Loading...
Permit CITY OF TIGARD BUILDING PERMIT 111 111 COMMUNITY DEVELOPMENT Permit#: BUP2019-00345 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/07/2020 TIC,A R t� g Parcel: 2S112DA00700 Jurisdiction: Tigard Site address: 15333 SW SEQUOIA PKWY, STE#100 Project: Spec space Subdivision: PACIFIC CORPORATE CENTER Lot: 3 Project Description: Replacing and enlarging entry canopy,reconfiguring landscape and hard surface areas,creating of courtyard, removing bike racks and delivery drive. Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALTY ASSOCIATES LP 15350 SW SEQUOIA PKWY#300 ATTN: N PIVEN PORTLAND, OR 97224 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-624-6300 PHONE: 503-624-6300 FAX: 503-624-7755 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 01/07/2020 $1,178.43 Demolition Occupancy Grp: B Occupancy Load: 49 12%State Surcharge-Building 01/07/2020 $141.41 Dwelling Units: Plan Review 12/19/2019 $765.98 Stories: Height: ft DC Provision Review,COM TI-Ping 01/07/2020 $254.00 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 01/07/2020 $471.37 Value: $111,810 Info Process/Archiving-Lg$2.00(over 01/07/2020 $16.00 11x17) Info Process/Archiving-Sm$0.50(up to 01/07/2020 $6.00 Floor Areas: 11x17) Metro Const.Excise Tax 01/07/2020 $134.17 Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $2,967.36 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: 1 Special Inspection(see plans) Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires yo to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR. 001-00 . You ay obtain a y of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: 1 Permittee Signature: e Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application RECEIVE II Commercial FOR OFFICE USE ONLY City of Tigard DEC 1 9 2019 DateBea al, (1. 11 ,/I 0101 1! 05 L 11111 _ 13125 SW Hall Blvd.,Tigard,OR 97223 CITY OF TIGARD Plan Revie /� a L Phone: 503.718.2439 Fax: 503.598.196 Date/By: 1— 23' 1` /, fJ"/�/l )V 1.1 Inspection Line: 503.639.4175 �UILDING DIVISION Date ReadyBy: Juris: 21 See Page 2 for I IGAR[) )) � Internet: www.tigard-or.gov Notified//M hood, ac /9i�i Supplemental Information � .Y `/ft1�' TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ® Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the ` `ATEGORY OF CON5TRIOTION • work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ElAccessory building El Multi-familyNumber of bedrooms: ❑ Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:15333 SW Sequoia Pkwy New dwelling area: square feet City/State/ZIP:Portland,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.:100 Project name:p or S�r Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA COMM RCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Project consists of replacement of entry canopy with new,larger canopy. Valuation: $111,810.00 Reconfiguration of existing landscape and hard surface areas,creation of Existing building area: 11247 square feet courtyard,removal of existing bike racks&delivery drive.All work to meet ADA New building area: 11247 square feet ® PROPERTY OWNER r ❑ TENANT Number of stories: 1 Name:Pacific Realty Associates,LP. Type of construction: II-B Address: 15350 SW Sequoia Parkway,Suite 300 Occupancy groups: City/State/ZIP:Portland,OR 97224 Existing: B/S-1 Phone:(503)624-6300 Fax:(503)624-7755 New: B/S-1 ►a APPLK T 0 CONTACT PE :- `, BUILDING PERMIT FEES* Business name:Pacific Realty Associates,LP. pla n (PteaseeferlcrJa'eseAedute) p n review fee(or deposit): Contact name:Robert Bumcrot FLS plan review fee(if applicable): Address: 15350 SW Sequoia Parkway,Suite 300 City/State/ZIP:Portland,OR 97224 Total fees due upon application: Phone:(503)624-6300 Fax::(503)624-7755 Amount received: E-mail:permits@pactrust.com PIIOTOVOLTAIC_ OLA.R I'A1"NEI,SYSTEM'.FEES* Commercial and residential prescriptive installation of CONTRACTOR ,,' roof-top mounted PhotoVoltaic Solar Panel System. Business name:Pacific Realty Associates,LP Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:15350 SW Sequoia Parkway,Suite 300 Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR 97224 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)624-6300 Fax:(503)624-7755 State surcharge(12%of permit fee): $21.60 CCB lie.:153913 Total fee due upon application: $201.60 Authorized signature:V.7 This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Print name:Robert Bumcrot Date: I Service Board. I:ABuilding\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) INmil City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT T 1 c R n Building Permit Review — Commercial - With Land Use Building Permit #: 4 (PoZo('.- 3 1-(4--- Site Address: / 3 �) p Llcier Pit�y�> Suite/Bldg#: a ��yt�).. U Project Name: Arran - (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review i �J y Proposal: /j r Z ,, i2;dr J (?et,Ut / cL X-P�I� /2 (34/117%_ f47'/.e.. r Verify site address/suite# exists and active in permit syste ' WO''ver Terrace Neighborhood: ❑ Yes VNo PI nd Use Case#: 4 M2) i g --0066 / E Plans atch Approved Land Use: Site Plan L✓J Landscape Plan Ile Other: rban Forestry Plan 111101 levation Plan Building Height: Ma)knum Height 1-ic Actual Height /2 E Conditions Met: Prior to Submittal ❑ Prior to Permit Issuance Business License: Exists: ❑ Yes ❑ No, applicant was provided a business license application ublic Facilities Improvement(PFI) Permit: 7 Required: ❑ Yes,applicant was notified 1 No Applied For: ❑ Yes ❑ No, stop intake Notes: Approved by Planning: -:----- —__ Date: ,2 0 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: E Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: if l9 Site Plans: # Building Plans: # Building Permit#: nter building permit# above. Workflow Routing: Planning ['Engineering Limit Coordinator Building Workflow Sign-off: ign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: w Date: l I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_111819.docx Engineering Review [ Slope at building pad: 2 ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ 9sements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes El---No Assess Water Quantity Fee in-lieu: ❑ Yes D No LIDA Facility on lot: ❑ Yes a—No ❑ NOT Approved by Engineering: f� Date Notes: `i4?9X Ji e"9// i re OD/9 Approved by Engineering: '%.,,., Date: /2/23/2a, Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: y4DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ZT/A Tigard Trans SDC: ❑ YesA Parks SDC: ❑ Yes dN/A OK to Issue Permit frbAcj Approved by Permit Coordinator: Date: 1 2/2__ L\Building\Fonns\B1dgPermitRvw_COM_WithLandUse_111819.docx