Loading...
Plans PROJECT INFORMATION i- / W g:, (E) PROPERTY LINE' /' _ OFFICE COPY OWNER MICHAEL FINK AND NIKKI BREITBARTH CONTRACTOR ELEMENTAL ENERGY VELI is O F Pa',, . (,I 12 2019 1339 SE 8TH AVE. 13123 SW WINTER LAKE CT,TIGARD,OR 97223 T E SUANCE OF A EF> (N)ARRAY#1 I I� .i'a{#� PORTLAND,OR 97214 (E) RESIDENCE ell`� U SINGLE FAMILY CONTACT:TOM CROWE -' ASED ON CO STR III gI .F�x " t SVI)"�< BUILDING DOCUMENTS _�°° '` ‘.1'- I��� PHONE: (503)967-5786 DATA RESIDENTIAL •ATA S / OT PRET SITE DETAILS ASPHALT.SHINGLE, T CORE OFF C.•- -i' APPLICABLE 2017 OESC&2014 OSSC 2X8 PRESCRIPTIVE RAFTERS,@ 24"O.C.,#2 DF ' REQUIR G THE ORR1- ;:•- CODES , TILT: 27°AND 45° � 270F E"ROBS. •R`:;• • • 'V{ SYSTEM HYUNDAI HIS-S29ORG(BK) SOLAR MODULES AZIMUTH: 192° AND 97° ,� AREA OF ROOF(PLAN VIEW)=1,524 SF _ •''*' (23)X290W=6.67 KWdc @ STC '.',, ° OFROOF ��- AREA OF NEW ARRAY=361 SF=24/at _ ;. 4.,\1311:-.al-Yrd and its (23)M215-60-2LL-S25-IG MICRO INVERTERS o . � — _. ���, `1, , AREA(ARRAY<25/o OF ROOF AREA) .`� . - �_ : •, �.,,., ; .. hall not be MODULE HYUNDAI HIS-S290RG BK .rte e for discrepancies ci CLIMATE DATA SOURCE: .�i -_ p @S SPECS (L)64.57"X(W)39.29"X(H) 1.38" • PORTLAND/HILLSBORO,OR, USA,45.53N, �i'�•• oo1 .41;.• .:,11.1.,•: ' mai! appear herein, WEIGHT=41.2 LBS • • .�' 4 COMBINED WEIGHT OF 122.95W :�I ,,i, -..•: =' MODULES AND RACKING:3.30 PSF_<4.5 PSF ASHRAE EXTREME LOW:-6°C 4% � .,. \ ' ASHRAE 4%HIGH:36°C �.`� v`� �® / 45° WIND SPEED: 110 MPH(ASCE7-10) \ 'r RISK CATEGORY:II NUMBER OF ARRAYS PROPOSED: 2 WIND EXPOSURE CATEGORY:B ,,i GROUND SNOW LOAD:20 PSF M215-60-2LL-S25-IG i'r ARRAY#1 DETAILS #OF MODULES: 14 TILT:27° AZIMUTH: 192° MICRO INVERTER !;•+ ,t:'' . / ARRAY#2 DETAILS #OF MODULES: 11 TILT:45° AZIMUTH:97° (UNDER MODULE) (E)MAIN SERVICE PANEL Approved plans .: Ate,\ _,; (INTERIOR WALL) shall be on job site. - ;' .0„: ir �,� PROJECT NOTES ..- (E) METER i (N)ARRAY#2 (EXTERIOR WALL) 1. PV SYSTEMS AND SUPPORTING STRUCTURE SHALL COMPLY WHERE THE SOLAR ARRAY EXCEEDS 25%AS MEASURED IN PLAN _44,;; WITH REQUIREMENTS OF 2017 OESC&2014 OSSC. VIEW OF TOTAL ROOF AREA OF THE STRUCTURE,A MINIMUM OF , �. i`k,� (N) RSID/ ONE 36”UNOBSTRUCTED PATHWAY SHALL BE PROVIDED IN ,,' AC DISCONNECT 2. 3111.3.2-PV RACKING AND ATTACHMENTS SHALL BE UL 1703 ADDITION TO A MINIMUM 12"UNOBSTRUCTED ALONG EA.SIDE ---- -.A ;,,_,Z.% (EXTERIOR WALL) CERTIFIED. OF ANY HORIZONTAL RIDGE. '• ..7.e-.; `��'�_ :z, _ 3. 3111.3.4-PV SYSTEM SHALL HAVE A FIRE CLASSIFICATION THAT 6. ROOF STRUCTURE IS CONVENTIONAL LIGHT FRAMED WOOD • IS EQUAL TO OR GREATER THAN THE ROOF ASSEMBLY CONSTRUCTION WITH 2X8 PRESCRIPTIVE RAFTERS @ 24"O.C. CITY OF TIGARD REQUIRED BY OSSC SECTION 1505.1. REFER TO ALLOWABLE SPAN REQUIREMENTS IN TABLE 305.4.1. REVIEWED FOR ODE COMPLIAN 4. 3111.4.3-3111.4.7-PV LAYOUT SHALL NOT RESTRICT EGRESS, 7. 3111.4.8.5.1 -DISCONNECTS,J-BOXES, COMBINER BOXES OR DRAWING LIST Approved: Ev LIGHT VENTILATION,OR ROOF DRAINAGE REQUIREMENTS. GUTTERS SHALL NOT BE PLACED IN ANY REQUIRED PATHWAY OR CUTOUT. PV1:SITE PLAN OTC: { I 5. 3111.4.8.1 -GENERAL PATHWAY REQUIREMENTS: PV-2: FRAMING PLAN crrnit#: S1a=1)IS kir LIZ\ 36"WIDE PATHWAY SHALL NOT BE REQUIRED ON STRUCTURES 8 PVIMODULESOTAL AND RACKING SHALL ESYSTEM WEIGHTHALL DIRECOTLY ATTACHED TO PV 2.1:FRAMING PLAN A dress: ‘31'Z , i1t- .A4A0/ t G ee WITH A PV ARRAY AREA OF 1,000 SF OR LESS INSTALLED ON A ROOF FRAMING AS SHOWN IN PV-2.ATTACHMENT SPACING WILL PV-3: ROOF PLAN Suite •• tt/`$/�t\r PV-4:THREE LINE DIAGRAM ROOF WITH A SLOPE THAT EXCEEDS 2:12 AND WITH AN BE 48"O.C. MAX,AND WHEN ATTACHMENT LOCATED WITHIN 3' INTERSECTING ADJACENT ROOF AND WHERE NO SECTION IS OF ROOF EDGE, HIP, EAVE, RIDGE SHALL BE 24"O.C.MAX. By: ' ► Date: N LARGER THAN 150 FEET MEASURED IN LENGTH OR WIDTH. PV-5: LABELS w\ 9. 3111.5.4-MAX MODULE HEIGHT< 18"OFF ROOF SURFACE. APPENDIX: DATA SHEETS CJ WHERE PV ARRAY DOES NOT EXCEED 25%AS MEASURED IN W ---"'%1:..---- E PLAN VIEW OF TOTAL ROOF AREA OF A STRUCTURE,A MINIMUM OF 12"UNOBSTRUCTED PATHWAY SHALL BE MAINTAINED ALONG 1 SITE PLAN EACH SIDE OF ANY HORIZONTAL RIDGE. NOTE:`CHECK WITH CITY/COUNTY OR LAND SURVEYOR SCALE: 1/8"=1.-0" FOR ACCURATE PROPERTY LOCATE. S CONTRACTOR MICHAEL FINK AND NIKKI BREITBARTH SITE PLAN ELEMENTAL ENERGY 1339 SE 8TH AVE. ELEMENTAL Residential Grid Interactive Solar Installation System AC Size @STC: 4.95 kW System DC Size @STC:6.67 kW Page: PORTLAND,OR 97214 ENERGY 131231SW WINTER LAKE CT,TIGARD, OR 97223 (23)HYUNDAI HIS-S290RG(BK) SOLAR MODULES Ph: (503) 967 5786 ENERGY (23)M215-60-2LL-S25-IG MICRO INVERTERS PV —1 Drawn by: Contractor#OR CCB#: 195141 Projectv Permit Set it Date: BO Rev 11/6/2019 13'-1" A � PV-2 1/......- o: PV-2 2x8 @ 24"O.C. . 11' PV MODULE 4 0 _ 0 N O gt/////////////////////////a N 1 ... F. ---g-- - o - 0 - D. . ® 0 - —min —6,4-44—, i ., ,, 2 r 0 0 ® 07 0-4-----8-- I- 22' 27° _ L— : 0 -.. ,rA 45° //s. / ih Eo o O >__ 0 / A SECTION DETAIL _ --- % r!) PV MODULE 0 6 1113 3 IC 0" 0 NOTES: %�' PV-2.1 0 I • 0 IRONRIDGE SUNMODO EZ3 MOUNT, TYP. .�' /11 i. IF 1:A91 LDI 02 2X8 PRESCRIPTIVE RAFTERS© 24"O.C.. 0 Q + / TYP. I--- 11'-2" 1 0 IRONRIDGE XR10 RAIL I ® RIDGEI N 5116"x4.5" LAG I EAVE SCREW WITH 2.5"MIN. ASPH A . I `=� FRAMING PLAN 0 1' 0"SET BACK TYP. L EMBEDMENT SHINGLE J w ` 6 SCALE: 1/8"=1'-0" A MOUNTING DETAIL s •v- Scale:NTS CONTRACTOR MICHAEL FINK AND NIKKI BREITBARTH FRAMING PLAN ELEMENTAL ENERGY41Ni System AC Size @STC: 4.95 kW System DC Size @STC:6.67 kW Page: 1339 SE 8TH AVE. ELEMENTAL Residential Grid Interactive Solar Installation PORTLAND, OR 97214 ENERGY 113123 SW WINTER LAKE CT,TIGARD, OR 97223 (23)HYUNDAI HIS-S29ORG(BK) SOLAR MODULES Ph: (503) 967-5786 ENERGY (23)M215-60-2LL-S25-IG MICRO INVERTERS PV-2 Contractor#OR CCB#: 195141 Drawn by: Project#:19-1286 Date: BO Rev:Permit Set 11/6/2019 O Mir /\:N �,� PV MODULE 6 \\ '.. ,;' 4kt ‘1a, PV MODULE / e :-IIMMMINIINIMI1111111111111111111111111•1111111111111.1111111111111111111111\ ::: 9'-8� 404 *\ MEMO - 5/16"x4.5" LAG L = INN= SCREW WITH 2.5" MIN. 22'-5° 1 EMBEDMENT ASPHALT. CEILING JOISTS L SHINGLE J II. MOUNTING DETAIL Scale:NTS SECTION DETAIL V-2, Scale:1/8" = 1'-0" CONTRACTOR MICHAEL FINK AND NIKKI BREITBARTH FRAMING PLAN ELEMENTAL ENERGY System AC Size @STC: 4.95 kW System DC Size @STC:6.67 kW Page: 1339 SE 8TH AVE. ELE�"IENT.AL Residential Grid Interactive Solar Installation PORTLAND,OR 97214 13123 SW WINTER LAKE CT,TIGARD, OR 97223 (23)HYUNDAI HIS-S29ORG(BK) SOLAR MODULES Ph: (503) 967-5786 ENERGY Ph: (23)M215-60-2LL-S25-IG MICRO INVERTERS PV-2.1 Contractor#OR CCB#: 195141 Drawn by: Project#:19-1266 Date: BO Rev:Permit Set 11/6/2019 - GENERAL NOTES: A. CONDUIT IS DIAGRAMMATIC. /� FINAL ROUTING TO BE \L/ DETERMINED BY INSTALLER. B. SUNEYE SHOT S1 WAS COLLECTED IN THE SPECIFIED LOCATIONS AND CORRESPONDS TO MICHAEL FINK AND NIKKI BREITBARTH SHADE REPORT" PDF KEYED NOTES: 3/4" EMT OR 0 (N) AC DISCONNECT/ RSID ROMEX IN (EXTERIOR WALL) BRANCH# 1 (14 MODS) /./� –9 �� ��rW./ ATTIC n (N) M215-60-2LL-S25-IG INVERTER "W l u ii (ARE LOCATED UNDERSIDE OF EACH MODULE AND ARE INSTALLED TO CONTINUOUS SUPPORT RAIL) e (N) BREAKERED SOLADECK O rl U (LOCATED ON ROOF) 51 C) (N) PV MODULE 0 (E) METER / (EXTERIOR WALL) No (6) (E) SERVICE PANEL / \V/ (INTERIOR WALL) BRANCH #2 (9 MODS) — P Li I 1N I / I \ i) S ROOF PLAN n SCALE: 1/8"= 1-0" CONTRACTOR _ MICHAEL FINK AND NIKKI BREITBARTH ROOF PLAN ELEMENTAL ENERGY 1339 SE 8TH AVE. 'LES° . Residential Grid Interactive Solar Installation System AC Size @ STC: 4.95 kW System DC Size @ STC:6.67 kW Page: _ PORTLAND, OR 97214 NE 3123 SW WINTER LAKE CT,TIGARD, OR 97223 (23)HYUNDAI HIS-S29ORG(BK) SOLAR MODULES PV-3 1 Ph: (503) 967-5786 1 Vl� (23)M215-60-2LL-S25-IG MICRO INVERTERS Contractor#OR CCB#: 195141 Drawn by: Project#:19-1286 Date: BO Rev:Permit Set 11/6/2019 GENERAL NOTES: 1. CONTRACTOR RESPONSIBLE FOR COMPLYING WITH ALL LOCAL OR NATIONAL CODE REQUIREMENTS AND EQUIPMENT INSTALLATION INSTRUCTIONS. 2. SEE PV-5 FOR LABELING REQUIREMENTSXO METER ENPHASE ENVOY EXISTINGOUTLET20V FREE AIR ENPHASE ET-10 CABLE(TYP.) —RI® I BLACK-L1 RED-L2 WHITE-N PATCH CABLE TO GREEN-GND NETWORK ROUTER BRANCH CIRCUIT#1 00 ✓✓> ____________• • • (14)HYUNDAI UL-S290RG(BK) , MODULES 0 — — — (14)MICRO-INVERTERS I I I I I I all, @ 240V VAC 60A BREAKERED LAY IN LUG SOLADECK,NEMA-3R, O LOCKABLE,NON-FUSED 120/240V,16 �'I}�� RAIL AC DISCONNECT _.-., 20A 1 II ENPHASE M215-60-2LL-525-IG 30A,2405,2-POLE _. A C`-� R – II 30A 20A r CIRCUIT#2 NEUT L� (9)< < HUNDAHHIS-S290RG(BK) GND� MODULES (9)MICRO-INVERTERS GROUNDI 000 I I I I I I ___ll_ �.c.:-,-...-:,..._"--- v @ 240V VAC EXISTING AC DISTRIBUTION PANEL I LAY IN LUG 120/00A WITH3W 3/4"EMT/ROMEX OR EQUIVALENT: RAIL 200A MAIN BREAKER (2)#10 AWG THWN-2 CONDUCTORS ' ENPHASE M215-60-2LL-S25-IG (1)#10 AWG THWN-2 NEUTRAL PIA ( L R (1)#10 AWG THWN-2 GROUND _ —� JUNCTION BOX #6 BARE CU(TYP.) BRANCH TERMINATOR E-TERM-10(TYP.) 3/4"EMT/ROMEX THWN-2 (2)#12 AWG THWN-2 CONDUCTORS (1)#12 AWG THWN-2 NEUTRAL (1)#12 AWG THWN-2 GROUND VOLTAGE DROP CALCULATIONS WIRE RUN #OF MODS V(VOLTS) I(AMPS) L(FT) VD" VD(%) WIRE SIZE RACEWAY BRANCH#1 TO SOLADECK 14 240V 13A 60 1.33V 0.55% 12 AWG FREE AIR BRANCH#2 TO J-BOX 9 240V 8A 38 0.57V 0.24% 12 AWG FREE AIR MODULE SPECS INVERTER SPECS J-BOX TO SOLADECK 9 240V 8A 25 0.80V 0.33% 12 AWG 3/4"EMT/ROMEX MODULE MAKE HYUNDAI ENPHASE MODEL M215-60-2LL-S25-IG ° 10 AWG 3/4"EMT/ROMEX MODULE MODEL HIS-S29ORG(BK) SOLADECK TO AC DISCONNECT 23 240V 21 A 40 2.05V 0.86/° MAX.POWER Pmax 215 W AC DISCONNECT TO POI 23 240V 21A 10 0.51V 0.21% 10 AWG 3/4"EMT/ROMEX MAX.POWER Pmax 290 W MAX.INPUT VOLTAGE 48 V CALCULATIONS NOTES: MAX VOLTAGE DROP: 1.64% OPEN CIRCUIT VOLTAGE Voc 38.8 V HIS-S29ORG(BK)Voc @ 39.8 V MAX. POWER POINT Vmp 32 A 16.88°C *WIRE SIZES INCLUDE DE-RATING FACTORS SUCH AS AMBIENT TEMPERATURE AND MORE THAN 3 CURRENT CARRYING CONDUCTORS IN CONDUIT. SHORT CIRCUIT CURRENT Ise 9.7 A 39.8V<48V YES **BRANCH CABLE VOLTAGE DROP AND LENGTH DATA FROM MICRO INVERTER MANUFACTURER.LENGTH FROM BRANCH TO SOLADECK INCLUDED. MAX.POWER POINT Imp 9.1 A OUTPUT CURRENT 0.9 A "'WHERE AC UNGROUNDED CONDUCTORS ARE INCREASED IN SIZE,EGC SHALL BE INCREASED IN SIZE PROPORTIONATELY ACCORDING TO THE Voc TEMP.COEFF. -0.30%/°C OUTPUT VOLTAGE 240 V,1 CIRCULAR MIL AREA OF THE UNGROUNDED CONDUCTORS, Pmax TEMP.COEFF. -0.44%/°C DC/AC RATIO 1.35 CONTRACTOR MICHAEL FINK AND NIKKI BREITBARTH THREE LINE DIAGRAM ELEMENTAL ENERGY _t--L �TA�n Residential Grid Interactive Solar Installation System AC Size @ STC: 4.95 kW System DC Size @ STC:6.67 kW Page: 1339 SE 8TH AVE. C ` PORTLAND, OR 97214 N.\'` 13123 SW WINTER LAKE CT, TIGARD, OR 97223 (23)HYUNDAI HIS-S29ORG(BK) SOLAR MODULES Ph: (503)967-5786 Ph: (23)M215-60-2LL-S25-IG MICRO INVERTERS PV-4 Contractor#OR CCB#: 195141 Drawn by: Project Perm1it Set Dab/2 BO Rev:Permit Set 11/6/2019