Loading...
Permit al CITY OF TIGARD ELECTRICAL PERMIT : COMMUNITY DEVELOPMENT Permit#: ELC2019 00666 TIGARD13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/07/2019 Parcel: 2S110DB00201 Jurisdiction: Tigard Site address: 15292 SW ROYALTY PKWY D Project: Arbor Heights Apartments, Building D Subdivision: WILLOW-BROOK-FARM Lot: 8 Project Description: Wifi metering on water heater circuits for building D units: 1,2,5,6, 11-18,21-28. Contractor: PEAK ELECTRIC GROUP LLC Owner: ARBOR HEIGHTS VENTURE LLC 11007 NE 109TH ST BY SECURITY PROPERTIES INC VANCOUVER,WA 98662 ATTN BOB KROKOWER 701 FIFTH AVE STE 5700 SEATTLE,WA 98104 PHONE: 360-693-0804 PHONE: FAX: FEES Quantity Description Date Amount 20 crt Branch Circuits wo/Purchase 10/04/2019 $197.16 Specifics: Service or Feeder 1 ea 12%State Surcharge- 10/04/2019 $23.66 Type of Use: COM Electrical Class of Work: ALT Type of Const: Occupancy Grp: Total $220.82 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: z-z�.X.,.- �— Permittee Signature: .�, 7 OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Electrical Permit Application :o FOR OFFICE USE ONLY IF �"A =1141 . City of Tigard ) [ o,,,0 °"' • Received f f, Iranirif IN 11 13125 SW Hall Blvd.,Tigard,OR 97223 �a1� Plan Review • Phone: 503.718.2439 Fax: 503.598.1960 DateB : Related Permit#: OCT I'I GA RD Inspection Line: 503.639.4175 Ready Date/By: ® See Page 2 for Internet: www.tigard-or.gov 4...7x - ' ',' 0 Notified/Method: �L Supplemental Information L .Wa _ ce _ ❑New construction ®Addition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked): ❑Demolition ❑Other: ❑Service or feeder 400 amps or more ❑Building over three stories. where the available fault current ❑Marinas and boatyards. GORY s c,'CONSTRid .'P a exceeds 10,000 amps at 150 volts or 0 Floating buildings. ❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building less to ground,or exceeds 14,000 ❑Commercial-use agricultural ❑Multi-family ❑Master builderamps for all other installations. buildings. ❑Other: 0 Fire pump. 0 Installation of 150 KVA or r, (I i OR 'i iON • ,_t p 'IT1O ❑Emergency system, larger separately derived Job#: 190663 Job site address: 15292 SW Royalty Pkwy ❑Additioo of oew motor load of system. Y Y 100HP or more. ❑"A","E","1-2","1-3", City/State/ZIP:Tigard,OR 97224 ❑Six or more residential units. occupancy. ❑Health-care facilities. ❑Recreational vehicle parks. Suite/bldg./apt.#: I Project name: 7/r-/jd476 ❑Hazardous locations. 0 Supply voltage for more than ❑Service or feeder 600 amps or more. 600 volts nominal. Cross street/directions to job site: .-j���- :10g- 0 71' Description Qty f Each f Total " New residential single-or multi-family dwelling unit. Subdivision: I Lot#: Includes attached garage. 1,000 sq.ft.or less 168.54 4 Tax map/parcel#: Ea.add'l 500 sq.ft.or portion 33.92 1 iiiiiiiniat' 111ManatinMajaraigegettinail011E25Limited energy,residential 75.00 2 Installing WiFi metering units on water heater circuits for apartment#'s- (with above sq.ft.) Limited energy,multi-family 75.00 2 1,2,5,6,11,12,13,14,15,16,17,18,21,22,23,24,25,26,27,28 residential(with above sq.ft.) .- Renewable Energy 0 See Page 2 4 °s t. fi' Services or feeders installation,alteration,and/or relocation Name: 200 amps or less 100.70 2 Address: 201 amps to 400 amps 133.56 2 401 amps to 600 amps 200.34 2 City/State/ZIP: 601 amps to 1,000 amps 301.04 2 Phone:( ) I Fax:( ) Over 1,000 amps or volts 552.26 2 Temporary services or feeders installation,alteration,and/or Email: relocation Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2 Owner signature: Date: 401 amps to 599 amps 168.54 2 �� 5 Branch circuits—new,alteration,or extension,per panel A.Fee for branch circuits with Business name:Peak Electric Group above service or feeder fee, 7.42 2 each branch circuit Contact name:Jerry Larson B.Fee for branch circuits without service or feeder fee,first 1 56.18 Address:57096 S.Morse Rd. branch circuit 56.18 2 City/State/ZIP:Warren Oregon 97053 Each add'!branch circuit ,r''7 7.42 140.98 2 Miscellaneous(service or feeder not included) Phone:(503)577-4311 I Fax: :( ) Each manufactured or modular 67.84 2 dwelling,serviceand/or feeder Email:jerryl@peakelectricgroup.com ��<< a Reconnect only 67.84 2 l` ntiN t .+1 "> Pump or irrigation circle 67,84 2 Business name:Peak Electric Group Sign or outline lighting 67.84 2 Address:57096 S.Morse Rd. Signal circuit(s)orlimited-energy 0 See Page 2 2 panel,alteration,or extension. City/State/ZIP:Warren Oregon 97053 Each additional inspection over allowable in any of the above Additional inspection(1 hr min) 66.25/hr Phone:(971)328-2001 Fax:( ) Investigation(1 hr min) 90.00/hr Email:gordon@peakelectricgroup.com Industrial plant(I hr min) 78.18/hr Inspections for which no fee is 90.00/hr CCB Lic.:206443 Electrical Lie.:C1109 Suprv.Lie.:57545 specifically listed('h hr min) Suprv.Electrician signature,required: "' (ig I TR1CAL P ik ii '�0 /Got, e5 c O�i Subtotal: 197.16 Print name: Tim Banaszek Date: 9/2_51/9 0 Plan Review Required(25%of permit fee): / State surcharge(12%of permit fee): 23.66 Authorized signature: ��,yt, a �� TOTAL PERMIT FEE: 220.82 This permit application expires if a permit is not obtained within 180 Print name: Tim Banaszek Date: Q/ //9days after it has en accepted as complete. * Number of inspections allowedbeper permit. I:\Building\Permits\ELC_PermitApp_ELR_ERE.doc Rev 06/17/2015 4404615T(I I/05JCOM/WEB Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY ' � ;� E'SCHEDULE Fee for all residential systems combined: $75.00 nese Qty. Each Total 3' Renewable electrical energy systems: Check Type of Work Involved: s kva or less 100.70 2 5.01 to 15 kva 133.56 2 ❑ Audio and Stereo Systems* 15.01 to25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 50.01 to 100 kva 552.26 2 ❑ Garage Door Opener* >100 witkhv2 ORe9n8a-c3c0oa0n4 ) 552 26 ❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva-no additional charge 0.0 3 Each additional inspection over allowable in any of the above: ❑ Other: Each additional inspection is 66.25/hr charged at an hourly(1 hr min) Inspections for which no fee is 90.00/hr specifically listed('/x hr min) COMMERCIAL WORK ONLY: ELECTRICAL Pt Rmt TEES, s Enter Fee for each commercial system: $75.00 Subtotal rpermonPage t). * Number of inspections allowed per permit. (SEE OAR 918-309-0000) Check Type of Work Involved: ❑ Audio and Stereo Systems ❑ Boiler Controls n Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical ❑ Nurse Calls ❑ Outdoor Landscape Lighting* ❑ Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations 1`.\Building\Permits\ELC_PermitApp_ELR_ERE.doc Rev 06/17/2015