Loading...
HomeMy WebLinkAboutTile Flat Analysis Matrix_draft 6-10-2025Tigard River Terrace 2.0 - Tile Flat Extension Evaluation (Draft 6-10-2025) Scenario 1 Scenario 2 Scenario 3 Scenario 4 A1. Total Vehicle Miles Traveled Ideal Definition: Total VMT decreases on the Arterial and Primary and Secondary Street network* as the RT 2.0 Primary and Secondary Street network is constructed and accommodates more local trips. Total VMT change from no-build: -0.5%Total VMT change from no-build: +1.0%Total VMT change from no-build: -0.4%Total VMT change from no-build: -0.3% A2. VMT on the Primary and Secondary Street Network Ideal Definition: The RT 2.0 Primary and Secondary Street network* serves local trips and discourages regional cut- through traffic. Share of Total VMT for RT 2.0 Trips: 92%Share of Total VMT for RT 2.0 Trips: 47%Share of Total VMT for RT 2.0 Trips: 62%Share of Total VMT for RT 2.0 Trips: 48% B. Quantity of Travel Ideal Definition: Forecasted average daily traffic volumes on the Primary and Secondary Street network are consistent with that of a Collector through a residential neighborhood, with the ideal condition being under 6,000 ADT Lowest overall ADT volumes ADT volumes are higher along Mountainside Way compared to Scenarios 1 and 3 Slighly higher ADT volumes along Mountainside Way compared to Scenario 1, but otherwise similiar Highest overall ADT volumes C. Intersection Capacity Ideal Definition: Intersections are forecasted to be less congested once the RT 2.0 Primary and Secondary Street network is constructed, with intersections forecasted to operate with a v/c ratio that is at or below the current 0.99 mobility target One intersection exceeds the current mobility target. This scenario results in the highest v/c ratios on Scholls Ferry and competitive or lower v/c ratios along Roy Rogers. Two intersections exceed the current mobility target. This scenario results in improved operations along Scholls Ferry with some degradation of operations at the Roy Rogers & Bull Mountain intersection. One intersection exceeds the current mobility target. This scenario results in similar operations on Scholls Ferry to Scenario 1, improved operations along parts of Roy Rogers, and some degradation of operations at the Roy Rogers & Perth intersection. One intersection exceeds the current mobility target. This scenario results in improved operations along Scholls Ferry with some degradation of operations at the Roy Rogers intersections with Bull Mountain and Perth. D. Travel Time Ideal Definition: Forecasted travel times for regional trips* decrease by more than one half of a traffic signal cycle (more than 30 seconds) once the RT 2.0 Primary and Secondary Street network is constructed. 6.91 minutes (-11 seconds from no-build)6.88 minutes (-13 seconds from no-build)7.07 minutes (-2 seconds from no-build)6.63 minutes (-28 seconds from no-build) Criteria 1. V e h i c u l a r N e t w o r k Tigard River Terrace 2.0 - Tile Flat Extension Evaluation (Draft 6-10-2025) Scenario 1 Scenario 2 Scenario 3 Scenario 4Criteria A. Bicycle Level of Traffic Stress Ideal Condition: Minimal investment to create BLTS 1.Lowest investment to achieve BLTS 1 Achieves BLTS 1 with some costs for median crossings at all locations Achieves BLTS 1 with some costs for additional median crossings Achieves BLTS 1 with some costs for median crossings at all locations B. Pedestrian Level of Traffic Stress Ideal Condition: Minimal investment to create PLTS 1.Lowest investment to achieve PLTS 1 Achieves PLTS 1 with some costs for additional median crossings Achieves PLTS 1 with some costs for additional median crossings Achieves PLTS 1 with some costs for additional median crossings C. Connectivity Ideal Condition: high performance in local and regional connectivity and walkshed coverage. Provides sufficient connectivity for development and good walkshed coverage Provides additional local and regional connectivity and walkshed coverage Provides additional local connectivity and walkshed coverage Provides the most local and regional connectivity and walkshed coverage D. Vulnerable Road User Safety Ideal Condition: vulnerable road user crash exposure is zero. Lowest VRU crash exposure VRU crash exposure is higher than Scenario 1 VRU crash exposure is somewhat higher than Scenario 1 VRU crash exposure is considerably higher than Scenario 1 E. Future Transit Service Ideal Condition: high performance in base coverage, route options, and minimal transit delay. Primary route provides good coverage and lowest traffic volumes minimize delays Alternative routes available but may reduce coverage. Traffic volumes may result in some transit delays Alternative routes could provide additional residential coverage but reduce commercial exposure. Alternative routes could reduce commercial exposure. Traffic volumes may result in transit delays A. GHG & Emissions Ideal Condition: cut-through VMT is minimized (zero)Lowest potential for emissions in RT 2.0 Emissions potential is considerably higher than Scenario 1 Emissions potential is somewhat higher than Scenario 1 Emissions potential is considerably higher than Scenario 1 B. Natural Resource Impacts Ideal Condition: minimal impact to streams, trees, wetlands, and impervious surface Fewest stream crossings, some impact to trees, lowest impervious surface Additional stream crossing, some impact to trees, potential wetlands impact, increased impervious surface Additional stream crossing, some impact to trees, increased impervious surface Two additional stream crossings, some impact to trees, potential wetlands impact, highest impervious surface C. Livability Impacts of Regional Vehicle Trips Ideal Condition: cut-through traffic is minimized (zero vpd) Lowest cut-through traffic and a small proportion of street volume Cut-through traffic is considerably higher than Scenario 1 and high proportion of street volume Some increase in cut-through traffic compared to Scenario 1 and relatively small portion of street volume Cut-through traffic is considerably higher than Scenario 1 and high proportion of street volume3. E n v i r o n m e n t a l / L i v a b i l i t y 2. M u l t i m o d a l N e t w o r k Tigard River Terrace 2.0 - Tile Flat Extension Evaluation (Draft 6-10-2025) Scenario 1 Scenario 2 Scenario 3 Scenario 4Criteria A. Support to Commercial Areas Ideal Condition: maximize traffic passing by and walkshed coverage for commercial areas Provides highest overall pass-by traffic but lower walkshed coverage Provides highest pass-by traffic for RRBM and good walkshed coverage Provides best performance for SFMW but lower pass-by traffic for RRBM Provides best performance for RRBM but lower pass-by traffic for SFMW B. Land Use & Development Feasibility Ideal Condition: least impact to development with costs contained to those supported by development Costs can be supported by development, potential impact on development yield on Vandermost Higher costs may have implications on funding strategy. Some additional dedication needs Higher costs may have implications on funding strategy. Some additional dedication needs and potential impacts on development yield on Vandermost Highest costs may have significant implications on funding strategy. Some additional dedication needs C. Order of Magnitude Infrastructure Costs Ideal Condition: lower costs contained to those supported by development Lowest cost and no need for CIP, County, or City funding sources Approximately double the cost of Scenario 1 and may need CIP, County, or City funding sources Higher cost compared to Scenario 1 and may need CIP, County, or City funding sources Approaching triple the cost of Scenario 1 and may need CIP, County, or City funding sources D. Timing, Phasing, and Project Cost Ideal Condition: development can be phased to delay infrastructure costs Phasing can be structured to delay costs Additional stream crossing may bring forward costs Additional stream crossing may bring forward costs Two additional stream crossings may bring forward costs E. Fire, Life, and Safety Ideal Condition: meets fire, life, safety with minimal impact on development yield and response times Meets fire, life safety needs with some impacts on development on Vandermost Meets fire, life safety needs with multiple accesses and response directions. Higher traffic volumes may impact emergency response time Meets fire, life safety needs with some impacts on development on Vandermost Meets fire, life safety needs with multiple accesses and response directions. Higher traffic volumes may impact emergency response time A. Equitable Impacts Ideal Condition: no impacts to vulnerable populations Lowest exposure to emissions, noise, and crash risk but some impacts from climate resilience Higher exposure to emission, noise, and crash risk, impacts to housing affordability and climate resilience Higher exposure to emission, noise, and crash risk, impacts to housing affordability and climate resilience. Increased connectivity Highest exposure to emission, noise, and crash risk and impacts to housing affordability and climate resilience. Increased connectivity Legend Scenario meets the ideal condition Scenario has a small impact compared to the ideal condition Scenario has medium impact compared to the ideal condition Scenario has a significant impact compared to the ideal condition Scenario has a very significant impact compared to the ideal condition Scenario is neutral or operates with no change to existing conditions 4. D e v e l o p m e n t F e a s i b i l i t y 5. E q u i t y