Loading...
PFI2019-00406 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT .101: = COMMUNITY DEVELOPMENT Permit#: PFI2019-00406 T 1G ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 11/25/2019 Parcel: SEG776 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: CenturyLink Project Description: SEG776/ 11740 SW 68th Parkway. The purpose of this project is to consolidate infrastructure. CTL National will remove 64 SF of sidewalk, place 2 vaults and pull fiber through existing conduit. Class of Work: FEES Type 1 -Utilities(gas, electric, data) Description Date Amount PFI Permit Fee 11/22/2019 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: NORTH SKY COMMUNICATIONS LLC 11818 SE MILL PLAIN BLVD SUITE 410 VANCOUVER, OR 98684 PHONE: 3602546920 Applicant: CURTIS PORRAS 214 E 24TH STREET VANCOUVER,WA 98663 PHONE: 5033491246 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: ;7 i `�{ �/a Issued By: 7 t®/)—YI/V) Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00406 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis, to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED NOV 0 6 2019 City of Tigard CITY OF TIGARD PFI#: PFi Zoic-OoL(OE illENGINEERING DEPARTMEN�LANNING/ENGINEERING TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION SW 67th Ave & SW Clinton St TYPE OF WORK Project name: 0 TYPE 1—Franchise Utility Work Thr purpose of this project is to consolidate performed by NWN,PGE, or utility Brief description of project: agency Infrastructure. CTL Nat. will remove, 64sqft of sidewalk, place 2 vaults ❑ TYPE2—ROW Sidewalk/Driveway/Sewer and pull fiber through existing conduit. Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 11740 SW 68th Pkwy, Portland, OR 97223 main line tap 0 TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: CenturyLink National (formerly Level 3) • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 214 E 24th St water service area City/State: Vancouver, WA Zip: 98663 0 TYPE 4—Small Cell Technology Phone: 0 TYPE 5—Tigard Triangle 503-349-1246 (cell) Email: curtis.porras@centurylink.com Phone: 503-416-1516 (office) NOTE: Type 1 and 2 applications may be Contact name: Curtis Porras emailed to rowpermits@n,tigard-or.gov. Phone: 503-349-1246 (cell) Email: curtis.porras@centurylink.com CONTRACTOR INFORMATION 0 Same as applicant Name: North Sky Communications, Inc. CCB Number: 208747 Mailing address: 10860 SW Clutter Rd City/State: Sherwood, OR Zip: 97140 Phone: (503) 949-8195 Email: bstavang@northskycomm.com ENGINEER INFORMATION Name: Matt Oliver Mailing address: 6566 SE Lake Rd, Suite F City/State: Milwaukee, OR Zip: 97222 Phone: 503-650-6051 ext 222 Email: matt_oliver@kbmail.net ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ Approximately $4000 (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes ©No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as `Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Matt Oliver(for Curtis Porras) 11/5/2019 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: r`1.-'),6 ( C1Llt Permit fee: 36Z' . Received by: Date: Il —� Approved by: /1"€.44 Date: /1/2/12015 Notified by: Date: t City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 9 S 1V '• '. •' S I Edge of Pavement f� "�'. bitch _." r,.bbStreetlight ` —•---•—•—• •.—�--- I ,r ' Ram Dram low f � � < < < 1 , ��o�orerSSwerTin -- 1 T- I r.= I j i °-' v i I , Ll i I e, 1 ExistiExisting House ng 1 ,. tm i Driveway Il7' ! .^1 cI Y! .I 11 AYH."' II O 1 i 1 Existing Shop 1 N. Prerpole . = I a 1 0 Q .-- 1 r..))1—°-. ------Trrop7i95.L.We"---------- I 0 I Fere Hydrant(FH) I I I Scale' 7'=30' I I I I I I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations — (sewer, storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 RECEIVED NO V 21 2019 Akk � City of Tigard ppJJ ee CITY OF TIGAR� PFI#: 1��1-2�1�-Q 10 6 ligENGINEERING DEPARTMEN"1 ANNING/ENGINEERIN G TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: SW 67th Ave & SW Clinton St 0 TYPE 1—Franchise Utility Work Brief description of project: Thr purpose of this project is to consolidate performed by NWN,PGF, or utility agency Infrastructure. CTL Nat. will remove, 64sqft of sidewalk, place 2 vaults ❑ TYPE2—ROW Sidewalk/Driveway/Sewer and pull fiber through existing conduit. Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and 11740 SW 68th Pkwy, Portland, OR 97223 main line tap Location (address if available): ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: CenturyLink National (formerly Level 3) • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 214 E 24th St water service area City/State: Vancouver, WAZip: 98663 ❑ TYPE 4—Small Cell Technology Phone: 503-349-1246 (cell) 0 TYPE 5—Tigard Triangle Email: curtis.porras@centurylink.com Phone: 503-416-1516 (office) NOTE: Type 1 and 2 applications may be Contact name: Curtis Porras emailed to rowpermitsAtigard-or.gov. Phone: 503-349-1246 (cell) Email: curtis.porras@centurylink.com CONTRACTOR INFORMATION 0 Same as applicant Name: North Sky Communications, Inc. CCB Number: 208747 Mailing address: 10860 SW Clutter Rd city/state: Sherwood, OR Zip: 97140 Phone: (503) 949-8195 Email: bstavang@northskycomm.com ENGINEER INFORMATION Name: Matt Oliver Mailing address: 6566 SE Lake Rd, Suite F City/State: Milwaukie, OR Zip: 97222 Phone: 503-650-6051 ext 222 Email: matt_oliver@kbmail.net ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ Approximately $4000 (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes III No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant arc different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. /(76,ZE,9:44.t.. Matt Oliver(for Curtis Porras) 11/5/2019 Applicant's or authorized agent's signature Print name bate Property owner's signature(if required) Print name Date STAFF USE ONLY Case No: Permit fee: Received by: Date: Approved by: Date: Notified by: Date: • City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PH Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PH Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONI.I FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit El Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4 4 SW •• ) .. I Edge of Favement '� Ditch _e_ \Streetlight (0- •—•—•—•—•�•�r—•— r•� Draae D��--� ® t • ���. . 1 -t I o • 1 I • T �ropoard"gerWin M ee r-) I 1 CL) v I J ' Existing House •1 tq� ( ar I Existing � t Driveway F-. r j 1 c. �I • LOl I .1-1 a 4, . Imo . a L u > I 0i � 1 Existing Shop J Powerpole ! Q r. IQ' 95' 1 I p � I I Fire Hydrant(FH) I I I I Scale. t-=30' ! I I I 1 I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 —w,� i �- ~—n CONSTRUCTION NOTES p'� w --,„--____,,,_______.„_____J —~r ���--vvv —w I.ALL WORK AREAS i0 BE RESTORED i0 LINE OR '01---.,..__UI(I)-2•RISER AT GRADE AND RESORT FROM PO E lllM �y �ER CONDITION. LOCATE'MIRE TO TIE NEWLY CUT 2•CONDUIT TO VAULT VT-01. _ STT wort ST OVERLASI A SWLI SECTION OF AERAL __- 2 LOCATES OR OIIL01'LITES STRUCTURES OFF EMEND GBIE-50'WEST TO 01011 POE. /•'`--"P---.W .o. SW BAYLOR Sr a.R 5 THE CONSTRUCTION CONTRACTORS / ® A —_�, RESPONSIBILRY i0 CAL FOR LOCATES BEFORE A •� DIGGING. 0 MER VMET(NERSEIS IND UPGRADES NAVE -.--. ��_.�,�-• ` • BEEN COMPLETE.ROUTE 48F FIBER CABLE 25 - - ��� ��--°'"�'^---v.�.,w��.�r"—�"-- DOWN RISER ADO 342'(E)AND(S)IN(1)OF .I M- A,_�, x „�� ^- THE(3)-1.25'CONDUITS TO NEW AULT VT-01. n—�*—..— LEGEND - iv wo nC"u NAME i I F PROPOSED LAS VAULT ❑- TYPE wrv,.aw N OWNER 67304,N...7 Q 0/' TRENCH ._..- 1� 1)-2.caa n I a..»..a �_ / VAI,b� 6,:'o rLP,m�i E%IsnNc Lna coNou i 1 i li 11tl0 n�6rd"N w^' `/ E050NG MLRY POLE �) a : "` W Fa7e AEMINE/AEPUC SIDEWALK Jam`, E W �� 1', rR.,�nu FIBS PROPERTY UNE 0 E r °ue m •"'� /\ Io FCURB 3 y - -_______z �4 I I pu�v DOMING SIDEWALK W I I II £051110 SEWER INLET t I.SC _ ' EXISTING SEWER MANHOLE 5 PLACE NEW 24•R36•VAULT 9.00 i /�vt EXISTING POWER VAULT/FED OVER COSTING wars. i rag0 .. tii 1 oakOVERLASN REMOVE AND REPLACE(1)-68 y` FLAG D<SIDEWAL%. -- - ' 90.00'-- R / \\ TYPICAL DETAIL - # 1 I I 21Y36%,36 406 A5y1®LY I I 11700 W/12)24'CR.(2)1 1/2'CR.NODE 3 1 &(1)e9 l/1 RNOD(OO1 VT-01 `-1 I ‘ 7 12ITL-t518FV2 1 9584 LEVELS -J+-1y I \� I ESN1100/1VItLT V-01.PULL IBF FIBFN 2OR RATING-ROM"IRE LMU 1 — i I i CAaIE 57(E)TO NEW VAULT VT-02. IMA , ( Tr',1_ 10:.' ENLARGED ROUTE \ -, 1,,....:11, 9.00,F'0k I„.: -, 1 a 4.....77..._,.A 211%• i _ I LEVELS 18011/01 ND Level 3 K C CenturyLink I I 18618110 NEI 14511•MT 11-02. 811 Row .n „DOTE Lo �, .^. DEW"u.K,�Ra G„ gib. 11100 Mei(3) R_.R P{IIEETMN� 7.0122 MOWER. Nl...TR01Crt vsU l6u1 ena MHNMG MOM:,,%�,mF yy exe^..r.wa`+o. 5CPLL`,-40, nm� a Page 54 2011 Edition Pedestrian Accommodation Diagrams See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work zones. Pedestrian Accommodation Principles: 1. If the work impacts the sidewalk or pedestrian facility, provide a safe, accessible path, where practical, in accordance with the requirements of the ADA. 2. If not practical to match the width of the existing pedestrian facilities, maintain a 4-ft minimum width. 3. Unless a reasonably safe route can be provided through the work space, pedestrians should be appropriately directed with advance signing to cross the road. Do not divert pedestrians into travel lanes. 4. Install pedestrian closure or detour signing on Type II barricades. Make every practical effort to satisfy the following: • If work closes a sidewalk or sidewalk ramp, close sidewalks at a point where an alternate crossing point or route can be provided. Minimize the amount of out-of-direction travel for pedestrians. • Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE" (R9-11a) signing to direct pedestrians to an alternate facility. • Where there are business destinations between the nearest crosswalk and the work area, close the sidewalk at the business access nearest the work area, where practical using the SIDEWALK CLOSED sign. Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the nearest crosswalk prior to the closure. 0 U T F Chapter 5 September 2016 2011 Edition Page 55 Pedestrian Accommodation, Mid-Block Diagram 5-7 The sidewalk should be closed at the nearest intersection on each side of the work area when a safe,ADA-compliant path through the work area is not available. SIDEWALK CLOSED SIDEWALK CI MED AHEAD or /�—► CROSS HERE CROSS HERE 24x12 Type"W1" 24x18 (Mount on B(II)L) Type"W1" SIDEWALK CLOSED 24x12 Type"W1" (Mount on B(II)LR) (2 Regd.) CD � SIDEWALK CLOSED D) SIDEWALK CLOSED AHEAD N' Or CROSS HERE ---- - --- CROSS HERE 24x12 24x18 Type"W1" Type"W1" (Mount on B(II)R) September 2016 Chapter 5 Page 62 2011 Edition 5.1 Mobile Operations Mobile Operation on Shoulder Diagram 100 Diagram 100 covers a typical continuous moving operation on the shoulder, not on a freeway(see Section 5.7—Freeway Work). 1. Use truck-mounted flashing warning lights on work and shadow vehicles. 2. For added visibility, truck-mounted arrow boards or PCMS in caution mode may be used. 3. If the work equipment has to be partially in the travel lane, maintain a lane width of ten feet or occupy the adjacent travel lane and use the appropriate mobile lane closure diagram. On low volume roads, a minimum lane width of 9 feet may be allowed. 4. A shadow vehicle should be used when: a. Sight distance is periodically less than 750 feet, or b. Dust created by the operation, fog or other low visibility conditions reduces sight distance to less than 500 feet. If the above conditions are not met, the shadow vehicle is optional. 5. A shadow vehicle is also optional when the volume is below 400 ADT. 6. When a shadow vehicle is used: a. Signs on work vehicle are optional, and b. The shadow vehicle may replace the advance warning signs. 7. The shadow vehicle should: a. Adjust the space between the work vehicle and between each additional shadow vehicle to maintain traveling distances found in Table 2-4; and, b. Slow down in advance of curves that restrict sight distance. 8. If a shadow vehicle is not used: a. Advance warning signs or PCMS should be used, and b. The signs may cover up to five miles and should include the 0 distance on the sign. 0 9. When the work vehicle is traveling alone, a TMA should be considered. 10. Use "SHOULDER WORK" (W21-5), "RIGHT SHOULDER CLOSED" 0 (W21-5aR)or other work-appropriate sign on the initial vehicle. Minimum sign size is 36 inches. A PCMS may be used in place of signs. 11. Where practical and when needed, the work and shadow vehicles should pull over periodically to allow motor vehicle traffic to pass. Chapter 5 September 2016 2011 Edition Page 63 Mobile Operation on Shoulder Diagram 100 Work Vehicle (Sign optional when \ using shadow vehicles) SHOULDER 1 1' Ilii WORK * Trailing I Distance A j = See Table 2-4 A • • • • Ilk' (Optional) Shadow Vehicle w/TMA(both hapteOptional)r4 See C Maximum Distance SHOULD 5 Miles WORK ROK 000000 WORK 000000 HPCMS AHEAD OR oo0000 0 MS (Optional) m 0 0 1 1 September 2016 Chapter 5