Loading...
HomeMy WebLinkAboutInspection report - MST2022-00493 11 CITY OF TIGARD 8/18/2026 = 13125 SW Hall Blvd.,Tigard OR 97223 5:43:32PM 503.639.4171 TIGARD Activity Listing Case #: MST2022-00493 Project Name: South River Terrace, Tract I, Bldg 6, Unit 2 Site Address: 16887 SW BEEMER LN CODE DESCRIPTION DATE DONE DISP DONE BY Notes (Descending Order) 280 Insulation Cancelled 115 Electrical service Cancelled Aaron Cillo-Gobel 242 Interior shearwall Cancelled Rick Stark 315 Post/beam plumbing Cancelled David Young 225 Post/beam structural Cancelled 315 Post/beam plumbing Cancelled 340 Storm sewer Cancelled 505 Sanitary sewer Cancelled 335 Rain drain Cancelled 310 Crawl drain Cancelled 330 Water service Cancelled 210 Foundation walls Cancelled Aaron Cillo-Gobel 205 Footing Cancelled Aaron Cillo-Gobel 205 Footing Cancelled 210 Foundation walls Cancelled 210 Foundation walls Cancelled 205 Footing Cancelled 205 Footing Cancelled 210 Foundation walls Cancelled 750 Initial erosion control 06/18/2024 PASS-30 Days CWS CaseActivityShortForm.rpt Page 1 of 5 CODE DESCRIPTION DATE DONE DISP DONE BY Notes (Descending Order) 210 Foundation walls 07/08/2024 FAIL David Young Provide hub and tack survey report and geotechnical report for each unit. unit next to Beemer missing 24x10 footing next to garage and footing boards next to entry. contractors on site working. re schedule when ready for inspection. R109 205 Footing 07/08/2024 FAIL David Young Provide hub and tack survey report and geotechnical report for each unit. unit next to Beemer missing 24x10 footing next to garage and footing boards next to entry. contractors on site working. re schedule when ready for inspection. R109 210 Foundation walls 07/09/2024 PASS David Young Initial erosion control approved. setbacks appear ok per certified hub and tack survey report and city approved plans. geotechnical report received. ufer ground tagged. holdowns installed. low point drain sleeve installed. 205 Footing 07/09/2024 PASS David Young Initial erosion control approved. setbacks appear ok per certified hub and tack survey report and city approved plans. geotechnical report received. ufer ground tagged. holdowns installed. low point drain sleeve installed. 310 Crawl drain 07/17/2024 PASS David Young backwater devise installed. 335 Rain drain 07/17/2024 FAIL David Young Fix belly in pipe by unit next to Beemer where pipe is off footing garage side. 330 Water service 07/17/2024 FAIL David Young No water service installed at this time. 340 Storm sewer 07/17/2024 PASS David Young 505 Sanitary sewer 07/17/2024 FAIL David Young Sanitary sewer lines not on test. 335 Rain drain 07/22/2024 PASS David Young Correction complete. 505 Sanitary sewer 07/22/2024 PASS David Young Sanitary sewer line under test with water. finish bedding pipe prior to cover. 330 Water service 07/24/2024 PASS David Young water service under working pressure test. CaseActivityShortForm.rpt Page 2 of 5 CODE DESCRIPTION DATE DONE DISP DONE BY Notes (Descending Order) 215 Footing drain 07/25/2024 PASS David Young 755 Regular erosion control 07/25/2024 PASS-30 Days CWS In utilities. No measureable tracking on inspection and inlets protected. Perimeter measures at Ada corner to be reinstalled after utilities backfilled. Crw 610 Gas Line 07/26/2024 PART David Young exterior underground gas line only to unit, ok. 27 psi, 15 minutes standard pressure. note: interior gas line to follow. 225 Post/beam structural 08/02/2024 FAIL David Young Provide approved post and beam plumbing inspection prior to post and beam structural inspection. R109 315 Post/beam plumbing 08/06/2024 PASS Aaron Cillo-Gobel 225 Post/beam structural 08/07/2024 PASS Rick Stark 242 Interior shearwall 08/21/2024 PART Rick Stark The plywood sheathing for the structural gable roof trusses at the party walls are approved at this time and can be covered with dens glass. 240 Exterior shearwall 08/21/2024 PART Rick Stark The plywood sheathing for the structural gable roof trusses at the party walls are approved at this time and can be covered with dens glass. 755 Regular erosion control 08/26/2024 PASS-30 Days CWS In framing. No perimeter concerns at this time, inlets protected and no measureable tracking on inspection. Crw 280 Insulation 09/10/2024 PART Aaron Cillo-Gobel parti wall rock wool/draft stopping verified 240 Exterior shearwall 09/16/2024 PASS Aaron Cillo-Gobel 280 Insulation 09/19/2024 PART Aaron Cillo-Gobel pre-insulation for parti wall prep areas verified.ok to cover 242 Interior shearwall 09/24/2024 PART Rick Stark Sections of party walls at plumbing wall locations are approved at this time. Two sections-P4; P6tn Disregard having to reschedule. 295 Misc. inspection 09/25/2024 PART Rick Stark First layer of drywall is approved at plumbing locations only at this time. 755 Regular erosion control 09/27/2024 PASS-30 Days CWS In meps. No perimeter concerns. Inlets protected and no measureable tracking on inspection. Ground cover will need installed soon. Crw CaseActivityShortForm.rpt Page 3 of 5 CODE DESCRIPTION DATE DONE DISP DONE BY Notes (Descending Order) 320 Plumbing rough-in 10/08/2024 PASS Don Sylvester 910 Sprinkler rough-in 10/08/2024 PASS Don Sylvester 610 Gas Line 10/08/2024 PASS Don Sylvester 295 Misc. inspection 10/14/2024 PART Rick Stark Ok to insulate floor section. Missing connections on the roof trusses. 245 Firewall 10/14/2024 PASS Aaron Cillo-Gobel Dens glass located exterior entry way/separation walls verified per plan 615 Mechanical rough-in 10/16/2024 PASS Aaron Cillo-Gobel 135 Low voltage rough-in 10/16/2024 PASS Aaron Cillo-Gobel 120 Electrical rough-in 10/16/2024 PASS Aaron Cillo-Gobel 275 Framing 10/16/2024 PART Aaron Cillo-Gobel 1)repair/fix unused penetrations through roof (multiple locations) per R801.3 and approved plans. All other framing appears ok per plans 115 Electrical service 10/18/2024 FAIL Rick Stark No disconnect at this time 280 Insulation 10/24/2024 PART Aaron Cillo-Gobel Parti/demising walls ok to cover 755 Regular erosion control 10/28/2024 PASS-30 Days CWS In MEPs. Ground cover applied. No measureable tracking on inspection. Inlets protected. Crw 242 Interior shearwall 10/28/2024 PASS Rick Stark 115 Electrical service 10/28/2024 PASS Rick Stark 275 Framing 10/29/2024 PASS Aaron Cillo-Gobel Previous corrections completed. 280 Insulation 11/04/2024 PART Aaron Cillo-Gobel Walls,vaults and garage ceiling verified.Attic and underfloor to be verified at final. 285 Drywall nailing 11/06/2024 PASS Rick Stark 755 Regular erosion control 11/07/2024 FAIL CWS Final graded early. Groundcover required to be reinstalled. DN issued. Crw 755 Regular erosion control 11/12/2024 PASS-30 Days CWS Ground cover reapplied. DN resolved, Crw 289 Approach/sidewalk 11/27/2024 PART Boris Piatski 289 Approach/sidewalk 12/03/2024 PASS Boris Piatski 755 Regular erosion control 12/11/2024 PASS-30 Days CWS In landscaping and nearly complete besides front yards. Rear has been mulched. Inlets remain protected. Final erosion expected next week. Crw CaseActivityShortForm.rpt Page 4 of 5 CODE DESCRIPTION DATE DONE DISP DONE BY Notes (Descending Order) 798 Final erosion control 12/19/2024 PASS- Final CWS Fully landscaped and finalnstabilized. Final erosion issued. Crw 399 Plumbing final 01/23/2025 PASS Aaron Cillo-Gobel Water pressure=75psi 199 Electrical final 01/23/2025 PASS Aaron Cillo-Gobel No A/C installed 699 Mechanical final 01/23/2025 PASS Aaron Cillo-Gobel No A/C installed 299 Final inspection 01/29/2025 PASS-C of 0 Aaron Cillo-Gobel -Final erosion control approved. -Moisture content form received. -Moisture barrier form received. -insulation certificate verified. -Duct seal/Blower door test received/verified. C of 0 issued. CaseActivityShortForm.rpt Page 5 of 5