Loading...
Permit (6) CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2019-00902 TRD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/22/2020 IiAA Parcel: 2S113AC01201 Jurisdiction: Tigard Site address: 7325 SW BRIDGEPORT RD Project: BV CENTERCAL LLC Subdivision: COUNCIL VIEW ACRES(LOTS 1-20) Lot: 18 Project Description: Replace a 12.5-ton RTU. Contractor: A-1 MECHANICAL LLC Owner: BV CENTERCAL LLC 18110 SE 34TH ST, SUITE 230 ATTN: FRED BRUNING VANCOUVER,WA 98683 7455 SW BRIDGEPORT RD TIGARD, OR 97224 PHONE: 360-695-0789 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 01/22/2020 $500.11 Class of Work: ALT Type of Const: VB Plan Review 01/22/2020 $125.03 Occupancy Grp: M Occupancy Load: 12%State Surcharge-Mechanical 01/22/2020 $60.01 Info Process/Archiving-Sm$0.50(up to 01/22/2020 $17.50 Stories: 11x17) Project Valuation: $16,000.00 Fuel Air Handlers Fuel Types: Natural Gas Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $702.65 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 . a 32.2344. Issued By: Permittee Signature: all 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Inspections Required for Permit No.: m _ cd 19 -- no 9 , IVR Code TA . Permit Descristion IVRCode Type Permit Description 01 BUP Buildin: —structural 07 SIT Site Work 02 ELC Electrical 08 SWR Sewer Connection _ 03 ELR Restricted 3 09 FPS Fire Protection 04 MEC Mechanical 10 RER Re-Roof 05 MST Master—residential combination 11 CMS Commercial Manufact.Structure 06 PLM Plumbin_ 12 SFM Single-Family Manufact.Structure J Req'd Code Inspection Description J Req'd Code Inspection Description Building(structural) Inspections Electrical Inspections 205 Footing 210 Foundation walls 105 Underground/slab cover 110 Temporary electrical service 215 Footing drain 115 Electrical'service 220 Slab , 120 Electrical rough-in 225 Post/bn structural 125 WaIl cover 230 Underfloor insulation 130 ,,Ceiling cover 240 Exterior shearwall 135 Low voltage rough-in 242 Interior shearwall 14y Sign installation 245 Firewall 145 A/C or heating unit circuit 250 Roof nailing 150 Hot tub/spa/pool 255 Wtr proofmg basement walls 195 Misc.inspection 260 Tilt-up panel 198 Low voltage final 265 Masonry 199 Electrical final 270 Reinforcing steel(rebar) 275 Framing Mechanical Inspections 280 Insulation 605 Post/beam mechanical 285 Drywall nailing 610 Gas line 287 Suspended ceiling 615 Mechanical rough-in 289 Approach/sidewalk 620 Hydropic piping 295 Misc.inspection 625 Duct work 299 Final inspection 630 Fire damper ----.....,...,3 635 Smoke detector shutdown Fire Protection System Inspections 640 Exhaust hood 901 Sprinkler supply lines 645 Grease duct test 905 Sprinlder underfloor/slab695 Misc.inspection 906 Flush test 699 Mechanical final 907 Sprinlder hydro test 910 Sprinkler rough-in/test Plumbing Inspections 915 Fire alarm rough-in305 Plumbing underslab 920 Suppression trip test \ 310 Crawl drain 995 Misc. inspection 312 Backwater valve 998 Alarm final 315 Post/beam plumbing 999 Sprinlder final 320 Plumbing rough-in 322 Shower pan Site Work Inspections 330 Water service 405 Excavation 335 Rain drain 410 Fill 340 Storm sewer 415 Grading 345 Culvert/catch basin 495 Misc Inspection 350 Septic tank 49.9 Final Inspection 395 Misc. inspection 399 Plumbing final Sanitary Sewer Inspections 505 Sanitary sewer Erosion Control Inspections 585 Misc. inspection 750 Initial erosion control 599 Final inspection 752 LIDA on-site facility inspection 755 Regular erosion control Manufactured Structure Inspections 797 Final LIDA inspection 810 MFG-Structure set-up 798 Final erosion control 899 MFG-Structure final I:\Building\Forms\Inspection Cards\AOP Insp Card By Case\InspCard_All_031816.docx Mechanical Permit Application_ FOR OFFICE USE ONLY City of Tigard Received Permit No.: /ham d i" 13125 SW Hall Blvd.,Tigard,OR 97223 �ED Date/By: ��/3i f c4 11-77 — / t +,t — ( Plan Review �l1 Phone: 503.718.2439 Fax: 503.598.19RErE� )-• — 'aQ A Other Permit: Inspection Line: 503.639.4175 ��.,�J►�"^ Date/By: TIGARD Date ReadyBy: ® See Page 2 for Internet: www.tigard-or.gov p�C 312p19 Notified/Method://Zj/ Ay y -- loris: Supplemental Information TYPE OF_WO OF 1.1G17014 N`'TJ�/��' COMMER�FEE* SCHEDULE - USE CHECKLIST s 1�,��pIVMechanical permit fees*are based on the value of the work ❑New construction -Addition/alteratiei Y�� nt performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ /f cc , 0-0 CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling I Commercial/industrial 0 Accessory building For special information use checklist. ❑Multi-family 0 Master builder 0 Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: 7 ✓� p Q Air conditioning 46.75 Job site address: 3,.5" 5&.) /3(14e i3 Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: 7704 Or'7, .2- f �k Furnace 100,000+BTU(ducts/vents) 54.91 I Heat pump 61.06 Suite/bldg./apt.no.: Project name: Duct work 23.32 Cross street/directions to job site: 0f,ode_i9-0-f I- U/ f ieQ e Hydronic hot water system 23.32 aj �✓ Residential boiler(radiator or t (di V.,27 )9,--2 hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 — Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 J Flue vent for water heater or gas Rep e, et-- e--� i /7 5 fZ� �©o-i- TZ), et,Ai T fireplace 23.32 Log lighter(gas) 23.32 41r 141 C4, /V``� /n TL 7f0 , IL2t,:74' Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 EIPROPERTY OWNER 0 TENANT Other: 23.32 Environmental exhaust and ventilation: Name: 6v .. LC,t'. Range hood/other kitchen l r equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 ❑ APPLICANT 0 CONTACT PERSON Other: 23.32 Business name: Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: Furnace,etc. _ Address: Gas heat pump Wall/suspended/unit heater City/State/ZIP: Water heater Phone:( ) Fax::( ) Fireplace Range E-mail: Barbecue CONTRACTOR -Clothes dryer(gas) Business name: 4 / 7f2,-,41,,,,,,, Other:,„( ther: MECHANICAL PERMIT FEES* Address: ( kilo 5 3g f__a "7 I ST£ 4;130 Subtotal City/State/ZIP: kaki c_c,G,,G,«' Lg/i4 -7r6e3 Minimum permit fee($90.00) Phone:(76o) / ei Fax:( ) Plan review(25%of permit fee) !B/ .- 7 State surcharge(12%of permit fee) CCB lie.: 1 R Z 33// //1/6"2.0,7eTOTAL PERMIT FEE T This permit application expires if a permit is not obtained within 180 Authorized signature: / , days after it has been accepted as complete. Authorized signature: / ,�� * Fee methodology set by Tri-County Building Industry Service Board Print name: r ,c Date: /.2_//9. /9 I:\BuildingU'ermits4MEC_Per itApp_040113.doc 440-4617T(I I/02/ B) City of Tigard III u COMMUNITY DEVELOPMENT DEPARTMENT I T1cAlzo Building Permit Review — Commercial - No Land Use Building Permit #: /"7. ,c,_.,201-7--a.,76, Site Address: 73,2 5 SW 1s rid ye Por+ ✓2-C-• Suite/Bldg#: Project Name: 13 r i d le po r Will C,f, C 6 i)4 cL n y 2 2 (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review i t Proposal: IQ cit. 2 y i S-Mny 12 . S to n 1'oo i-0 v Existing Business Activity: WI UC — I vo (y)rau-c4'41... Proposed Business Activity: / / li V 0 cih Ci n7)2_, fL jA Verify site address/suite# exists and active in permit system. JJ River Terrace Neighborhood: ❑ Yes /6 No yZoning: M V G — ( Permitted Use: ❑ Yes ❑ No ❑ Spec Space ? Confirm no land use required. Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: Nt0--1'"^. V\____—____ Date: i 2j 3 i I i c1 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /p14 / �4 Site Plans: # Building Plans: #�� Building Permit#: nter�building permit#above. Workflow Routing: EN-II—alining ❑ Permit Coordinator ding Workflow Sign-off: C...)35 -off for Planning(include notes from planning review) Route Application Documents: Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: _ Date: ;�i / / / I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BldgPermitRvw_COM_NoLandUse l 11819.docx