PFI2020-00013 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12020-00013 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/22/2020 Parcel: SEG1394 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: NW Natural Project Description: On SW Wall Street. Install 47'of 2"(p)main to stub in for future Fields Apartments prior to road improvements/open trench/see sketch/R00025302. Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric,data) PFI Permit Fee 01/22/2020 $300.00 Owner: Total $300.00 REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: LORENE NICHOLS PHONE: 5032264211 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: /t, F PLXA IU,1}J/ J /"� �"li Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12020-00013 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140 (Tri-Met) and 503-431-2345 (Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours (min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Trent Brickey>at <971-228-9269>, to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED JAN 14 2020 MV! City Of Tigard CITY OF TIGARD ENGINEERING DEPARTME��`NNING/ENGINEERING., Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: Wall Street 2"(p)main Stub In r TYPE 1—Franchise Utility Work Brief description of project: Install 47'of 2"(p)main to stub in for future performed by NWN,PGE, or utility agency Feld Apartments Subdivision prior to road improvements/open trench/see sketch/R00025302 r TYPE 2—ROW Sidewalk/Driveway/Sever Work performed for the purpose of • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and (address if available): SW Wall St .9F � -- main line tap Location F TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening NW Natural Gas • Mainline installation for sanitary sewer, Name: storm sewer, Tigard water, and Tigard Mailing address: 220 NW 2nd Ave water service area City/State: Portland OR Zip: 97209 r TYPE 4—Small Celt Technology Phone: 503-2264211 x4372 r TYPE 5—Tigard Triangle Email: eln@nwnatural.eom Phone: 503-226-4211 (VOTE: Type 1 and 2 applications may be Contact name: Lorene Nichols emailed to ro ermitsnalfieard„ -or.gov. Phone: 503-2264211 x4372 Email: eln@nwnatural.com CONTRACTOR INFORMATION E Same as applicant Name: Loy Clark-Jade Leedy CCB Number: 52281 Mailing address: PO Box 1369 City/State: Tualatin OR Zip: 97062 Phone: 971-806-2841 Email: jade.leedy@loyclark.com ENGINEER INFORMATION Name: NW Natural-same as above Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? `Yes =No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 1 of 4 .APPLICANTS NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with die City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain die owner's signature on the application. 1,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. y6p� Aw- Lorene Nichols 01/14/2020 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: `,.7 Permit fee: ZOO- M Received by: _� `� Date: Approved by: Date: 11211ZO2d Notified by:_ Date: Cityof Tigard`• 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wu>\vtigard-or.gov • 503-718-2421 • Page 2 of 4 CROSS SECTIONS GENERAL NOTES N CALL SEVEN DAYS PRIOR TO START OF DRY UTILITY TRENCH 1.Call the following Utilities Notification Center CALL PoUt DAYS PRIOR TO SHADING TO SET INSPECTION DATE 52' 8' 48 hours prior to any excavation: CONTACT:MARK FARLEY 9714084236 Oregon:811 or 1-800-332-2344 WE Washington:811 or 1-800-424.5555 ALL DEPTHS MEASURED FRDMFIN4L GRADE J 5.5' 17' 17' 5.5' T J 2.ATTENTION:Oregon law requiro you to follow ROAD 1I� 24- FIELD d d rules adopted by the Oregon Utility Notification S SIDE I MIN.--�I SIDE LU Center.Those rules are set forth in OAR 952.001- E O U g C/ L g 'a ° 0090.Y2 rosy obtain copies of the rules by calling Of W W E C a the anter.(Note:the telephone number for the Oregon / a. Q. Utility Notification Center is(503)232-1987 or 811). / 3.Fill out construction sketch as-built supplied with / T MEASURED job packet and return with work order.Only one a°x/ / '� FROM as-built is required. Mz3�p r/a / THE 30• o t—5'EX.MAIN 2' 4.AlI distribution mains must have a minimum depth of s/ PROPOSED 24"and services must have a minimum depth of I8" r, FINAL WIS SW WALL ST E/S unless there is an approved variance. �/% GRADE / CONTROPJ!ED Ir 5.All transmission lines must have a minimum depth of 1T REC. / BACKFILL / 30"in Class'I'locations and 36"in Class'2.3,&4' e,y 18"MIN.) // (SAND OR ROCK-// locations,unless there is an approved variance. / ///F� / 6.Written dimensions on this construction sketch Q" GAS ` VARIANCE S lel meas: have precedence over scal<ddimensums. vMlMxa 7.Pressure test shall be Tested in accordance with 3 t2• // standards in CFM and Engineering Standard Practice. r MIN. // / Raasan(•): S. Test medium for class"B"main shall be air,Unless 3 J /CATV RiONE SEC otherwise noted.Test medium for class"C-F"main / / O xwitamon Urian(9"): shall be water,unless otherwise noted. 9.For Class C or higher tests,see Design Document and TRENCH REQUIREMENTS Appevr Nm: siylmr.a ora: Hydrostatic Report. FOR JOINT UTILITY USE I~t2"—► MAIN EXTENSION Class"B"PRESSURE TEST INFORMATION(circle&label test area on as-built drawing) Test by NNG–Other Tar PY• rad- Pt» tsn ti ab Part aatar• Dr. TM mom' Ar A B S� C a Eqy F 4 �RYyc�O 2+�q 55 IP>, 40, QJ WELDS p1 d� " 4V X- CERT. OPER. PM PM x Q'•. ti FOOTAGE SIZE M P GRADE W.T. RAYED MAOP MAOPNOP ACTIVITY# ORDER# INSTALL 143' 2' P B P24 .216 60 57 45 710 03600466 Rqg � '�'•� 6 �� e r / FUSE 8 INSTALL: 4NN W Natural 0 50 100 Feet ❑ 2"PE VALVE Engineering Department 1 in=100 ft ❑ INSTALL: ADDRESS CRY COUNTY STATE DESIGNED BMK DATE 0111012020 ❑ LW SW WALL ST TIGARD WASHINGTON OR DRAWN KDC DATE 0111412020 ❑ 1#Anode BETWEEN AND SW VARNS ST SW CHERRYDR APPROVED L2C DATE 01dAa02 NAME CREW LDR. DATE WALL ST 2-(P)MAIN STUB IN PLATTED DATE PLAT TWN NNG SEC PIPELINE ID- JOB TYPE- 1-044-021 T02S R01W SW 1 NEW CONSTRUCTION MAINS PMN: PROJECTIREVISION# 03600466 00025302 Page 82 2011 Edition pT o-1n i�TrafBc _v�r orn U n Should_Diagi'a 3x101 Diagram 310 covers shifting traffic lanes on a two-lane,two-way roadway around the work site with one lane partially or fully on the shoulder. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. All travel lanes should have a minimum 10 foot lane width. 4. Shoulder shall be adequate in width and surfacing to cavy traffic. 5. Two advance warning signs are required. 6. Place cones as shown. Cones along the far edge of travel lane, farthest from the work space, are optional and may be added to clearly mark the travel path. Sign Spacing and Buffer Lengths(feet) p 71 20 50 25 100 100 100 75 30 100 35 40 350 350 1 350 1 25 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 2011 Edition Page 83 W`o � ne,Traffics ivers 6 WUi ASNUO Li � Bono e WORK AHEAD A 1 0 t I OP400-M.AJ =& LJ2 mh . . wyer . . . �ee�hep0 . LAffft A ROAD WORK AHEAD December 2011 Chapter 5