Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Kruger Creek Stabilization Design
PROJECT LOCATION S W G R E E N F I E L D D R SW G A A R D E S T SW BE N C H V I E W T E R R A C E PROJECT LOCATION LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING KRUGER CREEK STABILIZATION DESIGN CONSTRUCTION PLANS VICINITY MAP SITE MAP Know what's below. before you dig.Call R PREPARED FOR:ENGINEERING/SURVEYING/NATURAL RESOURCES/ARBORIST FIRM: ATTENTION EXCAVATORS: UTILITY LOCATES: 503.232.1987 UTILITY CONTACTS: VERTICAL DATUM: HORIZONTAL DATUM: GAS:WATER, SANITARY, STORMWATER, AND ROADS: SANITARY AND STORMWATER: POWER: COMMUNICATIONS: STREAM ENHANCEMENT:GEOTECHNICAL: SHEET INDEX: SEE SHEET C001 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SHEET INDEX GENERAL SHEETS EXISTING CONDITIONS PLANS TREE PRESERVATION AND REMOVAL PLANS EROSION AND SEDIMENT CONTROL PLANS SHEET INDEX STORMWATER MANAGEMENT PLANS STABILIZATION PLANS SHEET INDEX STREAM ENHANCEMENT PLANS LANDSCAPE AND VEGETATED CORRIDOR PLANS ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING †LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING †SW B E N C H V I E W P L A C E ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING †ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING S W G R E E N F I E L D D R I V E SW BEN C H V I E W T E R R A C E †ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING †S W G R E E N F I E L D D R I V E SW GALLIN COURTSW G R E E N F I E L D D R I V E ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING †ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING †SW G A A R D E S T R E E T SW R A P T O R P L A C E S W Y A L E P L A C E ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING LEGEND GENERAL NOTES ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SPECIAL TREE KEY NOTES: ARBORIST NOTE: SOME TREES ADJACENT TO CONSTRUCTION ACTIVITIES ARE PROPOSED FOR PRESERVATION, HOWEVER, CONSTRUCTION ACTIVITIES MAY RESULT IN SIGNIFICANT NEGATIVE IMPACTS TO THE HEALTH AND STRUCTURAL STABILITY OF THESE TREES. SW B E N C H V I E W P L A C E SW B E N C H V I E W P L A C E LEGEND GENERAL NOTES ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ARBORIST NOTE: SOME TREES ADJACENT TO CONSTRUCTION ACTIVITIES ARE PROPOSED FOR PRESERVATION, HOWEVER, CONSTRUCTION ACTIVITIES MAY RESULT IN SIGNIFICANT NEGATIVE IMPACTS TO THE HEALTH AND STRUCTURAL STABILITY OF THESE TREES. SPECIAL TREE KEY NOTES: LEGEND GENERAL NOTES ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SPECIAL TREE KEY NOTES: ARBORIST NOTE: SOME TREES ADJACENT TO CONSTRUCTION ACTIVITIES ARE PROPOSED FOR PRESERVATION, HOWEVER, CONSTRUCTION ACTIVITIES MAY RESULT IN SIGNIFICANT NEGATIVE IMPACTS TO THE HEALTH AND STRUCTURAL STABILITY OF THESE TREES. S W G R E E N F I E L D D R I V E SW BEN C H V I E W T E R R A C E S W G R E E N F I E L D D R I V E SW BEN C H V I E W T E R R A C E LEGEND GENERAL NOTES ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SPECIAL TREE KEY NOTES: ARBORIST NOTE: SOME TREES ADJACENT TO CONSTRUCTION ACTIVITIES ARE PROPOSED FOR PRESERVATION, HOWEVER, CONSTRUCTION ACTIVITIES MAY RESULT IN SIGNIFICANT NEGATIVE IMPACTS TO THE HEALTH AND STRUCTURAL STABILITY OF THESE TREES. S W G R E E N F I E L D D R I V E SW GALLIN COURTSW G R E E N F I E L D D R I V E S W G R E E N F I E L D D R I V E SW GALLIN COURTSW G R E E N F I E L D D R I V E LEGEND GENERAL NOTES ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SPECIAL TREE KEY NOTES: ARBORIST NOTE: SOME TREES ADJACENT TO CONSTRUCTION ACTIVITIES ARE PROPOSED FOR PRESERVATION, HOWEVER, CONSTRUCTION ACTIVITIES MAY RESULT IN SIGNIFICANT NEGATIVE IMPACTS TO THE HEALTH AND STRUCTURAL STABILITY OF THESE TREES. LEGEND GENERAL NOTES ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ARBORIST NOTE: SOME TREES ADJACENT TO CONSTRUCTION ACTIVITIES ARE PROPOSED FOR PRESERVATION, HOWEVER, CONSTRUCTION ACTIVITIES MAY RESULT IN SIGNIFICANT NEGATIVE IMPACTS TO THE HEALTH AND STRUCTURAL STABILITY OF THESE TREES. SPECIAL TREE KEY NOTES: SW G A A R D E S T R E E T SW R A P T O R P L A C E S W Y A L E P L A C E SW G A A R D E S T R E E T SW R A P T O R P L A C E S W Y A L E P L A C E LEGEND GENERAL NOTES ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ARBORIST NOTE: SOME TREES ADJACENT TO CONSTRUCTION ACTIVITIES ARE PROPOSED FOR PRESERVATION, HOWEVER, CONSTRUCTION ACTIVITIES MAY RESULT IN SIGNIFICANT NEGATIVE IMPACTS TO THE HEALTH AND STRUCTURAL STABILITY OF THESE TREES. SPECIAL TREE KEY NOTES: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ORANGE CONSTRUCTION FENCE PROJECT LOCATION S W G R E E N F I E L D D R SW G A A R D E S T SW BE N C H V I E W T E R R A C E PROJECT LOCATION ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X** X X X X X X X X X X X X X** X X X X X X X** X X X X X X X X** X X X X X X X X X X X X X X X X X X X X STANDARD EROSION AND SEDIMENT CONTROL PLAN DRAWING NOTES: INSPECTION FREQUENCY: KRUGER CREEK STABILIZATION DESIGN 1200CN EROSION AND SEDIMENT CONTROL PLAN DEVELOPER/APPLICANT CIVIL ENGINEERING FIRM PROJECT LOCATION PROPERTY DESCRIPTION NARRATIVE DESCRIPTIONS · · SITE MAP VICINITY MAP Know what's below. before you dig.Call R SHEET INDEX: SEE SHEET C102 PERMITTEE'S SITE INSPECTOR: RATIONALE STATEMENT ATTENTION EXCAVATORS: GENERAL LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING GRADING, UTILITY, AND SITE CONSTRUCTION EROSION AND SEDIMENT CONSTRUCTION NOTES EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION WET WEATHER MEASURES, SEEDING NOTES, AND SPECIFICATIONS PRE-CONSTRUCTION, CLEARING, AND TREE REMOVAL NOTES FINAL STABILIZATION EROSION AND SEDIMENT CONSTRUCTION NOTES: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SHEET INDEX EROSION AND SEDIMENT CONTROL PLANS 1200-CN PERMIT NARRATIVE SW G A A R D E S T C110 C120 C130 C111 C121 C131 C112 C122 C132 C113 C123 C133 C114 C124 C134 C115 C125 C135 C116 C126 C136 SW B E N C H V I E W T E R R A C E BULL MOUNTAIN PARK SW 129 T H A V E SW G R E E N F I E L D D R I V E SW B R I M P L A C E SW B E N C H V I E W P L A C E SW T A N O A K C O U R T ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING KRUGER CREEK KRUGER CREEK ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ESC LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING †4. ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SW G R E E N F I E L D D R I V E S W G A A R D E S T R E E T SW B E N C H V I E W T E R R A C E SW MORNINGSTAR DRIVE BULL MOUNTAIN PARK SW 129 T H A V E SW G R E E N F I E L D D R I V E SW B R I M P L A C E SW B E N C H V I E W P L A C E SW T A N O A K C O U R T ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING C206 C205 C204 C203C202 C201 STORMWATER SHEET INDEX: AS-BUILT DISCLAIMER: 10 10 11 11 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING AS-BUILT DISCLAIMER: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING AS-BUILT DISCLAIMER: 5 5 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING AS-BUILT DISCLAIMER: SW BENCHVIEW TERRACESW BENCHVIEW TERRACE 4 4 ENERGY DISSIPATION MANHOLE ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING AS-BUILT DISCLAIMER: SW G R E E N F I E L D D R I V E SW B E N C H V I E W T E R R A C E SW G R E E N F I E L D D R I V E SW B E N C H V I E W T E R R A C E PLAN VIEW A SECTION A-A A ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING GRATE DETAIL NTS AS-BUILT DISCLAIMER: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING INLET STRUCTURE 1 AS-BUILT DISCLAIMER: 1 1 2 2 1 1 2 2 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING S W G R E E N F I E L D D R I V E SW GALLIN COURT REV 1 - NEW ACCESS ROAD: BACK-IN (34' SINGLE UNIT TRUCK) AKRUGER CREEK STABILIZATION DESIGN REV 1 - NEW ACCESS ROAD: CULVERT PROFILES (34' SINGLE UNIT TRUCK) BKRUGER CREEK STABILIZATION DESIGN ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING FLOW CONTROL MANHOLE W/INLET TRENCH DRAINAGE LAYER AND STABILIZATION ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 5 5 © 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS SW G R E E N F I E L D D R I V E SW G A A R D E S T R E E T SW B E N C H V I E W T E R R A C E SW MORNINGSTAR DRIVE BULL MOUNTAIN PARK SW 129 T H A V E SW G R E E N F I E L D D R I V E SW B R I M P L A C E SW B E N C H V I E W P L A C E SW T A N O A K C O U R T ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING C301 C302 C311 C303 C310 C304 C305 C306 C307 C308 C309 1 1 2 2 3 3 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 3 3 4 4 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 3 3 4 4 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 3 3 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 3 3 4 4 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 3 3 4 4 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 SW G A A R D E S T R E E T ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 3 3 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING 1 1 2 2 3 3 1 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT KEY MAP C501 C502 C503 C504 C505 C506 C507 C508 SW G R E E N F I E L D D R I V E S W G A A R D E S T R E E T ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO STREAM ENHANCEMENT PLAN/PROFILE STA 30+00 TO 33+25 3 C510 3 C511 2 C509 1 C509 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT PLAN/PROFILE STA 26+00 TO 30+00 3 C510 3 C511 2 C509 1 C509 1 C511 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT PLAN/PROFILE STA 22+00 TO 26+00 2 C511 1 C509 1 C511 2 C509 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT PLAN/PROFILE STA 18+00 TO 22+00 2 C510 4 C510 3 C510 1 C509 1 C511 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT PLAN/PROFILE STA 14+00 TO 18+00 2 C510 4 C510 1 C510 3 C510 3 C511 2 C511 1 C509 1 C511 SW G R E E N F I E L D D R I V E ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT PLAN/PROFILE STA 10+00 TO 14+00 2 C510 4 C510 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT PLAN/PROFILE STA 6+00 TO 10+00 4 C510 2 C509 1 C509 1 C511 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM ENHANCEMENT PLAN/PROFILE STA 2+00 TO 6+00 1 C511 2 C509 2 C511 1 C509 ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM DETAILS SHEET 1 OF 3 SCALE: DETAIL - LOG SEDIMENT RETENTION TYPE 1 1 -NTS SCALE: DETAIL - DEFLECTION LOG 2 -NTS LOG SCHEDULE: LOG TYPE MINIMUM DIAMETER (IN) MINIMUM LENGTH (FT) ROOTWAD TOTAL QUANTITY PER STRUCTURE TOTAL ESTIMATED QUANTITY LOG SEDIMENT RETENTION TYPE 1 DEFLECTION LOG BEAVER DAM ANALOG TYPE 1 BEAVER DAM ANALOG TYPE 2 SLOT CHANNEL LOG STRUCTURAL STABILIZATION DOWNSTREAM TRANSITION R1 12 8, OR AS DIRECTED YES 1 46 R2 8 8, OR AS DIRECTED YES 1 11 R3 6 8, OR AS DIRECTED YES 1 1 1 51 R4 12 3, OR AS DIRECTED YES 1 7 L1 12 8, OR AS DIRECTED NO 1 46 L2 6 8, OR AS DIRECTED NO 1 3 SLASH NA 4 NA 3 CY 1 CY 3 CY 3 CY 1 CY 2 CY 177 CY ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM DETAILS SHEET 2 OF 3 SCALE: DETAIL - BEAVER DAM ANALOG - TYPE 1 1 -NTS SCALE: DETAIL - BEAVER DAM ANALOG - TYPE 2 2 -NTS SCALE: TYPICAL SECTION NTS SCALE: TYPICAL PROFILE NTS SCALE: PLAN - TYPE 1 NTS SCALE: PLAN - TYPE 2 NTS SCALE: DETAIL - SLOT CHANNEL BOULDER/LOG PLACEMENT 3 -NTS SCALE: DETAIL - CUT EXISTING CHANNEL-SPANNING LOG 4 -NTS SCALE: TYPICAL SECTION NTS SCALE: TYPICAL SECTION - BOULDER NTS SCALE: TYPICAL PLAN NTS SCALE: TYPICAL PLAN NTS SCALE: TYPICAL SECTION - ROOTWAD NTS ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NOSTREAM DETAILS SHEET 3 OF 3 SCALE: DETAIL - STRUCTURAL STREAM STABILIZATION 1 -NTS SCALE: TYPICAL SECTION NTS SCALE: TYPICAL PROFILE NTS SCALE: TYPICAL PLAN NTS SCALE: DETAIL - WATTLE 3 -NTS SCALE: TYPICAL PLAN NTS SCALE: TYPICAL SECTION NTS SCALE: DETAIL - STRUCTURAL STABILIZATION DOWNSTREAM TRANSITION 2 -NTS LEGEND VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SW B E N C H V I E W P L A C E SW B E N C H V I E W P L A C E LEGEND VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING LEGEND VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING S W G R E E N F I E L D D R I V E SW BEN C H V I E W T E R R A C E S W G R E E N F I E L D D R I V E SW BEN C H V I E W T E R R A C E LEGEND VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING S W G R E E N F I E L D D R I V E SW GALLIN COURTSW G R E E N F I E L D D R I V E S W G R E E N F I E L D D R I V E SW GALLIN COURTSW G R E E N F I E L D D R I V E LEGEND VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING LEGEND VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING SW G A A R D E S T R E E T SW R A P T O R P L A C E S W Y A L E P L A C E SW G A A R D E S T R E E T SW R A P T O R P L A C E S W Y A L E P L A C E LEGEND VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING VEGETATED CORRIDOR PLANTING LEGEND: ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING KRUGER CREEK VEGETATED CORRIDOR PLANTING SPECIFICATIONS TABLE 1. VEGETATED CORRIDOR REPLACEMENT MITIGATION (±21,145 SF) TABLE 2. VEGETATED CORRIDOR ENHANCEMENT AREA ( ±19,420 SF) · · · · TABLE 4. VEGETATED CORRIDOR ENHANCEMENT AREA (±4,115 SF) · · TABLE 3. VEGETATED CORRIDOR ENHANCEMENT AREA (±95,954 SF) · · TABLE 5. WILLOW STAKE AREA (±2,136 SF) WATER QUALITY SWALE PLANT SCHEDULE LEGEND ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING LIVE STAKE IN NATIVE SOIL LIVE STAKE IN RIPRAP ENGINEERING DVISION PUBLIC WORKS DEPARTMENTDateDescription No. By Revisions and Addendums DESIGN: DRAWN: CHECK:BID ON:PROJ. NO: SHEET OF FILE NO ENGINEERINGSURVEYING FORESTRY NATURAL RESOURCES LANDSCAPE ARCHITECTUREPLANNING CONSTRUCTION 1. Water Quality Facility shall be over-excavated and filled to final grade with 12-inch amended topsoil. Topsoil amendments shall be garden compost, not conventional fertilizer amendments. 2.A biodegradable Erosion Control Matting shall be placed over the topsoil throughout the swale cross section, fabric shall be held in place in accordance with the manufacturer's installation requirements. Anchor spacing shall be based on 3 fps flow over the fabric. a. Treatment area - high-density jute matting (Geojute Plus or other approved equal) b. All other areas - low-density jute matting (Econojute or other approved equal) 3. Plant materials shall be placed in accordance with the plan and plant table as shown on approved plans. 4. The water quality facility treatment area plantings can be deemed "substantially complete" once active green growth has occurred to an average growth of 3" and plant density is an average of approx. 6 plants (minimum 1-inch plugs or equivalent) per square foot. 5. The facility shall be deemed acceptable to begin the maintenance period when plant growth and density matches the engineer's design as shown on the approved plans and all other requirements have been met. The engineer must certify the facility to be functional, in accordance with the approved plan design to begin the two-year maintenance period. MAINTENANCE 1.The permittee is responsible for the maintenance of this facility for a minimum of two years following construction and acceptance of this facility per Chapter 2. 2.Irrigation is to be provided per separate irrigation plan as approved. Note: Irrigation needs are to be met using a temporary irrigation system with a timer during the dry season. Systems should be winterized during the wet season to assure longevity and guard against damage from freezing temperatures. Water source shall be as shown on the approved plans. 3.Engineer or Owner's Representative is required to perform Monitoring and Maintenance of the Site and provide Documentation as required in Appendix A, 2.5 of the Design and Construction Standards. The Approved Plans shall include a Maintenance Schedule per Appendix A, 2.6.e of the Design and Construction Standards. 4.The facility shall be re-excavated and planted if siltation greater than 3 inches in depth occurs within the two-year maintenance period. TYPICAL GROUNDCOVER PLANTING DETAIL2 TYPICAL SHRUB PLANTING DETAIL1 C609 C609