Loading...
Plans (284) l '] E COPY CONTENTS VEAL RESDENCE RECEIVED SHEET # SHEET NAME AUG 2 7 2019 T-1 TITLE SHEET. PHOTOVOLTAIC SYSTEM PROJECT CITY OF TIGARD - PV-1 SITE—MAP. BUILDING DIVISION E-1 ELECTRICAL ONE—LINE. S-1 STRUCTURAL MOUNTING. _ 1,6 kIN DC _ , OWNER: Aaron Veal LIABILITY ADDRESS: 9890 SW Kable St, Tigard, OR 97224 PHONE: 503.709.1696 The City of Tigard and its E-MAIL: kduthie447@grnail.com employees shall not be UTILITY PROVIDER: responsible for discrepancies UTILITY ACCOUNT#: SOLAR MODULES: Silfab Solar SLA300M which may appear herein. INVERTER: SE 3800H-US . RACKING: Roof Mount Snap N Rack CITY OF TIGARD REVIEWED POR ODE COMPLIANCE VALIDITY OF PERMIT Approved: [v FT THE ISSUANCE OF A PERMIT OTC I J BASED ON CONSTRUCTION DOCUMENTS AND OTHER Permit#: 1 A-l 2.b i9 - 0(y2?(-1 7 Approved plans DATA SHALL NOT PREVENT Address; CAM() Sri ,5a- Che[ be on 'Cb c_!•� THE CODE OFFICIAL FROM Suite #: REQUIRING THE CORRECTION OF ERRORS.ORSC 105.4 By: Date: 0I p GENERAL NOTES 1.ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE LATEST OR CODE OF REGULATIONS, NATIONAL 2.ALL PANELS, SWITCHES, ETC. SHALL HAVE SUFFICIENT GUTTER SPACE AND LUGS IN COMPLIANCE TO UL REQUIREMENTS TO ACCOMMODATE CONDUCTORS SHOWN. 3.WHERE WIRE SIZES ARE INDICATED ON PLANS, FOR INDIVIDUAL CIRCUITS, THE WIRE SIZE INDICATED SHALL APPLY TO THE COMPLETE CIRCUIT, UNLESS OTHERWISE NOTED. 4. CONTRACTOR SHALL EXTEND WIRING FROM ALL JUNCTION BOXES, SWITCHES, ETC. AND MAKE FINAL CONNECTION AS REQUIRED TO ALL BUILDING EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS. 5. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED. FOLLOW DRAWING IN LAYING OUT WORK AND CHECK DRAWINGS OR OTHER TRADES RELATING TO WORK TO VERIFY SPACE IN WHICH WORK WILL BE INSTALLED. MAINTAIN HEADROOM AND MINIMUM CODE REQUIRED WORKING CLEARANCES AT ALL TIMES. 6.ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT INCLUDING THOSE THAT ARE EXPOSED TO OUTSIDE ENVIRONMENT SHALL BE WEATHERPROOF TYPE, NEMA 3R. 7. DISCONNECT SWITCHES SHALL BE MOUNTED ON INDIVIDUAL SUPPORTS, OR OTHERWISE DIRECTLY ON EQUIPMENT, PROVIDED. 8. NO MODIFICATION TO EQUIPMENT IS NECESSARY.ALL ELECTRIC MATERIAL SHALL BE LISTED BY"UL" FOR THE TYPE OF APPLICATION AND"UL" LABEL SHALL APPEAR ON ALL ELECTRICAL EQUIPMENT. 9.WIRING METHOD SHALL BE EMT ABOVE GROUND AND MOUNTED IN CONCEALED SPACES (UNLESS APPROVED OTHERWISE)AND SCHEDULE-40 PVC FOR BELOW GROUND INSTALLATION UNLESS NOTED OTHERWISE. PHOTOVOLTAIC SYSTEM GREEN RIDGE POWER VEAL 5/31/18 DESIGN TITLE PAGE � g°SW Ra97224 SCALE: C Designed by Erik Duff V `!/ ROOF!SOLAR ARRAY Coverage: ` Total Roof SOFT: 1954 = — Total Array SOFT: 228 Inverter: SE3800H-US with Array to Roof%: 11% A/C Service Disconnect `vr VX ISEIDIMI PANEL N =t� TSRF: 87% it LI PV SYSTEM SIZE: 3.6 kW DC LEGEND SE SOLAREDGEINVERTER Modules: (12) Silfab Solar SLA300M a DISCONNECT SWITCH w/ P370 Optimizers 0 METER \— Array SetBacks: Tilt: 19 deg. PANEL MAIN PANEL Ridge: 12" Azimuth: 125 deg. Vents: 12" Rake: 36" PHOTOVOLTAIC SYSTEM GREEN RIDGE POWER VEAL 5/31 /18 SITE MAP 9890 SW Kable St SCALE: C GREEN RIDGE POWER DESIGN Tigard, OR 97224 Designed by r Erik Duff Notes: 1.This system meets the requirements of NEC 690.35 and is 7.Local utility provider shall be notified prior to use and exempt from the system grounding requirements of NEC activation of any solar photovoltaic installation. 690.41 System Grounding. 8.No sheet metal or tech screws shall be used to ground 2.The DC conductors are not bonded to ground and the disconnect enclosure with tin-plated aluminum lugs;proper MAX MAIN 0.C.Psee 690.64(B)12)OF 2014 NEC AMPACITY CALCS optimizers do not require a GEC. grounding/bar kits must be used. 3.NEC 690.43(C)Structure as Equipment Grounding 9.All solar modules,equipment,and metallic components Main Breaker=200A'(1.20)=240A Max Main Bus Rating WIRE AMPACITY THERMAL DERATE FACTOR NUMBER OF CONDUCTORS Conductor allows for equipment to be used as the EGC in are to be grounded in accordance with code and the Max PV Breaker 240A 2017 NEC 310.15(8))16) 2014 NEC 310.15(B)(2)(a) 2014 NEC 310.15(B)(3)(a) a photovoltaic system. manufacturer's installation instructions. Design Breaker size=20A ,:;,TH/:N-2 31°-35°C+22°C (4-6)MAX. so° 4.The devices listed and identified for grounding the 10.PV modules Cannot be installed over or block any attic (40A) '(0.76> '(0.60> equipment may be stand-alone grounding components or vents,plumbing vents,furnace or water heater vents etc. UL-2703 listed mounting hardware.Optimizers and 11.Wiring must be permanently and completely held off of the modules are bonded to the racking with listed and appoved roof surface per NEC 110.2,110.3(A),110.3(B)&300.4 • grounding components. EQUIPMENT O.C.P 5.Equipment operating 150 volts or greater shall only be 0A serviced or replaced by qualified personnel.Field EQUIPMENT. 16 AMP(MAX INVERTERA )(SOLARO BREAKER (CCP)MAIN P protection may be in the form of conduit,closed cabinet or (USE 20A BREAKER) BREAKER IN PANEL) an enclosure which require use of tools to open. Silfab Solar SLA300M 12) 6.Solar Photovoltaic System equipment will be installed in WIRE NEC310. THERMAL DERATE FACTOR NUMBER OF CONDUCTORS Solar Edge P370 optimizer(12) VOLTAGE 2017 EC 310.15(6)(16) 2014 NEC 310.16(e)(2)(a) 2014 NEC 310.15(5)(39a) accordance with the requirements of Art.690 of the 2014 DROP512 THJ*,-2 31°-35°C (4-6)MAX. Solar Edge SE 3800H-US Inverter(1) 90° NEC. AIC=2'K-Copper'16'15 ft/6530=0.94(.40%VD) (30A) '(0.76) '(.80) 0/C=2'K-Copper'9.47'45 ft!10380=1.05(.12%VD) Ir I O O ARRAY #1- String 1 (Qty 12) 0 Conduit and Conductor Schedule ( I Silfab Solar SLA300M Tag Description Wire Gauge #of Conductors Conduit Type Conduit Size W/ P370 Solar Edge Optimizers I 1 TYPE PV WIRE 10 AWG 2(L1+,L2-) FREE AIR N/A-Free Air 1 BARE CU 6 AWG 1 FREE AIR N/A-Free Air 2 THWN-2 10 AWG 5(L1+,L2-,G) MC Cable Cable - I + - + I 3 THWN-2 12 AWG 4(L1+,L2-,Neutral,G) THWN-2 2"Conduit L__ V - - - 1 — I I Main Panel UTILITY METER Junction Box Solar Edge Inverter Lf l -t• -I SE 3800H-US 200A, NC Service -4(---7-----,\ � /n n Disconnect 66 0 '\/I / 4 20A Solar aoom�G— __u- y. /— — — — — — — — — — — N I u ( 3 ) ...i 2. ( 3.) I , i PHOTOVOLTAIC SYSTEM GREEN RIDGE POWER VEAL 5/31/18 ONE LINE 9890igd, ORSW 9le St 224 SCALE: C GREEN RIDGE POWER DESIGN Tigard, OR 97224 Designed by Erik Duff TYPICAL ATTACHMENT TOP SECTION PV Module ,/ - v v ITEM# DESCRIPTION J,. 1 CAP SCREW,HE%HEAD,6116'-18%3l6"UNG2A,GTS OPT ,,==` ABASE,t-t/4"ID,FOR S/16'HARDWARE A3601 CAST AL 1. er �� 3 LAG SCREW HXHEAD,S:31Xi ',ZINC 2 __7. __ --40,1- = 14.,.. _ 7 I ............................................. 5 POST,t 2SODx66 6Dfi3 T6,MILL 1. 1 was, -'St === === 5 WASHER SEALING SItfi'IDX11I0"OD,EPDM BONDED 55 t. /� _ = =_ S.�=� 6 WASHER.FENDER.S/161DX1'OD,tB-B 55 $3 �-�__--_ =_SS�-_ = _ WASHER,SPLIT-LOCK Sltfi'ID 18 8 55 '. = � __� ===__�== g CAP SCREW HEX HEAD.5116'18X 1"UNC-2A-t8-BSS o� = ��ISI ��V�� "°""``°°`° E"TS ACTUAL MOUNTING POINT WILL VARY BASED ON 0 — ��==����==�=� ������ �_�z_ ROOF TYPE.ATTACHMENT TO RAFTER W ILL STAY ������ �'���i�v474= �� THE SAME. P.V uick mounts placed 48"O.0 mss..= _"__________________ ____ _ ________. �-- Q Across Array ________________ __ l���l 1�.�.�1 __________a__ 0 .. © —o 0 0— • : 00 0 . ...„.„ . , IX RE \ :,. Aluminum Sunmoto Rail II _ 0 Existing Rafter Spacing 24"O.0 CROSS SECTION PV Module FRAMING NOTES: Size- 2x4 Construction Clamp Base _ Typetl Engineered Truss Framed // li '-- Roof , Spacing- 24" O.G Truss \‘‘W 1 ` 'if,' Exterior Wall �� VEAL 5/31/18 /Ai PHOTOVOLTAIC SYSTEM GREEN RIDGE POWER Tigard, OR 97224 Erik Duff STRUCTURAL 9890 SW Kable St SCALE: C GREEN RIDGE POWER DESIGN Designed by