES-3.
2
3 Base Polymer: Urethane.
4
5 Type: M (multicomponent).
6
7 Grade: P (pourable).
8
9 Class: 25.
10
11 Use[s] Related to Exposure: T(traffic).
12
13 Uses Related to Joint Substrates: M.
14
15 Products: Subject to compliance with requirements, provide one of the following:
16
17 Multi-Part, Pourable, Urethane Sealant:
18
19 "Vulkem 245"; Mameco International, Inc.
20 "Pourthane"; W.R. Meadows, Inc.
21 "NR-200 Urexpan"; Pecora Corp.
22 "Sikaflex 2c Sr; Sika Corp.
23 "Sonolastic SL 2"; Sonneborn Building Products Div., Rexnord Chemical Products Inc.
24 "THC-900"; Tremco Inc.
25
26
27 END OF SECTION 07901
JOINT SEALANTS
GDA 07901 - 13
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 08110-STEEL DOORS AND FRAMES
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections, apply to work of this section.
11
12 DESCRIPTION OF WORK:
13
14 Extent of standard steel doors and frames is indicated and scheduled on drawings.
15
16 All exterior wall locations
17 Some interior locations, doors only
18
19 Extent of standard steel window frames is indicated and scheduled on drawings.
20
21 Related Work:
22
23 Knock-down steel frames for interior applications are specified elsewhere in Division-8.
24
25 Builder's hardware is specified elsewhere in Division-8.
26
27 QUALITY ASSURANCE:
28
29 Provide doors and frames complying with Steel Door Institute "Recommended Specifications:
30 Standard Steel Doors and Frames" (SDI-100)and as herein specified.
31
32 SUBMITTALS:
33
34 Product Data: Submit manufacturer's technical product data substantiating that products comply with
35 requirements.
36
37 Shop Drawings: Submit for fabrication and installation of steel doors and frames. Include details of
38 each frame type, elevations of door design types, conditions at openings, details of construction,
39 location and installation requirements of finish hardware and reinforcements, and details of joints and
40 connections. Show anchorage and accessory items.
41
42 Provide schedule of doors and frames using same reference numbers for details and
43 openings as those on contract drawings.
44
45 Indicate coordinate of glazing frames and stops with glass and glazing requirements.
46
47 Provide schedule of window frames using same reference numbers for details and openings
48 as those on contract drawings.
49
50 DELIVERY, STORAGE AND HANDLING:
51
52 Deliver hollow metal work cartoned or crated to provide protection during transit and job storage.
53 Provide additional sealed plastic wrapping for factory-finished doors.
54
55 Inspect metal work upon delivery for damage. Minor damages may be repaired provided refinished
56 items are equal in all respects to new work and acceptable to Architect; otherwise, remove and
57 replace damaged items as directed.
STEEL DOORS AND FRAMES
GDA 08110- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Store doors and frames at building site under cover. Place units on minimum 4" high wood blocking.
3 Avoid use of non-vented plastic or canvas shelters which could create humidity chamber. If cardboard
4 wrapper on door becomes wet, remove carton immediately. Provide 1/4" spaces between stacked
5 doors to promote air circulation.
6
7 WARRANTY:
8
9 Provide manufacturers standard warranty.
10
11
12 PART 2 - PRODUCTS
13
14
15 Manufacturers: Subject to compliance with requirements, provide products by one of the following:
16 Steel Doors and Frames:
17
18 Amweld Building Products, LLC.
19 Ceco Door Products; an ASSA ABLOY Group Company.
20 CURRIES Company; an ASSA ABLOY Group Company.
21 Deansteel Manufacturing, Inc.
22 Republic Builders Products Company.
23 Steelcraft; an Ingersoll-Rand Company.
24
25 MATERIALS:
26
27 Cold-Rolled Steel Sheets: Commercial quality carbon steel, complying with ASTM A 366 and ASTM A
28 568.
29
30 Galvanized Steel Sheets: Zinc-coated carbon steel sheets of commercial quality, complying with
31 ASTM A 526, with ASTM A 525, G60 zinc coating, mill phosphatized.
32
33 Supports and Anchors: Fabricate of not less than 18-gage galvanized sheet steel.
34
35 Inserts, Bolts and Fasteners: Manufacturer's standard units, except hot-dip galvanize items to be built
36 into exterior walls, complying with ASTM A 153, Class C or D as applicable.
37
38 Shop Applied Paint:
39
40 Primer: Rust-inhibitive enamel or paint, either air-drying or baking, suitable as a base for specified
41 finish paints.
42
43 DOORS
44
45 Steel Doors: Provide 1-3/4-inch- (44-mm- thick doors of materials and ANSI/SDI 100 grades
46 and models specified below, and as indicated on Drawings or schedules:
47
48 Interior Doors: Grade II, heavy-duty, Model 2, seamless design, minimum 0.0478-inch- (1.2-mm-
49 thick cold-rolled steel sheet faces.
50
51 Exterior Doors: Grade III, extra heavy-duty, Model 2, seamless design, minimum 0.0635-inch-
52 thick galvanized steel sheet faces, insulated core.
53
54 Fabricate joints at edges of doors continuously welded automatically by the gas shielded method
55 arc process.Arc welding and filling seams is not acceptable.
56
57 FRAMES
STEEL DOORS AND FRAMES
GDA 08110 - 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Provide metal frames for doors, transoms, sidelights, borrowed lights, and other openings,
3 according to ANSI/SDI 100, and of types and styles as shown on Drawings and schedules.
4 Conceal fastenings, unless otherwise indicated.
5
6 Fabricate frames with mitered corners, full throat welded construction for exterior applications
7 and where indicated by Schedule for some interior doors.
8
9 Fabricate frames with mitered corners, and knocked-down for field assembly at interior
10 applications.
11
12 Form exterior frames from 0.0635-inch- (1.6-mm-)thick galvanized steel sheet.
13
14 STANDARD STEEL FRAMES:
15
16 Provide metal frames for doors, transoms, sidelights, borrowed lights, windows and other openings, of
17 types and styles as shown on drawings and schedules. Conceal fastenings, unless otherwise
18 indicated.
19
20 FABRICATION, GENERAL:
21
22 Fabricate steel door and frame units to be rigid, neat in appearance and free from defects, warp or
23 buckle. Wherever practicable, fit and assemble units in manufacturer's plant. Clearly identify work
24 that cannot be permanently factory-assembled before shipment, to assure proper assembly at project
25 site. Comply with SDI-100 requirements as follows.
26
27 Internal Construction: One of the following manufacturer's standard core materials according to
28 SDI standards:
29
30 Rigid polyurethane conforming to ASTM C 591, at exterior door locations.
31
32 Clearances: Not more than 118 inch (3.2 mm) at jambs and heads, except not more than "11 nc`
33 (6.4 mm) between non-fire-rated pairs of doors. Not more than 3/4 inch (19 mm)at bottom.
34
35 Fire Doors: Provide clearances according to NFPA 80.
36
37 Fabricate exposed faces of doors and panels, including stiles and rails of nonflush units, from only
38 cold-rolled steel.
39
40 Fabricate frames, concealed stiffeners, reinforcement, edge channels, and moldings from either cold-
41 rolled or hot-rolled steel (at fabricator's option).
42
43 Fabricate exterior doors, panels, and frames from galvanized sheet steel. Close top and bottom
44 edges of exterior doors as integral part of door construction or by addition of minumum 16-gage
45 inverted steel channels.
46
47 Exposed Fasteners: Unless otherwise indicated, provide countersunk flat Phillips heads for exposed
48 screws and bolts.
49
50 Finish Hardware Preparation: Prepare doors and frames to receive mortised and concealed finish
51 hardware in accordance with final Finish Hardware Schedule and templates provided by hardware
52 supplier. Comply with applicable requirements of ANSI A115 series specifications for door and frame
53 preparation for hardware.
54
55 Reinforce doors and frames to receive surface-applied hardware. Drilling and tapping for surface-
56 applied finish hardware may be done at project site.
57
STEEL DOORS AND FRAMES
GDA08110-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Locate finish hardware as shown on final shop drawings or, if not indicated, in accordance with
2 "Recommended Locations for Builder's Hardware," published by Door and Hardware Institute.
3
4 Shop Painting:
5
6 Clean, treat, and paint exposed surfaces of steel door and frame units, including galvanized surfaces.
7
8 Clean steel surfaces of mill scale, rust, oil, grease, dirt, and other foreign materials before application
9 of paint.
10
11 Apply shop coat of prime paint of even consistency to provide a uniformly finished surface ready to
12 receive finish paint.
13
14
15 PART 3- EXECUTION
16
17
18 INSTALLATION:
19
20 General: Install standard steel doors, frames, and accessories in accordance with final shop
21 drawings, manufacturer's data, and as herein specified.
22
23 Placing Frames: Comply with provisions of SDI-105 "Recommended Erection Instructions For Steel
24 Frames", unless otherwise indicated.
25
26 Except for frames located at in-place concrete or masonry and at drywall installations, place
27 frames prior to construction of enclosing walls and ceilings. Set frames accurately in position,
28 plumbed, aligned, and braced securely until permanent anchors are set. After wall
29 construction is completed, remove temporary braces and spreaders leaving surfaces smooth
30 and undamaged.
31
32 In masonry construction, install at least 3 wall anchors per jamb adjacent to hinge location on
33 hinge jamb and at corresponding heights on strike jamb. Acceptable anchors include
34 masonry wire anchors and masonry T-shaped anchors. Fill jamb with grout. Coat inside of
35 metal frames with biuminous paint if mortar antifreeze is used.
36
37 At in-place concrete or masonry construction, set frames and secure to adjacent construction
38 with machine screws and masonry anchorage devices.
39
40 Install fire-rated frames in accordance with NFPA Std. No. 80.
41
42 In metal stud partitions, install at least 3 wall anchors per jamb at hinge and strike levels. In
43 open steel stud partitions, place studs in wall anchor notches and wire tie. In closed steel
44 stud partitions, attach wall anchors to studs with tapping screws.
45
46 Door Installation:
47
48 Fit hollow metal doors accurately in frames,within clearances specified in SDI-100.
49
50 Place fire-rated doors with clearances as specified in NFPA Standard No. 80.
51
52 ADJUST AND CLEAN:
53
54 Prime Coat Touch-up: Immediately after erection, sand smooth any rusted or damaged areas of
55 prime coat and apply touch-up of compatible air-drying primer.
56
57 Final Adjustments: Check and readjust operating finish hardware items, leaving steel doors and
STEEL DOORS AND FRAMES
GDA 08110 -4
GDA#12018.00 December 14, 2012
Issue for Permit
1 frames undamaged and in complete and proper operating condition.
2
3
4 END OF SECTION 08110
STEEL DOORS AND FRAMES
GDA08110-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08120 - INTERIOR ALUMINUM DOOR AND WINDOW FRAMES AND TRIM
2
3 PART 1 - GENERAL
4
5
6 DESCRIPTION OF WORK
7
8 Work included:
9
10 As Base Bid, provide all work required for complete prefinished, prefabricated, extruded
11 aluminum door and window frames for interior use.
12
13 RELATED SECTIONS:
14
15 Section 01030—Alternates
16
17 Hollow metal doors and frames are specified in another Division 8 Section.
18
19 Aluminum doors are specified in another Division 8 Section.
20
21 Aluminum storefront and entrance doors are specified in another Division 8 Section.
22
23 Wood doors are specified in another Division 8 Section.
24
25 Door hardware is specified in another Division 8 Section.
26
27 Glass and Glazing are specified in another Division 8 Section.
28
29 SUBMITTALS:
30
31 Shop Drawings: Supplier shall submit drawings showing all standard installation details as they may
32 apply to typical architectural details furnished in the contract documents by the owner's
33 representative for this project. Details for special conditions or custom building construction and
34 associated with the work of other contractors shall be submitted for record purposes as the approved
35 method of installation.
36
37 Manufacturer's Data: Submit copies of manufacturer's data for fabrication and installation of
38 aluminum door and window frames.
39
40 QUALITY ASSURANCE:
41
42 General: Provide aluminum door and window frames fabricated by a single firm specializing in the
43 production of this type of work for a minimum of five years.
44
45 DELIVERY, STORAGE AND HANDLING:
46
47 Deliver frames in cartons to provide protection during transit and job storage.
48
49 Inspect frames upon delivery for damage. Minor damages may be repaired provided the finish
50 items are equal in all respects to new units.
51
52 Store frames at the building site under cover. Avoid the use of coverings that would contribute
53 to discoloration of the finish.
54
55 PROJECT CONDITIONS:
56
57 Environmental Conditions: Temperature and humidity conditions within the building shall be
INTERIOR ALUMINUM DOOR AND WINDOW FRAMES AND TRIM
08120 -1
GDA#12018.00 December 14, 2012
Issue for Permit
1 maintained as close as possible to final occupancy standards. When required, heat and ventilation
2 shall be furnished by the general contractor at no expense to the installation contractor. Installation
3 will not begin until the building's exterior provides complete protection from weather elements that
4 may be damaging to the finished product. Storage areas shall be provided as near as possible to
5 the point of installation by the general contractor. The general contractor shall furnish hoisting
6 facilities and an equipment operator at no expense to the installation contractor.
7
8
9 PART 2-PRODUCTS
10
11
12 MANUFACTURER
13
14 Manufacturer: Subject to compliance with requirements, provide interior aluminum door and window
15 frames by the following:
16
17 Aluminum Frames, (General):
18
19 ConceptWall
20 Frameworks Manufacturing
21 Wilson Partitions
22 Or Architect approved equivalent.
23
24 MATERIALS:
25
26 Aluminum Extrusions: All component shapes shall be extruded from controlled alloy billets of 6063-
27 T5 to assure compliance with tight dimensional tolerances and maintain color uniformity.
28
29 Sightline: 2-inch.
30
31 Electrified Door Frames:
32
33 At Contractor's option, all frames receiving electrified hardware with factory-installed
34 common quick connect connectors on each end of wiring harness to accommodate up to
35 twelve wires.
36
37 Coordinate common quick connect on each end of the wiring harness to plug directly into
38 the electrified hardware and the electric hinge.
39
40 Basis of Design: ElectroLynx, a factory-installed quick connect system manufactured by
41 Ceco&Curries.
42
43 FINISHES
44
45 General: Comply with NAAMM "Metal Finishes Manual"for recommendations relative to application
46 and designations of finishes.
47
48 Finish designations prefixed by "AA" conform to the system established by the Aluminum
49 Association for designating aluminum finishes.
50
51 Class II, Clear Anodic Finish: AA-M12C22A31 (Mechanical Finish: nonspecular as fabricated;
52 Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class II, clear coating 0.010
53 mm or thicker)complying with AAMA 611.
54
55
56 PART 3-EXECUTION
57
INTERIOR ALUMINUM DOOR AND WINDOW FRAMES AND TRIM
08120-2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 INSTALLATION:
3
4 All products shall be furnished and installed by installers employing skilled craftsmen supervised by
5 personnel familiar with commercial applications and building codes.
6
7 The installer shall furnish all labor, materials, equipment, and misc. accessories necessary to
8 complete the installation of door and window frames, aluminum framing components, and glass
9 framing members.
10
11 The design of the framing members shall provide for direct attachments to standard commercial
12 drywall partitions. Door and window frames combined with additional components provide for the
13 acceptance of wood and glass doors, window units and various other architectural abutments to
14 base building construction. These components will maintain design and physically integrity
15 throughout the entire building.
16
17 Door and window frames shall be installed plumb and square. Jambs are pre-machined and
18 factory prepared for hardware as specified with concealed reinforcement plates, drilled and
19 tapped as required and fastened within the frame with concealed screws. Corner reinforcement
20 and alignment clips are furnished for precise installation in either butt joints or mitered
21 connections. Frames shall be anchored in accordance with manufacturer's standard installation
22 instructions.
23
24 Fasteners: shall be of basic metal and alloy, matching finished color and texture as the metal
25 being fastened, unless otherwise indicated. Do not use exposed fasteners, except where
26 indicated on approved shop drawings.
27
28 Cleaning
29
30 Clean exposed surfaces promptly after installation. Protect frames through the remainder of the
31 construction period, to ensure that they will be without damage or deterioration at the time of
32 acceptance.
33
34
35 END OF SECTION 08120
INTERIOR ALUMINUM DOOR AND WINDOW FRAMES AND TRIM
08120-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08121 — INTERIOR ALUMINUM DOORS
2
3 PART 1 —GENERAL
4
5
6 SUMMARY
7
8 Section includes:
9
10 Aluminum Doors for interior installation
11
12 Re lated Sections:
13
14 Hollow metal doors and frames are specified in another Division 8 Section.
15 Aluminum door frames and sidelight frames are specified in another Division 8 Section.
16 Wood doors are specified in another Division 8 Section.
17 Door hardware is specified in another Division 8 Section.
18 Glass and Glazing are specified in another Division 8 Section.
19
20 REFERENCES
21
22 American Architectural Manufacturers Association (AAMA)
23 American Society for Testing and Materials (ASTM)
24 Aluminum Association(AA)
25
26 SYSTEM DESCRIPTION
27
28 General: In addition to requirements shown or specified, comply with:
29
30 Applicable provisions of AAMA Aluminum Storefront and Entrance Manual for design,
31 materials, fabrication and installation of component parts.
32
33 Desiqn Requirements: Wilson MS362 Series Medium Stile door is a single source package of door,
34 doorframe and hardware that is engineered for moderate to high traffic.
35
36 Performance Requirements: Each assembly tested by a recognized testing laboratory or agency in
37 accordance with specified test methods.
38
39 Tested by the dual moment corner joint strength test.
40
41 Air infiltration tested in accordance with ASTM E283 (offset pivot or butt hung entrances).
42
43 Water penetration tested in accordance with ASTM E 331 (offset pivot or butt hung entrances).
44
45 Structural uniform load tested in accordance with ASTM E 330.
46
47 QUALITY ASSURANCE
48
49 Single Source Responsibility:
INTERIOR ALUMINUM DOORS
GDA 08121 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Obtain entrances, office fronts, window walls, windows and finish through one source from a
3 single manufacturer.
4
5 Provide test reports from AAMA accredited laboratories certifying the performances as specified in
6 "System Description."
7
8 WARRANTY
9
10 Door warranted against failure and/or deterioration of metals due to manufacturing process for a
11 period of two (2)years.
12
13
14 PART 2 — PRODUCTS
15
16
17 MANUFACTURERS
18
19 Acceptable Manufacturers:
20
21 Wilson Partitions, 2301 East Vernon Avenue, Vernon, CA.
22 Telephone 323-908-5430, Fax 323-908-5451
23 60 Bonner Street Stamford, CT
24 Telephone 203-316-8033, Fax 203-316-0019
25
26 Or acceptable equivalent from the following:
27
28 ConceptWall
29 Frameworks Manufacturing
30 Or Architect approved equivalent.
31
32 Acceptable Products Basis of Design:
33
34 Wilson Partitions MS362 Series, Medium Stile Door 1-3/4".
35
36 Vertical Stiles: 3-1/2 inches.
37 Top Rail: 3-5/8 inches.
38 Bottom Rail: 6 11/16 inches.
39 Glazing Stops: Square snap-in type for 1/4"glass infill.
40
41 Major portions of the door stiles a nominal .125 inches and glass stops .050 inches thick.
42
43 MATERIALS AND ACCESSORIES
44
45 Door Members: Extruded 6063-T5 aluminum alloy (ASTM B221-Alloy G.S. 10a T5).
46
47 Screws, Fastening Devices, and Internal Components: Aluminum, stainless steel, or zinc plated steel
48 in accordance with ASTM A-164. Shall be aluminum or steel, providing the steel is properly isolated
49 from aluminum.
INTERIOR ALUMINUM DOORS
GDA 08121 - 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Glazing Gasket(compression-type design).
3
4 HARDWARE
5
6 Hardware fabrication by the door manufacturer, and include the following standard hardware (as
7 selected).
8
9 Typical Door Hardware
10
11 Weather Stripping: Hard-backed poly pile in door and/or frame. Meeting stile of all pair of
12 doors has a double line hard-backed poly-pile astragal.
13
14 Pivots: Offset.
15
16 Pivots on non-fire rated doors: Where indicated as"Pivots", provide the following:
17
18 Product/Manufacturer: Subject to compliance with requirements, provide
19 products by one of the following:
20
21 Top Pivot:
22
23 P1; Glynn-Johnson Corp.
24 OP440/75120; Dorma Door Controls Inc.
25 0875/280AC; Dor-O-Matic
26 117/180; Rixson
27
28 Intermediate Pivot: Provide for doors over 7'-6"high.
29
30 P3; Glynn-Johnson Corp.
31 OP440/75220; Dorma Door Controls Inc.
32 0875/019AC; Dor-O-Matic
33 117/M19; Rixson
34
35 Bottom Pivot:
36
37 P2; Glynn-Johnson Corp.
38 OP440/75320; Dorma Door Controls Inc.
39 0875/220A/870; Dor-O-Matic
40 117; Rixson
41
42 Closers: Concealed in door.
43
44 Product/Manufacturer: Subject to compliance with requirements, provide the
45 following:
46
47 Concealed Overhead Closers:
48
49 2030; LCN, Div. Ingersoll-Rand Door Hardware Group.
50
51 Push Bar/Pull Set:
52
INTERIOR ALUMINUM DOORS
GDA 08121 -3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Product/Manufacturer: Subject to compliance with requirements, provide products by
2 one of the following:
3
4 Push Bar/Pull Sets:
5
6 2923 x 33" Builders Brass Works Corp.
7 536B x 1081 LBP 33"; Hiawatha, Inc.
8 No.482 x 33"; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
9 1731 x 33"; Triangle Brass Manufacturing Company(Trimco).
10
11 Access Controlled Door: In addition to the typical door hardware indicated above, provide the following
12 where indicated:
13
14 Electric Release: Electric strike.
15
16 Automatic Activation—Inside Approach (Egress):
17
18 Motion Sensors: Shall be the a self-contained, K-band-frequency, microwave-scanner
19 unit; achieving both a narrow or wide sensing pattern, adjustable to provide detection
20 field sizes and functions required by ANSI/BHMA A156.10.
21
22 Motion Sensors to offer three motion detection actions; bi-directional, uni-
23 directional, and uni-MTF detection.
24
25 Push Plate: Hard wired, 4-1/2 inch square stainless steel push plate switches
26 engraved with "Push to Open"with a blue handicap logo.
27
28 Knowing Act Activation—Outside Approach (Ingress):
29
30 Card Reader: Card Reader: Ingress opening function shall be operated by Owner
31 provided card reader device. Strike manufacturer shall provide all required interface
32 controllers.
33
34 FINISH
35
36 Finish all exposed areas of aluminum and components as indicated.
37
38 An Architectural Class I anodic coating conforming to AA-M12C22A31/AA-M12C22A41.
39
40 Anodize finish color shall be#11 Clear
41
42 DOOR FABRICATION
43
44 Stiles and rails shall be tubular sections accurately joined, flush and hairline at corners with heavy
45 concealed reinforcement brackets secured with machine bolts, with optional MIG weld. Exposed
46 screws not permitted.
47
48 Each door leaf equipped with an adjusting mechanism, located in the top rail near the lock stile.
49
50 Prepare internal reinforcement for door hardware.
51
52 Custom hardware templates and physical hardware must be submitted prior to any fabrication.
INTERIOR ALUMINUM DOORS
GDA 08121 -4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2
3 PART 3—EXECUTION
4
5
6 EXAMINATIONS
7
8 Examine conditions and verify substrate conditions are acceptable for product installation.
9
10 INSTALLATION
11
12 Install in accordance with approved shop drawings and manufacturers installation instructions.
13
14 FIELD QUALITY CONTROL
15
16 Make all necessary final adjustments to attain normal operation of each door and its mechanical
17 hardware.
18
19
20 END OF SECTION
INTERIOR ALUMINUM DOORS
GDA 08121 -5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08125- PREFINISHED STEEL DOOR FRAMES
2
3 PART 1 -GENERAL
4 Work Included
5 The work under this section shall include the furnishing of all items shown on the drawings and as
6 specified, including but not limited to, the following:
7 Knocked down, site assembled pre-finished steel door frames
8 Knocked down, site assembled sidelight, borrowed light, transom, and fullbound access door
9 frames
10 Related Sections
11 Section 01030—Alternates
12 Section 01040— Project Coordination
13 Section 01600—Materials and Equipment
14 Section 08110—Steel Doors and Frames
15 Section 08212 — Flush Wood Doors
16 Section 08410—Aluminum Storefronts and Entrances
17 Section 08710— Finish Hardware
18 Section 08800—Glass and Glazing
19 References
20 ASTM A1008M —Standard for cold rolled steel material
21 UBC 7-2-97, UBC 7-4-97 Positive Pressure Fire Test Certification.
22 UL 10B Fire test of Door Assemblies and UL10C Standard for Positive Pressure Fire Tests of Door
23 Assemblies
24 NFPA 80 - Fire Doors and Windows(Latest Edition)
25 NFPA-101 - Life Safety Codes (Latest Edition)
26 ASTM D2197-Standard Test Method for Adhesion of Organic Coatings by Scrape Adhesion.
27 ASTM D2247- Practice for Testing Water Resistance of Coatings in 100% Relative Humidity.
28 ASTM D2794 -Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid
29 Deformation (Impact).
30 ASTM D3361 -Standard Practice for Unfiltered Open-Flame Carbon-Arc exposures of Paint and
31 Related Coatings.
32 ASTM B117—Standard test for salt spray testing
33 Submittals
34 Section 01340: Submittal procedures.
35 Product Data: Indicate frame material, gage, configuration and finishes.
36 Shop Drawings: Indicate frame elevations, details of frame anchorage, reinforcements required, rough
37 opening requirements, location of hardware embosses, and finishes. Detail each floor of the building
38 separately.
39 Samples: Submit one 12"long standard frame sample, illustrating factory finished frame color.
PREFINISHED STEEL DOOR FRAMES
GDA 08125- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Manufacturer's Installation Instructions: Provide installation instructions for all products under this
2 section.
3 Manufacturer's Certificate of Warranty: Provide manufacturer's standard warranty certificate stating
4 material is warranted for a period of one year from date of building occupancy
5 Quality Assurance
6 Quality Standards
7 Material free from defects in material and according to project specifications for pre-
8 engineered opening systems
9 Proven durability of factory finishes allowing for bending and shaping of material after finish is
10 applied
11 Fire Rated Frame Construction
12 Conform to ASTM E152, NFPA 252, UL 10B and 10C.
13 Installed Frame Assembly: Conform to NFPA 80
14 Use only installers familiar with installation of pre-finished opening systems and applied casing
15 frame installation
16 Delivery, Storage and Handling
17 Section 01600: Transport, handle, store, and protect products in a dry area off the ground.
18 Accept frames on site in manufacturer's box packaging with identification labels intact. Inspect for
19 damage.
20 Do not open individual boxes until installation is to begin.
21
22 PART 2—PRODUCTS
23
24 Acceptable Manufacturers
25 Timely Industries, A Division of SDS Industries, Inc., 10241 Norris Avenue, Pacoima, CA,
26 91331-2292;
27 Phone toll free: 800-247-6242;
28 Fax: 818-492-3530.
29 Web site:www.timelyframes.com.
30 Frames: Provide all interior frames for project from same manufacturer. Provide exterior frames as
31 shown on plans
32 Substitutions: Refer to Section 01600
33 Frames
34 Frame Material: Cold rolled steel, typical. Electro galvanized steel for all frames used in the following
35 locations:
36 Public and Private Restrooms
37 Frame Throat Opening: As shown on plan details to suit finished wall thickness.
38 Fire rated frames and Office Entry frames to be CK series with kerf formed into frame profile with
39 factory installed, pre-mitered smoke/sound control gasket.
40 Frame Profile- Unequal Rabbet profile, standard with manufacturer.
PREFINISHED STEEL DOOR FRAMES
GDA 08125-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 "C"Series, 1.2 mm (18 gage)thick, other areas, non standard jamb depths.
2 "CK"Series, 1.2 mm (18 gage)thick, with kerf for door seal/gasket.
3 Side Light/Borrowed Light Frames: 1.2 mm (18 gage)thick.
4 Casings
5 Provide aluminum casings formed to be applied to heat treated clips on frame face after frame
6 is anchored to wall
7 Aluminum no reveal —TA-28M full 2" face profile with manufacturer's standard TA-24 corner
8 alignment clips
9 Frame Reinforcement and Accessories
10 Provide reinforcements shipped loose to project site for hardware application.
11 TA-10 - Regular arm closers, casing mounted coordinators.
12 TA-12-Parallel arm closers, Rim Exit device strikes, other stop mounted surface hardware.
13 TA-47 — For CK frame, Parallel arm closers, Rim Exit device strikes, other stop mounted
14 surface hardware.
15 Provide hinge reinforcement (TA-11) of 14 gage steel pierced to create depth of thread for
16 hinge screws equal to or exceeding 7 gage steel.
17 Weatherstrip/Smoke Gasket: TA-46 (QDS500) 90 minute rated gasket for kerfed frames. All pieces
18 factory mitered to assure perfect corner alignment.
19 Color: Grey
20 Silencers: TA-5 vinyl, 2 per frame, clear stick-on type. Silencers not required on Kerfed frames or
21 frames scheduled to receive stop mounted gasket or weatherstrip.
22 Glass Stops: TA-14 removable rolled steel, shape, butted ends. Pre-punch and countersink for flat
23 head TEK screws.
24 Adjustable strikes: Emboss frames for TA-1 strike for cylindrical lock. Provide TA-1 strike in finish
25 compatible with hardware finish.
26 Prepare frames for ASA 4-7/8"strikes where required. Provide minimum '/4" depth of threads in factory
27 tapped screw holes.
28 Installation fasteners:
29 Interior Frames: #6 Drywall type, length sufficient to penetrate studs or structure at least 1/2".
30 Fabrication
31 Openings for single swing, pair, borrowed light and sidelight frames to be pre-cut, notched and
32 fabricated at the manufacturer's facility. For fire rated and exterior openings, provide kerf at stop for
33 installation of smoke gasket or weatherstrip
34 Provide minimum 14 gage hinge reinforcement plate tapped for machine screws supplied with hinges.
35 Hinge plate to be mechanically attached to hinge emboss on frame
36 Casing Clips: Fabricate frames with factory applied, heat treated clips to ensure no deflection in the
37 clip upon application or removal of casing. Attachment clips may not be of same material as
38 frame
39 Provide notches,tabs and/or stops for positive alignment of frame parts at all corners.
40 Mullions to be notched as required to provide tight joints.
41 Provide manufacturer's standard mullion brackets for positive connection of frame and mullion parts.
PREFINISHED STEEL DOOR FRAMES
GDA 08125-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Provide manufacturer's standard steel glass stop pre-cut to exact length. Fire rated glazed openings
2 to have hole for installation screw within 2"of each end of stop piece.
3 Provide insert channel full width of borrowed lights installed on finish floor. Provide full width head
4 channel for ceiling height units.
5 Provide adequate structural support(by others)for ceiling insert channel for ceiling height frames.
6 Transom bars to be fixed type with compatible profiles to jamb and head.
7 Attach approved mylar label to each fire-rated frame indicating fire rating details.
8 Factory install TA-46 smoke gasket on all pre-finished, CK series frames. Install with factory mitered
9 corners to ensure adequate seal and pleasing appearance.
10 Finishing
11 Frame Units: Pre-finished with factory applied impact resistant, polyester baked enamel finish or
12 optional electrostatic applied water based paint system.
13 Casing Finishes
14 Steel: Prefinished with factory applied impact resistant, polyester baked enamel finish.
15
16 Colors:Alumatone (SC108).
17
18 Aluminum: Clear anodized for matching with Alumatone(SC108)paint finished frames
19
20 PART 3—EXECUTION
21
22 Examination
23 Verify acceptability of existing conditions before starting work.
24 Verify that opening sizes and wall thicknesses are within specified tolerances. Verify that all finished
25 walls are in plane to ensure proper door alignment.
26 Installation
27 Install frames in accordance with manufacturer's requirements.
28 Anchor frames with screws located at every casing clip or every 11" as shown on manufacturer's
29 instructions. Field verify quantity and location of fasteners prior to installing casing.
30 Install Pre-finished frames near end of the project after wall painting and wall coverings are applied.
31 Install frames using qualified installers familiar with installation of pre-finished drywall frames.
32 Coordinate installation of glass and glazing in glazed units.
33 Coordinate installation of frames with installation of hardware specified in Section 08710 and doors in
34 Section 08212.
35 Touch-up blemishes on finished frames with factory prepared touch up paint.
36
37 END OF SECTION
PREFINISHED STEEL DOOR FRAMES
GDA 08125-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08212 - FLUSH WOOD DOORS
2
3
4 PART 1 - GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections, apply to of this section.
11
12 SUMMARY:
13
14 Extent and location of each type of flush wood door is indicated on drawings and in schedules.
15
16 Types of doors required include the following:
17
18 Solid core flush wood doors with wood veneer faces.
19
20 Factory-finishing of flush wood doors is included in this section.
21
22 Factory-prefittinq to frames and factory-pre-machining for hardware for wood doors is included in this
23 section.
24
25 Metal door frames for flush wood doors are specified in a Division-8 section.
26
27 SUBMITTALS:
28
29 Product Data: Door manufacturer's technical data for each type of door, including details of core and
30 edge construction, trim for openings and louvers, and factory-finishing specifications.
31
32 Testing Data:
33
34 Interior Doors:
35
36 Water resistant bond for Type II doors.
37
38 Warp: NWMA I.S. 1-69.
39
40 Shop Drawings: Submit shop drawings indicating location and size of each door, elevation of each
41 kind of door, details of construction, location and extent of hardware blocking, fire ratings,
42 requirements for factory finishing and other pertinent data.
43
44 For factory-pre-machined doors, indicate dimensions and locations of cutouts for locksets and
45 other cutouts adjacent to light and louver openings.
46
47 Samples for Initial Selection: Color charts consisting of actual materials in small sections for the
48 following:
49
50 Faces of factory-finished doors with transparent finish. Show the full range of colors available
51 for stained and no stain finishes.
52
53 Samples for Verification: As follows:
54
55 Corner sections of doors approximately 8 by 10 inches (200 by 250 mm) with door faces and
56 edgings representing the typical range of color and grain for each species of veneer and solid
57 lumber required. Finish sample with same materials proposed for factory-finished doors.
FLUSH WOOD DOORS
GDA 08212-1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 QUALITY ASSURANCE:
3
4 Quality Standards: Comply with the following standards:
5
6 NWWDA Quality Standard: I.S.1 "Industry Standard for Wood Flush Doors", of National
7 Wood Window and Door Association (NWWDA).
8
9 AWI Quality Standards: "Architectural Woodwork Quality Standards", including Section 1300
10 "Architectural Flush Doors", of Architectural Woodwork Institute (AWI) for grade of door, core
11 construction, finish and other requirements exceeding those of NWWDS quality standard.
12
13 NWWDA Quality Marking: Mark each wood door with NWWDA Wood Flush Door Certification
14 Hallmark certifying compliance with applicable requirements of NWWDA I.S. 1 Series.
15
16 Identify each door with a label or mark for construction and manufacturer. Place label in an
17 non visible location.
18
19 Fire-Rated Wood Doors: Provide wood doors which are identical in materials and construction to units
20 tested in door and frame assemblies per ASTM E 152 and which are labeled and listed for ratings
21 indicated by UL, Warnock Hersey or other testing and inspection agency acceptable to authorities
22 having jurisdiction.
23
24 Manufacturer: Obtain doors from a single manufacturer.
25
26 PRODUCT DELIVERY, STORAGE, AND HANDLING:
27
28 Protect doors during transit, storage and handling to prevent damage, soiling and deterioration.
29 Comply with requirements of referenced standards and recommendations of NWWDA pamphlet "How
30 to Store, Handle, Finish, Install, and Maintain Wood Doors", as well as with manufacturer's
31 instructions.
32
33 Identify each door with individual opening numbers which correlate with designation system used on
34 shop drawings for door, frames and hardware, using temporary, removable or concealed markings.
35
36 PROJECT CONDITIONS:
37
38 Conditioning: Do not deliver or install doors until conditions for temperature and relative humidity have
39 been stabilized and will be maintained in storage and installation areas during remainder of
40 construction period to comply with the following requirements applicable to project's geographical
41 location:
42
43 Referenced AWI quality standard including Section 100-S-3 "Moisture Content".
44
45 WARRANTY:
46
47 General: Warranties shall be in addition to, and not a limitation of, other rights the Owner may have
48 under the Contract Documents.
49
50 Door Manufacturer's Warranty: Submit written agreement on door manufacturer's standard form
51 signed by Manufacturer, Installer and Contractor, agreeing to repair or replace defective doors which
52 have warped (bow, cup or twist) or that show telegraphing of core construction in face veneers, or do
53 not conform to tolerance limitations of referenced quality standards.
54
55 Warranty shall be in effect during following period of time after date of Substantial Completion.
56
57 Solid Core Interior Doors:
FLUSH WOOD DOORS
GDA 08212-2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Life of installation.
3
4 Contractor's Responsibilities: Replace or refinish doors where Contractor's work contributed to
5 rejection or to voiding of manufacturer's warranty.
6
7
8 PART 2-PRODUCTS
9
10
11 MANUFACTURERS:
12
13 Manufacturer: Subject to compliance with requirements, provide products of one of the following.
14
15 Solid Core Doors with Wood Veneer Faces:
16
17 Eggers Industries,Architectural Door Division.
18 Mohawk Flush Doors, Inc.
19 Weyerhauser Company.
20 Marshfield
21
22 INTERIOR FLUSH WOOD DOORS:
23
24 Solid Core Doors for Transparent Finish: Comply with the following requirements:
25
26 Faces: Quarter Cut Douglas Fir
27
28 AWI Grade: Custom.
29
30 Construction: PC-5 (Particleboard core, 5-ply).
31
32 Fire-Rated Solid Core Doors: Comply with the following requirements:
33
34 Faces and AWI Grade: Provide faces and grade to match non-rated doors in same area of
35 building, unless otherwise indicated.
36
37 Construction: Manufacturer's standard core construction as required to provide fire-resistance
38 rating indicated.
39
40 Edge Construction: Provide manufacturer's standard laminated edge construction for
41 improved screw-holding capability and split resistance as compared to edges composed of a
42 single layer of treated lumber.
43
44 Particleboard Cores: Comply with the following requirements:
45
46 Particleboard: ANSI A208.1, Grade LD-1.
47 Blocking: Provide wood blocking at particleboard-core doors as follows:
48
49 6-inch (150-mm)top-rail blocking, at doors indicated to have closers.
50
51 FABRICATION:
52
53 Fabricate flush wood doors to produce doors complying with following requirements:
54
55 Factory-prefit and premachine doors to fit frame opening sizes indicated with the following
56 uniform clearances and bevels:
57 Comply with tolerance requirements of AWI for prefitting. Comply with final hardware
FLUSH WOOD DOORS
GDA 08212-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 schedules and door frame shop drawings and with hardware templates.
2
3 Coordinate measurements of hardware mortises in metal frames to verify dimensions
4 and alignment before proceeding with factory premachining.
5
6 FACTORY FINISHING:
7
8 General: Comply with referenced AWI quality standard including Section 1500 "Factory Finishing".
9
10 Prefinished wood doors at factory.
11
12 Transparent Finish: Comply with requirements indicated for grade, finish system, staining effect and
13 sheen.
14 AWI Grade: Custom.
15
16 Finish:
17
18 AWI Finish System TR-6: Catalyzed polyurethane
19
20 Staining: Match Architect's sample.
21
22 Effect: Unfilled finish.
23
24 Sheen: Satin-medium rubbed effect (40 Satin 30°-50°).
25
26 Provide sealant coat (varnish) to any sanded or trimmed door edges (top, bottom, and sides) prior to
27 door installation.
28
29
30 PART 3- EXECUTION
31
32
33 EXAMINATION:
34
35 Examine installed door frames prior to hanging door:
36
37 Verify that frames comply with indicated requirements for type, size, location, and swing
38 characteristics and have been installed with plumb jambs and level heads.
39
40 Reject doors or door frames with defects.
41
42 Do not proceed with installation until unsatisfactory conditions have been corrected.
43
44 INSTALLATION:
45
46 Hardware: For installation see Division-8 "Finish Hardware"section of these specifications.
47
48 Manufacturer's Instructions: Install wood doors to comply with manufacturer's instructions and of
49 referenced AWI standard and as indicated. Maintain protective wrapping on doors until installation.
50
51 Install fire-rated doors in corresponding fire-rated frames in accordance with requirements of
52 NFPA No. 80.
53
54 Prefit Doors: Fit to frames for uniform clearance at each edge.
55
56 Factory-Finished Doors: Restore finish before installation, if fitting or machining is required at the job
57 site.
FLUSH WOOD DOORS
GDA 08212-4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 ADJUSTING AND PROTECTION:
3
4 Operation: Rehang or replace doors which do not swing or operate freely.
5
6 Finished Doors: Refinish or replace doors damaged during installation.
7
8 Protect doors as recommended by door manufacturer to assure that wood doors will be without
9 damage or deterioration at time of Substantial Completion.
10
11 Recover door with protective wrapping to protect it from soil and similar damage.
12
13 CLEANING
14
15 Remove all protective coverings, smudges, fingerprints, unwanted and unintended stain and similar
16 foreign matter to leave doors in perfect condition.
17
18
19 END OF SECTION 08211
FLUSH WOOD DOORS
GDA 08212-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08360—SERVICE COUNTER DOORS
2
3
4 PART 1 -GENERAL
5
6
7 GENERAL REQUIREMENTS
8
9 Provide all materials, labor, equipment and services necessary to furnish, deliver and install all work
10 under this section as shown on the contract documents, specified herein, and as specified by the job
11 conditions
12
13 DESCRIPTION
14
15 Stainless steel service counter door with integral frame and countertop.
16
17 Related work specified elsewhere
18
19 Finish Hardware: Section 08710
20 Gypsum Dry Wall: Section 09250
21
22 SUBMITTALS
23
24 Procedures: Furnish submittals in accordance with the general requirements specified in Section
25 01300.
26
27 Shop Drawing: Furnish shop drawings for architect's approval. Include elevations, sections, and
28 details indicating dimensions, materials, finishes, conditions for anchorage and support of each door.
29
30 Product Literature: Submit manufacturer's technical literature describing the product to be used under
31 this section.
32
33 Maintenance and Operating Manuals: Furnish complete manuals describing the materials, devices
34 and procedures to be followed in operating and maintaining all doors under this section. Include
35 manufacturer's brochures and parts lists describing the actual materials used in the product.
36
37 QUALITY ASSURANCE
38
39 Regulatory Requirements: Comply with applicable requirements of the laws, codes, ordinances and
40 regulations of federal, state and municipal authorities having jurisdiction.
41
42 DELIVERY, STORAGE AND HANDLING
43
44 General: Deliver and store materials in manufacturer's original packaging, labeled to show name,
45 brand and type. Store materials in a protected dry location off the ground in accordance with
46 manufacturer's instructions.
47
48 WARRANTY
49
50 Shutter Warranty: Furnish One(1) year written warranty signed by the manufacturer and installer
51 agreeing to repair or replace work which has failed as a result of defects in materials or workmanship.
52 Upon notification within the warranty period, such defects shall be repaired at no cost to the owner.
53
54
55 PART 2- MATERIALS
56
57
SERVICE COUNTER DOORS
GDA 08360-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 COILING ALUMINUM COUNTER SHUTTERS
2
3 Manufacturers: Stainless Steel Counter Shutters shall be 651 Series as manufactured by Overhead
4 Door Corp., Dallas, TX.
5
6 MATERIALS
7
8 Curtain: Shall be assembled of .030 interlocking, stainless steel slats. Slats shall have endlocks
9 attached to each end of alternate slats to act as a wearing surface, maintain slat alignment and retain
10 the curtain in guides.
11
12 Bottom Bar: Shall consist of a one angle, not less than 1-1/2" x 1/8" stainless steel, furnished with
13 conceacled slide bolts for locking and forming a flat front surface.
14
15 Guides: Each guide shall be fabricated of stainless steel angles and channels forming uniform box-
16 type configuration.
17
18 Brackets: Mounting brackets of square design fabricated of hot rolled 1/4" steel plate, shall be
19 provided to house ends of the counterbalance assembly.
20
21 Frame/Countertop: Provide integral frame with countertop. Reference drawings for all dimensional
22 requirements.
23
24 Sill Configuration for Counter Door: Stainless steel counter.
25
26 Counterbalance Assembly: Doors shall be counterbalanced by means of adjustable steel helical
27 torsion springs. Spring mechanism will be designed for a minimum 20,000 cycles.
28
29 Hoods: Hoods shall be constructed of 24 gauge stainless steel sheet.
30
31 Locking Devices: Equip door with slide bolt for padlock.
32
33 STAINLESS-STEEL FINISHES
34
35 Surface Preparation: Remove tool and die marks and stretch lines, or blend into finish.
36
37 Polished Finishes: Grind and polish surfaces to produce uniform finish, free of cross scratches.
38
39 Run grain of directional finishes with long dimension of each piece.
40
41 When polishing is completed, passivate and rinse surfaces. Remove embedded foreign
42 matter and leave surfaces chemically clean.
43
44 Directional Satin Finish: No. 4.
45
46 MANUAL DOOR OPERATORS
47
48 Equip door with manufacturer's recommended manual door operator unless another type of door
49 operator is indicated.
50
51 Push-up Door Operation: Design counterbalance mechanism so required lift or pull for door operation
52 does not exceed 25 lbf(111 N).
53
54
55 PART 3- EXECUTION
56
57
SERVICE COUNTER DOORS
GDA 08360-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 EXAMINATION
2
3 Examine surfaces and field conditions to which this work is to be performed and notify architect if
4 conditions of surfaces exist which are detrimental to proper installation and timely completion of work.
5
6 Verify all dimensions taken at job site affecting the work. Notify the architect in any instance where
7 dimensions vary.
8
9 Coordinate and schedule work under this section with work of other sections so as not to delay job
10 progress.
11
12 INSTALLATION
13
14 Perform installation using only factory approved and certified representatives of the door
15 manufacturer.
16
17 Install door assemblies at locations shown in perfect alignment and elevation, plumb, level, straight
18 and true.
19
20 Adjust shutter installation to provide uniform clearances and smooth non-binding operation.
21
22 Test doors opening and closing operational sequence.
23
24 PROTECTION AND CLEANING
25
26 Protect installed work using adequate and suitable means during and after installation until accepted
27 by owner.
28
29 Remove, repair or replace materials which have been damaged in any way.
30
31 Clean surfaces of grime and dirt using acceptable and recommended means and methods.
32
33
34 END OF SECTION 08360
SERVICE COUNTER DOORS
GDA 08360-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08386-SAFETY ALL GLASS SIDELIGHTS
2
3
4 PART 1 - GENERAL
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of the Contract, including General and Supplementary Conditions
9 and Division-1 Specification sections, apply to work specified in this section.
10
11 SUMMARY:
12
13 Extent and configuration of safety glass is indicated on drawings and in schedules.
14
15 Units shall be complete, including, but not limited to the following:
16
17 Glass in 2 or 3-sided captured framing system.
18
19 Glass and glazing, not included in safety glass units, is specified elsewhere in Division-8.
20
21 SYSTEM DESCRIPTION:
22
23 Performance Requirements: Provide assemblies that have been designed and fabricated to comply
24 with performance requirements specified. Each system shall be tested by a recognized testing
25 laboratory or agency in accordance with specified test methods.
26
27 Thermal Movement: Design, fabricate, and install component parts to provide for noiseless
28 expansion and contraction of safety glass sidelight frames over a temperature range for
29 material of 150 degrees fahrenheit, without buckling, sealed joint failure, glass breakage,
30 undue stress on members or anchors, and other detrimental effects.
31
32 Wind Loading Properties: The system will be designed to withstand a 5 mph inward and 5
33 mph outward wind load acting normal to the plane of the wall when tested in accordance
34 with ASTM E 330.
35
36 Building Movement: Design, fabricate and install safety glass sidelight frames to withstand
37 building movements including loading deflections, shrinkage, creep and similar movements.
38
39 SUBMITTALS:
40
41 Product Data: Submit manufacturer's product data, standard details, and installation
42 recommendations for safety glass doors, including the following:
43
44 Fabrication methods.
45 Finishing.
46 Hardware.
47 Accessories and other components.
48
49 Shop Drawings: Submit shop drawings for fabrication and installation of safety glass sidelights and
50 associated components. Include the following:
51
52 Elevations at 1/2"scale.
53 Full size detail sections.
54 Anchors,joint details and reinforcements.
55 Glazing details.
56
SAFETY ALL GLASS SIDELIGHTS
GDA 08386-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Templates and Diagrams: Furnish installation templates, diagrams, and other data to fabricators
2 and installers of related work as necessary for coordination of the installation.
3
4 Samples: Submit samples of each required metal finish, on 6" long extrusions, and each type of
5 glass, 12" square.
6
7 The Architect reserves the right to require samples of typical fabricated sections, indicating
8 joints, exposed fastenings, quality of workmanship, and finish, and including hardware and
9 accessory items, before proceeding with fabrication.
10
11 Certification: Provide certified test results showing that safety glass units have been tested by a
12 recognized testing laboratory or agency and comply with specified performance characteristics.
13
14 QUALITY ASSURANCE:
15
16 Safety Glazing Standard: Provide the type of products indicated that comply with ANSI Z97.1 and
17 testing requirements of 16 CFR Part 1201 for category II materials.
18
19 Manufacturer's Qualifications: Provide safety glass produced by a single manufacturer with not less
20 than 5 years successful experience in fabrication of safety glass of the type and quality required.
21
22 Installer's Qualifications: Engage as installer an authorized representative of the manufacturer for
23 both installation and maintenance of the type of safety glass units required.
24
25 Experience: The installer shall have a minimum of 3 years experience in installation and
26 service of safety glass assemblies manufactured for the project.
27
28 Maintenance Proximity: The installer shall maintain offices and repair or service facilities
29 within 2 hours normal travel time from the project site.
30
31 Design Criteria: Drawings are based on one manufacturer's standard safety glass system. Another
32 manufacturer's system of a similar and equivalent nature from list provided below will be acceptable
33 when, in the Architect's sole judgement, differences do not materially detract from the design
34 concept or intended performance.
35
36 DELIVERY, STORAGE, AND HANDLING:
37
38 Deliver safety glass and related components to the project in manufacturer's original, unopened
39 protective packaging. Use padded blankets or other approved protective wrapping for glass,
40 decorative metal work and other exposed elements.
41
42 Do not deliver units until work is ready for their installation.
43
44 Inspect components for damage upon delivery. Unless minor defects can be repaired to the
45 Architect's satisfaction, remove and replace damaged components at no additional cost.
46
47 Storage: If temporary storage is necessary, store units and related components inside the building
48 in a dry protected area apart from construction traffic, in their original shipping containers with
49 protective wrapping or packaging securely in place.
50
51 Protect finish surfaces from damage during handling and installation.
52
53 PROJECT CONDITIONS:
54
55 Field Measurement: Where possible, field measure openings before fabrication to ensure proper fit
56 of work; show measurements on final shop drawings. Coordinate fabrication with construction
SAFETY ALL GLASS SIDELIGHTS
GDA 08386-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 progress to avoid delay. If necessary, proceed with fabrication without measurements, and
2 coordinate tolerances to ensure proper fit.
3
4 WARRANTY:
5
6 General: Warranties shall be in addition to and not a limitation of other rights the Owner may have
7 under the Contract Documents.
8
9 Special Project Warranty: Submit a written warranty, executed by the Contractor, Installer, and
10 Manufacturer, agreeing to repair or replace components or entire units which fail in materials or
11 workmanship within the specified warranty period. Failures include, but are not necessarily limited
12 to, structural failure including excessive deflection, excessive leakage or air infiltration, , deterioration
13 of metals, metal finishes, and other materials beyond normal weathering. This warranty shall be in
14 addition to and not a limitation of other rights the Owner may have against the Contractor under the
15 Contract Documents.
16
17 Warranty period for safety glass units shall be 3 years after the date of substantial
18 completion.
19
20
21 PART 2-PRODUCTS
22
23 PRODUCT/MANUFACTURERS:
24
25 Manufacturer: Subject to compliance with requirements, provide products of one of the following:
26
27 ACI Distribution;a Division of Vitro America, Inc.
28 Arch Aluminum &Glass Co., Inc.
29 Blumcraft of Pittsburgh.
30 Oldcastle Glass, Inc.
31 Vistawall Architectural Products;The Vistawall Group; a Bluescope Steel company.
32
33 MATERIALS:
34
35 Glass for interior walls: Horizontally tempered safety glass complying with ASTM Standard C 1048-
36 90, Kind FT(fully tempered), Condition A(uncoated surfaces), Type I, of thickness indicated.
37
38 Clear Glass: Provide Class 1 (clear)glass.
39
40 Thickness: 1/2".
41
42 Anchorages and Fastenings: Provide manufacturer's standard, concealed anchors and fasteners.
43 Finish heads of exposed fasteners to match adjacent metal surfaces.
44
45 Furnish inserts and anchorage devices in ample time to avoid delays in other work.
46
47 Do not use exposed fasteners except where unavoidable for assembly of units and for
48 application of hardware.
49
50 Sealants: Tremco Proglaze, clear.
51
52 FABRICATION:
53
54 General: Sizes of glaass and frame units, and profile requirements, are indicated on the drawings.
55 Variable dimensions are indicated with maximum and minimum dimensions required to achieve
56 design requirements and coordination with other work.
57
SAFETY ALL GLASS SIDELIGHTS
GDA 08386-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Fabricate safety glass units to sizes and configurations indicated, with members closely fitted to
2 hairline joints, reinforced and mechanically joined or welded. Dress welds flush and finish to match
3 adjacent surfaces.
4
5 Dissimilar Metals: Separate dissimilar metals with zinc chromate primer, bituminous paint, or other
6 separator that will prevent corrosion.
7
8 Fasteners: Conceal fasteners wherever possible. Countersink heads of exposed fasteners.
9
10
11 PART 3- EXECUTION
12
13 INSPECTION:
14
15 Examine substrate and adjoining construction, and conditions under which work is to be installed. Do
16 not proceed with work until unsatisfactory conditions detrimental to proper and timely completion of
17 work have been corrected.
18
19 INSTALLATION:
20
21 Install safety glass in accordance with manufacturer's printed instructions and recommendations.
22
23 Do not install members that are warped, bowed, deformed, or otherwise damaged or
24 defaced to such extent as to impair strength or appearance. Remove and replace members
25 as directed which have been damaged during installation.
26
27 Set units level, plumb, and true to line, with uniform hairline joints. Support on metal shim and
28 secure in place by bolting to clip angles and supports anchored to supporting structure.
29
30 Set sill members and other members in a bed of compound as shown, or with joint fillers or
31 gaskets to provide a weather tight construction.
32
33 Paint concealed contact surfaces of dissimilar materials, including metal in contact with masonry or
34 concrete work, with a heavy coating of bituminous paint, or provide other separation as
35 recommended by manufacturer.
36
37 Seal joints.
38
39 ADJUSTING:
40
41 Adjust to provide a tight fit at contact points,for weathertight closure.
42
43 CLEANING:
44
45 Clean metal surfaces promptly after installation, exercising care to avoid damage to coatings.
46
47 Clean glass surfaces after installation, complying with requirements contained in the "Glass and
48 Glazing" section for cleaning and maintenance. Remove excess glazing and sealant compounds,
49 dirt, and other substances.
50
51 PROTECTION:
52
53 Institute protective measures required throughout the remainder of the construction period to ensure
54 that safety glass units will be without damage or deterioration, other than normal weathering, at time
55 of acceptance.
56
57
SAFETY ALL GLASS SIDELIGHTS
GDA 08386-4
GDA#12018.00 December 14,2012
Issue for Permit
1 END OF SECTION 08385
SAFETY ALL GLASS SIDELIGHTS
GDA 08386-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08415-ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections, apply to work of this section.
11
12 SUMMARY:
13
14 Extent of aluminum storefronts is indicated on drawings
15 and schedules.
16
17 Aluminum storefront types required for the project include:
18
19 Interior wall storefront type framing system to match existing system.
20
21 Glazed aluminum entrances.
22
23 Coordinate operation with access control hardware.
24
25 Related Sections:
26
27 Glazing: Refer to "Glass and Glazing" section of Division 8 for glazing requirements for
28 aluminum storefronts.
29
30 PERFORMANCE REQUIREMENTS
31
32 General Performance: Aluminum-framed systems shall withstand the effects of the following
33 performance requirements without exceeding performance criteria or failure due to defective
34 manufacture,fabrication, installation, or other defects in construction:
35
36 Movements of supporting structure indicated on Drawings including, but not limited to, story
37 drift and deflection from uniformly distributed and concentrated live loads.
38
39 Dimensional tolerances of building frame and other adjacent construction.
40
41 Failure includes the following:
42
43 Deflection exceeding specified limits.
44 Thermal stresses transferring to building structure.
45 Framing members transferring stresses, including those caused by thermal and
46 structural movements to glazing.
47 Noise or vibration created by wind and by thermal and structural movements.
48 Loosening or weakening of fasteners, attachments, and other components.
49 Sealant failure.
50 Failure of operating units.
51
52 Air Infiltration: Provide aluminum-framed systems with maximum air leakage through fixed glazing
53 and framing areas of 0.06 cfm/sq. ft. (0.03 Us per sq. m) of fixed wall area when tested according to
54 ASTM E 283 at a minimum static-air-pressure difference of 6.24 lbf/sq. ft. (300 Pa).
55
56 SUBMITTALS:
57
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Product Data: Submit manufacturer's specifications, standard details, and installation
2 recommendations for components of aluminum storefronts required for project, including test reports
3 certifying that products have been tested and comply with performance requirements.
4
5 Submit wind loading calculations at shop drawing submittal. Shop drawings will not be
6 returned without wind load calculations.
7
8 Shop Drawings: Submit shop drawings based on field verified dimensions for fabrication and
9 installation of aluminum storefronts, including elevations, detail sections of typical composite
10 members, hardware mounting heights, anchorages, reinforcement, expansion provisions, and glazing.
11
12 Samples: Submit samples of each type and color of aluminum finish, on 12" long sections of
13 extrusions or formed shapes and on 6" square sheets. Where normal color and texture variations are
14 to be expected, include 2 or more units in each set of samples showing limits of such variations
15
16 Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing
17 agency, for aluminum-framed systems, indicating compliance with performance requirements.
18
19 Product Approval Certificates: Notice of Acceptance (NOA) for aluminum-framed systems,
20 accessories, and components,from manufacturer.
21
22 QUALITY ASSURANCE
23
24 Installer Qualifications: Engage a single Installer who has successfully completed installation of
25 glazed curtain wall systems similar in material, design, and extent to that indicated for the Project.
26
27 Product Options: Information on Drawings and in Specifications establishes requirements for
28 systems' aesthetic effects and performance characteristics. Aesthetic effects are indicated by
29 dimensions, arrangements, alignment, and profiles of components and assemblies as they relate to
30 sightlines, to one another, and to adjoining construction. Performance characteristics are indicated by
31 criteria subject to verification by one or more methods including preconstruction testing, field testing,
32 and in-service performance.
33
34 Do not revise intended aesthetic effects, as judged solely by Architect, except with Architect's
35 approval. If revisions are proposed, submit comprehensive explanatory data to Architect for
36 review.
37
38 COORDINATION
39
40 Coordinate size and location of recesses in walls floors for the following door hardware components.
41 Concrete, reinforcement, and formwork requirements are specified in Division 3 Section "Cast-in-
42 Place Concrete."
43
44 Coordinate operation with access control hardware.
45
46 WARRANTY:
47
48 Special Product Warranty: Submit a written warranty, executed by the Contractor, Installer and
49 Manufacturer, agreeing to repair or replace units (including reglazing) which fail in materials or
50 workmanship within the specified warranty period. Failures include, but are not necessarily limited to
51 structural failures including excessive deflection, excessive leakage or air infiltration, faulty operation,
52 and deterioration of metals, metal finishes and other materials beyond normal weathering. This
53 warranty shall be in addition to and not a limitation of other rights the Owner may have against the
54 Contractor under the Contract Documents.
55
56 Warranty period for aluminum storefront is 3 years after the date of substantial completion.
57
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA08415-2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 PART 2 - PRODUCTS
3
4
5 MANUFACTURERS:
6
7 Entrance Manufacturers: Subject to compliance with requirements, provide products to match the
8 existing aluminum entrance doors.
9
10 System to accommodate 1/4"tempered glass clear glass.
11
12 Interior Wall Storefront Manufacturers: Subject to compliance with requirements, provide medium stile
13 and rail products.
14
15 System to accommodate 1/4"tempered glass clear glass.
16
17 MATERIALS:
18
19 Aluminum Members: Provide alloy and temper recommended by the manufacturer for strength,
20 corrosion resistance, and application of required finish; comply with ASTM B 221 for extrusions and
21 ASTM B 209 for sheet or plate.
22
23 Fasteners: Provide fasteners of aluminum, nonmagnetic stainless steel, or other materials warranted
24 by the manufacturer to be noncorrosive and compatible with aluminum components, hardware,
25 anchors and other components.
26
27 Reinforcement: Where fasteners screw-anchor into aluminum less than 0.125"thick, reinforce
28 the interior with aluminum or nonmagnetic stainless steel to receive screw threads, or provide
29 standard noncorrosive pressed-in splined grommet nuts.
30
31 Exposed Fasteners: Except where unavoidable for application for hardware, do not use
32 exposed fasteners. For the application of hardware, use fasteners that match the finish of
33 member or hardware being fastened.
34
35 Provide Phillips flat-head machine screws for exposed fasteners.
36
37 Concealed Flashing: Provide 26 gage minimum dead-soft stainless steel, or 0.026" minimum
38 extruded aluminum of alloy and type selected by manufacturer for compatibility with other
39 components.
40
41 Brackets and Reinforcements: Where feasible, provide high-strength aluminum brackets and
42 reinforcements; otherwise provide nonmagnetic stainless steel or hot-dip galvanized steel complying
43 with ASTM A 386.
44
45 Stile-and-Rail Type Aluminum Doors:
46
47 Frame: Provide tubular frame members, fabricated with mechanical joints using heavy
48 inserted reinforcing plates and concealed tie-rods or j-bolts.
49
50 Design: Provide 1-3/4"thick doors of design indicated.
51
52 Medium stiles, and top rails (3-1/2" nominal width).
53 Bottom rail -±10".
54
55 Glazing: Fabricate doors to facilitate replacement of glass or panels, without disassembly of
56 stiles and rails. Provide snap-on extruded aluminum glazing stops, with exterior stops
57 anchored for non-removal.
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415- 3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 HARDWARE:
3
4 General: Refer to hardware section in Division-8 for requirements for hardware items other than those
5 indicated to be provided by the aluminum entrance manufacturer.
6
7 Provide manufacturer's heavy-duty hardware units as indicated, scheduled, or required for operation
8 of each door, including the following items of sizes, number, and type recommended by manufacturer
9 for service required; finish to match door.
10
11 Butts: Provide 4-1/2"x 4-1/2" butts in accordance with tested system.
12
13 Overhead Closers: Units complying with ANSI A156.4, of the following type and
14 requirements:
15
16 Provide only institutional grade heavy duty cast iron door closers with double heat treated
17 steel piston/shaft design. All closers shall be factory handed, sized and shipped with
18 cardboard template to insure correct installation by contractor. Units shall be independently
19 certified to a minimum of 10,000,000 cycles in compliance with ANSI testing requirements.
20 Hydraulic fluid shall be o-ring compatible with constant viscosity for a temperature range of -
21 20 deg. F to 100 deg. F. At push side mounted locations provide extra duty arms and
22 knuckles similar to LCN 4110 EDA.
23
24 Provide parallel arms for all overhead closers, except where closer will be mounted on
25 exterior/public side of door; in this case provide regular arm mounting. Avoid use of
26 brackets wherever possible.
27
28 Adjust all closers in accordance with manufacturer's recommendations at the building
29 site.
30
31 Type: Overhead, exposed, modern type with cover.
32
33 Delayed action closing.
34
35 Keyed Cylinders: Install cylinder provided per Section 08710"Finish hardware."
36
37 Compression Weatherstripping: Provide the manufacturer's standard replaceable compressible
38 weatherstripping gaskets of molded neoprene complying with ASTM D 2000 or molded PVC
39 complying with ASTM D 2287.
40
41 Sliding Weatherstripping: Provide the manufacturer's standard replaceable weatherstripping of wool,
42 polypropylene, or nylon woven pile, with nylon fabric or aluminum strip backing, complying with AAMA
43 701.2.
44
45 Additional Hardware For Single Leaf Doors Only:
46
47 Push Bar/Pull Sets: Concealed fasteners.
48
49 2923 x 33" Builders Brass Works Corp.
50 536B x 1081 LBP 33"; Hiawatha, Inc.
51 No. 482 x 33"; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
52 1731 x 33"; Triangle Brass Manufacturing Company (Trimco).
53
54 Exit Devices:
55
56 Provide modern touchbar design overlapping "T" style touchpad to prevent pinching of fingers.
57 Touchpad shall incorporate fluid dampers to quiet operation and absorb shock. Unless
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 otherwise specified, touchpad shall be of stainless steel. For safety, touchpad shall not
2 extend full length of device. Provide only low friction fire rated roller strikes at all applicable
3 applications. Latchbolts shall be protected by anti-theft/pic proof device. Endcaps shall be
4 metallic with two point attachment to door and three point attachment to device. Unless
5 otherwise specified, provide lever trim in compliance with ADA similar to Von Duprin 35/99 x
6 06 with sag proof/vandal resistant design.
7
8 Electrified Panic Device: Provide electrified panic device where indicated.
9
10 Product/Manufacturer: Subject to compliance with requirements, provide products by one of
11 the following:
12
13 Exit/Panic Devices:
14
15 Corbin & Russwin Architectural Hardware, Div. Black& Decker Corp.
16 Monarch Hardware & Mfg. Co., Div Newman Tonks, Inc.
17 Sargent Manufacturing Company.
18 35/99 Series; Von Duprin, Div. Ingersoll-Rand Door Hardware Group.
19
20 FABRICATION:
21
22 General: Sizes of frame units, and profile requirements, are indicated on drawings. Variable
23 dimensions are indicated, with maximum and minimum dimensions required to achieve design
24 requirements and coordination with other work.
25
26 Prefabrication: Before shipment to the project site, complete fabrication, assembly, finishing,
27 hardware application, and other work to the greatest extent possible. Disassemble components only
28 as necessary for shipment and installation.
29
30 Preglaze frame units to greatest extent possible.
31
32 Perform fabrication operations, including cutting, fitting, forming, drilling and grinding of metal
33 work to prevent damage to exposed finish surfaces.
34
35 Welding: Comply with AWS recommendations; grind exposed welds smooth and restore mechanical
36 finish.
37
38 Reinforcing: Install reinforcing as required for hardware and necessary for performance requirements,
39 sag resistance and rigidity.
40
41 Dissimilar Metals: Separate dissimilar metals with zinc chromate primer, bituminous paint, or other
42 separator that will prevent corrosion.
43
44 Continuity: Maintain accurate relation of planes and angles,with hairline fit of contacting members.
45
46 Uniformity of Finish: Abutting extruded aluminum members shall not have an integral color or
47 texture variation greater than half the range indicated in the sample pair submittal.
48
49 Fasteners: Conceal fasteners wherever possible.
50
51 ENTRANCE FABRICATION:
52
53 General: Sizes of door units, and profile requirements, are indicated on drawings. Variable
54 dimensions are indicated, with maximum and minimum dimensions required to achieve design
55 requirements and coordination with other work.
56
57 Prefabrication: Before shipment to the project site, complete fabrication, assembly, finishing,
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 hardware application, and other work to the greatest extent possible. Disassemble components only
2 as necessary for shipment and installation.
3
4 Preglaze door and frame units to greatest extent possible.
5
6 Do not drill and tap for surface-mounted hardware items until time of installation of project site.
7
8 Perform fabrication operations, including cutting, fitting, forming, drilling and grinding of metal
9 work to prevent damage to exposed finish surfaces. For hardware, perform these operations
10 prior to application of finishes.
11
12 Welding: Comply with AWS recommendations; grind exposed welds smooth and restore mechanical
13 finish.
14
15 Reinforcing: Install reinforcing as required for hardware and necessary for performance requirements,
16 sag resistance and rigidity.
17
18 Dissimilar Metals: Separate dissimilar metals with zinc chromate primer, bituminous paint, or other
19 separator that will prevent corrosion.
20
21 Continuity: Maintain accurate relation of planes and angles, with hairline fit of contacting members.
22
23 Uniformity of Finish: Abutting extruded aluminum members shall not have an integral color or
24 texture variation greater than half the range indicated in the sample pair submittal.
25
26 Fasteners: Conceal fasteners wherever possible.
27
28 Weatherstripping: For exterior doors, provide compression weatherstripping against fixed stops; at
29 other edges, provide sliding weatherstripping retained in adjustable strip mortised into door edge.
30
31 Miscellaneous Break Metal:
32
33 Material: 6063-T5 aluminum alloy.
34
35 Fasteners: Hardened aluminum or stainless steel where exposed, cadmium or zinc coated
36 may be used in unexposed areas. Exposed fasteners shall be countersunk and shall match
37 storefronts in color.
38
39 ALUMINUM FINISHES
40
41 General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
42 recommendations relative to applying and designating finishes.
43
44 Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable
45 if they are within one-half of the range of approved Samples. Noticeable variations in the same piece
46 are not acceptable. Variations in appearance of other components are acceptable if they are within
47 the range of approved Samples and are assembled or installed to minimize contrast.
48
49 Finish designations prefixed by AA conform to the system established by the Aluminum Association
50 for designating aluminum finishes.
51
52 Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mm or thicker.
53
54
55 PART 3- EXECUTION
56
57
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415-6
GDA#12018.00 December 14, 2012
Issue for Permit
1 INSTALLATION:
2
3 Comply with manufacturer's instructions and recommendations for installation.
4
5 Set units plumb, level, and true to line, without warp or rack of framing members, or panels. Provide
6 proper support and anchor securely in place.
7
8 Separate aluminum and other corrodible metal surfaces from sources of corrosion of
9 electrolytic action at points of contact with other materials. Comply with requirements
10 specified under paragraph"Dissimilar Materials" in the Appendix to AAMA 101-85.
11
12 Set sill members and other members in bed of sealant as indicated, or with joint fillers or gaskets as
13 indicated to provide weathertight construction. Comply with requirements of Division 7 for sealant,
14 fillers, and gaskets.
15
16 Refer to"Glass and Glazing"section of Division 8 for installation of glass and other panels indicated to
17 be glazed into framing, and not preglazed by manufacturer.
18
19 ADJUSTING:
20
21 Adjust operating hardware to function properly, for smooth operation without binding, and for
22 weathertight closure.
23
24 CLEANING:
25
26 Clean the completed system, inside and out, promptly after installation, exercising care to avoid
27 damage to coatings.
28
29 Clean glass surfaces after installation, complying with requirements contained in the "Glass and
30 Glazing" section for cleaning and maintenance. Remove excess glazing and sealant compounds, dirt
31 and other substances from aluminum surfaces.
32
33 PROTECTION:
34
35 Institute protective measures required throughout the remainder of the construction period to ensure
36 that aluminum storefronts will be without damage or deterioration, other than normal weathering, at
37 time of acceptance.
38
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415-7
GDA#12018.00 December 14, 2012
Issue for Permit
1 HARDWARE SET SCHEDULE:
2
3 General: Provide the following hardware:
4
5 Set No. 17 - Pair Interior Aluminum Storefront Door w/Card Reader(Lobby)
6
7 Electrified Exit Device (CVR Type) x RX x OP—active leaf
8 Exit Device (CVR Type)x OP —inactive leaf
9 Pulls
10 Butt Hinges
11 Closers (Overhead Concealed)
12 Power Supply
13
14 Hardware provided per Section 08710
15
16 Cylinder
17
18 Hardware provided by Others
19
20 Card Reader on ingress side to activate ELR exit device
21
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415-8
GDA#12018.00 December 14,2012
Issue for Permit
1 Set No.4-Single Exterior Storefront Doors (New In Existing Storefront System)—Card Reader
2
3 Electrified Exit Hardware (Rim Type)x RX
4 Offset Pivots(Electric Transfer Operation)
5 Offset Pull
6 Closers (Overhead Concealed)
7 Stop(Overhead Surface)
8 Sweep
9 Threshold
10 Weatherseals
11 Door Position Switch
12 Power Supply
13
14 Hardware provided per Section 08710
15
16 Cylinder for night latch retraction
17
18 Hardware provided by Others
19
20 Card Reader
21
22
23 Set No. 21 -Single Interior Aluminum Storefront Door
24
25 Hardware provided per Section 08410
26
27 Straight Push/Pull
28 Offset Pivots
29 Closer(Overhead Concealed)
30 Stop—Overhead Surface Mounted
31 Silencers
32
33
34 END OF SECTION 08410
ALUMINUM STOREFRONTS AND ENTRANCES FOR INTERIOR APPLICATION
GDA 08415-9
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08710- FINISH HARDWARE
2
3
4 PART 1 - GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections, apply to the work of this section.
11
12 DESCRIPTION OF WORK:
13
14 Definition: "Builders' Hardware" includes items known commercially as builders hardware which are
15 required for swing, sliding and folding doors, except special types of unique and non-matching
16 hardware specified in the same section as the door and door frame.
17
18 Extent of finish hardware required is indicated on drawings and in schedules.
19
20 Types of finish hardware required include the following:
21
22 Hinges
23 Lock cylinders and keys
24 Lock and latch sets
25 Bolts
26 Exit devices
27 Push/pull units
28 Closers
29 Door trim units
30 Protection plates
31 Weatherstripping for exterior doors
32 Smoke and draft stripping for interior doors.
33 Silencersfor interior doors.
34 Astragals or meeting seals on pairs of doors
35 Thresholds
36 Security products
37
38 Coordinate operation with access control hardware.
39
40 Silencers included integral with hollow metal frames are specified with door frames elsewhere in
41 Division-8.
42
43 Fire-rated aluminum doors, frames and hardware are specified in Section 08125 - Fire-Rated
44 Aluminum Full Vision Doors and Frames.
45
46 QUALITY ASSURANCE:
47
48 Manufacturer: Obtain each type of hardware (latch and lock sets, hinges, closers, etc.) from only one
49 manufacturer, although several may be indicated as offering products complying with requirements.
50
51 Supplier: A recognized architectural finish hardware supplier, with warehousing facilities, who has
52 been furnishing hardware in the project's vicinity for a period of not less than 2 years, and who is, or
53 who employs an experienced architectural consultant who is available, at reasonable times during the
54 course of the work, for consultation about project's hardware requirements, to Owner, Architect and
55 Contractor.
56
57 Fire-Rated Openings: Provide hardware for fire-rated openings in compliance with NFPA Standard
FINISH HARDWARE
GDA 08710- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 No. 80 and local building code requirements. Provide only hardware which has been tested and listed
2 by UL or FM for types and sizes of doors required and complies with requirements of door and door
3 frame labels.
4
5 Where emergency exit devices are required on fire-rated doors (with supplementary marking
6 on doors' UL or FM labels indicating "Fire Door to be Equipped with Fire Exit Hardware")
7 provide UL or FM label on exit devices indicating "Fire Exit Hardware".
8
9 COORDINATION
10
11 Coordinate size and location of recesses in walls floors for the following door hardware components.
12 Concrete, reinforcement, and formwork requirements are specified in Division 3 Section "Cast-in-
13 Place Concrete."
14
15 Coordinate operation with access control hardware.
16
17 SUBMITTALS:
18
19 Product Data: Submit manufacturers technical product data for each item of hardware in accordance
20 with Division-1 section "Submittals". Include whatever information may be necessary to show
21 compliance with requirements, and include instructions for installation and for maintenance of
22 operating parts and finish.
23
24 Hardware Schedule: Submit final hardware schedule in manner indicated below. Coordinate
25 hardware with doors, frames and related work to ensure proper size, thickness, hand, function and
26 finish of hardware.
27
28 Final Hardware Schedule Content: Based on finish hardware indicated, organize hardware
29 schedule into "hardware sets" indicating complete designations of every item required for
30 each door or opening. Include the following information:
31
32 Type, style, function, size and finish of each hardware item.
33
34 Name and manufacturer of each item.
35
36 Fastenings and other pertinent information.
37
38 Location of hardware set cross-referenced to indications on Drawings both on floor
39 plans and in door and frame schedule.
40
41 Explanation of all abbreviations, symbols, codes, etc. contained in schedule.
42
43 Mounting locations for hardware.
44
45 Door and frame sizes and materials.
46 Keying information.
47
48 Submittal Sequence: Submit schedule at earliest possible date particularly where acceptance of
49 hardware schedule must precede fabrication of other work (e.g., hollow metal frames) which is critical
50 in the project construction schedule. Include with schedule the product data, samples, shop drawings
51 of other work affected by finish hardware, and other information essential to the coordinated review of
52 hardware schedule.
53
54 Submittal Sequence: Submit initial draft of schedule along with essential product data in order
55 to facilitate the fabrication of other work (e.g., hollow metal frame) which is critical in the
56 project construction schedule. Submit final draft of schedule after samples, product data,
57 coordination with shop drawings of other work, delivery schedules, and similar information has
FINISH HARDWARE
GDA 08710- 2
GDA#12018.00 December 14,2012
Issue for Permit
1 been completed and accepted.
2
3 Keying Schedule: Submit separate detailed schedule indicating clearly how the Owner's
4 final instructions on keying of locks has been fulfilled.
5
6 Templates: Furnish hardware templates to each fabricator of doors, frames and other work to be
7 factory-prepared for the installation of hardware. Upon request, check shop drawings of such other
8 work, to confirm that adequate provisions are made for proper location and installation of hardware.
9
10 PRODUCT HANDLING:
11
12 Tag each item or package separately, with identification related to final hardware schedule, and
13 include basic installation instructions with each item or package.
14
15 Packaging of hardware, is responsibility of supplier. As material is received by hardware supplier from
16 various manufacturers, sort and repackage in containers clearly marked with appropriate hardware set
17 number to match set numbers of approved hardware schedule. Two or more identical sets may be
18 packed in same container.
19
20 Inventory hardware jointly with representatives of the hardware supplier and the hardware installer
21 until each is satisfied that the count is correct.
22
23 Deliver individually packaged hardware items at the proper times to the proper locations (shop or
24 project site)for installation.
25
26 Provide secure lock-up for hardware delivered to the project, but not yet installed. Control handling
27 and installation of hardware items which are not immediately replaceable, so that completion of the
28 work will not be delayed by hardware losses, both before and after installation.
29
30 WARRANTY:
31
32 All finish hardware shall be supplied with one year warranty against defects in materials and
33 workmanship, commencing on Date of Substantial Completion.
34
35 EXTRA STOCK
36
37 At completion of Project, provide to Owner:
38
39 1. One complete bitting list of keys.
40 2. One set of instruction sheets for each item furnished.
41 3. One each of any non-standard tool for installation of any item furnished.
42
43
44 PART 2-PRODUCTS
45
46
47 MANUFACTURERS
48
49 Manufacturers: Subject to compliance with requirements, provide products by one of the following:
50
51 Butts and Hinges:
52
53 Hager Hinge Co.
54 McKinney Products Co.
55 Stanley Hardware, Div. Stanley Works.
56
57 Pivots:
FINISH HARDWARE
GDA 08710-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Glynn-Johnson Corp.
3 Norton Door Controls, Div. Yale Security Inc.
4 Rixson-Firemark, Div. Yale Security Inc.
5
6 Pocket Pivots:
7
8 H. B. Ives,A Harrow Company.
9
10 Key Control System:
11
12 Key Control Systems, Inc.
13 Telkee Inc.
14
15 Cylinders and Locks:
16
17 Best Lock Corp.
18 Corbin& Russwin Architectural Hardware, Div. Black& Decker Corp.
19 Sargent Manufacturing Company.
20 Schlage Lock, Div. Ingersoll-Rand Door Hardware Group.
21 Yale Security Inc.
22
23 Bolts:
24
25 Builders Brass Works Corp.
26 Glynn-Johnson Corp.
27 H. B. Ives,A Harrow Company.
28 Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
29
30 Exit/Panic Devices:
31
32 Adams Rite Manufacturing Co.
33 Corbin & Russwin Architectural Hardware, Div. Black& Decker Corp.
34 Monarch Hardware& Mfg. Co., Div Newman Tonks, Inc.
35 Sargent Manufacturing Company.
36 Von Duprin, Div. Ingersoll-Rand Door Hardware Group.
37
38 Push/Pull Units:
39
40 Builders Brass Works Corp.
41 Hiawatha, Inc.
42 H. B. Ives,A Harrow Company.
43 Triangle Brass Manufacturing Company(Trimco).
44
45 Surface Mounted Overhead Closers:
46
47 LCN, Div. Ingersoll-Rand Door Hardware Group.
48 Norton Door Controls, Div. Yale Security Inc.
49 Rixson-Firemark, Div. Yale Security Inc.
50 Sargent Manufacturing Company.
51 Yale Security Inc.
52
53 Concealed Overhead Closers:
54
55 LCN, Div. Ingersoll-Rand Door Hardware Group.
56 Norton Door Controls, Div. Yale Security Inc.
57 Rixson-Firemark, Div. Yale Security Inc.
FINISH HARDWARE
GDA 08710-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 Sargent Manufacturing Company.
2 Yale Security Inc.
3
4 Floor Closers:
5
6 Dor-O-Matic.
7 Dorma Door Controls International.
8 Rixson-Firemark, Div. Yale Security Inc.
9
10 Door Control Devices:
11
12 Builders Brass Works Corp.
13 Glynn-Johnson Corp.
14 H. B. Ives, A Harrow Company.
15 Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
16 Triangle Brass Manufacturing Company(Trimco).
17
18 Door Trim Units:
19
20 Builders Brass Works Corp.
21 H. B. Ives, A Harrow Company.
22 Triangle Brass Manufacturing Company (Trimco).
23
24 Kick, Mop,and Armor Plates:
25
26 Hiawatha, Inc.
27 H. B. Ives,A Harrow Company.
28 Triangle Brass Manufacturing Company(Trimco).
29
30 Bifold Door Hardware:
31
32 Grant Hardware Co.
33 P. C. Henderson Inc.
34 L. E. Johnson Products, Inc.
35 Stanley Hardware, Div. Stanley Works.
36
37 Door Stripping and Seals:
38
39 National Guard Products, Inc.
40 Pemko Manufacturing Co., Inc.
41 Reese Enterprises, Inc.
42 Ultra Industries.
43 Zero International, Inc.
44
45 Thresholds:
46
47 National Guard Products, Inc.
48 Pemko Manufacturing Co., Inc.
49 Reese Enterprises, Inc.
50 Zero International, Inc.
51
52 Automatic Drop Seals:
53
54 National Guard Products, Inc.
55 Pemko Manufacturing Co., Inc.
56 Reese Enterprises, Inc.
57 Zero International, Inc.
FINISH HARDWARE
GDA 08710- 5
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Sound Stripping:
3
4 National Guard Products, Inc.
5 Pemko Manufacturing Co., Inc.
6 Reese Enterprises, Inc.
7 Zero International, Inc.
8
9 Astragals:
10
11 National Guard Products, Inc.
12 Pemko Manufacturing Co., Inc.
13 Reese Enterprises, Inc.
14 Zero International, Inc.
15
16 Access Key Control Box:
17
18 The Knox Company
19
20 Access Control System:
21
22 Locknetics
23
24 Responsibilities of Finish Hardware Supplier:
25
26 Submittals: Provide through Contractor required Product Data, Final Hardware Schedule, Separate
27 Keying Schedule (if required), and samples as specified in Part 1 - General of this section, unless
28 otherwise indicated.
29
30 Construction Schedule: Inform Contractor at earliest possible date of estimated times and dates to
31 process submittals, to furnish templates, to deliver hardware, and to perform other work associated
32 with furnishing Finish Hardware for purposes of including in construction progress schedule and then
33 comply with this schedule.
34
35 Coordination and Templates: Assist Contractor as required to coordinate hardware with other work in
36 respect to both fabrication and installation. Furnish Contractor with templates and deliver hardware to
37 proper locations.
38
39 Product Handling: Package, identify, deliver, and inventory hardware as specified in Part 1 - General
40 of this section.
41
42 Discrepancies: Based on requirements indicated in Contract Documents in effect at time of hardware
43 selection: furnish proper types, finishes, and quantities of finish hardware, including fasteners, and
44 Owner's maintenance tools; and furnish or replace any items of finish hardware resulting from
45 shortages and incorrect items, at no cost to the Owner or Contractor. Obtain signed receipts from
46 Contractor for all delivered materials.
47
48 Responsibilities of Contractor:
49
50 Submittals: Coordinate and process submittals for Builders Hardware in same manner as submittals
51 for other work.
52
53 Construction Schedule: Cooperate with Finish Hardware supplier in establishing scheduled dates for
54 submittals and delivery of templates and finish hardware.
55
56 Coordination: Coordinate finish hardware with other work. Furnish hardware supplier or manufacturer
57 with shop drawings of other work where required or requested. Verify completeness and suitability of
FINISH HARDWARE
GDA 08710- 6
GDA#12018.00 December 14, 2012
Issue for Permit
1 hardware with supplier.
2
3 Product Handling: Provide secure lock-up for hardware delivered to the site. Inventory hardware
4 jointly with representative of hardware supplier and issue signed receipts for all delivered materials.
5 Any hardware items lost, damaged or stolen after being accepted by Contractor shall be replaced at
6 Contractor's expense.
7
8 Installation Information: The general types and approximate quantities of hardware required for this
9 project are indicated at the end of this section in order to establish Contractors costs for installation
10 and other work not included in allowance.
11
12 SCHEDULED HARDWARE:
13
14 General: Products listed in the Hardware Schedule by manufacturer's product designations shall be
15 used to the exclusion of all products listed in the body of the specification. Where a product is listed
16 as only generic type (i.e. wall stop) in the Hardware Schedule, any product in the body of the
17 specification must be used to the exclusion of all other available products.
18
19 Requirements for design, grade, function, finish, size and other distinctive qualities of each type of
20 finish hardware is indicated below or in the Hardware Schedule. Products are identified by using
21 hardware designation numbers of the following.
22
23 Manufacturer's product designations: One or more manufacturers are listed for each
24 hardware type required. An asterisk (*) after a manufacturer's name indicates whose product
25 designation is used in the Hardware Schedule for purposes of establishing minimum
26 requirements. Provide either the product designated, or, where more than one manufacturer
27 is listed, the comparable product of one of the other manufacturers which comply with
28 requirements including those specified elsewhere in this section.
29
30 MATERIALS AND FABRICATION:
31
32 General:
33
34 Hand of door: Drawings show direction of slide, swing or hand of each door leaf. Furnish each item of
35 hardware for proper installation and operation of door movement as shown.
36
37 Manufacturers Name Plate: Do not use manufacturer's products which have manufacturer's name or
38 trade name displayed in a visible location (omit removable nameplates), except in conjunction with
39 required UL labels and as otherwise acceptable to Architect.
40
41 Manufacturer's identification will be permitted on rim of lock cylinders, arm of closer, and end
42 cap of exit devices.
43
44 Base Metals: Produce hardware units of basic metal and forming method indicated, using
45 manufacturer's standard metal alloy, composition, temper and hardness, but in no case of lesser
46 (commercially recognized) quality than specified for the applicable hardware units by applicable
47 ANSI A156 series standard for each type hardware item and with ANSI A156.18 for finish
48 designations indicated. Do not furnish "optional" materials or forming methods for those indicated,
49 except as otherwise specified.
50
51 Fasteners: Provide hardware manufactured to conform to published templates, generally prepared for
52 machine screw installation. Do not provide hardware which has been prepared for self-tapping sheet
53 metal screws, except as specifically indicated.
54
55 Furnish screws for installation, with each hardware item. Provide Phillips flat-head screws except as
56 otherwise indicated. Finish exposed (exposed under any condition) screws to match hardware finish
57 or, if exposed in surfaces of other work, to match finish of such other work as closely as possible,
FINISH HARDWARE
GDA 08710- 7
GDA#12018.00 December 14, 2012
Issue for Permit
1 including "prepared for paint" in surfaces to receive painted finish.
2
3 Provide concealed fasteners for hardware units which are exposed when door is closed, except to
4 extent no standard units of the type specified are available with concealed fasteners. Do not use thru-
5 bolts for installation where bolt head or nut on the opposite face is exposed in other work, except
6 where it is not feasible to adequately reinforce the work. In such cases, provide sleeves for each thru-
7 bolt or use sex screw fasteners.
8
9 Tools and Maintenance Instructions for Maintenance: Furnish a complete set of specialized tools and
10 maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal
11 and replacement of finish hardware.
12
13 HINGES, AND BUTTS:
14
15 Templates: Except for hinges to be installed entirely (both leaves) into wood doors and frames,
16 provide only template-produced units.
17
18 Screws: Furnish Phillips flat-head or machine screws for installation of units, except furnish Phillips
19 flat-head or wood screws for installation of units into wood. Finish screw heads to match surface of
20 hinges or pivots.
21
22 Doors with Closers: Provide five knuckle ball bearing butts.
23
24 Thickness: Provide thickness indicated on the schedule. If not indicated, provide standard duty.
25
26 Standard Duty(indicated as Butts): 0.134 inch, minimum.
27
28 Heavy Duty (indicated as HD Butts): 0.180 inch, minimum.
29
30 Butt Hinge Height:
31
32 Doors 1-3/4"thick and up to 36"wide shall have 4-1/2" butts.
33
34 Doors 1-3/4"thick; 37"to 48"wide shall have 5" butts.
35
36 Butt Hinge Width: All hinges shall be sized to clear all trim.
37
38 Number of hinges: Provide number of hinges indicated but not less than 3 hinges per door leaf for
39 doors 90" or less in height and one additional hinge for each 30" of additional height.
40
41 Hinge Pins: Except as otherwise indicated, provide hinge pins as follows:
42
43 Steel Hinges: Steel pins.
44
45 Non-ferrous Hinges: Stainless steel pins.
46
47 Exterior Doors: Non-removable pins.
48
49 Out-swing Corridor Doors: Non-removable pins.
50
51 Interior Doors: Non-rising pins.
52
53 Tips: Flat button and matching plug, finished to match leaves, except where hospital tip (HT)
54 indicated.
55
56 Electric Transfer Wire Hinge (indicated as ETW Butt): Where electrified device is specified for
57 hardware set, provide 5-wire electric transfer hinge as intermediate hinge. When scheduled, provide
FINISH HARDWARE
GDA 08710- 8
GDA#12018.00 December 14,2012
Issue for Permit
1 one less hinge for door, required by specification.
2
3 PIVOTS:
4
5 Templates: Except for pivots to be installed entirely (both leaves) into wood doors and frames,
6 provide only template-produced units.
7
8 Screws: Furnish Phillips flat-head or machine screws for installation of units, except furnish Phillips
9 flat-head or wood screws for installation of units into wood. Finish screw heads to match surface of
10 hinges or pivots.
11
12 Pivots on non-fire rated doors: Where indicated as"Pivots", provide the following:
13
14 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
15 following:
16
17 Top Pivot:
18
19 P1; Glynn-Johnson Corp.
20 OP440/75120; Dorma Door Controls Inc.
21 0875/280AC; Dor-O-Matic
22 117/180; Rixson
23
24 Intermediate Pivot: Provide for doors over 7'-6" high.
25
26 P3; Glynn-Johnson Corp.
27 OP440/75220; Dorma Door Controls Inc.
28 0875/019AC; Dor-O-Matic
29 117/M19; Rixson
30
31 Bottom Pivot:
32
33 P2; Glynn-Johnson Corp.
34 OP440/75320; Dorma Door Controls Inc.
35 0875/220N870; Dor-O-Matic
36 117; Rixson
37
38 Pivots on fire rated doors (three-hour maximum): Where indicated as "Pivots-FR", provide the
39 following:
40
41 Finish: US32D only.
42
43 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
44 following:
45
46 Top Pivot:
47
48 P1 F; Glynn-Johnson Corp.
49 OPF440/75133; Dorma Door Controls Inc.
50 F0875/280AC; Dor-O-Matic
51 F117/F180; Rixson
52
53 Intermediate Pivot: Provide for doors over 7'-6"high.
54
55 P3F; Glynn-Johnson Corp.
56 OPF440/75220; Dorma Door Controls Inc.
57 F0875/019AC; Dor-O-Matic
FINISH HARDWARE
GDA 08710-9
GDA#12018.00 December 14, 2012
Issue for Permit
1 F117/FM19; Rixson
2
3 Bottom Pivot:
4
5 P2F ; Glynn-Johnson Corp.
6 OPF440/75323/7471 K; Dorma Door Controls Inc.
7 F0875/220A/870; Dor-O-Matic
8 F117; Rixson
9
10 POCKET PIVOTS:
11
12 Templates: Except for pivots to be installed entirely (both leaves) into wood doors and frames,
13 provide only template-produced units.
14
15 Screws: Furnish Phillips flat-head or machine screws for installation of units, except furnish Phillips
16 flat-head or wood screws for installation of units into wood. Finish screw heads to match surface of
17 hinges or pivots.
18
19 ProducUManufacturer: Subject to compliance with requirements, provide products the following:
20
21 P91105F; H. B. Ives, A Harrow Company.
22
23 LOCK CYLINDERS AND KEYING:
24
25 General: Supplier will meet with Owner to finalize keying requirements and obtain final instructions in
26 writing.
27
28 System: Except as otherwise indicated, provide new grandmasterkey system for project.
29
30 Equip locks with cylinders for interchangeable-core pin tumbler inserts. Furnish only temporary inserts
31 for the construction period, and remove these when directed.
32
33 Finish hardware supplier will provide final inserts, unless otherwise indicated.
34
35 Metals: Construct lock cylinder parts from brass/bronze, stainless steel or nickel silver.
36
37 Comply with Owner's instructions for masterkeying and, except as otherwise indicated, provide
38 individual change key for each lock which is not designated to be keyed alike with a group of related
39 locks.
40
41 Permanently inscribe each key with number or lock that identifies cylinder manufacturer key
42 symbol, and notation "DO NOT DUPLICATE".
43
44 Key Material: Provide keys of nickel silver only.
45
46 Key Quantity: Furnish 3 change keys for each lock; 6 master keys for each master system.
47
48 Deliver keys to Owner's representative.
49
50 Provide a key cabinet:
51
52 Model: 300 series x Velcro as manufactured by Key Control Systems, Inc.
53
54 LOCKSETS AND LATCHSETS:
55
56 Provide mortise style locksets with 3/4" throw anti-friction latchbolt, lock strikes shall be ASA 4-7/8"
57 with curved lipped design, unless otherwise specified. Locksets, latchsets, and cylinders to be by one
FINISH HARDWARE
GDA 08710- 10
GDA#12018.00 December 14, 2012
Issue for Permit
1 manufacturer.
2
3 Provide knurled finish on lockset levers to hazardous areas.
4
5 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
6 following:
7
8 Mortise Locksets:
9
10 35H Series; Best Lock Corp.
11 ML2200 Series; Corbin &Russwin Architectural Hardware, Div. Black& Decker Corp.
12 8100 Series; Sargent Manufacturing Company.
13 L Series; Schlage Lock, Div. Ingersoll-Rand Door Hardware Group.
14 Yale Security Inc.
15
16 Lever and Rose: 17 A; Schlage, or Architect approved equivalent from manufacturers listed
17 above.
18
19 Cylindrical Locksets:
20
21 9K Series; Best Lock Corp.
22 CL3400 Series; Corbin & Russwin Architectural Hardware, Div. Black& Decker Corp.
23 10-Line Series; Sargent Manufacturing Company.
24 D Series; Schlage Lock, Div. Ingersoll-Rand Door Hardware Group.
25 5400L Series; Yale Security Inc.
26
27 Lever and Rose: Sparta, or Architect approved equivalent from manufacturers listed above.
28
29 EXIT DEVICES:
30
31 Exit Device No. 1:
32
33 Provide modern touchbar design overlapping "T" style touchpad to prevent pinching of fingers.
34 Touchpad shall incorporate fluid dampers to quiet operation and absorb shock. Unless otherwise
35 specified, touchpad shall be of stainless steel. For safety, touchpad shall not extend full length of
36 device. Provide only low friction fire rated roller strikes at all applicable applications. Latchbolts shall
37 be protected by anti-theft/pic proof device. Endcaps shall be metallic with two point attachment to door
38 and three point attachment to device. Unless otherwise specified, provide lever trim in compliance with
39 ADA similar to Von Duprin 35/99 x 06 with sag proof/vandal resistant design.
40
41 Exit Device Dogging: Except on fire-rated doors where closers are provided on doors equipped with
42 exit devices, equip the units with standard hex keyed dogging device to keep the latch bolt retracted,
43 when engaged.
44
45 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
46 following:
47
48 Exit/Panic Devices:
49
50 Corbin & Russwin Architectural Hardware, Div. Black & Decker Corp.
51 Monarch Hardware & Mfg. Co., Div Newman Tonks, Inc.
52 Sargent Manufacturing Company.
53 35/99 Series; Von Duprin, Div. Ingersoll-Rand Door Hardware Group.
54
55 Exit Device No. 2:
56
57 Provide exit devices actuated by full-width crash bar; in compliance with UL 305. Provide radius faced
FINISH HARDWARE
GDA 08710 - 11
GDA#12018.00 December 14, 2012
Issue for Permit
1 touchbar of "I" style design touchpad. Provide unit for keyed mortise cylinder operation of the latch
2 from outside. Latchbolts shall be protected by anti-theft/pic proof device. Unless otherwise specified,
3 provide pullever trim in compliance with ADA.
4
5 Exit Device Dogging: Except on fire-rated doors where closers are provided on doors equipped with
6 exit devices, equip the units with standard hex keyed dogging device to keep the latch bolt retracted,
7 when engaged.
8
9 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
10 following:
11
12 Exit/Panic Devices:
13
14 8000 Series; Adams Rite Manufacturing Co.
15
16 Entry Trim: 3088 pullever entry trim, 08 function.
17
18 Manufacturer: Series 8000, radius face pushbar;Adams Rite.
19
20 EXIT CONTROL (ALARM) LOCK
21
22 Where indicated, provide the following:
23
24 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
25 following:
26
27 Alarm lock for single doors: ECL-2230D x ECL-445K with BE-960 Battery Eliminator and
28 12VAC transformer, and strike; Detex.
29
30 Alarm lock for double doors: ECL-230D x VRA-143D (Specify Door Height) with BE-960
31 Battery Eliminator and 12VAC transformer for each leaf;
32 Detex.
33
34 CLOSERS:
35
36 Provide only institutional grade heavy duty cast iron door closers with double heat treated steel
37 piston/shaft design. All closers shall be factory handed, sized and shipped with cardboard template to
38 insure correct installation by contractor. Units shall be independently certified to a minimum of
39 10,000,000 cycles in compliance with ANSI testing requirements. Hydraulic fluid shall be o-ring
40 compatible with constant viscosity for a temperature range of-20 deg. F to 100 deg. F.
41
42 At push side mounted locations provide extra duty arms and knuckles, similar to LCN 4110 EDA, or
43 Architect approved equivalent.
44
45 Size of Units: Except as otherwise specifically indicated, comply with the manufacturer's
46 recommendations for size of door control unit depending on size of door, exposure to weather, and
47 anticipated frequency of use.
48
49 Where parallel arms are indicated for closers, provide closer unit one size larger than
50 recommended for use with standard arms.
51
52 Provide parallel arms,where indicated on schedule, and for all overhead closers, except where closer
53 will be mounted on public side of door; in this case provide regular arm mounting. Avoid use of
54 brackets wherever possible.
55
56 Adjust all closers in accordance with manufacturer's recommendations at the building site.
57
FINISH HARDWARE
GDA 08710- 12
GDA#12018.00 December 14,2012
Issue for Permit
1 Access-Free Manual Closers: Where manual closers are indicated for doors required to be
2 accessible to the physically handicapped, provide adjustable units complying with ANSI A117.1
3 provisions for door opening force and delayed action closing.
4
5 Mount closers with wood or machine screws. No though bolt mounting allowed.
6
7 Product/Manufacturer: Subject to compliance with requirements, provide the following:
8
9 Surface Mounted Overhead Closers:
10
11 4010/4110; LCN, Div. Ingersoll-Rand Door Hardware Group.
12
13 Concealed Overhead Closers:
14
15 2030; LCN, Div. Ingersoll-Rand Door Hardware Group.
16
17 PULLS
18
19 Concealed Fasteners: Provide manufacturer's special concealed fastener system for installation, thru-
20 bolted for matched pairs but not for single units.
21
22 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
23 following:
24
25 Straight Pulls:
26
27 2909; Builders Brass Works Corp.
28 536B; Hiawatha, Inc.
29 No. 163; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
30 1195-2; Triangle Brass Manufacturing Company (Trimco).
31
32 Offset Pulls:
33
34 2952; Builders Brass Works Corp.
35 658A; Hiawatha, Inc.
36 No. 521; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
37 1191-3; Triangle Brass Manufacturing Company(Trimco).
38
39 PUSH BARS
40
41 Concealed Fasteners: Provide manufacturer's special concealed fastener system for installation, thru-
42 bolted for matched pairs but not for single units.
43
44 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
45 following:
46
47 Push Bars:
48
49 2988 x 33"; Builders Brass Works Corp.
50 1081 LBP 33"; Hiawatha, Inc.
51 No. 473 x 33"; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
52 1741 x 33"; Triangle Brass Manufacturing Company(Trimco).
53
54 PUSH BAR/PULL SETS
55
56 Concealed Fasteners: Provide manufacturer's special concealed fastener system for installation, thru-
57 bolted for matched pairs but not for single units.
FINISH HARDWARE
GDA 08710- 13
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
3 following:
4
5 Push Bar/Pull Sets:
6
7 2923 x 33" Builders Brass Works Corp.
8 536B x 1081 LBP 33"; Hiawatha, Inc.
9 No.482 x 33"; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
10 1731 x 33"; Triangle Brass Manufacturing Company (Trimco).
11
12 Offset Push Bar/Pull Sets:
13
14 2958 x 33"; Builders Brass Works Corp.
15 658A x 1081 LBP 33"; Hiawatha, Inc.
16 No.484 x 33"; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
17 1737 x 33"; Triangle Brass Manufacturing Company (Trimco).
18
19 PULL PLATES
20
21 Concealed Fasteners: Provide manufacturer's special concealed fastener system for installation, thru-
22 bolted for matched pairs but not for single units.
23
24 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
25 following:
26
27 Pull Plates:
28
29 47D x 2909 (plate preped for pull); Builders Brass Works Corp.
30 200D x 535B; Hiawatha, Inc.
31 1001-2 x 1195-2 (plate preped for pull); Triangle Brass Manufacturing Company (Trimco).
32
33 PUSH PLATES
34
35 Concealed Fasteners: Provide manufacturer's special concealed fastener system for installation, thru-
36 bolted for matched pairs but not for single units.
37
38 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
39 following:
40
41 Push Plates:
42
43 47-D; Builders Brass Works Corp.
44 200D; Hiawatha, Inc.
45 1001-2; Triangle Brass Manufacturing Company(Trimco).
46
47 PROTECTION PLATES:
48
49 Provide .050"thick stainless steel plates, with four beveled edges and flat head counter sunk screws.
50
51 Fabricate protection plates not more than 2-inches less than door width on push side and not more
52 than 1-inch less than door width on pull side by height indicated.
53
54 Kickplates: 8", unless indicated otherwise.
55
56 Mop plates: 6", unless indicated otherwise.
57
FINISH HARDWARE
GDA 08710- 14
GDA#12018.00 December 14, 2012
Issue for Permit
1 Armor plates: 36", unless indicated otherwise.
2
3 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
4 following:
5
6 Kick, Mop, and Armor Plates:
7
8 Hiawatha, Inc.
9 H. B. Ives,A Harrow Company.
10 Triangle Brass Manufacturing Company(Trimco).
11
12 FLOOR STOPS:
13
14 Provide floor stops with anchoring suitable for floor construction.
15
16 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
17 following:
18
19 Builders Brass Works Corp.
20 FB16R; Glynn-Johnson Corp.
21 436 x 435; H. B. Ives, A Harrow Company.
22 441; Rockwood Manufacturing
23 Triangle Brass Manufacturing Company(Trimco).
24
25 Where rubber bumper stops(RB Stop)are indicated on the Hardware Schedule, provide:
26
27 FB18S; Glynn Johnson.
28 462; Rockwood Manufacturing.
29
30 WALL STOPS:
31
32 Provide wall stops with anchoring suitable for wall construction.
33
34 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
35 following:
36
37 Builders Brass Works Corp.
38 60W; Glynn-Johnson Corp.
39 407-1/2; H. B. Ives,A Harrow Company.
40 406; Rockwood Manufacturing
41 Triangle Brass Manufacturing Company(Trimco).
42
43 OVERHEAD STOPS:
44
45 Provide stops of stainless steel with metallic shock blocks, endcaps, and components. Plastic
46 components are unacceptable.
47
48 Product/Manufacturer: Subject to compliance with requirements, provide the following:
49
50 Concealed Overhead Holder/Stop (Exterior Doors):
51
52 100; Glynn-Johnson Corp.
53
54 Concealed Overhead Holder/Stop(Interior Doors):
55
56 400; Glynn-Johnson Corp.
57
FINISH HARDWARE
GDA 08710- 15
GDA#12018.00 December 14, 2012
Issue for Permit
1 Surface Mounted Overhead Stop:
2
3 90; Glynn-Johnson Corp.
4
5 FLUSHBOLTS AND COORDINATORS:
6
7 Provide all components by one manufacturer. Flushbolts shall incorporate low friction, investment
8 cast, cam style trigger. Flushbolts, except manual bolts, shall be of stainless steel. Provide full
9 dustproof strike, similar to Glynn-Johnson DP2, or Architect approved equivalent, at all flushbolt
10 applications. Coordinators shall be modern type with adjustable override feature.
11
12 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
13 following:
14
15 Flushbolts:
16
17 FB6 x 12 w/DP2; Glynn-Johnson Corp.
18 No. 1357 wl No 1225; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
19 555 x 12 w/dustproof strike; Rockwood Manufacturing.
20
21 Flushbolts (Labeled Doors):
22
23 FB6 x 12 w/ DP2; Glynn-Johnson Corp.
24 No. 1357UL w/ No 1225; Quality Hardware Mfg. Co., Inc.; Div. Newman Tonks, Inc.
25 555 x 12 w/dustproof strike; Rockwood Manufacturing.
26
27 Coordinators:
28
29 3094; Builders Brass Works Corp.
30 COR Series; Glynn-Johnson Corp.
31 SR 400; Dorma Door Controls Inc.
32 3094; Triangle Brass Manufacturing Company (Trimco).
33
34 LATCH GUARDS
35
36 Provide units as specified or equivalent design units with respect to thickness, anchorage, finish,
37 surface, and dimensions.
38
39 LP3; Glynn-Johnson Corp.
40
41 SEALS:
42
43 Provide units as specified or equivalent design units with respect to thickness, anchorage, finish,
44 surface, and dimensions.
45
46 Smoke and Draft Seals at Jambs and Heads and Rigid Jamb Weatherstripping:
47
48 127NSA; National Guard Products, Inc.
49 305CR; Pemko Manufacturing Co., Inc.
50 DS70; Reese Enterprises, Inc.
51 WS 002-C; Ultra Industries.
52 Zero International, Inc.
53
54 Bulb Seal: Flexible, hollow silicone bulb or loop insert. Color as selected by Architect. Provide
55 surface-applied type of following:
56
57 PF181; National Guard Products, Inc.
FINISH HARDWARE
GDA 08710- 16
GDA#12018.00 December 14, 2012
Issue for Permit
1 S88; Pemko Manufacturing Co., Inc.
2 WS 108; Ultra Industries.
3
4 SWEEPS:
5
6 Provide units as specified or equivalent design units with respect to thickness, anchorage, finish,
7 surface, and dimensions.
8
9 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
10 following:
11
12 Sweep:
13
14 97VA; National Guard Products, Inc.
15 307AV; Pemko Manufacturing Co., Inc.
16 806; Reese Enterprises, Inc.
17 DB 005-A; Ultra Industries.
18
19 Sweep w/Drip:
20
21 101AV; National Guard Products, Inc.
22 3452AV; Pemko Manufacturing Co., Inc.
23 353; Reese Enterprises, Inc.
24 DB 037-A; Ultra Industries.
25
26 DRIP CAPS:
27
28 Provide units as specified or equivalent design units with respect to thickness, anchorage, finish,
29 surface, and dimensions.
30
31 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
32 following:
33
34 Drip Cap:
35
36 16AD; National Guard Products, Inc.
37 346C; Pemko Manufacturing Co., Inc.
38 R201A; Reese Enterprises, Inc.
39 WS 025-C; Ultra Industries.
40 142; Zero International, Inc.
41
42 THRESHOLDS:
43
44 General: Except as otherwise indicated on drawings provide standard metal threshold unit of type,
45 size and profile as shown or scheduled.
46
47 Provide threshold of following metal,finish:
48
49 Extruded aluminum with natural anodized finish; 0.062" minimum thickness of main walls and
50 flanges.
51
52 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
53 following:
54
55 Threshold No. 1 (1/4" Full Saddle1:
56
57 513; National Guard Products, Inc.
FINISH HARDWARE
GDA 08710- 17
•
GDA#12018.00 December 14, 2012
Issue for Permit
1 271A; Pemko Manufacturing Co., Inc.
2 S405A; Reese Enterprises, Inc.
3 TH 042-A; Ultra Industries.
4 545; Zero International, Inc.
5
6 Threshold No. 2 (1/4" Half Saddle):
7
8 274A; Pemko Manufacturing Co., Inc.
9 TH 162-A; Ultra Industries.
10
11 Threshold No. 3(1/2"oa. height Panic Exit Saddle):
12
13 2005AS; Pemko Manufacturing Co., Inc.
14 S483AV; Reese Enterprises, Inc.
15 TH 040-A; Ultra Industries.
16
17 POWER SUPPLY
18
19 Product/Manufacturer: Subject to compliance with requirements, provide the following:
20
21 Provide 505 with EIR-5 option; Locknetics.
22
23 MAGNETIC LOCK
24
25 Product/Manufacturer: Subject to compliance with requirements, provide the following:
26
27 Provide 390+; Locknetics.
28
29 MAGNETIC DOOR HOLD
30
31 Product/Manufacturer: Subject to compliance with requirements, provide the following:
32
33 SEM7850 MAGNET; LCN, Div. Ingersoll-Rand Door Hardware Group.
34
35 TRANSFORMER
36
37 Product/Manufacturer: Subject to compliance with requirements, provide the
38 following:
39
40 4040SED-3210; LCN, Div. Ingersoll-Rand Door Hardware Group.
41
42 SILENCERS
43
44 Silencers: Provide the following or Owner/Architect approved equal:
45
46 Provide door silencers at all openings w/o weatherstripping or smoke and draft seals. Provide two per
47 leaf at pair doors and three at single leaf doors.
48
49 Product/Manufacturer: Subject to compliance with requirements, provide products by one of the
50 following:
51
52 W07; Builders Brass Works Corp.
53 64; Glynn Johnson.
54 1229A; Triangle Brass Manufacturing Company(Trimco).
55
56 ACCESS KEY CONTROL BOX
57
FINISH HARDWARE
GDA 08710- 18
GDA#12018.00 December 14, 2012
Issue for Permit
1 Product/Manufacturer: Subject to compliance with requirements, provide the following:
2
3 Model 3200; The Knox Company
4
5 HARDWARE FINISHES:
6
7 Provide matching finishes for hardware units at each door or opening, to the greatest extent possible,
8 and except as otherwise indicated. Reduce differences in color and textures as much as commercially
9 possible where the base metal or metal forming process is different for individual units of hardware
10 exposed at the same door or opening. In general, match items to the manufacturer's standard finish
11 for the latch and lock set(or push-pull units if no latch-lock sets)for color and texture.
12
13 Provide finishes which match those established by BHMA or, if none established, match the
14 Architect's sample.
15
16 Provide quality of finish, including thickness of plating or coating (if any), composition, hardness and
17 other qualities complying with manufacturer's standards, but in no case less than specified for the
18 applicable units of hardware by referenced standards.
19
20 Provide protective lacquer coating on all exposed hardware finishes of brass, bronze and aluminum,
21 except as otherwise indicated. The suffix "-NL" is used with standard finish designations to indicate
22 "no lacquer".
23
24 Finishes:
25
26 Exterior Doors: US32D (630)
27 Interior Doors: US26D (626)
28
29
30 PART 3- EXECUTION
31
32
33 INSTALLATION:
34
35 Mount hardware units at heights indicated in "Recommended Locations for Builders Hardware for
36 Standard Steel Doors and Frames" by the Door and Hardware Institute, except as specifically
37 indicated or required to comply with governing regulations, and except as may be otherwise directed
38 by Architect.
39
40 Install each hardware item in compliance with the manufacturer's instructions and recommendations.
41 Wherever cutting and fitting is required to install hardware onto or into surfaces which are later to be
42 painted or finished in another way, coordinate removal, storage and reinstallation or application of
43 surface protections with finishing work specified in the Division-9 sections. Do not install surface-
44 mounted items until finishes have been completed on the substrate.
45
46 Set units level, plumb and true to line and location. Adjust and reinforce the attachment substrate as
47 necessary for proper installation and operation.
48
49 Drill and countersink units which are not factory-prepared for anchorage fasteners. Space fasteners
50 and anchors in accordance with industry standards.
51
52 Set thresholds for exterior doors in full bed of butyl-rubber or polyisobutylene mastic sealant.
53
54 ADJUST AND CLEAN:
55
56 Adjust and check each operating item of hardware and each door, to ensure proper operation or
57 function of every unit. Replace units which cannot be adjusted to operate freely and smoothly as
FINISH HARDWARE
GDA 08710- 19
GDA#12018.00 December 14, 2012
Issue for Permit
1 intended for the application made.
2
3 Clean adjacent surfaces soiled by hardware installation.
4
5 Final Adjustment: Wherever hardware installation is made more than one month prior to acceptance
6 or occupancy of a space or area, return to the work during the week prior to acceptance or
7 occupancy, and make final check and adjustment of all hardware items in such space or area. Clean
8 operating items as necessary to restore proper function and finish of hardware and doors. Adjust door
9 control devices to compensate for final operation of heating and ventilating equipment.
10
11 Instruct Owner's Personnel in proper adjustment and maintenance of hardware and hardware finishes,
12 during the final adjustment of hardware.
13
14 Continued Maintenance Service: Approximately six months after the acceptance of hardware in each
15 area, the Installer, accompanied by the representative of the latch and lock manufacturer, shall return
16 to the project and re-adjust every item of hardware to restore proper function of doors and hardware.
17 Consult with and instruct Owner's personnel in recommended additions to the maintenance
18 procedures. Replace hardware items which have deteriorated or failed due to faulty design, materials
19 or installation of hardware units. Prepare a written report of current and predictable problems (of
20 substantial nature)in the performance of the hardware.
21
22
23 END OF SECTION 0870
24
FINISH HARDWARE
GDA 08710- 20
GDA#12018.00 December 14, 2012
Issue for Permit
1 EXTERIOR HARDWARE SETS:
2
3 Set No. 1 — Not Used
4
5
6 Set No. 2 - Not Used
7
8
9 Set No. 3- Not Used
10
11
12 Set No. 4- Pair Exterior Storefront Doors (Existing to Remain in Use)—Card Reader
13
14 Hardware provided by Others
15
16 Magnetic Lock
17 Door Position Switch
18 Power Supply
19 Card Reader
20
21
22 Set No. 5—Single New Exterior Hollow Metal Door—Card Reader
23
24 Exit Device- Rim Type
25 Butt Hinges
26 Closer(Overhead Surface Mount)with Heavy Duty Spring Arm
27 Electric strike
28 Sweep
29 Threshold
30 Weatherseals
31 Drip Edge
32 Door Position Switch
33
34 Hardware provided by Others
35
36 Card Reader
37
38
39 Set No. 5a —Single New Exterior Hollow Metal Door
40
41 Exit Device - Rim Type
42 Butt Hinges
43 Closer(Overhead Surface Mount)with Heavy Duty Spring Arm
44 Sweep
45 Threshold
46 Weatherseals
47 Drip Edge
48 Door Position Switch
49
FINISH HARDWARE
GDA 08710 - 21
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Set No. 6 - Pair New Exterior Hollow Metal Doors
3
4 Electrified Exit Device-Concealed Vertical Rod (CVR) x RX x Lever Trim-Active Leaf(LHR)
5 Panic Hardware (CVR)- Inactive Leaf
6 Butt Hinges
7 Closers (Overhead Surface Mount)with hold open arm - each leaf
8 Stops(Concealed)
9 Sweeps
10 Threshold
11 Weatherseals
12 Meeting Stile Weatherseal
13 Drip Edge
14 Door Position Switch
15 Power Supply
16
17 Hardware provided by Others
18
19 Card Reader
20
21
22 INTERIOR HARDWARE SETS:
23
24 Set No. 7 -Overhead Coiling Shutter
25
26 Padlock
27 Door Position Switch
28
29
30 Set No. 7a-Overhead Rail Slide Gates
31
32 Padlock
33 Door Position Switch
34
35
36 Set No. 8-Not Used
37
38
39 Set No. 9 -Single Interior Hollow Metal Door
40
41 Exit Devices- Rim type x outside lever trim (classroom function)
42 Butt Hinges
43 Closer(Overhead Surface Mount)-with Heavy Duty Spring Arm
44 Silencers
45
46
47 Set No. 10- Not Used
48
49
50 Set No. 11 - Not Used
51
FINISH HARDWARE
GDA 08710- 22
GDA#12018.00 December 14, 2012
Issue for Permit
1 Set No. 12 - Single Interior Hollow Metal Door— Card Reader
2
3 Exit Device- Rim Type x RX x Lever Trim (Storeroom Function)
4 Butt Hinges
5 Closer(Overhead Surface Mount)
6 Electric Strike— Fail Secure
7 Stop (Wall)
8 Kick Plate- each side
9 Silencers
10 Power Supply
11
12 Hardware provided by Others
13
14 Card Reader on ingress side to retract electric strike
15
16
17 Set No. 13 -Single Interior Solid Core Wood Door
18
19 Cylindrical Lockset(Storeroom Function)
20 Butt Hinges
21 Closer(Overhead Surface Mount)w/Heavy Duty Hold Open Arm
22 Stop (Wall)
23 Silencers
24
25
26 Set No. 13a - Pair Interior Solid Core Wood Door
27
28 Cylindrical Lockset (Storeroom Function)—active leaf
29 Butt Hinges
30 Closer(Overhead Surface Mount)w/ Heavy Duty Hold Open Arm—active leaf
31 Flushbolts with dust proof strike— inactive leaf
32 Stop (Wall)
33 Silencers
34
35
36 Set No. 14 - Single Interior Door with Card Reader
37
38 Cylindrical Lockset (Storeroom Function)
39 Butt Hinges
40 Closer(Overhead Surface Mount)
41 Stop (Wall)
42 Silencers
43 Electric Strike— Fail Secure
44 Door Position Switch
45 Power Supply
46
47 Hardware provided by Others
48
49 Card Reader
50
FINISH HARDWARE
GDA 08710 -23
GDA#12018.00 December 14, 2012
Issue for Permit
1 Set No. 15-Single Interior Solid Core Wood Door
2
3 Cylindrical Lockset(Office Function)
4 Butt Hinges
5 Stop (Wall)
6 Coat Hook
7 Silencers
8
9
10 Set No. 16-Single Interior Solid Core Wood Door
11
12 Cylindrical Latchset(Passage Function)
13 Butt Hinges
14 Stop (Wall)
15 Silencers
16
17
18 Set No. 17- Pair Interior Aluminum Storefront Door(per Section 08410)w/Card Reader
19
20 Cylinder
21
22
23 Hardware provided per Section 08410
24
25 Electrified Exit Device (CVR Type)x RX x OP—active leaf
26 Exit Device (CVR Type)x OP—inactive leaf
27 Pulls
28 Butt Hinges
29 Closers (Overhead Concealed)
30 Power Supply
31
32 Hardware provided by Others
33
34 Card Reader on ingress side to activate ELR exit device
35
36
37 Set No. 18-Single Interior Solid Core Wood Door
38
39 Cylindrical Lockset(Privacy Function)
40 Butt Hinges
41 Stop (Wall)
42 Silencers
43 Kickplates
44
45
46 Set No. 19-Single Interior Solid Core Wood Door
47
48 Butt Hinges
49 Push/Pull Plates
50 Closer(Overhead Surface Mount)
51 Stop (Wall)
52 Silencers
53 Kickplate both sides
54
FINISH HARDWARE
GDA 08710-24
GDA#12018.00 December 14, 2012
Issue for Permit
1 Set No. 20- Pair Interior Fire Rated Solid Core Wood Doors
2
3 Exit Devices—CVR type x outside lever trim (classroom function)
4 Butt Hinges
5 Closers(Overhead Surface Mount)- Heavy Duty Arm
6 Stops (Wall)
7 Smoke Seals
8
9
10 Set No. 21 -Single Interior Aluminum Stile and Rail Doors (per Section 08121)
11
12 Straight Push/Pull
13 Butt Hinges
14 Closer(Overhead Surface)
15 Stop—Concealed Mounted
16 Silencers
17
18 Set No. 21a - Pair Interior Aluminum Stile and Rail Doors (per Section 08121)
19
20 Straight Push/Pulls
21 Butt Hinges
22 Closers (Overhead Surface)
23 Stops—Concealed Mounted
24 Silencers
25
26 HARDWARE NOTES
27
28 1. Set thresholds in full bed of mastic. Provide interchangeable core cylinders in all locks.
29
30 2. Provide number of hinges indicated but not less than 3 hinges per leaf for door 90"or less in height
31 and one additional hinge for each 30" of additional height. Provide 4 hinges per leaf for doors wider
32 than 36". Provide heavy duty ball bearing hinges on doors with closer. All hinges shall be fully
33 mortised type.
34
35 3. Provide tactile lever handle where indicated and at all hazardous locations (e.g. mechanical
36 equipment rooms, electrical rooms, sprinkler pump, and fire rooms).
37
38 4. Door closers shall be adjusted so that the sweep period of the door from an open position of
39 seventy (70) degrees, the door will take at least three (3) seconds to move to a point three (3) inches
40 from the latch, measured at leading edge of the door.
41
42 5. Signage "ACC"-provide accessable signage per accessibility standard and ADA requirements.
43 Note: all signage shall contain braille characters as required by building code.
44
45 6. Contractor to contract the purchase and installation of interior signage, required per accessibility
46 standard and the building code.
47
48 7. Provide smoke seals at all fire rated doors with a U.L. listing for the noted exposure.
49
50 8. Provide silencers for all doors not provided with weatherstripping or smoke seals
51
52 9. Provide lock guard at outside face of exterior H.M. doors typ.
53
54 10. Handles, latches, knobs, pulls, locks and other operating devices on accessible doors shall be
55 mounted no higher than 48"above the finished floor or ground surface. Door levers, etc. For wood and
56 hollow metal doors to be located at the same height a.f.f.
57
FINISH HARDWARE
GDA 08710 -25
GDA#12018.00 December 14, 2012
Issue for Permit
1 11. Operating force for interior hinged doors shall not exceed (5)ft. Lbs.
2
3 12. Strikes for door frames per Section 08125:
4
5 A. Adjustable strikes: Emboss frames for TA-1 strike for cylindrical lock. Provide TA-1 strike in
6 finish compatible with hardware finish. (ANSI 2 3/4" T strike supplied with cylindrical lock cannot be
7 used with standard frame because of unique strike location and screw piercing method)
8
9 B. Prepare frames for ASA 4-7/8"strikes where required. Provide minimum '/," depth of
10 threads in factory tapped screw holes
11
12
13 End of Schedule
FINISH HARDWARE
GDA 08710- 26
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08800- GLASS AND GLAZING
2
3
4 PART 1 - GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections, apply to work of this section.
11
12 DESCRIPTION OF WORK:
13
14 Definitions: "Glass" includes both primary and fabricated glass products as described in FMGA
15 "Glazing Manual". "Glazing" includes glass installation and materials used to install glass.
16
17 Extent of glass and glazing work is indicated on drawings and schedules.
18
19 Types of work in this section include glass and glazing for:
20
21 Interior storefront glazing
22 Borrowed lites
23
24 QUALITY ASSURANCE:
25
26 Glazing Standards: Comply with recommendations of Flat Glass Marketing Association (FMGA)
27 "Glazing Manual" and "Sealant Manual" except where more stringent requirements are indicated.
28 Refer to those publications for definitions of glass and glazing terms not otherwise defined in this
29 section or other referenced standards.
30
31 Safety Glazing Standard: Where safety glass is indicated or required by authorities having
32 jurisdiction, provide type of products indicated which comply with ANSI Z97.1 and testing
33 requirements of 16 CFR Part 1201 for category II materials.
34
35 Single Source Responsibility: Provide materials obtained from one source for each type of glass and
36 glazing product indicated.
37
38 SUBMITTALS:
39
40 Product Data: Submit manufacturer's technical data for each glazing material and fabrication glass
41 product required, including installation and maintenance instructions.
42
43 Samples: Submit, for verification purposes, 12" square samples of each type of glass indicated
44 except for clear single pane units, and 12" long samples of each color required (except black)for each
45 type of sealant or gasket exposed to view. Install sealant or gasket sample between two strips of
46 material representative of adjoining framing system in color.
47
48 DELIVERY, STORAGE, AND HANDLING:
49
50 Protect glass and glazing materials during delivery, storage and handling to comply with
51 manufacturer's directions and as required to prevent edge damage to glass, and damage to glass and
52 glazing materials from effects of moisture including condensation, of temperature changes, of direct
53 exposure to sun, and from other causes.
54
55
56 PART 2— PRODUCTS
57
GLASS AND GLAZING
GDA 08800 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 PRODUCTS AND MANUFACTURERS
3
4 Products: Subject to compliance with requirements, provide one of the products indicated in
5 schedules at the end of Part 3.
6
7 GLASS PRODUCTS, GENERAL:
8
9 Heat-Treated Glass Standard: Provide heat-treated glass which complies with FS DD-G-1403
10 requirements, including those indicated by reference to grade,style, type, quality, and class.
11
12 Sizes: Fabricate glass to sizes required for glazing openings indicated, with edge clearances and
13 tolerances complying with recommendations of glass manufacturer. Provide thicknesses indicated or,
14 if not otherwise indicated, as recommended by glass manufacturer for application indicated.
15
16 PRIMARY FLOAT GLASS
17
18 Float Glass: ASTM C 1036, Type I (transparent glass, flat), Quality q3 (glazing select); class as
19 indicated in schedules at the end of Part 3.
20
21 HEAT-TREATED FLOAT GLASS
22
23 Fabrication Process: By horizontal (roller-hearth) process with roll-wave distortion parallel to bottom
24 edge of glass as installed, unless otherwise indicated.
25
26 Heat-Treated Float Glass: ASTM C 1048; Type I (transparent glass, flat); Quality q3 (glazing select);
27 class, kind, and condition as indicated in schedules at the end of Part 3.
28
29 GLAZING GASKETS
30
31 Dense Compression Gaskets: Molded or extruded gaskets of material indicated below, complying
32 with standards referenced with name of elastomer indicated below, and of profile and hardness
33 required to maintain watertight seal:
34
35 Silicone, ASTM C 1115.
36
37 MISCELLANEOUS GLAZING MATERIALS:
38
39 Compatibility: Provide materials with proven record of compatibility with surfaces contacted in
40 installation.
41
42 Cleaners, Primers, and Sealers: Type recommended by sealant or gasket manufacturer.
43
44 Setting Blocks: Silicone blocks as required for compatibility with glazing sealants, 80 to 90 Shore A
45 durometer hardness.
46
47 Spacers: Silicone blocks, or continuous extrusions, as required for compatibility with glazing sealant,
48 of size, shape and hardness recommended by glass and sealant manufacturers for application
49 indicated.
50
51 Edge Blocks: Silicone blocks as required for compatibility with glazing sealant, of size and hardness
52 required to limit lateral movement(side-walking)of glass.
53
54
55 PART 3- EXECUTION
56
57
GLASS AND GLAZING
GDA 08800-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 INSPECTION:
2
3 Require Glazier to inspect work of glass framing erector for compliance with manufacturing and
4 installation tolerances, including those for size, squareness, offsets at corners; for presence and
5 functioning of weep system; for existence of minimum required face or edge clearances; and for
6 effective sealing of joinery. Obtain Glazier's written report listing conditions detrimental to
7 performance of glazing work. Do not allow glazing work to proceed until unsatisfactory conditions
8 have been corrected.
9
10 PREPARATION:
11
12 Clean glazing channels and other framing members to receive glass, immediately before glazing.
13 Remove coatings which are not firmly bonded to substrates. Remove lacquer from metal surfaces
14 where elastomeric sealants are indicated for use.
15
16 GLAZING, GENERAL:
17
18 Comply with combined printed recommendations of glass manufacturers, of manufacturers of
19 sealants, gaskets and other glazing materials, except where more stringent requirements are
20 indicated, including those of referenced glazing standards.
21
22 Glazing channel dimensions as indicated in details are intended to provide for necessary bite on
23 glass, minimum edge and face clearances, and adequate sealant thicknesses, with reasonable
24 tolerances. Adjust as required by job conditions at time of installation.
25
26 Protect glass from edge damage during handling and installation; use a rolling block in rotating glass
27 units to prevent damage to glass corners. Do not impact glass with metal framing. Use suction cups
28 to shift glass units within openings; do not raise or drift glass with a pry bar. Rotate glass with flares or
29 bevels along one horizontal edge which would occur in vicinity of setting blocks so that these are
30 located at top of opening. Remove from project and dispose of glass units with edge damage or other
31 imperfections of kind that,when installed, weakens glass and impairs performance and appearance.
32
33 GLAZING:
34
35 Install setting blocks of proper size in sill rabbet, located one quarter of glass width from each corner,
36 but no closer than 6", unless otherwise required. Set blocks in thin course of sealant which is
37 acceptable for heel bead use.
38
39 Provide spacers inside and out, of correct size and spacing to preserve required face clearances, for
40 glass sizes larger than 50 united inches, except where gaskets or glazing tapes with continuous
41 spacer rods are used for glazing. Provide 1/8" minimum bite of spacers on glass and use thickness
42 equal to sealant width, except with sealant tape use thickness slightly less than final compressed
43 thickness of tape.
44
45 Provide edge blocking to comply with requirements of referenced glazing standard, except where
46 otherwise required by glass unit manufacturer.
47
48 Set units of glass in each series with uniformity of pattern, draw, bow and similar characteristics.
49
50 Where wedge-shaped gaskets are driven into one side of channel to pressurize sealant or gasket on
51 opposite side, provide adequate anchorage to ensure that gasket will not "walk" out when installation
52 is subjected to movement.
53
54 Miter cut wedge-shaped gaskets at corners and install gaskets in manner recommended by gasket
55 manufacturer to prevent pull away at corners; seal corner joints and butt joints with sealant
56 recommended by gasket manufacturer.
57
GLASS AND GLAZING
GDA 08800-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 PROTECTION AND CLEANING:
2
3 Protect exterior glass from breakage immediately upon installation by use of crossed streamers
4 attached to framing and held away from glass. Do not apply markers to surfaces of glass. Remove
5 nonpermanent labels and clean surfaces.
6
7 Protect glass from contact with contaminating substances resulting from construction operations. If,
8 despite such protection, contaminating substances do come into contact with glass, remove
9 immediately by method recommended by glass manufacturer.
10
11 Examine glass surfaces adjacent to or below exterior concrete and other masonry surfaces at frequent
12 intervals during construction, but not less often than once a month, for build-up of dirt, scum, alkali
13 deposits or staining. When examination reveals presence of these forms of residue, remove by
14 method recommended by glass manufacturer.
15
16 Remove and replace glass which is broken, chipped, cracked, abraded or damaged in other ways
17 during construction period, including natural causes, accidents and vandalism.
18
19 Wash glass on both faces not more than 4 days prior to date scheduled for inspections intended to
20 establish date of substantial completion in each area of project. Wash glass by method recommended
21 by glass manufacturer.
22
23 SCHEDULE OF GLASS TYPES
24
25 Glass Type GL-1: Fully tempered float glass.
26
27 Thickness: 1/4".
28
29 Tint: Clear.
30
31
32 END OF SECTION 08800
GLASS AND GLAZING
GDA 08800- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08830-MIRRORS
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8 Drawings and general provisions of the Contract, including General and Supplementary Conditions
9 and Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section includes the following types of silvered flat glass mirrors.
14
15 Annealed monolithic glass mirrors.
16
17 Related Sections include the following:
18
19 Division 8 Section "Glazing" for clear glass and glass with reflective coatings used for interior and
20 exterior vision lites.
21
22 DEFINITIONS
23
24 Deterioration of Mirrors: Defects developed from normal use that are attributable to the manufacturing
25 process and not to causes other than glass breakage and practices for maintaining and cleaning
26 mirrors contrary to mirror manufacturer's written instructions. Defects include discoloration, black
27 spots, and clouding of the silver film.
28
29 PERFORMANCE REQUIREMENTS
30
31 Provide mirrors that will not fail under normal usage. Failure includes glass breakage and
32 deterioration attributable to defective manufacture,fabrication, and installation.
33
34 SUBMITTALS
35
36 Product Data: For the following:
37
38 Mirrors. Include description of materials and process used to produce each type of silvered flat glass
39 mirror specified that indicates sources of glass, glass coating components, edge sealer, and quality-
40 control provisions.
41
42 Mirror mastic.
43
44 Mirror hardware.
45
46 Shop Drawings: Include mirror elevations, edge details, mirror hardware, and attachments to other
47 work.
48
49 Samples: For each type of mirror product required, in the form indicated below:
50
51 Mirrors, 12 inches (300 mm)square, including edge treatment on 2 adjoining edges.
52
53 Mirror clips.
54
55 Mirror trim, 12 inches(300 mm)long.
56
57 Product Certificates: For each type of mirror and mirror mastic, signed by product manufacturer.
MIRRORS
GDA 08830-1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Coordinate paragraph below with qualification requirements in Division 1 Section "Quality
3 Requirements"and as supplemented in "Quality Assurance"Article.
4
5 Qualification Data: For Installer.
6
7 Mirror Mastic Compatibility Test Reports: From mirror manufacturer indicating that mirror mastic was
8 tested for compatibility and adhesion with mirror backing and substrates on which mirrors are
9 installed.
10
11 Warranty: Special warranty specified in this Section.
12
13 QUALITY ASSURANCE
14
15 Installer Qualifications: An experienced installer who has completed mirror glazing similar in material,
16 design, and extent to that indicated for this Project;whose work has resulted in mirror installations with
17 a record of successful in-service performance; and who employs glass installers for this Project who
18 are certified under NGA's Glazier Certification Program as Level 2 (Senior Glaziers) or Level 3
19 (Master Glaziers).
20
21 Source Limitations for Mirrors: Obtain mirrors from one source for each type of mirror indicated.
22
23 Source Limitations for Mirror Glazing Accessories: Obtain mirror glazing accessories from one source
24 for each type of accessory indicated.
25
26 Glazing Publications: Comply with the following published recommendations:
27
28 GANA Mirror Division's "Mirrors, Handle with Extreme Care: Tips for the Professional on the Care and
29 Handling of Mirrors."
30
31 Preconstruction Mirror Mastic Compatibility Test: Submit mirror mastic products to mirror
32 manufacturer for testing to determine compatibility of mastic with mirror backing and substrates on
33 which mirrors are installed.
34
35 DELIVERY, STORAGE,AND HANDLING
36
37 Protect mirrors according to mirror manufacturer's written instructions and as needed to prevent
38 damage to mirrors from condensation, temperature changes,direct exposure to sun, or other causes.
39
40 Comply with mirror manufacturer's written instructions for shipping, storing, and handling mirrors as
41 needed to prevent deterioration of silvering, damage to edges, and abrasion of glass surfaces and
42 applied coatings. Store indoors, protected from moisture including condensation.
43
44 PROJECT CONDITIONS
45
46 Environmental Limitations: Do not install mirrors until ambient temperature and humidity conditions
47 are maintained at levels indicated for final occupancy.
48
49 WARRANTY
50
51 Special Warranty: Manufacturer's standard form, made out to Owner and signed by mirror
52 manufacturer agreeing to replace mirrors that deteriorate as defined in "Definitions" Article, f.o.b. the
53 nearest shipping point to Project site, within specified warranty period indicated below:
54
55 Warranty Period: Five years from date of Substantial Completion.
56
57
MIRRORS
GDA 08830-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 PART 2- PRODUCTS
2
3
4 SILVERED FLAT GLASS MIRROR MATERIALS
5
6 Clear Glass Mirrors: ASTM C 1503, Mirror Select Quality.
7
8 Nominal Thickness: 6.0 mm.
9
10 MISCELLANEOUS MATERIALS
11
12 Setting Blocks: Elastomeric material with a Type A Shore durometer hardness of 85, plus or minus 5.
13
14 Edge Sealer: Coating compatible with glass coating and approved by mirror manufacturer for use in
15 protecting against silver deterioration at mirrored glass edges.
16
17 Mirror Mastic: An adhesive setting compound, produced specifically for setting mirrors and certified by
18 both mirror manufacturer and mastic manufacturer as compatible with glass coating and substrates on
19 which mirrors will be installed.
20
21 Manufacturers: Subject to compliance with requirements, provide products by one of the following:
22
23 Gunther Mirror Mastics.
24 Palmer Products Corporation.
25
26 MIRROR HARDWARE
27
28 Top and Bottom Aluminum J-Channels: Aluminum extrusions with a return deep enough to produce a
29 glazing channel to accommodate mirrors of thickness indicated and in lengths required to cover
30 bottom and top edges of each mirror in a single piece.
31
32 Available Products: Subject to compliance with requirements, products that may be incorporated into
33 the Work include, but are not limited to, the following:
34
35 Bottom Trim: J-channels formed with front leg and back leg not less than 5/16 and 3/4 inch (7.9 and
36 19 mm)in height, respectively.
37
38 Top Trim: Formed with front leg with a height of 5/16 inch (7.9 mm) and back leg designed to fit into
39 the pocket created by wall-mounted aluminum cleat.
40
41 Product: Subject to compliance with requirements, provide the following:
42
43 Bottom Trim: C. R. Laurence Co., Inc.; D638 FHA Type"J" Channel.
44
45 Top Trim: C. R. Laurence Co., Inc.;D 1638 Top Channel.
46
47 Cleat: C. R. Laurence Co., Inc.; D 1637M Mirror Mount System Cleat.
48
49 Mirror Bottom Clips: As selected by architect.
50
51 Mirror Top Clips: As selected by architect.
52
53 Fasteners: Fabricated of same basic metal and alloy as fastened metal and matching it in finished
54 color and texture where fasteners are exposed.
55
MIRRORS
GDA 08830-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Anchors and Inserts: Provide devices as required for mirror hardware installation. Provide toothed or
2 lead-shield expansion-bolt devices for drilled-in-place anchors. Provide galvanized anchors and
3 inserts for applications on inside face of exterior walls and where indicated.
4
5 FABRICATION
6
7 Mirror Sizes: To suit Project conditions, cut mirrors to final sizes and shapes.
8
9 Cutouts: Fabricate cutouts for notches and holes in mirrors without marring visible surfaces. Locate
10 and size cutouts so they fit closely around penetrations in mirrors.
11
12 Mirror Edge Treatment: Flat polished edge for concealed edges and pencil edge for exposed edges.
13
14 Seal edges of mirrors after edge treatment to prevent chemical or atmospheric penetration of glass
15 coating.
16
17 Require mirror manufacturer to perform edge treatment and sealing in factory immediately after cutting
18 to final sizes.
19
20
21 PART 3 - EXECUTION
22
23
24 EXAMINATION
25
26 Examine substrates, over which mirrors are to be mounted, with Installer present, for compliance with
27 installation tolerances, substrate preparation, and other conditions affecting performance.
28
29 Verify compatibility with and suitability of substrates, including compatibility of mirror mastic with
30 existing finishes or primers.
31
32 Proceed with mirror installation only after unsatisfactory conditions have been corrected and surfaces
33 are dry.
34
35 PREPARATION
36
37 Comply with mastic manufacturer's written installation instructions for preparation of substrates,
38 including coating surfaces with mastic manufacturer's special bond coating where applicable.
39
40 INSTALLATION
41
42 General: Install mirrors to comply with mirror manufacturer's written instructions and with referenced
43 GANA publications. Mount mirrors accurately in place in a manner that avoids distorting reflected
44 images.
45
46 Provide a minimum air space of 'ICI' (3 mm) between back of mirrors and mounting surface for air
47 circulation between back of mirrors and face of mounting surface.
48
49 Where mastic applications are specified for wall mirrors, GANA Mirror Division recommends use of
50 mirror hardware, with or without mastic, to support mirror weight at bottom edge and to prevent mirror
51 at top edge from coming away from wall.
52
53 For wall-mounted mirrors, install mirrors with mastic and mirror hardware.
54
55 Attach mirror hardware securely to mounting surfaces with mechanical fasteners installed with
56 anchors or inserts as applicable. Install fasteners so heads do not impose point loads on backs of
57 mirrors.
MIRRORS
GDA 08830-4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 For mirror hardware in the form of continuous J-channels at bottom, provide setting blocks 1/8 inch (3
3 mm) thick by 4 aches (100 mm) long at quarter points. To prevent trapping water, provide, between
4 setting blocks, 2 slotted weeps not less than 1/4 inch (6.4 mm)wide by 3/8 inch (9.5 mm) long.
5
6 For mirror hardware in the form of a continuous J-channel at bottom and continuous top trim at top,
7 fasten J-channel directly to wall and attach top trim to continuous cleat fastened directly to wall.
8
9 Where indicated, install mirror hardware in the form of J-channels specified in "Mirror Hardware"
10 Article that are fabricated in single lengths to fit and cover top and bottom edges of mirrors.
11
12 Install mastic as follows:
13
14 Apply mastic to comply with mastic manufacturer's written instructions for coverage and to allow air
15 circulation between back of mirrors and face of mounting surface.
16
17 After mastic is applied, align mirrors and press into place while maintaining a minimum air space of
18 1/8 inch (3 mm) between back of mirrors and mounting surface.
19
20 CLEANING AND PROTECTION
21
22 Protect mirrors from breakage and contaminating substances resulting from construction operations.
23
24 Do not permit edges of mirrors to be exposed to standing water.
25 Maintain environmental conditions that will prevent mirrors from being exposed to moisture from
26 condensation or other sources for continuous periods of time.
27
28
29 END OF SECTION 08830
MIRRORS
GDA 08830-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08842—DECORATIVE PLASTIC GLAZING
2
3
4 PART 1 -GENERAL
5
6
7 R ELATED DOCUMENTS
8
9 Drawings and general provisions of the Contract, including General and Supplementary Conditions
10 and other Division 1 Specification sections, apply to this Section
11
12 SUMMARY
13
14 This Section includes the following:
15
16 Decorative Plastic Glazing in vertical Applications
17
18 The extent of Decorative Plastic Glazing is shown on the drawings.
19
20 SUBMITTALS
21
22 Product Data: Indicate product description, fabrication information, and compliance with specified
23 performance requirements.
24
25 Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. Indicate:
26 Product, Decor, Dimensions, Thickness, and texture(s).
27
28 Samples for Verification: Submit minimum 8 inch by 10-inch sample for each type, texture, pattern and
29 color of polymer. Submit one sample of each item of hardware.
30
31 Maintenance Data: Submit manufacturer's care and maintenance data, including care, repair and
32 cleaning instructions. Include in Project closeout documents.
33
34 QUALITY ASSURANCE
35
36 Fire-Test-Response Characteristics: Provide original fire test reports to ensure compliance with the
37 following requirements:
38
39 Rate of Burning: ASTM D635 Class: C2 or CC2 rating.
40
41 Self-Ignition Temperature: ASTM D1929: greater than 650°F
42
43 Density of Smoke:ASTM D2843: Less than 75%
44
45 Flammability Classification: ASTM E-84/UL 723: Smoke less than 450, Flame spread less than
46 75.
47
48 Allowable Tolerances:
49
50 Maximum deflection: 1/16"over 12"
51
52 DELIVERY, STORAGE,AND HANDLING
53
54 Deliver no components to project site until areas are ready for installation
55
56 Handle materials to prevent damage to finished surfaces and edges.
DECORATIVE PLASTIC GLAZING
GDA 08842- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Keep protective masking in place white fabricating.
3
4 Provide protective coverings to prevent damage or staining following installation for duration of project.
5
6 Store components on edge, fully supported at 10 off vertical, indoors where atmospheric conditions
7 are controlled to avoid temperature extremes and exposure to ultraviolet light and moisture.
8
9 Follow Manufactures recommendations for storage and handling.
10
11 Before installing Decorative Plastic Glazing, permit them to reach room temperature.
12
13 PROJECT CONDITIONS
14
15 Environmental Limitations: Do not install Decorative Plastic Glazing until spaces are enclosed and
16 weatherproof, and ambient temperatures and humidity conditions are maintained at the levels
17 indicated for Project when occupied for its intended use.
18
19 WARRANTY
20
21 Provide manufacturers 1 year warranty against defects in materials. Warranty shall provide material to
22 repair, or replace, defective materials. Damage caused by physical or chemical abuse, or exposure to
23 high heat will not be warranted.
24
25 The warranty shall not deprive the owner of other rights or remedies the Owner may have under other
26 provisions of the Contract Documents, and is in addition to and runs concurrent with other warranties
27 made by the Contractor under the requirements of the Contract Documents.
28
29
30 PART 2- PRODUCTS
31
32
33 MANUFACTURERS
34
35 Provide the following, unless indicated otherwise on the Drawings.
36
37 Product: Varia Ecoresin; 3form
38
39 Product Style and Color: traffic+ atlantic
40
41 Gauge: 0. 375"
42
43 Texture (Front Finish): traffic emboss
44
45 Texture (Back Finish): sandstone
46
47 Panel Size: As indicated on the Drawings
48
49 Material: Acrylic.
50
51 Superficial damage to a depth of 0.010" (.25mm) shall be considered repairable by sanding
52 and polishing
53
54 Decorative Glazing:
55
56 Mounted as indicated on the drawings.
DECORATIVE PLASTIC GLAZING
GDA 08842- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 FABRICATION
3
4 General: Fabricate Decorative Plastic Glazing to designs, sizes and thicknesses indicated and to
5 comply with indicated standards. Sizes, profiles and other characteristics are indicated on the
6 drawings.
7
8 Comply with manufacturer's written recommendations for fabrication.
9
10 Machining: Acceptable means of machining are listed below. Ensure that material is not chipped or
11 warped by machining operations.
12
13 Sawing: Select equipment and blades suitable for type of cut required.
14 Drilling: Drills specifically designed for use with plastic products.
15 Milling: Climb cut where possible.
16 Routing
17 Tapping
18 Shearing and Punching: Acceptable only on 1/16"material.
19 Die Cutting:Acceptable only on material 1/8"or less.
20
21 MISCELLANEOUS MATERIALS
22
23 General: Provide products of material, size, and shape required for application indicated, and with a
24 proven record of compatibility with surfaces contacted in installation.
25
26 Cleaner: Type recommended by manufacturer.
27
28 Fasteners: Use screws designed specifically for plastics. Self-threading screws are acceptable for
29 permanent installations. Provide threaded metal or nylon inserts for applications requiring frequent
30 disassembly such as light fixtures.
31
32 Bonding Cements: Solvent or adhesives, suitable for use with product and application.
33
34
35 PART 3- EXECUTION
36
37
38 EXAMINATION
39
40 Examine substrates, areas, and conditions where installation of Decorative Plastic Glazing will occur,
41 with Installer present, for compliance with manufacturer's requirements. Verify that substrates and
42 conditions are satisfactory for installation and comply with requirements specified.
43
44 INSTALLATION
45
46 General: Comply with manufacturer's written instructions for the installation of Decorative Plastic
47 Glazing.
48
49 Shop fabricates items to the greatest degree possible.
50
51 Utilize fasteners, adhesives and bonding agents recommended by manufacturer for type of installation
52 indicated. Material that is chipped, warped, hazed or discolored as a result of installation or fabrication
53 methods will be rejected.
54
55 Install components plumb, level and rigid, scribed to adjacent finishes, in accordance with approved
56 shop drawings and product data.
DECORATIVE PLASTIC GLAZING
GDA 08842-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Form field joints using manufacturer's recommended procedures. Locate seams in panels so that they
3 are not directly in line with seams in substrates.
4
5 CLEANING AND PROTECTION
6
7 Protect surfaces from damage until date of substantial completion. Repair work or replace damaged
8 work, which cannot be repaired to Architect's satisfaction.
9
10
11 End of Section
DECORATIVE PLASTIC GLAZING
GDA 08842-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 08871 -SOLAR CONTROL FILM
2 PART 1 - GENERAL
3 SECTION INCLUDES
4 Solar control film applied to glass.
5 SUBMITTALS
6 Submit under provisions of Section 01300.
7 Product Data: Manufacturer's data on products to be provided, showing physical properties and
8 including installation instructions.
9 Test Data: Independent testing agency reports showing compliance with properties specified by
10 reference to a test method.
11 QUALITY ASSURANCE
12 Installer Qualifications: Experienced in application of self-adhesive window films, with at least 10
13 applications of similar size and complexity, and approved by manufacturer.
14 Mock-Up: Before proceeding with work, apply film to one window designated by Architect.
15 Accepted mock-up will constitute standard for workmanship for remaining work.
16 Accepted mock-up may remain.
17 Remove and replace rejected work.
18 WARRANTY
19 Provide film manufacturer's 10-year warranty against failure of film, including change of color, peeling,
20 bubbling, rippling, cracking, and delamination; include cost of material and labor for removal and
21 reinstallation.
22 PART 2- PRODUCTS
23 MANUFACTURERS
24 Acceptable Manufacturer:
25 3M
26 MATERIALS
27 Solar Control Film:As indicated on the Drawings Finishes Schedule.
28 PART 3- EXECUTION
29 INSTALLATION
SOLAR CONTROL FILM
GDA 08871-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Install in accordance with manufacturer's instructions.
2 Install without bubbles, ripples, drips, dirt, cuts, tears, or gaps between film and frame.
3 Clean newly installed film and window frames.
4 Clean cleaning solutions, run-off cleaning water, and adhesive mounting solution from adjacent
5 surfaces.
6 Where installed film could be damaged by subsequent construction work provide tape warning strips
7 or barricades to prevent contact.
8 END OF SECTION
SOLAR CONTROL FILM
GDA 08871-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 09250- GYPSUM DRYWALL
2
3 PART 1 - GENERAL
4
5
6 RELATED DOCUMENTS:
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 Division 1 Specification Sections, apply to work of this section.
10
11 SUMMARY:
12
13 Extent of each type of gypsum drywall construction required is indicated on Drawings:
14
15 This Section includes the following types of gypsum board construction:
16
17 Steel framing members to receive gypsum board.
18
19 Gypsum board screw-attached to steel framing and furring members.
20
21 Load-bearing steel studs and "C" shaped steel joists for structural framing are specified in Division-5
22 Section"Cold-Formed Metal Framing."
23
24 Wood framing and furring are specified in the following Division 6 sections:
25
26 "Rough Carpentry."
27
28 Gypsum sheathing for screw-attachment to steel framing is specified in Division-6 Section "Rough
29 Carpentry."
30
31 DEFINITIONS:
32
33 Gypsum Board Construction Terminology: Refer to ASTM C 11 and GA 505 for definitions of terms
34 for gypsum board construction not otherwise defined in this section or other referenced standards.
35
36 SUBMITTALS:
37
38 Product data from manufacturers for each type of product specified.
39
40 QUALITY ASSURANCE:
41
42 Fire-Resistance Ratings: Where indicated, provide materials and construction which are identical to
43 those of assemblies whose fire resistance rating has been determined per ASTM E 119 by a testing
44 and inspecting organization acceptable to authorities having jurisdiction.
45
46 Provide fire-resistance-rated assemblies, identical to those indicated by reference to GA File
47 Nos. in GA-600 "Fire Resistance Design Manual" or to design designations in U.L. "Fire
48 Resistance Directory" or in listing of other testing and agencies acceptable to authorities
49 having jurisdiction.
50
51 Single-Source Responsibility: Obtain each type of gypsum board and related joint treatment materials
52 from a single manufacturer.
53
54 DELIVERY, STORAGE,AND HANDLING:
55
56 Deliver materials in original packages, containers or bundles bearing brand name and identification of
57 manufacturer or supplier.
GYPSUM DRYWALL
GDA 09250- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Store materials inside under cover and keep them dry and protected against damage from weather,
3 direct sunlight, surface contamination, corrosion, construction traffic and other causes. Neatly stack
4 gypsum boards flat to prevent sagging.
5
6 Handle gypsum boards to prevent damage to edges, ends and surfaces. Do not bend or otherwise
7 damage metal corner beads and trim.
8
9 PROJECT CONDITIONS:
10
11 Environmental Conditions, General: Establish and maintain environmental conditions for application
12 and finishing gypsum board to comply with ASTM C 840 and with gypsum board manufacturer's
13 recommendations.
14
15 Minimum Room Temperatures: For nonadhesive attachment of gypsum board to framing, maintain
16 not less than 40 deg F (4 deg C). For adhesive attachment and finishing of gypsum board maintain
17 not less than 50 deg F (10 deg C) for 48 hours prior to application and continuously thereafter until
18 drying is complete.
19
20 Ventilate building spaces to remove water not required for drying joint treatment materials. Avoid
21 drafts during dry, hot weather to prevent materials from drying too rapidly.
22
23
24 PART 2 - PRODUCTS
25
26
27 MANUFACTURERS:
28
29 Manufacturer: Subject to compliance with requirements provide products of one of the following:
30
31 Steel Framing and Furring:
32
33 Clark Steel Framing Systems.
34 Dale Industries, Inc. - Dale/Incor.
35 Dietrich Industries, Inc.
36 MarinoWare; Division of Ware Ind.
37 National Gypsum Company.
38 Unimast, Inc.
39 Western Metal Lath & Steel Framing Systems.
40
41 Grid Suspension Systems:
42 Chicago Metallic Corp.
43 National Rolling Mills Co.
44
45 Gypsum Boards and Related Products:
46
47 American Gypsum Co.
48 BPB America Inc.
49 G-P Gypsum.
50 National Gypsum Company.
51 Temple.
52 USG Corporation.
53
54 STEEL FRAMING COMPONENTS FOR SUSPENDED AND FURRED CEILINGS:
55
56 General: Provide components which comply with ASTM C 754 for materials and sizes, unless
57 otherwise indicated.
GYPSUM DRYWALL
GDA 09250- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Wire for Hangers and Ties:
3
4 Tie Wire: ASTM A 641, Class 1 zinc coating, soft temper, 0.0625-inch- (1.59-mm-) diameter
5 wire, or double strand of 0.0475-inch-(1.21-mm-)diameter wire.
6
7 Wire Hangers: ASTM A 641, Class 1 zinc coating, soft temper, 0.162-inch (4.12-mm)
8 diameter.
9
10 Hanger Rods: Mild steel, zinc coated or protected with rust-inhibitive paint.
11
12 Flat Hangers: Mild steel, zinc coated or protected with rust-inhibitive paint.
13
14 Angle-Type Hangers: Angles with legs not less than 7/8 inch wide, formed from 0.0635 inch thick
15 galvanized steel sheet complying with ASTM A 466, Coating Designation G90, with bolted
16 connections and 5/16 inch diameter bolts.
17
18 Channels: Cold-rolled steel, 0.0598 inch minimum thickness of base (uncoated) metal and 7/16 inch
19 wide flanges, protected with rust-inhibitive paint, and as follows:
20
21 Carrying Channels: 1-1/2 inch deep, 475 lbs per 1000 ft., unless otherwise indicated.
22
23 Steel Rigid Furring Channels: ASTM C 645, hat-shaped, depth of 7/8 inch, and minimum thickness of
24 base (uncoated) metal as follows:
25
26 Thickness: 0.0179 inch, unless otherwise indicated.
27
28 STEEL FRAMING FOR WALLS AND PARTITIONS:
29
30 Steel Studs and Runners: ASTM C 645, with flange edges of studs bent back 90 deg and doubled
31 over to form 3/16" minimum lip (return) and complying with the following requirements for minimum
32 thickness of base(uncoated) metal and for depth:
33
34 Thickness: 0.179 inch, unless otherwise indicated.
35
36 Depth: 3-5/8 inches, unless otherwise indicated.
37
38 Fasteners: Provide fasteners of type, material, size, corrosion resistance, holding power and other
39 properties required to fasten steel framing and furring power members securely to substrates involved;
40 complying with the recommendations of gypsum drywall manufacturers for applications indicated.
41
42 GYPSUM BOARD:
43
44 General: Provide gypsum board of types indicated in maximum lengths available to minimize end-to-
45 end joints.
46
47 Thickness: Provide gypsum board in thicknesses indicated, or if not otherwise indicated, in
48 either 1/2 inch or 5/8 inch thicknesses to comply with ASTM C 840 for application system and
49 support spacing indicated.
50
51 Gypsum Wallboard: ASTM C 36,ASTM C1396, and as follows:
52
53 Type: Type X.
54
55 Edges: Tapered.
56
57 Thickness: 5/8", unless otherwise indicated.
GYPSUM DRYWALL
GDA 09250-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Water-Resistant Gypsum Backing Board: ASTM C 630,and as follows:
3
4 Type: Regular, unless otherwise indicated.
5
6 Thickness: 5/8 inch, unless otherwise indicated.
7
8 CEMENTITIOUS BACKER UNITS
9
10 Provide cementitious backer units complying with ANSI A118.9, of thickness and width indicated
11 below, and in maximum lengths available to minimize end-to-end butt joints.
12
13 Thickness: 1/2 inch (12.7 mm), unless otherwise indicated.
14
15 Products: Subject to compliance with requirements, provide one of the following products:
16
17 The Original Wonderboard; Custom Building Products.
18 DUROCK Cement Board; United States Gypsum Co.
19
20 TRIM ACCESSORIES:
21
22 Cornerbead and Edge Trim for Interior Installation: Provide corner beads, edge trim and control joints
23 which comply with ASTM C 1047 and requirements indicated below:
24
25 Material: Formed metal, plastic or metal combined with paper, with metal complying with the
26 following requirement:
27
28 Sheet steel zinc-coated by hot-dip process.
29
30 Edge trim shapes indicated below by reference to designations of Fig. 1 in ASTM C 1047:
31
32 "LC" Bead, unless otherwise indicated.
33
34 "L" Bead where indicated.
35
36 One-Piece Control Joints: Formed with vee-shaped slot per Fig. 1 in ASTM C 1047, with slot opening
37 covered with removable strip.
38
39 Aluminum Accessories: Where indicated, provide manufacturer's standard extruded-aluminum
40 accessories of profile indicated complying with the following requirements:
41
42 Aluminum Alloy: Alloy and temper recommended by aluminum producer and finisher for type of
43 finish indicated and with not less than the strength and durability properties of aluminum
44 extrusions complying with ASTM B 221 (ASTM B 221' for alloy and temper 6063-T5.
45
46 Primed Finish: Manufacturer's standard corrosion-resistant primer compatible with joint
47 compound and finish materials specified.
48
49 Manufacturer: Subject to compliance with requirements, provide aluminum accessories by one of
50 the following:
51
52 Z Reveal Molding:
53
54 DRMZ-625-50, Fry Reglet Corp. or equivalent from:
55 Gordon, Inc.
56
57 GYPSUM BOARD JOINT TREATMENT MATERIALS:
GYPSUM DRYWALL
GDA 09250- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 General: Provide materials complying with ASTM C 475, ASTM C 840, and recommendations of
3 manufacturer of both gypsum board and joint treatment materials for the application indicated.
4
5 Joint Tape: Paper reinforcing tape, unless otherwise indicated.
6
7 Use pressure sensitive or staple-attached open-weave glass fiber reinforcing tape with
8 compatible joint compound where recommended by manufacturer of gypsum board and joint
9 treatment materials for application indicated.
10
11 Setting-Type Joint Compounds: Factory-prepackaged, job-mixed, chemical-hardening powder
12 products formulated for uses indicated.
13
14 Where setting-type joint compounds are indicated for use as taping and topping compounds,
15 use formulation for each which develops greatest bond strength and crack resistance and is
16 compatible with other joint compounds applied over it.
17
18 For prefilling gypsum board joints, use formulation recommended by gypsum board
19 manufacturer for this purpose.
20
21 For filling joints and treating fasteners of water-resistant gypsum backing board behind base
22 for ceramic tile, use formulation recommended by gypsum board manufacturer for this
23 purpose.
24
25 Drying-Type Joint Compounds: Factory-prepackaged vinyl-based products complying with the
26 following requirements for formulation and intended use.
27
28 Ready-Mix Formulation: Factory-premixed product.
29
30 Job-Mixed Formulation: Powder product for mixing with water at Project site.
31
32 Taping compound formulated for embedding tape and for first coat over fasteners and flanges
33 of corner beads and edge trim.
34
35 Topping compound formulated for fill (second)and finish (third)coats.
36
37 All-purpose compound formulated for use as both taping and topping compound.
38
39 MISCELLANEOUS MATERIALS:
40
41 General: Provide auxiliary materials for gypsum drywall construction which comply with referenced
42 standards and the recommendations of the manufacturer of the gypsum board.
43
44 Spot Grout: ASTM C 475, setting-type joint compound of type recommended for spot grouting hollow
45 metal door frames.
46
47 Gypsum Board Screws: ASTM C 1002.
48
49 Asphalt Felt: ASTM D 226,Type I (No. 15).
50
51 Acoustical Sealant: Manufacturer's standard nonsag, paintable, nonstaining latex sealant complying
52 with ASTM C 834 and the following requirements:
53
54 Product is effective in reducing airborne sound transmission through perimeter joints and
55 openings in building construction as demonstrated by testing representative assemblies per
56 ASTM E 90.
57
GYPSUM DRYWALL
GDA 09250-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 Products: Subject to compliance with requirements, provide one of the following:
2
3 Acoustical Sealant:
4
5 "SHEETROCK Acoustical Sealant," United States Gypsum Co.
6 "AC-20 FTR Acoustical and Insulation Sealant," Pecora Corp.
7
8 Acoustical Sealant for Concealed Joints: Manufacturer's standard, nondrying, nonhardening,
9 nonskinning, nonstaining, gunnable, synthetic rubber sealant recommended for sealing interior
10 concealed joints to reduce transmission of airborne sound.
11
12 Products: Subject to compliance with requirements, provide one of the following:
13
14 Acoustical Sealant for Concealed Joints:
15
16 "BA-98," Pecora Corp.
17 "Tremco Acoustical Sealant," Tremco, Inc.
18
19 Sound Attenuation Blankets: Unfaced mineral-fiber blanket insulation produced by combining mineral
20 fibers of type described below with thermosetting resins to comply with ASTM C 665 for Type I
21 (blankets without membrane facing):
22
23 Thickness: 3-1/2" nominal.
24
25
26 PART 3- EXECUTION
27
28
29 EXAMINATION:
30
31 Examine substrates to which drywall construction attaches or abuts, preset hollow metal frames, cast-
32 in-anchors, and structural framing, with Installer present, for compliance with requirements for
33 installation tolerances and other conditions affecting performance of drywall construction. Do not
34 proceed with installation until unsatisfactory conditions have been corrected.
35
36 PREPARATION:
37
38 Ceiling Anchorages: Coordinate installation of ceiling suspension system with installation of overhead
39 structural system to ensure that inserts and other structural anchorage provisions have been installed
40 to receive ceiling anchors in a manner that will develop their full strength and at spacing required to
41 support ceiling.
42
43 Furnish concrete inserts and other devices indicated, to other trades for installation well in
44 advance of time needed for coordination with other construction.
45
46 INSTALLATION OF STEEL FRAMING, GENERAL:
47
48 Steel Framing Installation Standard: Install steel framing to comply with ASTM C 754 and with ASTM
49 C 840 requirements that apply to framing installation.
50
51 Install supplementary framing, blocking and bracing at terminations in the work and for support of
52 fixtures, equipment services, heavy trim, grab bars, toilet accessories, furnishings, and similar
53 construction to comply with details indicated and with recommendations of gypsum board
54 manufacturer, or if none available, with "Gypsum Construction Handbook" published by United States
55 Gypsum Co.
56
57 Isolate steel framing from building structure to prevent transfer of loading imposed by structural
GYPSUM DRYWALL
GDA 09250- 6
GDA#12018.00 December 14, 2012
Issue for Permit
1 movement, at locations indicated below to comply with details shown on Drawings:
2
3 Where edges of suspended ceilings abut building structure horizontally at ceiling perimeters
4 or penetration of structural elements.
5
6 Where partitions and wall framing abuts overhead structure.
7
8 Provide slip or cushioned type joints as detailed to attain lateral support and avoid
9 axial loading.
10
11 Do not bridge building expansion and control joints with steel framing or furring members;
12 independently frame both sides of joints with framing or furring members or as indicated.
13
14 INSTALLATION OF STEEL FRAMING FOR SUSPENDED AND FURRED CEILINGS:
15
16 Secure hangers to structural support by connecting directly to structure where possible, or other
17 anchorage devices or fasteners as indicated.
18
19 Do not attach hangers to metal deck tabs.
20
21 Do not attach hangers to metal roof deck.
22
23 Do not connect or suspend steel framing from ducts, pipes or conduit.
24
25 Keep hangers and braces 2 inches clear of ducts, pipes and conduits.
26
27 Sway-brace suspended steel framing with hangers used for support.
28
29 Install suspended steel framing components in sizes and at spacings indicated but not less than that
30 required by referenced steel framing installation standard.
31
32 Wire Hangers: 0.1620 inch diameter(8 gage),4 ft. on center.
33
34 Carrying Channels (Main Runners): 1-1/2 inch,4 ft. on center.
35
36 Rigid Furring Channels (Furring Members): 16 inches on center, or as indicated on the
37 Drawings.
38
39 Installation Tolerances: Install steel framing components for suspended ceilings so that cross furring
40 members or grid suspension members are level to within 1/8 inch in 12 ft. as measured both
41 lengthwise on each member and transversely between parallel members.
42
43 Wire-tie or clip furring members to main runners and to other structural supports as indicated.
44
45 INSTALLATION OF STEEL FRAMING FOR WALLS AND PARTITIONS:
46
47 Install runners (tracks) at floors, ceilings and structural walls and columns where gypsum drywall stud
48 system abuts other construction.
49
50 Where studs are installed directly against exterior walls, install asphalt felt strips between
51 studs and wall.
52
53 Installation Tolerances: Install each steel framing and furring member so that fastening surface do not
54 vary more than 1/8 inch from plane of faces of adjacent framing.
55
56 Extend partition framing full height to structural supports or substrates above suspended ceilings,
57 except where partitions are indicated to terminate at suspended ceilings. Continue framing over
GYPSUM DRYWALL
GDA 09250-7
GDA#12018.00 December 14, 2012
Issue for Permit
1 frames for doors and openings and frame around ducts penetrating partitions above ceiling to provide
2 support for gypsum board.
3
4 Install steel studs and furring in sizes and at spacings indicated but not less than that required by
5 referenced steel framing installation standard.
6
7 Install steel studs and furring in sizes and at spacings indicated.
8
9 For single layer construction: 24 inches on center, or as indicated on the drawings.
10
11 Cementitious Backer Unit Construction: Space studs 16 inches (406 mm) o.c., unless otherwise
12 indicated.
13
14 Install steel studs so that flanges point in the same direction and gypsum boards can be installed in
15 the direction opposite to that of the flange.
16
17 Seismic Bracing: Diagonally-brace wall systems.
18
19 Partitions that are tied to the ceiling and all partitions greater than 6 feet in height shall be
20 laterally braced to the structure. Bracing shall be independent of the ceiling splay bracing
21 system. Comply with ASCE 7-05 section 13.5.8.1.
22
23 Frame door openings to comply with detailed indicated, with GA-219-89 (Fig.6) and with applicable
24 published recommendations of gypsum board manufacturer. Attach vertical studs at jambs with
25 screws either directly to frames or to jamb anchor clips on door frames; install runner track section (for
26 cripple studs) at head and secure to jamb studs.
27
28 Extend vertical jamb studs through suspended ceilings and attach to underside of floor or roof
29 structure above.
30
31 Frame openings other than door openings to comply with details indicated or if none indicated, in
32 same manner as required for door openings; and install framing below sills of openings to match
33 framing required above door heads.
34
35 Install thermal insulation and sound attenuation balls as follows:
36
37 Erect balls vertically and hold in place until gypsum board is installed, hold insulation in place
38 with 10-inch staples fabricated from 0.0625-inch (16-gage)-diameter tie wire and inserted through
39 slot in web of member.
40
41 APPLICATION AND FINISHING OF GYPSUM BOARD, GENERAL:
42
43 Gypsum Board Application and Finishing Standard: Install and finish gypsum board to comply with
44 ASTM C 840.
45
46 Install sound attenuation blankets where indicated, prior to gypsum board unless readily installed after
47 board has been installed.
48
49 Locate exposed end-butt joints as far from center of walls and ceilings as possible, and stagger not
50 less than 24 inches in alternate courses of board.
51
52 Install ceiling boards across framing in the manner which minimizes the number of end-butt joints, and
53 which avoids end joints in the central area of each ceiling. Stagger end joints at least 24 inches.
54
55 Install wall/partition boards in manner which minimizes the number of end-butt joints or avoids them
56 entirely where possible. At stairwells and similar high walls, install board horizontally with end joints
57 staggered over studs.
GYPSUM DRYWALL
GDA 09250- 8
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Install exposed gypsum board with face side out. Do not install imperfect, damaged or damp boards.
3 Butt boards together for a light contact at edges and ends with not more than 1/16 inch open space
4 between boards. Do not force into place.
5
6 Locate either edge or end joints over supports, except in horizontal applications or where intermediate
7 supports or gypsum board back-blocking is provided behind end joints. Position boards so that like
8 edges abut, tapered edges against tapered edges and mill-cut or field-cut ends against mill-cut or
9 field-cut ends. Do not place tapered edges against cut edges or ends. Stagger vertical joints over
10 different studs on opposite sides of partitions.
11
12 Attach gypsum board to steel studs so that leading edge or end of each board is attached to open
13 (unsupported)edge of stud flange first.
14
15 Attach gypsum board to supplementary framing and blocking provided for additional support at
16 openings and cutouts.
17
18 Spot grout hollow metal door frames for solid core wood doors, hollow metal doors and doors over 32
19 inches wide. Apply spot grout at each jamb anchor clip just before inserting board into frame.
20
21 Form control joints and expansion joints at locations indicated on drawings,with space between edges
22 of boards, prepared to receive trim accessories, but in no case to exceed limits as defined in ASTM C
23 840.
24
25 Provide control joint in walls between framing suspended from structure and floor bearing
26 framing.
27
28 Cover both faces of steel stud partition framing with gypsum board in concealed spaces (above
29 ceilings, etc.), except in chase walls which are properly braced internally.
30
31 Except where concealed application is required for sound, fire, air or smoke ratings, coverage
32 may be accomplished with scraps of not less than 8 sq. ft. area,and may be limited to not less
33 than 75 percent of full coverage.
34
35 Fit gypsum board around ducts, pipes, and conduits.
36
37 Where partitions intersect open concrete coffers, cut gypsum board to fit profile of coffers and
38 allow 1/4 to 1/2 inch wide joint for sealant.
39
40 Isolate perimeter of non-load-bearing drywall partitions at structural abutments. Provide 1/4" to 1/2"
41 space and trim edge with "U" bead edge trim. Seal joints with acoustical sealant.
42
43 Acoustical Sealant Application Standard: Comply with recommendations of ASTM C 919 for use of
44 joint sealants in acoustical applications as applicable to materials, applications, and conditions
45 indicated.
46
47 Where sound-rated drywall construction work is indicated, seal construction at perimeters, control and
48 expansion joints, openings and penetrations with a continuous bead of acoustical sealant including a
49 bead at both faces of partitions. Comply with ASTM C 919 and manufacturer's recommendations for
50 location of edge trim, and close off sound-flanking paths around or through construction including
51 sealing of partitions above acoustical ceilings.
52
53 Space fasteners in gvpsum boards in accordance with referenced gypsum board application and
54 finishing standard and manufacturer's recommendations.
55
56 METHODS OF GYPSUM BOARD APPLICATION:
57
GYPSUM DRYWALL
GDA 09250-9
GDA#12018.00 December 14, 2012
Issue for Permit
1 Single-Layer Application: Install gypsum wallboard as follows.
2
3 On ceilings apply gypsum board prior to wall/partition board application to the greatest extent
4 possible.
5
6 On partitions/walls apply gypsum board vertically (parallel to framing), unless otherwise
7 indicated, and provide sheet lengths which will minimize end joints.
8
9 On partitions/walls 8'-1" or less in height apply gypsum board horizontally (perpendicular to
10 framing); use maximum length sheets possible to minimize end joints.
11
12 At "wet areas" install moisture resistant units and treat joints to comply with manufacturer's
13 recommendations for type of application indicated.
14
15 Single-Layer Fastening Methods: Apply gypsum boards to supports as follows:
16
17 Fasten with screws.
18
19 At toilets and locker rooms except as indicated below, install moisture resistant units and treat joints to
20 comply with manufacturer's recommendations for type of application indicated.
21
22 Wall Tile Substrates: For areas indicated below to receive thin-set ceramic tile and similar rigid
23 applied wall finishes, comply with the following:
24
25 Install water-resistant gypsum backing board panels at "wet areas" other than showers, and
26 where indicated. Install with 1/'4-inch open space where panels abut other construction
27 or penetrations.
28
29 INSTALLATION OF DRYWALL TRIM ACCESSORIES:
30
31 General: Where feasible, use the same fasteners to anchor trim accessory flanges as required to
32 fasten gypsum board to the supports. Otherwise, fasten flanges to comply with manufacturer's
33 recommendations.
34
35 Install corner beads at external corners.
36
37 Install metal edge trim whenever edge of gypsum board would otherwise be exposed or semi-
38 exposed, and except where plastic trim is indicated. Provide type with face flange to receive joint
39 compound except where "U-bead"(semi-finishing type)is indicated.
40
41 Install "LC" bead where drywall construction is tightly abutted to other construction and back
42 flange can be attached to framing or supporting substrate.
43
44 Install "L" bead where edge trim can only be installed after gypsum board is installed.
45
46 Install U-type trim where edge is exposed, revealed, gasketed, or sealant-filled (including
47 expansion joints).
48
49 Install U-bead where indicated, and where exterior gypsum board edges are not covered by applied
50 moldings or indicated to receive edge trim with face flanges covered with joint compound.
51
52 Install plastic edge trim where indicated on wall panels at juncture with ceilings.
53
54 Install control joints at locations indicated, or if not indicated at spacings and locations required by
55 referenced gypsum board application and finish standard, and approved by the Architect for visual
56 effect.
57
GYPSUM DRYWALL
GDA 09250 - 10
GDA#12018.00 December 14, 2012
Issue for Permit
1 FINISHING OF DRYWALL:
2
3 General: Apply joint treatment at gypsum board joints (both directions), flanges of corner bead, edge
4 trim, and control joints; penetrations; fastener heads, surface defects and elsewhere as required to
5 prepare work for decoration.
6
7 Prefill open joints and rounded or beveled edges, if any, using setting-type joint compound.
8
9 Apply joint tape at joints between gypsum boards, except where trim accessories are indicated.
10
11 Level 0: Only for areas indicated on the drawings or in schedules:
12
13 No taping, finishing, or accessories required.
14
15 Level 1: For plenum areas above ceilings, attics, and areas where assembly will be concealed from
16 view:
17
18 Finish interior gypsum wallboard by applying the following joint compounds in an embed coat (not
19 including prefill of openings in base), and sand after embed coat:
20
21 Embedding Coat: Setting-Type Joint Compound.
22
23 Level 2: For areas where gypsum wallboard receives tile, slotwall, FRP board or similar opaque panel:
24
25 Finish interior gypsum wallboard by applying the following joint compounds in 1 coat (not including
26 prefill of openings in base), and sand between coats and after last coat:
27
28 Embedding and First/Finish Coat: Setting-Type Joint Compound.
29
30 Level 3: For areas where gypsum wallboard receives medium or heavy texture, or heavy wallcoverinq:
31
32 Finish interior gypsum wallboard by applying the following joint compounds in 2 coats (not including
33 prefill of openings in base), and sand between coats and after last coat:
34
35 Embedding and First Coat: Setting-Type Joint Compound.
36 Finish (Second)Coat: Ready-mix drying-type all-purpose or topping compound.
37
38 Level 4: For areas where gypsum wallboard receives texture, semigloss enamel,or wallcoverinq:
39
40 Finish interior gypsum wallboard by applying the following joint compounds in 3 coats (not including
41 prefill of openings in base), and sand between coats and after last coat:
42
43 Embedding and First Coat: Setting-Type Joint Compound.
44 Fill (Second)Coat: Setting-type joint compound.
45 Finish (Third)Coat: Ready-mix drying-type all-purpose or topping compound.
46
47 Water-Resistant Gypsum Backing Board Base for Ceramic Tile: Comply with ASTM C 840 and
48 manufacturer's recommendations for treatment of joints behind tile.
49
50 Partial Finishing: Omit third coat and sanding on concealed drywall work which is indicated for drywall
51 finishing or which requires finishing to achieve fire-resistance rating, sound rating or to act as air or
52 smoke barrier.
53
54 Remove any texture droppings or oversprav from door frames, windows and other adjoining
55 construction.
56
57 PROTECTION:
GYPSUM DRYWALL
GDA 09250- 11
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Provide final protection and maintain conditions, in a manner suitable to Installer, which ensures
3 gypsum drywall construction being without damage or deterioration at time of Substantial Completion.
4
5
6 Drywall Finish Level Schedule:
7
8 Utility rooms, Warehouse, Electrical Rooms Level 3
9
10 All other exposed wall surfaces Level 4
11
12
13 END OF SECTION 09250
GYPSUM DRYWALL
GDA 09250- 12
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 09300—CERAMIC TILE
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division 1 Specification Sections, apply to this Section.
11
12 SUMMARY
13
14 This Section includes the following:
15
16 Porcelain floor/wall tile.
17
18 Related Sections: The following sections contain requirements that relate to this Section:
19
20 Division 3 Section "Concrete Work"for monolithic slab finishes specified for tile substrates.
21
22 Division 7 Section "Joint Sealers" for sealing of expansion, contraction, control, and isolation
23 joints in tile surfaces.
24
25 Division 9 Section "Gypsum Drywall" for substrate backer units installed as part of gypsum
26 wallboard systems.
27
28 SUBMITTALS
29
30 General: Submit the following in accordance with Conditions of Contract and Division 1 Specification
31 Sections.
32
33 Product data for each type of product specified.
34
35 Shop drawings indicating tile patterns and locations and widths of expansion, contraction, control, and
36 isolation joints in tile substrates and finished tile surfaces.
37
38 Locate precisely each joint and crack in tile substrates by measuring, record measurements
39 on shop drawings, and coordinate them with tile joint locations, in consultation with Architect.
40
41 Samples for verification purposes of each item listed below, prepared on samples of size and
42 construction indicated, products involve color and texture variations, in sets showing full range of
43 variations expected.
44
45 Each type and composition of tile and for each color and texture required, at least 12 inches
46 square, mounted on plywood or hardboard backing and grouted.
47
48 Full-size units of each type of trim and accessory for each color required.
49
50 Master grade certificates for each shipment, type, and composition of tile, signed by tile manufacturer
51 and Installer.
52
53 Material test reports from qualified independent testing laboratory indicating and interpreting test
54 results relative to compliance of tile and tile setting and grouting products with requirements indicated.
55
CERAMIC TILE
GDA 09300-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Qualification data for firms and persons specified in "Quality Assurance" article to demonstrate their
2 capabilities and experience. Include list of completed projects with project names, addresses, names
3 of Architects and Owners, plus other information specified.
4
5 QUALITY ASSURANCE
6
7 Single-Source Responsibility for Tile: Obtain each color, grade, finish, type, composition, and variety
8 of tile from a single source with resources to provide products of consistent quality in appearance and
9 physical properties without delaying progress of the Work.
10
11 Single-Source Responsibility for Setting and Grouting Materials: Obtain ingredients of a uniform
12 quality from one manufacturer for each cementitious and admixture component and from one source
13 or producer for each aggregate.
14
15 Installer Qualifications: Engage an experienced Installer who has successfully completed tile
16 installations similar in material, design, and extent to that indicated for Project.
17
18 Field-Constructed Mock-Up: Before installing tile, erect mock-ups for each form of construction and
19 finish required to verify selections made under sample submittals and to demonstrate aesthetic effects
20 as well as qualities of materials and execution. Build mock-ups to comply with the following
21 requirements, using materials indicated for final unit of Work.
22
23 Locate mock-ups on site in location and size indicated or, if not indicated, directed by
24 Architect.
25
26 Erect mock-ups in presence of Architect.
27
28 Demonstrate the proposed range of aesthetic effects and workmanship.
29
30 Obtain Architect's acceptance of mock-ups before start of final unit of Work.
31
32 Retain and maintain mock-ups during construction in undisturbed condition as a standard for
33 judging completed unit of Work.
34
35 When directed, demolish and remove mock-ups from Project site.
36
37 Preinstallation Conference: Conduct conference at Project site to comply with requirements of
38 Division 1 Section "Project Meetings".
39
40 DELIVERY, STORAGE, AND HANDLING
41
42 Deliver and store packaged materials in original containers with seals unbroken and labels intact until
43 time of use. Comply with requirement of ANSI A137.1 for labeling sealed tile packages.
44
45 Prevent damage or contamination to materials by water,freezing, foreign matter, and other causes.
46
47 Handle tile with temporary protective coating on exposed surfaces to prevent coated surfaces from
48 contacting backs or edges of other units. If despite these precautions coating does contact bonding
49 surfaces of tile, remove coating from bonding surfaces before setting tile.
50
51 PROJECT CONDITIONS
52
53 Maintain environmental conditions and protect work during and after installation to comply with
54 referenced standards and manufacturer's printed recommendations.
55
56 Vent temporary heaters to exterior to prevent damage to tile work from carbon dioxide buildup.
57
CERAMIC TILE
GDA 09300-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Maintain temperatures at 50 deg F (10 deg C)or more in tiled areas during installation and for 7 days
2 after completion, unless higher temperatures are required by referenced installation standard or
3 manufacturer's instructions.
4
5 EXTRA MATERIALS
6
7 Deliver extra materials to Owner. Furnish extra materials that match products installed as described
8 below, packaged with protective covering for storage and identified with labels clearly describing
9 contents.
10
11 Tile and Trim Units: Furnish quantity of full-size units equal to 3 percent of amount installed,
12 for each type, composition,color, pattern, and size.
13
14
15 PART 2- PRODUCTS
16
17
18 MANUFACTURERS
19
20 Manufacturers: Subject to compliance with requirements, provide products as indicated on the
21 Drawings.
22
23 PRODUCTS, GENERAL:
24
25 ANSI Standard for Ceramic Tile: Comply with ANSI A137.1 "American National Standard
26 Specifications for Ceramic Tile"for types, compositions, and grades of tile indicated.
27
28 Furnish tile complying with "Standard Grade" requirements unless otherwise indicated.
29
30 ANSI Standard for Tile Installation Materials: Comply with ANSI standard referenced with products
31 and materials indicated for setting and grouting.
32
33 Colors, Textures, and Patterns: Where manufacturer's standard products are indicated for tile, grout,
34 and other products requiring selection of colors, surface textures, patterns, and other appearance
35 characteristics, provide specific products or materials complying with the following requirements:
36
37 Provide selections indicated on the drawings and on the schedules or as selected by the
38 Owner/Architect.
39
40 Factory Blending: For tile exhibiting color variations within the ranges selected during sample
41 submittals, blend tile in factory and package accordingly so that tile units taken from one package
42 show the same range in colors as those taken from other packages and match approved samples.
43
44 TILE PRODUCTS
45
46 Floor/Wall Tile: Provide flat tile complying with the following requirements:
47
48 Composition: As indicated.
49
50 Wearing Surface: Matte.
51
52 Dimensions: As indicated on the Drawings.
53
54 Nominal Thickness:As indicated on the Drawings.
55
56 Trim Units: Provide tile trim units to match characteristics of adjoining flat tile and to comply with
57 following requirements:
CERAMIC TILE
GDA 09300-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Size:As indicated, coordinated with sizes and coursing of adjoining flat tile where applicable.
3
4 Shapes:As follows, selected from manufacturer's standard shapes:
5
6 Floor Base for Thinset Mortar Installations:As indicated on the Drawings.
7
8 SETTING MATERIALS
9
10 Latex-Portland Cement Mortar: ANSI A118.4, composition as follows:
11
12 Latex additive (water emulsion)of type described below, serving as replacement for part or all of
13 gauging water, combined at job site with prepackaged dry mortar mix supplied or specified by
14 latex additive manufacturer.
15
16 Products: Subject to compliance with requirements, provide one of the following:
17
18 Mortars:
19
20 "Hydroment Tile-Mate Premium"; Bostik Construction Products Div.
21 "Premium Blend"; Custom Building Products
22 "Laticrete Floor and Wall Thin Set"; Laticrete International Inc.
23 "Kerabond"; Mapei Corp.
24
25 Latex-Emulsion-Based Latex-Portland Cement Additive:
26
27 "Flexalastic"; Bostik Construction Products Div.
28 "Custom-Flex Ultra Strength Thin Set Additive"; Custom Building Products
29 "Laticrete No. 333"; Laticrete International Inc.
30 "Keralastic"; Mapei Corp.
31
32 GROUTING MATERIALS
33
34 Latex-Portland Cement Grout: ANSI A118.6, color as indicated, composition as follows:
35
36 Latex additive (water emulsion) serving as replacement for part or all of gauging water, added at
37 job site with dry grout mixture,with type of latex and dry grout mix as follows:
38
39 Dry Grout Mixture: Dry-set grout specified or supplied by latex additive manufacturer. Use
40 latex additive without retarder with dry-set grout.
41
42 Application: Use dry-set grout combined with latex additive for grouting joints in glazed
43 wall tile.
44
45 Color: As selected by the Architect.
46
47 Products: Subject to compliance with requirements, provide one of the following:
48
49 Dry-Set Grouts:
50
51 "Hydroment Ceramic Tile Grout"; Bostik Construction Products Div.
52 "Polyblend Colored Tile Grout-Sanded"; Custom Building Products
53 "Laticrete Grout"; Laticrete International Inc.
54 "Keracolor Floor Grout-Sanded"; Mapei Corp.
55
56 Latex-Emulsion-Based Latex-Portland Cement Additive:
57
CERAMIC TILE
GDA 09300-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 "Flexalastic"; Bostik Construction Products Div.
2 "Custom-Flex Ultra Strength Thin Set Additive"; Custom Building Products
3 "Laticrete No. 1776"; Laticrete International Inc.
4 "Keralastic"; Mapei Corp.
5
6 ELASTOMERIC SEALANTS
7
8 General: Provide manufacturer's standard chemically curing, elastomeric sealants of base polymer
9 indicated that comply with requirements of Division 7 Section "Joint Sealers," including ASTM C 920
10 as referenced by Type, Grade, Class, and Uses.
11
12 Colors: Provide colors of exposed sealants to match colors of grout in tile adjoining sealed joints
13 unless otherwise indicated.
14
15 One-Part Mildew-Resistant Silicone Sealant: Type S; Grade NS; Class 25; Uses NT, G, A, and as
16 applicable to nonporous joint substrates indicated, 0; formulated with fungicide, intended for sealing
17 interior ceramic tile joints and other nonporous substrates that are subject to in-service exposures of
18 high humidity and temperature extremes.
19
20 One-Part Mildew-Resistant Silicone Sealant:
21
22 "Dow Corning 786"; Dow Corning Corp.
23 "SCS 1702"; General Electric Co.
24 "863#345 White"; Pecora Corp.
25 "Rhodorsil 6B White"; Rhone-Poulenc Inc.
26 "Proglaze White"; Tremco Corp.
27
28 MIXING MORTARS AND GROUT
29
30 Mix mortars and grouts to comply with requirements of referenced standards and manufacturers
31 including those for accurate proportioning of materials, water, or additive content; type of mixing
32 equipment, selection of mixer speeds, mixing containers, mixing time, and other procedures needed
33 to produce mortars and grouts of uniform quality with optimum performance characteristics for
34 application indicated.
35
36
37 PART 3- EXECUTION
38
39
40 EXAMINATION
41
42 Examine substrates and areas where tile will be installed, with Installer present, for compliance with
43 requirements for installation tolerances and other conditions affecting performance of installed tile.
44
45 Verify that substrates for setting tile are firm, dry, clean, and free from oil or waxy films and
46 curing compounds.
47
48 Verify that installation of grounds, anchors, recessed frames, electrical and mechanical units
49 of work, and similar items located in or behind tile has been completed before installing tile.
50
51 Do not proceed with installation until unsatisfactory conditions have been corrected.
52
53 PREPARATION
54
55 Blending: For tile exhibiting color variations within the ranges selected during sample submittals,
56 verify that tile has been blended in factory and packaged accordingly so that tile units taken from one
57 package show the same range in colors as those taken from other packages and match approved
CERAMIC TILE
GDA 09300-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 samples. If not factory blended, either return to manufacturer or blend tiles at Project site before
2 installing.
3
4 INSTALLATION, GENERAL
5
6 ANSI Tile Installation Standard: Comply with parts of ANSI 108 series of tile installation standards
7 included under "American National Standard Specifications for the Installation of Ceramic Tile" that
8 apply to type of setting and grouting materials and methods indicated.
9
10 TCA Installation Guidelines: TCA "Handbook for Ceramic Tile Installation"; comply with TCA
11 installation methods indicated.
12
13 Extend tile work into recesses and under or behind equipment and fixtures to form a complete
14 covering without interruptions except as otherwise shown. Terminate work neatly at obstructions,
15 edges, and corners without disrupting pattern or joint alignments.
16
17 Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible
18 surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned
19 joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so that plates, collars,
20 or covers overlap tile.
21
22 Jointing Pattern: Unless otherwise shown, lay tile in grid pattern. Align joints when adjoining tiles on
23 base, walls, and trim are same size. Lay out tile work and center tile fields in both directions in each
24 space or on each wall area. Adjust to minimize tile cutting. Provide uniform joint widths unless
25 otherwise shown.
26
27 Lay out tile wainscots to next full tile beyond dimensions indicated.
28
29 Expansion Joints: Locate expansion joints and other sealant-filled joints, including control,
30 contraction, and isolation joints, where indicated during installation of setting materials, mortar beds,
31 and tile. Do not saw cut joints after installation of tiles.
32
33 Locate joints in tile surfaces directly above joints in concrete substrates.
34
35 Prepare joints and apply sealants to comply with requirements of Division 7 Section "Joint
36 Sealers."
37
38 Grout tile to comply with the requirements of the following installation standards:
39
40 For ceramic tile grouts (latex-portland cement grouts), comply with ANSI A108.10.
41
42 FLOOR INSTALLATION METHODS
43
44 Glazed Floor Tile: Install tile to comply with requirements indicated below for setting bed methods,
45 TCA installation methods related to types of subfloor construction, and grout types:
46
47 Latex-Portland Cement Mortar: ANSI A108.5.
48
49 Concrete Subfloors, Interior: TCA F113.
50
51 Grout: Latex-portland cement.
52
53 WALL TILE INSTALLATION METHODS
54
55 Glazed Wall Tile: Install types of tile designated for wall application to comply with requirements
56 indicated below for setting-bed methods, TCA installation methods related to subsurface wall
57 conditions, and grout types:
CERAMIC TILE
GDA 09300-6
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Latex-Portland Cement Mortar: ANSI A108.5.
3
4 Wood or Metal Studs, Interior: TCA W243.
5
6 Grout: Latex-portland cement.
7
8 CLEANING AND PROTECTION
9
10 Cleaning: Upon completion of placement and grouting, clean all ceramic tile surfaces so they are free
11 of foreign matter.
12
13 Remove latex-portland cement grout residue from tile as soon as possible.
14
15 Finished Tile Work: Leave finished installation clean and free of cracked, chipped, broken, unbonded,
16 and otherwise defective tile work.
17
18 Provide final protection and maintain conditions in a manner acceptable to manufacturer and installer
19 that ensures that tile is without damage or deterioration at time of Substantial Completion.
20
21 When recommended by tile manufacturer, apply a protective coat of neutral protective cleaner to
22 completed tile walls. Protect installed tile work with kraft paper or other heavy covering during
23 construction period to prevent staining, damage, and wear.
24
25 Before final inspection, remove protective coverings and rinse neutral cleaner from tile surfaces.
26
27
28 END OF SECTION 09300
CERAMIC TILE
GDA 09300-7
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 09512-ACOUSTICAL TILE CEILINGS
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division 1 Specification Sections, apply to this Section.
11
12 SUMMARY
13
14 This Section includes the following:
15
16 Acoustical tile ceilings, exposed grid suspension.
17
18 SUBMITTALS
19
20 General: Submit the following in accordance with Conditions of Contract and Division 1 Specification
21 Sections.
22
23 Product data for each type of product specified.
24
25 Coordination drawings for reflected ceiling plans drawn accurately to scale and coordinating
26 penetrations and ceiling-mounted items. Show the following:
27
28 Ceiling suspension members.
29
30 Method of attaching hangers to building structure.
31
32 Ceiling-mounted items including light fixtures; air outlets and inlets; sprinkler heads; and
33 special moldings at walls, column penetrations, and other junctures with adjoining
34 construction.
35
36 Scale: 1/8 inch = 1,-0".
37
38 Samples for verification purposes of each type of exposed finish required, prepared on samples of
39 size indicated below and of same thickness and material indicated for final unit of Work. Where
40 finishes involve normal color and texture variations, include sample sets showing full range of
41 variations expected.
42
43 6-inch-square samples of each acoustical tile type, pattern, and color.
44
45 Set of 12-inch-long samples of exposed moldings for each color and system type required.
46
47 Qualification data for firms and persons specified in "Quality Assurance" Article to demonstrate their
48 capabilities and experience. Include list of completed projects with project names, addresses, names
49 of Architects and Owners, and other information specified.
50
51 Research reports or evaluation reports of the model code organization acceptable to authorities
52 having jurisdiction that show compliance of acoustical ceiling system and components with building
53 code in effect for Project.
54
55 Product test reports from qualified independent testing laboratory that are based on its testing of
56 current products for compliance of acoustical ceiling systems and components with requirements.
57
ACOUSTICAL TILE CEILINGS
GDA 09512- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 QUALITY ASSURANCE
2
3 Installer Qualifications: Engage an experienced Installer who has successfully completed acoustical
4 ceilings similar in material, design, and extent to that indicated for Project.
5
6 Fire Performance Characteristics: Provide acoustical ceilings that are identical to those tested for the
7 following fire performance characteristics, per ASTM test method indicated below, by UL or other
8 testing and inspecting organizations acceptable to authorities having jurisdiction. Identify acoustical
9 ceiling components with appropriate markings of applicable testing and inspecting organization.
10
11 Surface Burning Characteristics: As follows, tested per ASTM E 84 and complying with ASTM
12 E 1264 for Class A products.
13
14 Flame Spread: 25 or less.
15 Smoke Developed: 50 or less.
16
17 Fire-Resistance Ratings: As indicated by reference to design designations in UL "Fire
18 Resistance Directory," for types of assemblies in which acoustical ceilings function as a fire
19 protective membrane and tested per ASTM E 119.
20
21 Protect lighting fixtures and air ducts to comply with requirements indicated for rated
22 assembly.
23
24 Seismic Standard: Provide acoustical tile ceilings designed and installed to withstand the effects of
25 earthquake motions according to the following:
26
27 Standard for Ceiling Suspension Systems Requiring Seismic Restraint: Comply with 2110
28 OSSC Section 1613.1.
29
30 CISCA's Guidelines for Systems Requiring Seismic Restraint: Comply with CISCA's
31 "Guidelines for Seismic Restraint of Direct-Hung Suspended Ceiling Assemblies--Seismic
32 Zones 3 &4."
33
34 ASCE 7, 2005, "Minimum Design Loads for Buildings and Other Structures": Section 13.5.6.
35
36 Single-Source Responsibility for Ceiling Units: Obtain each type of acoustical ceiling unit from a
37 single source with resources to provide products of consistent quality in appearance and physical
38 properties without delaying progress of the Work.
39
40 Single-Source Responsibility for Suspension System: Obtain each type of suspension system from a
41 single source with resources to provide products of consistent quality in appearance and physical
42 properties without delaying progress of the Work.
43
44 Obtain suspension system from same manufacturer that produces acoustical ceiling units.
45
46 Coordination of Work: Coordinate layout and installation of acoustical ceiling units and suspension
47 system components with other construction that penetrates ceilings or is supported by them, including
48 light fixtures, HVAC equipment, fire-suppression system components, and partition system.
49
50 Preinstallation Conference: Conduct conference at Project site to comply with requirements of
51 Division 1 Section "Project Meetings."
52
53 DELIVERY, STORAGE, AND HANDLING
54
55 Deliver acoustical ceiling units to project site in original, unopened packages and store them in a fully
56 enclosed space where they will be protected against damage from moisture, direct sunlight, surface
57 contamination, and other causes.
ACOUSTICAL TILE CEILINGS
GDA 09512- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Before installing acoustical ceiling units, permit them to reach room temperature and a stabilized
3 moisture content.
4
5 Handle acoustical ceiling units carefully to avoid chipping edges or damaging units in any way.
6
7 PROJECT CONDITIONS
8
9 Space Enclosure: Do not install interior acoustical ceilings until space is enclosed and weatherproof,
10 wet work in space is completed and nominally dry, work above ceilings is complete, and ambient
11 conditions of temperature and humidity will be continuously maintained at values near those indicated
12 for final occupancy.
13
14 EXTRA MATERIALS
15
16 Deliver extra materials to Owner. Furnish extra materials described below that match products
17 installed, are packaged with protective covering for storage, and are identified with appropriate labels.
18
19 Acoustical Ceiling Units: Furnish quantity of full-size units equal to 2.0 percent of amount
20 installed.
21
22
23 PART 2 - PRODUCTS
24
25
26 MANUFACTURERS:
27
28 Products: Subject to compliance with requirements, provide the following:
29
30 As indicated on the Drawings
31
32 ACOUSTICAL CEILING UNITS, GENERAL
33
34 Standard for Acoustical Ceiling Units: Provide manufacturers' standard units of configuration
35 indicated that comply with ASTM E 1264 classifications as designated by reference to types, patterns,
36 acoustical ratings, and light reflectance, unless otherwise indicated.
37
38 METAL SUSPENSION SYSTEMS, GENERAL
39
40 Standard for Metal Suspension Systems: Provide manufacturer's standard metal suspension systems
41 of types, structural classifications, and finishes indicated that comply with applicable ASTM C 635
42 requirements.
43
44 Duty Class: Heavy
45
46 Seismic Design Category: D
47
48 Attachment Devices: Size for 5 times design load indicated in ASTM C 635, Table 1, Direct Hung,
49 unless otherwise indicated.
50
51 Wire for Hangers and Ties: ASTM A 641, Class 1 zinc coating, soft temper.
52
53 Gage: Provide wire sized so that stress at 3 times hanger design load (ASTM C 635, Table 1,
54 Direct-Hung) will be less than yield stress of wire, but provide not less than 0.106-inch
55 diameter(12-gage).
56
57 Hanger Rods: Mild steel, zinc coated, or protected with rust-inhibitive paint.
ACOUSTICAL TILE CEILINGS
GDA 09512 - 3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Flat Hangers: Mild steel, zinc coated, or protected with rust-inhibitive paint.
3
4 Angle Hangers: Angles with legs not less than 7/8-inch wide, formed with 0.0365-inch-thick
5 galvanized steel sheet complying with ASTM A 446, Coating Designation G90, with bolted
6 connections and 5/16-inch-diameter bolts.
7
8 Seismic Struts: Manufacturer's standard compression struts designed to accommodate lateral forces.
9
10 Seismic Clips: Manufacturer's standard seismic clips designed and spaced to secure acoustical tiles
11 in-place.
12
13 Edge Moldings and Trim: Metal of types and profiles indicated or, if not indicated, provide
14 manufacturer's standard molding for edges and penetrations of ceiling that fits with type of edge detail
15 and suspension system indicated.
16
17 For circular penetrations of ceiling, provide edge moldings fabricated to diameter required to
18 fit penetration exactly.
19
20 For Seismic Separation Joint in ceiling, provide edge moldings fabricated to profiles and
21 thickness indicated.
22
23 Thickness: 0.0239 inch minimum, painted to match metal suspension system.
24
25 Finish Color: White
26
27 MISCELLANEOUS MATERIALS
28
29 Concealed Acoustical Sealant: Nondrying, non-hardening, non-skinning, non-staining, non-bleeding,
30 gunnable sealant complying with requirement specified in Division 7 Section "Joint Sealers."
31
32
33 PART 3-EXECUTION
34
35
36 EXAMINATION
37
38 Examine substrates and structural framing to which ceiling system attaches or abuts, with Installer
39 present, for compliance with requirements specified in this and other sections that affect installation
40 and anchorage of ceiling system. Do not proceed with installation until unsatisfactory conditions have
41 been corrected.
42
43 PREPARATION
44
45 Coordination: Furnish layouts for preset inserts, clips, and other ceiling anchors whose installation is
46 specified in other sections.
47
48 Furnish concrete inserts and similar devices to other trades for installation well in advance of
49 time needed for coordination of other work.
50
51 Measure each ceiling area and establish layout of acoustical units to balance border widths at
52 opposite edges of each ceiling. Avoid use of less-than-half-width units at borders, and comply with
53 reflected ceiling plans.
54
55 INSTALLATION
56
ACOUSTICAL TILE CEILINGS
GDA 09512-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 General: Install acoustical tile ceilings to comply with OSSC 1613.1 and seismic requirements
2 indicated, per manufacturer's written instructions and CISCA's"Ceiling Systems Handbook."
3
4 Arrange acoustical units and orient directionally patterned units (if any) in manner shown by reflected
5 ceiling plans.
6
7 Install tile with pattern running in one direction.
8
9 Suspend ceiling hangers from building structural members and as follows:
10
11 Install hangers plumb and free from contact with insulation or other objects within ceiling
12 plenum that are not part of supporting structural or ceiling suspension system. Splay hangers
13 only where required to miss obstructions and offset resulting horizontal forces by bracing,
14 counter splaying, or other equally effective means.
15
16 Where width of ducts and other construction within ceiling plenum produces hanger spacing
17 that interfere with the location of hangers at spacing required to support standard suspension
18 system members, install supplemental suspension members and hangers in form of trapezes
19 or equivalent devices. Size supplemental suspension members and hangers to support
20 ceiling loads within performance limits established by referenced standards.
21
22 Secure wire hangers by looping and wire-tying, either directly to structures or other devices
23 that are secure and appropriate for substrate, and in a manner that will not cause them to
24 deteriorate or otherwise fail due to age, corrosion, or elevated temperatures.
25
26 Secure flat, angle, channel, and rod hangers to structure, including intermediate framing
27 members, by attaching to inserts, eye screws, or other devices that are secure and
28 appropriate for structure to which hangers are attached as well as for type of hanger involved,
29 and in a manner that will not cause them to deteriorate or fail due to age, corrosion, or
30 elevated temperatures.
31
32 Do not support ceilings directly from permanent metal forms.
33
34 Do not attach hangers to steel deck tabs.
35
36 Do not attach hangers to steel roof deck. Attach hangers to structural members or
37 intermediate framing members.
38
39 Space hangers not more than 4'-0" o.c. along each member supported directly from hangers,
40 unless otherwise shown, and provide hangers not more than 8 inches from ends of each
41 member.
42
43 Install edge moldings of type indicated at perimeter of acoustical ceiling area and at locations where
44 necessary to conceal edges of acoustical units.
45
46 Sealant Bed: Apply continuous ribbon of acoustical sealant, concealed on back of vertical leg
47 before installing moldings.
48
49 Screw-attach moldings to substrate at intervals not over 16 inches o.c. and not more than 3
50 inches from ends, leveling with ceiling suspension system to tolerance of 1/8 inch in 12'-0".
51 Miter corners accurately and connect securely.
52
53 Seismic Separation Joints: For ceiling areas exceeding 2500 square feet, a seismic separation joint
54 that breaks the ceiling shall be provided.
55
56 The layout and location of the seismic separation joint shall be as indicated on the plans.
57
ACOUSTICAL TILE CEILINGS
GDA 09512-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 Install precut fiberglass batt insulation in coordination with suspension/tile system at locations
2 indicated on the drawings.
3
4 Install acoustical tile in coordination with suspension system.
5
6 Fit adjoining tile to form flush, tight joints. Scribe and cut for accurate fit at borders and
7 around penetrating work.
8
9 CLEANING
10
11 Clean exposed surfaces of acoustical ceilings, including trim, edge moldings, and suspension
12 members. Comply with manufacturer's instructions for cleaning and touch-up of minor finish damage.
13 Remove and replace work that cannot be successfully cleaned and repaired to permanently eliminate
14 evidence of damage.
15
16
17 END OF SECTION 09512
ACOUSTICAL TILE CEILINGS
GDA 09512- 6
GDA#12018.00 December 14,2012
Issue for Permit
1 SECTION 09650-RESILIENT FLOORING
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division 1 Specification sections, apply to work of this section.
11
12 DESCRIPTION OF WORK:
13
14 Extent of resilient flooring and accessories is shown on drawings and in schedules.
15
16 Vinyl Composition Tile
17 Static Dissipative Tile
18 Rubber flooring and stair treads
19 Rubber Wall Base
20
21 QUALITY ASSURANCE:
22
23 Manufacturer: Provide each type of resilient flooring and accessories as produced by a single
24 manufacturer, including recommended primers, adhesives, sealants, and leveling compounds.
25
26 Fire Test Performance: Provide resilient flooring which complies with the following fire test
27 performance criteria as determined by an independent testing laboratory acceptable to authorities
28 having jurisdiction.
29
30 Critical Radiant Flux (CRF): Not less than the following rating as per ASTM E 648.
31
32 0.45 watts per sq. cm.
33
34 0.22 watts per sq. cm.
35
36 Flame Spread: Not more than 75 per ASTM E 84.
37
38 Smoke Developed: Not more than 450 per ASTM E 84.
39
40 Smoke Density: Not more than 450 per ASTM E 662.
41
42 Installer's Qualifications: Engage Installer who is certified in writing by resilient flooring manufacturer
43 as qualified for installation of sheet vinyl employing heat welded seams.
44
45 SUBMITTALS:
46
47 Product Data: Submit manufacturer's technical data for each type of resilient flooring and accessory.
48
49 Samples for Verification Purposes: Submit the following samples of each type, color, and pattern of
50 resilient flooring required, showing full-range of color and pattern variations.
51
52 Full size tile samples.
53
54 6"x 9"samples of sheet flooring.
55
56 2-1/2"long samples of resilient flooring accessories.
57
RESILIENT FLOORING
GDA 09650- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Other materials as required.
2
3 Certification for Fire Test Performance: Submit certification from independent testing laboratory
4 acceptable to authorities having jurisdiction that resilient flooring complies with fire test performance
5 requirements.
6
7 Maintenance Instructions: Submit 2 copies of manufacturer's recommended maintenance practices
8 for each type of resilient flooring and accessory required.
9
10 PROJECT CONDITIONS:
11
12 Maintain minimum temperature of 65°F (18°C) in spaces to receive resilient flooring for at least 48
13 hours prior to installation, during installation, and for not less than 48 hours after installation. Store
14 resilient flooring materials in spaces where they will be installed for at least 48 hours before beginning
15 installation. Subsequently, maintain minimum temperature of 55°F (13°C) in areas where work is
16 completed.
17
18 Install resilient flooring and accessories after other finishing operations, including painting, have been
19 completed. Do not install resilient flooring over concrete slabs until the latter have been cured and are
20 sufficiently dry to achieve bond with adhesive as determined by manufacturer's recommended bond
21 and moisture test.
22
23 Space Enclosure and Environmental Limitations: Do not install carpet until space is enclosed and
24 weatherproof, wet-work in space is completed and nominally dry, work above ceilings is complete, and
25 ambient temperature and humidity conditions are and will be continuously maintained at values near
26 those indicated for final occupancy.
27
28 Subfloor Moisture Conditions: Moisture emission rate of not more than 3 lb/1000 sq. ft./24 hours
29 Ji 1JUu sq. mil=l rio... when tested by calcium chloride moisture test in compliance with CRI 104,
30 6.2.1,with subfloor temperatures not less than 55 deg F (12 7 deg C .
31
32 Subfloor Alkalinity Conditions: A pH range of 5 to 9 when subfloor is wetted with potable water and
33 pHydrion paper is applied.
34
35
36 PART 2 - PRODUCTS
37
38
39 FLOORING:
40
41
42 Manufacturers of Resilient Flooring Tile and Treads:
43
44 As indicated on the Drawings.
45
46 Manufacturers of Base and Trims:
47
48 As indicated on the Drawings.
49
50 Fire Test Data : ASTM E 648 Critical Radiant Flux Class I - 0.45 or more watts/cm2
51
52 ASTM E 662 Smoke Developed 450 or less
53
54 Static Load Limit: ASTM F 970 75 psi (5.27 kg/cm2)
55
56 Gauges: 1/8 in (3.2 mm)overall (nominal)
57
RESILIENT FLOORING
GDA 09650- 2
GDA#12018.00 December 14,2012
Issue for Permit
1 Durability : 1/8 in (3.2 mm)-Very Good
2
3 Maintainability : 1/8 in (3.2 mm)-Good
4
5 Resilience : 1/8 in (3.2 mm)-Good
6
7 Electrical Resistence: ESD-S7.1 and ASTM F-150 10e6 to 10e9 ohms
8 Point to point, and point to ground, when installed as a system.
9
10 Static Generation: ESD STM 97.2 At 40% R.H.:<10 volts. At 12% R.H.:<100 volts when installed as a
11 system,flooring in combination with ESD footwear and a person.
12
13 Static Decay: Fed Test 101c, Method 4046 5000 volts to zero in < 0.5 sec.; avg. 0.5 sec. system in
14 combination with ESD footwear and a person.
15
16 Color: As indicated on the drawings, or if not indicated, as selected by the Architect from the
17 manufacturer's standard range of colors.
18
19 ACCESSORIES:
20
21 Rubber Wall Base: Provide rubber base complying with FS SS-W-40, Type I, with matching end stops
22 and preformed or molded corner units, and as follows:
23
24 Height: 4".
25
26 Thickness: 1/8"gage.
27
28 Style: Standard top-set cove at areas indicated on the drawings.
29
30 Finish: Matte.
31
32 Color: As indicated on the drawings, or if not indicated, as selected by the Architect from the
33 manufacturer's standard range of colors.
34
35 Resilient Edge Strips: 1/8" thick, homogeneous rubber composition, tapered or bullnose edge, color
36 to match flooring, or as selected by Architect from standard colors available; not less than 1"wide.
37
38 Adhesives (Cements): Waterproof, stabilized type as recommended by flooring manufacturer to suit
39 material and substrate conditions, except no cutback asphalt adhesives allowed.
40
41 Static Dissipative Tile Adhesives(Cements): Waterproof, stabilized type as recommended by flooring
42 manufacturer to suit material and substrate conditions, except no cutback asphalt adhesives allowed.
43
44 Copper Grounding Strips: Type as recommended by flooring manufacturer.
45
46 Static Dissipative Polish: Type as recommended by flooring manufacturer.
47
48 Concrete Slab Primer: Non-staining type as recommended by flooring manufacturer.
49
50 Leveling and Patching Compound: Latex modified cementitious types as recommended by flooring
51 manufacturer.
52
53 RESILIENT STAIR ACCESSORIES
54
55 Resilient Stair Treads:
56
57 Manufacturers: As indicated on the Drawings
RESILIENT FLOORING
GDA 09650-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Resilient Stair Treads Standard: ASTM F 2169.
3
4 Material Requirement: Type TS (rubber, vulcanized thermoset) or Type TP (rubber,
5 thermoplastic).
6 Surface Design:
7
8 Manufacturing Method: Group 1, tread with embedded abrasive strips.
9
10 Nosing Style: Round.
11
12 Nosing Height: 2 inches (51 mm).
13
14 Thickness: 1/4 inch (6 mm)and tapered to back edge.
15
16 Size: Lengths and depths to fit each stair tread in one piece.
17
18 Risers: Smooth, flat, coved-toe, 7 inches (178 mm)high by length matching treads; produced
19 by same manufacturer as treads and recommended by manufacturer for installation with
20 treads.
21
22 Thickness: 0.080 inch (2.0 mm).
23
24 Colors and Patterns: As indicated by Architect from full range of industry colors and pattern.
25
26 PART 3- EXECUTION
27
28
29 INSPECTION:
30
31 Require Installer to inspect subfloor surfaces to determine that they are satisfactory. A satisfactory
32 subfloor surface is defined as one that is smooth and free from cracks, holes, ridges, coatings
33 preventing adhesive bond, and other defects impairing performance or appearance.
34
35 Perform bond and moisture tests on concrete subfloors to determine if surfaces are sufficiently cured
36 and dry as well as to ascertain presence of curing compounds.
37
38 Checking For Moisture Content
39
40 Before beginning any installation on concrete(on grade or below grade), check for moisture.
41
42 Moisture Testing: Perform tests recommended by manufacturer and as follows. Proceed with
43 installation only after substrates pass testing.
44
45 Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation
46 only after substrates have relative humidity level measurement acceptable to flooring
47 manufacturer.
48
49 Do not proceed with installation when moisture content readings exceed these rates. Notify Architect
50 of results immediately.
51
52 Checking for Porosity
53
54 All concrete is porous to some extent. Porosity also affects the adhesive, therefore care should be
55 taken to be sure that all areas of the building have the same porosity. Floor porosity is the number
56 one factor that influences adhesive setup time.
57
RESILIENT FLOORING
GDA 09650-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 The pH of the floor surface can be determined by slightly wetting the floor and applying pH paper is
2 placed in water on the concrete it changes colors, indicating the pH level.
3
4 Do not proceed with installation when pH level readings exceed the flooring adhesive manufacturer's
5 acceptable range. Notify Architect of results immediately.
6
7 1- ApHof7isneutral.
8 2- A pH of less than 7 indicates acidity which increases as the numbers decrease.
9 3- A pH of more than 7 denotes alkalinity which increases as the numbers increase.
10
11 Highly alkaline surfaces be "Neutralized" using an acid wash (Muriatic Acid). This can be
12 accomplished by using 10 parts water to 1 part Muriatic Acid and rinsing twice with clear water. In
13 some cases a 30% mixture of white vinegar to water can be used. Follow all manufacturers
14 recommendations and precautions before proceeding.
15
16 Do not allow resilient flooring work to proceed until subfloor surfaces are satisfactory.
17
18 ACCEPTANCE
19
20 Commencement of work indicates acceptance and suitability of surface for installation.
21
22 PREPARATION:
23
24 Prepare subfloor surfaces as follows:
25
26 Use leveling and patching compounds as recommended by resilient flooring manufacturer for
27 filling small cracks, holes and depressions in subfloors.
28
29 Remove coatings from subfloor surfaces that would prevent adhesive bond, including curing
30 compounds incompatible with resilient flooring adhesives, paint, oils, waxes and sealers.
31
32 Broom clean or vacuum surfaces to be covered, and inspect subfloor.
33
34 Apply concrete slab primer, if recommended by flooring manufacturer, prior to application of adhesive.
35 Apply in compliance with manufacturer's directions.
36
37 INSTALLATION:
38
39 GENERAL:
40
41 Where movable partitions are shown, install resilient flooring before partitions are erected.
42
43 Install resilient flooring using method indicated in strict compliance with manufacturer's printed
44 instructions. Extend flooring into toe spaces, door reveals, and into closets and similar openings.
45
46 Scribe, cut, and fit resilient flooring to permanent fixtures, built-in furniture and cabinets, pipes, outlets
47 and permanent columns, walls and partitions.
48
49 Maintain reference markers, holes, or openings that are in place or plainly marked for future cutting by
50 repeating on finish flooring as marked on subfloor. Use chalk or other non-permanent marking device.
51
52 Install resilient flooring on covers for telephone and electrical ducts, and other such items as occur
53 within finished floor areas. Maintain overall continuity of color and pattern with pieces of flooring
54 installed on these covers. Tightly cement edges to perimeter of floor around covers and to covers.
55
56 Tightly cement resilient flooring to subbase without open cracks, voids, raising and puckering at joints,
57 telegraphing of adhesive spreader marks, or other surface imperfections. Hand roll resilient flooring at
RESILIENT FLOORING
GDA 09650- 5
GDA#12018.00 December 14, 2012
Issue for Permit
1 perimeter of each covered area to assure adhesion.
2
3 INSTALLATION OF TILE FLOORS:
4
5 Lay tile from center marks established with principal walls, discounting minor offsets, so that tile at
6 opposite edges of room are of equal width. Adjust as necessary to avoid use of cut widths less than
7 1/2 tile at room perimeters. Lay tile square to room axis, unless otherwise shown.
8
9 Match tiles for color and pattern by using tile from cartons in same sequence as manufactured and
10 packaged if so numbered. Cut tile neatly around all fixtures. Broken, cracked, chipped, or deformed
11 tiles are not acceptable.
12
13 Lay tile with grain running in direction and in patterns as shown on the drawings, or as
14 directed by Architect.
15
16 Adhere tile flooring to substrates using full spread of adhesive applied in compliance with flooring
17 manufacturer's directions.
18
19 Static Dissipative Tile Requirements:
20
21 See manufacturer's instructions for adhesives, trowel notchings, and seam treatment.
22 When using tile from two or more cartons, check to be sure all pattern and lot numbers are the same
23 to ensure proper color match. On larger installations, open several cartons and mix them as they are
24 installed to help blend any slight shade differences from one carton to the next.
25
26 1. Line off the entire area to be installed.
27
28 2. Apply the SDT adhesive over the area not covering the chalk lines and using the fine notching of
29 the manufacturer's recommended trowel.
30
31 3. Allow the adhesive to set until dry to the touch approximately 60 minutes depending on atmospheric
32 conditions. To test, press your thumb lightly on the surface of the adhesive in several places. If the
33 surface feels slightly tacky as your thumb is drawn away and does not stick to your
34 thumb, the adhesive is ready for the installation.
35
36 4. Cut copper strips (0.0032 thick)which are supplied with the adhesive into two-foot strips. Generally,
37 one grounding strip (two-foot length) is recommended for every 1000 ft2 of SDT installed over
38 concrete on grade. For suspended subfloors, one grounding strip is recommended for every 500 ft2 of
39 tile. Additional strips may be requested by the end user. The installer should receive some guidance
40 from the general contractor or end user as to the desired location of the copper strips to make
41 subsequent grounding more convenient.
42
43 5. Install the tile along the chalk lines, laying the field area first and then fitting in the border tile.
44
45 6. In the copper grounding strip locations, place 18" of the copper grounding strip over the dry-to-touch
46 SDT adhesive on the subfloor. The remaining 6"of the strip should continue up the wall.
47
48 7. Apply additional SDT adhesive over the 18" section of the copper grounding strip on the floor. Allow
49 this adhesive to dry to the touch and install the tile over the strip.
50
51 8. Roll in both directions within the adhesive's six-hour working time using a 100-lb. roller. Clean
52 adhesive residue from the surface of the flooring using a clean, white cloth dampened with mineral
53 spirits.
54
55 9. Newly installed flooring should not be exposed to rolling load traffic for at least 72 hours after
56 installation to allow setting and drying of the adhesive.
57
RESILIENT FLOORING
GDA 09650- 6
GDA#12018.00 December 14, 2012
Issue for Permit
1 10. Follow manufacturer's initial maintenance procedures.
2
3 Grounding of SDT: It is NOT the responsibility of the flooring contractor to actually ground the strips.
4 Grounding is normally done by an electrician. It is important to note that it is the responsiblity of the
5 end-user and/or electrician to make certain that the grounding method employed meets applicable
6 code requirements. The ground connection may be made to either an earth ground or an electrical
7 ground. Two methods of grounding normally used are as follows:
8
9 1. Ground to steel support columns: Drill and tap holes in the steel column, and fasten the copper strip
10 using a machine screw.
11
12 2. Connect to ground bus: Solder a wire (#12 or #14) to the copper strip and connect this wire to a
13 ground bus in accordance with applicable building or electrical codes. Once the connection is made,
14 copper strip and wire may be hidden or covered as desired.
15
16 Precautions: If electrical certification of an installation is required, do not perform any maintenance
17 procedures until after certification has been completed.
18
19 Use manufacturer's Static Dissipative Tile Polish on SDT.
20
21 INSTALLATION OF ACCESSORIES:
22
23 Apply wall base to walls, columns, pilasters, casework and other permanent fixtures in rooms or areas
24 where base is required. Install base in lengths as long as practicable, with preformed corner units, or
25 fabricated from base materials with mitered or coped inside corners. Tightly bond base to substrate
26 throughout length of each piece, with continuous contact at horizontal and vertical surfaces.
27
28 On masonry surfaces, or other similar irregular substrates, fill voids along top edge of resilient
29 wall base with manufacturer's recommended adhesive filler material.
30
31 Install inside and exterior corners before installing straight pieces.
32
33 Form inside corners on lob from straight pieces of maximum lengths possible by cutting an
34 inverted V-shaped notch in toe of wall base at the point where corner is formed. Shave back
35 of base where necessary to produce snug fit to substrate.
36
37 Form outside corners on lob from straight pieces of maximum lengths possible by shaving
38 back of base at point where bending will occur. Remove a strip perpendicular to length of
39 base and only deep enough to produce a snug fit without bends whitening or removal of more
40 than half the thickness of wall base.
41
42 Place resilient edge strips tightly butted to flooring and secure with adhesive. Install edging strips at
43 edges of flooring which would otherwise be exposed.
44
45 Apply resilient accessories to stairs as indicated and in strict accordance with manufacturer's
46 installation instructions.
47
48 Resilient Stair Accessories:
49
50 Use stair-tread-nose filler to fill nosing substrates that do not conform to tread contours.
51
52 Tightly adhere to substrates throughout length of each piece.
53
54 CLEANING AND PROTECTION:
55
56 Perform following operations immediately upon completion of resilient flooring:
57
RESILIENT FLOORING
GDA 09650- 7
GDA#12018.00 December 14, 2012
Issue for Permit
1 Sweep or vacuum floor thoroughly.
2
3 Do not wash floor until time period recommended by resilient flooring manufacturer has
4 elapsed to allow resilient flooring to become well-sealed in adhesive.
5
6 Damp-mop floor being careful to remove black marks and excessive soil.
7
8 Remove any excess adhesive or other surface blemishes, using appropriate cleaner
9 recommended by resilient flooring manufacturers.
10
11 Protect flooring against damage during construction period to comply with resilient flooring
12 manufacturer's directions.
13
14 Apply protective floor polish to resilient flooring surfaces free from soil, excess adhesive or
15 surface blemishes. Use commercially available metal cross-linked acrylic product acceptable
16 to resilient flooring manufacturer.
17
18 Protect resilient flooring against damage from rolling loads for initial period following
19 installation by covering with plywood or hardboard. Use dollies to move stationary equipment
20 or furnishings across floors.
21
22 Cover resilient flooring with undyed, untreated building paper until inspection for substantial
23 completion.
24
25 Clean resilient flooring not more than 4 days prior to date scheduled for inspections intended to
26 establish date of substantial completion in each area of project. Clean resilient flooring by method
27 recommended by resilient flooring manufacturer.
28
29 Strip protective floor polish, which was applied after completion of installation, prior to
30 cleaning.
31
32 Reapply floor polish after cleaning.
33
34 EXTRA STOCK:
35
36 Deliver stock of maintenance materials to Owner. Furnish maintenance materials from same
37 manufactured lot as materials installed and enclosed in protective packaging with appropriate
38 identifying labels.
39
40 Tile Flooring: Furnish not less than one box for each 50 boxes or fraction thereof, for each
41 type, color, pattern and size installed.
42
43
44 END OF SECTION 09650
RESILIENT FLOORING
GDA 09650- 8
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 09681 -CARPET TILE
2
3
4 PART 1 - GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of the Contract, including General and Supplementary Conditions
10 and Division 1 Specification Sections, apply to this Section.
11
12 SUMMARY
13
14 This Section includes carpet tile and installation.
15
16 Related Sections include the following:
17
18 Division 9 Section "Resilient Tile Flooring" for resilient wall base and accessories installed
19 with carpet tile.
20
21 SUBMITTALS
22
23 Product Data: For each type of product indicated. Include manufacturer's written data on physical
24 characteristics, durability, and fade resistance. Include installation methods.
25
26 Shop Drawings: Show the following:
27
28 Columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where
29 cutouts are required in carpet tiles.
30 Carpet tile type, color, and dye lot.
31 Type of subfloor.
32 Type of installation.
33 Pattern of installation.
34 Pattern type, location, and direction.
35 Pile direction.
36 Type, color, and location of insets and borders.
37 Type, color, and location of edge, transition, and other accessory strips.
38 Transition details to other flooring materials.
39
40 Samples: For each of the following products and for each color and texture required. Label each
41 Sample with manufacturer's name, material description, color, pattern, and designation indicated
42 on Drawings and in schedules.
43
44 Carpet Tile: Full-size Sample.
45 Exposed Edge Stripping and Accessory: 12-inch- (300-mm-) long Samples.
46
47 Product Schedule: Use same room and product designations indicated on Drawings and in
48 schedules.
49
50 Maintenance Data: For carpet tile to include in maintenance manuals specified in Division 1.
51 Include the following:
52
53 Methods for maintaining carpet tile, including cleaning and stain-removal products and
54 procedures and manufacturer's recommended maintenance schedule.
55 Precautions for cleaning materials and methods that could be detrimental to carpet tile.
56
CARPET TILE
GDA 09681 - 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 QUALITY ASSURANCE
2
3 Installer Qualifications: An experienced installer who is certified by the Floor Covering Installation
4 Board or who can demonstrate compliance with its certification program requirements.
5
6 Fire-Test-Response Characteristics: Provide products with the critical radiant flux classification
7 indicated in Part 2, as determined by testing identical products per ASTM E 648 by an independent
8 testing and inspecting agency acceptable to authorities having jurisdiction.
9
10 Product Options: Products and manufacturers named in Part 2 establish requirements for product
11 quality in terms of appearance, construction, and performance. Other manufacturers' products
12 comparable in quality to named products and complying with requirements may be considered.
13 Refer to Division 1 Section "Substitutions."
14
15 Mockups: Before installing carpet tile, install mockups for each type of carpet tile installation
16 required to demonstrate aesthetic effects and qualities of materials and execution. Install mockups
17 to comply with the following requirements, using materials indicated for the completed Work:
18
19 Install mockups in the location and of the size indicated or, if not indicated, as directed by
20 Architect.
21 Notify Architect seven days in advance of dates and times when mockups will be installed.
22 Demonstrate the proposed range of aesthetic effects and workmanship.
23 Obtain Architect's approval of mockups before starting work.
24 Maintain mockups during construction in an undisturbed condition as a standard for judging
25 the completed Work.
26 Remove mockups when directed.
27 Approved mockups may become part of the completed Work if undamaged at time of
28 Substantial Completion.
29
30 DELIVERY, STORAGE, AND HANDLING
31
32 General: Comply with CRI 104, Section 5, "Storage and Handling."
33
34 PROJECT CONDITIONS
35
36 General: Comply with CRI 104, Section 6.1, "Site Conditions; Temperature and Humidity."
37
38 Environmental Limitations: Do not install carpet tile until wet work in spaces is complete and dry,
39 and ambient temperature and humidity conditions are maintained at the levels indicated for Project
40 when occupied for its intended use.
41
42 Do not install carpet tile over concrete slabs until slabs have cured and are sufficiently dry to bond
43 with adhesive and concrete slabs have pH range recommended by carpet tile manufacturer.
44
45 WARRANTY
46
47 General Warranty: Special warranty specified in this Article shall not deprive Owner of other rights
48 Owner may have under other provisions of the Contract Documents and shall be in addition to, and
49 run concurrent with, other warranties made by Contractor under requirements of the Contract
50 Documents.
51
52 Special Carpet Tile Warranty: Written warranty, signed by carpet tile manufacturer agreeing to
53 replace carpet tile that does not comply with requirements or that fails within specified warranty
54 period. Warranty does not include deterioration or failure of carpet tile due to unusual traffic, failure
55 of substrate, vandalism, or abuse. Failures include, but are not limited to, more than 10 percent
56 loss of face fiber, edge raveling, snags, runs, and delamination.
CARPET TILE
GDA 09681 - 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Warranty Period: 10 years from date of Substantial Completion.
3
4 EXTRA MATERIALS
5
6 Furnish extra materials described below, before installation begins, that match products installed
7 and that are packaged with protective covering for storage and identified with labels describing
8 contents.
9
10 Carpet Tile: Full-size units equal to 2 percent of amount installed for each type indicated,
11 but not less than i sq yd. (8.3 sq. m).
12
13
14 PART 2- PRODUCTS
15
16 CARPET TILE
17
18 Products: Subject to compliance with requirements, provide the following:
19
20 Citadel#100499
21
22 Interface Flooring Systems, Inc.
23 1503 Orchard Hill Road
24 LaGrange, GA 30241
25 Voice 706/882-1891
26 Fax: 706/882-0500
27
28 Contact: Stephanie Glinka
29 Voice 214-497-2340
30
31 INSTALLATION ACCESSORIES
32
33 Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based
34 formulation provided by or recommended by carpet tile manufacturer.
35
36 Adhesives: Water-resistant, mildew-resistant, nonstaining type to suit products and subfloor
37 conditions indicated, that complies with flammability requirements for installed carpet tile and that
38 is recommended by carpet tile manufacturer.
39
40 Vapor Retarder System: Moisture retarder that prevents high moisture and pH from concrete slabs
41 from reaching carpet manufacturer's modular carpet backing. Vapor retarder system protects
42 against up to 15 lbs of moisture and a pH of 12,when tested in accordance with ASTM F1869-04.
43
44 Manufacturer: Moisturegard 2.0, Interface Flooring Systems, Inc.
45
46
47 PART 3- EXECUTION
48
49
50 EXAMINATION
51
52 Examine substrates, areas, and conditions for compliance with requirements for maximum
53 moisture content, alkalinity range, installation tolerances, and other conditions affecting carpet tile
54 performance. Verify that substrates and conditions are satisfactory for carpet tile installation and
55 comply with requirements specified.
56
CARPET TILE
GDA 09681 - 3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following:
2
3 Slab substrates are dry and free of curing compounds, sealers, hardeners, and other
4 materials that may interfere with adhesive bond. Determine adhesion and dryness
5 characteristics by performing bond and moisture tests recommended by carpet tile
6 manufacturer.
7 Subfloor finishes comply with requirements specified in Division 3 Section "Cast-in-Place
8 Concrete"for slabs receiving carpet tile.
9 Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits.
10
11 Proceed with installation only after unsatisfactory conditions have been corrected.
12
13 PREPARATION
14
15 General: Comply with CRI 104, Section 6.2, "Site Conditions; Floor Preparation," and carpet tile
16 manufacturer's written installation instructions for preparing substrates indicated to receive carpet
17 tile installation.
18
19 Use trowelable leveling and patching compounds, according to manufacturer's written instructions,
20 to fill cracks, holes, and depressions in substrates.
21
22 Remove coatings, including curing compounds, and other substances that are incompatible with
23 adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical
24 methods recommended in writing by carpet tile manufacturer.
25
26 Broom and vacuum clean substrates to be covered immediately before installing carpet tile. After
27 cleaning, examine substrates for moisture, alkaline salts, carbonation, or dust. Proceed with
28 installation only after unsatisfactory conditions have been corrected.
29
30 VAPOR RETARDER INSTALLATION
31
32 Installation Method: Place, protect, and repair sheet vapor retarder according to manufacturer's
33 written instructions.
34
35 INSTALLATION
36
37 General: Comply with CRI 104, Section 13, "Carpet Modules (Tiles)."
38
39 Installation Method: Install per manufacturers recommendations.
40
41 Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture
42 including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as
43 recommended by carpet tile manufacturer.
44
45 Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable
46 flanges, alcoves, and similar openings.
47
48 Maintain reference markers, holes, and openings that are in place or marked for future cutting by
49 repeating on finish flooring as marked on subfloor. Use nonpermanent, nonstaining marking
50 device.
51
52 Install pattern as directed by architect.
53
54 CLEANING AND PROTECTION
55
56 Perform the following operations immediately after installing carpet tile:
CARPET TILE
GDA 09681 - 4
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Remove yarns that protrude from carpet tile surface.
3 Vacuum carpet tile using commercial machine with face-beater element.
4
5 Protect installed carpet tile to comply with CRI 104, Section 15, "Protection of Indoor Installations."
6
7 Protect carpet tile against damage from construction operations and placement of equipment and
8 fixtures during the remainder of construction period. Use protection methods indicated or
9 recommended in writing by carpet tile manufacturer.
10
11
12 END OF SECTION 09681
CARPET TILE
GDA 09681 -5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 09900-PAINTING
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of the Contract, including General and Supplementary Conditions
10 and Division 1 Specification Sections, apply to this Section.
11
12 SUMMARY
13
14 This Section includes surface preparation, painting, and finishing of exposed interior and exterior
15 items and surfaces.
16
17 Surface preparation, priming, and finish coats specified in this Section are in addition to shop-priming
18 and surface treatment specified under other Sections.
19
20 Painted exposed surfaces whether or not colors are designated in schedules, except where a surface
21 or material is specifically indicated not to be painted or is to remain natural. Where an item or surface
22 is not specifically mentioned, paint the same as similar adjacent materials or surfaces. If color or
23 finish is not designated,the Architect will select from standard colors or finishes available.
24
25 Painting includes field-painting exposed bare and covered pipes, hanger, exposed steel and
26 iron work, and primed metal surfaces of mechanical and electrical equipment.
27
28 Painting is not required on prefinished items, finished metal surfaces, concealed surfaces, operating
29 parts and labels.
30
31 Prefinished items not to be painted include the following factory-finished components:
32
33 Finished mechanical and electrical equipment.
34
35 Light fixtures.
36
37 Switchgear.
38
39 Distribution cabinets.
40
41 Concealed surfaces not to be painted include wall or ceiling surfaces in the following generally
42 inaccessible areas:
43
44 Foundation spaces.
45
46 Furred areas.
47
48 Utility tunnels.
49
50 Pipe spaces.
51
52 Finished metal surfaces not to be painted include:
53
54 Anodized aluminum.
55
56 Stainless steel.
57
PAINTING
GDA 09900- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Chromium plate.
2
3 Copper.
4
5 Bronze.
6
7 Brass.
8
9 Operating parts not to be painted include moving parts of operating equipment, such as the
10 following:
11
12 Valve and damper operators.
13
14 Linkages.
15
16 Sensing devices.
17
18 Motor and fan shafts.
19
20 Labels: Do not paint over Underwriters Laboratories, Factory Mutual or other code-required
21 labels or equipment name, identification, performance rating, or nomenclature plates.
22
23 Related Sections: The following Sections contain requirements that relate to this Section:
24
25 Division 5 Section "Structural Steel" for shop-priming structural steel.
26
27 Division 5 Section "Metal Fabrications: for shop-priming ferrous metal.
28
29 Division 8 Section "Standard Steel Doors and Frames" for shop-priming steel doors and
30 frames.
31
32 SUBMITTALS
33
34 General: Submit the following according to Conditions of the Contract and Division 1 Specification
35 Sections.
36
37 Product data for each paint system specified, including block fillers and primers.
38
39 Provide the manufacturer's technical information including label analysis and instructions for
40 handling, storage, and application of each material proposed for use.
41
42 List each material and cross-reference the specific coating, finish system, and application.
43 Identify each material by the manufacturer's catalog number and general classification.
44
45 Certification by the manufacturer that products supplied comply with federal, state, and local
46 regulations controlling use of volatile organic compounds (VOCs).
47
48 Samples for initial color selection in the form of manufacturer's color charts.
49
50 After color selection, the Architect will furnish color chips for surfaces to be coated.
51
52 Samples for Verification Purposes: Provide samples of each color and material to be applied, with
53 texture to simulate actual conditions, on representative samples of the actual substrate.
54
55 Provide stepped samples, defining each separate coat, including block fillers and primers.
56 Use representative colors when preparing samples for review. Resubmit until required sheen,
57 color, and texture are achieved.
PAINTING
GDA 09900-2
GDA#12018.00 December 14,2012
Issue for Permit
1
2 Provide a list of material and application for each coat of each sample. Label each sample as
3 to location and application.
4
5 Submit samples on the following substrates for the Architect's review of color and texture only:
6
7 Concrete: Provide two 4-inch-square samples for each color and finish.
8
9 Concrete Masonry: Provide two 4-by-8-inch samples of masonry, with mortar joint in
10 the center,for each finish and color.
11
12 Ferrous Metal: Provide two 4-inch-square samples of flat metal and two 8-inch-long
13 samples of solid metal for each color and finish.
14
15 VOLATILE ORGANIC COMPONENTS (VOC)COMPLIANCE:
16
17 In no circumstance, whether referenced in these specifications or not, shall any material or coating
18 product not in compliance with requirements and regulations for Volatile Organic Components (VOC)
19 of the Environmental Protection Agency (EPA), Occupational Safety Health Administration (OSHA),
20 and any State, County, or Local Air Control District be included on this project. If any product not in
21 compliance with these regulations and requirements is included herein, this clause shall have the
22 effect of removing it from the available products allowed in the work. If any of these regulations or
23 requirements do not have jurisdiction over the locale in which the work is to be performed, this clause
24 shall not have effect on the provisions of this section.
25
26 QUALITY ASSURANCE
27
28 Applicator Qualifications: Engage an experienced applicator who has completed painting system
29 applications similar in material and extent to those indicated for the Project that have resulted in a
30 construction record of successful in-service performance.
31
32 Single-Source Responsibility: Provide primers and undercoat paint produced by the same
33 manufacturer as the finish coats.
34
35 Field Samples: On wall surfaces and other exterior and interior components, duplicate finishes of
36 prepared samples. Provide full-coat finish samples on at least 100 sq. ft. of surface until required
37 sheen, color, and texture are obtained; simulate finished lighting conditions for review of in-place work.
38
39 Final acceptance of colors will be from job-applied samples.
40
41 The Architect will select one room or surface to represent surfaces and conditions for each
42 type of coating and substrate to be painted. Apply coatings in this room or surface according
43 to the schedule or as specified.
44
45 After finishes are accepted, this room or surface will be used to evaluate coating
46 systems of a similar nature.
47
48 DELIVERY, STORAGE,AND HANDLING
49
50 Deliver materials to the job site in the manufacturer's original, unopened packages and containers
51 bearing manufacturer's name and label, and the following information:
52
53 Product name or title of material.
54
55 Product description (generic classification or binder type).
56
57 Manufacturer's stock number and date of manufacture.
PAINTING
GDA 09900-3
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Contents by volume, for pigment and vehicle constituents.
3
4 Thinning instruction.
5
6 Application instructions.
7
8 Color name and number.
9
10 Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient
11 temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition, free of
12 foreign materials and residue.
13
14 Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste
15 daily. Take necessary measures to ensure that workers and work areas are protected from
16 fire and health hazards resulting from handling, mixing, and application.
17
18 JOB CONDITIONS
19
20 Apply water-based paints only when the temperature of surfaces to be painted and surrounding air
21 temperatures are between 50 deg F (10 deg C)and 90 deg F (32 deg C).
22
23 Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air
24 temperatures are between 45 deg F (7 deg C)and 95 deg F (35 deg C).
25
26 Do not apply paint in snow, rain, fog, or mist; or when the relative humidity exceeds 85 percent; or at
27 temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.
28
29 Painting may continue during inclement weather if surfaces and areas to be painted are
30 enclosed and heated within temperature limits specified by the manufacturer during
31 application and drying periods.
32
33 EXTRA STOCK
34
35 Deliver to and store on site where directed by Owner, not less than ten gallons of each type and color
36 used.
37
38
39 PART 2 - PRODUCTS
40
41
42 MANUFACTURERS
43
44 Manufacturer: Subject to compliance with requirements, provide products of one of the following:
45
46 Devoe and Reynolds Co. (Devoe)
47 Fuller O'Brien (Fuller)
48 The Glidden Company (Glidden)
49 Benjamin Moore and Co. (Moore)
50 PPG Industries, Pittsburgh Paints (PPG)
51 Pratt and Lambert(P & L)
52 The Sherwin-Williams Company (S-W)
53
54 Equivalent products of the following companies may be provided after signed approval of the
55 Architect:
56
57 Anchor Paint Co. (Anchor)
PAINTING
GDA 09900- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1 Monarch Paint Co. (Monarch)
2
3 PAINT MATERIALS, GENERAL
4
5 Material Compatibility: Provide block fillers, primers, finish coat materials, and related materials that
6 are compatible with one another and the substrates indicated under conditions of service and
7 application, as demonstrated by the manufacturer based on testing and field experience.
8
9 Material Quality: Provide the manufacturer's best-quality trade sale paint material of the various
10 coating types specified. Paint material containers not displaying manufacturer's product identification
11 will not be acceptable.
12
13 Proprietary Names: Use of manufacturer's proprietary product names to designate colors or
14 materials is not intended to imply that products named are required to be used to the
15 exclusion of equivalent products of other manufacturers. Furnish the manufacturer's material
16 data and certificates of performance for proposed substitutions.
17
18 Colors: Match colors indicated by reference to the manufacturer's standard color designations.
19
20 EXTERIOR FINISH MATERIAL
21
22 Finish Paint: Provide the manufacturer's recommended factory-formulated finish-coat materials that
23 are compatible with the substrate and undercoats indicated.
24
25 Products: Subject to compliance with requirements, provide products as scheduled at the end of this
26 section.
27
28 INTERIOR FINISH PAINT MATERIAL
29
30 Finish Paint: Provide the manufacturer's recomended factory-formulated finish-coat materials that are
31 compatible with the substrate and undercoats indicated.
32
33
34 PART 3- EXECUTION
35
36
37 EXAMINATION
38
39 Examine substrates and conditions under which painting will be performed for compliance with paint
40 application requirements. Surfaces receiving paint must be thoroughly dry before paint is applied.
41
42 Do not begin to apply paint until unsatisfactory conditions have been corrected.
43
44 Start of painting will be construed as the Applicator's acceptance of surfaces and conditions
45 within a particular area.
46
47 Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of
48 the total system for various substrates. On request, furnish information on characteristics of finish
49 materials to ensure use of compatible primers.
50
51 Notify the Architect about anticipated problems using the materials specified over substrates
52 primed by others.
53
54 PREPARATION
55
56 General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures,
57 and similar items already installed that are not to be painted, or provide surface-applied protection
PAINTING
GDA 09900- 5
GDA#12018.00 December 14, 2012
Issue for Permit
1 prior to surface preparation and painting. Remove these items, if necessary, to completely paint the
2 items and adjacent surfaces. Following completion of painting operations in each space or area, have
3 items reinstalled by workers skilled in the trades involved.
4
5 Cleaning: Before applying paint or other surface treatments, clean the substrates of substances that
6 could impair the bond of the various coatings. Remove oil and grease prior to cleaning. Schedule
7 cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet,
8 newly painted surfaces.
9
10 Surface Preparation: Clean and prepare surfaces to be painted according to the manufacturer's
11 instructions for each particular substrate condition and as specified.
12
13 Provide barrier coats over incompatible primers or remove and reprime. Notify Architect in
14 writing about anticipated problems using the specified finish-coat material with substrates
15 primed by others.
16
17 Cementitious Materials: Prepare concrete, and concrete tiltwall panel surfaces to be painted.
18 Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen, as
19 required, to remove glaze. If hardeners or sealers have been used to improve curing, use
20 mechanical methods of surface preparation.
21
22 Use abrasiveor brush-off blast-cleaning methods.
23
24 Determine alkalinity and moisture content of surfaces by performing appropriate tests.
25 If surfaces are sufficiently alkaline to cause the finish paint to blister an burn, correct
26 this condition before application. Do not paint surfaces where moisture content
27 exceeds that permitted in manufacturer's printed directions.
28
29 Prime all surfaces with alkali resistant primers where PH level is 13 or greater.
30
31 Concrete Tiltwall Panels: All patching of concrete tiltwall panels shall be completed at
32 least thirty (30) days prior to applying specified coating. If patchwork is not completed
33 at least thirty (30) days prior to coating, all surfaces shall be tested for alkalinity
34 content and primed with specified primer if PH levels exceed 13.
35
36 Ferrous Metals: Clean ungalvanized ferrous metal surfaces that have not been shop-coated;
37 remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or
38 mechanical cleaning methods that comply with recommendations of the Steel Structures
39 Painting Council (SSPC).
40
41 Blast steel surfaces clean as recommended by the paint system manufacturer and
42 according to requirements of SSPC specification SSPC-SP 10.
43
44 Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat
45 before priming.
46
47 Touch up bare areas and shop applied prime coats that have been damaged. Wire-
48 brush, clean with solvents recommended by the paint manufacturer, and touch up
49 with the same primer as the shop coat.
50
51 Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so that
52 the surface is free of oil and surface contaminants. Remove pretreatment from galvanized
53 sheet metal fabricated from coil stock by mechanical methods.
54
55 Materials Preparation: Carefully mix and prepare paint materials according to manufacturer's
56 directions.
57
PAINTING
GDA 09900- 6
GDA#12018.00 December 14, 2012
Issue for Permit
1 Maintain containers used in mixing and applying paint in a clean condition, free of foreign
2 materials and residue.
3
4 Stir material before application to produce a mixture of uniform density; stir as required during
5 application. Do not stir surface film into material. Remove film and, if necessary, strain
6 material before using.
7
8 Use only thinners approved by the paint manufacturer and only within recommended limits.
9
10 Tinting: Tint each undercoat a lighter shade to facilitate identification of each coat where multiple
11 coats of the same material are applied. Tint undercoats to match the color of the finish coat, but
12 provide sufficient differences in shade of undercoats to distinguish each separate coat.
13
14 APPLICATION
15
16 General: Apply paint according to manufacturer's directions. Use applicators and techniques best
17 suited for substrate and type of material being applied.
18
19 Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to
20 formation of a durable paint film.
21
22 Paint colors, surface treatments, and finishes are indicated in the schedules.
23
24 Provide finish coats that are compatible with primers.
25
26 The number of coats and the film thickness required are the same regardless of the
27 application method. Do not apply succeeding coats until the previous coat has cured as
28 recommended by the manufacturer. Sand between applications where sanding is required to
29 produce a smooth even surface according to the manufacturer's directions.
30
31 Apply additional coats if substrate, undercoats, stains, or other conditions show through final
32 coat of paint until paint film is of uniform finish, color, and appearance. Give special attention
33 to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners,
34 receive a dry film thickness equivalent to that of flat surfaces.
35
36 The term exposed surfaces includes areas visible when permanent or built-in fixtures,
37 convector covers, covers for finned tube radiation, grilles, and similar components are in
38 place. Extend coatings in these areas, as required, to maintain the system integrity and
39 provide desired protection.
40
41 Paint surfaces behind movable equipment and furniture the same as similar exposed
42 surfaces. Before the final installation of equipment, paint surfaces behind permanently fixed
43 equipment or furniture with prime coat only.
44
45 Paint interior surfaces of ducts, where visible through registers or grilles, with a flat,
46 nonspecular black paint.
47
48 Finish exterior doors on tops, bottoms, and side edges same as exterior faces.
49
50 Sand lightly between each succeeding enamel or varnish coat.
51
52 Omit primer on metal surfaces that have been shop-primed and touch-up painted.
53
54 Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise
55 prepared for painting as soon as practicable after preparation and before subsequent surface
56 deterioration.
57
PAINTING
GDA 09900- 7
GDA#12018.00 December 14, 2012
Issue for Permit
1 Allow sufficient time between successive coats to permit proper drying. Do not recoat until
2 paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb
3 pressure, and where application of another coat of paint does not cause the undercoat to lift
4 or lose adhesion.
5
6 Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators
7 according to the manufacturer's directions.
8
9 Brushes: Use brushes best suited for the material applied.
10
11 Rollers: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by the
12 manufacturer for the material and texture required.
13
14 Spray Equipment: Use airless spray equipment with orifice size as recommended by the
15 manufacturer for the material and texture required.
16
17 Minimum Coating Thickness: Apply materials no thinner than the manufacturer's recommended
18 spreading rate. Provide the total dry film thickness of the entire system as recommended by the
19 manufacturer.
20
21 Mechanical and Electrical Work: Painting mechanical and electrical work is limited to items exposed
22 in mechanical equipment rooms and as indicated below:
23
24 Paint PVC roof drain leaders.
25
26 Electrical items to be painted include, but are not limited to, the following:
27
28 Switchgear(if not factory finished).
29 Distribution cabinets (if not factory finished).
30
31 Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete coverage with
32 pores filled.
33
34 Prime Coats: Before applying finish coats, apply a prime coat of material, as recommended by the
35 manufacturer, to material that is required to be painted or finished and that has not been prime-coated
36 by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in
37 first coat appears, to ensure a finish coat with no burn-through or other defects due to insufficient
38 sealing.
39
40 Stipple Enamel Finish: Roll and redistribute paint to an even and fine texture. Leave no evidence of
41 rolling such as laps, irregularity in texture, skid marks, or other surface imperfections.
42
43 Pigmented (Opaque) Finishes: Completely cover to provide a smooth, opaque surface of uniform
44 finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs,
45 sags, ropiness, or other surface imperfections will not be acceptable.
46
47 Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or
48 repaint work not complying with specified requirements.
49
50 FIELD QUALITY CONTROL
51
52 The Owner reserves the right to invoke the following test procedure at any time and as often as the
53 Owner deems necessary during the period when paint is being applied:
54
55 The Owner will engage the services of an independent testing agency to sample the paint
56 material being used. Samples of material delivered to the Project will be taken, identified,
57 sealed, and certified in the presence of the Contractor.
PAINTING
GDA 09900- 8
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 The testing agency will perform appropriate tests for the following characteristics as required
3 by the Owner:
4
5 Quantitative materials analysis.
6 Abrasion resistance.
7 Apparent reflectivity.
8 Flexibility.
9 Washability.
10 Absorption.
11 Accelerated weathering.
12 Dry opacity.
13 Accelerated yellowness.
14 Recoating.
15 Skinning.
16 Color retention.
17 Alkali and mildew resistance.
18
19 If tests results show material being used does not comply with specified requirements, the
20 Contractor may be directed to stop painting, remove noncomplying paint, pay for testing,
21 repaint surfaces coated with rejected paint, and remove rejected paint from previously painted
22 surfaces if, upon repainting with specified paint,the two coatings are incompatible.
23
24 CLEANING
25
26 Cleanup: At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint
27 materials from the site.
28
29 After completing painting, clean glass and paint-spattered surfaces. Remove spattered paint
30 by washing and scraping. Be careful not to scratch or damage adjacent finished surfaces.
31
32 PROTECTION
33
34 Protect work of other trades, whether being painted or not, against damage by painting. Correct
35 damage by cleaning, repairing or replacing,and repainting, as acceptable to Architect.
36
37 Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings
38 provided by others to protect their work after completing painting operations.
39
40 At completion of construction activities of other trades, touch up and restore damaged or
41 defaced painted surfaces.
42
PAINTING
GDA 09900-9
GDA#12018.00 December 14, 2012
Issue for Permit
1 PAINTING SCHEDULE
2 1.1 CONCRETE MASONRY UNIT BLOCK FILLERS
3 A. Concrete Masonry Unit Block Filler: Factory-formulated high-performance latex block fillers.
4 1. Benjamin Moore; Moorcraft Super Craft Latex Block Filler No. 285: Applied at a dry
5 film thickness of not less than 3.1 mils (0.206 mm).
6 2. Kelly-Moore; 521 Fill and Prime Acrylic Block Filler: Applied at a dry film thickness of
7 not less than 10 0 r- (0 254 mm).
8 3. Pittsburgh Paints; 6-7 SpeedHide Interior/Exterior Masonry Latex Block Filler: Applied
9 at a dry film thickness of not less than 3 U to 12.5 rugs (0.152 to 0,318 mm).
10 4. Sherwin-Williams; PrepRite Interior/Exterior Block Filler B25W25: Applied at a dry
11 film thickness of not less than (0.203 mm).
12 1.2 INTERIOR PRIMERS
13 A. Interior Gypsum Board Primer: Factory-formulated latex-based primer for interior
14 application.
15 1. Benjamin Moore; Regal FirstCoat Interior Latex Primer & Underbody No. 216:
16 Applied at a dry film thickness of not less than J mil (0.025 mm).
17 2. Kelly-Moore; 971 Acry-Prime Interior Latex Primer/Sealer: Applied at a dry film
18 thickness of not less than 6 mils (0 041 mm).
19 3. Pittsburgh Paints; 6-2 SpeedHide Interior Quick-Drying Latex Sealer: Applied at a dry
20 film thickness of not less than 1.0 (0.025 mm).
21 4. Sherwin-Williams; PrepRite 200 Latex Wall Primer B28W200 Series: Applied at a dry
22 film thickness of not less than 1.6 mils (0.041 mm).
23 B. Interior Ferrous-Metal Primer: Factory-formulated quick-drying rust-inhibitive alkyd-based
24 metal primer.
25 1. Benjamin Moore; IronClad Alkyd Low Lustre Medal and Wood Enamel No. 163:
26 Applied at a dry film thickness of not less than ' 3 m . (0.033 mm).
27 2. Kelly-Moore; 1711 Kel-Guard Alkyd White Rust Inhibitive Primer: Applied at a dry film
28 thickness of not less than 2.0 mils (0.051 mm).
29 3. Pittsburgh Paints; 7-858 Pittsburgh Paints Industrial Rust Inhibitive Steel Primer:
30 Applied at a dry film thickness of not less than m ,s (0.038 mm).
31 4. Sherwin-Williams; Kem Kromik Universal Metal Primer B50NZ6/B50WZ1: Applied at
32 a dry film thickness of not less than 3 mils (0.076 mm).
33 5. Sherwin-Williams; DTM Acrylic Primer/Finish: Applied at a dry film thickness of not
34 less than 3.0 mils (0.076 mm).
35
PAINTING
GDA 09900- 10
GDA#12018.00 December 14, 2012
Issue for Permit
1 1.3 INTERIOR FINISH COATS
2 A. Interior Flat Acrylic Enamel: Factory-formulated flat acrylic-latex interior enamel.
3 1. Benjamin Moore; Moore's Regal Classic Premium Interior Paint No. 215: Applied at a
4 dry film thickness of not less than 1.4 mils (0.036 mm).
5 2. Kelly-Moore; 1610 Sat-N-Sheen Interior Latex Flat Wall and Trim Finish: Applied at a
6 dry film thickness of not less than 1.7 mils (0.043 mm).
7 3. Pittsburgh Paints; 86-Line Manor Hall Interior Flat Wall and Trim: Applied at a dry film
8 thickness of not less than 1 mils (0.036 mm).
9 4. Sherwin-Williams; SuperPaint Interior Latex Flat Wall Paint A86 Series: Applied at a
10 dry film thickness of not less than '.6 mils (0.041 mm).
11 B. Interior Eggshell Acrylic Enamel: Factory-formulated eggshell acrylic-latex interior enamel.
12 1. Benjamin Moore; Moore's Regal Classic Premium Interior Paint No. 319: Applied at a
13 dry film thickness of not less than m is (0.036 mm).
14 2. Kelly-Moore; 1610 Sat-N-Sheen Interior Latex Low Sheen Wall and Trim Finish:
15 Applied at a dry film thickness of not less than 1.7 mils (0.043 mm).
16 3. Pittsburgh Paints; 89-Line Manor Hall Interior Eggshell Wall and Trim: Applied at a
17 dry film thickness of not less than 1 4 mils (0.036 mm).
18 4. Sherwin-Williams; SuperPaint Interior Latex Satin Wall Paint A87 Series: Applied at a
19 dry film thickness of not less than I 6 'rilS (0.041 mm).
20 C. Interior Semigloss Acrylic Enamel: Factory-formulated semigloss acrylic-latex enamel for
21 interior application.
22 1. Benjamin Moore; Regal Classic Premium Interior Paint No. 333: Applied at a dry film
23 thickness of not less than ' 3 rriis (0.033 mm).
24 2. Kelly-Moore; 1650 Acry-Plex Latex Interior Latex Semi-Gloss Enamel: Applied at a
25 dry film thickness of not less than 1.5 mils (0.038 mm).
26 3. Pittsburgh Paints; 88-110 Satinhide Interior Enamel Wall & Trim Lo-Lustre Semi-
27 Gloss Latex: Applied at a dry film thickness of not less than 1.1 mils (0.028 mm).
28 4. Sherwin-Williams; SuperPaint Interior Latex Semi-Gloss Enamel A88 Series: Applied
29 at a dry film thickness of not less than 1.6 mils (0.041 mm).
30 D. Interior Full-Gloss Acrylic Enamel: Factory-formulated full-gloss acrylic-latex interior enamel.
31 1. Benjamin Moore; Impervex Enamel No. 309: Applied at a dry film thickness of not
32 less than 1 2 m ,s (0.031 mm).
33 2. Kelly-Moore; 1680 Dura-Poxy Gloss Acrylic Enamel: Applied at a dry film thickness of
34 not less than 1.6 mils (0.041 mm).
35 3. Pittsburgh Paints; 51 Line Brilliant Reflections Interior/Exterior Latex Gloss Enamel:
36 Applied at a dry film thickness of not less than 1 3 ails (0.033 mm).
37 4. Sherwin-Williams; ProMar 200 Interior Latex Gloss Enamel B21 W201: Applied at a
38 dry film thickness of not less than 1.5 mils (0.038 mm).
39 E. Interior Acrylic Dryfall: Factory-formulated flat acrylic interior dryfall finish.
40 1. Sherwin-Williams; Waterborne Acrylic Dryfall B42W1: Applied at a dry film
41 thickness/coat of not less than 3.0 to 4.5 mils (0.076 to .114 mm).
42
PAINTING
GDA 09900- 11
GDA#12018.00 December 14, 2012
Issue for Permit
1 1.4 INTERIOR PAINT SCHEDULE
2 A. Concrete Masonry Units: Provide the following finish systems over concrete masonry units:
3 1. Semigloss Acrylic-Enamel Finish: Two finish coats over a block filler.
4 a. Block Filler: Concrete Unit Masonry Block Filler.
5 b. Finish Coats: Interior semigloss acrylic enamel.
6 B. Gypsum Board: Provide the following finish systems over interior gypsum board ceiling
7 surfaces:
8 1. Flat Acrylic-Enamel Finish: Two finish coats over a primer.
9 a. Primer: Interior gypsum board primer.
10 b. Finish Coats: Interior flat acrylic enamel.
11 C. Gypsum Board: Provide the following finish systems over interior gypsum board wall
12 surfaces:
13 1. Low-Luster Acrylic-Enamel Finish: Two finish coats over a primer.
14 a. Primer: Interior gypsum board primer.
15 b. Finish Coats: Interior low-luster acrylic enamel.
16 D. Ferrous Metal: Provide the following finish systems over ferrous metal, except as indicated
17 below:
18 1. Semigloss Acrylic-Enamel Finish: Two finish coats over a primer.
19 a. Primer: Interior ferrous-metal primer.
20 b. Finish Coats: Interior semigloss acrylic enamel.
21 2. Full-Gloss Acrylic-Enamel Finish:Two finish coats over a primer.
22 a. Primer: Interior ferrous-metal primer.
23 b. Finish Coats: Interior full-gloss acrylic enamel.
24 E. Ferrous Metal — Steel Joists, Joist Girders, Steel Roof Deck, HVAC Ducts, Electrical
25 Conduits, Roof Drain Leaders, etcetera (all surfaces): Provide the following finish systems
26 over primed ferrous metal:
27 1. Dryfall Acrylic Finish: Two finish coats over a primer.
28 a. Primer(if not shop primed): DTM Acrylic primer.
29 b. Finish Coats: Interior acrylic dryfall.
30
PAINTING
GDA 09900- 12
GDA#12018.00 December 14, 2012
Issue for Permit
1 1.5 EXTERIOR FINISH COATS
2 A. Exterior Flat Acrylic Paint: Factory-formulated flat acrylic-emulsion latex paint for exterior
3 application.
4 1. Benjamin Moore; MoorLife Latex House Paint No. 105: Applied at a dry film thickness
5 of not less than 1.5 mils (0.038 mm).
6 2. Kelly-Moore; 1240 Acry-Shield Exterior Acrylic Flat Finish: Applied at a dry film
7 thickness of not less than 2.0 mils (0.051 mm).
8 3. Pittsburgh Paints; 72 Line Sun-Proof Exterior Flat Latex House Paint: Applied at a dry
9 film thickness of not less than , 5 mils (0.038 mm).
10 4. Sherwin-Williams; SuperPaint Exterior Latex Flat House and Trim Paint, A80 Series:
11 Applied at a dry film thickness of not less than 1.4 mils (0.036 mm).
12 B. Exterior Low-Luster Acrylic Paint: Factory-formulated low-sheen (eggshell) acrylic-latex
13 paint for exterior application.
14 1. Benjamin Moore; MoorGard Latex House Paint No. 103: Applied at a dry film
15 thickness of not less than 1.1 mils (0.028 mm).
16 2. Kelly-Moore; 1245 Acry-Velvet Exterior Low Sheen Acrylic Finish: Applied at a dry
17 film thickness of not less than ' <. s (0.046 mm).
18 3. Pittsburgh Paints; 76 Line Sun-Proof Exterior House & Trim Acrylic Satin Latex:
19 Applied at a dry film thickness of not less than 1.0 mil (0.025 mm).
20 4. Sherwin-Williams; SuperPaint Exterior Latex Satin Wall Paint A89 Series: Applied at
21 a dry film thickness of not less than 1.4 mils (0.036 mm).
22 C. Exterior Semigloss Acrylic Enamel: Factory-formulated semigloss waterborne acrylic-latex
23 enamel for exterior application.
24 1. Benjamin Moore; MoorGlo Latex House & Trim Paint No. 096: Applied at a dry film
25 thickness of not less than 1 2 ' l:, (0.031 mm).
26 2. Kelly-Moore; 1250 Acry-Lustre Exterior Semi-Gloss Acrylic Finish: Applied at a dry
27 film thickness of not less than '.6 mils (0.041 mm).
28 3. Pittsburgh Paints; 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint:
29 Applied at a dry film thickness of not less than 1.2 mils (0.031 mm).
30 4. Sherwin-Williams; SuperPaint Exterior Gloss Latex A-84 Series: Applied at a dry film
31 thickness of not less than 1.4 mils (0.036 mm).
32 D. Exterior Acrylic Emulsion: Refer to Section 09985—Exterior Acrylic Coating.
33 E. Exterior Full-Gloss Acrylic Enamel for Ferrous and Other Metals: Factory-formulated full-
34 gloss waterborne acrylic-latex enamel for exterior application.
35 1. Benjamin Moore; Impervex Enamel High Gloss Metal & Wood Enamel No. 309:
36 Applied at a dry film thickness of not less than 1 2 mils (0.031 mm).
37 2. Kelly-Moore; 5780 DTM Acrylic Gloss Enamel: Applied at a dry film thickness of not
38 less than 1.7 mils (0.043 mm).
39 3. Pittsburgh Paints; 90-Line Pitt-Tech One Pack Interior/Exterior High Performance
40 Waterborne High Gloss DTM Industrial Enamels: Applied at a dry film thickness of
41 not less than 3.0 mils (0.076 mm).
42 4. Sherwin-Williams; DTM Acrylic Coating Gloss (Waterborne) B66W100 Series:
43 Applied at a dry film thickness of not less than 2 4 mils (0.061 mm).
44
PAINTING
GDA 09900- 13
GDA#12018.00 December 14, 2012
Issue for Permit
1 1.6 EXTERIOR PAINT SCHEDULE
2 A. Concrete Masonry Units (CMU): Provide the following finish systems over exterior CMU
3 substrates:
4 1. Flat Acrylic Finish: Two finish coats.
5 a. Exterior Acrylic Emulsion: Refer to Section 09985—Exterior Acrylic Coating.
6 B. Ferrous Metal: Provide the following finish systems over exterior ferrous metal. Primer is
7 not required on shop-primed items.
8 1. Semigloss Acrylic-Enamel Finish: Two finish coats over a rust-inhibitive primer.
9 a. Primer: Exterior ferrous-metal primer.
10 b. Finish Coats: Exterior semigloss acrylic enamel.
11 2. Full-Gloss Acrylic-Enamel Finish: Two finish coats over a rust-inhibitive primer.
12 a. Primer: Exterior ferrous-metal primer.
13 b. Finish Coats: Exterior full-gloss acrylic enamel for ferrous and other metals.
14 C. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated metal
15 surfaces:
16 1. Semigloss Acrylic-Enamel Finish: Two finish coats over a galvanized metal primer.
17 a. Primer: Exterior galvanized metal primer.
18 b. Finish Coats: Exterior semigloss acrylic enamel.
19 2. Full-Gloss Acrylic-Enamel Finish: Two finish coats over a galvanized metal primer.
20 a. Primer: Exterior galvanized metal primer.
21 b. Finish Coats: Exterior full-gloss acrylic enamel for ferrous and other metals.
22
23 END OF SECTION 09900
PAINTING
GDA 09900-14
GDA#12018.00 December 14, 2012
Issue for Permit
1 GDA SECTION 10155-TOILET COMPARTMENTS
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division-1 Specification sections, apply to work of this section.
11
12 SUMMARY:
13
14 Extent of toilet partitions is indicated on drawings.
15
16 Types of toilet compartments include:
17
18 Metal --baked enamel finish.
19
20 Styles of toilet compartments include:
21
22 Floor-anchored, overhead braced with anti-grip head rails.
23
24 Toilet access ories, such as toilet paper holders, grab bars, purse shelves, are specified elsewhere in
25 Division 10.
26
27 SUBMITTALS:
28
29 Product Data: Submit manufacturer's detailed technical data for materials, fabrication, and
30 installation, including catalog cuts of anchors, hardware, fastenings, and accessories.
31
32 Shop Drawings: Submit shop drawings for fabrication and erection of toilet partition assemblies not
33 fully described by product drawings, templates, and instructions for installation of anchorage devices
34 built into other work.
35
36 Samples: Submit full range of color samples for each type of unit required. Submit 6" square samples
37 of each color and finish on same substrate to be used in work, for color verification after selections
38 have been made.
39
40 QUALITY ASSURANCE:
41
42 Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication
43 where possible, to ensure proper fitting of work. However, allow for adjustments within specified
44 tolerances wherever taking of field measurements before fabrication might delay work.
45
46 Coordination: Furnish inserts and anchorages which must be built into other work for installation of
47 toilet partitions and related work;coordinate delivery with other work to avoid delay.
48
49
50 PART 2- PRODUCTS
51
52
53 MANUFACTURERS:
54
55 Manufacturer: Subject to compliance with requirements, manufacturer offering products which may be
56 incorporated in the work is limited to the following:
57
TOILET COMPARTMENTS
GDA 10155- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Hadrian Manufacturing Inc.
2
3 MATERIALS:
4
5 General: Provide materials which have been selected for surface flatness and smoothness. Exposed
6 surfaces which exhibit pitting, seam marks, roller marks, stains, discolorations, telegraphing of core
7 material, or other imperfections on finished units are not acceptable.
8
9 Steel Sheets for Baked Enamel Finish: ASTM A 591, Class C, galvanized-bonderized, of following
10 minimum thicknesses:
11
12 Construction: Doors, Panels and Pilasters shall be constructed of two sheets of panel flatness
13 zinc-coated steel, Galvanneal ASTM A653 GR33, laminated under pressure to a honeycomb
14 core for sound deadening and rigidity. Formed edges to be welded together and inter-locked
15 under tension with a roll-formed oval crown locking bar, mitred, welded and ground smooth at
16 the corners.
17
18 Doors: Shall be 25mm (1")thick with cover sheets not less than 22ga. (0.8mm).
19
20 Panels: Shall be 25mm (1")thick with cover sheets not less than 22ga. (0.8mm).
21
22 Pilasters: Shall be 32mm (1.25")thick with cover sheets not less than 20 ga. (0.9mm). Pilaster
23 tops shall be reinforced with 20 ga. channel to create extra strength and twist-free rigidity
24 along with minimizing damage by handling and/or shipping.
25
26 Headrail: Shall be 25mm (1") by 41mm (1.625") extruded anodized aluminum with double-
27 ridge anti-grip design. Wall thickness to be 1.5mm (0.060") and shall be securely attached to
28 wall and pilasters with manufacturer's fittings in such a way as to make a strong and rigid
29 installation. All joints in headrails shall be made at pilaster.
30
31 Concealed Anchorage Reinforcement: Minimum 12-gage galvanized steel sheet.
32
33 Concealed Tapping Reinforcement: Minimum 14-gage galvanized steel sheet.
34
35 Core Material for Metal Partitions: Manufacturer's standard sound-deadening, honeycomb, of
36 impregnated Kraft paper, in thickness to provide finished dimension of 1" minimum for doors, panels,
37 and screens, 1-1/4" minimum for pilasters.
38
39 Pilaster Shoes: ASTM A 167, Type 302/304 stainless steel, not less than 3" high, 20 gage, finished to
40 match hardware.
41
42 Brackets (Fittings):
43
44 Full-Height(Continuous) Type: Manufacturer's standard design; stainless steel.
45
46 Hardware and Accessories: Manufacturer's standard design, heavy-duty operating hardware and
47 accessories of chromium-plated non-ferrous cast alloy ("Zamac").
48
49 Anchorages and Fasteners: Manufacturer's standard exposed fasteners of stainless steel, chromium-
50 plated steel, or brass finished to match hardware, with theft-resistant type heads and nuts. For
51 concealed anchors, use hot-dip galvanized, cadmium-plated, or other rust-resistant protective-coated
52 steel.
53
54 FABRICATION:
55
56 General: Furnish standard doors, panels, screens, and pilasters fabricated for partition system,
57 unless otherwise indicated. Furnish units with cutouts, drilled holes, and internal reinforcement to
TOILET COMPARTMENTS
GDA 10155- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1 receive partition-mounted hardware, accessories, and grab bars, as indicated.
2
3 Door Dimensions: Unless otherwise indicated, furnish 24" wide inswinging doors for ordinary toilet
4 stalls and 32"wide (clear opening) outswinging doors at stalls equipped for use by handicapped.
5
6 Metal Toilet Partitions and Screens:
7
8 General: Pressure laminate seamless face sheets to core material and seal edges with continuous
9 interlocking strip or with lapped and formed edges. Weld edges and corners, with exposed welds
10 ground smooth.
11
12 Overhead-Braced Partitions: Furnish galvanized steel supports and leveling bolts at pilasters, as
13 recommended by manufacturer to suit floor conditions. Make provisions for setting and securing
14 continuous extruded aluminum anti-grip overhead-bracing at top of each pilaster. Furnish shoe at
15 each pilaster to conceal supports and leveling mechanism.
16
17 Wall-Hung Screens: Furnish panel units in sizes indicated, of same construction and finish as
18 partition system panels.
19
20 Hardware and Fittings: Furnish hardware for each compartment in partition system, as follows:
21
22 All panel and pilaster brackets and all door hardware shall be chrome plated zinc die castings.
23 Fasteners are zinc plated 12 x 1-3/4" and 12 x 5/8" TR-27 6-lobe security screws. Doors shall be
24 equipped with a gravity type hinge mounted on the lower pilaster hinge bracket. Door hinges shall be
25 fully concealed within the thickness of the door and adjustable to permit the door to come to rest at
26 any position when not latched. Each door to be fitted with a combined coat hook and bumper and a
27 concealed latch, with face mortised flush with edge strip of door. Barrier-free doors shall include
28 thumbturn lever to activate latch without fingertip grip application. Both standard and barrier-free
29 latches shall have a turn slot designed to allow emergency access from exterior. The combined stop
30 and keeper shall have a 19mm (0.75") diameter bumper locked in place. Threaded upper hinge pin
31 shall have a metal core and self-lubricating nylon sleeve to ensure smooth, quiet operation. Pilaster
32 shoes shall be a welded one-piece design made from polished stainless steel. Two-piece shoes that
33 can disassemble when kicked are unacceptable.
34
35 Shelf: Purse shelf(women's only).
36
37 Provide other materials, not specifically described but required for a complete and proper installation.
38
39 FINISHES:
40
41 Clean galvanized steel surfaces after fabrication and before application of powder coating system, to
42 remove processing compounds, oils, and other contaminants.
43
44 All sheet metal to be thoroughly cleaned, phosphated and finished with a high performance powder
45 coating, electrostatically applied and oven cured to provide a uniform, smooth protective finish. Color
46 shall be as selected from Hadrian's color card.
47
48 Color: Linen, #504.
49
50
51 PART 3 - EXECUTION
52
53
54 INSTALLATION:
55
56 General: Comply with manufacturer's recommended procedures and installation sequence. Install
57 partitions rigid, straight, plumb, and level. Provide clearances of not more than 1/2" between pilasters
TOILET COMPARTMENTS
GDA 10155 - 3
GDA#12018.00 December 14, 2012
Issue for Permit
1 and panels, and not more than 1" between panels and walls. Secure panels to walls with not less than
2 two stirrup brackets attached near top and bottom of panel. Locate wall brackets so that holes for wall
3 anchorages occur in masonry or tile joints. Secure panels to pilasters with not less than two stirrup
4 brackets located to align with stirrup brackets at wall. Secure panels in position with manufacturer's
5 recommended anchoring devices.
6
7 Overhead-Braced Partitions: Secure pilasters to floor, and level, plumb, and tighten installation with
8 devices furnished. Secure overhead-brace to each pilaster with not less than two fasteners. Hang
9 doors and adjust so that tops of doors are parallel with overhead-brace when doors are in closed
10 position.
11
12 Screens: Attach with concealed anchoring devices, as recommended by manufacturer to suit
13 supporting structure. Set units to provide support and to resist lateral impact.
14
15 ADJUST AND CLEAN:
16
17 Hardware Adjustment: Adjust and lubricate hardware for proper operation. Set hinges on inswinging
18 doors to hold open approximately 30 degrees from closed position when unlatched. Set hinges on
19 outswinging doors (and entrance swing doors)to return to fully closed position.
20
21 Clean exposed surfaces of partition systems using materials and methods recommended by
22 manufacturer, and provide protection as necessary to prevent damage during remainder of
23 construction period.
24
25 END OF SECTION 10160
TOILET COMPARTMENTS
GDA 10155-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 10260—WALL SURFACE PROTECTION
2
3
4 PART 1 -GENERAL
5
6
7 SUMMARY
8
9 Section Includes:
10
11 Wall protection systems:
12
13 Impact-resistant wall coverings.
14
15 Related Sections/Items:
16
17 Section 06100-Wood blocking and grounds.
18 Section 09250-Gypsum Board:Wall substrates.
19 Section 09900-Painting: Preparation and priming of substrate surfaces.
20
21 SUBMITTALS
22
23 Comply with Section 01330.
24
25 Product data indicating compliance with specified requirements.
26
27 Shop drawings showing methods of attachment to substrate.
28
29 Samples for Initial Selection: For each type of impact-resistant wall-protection unit indicated.
30
31 Samples for Verification: For each type of exposed finish required, prepared on Samples of size
32 indicated below.
33
34 Wall and Corner Guards: 12 inches (300 mm) long. Include examples of joinery, corners,
35 and field splices.
36
37 QUALITY ASSURANCE
38
39 Single Source Responsibility: Obtain wall surface protection system components from a single
40 source.
41
42 Deliver materials in original factory wrappings and containers, clearly labeled with manufacturer and
43 brand name.
44
45 Store materials in original undamaged packages and containers inside a well-ventilated area
46 protected from weather, moisture, soiling, extreme temperatures, and humidity.
47
48 Maintain room temperature within the storage area between 60 deg F (16 deg C) and 80 deg F (27
49 deg C) during the period plastic materials are stored. Keep materials out of direct sunlight to avoid
50 excessive surface temperatures.
51
52 Store rigid plastic corner guard, wall guard and handrail covers in a horizontal position for a minimum
53 of 72 hours, or until the plastic material attains the ambient room installation temperature of between
54 65 deg F (18 deg C)and 75 deg F (24 deg C).
55
56 PROJECT CONDITIONS
57
WALL SURFACE PROTECTION
GDA 10260-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Maintain ambient temperature within building at not less than 65 deg F (18 deg C) or greater than 75
2 deg F (24 deg C)for a minimum 72 hours prior to beginning of installation.
3
4 Do not install wall surface protection system components until the space is enclosed, weatherproof
5 and climate controlled.
6
7 Do not install semi-rigid wall protection systems until temperature is stable and permanent lighting is in
8 place.
9
10 MAINTENANCE
11
12 Maintenance Instructions: Include precautions against cleaning materials and methods that may be
13 detrimental to finishes and performance.
14
15 Replacement Materials: Minimum 2 percent of each type, color, and pattern of wall surface protection
16 materials and components. Include accessory components as required. Replacement materials shall
17 be from the same production run as installed materials. Package with protective coverings and
18 appropriate labels.
19
20
21 PART 2 - PRODUCTS
22
23
24 MATERIALS
25
26 Stainless-Steel Sheet: ASTM A 240/A 240M.
27
28 IMPACT-RESISTANT WALL COVERINGS
29
30 Impact-Resistant Sheet Wall Covering: Fabricated from stainless steel sheet wall-covering material.
31
32 Size: As indicated, and to minimize seams, in longest possible stock lengths to
33 minimize field joints
34
35 Sheet Thickness: 0.028 inch (0.7 mm).
36
37 Finish: No. 4, directional.
38
39 Height: Wainscot, as indicated.
40
41 Mounting: Adhesive and button head sheet metal screws.
42
43 FABRICATION
44
45 Comply with requirements indicated for design, dimensions, details, finish, and member sizes,
46 including wall thicknesses of components.
47
48 Shop-assemble components to the greatest extent possible. Disassemble only as necessary for
49 shipping and handling.
50
51 Fabricate components with tight seams and joints with exposed edges rolled. Provide surfaces free of
52 evidence of wrinkling, chipping, uneven coloration, dents, and other imperfections. Fabricate
53 members and fittings to produce flush, smooth, and rigid hairline joints.
54
55 Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and
56 anchors for interconnection of members to other construction.
57
WALL SURFACE PROTECTION
GDA 10260-2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 PART 3- EXECUTION
3
4
5 EXAMINATION
6
7 Examine areas and conditions in which wall surface protection components and wall protection
8 systems will be installed.
9
10 Complete finishing operations, including painting, before beginning installation of wall surface
11 protection system materials.
12
13 Wall surfaces to receive impact-resistant wall covering materials shall be dry and free from dirt,
14 grease, loose paint, and scale.
15
16 Do not proceed with installations until unsatisfactory conditions have been corrected.
17
18 PREPARATION
19
20 Properly prepare substrate and clean to remove dust, debris, and loose particles.
21
22 INSTALLATION
23
24 Install wall surface protection units plumb, level, and true to line without distortions.
25
26 Do not use materials with scratches, chips, cracks, voids, stains, or other defects that might be visible
27 in the finished work.
28
29 Install impact-resistant wall covering in strict accordance with the manufacturer's instructions.
30
31 Where splices occur in horizontal runs, splice over stud backup or blocking. Abut pieces and install
32 with sheet metal button head screws. Fasten at 16-inches on center, unless manufacturer
33 recommends closer spacing. Apply continuous beads of construction adhesive to wall at 4' on center,
34 immediately prior to application of impact-resistant wall covering. Apply in longest possible stock
35 lengths to minimize field joints.
36
37 CLEANING
38
39 Clean metal impact-resistant wall covering in accordance with the manufacturer's recommendations.
40
41 Remove excess adhesive using methods and materials recommended by manufacturer.
42
43
44 END OF SECTION 10260
WALL SURFACE PROTECTION
GDA 10260-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 10425-SIGNS
2
3
4 PART 1 -GENERAL
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of the Contract, including General and Supplementary Conditions
9 and Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section includes the following types of signs:
14
15 Panel signs.
16
17 Braille plates.
18
19 Specialty metal signage
20
21 Meet with Owner's representative to develop complete list of all necessary signage.
22
23 Related Sections: The following sections contain requirements that relate to this section:
24
25 Division 1 Section"Temporary Facilities"for temporary project identification signs.
26
27 Division 8 Section "Finish Hardware"for schedule of signs required.
28
29 SUBMITTALS
30
31 General: Submit the following in accordance with Conditions of the Contract and Division 1
32 Specification Sections.
33
34 Product Data: Include manufacturer's construction details relative to materials, dimensions of
35 individual components, profiles, and finishes for each type of sign required.
36
37 Shop Drawings: Provide shop drawings for fabrication of signs. Include elevations, and large-scale
38 sections of typical members and other components. Show anchors, grounds, reinforcement,
39 accessories, layout, and installation details.
40
41 Provide message list for each sign required, including large- scale details of wording and
42 layout of lettering.
43 For signs supported by or anchored to permanent construction, provide setting drawings,
44 templates, and directions for installation of anchor bolts and other anchors to be installed as a
45 unit of Work in other Sections.
46
47 Samples: Provide the following samples of each sign component for initial selection of color, pattern
48 and surface texture as required and for verification of compliance with requirements indicated.
49
50 Samples for initial selection of color, pattern, and texture:
51
52 Cast Acrylic Sheet and Plastic Laminate: Manufacturer's color charts consisting of actual
53 sections of material including the full range of colors available for each material required.
54
55 Samples for verification of color, pattern, and texture selected and compliance with requirements
56 indicated:
57
SIGNS
GDA 10425- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Cast Acrylic Sheet and Plastic Laminate: Provide a sample panel not less than 8-1/2 inches
2 by 11 inches for each material, color, texture, and pattern required. On each panel include a
3 representative sample of the graphic image process required, showing graphic style, and
4 colors and finishes of letters, numbers, and other graphic devices.
5
6 QUALITY ASSURANCE
7
8 Single-Source Responsibility: For each separate type of sign required, obtain signs from one source
9 from a single manufacturer.
10
11 Design Criteria: The drawings indicate sizes, profiles, and dimensional requirements of signs. Other
12 signs with deviations from indicated dimensions and profiles may be considered, provided deviations
13 do not change the design concept. The burden of proof of equality is on the proposer.
14
15
16 PART 2- PRODUCTS
17
18 MANUFACTURERS
19
20 Manufacturers: Subject to compliance with requirements, manufacturers that may be incorporated in
21 the work include the following:
22
23 Manufacturers of Panel Signs:
24
25 Series 1000; Andco Industries Corp.
26 ASI SignSystems
27
28 MATERIALS
29
30 Steel:
31
32 Steel Plate: ASTM A 558.
33
34 Acrylic Sheet: ASTM D 4802, Category A-1 (cell-cast sheet), Type UVA (UV absorbing).
35
36 PANEL SIGNS
37
38 Sign Type No. 1:
39
40 Panel Signs: Comply with requirements indicated for materials, thicknesses, finishes, colors, designs,
41 shapes, sizes, and details of construction.
42
43 Produce smooth, even, level sign panel surfaces, constructed to remain flat under installed
44 conditions within a tolerance of plus or minus 1/16 inch measured diagonally.
45
46 Unframed Panel Signs: Fabricate signs with edges mechanically and smoothly finished to conform
47 with the following requirements:
48
49 Edge Condition: Beveled.
50
51 Edge Color for Plastic Laminate: Edge color same as background.
52
53 Corner Condition: Corners rounded to radius indicated.
54
55 Graphic Content and Style: Provide sign copy that complies with the requirements indicated for size,
56 style, spacing, content, position, material, finishes, and colors of letters, numbers, and other graphic
57 devices.
SIGNS
GDA 10425- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Raised Copy: Machine-cut copy characters from matte-finished opaque acrylic sheet and chemically
3 weld onto the acrylic sheet forming sign panel face. Produce precisely formed characters with square
4 cut edges free from burrs and cut marks.
5
6 Panel Material: Matte-finished opaque acrylic sheet.
7
8 Raised Copy Thickness: Not less than 1/32 inch.
9
10 Colors and Surface Textures: For exposed sign material that requires selection of materials with
11 integral or applied colors, surface textures or other characteristics related to appearance, provide
12 color matches indicated, or if not indicated, as selected by the Architect from the manufacturer's
13 standards.
14
15 Color:
16
17 Facing: As selected by Architect.
18
19 Backing: As selected by Architect.
20
21 Copy: As selected by Architect.
22
23 Character Proportion: Letters and numbers on signs shall have a width-to-height ratio between 1:5
24 and 1:10.
25
26 Raised and Brailled Characters: Letters and numerals shall be raised 1/32 in (0.8 mm) minimum,
27 upper case, sans serif, or simple serif type and shall be accompanied with Grade 2 Braille. Raised
28 characters shall be 5/8 in (16mm) high, but no higher than 2 inches (50mm), or as scheduled.
29
30 Mounting Location and Height: Where permanent identification is provided for rooms and spaces,
31 signs shall be installed on the wall adjacent to the latch side of the door. Where there is no wall space
32 to the latch side of the door, including at double leaf doors, signs shall be placed on the nearest
33 adjacent wall. Mounting location for such signage shall be so that a person may approach within 3 in.
34 (76mm)of signage without encountering protruding objects or standing within the swing of a door.
35
36 Sign Type No. 2: Specialty metal corporate logo sign.
37
38 Graphic Content and Style: Provide sign graphic content that complies with the requirements
39 indicated for size, style, spacing, content, position, material, finishes, and colors of letters, numbers,
40 and other graphic devices.
41
42 Material: Cor-Ten steel.
43
44 Thickness: Not less than 1/4 inch.
45
46 Colors and Surface Textures: For sign material that requires selection of materials with integral or
47 applied colors, surface textures or other characteristics related to appearance, provide color matches
48 indicated, or if not indicated, as selected by the Architect from the manufacturer's standards.
49
50 Mounting Location and Height: As indicated on the drawings.
51
52 FABRICATION
53
54 General: Provide manufacturer's standard signs of configurations indicated.
55
56 Welded Connections: Comply with AWS standards for recommended practices in shop
57 welding. Provide welds behind finished surfaces without distortion or discoloration of exposed
SIGNS
GDA 10425- 3
GDA#12018.00 December 14, 2012
Issue for Permit
1 side. Clean exposed welded surfaces of welding flux and dress exposed and contact
2 surfaces.
3
4 Mill joints to tight, hairline fit. Form joints exposed to weather to exclude water penetration.
5
6 Preassemble signs in the shop to greatest extent possible. Disassemble signs only as
7 necessary for shipping and handling limitations. Clearly mark units for reassembly and
8 installation, in location not exposed to view after final assembly.
9
10 Conceal fasteners if possible; otherwise, locate fasteners where they will be inconspicuous.
11
12 FINISHES, GENERAL
13
14 Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
15 recommendations for applying and designating finishes.
16
17 Protect mechanical finishes on exposed surfaces from damage by applying a strippable,
18 temporary protective covering before shipping.
19
20 STEEL FINISHES
21
22 Surface Preparation: Remove mill scale and rust, if present, from uncoated steel, complying
23 with SSPC-SP 5/NACE No. 1, "White Metal Blast Cleaning,"or SSPC-SP 8, "Pickling."
24
25 Finish: Natural or accelerated weathering to match Architect's sample.
26
27 ACRYLIC SHEET FINISHES
28
29 Colored Coatings for Acrylic Sheet: For copy and background colors, provide colored
30 coatings, including inks, dyes, and paints, that are recommended by acrylic manufacturers for
31 optimum adherence to acrylic surface and that are UV and water resistant for five years for
32 application intended.
33
34
35 PART 3- EXECUTION
36
37 INSTALLATION
38
39 General: Locate sign units and accessories where indicated, using mounting methods of the type
40 described and in compliance with the manufacturer's instructions.
41
42 Install signs level, plumb, and at the height indicated, with sign surfaces free from distortion or
43 other defects in appearance.
44
45 Interior Wall Mounted Panel Signs: Attach panel signs to wall surfaces using the methods indicated
46 below:
47
48 Vinyl-Tape Mounting: Use double-sided foam tape, of thickness indicated, to mount signs to
49 smooth, nonporous surfaces. Do not use this method for vinyl-covered or rough surfaces.
50
51 CLEANING AND PROTECTION
52
53 At completion of the installation, clean soiled sign surfaces in accordance with the manufacturer's
54 instructions. Protect units from damage until acceptance by the Owner.
55
56 SCHEDULE OF SIGNS
57
SIGNS
GDA 10425-4
GDA#12018.00 December 14, 2012
Issue for Permit
1 All signs as scheduled on the Drawings.
2
3 END OF SECTION 10425
SIGNS
GDA 10425-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 10505 - METAL LOCKERS
2
3
4 PART 1 - G_ENERAL
5
6
7 RELATED DOCUMENTS
8 Drawings and general provisions of the Contract, including General and Supplementary Conditions
9 and Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12 This Section includes the following:
13 Knocked-down, standard metal lockers.
14 Related Sections include the following:
15 Division 6 Section "Rough Carpentry" for furring, blocking, and shims required for installing
16 metal lockers and concealed within other construction before metal locker installation.
17
18 DEFINITIONS
19 Uncoated Steel Sheet Thicknesses: Indicated as the minimum thicknesses.
20
21 SUBMITTALS
22 Product Data: Include construction details, material descriptions, dimensions of individual
23 components and profiles, and finishes for each type of metal locker and bench.
24 Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
25 Show and other accessories.
26 Samples for Initial Selection: For units with factory-applied color finishes.
27 Samples for Verification: For metal lockers and locker benches, in manufacturer's standard sizes.
28 Maintenance Data: For adjusting, repairing, and replacing locker doors and latching mechanisms to
29 include in maintenance manuals.
30 Warranty: Special warranty specified in this Section.
31
32 QUALITY ASSURANCE
33 Installer Qualifications: An authorized representative of metal locker manufacturer for installation
34 and maintenance of units required for this Project.
35 Source Limitations: Obtain metal lockers and accessories through one source from a single
36 manufacturer.
37 Product Options: Drawings indicate size, profiles, and dimensional requirements of metal lockers
38 and are based on the specific system indicated. Refer to Division 1 Section "Product Requirements."
METAL LOCKERS
GDA 10505- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Do not modify intended aesthetic effects, as judged solely by Architect, except with
2 Architect's approval. If modifications are proposed, submit comprehensive explanatory
3 data to Architect for review.
4 Regulatory Requirements: Where metal lockers are indicated to comply with accessibility
5 requirements, comply with the U.S. Architectural & Transportation Barriers Compliance Board's
6 "Americans with Disabilities Act (ADA), Accessibility Guidelines for Buildings and Facilities
7 (ADAAG)," and California Title 24, Part 2.
8 Provide not less than 1 shelf located no higher than 48 inches (1219 mm) above the floor
9 for forward reach.
10
11 Provide hardware that does not require tight grasping, pinching, or twisting of the wrist, and
12 that operates with a force of not more than 5 lbf(22.2 N).
13 Preinstallation Conference: Conduct conference at Project site to comply with requirements in
14 Division 1 Section "Project Management and Coordination."
15
16 DELIVERY, STORAGE, AND HANDLING
17 Do not deliver metal lockers until spaces to receive them are clean, dry, and ready for metal locker
18 installation.
19
20 PROJECT CONDITIONS
21 Field Measurements: Verify the following by field measurements before fabrication and indicate
22 measurements on Shop Drawings:
23 Established Dimensions: Where field measurements cannot be made without delaying the
24 Work, establish recessed opening dimensions and proceed with fabricating metal lockers
25 without field measurements. Coordinate wall and floor construction to ensure that actual
26 recessed opening dimensions correspond to established dimensions.
27
28 COORDINATION
29 Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related units
30 of Work specified in other Sections to ensure that metal lockers can be supported and installed as
31 indicated.
32
33 WARRANTY
34 Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace
35 components of metal lockers that fail in materials or workmanship, excluding finish, within specified
36 warranty period.
37 Failures include, but are not limited to, the following:
38 Structural failures.
39 Faulty operation of latches and other door hardware.
40 Damage from deliberate destruction and vandalism is excluded.
41 Warranty Period for Knocked-Down Metal Lockers: Two years from date of Substantial
42 Completion.
METAL LOCKERS
GDA 10505 -2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2
3 PART 2- PRODUCTS
4
5
6 MANUFACTURERS
7 In other Part 2 articles where titles below introduce lists, the following requirements apply to product
8 selection:
9 Products: Subject to compliance with requirements, provide the products specified, or
10 Architect approved equivalent.
11
12 MATERIALS
13 Cold-Rolled Steel Sheet: ASTM A 1008, Commercial Steel (CS) Type B, suitable for exposed
14 applications.
15 Fasteners: Zinc- or nickel-plated steel, slotless-type exposed bolt heads, and self-locking nuts or
16 lock washers for nuts on moving parts.
17 Anchors: Select material, type, size, and finish required for secure anchorage to each substrate.
18 Provide nonferrous-metal or hot-dip galvanized anchors and inserts on inside face of
19 exterior walls and elsewhere as required]for corrosion resistance.
20
21 Provide toothed-steel or lead expansion sleeves for drilled-in-place anchors.
22
23 STANDARD METAL LOCKERS
24 Products: Standard Lockers; Lyon Workspace Products
25 Locker Arrangement: 2-tier
26 Locker Size: 12-inches wide by 12-inches deep by 72-inches tall.
27 Product:#5202
28 Body: Assembled by riveting or bolting body components together. Fabricate from unperforated,
29 cold-rolled steel sheet with thicknesses as follows:
30 Tops, Bottoms, Sides and Intermediate Dividers: 0.024 inch, with single bend at sides.
31 Backs: 0.024 inch thick, with full-height, double-flanged connections.
32 Frames: Channel formed; fabricated from 0.0528-inch- (1.35-mm-) thick, cold-rolled steel sheet;
33 lapped and factory welded at corners; with top and bottom main frames factory welded into vertical
34 main frames. Form continuous, integral door strike full height on vertical main frames.
35 Cross Frames between Tiers: Channel formed and fabricated from same material as main
36 frames;welded to vertical frame members.
37 Doors: One-piece; fabricated from 0.0528-inch- (1.35-mm-) thick, cold-rolled steel sheet; formed
38 into channel shape with double bend at vertical edges, and with right-angle single bend at
39 horizontal edges.
40
METAL LOCKERS
GDA 10505-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Reinforcement: Manufacturer's standard reinforcing angles, channels, or stiffeners for
2 doors more than '5 inches (381 mn• wide; welded to inner face of doors.
3
4 Stiffeners: Manufacturer's standard full-height stiffener fabricated from 0.0428-inch- (1.1-
5 I thick, cold-rolled steel sheet; welded to inner face of doors.
6 Door Style:
7 Louvered Vents: No fewer than six louver openings at top and bottom.
8 Hinges: Self-closing; welded to door and attached to door frame with not less than 2 factory-installed
9 rivets per hinge that are completely concealed and tamper resistant when door is closed; fabricated
10 to swing 180 degrees.
11 Hinges: Manufacturer's standard, steel 5 knuckle type.
12 Projecting Door Handle and Latch: Manufacturer's standard, finger-lift latch control designed for use
13 with padlocks; positive automatic, prelocking, pry resistant; chromium-plated, vandal-resistant, lift-up
14 handle.
15 Latch Hooks: Equip doors less than 45 Ie es (1219 mm) high with 2 latch hooks;
16 fabricated from minimum :)96i; ;h- (2.5-mm-)thick steel; welded or riveted to full-height
17 door strikes; with resilient silencer on each latch hook.
18 Provide ADA-Compliant handles for lockers designated for the disabled.
19 Padlocks: Provided by Owner.
20 Equipment: Equip each metal locker with identification plate and the following, unless otherwise
21 indicated:
22 2 Tier Box Units: One double-prong ceiling hook, and three single-prong coat hooks.
23 Finish: Powder coat.
24 Color(s): As indicated on the Drawings, or as selected by Architect.
25 Accessories:
26 Continuous Sloping Tops: Fabricated from standard thickness, but not less than 036 •ich (0.91-
27 mm) nominal-thickness steel sheet.
28 Sloping-top corner fillers, mitered.
29 Individual Sloping Tops: Fabricated from 1.024-inch (0.61-mm' nominal-thickness steel sheet.
30 LOCKER BENCHES
31 Provide bench units with overall assembly height of 17-1/2 inches (445 mm).
32 Bench Tops: Manufacturer's standard one-piece units, with rounded corners and edges.
33 Size: Minimum 9-1/2 inches wide by 48 inches long by 1-1/4 inches thick(508 mm wide by
34 1200 mm long by 32 mm thick).
METAL LOCKERS
GDA 10505 -4
GDA#12018.00 December 14, 2012
Issue for Permit
1 Laminated clear hardwood with one coat of clear sealer on all surfaces and one coat of
2 clear lacquer on top and sides.
3 Fixed Pedestals: Manufacturer's standard supports, with predrilled fastener holes for attaching
4 bench top and anchoring to floor, complete with fasteners and anchors, and as follows:
5 Tubular Steel: 1-1/2-inch- (38-mm-) diameter steel tubing threaded on both ends, with
6 standard pipe flange at top and bell-shaped cast-iron base; with powder-coat finish;
7 anchored with exposed fasteners.
8 Color: Match metal lockers.
9 FABRICATION
10 General: Fabricate metal lockers square, rigid, and without warp; with metal faces flat and free of
11 dents or distortion. Make exposed metal edges free of sharp edges and burrs, and safe to touch.
12 Form body panels, doors, shelves, and accessories from one-piece steel sheet, unless
13 otherwise indicated.
14 Provide fasteners, filler plates, supports, clips, and closures as required for a complete
15 installation.
16 Unit Principle: Fabricate each metal locker with an individual door and frame; individual top, bottom,
17 and back; and common intermediate uprights separating compartments.
18 Knocked-Down Construction: Fabricate metal lockers for nominal assembly at Project site using
19 nuts, bolts, screws, or rivets. Factory weld frame members together to form a rigid, one-piece
20 assembly.
21 Hooks: Manufacturer's standard ball-pointed type, aluminum or steel; zinc plated.
22
23 STEEL SHEET FINISHES
24 General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
25 recommendations for applying and designating finishes.
26 Factory finish steel surfaces and accessories except stainless-steel and chrome-plated surfaces.
27 Surface Preparation: Clean surfaces of dirt, oil, grease, mill scale, rust, and other contaminants that
28 could impair paint bond. Use manufacturer's standard methods.
29 Powder-Coat Finish: Immediately after cleaning and pretreating, electrostatically apply
30 manufacturer's standard, baked-polymer, thermosetting powder finish. Comply with resin
31 manufacturer's written instructions for application, baking, and minimum dry film thickness.
METAL LOCKERS
GDA 10505-5
GDA#12018.00 December 14, 2012
Issue for Permit
1 Color: As indicated on the Drawings, or as selected by Architect from manufacturer's full
2 range.
3 PART 3- EXECUTION
4 EXAMINATION
5 Examine walls, floors, and support bases, with Installer present, for compliance with requirements for
6 installation tolerances and other conditions affecting performance of work.
7 For the record, prepare written report, endorsed by Installer, listing conditions detrimental
8 to performance of work.
9 Proceed with installation only after unsatisfactory conditions have been corrected.
10
11 INSTALLATION
12 General: Install level, plumb, and true; shim as required, using concealed shims.
13 Anchor single rows of metal lockers to walls near top and bottom of lockers.
14 Knocked-Down Metal Lockers: Assemble knocked-down metal lockers with standard fasteners, with
15 no exposed fasteners on door faces or face frames.
16
17 Fixed Locker Benches: Provide no fewer than two pedestals for each bench, uniformly spaced not
18 more than 36 inches(915 mm)apart. Securely fasten tops of pedestals to undersides of bench tops,
19 and anchor bases to floor.
20 ADJUSTING, CLEANING,AND PROTECTION
21 Clean, lubricate, and adjust hardware. Adjust doors and latches to operate easily without binding.
22 Protect metal lockers from damage, abuse, dust, dirt, stain, or paint. Do not permit metal locker use
23 during construction.
24 Touch up marred finishes, or replace metal lockers that cannot be restored to factory-finished
25 appearance. Use only materials and procedures recommended or furnished by metal locker
26 manufacturer.
27
28
29 END OF SECTION 10505
30
METAL LOCKERS
GDA 10505-6
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 10522- FIRE EXTINGUISHERS, CABINETS,AND ACCESSORIES
2
3 PART 1 - GENERAL
4
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section includes the following:
14
15 Fire extinguishers.
16 Fire extinguisher cabinets.
17 Mounting brackets.
18
19 SUBMITTALS
20
21 General: Submit the following in accordance with Conditions of Contract and Division 1 Specification
22 Sections.
23
24 Product data for each type of product specified. For fire extinguisher cabinets include rough-in
25 dimensions, details showing mounting methods, relationships of box and trim to surrounding
26 construction, door hardware, cabinet type and materials, trim style, door construction, panel style, and
27 materials.
28
29 Samples for verification purposes of each type of metal finish required, prepared on metal samples of
30 same thickness and alloy indicated for final unit of Work. Where finishes involve normal color and
31 texture variations, include sample sets showing full range of variations expected.
32
33 QUALITY ASSURANCE
34
35 Single-Source Responsibility: Obtain fire extinguishers and cabinets from one source from a single
36 manufacturer.
37 Coordination: Verify that fire extinguisher cabinets are sized to accommodate fire extinguishers
38 provided by Owner under separate contract of type and capacity indicated.
39
40 UL-Listed Products: Fire extinguishers UL-listed and bear UL "Listing Mark" for type, rating, and
41 classification of extinguisher.
42
43 FM-Listed Products: Fire extinguishers approved by Factory Mutual Research Corporation for type,
44 rating, and classification of extinguisher and carry appropriate FM marking.
45
46
47 PART 2- PRODUCTS
48
49
50 MANUFACTURERS
51
52 Manufacturers: Subject to compliance with requirements, provide products the following:
53
54 Allenco.
55 J.L. Industries.
56 Larsen's Manufacturing Co.
Fire Extinguishers, Cabinets&Access.
10522- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 Walter Kidde, Division of Kidde, Inc.
2
3 FIRE EXTINGUISHERS
4
5 General: Provide fire extinguishers for each extinguisher cabinet and other locations indicated, in
6 colors and finishes selected by Architect from manufacturer's standard, which comply with
7 requirements of governing authorities.
8
9 Fill and service extinguishers to comply with requirements of governing authorities and
10 manufacturer.
11
12 Abbreviations indicated below identify extinguisher types related to UL classification and
13 rating system and not necessarily to type and amount of extinguishing material contained in
14 extinguisher.
15
16 Multipurpose Dry Chemical Type: UL-rated 2-A:10:B:C, 5-lb nominal capacity, in enameled steel
17 container.
18
19 MOUNTING BRACKET S
20
21 Provide brackets designed to prevent accidental dislodgement of extinguisher, of sizes required for
22 type and capacity of extinguisher indicated in plated finish.
23
24 Identify bracket-mounted extinguishers with red letter decals spelling "FIRE EXTINGUISHER" applied
25 to wall surface. Letter size, style, and location as selected by Architect.
26
27 FIRE EXTINGUISHER CABINETS
28
29 General: Provide fire extinguisher cabinets for all cabinets in private offices, open office areas,
30 corridors, and public spaces of suitable size for housing fire extinguishers of types and capacities
31 indicated.
32
33 Construction: Manufacturer's standard enameled steel box, with trim, frame, door, and hardware to
34 suit cabinet type, trim style, and door style indicated. Weld all joints and grind smooth. Miter and weld
35 perimeter door frames.
36
37 Cabinet Type: Suitable for mounting conditions indicated,of the following types:
38
39 Semi-recessed Cabinet (indicated as FEC-SR on the Drawings): Cabinet box partially recessed
40 in walls of sufficient depth to suit style of trim indicated; with one-piece combination trim and
41 perimeter door frame overlapping surrounding wall surface with exposed trim face and wall return
42 at outer edge (backbend). Provide where walls are of insufficient depth for recessed cabinets but
43 are of sufficient depth to accommodate semi-recessed cabinet installation.
44
45 Rolled-Edge Trim: 3-incn backbend depth.
46
47 Trim Metal: Of same metal and finish as door.
48
49 Product: Subject to compliance with requirements, provide the following product:
50
51 Product: 1017V10, JL Industries
52
53 Door Material and Construction: Manufacturer's standard door construction, of material indicated,
54 coordinated with cabinet types and trim styles selected.
55
Fire Extinguishers, Cabinets&Access.
10522-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Enameled Steel: Manufacturer's standard finish, hollow steel door construction with tubular
2 stiles and rails.
3
4 Identify fire extinguisher in cabinet with lettering spelling "FIRE EXTINGUISHER" applied to door.
5 Provide lettering to comply with requirements indicated for letter style, color, size, spacing, and
6 location or, if not otherwise indicated, as selected by Architect from manufacturer's standard
7 arrangements.
8
9 Application Process: Silk screen.
10
11 Door Style: Manufacturer's standard design.
12
13 Duo Panel: Vertical duo panel with frame.
14
15 Silk-screen lettering or design as indicated.
16
17 Door Glazing: Acrylic sheet.
18
19 Acrylic Sheet Color: Clear transparent acrylic sheet.
20
21 Door Hardware: Provide manufacturer's standard door-operating hardware of proper type for cabinet
22 type, trim style, and door material and style indicated. Provide either lever handle with cam action
23 latch, or door pull, exposed or concealed, and friction latch. Provide concealed or continuous-type
24 hinge permitting door to open 180 deg.
25
26 FINISHES FOR FIRE EXTINGUISH E R CABINETS, GENERAL
27
28 Comply with NAAMM "Metal Finishes Manual" for recommendations relative to application and
29 designations of finishes.
30
31 Protect mechanical finishes on exposed surfaces from damage by application of strippable, temporary
32 protective covering prior to shipment.
33
34 FIRE EXTINGUISHER CABINET FINISHES
35
36 Interior Surfaces:
37
38 Surface Preparation: Solvent-clean surfaces in compliance with SSPS-SP 1 to remove dirt, oil,
39 grease, and other contaminants that could impair paint bond. Remove mill scale and rust, if present,
40 from uncoated steel in compliance with SSPC-SP 5 (White Metal Blast Cleaning) or SSPC-SP 8
41 (Pickling).
42
43 Baked Enamel Finish: Immediately after cleaning and pretreatment, apply manufacturer's standard 2-
44 coat baked enamel finish consisting of prime coat and thermosetting topcoat. Comply with paint
45 manufacturer's instructions for application and baking to achieve a minimum dry film thickness of 2.0
46 mils.
47
48 Color and Gloss: As selected by Architect from manufacturer's standard choices for color and
49 gloss.
50
51
52 PART 3- EXECUTION
53
54
55 INSTALLATION
56
Fire Extinguishers, Cabinets&Access.
10522-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 Install items included in this section in locations and at mounting heights indicated, or if not indicated,
2 at heights to comply with applicable regulations of governing authorities. Obtain Owner approval of all
3 locations prior to installation of any extinguishers, or accessories.
4
5 Prepare recesses in walls for fire extinguisher cabinets as required by the type and size of
6 cabinet and style of trim and to comply with manufacturer's instructions.
7
8 Fire-Protection Cabinets: 48 inch( above finished floor to top of cabinet.
9
10 Mounting Brackets: ^R inr.hcr: above finished floor to top of fire extinguisher.
11
12 Fire-Protection Cabinets: Fasten fire-protection cabinets to structure, square and plumb.
13
14 Provide brackets for all extinguishers in mechanical rooms, warehouse areas and where shown on
15 Drawings.
16
17 Securely fasten mounting brackets to structure, square and plumb, to comply with
18 manufacturer's instructions.
19
20 Provide Multi-Purpose Dry Chemical type fire extinguishers at locations indicated on the drawings and
21 in accordance with Fire Department requirements.
22
23 Where exact location of fire extinguishers is not indicated, locate as directed by Architect.
24
25
26 END OF SECTION 10522
Fire Extinguishers, Cabinets&Access.
10522- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 10530- EXTRUDED ALUMINUM WALKWAY COVERS
2
3
4 PARTI -GENERAL
5
6
7 RELATED DOCUMENTS:
8
9 The bidding requirements, general conditions, supplementary conditions, drawings and requirements
10 of division one specification shall apply to work specified in this section.
11
12 DESCRIPTION OF WORK:
13
14 The extent of aluminum walkway cover decking is shown on the drawings and as specified herein.
15
16 Definition: Extruded Aluminum Decking shall consist entirely of extruded aluminum sections (roll-
17 formed not acceptable). System shall consist of decking, fascia, accessory items and hardware to
18 provide a complete system.
19
20 Water shall drain from deck into designated beams and out at grade level of columns through
21 weepholes.
22
23 SUBMITTALS
24
25 Shop Drawings: Submit detailed drawings, layout of walkway cover system, bent locations (identify
26 drain columns and wet bents), all mechanical joint locations with complete details, connections,
27 jointing and accessories. Include details of concrete footings and bent anchorage.
28
29 Product Data: Submit manufacturer's product data, specifications, component performance data
30 and installation instructions.
31
32 Calculations: Provide signed and sealed structural calculations for the proposed walkway cover, by a
33 professional engineer registered in the state of Oregon, who professes his discipline to be structural
34 engineering.
35
36 QUALITY ASSURANCE
37
38 Codes and Standards: Comply with provisions of the following except as other-wise indicated:
39
40 Standard Building Code, latest addition with amendments, if any.
41
42 AWS (American Welding Society)standards for structural aluminum welding.
43
44 Manufacturer: Obtain aluminum covered walkway system from only one (1) manufacturer, although
45 several may be indicated as offering products complying with requirements.
46
47 Installer Qualification: Firm with not less than three (3) years experience in installation of aluminum
48 walkway covers of type, quantity and installation methods similar to work of this section.
49
50 Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication
51 where possible, to insure proper fitting of work. However, allow for adjustments within specified
52 tolerations wherever taking of field measurements before fabrication might delay work.
53
54 Coordination: Coordinate work of this section with work of other sections which interface with covered
55 walkway system (sidewalks, curbs, building fascias, etc.).
56
EXTRUDED ALUMINUM WALKWAY COVERS
GDA 10530- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1 PERFORMANCE REQUIREMENTS:
2
3 System Performance: Provide aluminum covered walkway system that has been designed, produced,
4 fabricated and installed to withstand normal temperature changes as well as live loading, dead loading
5 and wind loading in compliance with local or state building code requirements for geographic area in
6 which work is located and as follows:
7
8 Live Load: 30 psf, minimum
9
10 Structural design for wind forces: Comply with ANSI A58.1-1982
11
12 Design Wind Velocity: 90 mph.
13
14 Importance Factor: 1.0.
15
16 Stability Criteria: Building code for the State of Oregon.
17
18 Sizes shown on drawings are to be considered minimum.
19
20 Structure shall be capable of sustaining severe icing, hail, hurricane force winds and supporting a
21 concentrated load such as being walked upon.
22
23 WARRANTY:
24
25 Manufacturer shall warrant the entire system against defects in labor and materials for a
26 period of one (1) year commencing on the date of substantial completion as established in
27 Division One of these specifications.
28
29 Intention of this warranty is the manufacturer will come onto the jobsite and do all necessary
30 to effect corrections of any deficiencies.
31
32 Prima Facie Evidence of defects in labor and material may include but is not limited to, one or
33 more of the following:
34
35 Moisture leaks
36
37 Metal failure including excessive deflection
38
39 Fastener failure
40
41 Finish failure
42
43
44 PART 2 - PRODUCT
45
46
47 ACCEPTABLE MANUFACTURERS
48
49
50 Basis-of-Design: Aluminum decking by MAPES Architectural Canopies is specified as the standard of
51 quality.
52
53 MATERIALS
54
55 All aluminum extrusions shall be alloy 6063 heat treated to a T-6 temper.
56
EXTRUDED ALUMINUM WALKWAY COVERS
GDA 10530- 2
GDA#12018.00 December 14, 2012
Issue for Permit
1 Standard finish for all components shall be satin anodize 204-R1 meeting Aluminum Association
2 Specification AA-M-10C-22A-21.
3
4 Fasteners:
5
6 Deck Screws (rivets not permitted): Type 18-8 non-magnetic stainless steel sealed with a
7 neoprene"0"ring beneath 5/8"outside dimension, conical washer.
8
9 Fascia Rivets: Size 3/16" by 1/2"grip range aluminum rivets with aluminum mandrel.
10
11 Bolts: All bolts, nuts and washers to be 18-8 non-magnetic stainless steel.
12
13 Tek Screws: not permitted
14
15 FABRICATION
16
17 Comply with indicated profiles, dimensioned requirements and structural requirements.
18
19 Use sections true to details with clean, straight, sharply defined profiles and smooth surfaces of
20 uniform color and texture, free from defects impairing strength and durability.
21
22 All welding do be done by heli-arc process.
23
24 Bents shall consist of shop welded one piece units. When size of bents do not permit shipment as a
25 welded unit, concealed mechanical joints may be used.
26
27 Mechanical joints shall consist of stainless steel bolts with a minimum of two (2) bolts per fastening.
28 Bolts and nuts shall be installed in a concealed manner utilizing 1/2" thick by 1 1/2" aluminum bolt
29 bars welded to structural members.
30 All such mechanical joints must be detailed on shop drawings showing all locations.
31
32 Roof Deck: Extruded Aluminum shapes, interlocking self-flashing sections. Shop fabricate to lengths
33 and panels widths required for field assembly. Depth of sections to comply with structural
34 requirements. Provide shop induced camber in deck units with spans greater than 16'- 0" to offset
35 dead load deflections. Welded dams are to be used at non-draining ends of deck.
36
37 Expansion joints, design structure for thermal expansion and contraction. Provide expansion joints as
38 required.
39
40 Exposed rivets used to fasten bottom of fascia to deck to have finish to match fascia.
41
42 Apply a shop applied dip-coat of clear acrylic enamel to each column end terminating in concrete to
43 insulate from electrolytic reaction. Column ends shall be pierced to "key" grout to bent for maximum
44 uplift protection.
45
46 FINISH:
47
48 Manufacturer's standard baked enamel finish for decking and fascia, and polyurethane for bents and
49 columns.
50
51 Color:As selected by Architect.
52
53
54 PART 3-EXECUTION
55
56
EXTRUDED ALUMINUM WALKWAY COVERS
GDA 10530-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 DELIVERY, STORAGE AND HANDLING:
2
3 Deliver, store and handle covered walkway system components as recommended by manufacturer.
4 Handle and store in a manner to avoid deforming members and to avoid excessive stresses.
5
6 EXAMINATION
7
8 Examine adjacent work for conditions that would prevent quality installation of system.
9
10 Do not proceed until defects are corrected.
11
12 CONCRETE FOOTINGS
13
14 Concrete footings are not work of this section. Refer to"concrete work", Section 03310.
15
16 Sleeves (styrofoam blockouts) shall be furnished by walkway cover manufacturer and placed by
17 general contractor.
18
19 FIELD DIMENSIONS
20
21 General contractor shall field confirm bent locations, dimensions and elevations shown on shop
22 drawings prior to fabrication.
23
24 INSTALLATION
25
26 Erection: Set roof support frames (bents) into pockets provided in top of footings; set to required
27 elevations, align, plumb and level; and grout in place with 2,000 p.s.i. portland cement grout. Assure
28 that grout fills all voids and "keys" to columns. Fill downspout units with grout to bottom of discharge
29 level. Install aluminum deflectors after grouting. Follow manufacturer's instructions. Match to finish
30 and elevation of adjacent sidewalks.
31
32 Install roof deck sections, accessories and related flashing in accordance with manufacturer's
33 instructions. Provide roof slope for rain drainage without ponding water. Align and anchor roof deck
34 units to structural support frames.
35
36 Assemble all components in a neat, workmanlike manner.
37
38 FLASHING
39
40 Flashings: Flashings required between covered walkway system and adjoining structures are not
41 work of this section. Refer to"Flashing and Sheet Metals", Section 07600.
42
43 CLEANING AND PROTECTION
44
45 Damaged Units: Replace roof deck panels and other components of the work which have been
46 damaged or have deteriorated beyond successful minor repair.
47
48 Cleaning: Remove protective coverings at time in project construction sequence which will afford
49 greatest protection of work. Clean finished surfaces as recommended by manufacturer. Maintain in a
50 clean condition during construction.
51
52 Protection: Advise Contractor of protection and surveillance procedures, as required to ensure that
53 work of this section will be without damage or deterioration at time of substantial completion.
54
55
56 END OF SECTION 10530
EXTRUDED ALUMINUM WALKWAY COVERS
GDA 10530- 4
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 10800-TOILET ACCESSORIES
2
3 PART 1 -GENERAL
4
5
6 RELATED DOCUMENTS
7
8 Drawings and general provisions of Contract, including General and Supplementary Conditions and
9 Division 1 Specification Sections, apply to this Section.
10
11 SUMMARY
12
13 This Section includes the following toilet accessory items:
14
15 As scheduled on the drawings.
16
17 SUBMITTALS
18
19 General: Submit the following in accordance with Conditions of Contract and Division 1 Specifications
20 Sections.
21
22 Product Data for each toilet accessory item specified, including details of construction relative to
23 materials, dimensions, gages, profiles, method of mounting, specified options, and finishes.
24 Samples: When requested, full-size samples of each toilet accessory item for verification of design,
25 operation, and finish requirements. Acceptable samples will be returned and may be used in the
26 work.
27
28 Schedule: Indicating types, quantities, sizes, and installation locations (by room) for each toilet
29 accessory item to be provided for project.
30
31 Setting Drawings: Where cutouts are required in other work, provide templates, substrate preparation
32 instructions, and directions for preparing cutouts and for installation of anchorage devices.
33
34 QUALITY ASSURANCE
35
36 Inserts and Anchorages: Furnish inserts and anchoring devices that must be set in concrete or built
37 into masonry; coordinate delivery with other work to avoid delay.
38
39 Single-Source Responsibility: Provide products of same manufacturer for each type of accessory unit
40 and for units exposed to view in same areas, unless otherwise acceptable to Architect.
41
42 PROJECT CONDITIONS
43
44 Coordination: Coordinate accessory locations, installation, and sequencing with other work to avoid
45 interference and to assure proper installation, operation, adjustment, cleaning, and servicing of toilet
46 accessory items.
47
48 WARRANTY
49
50 Special Project Warranty: Provide manufacturer's written 5-year warranty against silver spoilage of
51 mirrors, agreeing to replace any mirrors that develop visible defects within warranty period.
52
53
54 PART 2- PRODUCTS
55
56
57 ACCEPTABLE MANUFACTURERS
TOILET ACCESSORIES
GDA 10800- 1
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Manufacturers: Subject to compliance with requirements, provide toilet accessories by one of the
3 following:
4
5 Bradley Corporation, or Architect approved equal from:
6
7 American Specialties, Inc.
8 Bobrick Washroom Equipment, Inc.
9
10 MATERIALS, GENERAL
11
12 Stainless Steel: AISI Type 302/304, with polished No. 4 finish, 22-gage (.034-inch) minimum
13 thickness, unless otherwise indicated.
14
15
16 Galvanized Steel Mounting Devices: ASTM A 153, hot-dip galvanized after fabrication.
17
18 Fasteners: Screws, bolts, and other devices of same material as accessory unit or of galvanized steel
19 where concealed.
20
21 Keys: Unless otherwise indicated, provide universal keys for access to toilet accessory units requiring
22 internal access for servicing, resupply, etc. Provide minimum of six (6) keys to Owner's representative
23 and obtain receipt.
24
25 FABRICATION
26
27 General: No names or labels are permitted on exposed faces of toilet accessory units. On either
28 interior surface not exposed to view or on back surface, provide identification of each accessory item
29 by either a printed, waterproof label or a stamped nameplate indicating manufacturer's name and
30 product model number.
31
32 Surface-Mounted Toilet Accessories, General: Except where otherwise indicated, fabricate units with
33 tight seams and joints, exposed edges rolled. Hang doors or access panels with continuous stainless
34 steel piano hinge. Provide concealed anchorage wherever possible.
35
36 Framed Mirror Units, General: Fabricate frames for glass mirror units to accommodate wood, felt,
37 plastic, or other glass edge protection material. Provide mirror backing and support system that will
38 permit rigid, tamperproof glass installation and prevent accumulation of moisture, as follows:
39
40 Provide galvanized steel backing sheet, not less than 22 gage (.034 inch) and full mirror size,
41 with nonabsorptive filler material. Corrugated cardboard is not an acceptable filler material.
42
43 Mirror Unit Hangers: Provide system of mounting mirror units that will permit rigid, tamperproof, and
44 theftproof installation, as follows:
45
46 Heavy-duty wall brackets of galvanized steel, equipped with concealed locking devices
47 requiring special tool to remove.
48
49
50 PART 3- EXECUTION
51
52
53 INSTALLATION
54
55 Install toilet accessory units in accordance with manufacturers' instructions, using fasteners
56 appropriate to substrate and recommended by manufacturer of unit. Install units plumb and level,
57 firmly anchored in locations and at heights indicated.
TOILET ACCESSORIES
GDA 10800- 2
GDA#12018.00 December 14,2012
Issue for Permit
1
2 Secure mirrors to walls in concealed, tamperproof manner with special hangers, toggle bolts, or
3 screws. Set units plumb, level, and square at locations indicated, in accordance with manufacturer's
4 instructions for type of substrate involved.
5
6 ADJUSTING AND CLEANING
7
8 Adiust toilet accessories for proper operation and verify that mechanisms function smoothly. Replace
9 damaged or defective items.
10
11 Clean and polish all exposed surfaces in strict accordance with manufacturer's recommendations after
12 removing temporary labels and protective coatings.
13
14 TOILET ACCESSORY SCHEDULE
15
16 Refer Drawings.
17
18
19 END OF SECTION 10800
TOILET ACCESSORIES
GDA 10800-3
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 10990- MISCELLANEOUS SPECIALTIES
2
3
4 PART 1 - GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Provisions established within the General and Supplementary General Conditions of the Contract,
10 Division 1 -General Requirements,and the Drawings are collectively applicable to this Section.
11
12 SECTION INCLUDES
13
14 Section Includes: Miscellaneous specialty items as listed herein:
15
16 High security key box
17 Knox Box Pedestal
18 Access Control Device Pedestals for Swing Gates
19
20 Related Sections:
21
22 Swing gates specified in Division 2 section"Ornamental Metal Fencing System."
23
24 Pedestals for access controls for sliding cantilever gates specified in Division 2 section "Gate
25 Operator."
26
27 SUBMITTALS
28
29 General: Submit following items in accordance with Section 01340.
30
31 Product Data: Including all pertinent performance characteristics and criteria.
32
33 Shop Drawings: Indicate materials,construction, sizes, quantities, finishes, and installation details.
34
35 QUALITY ASSURANCE
36
37 Pre-order Confirmation: Prior to ordering television brackets, confirm with Owner television bracket is
38 adequate to support size and weight of television to be installed by Owner.
39
40 Coordinate layout and installation of television brackets and concealed wall bracing with other
41 construction including electrical and communication cabling.
42
43 DELIVERY, STORAGE AND HANDLING
44
45 Deliver, store, handle, and protect products in accordance with Section 01600.
46
47
48 PART 2- PRODUCTS
49
50
51 HIGH SECURITY KEY BOX
52
53 General: High security key box, recess mounted with hinged door, UL Listed tamper switches, 'A-inch
54 steel plate housing, Winch thick steel door with interior gasket seal and stainless steel door hinge.
MISCELLANEOUS SPECIALTIES
GDA 10990- 1
GDA #12018.00 December 14, 2012
Issue for Permit
1 Box and lock shall be UL Listed. Lock has 1/8-inch thick stainless steel dust cover with tamper seal
2 mounting capability.
3
4 Manufacturer: 3200 Series Knox Box Recessed, Knox Company, aluminum finish.
5
6 KNOX BOX AND ACCESS CONTROL DEVICE PEDESTAL
7
8 Access Control Device Pedestals: Steel, mounted to concrete pad as indicated on Drawings.
9
10 Manufacturer: Model 42-9C, The Pedestal Company
11
12 Pedestal CEO
13 561 Wilderness Dr.
14 Alpine, UT 84004
15 Ph: (800)660-3072
16 FX: (801)907-7773
17 info(c pedestalCEO.com
18
19
20 PART 3- EXECUTION
21
22
23 EXAMINATION
24
25 Verify that surfaces and conditions are ready to receive work of this Section.
26
27 Notify General Contractor of any existing conditions that will adversely affect execution.
28
29 Beginning of execution will constitute acceptance of existing conditions.
30
31 PREPARATION
32
33 Prepare substrate surfaces as recommended by manufacturer.
34
35 INSTALLATION
36
37 Install using skilled workmen in accordance with manufacturer's printed instructions and
38 recommendations.
39
40 High security Key Box and Pedestals: Install at locations indicated by the Drawings to comply with
41 device manufacturer's written instructions. Provide for two locations
42
43 Card Reader Pedestals: Install at locations indicated by the Drawings to comply with device
44 manufacturer's written instructions.
45
46 ADJUSTING/CLEANING
47
48 Adjust and fit items to be flush with adjacent construction.
49 Fasten or adhere for tight connections and joints.
50
51
52 END OF SECTION
MISCELLANEOUS SPECIALTIES
GDA 10990-2
GDA#12018.00 December 14, 2012
Issue for Permit
1 SECTION 12500- HORIZONTAL LOUVER BLINDS
2
3
4 PART 1 -GENERAL
5
6
7 RELATED DOCUMENTS
8
9 Drawings and general provisions of Contract, including General and Supplementary Conditions and
10 Division 1 Specification Sections,apply to this section.
11
12 SUMMARY
13
14 This Section includes basic window treatment as follows:
15
16 Horizontal blinds.
17
18 SUBMITTALS
19
20 General: Submit the following in accordance with Conditions of Contract and Division 1
21 Specification Sections.
22
23 Product data and installation instructions for each type of window treatment unit required. Include
24 methods of installation for each kind of opening and supporting structure.
25
26 Shop drawings for special components and application conditions that are not fully dimensioned or
27 detailed in manufacturers' product data. Show relationships to adjoining work.
28
29 Include typical elevation layout indicating proposed division between blind units and
30 meeting edges at corners. Provide sections and details at head and sill between blind
31 units and corners including inclined installations.
32
33 Provide schedule of all units to be furnished, including field measurements at each location.
34
35 Samples for initial selection of colors, in form of manufacturers' color charts consisting of sections of
36 exposed components with integral or applied finishes showing full range of colors and materials.
37
38 Samples for verification purposes, in full-size units of each component, material, and finish to be
39 exposed to view, for each type of window treatment required. Prepare samples from same materials
40 to be used for fabricating units.
41
42 In addition, submit one complete small operating unit for each type of window treatment
43 required.
44
45 QUALITY ASSURANCE
46
47 General: Provide units produced by one manufacturer for each type required, with complete
48 standard assemblies including hardware, accessory items, mounting brackets, and fastenings.
49
50 Furnish materials in colors and patterns selected by Architect from manufacturer's standard
51 colors/patterns.
52
53
54
55 PART 2 - PRODUCTS
56
57
HORIZONTAL LOUVER BLINDS
GDA 12500-1
GDA#12018.00 December 14, 2012
Issue for Permit
1 MODEL MANUFACTURER
2
3 Model/Manufacturers: Subject to compliance with requirements, provide products of the following:
4
5 Lightlines; Hunter Douglas,or Architect approved equivalent.
6
7 HORIZONTAL BLINDS
8
9 Headrail: Channel-shaped section complete with tilting mechanism, top and end braces, top
10 cradles, cord lock, and accessory items required for type of blind and installation.
11
12 Bottom Rail: Tubular steel bottom rail, designed to withstand twisting or sagging. Contour top
13 surface to match slat curvature, with flat or slightly curved bottom. Close ends with metal or plastic
14 end caps of same color as rail. Finish rail in same color as slats.
15
16 Slats: Spring-tempered aluminum (louver blades), rounded corners with forming burrs removed, as
17 follows:
18
19 Slat Width: 1-inch (25mm) nominal slats,with other components sized to suit.
20
21 Ladders: Designed to support and maintain slats at proper spacing and alignment in open and
22 closed positions, as follows:
23
24 Braided polyester cord design consisting of vertical components of not less than 0.043-inch
25 nor more than 0.068-inch in diameter and integrally braided ladder rungs of not less than 4
26 threads; space ladders not further than 23 inches apart and 7 inches from ends of slats.
27
28 Tilting Mechanism: Assembly including disengaging worm and gear mechanism to eliminate
29 overdrive, low-friction gear tilter, drum and cradle at each ladder, tilt rod, tape clips, and grommet
30 guides to prevent wear on ladder and cords; designed to hold slats at any angle and prevent
31 movement of slats due to vibration, operated as follows:
32
33 Wand Operation: Detachable clear plastic wand, of proper length to suit blind installation,
34 detachable without tools by raising locking sleeve.
35
36 Lifting, Mechanism: Crashproof cord locks with cord separators and braided polyester or nylon lift
37 cords with tassels at ends. Size cord to suit blind type. Include self-aligning cord equalizers
38 designed to maintain horizontal blind position.
39
40 Installation Brackets: Designed to facilitate removal of head channels. Provide intermediate brackets
41 at spacing recommended by blind manufacturer. Include hardware necessary for secure attachment
42 of brackets to adjoining construction and to headrails. Design brackets to support safely the weight
43 of blind assemblies plus forces applied to operate blinds.
44
45 Finish: Provide finishes indicated below. Finish exposed accessories and hardware to match rail
46 color. Provide corrosion-resistant finish to concealed items of hardware.
47
48 Color:#318, Silver Cloud
49
50 Ionized Coating: Antistatic, dust-repellent, baked polyester finish.
51
52 FABRICATION AND OPERATION
53
54 Prior to fabrication, verify actual opening dimensions by accurate site measurements. Adjust
55 dimensions for proper fit at openings.
56
57 Coordinate with other trades for securing tracks to substrates and other finished surfaces.
HORIZONTAL LOUVER BLINDS
GDA 12500-2
GDA#12018.00 December 14, 2012
Issue for Permit
1
2 Fabricate window treatment components from noncorrosive, nonstaining, nonfading materials which
3 are completely compatible and which do not require lubrication during normal expected life.
4
5 Fabricate blind units to openings from head to sill and from jamb to jamb.
6
7 For continuous window wall installations, fabricate blinds so that ends occur only over mullions or
8 other defined vertical separation.
9
10 Space slats to provide overlap for light exclusion when fully closed.
11
12 Equip horizontal blind units for the following operation:
13
14 Full-tilting operation with slats rotating approximately 180 deg. Place tilt operating controls
15 on left-hand side of blind units unless otherwise indicated.
16
17 Full-height raising, to minimum stacking dimension, with lifting cord locks for stopping blind
18 at any point of ascending or descending travel. Place pull cords on right-hand side of blind
19 units unless otherwise indicated.
20
21
22 PART 3- EXECUTION
23
24
25 INSTALLATI.ON
26
27 General: Install window treatment units to comply with manufacturer's instructions. Position units
28 level, plumb, secure, at proper height and location relative to adjoining window units and other
29 related work. Securely anchor units with clips, brackets, and anchorages suited to type of substrate.
30
31 Provide clearance between sash and blinds to permit unencumbered operation of sash hardware.
32
33 Isolate metal parts from concrete and mortar to prevent galvanic action. Use thick coating or other
34 means recommended by manufacturer to effect separation.
35
36 Protect installed units to ensure their being in operating condition, without damage, blemishes, or
37 indication of use at substantial completion of project. Correct nonconforming damaged units.
38 Replace units that cannot be field corrected.
39
40
41 END OF SECTION 12500
HORIZONTAL LOUVER BLINDS