Loading...
HomeMy WebLinkAboutSW Frewing Court Improvements ProjectSW A S H A V E S W F R E W I N G C T S W H I L L S T SW VILL A G E G R E E N D R S W G A R R E T T S T 99W S W F R E W I N G S T S W A S H D R 213 p205 99E 211 p5 211 224 o26 p405o26 p5 p205 p84 COLUMBIA RIV E R ESTACADA SANDY VANCOUVER PORTLAND CANBY TROUTDALE TUALATIN BEAVERTON OREGON CITY TIGARD 99W CO V E R C1 1 PROJECT SITE MAP NOT TO SCALE LOCATION MAP NOT TO SCALE PROJECT LOCATION (360) 695-7041 Civil Engineer: Wallis Engineering Vancouver, Washington 98660 215 W. 4th Ave., Suite 200 Contact: David Brokaw, P.E.Tigard Public Works Department Other Agencies: Owner: City of Tigard 13125 SW Hall Blvd Tigard, Oregon 97223 Contact: Andy Newbury, P.E. (503) 718-2472 Ziply Fiber Contact: Riu Wu (971) 990-7269 Contact: Hap English (503) 672-5489 Portland General Electric (503) 798-5785 Comcast Contact: Steven Monier (217) 741-4203 NW Natural Contact: Mircea Burghelea CITY OF TIGARD SW FREWING COURT IMPROVEMENTS PROJECT JUNE 2024 PROJECT SITE OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E SHEET INDEX C1 COVER C2 GENERAL NOTES C3 GENERAL NOTES & LEGEND C4 EROSION CONTROL DETAILS C5 EROSION CONTROL & DEMO PLAN C6 TYPICAL SECTION C7 SW FREWING COURT IMPROVEMENTS PLAN C8 SW FREWING COURT DRIVEWAYS PLAN D1 DETAILS I D2 DETAILS II D3 DETAILS III D4 DETAILS IV RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. GE N E R A L N O T E S C2 2 GENERAL CONSTRUCTION NOTES: 1.ALL PUBLIC IMPROVEMENTS SHALL BE CONSTRUCTED PER THE APPLICABLE SECTIONS OF THE CITY OF TIGARD PUBLIC IMPROVEMENT DESIGN STANDARDS, EXCEPT AS MODIFIED HEREIN, THE 2018 APWA OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION AND CLEAN WATER SERVICES DISTRICT'S DESIGN AND CONSTRUCTION STANDARDS (RESOLUTION AND ORDER 17-05). THE CONTRACTOR MUST COMPLY WITH ALL APPLICABLE PROVISIONS OF FEDERAL AND STATE LAW AND THE TIGARD MUNICIPAL CODE. 2.EXISTING UTILITY LOCATIONS ARE APPROXIMATE ONLY. IN ORDER TO PROTECT EXISTING UNDERGROUND UTILITIES, CONTRACTORS PERFORMING WORK SHOWN ON THESE PLANS MUST NOTIFY UTILITIES AND PUBLIC AGENCIES AT LEAST 48 BUSINESS HOURS IN ADVANCE OF, AND NO MORE THAN 10 BUSINESS DAYS BEFORE, BEGINNING EXCAVATION, IN ACCORDANCE WITH THE PROVISIONS OF OAR 952-001-0090. LIMITS OF WORK SHALL BE PRE-MARKED FOR THE UTILITY LOCATORS. POTHOLE ALL CROSSINGS AS NECESSARY TO PREVENT GRADE AND ALIGNMENT CONFLICTS. REPORT ALL CONFLICTS TO THE ENGINEER IMMEDIATELY. PROTECT EXISTING UTILITIES AT ALL TIMES DURING CONSTRUCTION. CALL THE ONE CALL UTILITY NOTIFICATION CENTER AT 503-246-6699 FOR UTILITY LOCATES. ANY DAMAGE TO EXISTING UTILITIES, WHETHER THEY'RE SHOWN ON THESE DRAWINGS OR NOT, WILL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE. ATTENTION: OREGON LAW REQUIRES ALL EXCAVATORS TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER OF THE ADMINISTRATION OFFICE FOR THE OREGON UTILITY NOTIFICATION CENTER IS 503-232-1987). 3.PRIVATE FACILITIES MAY REQUIRE ADJUSTMENT OR RELOCATION. THE CONTRACTOR SHALL COORDINATE WITH EACH AFFECTED UTILITY A MINIMUM OF TWO WEEKS PRIOR TO WORK IN AN AREA REQUIRING ADJUSTMENT OR RELOCATION OF A PRIVATE UTILITY'S FACILITY. SEE SPECIFICATION SECTION 00150.50(B). 4.THE CONTRACTOR SHALL EXERCISE ALL DUE CARE IN PROTECTING PROPERTY ALONG THE ROUTE OF THE IMPROVEMENTS. THIS PROTECTION SHALL INCLUDE, BUT NOT BE LIMITED TO, TREES, YARDS, FENCES, DRAINAGE LINES, MAIL BOXES, DRIVEWAYS, SHRUBS, LAWNS, IRRIGATION SYSTEMS, WITHIN ANY RIGHTS-OF-WAYS AND EASEMENTS. IF ANY OF THE ABOVE HAVE BEEN DISTURBED, THEY SHALL BE RESTORED AS NECESSARY TO AS NEAR THEIR ORIGINAL CONDITION AS POSSIBLE OR REPLACED IN KIND. 5.THE CONTRACTOR SHALL PERFORM ALL THE WORK SHOWN ON THE DRAWINGS AND ALL INCIDENTAL WORK CONSIDERED NECESSARY TO COMPLETE THE PROJECT IN AN ACCEPTABLE MANNER. 6.THE CONTRACTOR AND/OR EACH SUB-CONTRACTOR SHALL HAVE A MINIMUM OF ONE SET OF CITY-APPROVED CONSTRUCTION PLANS ON THE JOB SITE AT ALL TIMES WHILE WORK IS BEING DONE. 7.UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT "REDLINE DRAWINGS" TO PROJECT ENGINEER FOR PREPARATION OF RECORD DRAWINGS. "REDLINE DRAWINGS" DOCUMENT ALL DEVIATIONS AND REVISIONS TO THE APPROVED PLANS; THEY ALSO RECORD A DESCRIPTION OF CONSTRUCTION MATERIALS ACTUALLY USED (PIPE MATERIAL, ETC.) 8.A COPY OF THE PERMIT AND ALL ATTACHMENTS, AND A COPY OF THE APPROVED CONSTRUCTION PLAN AND ALL AMENDMENTS SHALL BE AVAILABLE AT THE WORK AREA. ALL WORK SHALL CONFORM TO THE PERMIT TERMS, CONDITIONS AND PROVISIONS AND TO THE CITY APPROVED PERMIT PLANS, AND APPROVED PLAN AMENDMENTS AND TO THE CITY'S STANDARDS AND SPECIFICATIONS AND TO THESE GENERAL CONDITIONS. CHANGES TO ANY OF THE AFORESAID MUST BE APPROVED BY THE CITY, IN ADVANCE OF WORK PERFORMANCE. 9.IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND POTHOLE AS NEEDED TO VERIFY ALL EXISTING CONDITIONS BEFORE THE START OF WORK. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED AND/OR SHOWN ON THE PLANS. SHOULD ANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED WITH THE WORK AFFECTED UNTIL REPORTED TO THE PROJECT ENGINEER FOR CLARIFICATION OR CORRECTION. 10.THE CONTRACTOR SHALL MAKE PROVISIONS TO KEEP ALL EXISTING UTILITIES IN SERVICE AND PROTECT THEM DURING CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY DAMAGED UTILITIES USING MATERIAL AND METHODS APPROVED BY THE UTILITY OWNER. NO SERVICE INTERRUPTIONS SHALL BE PERMITTED WITHOUT PRIOR WRITTEN APPROVAL FROM THE UTILITY PROVIDER. 11.THE CONTRACTOR SHALL PRUNE ALL VEGETATION, AS NECESSARY AWAY AND UP FROM THE STREET AND SIDEWALK. AS WELL AS ANY ROOT PRUNING AS DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL PROTECT ALL EXISTING LANDSCAPING THAT IS TO REMAIN. 12.AT THE END OF EACH WORK DAY, THE CONTRACTOR SHALL CLEAN UP THE PROJECT AREA AND LEAVE IT IN A NEAT AND SECURED MANNER. UPON COMPLETION, THE CONTRACTOR SHALL LEAVE THE PROJECT AREA FREE OF DEBRIS AND UNUSED MATERIAL. 13.THE CONTRACTOR SHALL MAINTAIN AND COORDINATE ACCESS TO ALL PROPERTIES/BUSINESSES ADJACENT TO THE PROJECT. THE CONTRACTOR SHALL NOTIFY AFFECTED PROPERTY/ BUSINESS OWNERS A MINIMUM OF 48 HOURS PRIOR TO ANY DRIVEWAY CLOSURES AND ASSIST PROPERTY OWNER WITH ALTERNATIVE PARKING. PEDESTRIAN AND VEHICLE ACCESS TO ENTRANCES SHALL BE MAINTAINED AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE RAMPS OR OTHER APPROVED METHODS FOR MAINTAINING ACCESS TO ENTRANCES. RAMPS SHALL BE ADA COMPLIANT, APPROVED BY THE ENGINEER, AND INCIDENTAL TO THE CONTRACT WORK. 14.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL CONSTRUCTION SAFETY, HEALTH AND OTHER RULES AND REGULATIONS FROM OSHA, DEQ, STATE, AND LOCAL REGULATING AGENCIES FOR SAFETY AND INSTALLATION OF THE WORK INCLUDING BUT NOT LIMITED TO SHORING, BRACING, ERECTION/INSTALLATION, FALL PROTECTION, GUARDRAILS, ETC. 15.IF CULTURAL OR ARCHAEOLOGICAL RESOURCES ARE DISCOVERED ON THE SITE DURING CONSTRUCTION ACTIVITY, INCLUDING BURIAL SITES, THE CITY OF TIGARD SHALL BE NOTIFIED IMMEDIATELY AND THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF SECTION 00290.50 OR 00290.51 OF THE OREGON STANDARD SPECIFICATIONS AS APPLICABLE. 16.MATERIALS SHALL BE NEW. THE USE OF MANUFACTURER'S NAMES, MODELS, AND NUMBERS IS REQUIRED AND INTENDED TO ESTABLISH STYLE, QUALITY, APPEARANCE, AND USEFULNESS. PROPOSED SUBSTITUTIONS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF TIGARD PRIOR TO INSTALLATION. 17.BEFORE INITIATING ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL CONTACT THE CITY'S PROJECT MANAGER, ANDREW NEWBURY (503-718-2472) TO ESTABLISH A PLACE, TIME, AND DATE FOR A PRE-CONSTRUCTION MEETING. 18.THE CONTRACTOR SHALL NOTIFY THE CITY PROJECT MANAGER, ANDREW NEWBURY (503-718-2472) 24 HOURS PRIOR TO COMMENCING WORK, 24 HOURS PRIOR TO ANY STAGED INSPECTION, AND AFTER COMPLETING WORK COVERED BY THE PERMIT. 19.MAINTENANCE OF THE WORK AREA AND APPROACH ROADS IS THE RESPONSIBILITY OF THE CONTRACTOR. THE WORK AREA AND APPROACH ROADS SHALL BE MAINTAINED IN A CLEAN CONDITION, FREE FROM OBSTRUCTIONS AND HAZARDS. A COPY OF THE CONTRACTORS CERTIFICATE OF INSURANCE SHALL BE AVAILABLE AT THE WORK AREA. 20.THE SPREADING OF MUD OR DEBRIS OR STORAGE OF MATERIALS OR EQUIPMENT OF ANY KIND UPON ANY PUBLIC ROADWAY IS STRICTLY PROHIBITED AND VIOLATION SHALL BE CAUSE FOR IMMEDIATE CANCELLATION OF THE PERMIT. THE CITY MAY AT ANY TIME ORDER IMMEDIATE CLEAN UP AND STOPPAGE OF WORK TO ACCOMPLISH CLEAN UP. 21.EFFECTIVE EROSION CONTROL IS REQUIRED. EROSION CONTROL DEVICES MUST BE INSTALLED AND MAINTAINED MEETING THE D.E.Q. REQUIREMENTS. THE CITY MAY AT ANY TIME ORDER CORRECTIVE ACTION AND STOPPAGE OF WORK TO ACCOMPLISH EFFECTIVE EROSION CONTROL. 22.PROPERTY DISTURBED BY CONSTRUCTION ACTIVITY SHALL BE SEEDED WITH A STANDARD GRASS MIX; SHRUBS, FLOWERS, BARKDUST, EXISTING SIGNS, PAVEMENT MARKINGS, MAILBOXES, ETC. SHALL BE REESTABLISHED, REINSTALLED OR REPLACED, WITH LIKE KIND AND MATERIAL. 23.EFFECTIVE DRAINAGE CONTROL IS REQUIRED. DRAINAGE SHALL BE CONTROLLED WITHIN THE WORK SITE AND SHALL BE SO ROUTED THAT ADJACENT PRIVATE PROPERTY, PUBLIC PROPERTY AND THE RECEIVING SYSTEM IS NOT ADVERSELY IMPACTED. THE CITY MAY AT ANY TIME ORDER CORRECTIVE ACTION AND STOPPAGE OF WORK TO ACCOMPLISH EFFECTIVE DRAINAGE CONTROL. 24.CONTRACTOR MUST VERIFY ALL EXISTING UTILITIES FOR BOTH VERTICAL ELEVATION AND HORIZONTAL LOCATION PRIOR TO START OF WORK (POTHOLE BEFORE DIGGING IF NECESSARY). SHOULD CONFLICTS ARISE AND REDESIGN OR RELOCATION OF FACILITIES BE NECESSARY, IT SHALL BE DONE AT THE CONTRACTORS EXPENSE. CHANGES MUST BE APPROVED BY THE CITY IN ADVANCE OF WORK PERFORMANCE. CONTRACTOR SHALL COORDINATE THE WORK WITH AFFECTED UTILITY AGENCIES. 25.A TEMPORARY HARD-SURFACE PATCH (COLD MIX AC OR HOT MIX BASE PAVING) SHALL BE PLACED ON TRENCHES WITHIN ROADWAYS AT THE END OF EACH DAYS WORK. NO TRENCH, ON SITE OR OFF-SITE, SHALL BE LEFT AT ANY TIME IN AN UNSAFE CONDITION. THE CONTRACTOR IS RESPONSIBLE FOR AND IS LIABLE FOR HAZARDS OR DAMAGE RESULTING FROM THE PROSECUTION OF THE WORK. 26.WORK PROVIDED FOR UNDER THE PERMIT SHALL INCLUDE REPAIR OF EXISTING FACILITIES (ROADS, DITCHES, ETC.) AS MAY BE NECESSARY, IN THE CITY INSPECTORS OPINION, TO OVERCOME DETERIORATION OR DAMAGE WHICH OCCURRED IN CONJUNCTION WITH THE WORK AUTHORIZED BY THE PERMIT. CORRECTIVE WORK SHALL BE DONE AT THE CONTRACTORS' EXPENSE. 27.THE CITY'S INSPECTORS MAY, AT THEIR DISCRETION, REQUIRE PROVISION OF TESTS AND OR REPORTS FROM THE CONTRACTOR TO VALIDATE CLAIMS OF MATERIAL OR CONSTRUCTION ADEQUACY/ COMPLIANCE. SUCH TESTS/REPORTS SHALL BE PROVIDED AT THE CONTRACTORS' EXPENSE. 28.EXISTING MONUMENTS, PROPERTY CORNERS, AND SURVEY MARKERS SHALL BE PROTECTED. REPLACEMENT SHALL BE AT THE CONTRACTORS' EXPENSE. 29.THE CONTRACTOR SHALL PROVIDE TO THE CITY INSPECTOR, IN WRITING, THE NAMES AND 24 HOUR EMERGENCY TELEPHONE NUMBER OF TWO (2) PERSONS WHO HAVE AUTHORITY TO RESOLVE PROBLEMS, TAKE CORRECTIVE ACTION AND, IN GENERAL, WILL BE RESPONSIBLE IN CASE OF ANY EMERGENCY. THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR, IN WRITING, OF ANY/ALL ASSIGNMENT CHANGES. 30.THE CONTRACTOR SHALL PROVIDE TO THE CITY INSPECTOR, IN WRITING, THE NAME AND 24 HOUR EMERGENCY TELEPHONE NUMBER OF A DESIGNATED "COMPETENT PERSON" RESPONSIBLE FOR CONSTRUCTION SAFETY AS PER OR-OSHA, CHAP. 437, DIV. 3 CONSTRUCTION, SUB-DIVISION P - EXCAVATIONS. THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR OF ANY/ALL ASSIGNMENT CHANGES. 31.OREGON LAW REQUIRES FOLLOWING THE RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. SAID RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0080. COPIES OF SAID RULES MAY BE OBTAINED FROM THE CENTER BY CALLING 503-246-1987. IF YOU HAVE ANY QUESTION ABOUT THE RULES, CONTACT THE CENTER. NOTE: DAMAGE TO UTILITIES SHALL BE CORRECTED AT THE PERMIT HOLDERS EXPENSE. 32.IT IS THE SOLE RESPONSIBILITY OF THE PERMIT HOLDER TO PROVIDE FOR PROPER RIGHT-OF-ENTRY AND/OR EASEMENTS PRIOR TO STARTING WORK. PROOF OF RIGHT-OF-ENTRY OR PROPERLY EXECUTED EASEMENTS, SHALL BE PROVIDED TO THE CITY. THE CITY SHALL IN NO WAY BE CONSTRUED TO BE LIABLE FOR THE PERMIT HOLDERS FAILURE TO OBTAIN OR PROVIDE FOR PROOF OF RIGHT-OF-ENTRY OR EASEMENTS. 33.CONTRACTOR TO SUBMIT A DEWATERING PLAN FOR APPROVAL PRIOR TO EXCAVATION STREETS AND STRUCTURAL FILLS NOTES: 1.ALL TREES, BRUSH AND DEBRIS WITHIN THE LIMITS OF THE RIGHT-OF-WAY AND ON THE AREAS TO BE FILLED SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR UNLESS OTHERWISE NOTED ON THE PLANS OR FLAGGED IN THE FIELD. 2.ALL AREAS OF CONSTRUCTION SHALL BE STRIPPED. STRIPPING SHALL CONSIST OF REMOVING THE TOPSOIL HUMUS. STRIPPING DEPTH SHALL BE 6" PER 00220.41. STRIPPING MATERIALS SHALL BE PLACED OR STOCKPILED BY THE CONTRACTOR ON SITE AS SHOWN ON THE PLANS AND PER INSTRUCTION BY THE INSPECTOR, OR HAULED OFF SITE TO AN APPROVED LOCATION. 3.EMBANKMENTS AND STRUCTURAL FILLS FOR ROADWAY CONSTRUCTION OR FILLS TO BE CONSTRUCTED ON BUILDABLE AREAS SHALL BE CONSTRUCTED FROM EXCAVATED MATERIALS ACCEPTABLE TO THE SOILS ENGINEER AND SHALL BE BROUGHT TO GRADE IN LIFTS NOT TO EXCEED 8” LOOSE MEASURE. EACH LIFT SHALL BE COMPACTED TO 95 PERCENT OF MAXIMUM DENSITY AS OBTAINED BY AASHTO T-99 COMPACTION TEST. COMBINATION TEST RESULTS SHALL BE SUBMITTED TO THE CITY INSPECTOR. 4.FILLS SHALL NOT BE CONSTRUCTED ON NATURAL SLOPES STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL. ALL FILL SLOPES SHALL NOT EXCEED 2 HORIZONTAL TO 1 VERTICAL. NO ROCK OR SIMILAR IRREDUCIBLE MATERIAL WITH A MINIMUM DIMENSION GREATER THAN 12 INCHES SHALL BE BURIED OR PLACED IN THE FILLS. 5.ROCK BASE FOR ASPHALTIC CONCRETE PAVEMENT, CURB AND SIDEWALK CONSTRUCTION SHALL BE AS SHOWN ON THE TYPICAL SECTIONS AND DETAIL SHEET AND IN ACCORDANCE WITH THE ABOVE REFERENCED SPECIFICATIONS. 6.THE CONTRACTOR SHALL CLEAN ALL SPILLED DIRT, GRAVEL OR OTHER FOREIGN MATERIAL CAUSED BY THE CONSTRUCTION OPERATIONS FROM ALL STREETS AND ROADS AT THE CONCLUSION OF EACH DAY OR OPERATION. CLEANING SHALL BE BY GRADER AND FRONT-END LOADER, SUPPLEMENTED BY POWER BRUSHING AND HAND LABOR UNLESS OTHERWISE APPROVED BY THE CITY. THE CONTRACTOR SHALL FOLLOW CITY AND CWS EROSION CONTROL PROCEDURES. 7.AS SOON AS PRACTICAL AFTER COMPLETION OF ALL PAVING AND GRAVEL SHOULDER RESURFACING, THE CONTRACTOR SHALL REMOVE ALL DIRT, MUD, ROCK GRAVEL AND OTHER FOREIGN MATERIAL FROM THE PAVED SURFACE AND STORM DRAINAGE SYSTEM. 8.ALL RADII INDICATE FACE OF CURB OR EDGE OF PAVEMENT, AS APPLICABLE. ALL DIMENSIONING IS WITH RESPECT TO FACE OF CURB. 9.ALL CUT EDGES SHALL BE SAND SEALED WITH CRS-1 OR CRS-2 EMULSIFIED ASPHALT OR APPROVED EQUAL. TRAFFIC CONTROL NOTES: 1.THE CITY'S STANDARD SPECIFICATION FOR TRAFFIC CONTROL IS "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS", U.S. DEPT. OF TRANSPORTATION, FHWA, CURRENT EDITION. 2.TRAFFIC CONTROL SHALL BE PROVIDED FOR BY THE CONTRACTOR IN ACCORDANCE WITH THE CITY'S STANDARD SPECIFICATIONS AND, ALSO, IN ACCORDANCE WITH A CITY (JOB SPECIFIC) APPROVED TRAFFIC CONTROL PLAN. A COPY OF THE APPROVED TRAFFIC CONTROL PLAN SHALL BE AVAILABLE AT THE WORK AREA. 3.PUBLIC ROADWAY SHALL NOT BE CLOSED TO TRAFFIC, AT ANY TIME, WITHOUT HAVING FIRST OBTAINED WRITTEN APPROVAL FROM THE CITY ENGINEER. THE PERMIT HOLDER IS RESPONSIBLE FOR PROVISION OF TIMELY NOTIFICATION OF TRAFFIC FLOW DISRUPTIONS TO AREA WIDE EMERGENCY SERVICES (TIGARD POLICE DEPT., TUALATIN FIRE & RESCUE) AND TO TRI-MET AND TIGARD SCHOOL DISTRICT AND OTHER SERVICE PROVIDERS. 4.ADVANCE WARNING OF IMMINENT TRAFFIC DISRUPTION SHALL BE PROVIDED TO THE GENERAL MOTORING PUBLIC BY PLACEMENT OF AN ADVANCE NOTIFICATION SIGN AT EACH END OF THE CONSTRUCTION AREA 72 HOURS (MIN.) BEFORE INITIATION OF CONSTRUCTION WORK. 5.ACCESS TO EXISTING PROPERTIES SHALL BE MAINTAINED AT ALL TIMES, INCLUDING NORMAL DELIVERY SERVICE AND MAIL SERVICE AND IF NOT, SHALL BE CAUSE FOR WORK STOPPAGE UNTIL EFFECTIVE ACCESS IS ESTABLISHED. 6.TRAFFIC CONTROL DEVICES, FLAGPERSONS, ETC., SHALL BE IN PLACE PRIOR TO INITIATION OF CONSTRUCTION WORK AND SHALL BE EFFECTIVELY MAINTAINED. 7.PURSUANT TO TIGARD MUNICIPAL CODE SECTION 7.40.180, WORK IS PERMITTED BETWEEN THE HOURS OF 7:00 A.M. TO 7:00 P.M. DAILY UNLESS OTHERWISE AUTHORIZED BY THE CITY MANAGER. 8.MINIMUM TRAVEL LANE WIDTH SHALL BE TWELVE (12) FEET; PEDESTRIAN TRAVEL SHALL ALSO BE PROVIDED FOR. 9.THE CITY RESERVES THE RIGHT TO ADD TO OR MODIFY TRAFFIC CONTROL REQUIREMENTS AS MAY BE NECESSARY TO EFFECTIVELY CONTROL TRAFFIC AND TO ASSURE PUBLIC SAFETY. 10.TRAFFIC CONTROL TO BE PERFORMED IN ACCORDANCE WITH THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND OREGON AMENDMENTS AS REQUIRED. THE CITY CAN REQUIRE ADDITIONAL TRAFFIC CONTROL MEASURES AS NEEDED TO PROVIDE FOR PUBLIC SAFETY. 11.THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN FOR APPROVAL PER THE SPECIFICATIONS 7 DAYS PRIOR TO STARTING CONSTRUCTION. 12.THE CONTRACTOR SHALL COORDINATE ACCESS TO DRIVEWAYS WITH PROPERTY OWNERS. ACCESS TO ROADWAY APPROACHES WITHIN THE PROJECT LIMITS SHALL BE MAINTAINED AT ALL TIMES. TRAFFIC PLATES SHALL BE USED (AND SECURED IN A MANNER ACCEPTABLE BY THE AGENCY) ACROSS ALL TRENCHES BLOCKING DRIVEWAYS TO PROVIDE ACCESS AT ALL TIMES. AT NO TIME SHALL CONTRACTORS DETAIN OR DELAY EMERGENCY VEHICLES. 13.CONTRACTOR SHALL COORDINATE ACCESS FOR SERVICES INCLUDING, BUT NOT LIMITED TO, MAIL DELIVERY, TRASH PICKUP, SCHOOL TRANSPORTATION, AND ANY OTHER SPECIAL TRANSPORTATION SERVICES THAT EXIST WITHIN THE PROJECT AREA. 14.EXISTING SIGNS THAT CONFLICT WITH CONSTRUCTION SIGNING ARE TO BE COVERED OR REMOVED AND REINSTALLED AFTER CONSTRUCTION. 15.GRADE CHANGES WITHIN THE TRAVELED LANE OR A VERTICAL CHANGE OF MORE THAN 1" WILL REQUIRE TEMPORARY HMAC RAMP WITH PAPER OR SAND JOINTS AS NEEDED. 16.CONTRACTOR SHALL PROVIDE SAFE, STABLE, AND ACCESSIBLE ACCESS TO ALL DRIVEWAY AND PEDESTRIAN PATHS CONNECTING TO FRONT DOORS AT ALL TIMES. TEMPORARY INTERRUPTIONS IN ACCESS SHALL BE COORDINATED BY THE CONTRACTOR WITH THE PROPERTY OWNER/RENTER AS REQUIRED. 17.MAINTENANCE OF THE WORK AREA AND APPROACH ROADS IS THE RESPONSIBILITY OF THE PERMIT HOLDER. THE WORK AREA AND APPROACH ROADS SHALL BE MAINTAINED IN A CLEAN CONDITION, FREE FROM OBSTRUCTIONS AND HAZARDS. A COPY OF THE PERMIT HOLDERS CERTIFICATE OF INSURANCE SHALL BE AVAILABLE AT THE WORK AREA. OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. EXISTING ROW LINE EXISTING PROPERTY LINE EXISTING EDGE OF PAVEMENT EXISTING CURB EXISTING CONCRETE SIDEWALK EXISTING WALL EXISTING STORM SEWER EXISTING SANITARY SEWER EXISTING WATER EXISTING GAS EXISTING UNDERGROUND POWER EXISTING OVERHEAD TELEPHONE EXISTING UNDERGROUND COMMUNICATIONS/CABLE EXISTING STORM DRAIN MANHOLE EXISTING CATCH BASIN EXISTING SANITARY SEWER MANHOLE EXISTING WATER VALVE EXISTING FIRE HYDRANT EXISTING GAS VALVE EXISTING STREET LIGHT EXISTING POWER TRANSFORMER EXISTING COMMUNICATION JUNCTION BOX EXISTING COMMUNICATION RISER EXISTING SIGN EXISTING MAILBOX EXISTING UTILITY POLE EXISTING SURVEY MONUMENT EXISTING TREE / BUSH PROPOSED WATERMAIN, SIZE AS NOTED PROPOSED CAP PROPOSED WATER VALVE PROPOSED THRUST BLOCK PROPOSED ASPHALT REHABILITATION PROPOSED DRIVEWAY RESTORATION PROPOSED SAWCUT LIMITS SD SS W G UGP OHT UGC LEGEND C 8'' W GE N E R A L N O T E S & LE G E N D C3 3 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E PAVING NOTES: 1.TRIM VEGETATION AS NEEDED PRIOR TO PAVING TO ENSURE ALL VEGETATION IS CLEAR OF PAVING OPERATIONS. 2.ALL EDGES REMAINING AFTER COLD PLANE PAVEMENT REMOVAL SHALL BE VERTICAL TO ACCEPT THE SUCCEEDING FULL DEPTH ASPHALT LIFT. 3.EDGE SEAL ALL END JOINTS AND ALL ACP JOINTS WITH CURB/GUTTER WITH 6-WIDE HOT CRACK SEAL. SEE SPECIAL PROVISIONS 00744. 4.PROVIDE MINOR GRADE ADJUSTMENTS OF DRAINAGE STRUCTURES AS REQUIRED TO FACILITATE DRAINAGE INTO STORM DRAINAGE FACILITIES. NO PONDlNG SHALL OCCUR BETWEEN CATCH BASINS FOLLOWING CONSTRUCTION. 5.THE MAXIMUM EXPOSURE AT DRIVEWAYS SHALL BE 1/2-INCH UNLESS OTHERWISE NOTED IN SPECIFICATION OR ON PLANS. 6.PAVING GRADE RINGS, IF USED FOR MANHOLE ADJUSTMENTS, SHALL NOT BE LESS THAN 2" IN HEIGHT. PRIOR TO PAVING, RISERS SHALL BE TESTED FOR FITNESS AND SHALL BE APPROVED BY THE ENGINEER. 7.COORDINATE WITH CITY STAFF FOR IN-GROUND VALVE, MANHOLE OR VAULT ADJUSTMENTS OF PUBLIC UTILITY STRUCTURES. COORDINATE WITH FRANCHISE UTILITY OWNERS FOR ADJUSTMENTS OF ALL OTHER IN GROUND FACILITIES. 8.ALL PAVING SEAMS SHALL BE LOCATED AT LANE LINES AND GRADE BREAKS REGARDLESS OF THE WIDTH OF THE ROAD UNLESS ALLOWED OTHERWISE IN WRITING BY THE CITY OR REQUIRED BY PHASING REQUIREMENTS INCLUDED IN THE CONTRACT DOCUMENTS. 9.FOLLOWING GRINDING/ SWEEPING OPERATION, THE INSPECTOR MAY ORDER ADDITIONAL RESTORATIONS AS NECESSARY TO ADDRESS EXISTING PAVEMENT DEFICIENCIES. WORK MAY INCLUDE ADDITIONAL GRINDING AND INLAY DEPTH, FULL REPLACEMENT OF PAVEMENT STRUCTURE INCLUDING AGGREGATE BASE, OR OTHER IMPROVEMENTS AS DEEMED NECESSARY BY THE CITY. CONTRACTOR SHALL SHOW APPROPRIATE TIME AND RESOURCES IN THE PROJECT SCHEDULE TO COMPLETE THIS WORK. 10.PAVE DRIVEWAY AND STREET TRANSITIONS CONCURRENTLY WITH MAINLINE PAVING UNLESS OTHERWISE APPROVED BY THE ENGINEER. 11.WHERE FULL PAVEMENT SECTION IS TO BE REPLACED TO MATCH EXISTING GRADE AT THE CENTERLINE/ROADWAY CROWN AND ADJACENT TO THE EXISTING CURB, CONTRACTOR SHALL: ·MARK EXISTING CURB FLOW LINE WITH PAINT PRIOR TO A.C. SURFACING REMOVAL TO DOCUMENT EXISTING PAVEMENT ELEVATION AND CURB EXPOSURE. ·SURVEY THE EXISTING ROADWAY CROWN, GRADE BREAKS, EDGE OF PAVEMENT (AS NECESSARY) AND ANY OTHER LOCATIONS AS NECESSARY TO RE-ESTABLISH THE EXISTING ROAD GRADE. EXISTING ELEVATIONS SHALL BE COLLECTED AT A MAXIMUM DISTANCE OF 25 FEET ALONG THE STREET ALIGNMENT. SURVEY INFORMATION SHALL BE USED TO PROVIDE CONSTRUCTION STAKING, AS NECESSARY, DURING FINAL GRADING PRIOR TO PAVING. 12.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT THE EXISTING SUBGRADE OF PROJECT SEGMENTS WHERE THE ENTIRE THICKNESS OF EXISTING ASPHALT IS SCHEDULED FOR REMOVAL. PROTECTION INCLUDES LIMITING HEAVY CONSTRUCTION EQUIPMENT LOADING ON THE SUBGRADE UNLESS SPECIFICALLY REQUIRED TO COMPLETE THE GRADING AND COMPACTION WORK, SELECTING EQUIPMENT THAT MINIMIZES THE RISK OF SUBGRADE DAMAGE, AND ALL NECESSARY MEASURES REQUIRED TO PROTECT THE SUBGRADE FROM MOISTURE DAMAGE CAUSED BY PRECIPITATION. THIS INCLUDES ANY MATERIALS NECESSARY TO COVER THE ROADWAY BEFORE RAINFALL EVENTS. SURVEY NOTES: 1.THE HORIZONTAL DATUM AND BASIS OF BEARINGS IS NAD 83 (2011) EPOCH 2010.00 OREGON NORTH 3601, INTERNATIONAL FEET. GPS OBSERVATIONS UTILIZING THE OREGON REAL TIME NETWORK (ORGN) WERE HELD AT CONTROL POINT NUMBER 10 AND 11. 2.THE VERTICAL DATUM IS NGVD 29. AN ELEVATION OF 214.00' WAS HELD AT CITY OF TIGARD BENCH NUMBER 223. A 2" BRASS DISC IN THE NORTHERLY WHEELCHAIR RAMP OF THE CURB ISLAND AT PARK STREET AND HIGHWAY 99W. DIGITAL DIFFERENTIAL LEVELS WERE RUN THROUGH CONTROL POINTS 23, 24 AND 25. WATER NOTES: 1.ALL JOINTS TO BE RESTRAINED. 2.OPERATION OF VALVES BY TIGARD WATER PERSONNEL ONLY. 3.OPERATION OF VALVES IN THE TIGARD WATER SERVICE AREA BY ANYONE OTHER THAN TIGARD WATER PERSONNEL IS PROHIBITED. VIOLATORS WILL BE FINED UP TO $5,000 PER INCIDENT. 4.THE CONTRACTOR SHALL MAINTAIN ONE SET OF STAMPED, APPROVED PLANS ON THE CONSTRUCTION SITE AT ALL TIMES. 5.ALL WORK SHALL BE IN ACCORDANCE WITH AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS. 6.ALL WORK SHALL BE APPROVED BY THE CITY INSPECTOR. 7.ALL PIPE AND FITTINGS SHALL BE DUCTILE IRON, CEMENT LINED, OF NEW MANUFACTURE, AND MADE IN THE UNITED STATES OF AMERICA (USA). PIPE SHALL BE “TYTON” JOINT DUCTILE IRON, CLASS 52. ALL FITTINGS SHALL BE MECHANICAL JOINT (MJ) UNLESS OTHERWISE SPECIFIED. 8.COVER FOR ALL WATER MAINS IN THE STREET AND RIGHTS-OF-WAY SHALL BE 36 INCHES. BACKFILL SHALL BE ¾-INCH - 0-INCH GRAVEL. 9.ALL VALVE-OPERATING NUTS SHALL BE WITHIN 36 INCHES OF FINISHED GRADE. IF VALVE NUTS ARE LOCATED GREATER THAN 36 INCHES OF FINISHED GRADE, THEN VALVE OPERATING NUT EXTENSIONS WILL BE REQUIRED. 10.THRUST BLOCKS MAY BE REQUIRED AT TEES, CROSSES, OR BENDS AS REQUIRED BY THE CITY INSPECTOR. POURED CONCRETE THRUST BLOCKS WILL HAVE AT LEAST EIGHT SQUARE FEET OF BEARING SURFACE AT EACH TEE, CROSS AND BEND LOCATIONS (SEE DETAILS FOR MINIMUM BEARING AREAS). 11.FIRE HYDRANT ASSEMBLY CONSISTS OF AN MJ X 6-INCH FLANGE (FLG.) TEE, 6-INCH FLG. X MJ GATE VALVE, 6-INCH MJ X MJ HOLDING SPOOL AND A MODERN MUELLER CENTURION FIRE HYDRANT, A-443, 6-INCH MJ, 5 ¼-INCH MVO, 3 PORT (2-2½-INCH NST HOSE CONNECTION, 1-4 ½-INCH NST PUMPER,) 1 ½-INCH PENTAGON OPERATING NUT OPENING LEFT, COLOR BEING YELLOW OR APPROVED EQUAL: WATERIOUS PACER 6790, CLOW MEDALLION 12.EACH FIRE HYDRANT SHALL BE INSTALLED UPON A PRE-FORMED CONCRETE BLOCK WITH 1 ½ CUBIC YARDS OF CRUSHED 2-INCH - ¾-INCH DRAIN ROCK. GEOTEXTILE FABRIC WILL BE LAID ON TOP OF THE DRAIN ROCK TO SEPARATE THE ROCK FROM THE EARTH COVER. 13.ALL SANITARY SEWER LINES WITHIN 10 FEET LATERALLY OR 3 FEET VERTICALLY OF A WATER MAIN SHALL BE ENCASED IN A REINFORCED CONCRETE JACKET 6 INCHES THICK FOR A DISTANCE OF 10 FEET ON BOTH SIDES OF THE CROSSING. WHERE CROSSINGS ARE NECESSARY, THEY MUST BE MADE AT APPROXIMATELY 90 DEGREES WITH AT LEAST 18 INCHES OF SEPARATION BELOW THE WATER LINE. 14.THE CONTRACTOR SHALL SCHEDULE CONSTRUCTION WORK SPECIFIED HEREIN TO MAINTAIN CONTINUOUS WATER SERVICE TO EXISTING WATER USERS. WHERE IT IS NECESSARY TO SHUT DOWN SERVICE TO MAKE REQUIRED INTERTIES, THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR AT LEAST FIVE (5) WORKING DAYS PRIOR TO A PLANNED WATER SERVICE SHUT DOWN TO ALLOW THE OWNER TO NOTIFY USERS OF THE UPCOMING TEMPORARY SUSPENSION OF WATER SERVICE. 15.PRIOR TO ANY CUT-IN OR CONNECTION, THE CONTRACTOR SHALL HOLD AN ONSITE PRE-CONSTRUCTION MEETING WHERE THE CUT-IN SCHEDULE AND COORDINATION WILL BE DISCUSSED. THOSE TO ATTEND SHALL INCLUDE THE ONSITE FOREMAN, CITY PROJECT INSPECTOR, AND TIGARD WATER PERSONNEL. THIS MEETING SHALL TAKE PLACE PRIOR TO EACH CONNECTION AND BE HELD BETWEEN ONE WEEK PRIOR TO TWO (2) WORKING DAYS PRIOR TO THE CONNECTION. THE CONTRACTOR SHALL HAVE ALL FITTINGS, PIPE, CHLORINE SWABBING EQUIPMENT, PUMPS AND HOSES, AND ALL EQUIPMENT NEEDED TO MAKE THE CUT-IN CONNECTION AT THE MEETING AND AVAILABLE FOR CITY INSPECTION. 16.NEW PIPELINE SHALL BE FLUSHED, PRESSURE TESTED, AND DISINFECTED BEFORE ANY CONNECTION TO THE EXISTING WATER SYSTEM IS MADE. TEMPORARY BLOW-OFFS SHALL BE PROVIDED BY THE CONTRACTOR AT ALL DEAD-ENDS. ALL FLUSHING, PRESSURE TESTING, AND DISINFECTION WATER SHALL BE DELIVERED THROUGH AN APPROPRIATELY SIZED OREGON HEALTH AUTHORITY (OHA) APPROVED DOUBLE CHECK VALVE ASSEMBLY (DCVA) BACKFLOW PREVENTION DEVICE. THE CONTRACTOR SHALL PROVIDE OR OBTAIN A DVCA BACKFLOW PREVENTION DEVICE. ONCE INSTALLED, A CERTIFIED BACKFLOW TESTER SHALL TEST THE DEVICE AND DOCUMENTATION MUST BE SUPPLIED TO THE CITY INSPECTOR BEFORE ANY FLUSHING ACTIVITIES MAY BEGIN. 17.ALL PIPES, VALVES, AND FITTINGS SHALL BE THOROUGHLY FLUSHED PRIOR TO PRESSURE TESTING AND CHLORINATION. FLUSHING SHALL BE DONE THROUGH BLOW-OFF UNITS, HYDRANTS, INDIVIDUAL SERVICES, AND MAINS AT A VELOCITY OF AT LEAST 2.5 FEET PER SECOND (FPS). 18.PRIOR TO ANY FLUSHING PROCEDURES, THE CONTRACTOR SHALL ISSUE A FLUSHING PLAN PROVIDING DIRECTION OF FLOW, SURFACE WATER MANAGEMENT BEST MANAGEMENT PRACTICES (BMPS), AND A WRITTEN SCHEDULE TO THE CITY PROJECT INSPECTOR FOR APPROVAL. A TWO (2) WORKING DAY NOTICE SHALL BE GIVEN TO THE CITY PROJECT INSPECTOR PRIOR TO ANY SYSTEM SHUT-DOWN OR FLUSHING PROCEDURES. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR OPERATE ANY CITY VALVES. 19.PRESSURE TESTING SHALL COMMENCE ONLY AFTER BACKFILL HAS PASSED THE REQUIRED COMPACTION TESTS PER AASHTO T-180 AND THE ROADWAY BASE ROCK HAS BEEN PLACED, COMPACTED, PROOF ROLLED, AND APPROVED BY THE CITY PROJECT INSPECTOR. 20.ALL MAINS WITH A STATIC PRESSURE UP TO 100 POUNDS PER SQUARE INCH (PSI) SHALL BE TESTED AT 150 PSI FOR 1 HOUR WITH A MAXIMUM ALLOWABLE LOSS OF 5 PSI. WATER MAINS WITH A STATIC PRESSURE GREATER THAN 100 PSI SHALL BE PRESSURE TESTED AT 1.5 TIMES THE STATIC PRESSURE FOR 1 HOUR WITH A MAXIMUM LOSS OF 5 PSI. ALL PRESSURE TESTING SHALL BE COMPLETED IN THE PRESENCE OF THE CITY PROJECT INSPECTOR. 21.UPON SATISFACTORY COMPLETION OF PRESSURE TESTING, THE NEW MAINS SHALL BE CLEANED AND FLUSHED WITH POTABLE WATER PRIOR TO DISINFECTION. FLUSHING VELOCITIES SHALL BE AT LEAST 2.5 FPS. THE PIPELINE SHALL BE THOROUGHLY FLUSHED, CHLORINATED, AND TESTED IN ACCORDANCE WITH AWWA STANDARD C651-92, THE STATE HEALTH DIVISION AND CITY REQUIREMENTS. THE CONTINUOUS FEED METHOD OF DISINFECTION SHALL BE USED. DISINFECTING MIXTURE SHALL BE A CHLORINE-WATER SOLUTION HAVING A FREE CHLORINE RESIDUAL OF 40 TO 50 MILLIGRAMS PER LITER (MG/L), AND IT SHALL BE INTRODUCED INTO THE MAIN THROUGH A TAP NO MORE THAN 18 INCHES FROM THE CONNECTION POINT TO THE EXISTING SYSTEM. THE DISINFECTION MIXTURE WILL BE PREPARED BY INJECTING A CALCIUM OR SODIUM HYPOCHLORITE AND WATER SOLUTION INTO THE PIPELINE AT A MEASURED RATE WHILE FRESH, POTABLE WATER IS ALLOWED TO FLOW THROUGH THE PIPELINE SO THAT THE CHLORINE WATER SOLUTION IS OF THE SPECIFIED STRENGTH. TREATED (CHLORINATED) WATER SHALL BE RETAINED IN THE PIPELINE LONG ENOUGH TO DESTROY ALL NON-SPORE-FORMING BACTERIA. DURING THE CHLORINATION PROCESS, ALL VALVES AND ACCESSORIES SHALL BE OPERATED. ALL PARTS OF THE LINES AND SERVICES SHALL BE DISINFECTED. TYPICAL RETENTION PERIOD IS 24 HOURS. AT THE END OF THE 24-HOUR PERIOD, THE PIPELINE IS TO HAVE A FREE CHLORINE RESIDUAL OF AT LEAST 10 MG/L. AFTER SATISFACTORY DISINFECTION, FLUSH THE CHLORINATION WATER FROM THE LINE UNTIL THE WATER THROUGHOUT THE PIPELINE IS EQUAL CHEMICALLY AND BACTERIOLOGICALLY TO THE PERMANENT SOURCE OF SUPPLY. THE DISINFECTION WATER MUST BE DISPOSED OF IN AN APPROVED MANNER. DO NOT ALLOW DISINFECTION WATER TO FLOW INTO A WATERWAY WITHOUT ADEQUATE DILUTION OR OTHER SATISFACTORY METHODS OF REDUCING CHLORINE RESIDUALS TO A SAFE LEVEL AS MANDATED BY THE DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ). AFTER FLUSHING AND DISPOSAL OF THE DISINFECTION SOLUTION THERE WILL BE ANOTHER 24-HOUR PERIOD PRIOR TO BACTERIOLOGICAL TESTING. BACTERIOLOGICAL TEST SAMPLES WILL BE COLLECTED BY A TRAINED TIGARD WATER PERSONNEL WORKER. 22.PROVIDE AN ECLIPSE NO. 88 SAMPLING STATION MANUFACTURED BY KUPFERTE FOUNDRY, ST. LOUIS, MO 63102. THE SAMPLING STATION SHALL BE 2-INCH - 0-INCH BURY, WITH A ¾-INCH FIPT (FEMALE IRON PIPE THREAD) INLET, AND A ¾-INCH UNTHREADED HOSE NOZZLE. ALL SAMPLING STATIONS SHALL BE ENCLOSED IN A LOCKABLE, NON-REMOVABLE, ALUMINUM-CAST HOUSING. WHEN OPENED, THE SAMPLING STATION SHALL REQUIRE NO KEY FOR OPERATION AND THE WATER WILL FLOW IN AN ALL-BRASS WATERWAY. ALL WORKING PARTS WILL BE OF BRASS AND BE REMOVABLE FROM ABOVE GROUND WITH NO DIGGING. A COPPER VENT TUBE (STANDARD) WILL ENABLE THE SAMPLING STATION TO BE PUMPED FREE OF STANDING WATER TO PREVENT FREEZING AND TO MINIMIZE BACTERIA GROWTH. THE EXTERIOR PIPING WILL BE BRASS AND A ¼-INCH BALL VALVE SHALL BE PROVIDED IN PLACE OF THE ¼-INCH PET COCK ON THE VENT PIPE. 23.WATER METERS WILL BE INSTALLED BY TIGARD WATER PERSONNEL UPON INDIVIDUAL REQUEST AND PAYMENT BY OTHERS (PROPERTY OWNER). ALL WATER METERS CONNECTED TO AN IRRIGATION SYSTEM MUST HAVE THE PROPER OREGON STATE APPROVED BACKFLOW PREVENTION DEVICE (MINIMUM OF A DCVA) INSTALLED ON THE PROPERTY SIDE OF THE WATER METER. IN ADDITION, REGARDLESS OF SIZE, EVERY METER FOR COMMERCIAL, MULTI-FAMILY, INDUSTRIAL, AND INSTITUTIONAL SERVICE SHALL HAVE THE PROPER OREGON STATE APPROVED BACKFLOW PREVENTION DEVICE (MINIMUM OF A DCVA) INSTALLED ON THE PROPERTY SIDE OF THE METER. THE BACKFLOW PREVENTION DEVICE SHALL BE INSTALLED AND TESTED BY THE PROPERTY OWNER, WITH THE RESULTS FORWARDED TO THE TIGARD PUBLIC WORKS WATER DIVISION BEFORE WATER SERVICE CAN BEGIN. RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. ER O S I O N C O N T R O L DE T A I L S C4 4 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. 16 5 17 0 1 7 5 18 0 185 19 0 190 190 195 1 6 0 16 5 2 0 0 12'' W UGC G G UGP U G C UG C 8'' S S 8'' S S 8'' S S 8'' S S 8'' S S 8'' S S 8'' S S UGP U G P G G G SD SD G G G G G G UG P U G P U G P W W W W W W 8' ' S S 8' ' S S W W G G G UG C UG C U G C UG C G G G G UG P UGP UGP UGP UGP UGP UGP UGC UGC UGC UGC 8'' SS 8'' SS 8'' SS W W W W G G G G G UG P UG P U G P U G P U G P U G P SD SD SD SD S D SD SD SD OHP OHP OHP C C SS SS SS C C C C SS SS SS SS SS SD SD SD SD SD SS SS SS SS X X X X X C G G G 12'' W UGP U G C W W 8'' S S 8'' S S 8'' S S C C C C C SS 8'' SS 8'' S S C 14'' S D SD SD SD ER O S I O N C O N T R O L & DE M O P L A N C5 5 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E DEMOLITION KEY NOTES SAWCUT EXISTING AC OR CONCRETE PAVEMENT TO FULL SECTION DEPTH (AND TO NEAREST JOINT IF APPLICABLE) TO LIMITS SHOWN. COORDINATE LIMITS WITH ENGINEER PRIOR TO SAWCUTTING. 1 REMOVE EXISTING AC OR CONCRETE TO LIMITS SHOWN. DISPOSE OF DEMOLISHED MATERIALS PER THE SPECIFICATIONS. 2 EROSION CONTROL NOTES 1.SEE SHEETS C4 FOR GENERAL EROSION CONTROL NOTES & DETAILS. INSTALL INLET PROTECTION. SEE CWS STANDARD DETAILS 915 & 920, SHEET C3. GENERAL DEMOLITION NOTES 1.PROTECT EXISTING CURBS, SIDEWALK AND DRIVEWAYS. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND DISPOSAL OF EXISTING SURFACE STRUCTURES AND OTHER SITE ELEMENTS WITHIN THE SITE AREA TO ALLOW FOR EXECUTION OF THE WORK. 3.EXCEPT FOR MATERIALS INDICATED TO BE STOCKPILED OR TO REMAIN THE PROPERTY OF THE CITY OF TIGARD, CLEARED MATERIALS SHALL BECOME CONTRACTOR'S PROPERTY, REMOVED FROM THE SITE, AND DISPOSED OF PROPERLY. ALL TRUCKS SHALL FOLLOW THE DESIGNATED HAUL ROUTE ON THE PLANS. 4.ALL LANDSCAPING, PAVEMENT, CURBS, WALLS, FENCES AND SIDEWALKS, BEYOND THE IDENTIFIED SITE AREA, DAMAGED DURING THE CONSTRUCTION SHALL BE REPLACED TO THEIR ORIGINAL CONDITION OR BETTER AT NO ADDITIONAL COST. 5.SAWCUT STRAIGHT MATCHLINES TO CREATE A BUTT JOINT BETWEEN THE EXISTING AND NEW PAVEMENT. 6.CONTRACTOR SHALL UTILIZE HAUL ROUTE AS SHOWN ON THE DRAWINGS FOR THE DURATION OF THE PROJECT. DEVIATIONS FROM HAUL ROUTE MUST BE APPROVED BY ENGINEER. 0 SCALE IN FEET 40 80 SW A S H D R SW A S H A V E S W F R E W I N G C T 1 ~ 2 ~ DEMOLITION HAUL ROUTE RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. ℄FINISHED GRADE TO MATCH EXISTING GRADE 32.0'± AND VARIES EXISTING CURB, SIDEWALK AND DRIVEWAYS TO REMAIN (WHERE PRESENT), TYP, PROTECT FROM DAMAGE EXISTING ROADWAY SUBGRADE 3/4"-0" AGGREGATE BASE, 10" DEPTHWOVEN SUBGRADE GEOTEXTILE FOR SOIL SEPARATION PER TABLE 02320-4 OF THE STANDARD SPECIFICATIONS 3" DEPTH INLAY WITH LEVEL 2, 1/2" DENSE ACP FULL DEPTH RECONSTRUCTION MATCH ORIGINAL CURB AND DRIVEWAY EXPOSURE, TYP TY P I C A L S E C T I O N C6 6 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E FULL DEPTH RECONSTRUCTION SECTION SW FREWING COURT NTS 2% (TYP) RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. SD 8'' SS 8'' SS W W W W SD G G G G G U G C UG C UGC UGC UGC UGC UGC UG C UGP UGP UG P UG P UG P UG P UG C 8'' S S 8'' S S 8'' S S W W W G G G G SD SD SSSS 8'' S S 8'' SS 8'' SS C 30+00 31+00 32+00 32+52 W 4'' W 4'' W 4'' W 180 177 17 8 179 181 182 183 17 6 1 7 9 17 8 177 160 170 180 190 160 170 180 190 30+00 31+00 32+00 32+50 UG C W G UG C G6" W EXISTING GROUND ABOVE ℄ OF ROW 12" SD UG C UG P SS SS 36" MIN OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E SW F R E W I N G C O U R T IM P R O V E M E N T S P L A N C7 7 0 SCALE IN FEET 20 40 SW A S H D R PROFILE SCALE: 1" = 20' HORIZ 1" = 5' VERT PLAN SW FREWING CT 9588 9560 9540 9520 9525 9545956513210 PAVING CONSTRUCTION NOTES ADJUST EXISTING RIM, COVER OR FRAME TO FINISH GRADE. 1 PROTECT EXISTING CURB, MARK EXISTING ASPHALT GRADE ON CURB PRIOR TO REMOVAL. 2 PAVEMENT TREATMENT LEGEND PAVEMENT REHABILITATION. SEE TYPICAL SECTION SHEET C6. VALVE & FITTING SCHEDULE 1 ~ 6" X 6" MJ TAPPING SLEEVE 1 ~ 6" X 8" MJ REDUCER 1 ~ 8" MJ GATE VALVE INSTALL:A (TYP 1) 1 ~ 8" X 6" MJ TEE 1 ~ 8" X 4" MJ REDUCER INSTALL:B (TYP 1) 1 ~ STANDARD BLOWOFF ASSEMBLY PER CITY STANDARD DETAIL 570. INSTALL:C (TYP 2) 1 ~ STANDARD HYDRANT ASSEMBLY PER CITY STANDARD DETAIL 542. MUELLER CENTURION HYDRANT PROVIDED BY CITY. INSTALL:D (TYP 1) FOR FUTURE CONNECTION: 1 ~ 8" X 8" MJ TEE 1 ~ 8" MJ GATE VALVE W/ MJ PLUG WRAP IN POLY SHEETING AND BURY VALVE INSTALL:E (TYP 1) WATER CONSTRUCTION NOTES INSTALL FULLY RESTRAINED 8" CL 52 DIP WATER MAIN. SEE CITY STANDARD DETAIL 180 FOR TRENCH BACKFILL REQUIREMENTS. 1 INSTALL NEW 1" WATER SERVICE LINE. CONFIRM METER ORIENTATION AND CONNECT TO EXISTING SERVICE PER CITY STANDARD DETAIL 520. CUT AND REMOVE OLD ANGLE STOP/WATER SERVICE 12" BELOW METER. 2 INSTALL FULLY RESTRAINED 6" CL 52 DIP WATER MAIN. SEE CITY STANDARD DETAIL 180 FOR TRENCH BACKFILL REQUIREMENTS. 3 SAWCUT AND REMOVE EXISTING CURB AS REQUIRED FOR WATERLINE INSTALLATION. RECONSTRUCT CURB PER CITY STANDARD DETAIL 125. 4 ABANDON EXISTING WATER MAIN CONNECTION AFTER NEW WATER MAIN IS BROUGHT INTO SERVICE. REMOVE 5' OF ABANDONED 6" WATER MAIN AND CAP DEAD END WITH GROUT PLUG PER PIPE ABANDONMENT PLUG DETAIL, SHEET D2. 5 REMOVE VALVE BOX AND RESTORE SURFACE TO MATCH SURROUNDINGS. 6 HYDRANT SHALL NOT BE TAKEN OUT OF SERVICE FOR MORE THAN 48 HOURS. REMOVE AND DISPOSE AFTER NEW HYDRANT IS IN SERVICE. 7 INSTALL FULLY RESTRAINED 4" CL 52 DIP WATER MAIN. SEE CITY STANDARD DETAIL 180 FOR TRENCH BACKFILL REQUIREMENTS. 8 INSTALL STRADDLE BLOCK ON 4" MAIN.9 C 2 2 2 1 WATER SERVICE SCHEDULE STATION SIDE LENGTH SIZE 31+39 RIGHT 8'1" 31+62 LEFT 29'1" 32+07 LEFT 44'1" 32+11 RIGHT 41'1" 32+24 RIGHT 33'1" 32+33 LEFT 21'1" 2 2 2 B 3 6 4 8" CL 52 DIP WATER MAIN 2 (TYP) 7 1 SEE SHEET C8 FOR FREWING COURT CULDESAC GRADING AND DRIVEWAY IMPROVEMENTS 4" CL 52 DIP WATER MAIN 8 5 A 9 CONTRACTOR TO CONFIRM EXISTING WATER MAIN DEPTH PRIOR TO CONSTRUCTION STRIPING NOTES 1.INSTALL NEW STRIPING AS CALLED OUT WITH ......... , WHERE X REFERS TO PAVEMENT MARKINGS SHOWN ON ODOT STANDARD DRAWING, SHEET D4. 2.COORDINATE STRIPING LAYOUT WITH ENGINEER PRIOR TO PLACEMENT. MATCH EXISTING LAYOUT AT PAVEMENT RECONSTRUCTION LIMITS. COORDINATE TRANSITIONS TO EXISTING STRIPING WITH ENGINEER. X S REPLACE EXISTING STREET SIGN AND POST WITH NEW STOP SIGN PER CITY STANDARD DETAIL 405, SHEET D4 RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. REPLACE DRIVEWAY APPROACH AND CURB TO NEAREST JOINT AT 9588 FREWING COURT D E C SS C FL=176.55 N=649242.041 E=7617969.987 FL=176.84 N=649269.303 E=7617968.410 FL=176.20 N=649214.808 E=7617969.559 FL=176.28 N=649194.428 E=7617985.146 FL=176.15 N=649188.082 E=7618000.341 FL=175.97 N=649190.148 E=7618023.382 FL=175.75 N=649226.189 E=7618049.331 FL=176.01 N=649247.564 E=7618044.485 FL=176.27 N=649263.138 E=7618029.240 FL=176.54 N=649271.508 E=7618008.652 FL=175.72 N=649223.507 E=7618049.098 FL=175.75 N=649208.507 E=7618044.398 FG=176.45 N=649227.933 E=7618006.639 FL=176.87 MATCH EXISTING N=649271.717 E=7617966.608 TC=176.85 TC=177.37 TC=176.56 TC=176.22 TC=176.77 TC=177.04 FL=176.68 MATCH EXISTING N=649280.027 E=7618000.115 TC=177.14 FL=176.16 N=649211.491 E=7617970.841 FL=176.15 N=649203.385 E=7617975.639 FL=175.90 N=649194.437 E=7618031.591 FL=175.70 N=649214.780 E=7618047.129 TC=176.70 TC=176.17 TC=176.13 FL=176.12 N=649208.483 E=7617972.306 FL=176.11 N=649205.904 E=7617973.845 TC=176.12 TC=176.16 TC=176.78 FL=176.25 N=649196.180 E=7617982.756 TC=176.26 TC=176.65 FL=176.13 N=649187.613 E=7618003.267 TC=176.14 TC=176.01 FL=176.00 N=649189.166 E=7618020.586 TC=176.47 FL=175.95 N=649191.461 E=7618026.377 TC=176.45 FL=175.93 N=649192.858 E=7618029.032 TC=176.43 TC=176.40 TC=176.25 FL=175.72 N=649211.162 E=7618045.711 TC=175.73 TC=175.71 FL=175.68 N=649217.669 E=7618047.985 TC=175.69 FL=175.69 N=649220.596 E=7618048.637 TC=175.70 TC=176.25 FL=175.79 N=649229.151 E=7618049.380 TC=175.80 FL=175.98 N=649244.912 E=7618045.806 TC=175.99 TC=176.51 FL=176.51 N=649239.216 E=7617969.051 TC=177.01 FL=176.64 MATCH EXISTING N=649277.603 E=7618001.883 TC=177.18 FL=176.31 N=649264.527 E=7618026.618 TC=176.32 FL=176.50 N=649270.012 E=7618011.315 TC=176.51 CENTER OF CUL-DE-SAC EG=176.33 4 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E SW F R E W I N G C O U R T DR I V E W A Y S P L A N C8 8 0 SCALE IN FEET 5 10 9560 9540 9520 9545 9565 S W F R E W I N G C T 9525 PROTECT EXISTING MONUMENT PROTECT EXISTING MONUMENT PROTECT EXISTING MONUMENT PROTECT EXISTING MONUMENT PROTECT EXISTING MAILBOX PROTECT EXISTING MAILBOX PROTECT EXISTING MAILBOX PROTECT EXISTING MAILBOX CONSTRUCTION NOTES CONSTRUCT STANDARD CURB AND GUTTER PER CITY STANDARD DETAIL 126. 2 CONSTRUCT CATCH BASIN GUTTER TAPER PER CWS STANDARD DETAIL 300. 3 CONSTRUCT TRANSITION TO CURB AND GUTTER PER DETAIL, SHEET D3. 4 CONSTRUCT STANDARD DRIVEWAY PER CITY STANDARD DETAIL 142. SAWCUT AND MATCH IMPROVEMENTS TO NEAREST JOINT. 5 INSTALL AND CONNECT ROOF DRAIN. INSTALL BENDS AS NEEDED TO LOCATE OUTLET WITHIN FULL EXPOSURE CURB. SEE DETAIL, SHEET D3. 6 4 5 5 5 5 5 5 6 6 2 3 3 3 3 3 3 8.7'± 8.2'± 8.8'± 8.4'± 8.8'± 8.8'± PROTECT EXISTING WATER METER PROTECT EXISTING COMMUNICATION JUNCTION BOX PROTECT EXISTING WATER METER PROTECT EXISTING MAILBOX PROTECT EXISTING WATER METER PROTECT EXISTING WATER METER BEGIN TRANSITION FROM EG TO CENTER OF CUL-DE-SAC FG ABBREVIATIONS EG - EXISTING GRADE FG - FINISHED GRADE FL - FLOWLINE TC - TOP OF CURB RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. DE T A I L S I D1 9 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. DE T A I L S I I D2 10 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E TABLE 1 BRANCH PIPE DIA (IN) 4 6 8 12 THRUST BLOCK BEARING AREA (SF) 2.00 4.50 8.25 18.00 KEY NOTES: A.CONCRETE THRUST BLOCK POURED AGAINST UNDISTURBED EARTH. THRUST BLOCK SHALL BE PER TABLE 1 AND SHALL NOT BE LESS THAN ONE FOOT IN ANY DIMENSION. CONCRETE SHALL BE MINIMUM 3500 PSI. BRANCH PIPE SHALL NOT BE PRESSURIZED FOR 5 DAYS. B.WRAP TAPPING SADDLE AND VALVE WITH 3 LAYERS OF POLYETHYLENE ENCASEMENT PRIOR TO POURING THRUST BLOCK AND BACKFILLING. EXTEND POLYETHYLENE 6" MINIMUM BEYOND SADDLE AND VALVE AND SECURE TO PIPE WITH POLYETHYLENE PIPE WRAP TAPE. C.STAINLESS STEEL TAPPING SADDLE WITH GASKET AND FLANGED CONNECTION, JCM 432 OR EQUAL BY WRITTEN APPROVAL OF CITY ENGINEER. D.LINE-SIZE GATE VALVE (FL X MJ) PER CITY STANDARD DETAIL 503. E.JOINTS ON BRANCH PIPE SHALL BE RESTRAINED. NOTES: 1.BEFORE INSTALLING TAPPING SADDLE, CONTRACTOR SHALL THOROUGHLY CLEAN PIPE TO REMOVE ALL DIRT, ROCKS, AND OTHER FOREIGN MATERIAL FROM PIPE WHERE SADDLE WILL BE INSTALLED. 2.SADDLE BOLTS SHALL BE TORQUED TO MANUFACTURER'S SPECIFICATIONS. BOLTS SHALL CONFORM TO ANSI/AWWA C111/A21.11. 3.CONTRACTOR SHALL ENSURE THAT GASKET IS PROPERLY ALIGNED AND FREE OF FOREIGN MATERIAL PRIOR TO TIGHTENING SADDLE. 4.SADDLE LOCATION AND INSTALLATION SHALL BE APPROVED BY CITY INSPECTOR PRIOR TO TAPPING. 5.CONTRACTOR SHALL AIR TEST SADDLE TO 40 PSI PRIOR TO TAPPING. 6.CONTRACTOR SHALL FLUSH AND PRESSURE TEST VALVE PRIOR TO BACKFILLING. 7.ENGINEER SHALL PROVIDE CALCULATION AND SIZING IF TEST PRESSURE EXCEEDS 150 PSI. SAFETY FACTOR SHALL BE 1.5. TAPPING SADDLE NTS RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. X Y AA DE T A I L S I I I D3 11 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E 6" 12" 4" 3"4" SIDEWALK SECTION B-B SIDEWALK/ROOF DRAIN DETAIL NTS NOTE: 1.COORDINATE LAYOUT/ CONNECTIONS TO EXISTING DRAINS W/ ONSITE INSPECTOR PRIOR TO FORMING/ POURING CURB & SIDEWALK. ENSURE POSITIVE DRAINAGE OF DRAIN PIPE. 3" SCH 40 PVC TOP OF CURB BACK OF SIDEWALK PROVIDE WATER-TIGHT CONNECTION TO EXISTING DRAINS AS REQUIRED. SCORE JOINT FACE OF CURB PLAN 6"6" B B EXISTING GRATEFINISH GRADE EXISTING INLET 6" NORM 12" MIN EXISTING CAP REMOVAL DEPTH. SEE NOTE 1. 10" MIN. REPLACEMENT CAP DEPTH. SEE NOTE 1. SECTION A-A PLAN EXISTING GRATE 4 #4 DOWEL BARS EACH SIDE AT EQUAL SPACING, SEE NOTE 3. NOTES: 1.REMOVE EXISTING CAP TO MINIMUM DEPTH OF 12" AS SHOWN. REMOVE ADDITIONAL CAP DEPTH AS NECESSARY TO PROVIDE A MINIMUM 10" DEPTH REPLACEMENT CAP. 2.SALVAGE ARE RE-USE EXISTING GRATE AND FRAME. REMOVE EXISTING CONCRETE FROM GRATE/FRAME ASSEMBLY. 3.DOWEL #4 BARS AT EQUAL SPACING 3" DEPTH INTO EXISTING CONCRETE INLET. BARS SHALL EXTEND 3" MINIMUM INTO CAP REPLACEMENT. EXISTING INLET ADJUSTMENT DETAIL NTS NOTE: 1.X & Y DIMENSIONS TO BE DETERMINED BY FIELD MEASUREMENTS. 6" LENGTH #4 BARS. SEE NOTE 3. CITY OF TIGARD STANDARD CURB AND GUTTER. SEE DETAIL 126, SHEET D1 CITY OF TIGARD STANDARD CURB. SEE DETAIL 125, SHEET D1. SAWCUT AT EXISTING JOINT 3' MIN. CURB TRANSITION DETAIL NTS RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. DE T A I L S I V D4 12 OF NO . RE V I S I O N BY DA T E DR A W N B Y : RE V : DRAWING NO: DA T E : DE S I G N E D B Y : PR O J E C T N O : 6/ 2 0 2 4 CI / T B / C K CI 12 15 1 8 C DB ON E I N C H ON E I N C H A T F U L L S C A L E . IF N O T O N E I N C H A D J U S T SC A L E A C C O R D I N G L Y 0 1" SW F R E W I N G C O U R T IM P R O V E M E N T S P R O J E C T EN G I N E E R O F R E C O R D DA V I D C H A N N I N G B R O K A W OR E G O N P . E . # 8 4 1 3 6 P E RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WALLIS ENGINEERING IS RELYING UPON THE ACCURACY AND COMPLETENESS OF THE INFORMATION FURNISHED BUT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE USING THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE.