Loading...
Report m<ST2o/ 0038/ 9.215 Skil 70 TABLE OF C POSTS 1 PANELS & BRACKETS 6 COLLAR BRACKETS. 7 UNIVERSAL B RACKETS. 17 GATES 26 ACCENT TOP RAIL 29 CAP RAIL CLIP 31 • FORTRESS" —RAILING PRODUCTS— www.fortressrailing.com FORTRESS Fortress Fe26 2" (51mm) Post Mounting Applications —RAILINGG PRODUCTS— It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required building permits. The deck and railing installer should determine and implement appropriate installation techniques for each installation situation.The Fortress Company or its distributors shall not be held liable for improper or unsafe installations. Fortress Fe26 Posts must always be secured to the deck framing. Fortress Fe26 Posts should never be attached to only the deck boards. Note When cutting Fortress railing, it is very important to complete the following at cut points. Not following the below steps will result in rust at the cut areas: • Remove all metal shavings from the cut area • File any sharp edges left by cutting.Thoroughly wipe and remove any filings, grime or dirt from the railing. •Apply two coats of Fortress zinc based touch-up paint to the cut area.Allow paint to dry. • Be sure to remove any metal shavings from the surface of deck, patio or balcony to prevent rust on the surface. Fe26 2"(51mm) Post Top Mount To Southern Yellow Fe26 2"(51mm)Post with through bolt&washers on Pine or Douglas Fir Floor Joist Mounted Parallel bottom t/ Fe26 2"(51mm) Post * I Fe26 2"(51mm) Post 3/8"(10mm) diameter Hex Head :olt 3/8"(10 mm)diameter X 6"(152mm)lag 3/8"(10mm) Flat Washer Standard Hex Lag Screws in pre-drilled holes Southern Pine or I 3/8"(10 mm)Flat Washer Douglas Fir Deck Board Southern Pine of Douglas Fir Deck I-II ' Board 2"X 10"(51mm x 254mm) Southern Pine or Douglas Fir II ' Blocking ilk, Ti 3/8"(10mm) Hex Nut Southern Pine or 2 3/4" X 2 3/4" X 1/4" Plate Washer Douglas Fir Framing (70mm x 70mm x 6mm) 9/16"(14mm) min edge distance Typ. Fe26 2"(51mm) Post Top Mount To Southern Pine Fe26 2"(51mm)Post Top Mount To Concrete or Douglas Fir Floor Joist Mounted Perpendicular Fe26 2"(51mm)Post 3/8"(10mm)diameter X 6"(152mm)long It Fe26 2"(51mm)Post 3/8"(10mm)diameter x Standard Flex Lag Screws in pre-drilled holes 3.75" 3/8"(10mm)Flat Washer (95mm) 3"(76mm) long'Redhead' Southern Pine or ~MIN. Trubolt - - Douglas Fir Deck Board ,_-MAK Ti n1 ii 11111111 11 ll 3-1/2"(89mm) min. iii Southern Pine or Douglas Fir Framing 27.6 MPa(4000 psi) MIN. Concrete -1 9/16"(14mm)min.edge distance Typ. For technical assistance, please email: technicalhelp@fortressrailing.com Hours of Operation: Monday through Friday 7:00 AM to 6:00 PM, CST Phone: 1-844-909-2999 Fax: 972-372-0924 2 www.fortressrailing.com FORTRESS Fortress Fe26 Posts Installed on a Wood Deck —RAILING PRODUCTS— It is the responsibility of the installer to meet all code and safety requirements,and to obtain all required building permits. The deck and railing installer should determine and implement appropriate installation techniques for each installation situation .The Fortress Company or its distributors shall not be held liable for improper or unsafe installations. Fortress Iron Posts must always be secured to the deck framing. Fortress Iron Posts should never be attached to only the deck boards. Required Materials: Wood Blocking,3/8"X 3-1/2"(10mm x 89mm)Hex Head Galvanized Bolts(4 for each post), 3/8"(10mm) Galvanized Washers(4 for each post), 3/8" (10mm) Fender Washers (4 for each post), 3/8" (10mm)Split Lock Washers (4 for each post), and 3/8" (10mm) Hex Nuts (4 for each post). A Install Joist Blocking Install wood block flat and level with top of joist ma Install wood block flat ' -.41111111114 - and level with top of joist Y €Le ' �'T': Cdr- a"i �-'°`-'-'-1.°:: ' ate` � �R}''�,",� #10X3-1/2" (89mm) l-- ,.. Rim Joist Deck Screws , ? . Rim Joist • Blocking must be constructed with treated dimensional lumber. •Attach all blocking with#10 X 3-1/2" (89mm)deck screws. •Wood Block must be constructed with treated dimensional lumber with a minimum thickness of 1-1/2" (38mm) . • Secure Wood Block to blocking on all four sides with#10 X 3-1/2" (89mm)deck screws. B Position the edge of post base plate a )11. minimum of '/2" (13mm) from the inside edge of rim joist to allow for fender - - . 1/2" (13mm) minimum 1/2"(13mm) minimum r .1: 4 Surface Mounting Fortress Iron Posts Installed FORTRESS on a Wood Deck —RAILING PRODUCTS— Insert 3/8' X 3-1/2" (10mm x C 89mm) Hex Head Galvanized I � � Bolts through 3/8'(10mm) F.w `' Galvanized Washers and �Fortress Iron Post Basendplate. Plate. ' ^eli&-:::;"'•...:/4,:ili, 4.0.,...3..„047,,ii ; , , i 4 t 1, m 4. i Mark mounting hole locations and I 1 ,A 11 pre-drill a 7/16" (11 mm) hole , r `, 0 t----'‘,„Vs.y,60-,ftfi !IG �( ,1 t •t _.....geitaddiF v - • Iron Post Base Plate holes MUST be positioned a minimum 1/2" (13mm)from edge of deck board. • Use only 3/8" (10mm) Hex Head Galvanized Bolts. Lag Screws should NOT be used. • Secure each post with four bolts. DShim Post as needed to ensure post is level. IIIIM ., , s = � � Deck Board _ � w t 11 1/2" #' Secure each bolt with a 3/8" (10mm) '` Fender Washer, 3/8" (10mm) Split Lock w;. (13mm) , min. r Washer, and a 3/8" (10mm) Hex Nut :. Wood Block �.,'. nj 64 - Joist/Blocking` _ Rim Joist For technical assistance, please email: technicalhelp@fortressiron.com Hours of Operation: Monday through Friday 7:00 AM to 6:00 PM, CST Phone: 1-844-909-2999 Fax: 972-372-0924 www.fortressrailing.com 5 Fe26 Traditional Panel Installation Options RI— Ball Cap Pressed Dome Cap--►8 CB-04 ►] i i E t CB-04 ] ' 1 C 3-7/8'� rTh (98mm) Fe26Traditional Panel i 69-1/2"or 93-1/2" CB-04 (1765mm) or(2375mm) CB-04 Base Cover 2" X 2" (51 mm)or 3"X 3" (76mm) Iron Posts with base Fe26 Traditional Panel with Accent Top Panel Installation Options i Ball Cap Accent Top Panel (ATP) Pressed Dome Cap—10. 1 CB-04 -►ti x1 / 1 /1 / - ( 1 ( 1 ( 1 � 1 � 1 � 1 / \ / \ I 1~— CB 04 )I �_ � � � �) � � �- ?) r1X01 ��� ��i ��i ��1 CB-05 ►] 1 I [1i CB-05 0] ' C 3-7/8" 4-4,�� 143-7/8"_4,1Fe26Traditional Panel , 69-1/2" or 93-1/2" (1765mm)or(2375mm) CB-04 C B-04 Base Cover 2" X 2" (51 mm) or 3" X 3" (76mm) Iron Posts with base 8 Fe26 Traditional Panel and Iron Post Configurations Railing Panel Only Railing Panel with Accent Top Panel Railing Panel Installed Panel Required Installed Panel Required Height Height* Post Height with ATP* Post 28" (711mm) X X 36-11/16" (932mm) 39-1/2" (1003mm) 34" (864mm) 37-3/4" (959mm) 39-1/2" (1003mm) 42-11/16" (1084mm) 45-1/2" (1156mm) 40" (1o16mm) 43-3/4" (1111mm) 45-1/2"(1156mm) X X *Heights includes a 3-314"(95mm)space between deck surface and bottom edge of bottom rail. CB-04 Bracket Hole Locations for Fe26 Traditional Panel Installations 1T Pre-Drilling with a 3116"(5mm) drill bit is required. t Pre-Drill Dimensions J j--B Railing Panel Height A* B C 28" (711mm) X X X C 34" (864mm) 3-1/8" (79mm) 2-1/4"(57mm) 30-3/4" (781mm) 40" (1016mm) 3-1/8"(79mm) 2-1/4" (57mm) 36-3/4" (933mm) 11—A 9 *Dimension A positions bottom edge of rail 3-3/4"(95mm) above deck surface. e *Dimension A is measured from the bottom surface of post base. t Remove all metal shavings from deck, post base cover, post, and B panel before bracket is screwed to post to prevent rust stains. Fe26 Traditional Panel Installation with CB-04 • If rails were cut to length, file cut edges and coat with 2 coats of Fortress zinc based touch-up paint. • Check fit of rail between installed posts. • If using a Base Cover install it now by sliding over the top of Iron Post. • Slide a CB-04 bracket over the end of each rail. Make sure that all set screw holes face the desired direction. • Place rail assembly on 3-3/4" (95mm) support block between posts. • Slide CB-04 brackets to post and secure with T-25 Drive Thread Cutting Screws. Use low speed setting on drill. • Secure rails with provided set screws at each CB-04 bracket. CB-04 brackets slid over rails L] [i Set Screw Pre-Drilled ~ Post 1 4. I,____. k rIt--- ---------- Base Cover L] C , Installed I 3-3/4"(95mm) Support Block F=44-1 = L= Important - Every stair installation will be different. The rise and run, post position, and post height all need to be carefully laid out before posts are permanently installed and Fortress Fe26 Traditional Adjustable panels are cut. Mount Fe26 Posts* •Wood Blocking tied to deck frame must be installed and constructed with treated dimensional lumber with a minimum thickness of 1-1/2"(38mm). • Position the edge of Fe26 Post base plate a minimum of /2"from the inside edge of rim joist. • Mount Fe26 Posts at appropriate points based on panel length. • Attach Fe26 Posts with 3/8"X 3-1/2" (10mm x 89mm) Hex Head Galvanized Bolts. a, E E Added Blocking U U N a) 0 / 1/2"(13mm) )min' um z Deck Framing *Reference Fortress Fe26 Post mounting instructions Determine Rake and Center Panel Between Posts A Use Fe26 Adjustable Panel to determine the angle of stair installation. To do this use support blocks resting on the stair tread. Position support blocks so that the position of the bottom rail meets the spacing requirement of your building code. Rake the panel so that the balusters run parallel with the posts. Center the balusters so that there is a equal amount of rail between the post and baluster at each end (Dimension A). Make sure that there is enough clearance between the post and first A 4-- picket to allow for the bracket. INNNNNNNN Mark location of support blocks. • Support Blocks PP \\� 12