Loading...
HomeMy WebLinkAboutInspection Report-Photo Red Light 1-13ÐÏࡱdations were complete. No work on 72nd had started. Inspected conduit and foundations to make sure correct materials were being used. All materials were satisfactory. Asked contractor to protect irrigation line from concrete overpour, spacing on drilled shaft and rebar cage didn’t have 3” clearance between cage and drilled shaft on C-2.   cc: PAGE ___ of ___ %9IJbcdeqsŽ‘’žŸ ¡¢¬ ¯¾¿ÀÁÂÆÈÌÙÚÛÜÝæñòóôõö