Certificates of Substantial Completion .-A IA Document G704' - 2000 Certificate of Substantial Completion OWNER X • ARCHITECT X CONTRACTOR X FIELD X MARGARET BARNES,CHARLES BAHLMAN,PROJECT MANAGER X PROJECT: PROJECT NUMBER:2216/ (Name and address): CONTRACT FOR:General Construction Tigard Library CONTRACT DATE:November 22,2002 13500 SW Hall Blvd. Tigard,OR 97223 TO OWNER: TO CONTRACTOR: (Name and address): (Name and address): City of Tigard Hoffman Construction PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: Entire project. The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief, to be substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate,which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Date of Commencement Warranties on any sytems that are not working yet will begin 7/7/2004 once they have been startedand are acceptable to the City. SRG Partnership,Inc. o — ARCHITECT - DAT77' FISSUA CE A list of items to be completed or correcte• is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete.11 Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective:$0.00 AIA Document G704Tr"—2000.Copyright ©1963,1980,1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING:This AIAx Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA5 Document,or any portion of it.may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This 7 document was produced by AIA software at 10:34:26 on 07/07/2004 under Order No.1000104558 1 which expires on 3/9/2005,and is not for resale. User Notes: (412155530) The Contractor will complete or correct the Work on the list of items attached hereto within Twenty One(21 )days from the above date of Substantial Completion. Hoffman Construction L-f .E 7- - 0 4 CONTRACTOR BY DATE The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 12:00 AM(time) on July 07,2004(date). City of Tigard 4 OWNER BY DATE ! !! The responsibilities of the Owner and Contractor or security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) Contractor is responsible for completing all items on the Punch List attached include:Margaret Barnes(1),AK(2),Halliday(2), PAE-Electrical(2),PAE-Mechanical(1),Greenworks(2),PLW(2),and SRG(6). AIA Document G704n"—2000.Copyright ©1963,1980,1992 and 2000 by The American Institute of Architects. All rights reserved.WARNING:This me Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document,or 2 any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:34:26 on 07/07/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (412155530) • • • Jon Wiener From: Margaret Barnes [MARGARET@ci.tigard.or.us] Sent: Friday, June 18, 2004 3:57 PM To: Jon Wiener Subject: New Tigard Library-Items to consider for punchlist Hi Jon, Here is my list-most if not all of it relates to how things look *Children's Room-Large green carpet square-by north windows-black spot on carpet from asphalt *Cleaning of the window frames in this area-many little brown spots *Recessed outlets in fabric wall of community room-will the outlets remain that far recessed? *Community Room-Floor box by southwest corner of AV room-bump in carpet *Gap in baseboard and wall-south wall of AV room *Houghton Room *Northeast row of lights-gap-space between light fixture and wood ceiling *East entrance in the room-gouge in metal base near the door-east window frame *I'm assuming the carpet and other items will be cleaned in this room-in particular where the return air grill has been added Entrance into Houghton Room on the build out wall the encloses the brace frame-eastside the woodwork isn't even going up the wall-near the top *Carpet at the base of the bench-rough uneven finish *Column outside of the room-east side-tack down the carpet West door of Houghton Room-Markings on the yellow wall-westside *Fiction area upstairs- *North wall of fiction area-markings on wall *Carpet near fire extinguisher & thermostat-gap in carpet and uneven finish *Paint in fiction area near the northwest column-near the bottom *Check carpet southwest column Fiction area-uneven-bump Study Room 1 Outside Column-west side gap in baseboard finish-check much of the south wall through YA area in baseboard finish at base of column's *Conference Room *Carpet for floor box cover on the northside of the room *Unfinished outlet below white board *Paint by plate near the projection screen *2nd floor Women's bathroom-hole in wall of handicap stall-work maybe isn't complete *Question about the placement of light pole over vents throughout the second floor? *Adult Services/Reference Workroom-split lights *Ceiling tile by door-gouge *Compact Storage-black x's on floor *Staff Room-lights split Staff Bathroom-lst floor-chip in tile at the base near the door-small corner missing Staff Room-Northwest corner by blue wall-gap in tile on the floor Technical Services Workroom-Looks like work is still being done on the counters *West wall in Technical services-gray paint on yellow wall-flecks *Delivery Doors-Gray paint on yellow around frame-in particular northeast side *1st floor Men's Bathroom-tile between mirror and trash receptacles is not smooth-maybe it can't be fixed Circulation Workroom-Loose wires still to be trimmed by fixtures-true throughout the building *Circulation -Public area-What is the metal circle in the floor near the entrance into the workroom-why is it there Thanks, Margaret 1 Tigard Public Library SIGN INSTALLATION REVIEW Page 1 Sign Program June 24, 2004 Karen Fishel of Anderson Krygier, Inc. visited Tigard Public Library on Wednesday,June 23,2004 to review the installed signs. In general, the signs appear well executed in terms of both fabrication and installation. Specific comments are noted below. SIGNS LEVEL LOCATION TYPE -"COMMENT EXTERIOR 2 thru 7, 9 Signs are not installed. /SITE & 10 Various Action: Sign Contractor to install per Hoffman schedule. Vinyl messages are not installed. 1 1A H Action: Sign Contractor to install as soon as possible. Insert holder signs are not installed. 1 2&3 Q-4 Action: Sign Contractor to install as soon as possible. Vinyl hours listing is not installed. 1 12 H-1 Action: Sign Contractor to install as soon as possible. Sign is not installed. 1 21 Q-4 Action: Sign Contractor to install as soon as possible. Sign is not installed. 1 23 Q-3 Action: Sign Contractor to install as soon as possible. Ceiling-mounted signs are placed too low. Action: Sign Contractor to raise signs so height matches placement 26, 93, , on Level 2, if possible. If this is not possible, installer must field 1 125 C-1 verify mounting height with Library and Architect. Sign is not installed. 1 27 G-4 Action: Sign Contractor to install as soon as possible. Sign is not installed. 1 30 Q-1 Action: Sign Contractor to install as soon as possible. 33-42, 81- Signs are not installed as shelving end panels are not yet in place. 1 90 Q-2 Action: Sign Contractor to install as soon as possible. Sign is not installed. 1 55 D/P Action: Sign Contractor to install as soon as possible. 57, 70, Signs are not installed. 1 78, 79, 86 Q-2 Action: Sign Contractor to install as soon as possible. Signs are not installed and should not be mounted on stack-ends as their visibility would be compromised by structural columns. Action: Sign Contractor to coordinate with Hoffman re: either reducing Q-2 size to that of a Q-5 -or using Sign Type Q-1 -and 1 99, 114 Q-2 installing on columns at these locations. SIGN LEVEL LOCATION TYPE COMMENT Tigard Public Library SIGN INSTALLATION REVIEW Page 2 Sign Program June 24, 2004 Signs are not installed. 120A, 121 Action: Sign Contractor to install as soon as possible; coordinate 1 & 122 C locations and mounting heights with Library and Architect. Sign is not installed. 1 135 F-1 Action: Sign Contractor to install as soon as possible. Sign is not installed. 1 137A R-2 Action: Sign Contractor to install as soon as possible. Sign is not installed. 1 143 E/N-3A Action: Sign Contractor to install as soon as possible. Letter M has a dark discoloration on the left vertical stroke. Action: Sign Contractor to clean or touch-up finish as needed so 2 4 G-4 letter color is uniform and matches other letters. Signs are not installed and should not be mounted on stack-ends as their 17, 34, visibility would be compromised by structural columns. 35, 44, Action: Sign Contractor to coordinate with Hoffman re: either 45, 54, reducing Q-2 size to that of a Q-5-or using Sign Type Q-1 -and 2 55, 76 Q-2 installing on columns at these locations. 79, 80, 87, 88, 91, 92, Signs are not installed as shelving is not yet in place. 2 95, 96 Q-2 Action: Sign Contractor to install as soon as possible. Sign is not installed. 2 103 N-2 Action: Sign Contractor to install as soon as possible. Signs are not installed. 2 116, 117 R-2 Action: Sign Contractor to install as soon as possible. Sign is not installed. 2 120 N-2 Action: Sign Contractor to install as soon as possible. END OF REVIEW Anderson Krygier, Inc.will make one additional site visit for a final sign review after confirming that all exterior and interior signs have been installed. PUNCH LIST HALLIDAY TO: Jon Weiner A S S O C I A T E S SRG Partnership 6 5 6 NW NORWOOD CAMAS, WASH. 98607 3 6 0 - 8 3 4 - 6 6 5 7 FROM: Laura Bourland F A X 3 6 0 - 8 3 4 - 5 4 5 3 FOOD SPACEAPLANNIING in DES CILITIES CONSULTANTS GN DATE: June 28, 2004 Food Facilities for: Schools Colleges SUBJECT: Tigard Library Coffee Bar Universities - Inspection No. 1 Health Care Retirement Centers Shelters Treatment Centers Retail The following Inspection Report was prepared during my site visit Restaurants Hotels Thursday, June 24, 2004. Resorts Catering Science Museums Item 1 Coffee Bar Counter with Sinks: Install missing Interpretive Centers Community Centers disposer control bracket per Sheet FS2.4; install missing High Technology Churches adjustable intermediate shelf per details (under Espresso Temples Machine section); -- :: : - : - •• - - - -: - - ... . . - J) Corrections Fraternal - - a - -= • - •;-; _ • , left door catch Convention Centers needs adjustment at customer side waste chute section. Day Care Item 3 Dual Temp Pastry Display Case: Not operational; top left curved glass has a low spot (sight glass along top front); install lower left closure panel on serving side. Item 6 Undercounter Refrigerator: Reverse hinge door per plan; what is the 'L' bracket for at top front center? - it doesn't align with slot in top of door; not operational. Item 11 Undercounter Ice Machine: Not operational. Item 14 Disposer: Install control pane I. Tigard Library Coffee Bar Inspection No. 1 Page 2 Notes: 1.) Complete installation and clean-up. 2.) Set-up demonstraton/startup for Owner. 3.) Complete electrical outlet installation/cover plates. END OF PUNCH LIST File: Tigard Library Insp-1 rpEe808 S.W.3`d Avenue,Suite 300 Mechanical �I Portland,Oregon Electrical 97204-2426 Energy Management PAE Consulting Engineers, Inc. 503/226-2921 Fax 503/226-2930 Lighting Design ACEC PROJECT REPORT - ELECTRICAL FINAL PROJECT: Tigard Library DATE: 6/16/04 ISSUE DATE: 6/17/04 WEATHER: Warm and Clear BY: Dennis Bohn DISTRIBUTION: Jon Wiener- SRG; PAE File (NPC, RAS) THOSE PRESENT: Mark— EC Electric DEFICIENCIES: (1/22/04) Bohn None (3/23/04) Bohn 3. Transformer in Electric Room 211 has excessive noise being transmitted to Training 209. (6/16/04) Bohn Community Room 4. Receptacles not mounted flush with wall panels. 5. Installation of wall controls for projection screen and window shades not installed. 6. Installation of receptacles in floor boxes not complete. 7. Switch for floor box power control not installed in Projection Room. 8. Panel labels not installed and panel directories not complete. Library 9. Receptacles not installed in Main Lobby. 10. Receptacle coverplates and lighting control device installation not complete in Espresso Bar. 11. Panel labels not installed and panel directories not complete for Espresso Bar. 12. Switch and two receptacles not installed in Storage 114. 13. Transformer in IDF 112 producing excessive noise. 14. Receptacles not installed in Hall 111 and IDF 112. 15. Panel labels not installed and panel directories not complete in Janitors 133. 16. Switch and receptacle coverplate not installed in Staff Room 132. 17 Finnr hnx rnnnPc:tinns and devices not complete. rose Project Report—Electrical Final June 17, 2004 Page Two 18. Receptacles not mounted flush with wall panels in Children's Program Room 146. 19. Receptacles under counter not installed in Youth Service Work Area 148. 20. TV outlets not installed in Conference Room 224, Training Room 209, Group Study rooms 200, 206 and 207. • 21. Data outlet not installed in Oregon History 201. 22. Receptacle in floor box not installed in Oregon History 201. 23. MCC, MDP and panel labels not installed and panel directories not completed in Electrical 211. 24. Blank coverplates for future data outlets not installed in Houghton Reading room 236. 25. Panel labels not installed and panel directories not complete in Reference Workroom 215. 26. Dust covers on fire alarm detectors not removed. Site 27. Receptacles not complete at building exterior. 28. Lighting for Community Room signage not installed. 29. Lighting for front entrance signage not installed. DMB/dmb 7692/PR ,d S.W.3rd Avenue,Suite 300 .hanical Portland,Oregon Electrical 972042426 Energy Management PAE Consulting Engineers, Inc. 503/226-2921 Fax 503/226-2930 Lighting Design ACEC PROJECT REPORT - MECHANICAL FINAL PROJECT: Tigard Library DATE: 6/17/2004 ISSUE DATE: 6/18/2004 WEATHER: Warm BY: Nick Collins DISTRIBUTION: Jon Wiener-SRG; PAE File (DMB, RAS, VET) THOSE PRESENT: DEFICIENCIES: (12/5/03) Collins 6. Piping supports are cantilevered on a uni strut support (west of grid 2). No calculations have been received for this configuration. (3/24/04) Collins 11. The flexible ductwork serving the floor diffusers is severely kinked due to piping. The existing flexible ductwork route and configuration may be acceptable if design conditions are met. (5/5/04) Collins 13. Supply air diffuser located in rooms 146, 147 and 148 are incorrect type. Type installed is a Titus PCS, and Titus PMC is specified and installed in all other areas. . (6/17/04) Collins 16. Valve Tags are not provided for all valves. Submit valve tag directory with O&M manual. 17. Piping is not labeled. 18. Equipment is not tagged with final tags. 19. Thermostats in public area are shall be a brushed aluminum tamper proof cover (see section 15950). Temperature sensors with temperature readout and adjustable function are not acceptable in public spaces. Brad Wagner of Airefco knows of this issue and has indicated the replacement is forthcoming. 20. Electric water heaters do not appear to be providing heating water. NPC/npc 7692/PR SUBSTANTIAL COMPLETION INSPECTION 1.FIEEI1IUOIIcS DATE: 6/18/04 TO: Dan VanBrabant(HOC) FROM: Brian Wethington PROJECT: New Tigard Library RE: Final Walk-through report I performed a substantial completion inspection of the New Tigard Library on June 18`h,2004 and have determined that the project is substantially complete for items shown on our contract documents. Final acceptance for this work shall occur upon completion of the below items: Buffer Area: Landscape Items: 1. Replace dead or dying plant material. 2. Tag all plants for dormant identification,per CWS requirements. 3. It appears that the buffer has not been seeded per sheet L3.01. Obtain and broadcast seed per plans. On-Site: Landscape Items 1. Stake all trees until established 2. Remove survey spikes from beds. 3. Remove gravel from beds around handicap parking signage. In general clean up debris and garbage from planting beds. 4. Prune existing Linden Trees in center island so that branches are at least 8'above the ground. Hanging limbs are blocking irrigation and pedestrian paths. 5. Replace dead Aspen at front door 6. Replace dead Evergreen Huckleberry and Oregon Grape at front of building. 7. Replace dead Vine Maples in rear courtyard. 8. Fill in gap of Pennisetum Alepeuroides (5-6)plants near trash can at entry plaza. Space to match plants already installed. 9. Eradicate blackberry growing at base of pine tree at front of building. It appears that the soil was not clear of all invasive weeds. GreenWorks,P.C. • Landscape Architecture • Environmental Design 24 NW 2nd Avenue,Suite 100 • Portland,Oregon 97209 • 503.222.5612• Fax:503.222.2283•www.greenworkspc.com G:iProjects!i02160.t_Tigard Library!GEN'ERALiFWT 6_.18__04(toe Dan VanBrabant 6/22/2004 Page 2 Irrigation Items: 1. Bury&cover exposed drip irrigation tubing in all beds. 2. Spray zones were inspected for coverage. Adjust heads so they do not spray on parking area or building. 3. There is a spray head located in the center of the easternmost gravel path through the large island in the center of the parking lot. Move the head into the landscape area. 4. Raphael(with Highridge Corp.)mentioned that the timer is set to water 30 min.a day,twice a week on the drip zones,and 30 minutes a day on the field grass/spray zones. We are concerned that because the material was installed this late in the season it is not adequately watered to provide good establishment. We recommend increasing water times to provide replacement of water loss due to evapotransporation(5.5-7.5"per month for the next three months). 5. Install perforated caps on aeration tubing for pine tree(see detail 6/L4.04). There are currently solid caps in place on some pipes,and no caps on others. Fix them in place permanently so they cannot be removed. Hardscape Items: 1. Raise benches so that center of bench is 16 1"above finished plaza surface,per detail 7/L4.02. 2. There appear to be a few pavers around the bike rack posts that are not level with surrounding pavers. Remove and replace pavers so they are flush with adjacent pavers. 3. Install spacers along edges of paver area where there are gaps between the tabs on the pavers and the concrete edge restraints. The pavers need to be locked in tightly to prevent them from heaving. 4. Install wood gates on trash enclosure. 5. Install courtyard fencing. 6. Prime and paint handrails at accessible ramp Harbor Gray to match other site furnishings. 7. Grout or caulk around bollards. 8. Prime and paint drain cover and rim in rear courtyard. 9. We recommend setting wheel stops in parking area back 12"from edge of asphalt paving per civil drawings. Confirm with Kurahashi and Associates that this is a requirement. 10. We recommend providing a drainage swale,or inlet,near the front door,to the east of the entrance plaza to prevent water from standing water. Confirm with Kurahashi and Associates the appropriate method for drainage. Please call me if you have any questions in regards to this memo. End of memo cc: Jon Weiner (SRG); Greg Kurahashi (KIA), File Tigard Library Lighting Punch list June 21,2004 Prepared By: Pacific Lightworks, LLC Some items may be already complete First floor o Staff breakroom o Repair or replace damaged louvers F12 o Bathrooms o Install occupancy sensors o Verify cold cathode detail o Verify photocell installation matches Lutron factory specification and one line information o Reception desk o Louvers to be straight and clean o Elevator Lobby o Remove"Home Depot"downlight o Re-install original downlight o Install Osram Sylvania 50MR16/JRISP10 in three downlights along face of elevator with linear spread lens Second Floor This couldbe wee l��vOtitd o Elevator Front o Install Track Lighting o Back of House stairwell o Install Osram Sylvania 50MR16/IR/SP10. o Houghton Room o Pendants ■ Incorrect product? • Non-Dim ballasts on site. o Verify photocell installation matches Lutron factory specification and one line information provided with system Community Room o Wall Wash @ perimeter walls o Adjust to match position of same fixture over Library Stairwell o Stage Lighting to be adjusted o Install Lighting Control System components ❑ Downlights to be focused off perimeter walls. General Notes: ❑ F12 fixtures o Adjust to be straight and level o Repair or replace damaged louvers o Clean Louvers of fingerprints and dust o Use white cotton gloves to handle ❑ A01 o Will require Focusing in some areas ❑ Stack Lights o Adjust to be straight and level o Repair or replace damaged louvers ❑ Lighting Control System o Some photocells not installed as shown on Lutron Factory one-line schematic o Owners to provide 24/7 server to operate software. o Contractor to schedule 2nd site visit by Lutron Tech Engineer. o Community room lighting control system not installed at this time. •Tigard Library SRG JOB No.2216 issued: June 18,2004 Follow up: Added items final: SRG will confirm all corrected items on this this punch list: PUNCH LIST THIS LIST DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES SPECIFIED IN CONTRACT DOCUMENTS. ALSO IT IS ASSUMED UNFINISHED ITEMS WILL BE CORRECTED REGARDLESS OF WHETHER THEY ARE NOTED ON THIS LIST. YELLOW DOTS HAVE BEEN USED TO HELP IN LOCATING PROBLEMS NOTED AS WELL AS OTHERS NOT ON THIS LIST. Plan Room CORRECTION No. Items to be covered DATE IINITIALS SRG Seal tops of doors Clean window sills-remove all corrosion spots Caulk around round diagonal brace frames were they penetrate gyp.board walls Provide longer pull chains for shades on upper windows where possible Install missing electrical outlet cover plates Paint all conduit and flex cable black above ceiling along south wall 1st floor Trim aircraft cable for suspended light fixtures General Paint(black)all flex conduit and junction boxes within"black"ceiling zone Examin carpet thoughout for shags and imperfect seams.Yellow dots have been placed where some imperfections have been noticed.Correct as required. Adjust stack lights so units are vertical and aligned horizontally. Examin all brick headers to confirm that weep vent material is in place and filling joint complete and neat. Examin all exterior window sills.Caulk any gaps in glazing gaskets at corners. Examin all louvers in suspended linear light fixtures and replace ones that are damaged. Provide escutcheon plates for sprinkler valves in hard ceilings Clean or refinish chip board panels in NW corner where change in finish texture is visible Slightly adjust location of acoustic panels so all joints are equal widths. Comm. Floor box by southwest corner of AV room-bump in carpet Room Gap in baseboard and wall-south wall of AV room #100 Adjust acoustic panels so all joints are equal Clean or refinish wheat board panels in NW corner where change in finish texture is visible Recessed outlets in fabric wall of community room-will the outlets remain that far recessed? AV Controls #101 Pantry #102 Storage #103 Women #105 Trim exposed red shims at steel to aluminum curtain wall connection at SW corner,approximately 16'high Clean aluminum header above vestibule in front of doors 108 Lobby Relocate fire alarm pull stations at both front and rear entry doors to adjacent steel columns #109 Clean efflorescence off of brick on lower portion of west wall Seal under threshold of main entry doors,exterior side. Clean metal panel column cover base Clean efflorescence off of brick on lower portion of west wall Coffee Bar Provide escutcheon for ceiling sprinkler valve Entry #115 Remove sign#22 Touch up paint at counter top behind circular desk Cir. Adjust magnetic latches on upper cabinet doors Desk Touch up paint on column 4E at beam height #118 Recess electrical junction box on south wall 8 feet east of column 3E Punchlist 2216.XLS 1 of 6 PUNCH LIST THIS LIST DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES SPECIFIED IN CONTRACT DOCUMENTS. ALSO IT IS ASSUMED UNFINISHED ITEMS WILL BE CORRECTED REGARDLESS OF WHETHER THEY ARE NOTED ON THIS LIST. YELLOW DOTS HAVE BEEN USED TO HELP IN LOCATING PROBLEMS NOTED AS WELL AS OTHERS NOT ON THIS LIST. Plan Room CORRECTION No. Items to be covered DATE INITIALS SRG Paint electrical conduit above ceiling just east of column 6D Work Rin Fill holes on door E03 #119 Paint conduit above ceiling black just west of column 6E Several of cabinet doors by sink need to magnetic latches adjusted Loose wires still to be trimmed by fixtures-true throughout the building Hall #123 Adjust ceiling tile so they sit down fully in grid Touch up paint on east wall behind column and around exterior door frame(E06) Fix rubber base at column 7C Touch up paint on column 7C Corridor Touch up paint on ceiling next to light fixture in frontof door E05 #125 Repair holes on door E05 Adjust ceiling tile just inside door E06 that doesn't sit down in ceiling grid.Also,nearby tile with sprinkler head Adjust door#129 to fully close.It's too tight. Touch up paint on wall at base of stairs Compact storage-black x's on floor Install turning wheel for compact shelving Compact Replace stained ceiling tile along west wall Storage Adjust ceiling tile in SW corner so that it sits fully in grid #127 Paint column in SE corner up to steel beams Adjust door so it fully closes automatically Boiler Room #128 Patch holes in door where closer was In SE corner,on south wall,touch up wall paint behind diagonal steel tube Install Rubber base Tech Serv. Clean #130 North wall,clean scuff marks off of window frame Window shade housing in SE corner of room is too small.Replace. Adjust door 131 to close easier.It's too tight West wall-gray paint on yellow wall-flecks E06-Delivery Doors-gray paint on yellow around frame-in particular northeast side Staff In NW corner,adjust floor tile. #132 On North wall above window shades,attach flex cables to wall. Preplace or repair light fixture louvers that are damaged Toilet Paint access panel to match tile #134 Chip in tile at the base near the door-small corner missing Northwest corner by blue wall-gap in tile on the floor Men Provide escutcheon for ceiling sprinkler valve #136 Tile between mirror and trash receptacles is not smooth-maybe it can't be fixed Fix gouge in wall at NW corner Women Clean grout off of floor near HC stall #137 Replace or repair southern most light fixture;it goes off and on Provide escutcheon for fire sprinkler valve in ceiling Vestibule #138 Provide housing for recessed light fixture Vol. Coord. There is a gouge in the window frame #140 Remove cable clamp on west wall above ceiling.Patch gyp board and paint. New Books #141 Near grids 6C on south wall patch junction box in wall that was not used. #142 Replace three suspended light louvers western most wall Punchlist 2216.XLS 2 of 6 PUNCH LIST THIS LIST DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES SPECIFIED IN CONTRACT DOCUMENTS. ALSO IT IS ASSUMED UNFINISHED ITEMS WILL BE CORRECTED REGARDLESS OF WHETHER THEY ARE NOTED ON THIS LIST. YELLOW DOTS HAVE BEEN USED TO HELP IN LOCATING PROBLEMS NOTED AS WELL AS OTHERS NOT ON THIS LIST. Plan Room CORRECTION No. Items to be covered DATE (INITIALS SRG Relocate 2 suspended light fixtures over front desk one ceiling tile to the east Clean masking tape off of base of window wall at NE corner Children Paint(black)electrical conduit and boxes along grid C,also just east of column 3C,paint(black)foil duct insulatior #143 and duct-at grid 2 above ceiling tiles. #144 Shim up round covers for walker duct splice boxes in floor. Paint black duct support above ceiling tiles at grid 2A Large green carpet square by north windows-black spot on carpet from asphalt. Cleaning of the window frames in this area-many little brown spots Clean curtain wall at NW corner Children Touch up ceiling on wall at ceiling line NE corner #145 Touch up paint on column A"2.7 Touch up paint behind column A"2.7 Family WC #149 Adjust door 149 so it fully latches.It's too tight. Clean grout off tile next to TP dispenser Hall #150 Provide cover plate for unused junction box above door E03 Group Clean all marks and debris off of aluminum at curtain wall Study Clean rubber gaskets at curtain wall-caulking 200 Outside column-west side gap in baseboard finish-check much of the south wall through YA area in baseboard finish at base of columns Young Adult 202 Small dent right of windows at 7'-0"AFF North Wall Small dent below windows in middle Finishing at beams to match Houghton room(putty in and around beam at GYP.) South Touch up paint at reveal,paint typ.Needs minor repair Wall Cleam aluminum scratches,roughness at right sill Paint behind column E3 Young Adult 203 South Clean/repair aluminum blotchiness at sills and verts.At windows Wall Conduit near E5,paint should change color at edge of beam Stack lighting not vertical-mount Perp.To F.F. Reference 204 South Touch up paint above glazing at right side and in middle below glazing Wall Finish at beams similar to interior at Houghton Room Lights over Ref.Desk coming away from decking(I think I can see daylight!Yikes!) Group Study 206 Replace damaged lever in suspended light fixture. Paint/touch up above marker board West Wall Scuffed up ceiling tile/or dirty?Clean Caulk/touch up at braced frame-wall-bench conn. Touch up paint at reveal and below bench South Clean up aluminum curtain wall Wall Fix gouges at left befow reveal Clean wood-paint caulk at bench North Wall HM Frame-touch up paint at base and mullion,clean at door Punchlist 2216.XLS 3 of 6 PUNCH LIST THIS LIST DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES SPECIFIED IN CONTRACT DOCUMENTS. ALSO IT IS ASSUMED UNFINISHED ITEMS WILL BE CORRECTED REGARDLESS OF WHETHER THEY ARE NOTED ON THIS LIST. YELLOW DOTS HAVE BEEN USED TO HELP IN LOCATING PROBLEMS NOTED AS WET.1 AS OTHERS NOT ON THIS LIST. Plan Room CORRECTION No. Items to be covered DATE INITIALS SRG Group Study 207 West Wall Fix dings in wall above door stop South Touch up paint behind column and paint below bench Wall Fix ding in wall by column at 7'A.F.F. • Touch up right side of reveal below window. North Wall Scratches,nicks and dings on HM frame Training 209 Lighting is crooked and not level.Adjust. Dings in paint below projector screen North Wall Patch hole right of projector screen Wood trim at marker board Adjust suspended light fixture at NE corner.(It's not hanging straight) Replace ceiling tile with damage edge in center of west wall Provide escutcheon plates on electrical outlets on west wall Work Rm Cut extra aircraft cable hangers on suspended light fixtures #215 Remove stain from aluminum window sill at SW corner Clean off paint splatters at same place Repair or replace suspended light fixtures where louver has been damaged Ceiling tile by door-gouge Clean Office Replace ceiling tile on west edge that doesn't fit in grid #216 Touch up paint at scrapes on east wall Caulk wall at column above ceiling for acoustical separation Corridor Touch up paint on edge of door frame#218 #217 Clean off paint on metal of corner guard adjacent to door#220 Storage Repair ceiling adjacent to strobe #218 Provide escutcheon or cover plate at ceiling penetration Ceiling tile in SW corner does not fully sit in grid.Replace or correct. Replace tiles(2)with damaged edges or touch up with paint Admin Clean scuff marks from aluminum window sill #221 Clean relite frame into office#223 Touch up paint on upper part of wall adjacent to exterior window Clean off glue from bottom of door frame#223 Office Lights don't work #222 Vacumn Clean wood sill Office East wall,attach flex cable to beam above #223 Touch up paint on north wall next to column Replace ceiling tile in SW corner that does not fit in grid Install small piece of closure at top of light recess at both ends Repair dent in door#224 frame Trim wall covering adjacent to door#224 frame Clean inside of cabinet below sink Conf.Rm At SW corner of room,a small piece of ceiling grid is missing. #224 Repaint frame at door#224(outside face) Provide longer pull chain for window shade at SW corner(similar to SE corner) Carpet for floor box cover on the northside of the room Unfinished outlet below white board • Paint by plate near the projection screen 2nd floor Women's bathroom-hole in wall of handicap stall-work maybe isn't complete Questions about the placement of light pole over vents throughout the second floor? Toilet #226 Replace tile where soap dispenser was removed Toilet Replace ceiling tile that doesn't fit in grid at SE corner #227 Clean Punchlist 2216.XLS 4 of 6 PUNCH LIST THIS LIST DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES SPECIFIED IN CONTRACT DOCUMENTS. ALSO IT IS ASSUMED UNFINISHED ITEMS WILL BE CORRECTED REGARDLESS OF WHETHER THEY ARE NOTED ON THIS LIST. YELLOW DOTS HAVE BEEN USED TO HELP IN LOCATING PROBLEMS NOTED AS WELL AS OTHERS NOT ON THIS LIST. Plan Room CORRECTION No. Items to be covered DATE INITIALS SRG Clean paint off of floor tile Men#228 Touch up paint Close access panel in ceiling Women Install access panel in HC stall #229 Take clear protective cover off of stall door locks 2nd FL Elevator Enclosure Screw in set screens for wall mounted light fixture Non Fiction Electrical cover plate in floor box near grid A between 4&5 does not fully close.Replace. #231 Also between grids 5&6 in front of window seat.Maybe typical.Please confirm nature of problem and potential solution. Reference Desk Suspend lights above desk should all be at the same height above the floor.Adjust(preferably to lowest common height) Electronic Info #234 Central light fixture(suspended)vanes are bent.Adjust or replace. Large- Entrance into Houghton Room on the build out wall the encloses the brace frame-eastside the woodwork isn't even Print gong up the wall-near the top #235 Carpet at the base of the bench-rough uneven finish Column outside of the room-east side-tack down the carpet. Scuff mark and dent at middle of crown molding Left end of bump out-crown molding has red paint on it Wall around sprinkler pipe penetration to be cleaned up Touch up paint at right end of red bump out at bench North Wall HM frame paint-touch up at bench,Door and clean out between bench and glass Marks on bench right side by HM frame-remove marks Paint on wall above door#235-touch up Clean all surfaces-dusty-typ. Paint at left corner of red bump out at floor-touch up Finish at beams to match inside Houghton Room.(caulk all around) West Wall Clean corrosion at aluminum curtain wall and other marks. Touch up paint righ to window by corner column Houghton Northeast row of lights-gap-space between light fixture and wood ceiling 236 Pm assuming the carpet and other items will be cleaned in this room-in particular where the return air grill has been added. Paint in right north corner behind column and blemishes right of fireplace(left side too) Cushion back not attached Glue/caulk on wood paneling below bench West Wall Clean caulk/debris out of lower grill at fireplace and touch up paint at fireplace(scratches,etc.) Scratch below fireplace in wood paneling Clean all surfaces typ.(dusty) West door of Houghton Room-Markings on the yellow wall-westside Streaks in paint typ.Pencil marks at left picture rail Scratches/marks by bench(paint) North Wall Wood nailer at upper left is excessively discolored.Sand and refinish. Paint projection screen brackets Touch up paint in reveal below windows and clean out reveal at each end Paint in corner behind column East Wall Bulging sealant at lower right corner of 2nd from left East entrance in the room-gouge in metal base near the door-east window frame Paint at HM frames to be touched up,typ.Clean as well. South Paint access panel at bump out-touch up Wall Access panel is not flat to wall Clean/touch up scuffs on HM door at right side General Dust cleaned off beams/sprinkler piping,wood,etc. Issues Corrosion at window sills to be cleaned Carpet edges are bulging up-clean up at windows typ. Punchlist 2216.XLS 5 of 6 PUNCH LIST THIS LIST DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES SPECIFIED IN CONTRACT DOCUMENTS. ALSO IT IS ASSUMED UNFINISHED ITEMS WILL BE CORRECTED REGARDLESS OF WHETHER THEY ARE NOTED ON THIS LIST. YELLOW DOTS HAVE BEEN USED TO HELP IN LOCATING PROBLEMS NOTED AS WET T AS OTHERS NOT ON THIS LIST. Plan Room CORRECTION No. Items to be covered DATE IINITIALS SRG Make painting uniform,typ.-touch up's clean Stack lighting-adjust,level,straighten Fiction Markings on north wall 237 Carpet near fire extinguisher and thermostat-gap in carpet and uneven finish Paint in fiction area near the northwest column-near the bottom Check carpet southwest column Fiction area-uneven-bump Clean punched aluminum windows typ. Clean up paint at reveals below windows and paint back onto reveals West Wall Clean marks on wood top below window(caulk,pencil,scuff marks,etc.) Touch up paint typ. Columns at 2B,2C have yellow at rubber base-clean or otherwise remove yellow ink South Top of shelf at left side not attatched to side panel Wall Paint-touch up typ.(scuff by stair) EXTERIOR • Finish painting entry canopy,and ensure all parts of the canopy are covered with no parts left exposed. Front West: Clean exposed concrete stem wall Entry South: Door thresholds to be secured/sealed to concrete slab There are several sealant joints that are too large.One is next to door E09.The store front should be replaced so that the joint conforms to manufacturer's recommendations and meets specified ASTM requirements Grid 3,close large gap at bottom right corner of window South Grid 3,red shim at right of sunshade:remove or cut back and finish to match curtain wall Grid 4,correct excessive sealant under sunshade,left Service Entry Replace sanded sealant with building standard light gray sealant at doors E03,E04 and E05 South/East Clean excess mortar at bottom of masonry between grid 7-8 and D-E Clean white material off of masonry above door E06 East Fill in bed joints above door E06 Corner window at grid A: close large gap in sealant,bottom right North Small windows at Houghton room:fill bed joints above windows Repair dent in flashing between grid Al-A Courtyard Door E07-fill bed joints(fill falling out) West Clean metal shavings/rust off of concrete at base of canopy Provide aluminum cover to seismic separation joint just west of door E08 Commun. Rm-East Door E09-Cut back flashing that is under door threshold Commun. Rm-West Door El0 Affix gasket that is peeling away at top right Punchlist 2216.XLS 6 of 6 t305H, HOFFMAN CONSTRUCTION COMPANY Transmittal Date: July 7,2004 To: Charlie Bahlman Company: Shiels Obletz Johnson Address: 520 SW Sixth Avenue, Ste.400 Portland,OR 97204 RE: Tigard Library Job No. 2130002 Transmitted are the following: Copies Dated Rev# DESCRIPTION 6 7/7/04 Certificate of Substantial Completion ❑ For Your Use 0 Approved as Submitted 0 Resubmit copies for approval ❑ For Price 0 Returned for Corrections 0 Submit copies for distribution ❑ As Requested 0 For Duplication 0 Return corrected prints ❑ Approved as Noted 0 For Bids Due: 0 For Review and Comment ❑ Other: Sent By: ❑ U.S.Mail El Courier Service 0 UPS—Next Day Air ❑ E-Mail 0 Hand Carry 0 UPS—2nd Day Service ❑ Via FAX 0 Via Job Mail 0 Fed Ex Overnight ❑ Via Courier Comments: pc: EHIH(G704 only),File S' d: \ (` "LfC H.I.Hoffman,Operations Manager Phone(503)221-8811 • Fax(503)221-8934 805 SW Broadway,Suite 2100• Portland,Oregon 97205 OR Registration No.28417 AI A Document G704/CMa — 1992 Certificate of Substantial Completion Gus DuenkS OWNER X Charles Bahlman CONSTRUCTION MANAGER X- Jon Wiener • ARCHITECT X=., Eric Hoffman CONTRACTOR FIELD )C k ane ,OTHER oopma PROJECT: (Name and address): PROJECT NUMBER �V CONTRACT FOR 8,091 ,788.003, g *Alit©R 7223 CONTRACT DATE: November 22, 2002 ' TO OWNER: TO CONTRACTOR: (Name and address): (Name and address): City(t � r man co fruction g DATE OF ISSUANCE:ISSUANCE:loikipoif:z.994. Portland:;. OR 97205 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: Ent pro�j`ect.punch list attac led inc ude Margaret Barnes(I),AIK(2} Halliday(2� PAB ctrical(2i),p -i echanical(l) eO*(41s iq• 2)s and.S.R,G(6). : 3,..., -a�°,� .i The Work performed under this Contract has been reviewed and found,to the Construction Manager's and Architect's best knowledge,information and belief,to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents.so the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion thereof . designated above is hereby established as Julyp7,2004 which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Date of Commencement„.„,,,, Warr nttes on t systemm• s�aaare not<working yet will l t + a�started and are acceptable�x he C A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter,the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. FRD3eG'C MANAGER BY DATE ARCHITECT BY DATE ._.. MA Document G704/CMam—1992.Copyright 01992 by The American Institute of Architects. All rights reserved. WARNING:ThisAIA®AIA'® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA'y Document,or any portion of it, may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) The Contractor will complete or correct the Work on the list of items attached hereto within 0 days from the above date of Substantial Completion. 11U alt CC 2[ tt11 L. T -7 -- 7_ a 4 CONTRACTOR BY DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof at 1 040 (time)on' (date). OpLoligard„ w OWNER BY DATE The responsibilities of the Owner and the Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note--Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) • AIA Document G704/CMaTT"-1992.Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING:This AIA' Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document,or any portion of it, 2 may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) ® AIA_ Document G704/CMang - 1992 Certificate of Substantial Completion Gus Duenat OWNER ' Charles Bahlman CONSTRUCTION MANAGER 3( Jon Wiener ARCHITECT Eric Hoffman CONTRACTOR X;__ Dirk Koo• an. FIELD ' fry ),( OTHER PROJECT: (Name and address): igard ibrary PROJECT NUMBER 22;G 477 YV ITa l lvd CONTRACT FOR 8 ,091 ,788 .00,- CONTRACT 091 ,788 ..00;CONTRACT DATE: November 22 2002 TO OWNER: TO CONTRACTOR: (Name and address): (Name and address): City of Tigard Hoffmanq tion q , ®'J � B�'O�t'�'Gi1 `�. „,���� .�,1.,���, DATE OF ISSUANCE 3 1y06,„27 4 Portland.;. OR 97205 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: Entireproject l' l list attached inc7.0 t$arttes(1 AI£'( T day(2),PAH trical ) T'A) eeh*t l}, The Work performed under this Contract has been reviewed and found,to the Construction Manager's and Architect's best knowledge,information and belief,to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion thereof designated above is hereby established as July 07 2004 which is also the date of commencement of applicable warranties`' required by the Contract Documents,except as stated below: Warranty . Date of Commencement Warr noes on art systems that are not working yet w>11 be m , on r.lii* �� is a to th ty. A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Spiels Olife JohnsonD3e.GT MANAGER . BY DATE • S.R 'artnership,.Inc . O 4., 7' 6 B ' ARCHITECT BY DATE AIA Document G704/CMa**f-1992.Copyright©1992 by The American Institute of Architects. All rights reserved. WARNING:This AlAe Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA'Document,or any portion of it, may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) The Contractor will complete or correct the Work on the list of items attached hereto within 0 days from the above date of Substantial Completion. Bo titian ± on 43,6 44 .E . 7 - -i -c 4 CONTRACTOR BY DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume fullpossession thereof at igto 1rt D7ltt ygop4(time)on h (date). :CVY ttf' igard ..,: a�. .. .. OWNER BY DATE The responsibilities of the Owner and the Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note--Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) "' AIA Document G704/CMaTM—1992.Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING:This AIA' Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA' Document,or any portion of it, 2 may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) -- ^o ® Document G704/CMan" - 1992 Certificate of Substantial Completion Gus Duena. OWNER " Charles Bahlman CONSTRUCTION MANAGER X Jon Wiener ARCHITECT. x„. . __, Eric Hoffman CONTRACTOR X Dirk Koopman FIELD .. . ,..d,., , E. ° . .. t4 : --., , �. Margaret Barnes. 1M t . OTHE•R, ” PROJECT: (Name and address): Tib � 'x PROJECT NUMBER:f � ,Ra 3tvzi t 1 CONTRACT FOR 8 T , �2 r . .. ` CONTRACT DATE: N 'o�embe822�; 2002 TO OWNER: TO CONTRACTOR: (Name and address): (Name and address): City of Tigard -kit Hom. Construction ) 13125. -SW -Hal I Blvd .. ._ € 5.. SW Broadwafy, k td.._, 400 ,.,T._ .Y... .. DATE OF ISSUANCE:Jtuly06,2 4 Portland:;_ OR 97205 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: En, "-tfiuect.P list attac ted incltude:M. tBarne (q , ) allday 2) PAt Eecca2),PMchanica ( ) O tworlcs 2) 2 idRG(6 e . The Work performed under this Contract has been reviewed and found,to the Construction Manager's and Architect's best knowledge,information and belief,to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion thereof. designated above is hereby established as July0 4 which is also the date of commencement of applicable warranties`'; required by the Contract Documents,except as stated below: Warranty Date of Commencement Warrant on >sy+stems that are note vorkin:giy*lill begin ,k �.< , ,, . . ,u oncetlt �ve be i f B rp ee® f 3 !the City ...... oi• . •r¢% m,.E..� _ .. F., SSS.<.. A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Shi ls,Oblctz.John i, 12R+D 386 I MANAGER BY DATE SRG Partnership,Inc; j 6'^- At = 7. 6 ' 0`— ARCHITECT BY DATE AIA Document G704/CMan'—1992.Copyright©1992 by The American Institute of Architects. All rights reserved. WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAy'Document,or any portion of It, may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: - (341326613) The Contractor will complete or correct the Work on the list of items attached hereto within 0 days from the above date of Substantial Completion. HQ rtr,a Constnietit pix, . ;,' L .1-+ L . I G✓ '7 - 7 - 0 4_ CONTRACTOR BY 7� DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume fullpossession thereof at 12 00 ain 0/0W: OO4(time)on (date). Cil © lgard ,>, .. OWNER BY DATE The responsibilities of the Owner and the Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note--Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) • AIA Document G704/CMa"r—1992.Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlAV Document,or any portion of it, 2 may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) A ATA Document G704/CMan" — 1992 Certificate of Substantial Completion Gus Duenkt OWNER X Charles Bahlman CONSTRUCTION MANAGER -X Jon Wiener ARCHITECT X,, Eric Hoffman CONTRACTOR X Dirk Kan_ FIELD X are Bad PROJECT: (Name and address): igard i br y � ��s PROJECT NUMBER:221 1 S W�� vcl CONTRACT FOR.$8, 091 ,788.0 0 f. ,, F ,,,,. .; CONTRACT DATE: November 22, 2002 TO OWNER: TO CONTRACTOR: (Name and address): (Name and address): City o and Hoff man ®strietro x • DATE OF ISSUANCE:July 06,2004 Portland, OR 97205 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: Entt erect. hlist attachee c u �pare`t AK( ? ] lay(2� P E Electrical(2,PA Mechanical(1), .r y The Work performed under this Contract has been reviewed and found,to the Construction Manager's and Architect's best knowledge,information and belief,to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or,portion thereof. • designated above is hereby established as July 07 which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Date of Commencement Wit k��t 1 any systGI)s th tare not working, I ° gin �. �9 .._. s ; on a ave been start atit �� to • th-e A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Shiel Oble ohnson .; ..' 423e•GT MANAGER B DATE RO P er hip, § : D 7.r�0 ARCHITECT BY• �� DATE AIA Document G704/CMan"—1992.Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING:This AIA' Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document,or any portion of it, 1 may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) The Contractor will complete or correct the Work on the list of items attached hereto within 0 days from the above date of Substantial Completion. Idf inau,Pati OI tbrt _.. :, 14"t— . I� 3 - 1 - c CONTRACTOR BY U DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume;full possession thereof at 1 0O 7!O ) O (time)on ' ,(date). ! fgard,. §, OWNER BY DATE The responsibilities of the Owner and the Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note--Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) • AIA Document G704/CManf—1992.Copyright ®1992 by The American Institute of Architects. All rights reserved. WARNING:This AlAe Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA9 Document,or any portion of it, 2 may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) • AI ® Document G704/CMaIN - 1992 Certificate of Substantial Completion Gus Duena OWNER X Charles Bahlman CONSTRUCTION MANAGER 'X=. Jon Wiener ARCHITECT Xrt,� Eric Hoffman , ,CONTRACTOR X Dir]1Koopmasa FIELD X, . T . i ? garet' 3a nesF.: ' :EITHER PROJECT: (Name and address): i ibrar PROJECT NUMBER 22"16 l iXt W Hall 13 v CONTRACT FOR 1$8;091 ,788.00 CONTRACT DATE: November 22, 2002 TO OWNER: TO CONTRACTOR: (Name and address): (Name and address): C' tT� o Cons ction � a $lid X05 S` it �roeway .; ,+ 1,0{x. DATE OF ISSUANCE:;Ju 06,2 ?4 Portland;, OR 97205 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: En e ` ect.Pt It list attac snc u g �, 1 t r " T :AK(2 LTa]hdaty(2) 'A�Electrical(2) PA Mechanical(I), The Work performed under this Contract has been reviewed and found,to the Construction Manager's and Architect's best knowledge,information and belief,to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion thereof designated above is hereby established as July07,22904 which is also the date of commencement of applicable warranties' required by the Contract Documents,except as stated below: Warranty ,, Date of Commencement Warr abet on arty systems that ar of wo n- fet will , E� heey�Lave e� Cit ©�E �d are acc b1e trt the .� .,. A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter"the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Sl els Obletz Joh r „ , F ge'G? MANAGER BY DATE ARCHITECT BY DATE • AIA Document G704/CMaT'—1992.Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING:This AIA8 Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA'°'Document,or any portion of it, may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613) The Contractor will complete or correct the Work on the list of items attached hereto within Q days from the above date of SubstantialyCompletion. / Fhf'€nanV lnstrugtt l ,` ,_ q5 .� ��/a - 0 4. CONTRACTOR BY 1&) DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume full,possession thereof at i2 O7X(7 ( (time)on (date). OWNER BY DATE The responsibilities of the Owner and the Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note--Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) AIA Document G704/CMaTM—1992.Copyright ®1992 by The American Institute of Architects. All rights reserved. WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA''Document,or any portion of it, 2 may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 16:48:31 on 07/06/2004 under Order No.1000104558_1 which expires on 3/9/2005,and is not for resale. User Notes: (341326613)