Loading...
PFI2019-00423 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT IN s COMMUNITY DEVELOPMENT Permit#: PF12019-00423 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 11/20/2019 TIGARD g Parcel: SEG80 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE#M2617381 Project Description: SEG80//6815 SW Walnut Terrace. Install light on existing pole#3740 Class of Work: FEES Type 1 -Utilities(gas, electric, data) Description Date Amount Total Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: RICO SOLIS 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 5034039084 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant CCE t p ^c���Tot1 Signature: t� '° (If\Issued By: . Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00423 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02 -WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04 -WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345 (Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14 -UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED . City of Tigard NOV 1 9 2019 PFI#: f F2 II_0 01 L3 ENGINEERING DEPARTMENT CITY OF TIGARD P ANNING/ENGINEERING T A :D Public Facilities improvement (PFI) Permit PROJECT INFORMATION PGE Job # M2617381 TYPE OF WORK Project name: 8 TYPE 1—Franchise Utility Work Brief description of project: performed by NWN,PGE, or utility agency Install Light on existing pole #3740 ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 8 6 main line tap 0 TYPE 3—Full Scale Development Work 6815 SW Walnut Terrace performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE LINDA OTT • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 10800 SW Avery Street water service area City/State: Tualatin, OR Zip: 97062 0 TYPE 4—Small Cell Technology Phone: 503.612.6093 0 TYPE 5—Tigard Triangle Email: prereqcoord@pgn.com Phone: NOTE: Type 1 and 2 applications may be Contact name: RICO SOLIS emailed to rowpermits n,rigard-or.gov. Phone: 503.403.9084 Email: PREREQCOORD@PGN.COM CONTRACTOR INFORMATION 0 Same as applicant Name: PGE CREW CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as "Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Lid - LINDA OTT FOR RICO SOLIS 11/19/19 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date Case No: erimq-0113 Permit fee: —" Received by: Jam- Date: I 11-161 Approved by: fad. Date: 11/19/240/7 Notified by: 5 C- Date: 1(-1411 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 RECEIVED NOV 1 9 2019 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: CITY OF I IlaAt 1U PLANNINGIENGINEERING INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4 s\\' .. .y '• SI Edge ofFavement '* Ditch ��" 0 Streetlight —•-----•—•—•- --- 1 ,' Ram Dram /��'��i a aI I t oI f .1 IT-- rlrs ;►arriTs-- • -` 1 J v9V I Existing House 1 ' Vi 1 Existing 1 , '� }s . Driveway `Iii 3s 1 •I G' ^ ' ' En' ' II. ri al , 11 a. • I • iv i rij 0 : cr'. I I Existing Shop I \ • . -. \ • Powerpoie 8 I o I I r I' 95' p-— • I -—-—-FropeityLine---•------ I I Fire Hydrant(FH) 1 I I Scale' 1•=30* I ' I I I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 RECEIVED NOV 19 2019 9216 E LIGHTIN�Igo,ARD JEERING M1r f.r° (UNLESS ED) ..15 GHT ON EXISTING DISTRI OLE 37405 WITH 6ISTALL 4W LEDL MAST ARMA(2T MM CONNECT @ 24OVBUTION J5 CONSTRUCTION NOTES: SLCST Y 1.CUSTOMER TO PROVIDE ALL TRENCHING,BACKFILLING,CONDUIT.ELBOWS.JUNCTION BOXES,VAULTS AND PADS.JOINT USE TRENCH WITH GAS TRENCH TO BE Ar c 2 0585•34 j 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM FINAL GRADE. 41111111111 SW WALNUT TER - N 2'N 5P"" ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL < (3a Cu I GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST) $ .'.7 rD - L_ PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED. MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN _ GAS AND OTHER UTILITIES. ALL ELBOWS 4 INCH 8 SMALLER TO BE 36 INCH RADIUS. RIGID STEEL OR PGE APPROVED FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES 5 IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES.ALL D ENDS MUST BE FACTORY MADE.REFER TO LETTER OF RESPONSIBILITY FOR zAll FURTHER DETAILS. 2.A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS y JUNCTION BOXES AND EQUIPMENT/FACILITIES,INCLUDING CONNECTION OR INSTALLATION OF CONDUITS AND PULL STRINGS.CALL SERVICE COORDINATION AT 503-323.6700 "A' TO SCHEDULE A PGE STANDBY CREW. 3.ALL CONCRETE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE FLUSH TO CURB!SIDEWALK. 4.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. ALL CROSSINGS MUST EXTEND FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 48 INCHES DEEP, MEASURED FROM FINAL GRADE. 5. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHYLENE DUCT OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LIKE MECHANICAL CONNECTION PRODUCT) AS AN ALTERNATIVE TO HDPE DUCT.HDPE SHALL MEET THE REQUIREMENTS OF PGE SPECIFICATION L22501 (AVAILABLE ON REQUEST FROM PGE PROJECT MANAGER) .FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE EXTRUDED RED STRIPES(WHICH ISA SPECIFICATION REQUIREMENT).MANDREL TEST OF VICINITY MAP HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT. ~ 6. FINALTRAN GRADE.RPADS CONDUITTE TO IS OBE E INST TALLD IN PTHAT AD AS IP NDICNATED IN DETAIL VE „ GROUNDING STREET LIGHTS ON DISTRIBUTION POLES AND TO EXTEND 1 INCH ABOVE THE PAD. ® WIND ROD 7.ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN) FROM ANY COMBUSTIBLE SW Taylors Ferry lar SW Taylors Ferty Rd I I—I BUILDING,WALL OR OVERHANG AND 4 FEET(MINI FROM ANY FIRE HYDRANT. 6 BRACKET I— PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. g-Ida151s1:Wi'` . ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. g u STREETLIGHT 3 8.STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED i.. -PERLC 11560 TO VEHICLES. `9 IF THE CLEARANCSC E BBETWEEN, THATHE BRACKET AND COJ Aliy, BE FFMMTUN LCAO LADED • h —I COMPANY ATTACHMENT POINT IS LESS THAN 40INCHES. 9.10 FEETDE PRE ERRED)PUBLIC UTILITY EASEMENT(P.U.EJ TO BE 8 FEET(MIMI CONNECT A6-AWGRCOPPER NEUTRAL JUMPER CONDUCTOR FROM 10.CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER THE POLE GROUND WIRE.IF THE GROUND WIRE DOES TRENCHING FOR A PRECONSTRUCTION CONFERENCE. INCLUDED IN THIS CONFERENCE TO---CEOPPERPARLLEL GROVE ClAMP TI TMIE MAST ARM(NUM- WILL BE EXCAVATOR,PGE,TELCO,CATV,AND GAS. USING A 2 INCH GROUNDING CLAMP. 11.CUSTOMER TRENCH AND ELBOW CONFIGURATIONS,ALL CONDUIT,VAULT AND PAD INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFILLING.WHEN YOU ARE ELEPHONE OR CABLE READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE) CALL 503-736-5450 • a COMPANY ATTACHMENT OR 503-463.4348(SALEM AREA: ALLOW UP TO 2 WORKING DAY FOR INSPECTION TO OCCUR 12.REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS. 13,DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD UNDER- GROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER. 5111'^^^"••n PGE CONSTRUCTION DRAWING THINK DATE.11/13/19 SCALE NTS (ACCOUNT 1070001 I AW°I 1000009106 IJOB NO.M2617381 TITLE - - SAFETYpQry ..\\ Garo R Wright/City of Tigard/Wright Partition • FIRST!i CIRCUIT SIZE S. 1Plssanhwen GARDEN HOME-METZGER 11x17 WaHu1 Terrace /PG E LOCATION 6815 SW Walnut Terrace,TIGARD TTENTON: CALL 811 BEFORE YOU DIG DESCRIPTION ,W Wain sr,. OREGON LAW REQUIRES YOU TO FOLLOWRULES ADOPTED Install LED Light TEl existing distribution pole#37408 connect at 240V BY THE OREGON UTILITY NOTIFICATION CENTER. } JOB SITE OSE RULES ARE SET FORTH IN OAR 552-0010018 ¢/ i • COUNTY SECTION(S) WORK WITH SHEET k ROUGH 852-001-0080.YOU MAY OBTAIN COPIES OF WASHINGTON C11-25D E RULES BY CALLING THE OREGON UTILITY IllirBEAVERTON 1 OF 1 NOTIFICATION CENTER ADMINISTRATION @1503-232.15W LINE CREW CENTER DESIGN BY PHONE 1503) DRAWN BY TO REOUEST UTILITY LOCATES CALL THE OREGON 5,NA,eller,below. 2213 SW 153RD DR RICO SOLIS 672-5417 I CESAR DEL ROSARIO UTILITY NOTIFICATION CENSER.511 AT LEAST Call be18ro rW dig. BEAVERTON,OR 8/005 2 BUSINESS DAYS PRIOR TO EXCAVATION. 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED • ( LIGHTING LEGEND a`Ar (UNLESS OTHERWISE SPECIFIED) INSTALL W LED EOTEK Y GHT ON STING DISTRI . - eras I OLE 37 OSWITH LEL' ARMAI 2T CKFILLMM CONINECT @ 240VBUTION aa- CONSTRUCTION NOTES: SLCST i M 1. CUSTOMER TO PROVIDE ALL TRENCHING,BAING,CONDUIT,ELBOWS,JUNCTION 2. An — BOXES,VAULTS AND PADS.JOINT USE TRENCH WITH GAS TRENCH TO BE u2AL C60! 3LIT c+rou. 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM kINAL GRADE. SW WALNUT 2AL6WN ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICALTER / GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS TEST) . C/1-25D PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED. MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN 1p GAS AND OTHER UTILITIES. ALL ELBOWS 4 INCH 8 SMALLER TO BE 36 INCH RADIUS. �j RIGID STEEL OR PGE APPROVED FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR o 3738 • LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES.ALL u 45,3 NM BENDS MUST BE FACTORY MADE.REFER TO LETTER OF RESPONSIBILITY FOR T0°° FURTHER DETAILS. moa 1,,os 2.A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS Y y JUNCTION BOXES,AND EQUIPMENT/FACILITIES,INCLUDING CONNECTION OR INSTALLATION 1 TOF CONDUITS O SCHEDULE AND STANDBY STRINGS. SERVICE COORDINATION AT 503-323-6700 AP, AVT 3.ALL CONCRETE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE FLUSH TO CURB/SIDEWALK. 4.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. ALL CROSSINGS MUST EXTEND FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 48 INCHES DEEP, MEASURED FROM FINAL GRADE. 5. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHYLENE DUCT OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LIKE MECHANICAL CONNECTION PRODUCT) AS AN ALTERNATIVE TO HDPE DUCT.HOPE SHALL MEET THE REQUIREMENTS OF PGE SPECIFICATION L22501 (AVAILABLE ON REQUEST FROM PGE PROJECT MANAGER) FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE EXTRUDED RED STRIPES(WHICH IS A SPECIFICATION REQUIREMENT) .MANDREL TEST OF VICINITY MAP�YIl1�p HOPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT. 1`4 6.TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE L GROUNDING STREET LIGHTS ON DISTRIBUTION POLES FINAL GRADE. CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL AND TO EXTEND 1 INCH ABOVE THE PAD. SW rs Ferry Rd t SW Taylors Fe F I° WIND ROD 7.ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN) FROM ANY COMBUSTIBLE T°YFerry Rd 0 -- ISI BUILDING.WALL OR OVERHANG AND 4 FEET(MI I.O FROM ANY FIRE HYDRANT. PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. ,�Lpd BRACKET t— ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. C" £ F S2. STREETLIGHT $ i - 8. STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED � -PERLC11590 TO VEHICLES. 4 n y ,n. THE 201 NLNESC REQUIRES QUIRE ETNAT MAST ARMS BE F EFFECTIVELYLYBBOONDED 3 9.AS NEEDED-FRONT LOT PUBLIC UTILITY EASEMENT(P.U.E.) TO BE 8 FEET(MIM , t _ COMPANY ATTACHMENT POINT IS LESS TWA40INCHE5. 10 FEET(PREFERRED) . TO BOND A MAST ARM FOR NEW INSTALLATIONS AND RETROFITS: �� CONNECT E GRO ND WIRE.REF THE GROUND WIRE DOERS CONDUCTOR FROM 70.TTRENCHINGIFOR A PRECONSTRUCTION CONFERENCE.INCLUDED IN THIPOWER CON ERENCE TO--CEOPPETHE PARLLEL GROVE NEUTRAL, CLAMP To USING GASTARALUMINUM- WILL BE EXCAVATOR,POE,TELCO,CAN,AND GAS. E USING A 21NCH GROUNDING CLAMP. 11.CUSTOMER TRENCH AND ELBOW CONFIGURATIONS.ALL CONDUIT,VAULT AND PAD Y INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFILLING.WHEN YOU ARE 1 4/ ELEPHONE OR CABLE READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE) CALL 503-736-5450 • ''•,...0***' COMPANY ATTACHMENT OR 503-463-4348(SALEM AREA) ALLOW UP TO 2 WORKING DAY FOR INSPECTION TO OCCUR 12.REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS. 13.DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD UNDER- GROUND EQUIPMENT MAY BEAN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER. stv..,..vf PGE CONSTRUCTION DRAWING E THINK DATE:11/13/19 SCALE NTS !ACCOUNT:1070001 IAWO: 1000009106 I'm NQ.M2617381 ` TITLE SAFETY ` Garo R Wright/City of Tigard/Wright Partition g FIRST! CIRCUIT SIZE '5815 SOUthwest GARDEN HOME-METZGER 11x17 Walnut Terrace G E LOCATION CALL 811 BEFORE YOU DIG ` 6815 SW Walnut Terrace,TIGARD ATTENTION DESCRIPTION R2 W.a.4 RENO* rw W.w.,.,.,v.. OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED Install LED Light on existing distribution pole#3740&connect at 240V • BY THE OREGON UnLRY NOTIFICATION CENTER. WORK WITH SHEET JOB SITE THOSE RULES ARE SET FORTH IN OAR 952-001-0010 COUNTY SECTION($ g THROUGH 952-0010080.YOU MAY OBTAIN COPIES OF WASHINGTON C11-25D 4THE RULES BY CALLING TIE OREGON UTEITY BEAVERTON 1 OF 1 9 ' yA$ MOTIFICANON CENTER ADMINISTRATION @1603-212-1980 LINE CREW CENTER DESIGN BY PHONE(503) DRAWN BY # TO REQUEST UM,LOCATES CALL TME OREGON 15nedn6belew UTILITY NOTIFICATION CENTER.III AT LEAST 3213 SW 153RD DR RICO SOLIS 672-5417 CESAR DEL ROSARIO 2 BUSINESS DAYS PRIOR TO EXCAVATION. cmb.f..Te9A0. BEAVERTON,OR 07006 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED RECEIVED NOV 1 92019 CITY OF TIGARD PLANNING/ENGINEERING Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 \ o Es w Zoo A Zs k 0 Zao i 0, C) • w 0 11 L •C 12 LU �o A 0 Q — • • g� c • • U O.. I.fig •• N nN 6 _ A • > a o • OP 0 L le, 4 t • MCO �i 3 � ? I.21/ © • 2 ig • C CO Q-= • Z o�0 i., C 0v • 0>V . . _ , CO ci Ce o E. — i y4 a o� O �� i I main in jt �� _ V I ao m Sign Spacing and Buffer Lengths(feet) 1 1 V I w m Posted Spacing Between Signs Buffer V, g p O Speed A B C Space V� z°C a / a 20 50 0 0 25 100 100 100 75 1 y ,r- 30 100 V Y 0 405 350 350 350 150 O m 45 180 a 50 500 500 500 210 55 250 December 2011 Chapter 5