Loading...
Report (2) E / E,P, - NOV 1 9 2019 ;: City of Tigard • COMMUNITY DES �OPMENTTEPARTMENT ,I' Plan Submittal Requirements ili Commercial & Multi-Family - New,,Additions or Alterations 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gpv 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ® map&tax lot# ® project name ® site address ® suite number IN zoning M applicant name ® phone number B. North arrow. X C. Scale (architectural or engineering only). X D. Street names. X E. Setbacks. X F. Parking,including disabled access. (existing, compliant, shown on A1.1) G. Finished floor elevations. x 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 fiErt:01Prt NOV 1 9 2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT h " Plan Submittal Requirements Matrix .. =, Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigalyd-or.gov_ Type of Submittal # of Plans (Includes new, additions and alterations.) Required at. Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County,and Tualatin Valley Fire Sc. Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019