Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Dirksen Nature Park Tigard Street Community Trail
FANNO CREEK TRAIL FEMA 100 YR FLOODPLAINVEGETATED CORRIDOR FANNO CRE E K T R A I L FEMA 1 0 0 Y R F L O O D P L A I N VEGETATED C O R R I D O R CITY OF TIGARD DIRKSEN NATURE PARK TIGARD STREET COMMUNITY TRAIL 13125 SW HALL BLVD. TIGARD, OR 97223 PROJECT MANAGER: JEFF PECK (503) 718-2466 OWNER PROJECT TEAM CITY OF TIGARD ENVIRONMENTAL SCIENCE ASSOCIATES 819 SE MORRISON ST, SUITE 310 PORTLAND, OR 97214 (503) 274-2010 PROJECT MANAGER: MAUREEN RAAD, PLA CIVIL ENGINEER: HUNTER WHITE, PE LANDSCAPE ARCHITECT: DEREK SERGISON, PLA BID SET NOVEMBER 2021 PROJECT LOCATION: 11130 SW TIEDEMAN AVE, TIGARD, OR 97223 SCALE 0 FEET 3000 1500 3000 6000 NORTH VICINITY MAP SCALE 0 FEET 250 125 250 500 NORTH SITE MAP SHEET INDEX PROJECT LOCATION SW TIG A R D S T IN T E R S T A T E 5 SW SCHOLLS F E R R Y SW GAARDE ST SW WALNUT S T H W Y 2 1 7 HWY 9 9 W SW T I E D E M A N A V E . FA N N O C R E E K SW TIGARD ST. DIRKSEN NATURE PARK SUMM E R C R E E K PROJECT LOCATION PAGE # SHEET # SHEET TITLE 1 -- COVER SHEET 2 G0.1 NOTES & ABBREVIATIONS 3 CS 1200-C 1200-C COVER SHEET 4 EC0.1 EXISTING CONDITIONS OVERVIEW PLAN 5 EC0.2 EX CONDITIONS, CLEARING, DEMO & PROTECTION PLAN 6 EC0.3 EX CONDITIONS, CLEARING, DEMO & PROTECTION PLAN 7 EC1.1 GRADING, UTILITY & EROSION CONTROL PLAN 8 EC1.2 GRADING, UTILITY & EROSION CONTROL PLAN 9 EC2.1 EC DETAILS 10 EC2.2 DRAINAGE DETAILS 11 EC2.3 DRAINAGE DETAILS 2 12 L1.0 OVERALL SITE PLAN 13 L1.1 MATERIALS PLAN 14 L1.2 MATERIALS PLAN 15 L1.3 MATERIALS PLAN 16 L2.1 GRADING & DRAINAGE PLAN 17 L2.2 PROFILES 18 L2.3 GRADING & DRAINAGE PLAN 19 L2.4 GRADING & DRAINAGE PLAN 20 L3.1 LAYOUT PLAN 21 L3.2 ALIGNMENT TABLES 22 L3.3 LAYOUT PLAN 23 L3.4 LAYOUT PLAN PAGE # SHEET # SHEET TITLE 24 L4.0 IRRIGATION LEGEND AND NOTES 25 L4.1 IRRIGATION PLAN 26 L4.2 IRRIGATION PLAN 27 L5.0 PLANTING LEGEND AND NOTES 28 L5.1 PLANTING PLAN 29 L5.2 PLANTING PLAN 30 L6.0 SITE DETAILS 31 L6.1 SITE DETAILS 32 L6.2 SITE DETAILS 33 L6.3 SITE DETAILS 34 L7.0 IRRIGATION DETAILS 1 35 L7.1 IRRIGATION DETAILS 2 36 L8.0 PLANTING DETAILS FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ G - N O T E S & A B B R E V I A T I O N S . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 5 : 5 7 : 2 9 P M P L O T T E D B Y : K A Y L A N O L L E T T E NOTES & ABBREVIATIONS G0.1 2 DMS MFR AC ASPHALTIC CONCRETE AB ANCHOR BOLT ADA AMERICANS WITH DISABILITIES ACT ALT ALTERNATIVE APL AMERICAN PLASTIC LUMBER APPD APPROVED APPROX APPROXIMATE AVG AVERAGE B+B BALLED AND BURLAPPED BC BOTTOM OF CURB BE BOTTOM ELEVATION BHD BREAST HEIGHT DIAMETER BLDG BUILDING BOT BOTTOM BW BOTTOM OF WALL B/W BACK OF SIDEWALK CAL CALIPER CB CATCH BASIN CL CENTERLINE CM CONSTRUCTION MANAGEMENT CO CLEANOUT CONC CONCRETE CONST CONSTRUCT /CONSTRUCTION CONT CONTAINER COT CITY OF TIGARD CMP CORRUGATED METAL PIPE CRK CREEK CSO COMBINED SEWER OVERFLOW CSP CONCRETE SEWER PIPE CTD CONTINUED CULV CULVERT CWS CLEAN WATER SERVICES CY CUBIC YARD D DEPTH DBH DIAMETER AT BREAST HEIGHT DEFL DEFLECTION DEG DEGREES DEMO DEMOLITION DIA / Ø DIAMETER DTL DETAIL DWG DRAWING D/S DOWNSTREAM E EASTING EF EACH FACE EG EXISTING GRADE EL ELEVATION ELECT ELECTRICAL EP EDGE OF PAVEMENT ESC EROSION AND SEDIMENT CONTROL ESPCP EROSION, SEDIMENT, AND POLLUTION CONTROL PLAN EQ EQUAL EW EACH WAY EX EXISTING FD FINISH DECK FDC FIRE DEPARTMENT CONNECTION FG FINISH GRADE FGFF FINISH GRADE FRONT FACE FH FIRE HYDRANT FO FIBER OPTIC CABLE MARKER FP FIRE PROTECTION FT FOOT/FEET GA GAS GAL GALLON GB GRADE BREAK GCS GRADE CONTROL STRUCTURE GIS GEOGRAPHICAL INFORMATION SYSTEM GR GUTTER GRAD GRADIENT HDPE HIGH DENSITY POLYETHYLENE HT HEIGHT HORIZ HORIZONTAL HP HIGH POINT HPSS HIGH PRESSURE SERVICE SET IE INVERT ELEVATION IN INCHES L LENGTH LF LINEAR FEET LP LOW POINT LT LEFT MAX MAXIMUM MH MANHOLE MIN MINIMUM MULT MULTIPLE N NORTHING NIC NOT IN CONTRACT NTS NOT TO SCALE OC ON CENTER OE OVERFLOW ELEVATION OHL OVERHEAD LINES OHW ORDINARY HIGH WATER PA PLANTING AREA PB POINT OF BEGINNING PC POINT OF CURVATUREPDPLANTER DRAIN PERF PERFORATED PLS PURE LIVE SEED PROP PROPOSED PRC POINT OF REVERSE CURVATURE PTL PRESSURE TREATED LUMBER PT POINT OF TANGENCY PUD PUBLIC UTILITY DISTRICT PUE PUBLIC UTILITY EASEMENT RD ROAD ROW RIGHT OF WAY RT RIGHT S SLOPE (FT/FT) SD STORM DRAIN SHT/SHTS SHEET/SHEETS SPEC/SPECS SPECIFICATIONS SPP SPECIES SF SQUARE FOOT/SQUARE FEET SS SANITARY SEWER STD STANDARD STA STATION SWL SWALE T TRAIL TC TOP OF CURB TCE TEMPORARY CONSTRUCTION EASEMENT TEMP TEMPORARY TL TOP OF LOG TOC TOP OF CONCRETE TP TOP OF PAVEMENT TW TOP OF WALL TYP TYPICAL UP UTILITY POLE U/S UPSTREAM VERT VERTICAL VC VEGETATED CORRIDOR W WIDTH W/WITH WBF WIDTH - BANKFULL WTR WATER LINE WV WATER VALVE WWM WELDED WIRE MESH 1. CONTRACTOR SHALL NOTIFY THE CITY OF TIGARD'S PROJECT MANAGER 48 BUSINESS HOURS PRIOR TO START OF CONSTRUCTION AND COMPLY WITH ALL OTHER REQUIREMENTS OF ORS 757.541 TO 757.571. 2. CONTRACTOR SHALL PROVIDE 24 HOUR NOTICE OF WORK RESUMPTION TO THE CITY OF TIGARD AFTER ANY SHUTDOWN EXCEEDING ONE DAY DURATION EXCEPT FOLLOWING WEEKENDS OR HOLIDAYS. 3. ALL TRAFFIC CONTROL SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AS MODIFIED BY THE OREGON SUPPLEMENTS. 4. CONTRACTOR SHALL HAVE A COPY OF ALL PERMITS ONSITE AT ALL TIMES AND COMPLY WITH ALL CONDITIONS STIPULATED IN THE PERMITS. 5. CONTRACTOR SHALL SUBMIT AND RECEIVE APPROVAL OF TRAFFIC CONTROL PLAN FROM THE CITY OF TIGARD PRIOR TO START OF CONSTRUCTION. 6. CONTRACTOR SHALL CONFINE CONSTRUCTION OPERATIONS WITHIN THE LIMITS OF WORK DEPICTED ON THE PLANS. IF AREAS OR FEATURES OUTSIDE DESIGNATED CONSTRUCTION ZONES SUSTAIN IMPACT FROM CONTRACTOR ACTIVITIES, CONTRACTOR SHALL RESTORE TO PRE-CONSTRUCTION CONDITION AT NO COST TO THE CITY OF TIGARD. 7. ALL EXISTING UTILITY LOCATIONS AND DESCRIPTIONS SHOWN ON PLANS HAVE BEEN COMPILED FROM AVAILABLE RECORDS AND/OR FIELD SURVEY. THE CITY OF TIGARD CANNOT GUARANTEE THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATION AND DEPTH (POTHOLE) OF ALL EXISTING UTILITIES WITHIN CONSTRUCTION ZONE PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL PROMPTLY NOTIFY THE CITY OF TIGARD OF POTENTIAL CONFLICTS. UNDER THESE TERMS THE CITY OF TIGARD SHALL BE RESPONSIBLE FOR COST OF REQUIRED RELOCATIONS. IF CONTRACTOR FAILS TO LOCATE ANY KNOWN UTILITY WITHIN CONSTRUCTION ZONE THAT CONFLICTS WITH WORK, CONTRACTOR SHALL CORRECT CONFLICT AT OWN COST. ANY COSTS TO THE CONTRACTOR ARISING FROM COORDINATION WITH UTILITY COMPANY TO RELOCATE UTILITIES SHALL BE CONSIDERED INCIDENTAL TO COST OF PROJECT AND NO ADDITIONAL COMPENSATION SHALL BE DUE CONTRACTOR. 8. CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTS AND CONSTRUCTION STAKING. CONTRACTOR SHALL NOTIFY THE CITY OF TIGARD PRIOR TO DISTURBANCE OR REMOVAL OF ANY PERMANENT MONUMENTS AND COORDINATE RESETTING WITH A LICENSED LAND SURVEYOR. 9. CONTRACTOR SHALL RESTORE ALL STREET FEATURES IMPACTED BY CONSTRUCTION. FEATURES SHALL INCLUDE , BUT NOT BE LIMITED TO, PAVEMENT, CURBS, GUTTERS, SIDEWALKS, DRIVEWAYS, TRAILS, SHOULDERS, STREET STRIPING, SIGNAGE, FENCES, MAILBOXES, UTILITIES, DITCHES, AND SWALES. 10. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0001 THROUGH 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER.NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987). ABBREVIATIONS GENERAL NOTES NOTICE TO EXCAVATORS:ATTENTION: OREGON LAW REQUIRES YOU TOFOLLOW RULES ADOPTED BY THE OREGON UTILITYNOTIFICATION CENTER. THOSE RULES ARE SETFORTH IN OAR 952-001-0010 THROUGH OAR952-001-0090. YOU MAY OBTAIN COPIES OF THERULES BY CALLING THE CENTER.(NOTE: THE TELEPHONE NUMBER FOR THE OREGONUTILITY NOTIFICATION CENTER IS (503)-232-1987). Dig Safely. POTENTIAL UNDERGROUND FACILITY OWNERS Call the Oregon One-Call Center1-800-332-2344 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - 1 2 0 0 C . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 5 : 5 9 : 2 8 P M P L O T T E D B Y : K A Y L A N O L L E T T E 1200-C COVER SHEET CS 1200-C 3 BWT HLW CITY OF TIGARDPUBLIC WORKS DEPARTMENT13125 SW HALL BLVD.TIGARD, OREGON 97223CONTACT: JEFF PECKPHONE: 503-718-2466FAX: 503-624-0752 SHEET NUMBER & TITLE CS 1200-C - 1200-C COVER SHEETEC0.1 - EXISTING CONDITIONS OVERVIEW PLANEC0.2 - EX CONDITIONS, CLEARING, DEMO & PROTECTION PLANEC0.3 - EX CONDITIONS, CLEARING, DEMO, & PROTECTION PLAN EC1.1 - GRADING, UTILITY & EROSION CONTROL PLANEC1.2 - GRADING, UTILITY & EROSION CONTROL PLAN EC2.1 - EC DETAILSEC2.2 - DRAINAGE DETAILSEC2.3 - DRAINAGE DETAILS 2 PROJECT SITE 1.IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAT SEPTEMBER 1; THE TYPE AND PERCENTAGESOF SEED IN THE MIX MUST BE IDENTIFIED ON THE PLANS.2.ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER AN UNDISTURBED, PREFERABLY VEGETATED AREA, ANDTHROUGH A SEDIMENT CONTROL BMP I.E. (FILTER BAG).3.ALL EXPOSED SOILS MUST BE COVERED DURING THE WET WEATHER PERIOD, OCTOBER 01 - MAY 31. SITE MAP N.T.S. VICINITY MAP N.T.S. INSPECTION FREQUENCY: SITE CONDITION MINIMUM FREQUENCY 1. ACTIVE PERIOD DAILY WHEN STORMWATER RUNOFF, INCLUDING RUNOFF FROMSNOWMELT, IS OCCURRING. AT LEAST ONCE EVERY FOURTEEN (14)CALENDAR DAYS, REGARDLESS OF WHETHER OR NOT RUNOFF ISOCCURRING. 2. PRIOR TO THE SITE BECOMING INACTIVE OR INANTICIPATION OF SITE INACCESSIBILITY.ONCE TO ENSURE THAT EROSION AND SEDIMENT CONTROL MEASURESARE IN WORKING ORDER. ANY NECESSARY MAINTENANCE AND REPAIRMUST BE MADE PRIOR TO LEAVING THE SITE. 3.INACTIVE PERIODS GREATER THAN FOURTEEN (14)CALENDAR DAYS.ONCE EVERY MONTH. 4.PERIODS DURING WHICH THE SITE ISINACCESSIBLE DUE TO INCLEMENT WEATHER.MONTHLY, RESUME MONITORING UPON MELT, OR WHEN WEATHERCONDITIONS MAKE DISCHARGES LIKELY. A COMPREHENSIVE LIST OF AVAILABLE BEST MANAGEMENT PRACTICES (BMP)OPTIONS BASED ON DEQ's GUIDANCE MANUAL HAS BEEN REVIEWED TOCOMPLETE THIS EROSION AND SEDIMENT CONTROL PLAN. SOME OF THEABOVE LISTED BMP's WERE NOT CHOSEN BECAUSE THEY WERE DETERMINEDTO NOT EFFECTIVELY MANAGE EROSION PREVENTION AND SEDIMENTCONTROL FOR THIS PROJECT BASED ON SPECIFIC SITE CONDITIONS,INCLUDING SOIL CONDITIONS TOPOGRAPHIC CONSTRAINTS, ACCESSIBILITYTO THE SITE, AND OTHER RELATED CONDITIONS, AS THE PROJECTPROGRESSES AND THERE IS A NEED TO REVISE THE ESC PLAN, AN ACTIONPLAN WILL BE SUBMITTED. INITIAL RATIONALE STATEMENT SHEET INDEX THE PERMITTEE IS REQUIRED TO MEET ALL THE CONDITIONS OF THE 1200-C PERMIT. THIS ESCP ANDGENERAL CONDITIONS HAVE BEEN DEVELOPED TO FACILITATE COMPLIANCE WITH THE 1200-CPERMIT REQUIREMENTS. IN CASES OF DISCREPANCIES OR OMISSIONS, THE 1200-C PERMITREQUIREMENTS SUPERCEDE REQUIREMENTS OF THIS PLAN. EROSION AND SEDIMENT CONTROL PLANS BMP MATRIX FOR CONSTRUCTION PHASES REFER TO DEQ GUIDANCE MANUAL FOR A COMPREHENSIVE LIST OF AVAILABLE BMP'S. NARRATIVE DESCRIPTIONS EXISTING SITE CONDITIONSTHE SITE CONSISTS OF A MODULAR BUILDING, SMALL PARKING LOT,SHELTER AND RESTROOM , PLAY AREA, SPORTS FIELD, PAVED PATHS,SOFT-SURFACE TRAILS, LANDSCAPED, AND NATIVE PLANTCOMMUNITIES INCLUDING WETLAND, OAK SAVANNAH, FOREST, ANDMEADOWS. BORDERED BY SW TIGARD STREET ON THE NORTH SIDE,FANNO CREEK AND SUMMER CREEK ON THE EAST AND SOUTH SIDES. DEVELOPED CONDITIONSCURRENT PHASE (2021): CONSTRUCTING NEW LARGER PARKING LOTALONG SW TIGARD STREET, PAVED PATH SEGMENTS, AND BOARDWALKOVERLOOK. GRAVEL INFILTRATION SHOULDERS, LANDSCAPE FILTERSTRIPS, LANDSCAPED AND NATURAL PLANTINGS. CONSTRUCTION PHASE AND ESTIMATED TIME TABLECURRENT PHASE:JUN-NOV 2022CLEARING & SITE PREPARATION:JUNE 2022MASS GRADING:JULY 2022DRAINAGE & UTILITY INSTALLATION:AUGUST 2022HARDSCAPE & PAVING:SEPTEMBER 2022FINAL STABILIZATION & PLANTING:NOVEMBER 2022 TOTAL SITE AREA:48 AC DISTURBED AREA BY PHASE:CURRENT PHASE (COMMUNITY TRAIL):1.45 AC SITE SOIL CLASSIFICATION1 - ALOHA SILT LOAM13 - COVE SILTY CLAY LOAM THESE SOILS HAVE A MODERATE EROSION POTENTIAL. RECEIVING WATER BODIES NEAREST WATER BODIES: SUMMER CREEK & FANNO CREEK OWNER/DEVELOPER ENGINEERING / LANDSCAPE FIRM ENVIRONMENTAL SCIENCE ASSOCIATES819 SE MORRISON ST, SUITE 310PORTLAND, OR 97214HUNTER WHITE, PE(PH) 503.274.2010 PERMITEES SITE INSPECTOR COMPANY/AGENCY:ENVIRONMENTAL SCIENCE ASSOCIATES - BRANDON TEETSEL, PEPHONE:(315) 532-5363EMAIL:BTEETSEL@ESASSOC.COMEXPERIENCE/CERTIFICATION: BRANDON HAS 6 YEARS OF ENGINEERING EXPERIENCEAND IS CESCL-LICENSED WITH EROSION AND SEDIMENT CONTROL INSTALLATION,MAINTENANCE AND MONITORING EXPERIENCE. 11130 SW TIEDEMAN AVENUE TIGARD, OR 97223MAJOR CROSS STREETS: SW TIEDEMAN AVE & SW TIGARD STLATITUDE=45° 26' 10" N LONGITUDE=122° 47' 20" W TAX LOTS: (WASHINGTON COUNTY ASSESSOR MAPS) 1S 134 DC: #3000, 3001, 3002, 3100, 3101, 3102, 3300, 3400 1S 134 DD: #900, 1000, 2400, 2500 38.99 ACRES LOCATED IN SECTION 34, TOWNSHIP 1 SOUTH,RANGE 1 WEST, WILLAMETTE MERIDIAN, WASHINGTONCOUNTY, OREGON PROPERTY LOCATION:PROPERTY DESCRIPTION: **SIGNIFIES BMP THAT WILL BE INSTALLED PRIOR TO ANY GROUND DISTURBING ACTIVITY. MASS UTILITY FINAL CLEARING GRADING INSTALLATION CONSTRUCTION STABILIZATION EROSION PREVENTION PRESERVE NATURAL VEGETATION ** X X X X X GROUND COVER X PLASTIC SHEETING X DUST CONTROL X X X X X TEMPORARY/PERMANENT SEEDING OTHER: SEDIMENT CONTROL INLET PROTECTION ** X X X X OTHER: RUN OFF CONTROL CONSTRUCTION ENTRANCE ** X X X X OUTLET PROTECTION OTHER: POLLUTION PREVENTION PROPER SIGNAGE X X X X X HAZ WASTE MGMT X X X X X SPILL KIT ON-SITE X X X X X CONCRETE WASHOUT AREA X X X X X X X MULCHES X X X X X X WATTLES ** X X X X X X X X X PROJECTSITE PLASTIC SHEETING X X X X X C A L L BEFOR E Y O U DIG 1. ALL PERMIT REGISTRANTS MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURES OR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. 2. THE ESCP MEASURES SHOWN ON THIS PLAN ARE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, UPGRADE THESE MEASURES AS NEEDED TO COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL EROSION AND SEDIMENT CONTROL REGULATIONS. 3. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT. 4. PHASE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED INACTIVE AREAS FROM BECOMING A SOURCE OF EROSION. 5. IDENTIFY, MARK, AND PROTECT (BY FENCING OFF OR OTHER MEANS) CRITICAL RIPARIAN AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G., WETLANDS), AND OTHER AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. 6. PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE TYPE OF VEGETATIVE SEED MIX USED. 7. EROSION AND SEDIMENT CONTROL MEASURES INCLUDING PERIMETER SEDIMENT CONTROL MUST BE IN PLACE BEFORE VEGETATION IS DISTURBED AND MUST REMAIN IN PLACE AND BE MAINTAINED, REPAIRED, AND PROMPTLY IMPLEMENTED FOLLOWING PROCEDURES ESTABLISHED FOR THE DURATION OF CONSTRUCTION, INCLUDING PROTECTION FOR ACTIVE STORM DRAIN INLETS AND CATCH BASINS AND APPROPRIATE NON-STORMWATER POLLUTION CONTROLS. 8. ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE BEGINNING CONCRETE WORK. DIRECT ALL WASH WATER INTO A PIT OR LEAK-PROOF CONTAINER. HANDLE WASH WATER AS WASTE, CONCRETE DISCHARGE TO WATERS OF THE STATE IS PROHIBITED. 9. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS AS GRADING PROGRESSES AND FOR ALL ROADWAYS INCLUDING GRAVEL ROADWAYS. 10. ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS. 11. PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OR PRIVATE ROADS USING BMPS SUCH AS: GRAVELED (OR PAVED) EXITSAND PARKING AREAS, GRAVEL ALL UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BEIN PLACE PRIOR TO LAND-DISTURBING ACTIVITIES. 12. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN LOADS ON SITE. 13. USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS; VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND MACHINERY, AS WELL AS DEBRIS, LEFTOVER PAINTS, SOLVENTS, AND GLUES FROM CONSTRUCTION OPERATIONS. 14. IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULARMAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING ANDSIGNAGE, AND COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. 15. USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID WIND-BLOWN SOIL. 16. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS. EXERCISE CAUTION WHEN USING TIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE. 17. IF A STORMWATER TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FOR SEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN OPERATION AND MAINTENANCE PLAN (INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM, LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGE DISPERSION DEVICE DESIGN, AND A SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM. OBTAIN PLANAPPROVAL BEFORE OPERATING THE TREATMENT SYSTEM. OPERATE AND MAINTAIN THE TREATMENT SYSTEMACCORDING TO MANUFACTURER'S SPECIFICATIONS. 18. AT THE END OF EACH WORKDAY SOIL STOCKPILES MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT DISCHARGES TO SURFACE WATERS OR CONVEYANCE SYSTEMS LEADING TO SURFACEWATERS. 19. CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVATION AND CREATION OF BARE GROUND DURING WET WEATHER OCTOBER 01 - MAY 31. 20. SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE GROUND FENCE HEIGHT AND BEFORE FENCE REMOVAL. 21. OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO INCHES DEPTH ABOVE GROUND HEIGHT. AND BEFORE BMP REMOVAL. 22. CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT AND AT COMPLETION OF PROJECT. 23. WITHIN 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE REMEDIATED. INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT SHALL BE PERFORMED ACCORDING TO THE OREGON DIVISION OF STATE LANDS REQUIRED TIMEFRAME. 24. THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT OCCUR. VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEANUP RELEASED SEDIMENTS. 25. PROVIDE PERMANENT EROSION CONTROL MEASURES ON ALL EXPOSED AREAS. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. HOWEVER, DO REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AS EXPOSED AREAS BECOME STABILIZED, UNLESS DOING SO CONFLICTS WITH LOCAL REQUIREMENTS. PROPERLY DISPOSE OF CONSTRUCTION MATERIALS AND WASTE, INCLUDING SEDIMENT RETAINED BY TEMPORARY BMPS. 26. IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAT SEPTEMBER 1; THE TYPE AND PERCENTAGES OF SEED IN THE MIX MUST BE IDENTIFIED ON THE PLANS. 27. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER AN UNDISTURBED, PREFERABLY VEGETATED AREA, AND THROUGH A SEDIMENT CONTROL BMP I.E. (FILTER BAG). 28. ALL EXPOSED SOILS MUST BE COVERED DURING THE WET WEATHER PERIOD, OCTOBER 01 - MAY 31. 29. IF WATER OF THE STATE IS WITHIN THE PROJECT SITE OR WITHIN 50 FEET OF THE PROJECT BOUNDARY, MAINTAIN THEEXISTING NATURAL BUFFER WITHIN THE 50-FOOT ZONE FOR THE DURATION OF THE PERMIT COVERAGE, OR MAINTAINLESS THAN THE ENTIRE EXISTING NATURAL BUFFER AND PROVIDE ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS. 5. PERIODS DURING WHICH DISCHARGE IS UNLIKELYDUE TO FROZEN CONDITIONS.MONTHLY, RESUME MONITORING IMMEDIATELY UPON MELT, OR WHENWEATHER CONDITIONS MAKE DISCHARGES LIKELY.PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM © 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS FL F L FL FL FL FL FL FL FL FL FL FL FL FL FL F L FL FL FL FL FL F L FL FLFLFL FL F L F L F L F L F L FL FL FL FL FL F L FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FLF L FL FL FL FL FL FL F L F L FL FL FLFLFLFL FL FLFL FL FL FL FL FLFLFLFLFLFLFL FL FL FL FL FL FL FL F L FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL F L FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL F L FL FL FL FLO W FLOW FLO W OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH TTT T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSS SS SS SS SSG G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ST ST ST ST ST STE E ~ ~ ~ ~ ~ ~ ~ ~~ ~~~ ~ ~ ~ ~~~~ ~ ~ ~ ~ W W W W W W W W W W W W W W W W W W W W W W W W ~ ~ TREE G R O V E E D G E TREE GROVE EDGE TR E E G R O V E E D G E TR E E G R O V E E D G E TREE GROVE EDGE TREE GROVE EDGE TRE E G R O V E E D G E TR E E G R O V E E D G E TR E E G R O V E E D G E TREE GROVE EDGE TREE G R O V E E D G E TREE GROVE EDGE TREE GROVE EDGE SS SS SS SS SS SS W W W W W W W W FEMA 1 0 0 Y R F L O O D P L A I N FEMA 10 0 Y R F L O O D P L A I N WETLAND BO U N D A R Y VEGETATED CORRIDOR VE G E T A T E D CO R R I D O R WE T L A N D B O U N D A R Y VEG E T A T E D C O R R I D O R WETLAND BOUNDARY VEGETATED CORRID O R WETLAND BOUNDARY VE G E T A T E D C O R R I D O R WET L A N D B O U N D A R Y TRE E G R O V E E D G E E EEE E E E E W FEMA 100-YR. FLOODPLAIN EXISTING PEDESTRIAN BRIDGE EXISTING PEDESTRIAN BRIDGE FANNO CREEK FANNO CREEK SUMMER CREEK EXISTING PAVED PATH RIGHT OF WAY CENTERLINE WETLAND BOUNDARY VEGETATED BUFFER FOWLER MIDDLESCHOOL EXISTINGRECREATIONAREA (6.9 AC) SW TIE D E M A N A V E PLAY AREASHELTER &RESTROOM TAX LOT3100(1.47ac) TAXLOT3101(0.44ac) TAX LOT3000(1.34ac) TAX LOT3001(1.58ac) TAX LOT3100 (1.47ac)TAX LOT3100 (1.47ac) NATURECENTER ANDPARKING LOT TAX LOT900(8.98ac) SPORTSFIELD TAX LOT2500 (0.8ac)TAX LOT 2400 (1.1ac) TAX LOT 200 (6.33ac) TAX LOT 900 (8.98ac) TAX LOT3300 (3.0ac) TAX LOT3400 (3.0ac) TAX LOT200 (3.56ac) SW TIGARD ST FULL SITE/PARK BOUNDARY (48 AC.) FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - 1 2 0 0 C . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 5 : 5 9 : 3 8 P M P L O T T E D B Y : K A Y L A N O L L E T T E EXISTING CONDITIONS OVERVIEW PLAN EC0.1 4 BWT HLW N SCALE 0 FEET 100 50 100 200 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM SEE SHEET EC0.2 SEE SHEET EC0.3 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 182 183 185 183 184 185 186 187 188 189 190 191 192 188 189 191 192 193 194 186 195 196 197 198 T H Y D WM S EM 6302188.55DECK 6303188.61DECK 6304189.84DECK6305189.82DECK 6306190.10DECK6307192.22DECK S OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH 8" C.I.P. 8" C.I.P. 6" D . I . P . 6" D . I . P . 2" POLY 2" POLY 2" POLY 1 1 / 4 " PO L Y 1 1 / 4 " PO L Y E.P. 4' CHAIN LINK FENCE E.P. OH WOOD SHED SINGLE STORY WOOD BUILDING 4' WIRE FENCE 4' CHAIN LINK END 4' W I R E F E N C E F.O. DUCT W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ~ ~ ~ ~ ~ ~ W W W W W W W W W W W W W W W W W W W W W W W W W W W SPEED 35 E.P. ~ FACE OF CURB FACE OF CURB FACE OF CURB TT VEGETATED COR R I D O R WETLAND BOUNDA R Y V E G E T A T E D C O R R I D O R W E T L A N D B O U N D A R Y W W W W X X X X X X XXXXXXXXX X X X X XX X X XXXXXXXX X X XX X X X X X X X X 1 2 1 2 3 444 5 TYP. TYP. TYP. TYP. PROTECT EX CHAIN LINK FENCE REMOVE AC DRIVEWAY AND PART OF PARKING LOT REMOVE AND SALVAGE EXISTING PARK RULES AND RESTORATION SIGNS FOR REUSE REMOVE BARRIER SIGN AND PROVIDE TO OWNER. SW TIGARD STREET SW T W I N P A R K P L . SW C O R N E L L P L . PLUG END OF EXISTING 12" CULVERT PIPE PROTECT OH UTILITY POLE REMOVE AND SALVAGE ADA PARKING SIGNS EXPOSE MAINLINE AND SHUT OFF CORPORATION STOP. REMOVE SERVICE LINE AND METER BOX. CAP SERVICE LINE TO THE SOUTH. CITY TO REMOVE WATER METER. REMOVE AND SALVAGE EXISTING "SPEED 35 MPH" TRAFFIC SIGN FOR REUSE APPROXIMATE ROUTE OF EXISTING WATER SERVICE LINE, DERIVED FROM PAINT MARKINGS APPROXIMATE LOCATION FOR SELECTED TOPSOIL HARVESTING TO BE VERIFIED IN THE FIELD AND APPROVED BY ENGINEER. WORK LIMIT REMOVE AND SALVAGE DIRKSEN NATURE PARK SIGN AND POSTS FOR REUSE PRUNUS AVIUM DBH=12" CHAMAECYPARIS LAWSONIANA DBH=20" PRUNUS AVIUM DBH=2*8" PRUNUS AVIUM DBH=2*6" PRUNUS AVIUM DBH=3*12" ACER SACCHARINUMDBH=3*10" PYRUS SPP. DBH=2*10" JUGLANS REGIADBH=3*14" PRUNUS AVIUM DBH=3*8" CRATAEGUS MONOGYNA DBH=8" ARBUTUS MENZIESII DBH=2*6" POPULUS TRICHOCARPADBH=7" POPULUS NIGRA DBH=7" POPULUS NIGRA DBH=6" POPULUS NIGRA DBH=14" POPULUS NIGRA DBH=7" POPULUS NIGRA DBH=16" ACER PLATANOIDES DBH=22" POPULUS NIGRA DBH=17" CRATAEGUS MONOGYNA DBH=6" APPROXIMATE LOCATION FOR SELECTED TOPSOIL HARVESTING TO BE VERIFIED IN THE FIELD AND APPROVED BY ENGINEER. GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 X X ORANGE CONSTRUCTION FENCING CLEARING, DEMO, AND PROTECTION LEGEND EROSION CONTROL WATTLES DRAINAGE FLOW ARROW INLET PROTECTION GRAVEL CONSTRUCTION ENTRANCE CLEARING AND GRUBBING REMOVE ASPHALTIC CONCRETE TREE TO BE REMOVED PRE-CONSTRUCTION, CLEARING, AND DEMOLITION NOTES: 1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE, FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. 2. SEDIMENT BARRIERS APPROVED FOR USE INCLUDE SEDIMENT FENCE, BERMS CONSTRUCTED OUT OF MULCH, CHIPPINGS, OR OTHER SUITABLE MATERIAL, STRAW WATTLES, OR OTHER APPROVED MATERIALS. 3. SENSITIVE RESOURCES INCLUDING, BUT NOT LIMITED TO, TREES, WETLANDS, AND RIPARIAN PROTECTION AREAS SHALL BE CLEARLY DELINEATED WITH ORANGE CONSTRUCTION FENCING IN A MANNER THAT IS CLEARLY VISIBLE TO ANYONE IN THE AREA. NO ACTIVITIES ARE PERMITTED TO OCCUR BEYOND THE CONSTRUCTION BARRIER. 4. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, STREET SWEEPING, AND VACUUMING, MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 5. RUN-ON AND RUN-OFF CONTROLS SHALL BE IN PLACE AND FUNCTIONING PRIOR TO BEGINNING SUBSTANTIAL CONSTRUCTION ACTIVITIES. RUN-ON AND RUN-OFF CONTROL MEASURES INCLUDE: SLOPE DRAINS (WITH OUTLET PROTECTION), CHECK DAMS, SURFACE ROUGHENING, AND BANK STABILIZATION. 6. THESE EROSION AND SEDIMENT CONTROL PLANS ASSUME "DRY WEATHER" CONSTRUCTION. "WET WEATHER" CONSTRUCTION MEASURES NEED TO BE APPLIED BETWEEN OCTOBER 1ST AND MAY 31ST. 7. CONTRACTOR SHALL REMOVE AND SALVAGE BUCK & POLE AND SPLIT-RAIL FENCING TO FACILITATE CONSTRUCTION AND ACCESS. REPLACE FENCE FOLLOWING CONSTRUCTION TO MATCH PRE-CONSTRUCTION CONDITIONS. 8. CONTRACTOR SHALL PROTECT ALL OVERHEAD AND BURIED UTILITIES IN PLACE. 9. CONTRACTOR SHALL COORDINATE WITH CITY OF TIGARD FOR RELOCATION OF WATER METER AND SHUT-OFF PERIOD. MAINTAIN WATER SERVICE TO EDUCATION CENTER DURING CONSTRUCTION. 10. CONTRACTOR SHALL REMOVE ALL HAWTHORN TREES/SHRUBS FROM WITHIN THE WORK LIMITS. TREE SYMBOLS INDICATE TREES GREATER THAN 6-IN DBH AT TIME OF SURVEY. CONDITIONS MAY HAVE CHANGED CONTRACTOR SHALL MARK TREES FOR REMOVAL AND OBTAIN OWNER AUTHORIZATION PRIOR TO REMOVAL. OWNER MAY DIRECT CONTRACTOR TO LIMB/TOP TREES TO RETAIN AS 10-FT SNAGS. 11. COORDINATE TREES TO BE REMOVED WITH OWNER'S REPRESENTATIVE PRIOR TO REMOVAL. 12. SEE MATERIALS AND LAYOUT PLANS FOR RELOCATION OF SALVAGED SIGNS AND COORDINATE WITH OWNER'S REPRESENTATIVE FOR ALL SALVAGED ITEMS. TREE AND VEGETATION PROTECTION NOTES: 1. NO CLEARING, GRUBBING, DEMOLITION OR OTHER GROUND DISTURBING ACTIVITIES SHALL OCCUR OUTSIDE THE WORK AREA BOUNDARY MARKED BY ORANGE CONSTRUCTION FENCING. SEE GRADING PLANS FOR LIMITS OF GRADING. 2. CONTRACTOR SHALL MARK TREES DESIGNATED FOR REMOVAL FOR ENGINEER APPROVAL PRIOR TO BEGINNING WORK. TREES AND BRUSH REMOVAL IN THE STAGING AREAS SHALL NOT BE COMPLETED WITHOUT ENGINEER APPROVAL. 3. CONTRACTOR SHALL INSTALL AND MAINTAIN TREE PROTECTION FENCING AS SHOWN. FENCING SHALL REMAIN IN PLACE UNTIL PROJECT COMPLETION. 4. EXCAVATION, SOIL COMPACTION, OR OTHER POTENTIALLY DAMAGING ACTIVITES ARE PROHIBITED WITHIN THE TREE PROTECTION ZONE. 5. CLEARING AND GRUBBING SHALL BE PER SECTION 00320.40 AND 00320.41 OF THE STANDARD SPECIFICATIONS. FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - C L E A R I N G G R U B B I N G & D E M O P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 0 : 1 2 P M P L O T T E D B Y : K A Y L A N O L L E T T E EX CONDITIONS, CLEARING, DEMO & PROTECTION PLAN EC0.2 5 TTF MFR CONSTRUCTION KEYNOTES: EROSION CONTROL WATTLES PER CWS DWG #880, SHEET EC2.1. ORANGE CONSTRUCTION FENCING. SEE SHEET EC2.1. GRAVEL CONSTRUCTION ENTRANCE PER CWS DWG #855, SHEET EC2.1. INLET PROTECTION PER CWS DWG #920, SHEET EC2.1. SAWCUT AC PAVEMENT AT SW TIGARD ST TO PREPARE FOR NEW PAVEMENT. N SCALE 0 FEET 30 15 30 60 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM 1 2 3 4 5 MA T C H L I N E - S E E S H T E C 0 . 3 176 177 178 179 180 181 182 183 184 188 189 190 179 188192 183 179 177 176 175 174 173 172 171 170 169 168 167 166 165 164 163 162 161 164 151 152 153 154 155 156 180 181 182 178 177 170 168 173 171 170 169 168 167174175176178 172 166 165 164 163 162 161 160 159 158 157 156 155 171172 167 169 T S S S D S OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH 8" C.I.P.8" C.I.P. 8" C.I.P. 2" POLY 2" POLY 2" POLY F.O. DUCT F.O. DUCT W W W W W W W W T TT T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST E E E E E E E E E E E E E ~ ~~ ~~~ ~ ~ NO DUMPING ~ W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W E.P. FACE OF CURB FACE OF CURB TT FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL W W W W W W W W W W W W W W W W W W W W W FEMA 1 0 0 Y R F L O O D P L A I N V E G E T A T E D C O R R I D O R W E T L A N D B O U N D A R Y VEG E T A T E D C O R R I D O R WETLAND BOUNDARY X X X X X X X E E E E E E E E E E X XX X X X X X X X X X X X X X X X XX X X X X XXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X1 2 4 4 TYP. TYP. PROTECT EX WATER LINES POTENTIAL STAGING AREA, OUTSIDE OF VEGETATED CORRIDOR, ADJUST BMPS TO PROVIDE PERIMETER PROTECTION REMOVE 'NO DUMPING SIGN' AND SALVAGE FOR REUSE. COORDINATE WITH OWNER'S REP. FOR RELOCATION SW TIGARD STREET SW 1 0 8 T H A V E . SW 1 0 7 T H P L . WORK LIMIT 2 TYP. APPROXIMATE LOCATION FOR SELECTED TOPSOIL HARVESTING TO BE VERIFIED IN THE FIELD AND APPROVED BY ENGINEER. PYRUS SPP.DBH=18" PYRUS SPP. DBH=6" ENGLISH HAWTHORN DBH=6" OREGON WHITE OAKDBH=20" GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 X X ORANGE CONSTRUCTION FENCING CLEARING, DEMO, AND PROTECTION LEGEND EROSION CONTROL WATTLES DRAINAGE FLOW ARROW INLET PROTECTION GRAVEL CONSTRUCTION ENTRANCE CLEARING AND GRUBBING REMOVE ASPHALTIC CONCRETE TREE TO BE REMOVED PRE-CONSTRUCTION, CLEARING, AND DEMOLITION NOTES: 1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE, FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. 2. SEDIMENT BARRIERS APPROVED FOR USE INCLUDE SEDIMENT FENCE, BERMS CONSTRUCTED OUT OF MULCH, CHIPPINGS, OR OTHER SUITABLE MATERIAL, STRAW WATTLES, OR OTHER APPROVED MATERIALS. 3. SENSITIVE RESOURCES INCLUDING, BUT NOT LIMITED TO, TREES, WETLANDS, AND RIPARIAN PROTECTION AREAS SHALL BE CLEARLY DELINEATED WITH ORANGE CONSTRUCTION FENCING IN A MANNER THAT IS CLEARLY VISIBLE TO ANYONE IN THE AREA. NO ACTIVITIES ARE PERMITTED TO OCCUR BEYOND THE CONSTRUCTION BARRIER. 4. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, STREET SWEEPING, AND VACUUMING, MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 5. RUN-ON AND RUN-OFF CONTROLS SHALL BE IN PLACE AND FUNCTIONING PRIOR TO BEGINNING SUBSTANTIAL CONSTRUCTION ACTIVITIES. RUN-ON AND RUN-OFF CONTROL MEASURES INCLUDE: SLOPE DRAINS (WITH OUTLET PROTECTION), CHECK DAMS, SURFACE ROUGHENING, AND BANK STABILIZATION. 6. THESE EROSION AND SEDIMENT CONTROL PLANS ASSUME "DRY WEATHER" CONSTRUCTION. "WET WEATHER" CONSTRUCTION MEASURES NEED TO BE APPLIED BETWEEN OCTOBER 1ST AND MAY 31ST. 7. CONTRACTOR SHALL REMOVE AND SALVAGE BUCK & POLE AND SPLIT-RAIL FENCING TO FACILITATE CONSTRUCTION AND ACCESS. REPLACE FENCE FOLLOWING CONSTRUCTION TO MATCH PRE-CONSTRUCTION CONDITIONS. 8. CONTRACTOR SHALL PROTECT ALL OVERHEAD AND BURIED UTILITIES IN PLACE. 9. CONTRACTOR SHALL COORDINATE WITH CITY OF TIGARD FOR RELOCATION OF WATER METER AND SHUT-OFF PERIOD. MAINTAIN WATER SERVICE TO EDUCATION CENTER DURING CONSTRUCTION. 10. CONTRACTOR SHALL REMOVE ALL HAWTHORN TREES/SHRUBS FROM WITHIN THE WORK LIMITS. TREE SYMBOLS INDICATE TREES GREATER THAN 6-IN DBH AT TIME OF SURVEY. CONDITIONS MAY HAVE CHANGED CONTRACTOR SHALL MARK TREES FOR REMOVAL AND OBTAIN OWNER AUTHORIZATION PRIOR TO REMOVAL. OWNER MAY DIRECT CONTRACTOR TO LIMB/TOP TREES TO RETAIN AS 10-FT SNAGS. 11. COORDINATE TREES TO BE REMOVED WITH OWNER'S REPRESENTATIVE PRIOR TO REMOVAL. 12. SEE MATERIALS AND LAYOUT PLANS FOR RELOCATION OF SALVAGED SIGNS AND COORDINATE WITH OWNER'S REPRESENTATIVE FOR ALL SALVAGED ITEMS. TREE AND VEGETATION PROTECTION NOTES: 1. NO CLEARING, GRUBBING, DEMOLITION OR OTHER GROUND DISTURBING ACTIVITIES SHALL OCCUR OUTSIDE THE WORK AREA BOUNDARY MARKED BY ORANGE CONSTRUCTION FENCING. SEE GRADING PLANS FOR LIMITS OF GRADING. 2. CONTRACTOR SHALL MARK TREES DESIGNATED FOR REMOVAL FOR ENGINEER APPROVAL PRIOR TO BEGINNING WORK. TREES AND BRUSH REMOVAL IN THE STAGING AREAS SHALL NOT BE COMPLETED WITHOUT ENGINEER APPROVAL. 3. CONTRACTOR SHALL INSTALL AND MAINTAIN TREE PROTECTION FENCING AS SHOWN. FENCING SHALL REMAIN IN PLACE UNTIL PROJECT COMPLETION. 4. EXCAVATION, SOIL COMPACTION, OR OTHER POTENTIALLY DAMAGING ACTIVITES ARE PROHIBITED WITHIN THE TREE PROTECTION ZONE. 5. CLEARING AND GRUBBING SHALL BE PER SECTION 00320.40 AND 00320.41 OF THE STANDARD SPECIFICATIONS. FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - C L E A R I N G G R U B B I N G & D E M O P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 0 : 2 9 P M P L O T T E D B Y : K A Y L A N O L L E T T E EX CONDITIONS, CLEARING, DEMO & PROTECTION PLAN EC0.3 6 TTF MFR CONSTRUCTION KEYNOTES: 1. EROSION CONTROL WATTLES PER CWS DWG #880, SHEET EC2.1. 2. ORANGE CONSTRUCTION FENCING. SEE SHEET EC2.1. 3. GRAVEL CONSTRUCTION ENTRANCE PER CWS DWG #855, SHEET EC2.1. 4. INLET PROTECTION PER CWS DWG #920, SHEET EC2.1. N SCALE 0 FEET 30 15 30 60 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM 1 2 3 4 MA T C H L I N E - S E E S H T E C 0 . 2 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 19 5 182 183 185 183 184 185 18 6 187 188 189 190 191 19 2 188 189 191 192 193 194 186 195 196 197 198 T HY D WM S EM 6302188.55DECK 6303188.61DECK 6304189.84DECK6305189.82DECK 6306190.10DECK6307192.22DECK S OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH E.P. E.P. OH WOOD SHED SINGLE STORY WOOD BUILDING W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ~ ~ ~ ~ ~ ~ W W W W W W W W W W W W W W W W W W W W W W W W W W W E.P. ~ TT VEGETATED C O R R I D O R WETLAND BOU N D A R Y V E G E T A T E D C O R R I D O R W E T L A N D B O U N D A R Y W W W WX X X X WD WD WD WD WD WD WD WD W D X X X X X X XXXXXXXXX X X X X XX X X XXXXX X XX X X XX X X X X X X X X 195194 196197198 199 195 1 9 1 1 9 2 1 9 3 19 4 196 197 198 199 195 192 193 194 196197198 195194193192 190 191 195 197196 19 5 192193 19 8 196 TYP. TYP. TYP. 50 . 0 ' TYP. 1 2 1 2 44 4 5 6 12 14 15 13 8 9 3 11 13 7 WORK LIMIT EM W NEW 1" MAINLINE TAP BY CITY OF TIGARD APPROVED CONTRACTOR. INSTALL LINE ABOVE EXISTING UTILITY VAULT. VERTICAL BENDS AS NECESSARY AFTER DOUBLE CHECK VALVE ASSEMBLY. APPROXIMATE POINT OF CONNECTION FOR NEW SERVICE. CONTRACTOR TO POTHOLE TO VERIFY LOCATION INSTALL 3'L X 3'W X 1'D RIVER ROCK OUTFALL PROTECTION 21 LF 8" PVC D3034 SDR35 SW TIGARD STREET 182 LF 8" PVC D3034 SDR35 SW T W I N P A R K P L SW C O R N E L L P L A C E 13 13 13 1111 1113 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 X X ORANGE CONSTRUCTION FENCING CLEARING, DEMO, AND PROTECTION LEGEND EROSION CONTROL WATTLES DRAINAGE FLOW ARROW INLET PROTECTION GRAVEL CONSTRUCTION ENTRANCE GRADING LEGEND PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR 191 190 CONSTRUCTION KEYNOTES: 1.EROSION CONTROL WATTLES PER CWS DWG #880, SHEET EC2.1. 2.ORANGE CONSTRUCTION FENCING. SEE SHEET EC2.1. 3.GRAVEL CONSTRUCTION ENTRANCE PER CWS DWG. #855, SHEET EC2.1. 4.INLET PROTECTION PER CWS DWG. #920, SHEET EC2.1. 5.LOCATION OF CONTRACTOR TRAILERS, SOLID WASTE, HAZARDOUS MATERIAL AND FUELING AREA. CONTRACTOR TO DETERMINE ACTUAL LOCATION ON-SITE. 6.CONCRETE TRUCK CHUTE WASHOUT, ECO-PAN OR EQUAL PER SHEET EC2.1. GRADING, HARDSCAPE, AND UTILITY EROSION & SEDIMENT CONSTRUCTION NOTES: 1.SEE SHEET CS 1200-C FOR EROSION AND SEDIMENT CONTROL NOTES. 2.UTILITY TRENCHING PER 4/L7.1 3.SEED USED FOR TEMPORARY SEEDING SHALL BE COMPOSED OF ONE OF THE FOLLOWING MIXTURES, UNLESS OTHERWISE AUTHORIZED: A.VEGETATED CORRIDOR AREAS REQUIRE NATIVE SEED MIXES. SEE RESTORATION PLAN FOR APPROPRIATE SEED MIX. B.DWARF GRASS MIX (MIN. 100 LB./AC.) -DWARF PERENNIAL RYEGRASS (80% BY WEIGHT) -CREEPING RED FESCUE (20% BY WEIGHT) C.STANDARD HEIGHT GRASS MIX (MIN. 100LB./AC.) -ANNUAL RYEGRASS (40% BY WEIGHT) -TURF-TYPE FESCUE (60% BY WEIGHT) 4.SLOPE TO RECEIVE TEMPORARY OR PERMANENT SEEDING SHALL HAVE THE SURFACE ROUGHENED BY MEANS OF TRACK-WALKING OR THE USE OF OTHER APPROVED IMPLEMENTS. SURFACE ROUGHENING IMPROVES SEED BEDDING AND REDUCES RUN-OFF VELOCITY. 5.LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE ESTABLISHMENT OF PERMANENT VEGETATIVE COVER VIA SEEDING WITH APPROVED MIX AND APPLICATION RATE. 6.TEMPORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE: COVERING EXPOSED SOIL WITH PLASTIC SHEETING, STRAW MULCHING, WOOD CHIPS, OR OTHER APPROVED MEASURES. 7.STOCKPILED SOIL OR STRIPPINGS SHALL BE PLACED IN A STABLE LOCATION AND CONFIGURATION. DURING "WET WEATHER" PERIODS, STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING OR STRAW MULCH. SEDIMENT FENCE IS REQUIRED AROUND THE PERIMETER OF THE STOCKPILE. 8.EXPOSED CUT OR FILL AREAS SHALL BE STABILIZED THROUGH THE USE OF TEMPORARY SEEDING AND MULCHING, EROSION CONTROL BLANKETS OR MATS, MID-SLOPE SEDIMENT FENCES OR WATTLES, OR OTHER APPROPRIATE MEASURES. SLOPES EXCEEDING 25% MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURES. 9.AREAS SUBJECT TO WIND EROSION SHALL USE APPROPRIATE DUST CONTROL MEASURES INCLUDING THE APPLICATION OF A FINE SPRAY OF WATER, PLASTIC SHEETING, STRAW MULCHING, OR OTHER APPROVED MEASURES. 10.CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, TIRE WASHES, STREET SWEEPING, AND VACUUMING MAY BE BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 11.ACTIVE INLETS TO STORM WATER SYSTEMS SHALL BE PROTECTED THROUGH THE USE OF APPROVED INLET PROTECTION MEASURES. ALL INLET PROTECTION MEASURES ARE TO BE REGULARLY INSPECTED AND MAINTAINED AS NEEDED. 12.SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE TRANSPORTED IN WATER-TIGHT TRUCKS TO ELIMINATE SPILLAGE OF SEDIMENT AND SEDIMENT-LADEN WATER. 13.AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE TRUCKS IN A LOCATION THAT DOES NOT PROVIDE RUN-OFF THAT CAN ENTER THE STORM WATER SYSTEM, OR SURFACE WATERS. IF THE CONCRETE WASH-OUT AREA CAN NOT BE CONSTRUCTED GREATER THAN 50' FROM ANY DISCHARGE POINT, SECONDARY MEASURES SUCH AS BERMS OR TEMPORARY SETTLING PITS MAY BE REQUIRED. THE WASH-OUT SHALL BE LOCATED WITHIN SIX FEET OF TRUCK ACCESS AND BE CLEANED WHEN IT REACHES 50% OF THE CAPACITY. 14.SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE TRANSFERRED TO THE STORM WATER SYSTEM. SWEEPINGS SHALL BE PICKED UP AND DISPOSED IN THE TRASH. 15.AVOID PAVING IN WET WEATHER WHEN PAVING CHEMICALS CAN RUN-OFF INTO THE STORM WATER SYSTEM. 16.USE BMPS SUCH AS CHECK-DAMS, BERMS, AND INLET PROTECTION TO PREVENT RUN-OFF FROM REACHING DISCHARGE POINTS. 17.COVER CATCH BASINS, MANHOLES, AND OTHER DISCHARGE POINTS WHEN APPLYING SEAL COAT, TACK COAT, ETC. TO PREVENT INTRODUCING THESE MATERIALS TO THE STORM WATER SYSTEM. 1 2 4 5 1.STOCKPILE AREA. CONTRACTOR TO DETERMINE ACTUAL LOCATION ON-SITE. SEE CWS DWG. #810, SHEET EC2.1. 2.5' WIDE WATER QUALITY VEGETATED FILTER STRIP PER CWS DWG. #796, SHEET EC2.1. 3.GRAVEL INFILTRATION SHOULDER ALONG PATH, PER DTL 3 ON SHEET L6.0 4.6" CROSS DRAIN PIPE AND STORM OUTFALL PER DETAIL 1, SHEET EC2.2. MITER END OF PIPE TO MATCH SLOPE. INSTALL RIPRAP BASIN, 3'L X 2'W X 1.5'D, CLASS 50 RIPRAP, GEOTEXTILE TYPE 1 UNDER RIPRAP. OUTFALL PROTECTION PER CWS DWG. #820, SHEET EC2.1. 5.LIDA RAIN GARDEN PER CWS DWG. #797, SHEET EC2.2. 6.INSTALL STORM OUTFALL PROTECTION RIPRAP BASIN, 3'L X 2'W X 1.5'D, CL 50 RIPRAP PER CWS DWG #820, SHT EC2.1. 7.CG-30 CATCH BASIN PER CWS DWG. #330, SHEET E2.3. 8.BEEHIVE INLET / RAIN GARDEN OVERFLOW PER CWS DWG. #405, SHEET EC2.2. 7 8 9 11 13 3 6 12 14 15 FI L E : \\ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - G R A D I N G U T I L I T Y & E S C P L A N P 2 . d w g P L O T D A T E : 5/ 2 3 / 2 0 2 2 4 : 5 0 : 3 5 P M P L O T T E D B Y : DE R E K S E R G I S O N GRADING, UTILITY & EROSION CONTROL PLAN EC1.1 7 MFN HLW N SCALE 0 FEET 30 15 30 60 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E #DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM MA T C H L I N E - S E E S H T EC 1 . 2 176 177 178 179 180 181 182 183 184 188 189 190 179 188192 183 179 177 176 175 174 173 172 171 170 169 168 167 166 165 164 163 162 161 164 151 152 15 3 154 155 156 180 181 182 178 177 170 168 173 171 170 169 168 167174175176178 172 166 165 164 163 162 161 160 159 158 157 156 155 171172 167 169 T S S S D S OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH 8" C.I.P.8" C.I.P. 8" C.I.P. 2" POLY 2" POLY 2" POLY F.O. DUCT F.O. DUCT W W W W W W W W T TT TT T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST E E E E E E E E E E E E E ~ ~~ ~~~ ~ ~ NO DUMPING ~ W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W E.P. FACE OF CURB FACE OF CURB TT FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL W W W W W W W W W W W W W W W W W W W W W FEM A 1 0 0 Y R F L O O D P L A I N V E G E T A T E D C O R R I D O R W E T L A N D B O U N D A R Y VE G E T A T E D C O R R I D O R WETLAND BOUNDARY X X X X X X X E E E E E E E E E E X XX X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 186.64 17 017 518 0 18 5 190 16 917 1 17 217 317 417 617 717 817 918 118 218 3 18 4 18 6 1 8 7 187 187188 189 191 TYP.TYP. SW TIGARD ST 4 1 2 4 7 13 11 4 13 11 11 139 WORK LIMIT TYP.2 13 16 16 13 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 X X ORANGE CONSTRUCTION FENCING CLEARING, DEMO, AND PROTECTION LEGEND EROSION CONTROL WATTLES DRAINAGE FLOW ARROW INLET PROTECTION GRAVEL CONSTRUCTION ENTRANCE GRADING LEGEND PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR 191 190 GRADING, HARDSCAPE, AND UTILITY EROSION & SEDIMENT CONSTRUCTION NOTES: 1.SEE SHEET CS 1200-C FOR EROSION AND SEDIMENT CONTROL NOTES. 2.UTILITY TRENCHING PER 4/L7.1 3.SEED USED FOR TEMPORARY SEEDING SHALL BE COMPOSED OF ONE OF THE FOLLOWING MIXTURES, UNLESS OTHERWISE AUTHORIZED: A.VEGETATED CORRIDOR AREAS REQUIRE NATIVE SEED MIXES. SEE RESTORATION PLAN FOR APPROPRIATE SEED MIX. B.DWARF GRASS MIX (MIN. 100 LB./AC.) -DWARF PERENNIAL RYEGRASS (80% BY WEIGHT) -CREEPING RED FESCUE (20% BY WEIGHT) C.STANDARD HEIGHT GRASS MIX (MIN. 100LB./AC.) -ANNUAL RYEGRASS (40% BY WEIGHT) -TURF-TYPE FESCUE (60% BY WEIGHT) 4.SLOPE TO RECEIVE TEMPORARY OR PERMANENT SEEDING SHALL HAVE THE SURFACE ROUGHENED BY MEANS OF TRACK-WALKING OR THE USE OF OTHER APPROVED IMPLEMENTS. SURFACE ROUGHENING IMPROVES SEED BEDDING AND REDUCES RUN-OFF VELOCITY. 5.LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE ESTABLISHMENT OF PERMANENT VEGETATIVE COVER VIA SEEDING WITH APPROVED MIX AND APPLICATION RATE. 6.TEMPORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE: COVERING EXPOSED SOIL WITH PLASTIC SHEETING, STRAW MULCHING, WOOD CHIPS, OR OTHER APPROVED MEASURES. 7.STOCKPILED SOIL OR STRIPPINGS SHALL BE PLACED IN A STABLE LOCATION AND CONFIGURATION. DURING "WET WEATHER" PERIODS, STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING OR STRAW MULCH. SEDIMENT FENCE IS REQUIRED AROUND THE PERIMETER OF THE STOCKPILE. 8.EXPOSED CUT OR FILL AREAS SHALL BE STABILIZED THROUGH THE USE OF TEMPORARY SEEDING AND MULCHING, EROSION CONTROL BLANKETS OR MATS, MID-SLOPE SEDIMENT FENCES OR WATTLES, OR OTHER APPROPRIATE MEASURES. SLOPES EXCEEDING 25% MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURES. 9.AREAS SUBJECT TO WIND EROSION SHALL USE APPROPRIATE DUST CONTROL MEASURES INCLUDING THE APPLICATION OF A FINE SPRAY OF WATER, PLASTIC SHEETING, STRAW MULCHING, OR OTHER APPROVED MEASURES. 10.CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, TIRE WASHES, STREET SWEEPING, AND VACUUMING MAY BE BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 11.ACTIVE INLETS TO STORM WATER SYSTEMS SHALL BE PROTECTED THROUGH THE USE OF APPROVED INLET PROTECTION MEASURES. ALL INLET PROTECTION MEASURES ARE TO BE REGULARLY INSPECTED AND MAINTAINED AS NEEDED. 12.SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE TRANSPORTED IN WATER-TIGHT TRUCKS TO ELIMINATE SPILLAGE OF SEDIMENT AND SEDIMENT-LADEN WATER. 13.AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE TRUCKS IN A LOCATION THAT DOES NOT PROVIDE RUN-OFF THAT CAN ENTER THE STORM WATER SYSTEM, OR SURFACE WATERS. IF THE CONCRETE WASH-OUT AREA CAN NOT BE CONSTRUCTED GREATER THAN 50' FROM ANY DISCHARGE POINT, SECONDARY MEASURES SUCH AS BERMS OR TEMPORARY SETTLING PITS MAY BE REQUIRED. THE WASH-OUT SHALL BE LOCATED WITHIN SIX FEET OF TRUCK ACCESS AND BE CLEANED WHEN IT REACHES 50% OF THE CAPACITY. 14.SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE TRANSFERRED TO THE STORM WATER SYSTEM. SWEEPINGS SHALL BE PICKED UP AND DISPOSED IN THE TRASH. 15.AVOID PAVING IN WET WEATHER WHEN PAVING CHEMICALS CAN RUN-OFF INTO THE STORM WATER SYSTEM. 16.USE BMPS SUCH AS CHECK-DAMS, BERMS, AND INLET PROTECTION TO PREVENT RUN-OFF FROM REACHING DISCHARGE POINTS. 17.COVER CATCH BASINS, MANHOLES, AND OTHER DISCHARGE POINTS WHEN APPLYING SEAL COAT, TACK COAT, ETC. TO PREVENT INTRODUCING THESE MATERIALS TO THE STORM WATER SYSTEM. 1 2 4 5 1.STOCKPILE AREA. CONTRACTOR TO DETERMINE ACTUAL LOCATION ON-SITE. SEE CWS DWG. #810, SHEET EC2.1. 2.GRAVEL INFILTRATION SHOULDER ALONG PATH, PER DTL 3 ON SHT L6.0 3.6" CROSS DRAIN PIPE AND STORM OUTFALL. MITER END OF PIPE TO MATCH SLOPE. INSTALL RIPRAP BASIN, 3'L X 2'W X 1.5'D, CLASS 50 RIPRAP, GEOTEXTILE TYPE 1 UNDER RIPRAP. OUTFALL PROTECTION PER CWS DWG. #820, SHEET EC2.2. 4.INSTALL STORM OUTFALL PROTECTION RIPRAP BASIN, 3'L X 2'W X 1.5'D, CL 50 RIPRAP PER CWS DWG #820, SHT EC2.1. 5.4" STORM PIPE FROM GRAVEL INFILTRATION SHOULDER. 7 9 11 13 CONSTRUCTION KEYNOTES: 1.EROSION CONTROL WATTLES PER CWS DWG #880, SHEET EC2.1. 2.ORANGE CONSTRUCTION FENCING. SEE SHEET EC2.1. 3.INLET PROTECTION PER CWS DWG. #920, SHEET EC2.1. 4.LOCATION OF CONTRACTOR TRAILERS, SOLID WASTE, HAZARDOUS MATERIAL AND FUELING AREA. CONTRACTOR TO DETERMINE ACTUAL LOCATION ON-SITE. 16 1 2 3 4 FI L E : \\ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - G R A D I N G U T I L I T Y & E S C P L A N P 2 . d w g P L O T D A T E : 5/ 2 3 / 2 0 2 2 4 : 5 0 : 5 8 P M P L O T T E D B Y : DE R E K S E R G I S O N GRADING, UTILITY & EROSION CONTROL PLAN EC1.2 8 TTF HLW PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E #DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM N SCALE 0 FEET 30 15 30 60 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E #DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM MA T C H L I N E - S E E S H T EC 1 . 1 METAL T-POST ZIP TIES FINISH GRADE 48" +/- 5'-0" MIN DRIPLINE OF TREE OR AS SHOWN ON PLAN MAX 10'-0" O.C. TYP ORANGEPOLYETHYLENE(HDPE) MESHFENCING FABRIC48" WIDE ROLLS FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 2 : 1 4 P M P L O T T E D B Y : K A Y L A N O L L E T T E EC DETAILS EC2.1 9 MFN HLW P:\City of Tigard\035975\Design\Drawings\Civil\Details\WASHOUT.jpg CONCRETE TRUCK CHUTE WASHOUTECO-PAN OR EQUAL ORANGE CONSTRUCTION / TREE PROTECTION FENCING DETAILN.T.S PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM â„„ CROSS SLOPE VARIES 6" STORM PIPE OUTLET, IE PER PLAN EXISTING OR PROPOSED PATH EXCAVATE SMALL BASIN AT UPSTREAM SIDE, APPROX 2'X2' WITH DEPTH TO MEET IE AND ALLOW DRAINAGE (FIELD FIT AS REQUIRED) 6" STORM PIPE INLET, IE PER PLAN CONSTRUCT OUTLET RIPRAP PROTECTION PER CWS STANDARD DWG NO. 820 BEVEL CUT PIPE ENDS TO MATCH SLOPE 2% MIN 8" CONC. DRIVEWAY CONC. COLLAR TO PROTECT AGAINST MOWING 10" DI PIPE 2" AGGREGATE 2:1 6" 6" 12" TALL INTERNAL EARTHEN DAM, SEE NOTE 1 GEOTEXTILE FABRIC 3" - 134" OPEN GRADED CRUSHED ROCK 4" PERF PIPE, SEE NOTE 2 4" DRAIN PIPE (PVC D3034 SDR 35) TO OUTFALL MAX 4.5% SLOPE DISCHARGE TO OUTFALL EG OR FG, PER PLAN 30" 12" MIN 9" MIN FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 2 : 2 2 P M P L O T T E D B Y : K A Y L A N O L L E T T E DRAINAGE DETAILS EC2.2 10 MFN HLW PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM SCALE: EC2.21 N.T.S. 6" PVC D3034 SDR35 CROSS DRAIN AND STORM OUTFALL SCALE: EC2.22 N.T.S. 10" CL. 50 DI CROSS DRAIN IN RIGHT-OF-WAY SCALE: EC2.23 N.T.S. GRAVEL INFILTRATION SHOULDER DRAINAGE PROFILE NOTES: 1. WHERE LONGITUDINAL SLOPE OF PAVED PATH AND GRAVEL INFILTRATION SHOULDER EXCEEDS 3%, CONSTRUCT 12" HIGH INTERNAL CHECK DAMS EVERY 50 FEET. INTERNAL CHECK DAMS SHALL BE 12" TALL, WITH A TOP CREST WIDTH OF 12", AND 1:1 SIDE SLOPES. ADJUST SUBGRADE EXCAVATION TO CREATE CHECK DAMS, OR PLACE AND COMPACT NATIVE BACKFILL IN THIS SHAPE PRIOR TO PLACING GEOTEXTILE FABRIC AND OPEN GRADED ROCK. 2. AT THE DOWNSLOPE ENDS OF GRAVEL INFILTRATION SHOULDERS EXCEEDING 3%, OR WHERE OTHERWISE SHOWN ON THE PLANS, INSTALL A MINIMUM OF 20 LINEAR FEET OF 4" PERFORATED PIPE DIRECTED TO DISCHARGE AT A RIPRAP OUTFALL CONSTRUCTED PER CWS DWG NO 820. PERF PIPES MAY BE DISCHARGED TO THE SAME OUTFALLS CONSTRUCTED FOR CROSS DAMS. PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ E C - D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 2 : 2 7 P M P L O T T E D B Y : K A Y L A N O L L E T T E DRAINAGE DETAILS 2 EC2.3 11 MFN HLW PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191ASPHALT PAVING - BUS PARKING ASPHALT PAVING COMMERCIAL DRIVEWAY - CONCRETE PAVING VEHICULAR CONCRETE PAVING - PEDESTRIAN STORMWATER FEATURE BOULDER WALL DETECTABLE WARNING TILES MATERIAL LEGEND DETAIL REFERENCE GRAVEL INFILTRATION SHOULDER 1/ L6.0 2/ L6.0 8/ L6.0 4/ L6.0 2/ L6.2 3/ L6.0 7/ L6.1 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 194 95 182 183 185 183 184 185 186 187 188 189 190 1 188 189 191 1 9 176177178 179180 181 182 183 184 188 189 190 186 179 188192 183 179 177 176 175 174 173 172 171 170 169168 167 166 165164 163 162 161 164 151 152 153 154 155 156 15 0 180 181 182 178 177 1 168 173 171 170 169 168 167174175176178172 166 165 164 163162161160159158157156 155 1 16716 195 196 197 19 T H Y D WM S EM T S S S S D S SS SS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS ~ ~ ~ ~ ~ ~ ~~ ~~~ ~ ~ ~ ~ FL FL FL FL FL FL FL FL FL FL FL FL FL X X X X X X XX L1.1 - MATERIALS PLAN L2.1 - GRADING & DRAINAGE PLAN L3.1 - LAYOUT PLAN L1.2 - MATERIALS PLAN L2.3 - GRADING & DRAINAGE PLAN L3.3 - LAYOUT PLAN L1.3 - MATERIALS PLAN L2.4 - GRADING & DRAINAGE PLAN L3.4 - LAYOUT PLAN SW TIGARD ST SW C O R N E L L P L SW T W I N PA R K P L NATURE CENTER WORK LIMIT WD WD WD WD WD OVERALL SITE PLAN L1.0 12 DMSMFR NSCALE 0 FEET 50 25 50 100 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM VEGETATED CORRIDOR BOUND A R Y WETLAND BOUNDARY MATERIAL KEY NOTES 1 / L6.1 DETAIL REFERENCE 3 / L6.0 4/ L6.0 6 / L6.0 8/ L6.0 4 & 5/ L6.1 4/ L6.2 1/ L6.3 2/ L6.2 ACCESSIBLE PARKING STALL - SAWCUT, REPAVE, & RESTRIPE ASPHALT CONCRETE STAIR & HANDRAIL (E) UTILITY MANHOLE - ADJUST AND ROTATE RIM AWAY FROM CURB AS REQ'D. CONTACT FRONTIER AT 1-800-239-4430 FOR COORDINATION. CATCH BASIN, CG-30 GRAVEL INFILTRATION SHOULDER LANDSCAPE FILTER STRIP INFILTRATION PLANTER RAIN GARDEN CONCRETE CURB CONCRETE PATH W/ GRAVEL INFILTRATION SHOULDER ASPHALT PATH W/ INFILTRATION SHOULDER CONCRETE PAVING - PEDESTRIAN COMMERCIAL DRIVEWAY - CONCRETE PAVING VEHICULAR BUS PARKING SHOULDER PARKING STALLS BOULDER WALL DETECTABLE WARNING TILES SPLIT RAIL FENCE WHEELSTOP 3 / L6.0 CWS #796 CWS #797 CWS #330 CWS #405 BEEHIVE INLET / RAIN GARDEN OVERFLOW 1 2 3 4 5 6 7 9 10 8 11 12 13 14 15 16 17 18 19 ROOT BARRIER206/ L6.1 7/ L6.1 1/ L6.0 189 193 194 195 187 188 189 190 191 195 196 197 198 T WM S EM SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS ~ ~ ~ ~ X X X X X X XXXX X X X X X SW T W I N PA R K P L SW TIGARD ST 1 OF 3, TYP. NATURE CENTER L6.2 1 4 6 9 1 15 87 5 4 MATCH (E) CURB AND (E) SIDEWALK 2 MATCH (E) PARKING LOT PAVEMENT 12 18 18 11 13 17 17 10 11 RIGHT OF WAY (E) EDGE OF PAVEMENT 14 3 17 L6.2 2 A C B ED FG H 19 WORK LIMIT PROTECT (E) UTILITY POLE. PAVE TO EXISTING CONCRETE WORK LIMIT ACCESSIBLE ISLE STRIPING - SEE DETAIL 1/ L6.3 18 MATCH (E) PARKING LOT PAVEMENT SAWCUT 1' MIN. FROM EXISTING EDGE OF PAVEMENT, TYP. SAWCUT 1' MIN. FROM EXISTING EDGE OF PAVEMENT, TYP. 16 20 49 LF 20 40 LF 20 27 LF 16 66 LF 52 LF 16 44 LF WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD W D W D WD GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191ASPHALT PAVING - BUS PARKING ASPHALT PAVING COMMERCIAL DRIVEWAY - CONCRETE PAVING VEHICULAR CONCRETE PAVING - PEDESTRIAN STORMWATER FEATURE BOULDER WALL DETECTABLE WARNING TILES MATERIAL LEGEND DETAIL REFERENCE GRAVEL INFILTRATION SHOULDER 1/ L6.0 2/ L6.0 8/ L6.0 4/ L6.0 2/ L6.2 3/ L6.0 7/ L6.1 SIGN R7-8 & POST SIGN OR7-9 & POST SIGN R7-8P SIGN TYPE LEGEND DETAIL REFERENCE 5 & 6 / L6.3 2 & 6 / L6.3 4 & 6 / L6.3 BUS ONLY PARKING SIGN & POST RELOCATED PARK SIGN & SALVAGED POSTS BIKE-PED WARNING SIGN & POST3 & 6 & 7 / L6.3 A B C D E F H G RELOCATED 35 MPH SPEED LIMIT SIGN & NEW POST RELOCATED RULES AND RESTORATION SIGNS ON NEW POST TO MATCH EXISTING 6 & 8 / L6.3 6 / L6.3 MATERIALS PLAN L1.1 13 DMSMFR NSCALE 10 5 0 FEET 10 20 MA T C H L I N E - S E E S H T L 1 . 2 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM 188 189 191 192 188 189 190 192 HYD T S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS ~ ~ SW TIGARD ST SW CO R N E L L PL 3 (E) R.O.W.(E) EDGE OF PAVEMENT 10 4 17 WORK LIMIT SAWCUT 1' MIN. FROM EXISTING EDGE OF PAVEMENT, TYP. 20 53 LF 2055 LF MATERIAL KEY NOTES DETAIL REFERENCE 3 / L6.0 4/ L6.0 8/ L6.0 ASPHALT PATH W/ INFILTRATION SHOULDER CONCRETE PAVING - PEDESTRIAN COMMERCIAL DRIVEWAY - CONCRETE PAVING VEHICULAR GRAVEL INFILTRATION SHOULDER DETECTABLE WARNING TILES 3 4 5 10 17 ROOT BARRIER206/ L6.1 7/ L6.1 ASPHALT PAVING - BUS PARKING ASPHALT PAVING COMMERCIAL DRIVEWAY - CONCRETE PAVING VEHICULAR CONCRETE PAVING - PEDESTRIAN STORMWATER FEATURE BOULDER WALL DETECTABLE WARNING TILES MATERIAL LEGEND DETAIL REFERENCE GRAVEL INFILTRATION SHOULDER 1/ L6.0 2/ L6.0 8/ L6.0 4/ L6.0 2/ L6.2 3/ L6.0 7/ L6.1 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 MATERIALS PLAN L1.2 14 DMSMFR NSCALE 0 FEET 20 10 20 40 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM MA T C H L I N E - S E E S H T L 1 . 1 MA T C H L I N E - S E E S H T L 1 . 3 176 177 178 179 180 181 182 183 184 179 188192 183 179 177 176 175 174 173 172 171 170 169 168 167 166 165 164 163 162 161 153 154 155 180 181 182 178 177 1 7 168 173 171 170 169 174175176178 172 166 165 164 163 162 161 160 159 158 157 156 155 1172 167 169 S S S D S SSSS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS ~ ~~ ~~~ ~ ~ FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FEMA 1 0 0 Y R F L O O D P L A I N V E G E T A T E D C O R R I D O R W E T L A N D B O U N D A R Y VEG E T A T E D C O R R I D O R WETLAND BOUNDARY X X SW TIGARD ST EXISTING PARKING LOT, TRAIL, AND SIDEWALK MATCH EX 3 (E) R.O.W. (E) EDGE OF PAVEMENT 10 4 18 SAWCUT 1' MIN. FROM EXISTING EDGE OF PAVEMENT, TYP. 21 64 LF 21 89 LF 2143 LF ASPHALT PAVING - BUS PARKING ASPHALT PAVING COMMERCIAL DRIVEWAY - CONCRETE PAVING VEHICULAR CONCRETE PAVING - PEDESTRIAN STORMWATER FEATURE BOULDER WALL DETECTABLE WARNING TILES MATERIAL LEGEND DETAIL REFERENCE GRAVEL INFILTRATION SHOULDER 1/ L6.0 2/ L6.0 8/ L6.0 4/ L6.0 2/ L6.2 3/ L6.0 7/ L6.1 MATERIAL KEY NOTES DETAIL REFERENCE 3 / L6.0 4/ L6.0 ASPHALT PATH W/ INFILTRATION SHOULDER CONCRETE PAVING - PEDESTRIAN GRAVEL INFILTRATION SHOULDER DETECTABLE WARNING STRIP 3 4 10 18 ROOT BARRIER216/ L6.1 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 L1.3 - MATERIALS PLAN L1.3 15 DMSMFR MA T C H L I N E - S E E S H T L 1 . 2 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NSCALE 0 FEET 20 10 20 40 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 186 187 188 189 190 191 192 193 194 195 184 185 186 187 188 189 190 191 192 186 195 196 197 198 WM S EM OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH E.P. E.P. OH OH OH OH OH W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST~ ~ ~ W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W E.P. ~ T T T W W W W W W W W W W W W SD SD S D S D SD SD S D SD SD S D S D SD S D SD SD S D S D SD SD SD SD SD SD SD SD SD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD W D W D WD WORK LIMIT X X X X X X XXXX X X X X X SW TIGARD ST SW TWIN PARK PL 195 1 9 1 1 9 2 1 9 3 194 196 197 198 199 BEEHIVE INLET, OVERFLOW ELEV=190.50 4" SD IN (E) IE=188.00 8" SD OUT (S) IE=186.83 DRAIN OUTFALL IE=190.00 196.68 196.63194.47 MATCH EXISTINGCURB ANDSIDEWALK MATCH EXISTINGPAVEMENT 194.29 TS 196.55 BS 192.34192.10 MATCHEXISTING(E)191.00 MATCHEXISTING(E)189.5 MATCH EXISTINGPAVEMENT 195 194 193 192 190 191 195 197196 19 5 192 193 CG-30 CATCH BASIN RIM=195.05 8" PVC D303344 SDR35 OUT (S) IE=192.00 SEE NOTE 6 (E)191.56 MATCHEXISTING 1. 5 % 1. 5 % 4.6% 4.6% 1. 5 % 1. 5 % 1.5 % 1. 5 % 1. 5 % 1. 5 % 1.6% 1.6% 1. 5 % 3:1 4: 1 M A X . 1. 5 % 1.5% 1. 5 % 3: 1 3 : 1 MATCHEXISTING 1. 5 % 1. 5 % 192.00 TW 194.50BW 191.85 TW 195.00BW 193.00193.00 191.56 1.5% 191.85191.85 4.5%1. 5 % 193.25 192.50 4.5% MAX. TW 195.00BW 194.50 TW 193.00BW 192.00 TW 196.00 TW 194.50 BW 194.00 BW 193.00 TW 194.30BW 193.00 TW 194.30 DRAIN OUTFALL IE=184.20 N:653325.06 E:7613978.31 EXISTING OUTFALL (E ) 8 . 3 % TW 198.00BW 196.00 TW 198.00BW 196.00 9. 3 % 119 LF 8" PVC D3034 SDR35 SL= 2.2% 198.45197.81 198.30 199.30 199.74 199.17 199.65 199.36199.01 19 8 196 BW 192.00 TW 193.00BW 192.00 TW 196.50BW 191.85 TW 197.00BW 195.00 TW 196.50 TW 192.50BW 192.00 0.5% 20.7 LF SL= 9.7% 29.0 LF SL= 8.62% 39.5 LF SL= 3.80% DRAIN OUTFALL IE=188.50 6" CROSS DRAIN IE=190.00 6" CROSS DRAIN IE=197.00 DRAIN OUTFALL IE=194.50 DISCHARGE WALL DRAIN PIPES TO BEEHIVE INLET 166 LF PVC D3034 SDR35 PERF (WEST OF STAIRS) DISCHARGE WALL DRAIN FROM EASTERN WALL SEGMENT TO OUTFALL IE=194.50 0+00 1+ 0 0 1+ 7 4 11+0011+06 0+00 1+00 2+00 2+ 1 3 TC: 195.25' GR: 194.75' TC: 165.67 GR:195.17'TC:197.21' GR:196.71' TC:198.62' GR:198.12' GRADING LEGEND PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR GRADE BREAK 191 190 TW BW TC BCIE(E) TOP OF WALL BOTTOM OF WALL TOP OF CURB BOTTOM OF CURB INVERT ELEVATION EXISTING WALL DRAIN (DTL 2, L6.2) STORM PIPE, SIZE PER PLAN FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - G R A D I N G & D R A I N A G E P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 6 : 2 7 P M P L O T T E D B Y : K A Y L A N O L L E T T E GRADING & DRAINAGE PLAN L2.1 16 AMFDMS NSCALE 10 5 0 FEET 10 20 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM MA T C H L I N E - S E E S H T L 2 . 3 GRADING & ACCESSIBILITY NOTES: 1. CONTRACTOR TO VERIFY ACCURACY OF EXISTING GRADES AND INTERPOLATED ELEVATIONS AND NOTIFY ENGINEER OF ANY DISCREPANCY PRIOR TO BEGINNING WORK. 2. SPOT ELEVATIONS, PATHWAY SLOPES, AND CLEAR ZONES ARE PROVIDED FOR THE GENERAL DIRECTION OF THE CONTRACTOR. THE CONTRACTOR SHALL ENSURE THAT ALL PAVED AREAS ARE CONSTRUCTED TO ADA STANDARDS FOR OUTDOOR RECREATION AREAS. 5.0% MAXIMUM RUNNING SLOPE, UNLESS OTHERWISE NOTED 2.0% MAXIMUM CROSS SLOPE 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY SITE CONDITIONS AND ENSURE THAT THE PAVED AREAS CAN BE CONSTRUCTED TO THESE STANDARDS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IN CASE OF DISCREPANCY OR IF SITE CONDITIONS DO NOT ALLOW CONSTRUCTION TO MEET THESE STANDARDS. 4. CONTRACTOR SHALL VERIFY EXISTING GRADE AT TRANSITIONS BETWEEN EXISTING AND PROPOSED SURFACES. 5. SET STRAIGHT GRADES BETWEEN GIVEN ELEVATIONS UNLESS OTHERWISE INDICATED.PAVED AREAS SHALL HAVE SMOOTH AND CONTINUOUS ELEVATION CHANGES. 6. INSTALL CONCRETE GUTTER PER CLEAN WATER SERVICES STANDARD DETAIL. , SEE SHEET EC2.3, DETAIL CG-30. 191 WD SD 55 LF 4" PVC D3034 SDR35 PERF (EAST OF STAIRS) 50 LF 4" PVC D3034 SDR35 PERF EL E V A T I O N STATION 190 195 200 190 195 200 0+00 1+00 1+74 S = 9.3% S = 1.5% GB STA 1+43.14 EL 199.32 GB STA 1+60.18 EL 199.57 PROPOSED GRADE AT DRIVEWAY CENTERLINE EXISTING GRADE AT DRIVEWAY CENTERLINE EL E V A T I O N STATION 185 190 195 200 205 185 190 195 200 205 5+506+007+008+009+0010+0011+0011+06 S = 2.0%S = 0.9%GB STA 8+23.35 EL 198.16 GB STA 6+31.75 EL 189.70 GB STA 8+18.34 EL 198.08 GB STA 10+17.20 EL 199.95 GB STA 10+41.17 EL 199.47GB STA 10+90.54 EL 199.03 S = 1.5% S = 4.5% S = 0.9% S = 1.6% PROPOSED GRADE AT COMMUNITY PATH CENTERLINE EXISTING GRADE AT COMMUNITY PATH CENTERLINE EL E V A T I O N STATION 165 170 175 180 185 190 165 170 175 180 185 190 0+001+002+003+004+005+005+50 S = 4.5% S = 1.5% S = 1.6% GB STA 0+20.00 EL 167.87 GB STA 4+32.58 EL 186.49 GB STA 4+45.42 EL 186.69 END NEW PATH CONSTRUCTION, STA 0+20.00 CONNECT TO EXISTING PATH S = 4.5%(EXISTING) PROPOSED GRADE AT COMMUNITY PATH CENTERLINE EXISTING GRADE AT COMMUNITY PATH CENTERLINE FI L E : \ \ A Z R - F I L E 0 1 \ P R O J E C T S \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - G R A D I N G & D R A I N A G E P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 7 : 2 9 P M P L O T T E D B Y : K A Y L A N O L L E T T E PROFILES L2.2 17 AMFDMS PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM DRIVEWAY VERTICAL PROFILE SCALE: H: 1":10' V: 1":2.5' COMMUNITY PATH VERTICAL PROFILE SCALE: H: 1":20' V: 1":5' COMMUNITY PATH VERTICAL PROFILE SCALE: H: 1":20' V: 1":5' 185 186 187 188 189 190 191 192 193 194 195 188 189 191 192 193 194 188 189 190 192 H Y D T S OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ST ST ST ST ST E E E ~ ~ ~ ~ W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W E.P. T T S D S D SD SD SD 195194 196197198 199 (E) 197.75(E) 197.75 195 1 9 2 1 9 3 194 196 197 198 199 190 195 187188 189 191 192 193 194 196197198 3:1 1.5 % 1. 5 % 1. 5 % 3: 1 3 : 1 DRAIN OUTFALL IE=193.50 DRAIN OUTFALL IE=186.00 6" CROSS DRAIN IE=196.50 6" CROSS DRAIN IE=187.50 ( E ) 1 0 % 4. 5 % 4.5% 2.0% 3 : 1 196 34.5 LF SL= 8.70% DRAIN OUTFALL IE=196.50 6" CROSS DRAIN IE=198.50 25.6 LF SL= 7.81% 26.0 LF @ SL = 5.77% SW TIGARD ST SW CORNELL PL 1+ 0 0 1+ 7 4 6+00 7+00 8+00 9+00 10+00 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 GRADING LEGEND PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR GRADE BREAK 191 190 TW BW TC BC IE(E) TOP OF WALL BOTTOM OF WALL TOP OF CURB BOTTOM OF CURB INVERT ELEVATION EXISTING STORM PIPE, SIZE PER PLAN FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - G R A D I N G & D R A I N A G E P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 0 8 : 3 4 P M P L O T T E D B Y : K A Y L A N O L L E T T E GRADING & DRAINAGE PLAN L2.3 18 AMFDMS NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E S H T L 2 . 4 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM MA T C H L I N E - S E E S H T L 2 . 1 WORK LIMIT SD 176 177 178 179 180 181 182 183 184 179 188192 183 179 177 176 175 174 173 172 171 170 169 168 167 166 165 164 163 162 161 153 154 155 180 181 182 178 177 170 168 173 171 170 169 17417517 6178 172 166 165 164 163 162 161 160 159 158 157 156 155 171 172 167 169 S S S D S OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST E E E E E E E E E E E E E E E E E E E ~ ~~ ~~~ ~ ~ W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL W W W W W W W W W W W W W W W W W W W W W W W W W W W FEM A 1 0 0 Y R F L O O D P L A I N V E G E T A T E D C O R R I D O R W E T L A N D B O U N D A R Y VEG E T A T E D C O R R I D O R WETLAND BOUNDARY X X E E E E E S D SD SD SD SD SD SD SD S D S D SD SD 186.64 1 . 5 % 1 . 5 % 1. 5 % 4.8% 17 017 518 0 18 5 16 917 117 217 317 417 617 717 817 918 118 218 3 18 4 18 6 1 8 7 187 187 188 4.8% 3 : 1 DRAIN OUTFALL IE=174.50 DRAIN OUTFALL IE=184.00 6" CROSS DRAIN IE=185.50 6" CROSS DRAIN IE=175.00 1.5% 4.5% 4.5% TIE-IN EL: 181' DRAIN OUTFALL IE=178.50 3 : 1 64.0 LF 4" PVC D3034 SDR35, SL= 6.25% DRAIN OUTFALL IE=162.50 16.0 LF @ SL = 3.13% 28.0 LF @ SL = 5.36% 4" DRAIN CONNECTION TO GRAVEL INFILTRATION PERF PIPE, IE=166.50 4" DRAIN CONNECTION TO GRAVEL INFILTRATION PERF PIPE, IE=180.20 31.7 LF 4" PVC D3034 SDR35 @ SL = 5.36% SW TIGARD ST 0+00 1+00 2+00 3+00 4+00 5+00 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 GRADING LEGEND PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR GRADE BREAK 191 190 TW BW TC BC IE (E) TOP OF WALL BOTTOM OF WALL TOP OF CURB BOTTOM OF CURB INVERT ELEVATION EXISTING STORM PIPE, SIZE PER PLAN FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - G R A D I N G & D R A I N A G E P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 3 5 : 1 3 P M P L O T T E D B Y : K A Y L A N O L L E T T E GRADING & DRAINAGE PLAN L2.4 19 AMF DMS NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E S H T L 2 . 3 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM WORK LIMIT SD 190 191 192 193 194 195 188 189 190 191 192 195 196 197 198 S EM E.P. W W W W W W W W W W W W X X X X X X XXXX X X X X X 195 1 9 1 1 9 2 1 9 3 194 196 197 198 199 195 194 193 192 190 191 195 197196 19 5 192 193 19 8 196 8' - 6 " 5' - 0 " R5 0 ' - 0 " R5 0 ' - 0 " R 5 0 ' - 0 " R3 0 ' - 0 " R 3 0 ' - 0 " 9' - 0 " COMMUNITY PATH CENTERLINE, SEE ALIGNMENT TABLE SHEET L3.2, SEE PROFILE SHEET L2.2. DRIVEWAY CENTERLINE, SEE ALIGNMENT TABLE SHEET L3.2, AND PROFILE SHEET L2.2 98'-0" 10 ' - 6 " (E ) 1 0 ' - 3 " 8' - 6 " 5' - 0 " 5'- 0 " 5'-0" 11 ' - 6 " 9' - 0 " 16'-6" 11 ' - 5 " 11 ' - 0 " 7' - 0 " 8' - 3 " 10 ' - 0 " 24'-0" 24'-0" 5' - 0 " 6' - 5 12" 5'-0" 6' - 9 " 46'-11" 47'-0" 20'-0" 7'-412" 44'-7" 5'-0" (E ) 9 ' - 0 " N:653437.40 E:7614102.79 N:653419.39 E:7614102.63 N:653444.75E:7613972.06 N:653457.98E:7614024.36 N:653452.97 E:7614024.21 N:653445.97E:7614024.00 N:653439.96 E:7614023.82 N:653461.27E:7614024.47 N:653479.71 E:7613931.63 N:653475.64 E:7613949.90 N:653471.62E:7613968.01 N:653468.37E:7614066.02 N:653472.86E:7614088.42 N:653477.37E:7614109.85 N:653477.09E:7614118.97 N:653477.21E:7614122.47 N:653446.82E:7614086.58 N:653480.25 E:7613914.85 N:653474.12 E:7614092.74 WORK LIMIT N:653471.41 E:7614092.79 N:653459.21 E:7614087.26 N:653459.21 E:7614087.26 N:653461.06 E:7614103.97 5'-0"28'-10" 0+00 1+ 0 0 1+ 7 4 11+0011+06 P8 D1 D3 D2 2+ 1 3 0+00 1+00 2+00 B1 B4 B7 B9 B2 B3 B5 B6 B 8 R 5 0 ' - 0 " N:653448.57 E:7613926.09 BEGIN TRANSITION OF SIDEWALK WIDTH FROM 8'3" TO 8'6" AT STA 0+06.62 WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD W D W D WD N:653474.70E:7613957.79 N:653443.23E:7613960.34 N:653449.69 E:7613949.58 N:653469.27 E:7614086.19 N:653459.47 E:7613929.54 N:653437.83E:7613958.59 N:653448.68E:7613962.47 R5'-9" R5' - 9 " GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 EL E V A T I O N STATION 190 195 200 190 195 200 0+00 1+00 2+00 2+13 CG-30 CATCH BASIN STA 0+43 RIM EL 195.05 S=2.37% S=1.47% GB STA 0+16.71 EL 195.25 GB STA 1+61.64 EL 197.38 GB STA 1+98.51 EL 198.44 GB STA 1+90.24 EL 198.26 S=3.07% S=2.10% EXISTING GRADE AT GUTTER FINISHED GRADE AT TOP OF CURB FINISHED GRADE AT GUTTER EXISTING GRADE AT SAWCUT LAYOUT PLAN L3.1 20 AMFHLW N SCALE 10 5 0 FEET 10 20 LAYOUT NOTES: 1. ALL COORDINATES SHOWN ON THE DRAWINGS ARE BASED UPON THE COORDINATE SYSTEM ESTABLISHED BY THE SURVEYOR. ENVIRONMENTAL SCIENCE ASSOCIATES ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF SURVEYED CONDITIONS AS SHOWN. SURVEY INFORMATION IS PROVIDED FOR REFERENCE ONLY. 2. THE LOCATION OF FEATURES NOT SPECIFICALLY LOCATED MAY NOT BE DETERMINED BY SCALING FROM THE DRAWING. IF CONFLICTS ARISE IN THE FIELD, CONTACT OWNER'S REPRESENTATIVE FOR RESOLUTION. 3. ALL DIMENSIONS ARE TO THE OUTSIDE FACE OF BUILDINGS AND AND WALLS OR BACK OF CURBS, UNLESS OTHERWISE NOTED. 4. ALL CURVED OBJECTS SHALL HAVE SMOOTH CONTINUOUS CURVES WITH CONSISTENT RADII AS INDICATED. EACH CURVE SHALL MEET ADJACENT CURVES OR LINEAR SECTIONS OF THE TANGENT, UNLESS NOTED OTHERWISE.. 5. CONFIRM LOCATION OF ALL SIGNS AND SITE FURNISHINGS WITH OWNER PRIOR TO INSTALLATION. 6. SEE SHEET L3.2 FOR ALIGNMENT TABLES. PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM MA T C H L I N E - S E E S H T L 3 . 3 BUS PULLOUT CURB PROFILE SCALE: H: 1":10' V: 1":2.5' ALIGNMENT CONTROL TABLE SEGMENT D1 D2 D3 BEGIN STATION 0+00 0+61 1+11 BEGIN EASTING 7,614,085.8 7,614,146.4 7,614,179.3 BEGIN NORTHING 653,397.2 653,395.4 653,426.3 LINE BEARING S88° 16' 39"E --- N1° 43' 21"E LINE DISTANCE 60.6 --- 63.0 CURVE DISTANCE --- 50.1 --- CURVE RADIUS --- 31.9 --- DELTA ANGLE --- 90° 00' 00" --- DRIVEWAY CENTERLINE ALIGNMENT TABLE ALIGNMENT CONTROL TABLE SEGMENT P1 P2 P3 P4 P5 P6 P7 P8 BEGIN STATION 0+00 3+52 4+49 7+05 8+69 9+50 9+99 10+17 BEGIN EASTING 7,615,190.3 7,614,838.6 7,614,744.6 7,614,497.1 7,614,338.0 7,614,258.6 7,614,210.6 7,614,192.4 BEGIN NORTHING 653,433.9 653,444.2 653,423.8 653,424.2 653,445.4 653,452.8 653,462.9 653,463.4 LINE BEARING N88° 19' 25"W --- --- --- --- --- N88° 16' 39"W N88° 16' 39"W LINE DISTANCE 351.9 --- --- --- --- --- 18.2 88.8 CURVE DISTANCE --- 97.1 256.3 163.5 80.8 49.3 --- --- CURVE RADIUS --- 200.0 280.0 250.0 140.0 140.0 --- --- DELTA ANGLE --- 27° 48' 57" 52° 26' 51" 37° 28' 05" 33° 03' 59" 20° 11' 00" --- --- COMMUNITY PATH CENTERLINE ALIGNMENT TABLE ALIGNMENT CONTROL TABLE SEGMENT B1 B2 B3 B4 B5 B6 B7 B8 B9 BEGIN STATION 0+00 0+17 0+36 0+54 1+52 1+75 1+99 2+07 2+08 BEGIN EASTING 7,613,914.8 7,613,931.5 7,613,949.8 7,613,968.0 7,614,066.0 7,614,088.4 7,614,110.9 7,614,118.9 7,614,119.9 BEGIN NORTHING 653,480.3 653,479.7 653,475.7 653,471.6 653,468.4 653,472.9 653,477.4 653,477.1 653,476.1 LINE BEARING S88° 16' 39"E --- --- S88° 07' 27"E --- --- S88° 10' 51"E --- S1° 43' 21"W LINE DISTANCE 16.7 --- --- 98.0 --- --- 8.0 --- 5.0 CURVE DISTANCE --- 18.9 18.7 --- 23.1 23.1 --- 1.6 --- CURVE RADIUS --- 50.0 50.0 --- 47.5 50.0 --- 1.0 --- DELTA ANGLE --- 21° 36' 38" 21° 27' 26" --- 27° 51' 13" 26° 30' 58" --- 90° 37' 27" --- BUS PULLOUT CURB ALIGNMENT TABLE ALIGNMENT TABLES L3.2 21 AMFHLW PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM 188 189 190 191 192 193 194 195 188 189 191 192 193 194 188 189 190 192 198 S E.P. TR E E G R O V E E D G E 195194 196197198 199 195 1 9 1 1 9 2 1 9 3 194 196 197 198 199 190 195 188 189 191 192 193 194 196197198 19 8 196 RIGHT-OF-WAY 10 ' - 0 " 5'-0" COMMUNITY PATH CENTERLINE, SEE ALIGNMENT TABLE SHEET L3.2, SEE PROFILE SHEET L2.2.N:653437.40 E:7614102.79 N:653419.39E:7614102.63 N:653477.37 E:7614109.85 N:653477.09 E:7614118.97 N:653477.21E:7614122.47 N:653470.17 E:7614386.14 N:653461.06E:7614103.97 SW TIGARD ST SW CORNELL PL 1+ 0 0 1+ 7 4 6+00 7+00 8+00 9+00 10+0011+0011+06 P7P8 P3 P4 P5 P6 D1 D3 D2 2+ 1 3 2+00 B7 B9 B6 B 8 SW TWIN PARK WD WD W D GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 LAYOUT PLAN L3.3 22 AMFHLW PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E S H T L 3 . 4 WORK LIMIT 182 183 184 179 188192 183 179 177 176 175 174 173 172 171 170 169 168 167 166 180 181 182 178 177 170 168 173 171 170 169 174175176178 172 166 165 164 163 162 161 171172 167 169 S S S D S FL V E G E T A T E D C O R R I D O R W E T L A N D B O U N D A R Y VEG E T A T E D C O R R I D O R WETLAND BOUNDARY 186.64 170175180 18 5 169171172173174176177178179181182183 18 4 18 6 1 8 7 187 187188 COMMUNITY PATH CENTERLINE, SEE ALIGNMENT TABLE SHEET L3.2, SEE PROFILE SHEET L2.2. RIGHT-OF-WAY 1 0 ' - 0 " 5'-0" 5'-0" 10 ' - 0 " N:653459.61E:7614751.86 SW TIGARD ST EX CONCRETE OVERLOOK END OF IMPROVEMENTS 0+001+002+003+004+00 5+00 P1P2 GENERAL LEGEND FL FL FLOODPLAIN: CITY OF TIGARD GIS MAP CWS FEMA FLOOD WETLAND CWS VEGETATED CORRIDOR EXISTING TREES EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPERTY LINE WORK LIMIT 190 191 LAYOUT PLAN L3.4 23 AMFDMS NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E S H T L 3 . 3 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM WORK LIMIT IRRIGATION NOTES: 1.PRESSURE REQUIREMENTS: THE SYSTEM ASSUMES A STATIC PRESSURE AT THE P.O.C. OF 75 PSI MINIMUM. BRING ANY DISCREPANCIES TO THE ATTENTION OF THE OWNER'S REP. 2.CONTROLLER CONNECTION: IRRIGATION SYSTEM SHALL OPERATE ON A CONVENTIONAL 14 GAUGE WIRING SYSTEM CONNECTED TO SPECIFIED CONTROLLER. CONTRACTOR TO COORDINATE WITH OWNER'S REPRESENTATIVE ON FINAL LOCATION OF CONTROLLER. 3. INSTALL ADEQUATE EARTH GROUND (NOT TO EXCEED 10 Ohms) AND CONNECT IT TO ONE OF THE DECODER GROUND LEADS EVERY 1,000 FEET. MINIMUM GROUND HARDWARE SHALL BE 4" x 36" COPPER PLATE WITH AT LEAST 10 AWG/2.5MM DIA. COPPER WIRE. 4. ADJUST NOZZLES WHERE REQUIRED TO PROVIDE ADEQUATE COVERAGE FOR ALL PLANTING AND LAWN AREAS. 5. IRRIGATION WORK MUST BE ACCOMPLISHED IN A MANNER WHICH WILL NOT INJURE OR OTHERWISE ADVERSELY EFFECT THOSE TREES DESIGNATED TO BE SAVED / PROTECTED IN PLACE. CONTACT THE OWNER'S REPRESENTATIVE PRIOR TO ANY EXCAVATION ADJACENT TO EXISTING TREES. A TREE INSPECTION MUST BE MADE BEFORE CUTTING ANY ROOTS. 6. COORDINATE WORK WITH OTHER TRADES AND WITH ADJACENT CONSTRUCTION BY OTHERS. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL UTILITIES AND HARDSCAPES PRIOR TO WORK. FIELD ADJUST FINAL IRRIGATION LOCATIONS TO AVOID CONFLICTS, AND NOTIFY LANDSCAPE ARCHITECT FOR APPROVAL. 7. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVING UNDER ALL HARD SURFACES. COORDINATE WITH GENERAL CONTRACTOR. 8. INSTALL VALVE BOXES PERPENDICULAR TO WALLS, WALKS, AND CURBS. 9. PLACE ONLY ONE (1) CONTROL VALVE IN EACH IRRIGATION VALVE BOX. 10. INSTALL HEADS FLUSH WITH TOP OF WALKS, WALLS, AND CURBS. 11. INSTALL HEADS A MIN. OF 9" AWAY FROM BUILDING WALLS AND 4" AWAY FROM CURBS AND SIDEWALK EDGES. 12. WHERE QUICK COUPLING VALVES ARE SHOWN ADJACENT TO CONTROL VALVE, INSTALL IN OWN VALVE BOX. 13. THIS DESIGN IS DIAGRAMMATIC. ALL PIPING, VALVES, ETC. SHOWN WITHIN PAVED AREAS IS FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHERE POSSIBLE. AVOID ANY CONFLICTS BETWEEN THE SPRINKLER SYSTEM, PLANTINGS, UTILITIES AND ARCHITECTURAL FEATURES. 14. THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL SPRINKLER HEADS FOR OPTIMUM PERFORMANCE AND TO PREVENT OVERSPRAY ONTO WALKS, ROADWAYS AND/OR BUILDINGS AS MUCH AS POSSIBLE. THIS SHALL INCLUDE SELECTING THE BEST DEGREE OF ARC TO FIT THE EXISTING SITE CONDITIONS AND TO THROTTLE THE FLOW CONTROL AT EACH VALVE TO OBTAIN THE OPTIMUM OPERATING PRESSURE FOR EACH SYSTEM. 15. DO NOT WILLFULLY INSTALL THE SPRINKLER SYSTEM AS SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES OR DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. SUCH OBSTRUCTIONS OR DIFFERENCES SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. IN THE EVENT THIS NOTIFICATION IS NOT PERFORMED, THE IRRIGATION CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY. IRRIGATION LEGEND: IRRIGATION HEAD KEY: X"# # CONTROL VALVE NUMBERG.P.M.VALVE SIZE HUNTER ICV SERIES ELECTRIC VALVES - SEE DETAILS 1 INCH MANUAL DRAIN VALVE HUNTER HQ5-RC 1 INCH QUICK COUPLING VALVE U.S. BRASS ISOLATION VALVES - SAME SIZE AS MAINLINE 2" IRRIGATION MAINLINE - SCHEDULE 40 PVC LATERAL LINES - CLASS 200 PVC, TYPICAL SCHEDULE 40 PVC SLEEVES - SIZES AS NOTED HUNTER PRO-SPRAY MP1000 ROTATOR 12' 0.17, 0.34, 0.69 40 PROVIDE AND INSTALL HUNTER PROS-12-PRS40 BODIES FOR ALL SHRUB ZONES. HUNTER RZWS-18-50 WATERING TUBES BUBBLER 0.5 40 C A L L BEFORE Y O U DIG SYMBOL COMPANY & CAT. NO. RADIUS G.P.M. P.S.I. POC IRRIGATION POINT OF CONNECTION: SEE DETAIL 1/L7.0 C EXISTING IRRIGATION CONTROLLER - HUNTER XCH-1200-SS 12-STATION OUTDOOR CONTROLLER, STAINLESS STEEL CABINET AND SOLAR PANEL. SYSTEM OPERATING ON CONVENTIONAL 14 GAUGE WIRING. CONTROLLER SENSOR TO BE WIRELESS SOLAR SYNC SENSOR AND RECEIVER HUNTER PRO-SPRAY MP1000 ROTATOR 8' 0.17, 0.34, 0.69 40 EM 6302188.55DECK 6303188.61DECK 6304189.84DECK6305189.82DECK6306190.10DECK6307192.22DECK D E.P. WOOD SHED TOP ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ~ X X XX MM C MAIN LINE POC AT EXISTING STUB IRRIGATION PLAN - SEE SHT L4.2 IRRIGATION PLAN - SEE SHT L4.1 2" C (E) CONTROLLER FI L E : \ \ A Z R - F I L E 0 1 \ P R O J E C T S \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - I R R L E G E N D & N O T E S . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 1 : 1 4 P M P L O T T E D B Y : K A Y L A N O L L E T T E IRRIGATION LEGEND AND NOTES L4.0 24 DMSMFR PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NSCALE 0 FEET 50 25 50 100 IRRIGATION OVERVIEW EM V E G E T A T E D C O R R I D O R TR E E G R O V E E D G E W W W W W W X X X XX X X SW TIGARD STREETSW TIGARD STREET RIGHT-OF-WAY SW C O R N E L L P L . SW T W I N P A R K P L . 2" 1.5â€18 2 1"5 6 1.5â€20 3 1.5"20 4 1"15 5 WORK LIMIT INSTALL MAINLINE IN PLANTING AREA SOUTH OF SIDEWALK RIGHT-OF-WAY STUB MAIN TO THIS APPROX LOCATION, CAP MAINLINE. 4" SLV. 4" SLV. 6" SLV. 4" SLV.4" SLV. 4" SLV. SW C O R N E L L P L . SW T W I N P A R K P L . IRRIGATION LEGEND: X"# # CONTROL VALVE NUMBERG.P.M.VALVE SIZE HUNTER ICV SERIES ELECTRIC VALVES - SEE DETAILS 1 INCH MANUAL DRAIN VALVE HUNTER HQ5-RC 1 INCH QUICK COUPLING VALVE U.S. BRASS ISOLATION VALVES - SAME SIZE AS MAINLINE 2" IRRIGATION MAINLINE - SCHEDULE 40 PVC LATERAL LINES - CLASS 200 PVC, TYPICAL SCHEDULE 40 PVC SLEEVES - SIZES AS NOTED POC IRRIGATION POINT OF CONNECTION: SEE DETAIL 1/L7.0 C EXISTING IRRIGATION CONTROLLER - HUNTER XCH-1200-SS 12-STATION OUTDOOR CONTROLLER, STAINLESS STEEL CABINET AND SOLAR PANEL. SYSTEM OPERATING ON CONVENTIONAL 14 GAUGE WIRING. CONTROLLER SENSOR TO BE WIRELESS SOLAR SYNC SENSOR AND RECEIVER IRRIGATION HEAD KEY: HUNTER PRO-SPRAY MP1000 ROTATOR 12' 0.17, 0.34, 0.69 40 PROVIDE AND INSTALL HUNTER PROS-12-PRS40 BODIES FOR ALL SHRUB ZONES. HUNTER RZWS-18-50 WATERING TUBES BUBBLER 0.5 40 SYMBOL COMPANY & CAT. NO. RADIUS G.P.M. P.S.I. HUNTER PRO-SPRAY MP1000 ROTATOR 8' 0.17, 0.34, 0.69 40 WETLAND CWS VEGETATED CORRIDOR EXISTING TREES PROPERTY LINE WORK LIMIT GENERAL LEGEND FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - I R R I G A T I O N P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 2 : 0 0 P M P L O T T E D B Y : K A Y L A N O L L E T T E IRRIGATION PLAN L4.1 25 DMSMFR NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E S H T L 4 . 2 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM FEMA 1 0 0 Y R F L O O D P L A I N W E T L A N D B O U N D A R Y VEG E T A T E D C O R R I D O R WETLAND BOUNDARY SW TIGARD STREET 1.5"24 1 WORK LIMIT RIGHT-OF-WAY 4" SLV. 4" SLV. INSTALL MAINLINE IN PLANTING AREA SOUTH OF SIDEWALK 4" SLV. SW 1 0 8 T H A V E . V E G E T A T E D C O R R I D O R MAIN LINE POC AT EXISTING STUB C MM C POC WORK LIMIT INSTALL MAINLINE IN PLANTING AREA SOUTH OF SIDEWALK WIRE IRRIGATION SYSTEM TO EXISTING XCH-1200-SS CONTROLLER. COORDINATE WITH OWNER'S REPRESENTATIVE SW TIGARD STREET IRRIGATION LEGEND: X"# # CONTROL VALVE NUMBERG.P.M.VALVE SIZE HUNTER ICV SERIES ELECTRIC VALVES - SEE DETAILS 1 INCH MANUAL DRAIN VALVE HUNTER HQ5-RC 1 INCH QUICK COUPLING VALVE U.S. BRASS ISOLATION VALVES - SAME SIZE AS MAINLINE 2" IRRIGATION MAINLINE - SCHEDULE 40 PVC LATERAL LINES - CLASS 200 PVC, TYPICAL SCHEDULE 40 PVC SLEEVES - SIZES AS NOTED POC IRRIGATION POINT OF CONNECTION: SEE DETAIL 1/L7.0 C EXISTING IRRIGATION CONTROLLER - HUNTER XCH-1200-SS 12-STATION OUTDOOR CONTROLLER, STAINLESS STEEL CABINET AND SOLAR PANEL. SYSTEM OPERATING ON CONVENTIONAL 14 GAUGE WIRING. CONTROLLER SENSOR TO BE WIRELESS SOLAR SYNC SENSOR AND RECEIVER IRRIGATION HEAD KEY: HUNTER PRO-SPRAY MP1000 ROTATOR 12' 0.17, 0.34, 0.69 40 PROVIDE AND INSTALL HUNTER PROS-12-PRS40 BODIES FOR ALL SHRUB ZONES. HUNTER RZWS-18-50 WATERING TUBES BUBBLER 0.5 40 SYMBOL COMPANY & CAT. NO. RADIUS G.P.M. P.S.I. HUNTER PRO-SPRAY MP1000 ROTATOR 8' 0.17, 0.34, 0.69 40 WETLAND CWS VEGETATED CORRIDOR EXISTING TREES PROPERTY LINE WORK LIMIT GENERAL LEGEND FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - I R R I G A T I O N P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 2 : 2 2 P M P L O T T E D B Y : K A Y L A N O L L E T T E IRRIGATION PLAN L4.2 26 DMSMFR NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E L O W E R L E F T MA T C H L I N E - S E E S H T L 4 . 1 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM MA T C H L I N E - S E E U P P E R R I G H T PLANT SCHEDULE: SCREENING AND GENERAL PLANTING SYMBOL ABBR.BOTANICAL NAME COMMON NAME SIZE CONDITION SPACING TREES SHRUBS - 9,900 SF NOTESQTY PERMANENT SEED MIX SCHEDULE - 24,500 SF Native California BromeBromus carinatus AS SHOWN SEED ALL DISTURBED AREAS AND VEGETATED PLANTER STRIPSB&B 5 lbs. / ACRE QUGA Oregon White OakQuercus garryana 2" CAL9 GodetiaClarkia amoena 0.06 lb / ACRE Roemer's FescueFestuca roemeri 10 lbs. / ACRE Slender CinquefoilPotentilla gracilis Canadian GoldenrodSolidago canadensis California OatgrassDanthonia californica Blue Wild-ryeElymus glaucus Prairie LupineLupinus lepidus SYMBOL BOTANICAL NAME COMMON NAME QUANTITY NOTES 10 lbs. / ACRE 5 lbs. / ACRE 0.06 lb / ACRE 0.06 lb / ACRE 0.06 lb / ACRE TOTAL: 30.24 LBS / ACRE SOIL AND MULCH SOIL CONDITIONER COMMERCIALLY MANUFACTURED COMPOST MULCH BARK MULCH SOIL SELECTED TOPSOIL PLANTING AREA PREPARATION METHOD "A" SOIL AND MULCH SOIL CONDITIONER COMMERCIALLY MANUFACTURED COMPOST MULCH HYDRO MULCH PLANTING AREA PREPARATION METHOD "D" COSE Red Twig DogwoodCornus sericea50 #2 CONT. STORMWATER FACILITY - 485 SF CAOB Slough SedgeCarex obnupta PLUG140 CARO Rossi SedgeCarex rossi280 PLUG 10" O.C. 10" O.C. 20% COVERAGE 40% COVERAGE JUPA Spreading RushJuncus patens280 PLUG 10" O.C. 40% COVERAGE SOIL AND MULCH WATER QUALITY MIXTURE MULCH NONE SOIL PLANTING AREA PREPARATION - GROUNDCOVER - 590 SF ARUV Massachusetts KnnikinnikA. Uva-Ursi 'Massachusetts'40 #1 CONT.4' O.C HODI OceansprayHolodiscus discolor60 CONT. MAAQ Tall Oregon GrapeMahonia aquifolium60 CONT. PHLE Mock OrangePhiladelphus lewisii CONT. SPDO Douglas SpireaSpiraea douglasii60 CONT. #2 #2 #2 #2 SYAL SnowberrySymphoricarpos albus60 CONT.#2 PLANT DOUBLE ROW OF SAME-SPECIES GROUPS OF 5 AND 7. LOCATE SHRUBS 6' MIN. FROM EDGE OF PAVEMENT. 8' O.C. 6' O.C. 6' O.C. 8' O.C. 6' O.C. 6' O.C. LAWN SEEDING SCHEDULE - 4,350 SF SEEDED LAWN - 'NATURAL KNIT' (BY JB LAWN OR APPROVED EQUAL) PERENNIAL RYE GRASS SEED. INSTALL PER MANUFACTURERS RECOMMENDATIONS. TOTAL: 10 LBS per 1,000 SFSOIL AND MULCH SOIL CONDITIONER COMMERCIALLY MANUFACTURED COMPOST MULCH HYDRO MULCH PLANTING AREA PREPARATION METHOD "C" SOIL CONDITIONED TOPSOIL IN PLACE 45 12" DEPTH AROUND EDUCATION CENTER AND ALONG DRIVEWAY. 6" DEPTH ELSEWHERE. ENTIRE SHRUB BED NOTES SYMBOL ABBR.BOTANICAL NAME COMMON NAME SIZE SPACING NOTESQTY 6302188.55DECK 6303188.61DECK 6304189.84DECK6305189.82DECK6306190.10DECK6307192.22DECK TOP X X XX PLANTING PLAN - SEE SHT L5.2 PLANTING PLAN - SEE SHT L5.1 EDUCATION CENTER DRIVEWAY FI L E : \ \ A Z R - F I L E 0 1 \ P R O J E C T S \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - P L A N T I N G L E G E N D A N D N O T E S . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 2 : 5 3 P M P L O T T E D B Y : K A Y L A N O L L E T T E PLANTING LEGEND AND NOTES L5.0 27 DMS MFR NOTES 1. REFER TO GRADING AND UTILITY PLANS ON SHEETS L2.1-L2.4 FOR UTILITY LOCATIONS AND FINAL GRADING. IF ACTUAL SITE CONDITIONS VARY FROM WHAT IS SHOWN ON THE PLANTING PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR DIRECTION AS TO HOW TO PROCEED. 2. VERIFY LOCATIONS OF ALL PERTINENT SITE IMPROVEMENTS INSTALLED UNDER OTHER SECTIONS. IF ANY PART OF THIS PLAN CANNOT BE FOLLOWED DUE TO SITE CONDITIONS, CONTACT THE ENGINEER FOR INSTRUCTION PRIOR TO COMMENCING WORK. 3. EXACT LOCATIONS OF PLANT MATERIALS SHALL BE REVIEWED BY THE ENGINEER IN THE FIELD PRIOR TO INSTALLATION. THE ENGINEER RESERVES THE RIGHT TO ADJUST PLANTS TO EXACT LOCATION IN FIELD. 4. CONTRACTOR SHALL NOT WILLFULLY PROCEED WITH CONSTRUCTION AS DESIGNED WHEN IT IS OBVIOUS THAT OBSTRUCTIONS, AREA DISCREPANCIES AND/OR GRADE DIFFERENCES EXIST THAT MAY NOT HAVE BEEN KNOWN DURING DESIGN. SUCH CONDITIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL NECESSARY REVISIONS DUE TO FAILURE TO GIVE SUCH NOTIFICATIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PLANT COUNTS AND SQUARE FOOTAGES. QUANTITIES ON PLANS TAKE PRECEDENCE OVER WRITTEN QUANTITIES. 6. PROVIDE MATCHING FORMS AND SIZES FOR ALL PLANT MATERIAL WITHIN EACH SPECIES AND SIZE DESIGNATED ON THE DRAWINGS. PLANT MATERIAL SIZES SHALL COMPLY WITH AMERICAN STANDARDS FOR NURSERY STOCK. 7. FINISH GRADES OF ALL SHRUB AREAS SHALL BE 2" BELOW ADJACENT CURB, PAVEMENT, OR HEADER. 8. MODIFY SOIL CULTIVATION DEPTH TO PROTECT EXISTING TREE ROOTS PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NSCALE 0 FEET 50 25 50 100 PLANTING OVERVIEW EM V E G E T A T E D C O R R I D O R X X X XX X X 10' CLEAR, TYP. SW TIGARD STREET HODI RIGHT-OF-WAY SW C O R N E L L P L . SW T W I N P A R K P L . MAAQ - SINGLE ROW HODI COSE - SINGLE ROW SYAL - SINGLE ROW WETLAND CWS VEGETATED CORRIDOR EXISTING TREES PROPERTY LINE WORK LIMIT GENERAL LEGEND FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - P L A N T I N G P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 3 : 2 6 P M P L O T T E D B Y : K A Y L A N O L L E T T E PLANTING PLAN L5.1 28 DMSMFR NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E S H T L 5 . 2 PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM WORK LIMITV E G E T A T E D C O R R I D O R B O U N D A R Y WE T L A N D B O U N D A R Y NOTES: 1. SEE SHEET L5.0 FOR PLANTING LEGENDS AND NOTES. 2. CONTRACTOR TO LOCATE PLANTINGS IN THE FIELD AND GET APPROVAL FROM ENGINEER BEFORE INSTALL. ROOT BARRIER, TYP. SEE MATERIALS PLANS 5' WIDE WATER QUALITY VEGETATED FILTER STRIP PER CWS DWG. #796, SHEET EC2.1. PREPARE SOIL WITH WATER QUALITY MIXTURE FEMA 1 0 0 Y R F L O O D P L A I N W E T L A N D B O U N D A R Y VEG E T A T E D C O R R I D O R WETLAND BOUNDARY 10' CLEAR, TYP. D V E G E T A T E D C O R R I D O R WETLAND CWS VEGETATED CORRIDOR EXISTING TREES PROPERTY LINE WORK LIMIT GENERAL LEGEND FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - P L A N T I N G P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 3 : 4 1 P M P L O T T E D B Y : K A Y L A N O L L E T T E PLANTING PLAN L5.2 29 DMSMFR NSCALE 0 FEET 20 10 20 40 MA T C H L I N E - S E E S H T L 5 . 1 MA T C H L I N E - S E E L O W E R L E F T MA T C H L I N E - S E E U P P E R R I G H T PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NOTES: 1. SEE SHEET L5.0 FOR PLANTING LEGENDS AND NOTES. 2. CONTRACTOR TO LOCATE PLANTINGS IN THE FIELD AND GET APPROVAL FROM ENGINEER BEFORE INSTALL. WORK LIMIT VEGETATED CORRIDOR BOUNDARY WET L A N D B O U N D A R Y ROOT BARRIER, TYP. SEE MATERIALS PLANS SHOULDER INFILTRATION TRENCH, 3" - 1-3/4" CLEAN CRUSHED ROCK PROFILE GRADE ASPHALT PATH PER DETAIL 2/L6.0 TAMP AND BEVEL EXPOSED EDGE OF AC PREPARED SUBGRADE GEOTEXTILE SEPARATION FABRIC â„„ 1.5% CROSS SLOPE 3H:1V F I L L S L O P E , T Y P 2% 3H:1 V F I L L S L O P E , T Y P 3H:1V C U T S L O P E , T Y P 3H:1 V C U T S L O P E , T Y P WIDTH VARIES - SEE PLANS 2' INFILTRATION SHOULDER - SEE PLANS FOR LOCATIONS 1' SHOULDER 2' - 6 " 2% 1' MIN 9" M I N 4" PERFORATED DRAIN PIPE WHERE SHOWN ON PLAN NON-WOVEN FABRIC TO WRAP TRENCH NOTE: 1. SEE DETAIL 3 / EC2.1 FOR ADDITIONAL DETAILS FOR GRAVEL INFILTRATION SHOULDERS, INCLUDING PERF. PIPE DISCHAGE CONNECTION AND INTERNAL CHECK DAMS WHERE LONGITUDINAL SLOPE EXCEEDS 3%. COMPACTED SUBGRADE COMPACTED AGGREGATE BASE COMMERCIAL DRIVEWAY CONCRETE PAVING PER DETAIL 7/L6.1CONCRETE TRANSITION SLAB ASPHALT PAVING AT PARKING LOT PER DETAIL 1/L6.0 6" LONG, #4 REBAR AT 18" O.C. (OMIT IF TRANSITION SLAB CAN BE POURED AND REINFORCED WITH PAVING OR ABUTMENT) 3" 8"2'-0" 5"8" 3" LEVEL 2, 1/2", DENSE ASPHALT CONCRETE PAVEMENT, SINGLE LIFT TAMP EDGE AT 45° ANGLE3" 9" 12" SEPARATION GEOTEXTILE PREPARED SUBGRADE FINISHED GRADE NOTE: SEPARATION GEOTEXTILE MIN MULLEN BURST STRENGTH 250 POUNDS PER SQUARE INCH WITH APPARENT OPENING SIZE BETWEEN U.S. STANDARD NO. 70 AND NO. 100 SIEVES. TYPICAL CONDITION 9" MIN 3/4"-0" AGGREGATE BASE, COMPACTED TO 95% MAX DENSITY ASTM D698 PREPARED SUBGRADE 1.5% CROSS SLOPE 3H:1V FIL L S L O P E , T Y P 3H:1V C U T S L O P E , T Y P WIDTH VARIES - SEE PLANS 1' SHOULDER 2% 2' INFILTRATION SHOULDER 2' 3H:1V F I L L S L O P E , T Y P 3H:1V CU T S L O P E , T Y P CONCRETE PAVING - PEDESTRIAN PER DETAIL 4/L6.0 SHOULDER INFILTRATION TRENCH, 3" - 1-3/4" CLEAN CRUSHED ROCK 2' - 6 " 9" M I N 4" PERFORATED DRAIN PIPE WHERE SHOWN ON PLAN NON-WOVEN FABRIC TO WRAP TRENCHNOTE: 1. SEE DETAIL 3 / EC2.1 FOR ADDITIONAL DETAILS FOR GRAVEL INFILTRATION SHOULDERS, INCLUDING PERF. PIPE DISCHAGE CONNECTION AND INTERNAL CHECK DAMS WHERE LONGITUDINAL SLOPE EXCEEDS 3%. AGGREGATE BASE COMPACTED TO TO 95% MAX DENSITY PER ASTM D698 12" COMPACTED SUBGRADE CONCRETE PAVING 1/2" TOOLED RADIUS AT EDGES WITH SHINER BANDS FINISH GRADE 6" 8" 4" 1-1/2" IN LANDSCAPE AREAS. FLUSH WHEN ADJACENT TO PAVEMENT THICKENED EDGE OF PAVEMENT WHERE ADJACENT TO SOIL, INFILTRATION TRENCH, EXISTING PAVING, OR ASPHALT PATH 45° #4 BAR HORIZ. CONTINUOUS 1'-0" 4" 6" 4" 1'-0" SEPARATION GEOTEXTILE 1-1/2"-0 AGGREGATE BASE PREPARED SUBGRADE 2" 2"3/4"-0 AGGREGATE LEVELING COURSE LEVEL 2, 1/2" DENSE ASPHALT CONCRETE PAVEMENT BASE COURSE, (2) 2" LIFTS LEVEL 2, 1/2" DENSE ASPHALT CONCRETE PAVEMENT WEARING COURSE, SINGLE LIFT FINISHED GRADE NOTE: SEPARATION GEOTEXTILE MIN MULLEN BURST STRENGTH 250 POUNDS PER SQUARE INCH WITH APPARENT OPENING SIZE BETWEEN U.S. STANDARD NO. 70 AND NO. 100 SIEVES. FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - S I T E D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 4 : 1 9 P M P L O T T E D B Y : K A Y L A N O L L E T T E SITE DETAILS L6.0 30 1 - ASPHALT PAVING - BUS STOP NOT TO SCALE 4 - CONCRETE PAVING - PEDESTRIAN NOT TO SCALE 5 - CONTROL JOINTS NOT TO SCALE 3 - ASPHALT PATH W/ GRAVEL INFILTRATION SHOULDER NOT TO SCALE 6 - CONCRETE PATH W/ GRAVEL INFILTRATION SHOULDER NOT TO SCALE 7 - ASPHALT PAVING TRANSITION SLAB TO CONCRETE DRIVEWAY NOT TO SCALE 2 - ASPHALT PAVING NOT TO SCALE TTF DMS 1. PROVIDE EXPANSION JOINTS WHERE NEW WORK ABUTS EXISTING CONSTRUCTION. PROVIDE EXPANSION JOINT AROUND WHEEL CHAIR RAMP. 2. PROVIDE WEAKENED PLANE CONTRACTION JOINTS IN SIDEWALKS AT A MINIMUM SPACING OF 5 FEET UNLESS OTHERWISE NOTED. 3. CONCRETE PAVING SHALL BE MEDIUM BROOM-FINISHED WITH DIRECTION OF BROOMING PERPENDICULAR TO DIRECTION OF TRAFFIC, UNLESS OTHERWISE INDICATED. 4. SCORE SIDEWALKS AS SHOWN ON PLANS AND INCLUDE SHINERS ON ALL FOUR SIDES. 5. ALL PEDESTRIAN CONCRETE PAVING ADJACENT TO SOIL, EXISTING PATH, AND ASPHALT SHALL HAVE A THICKENED EDGE PER DETAIL 9L6./0 6. ALL CONCRETE DRIVEWAYS PAVING ADJACENT TO LANDSCAPE AREA SHALL HAVE THICKENED EDGE PER DETAIL 9/L6.0 8 - COMMERCIAL DRIVEWAY - CONCRETE PAVING VEHICULAR NOT TO SCALE HALF STREETIMPROVEMENT CURB IS NOT INCLUDED ON PROJECT SEE PLANS 1.5% MAX. SEE GRADING PLAN NOTE: JOINTS SHALL INCLUDED TROWELED SHINER EDGES ON ON ALL FOUR SIDES PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NOTES: 1. INSTALLATION TO BE IN ACCORDANCE WITH MANUFACTURER'S SPECS. 2. RAISED ROOT GUIDING RIBS MUST BE FACING TOWARDS THE TREE ROOTS. 3. THE TOP OF THE BARRIER PANNERS MUST BE SLIGHTY ABOVE GRADE (NEVER BELOW GRADE). 4. POSITION BARRIER PANNELS VERTICALLY WITH THE TOP AGAINST THE STRUCTURE TO BE PROTECTED. 5. SEE MATERIAL PLAN FOR LOCATIONS 24" MIN. PER STATE CODE 1/4" RADIUS AT ALL EDGES, TYP. PREPARED SUBGRADE DETECTABLE WARNING TILE - INSTALL PER TILE MANUFACTURER'S RECOMMENDATION COMPACTED AGGREGATE BASE CONCRETE SLAB - SCRATCH FINISH NOTE: INSTALL DETECTABLE WARNING TILES FLUSH WITH ADJACENT SURFACES DEPTH PER MANUFACTURER'S RECOMMENDATION CONDITION VARIES - SEE PLANS FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - S I T E D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 4 : 2 7 P M P L O T T E D B Y : K A Y L A N O L L E T T E SITE DETAILS L6.1 31 1 - CONCRETE CURB, STANDARD NOT TO SCALE 2 - CONCRETE CURB ENDING NOT TO SCALE 3 - CONCRETE WHEEL STOP NOT TO SCALE 4 - HANDRAIL NOT TO SCALE 5 - CONCRETE STAIR NOT TO SCALE TTF DMS 6" PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM 6 - ROOT BARRIER NOT TO SCALE 7 - DETECTABLE WARNING TILES NOT TO SCALE EXISTING EDUCATION CENTER BUILDING1.5% 1.5% 1.5% BOULDERS 1:1 TO MATCH SLOPE BETWEEN PATHS BOULDER WALL - SEE DETAIL THIS SHEET CONCRETE PATH - SEE DETAIL 4 SHEET L6.0 CONCRETE PATH - SEE DETAIL 4 SHEET L6.0 CONCRETE PATH - SEE DETAIL 4 SHEET L6.0 VARIES - 30" MIN.VARIES5'-0"VARIES5'-0"VARIES VARIES - 30" MAX. 2'-0" SHOULDER EQ EQ SPLIT RAIL FENCE - SEE DETAIL THIS SHEET 3 1 3H:1V MAX SLOPE BEHIND WALL MAX. HT. = 30" 1 6 1 1/2" - 3/4" DRAINAGE ROCK - MIN. 8" BEDDING DEPTH BATTER ROCK AT BASE TO BE HALFWAY MIN. BELOW SURFACE NOTES: BOULDER, SEE NOTE 3 1 1-2"-3/4" DRAINAGE ROCK COMPACTED TO FORM BOULDER BEDDING CONDITION VARIES - SEE PLANS 18" IF EITHER SLOPE BEHIND WALL OR BATTER SLOPE ARE EXCEEDED, THE WALL MUST BE SITE-SPECIFICALLY ENGINEERED. INDIVIDUALLY PLACE EACH BOULDER PER SPECIFICATIONS. BOULDERS SHALL HAVE FRACTURED ANGULAR FACES AND BE 150-500 LBS. USE APPROXIMATELY 18" DIA BOULDERS AND PLACE LARGER BOULDERS AT WALL BASE. 1. 2. 3. 8" 18" 12.59 4" PVC PERF PIPE WALL DRAIN, MAINTAIN POSITIVE DRAINAGE TO DISCHARGE LOCATION IDENTIFIED ON PLANS 8" GEOTEXTILE FABRIC ANCHOR, TYP. ASPHALT PAVING - SEE DETAIL 1 SHEET L6.0 BOULDER WALL - SEE DETAIL THIS SHEET CONCRETE PATH - SEE DETAIL 4 SHEET L6.0ASPHALT PAVING - SEE DETAIL 1 SHEET L6.0 VARIES 7' PLANTING AREA 1'-0" MIN. SPLIT RAIL FENCE - SEE DETAIL THIS SHEET SLOPE VARIES - 3:1 MAX. 2'-0" SHOULDER EQ EQ BOTTOM OF WALL TOP OF WALL 6" 10" 1'-0" 6" 3'-0" 8'-0" 2'-0" 3" ELEVATION SECTION POST CENTERED IN GRAVEL FOOTING COMPACTED AGGREGATE FOOTING 4" X 6" ROUGH CUT POST MORTISE & TENON JOINT, TYP. 4" X 4" ROUGH CUT RAIL, TYP FINISH GRADE COMPACTED AGGREGATE FOOTING 1'-0" FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - S I T E D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 4 : 3 4 P M P L O T T E D B Y : K A Y L A N O L L E T T E SITE DETAILS L6.2 32 TTF DMS 1 - SECTION - A NOT TO SCALE 2 - BOULDER WALL NOT TO SCALE 3 - SECTION - B NOT TO SCALE 4 - SPLIT RAIL FENCE NOT TO SCALE 5 - STANDARD EMBANKMENT CONSTRUCTION NOT TO SCALE PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - S I T E D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 4 : 4 0 P M P L O T T E D B Y : K A Y L A N O L L E T T E SITE DETAILS L6.3 33 6 - SIGN POST ASSEMBLY NOT TO SCALE 1 - ACCESSIBLE PARKING STALL NOT TO SCALE 5 - SIGN R7-8 NOT TO SCALE 2 - SIGN OR7-9 NOT TO SCALE 3 - SIGN OR7-9A NOT TO SCALE 4 - SIGN R7-8P NOT TO SCALE TTF DMS 1. ALL PAVEMENT MARKINGS ARE TO BE PREMARK DURABLE THERMOPLASTIC WHITE AS SPECIFIED OR APPROVED. 2. INSTALL ACCESSIBLE PARKING SIGN AT EACH DESIGNATED STALL. SIGNAGE SHALL COMPLY WITH CURRENT STATE REGULATIONS AND DENOTE "VAN ACCESSIBLE": AND WHEELCHAIR USER ONLY" SPACES WHERE SHOWN. FIGURE 6 FIGURE 7 7 - BIKE-PED WARNING SIGN NOT TO SCALE OREGON DEPARTMENT OF TRANSPORTATION SIGN OBW8-22 8 - BUS PARKING ONLY SIGN NOT TO SCALE PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NOTE: VERIFY SIGN TYPE WITH OWNER'S REPRESENTATIVE PRIOR TO PURCHASE AND INSTALL M (E) 2" METER (E) PRV VALVE M (E) BRASS GATE VALVE FS (E) METER (E) PRV VALVE (E) DOUBLE CHECK VALVE (E) MASTER VALVE (E) FLOW SENSOR (E) DRAIN VALVE (E) WATER MAIN (E) 2" MAINLINE AND BALL VALVE (E) QUICK COUPLER (E) 4" MAINLINE (E) POTABLE MAINLINE (E) 2" MAINLINE STUBBED CONNECTION WIRED TO PARKING LOT IRRIGATION CONTROLLER FS (E) FLOW SENSOR AND CABLE CONDUIT WIRED TO CONTROLLER AT PARKING LOT NEW 2" MAINLINE CONNECTION FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - S I T E D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 4 : 4 8 P M P L O T T E D B Y : K A Y L A N O L L E T T E IRRIGATION DETAILS 1 L7.0 34 3 - ISOLATION VALVE DETAIL NOT TO SCALE2 - CONTROL VALVE AND BOX DETAIL NOT TO SCALE 5 - QUICK COUPLING VALVE DETAIL NOT TO SCALE 4 - MANUAL DRAIN VALVE DETAIL NOT TO SCALE 6 - DOUBLE CHECK VALVE DETAIL NOT TO SCALE 1 - POINT OF CONNECTION DETAIL NOT TO SCALE TTF DMS BRASS GATE VALVE W/ PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM NOTES: 1) CONTRACTOR WILL REPAIR ALL TRENCH SETTLEMENT AND RESTORE FINISH GRADES PRIOR TO SEEDING OR PLANTING AREAS. 2) INSTALL ALL WIRES IN SLEEVE(S) WHERE PIPE PASSES UNDER PAVING CONC. PAVEMENT EDGE 1" ARROW SCORE LINE AT EDGE OF CONC. PAVEMENT WHERE SLEEVE IS LOCATED SLEEVE LOCATION, BEYOND A:PLAN PAVEMENT CLEAN BACKFILL MAINLINE UNDISTURBED SUBGRADE OR COMPACTED FILL SLEEVE(S) AS REQUIRED SPECIFIED PIPE BEDDING INSTALL WIRE IN SEPERATE SLEEVE AS SHOWN LATERAL LINE B: MAINLINE WITH LATERAL VARIES 3" MIN 2" AGGREGATE ADD 1" ARROW SCORE LINE AT BOTH EDGES OF CONCRETE SURFACE TO MARK SLEEVE LOCATION. SEE PLAN A, THIS DETAIL. TRACER WIRE FINISH GRADE (BUNDLE AT 10' INTERVALS) SPECIFIED CLEAN TOPSOIL COMMON AND CONTROL WIRE MAINLINE LATERAL LINE 3" MIN. FROM EDGE OF TRENCH, â„„ 3" MIN. PAVING OR FOOTING D: TRENCHING IN PLANTING AREA 14" MIN., 18" MAX. 12" MIN. 24" MAX. SPECIFIED CLEAN BACKFILL AGGREGATE CLEAN BACKFILL LATERAL LINE UNDISTURBED SUBGRADE OR COMPACTED FILL SLEEVE(S) AS REQUIRED SPECIFIED PIPE BEDDING C: LATERAL ONLY VARIES 3" MIN PAVEMENT ADD 1" ARROW SCORE LINE AT BOTH EDGES OF CONCRETE SURFACE TO MARK SLEEVE LOCATION. SEE PLAN 'A'.TRACER WIRE 2" FACTORY-INSTALLED SWING ASSEMBLY LATERAL PIPE HUNTER ROOT ZONE WATERING SYSTEM 4" LOCKING GRATE CAP FINISH GRADE LATERAL TEEOR ELL SECTION MARLEX STREET ELL AND POLYETHYLENE RISER LATERAL LINE CONNECTED TO PVC TEE POLYETHYLENEPIPE TREE BUBBLER ROOT BALL PLAN FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - S I T E D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 4 : 5 5 P M P L O T T E D B Y : K A Y L A N O L L E T T E IRRIGATION DETAILS 2 L7.1 35 3 - BUBBLER DETAIL NOT TO SCALE 1 - POLY FLEX RISER DETAIL NOT TO SCALE 2 - THRUST BLOCK DETAIL NOT TO SCALE 4 - UTILITY TRENCHING DETAIL NOT TO SCALE TTF DMS PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM FINISH GRADE MULCH RING, 4" TO 6" CLEAR OF TRUNK INSTALL CROWN OF ROOT BALL 1" ABOVE FINISH GRADE TREE TIES (2) WOOD STAKES - REMOVE STAKES AND TIES 1 FULL YEAR AFTER PLANTING TREE ROOT BALL: CUT AND REMOVE ALL TWINE, ROPE, WIRE, AND BURLAP FROM THE TOP AND SIDES OF THE ROOT BALL PRIOR TO BACK FILLING. CUT WIRE BASKET (IF USED) AND REMOVE AFTER SETTING TREE IN PLANTING PIT. SET ROOT BALL ON UNDISTURBED SOIL BACKFILL SOIL MIX 3" HIGH WATER BASIN AT EDGE OF MULCH RING 4' MIN. 2'-0" 3" 12" MIN. ALL SIDES PLANTING PIT 2X DIAMETER OF ROOT BALL FINISH GRADE 3" HIGH WATERING BASIN MULCH, KEEP 6" AWAY FROM TRUNK ROOTBALL; CUT AND REMOVE ALL BINDING FROM THE TOP AND SIDES OF THE ROOTBALL BEFORE BACKFILLING INSTALL ROOTBALL CROWN 1" ABOVE FINISH GRADE BACKFILL MIX 2 X DIAMETER OF ROOT BALL 3" O.C. SPACING NOTES: 1. SEE PLANT SCHEDULE FOR EACH PLANT'S APPROPRIATE O.C. SPACING. 2. PLANTING PLAN SHOWING INDIVIDUAL LOCATION OF A SHRUB AND OR GROUND COVER TAKE PRECEDENT OVER THIS DETAIL. EDGE OF PLANTING; PAVING, LAWN, OR EQUAL ROW TRIANGULAR SPACING AT SPECIFIED O.C. DISTANCE - EQUIDISTANT PLANT CENTER DISTANCE FROM EDGE IS 1/2 THE SPECIFIED O.C. SPACING O.C. SPACING 2:1 MAX FLAT PLANTING BENCH COMPOSED OF AMENDED SOIL BACKFILL CONCAVE WATERING BASIN 1" MIN DEPTH, 3" MAX DEPTH FINISHED GRADE EXISTING SLOPE EXISTING SUBGRADE 2X DIA OF ROOTMASS FI L E : \ \ a z r - f i l e 0 1 \ P r o j e c t s \ 0 1 C A D \ 2 0 2 0 x x x x x \ D 2 0 2 0 0 1 0 9 3 . 0 1 D i r k s e n P h a s e 1 & 2 C D s \ 0 8 _ C A D \ D W G \ L - S I T E D E T A I L S P 2 . d w g P L O T D A T E : 5 / 1 3 / 2 0 2 2 6 : 1 5 : 0 0 P M P L O T T E D B Y : K A Y L A N O L L E T T E PLANTING DETAILS L8.0 36 TTF DMS 1 - TREE PLANTING NOT TO SCALE 2 - CONTAINER PLANTING NOT TO SCALE 3 - PLANT SPACING NOT TO SCALE 4 - PLANTING ON SLOPE NOT TO SCALE PHASE SHEET TITLE SHEET NUMBER ISSUE DATE PROJECT # SHEET OF SCALE IS AS SHOWN WHEN PLOTTED TO FULL SIZE (22"x34") 1" BID SET 11/01/2021 D202001093.01 36 STAMP REVISIONS PR O J E C T N A M E # DATE DESCRIPTION DRAWN CHECKED DI R K S E N N A T U R E P A R K TI G A R D S T R E E T CO M M U N I T Y T R A I L 11 1 3 0 S W T I E D E M A N A V E . TI G A R D , O R , 9 7 2 2 3 WWW.ESASSOC.COM