Loading...
HomeMy WebLinkAboutJuly 7 PC RT2.0 Transportation Update Memo To: Planning Commissioners From: Brittany Gada, Senior Planner Schuyler Warren, Assistant Director of Community Development Re: July 7th River Terrace 2.0 Transportation Update Date: June 30, 2025 This memorandum accompanies the materials for the River Terrace 2.0 transportation update scheduled during the July 7th Planning Commission meeting. During the meeting, staff will provide a brief general transportation update followed by a discussion of the potential extension of Tile Flat Road through the River Terrace 2.0 neighborhood. Specifically, the update will discuss the draft Tile Flat Road Extension Scenarios Analysis, dated June 10, 2025, prepared by the River Terrace 2.0 transportation consultants, Toole Design and DKS Associates. The materials provided for this discussion include the following documents: • Tile Flat Extension Scenarios Evaluation Summary • Tile Flat Extension Scenarios Evaluation Technical Analysis • Tile Flat Extension Evaluation Matrix Due to the extensive information provided in these documents, staff recommend that the Commissioners prioritize reviewing the evaluation summary as it provides an overview of the four Tile Flat Road extension scenarios and the performance metrics used to assess them. The summary also synthesizes the results of the technical analysis and the information in the evaluation matrix. The summary also includes the joint staff-consultant scenario recommendation based on the results of the technical analysis. If time permits a more in-depth review of the materials, the technical analysis and the evaluation matrix are also provided. The technical analysis details the methodologies used to assess the four scenarios and includes complete evaluation results. The evaluation matrix consolidates the methodology information and results from the technical analysis into a color-coded matrix. The July 7th transportation update to the Planning Commission precedes the transportation update that will be presented to City Council on July 15th during which staff will be requesting direction from the Council on the Tile Flat extension scenarios. As such, during the July 7th meeting, staff will be requesting that the Planning Commission provide feedback to staff on whether there is a preferred Tile Flat extension scenario that should be incorporated into the River Terrace 2.0 street network. Staff will share the Planning Commission’s feedback with Council. Although no formal vote is required, the Commission could opt to take a straw poll or vote on a scenario if a consensus is not reached.