Loading...
PFI2019-00225 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT s COMMUNITY DEVELOPMENT Permit#: PF12019-00225 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 07/15/2019 Parcel: SEG1558 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Pulling wire through conduit for underground service to new commercial building Class of Work: FEES Type 1 -Utilities(gas, electric, data) Description Date Amount Total Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tidard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: HAP ENGLISH PHONE: 5036725489 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: S ee- CAppLi� Issued By: TkaVv Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00225 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OUCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED City of Tigard JUL 1 1 2019 PFI#: d2O/-1—Ct-- " ! ENGINEERING DEPARTMENT CITY OF TIGARD TIGARD Public Facilities rn N ING ErvemeNGINEERINGilt (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: M2678063 0 TYPE 1-Franchise Utility Work performed by NWN,PGE and/or Brief description of project: utility agency PULLING WIRE THRU CONDUIT FOR UNDERGROUND ❑ TYPE 2—ROW SERVICE TO NEW COMMERCIAL BLDG Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair. SITE INFORMATION • Driveway approach installation and repair Location (address if available): / • Sanitary sewer lateral installation and main 6755 SW SANDBERG ST and SW 72NTIGARD OR 97224 line tap ❑ TYPE 3—Full scale Development Work performed with Land use APPLICANT INFORMATION approval which includes any of the following: Name: PORTLAND GENERAL ELECTRIC • Subdivisions or Partitions Mailing address: 10800 SW AVERY ST • Street widening TUALATIN, OR 97062 • Mainline installation for Sanitary City/State: Zip: sewer,Storm sewer,Tigard water and Tigard Water Service Area Phone: 503.464.7777 PGE EMERGENCY NUMBER ❑ TYPE 4—Small Cell Technology Email: PREREQCOORD@PGN.COM Phone: 503.672.5489 ❑ TYPE 5—Tigard Triangle Contact name: HAP ENGLISH Phone: Email: CONTRACTOR INFORMATION 0 Same as applicant Name:E.I.B CONSTRUCTION PGE APPROVED CONTRACTOR CCB Number: 83327 Mailing address: 20669 S MATON RD City/State: TUALATIN,OR TOZip: 97062 Phone: 503.631.7499,503.880.5791 Email: PNMWILL@YAHOO.COM ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION 31,726.39 thepublic right-of-way) Estimated value of work is required(if over$5,000):$ (withing y) Is work related to a LAND USE DECISION? 0 Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as "Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • a% I2 V Ott' Linda Ott for Hap English 7.11.19 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY • 13 • Case No: ��A0� 'Oa2.2-g---.Permit fee: "er Received by: kg Date: Approved by: /gr 047 Date: 7- 15 - ZDI' Notified by: Al— Date: 1 15 161 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI) Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell ❑Macro ❑ Street Name ❑ Site Address How many install sites are proposed as part of this permit application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way 0 Private Property ❑ Cover—Site,\vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(Ciro,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature O Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report O Preliminary Access Report(Sight Distance) O Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 SW "Y " St. Edge of Pavement Streetlight ! _ .Ditch —� .__..„..._r_. I ® JC l • 1 T-15'roPirei'SkSrTi'ne" I k I I N� I I 1 651 , Existing House • Existing H' 31 •' Driveway ll vioiI ry i � r1 01 • vl w trTI � I O c Existing Shat 1 I Powerpole I l 0 1 -----FiopertyCne_.____i— ---.-- I F I 0 Hydrant(FH) I Scale: 'I"=30' I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if nut applicable) North arrow Property lines&dimensions _ Existing utilities locations (sewer, storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 • Bx6• COMMERCIAL LEGEND • 5.: TRANSFORMER PAD • -, NEW PGE FACILITIES TO BE INSTALLED 'A"; '0'l (UNLESS OTHERWISE SPECIFIED) 44"'MINUS CRUSHED ROCK If y{ IT DEEP(MINI ,qT.; 5�xE� INN REMOVE FACILITIES INSTALL FACILITIES •81.ei� 3'SECONDARY PD-28 9p •'- CONDUITS I�'-' OPENING IN PAD 1 INSTALL: `S.a ABC 0 300KVA ■ PXE TRANSFORMER PAD if .\ (CRO WD TO OUTSID•�4 r• �B X2+0 Spr ABC 228363 PAD MT PROVIDED 8,INSTALLED BY CUSTOMER OF OPENING) ���� - - 5001 7200V,120/208V.3 0,4W 4"PRIMARY '"T CONDUIT •\C O SPA FAULT INDICATOR l��i•d. OI ® «\�' • PROVIDED BSNSTALLED BY CUSTOMER 0904766 ©� j• FRONT OF GEAR .r"-----'—'— 44.0/ir; k."..: 1' 00 ®®© ABC 300KVA INSTALL 142 AL-TX PRIMARY IN I-A'PVC /001 ��. PO-28 CONDUIT,PROVIDED 8 INSTALLED BY CUSTOMER r•i• £RON7 OF/AD '•Ma WALL • C• •\• e� ' �` le •a.:� GEAR // • INSTALL 14350 AL-Q%SECONDARY IN 5 OF 5-3"PVC CONDUIT \N•\•I814*-10•04*-1044\••Ar+\• _rAy, / • `N 75 PROVIDED&INSTALLED BY CUSTOMER I 2'MIN.BETWEEN T-1- 5,15' - / NEAREST PRI 8 SEC CONDUIT 5'-15'FROM vuH $,a'I ABC 112• ` AaD."�� -3-PHASE TRANSFORMER PAD- DRIVEWAY 3 . r / Fo91 . ` CONSTRUCTION NOTES- CMDEV CONDUIT CONFIGURATION — _ y 2�.+y// 1ti•' (TOP VIEW M}5 C21-01D ~�/ 260 •4C 1.CUSTOMER IS RESPONSIBLE FOR ALL TRENCH CONDUIT VAULTS,PADSAND ROAD PD-28 �. CROSS)NOS.ALLCONDNTTOBEINSTALLEDVJTTH301NC1ES(MINT COVERATTOP G V / j 120/208V OF CONDUIT FROM FINAL GRADE. • ///,/� 1200AMP COMMERCIALSVC' I j/ ''BIBS 2 2%FLKR 2.A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS, JUNCTION BOXES AND EQUIPMENT/FACILITIES.INCLUDING CONNECTION OR INSTALLATION 4 28.023A AFC TOOCONDUITSLAND GPULL STANDBY STCALL RINGS. SERVICE COORDINATION AT 5013216700 xg 3. ALL CONDUITCONWITHONYLON PULL STO BE TRINGSIFI MIN.GRAY,0 LBS.TEST O.PGE TOD ERMIECTRICAL NE THE SIZE AND NUMBER OF CONDUITS REQUIRED.MAINTAIN 12 VERTICAL RICHES AND N BC 112 563 24 HORIZONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER UTILITIES.ALL ELBOWS 4 INCH 8 SMALLER TO BE 36 INCH RADIUS.ALL BENDS MUST BE FACTORY MADE. ALL ELBOWS LARGER THAN 4 INCH TO BE 60 INCH RADIUS.RIGID STEEL OR PGE yrNOT APPROVED.FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 151 FEET OR LONGER, OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES IN BENDS.PVC SCHEDULE CUSTOMER TO CALL PGE SERVICE DESK @ 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES. 503-323-6700.TO SCHEDULE CREW STAND BY T - V 16TI 4.DIRECTIONAL BORING REQUIREMENTS:BLACK HOPE(HIGH DENSITY POLYETHYLENE) DUCT A 1000 Dz WHILE PLUMBING INTO VT-5577 OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LIKE MECHANICAL • ABO DOco 4,1000 DX -NEED AFTER HOURS SHUTDOWN TO REBUILD CONNECTION PRODUCT) AS AN ALTERNATIVE TO HDPE DUCT,HOPE SHALL MEET THE T2a REQUIREMENTS OF PGE SPECIFICATION LC20515(AVAILABLE ON REQUEST FROM PGE PROJECT VT-6577 MANAGER) FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE 1:26 4,28%188 - WM EXTRUDED RED STRIPES(WHICH IS A SPECIFICATION REQUIREMENT).MANDREL TEST OF HOPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT. vr25T6 2µ48c 4 T)2 FaedBIB aCc - VTdS1S etm CONTACT5.ALL PGE TRANSFORMERS TO BE INSTALLED I METN(MIM FROM ANY COMBUSTIBLE zflkT^ BUILDING,WALL OR OVERHANG AND 4 FEET(Mlld FROM ANY FIRE HYDRANT. 6.0 i% U PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. SERVICE COORDINATOR ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. Jt-B1a3fi FON BR CONDUIT N usvecr.µaN 8.TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2INCHES ABOVE WM.TRENCHLao*BacEFLLED.o FINAL GRADE.CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL Y ' 332VICECORRORIATQR STEXTEND RIER POSTS ARE EQUE PAD. 503-323-6700 OR 800-542-8818 7.STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED TO VEHICLES. FIGURE 6-4 HEAVY DUTY BARRIER POST 8.ALL SWITCH VAULTS TO BE SET AT FINAL GRADE WITH 8 INCH GRAVEL BASE AND Road Side 24" • Spoil CONDUITS ALIGNED TO ENTER THE VAULT END LOWER KNOCKOUTS(TERM-A-DUCTS). Typical (SEE DETAILS ON SKETCH 0 0 rc 9,PGE TO BE NOTIFIED AND INSPECT ALL CONDUIT VAULT AND PAD INSTALLATIONS BEFORE 1 A� I c 04591 I � O LEGEND WITH PGE AND CUSTOMERR REPRESENTATIVEL.ALL NEW VAULT 8 PAD . TO BE FIELD VERIFIED 8.001 iNou 3p• PGE Primary/ 365 Min Secondary Cable THINK 10'RSPEC FGREQUECTRICTS.LENKTO REQUIREMENTS BOOK FOR C1SJIRHFERR DETAILS MILL Snn.V. ,.;�� i -nom wur EaE +� Cover Imide Duct Y xl ta'�M a BE DEVIATION FROM THIS DESIGN MUST MIa „ SAFETY v BE APPROVED BY PGE PROJECT MANAGER Teem• ®/ O Telco/CATV FIR3T1 11.DESIGN IS BASED ON STANDARD UNDERGROUND TEQUIPMENT.ADDMNON-STANDARD FIRS11, UNDERGROUND EQUIPMENT MAY BEAN OPTION AT AN ADD(DONAL COST TO XI tel PBackffl THE CUSTOMER. '� s ,O� I10" 12.THE POINT OF DELIVERY AND DIVISION OF OWNERSHIP BETWEEN THE CUSTOMER AND p� R; s L ISeIeel Backfill PGE WILL RE AT THF LINE SIDE OF THE NEW CUSTOMER PROVIDED SWITCH GEAR. �t o x+xr ue Undisturbed 660-PGE SWITCH VAULT m•Min?�It II /l/�y1/` NOTE:, _Ea^" PGE CONSTRUCTION DRAWING I.MATS TO BE L_.,,J Zr corE. U �'p6D wr \ APPR�Srl�. Joint Use Trench WA) Gas DATE:5/29/2019 SCALE NTS (ACCOUNT:1070001 I AWG' 1000004599 )JOB NO.M2678063 mNcvESr ,SEE 0ECIIO 080 4 TO I'-enrr ---------- - 1 2.TOP a F R.ro TITLE RIGHT-OF-WAYIN SU AT PERMIT NOTICE: REECE SECURITY 111. TABLE 63.BARRIER POST RETAILS PD-28 L rc ISE. A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY oxcxuoxs xsl.ov xErair. • �� I I 4 N 5 WORK IN THE RIGHT-OF-WAV MAY BE PERFORMED. ONLY PGE APPROVED ` CIRCUIT SIZE CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL WEST PORTLAND-72ND 11X17 E VAULTS. E�oS AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. INSTALL 50o THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS PG LOCATION Iru R a x011.7 r v rorrrerotP pg,NEEOEx SJ �� I.Re�NG�!v1 UWC. BEFORE WORK IS TO BEGIN.ACOPY OF THE PERMIT MUST BE ON SITE. 6755 SW SANDBERG ST.,TIGARD,OR 97224 VT-6577 H ATTENTION, CALL 811 BEFORE YOU DIG ` DESCRIPTION r OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 1200A 120/208 3PH UG SRVC TO NEW COMMERCIAL BLDG'NEED TEMP SRVC' BY THE OREGON UTILITY NOTIFICATION CENTER. COUNTY SECTION(S) WORK WITH SHEET oBTR 1805PSI AFTER 2R DAYS rtAnrwlul THOSE RULES ARE SET FORTH IN OAR 952-001-0010 WASHINGTON SECTIOC21-01N THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF 1 OF 1 11:1141 THE RULES BY CALLING THE OREGON UTILITY BEAVERTEN I .wu"`reE iF`"°umwmEa,STRENGTH .s °°SFO `E`°rxeN`EEr CROP+Us 4 �S� LINE CREW CENTER DESIGN BY PHONE(503) DRAWN BY c-Dn7D157 A•„_ NOTIFICATION CENTER ADMINISTRATION S(501232-1987) 2213SW 153R0 DR HAP ENGLISH 672-5489 PENKA TANTILOVA o1ronfO L - 4 IµM ` TO REQUEST UTILITY LOCATES CALL THE OREGON ocxr YELLOW,wue Tar 05 7011 W. 1 WUNIN0 S..00 of UTILITY NOTIFICATION CENTER,811 AT LEAST Know wheys below. BEAVERTON,OR 97006 coNlv.lxNo colo+: 2 BUSINESS DAYS PRIOR TO EXCAVATION. Call before you dig. 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED