Loading...
HomeMy WebLinkAboutSIT2024-00020 CITY OF TIGARD SITE WORK PERMIT III ' COMMUNITY DEVELOPMENT Permit#: SIT2024-00020 Date Issued: 10/23/2024 T I G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S112BD00900 Jurisdiction: Tigard Site address: 7750 SW BONITA RD Project: Bonita Cottage Cluster Subdivision: Lot: Project Description: Site work for future 7 detached cottage cluster Contractor: LUCAS MAIN CONSTRUCTION LLC Owner: FOREAL DEVELOPMENT LLC 695 E VILAS RD STE 102 695 E VILAS RD STE 102 CENTRAL POINT, OR 97502 CENTRAL POINT, OR 97502 PHONE: 541-660-3361 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 10/21/2024 $957.59 Plan Review 10/21/2024 $622.43 Type of Use: SF 12%State Surcharge-Building 10/21/2024 $114.91 Class of Work: NEW Info Process/Archiving-Lg$2.00(over 10/21/2024 $18.00 11x17) Project Valuation: $133,000.00 Erosion Control w/Development 10/21/2024 $236.40 DC SIT Cottage Cluster 10/21/2024 $300.00 1 Site Specifics: Excavation Volume: 42 cu.yd. Fill Volume: 5 cu.yd. Impervious Surface: 8470 sq.ft. Engineered Fill: No Soil Report Required: No Paving: Yes Grading: Yes Landscaping: Yes Site Prep: Yes Store Drains: Retaining Wall: No Fire Underground: No Accessible Parking: Yes Fence: No Total $2,249.33 Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow thie rules adopted by the Oregon Utility Notification Cente Those rules are set forth in OAR 952-001-0010 through OAR 9 01-0090. Yo ay obtai copy of the rules Issued By: '%,z' Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Docusign Envelope ID:37F0595F-C2D4-4359-B875-DE15BF4DB438 Building Permit Application Site Work Cityof Ti and Received Permit No.: � a d g Date/By: 4 -odcao 1,1 . 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 Plan ReviewDate/By: 9. I,.ail.� Other Permit' l I t;n tt n Inspection Line: 503.639.4175 Date Ready/By: p Juris: ® See Page 2 for Internet: www.tigard-or.gov Notified/Method:\ i rrik4 Supplemental Information pe attc00�' it TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 121 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. in1-and 2-family dwelling 0 Commercial/industrial Valuation: site ogl y per home $19,000 ❑Accessory building 0 Multi-family Number of bedrooms: ' 3%4 0 0 0 ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7750 Bonita RD New dwelling area: square feet City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Boni ta Cottages Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Boni ta / 74th Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Develop and build 7 detached cottage cluster homes Valuation: $ 7750/7754/7758/7762/7766/7770/7774 LOT 1 through 7 Existing building area: square feet New building area: square feet ® PROPERTY OWNER 0 TENANT Number of stories: Name: Foreal Devel poment LLC Type of construction: Address: 3500 5 Stage RD Occupancy groups: City/State/ZIP:Tigard, OR 97501 Existing: Phone:( 54)1.-660-4053 Fax:( ) New: in APPLICANT ❑ CONTACT PERSON NOTICE Business name: Foreal Development LLC All contractors and subcontractors are required to be Contact name: Richard Lundstrom licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: PO BOX 230207 jurisdiction in which work is being performed.If the City/State/ZIP: Tigard, OR 97281 applicant is exempt from licensing,the following reasons apply: Phone:( 503).849-6325 Fax::( ) r E-mail: richardtahomemasters.com CONTRACTOR Business name: Lucas Main construction LLC BUILDING PERMIT FEES* Address: 3500 Stage RD S (Please reJerto fee schdrk) City/State/ZIP: Medford, OR 97501 Structural plan review fee(or deposit): Phone:( 541-660-3361 Fax:( ) FLS plan review fee(if applicable): CCB lic.: 248800 Total fees due upon application: ,�JDo*uSi a by, Amount received: Authorized signature: / /A This permit application expires if a permit is not obtained �•�—✓ within 180 days after it has been accepted as complete. Print name: Ri chard Luttliat�s oaos... Date: 9/9/2024 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\SIT-PennitApp.doc 08/02/2016 440-4613T(11/02/COM/WEB) [ cisie,invelope ID:37F0595F-C2D4-4359-B875-DE15BF4DB438 City of Tigard: Site Work Permit Checklist Page 2-Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads),or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill,it must be engineered fill. If fill is in a flood plain,drainage way,or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below,unless otherwise noted. site only calculated per home Excavation Volume: 42 cu. yds. Grading Volume: (Soils report required for>5,000 cu. yds.) 5 cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU in Concrete ❑ Other: *Total new impervious area including all buildings, sidewalks,and paving: < 4 7 Q sq.ft. Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached. The following must accompany this application: ® Site Plan with Vicinity Map showing ADA 0 *Parking(including ADA)and Lighting compliance Plan © Grading Plan and details ❑ *Landscaping Plan E , Erosion Control Plan and details Soils Report(if required) Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans Valuation: Permit Fee: (New,Additions or Required at $.00 to$500.00• $51.09 minimum permit fee Alterations) Submittal $500.01 to$2,000.00 $51.09 for the first$500.00 and $2.69 for each additional$100 or fraction Commercial 3 thereof,to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including $25,000.00. One-&Two-Family Dwelling 3 $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 2 City of Tigard IIIIIa II COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review - Residential TIGARD e _. Building Permit #: 577- may -tea Site Address: 9-9-cD S� W=CillOk 'C4'V -e'Verified in Accela Project Name: 1?)CO Lot/Unit #: Proposal: Stl� 1. Zone: Q'S Housing Type: 0 SFR(0 Single Detached 0 Duplex 0 Triplex 0 ADU) 0 Rowhouse ottage Cluster 0 CYU :Quad 0 Other Required Site Plan Elements: '3 H cop' s of site plan on max 11x17" awn to standard scale ❑ ne ttection c4irh arrow S t and site trees shown / labeled e address, project name, lot # Table calculating tree canopy at maturity Aeet names (N/A for SFR) licant name and phone # • D'Lot and setback dimensions Frcieefance_triangle locations &easements F otprint of new structure and FFE ly visible topo lines and property corner elevations Sidewalk/driveway dimensioned (>1,000 sf disturbance) p rosion control Re 'red Elevation Plan Elements: ,.----.---- (For SF . Ics needed only on street-facing) Summary tale'Gvith calculations for: O Drawn t ndard scale 0 Totaade area v�,/J�, O Building heigh ' ensioned _metal window and door area 5 - O Façade dimensioned :- O�Cr O Windows and doors dimensii ined,.<-'� y 0 Garage doors dimensioned j; `'`-----.�� Required Floor Plan ents: -'`' •� (Not required for S 0 Summaflle that includes O Each st dimensioned 0 Total floor area O Ea tory floor area calculated ❑ Floor area per story P nning Review The following standards have been met: Setbacks ❑ Front: IC) Rear: -S Side: S _ Min/Max Street Side: b / Garage: 7 O Heigh 0 Max. Height: /" Proposed Height: NRr SiSTre cAAP3E-°'`r Yes 0 N/A Landscape ❑ Yes N/A Screening (Quad only) ❑ Yes N/A % Window Coverage ❑ Yes N/A Garage (SFR Only) Parking (Other Res) ❑ Yes N/A Entrance (SFR, Rowhouse, Quad only) ❑ Yes N/A Other building design standards (Rowhouse only) ❑ Yes N/A Accessory Structure Standards ❑ Yes No Qualifying pre-existing unit exempt from standards (Cottage unit only) Additional standards for Courtyard Units, Cottage Clusters, Rowhouses, and Quads: s ❑ N/A Unit Count: 1- 0 N/A Lot Width and Size Yes 0 N/A Pathway Additiostandards for Courtyard Units and Cottage Clusters only: ❑ Yes Unit Area: ❑ N/A Floor Area (per story) Yes'❑ N/A Courtyard es 10 N/A Fence ❑ Yes ❑ No B1V/�Clean Water Services - Service Provider Letter (lot platted prior to 9/10/1995) ❑ Yes 0 No /A Public Facilities Improvement (PFI) Permit: Required: ❑ Yes 0 No Applied For: 0 Yes 0 N�o-stop intake ensitive Lands: ❑ Yes l�l�lo ❑ Main Land Use Case #s: cSDC,DO 0 Conditions met ❑Applicant notified of land use expira ' date: (o 2025 TRate �2n1� CoISC27-nrciL ocC Approved By Planning: Date: �l/9 ZN Notes Siiri,,.3oak 4:tem tr-01(r Revision 1: ❑ Approved ❑ Not Approved Date: Revision 2: 0 Approved 0 Not Approved Date: Building Permit Submittal Original Submittal Date: Site Plans #: Building Plans #: Building Permit #: dicqilding permit # entered on age 1 Workflow Routing: manning ineering ermit Coordinator ErSi ilding Workflow Sign-off: gn-off for Planning (include notes from planning review) Route Documents: l Errgineering: (1) copy of permit application, (1) site plan, (1) building plan and original plan review routing form. ❑ Building: original permit application, site plans, building plans, engineer and beam calculations and trust details, if applicable, etc. Permit Technician: Date: Notes: Engineering Review E PFI Permit: _PIl 2-a2-2-vb 240 lope at building pad: Zr/p % PJ Conditions met prior to issuance of permit 2 asements (encroachments) per engineering conditions of approval and plat Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes �No Assess Water Quantity Fee in-lieu: ❑ Yes C�o LIDA Facility on lot: ❑ Yes [ No Add Fee: ❑ Yes ❑ No 14inal Plat Recorded ❑ NOT Approved: Date: Notes: Approved By Engineering: f`uti/f��`" Date: 91 1 f Iz)/ Revision 1: 0 Approved ❑ Not Approved Date: Revision 2: ❑ Approved ❑ Not Approved Date: Permit' Coordinator Review 1 Conditions met prior to permit issuance ❑ Approved, NOT Released: Date notified applicant: ❑ ENG Revisions Required: Date notified applicant: f�SDC Exemption: ❑ Applied for ❑ Received �es not apply Ci"SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A ❑ Deferred Parks SDC: 0 Yes 4 N/A 0 Deferred LIDA 0 Yes ,, El N/A OI q'OK to Issue/Approved by Permit Coordinator: J , M (r_J AY\ S Date: I 0 r f z Revision 1: 0 Approved ID Not Approved t Date: Revision 2: ❑ Approved 0 Not Approved Date: