Loading...
Permit (163) 110„-- CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2019-00583 TtGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/27/2019 Parcel: 25101 DD00500 Jurisdiction: Tigard Site address: 6755 SW SANDBURG ST Project: Reece Security Subdivision: SALEM FREEWAY SUBDIVISION Lot: 2 Project Description: Mechanical for TI: (6)new RTU's. Contractor: HVAC INC Owner: REECE HOLDINGS LLC 5188 SE INTERNATIONAL WAY 25977 SW CANYON CREEK RD, STE E MILWAUKIE, OR 97222 WILSONVILLE, OR 97070 PHONE: 503-462-4822 PHONE: 503-803-7673 FAX: 503-462-6555 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 08/27/2019 $4,433.71 Class of Work: ALT Type of Const: VB Plan Review 08/27/2019 $1,108.43 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 08/27/2019 $532.05 Stories: 2 Info Process/Archiving-Lg$2.00(over 08/27/2019 $12.00 11x17) Project Valuation: $162,500.00 Info Process/Archiving-Sm$0.50(up to 08/27/2019 $27.50 11x17) Fuel Air Handlers Fuel Types: Natural Gas Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 3 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: 1 Appliances Vent Fans: 2 Vent Systems: Total $6,113.69 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1000 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-00.0. You may obtain a copy of the rules or direct questions to OUNC by calling 5 03.23 2 .801) 32.2344. Issued By: r Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection d te. This permit card shall be kept in a conspicuous place on the job site until comp etion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application HAI()HA( l SE ()yLl Cityof Tigard ..11,-....!, ceived a•'s" Permit No.: r E3 g «. s:-�DateBy: ��74�j r���t cZ(}i f���J • 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review ■ Phone: 503.718.2439 Fax: 503.598.1960 /`. Date/BY: other Permit:�` e -64093/ Inspection Line: 503.639.4175 `�' ``' ` 111�� ---13.- � � � 'i�'l�� r�, fd��`� T I C A R p p Date Ready/By: /, 5: ® See Page 2 for Internet: www.tigard-or.gov a , A.i: Notifies 4 ethod Supplemental Information TYPE OF WORK r 4 1 I ' IAL FEE* SCHEDULE— USE CHECKLIST Mechanical permit fees*are based on the value of the work ❑New construction !"'Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all 0 Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. Value:$$162,500.00 CATEGORY OF CONSTRUCTION .,RESIDENTIAL EQUIPMENT I SYI7.MS FEES* ❑ 1-and 2-family dwelling Commercial/industrial 0 Accessory building For special information use checklist. ❑Multi-family 0 Master builder 0 Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning 46.75 Job site address:6755 SW Sandburg St. Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:Tigard,OR 97223 Furnace 100,000+BTU(ducts/vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.: I Project name:Reese Security Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: I Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 W. p , �t l Q_ ,t Flue vent for water heater or gas �.\ ) �Ps'C.,�.,�i J2 C L N 1f V'l,AP"T� Pol . fireplace 23.32 /�� Log lighter(gas) 23.32 6 N !`iJ Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 0 PROPERTY OWNER I 0 TENANT Other: 23.32 Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 0 APPLICANT 0 CONTACT PERSON Other: 23.32 Business name:HVAC, Inc. Fuel piping: $14.15 for first four;$4.03 for each additional Contact name:Jody DePew Furnace,etc. Address:5188 SE International Way Gas heat pump Wall/suspended/unit heater Ck/State/ZIP;Milwaukie,OR 97222 _ Water heater _ _ Phone:(503-)462-4822 I Fax::(503)462-6555 Fireplace Range E-mail:jodyd@hvacincorp.com Barbecue CONTRACTOR Clothes dryer(gas) Business name:HVAC,Inc. Other: MECHANICAL PERMIT FEES* Address: Subtotal City/State/ZIP: Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:( ) Fax:( ) State surcharge(12%of permit fee) CCB lic.:50897 TOTAL PERMIT FEE e- This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authorized signature: ir ) * Fee methodology set by Tri-County Building Industry Service Board Print name:Jody DePe Date:8/7/19 I:\Building\Permits\MEC_PermitApp_040113.doc 440-4617T(11/02/COM/WEB) City of Tigard INI ® COMMUNITY DEVELOPMENT DEPARTMENT ■ TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: fij-?lei—(45--7-? Site Address: 67-S5 Sw 5„61L9 S4. Suite/Bldg#: ____ Project Name: 'ee(e 5 r-I (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning ReviewrII i, I I i i 1 Proposal: 6 ne.' f'oo iF r,GL4t vAA. Set, �1' .ctv,A „gree 1 -- �A,J 11ya,J1r i ,,,;)1 k col eAil Existing Business Activity: Il/ Propo ed Business Activity: 'Vit /Verify site address/suite# exists and active in permit sysstte Ier Terrace Neighborhood: ED Yes LV No Zoning: C,`-f -Permitted Use: ❑ Yes ❑ No ❑ Spec Space ,I VConfirm no land use required. 11 Business License: �/ Exists: ❑ Yes Lf No,applicant notified to obtain business license Notes: Approved by Planning: ,/. -- LiiiDate: g-7—!g Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: I' 7 Site Pests: -# Building Plans: # Building Permit#: E 'nter building permit# above. Workflow Routing: anning 1Pftgiait-eQAedinr,� B— ilding Workflow Sign-off: E - ign-off for Planning(include notes from planning review) Route Application Documents: E aiding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: 4--"z, _ , Date: / �/cj I:\Building\Forms\BldgPermitRvw_COM_NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: / Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applic.-tet: Revision Notice 2: Date Sent to Ap :cant: Revision Notice 3: Date Sent to iplicant: ❑ SDC Fees Entered: Wash Co rans Dev Tax: ❑ Yes ❑ N/A Tigar. rans SDC: ❑ Yes ❑ N/A P:rks SDC: D Yes ❑ N/A ❑ OK to Issue Permit Approved by Pe i't Coordinator: Date: I:\Building\Forms\B1dgPermitRvw_COM_NoLandUse_070915.docx