HomeMy WebLinkAboutLIVTIG_Mechanical_w_SOW_4-28-26_v3 Mission: PET HEALTH 6/3/2026 City of Tigard Community Development 13125 SW Hall Blvd. Tigard, OR 97223 Re: Permit Application for 12284 SW Scholls Ferry Road, Tigard, OR 97223 Dear Sir/Madam, Project HVAC scope provides new interior ductwork layout to serve architectural floor plan as part of new tenant. Existing rooftop HVAC units to be used as is. New exhaust needs in tenant space served by ceiling mounted exhaust fans discharging to gooseneck at roof above. Should you have any questions or require clarification,please do not hesitate to contact me directly. Sincerely, Steven Hornbuckle Senior Pre-Construction Manager Mission Pet Health steven.hombuckle@missionpethealth.com (205) 999-1597 2204 Lakeshore Drive,Suite 325 W,Birmingham,AL 35209 205-453-4760 I missionpethealth.com A B C D IE F G H J EXISTING AHU REBALANCE NOTE CEILING DIFFUSER SCHEDULE HVAC GENERAL NOTES HVAC DEMOLITION NOTES MECHANICAL DUCTWORK LEGEND ® 00 NOTES: 1. PERFORMANCE OF SA-SE BASED ON PRICE MODEL ASPD PLAQUE FACED DIFFUSER. FD ==ii FIRE DAMPER O O 990e 1. AS A PART OF THIS PROJECT. THE EXISTING AIR HANDLING UNIT RTU 1 SHALL BE RE-BALANCED 2. PERFORMANCE OF SF BASED ON PRICE MODEL LFD LAMINAR FLOW DIFFUSER. 1. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR IS REQUIRED TO REROUTE DUCTWORK AND 1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF EXISTING - TO THE FOLLOWING CRITERIA: PIPE, PROVIDE OFFSETS, 90 AND 45 DEGREE BENDS, CHANGE ASPECT RATIO OF DUCTWORK AS EQUIPMENT, EXACT SIZES OF EXISTING DUCT AND PIPING, ETC. BEFORE DEMOLITION WORK BEGINS. SD I=s=a SMOKE DAMPER 3. ALL DIFFUSERS SHALL BE FURNISHED WITHOUT DAMPERS UNLESS OTHERWISE NOTED. REQUIRED IN COORDINATION WITH OTHER TRADES AT NO ADDITIONAL COST TO THE PROJECT. REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO ARCHITECT AND SUPPLY FAN 1,250 4. ROUTE RUN-OUT SIZE TO GRILLE UNLESS OTHERWISE NOTED ON DRAWINGS. ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK. FSD I� FIRE/SMOKE DAMPER RETURN FAN - 1,075 2. ALL THERMOSTATS WILL BE INSTALLED 45"ABOVE FINISHED FLOOR TO CENTERLINE OF - 1 OUTSIDE AIR-270 THERMOSTAT TO MATCH LIGHT SWITCHES UNLESS OTHERWISE NOTED. 2. DEMOLITION WORK SHALL BE PHASED TO ACCOMPLISH REPLACEMENT WITH MINIMUM AMOUNT OF 1 SYMBOL RUN OUT SIZE NECK SIZE FACE SIZE MAX. NC MAX. SP DOWNTIME. IE MANUAL VOLUME DAMPER PROFESSIONAL SEALS: 2. AS A PART OF THIS PROJECT. THE EXISTING AIR HANDLING UNIT RTU 3 SHALL BE RE-BALANCED 3. ROUTE NEW DUCTWORK ABOVE CEILING TIGHT TO STRUCTURE. RELOCATE OR OFFSET EXISTING TO THE FOLLOWING CRITERIA: SAA 6"0 6"S2S 12"x12" .016 PIPING, CONDUIT AND DUCTWORK AS REQUIRED FOR INSTALLATION OF NEW WORK AT NO 3. SCHEDULE NEW AND DEMOLITION WORK IN ADVANCE WITH OWNER. CD 2 DUCT MOUNTED SMOKE ADDITIONAL COST TO THE PROJECT. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND DETECTOR (SUPPLY, RETURN, SUPPLY FAN -2,545 SA 6"Q� 6"Q� 24"x24" .016 INDICATE ROUTING OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND DROPS MAY 4. REMOVE EXISTING DUCTWORK(AND ASSOCIATED HANGERS, STRAPS, AND SUPPORT RODS), PIPING, - EXHAUST) RETURN FAN -2,240 SB 8"0 8"0 24"x24" - .042 BE NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS. DIFFUSERS, GRILLES IN THE AREA OF DEMOLITION WHICH ARE NOT SHOWN TO REMAIN OR BE SC SUPPLY DIFFUSER&AIR QUANTITY t,Q PROF OUTSIDE AIR- 150 REUSED ON THE DRAWING. IF THE EXISTING DUCTWORK, PIPING, DIFFUSERS, OR GRILLES SHOWN VN 240 (INDICATES 4-WAY BLOW) �Q` FS 4. DO NOT ROUTE ANY DUCTWORK OR PIPING DIRECTLY ABOVE OR 42" IN FRONT OF ELECTRICAL TO REMAIN ARE IN CONFLICT WITH THE NEW WORK SHOWN THEY SHALL BE RELOCATED AS S� , .uINF S'/O SC 10"� 10"� 24"x24" - .065 C� CONTRACTOR IS RESPONSIBLE FOR REPLACING BELTS, MOTORS, SHEAVES, AND/OR PULLEYS IN SWITCHGEAR, PANELS OR TRANSFORMERS. REQUIRED. DEMO NOTES HAVE BEEN PLACED ON THE PLANS TO DEPICT ITEMS OF SPECIAL �`� may. ORDER TO OBTAIN NEW AIRFLOWS LISTED. INTEREST AND DO NOT NECESSARILY INCLUDE ALL DEMO WORK. NO CHANGE ORDERS WILL BE SC SUPPLY DIFFUSER&AIR QUANTITY 1 SD 12"0 12"0 24"x24" 15 .093 240 (INDICATES 3-WAY BLOW) 5. ALL LAY-IN DIFFUSERS, RETURN AND EXHAUST GRILLES SHALL BE 24"x24" OR 12"x12" FULL FACE ENTERTAINED FOR DEMO ITEMS REQUIRED IN THE AREA OF DEMOLITION. SE 14"0 14"0 24"x24" 18 .127 UNLESS OTHERWISE NOTED. CONTRACTOR SHALL COORDINATE DIFFUSER FRAMES WITH RC RETURN AIR GRILLE &AIR QUANTITY F 41/27/26, o, REFLECTED CEILING PLAN TO DETERMINE TYPE OF FRAME REQUIRED, GYP-BOARD MOUNTING OR 5. WHERE EXISTING DUCTWORK IS TO BE REUSED, REMOVE ALL INSULATION FROM DUCTWORK AND / 240 ''3j, OREGON r,10 SF 10"0 10"0 48"x24" 17 .030" LAY-IN TYPE. APPLY"HARDCAST" SEALANT TO ALL JOINTS AND APPLY NEW INSULATION. THIS APPLIES TO SUPPLY, �Q M$ �O { RETURN, AND EXHAUST DUCTWORK. WHERE DUCTWORK IS REMOVED, CAP EXISTING CONNECTIONS EC EXHAUST AIR GRILLE &AIR }' Pv ,Q ER FAN SCHEDULE REMARKS: 6. FOR BRANCH DUCT SIZES AND GRILLE/DIFFUSER NECK SIZES REFER TO SCHEDULE DRAWINGS. WITH STEEL METAL, APPLY"HARDCAST" SEALANT AND APPLY NEW INSULATION. 240 QUANTITY N P C1.� O/ Tc THERMOSTAT(ADJUSTABLE)/ 7. FLEXIBLE DUCT SHALL BE LIMITED TO A MAXIMUM LENGTH OF 5 FEET WITH NO MORE THAN 90 6. WHERE EXISTING PIPING IS REMOVED CAP PIPING CONNECTIONS TO REMAIN AT MAINS AND APPLY T'STAT (CONCEALED/KEY OPER.) EXPIRES 12/31/27 ACCESSORIES: 01 -- FAN SPEED CONTROLLER DEGREES OF ACCUMULATED BEND. NEW INSULATION. ®/ Hs HUMIDISTAT/ HUMIDITY SENSOR 02-- INTEGRAL DISCONNECT SWITCH 8. PROVIDE MANUAL VOLUME DAMPERS IN MAIN SUPPLY, RETURN AND EXHAUST TRUNKS WHERE 7. ALL EQUIPMENT TO BE REMOVED IS THE PROPERTY OF THE OWNER AND SHALL BE TURNED OVER SHOWN ON DRAWINGS FOR BALANCING AS INDICATED AND AT LOCATIONS REQUIRED BY TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. AT THE DISCRETION OF THE OWNERS' Ovvvvvvv RETURN/EXHAUST GRILLE SCHEDULE INDEPENDENT TEST AND BALANCING AGENCY. SEE DETAIL FOR EXACT LOCATION REQUIREMENTS REPRESENTATIVE,ANY OR ALL OF SUCH EQUIPMENT MAY BE REFUSED AND RELEASED TO THE H STEAM HUMIDIFIER 03 BACKDRAFT DAMPER OF MANUAL VOLUME DAMPERS. CONTRACTOR FOR DISPOSAL. 2 M MOTORIZED DAMPER 2 NOTES: 1. GRILLES BASED ON PRICE MODEL 80 0.5"GRID DESIGN. 9. COORDINATE DIFFUSERS, RETURN AND EXHAUST GRILLES WITH LIGHTS AND ARCHITECTURAL 8. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW 2. GRILLES TO BE FURNISHED WITHOUT DAMPER. REFLECTIVE CEILING PLANS. DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND DROPS MAY BE NECESSARY BECAUSE OF O TEMPERATURE SENSOR CONSULTANTS: DESIGNATION EF-1 EF-2 EF-3 EF-4 3. FACE SIZE BASED ON LAY-IN CEILING.ADD 1.75"TO FACE SIZE FOR DRYWALL APPLICATIONS. EXISTING FIELD CONDITIONS. 10. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR IN INCHES UNLESS OTHERWISE NOTED. UP BUILDING PRESSURE SENSOR MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK 4. PROVIDE SQUARE TO ROUND TRANSITION ON BACK OF GRILLE. 9. IN AREAS OF RENOVATION, INSTALLATION OF NEW PIPING, DUCTWORK AND EQUIPMENT WILL 11. PROVIDE FLEXIBLE CONNECTION ON DUCTWORK AT ALL MECHANICAL EQUIPMENT. REQUIRE REMOVAL OF THE EXISTING CEILING AND THE CEILING GRID. SURVEY THE SITE AND BE ' SYMBOL RUN OUT SIZE NECK SIZE FACE SIZE MAX. NC MAX. SP INFORMED OF EXISTING CONDITIONS THAT WILL REQUIRE CEILING REMOVAL. INCLUDE THE COST OF 6/ 0 CARBON DIOXIDE SENSOR/ CARBON MONOXIDE SENSOR - _ MODEL NO. SP-LP0511 SP-LP0511 SP-B150 SP-B200 12. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE SYSTEMS AND VERIFY DIMENSION THE CEILING WORK OR COORDINATE ITS REMOVAL WITH THE GENERAL CONTRACTOR. RA EA 6"0 12"x12" 12"x12" 18 .02" CONDITIONS PRIOR TO INSTALLATION. PROVIDE MANUFACTURERS' RECOMMENDED CLEARANCE REDUCER/TRANSITION SERVICE EXHAUST EXHAUST EXHAUST EXHAUST REQUIREMENTS ON ALL AC UNITS AND EQUIPMENT FOR SERVING CLEANING, COIL REMOVAL,AND 10. FIRESTOPPING OF EXISTING PIPING, CONDUIT AND DUCTWORK WITHIN THE AREA OF RENOVATION • • RB EB 8"0 24"x24" 24"x24" 24 .03" FILTER CHANGING. SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. FIRESTOPPING OF NEW PIPING, CONDUIT AND DUCTWORK WITHIN THE AREA OF RENOVATION SHALL BE PROVIDED BY THE INSTALLING SUPPLY OR OA DUCT TURNING UP fl n TYPE CEILING MOUNTED CEILING MOUNTED CEILING MOUNTED CEILING MOUNTED RC EC 10"0 24"x24" 24"x24" 24 .03" 13. PROVIDE IDENTIFICATION STENCILING ON ALL CONCEALED ACCESS DOORS FOR FIRE DAMPERS AND SUBCONTRACTOR. N/ SUPPLY OR OA DUCT TURNING COMBINATION FIRE/SMOKE DAMPERS. CFM 75 75 120 150 RD ED 12"0 24"x24" 24"x24" 24 .03" 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING, STORING, AND REINSTALLING ANY V\ DOWN 14. IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE ALL FLOOR AND EQUIPMENT NOTED AS EXISTING TO BE RELOCATED. THE CONTRACTOR SHALL REPAIR OR REPLACE / RETURN OR EXHAUST DUCT CityPark Building b S.P. (IN. H20) 0.5 0.5 0.5 0.5 RE EE 14"0 24"x24" 24"x24" 24 .03" ROOF PENETRATIONS WITH THE GENERAL CONTRACTOR PRIOR TO STEEL FABRICATION. ANY SUCH EQUIPMENT THAT IS DAMAGED OR LOST THROUGHOUT THE DURATION OF THIS PROJECT TURNING UP 214 Centerview Drive,Suite 200 Brentwood,Tennessee 37027 WITHOUT ADDITIONAL COSTS TO THE OWNER. I /I RETURN OR EXHAUST DUCT MAX. FAN RPM 773 773 1050 1050 RF EF 18"0 24"x24" 24"x24" 24 .03" 15. EXHAUST DUCTS TO BE UN-INSULATED GALVANIZED SHEET METAL CONSTRUCTED TO LATEST V I TURNING DOWN Phone: 615.377.0093 SMACNA STANDARDS. 12. WHERE EXISTING PIPING (HOT WATER, COLD WATER, DOMESTIC WATER, GAS, MEDICAL GAS, Enfinity Project#25180 MIN. MOTOR H.P. 16 WATTS 16 WATTS 128 WATTS 172 WATTS RG EG 24"x14" 24"x24" 24"x24" 24 .03" CHILLED WATER, STEAM, CONDENSATE, DRAIN, SANITARY SEWER, STORM, ETC.) IS FOUND IN WALLS 1. BOOT TAP CONNECTION 16. INSTALL EXHAUST FANS AND EXHAUST OUTLETS TO MAINTAIN AT LEAST 15 FEET CLEARANCE FROM TO BE REMOVED, OFFSET AND REROUTE PIPING INTO NEW PARTITION LAYOUT. IF PIPE SERVICE IS - SONES 3.0 3.0 3.0 3.0 RH EH 24"x16" 24"x24" 24"x24" 24 .03" FRESH AIR INTAKES ON AIR HANDLERS AND OPERABLE ROOM WINDOWS. TO BE ABANDONED, REMOVE PIPING IN WALL AND CAP IN CEILING ABOVE WALL AND IN SPACE V4/HZ 115/ 1 /60 115/ 1 /60 115/ 1 /60 115/ 1 /60 REMARKS: BELOW WALL. V CONICAL TAP CONNECTION 3 17. ALL NEW ROOF MOUNTED EQUIPMENT MUST BE LOCATED A MINIMUM 10 FEET FROM THE ROOF 3 EDGE OR A PROTECTIVE RAILING OR PARAPET SHALL BE PROVIDED NO LESS THAN 42 INCHES 13. WHERE EXHAUST, RELIEF AND INTAKE HOODS AND FANS ARE REMOVED, INSULATE ROOF OPENING RISE IN DUCTWORK WEIGHT (LBS.) 20 20 20 20 ABOVE FINISHED ROOF IN ACCORDANCE WITH IMC. AND PATCH TO MATCH EXISTING MATERIALS. - R. INTERLOCK W/ CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS DROP IN DUCTWORK 18. EACH SUBCONTRACTOR SHALL PERFORM CUTTING AND PATCHING OF PENETRATIONS FOR THEIR 14. IN AREAS TO RECEIVE NEW CEILINGS, DIFFUSERS TO REMAIN SHALL BE TAKEN DOWN, CLEANED, D. ACCESSORIES SUPPLIED 1 --3 1 --3 1 --3 1 --3 PRE-DEMOLITION TEST AND BALANCE / OWN DISCIPLINE. PAINTED, AND REINSTALLED. AT CONTRACTOR'S OPTION DIFFUSERS MAY BE REPLACED. DUCT WITH INTERNAL SOUND 19. UNLESS SPECIFICALLY NOTED OTHERWISE, NO T-DRILL FITTINGS OR TYPE M COPPER PIPING IS LINER REMARKS: CONTROLS VERIFICATION ALLOWED FOR ANY SERVICE. -- STARTERS BY ELECTRICAL DIVISION IF REQUIRED if I + REHEAT COIL 1. A MEASUREMENT OF EXISTING SYSTEMS AFFECTED BY THIS RENOVATION SHALL BE PERFORMED 20. INTERMEDIATE SUPPORTS SUCH AS ANGLES, UNISTRUT, ETC. NECESSARY FOR SUPPORT OF PIPING, QUALITY ASSURANCE DUCTWORK AND EQUIPMENT AS WELL AS ANGLE FRAMING FOR DAMPERS SHALL BE FURNISHED AND q11 AND RECORDED BY THE BALANCING CONTRACTOR PRIOR TO THE COMMENCEMENT OF ANY I VAV BOX WITH CLEARANCE AND DEMOLITION WORK. THESE MEASUREMENTS SHALL INCLUDE THE FOLLOWING: INSTALLED BY MECHANICAL DIVISION. STRUCTURAL OPENINGS REQUIRING FRAMING SHALL BE 1-01 IDENTIFICATION I FURNISHED UNDER STRUCTURAL DIVISION. I 1. CONTRACTOR IS RESPONSIBLE TO BE IN FULL COMPLIANCE WITH ALL APPLICABLE LOCAL, STATE L - J • SUPPLY AND RETURN AIR FLOWS AT EXISTING AIR HANDLING UNIT. 21. MECHANICAL CONTRACTOR TO PROVIDE COORDINATION DRAWINGS DEVELOPED IN CAD SOFTWARE AND FEDERAL CODES. SEE ARCHITECTURAL DRAWINGS FOR APPLICABLE CODES. NOTIFY ENGINEER • SUPPLY, RETURN, OUTSIDE AIR AND MIXED AIR TEMPERATURES AT EXISTING AIR HANDLING SQUARE ELBOW WITH TURNING FOR MECHANICAL SYSTEMS AND SHALL COORDINATE WITH ALL TRADES INCLUDING STRUCTURAL, OF ANY DISCREPANCIES BETWEEN DESIGN AND LOCAL CODES. CONTRACTOR'S PRICING TO VANES SUBMITTAL/REVISION SCHEDULE: UNIT. _DUCTWORK, PIPING, ELECTRICAL, COMMUNICATION SYSTEMS, FIRE PROTECTION AND MECHANICAL REFLECT INSTALLATION IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS. • MOTOR SIZE AND FULL LOAD AMP READINGS AT FAN PIPING PRIOR TO FABRICATION OR INSTALLATION OF SYSTEMS. DESIGN MODELS ARE DEVELOPED POINT OF DEMOLITION NO. DATE DESCRIPTION • PRE-FILTER AND FINAL FILTER TYPES AND MERV RATINGS FOR CONSTRUCTION DOCUMENT PRINTS ONLY. • • STATIC PRESSURE AT EACH SECTION OF THE AIR HANDLING UNIT 2. NOTIFY ENGINEER OF ANY CONFLICTS ON THE DRAWINGS OR BETWEEN DRAWINGS AND SPECIFICATIONS. FAILURE TO NOTE CONFLICTS WILL RESULT IN ADDITIONAL COSTS BEING THE S POINT OF CONNECTION 2. THE AIR DISTRIBUTION SYSTEM(S) SHALL BE REBALANCED TO MEET EXISTING AIR FLOWS AS WELL 22. ALL MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE FEDERAL, STATE AND LOCAL CODES RESPONSIBILITY OF THE CONTRACTOR. - ' AS NEW AIR FLOW REQUIREMENTS AS INDICATED ON THE NEW CONSTRUCTION HVAC DOCUMENTS. AND LAWS. SEE ARCHITECTURAL DRAWINGS FOR APPLICABLE CODES. CONTRACTOR SHALL PAY INDICATES DIRECTION AND AREAS SERVED BY AFFECTED EXISTING SYSTEMS NOT RENOVATED IN THIS PROJECT SHALL BE FOR FEES AND PERMITS. 3. COMPLY WITH APPLICABLE REQUIREMENTS OF RECOGNIZED INDUSTRY ASSOCIATIONS WHICH 50 1 QUANTITY OF ROOM AIR • REBALANCED TO AIR FLOWS EXISTING PRIOR TO COMMENCEMENT OF WORK. PUBLISH STANDARDS FOR THE VARIOUS TRADES. / PRESSURIZATION 4 23. ALL DUCTWORK SHALL BE SHEET METAL IN ACCORDANCE WITH THE LATEST SMACNA HVAC DUCT 4 CONSTRUCTION STANDARDS. DUCT DIMENSIONS ARE INSIDE CLEAR. 4. EMPLOY ONLY QUALIFIED JOURNEYMEN FOR THIS WORK. D-0 DIFFERENTIAL PRESSURE 3. CHECK THE CONDITION OF THE EXISTING TEMPERATURE CONTROLS ON ALL AIR HANDLING MONITOR • EQUIPMENT INVOLVED IN THE RENOVATION. VERIFY AND REPORT ON THE CONDITION OF EXISTING 24. ALL SUPPLY DIFFUSERS SHALL BE PRICE MODEL ASPD AND RETURN GRILLS SHALL BE PRICE MODEL 5. ADDITIONAL INSTALLATION COSTS ASSOCIATED WITH SUBSTITUTED EQUIPMENT REQUIRING DAMPERS, ACTUATORS, VALVES, CONTROL DEVICES, AND ACTUAL OPERATION PRIOR TO STARTING 80 ALUMINUM 1/2"X1/2"GRID OR APPROVED EQUAL OR AS OTHERWISE NOTED. INSULATE BACK OF ADDITIONAL WORK ON THE PART OF THIS CONTRACTOR OR OTHER SUBCONTRACTORS TO SATISFY A.T.C. AUTOMATIC TEMP. CONTROL . ANY DEMOLITION. PANEL DIFFUSERS SIMILAR TO DUCTWORK IF SYSTEM USES A DUCTED RETURN. THE MANUFACTURER'S INSTALLATION REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE 4. THE PRE-DEMOLITION STATIC PRESSURE AND AIR FLOW READINGS SHALL BE PERFORMED BY THE SUBMITTING CONTRACTOR. A.D. ACCESS DOOR TEST AND BALANCE SUBCONTRACTOR. 25. ALL ROUND TAPS ON LOW PRESSURE DUCT SHALL BE MADE USING STICK-ON METAL COLLARS WITH DAMPER(SOUTHWARK MODEL ATD OR EQUAL). NO SCOOPS ARE ALLOWED. 6. SUPERVISE ALL WORK BY COMPETENT MECHANIC SPECIFICALLY QUALIFIED IN HIS DISCIPLINE. INDICATES 3/4" DOOR UNDERCUT -04 5. THE BALANCING CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER OF DEFICIENCIES 26. SEAL ALL DUCT(SUPPLY, RETURN, OUTSIDE AIR, EXHAUST) JOINTS WITH MEI EDS 44-55 OR 44-52; 7. ANY UNIT EQUIPPED WITH FINAL FILTERS SHALL NOT BE OPERATED WITHOUT THE FINAL FILTERS IN 50WITH DIRECTION &QUANTITY OF • FOUND IN ANY OF THE SYSTEMS LISTED IN NOTE# 1. DESIGN POLYMERICS DP1010; IRON GRIP OR EQUAL. APPLY WHEN ENVIRONMENT IS BETWEEN 50 deg PLACE. IF UNIT IS OPERATED WITHOUT FINAL FILTERS IN PLACE, THE ENTIRE SUPPLY AIR DUCT ROOM AIR PRESSURIZATION F TO 95 deg F. SYSTEM MUST BE CLEANED IN ITS ENTIRETY. SP DUCT MOUNTED STATIC PRESSURE CONTROLLER • 27. CONDENSATE DRAIN PIPING INSIDE THE BUILDING SHALL BE TYPE M HARD COPPER WITH 1/2" 8. CONTRACTOR IS REQUIRED TO DEMONSTRATE COMPLETE FUNCTIONALITY OF ALL DESIGNED AND ARMAFLEX INSULATION. EXTERIOR CONDENSATE DRAIN PIPING SHALL BE PVC WITH A UV RESISTANT INSTALLED SYSTEMS TO DESIGN TEAM UPON COMPLETION OF TEST& BALANCE OR SUBSTANTIAL A.F.F. ABOVE FINISHED FLOOR COATING. ICE MAKER DRAINS SHALL ALSO BE EQUIPPED WITH 1/2"ARMAFLEX INSULATION. COMPLETION. CONTRACTOR IS TO HAVE ALL REQUIRED PERSONNEL ON HAND, INCLUDING, BUT NOT •APPROVED FOR CONSTRUCTION LIMITED TO; MECHANICAL, ELECTRICAL, TEST AND BALANCE AGENT, AND CONTROLS. A.F.R. ABOVE FINISHED ROOF J NOT APPROVED FOR CONSTRUCTION 28. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR. NEW COMPRESSORS SHALL HAVE A FIVE YEAR REPLACEMENT WARRANTY. 9. FACTORY START-UP SHALL BE PROVIDED FOR ALL NEW EQUIPMENT. ALL EQUIPMENT WITH EMERGENCY SHUT-DOWN BUTTON CLIENT INFORMATION: COMPRESSORS AND/OR EQUIPMENT CONTROLLED BY MICRO-PROCESSORS IS TO BE STARTED, E.S.D. FOR AHU UNIT 29. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS SHOWN ON MECHANICAL DRAWINGS. ADJUSTED,AND VERIFIED FOR PROPER OPERATION WITH RESPECT TO THIS PROJECT BY FACTORY CONNECTIONS TO EXISTING SERVICES ARE ENGINEERS BEST UNDERSTANDING BASED ON - TRAINED AND CERTIFIED TECHNICIAN. NO EXCEPTIONS WILL BE ALLOWED. MISSION PET HEALTH AVAILABLE INFORMATION, CONTRACTOR SHALL ROUTE DUCT AND PIPING AS NECESSARY TO MAKE CONNECTIONS TO EXISTING SERVICES AS THEY EXIST IN THE FACILITY REGARDLESS OF HOW - - THEY'RE SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMMUNICATE ANY DEVIATION FOUND PRIOR TO CONSTRUCTION. REQUIRED COORDINATION 5 5 SVp !NO 1. VISIT SITE AND BE INFORMED OF CONDITIONS UNDER WHICH WORK MUST BE PERFORMED. PREVENTATIVE MAINTENANCE 2. NO SUBSEQUENT ALLOWANCE WILL BE MADE BECAUSE OF ERROR OR FAILURE TO OBTAIN NECESSARY INFORMATION TO COMPLETELY ESTIMATE AND PERFORM ALL WORK INVOLVED. Southern Veterinary Partners 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY ALL DEVIATIONS ON THE SHOP DRAWINGS 1. THE CONTRACTOR SHALL PERFORM THE FOLLOWING FOR EACH EXISTING HVAC RTU: FROM THE SPECIFIED ITEM AND REVIEW OF THE SHOP DRAWINGS WITH NO EXCEPTIONS TAKEN WILL 2204 LAKESHORE DRIVE, SUITE 325 NOT BE CONSIDERED ACCEPTANCE OF THE DEVIATION UNLESS IT'S BEEN EXPLICITLY IDENTIFIED. BIRMINGHAM, AL 35209 • CHECK EXISTING COMPRESSOR OPERATION. • CHECK FAN MOTORS. 4. CAREFULLY EXAMINE DRAWINGS AND SPECIFICATIONS TO BE THOROUGHLY FAMILIAR WITH ITEMS • CLEAN EXISTING EVAPORATOR AND CONDENSER COILS. WHICH REQUIRE PLUMBING OR HVAC CONNECTIONS AND COORDINATION. • REPLACE FILTERS AND BELTS. 5. NOTIFY OTHER TRADES OF ANY DEVIATIONS OR SPECIAL CONDITIONS NECESSARY FOR 2. PROVIDE A REPORT FOR THE OWNER OF ALL ITEMS THAT REQUIRE REPLACEMENT OR SERVICE. INSTALLATION OF WORK. 6. RESOLVE INTERFERENCES BETWEEN WORK OF OTHER TRADES PRIOR TO INSTALLATION OR FABRICATION. PROJECT INFORMATION: 7. ADVISE OTHERS TRADES TO LEAVE PROPER CHASES AND OPENINGS. PLACE OUTLETS, ANCHORS, L IVEW ELL ANIMAL SLEEVES AND SUPPORTS PRIOR TO POURING CONCRETE OR INSTALLATION OF MASONRY WORK. 8. COORDINATE ALL NECESSARY POWER CONNECTIONS AS RECOMMENDED BY THE MANUFACTURERS HOSPITAL OF INSTALLED EQUIPMENT WITH ELECTRICAL TRADESMAN. 6 9. SHOULD THIS COORDINATION BE NEGLECTED, ANY CUTTING AND/OR PATCHING REQUIRED TO BE 6 DONE AT CONTRACTOR'S EXPENSE. 12284 SW Scholls Ferry Road, Tigard, Oregon 97223 SSOE PROJECT#: 025-00883-00 SSOE MANAGER: Cope, Amy MECHANICAL SHEET INDEX ggssOe® 2204 Lakeshore M001 MECHANICAL LEGEND AND SCHEDULES Birmingham, AL 335209Suite 110 M002 MECHANICAL SPECIFICATIONS T. (20 323-2373 THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. M003MECHANICAL SUPPORTING DOCUMENTS UNAUTHORIZED USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. ©SSOE I STEVENS&WILKINSON AL,INC.2021 M101 MECHANICAL FIRST FLOOR DEMOLITION PLAN M102 MECHANICAL ROOF DEMOLITION PLAN MECHANICAL 7 M201 MECHANICAL FIRST FLOOR NEW WORK PLAN 7 LEGEND AND M202 MECHANICAL ROOF NEW WORK PLAN M301 MECHANICAL DETAILS SCHEDULES M302 MECHANICAL DETAILS MOOI A B C D E F G H J Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATH 4/27/2026 12:17:12 PM :PRINT DATE A B 1C 1D 1E F 1G H J 23 01 00 GENERAL 23 31 13.23 AIR DISTRIBUTION LOW 23 81 19. 13 SMALL CAPACITY A/C UNITS 23 34 16. 13 INLINE FANS 00 PRESSURE DUCTWORK 00 ssoe® 1. THE LOCATION OF PIPE, DUCT AND EQUIPMENT SHOWN ON THE DRAWINGS ARE DIAGRAMMATIC AND 1. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNA DUCT MANUAL 1. GENERAL 1. GENERAL SCHEMATIC AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE HIS OWN WORKING RECOMMENDATIONS. WHERE CODES FOR REQUIREMENTS OF U.L. ASSEMBLIES ARE MORE A. FANS SHALL BEAR THE AMCA CERTIFIED RATINGS SEAL FOR BOTH SOUND AND AIR PERFORMANCE. A. DESCRIPTION: THIS SECTION INCLUDES SMALL ROOFTOP AIR HANDLERS LESS THAN 20 TONS LAYOUT TO ELIMINATE ALL STRUCTURAL AND ARCHITECTURAL CONFLICTS IN THE BUILDING STRINGENT THEY SHALL SUPERSEDE SPECIFICATIONS AND DRAWINGS. B. FANS SHALL BE UL OR ETL LISTED. FOR DIRECT EXPANSION, SINGLE PACKAGED GAS OR ELECTRIC HEATING AND COOLING UNIT. 2. VERIFY ALL MEASUREMENTS AT THE SITE AND COORDINATE ALL WORK SO THAT IT DOES NOT 2. DUCTWORK SHALL BE OF S AND DRIVE CONSTRUCTION (OR EQUIVALENT IN POCKET-LOCK 2. REQUIREMENTS B. QUALITY CONTROL: UNIT SHALL BE ARI CERTIFIED, AGA AND UL LISTED. A. CAPACITY SHALL BE AS SHOWN ON DRAWINGS. 1 INTERFERE WITH THE WORK OF OTHER TRADES. CONSTRUCTION) IN ACCORDANCE WITH LATEST SMACNA STANDARDS. DUCT SHALL BE BUILT TO B. DUCT MOUNTED SUPPLY,EXHAUST OR RETURN FANS SHALL BE OF THE CENTRIFUGAL DIRECT//BELT DRIVEN C. ALL COMPONENTS SHALL BE FACTORY APPROVED BY AMCA AND SHALL BE A CURRENTLY 1 2"W.G. PER SMACNA STANDARDS. IN-LINE TYPE.THE FAN HOUSING SHALL BE OF THE SQUARE DESIGN CONSTRUCTED OF HEAVY GAUGE GALVANIZED CATALOGED PRODUCT. AIR MOVING AND COIL CAPACITY AND UNIT ARRANGEMENT SHALL BE PROFESSIONAL SEALS: MECHANICAL WORK INCLUDES THE FOLLOWING: DUCT GAUGE AND S SLIP CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF SMACNA. STEEL OR ALUMINUM AND SHALL INCLUDE SQUARE DUCT MOUNTING COLLARS. AS SHOWN ON DRAWINGS. UNITS SHALL BE FACTORY ASSEMBLED, INTERNALLY WIRED, 3. IN ADDITION TO THE ABOVE, SUPPLEMENTAL BRACING SHALL BE ADDED AS NECESSARY TO PREVENT C. FAN CONSTRUCTION SHALL INCLUDE TWO REMOVABLE ACCESS PANELS LOCATED PERPENDICULAR TO THE MOTOR SHIPPED IN ONE PIECE, SHALL MEET EXISTING REGULATORY NOISE STANDARDS AND SHALL 1. HEATING, VENTILATING, AIR CONDITIONING SYSTEMS, AND OTHER PIPING SYSTEMS AS SPECIFIED; SAGGING AND DRUMMING. MOUNTING PANEL.THE ACCESS PANELS MUST BE OF SUFFICIENT SIZE TO PERMIT EASY ACCESS TO ALL INTERIOR BE WEATHERPROOF. COMPONENTS. COMPLETE AND IN OPERATING ORDER. 4. DRIVE SLIPS SHALL BE USED FOR NARROW SIDES OF DUCTS THAT ARE 18 INCHES OR LESS, FOLDED D. THE FAN WHEEL SHALL BE CENTRIFUGAL BACKWARD INCLINED,CONSTRUCTED OF ALUMINUM AND SHALL INCLUDE D. THE UNIT SHALL BE FACTORY ASSEMBLED, INTERNALLY WIRED, FULLY CHARGED WITH R-454B, 2. EXCAVATION AND BACKFILLING FOR MECHANICAL WORK. OVER TO SEAL CORNERS. DRIVE SLIPS 19 INCHES TO 30 INCHES SHALL BE REINFORCED WITH ONE A WHEEL CONE CAREFULLY MATCHED TO THE INLET CONE FOR PRECISE RUNNING TOLERANCES.WHEELS SHALL AND 100% RUN TESTED. 3. CUTTING AND PATCHING REQUIRED DUE TO OMISSIONS IN THE INSTALLATION OF WORK IN THIS INCH BY ONE INCH BY 1/8 INCH ANGLE. BE STATICALLY AND DYNAMICALLY BALANCED. E. THE COOLING CAPACITY SHALL BE RATED IN ACCORDANCE WITH ARI STANDARD 360. ��Q PROFf DIVISION. 5. DUCT SECTIONS AND FITTINGS SHALL BE SECURED WITH SHEET METAL SCREWS. E. EACH FAN SHALL BEAR A PERMANENTLY AFFIXED MANUFACTURER'S NAMEPLATE CONTAINING THE MODEL NUMBER 2. CASING •\- ,uINF `Ssi AND INDIVIDUAL SERIAL NUMBER FOR FUTURE IDENTIFICATION. \ O 4. COUNTERFLASHING DUCTS AND PIPES WHERE THEY PENETRATE ROOFS AND OUTSIDE WALLS. 6. CONNECTIONS OF ROUND DUCT TO RECTANGULAR SHALL BE MADE WITH SPIN-IN COLLARS. A. EXTERIOR PANELS SHALL BE CONSTRUCTED OF ZINC COATED GALVANIZED STEEL, U I- F. MOTORS SHALL BE HEAVY-DUTY BALL BEARING TYPE,CAREFULLY MATCHED TO THE FAN LOAD AND FURNISHED AT � 'Y. 5. MAINTENANCE OF HEATING AND NC EQUIPMENT USED FOR TEMPORARY HEATING, COOLING AND 7. A DUCT IN WHICH THE LARGER SIDE IS LESS THAN 18 INCHES SHALL HAVE TRANSVERSE JOINTS AT THE SPECIFIED VOLTAGE,PHASE AND ENCLOSURE.MOTORS AND DRIVES SHALL BE MOUNTED OUT OF THE PHOSPHATIZED, AND PAINTED WITH A WEATHER RESISTANT BAKED ENAMEL FINISH. 1 FOR TESTING. LEAST EVERY EIGHT FEET. DUCTS 18 INCHES OR OVER LARGER SIDE DIMENSION SHALL HAVE AIRSTREAM.MOTORS SHALL BE READILY ACCESSIBLE FOR MAINTENANCE. PRECISION GROUND AND POLISHED FAN B. CABINET CONSTRUCTION SHALL ALLOW FOR ALL MAINTENANCE ON ONE SIDE OF THE UNIT. 6. INSTALL ALL MECHANICAL CONTROL COMPONENTS WHICH REQUIRE MECHANICAL CONNECTIONS TRANSVERSE JOINTS, OR EQUIVALENT SUPPLEMENTAL ANGLE REINFORCING ON 4 FOOT CENTERS. SHAFTS SHALL BE MOUNTED IN PERMANENTLY SEALED,LUBRICATED PILLOW BLOCK BALL BEARINGS. BEARINGS SERVICE PANELS SHALL HAVE LIFTING HANDLES AND BE REMOVED AND REINSTALLED BY N /27/2CD o�, ONLY (INCLUDING CONTROL WIRING-24 VOLT), BOTH MECHANICAL AND ELECTRICAL CONNECTIONS, 8. LONGITUDINAL JOINTS SHALL BE PITTSBURGH LOCK OR GROOVED SEAMS CLOSED TIGHTLY AND SHALL BE SELECTED FOR A MINIMUM(L10)LIFE IN EXCESS OF 100,000 HOURS AT MAXIMUM CATALOGED OPERATING REMOVING ONLY A SINGLE FASTENER WHILE PROVIDING A WATER AND AIRTIGHT SEAL. ON PENETRATIONS OF AIR PLENUMS AND DUCTS OR INSTALLATIONS INTO PIPING SYSTEMS. EVENLY. SPEED. DRIVES SHALL BE SIZED FOR A MINIMUM OF 150%OF DRIVEN HORSEPOWER.PULLEYS SHALL BE OF THE C. ALL EXPOSED VERTICAL PANELS AND TOP COVERS IN THE INDOOR AIR SECTION SHALL BE ,, OREGON FP, FULLY MACHINED CAST IRON TYPE,KEYED AND SECURELY ATTACHED TO THE WHEEL AND MOTOR SHAFTS. 'Q FM$ { 7. LOUVERS AND SCREENS, WHICH ARE SHOWN ON MECHANICAL DRAWINGS. 9. DUCTWORK OVER TEN INCHES DIMENSION, EITHER SIDE, SHALL HAVE SIDES CROSS BROKEN. INSULATED WITH A CLEANABLE FOIL-FACED, FIRE-RETARDANT, GLASS FIBER MATERIAL. THE Y ER MOTORS USED WITH VARIABLE FREQUENCY DRIVES SHALL BE DRIVE RATED. ,Q P`P 8. ALL BUILT-IN EQUIPMENT SHALL BE FURNISHED BY THE OWNER, UNLESS OTHERWISE NOTED, 10. GENERAL: FABRICATE AND INSTALL ALL DUCTWORK IN STRICT ACCORDANCE WITH THE APPROVED G. MOTORS SHALL BE PERMANENTLY LUBRICATED AND CAREFULLY MATCHED TO THE FAN LOADS.MOTORS SHALL BE BASE OF THE UNIT SHALL BE INSULATED WITH IA"THICK, 1 POUND DENSITY FOIL FACED, N P Ct.� INSTALLED UNDER OTHER DIVISION OF THESE SPECIFICATIONS, AND CONNECTED UNDER THIS SHOP DRAWINGS AND THE REFERENCED STANDARDS. READILY ACCESSIBLE FOR MAINTENANCE. CLOSED CELL MATERIAL. DIVISION. ROUGHING-IN SHALL ONLY BE DONE USING APPROVED ROUGHING-IN DRAWINGS. 11. CONNECTIONS: INSTALL AND MAKE ALL NECESSARY CONNECTIONS REQUIRED FOR THE COMPLETE H. PROVIDE THE FOLLOWING ACCESSORIES: D. THE TOP COVER SHALL BE ONE-PIECE CONSTRUCTION OR WHERE SEAMS EXIST, IT SHALL BE EXPIRES: 12/3 1/27 • PROVIDE INLET/DISCHARGE GUARDS FOR NON-DUCTED APPLICATIONS. SUPPLY, CIRCULATION, AND EXHAUST SYSTEMS INDICATED ON THE APPROVED SHOP DRAWINGS, DOUBLE-HEMMED AND GASKET-SEALED. THE FOLLOWING WORK SHALL BE FURNISHED UNDER OTHER DIVISION OF THESE SPECIFICATIONS: INCLUDING ALL DUCTWORK, GRILLE COLLARS, INTAKE HOUSINGS, CONNECTIONS, FASTENERS, • PROVIDE A VARIABLE SPEED CONTROLLER(FOR DIRECT DRIVE FANS ONLY). 3. COMPRESSORS HANGERS, AND OTHER ITEMS REQUIRED. • PROVIDE GRAVITY//MOTORIZED PARALLEL BLADE DAMPERS WITH GALVANIZED FRAMES PRE-PUNCHED A. FOR STANDARD EFFICIENCY 3-TON UNITS: THE UNIT SHALL HAVE DIRECT DRIVE, HERMETIC, MOUNTING HOLES,ALUMINUM BLADES WITH FELT EDGES AND A BALANCED DESIGN FOR MINIMAL 1. THE RELATED ELECTRICAL WORK IS COVERED IN DIVISION 26, ELECTRICAL. ELECTRICAL POWER AND 12. SEAL ALL JOINTS TO PROVIDE AN AIRTIGHT SYSTEM. RESISTANCE TO AIRFLOW. RECIPROCATING TYPE COMPRESSORS. THE RECIPROCATING TYPE COMPRESSORS SHALL CONTROL (120 VOLT)WIRING SHALL BE PROVIDED AND INSTALLED UNDER THE ELECTRICAL DIVISION. 13. DUCTWORK ASPECT RATIO (W/H) SHALL NOT EXCEED 4:1 WITHOUT ENGINEER APPROVAL. • A FACTORY WIRED NEMA 1 DISCONNECT SWITCH SHALL BE PROVIDED. HAVE A CENTRIFUGAL OIL PUMP THAT PROVIDES POSITIVE LUBRICATION TO MOVING PARTS. DISCONNECTS SHALL BE FURNISHED AND INSTALLED UNDER ELECTRICAL DIVISION. UNLESS NOTED 14. FLEX DUCTWORK SHALL NOT EXCEED 5 FEET IN LENGTH WITH ONE ELBOW(NOT EXCEEDING 90°)AND • PROVIDE AN INSULATED HOUSING FOR NOISE REDUCTION AND CONDENSATION CONTROL.THE INTERIOR OF THE MOTOR SHALL BE SUCTION GAS-COOLED. THE UNIT SHALL BE COMPLETE WITH 2 OTHERWISE IN SPECIFIC SECTIONS OF THAT SPECIFICATION. SHALL ONLY BE USED AT CONNECTION TO AIR DISTRIBUTION DEVICES. THE FAN HOUSING SHALL BE LINED WITH A FIBERGLASS DUCT LINER. CRANKCASE HEATER, INTERNAL TEMPERATURE,AND CURRENT-SENSITIVE MOTOR 2 2. PAINTING INCLUDING PIPING SHALL BE DONE UNDER THE PAINTING DIVISION. • PROVIDE A PRESSURE PROBE CONSISTING OF A 1/4 INCH DIAMETER TUBE IN THE FAN VENTURI THAT OVERLOADS FOR MAXIMUM PROTECTION. COMPRESSORS SHALL HAVE INTERNAL SPRING 3. FLASHING OF DUCTS AND PIPES INTO ROOFS AND OUTSIDE WALLS SHALL BE DONE UNDER ALLOWS HOOK-UP TO THE MANOMETER(FOR STATIC PRESSURE MEASUREMENT). ISOLATION AND SOUND MUFFLING TO MINIMIZE VIBRATION TRANSMISSION AND NOISE. CONSULTANTS: ARCHITECTURAL DIVISION. • PROVIDE STANDING//HANGING SPRING//NEOPRENE VIBRATION ISOLATION KIT. B. FOR 3-TON HIGH EFFICIENCY AND 4 THROUGH 25-TON UNITS: THE UNIT SHALL HAVE 4. HOLES, CHASES AND RECESSES REQUIRED FOR MECHANICAL WORK, WHERE ADVANCE NOTICE IS 3. INSTALLATION DIRECT-DRIVE, HERMETIC, SCROLL TYPE COMPRESSORS WITH CENTRIFUGAL TYPE OIL A. FURNISH AND INSTALL FANS PER THE MANUFACTURER'S RECOMMENDED INSTALLATION INSTRUCTIONS. 5. MISCELLANEOUSGIVEN THE STEELR.WORK, SUCH AS EQUIPMENT SUPPORTS. 23 07 13 / 23 07 19 MECHANICAL SYSTEM INSULATION PUMPS. MOTOR SHALL BE SUCTION GAS-COOLED. INTERNAL OVERLOADS, CRANKCASE HEATERS,AND HIGH/LOW PRESSURE CONTROL SHALL BE PROVIDED WITH THE SCROLL 6. ACCESS PANELS AND DOOR GRILLES SHALL BE INSTALLED UNDER OTHER DIVISIONS. COMPRESSOR. 7. OWNER-FURNISHED EQUIPMENT SHALL BE INSTALLED BY OTHER DIVISIONS. C. DISCHARGE AND LIQUID LINE SERVICE VALVES SHALL BE PROVIDED FOR EACH REFRIGERANT (40iii;i0, 8. OPENINGS IN CASEWORK SHALL BE PROVIDED BY CASEWORK MANUFACTURERS. 1. THE EXTENT OF PIPING AND DUCT INSULATION WORK IS INDICATED ON THE DRAWINGS AND BY THE CIRCUIT. REQUIREMENTS OF THIS SECTION. D. COMPRESSORS SHALL BE WARRANTED AGAINST FAILURE OF A MINIMUM PERIOD OF FIVE WORKMEN SHALL BE EXPERIENCED IN THEIR RESPECTIVE TRADES. THE WORKMANSHIP OF THE 2. MATERIALS FOR DUCTS: BLANKET TYPE DUCT INSULATION: PROVIDE MINIMUM 1 POUND PER CUBIC YEARS AFTER STARTUP. INSTALLED WORK SHALL BE FIRST CLASS AND SHALL BE JUDGED BY THE ARCHITECT AND ENGINEER. FOOT DENSITY, FLEXIBLE, FACTORY REINFORCED FOIL FACED KRAFT VAPOR BARRIER GLASS FIBER 4. REFRIGERANT CIRCUIT enfinitY BLANKET"SYSTEM"TYPE INSULATION, HAVING A MINIMUM INSTALLED "R"VALUE OF 6.0. PRODUCT TO A. PROVIDE EACH CIRCUIT WITH AN INDEPENDENT FIXED ORIFICE EXPANSION DEVICE OR BE "MICROLITE"WITH FSKL ALUMINUM FOIL REINFORCED WITH FIBERGLASS SCRIM LAMINATED TO A EXPANSION VALVE. SERVICE PRESSURE PORTS AND REFRIGERANT LINE FILTER DRYERS UL RATED KRAFT, AS MANUFACTURED BY MANVILLE, OR EQUIVALENT BY C.S.G., KNOFF, OR SHALL BE FACTORY INSTALLED. OWENS-CORNING. PROVIDE INSULATION FOR FOLLOWING: UNLINED CONDITIONED SUPPLY/RETURN B. PROVIDE AN AREA FOR REPLACEMENT OF THE SUCTION LINE DRYER. CityPark Building 6 DUCTS 2"THICK. 5. EVAPORATOR AND CONDENSER COILS 214 Centerview Drive,Suite 200 23 01 02 SUBMITTALS 3. ALL VAPOR BARRIER MATERIAL, INCLUDING THE ASJ JACKETS AND KRAFT-PAPER ALUMINUM-FOIL A. FOR PRECEDENT UNITS: EVAPORATOR AND CONDENSER COILS SHALL BE CONSTRUCTED OF Brentwood,Tennessee 37027 JACKETS PREVIOUSLY DESCRIBED SHALL MEET THE REQUIREMENTS OF FEDERAL SPECIFICATION INTERNALLY FINNED 5/16"O.D. COPPER TUBING MECHANICALLY BONDED TO A CONFIGURED HN-B-100B, "BARRIER MATERIAL VAPOR (FOR PIPE, DUCT AND EQUIPMENT THERMAL INSULATION) ALUMINUM PLATE FIN. Phone: 615.377.0093 TYPE 1". B. ALL COILS SHALL BE EQUIPPED WITH THERMAL EXPANSION VALVES AND FACTORY PRESSURE Enfinity Project#25180 1. SUBMIT FOR REVIEW,A LIST OF MAJOR EQUIPMENT WITHIN 25 DAYS AFTER AWARD OF CONTRACT. 4. STAPLES, BANDS, WIRES AND CEMENTS SHALL BE AS RECOMMENDED BY THE INSULATION TESTED AT 400 PSIG AND LEAK TESTED AT 200 PSI. 2. SUBMIT TO THE ENGINEER FOR REVIEW, 1 COPY OF ELECTRONIC SUBMITTALS ON MATERIAL MANUFACTURER FOR THE APPLICATIONS INDICATED. C. PROVIDE A REMOVABLE, REVERSIBLE, DOUBLE-SLOPED CONDENSATE DRAIN PAN WITH FURNISHED UNDER THIS DIVISION. SUBMITTAL DATA SHALL BE CHECKED AND STAMPED 5. ADHESIVES, SEALERS, AND PROTECTIVE FINISHES SHALL BE AS RECOMMENDED BY THE INSULATION PROVISION FOR THROUGH THE BASE CONDENSATE DRAIN. APPROVED BY THE CONTRACTOR PRIOR TO HIS TRANSMITTING TO THE ENGINEER. SUBMITTALS FOR EACH APPLICATION. 6. CONDENSER FANS 3 SHALL CONTAIN RATING DATA, ACCESSORIES, AND FEATURES THE SAME AS LISTED IN 6. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN 3 A. ALL CONDENSER FANS SHALL BE VERTICAL DISCHARGE, DIRECT DRIVE FANS, STATICALLY SPECIFICATIONS AND CAPACITIES SHALL BE STATED IN THE TERMS SPECIFIED. INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. BALANCED, WITH STEEL BLADES AND ZINC PLATED STEEL HUBS. 3. SUBMITTALS SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:ALL EQUIPMENT AND 7. INSTALL PROTECTIVE METAL SHIELDS AND INSULATED INSERTS WHEREVER NEEDED TO PREVENT B. CONDENSER FAN MOTORS SHALL BE PERMANENTLY LUBRICATED WITH BUILT-IN THERMAL FIXTURES SHOWN OR INDICATED ON THE HVAC MECHANICAL AND PLUMBING DRAWINGS AND COMPRESSION OF INSULATION. OVERLOAD PROTECTION. SPECIFICATIONS. 7. AIR HANDLING SYSTEM 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FLAG ALL DEVIATIONS ON THE SHOP DRAWINGS A. SUPPLY FAN FROM THE SPECIFIED ITEM AND APPROVAL OF THE SHOP DRAWINGS WILL NOT BE CONSIDERED • 3 TO 5 TON UNITS SHALL BE PROVIDED WITH DIRECT DRIVE, FORWARD CURVED, ACCEPTANCE OF THE DEVIATION UNLESS IT'S BEEN EXPLICITLY FLAGGED. 5. ADDITIONAL INSTALLATION COSTS ASSOCIATED WITH SUBSTITUTED EQUIPMENT REQUIRING CENTRIFUGAL FANS OR BELT DRIVEN, FORWARD CURVED FANS WITH ADJUSTABLE MOTOR ADDITIONAL WORK ON THE PART OF THIS CONTRACTOR OR OTHER SUBCONTRACTORS TO 23 33 00 SHEET METAL ACCESSORIES SHEAVES. SATISFY THE MANUFACTURER'S INSTALLATION REQUIREMENTS SHALL BE THE RESPONSIBILITY OF • 6 TO 20 TON UNITS SHALL BE PROVIDED WITH BELT DRIVE MOTORS WITH AN ADJUSTABLE THE SUBMITTING CONTRACTOR. IDLER-ARM ASSEMBLY FOR QUICK ADJUSTMENT TO FAN BELTS AND MOTOR SHEAVES. 1. CONTRACTOR SHALL PROVIDE AND INSTALL THE FOLLOWING EQUIPMENT AS SPECIFIED HEREIN AND ALL MOTORS SHALL BE THERMALLY PROTECTED. IN LOCATIONS SHOWN ON DRAWINGS. B. FILTERS 2. FIRE DAMPERS TO BE UL LABELED AND CONFORM TO NFPA 90A AND NFPA 90B. • PROVIDE THE UNIT WITH 2"THICK PLEATED FILTERS. 3. AIR DIFFUSERS, GRILLES, AND REGISTERS TO HAVE RATING CERTIFIED BY AIR DIFFUSION COUNCIL C. MANUAL OUTSIDE AIR OPTION: PROVIDE MANUALLY CONTROLLED OUTSIDE AIR DAMPER THAT AND TESTED PER ADC EQUIPMENT TEST CODE 1062R2 AND ASHRAE STANDARD 36B-63. CAN PROVIDE UP TO 15°/0 OUTSIDE AIR. SUBMITTAL/REVISION SCHEDULE: 23 05 93 TEST AND BALANCE 4. FIRE DAMPERS SHALL MEET TEST REQUIREMENTS OF UL 555. D. ECONOMIZER 5. EQUIPMENT REQUIREMENTS FOR REGISTERS, GRILLES AND DIFFUSERS: • PROVIDE AN ASSEMBLY THAT INCLUDES FULLY MODULATING 0-100% MOTOR AND NO. DATE DESCRIPTION • ACCEPTABLE MANUFACTURERS INCLUDE PRICE, TITUS, GREENHECK, AND ANEMOSTAT. (PRICE DAMPERS, MINIMUM POSITION SETTING, PRESET LINKAGE, WIRING HARNESS WITH PLUG, NUMBERS ARE USED.) AND SPRING RETURN ACTUATOR. 1. THIS WORK SHALL INCLUDE ALL HVAC SUPPLY, RETURN AND EXHAUST DUCT SYSTEMS. • • CEILING DIFFUSERS: PRICE ASPD, SQUARE RECESSED DIFFUSERS, WITH BAKED-ON WHITE • THE BAROMETRIC RELIEF SHALL PROVIDE A PRESSURE-OPERATED DAMPER THAT SHALL CONTRACTOR SHALL PROVIDE ALL EQUIPMENT NECESSARY FOR TESTING AND BALANCING. ENAMEL FINISH. FRAME TO BE FOR A LAY-IN CEILING GRID. DIFFUSERS LOCATED IN CEILING BE GRAVITY CLOSING AND SHALL PROHIBIT THE ENTRANCE OF OUTSIDE AIR DURING THE 2. THE CLEANING, TESTING AND BALANCING DESCRIBED HEREIN ARE MINIMUM REQUIREMENTS AND DIRECTLY BELOW ROOF SHALL HAVE INSULATED BACKS. EQUIPMENT"OFF"CYCLE. FOR 6-20 TON UNITS PROVIDE A POWERED EXHAUST FAN FOR • SHALL BE PERFORMED BY AN INDEPENDENT NEBB OR AABC CERTIFIED TEST AND BALANCE • CEILING DIFFUSERS MAY BE SUITABLE FOR LAY-IN TILE INSTALLATION BY MOUNTING IT IN A USE WITH THE ECONOMIZER CYCLE TO MAINTAIN PROPER BUILDING PRESSURIZATION. • 4 CONTRACTOR. ADDITIONAL TESTS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION SHALL FACTORY FABRICATED, 24"X 24" BACK PAN. DO NOT USE DIRECTIONAL DIFFUSERS. DIFFUSERS • PROVIDE THE FOLLOWING ECONOMIZER CONTROL: DRY BULB CONTROL//COMPARATIVE 4 ALSO BE PERFORMED. NOTED ON DRAWINGS, AS THREE-WAY OR TWO-WAY BLOW SHALL BE FOUR-WAY DIFFUSERS 3. DUCTWORK AND RELATED ITEMS SHALL BE INSPECTED FOR SHARP EDGES OR OTHER HAZARDOUS ENTHALPY CONTROL // REFERENCE ENTHALPY CONTROL. WITH SIDES BLANKED OFF WITH SHEET METAL PLATES INSTALLED IN THE DIFFUSER NECKS. 8. HEATING SYSTEM CONDITIONS. SUCH CONDITIONS SHALL BE CORRECTED APPROPRIATELY PRIOR TO FINAL • EXHAUST AND RETURN REGISTERS: PRICE MODEL 80 1/2" EGG-CRATE ALUMINUM WITH A. ELECTRIC HEATING INSPECTION. BAKED-ON, WHITE ENAMEL FINISH. INTERIOR OF SQUARE TO ROUND TRANSITION ABOVE • 4. THOROUGHLY CLEAN ALL COMPONENTS OF THE SUPPLY, RETURN AND EXHAUST SYSTEMS AND • THE ELECTRIC HEAT MODULE SHALL BE CONSTRUCTED OF HEAVY-DUTY NICKEL REGISTER SHALL BE MATTE BLACK. SCREWS IN THE FACE OF THESE GRILLES SHALL MATCH THE REMOVE ALL DIRT, SCALE, OIL AND OTHER FOREIGN MATERIALS, WHICH MAY BE PRESENT. CHROMIUM ELEMENTS INTERNALLY DELTA CONNECTED FOR 240 VOLT, WYE CONNECTED 5. AFTER COMPLETION OF THE INSTALLATION OF THE AIR CONDITIONING, HEATING, VENTILATING AND FINISH. FOR 480 VOLT. EXHAUST SYSTEMS, AND PRIOR TO ACCEPTANCE BY THE OWNERS, ALL AIR HANDLING SYSTEMS AND 6. EQUIPMENT REQUIREMENTS FOR FIRE AND SMOKE DAMPERS: • EACH HEATER PACKAGE SHALL HAVE AUTOMATICALLY RESET HIGH LIMIT CONTROL • • DAMPERS SHALL BE UL LISTED AND IN COMPLIANCE WITH NFPA 90A. FIRE DAMPERS FOR USE IN OPERATING THROUGH HEATING ELEMENT CONTACTORS. ALL HEATERS SHALL BE APPURTENANCES APPLICABLE TO THE ABOVE SYSTEM SHALL BE ADJUSTED AND BALANCED TO WALLS, CEILINGS AND FLOORS SHALL BE GREENHECK, RUSKIN, OR LEADER INDUSTRIES. SEE DELIVER THE AIR QUANTITIES AS SPECIFIED, INDICATED ON THE DRAWINGS, OR AS DIRECTED. INDIVIDUALLY FUSED FROM THE FACTORY, AND SHALL MEET ALL NEC REQUIREMENTS. • ARCHITECTURAL AND/OR MECHANICAL PLANS FOR HOUR RATING OF FLOORS AND/OR WALL AT 6. INSTRUMENTS REQUIRED FOR THE AIR BALANCE SHALL HAVE BEEN CALIBRATED WITHIN A PERIOD DAMPER LOCATIONS. DAMPERS TO BE COMPATIBLE WITH HOUR RATINGS. DO NOT USE • POWER ASSEMBLIES SHALL PROVIDE A SINGLE POINT POWER CONNECTION. OF SIX MONTHS PRIOR TO BALANCING. TYPES AND DATES OF CALIBRATION OF ALL INSTRUMENTS DAMPERS WITH ASBESTOS PAPER OR COATING. SMOKE DETECTORS SHALL BE EITHER ORDERED 9. CONTROLS SHALL BE LISTED IN THE FINAL AIR BALANCE REPORTS HEREINAFTER SPECIFIED. CONTRACTOR WITH THE DAMPER OR PROVIDED BY ELECTRICAL DIVISION. COORDINATE LOCATION AND A. THE UNIT SHALL BE COMPLETELY FACTORY WIRED WITH NECESSARY CONTROL AND • SHALL BALANCE SUPPLY, RETURN, AND EXHAUST AIR TO WITHIN PLUS OR MINUS 10% OF DESIGN. CONTACTOR PRESSURE LUGS OR TERMINAL BLOCK FOR POWER WIRING. AIR BALANCE SHALL BE PERFORMED BY AABC OR NEBB CERTIFIED AIR BALANCE COMPANY AND THE REQUIREMENT FOR SMOKE DETECTORS PRIOR TO ORDERING DAMPERS. B. UNIT CONTROLLER: PROVIDE DDC MICROPROCESSOR CONTROLS TO CONTROL ALL UNIT • FIRE DAMPERS TO BE UL555 DYNAMIC RATED CURTAIN STYLE WITH SPRING CLOSING FOR BOTH PROCEDURE FOLLOWED AND FORMS USED SHALL AGREE WITH NEBB OR AABC STANDARDS. DUCT FUNCTIONS. THE RESIDENT CONTROL ALGORITHMS SHALL MAKE ALL HEATING, COOLING, HORIZONTAL AND VERTICAL MOUNTING. DAMPERS TO BE MANUFACTURED BY GREENHECK, •APPROVED FOR CONSTRUCTION SYSTEMS SHALL BE LEAK TESTED IN ACCORDANCE WITH SMACNA STANDARDS. LEAKAGE RATE RUSKIN, OR LEADER INDUSTRIES. ALL DAMPERS SHALL BE "C" STYLE FRAMES IN SQUARE AND AND/OR VENTILATING DECISIONS IN RESPONSE TO ELECTRONIC SIGNALS FROM SENSORS J NOT APPROVED FOR CONSTRUCTION SHALL NOT EXCEED MAXIMUM LEVELS AS SPECIFIED IN THE STANDARDS. MEASURING INDOOR AND OUTDOOR TEMPERATURES. THE CONTROL ALGORITHM SHALL 7. AIR QUANTITY MEASUREMENTS IN MAIN AND BRANCH DUCTS SHALL BE PERFORMED BY PITOT TUBE RECTANGULAR LOW PRESSURE SUPPLY, RETURN, OR EXHAUST DUCTS OR ROUND, OVAL OR MAINTAIN ACCURATE TEMPERATURE CONTROL, MINIMIZE DRIFT FROM SET POINT, AND TRAVERSE OF THE ENTIRE CROSS-SECTIONAL AREA OF THE DUCT. DUCTS HAVING VELOCITIES OF MEDIUM PRESSURE APPLICATIONS AND MAY HAVE NO MORE THAN ZERO (0) PERCENT PROVIDE BETTER OCCUPANT COMFORT. THE CENTRALIZED MICROPROCESSOR SHALL CLIENT INFORMATION: OBSTRUCTION TO AIRFLOW. PROVIDE DAMPERS WITH INTEGRAL SLEEVES AND PREFORMED 1000 OR MORE FEET PER MINUTE SHALL BE MEASURED BY INCLINED MANOMETERS (DRAFT GAUGE) PROVIDE ANTI-SHORT CYCLE TIMING AND TIME DELAY BETWEEN COMPRESSORS. OR MAGNEHELIC GAUGES. AIR MEASUREMENTS REQUIRED FOR DUCTS HAVING VELOCITIES OF LESS ANGLE FRAMES WITH METAL GAUGES AS REQUIRED BY SMACNA AND IN ACCORDANCE WITH UL 10. ACCESSORIES THAN 1000 FEET PER MINUTE SHALL BE PERFORMED WITH MICROMANOMETERS, HOOD GAUGES OR AND NFPA REQUIREMENTS. A. ROOF CURB MISSION PET HEALTH • ALL DAMPERS SHALL HAVE SUITABLE ACCESS DOORS IN THE DUCT FOR EXAMINATION, TESTING SIMILAR LOW PRESSURE INSTRUMENTS. OPENINGS IN DUCTS FOR PITOT TUBE INSERTION SHALL BE AND SERVICE OF THE DAMPER. • PROVIDE A ROOF-MOUNTING CURB CONSTRUCTED OF HEAVY GAUGE ZINC COATED STEEL SEALED WITH SNAP-IN PLUGS AFTER AIR BALANCE IS COMPLETE. OUTLET AND INLET AIR QUANTITIES 8. EQUIPMENT REQUIREMENTS FOR LOW PRESSURE FLEX AND FLEXIBLE DUCT: WITH NOMINAL 2"X 4" NAILER SETUP. SUPPLY/RETURN AIR OPENING GASKETING SHALL SHALL BE DETERMINED BY DIRECT READING VELOCITY METERS IN ACCORDANCE WITH OUTLET AND • CONNECT INDOOR FANS TO DUCT SYSTEM WITH UL LISTED 20 OUNCE FLAME RETARDANT BE PROVIDED. INLET MANUFACTURER'S RECOMMENDATIONS. CANVAS. • THE CURB HEIGHT SHALL BE 14"TALL.5 8. TOTAL AIR QUANTITIES SHALL BE OBTAINED BY ADJUSTMENT OF FAN SPEEDS. BELT DRIVEN FANS • USE FLEXIBLE DUCT SPECIFIED AS REQUIRED BETWEEN DUCT AND REGISTERS, GRILLES, AND • THE CURB SHALL BE OF SUFFICIENT HEIGHT TO ALLOW THE BOTTOM OF THE INTAKE 5 Oji. SHALL HAVE SHEAVES CHANGED AS REQUIRED TO OBTAIN DESIGN AIRFLOW QUANTITIES. BRANCH DIFFUSERS. LOUVER TO BE 36" INCHES FROM THE ROOF LEVEL. SV DUCT AIR QUANTITIES SHALL BE ADJUSTED BY VOLUME OR SPLITTER DAMPERS. DAMPERS SHALL BE • SEAL OFF THE INSULATION JACKET AT ITS ENDS, AT JOINTS AND OVER PUNCTURES OF THE B. HOT GAS REHEAT: PROVIDE A HOT-GAS REHEAT COIL LOCATED ON THE LEAVING AIRSIDE OF PERMANENTLY MARKED AFTER AIR BALANCE IS COMPLETE SO THAT THEY CAN BE RESTORED TO VAPOR BARRIER JACKET WITH 3"WIDE PRESSURE SENSITIVE TAPE. THE EVAPORATOR COIL THAT IS PRE-PIPED AND CIRCUITED AT THE FACTORY. THE UNIT THEIR CORRECT POSITION IF DISTURBED AT ANY TIME. 9. SHEET METAL ACCESSORIES TO BE INSTALLED IN LOCATIONS SHOWN ON DRAWINGS. SHALL BE EQUIPPED WITH CRANKCASE HEATER(S), LOW-PRESSURE SWITCH(ES), FROST STAT, 9. VOLUME ADJUSTERS MAY BE USED TO BALANCE AIR QUANTITIES AT OUTLETS AND INLETS 10. INSTALLATION TO BE IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED RECOMMENDATIONS AS AND THERMOSTATIC EXPANSION VALVE. Southern Veterinary Partners PROVIDING FINAL ADJUSTMENTS DO NOT PRODUCE SOUND LEVELS IN EXCESS OF HERETOFORE WELL AS APPLICABLE SECTIONS OF SMACNA MANUAL AND OTHER STANDARDS SET FORTH IN PART C. HINGED ACCESS DOORS: PROVIDE HINGED ACCESS DOORS ON THE FILTER/EVAPORATOR, SPECIFIED LIMITS, OR OBJECTIONABLE DRAFTS. AIR QUANTITY ADJUSTMENTS BY OUTLET 1.03 ABOVE. SUPPLY FAN/HEAT,AND COMPRESSOR/CONTROL SECTIONS OF THE UNIT. DEFLECTORS, GRIDS OR AIR SCOOPS WILL NOT BE PERMITTED. 2204 LAKESHORE DRIVE, SUITE 325 11. PROVIDE ALL SCREWS, BOLTS, NUTS, INSERTS,AND MATERIAL REQUIRED FOR ATTACHING SHEET D. THROUGH THE BASE CONNECTIONS 10. RECORD AND SUBMIT FOR EVALUATION AND APPROVAL THREE (3) COPIES OF THE COMPLETE AIR BIRMINGHAM, AL 35209 METAL TO DUCT, WALLS, FLOORS, AND CEILINGS. • PROVIDE THE ELECTRICAL SERVICE ENTRANCE FOR BOTH CONTROL AND MAIN POWER BALANCE REPORT. REPLACEMENT OF ADJUSTABLE PULLEYS, ADDITION OF BALANCING DAMPERS OR PRESSURE TAPS, REQUIRED TO EFFECT PROPER AIR BALANCE SHALL BE FURNISHED AND INSTALLED 12. PROVIDE BALANCING DAMPERS AT POINTS ON LOW PRESSURE SUPPLY, RETURN, AND EXHAUST WIRING INSIDE THE CURB AND THROUGH THE BASE OF THE UNIT. BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. IF REQUESTED, ANY OR ALL OF THE SYSTEMS WHERE BRANCHES ARE TAKEN FROM LARGER DUCTS AS REQUIRED FOR AIR BALANCING. • PROVIDE A THERMAL MAGNETIC, MOLDED CASE HACR CIRCUIT BREAKER WITH ALL USE SPLITTER DAMPERS ONLY WHERE INDICATED. ELECTRICAL CONNECTIONS THROUGH THE UNIT BASE. THE CIRCUIT BREAKER SHALL BE ABOVE FIELD TESTS SHALL BE CONDUCTED IN THE PRESENCE OF THE ARCHITECT'S REPRESENTATIVE. 13. PROVIDE FIRE DAMPERS AT LOCATIONS INDICATED, WHERE DUCTS AND OUTLETS PASS THROUGH INSTALLED WITH A WATERTIGHT ENCLOSURE IN THE UNIT WITH ACCESS THROUGH A 11. IN ADDITION, THE CONTRACTOR SHALL SUBMIT TO THE ARCHITECT A TYPED, WRITTEN REPORT TO FIRE RATED COMPONENTS, AND WHERE REQUIRED BY AUTHORITIES HAVING JURISDICTION. INSTALL SWINGING DOOR. WIRING SHALL BE PROVIDED FROM THE SWITCH TO THE UNIT HIGH INCLUDE THE FOLLOWING: WITH REQUIRED PERIMETER MOUNTING ANGLES, SLEEVES, BREAKAWAY DUCT CONNECTIONS, VOLTAGE TERMINAL BLOCK. THE CIRCUIT BREAKER SHALL PROVIDE OVERCURRENT • A STATEMENT THAT ALL SYSTEMS HAVE BEEN TESTED, CHECKED OUT, BALANCED AND ARE CORROSION RESISTANT SPRINGS, BEARINGS, BUSHINGS AND HINGES. PROTECTION, BE SIZED PER NEC AND UL GUIDELINES, AND BE AGENCY RECOGNIZED BY 14. PROVIDE BACKDRAFT DAMPERS ON EXHAUST FANS OR EXHAUST DUCTS NEAREST TO OUTSIDE AND UL. PROJECT INFORMATION: OPERATING PROPERLY. • A STATEMENT THAT ALL FILTERS HAVE BEEN REPLACED WHERE INDICATED. • PROVIDE A 3-POLE, MOLDED CASE, DISCONNECT SWITCH WITH THE ELECTRICAL • A STATEMENT, SIGNED BY THE OWNER, STATING THAT WRITTEN OPERATING PROCEDURES AND 15. PROVIDE FLEXIBLE CONNECTIONS IMMEDIATELY ADJACENT TO EQUIPMENT IN DUCTS ASSOCIATED CONNECTION THROUGH THE UNIT BASE. THE DISCONNECT SWITCH SHALL BE INSTALLED L IVEW ELL ANIMAL TRAINING HAVE BEEN RECEIVED. WITH FANS AND MOTORIZED EQUIPMENT. IN THE UNIT IN A WATERTIGHT ENCLOSURE WITH ACCESS THROUGH A SWINGING DOOR. 16. PROVIDE DUCT ACCESS DOORS FOR INSPECTION AND CLEANING BEFORE AND AFTER FILTERS, 12. AIR-SIDE TEMPERATURE AND OTHER READINGS FOR EACH NC UNIT, INCLUDING: WIRING SHALL BE PROVIDED FROM THE SWITCH TO THE UNIT HIGH VOLTAGE TERMINAL HOSPITAL • OUTSIDE AIR TEMP (DB/WB) COILS, FANS, AUTOMATIC DAMPERS, AT FIRE DAMPERS,AND ELSEWHERE AS INDICATED. BLOCK. THE SWITCH SHALL BE UL RECOGNIZED. • RETURN AIR TEMP (DB/WB) E. ELECTRONIC ZONE SENSORS: PROVIDE A PROGRAMMABLE NIGHT SETBACK SENSOR WITH • MIXED AIR TEMP (DB/WB) AUTO OR MANUAL CHANGEOVER WITH 7 DAY PROGRAMMING. 6 • SUPPLY AIR TEMP (DB/WB) F. GFI CONVENIENCE OUTLET: PROVIDE A FACTORY INSTALLED 15A, 115V GROUND FAULT 6 • FAN RPM INTERRUPTER CONVENIENCE OUTLET. OUTLET SHALL BE FACTORY INSTALLED AND • TOTAL STATIC PRESSURE CIRCUITED SEPARATELY FROM MAIN UNIT DISCONNECT TO ALLOW POWER WHEN MAIN • PRESSURE DROP ACROSS COMPONENTS DISCONNECT IS SHUT OFF. PROVIDE SEPARATE DISCONNECT FOR CONVENIENCE OUTLET. • CFM AT EACH SUPPLY, RETURN AND EXHAUST OUTLET G. PROVIDE UNIT WITH UL LISTED, FACTORY INSTALLED AND CALIBRATED REFRIGERANT 14. ALL REPORTS BY THE CONTRACTOR SHALL INCLUDE BOTH THE DATE OF THE TEST AND THE NAMES SENSOR. UNIT SHALL BE EQUIPPED WITH MANUFACTURER'S CONTROL SEQUENCE TO 12284 SW Scholls Ferry Road, Tigard, Oregon OF ALL PERSONS PERFORMING AND WITNESSING THE TESTS. ENERGIZE FANS, DE-ENERGIZE COMPRESSORS, DE-ENERGIZE HEATING, AND SIGNAL AN 97223 15. IF, AFTER BALANCING TO THE REQUIREMENTS ABOVE, SOME ROOM TEMPERATURES DEVIATE MORE ALARM UPON DETECTION OF REFRIGERANT LEAK. THAN 2 DEGREES F FROM THE THERMOSTATIC SET POINT FOR THE RESPECTIVE ZONE, THE 11. INSTALLATION SSOE PROJECT#: 025-00883-00 CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS IN THE AIRFLOW TO MINIMIZE TEMPERATURE A. UNIT SHALL BE LOCATED WHERE SHOWN ON THE DRAWINGS. ALL UNITS SHALL BE INSTALLED DEVIATIONS AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL INCLUDE LINE ITEM IN A NEAT, WORKMANLIKE MANNER IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. SSOE MANAGER: Cope, Amy COST FOR THIS/THESE TRIPS IN BID. B. ALL CONTROLS SHALL BE PROPERLY CONNECTED AND COORDINATED AS REQUIRED UNDER 16. MECHANICAL CONTRACTOR SHALL MEASURE THE DIFFERENTIAL PRESSURE BETWEEN TUBES ON ALL THE CONTROLS SECTION OF THIS DIVISION. 88 SSOe® DUCT MOUNTED SMOKE DETECTORS AND VERIFY COMPLIANCE WITH MANUFACTURER'S RANGE OF C. ANY DAMAGE TO FINS, GUARDS, OR HOUSING FROM SHIPPING OR INSTALLATIONS SHALL BE 2204 Lakeshore Drive, Suite 110 ACCEPTABLE DIFFERENTIAL PRESSURES. CORRECTED AND PAINTED AS REQUIRED. Birmin ham, AL 35209 18. CODE REQUIRED PRESSURE RELATIONSHIPS AS INDICATED ON THE PLANS SHALL BE MAINTAINED D. UNITS SHALL BE MOUNTED ON A FULL PERIMETER ROOF CURB AND INSTALLED AS SHOWN ON T. (205) 323-2373 REGARDLESS OF ALLOWED 10°/D TOLERANCES. THE PLANS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. THIS DRAWING IS THE PROPERTY OF SSOE 1 STEVENSB WILKINSON AL,INC E. RUN CONDENSATE DRAIN FULL SIZE TO NEAREST DOWNSPOUT GUTTER OR ROOF DRAIN. UNAUTHORIZEDUSEOFANY KIND INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. F. PROVIDE TESTING BALANCING AND CORRECTIONS TO SYSTEM AS REQUIRED TO INSURE ©SSOE I STEVENS&WILKINSON AL,INC 2021 COMPLETE OPERATION AS DESIGNED. 7 7 MECHANICAL SPECIFICATIONS M002 _ _ __ A B C D E F G H J Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATH 4/27/2026 12:17:12 PM :PRINT DATE A B C D E F G H J 00 ssoe® 00 1 1 PROFESSIONAL SEALS: Customer: SSOE Project: SVP LIVTIG Date: 12/18/2025 System: RTU Mark: RTU-01 ZONE LEVEL �p PROp Zones served by Description n 1stem Zone eDOCTO 16 Zone SURGE 17onXRAY 18 e 3 a AUNC 19-DOG IA 20-ISOA'21-BREAK I ISO CORRIEXISTING FORGERY CORRIDOR 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 11 �J���,..CANE F`ss'/02 Az Floor area of zone,ft2 98 111 84 101 137 70 168 170 25 139 �� Pz Zone population,largest#of people expected to occupy 4 2 2 1 3 2 4 0 0 0 • "9 // : -4 1 0 Rp People outdoor air rate from Table 6.1,cfm/person 5 5 5 5 5 5 5 5 5 5 5 / i ` Ra Area outdoor air rate from Table 6.1,cfm/ft2 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 Pz'Rp 20 10 10 5 15 10 20 0 0 0 0 (11 IV Z VZ CD o) Az'Ra 5.88 6.66 5.04 6.06 8.22 4.2 10.08 10.2 1.5 8.34 0 1...Ez Zone air distribution effectiveness,Table 6.2 0.8 0.8 0.8 0.8 0.8 0.8 0.8 1.8 2.8 3.8 4.8 % OREGON C Voz Outdoor airflow to the zone corrected for zone air distribution 32 21 19 14 29 18 38 91,-Fie R AO effectiveness,(Pz*Rp+ Ez,cfm Vpz Primary airflow to zone from air R /handler.In VAV systems, 140 150 190 125 120 100 190 130 105 �9N P G`�p� use the design value.cfm %Min Minimum set back percentage 100% 100% 100% 100% 100% 100% 100% 200% 300% 400% 500% EXPIRES! (2,11/27 Vpzm The minimum value of the primary airflow to zone from air 140 150 190 125 120 100 190 260 0 420 0 handler.In CAV systems,Vpzm=Vpz.cfm Zp Primary outdoor air fraction,Voz/Vpzm 0.23 0.14 0.10 0.11 0.24 0.18 0.20 0.00 0.00 0.00 0.00 Evz Zone Ventilation Efficiency 0.89 0.99 1.03 1.01 0.88 0.95 0.93 1.12 1.12 1.12 1.12 SYSTEM LEVEL CFMBLK Block CFM for building 100% 1,250 Ps System population,maximum simultaneious#of occupants 18 of space served by system 2 D Occupant diversity,ratio of system peak occupancy to sum 1.00 2 of space peak occupancies,=Ps/EPZ Xs Average Outdoor Air Fraction 0.12 CONSULTANTS: Vou Uncorrected outdoor air intake,=D`ERp*Pz+ERa*Az,cfm I 1561 Xs Mixing ratio at primary air handler of uncorrected outdoor air 0.12 Not used in calculation intake to system primary flow,=VouNps SYSTEM EFFICIENCY Max Zp Max Zp(look minimize this number) 0.88 Ev System ventilation efficiency,Caculated Value 0.88 Ev System ventilation efficiency,Table 6.3 based on maxZp 0.90 Percent outdoor air intake Vot ASHRAE Minimum outdoor air intake,Vou/Ev,cfm 174 14% =Vot/BLOCK Load Design Outside Air 175 14% enf)rntY CityPark Building 6 214 Centerview Drive,Suite 200 Brentwood,Tennessee 37027 Phone: 615.377.0093 Enfinity Project#25180 3 3 Customer:SSOE Project: SVP LIVTIG Date: 12/18/2025 System: RTU Mark: RTU-03 ZONE LEVEL Zones served by system Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 11 Zone 12 Zone 13 Zone 14 Zone 15 Description 01-LOBBY 02-PHONES 03-EXAM 04-EXAM 2 05-EXAN 06-EXAM 04 07-EXAM 08-TLT 09-TLT 10-COMFORT EXP 11-HOSPITAL MAW-LAB/PHA 13-TREATIA-PACK AN LOBBI Az Floor area of zone,ft2 478 63 72 74 74 74 74 54 54 81 42 296 431 76 143 P a Zone population,largest#of people expected to occupy 4 2 2 2 2 2 2 0 0 2 1 4 4 2 0 Re People aoutdorairratefrom from ble61,cfmcfm/person 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 SUBMITTAL/REVISION SCHEDULE: Ra Area outdoor air rate from Table 6.1,cfrrJfl2 0.06 OD6 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 P z'Rp 20 10 10 10 10 10 10 0 0 10 5 20 20 10 0 AoRa 28.68 3.78 4.32 4.44 4.44 4.44 4.44 3.24 3.24 4.86 2.52 17.76 25.86 4.56 8.58 Ez Zone air distribution effectiveness,Table 6.2 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 NO. DATE DESCRIPTION Voz Outdoor airflow to the zone corrected for zone air distribution 61 17 18 18 18 18 18 4 4 19 9 47.2 57.325 18.2 10.725 effectiveness,(Pz'Rp+Az'Ra)/Ez,cfrn Vpz Primary airflow to zone from air handler.In VAV systems, 1025 75 100 100 100 100 100 100 80 225 325 105 110 use the design value.cfrn %Min Minimum set back percentage 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% • Vpzm The minimum value of the primary airflow to zone from air 1025 75 100 100 100 100 100 0 0 100 80 225 325 105 110 handler.In CAV systems,Vpzm o Vpz.chn Zp Primary outdoor air fraction,VozNpzm 0.06 0.23 0.18 0.18 0.18 0.18 0.18 0.00 0.00 0.19 0.12 0.21 0.18 0.17 0.10 Evz Zone Ventilation Efficiency 1.05 0.88 0.93 0.93 0.93 0.93 0.93 1.11 1.11 0.92 0.99 0.90 0.93 0.93 1.01 • SYSTEM LEVEL . CFMauc Block CFM for building 100% 2,545 4 Ps System population,maximum simultaneious#of occupants 29 4 of space served by system D Occupant diversity,ratio of system peak occupancy to sum 1.00 of space peak occupancies,=Ps/EPz _ Xs Average Outdoor Air Fraction 0.11 Vou Uncorrected outdoor air intake,=D'ORp'PZ+ERa'Az,cfm I 2701 Xs Mixing ratio at primary air handler of uncorrected outdoor air 0.11 Not used in calculation • intake to system primary flow,=VouNps SYSTEM EFFICIENCY Max Zp Max Zp(lwk to mninae this number) 0.23 Ev System ventilation efficiency,Caculated Value 0.88 Ev System ventilation efficiency,Table 6.3 based on maxZp 0.90 Percent outdoor air intake • Vot ASHRAE Minimum outdoor air Intake,Vou/Ev,6851 300 12% =Vot/BLOCK Load Design Outside Air 300 12% •APPROVED FOR CONSTRUCTION • NOT APPROVED FOR CONSTRUCTION CLIENT INFORMATION: MISSION PET HEALTH 5 5 SVPt . • Southern Veterinary Partners 2204 LAKESHORE DRIVE, SUITE 325 BIRMINGHAM,AL 35209 PROJECT INFORMATION: LIVEWELL ANIMAL HOSPITAL 6 6 12284 SW Scholls Ferry Road, Tigard, Oregon 97223 SSOE PROJECT#: 025-00883-00 SSOE MANAGER: Cope, Amy 00 96oe® 2204 Lakeshore Drive, Suite 110 Birmingham,AL 35209 T. (205) 323-2373 THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. UNAUTHORIZED USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. ©SSOE I STEVENS&WILKINSON AL,INC.2021 MECHANICAL 7 7 SUPPORTING DOCUMENTS M 003 A 1 B 1 C 1 D 1 E 1 F 1 G 1 H Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATI 4/27/2026 12:17:13 PM :PRINT DATE A B C D E F G H J 00 ssoe® 00 1 1 PROFESSIONAL SEALS: I �� — — — —I- D PROFFs ��Q,� siO .GtNE -17 L - 11/Z7/Z60 o) 'o OREGON C= I I III I / // I 9y�`'ye a 10 — I \ \ - I I 'INN P G` to I \ I I 1 EXPIRES 12/11/27 I I 2 11-0— 2 CONSULTANTS: - z - - - J - E 7----FIT711 -11 L - — jH I— -7 1 II1 I�' �� iiii HH % 1 1 — 1 III 1 / I H � H LL=X- J enfinitY \ \ \ Tom\ _L \ CityPark Building 6 \ \ 214 Centerview Drive,Suite 200 — — — — _ _ Brentwood,Tennessee 37027 Ii--i_ I Phone: 615.377.0093 Enfinity Project#25180 I ;I I I i \�`�i I 3 1 ri II 3 L ---�] I I -__J I L n ,_ _ = 111I #O KEYED NOTES I I I 1 SUBMITTAL/REVISION SCHEDULE: 1 1. DEMOLISH DUCT DROP UP DEMOLISHED RTU ON L_ ROOF ABOVE. PATCH ROOF CURB TO BE NO. DATE DESCRIPTION I— =I I I \I WEATHER TIGHT. IL _II \� L _ J � � I • • 4 - II 4 I I � il • L_ _ II1 / I . - � II 1 / I _ _ 1 L_ •APPROVED FOR CONSTRUCTION r _ — — �� I I J NOT APPROVED FOR CONSTRUCTION I CLIENT INFORMATION: II I — I I MISSION PET HEALTH L _ _ _ _ _ - II r _ - - - - r ��� i� _ < II 17 - 7 I 5 — 7I /\ II � _ _�iL J 5 SVp !NO /\ I ___JJ V _ A ....,, ----.-- % ..-- — -., — --� ���� — Southern Veterinary Partners /ice / 0 % 1 / 11 � ��� I \/ I ,1 / II �� 1 I — /\ 2204 LAKESHORE DRIVE, SUITE 325 // II /V - A BIRMINGHAM,AL 35209 j 7 ' CNN 77 1 CNN V/ 1 N., r 17 - 7 — 7 — ill — � 1 I�\� k'\\I �'< 11 - 1 1'\ 1�I \I L - - J PROJECT INFORMATION: I- I -I L _ � J I- _ LIVEWELL ANIMAL / / HOSPITAL 6 I I I /' 6 - — 7- - - - _L_ / 1L-\ / I 17 I IH / I 17 — 71 17 — 71 t V I 1 V 1 V 1 \/ 1 I V I L — — — )) IL\ I IL �I IL �I IL �I IL �I — 12284 SW Scholls Ferry Road, Tigard, Oregon 1 I� - 97223 II \ 1 \/ 1 \� DEMOLITION LEGEND SSOE PROJECT#: 025-00883-00 - 7 N - 7 17 - SSOE MANAGER: Cope, Amy C — II j I 1 j I I /\ / / L _ I DEMOLITION 88ssoe® v - � v - � IL - � oossoe / EXISTING TO REMAIN 2204 Lakeshore Drive, Suite 110 — _ Birmin ham,AL 35209 T. (205) 323-2373 J % POINT OF REMOVAL THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. UNAUTHORIZED USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. _ I I I I I I _ I ©SSOE I STEVENS&WILKINSON AL,INC.2021 MECHANICAL 7 � 7 FIRST FLOOR DEMOLITION PLAN MECHANICAL FIRST FLOOR DEMOLITION PLAN M 1 01 SCALE: 1/4" = 1'-0" A I B C I D 1 E1 F G H Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATI-- 4/27/2026 12:17:13 PM :PRINT DATE A B C D E F G H J 000 0 ssoe® 1 PROFESSIONAL SEALS: iskED PRO% GINE /0 y 1 cn 11/2 Viet, o) VIN'o OREGON C 91:Me R1ok� Np 0%. EXPIRES! 12/11/27 2 2 CONSULTANTS: • enf3nitY CityPark Building 6 214 Centerview Drive,Suite 200 Brentwood,Tennessee 37027 Phone: 615.377.0093 Enfinity Project#25180 3 3 #O KEYED NOTES SUBMITTAL/REVISION SCHEDULE: 1. DEMOLISH EXISTING ROOFTOP UNIT AND RETURN TO BUILDING OWNER. SEAL ROOF CURB NO. DATE DESCRIPTION TO BE WEATHER TIGHT. 4 4 •APPROVED FOR CONSTRUCTION ▪ NOT APPROVED FOR CONSTRUCTION r , CLIENT INFORMATION: MISSION PET HEALTH 5 5 SVp !NO 0 Southern Veterinary Partners 2204 LAKESHORE DRIVE, SUITE 325 BIRMINGHAM, AL 35209 PROJECT INFORMATION: LIVEWELL ANIMAL HOSPITAL 6 6 12284 SW Scholls Ferry Road, Tigard, Oregon 97223 SSOE PROJECT#: 025-00883-00 DEMOLITION LEGEND SSOE MANAGER: Cope, Amy DEMOLITION 00 ssOe® 2204 Lakeshore Drive, Suite 110 EXISTING TO REMAIN Birmin ham, AL 35209 T. (205) 323-2373 MECHANICAL ROOF DEMOLITION PLAN THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. POINT O F REMOVAL THIS USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. ©SSOE I STEVENS&WILKINSON AL,INC.2021 SCALE: 1/4" = 1'-0" MECHANICAL 7 7 ROOF DEMOLITION PLAN M102 A B C D E F G H J Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATH 4/27/2026 12:17:13 PM :PRINT DATE A B C D E F G 1H J 00 „oe® 00 1 1 1 SC � sc SC' PROFESSIONAL SEALS: 255 ,;_`_ 260 255 0 A1 ����EGINE�F`ss'�0 _ 1 > : s 1 -17 . `,,27/ZCo _ 4 255 ,,,< SC 'o OREGON C 7--- q1 Me R 10 is gm qN P G`�p� :!�• ° •- MIR • 101127 zr LOBBY MIRES! QE, Sr Iron 26"x16" , ID RD 460 RD i T .. � 2 2 I 465 .vs-, u I - I �` 6. `- - \ 1 �., Iv / CONSULTANTS: a -r 11=1 RB SAA RA 75 75 Fo 11 1 x' JTL enfinity PHON S ' I—CHI „ 1 n 1 02 SB '� 1 u 100 i 110 - - 03 CityPark Building 6 PIM 7 _-� 214 Centerview Drive,Suite 200 Imo:17: Brentwood,Tennessee ate 27 Phone: 615.377.0093 I r II IL Enfinity Project#25180 S B �'_ 100 , �I" .X Ail I 3 , ^ 3- - 3 SB -14 100 In RB If ! - �05 - 100 1_ ril el' ■i r ''' r � RB 2 100 SB 1 100 I ' j ". -.--1--,� RB 110lat i'lc;� 0 KEYED NOTES > :5 SUBMITTAL/REVISION SCHEDULE: — SB 07 - r, 7 100 1. DUCT WORK UP TO EXISTING RTU-01 ON ROOF NO. DATE DESCRIPTION ABOVE. PROVIDE DUCT SMOKE DETECTORS IN x, BOTH SUPPLY AND RETURN DUCT. I UNISEX TLT711 r Rg _ 2. DUCT WORK UP TO EXISTING RTU-03 ON ROOF 100 ..;OMFO ABOVE. PROVIDE DUCT SMOKE DETECTORS IN ri O 08 �'- EXAM BOTH SUPPLY AND RETURN DUCT. 4 11 10 3. MOUNT 18"x12"WALL LOUVER (MIN. FREE AREA 4 OF 0.5 SQFT) 12" BELOW STRUCTURE ABOVE • `� I ENTRY DOOR. WALL LOUVER SHALL BE EQUAL i m SB TO RUSKIN ELF-375DX. ENTRY DOOR TO INCLUDE • _100 _ - I MS ;71- INTEGRAL FIXED LOUVER AT LEAST 12"ABOVE FINISHED FLOOR. SEE ARCH FOR DOOR LOUVER , STAFF UNISEX - INFORMATION." • O , TLT - 1 J 4. ROUTE EXHAUST DUCT WORK FROM CEILING A I 09 EXHAUST FAN TO GOOSENECK ON ROOF ABOVE. ►� • S 0 5. PROVIDE DRYER EXHAUST VENT IN WALL. ROUTE 8 4"VENT UP TO ROOF ABOVE AND TERMINATE AT ' �1 ROOF CAP PER MANUFACTURERS • _ OS141-AL RECOMMENDATIONS. SEE M3.02 FOR DETAILS. O 1, ____ II GER KEEP VENT INSIDE SPACE. DO NOT ROUTE IN O RA DEMISING WALL. •APPROVED FOR CONSTRUCTION -1n 1 _� T \ — 80 I 11 J J NOT APPROVED FOR CONSTRUCTION (P H n 10"0I 14"� p 16"x16" 1 •�' CLIENT INFORMATION: 2B 1 SB ' 14 MISSION PET HEALTH 150 RB SB - :i J •I 10„0 �li cc) 1 _ (_ )- - 10"0 jJ SB100 u 1200,,f_ v1 � RB 105 1 � a - -� J11 125 ,I __; w05 4O i SB r'� �� 0140 . 135 rf51 :1 ARD j19 �I /! OG ------, --- " U __---- SB ,- EF-3 � � - --- --- ------ -- -- / 135 ` Southern VeterinaryPartners -� - 1� ---„ r----� - / I 10"� 1 `\ ,' 1 14"ra 16"x14" -�' SB — -.ea i„, / J I 2204 LAKESHORE DRIVE, SUITE 325 105 \ >,s / 1-23 BIRMINGHAM, AL 35209 I'`' -- RB o — ' yy 200 —I TREATMENT 1 1 r----71 - — ' .Z d I — 13 L ii ,•• RB I RC .: �- -E � i'-7r I . 190 R9 _ 225 I f / I i "'` RC I �Gj/Ld � .' 225 J ISOLATION p 6 R B9 '� SB I 1 140 PROJECT INFORMATION: 190 � % X-RAY Do-=R-.; ' OFFICE LIVEWELL ANIMAL BREAK F-- I , RB 1 Sgj - 17 15 „� 190 1 SB 190 SB / HOSPITAL r �at N140 „ ,.. 01° — AI > 1- 11 a (7-13 IL A I - X EXISTING- L EF-4 - FIRE RISER ��s�� RB I I r� l SB - SB MED 12284 SW Scholls Ferryi Road, Tigard, Oregon 22 ` 3 SB 130 ��' 140 140 GAS 130 - 23 SSOE PROJECT#: 025-00883-00 n I — WVO SSOE MANAGER: Cope, Amy \ 88 sloe® 2204 Lakeshore Drive, Suite 110 Birmin ham, AL 35209 T. (205) 323-2373 NEW WORK LEGEND THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. UNAUTHORIZED USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. ©SSOE I STEVENS&WILKINSON AL,INC.2021 NEW WORK EXISTING TO REMAIN MECHANICAL 7 MECHANICAL FIRST FLOOR NEW WORK PLAN 5 POINT OF CONNECTION 7 FIRST FLOOR NEW SCALE: 1/4" = 1'-0" WORK PLAN M201 A B C D 1 E F 1 G H J Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATH 4/27/2026 12:17:14 PM :PRINT DATE A IB IC 1D 1E 1F 1G 1H J 00 00 ssoe. 1 1 PROFESSIONAL SEALS: �.\ ,GP NE�FS'd'/O c�, 2-v cn `1/27/2Co Q, 1'o OREGON C 91,MeR10P0 N p GCE EXPIRES 12/11/27 2 2 / ���\\\\ CONSULTANTS: \ • \ �- i i i \\ i \ i I I enfinit I RTU-3 1 I i 1 1 j CityPark Building 6 i 1 214 Centerview Drive,Suite 200 jBrentwood,Tennessee 37027 I 1 1 i Phone: 615.377.0093 I I / Enfinity Project#25180 I 3 •\ // 3 . / /\ . / . / . . / . ' . ' . #O KEYED NOTES SUBMITTAL/REVISION SCHEDULE: 1. EXISTING ROOF CURB TO REMAIN. COVER AND SEAL TO MAKE WEATHER TIGHT. NO. DATE DESCRIPTION 4 4 0 DUCT WORK FROM DRYER VENT BELOW. SEE M301 FOR GOOSENECK DUCT WORK FROM EXHAUST FAN DETAIL. BELOW. SEE M301 FOR GOOSENECK DETAIL. • i ' �\ •APPROVED FOR CONSTRUCTION i �\ J NOT APPROVED FOR CONSTRUCTION 0 i i 11 CLIENT INFORMATION: i I / Ili 1 i MISSION PET HEALTH ® 0 IIf' . 1 5 Iil RTU-1 5 SVP '4• I I I / I I / 0 0 Southern Veterinary Partners \ / `�\ at ` ,�/ 2204 LAKESHORE DRIVE, SUITE 325 . / / BIRMINGHAM,AL 35209 . , . , , DUCT WORK FROM EXHAUST FAN BELOW. SEE M301 FOR GOOSENECK DETAIL. PROJECT INFORMATION: MAINTAIN 10 FT CLEARANCE BETWEEN UNIT OUTSIDE AIR INTAKE AND ANY EXHAUST OR PLUMBING LIVEWELL ANIMAL VENT OUTLETS. (TYP). HOSPITAL 6 6 12284 SW Scholls FerryRoad, Tigard, Oregon 0 97223 SSOE PROJECT#: 025-00883-00 SSOE MANAGER: Cope, Amy 88 ssoe® 2204 Lakeshore Drive, Suite 110 NEW WORK LEGEND Birmin ha ,AL 35209 T. (205) m 323-2373 THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. l_ NEW WORK UNAUTHORIZED USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. ©SSOE I STEVENS&WILKINSON AL,INC.2021 EXISTING TO REMAIN MECHANICAL 7 MECHANICAL ROOF NEW WORK PLAN S POINT OF CONNECTION 7 ROOF NEW WORK SCALE: 1/4" = 1 .0 PLAN M202 A B C 1 D I EI F G H Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATI- 4/27/2026 12:17:15 PM :PRINT DATE A 1B C 1D 1E 1F G H J 00 00 1 1 PROFESSIONAL SEALS: _,,e. ® (1C NE • /Dy <c, y 0 V Z 7/2 Co o, 4i, OREGON rL5; 91-`:M$ER \o Qd �4N P G .EP ANGLE RIVETED OR TACK WELDED AS REQUIRED EXPIRES: 12/$1/27 SPIN-IN TAP WITH VOLUME DAMPER ,/ WITH LOCKING QUADRANT HANDLE OFFSET FOR INSULATION WITH 1/2" GASKET FOR ROUND CONNECTIONS. HARDWARE FOR SUPPLY AND RETURN DUCT. CLOTH WATERPROOF SEAMS AND JOINTS 2 1 RETURN/EXHAUST SECURE INSULATION 2 TRUNK DUCT TRANSITION SMOOTH RADIUS = 1.5* DUCT WIDTH — ,/ DUCT WITH DUCT PANDUIT CONSULTANTS: / STRAP RATED FOR ///��a PLENUM SUPPLY SECURE INSULATION ROOF PENETRATIONS SHALL SUPPLY HANGING STRAP RATED DUCT WITH DUCT PANDUIT _ BE FLASHED TO AND COUNTER STRAP RATED FOR 30° FLASH TO PROVIDE A WATER AIR FLOW RETURN `� FOR USE IN PLENUM PLENUM TIGHT SEAL. EXHAUST PROVIDE 6" GALVANIZED \ 45 DEG. AIR FLOW DUCT SIZE +25/o $°` "` \ SHEET METAL SADDLEI° 0 j*._ ", - HANGING STRAP RATED o • • rEr FOR USE IN PLENUM ��rrr 4 M.V.D. FOR LAST OUTLET � r \ PROVIDE 6" GALVANIZED en n� Y r r 24" FOR RELIEF AND EXHAUST. 12" MIN. r i n ci SHEET METAL SADDLE 36" FOR OUTSIDE AIR. "L" =0.25x"W", 4" MINIMUM SPIN IN TAP WITH -- ~~~ "W" f FLEX DUCT MAX. CityPark Building b VOLUME DAMPER AND r r —r—r ~f�r LOCKING QUADRANT r J 5' 0"AND ONE / \ 14" MIN. 214 Centerview Drive,Suite 200 �rrr ����� FLEX DUCT MAX. HANDLE WITH GASKET. ———-- 90 Brentwood,Tennessee 37027 J DEGREE TURN SPIN IN TAP WITH VOLUME Phone: 615.377.0093 M.V.D. r 5' 0"AND ONE DAMPER AND LOCKING 90 DEGREE TURN n EnfinityProject#25180 M.V.D. = MANUAL SQUARE TO ROUND4:t.4, NOTE: / ` VOLUME QUADRANT HANDLE OFFSET ---- DAMPER FOR INSULATION WITH GASKET INSTALL AWAY FROM PREVAILING WIND DIRECTION. BRANCH TAKE-OFF 4 >, ROUND EXTERNALLY 3 —. INSULATED DUCTWORK 3 CEILING DIFFUSER INSULATE BACK OF RETURN/EXHAUST DIFFUSER IF SYSTEM IN DRYWALL CEILING WHERE ACCESS CANNOT REGISTER HAS DUCTED RETURN BE GAINED THROUGH A LIGHT FIXTURE, IN DRYWALL CEILING WHERE ACCESS CANNOT PROVIDE GREENHECK EZ BALANCE SYSTEM, BE GAINED THROUGH A LIGHT FIXTURE, EQUAL TO MODEL RBDR-50,TO ADJUST MVD. PROVIDE GREENHECK EZ BALANCE SYSTEM, EQUAL TO MODEL RBDR-50, TO ADJUST MVD. r SUBMITTAL/REVISION SCHEDULE: NO. DATE DESCRIPTION RECT. L.P. MAIN DUCT BRANCH TAKE-OFF DETAIL TYPICAL RETURN/EXHAUST CONNECTION DETAIL TYPICAL SUPPLY DIFFUSER RUNOUT DETAIL GOOSENECK OUTSIDE AIR/RELIEF/EXHAUST DETAIL • NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE J • 4 4 STEEL ANGLE LINTELS W \7///�/, 4.4N4*� ... � / �!%� ,�;���p�� •APPROVED FOR CONSTRUCTION SUSPEND EXHAUSTER FROM STRUCTURE WITH \ ,��� CLIP ANGLE I`��0� 7S J NOT APPROVED FOR CONSTRUCTION DUCTWORK - SEE PLANS FOR SIZE. • .���� , / BAND IRON STRIPS AT EACH CORNER. Gy ���� 44*per CLIENT INFORMATION: / � BIRD SCREEN41 BACKDRAFT DAMPER ,O $ PRIMARY 90° ELBOW OPTION: MISSION PET HEALTH Ar / , SHEET METAL / \1.101,, ;%�� COLLAR WHEN PROVIDE SMOOTH ELBOW WITH RADIUS = 1.5*W / REQUIRED. 41 5 / / \ `�� **Q�� $ II 0 5 • / CLIP ANGLE 't O • i o EXTENDED SILL \ ������� 3 46 4co`','. $ '4�``�.s I SIVIP i �IIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ���'��4 �� Southern Veterinary Partners / FRAMED WALL 1.4 '_.. 4_). 2204 LAKESHORE DRIVE, SUITE 325 o CAULK LOUVER j BIRMINGHAM, AL 35209 WATER TIGHTZ , 4 FACE BRICK V oA ,.., 1. FIBERGLASS DUCT WRAP (OVER RIGID INSULATION BLOCKS) 2. DUCTWORK PROJECT INFORMATION: CEILING ASSEMBLY INSTALLATION NOTES: 3. CONTINUOUS RIGID 3 PCF FIBERGLASS BOARD INSULATION 11 II II IMIVAIP' 1. LOUVERS TO BE FABRICATED 1/2" SMALLER THAN OPENING SIZE. 4. UNI-STRUT HANGER UNDER INSULATION L IVEW ELL ANIMAL 2. LOUVER BLADES SHOULD NOT EXCEED 5'-0" IN WIDTH AND SHOULD BE SECONDARY 90° ELBOW OPTION: HOSPITAL DRAINABLE. USE MULLION CONNECTED SECTIONS FOR GREATER WIDTHS. - PROVIDE MITERED ELBOW WITH TURNING VANES 3. CAULK WITH G.E. SILICONE OR EQUAL. 4. INTAKE LOUVER SHALL BE SELECTED AT POINT OF ZERO WATER 6 CEILING EXHAUSTER WITH REMOVEABLE EXHAUST GRILLE FOR ACCESS PENETRATION. 6 TO AND SERVICE OF BLOWER ASSEMBLY. M D-01 12284 SW Scholls Ferry Road, Tigard, Oregon 97223 SSOE PROJECT#: 025-00883-00 CEILING MOUNTED EXHAUST FAN FIXED LOUVER IN MASONRY WALL DUCT WITH BLOCKING AT HANGER DETAIL 90° BEND IN DUCTWORK DETAIL SSOE MANAGER: Cope, Amy NOT TO SCALE J NOT TO SCALE J NOT TO SCALE J NOT TO SCALE J oo SSO@® 2204 Lakeshore Drive, Suite 110 Birmin ham, AL 35209 T. (205) 323-2373 THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. UNAUTHORIZED USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. ©SSOE I STEVENS&WILKINSON AL,INC.2021 7 7 MECHANICAL DETAILS M301 A B C D E F G H J Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATH 4/27/2026 12:17:15 PM :PRINT DATE A 1B 1C 1D E 1F G H J 00 „oe. 00 (_ __ (,_ __ (,_ 1 NOTE: 1 INSTALL DRYER VENT SYSTEM PER MANUFACTURER'S PROFESSIONAL SEALS: CONDENSATE RECOMMENDATIONS. CONTRACTOR SHALL PROVIDE ADDITIONAL DRAIN LINT TRAP AND BOOSTER FAN IF ACTUAL TOTAL DEVELOPED (ROUTE TO LENGTH EXCEEDS MANUFACTURER'S ALLOWABLE LENGTH. SEE ROOF DRAIN OR GUTTER) PLANS FOR OVERALL DRYER VENT LENGTH. .\<?E0 PROrtss CONDENSER �V "INS • O,y FAN DISCHARGE // sue.<1��• �� / \ DRYER EXHAUST VENT ' V2 7/26, °f t<\4,,, OREGON r° CONDENSER / 9y�MR ° Q►'$� k INLET OUTSIDE AIR �/ P Mg-1 CONDENSATE OR REFRIGERANT �b \\ ' LINE. SEE PLANS FOR ROUTING. MIN 12" ROOF EXPIRES: t2/31/27 FLEXIBLE CONNECTOR \ / RIGID PIPE CLAMP (SUPPLY& RETURN) / 7/ COUNTER OPTIONAL: / //2 /\ w FLASHING DRYER EXHAUST B TJERN UND MODEOLOR LB2E(UL 705 LISTED) 2 // �I RAISED CANT / %/ \� \RETURN STRIP , CONSULTANTS: COOPER B-LINE DB SERIES LJ CEILING %/ / \ ROOFTOP PIPE SUPPORT 18"X18"X1" RUBBER MAT � ROOF CURB ✓/ SUPPLY � / �_ '� . ,a.4.• .ag t.,, :...,. ///////////// ,,w.sa...,t*:,a..,, =a..ru=a... �� ��� SECONDARY LINT TRAP 7/ 10 JLØ NOTE i T OPTIONAL BOOSTER FANS& LINT TRAPS er1fi1T1it11/ SHALL NOT HAVE ANY PLASTIC PARTS / ' , 7 \ \ EXPOSED TO THE AIRSTREAM. r I n ci 0,1 ROOF STRUCTURECityPark Building 6 214 Centerview Drive,Suite 200 0 I , Brentwood,Tennessee 37027 ROOF �\ SMOKE I k , ' Phone: 615.377.0093 MEMBRANE -4 DETECTOR 0 Enfinity Project#25180 OR METAL r NOTE: ROOF / ROOFTOP PIPE SUPPORTS SHALL BE MOUNTED BAR JOIST(SEE STRUCTURAL) ON 10'-0"CENTERS AND AT EACH TEE OR ELBOW. > 3 INSULATION 3 \ \ METAL SMOKE DECKING DETECTOR J SUPPORT FOR CONDENSATE AND REFRIGERANT TYPICAL ROOFTOP UNIT DETAIL DRYER VENT DETAIL PIPING ON ROOF DETAIL NOT TO SCALE NOT TO SCALE J NOT TO SCALE J SUBMITTAL/REVISION SCHEDULE: NO. DATE DESCRIPTION 4 4 •APPROVED FOR CONSTRUCTION J NOT APPROVED FOR CONSTRUCTION CLIENT INFORMATION: MISSION PET HEALTH 5 5 SVp 04* Southern Veterinary Partners 2204 LAKESHORE DRIVE, SUITE 325 BIRMINGHAM, AL 35209 PROJECT INFORMATION: LIVEWELL ANIMAL HOSPITAL 6 6 12284 SW Scholls Ferry Road, Tigard, Oregon 97223 SSOE PROJECT#: 025-00883-00 SSOE MANAGER: Cope, Amy 88 ssoe® 2204 Lakeshore Drive, Suite 110 Birmin ham, AL 35209 T. (205) 323-2373 THIS DRAWING IS THE PROPERTY OF SSOE I STEVENS&WILKINSON AL,INC. UNAUTHORIZED USE OF ANY KIND,INCLUDING USE ON OTHER PROJECTS,IS PROHIBITED. ©SSOE I STEVENS&WILKINSON AL,INC.2021 7 7 MECHANICAL DETAILS M302 A 1 B 1 C D E F G 1 H Autodesk Docs://SVP LIVTIG/25180 SVP LIVTIG Mechanical R24.rvt :FILE PATH 4/27/2026 12:17:15 PM :PRINT DATE