Loading...
PFI2019-00425 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 11111 * COMMUNITY DEVELOPMENT Permit#: PFI2019-00425 Date Issued: 11/25/2019 TI C A RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG3249 Jurisdiction: Site address: Subdivision: Lot: Project: PGE Project Description: SEG 3249. Replace 3 poles 400,401 and 402 for overhead work, Pre tree trimming and post landscape possibility. Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric,data) PFI Permit Fee 11/25/2019 $300.00 Owner: Total $300.00 REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: NICK CHANEY 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 5036126093 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: r� / Issued By: -" /Z7��' Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00425 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED . City of Tigard NOV 2 5 2019 PFI#: 2v t�1- a 2-c— . � ENGINEERING DEPARTMENT CITY OF TIGARD PLANNING/ENGINEERING TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M2783240 a TYPE 1—Franchise Utility Work Brief description of project: replace 3 poles 400, 401, 402 for performed by NWN,PGE, or utility agency over head work. pre tree trimming post land scape possibility 0 TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 9619 SW SHADY LN main line tap 0 TYPE 3—Full Scale Development Work starting at the abv address 5& 3•2-49 performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE Linda Ott • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 10800 SW Avery Street water service area City/state: Tualatin, OR Zip: 97062 0 TYPE 4—Small Cell Technology Phone: 503.612-6093 0 TYPE 5—Tigard Triangle Email: prereqcoord@pgn.com Phone: NOTE: Type 1 and 2 applications may be Nick Chane emailed to rowpermits@tigard-or.gov. Contact name: y Phone: 971-275-2597 Email: preregcoord@pgn.com CONTRACTOR INFORMATION 0 Same as applicant Name: pge crew CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? DYes D No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as "Applicant" shall be designated "Permittee" and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant, certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Z utila, Ott Linda Ott for Nick Chaney 11.25.19 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: _Pf co 4•2, Permit fee: gi )6(J Received by: `t-- Date: 112<`-';J Approved by: 8n.a g. Date: 'I' 2. S • 2.o/`/ Notified by: ttt- Date: 14 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI) Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee. See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY' FOR STAFF USE ONLY- TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat El Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4 sly NI s I Edge of Pavement Streetlight Ditch .t •— Raaf Draa2 ...... ' T-1317iposrif Telnn E TiET— � YTS I I a' 1 N•r Existing House Existing I 1 1 �. `� >r • Driveway �I vi 1 O H ri dI r1 ' a IA l C/41' v 1 I� gli I 1 Existing Shop 1 1 • C 1 Powerpole i ( I a' I o �' 0 1 95' 1 I -----VropertyLne - ------- -- I �-flN - Iire Hydrant(FH) I I I I Scale: 'I"=30' I I I I I I I I I • TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility& street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 www.invarion.com oy Oy04, DEVICE SPACING: N / 5 TAPER: 20' A x� �4fr ' 4' / / TANGENT:20' ��a / / TTURNED DFF DU RYNG Ay N�N�b / / ISI e FLAGGING OPERATIONS iy y / l \ / l / NOTE: till fiA / / / / 0 FAGGERS SNALL T. BE ILLUN.NATED DURING NOM DAYUGNT HOURS / AhO o\ 1dbn \ OysO4 \ .0 * / o+-bo do \ # a Pole#401 ...... g °ayo��� �t's fr\ J \ h . / Toe 4 &at. \, / ♦ / 3`r0.to Pole#402• ,/ / x< IIIcrI IIII / f / dfiP l�J Y l / • m‘ /♦ 4 / g / . l i 1 i;t z g o V \ Q m ° a / A -8!E A O Z O c / a/ • J / /A W I ' t l4' p = ,1_ 4I) 0 1� // SW Shady Ln Co'u at r Fg3 a� F t= O 4 & N, / c•>/ cq, / W $ ,I 'o,o o m >R c 111111 Gila I- d = 2 N p d / / 0 W m t N U t /� x Z .- W = E -/ / °�y°� �y° 4:P o o, Z C g X90 �a°h� All signs and devices SHALL conform to the MUTCD/OTTCH. -1,,,,„o, 5 Will adjust to fit field conditions as needed for safety. 96 Plan NOT to scale. www.invarion.com Right Lane Closure, Multi-Lane Non-Freeway Diagram 500 1 1 t t I Ia 0 0 0 0 Protection Vehicle 0 w/TMA(both Optional) 0 See Chapter 4 I O✓ O ¢w 0 1 0 Buffer t 0 Buffer IV ------- I I IMMOO O♦ O O BE O 0 PREPARED 0 L • 0 TO STOP I I O ;•• •• 1 0 O (Optional) ••• Flagger Layout 00o L/3 A Detail o A ve.-----1------.44.1=,. 411> * * See Note 4 I * RIGHT LANE CLOSED 4 1 t t AHEAD c M ROAD I * • I WORK AHEAD www.invarion.com Right Lane Closure, Multi-Lane Non-Freeway Diagram 500 Diagram 500 covers work which closes the right lane of a multi-lane nonfreeway road. If closing more than one lane on a multi-lane road, provide a minimum tangent distance of 2L between the end of the first lane closure taper and the beginning of the second lane closure taper. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3 — Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When the posted speed is 40 mph or less, the RIGHT LANE CLOSED AHEAD signs may be omitted. 4. Placement of signs in a non traversable median or other median that is not a two-way left turn lane is required for lane closures any time there is room for a truck to be parked on the left, out of the travel lane. When there is no room for a truck to be parked on the left an additional RIGHT LANE CLOSED AHEAD sign should be placed on the right side and placement of signs in the median is optional. 5. If flagging is needed for work vehicle ingress/egress, use Flagger Layout Detail (see Inset). Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space ERRATA: 20 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 _ Updated: February 12, 40 150 2016 45 180 By:ODOT Traffic-Raodway 50 500 500 500 210 Section 55 250 Signs Spacing and Buffer Lengths (feet) Supplement Posted Spacing Between Signs "Buffer" Speed A B C Space 60 285 65 700 700 700 325 70 365 www.invarion.com Rolling Slowdown Diagram 150 ,0 Il liI I It ILII tt Chase Vehicle I (Last free flowing vehicle through ° is MI work area) Q I En '1fi 11111 TMA(Optional) W Clear Area (Distance Varies Depending on Operation and Location of Work Area) it { "111 I Q Blocade Vehicles El IIIII IIIII (With Optional TMA) K M4t� ` • • it4 • • tt I AND 00oo00 OR 000000 D0 000000 PCMS NOT PASS N Blockade Vehicles —irk I0 AI *4 lill> 0 I i BE I 0 PREPARED 1t TO STOP 1 K ROAD r WORK I \% AHEAD tit t www.invarion.com Rolling Slowdown Diagram 150 A rolling slowdown provides short road closures for such activities as cleaning debris from the road, pushing disabled vehicles to the shoulder or pulling power lines across the road. Although rolling slowdowns are typically done on freeways, they may be used on other limited access roads as well. The diagram shows the standard configuration for performing a rolling slowdown. 1. The slowdown should be scheduled during off-peak traffic periods except in emergencies. Inform all local enforcement. 2. Use truck-mounted flashing lights on work and blockade vehicles. 3. The slowdown should be planned to maintain at least 15 mph. If the work is progressing more slowly than planned, the traffic speeds can be reduced as needed. The queue should never stop completely. 4. Advance warning is required at least " mile before the start of the slowdown. Changeable messages signs, either portable or permanent, are required at least as the initial sign. a. A typical message sequence would be "SLOW TRAFFIC AHEAD/ PREPARE TO SLOW". b. The slowdown may be announced in advance on changeable message signs. Consider public service announcements when there is primarily local traffic. c. Start the sign displays when the blockade vehicles are ready to enter the road and continue until the traffic speeds are close to normal. 5. Advance signing shall be placed at the approach to each entry ramp except when not practical for emergency operations. 6. All ramps and entrances to the road between the moving blockade and the work space shall be temporarily closed. 7. One blockade (slowdown) vehicle per lane should be used. Each vehicle shall have an arrow panel in caution mode with "DO NOT PASS" (R4-1) sign or a truck-mounted PCMS ("DO NOT PASS / ROLLING SLOWDOWN"). 8. The slowdown proceeds as follows: a. The chase vehicle follows the last free moving vehicles and communicates when it is safe to begin work. b. Traffic is held at every entrance until the rolling slowdown passes. c. The blockade vehicles notify flaggers when to release traffic. 9. Good communication is essential among all traffic control vehicles, flaggers, chaser vehicle and the job site. Assign a competent person at the job site to keep in contact with the blockade vehicles and work crew for adjustments. WL3 PL400, PGE OWNED POLE OVERHEAD LEGEND 15510: CTL#10905 PL 50'-3 9460 1 WORK LOCATIONS 1'SOUTH Se D38 • SURVEY GRID BOUNDARY 1P 7.2 120/240 OH 15KVA NT1CB NF c 2 ACCOUNTS N REMOVFJABANDON FACILITIES_INSTALL FACILITIES n. 9.88 KVA 6691 MODIFY/TRANSFERANSTALL ADDITIONAL FACILITIES Transfer: 50'-2 STREETLIGHT 1988 110 POLES Remove: I—POLE CLASS(1,2,3,4,H1,H2,S) PL45'-4 HT-CL N.S.FRAMING 1P 7.2 120/240 OH 15KVA NT1CB NF191' = 9420 POLE HEIGHT H —TEMP TRANSFER COMMIS), q FRAMING TRANSMISSION&DISTRIBUTION(SEE CODES BELOW) PGE PULLED TOPPED TO COMM(S) 3 y 10590 FRAME DISTRIBUTION-LC10729,MU 0035 _TELCO TO PULL 400 D35—(3PH(3PH BFT SGL LT,TANG,PIN) WL 2 PL-401: on •;f 15 D38—FRAME DISTRIBUTION-LC10729,MU 0038 Install: PGE OWNED POLE c) (3PH 10FT SGL LT TANG,POST) PL 60'-2 9600 C 1 ' 87 D131—FRAME DISTRIBUTION-LC10717,MU 0131 1'NORTHWEST 10620 (3PH 10FT DBL DE FIBERGLASS,POLY) D131 Al-L10'-3,679#(NORTH) CONDUCTORS G16-PRI-1,954# V --63',b G16-NEU-1,726# - INSTALL I-4/0 AL-TX OH SECONDARY Al-L10'-13,475#(WEST) G16-PRI-7,603# REMOVE 1-4/0 AL-TX OH SECONDARY G16-NEU-5,874# 273' Remove: GUYING PL 55'-2 ANCHORSO m x e r r? o 10 N.S.FRAMING x 2 6__ o O , d o b d Al x POS.LBS 5 ^% �±�!rw R 018CC (LEAD, L6 D' a IGUv �Q�W114L C1GC TEMP (I 4 ..- P 6 b F3 2GUYS ©00®C�ECC OPGE PULLEDFER COMMIS), C e , Anchor Code 0 TELCO TOPPED TOO COMM(S) 40 ULL UO2 lf mmmml 3GUYS ©OCCEC�G�G 60'-2 t .s. None 2 LANDSCAPING NOTES WL2 AND 3 (PL-401 AND PL-400): 260' 1m sq M M CLEAR AROUND POLE. WL 1-2 Span: V.V. Remove: OR G1 V. V(.1 �, TREE TRIMMING NOTES OQ WLt(PL-402): 9735 • 'CQ 30? ? TRIM BRANCHES c40A\` AROUND POLE. 40. SW SHADY LN TENSION:59# 1 50'- �/� s. TENSION:59# Nov:r VICINITY-MAP W/LUBE CB AL TX, 4 ,4 WL 1 PL-402: PGE OWNED POLE 223' Install: CTL IH0795 j(y, PL50'-3 ,�.. �� I'NORTHEAST "vk- #, D131 " +"' 3-IN PVC GOND UNIT W/12"BKTS C1 10045 ., Eo e Al-1_8'-0#(SOUTH) c --'1^;N47 '""•"` 018-PRI-0# `.r:_ POLE 400&401 LOCATED G16-NEU-O# '-i' -N. i OFF OF SW 95TH,NORTH Al-L12'-9,717#(NORTH) OF HWY-217. G16-SEC-9,717# Transfer: , STREETLIGHT 10860 Remove: PL 45'-4 11 _- ....... ... D35 /� 134 POLE 402 LOCATED OFF SHADY LANE.N,, 3-IN PVC CONDUIT UNIT 9ga'� 10875 30'-Unknown ACCESS SHADY LN —TEMP TRANSFER COMM(S), M1fL 3 SE, 404 A2AL " FROM GREENBURG_ RD, VT-130 A 10 CU.TX— SOUTH OF HINY-217 —PGE PULLED NEyI;3 SE;. 45'4 "+ TOPPED TO COMM(S) `) SW MANDAMUS CT -TELCO TO PULL ..',C 25 4498 142657 A 350 AL-TX °i•`" I 3 4 5 1 0 9272 I t y t , " 10895 I 6 • ? "'' + Smits.INI5(.1ERE TGoma P NNCiSGS 1 Intsrmap.INQRFl.1ENT P.NI(Cen.Eon 9655 g yr �V�. Japan.METI.Eui China Mone Keno) 45 "o 355 L.A1- 3 I -C 2 AL__„_ `g eC - pp�n5tn#EMI sonm�u»rn.aMDtl» i'^^�' VT-50311li I 10940 10950 9425 N GIS User Community f� POE CONSTRUCTION DRAWING AS-BUILT VERIFICATION 8 NESC VIOLATIONS CORRECTED THINK Foreman: Date: General Foreman: Date: SAFETY (Signature only required for field construction changes.) IRS SDATE NG REVISCA IASBUILT BY DESIGNER: ANY DEVIATION FROM THIS DESIGN MUST DATE”. SCALE ACCO07C ANO' JOB NO 10/22/2019 lin=80 ft 1070001 1000004544 M2783240 BE APPROVED BY THE PGE PROJECT MANAGER I nTLE (UAM due by 10/22/19)Replace 3 poles with 5'talar poles CALL 811 BEFORE YOU DIG CIRCUIT SIZE ATTENTION: p/� TIGARD-13361 17 x 11 OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED er G E/ LOCATION BY THE OREGON UTILITY NOTIFICATION CENTER. l 9619 SW SHADY LN,TIGARD THOSE RULES ARE SET FORTH IN OAR 952-001-0010 ` DESCRIPTION THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF s3 REPLACE POLES 400,401&402 SHEET THE RULES BY CALLING THE OREGON UTILITY '' COUNTY SECTIONS WORK WITH ' NOTIFICATION CENTER ADMINISTRATION N(502-232-1987) WASHINGTON C1135B 1 OF I TO REQUEST UTILITY LOCATES CALL THE OREGON KmNnMYNhblIOYIL BEAVERTON DESIGN BY PHONE DRAWN BY UTILITY NOTIFICATION CENTER,811 AT LEAST Ca® won Ieu4g. UNECREWCENIER NICK CHANEY 971.275.2597 WILL ZOBRIST 2 BUSINESS DAYS PRIOR TO EXCAVATION BEAVERTON ore 97000 C PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED