Loading...
Permit (104) Site Address: ri es p ,s w ,97 '1' s lig . Building Division T l G A R D Deferred Submittal Transmittal Letter TO: /Ory% DATE RECEIVED: DEPT: BUILDING DIVISION FROM: l..ir,s O!e ; 11. / COMPANY: 1-c,0e21L" Elea k ✓1 / Bye/' ` PHONE: C S� j9S', ( 5r7 RE: it-16 0 C).i_/ cM441 Ave. , f3l/po) 9- OCR Q 3 (Site Address) (Perini ase Number) `two,. 1 ;+ (Project name ot subdivision name and lot number) / / )4; Valuation of Deferred Submittal: ��' $ 1 Si 4- C> / ::-:.,' i ATTACHED IS THE FOLLOWING DEFERRED Sx1BMITTAL ITEM: `' Copies: Description: j°' ..m... 't-.... ..............�J...-#.-.c.►r._...5_.. -f. ...................-__..._. _... _ ....._ ....._... Ck. i Remarks: .,„,. e \\:h.\\.4 40.) NOTE:Documents for deferred sub 1 txa items shall be submitted to the registered design professional in responsible charge who shall review t 1- and forward them to the building official with a notation indicating that '.h deferred submittal documents hav• been reviewed and been found to be in general conformance to the design of th;:building.The deferred submitt. items shall not be installed until the design and submittal documents have been approved by the building official Oregon Structural Specialty Code Section 106.3.4.2 r FOR OFFICE USE ONLY Routed to Permit Tec ician: Date: Initials: Fees Due Ye ❑ No Fee Description: Amount Due: e ,` Deferred Submittal Fee: $c off.o 0, A v� ``, Additional fee based on valuation: $ 4 7 G . ),6 Other: $ ---,Th 17 Total Fees Due: �%''I r 1 (� Special / I Instrucrons: Rep ' t Permit(per PE): ❑ Yes ;� No ElDone A icant Notified: CVMS ifriDate: /„2 C , 7 Initials:`?; 'he fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based /on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in ,,..✓` addition to the project plan review fee based on the total project value. 1:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07 CITY OF TIGARD BUILDING PERMIT 191 I `' COMMUNITY DEVELOPMENT Permit#: BUP2019-00035 T f G RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/15/2019 Parcel: 2S111 ACO2700 Jurisdiction: Tigard Site address: 14650 SW 97TH AVE Project: Twality Middle School Subdivision: None Lot: None Project Description: Rebuilding a new two-story school. 27,000 sq.ft.of existing building will be incorporated into the new building.The demolition includes 132,000 sq.ft.of existing building. Contractor: TRIPLETT WELLMAN INC Owner: UNION HIGH SCHOOL DISTRICT PO BOX 160 NO. 3 JT WOODBURN, OR 97071 00000 PHONE: 503-982-4188 PHONE: FAX: 503-982-0390 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 07/15/2019 $108,522.92 Demolition Occupancy Grp: E Occupancy Load: 12%State Surcharge-Building 07/15/2019 $13,022.75 Dwelling Units: 0 Plan Review 02/19/2019 $70,539.90 Stories: 2 Height: 44 ft Parks SDC Improvement 07/15/2019 $4,198.00 Bedrooms: 0 Bathrooms: 35 Parks SDC Reimbursement 07/15/2019 $762.00 Value: $31,222,818 DC Provision Review,COM New-Ping 07/15/2019 $203.00 Plan Review-Fire Life Safety 07/15/2019 $43,409.17 Info Process/Archiving-Lg$2.00(over 07/15/2019 $816.00 Floor Areas: 11x17) Total Area: 101116 Info Process/Archiving-Sm$0.50(up to 07/15/2019 $1,502.50 11x17) Accessory Struct: 0 Metro Const. Excise Tax 07/15/2019 $12,000.00 Basement: 0 Additional Plan Review 07/15/2019 $1,200.00 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $256,176.24 Required: Required Items and Reports(Conditions) 1 Special Inspection(see plans) Fire Sprinkler: Yes Parapet: Yes Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is sus.-nded for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Ce er. Those rule- are set forth in OAR 952-001-0010 through OAR 952-001-0090. You in a copy of the rules or direct questions to OUNC by calling 503.2 2.1:87 or .:.0. .2.2 Issued By: ermi ee Signature: Li 1 / 03.639.4175 by 7:00 a.m.for the next available inspection .ate. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each Inspection. Engineering Review .B' Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) . X7ater Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes in.No Assess Water Quantity Fee in-lieu: ❑ Yes Er No LIDA Facility on lot: ,1 Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: 4 to i7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: /11DC Fees Entered: Wash Co Trans Dev Tax: e Yes Q' 0 N/A Tigard Trans SDC: Yes ❑ N/A Parks SDC: Yes 0 N/A OK to Issue Permit / Approved by Permit Coordinator: Date: ')/ j I:\Building\Forms\BldgPermitRvw COM_WithLandUse_070915.docx FOR OFFICE USE ONLY–SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT = Transmittal Letter T 1 G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION ® tt FIE FROM:—�� SUN 10 2019 • RD COMPANY_ ��- rCTY, � IGP� PHONE: WILDING DIVISION �l / / IL 7 – illG,tr By: RE: cam\ 4c-\410., Lc-- Le(1,122e//- c6.635---- . (Site Address) " (Permit Number) /11(e5-- ) 724 (Project name or subdivision name and lot number) L.) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: a' .. Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: � �c� c� ��c\ v�� t `i FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑ No Fee Description: Amount Due: Special Instructions: Reprint Permit(per PE): ❑ Yes ❑No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions_061316.doc May 23, 2019 RE: Twality Middle School Project Information Building Permit: BUP2019-00035 Class of Work: V-B Address: 6960 SW Sandburg Lot Number: Area: 117,524 Sq. Ft. Stories: 2 Builders Name: Triplett Wellman The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2014 edition. Please respond to conditions below. 1. Building D is over the allowable area increase. Per the OSSC 506. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Tom Hochstatter Senior Plans Examiner (503) 718-2432 tomh@tigard-or.gov FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. II City of Tigard ® COMMUNITY DEVELOPMENT DEPARTMENT Transmittal a smittal Letter TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigarc �r.gov TO: --//d/11 DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: ��r,y 0Q,:t\ 1 JAN 1 3 2020 CITY OF TIGARD COMPANY: 'T,,\,`6.4 off,, 1v,,( BUILDING DIVISION PHONE: / c73 )0-1\5 — S By: _ RE: ( SL) ° J l '2)L; 11- (. 035 _ (Site Address) (Permit Number) (Project namsubdV . • • number) i ATTACHED ARE THE FOLL S •4 N ' .M A Copies: Description: Copies: Description: Additional set(s) of plans \ Revisions: Cross section(s) and d-. .ils. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations.:" Engineer's calculations. Other(explain): 11 REMARKS (4\e..-- trA,A1 ' .�a..A lc0, -,-Pil 4 `C)rn' 3 --- \ !!CAVA r- )10\N, / 4 c c 067 / FOR OFFICE USE ONLY Route o Pe it Technician: Date: j ,r"' 2 Initials: Fees Due: Yes ❑No Fee Description: Amount Due: T-oTYtZ . .t.t.-c $ /-7/9 /. 5.-1--- Special Instructions: Reprint Permit (per PE): ❑ Yes No ❑ Done Applicant Notified: n 072.is Date: ill'?/zc; Initial.? 1:\Building\Forms\TransmittalLetter-Revisions 061316.doc It u Site Address: )(4 6so s , g 7 ' `ST 7 Building Division TIGARD Deferred Submittal Transmittal Letter TO: / -cr') DATE RECEIV D: DEPT: BUILDING DIVISION ' Luck., FROM: IL,c o`er ;k,� ;'OF MARE 13 WING DIVISIO N COMPANY: / , PHONE: (5,-,-z. ctl S ,. r-X2)_C'7 B-.. ,, . RE: j46SC S w 9-7-t' S7 13 aQ 19-p pO,3�" (Site Address) (P it/Case Number) j% ' J i+� p): delIe c, -. a l (Project nam or subdivision name and lot nu ,.er) Valuation of Deferred Sub al: $ K) 2r._. ATTACHED IS THE FOLLOWING DEFE '1' ED SUBMITTAL ITEM: Copies: Description: 111. ' Remarks: k NOTE: Documents for deferre.\�'�f:i, .1 ite\s shall be submitted to the registered design professional in responsible charge who shall rev taw ,em and r rward them to the building official with a notation indicating that the deferred submittal documents e been reviewed and been found to be in general conformance to the design of the building. The deferred submitta items shall not be installed until the design and submittal documents have been approved by the building official.,Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY ` Routed to Permit Techni '.n: Date: ) j 5 c „© Initials: Fees Due: , �❑ Yes ❑ No Fee Description: Amount Due:' Deferred Submittal Fee: $ 6100 — Additional fee based on valuation: $ /i 3 i -. . ki f Other: Card,1 V,\.., $ a o , v() Total Fees Due: $ ' 7 3 V, (II Special • mill Instructions: Reprint Permit (per PE): ❑ Yes /N No ❑ Done _- Applicant Notified: . iy- Date: i/t5"/d-6.1 \ Initials: ,'--r- The fee for processing and eviewing deferred plan submittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in addition to the project plan review fee based on the total project value. I:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07 Site Address: , Esc) s tAt 97 '' s--t-- ei Building Division T►GARD Deferred Submittal Transmittal Letter TO: DATE RECEIVED: DEPT: BUILDING DIVISION JJ RECEIVED FROM: JU Ci,p L/le�,i�'l�. GGv, P (0 -Are N 12020 COMPANY: CITYCFTiGARD p J �' l� �✓1 BU!LDiIVG DIVISION PHONE: (_SC) /SJ (-)07 By RE: ) ti'6 S d<.5\nr C17 - t'3 (Site Address) (Pbrmit/Case Number) (Project name subdivision name and lot number) Valuation of Deferred Submittal: $ L)E`D ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM: Copies: Description: Seismic Bracing - Electrical Remarks: NOTE: Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: /lit- Fees Due: j Yes ❑ No Fee Description: Amount Due: Deferred Submittal Fee: $ /Vdf/Q,t,t?.{ Additional fee based on valuation: ) 3 c 8 Other: S4Si. O o Total Fees Due: S(X- , Special Instructions: Reprint Permit(per PE): ❑ Yes No E Done Applicant Notified: Date: /AS7, j? Initials: j The fee for processing a reviewing deferred plan`subrfiittal shall be an amount equal to 65% of the building based on the valuation of the particular portion or portions of the project with a minimum S200.00 fee. This fee is in addition to the project plan review fee based on the total project value. 1:BuildingTonnsTransmittalLetter-DefrdSubmtl.doc 04 04 07 - I - ' 6 Site Address: 1 L}6�,b S w 97 �'{' ��- !� ii Building Division T► �ARD Deferred Submittal Transmittal Letter TO: DATE RECEIVED: DEPT: BUILDING DIVISION FROM: Olt o/Pn�/� COMPANY: ,4 U�// PHONE: B — S'O"�S ill��— Q"x�'7 - y RE: J 4'6SOS\►„ 97 ' S'7 j3vpp-f) i 9 - t� c�O,3.S� (Site Address) (Permit/Case Number) j w c,.1 ;-i-,j M i d d I r Sr-kCI O 1 (Project name subdivision name and lot number) Valuation of Deferred Submittal: $ c-C,OcQ ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM: Copies: Description: �l1J -1n!_c l !_+�.-..Lio._..._...-00..1.._..ct-_..5 cr c 5 c._ r, ez.ry S _..._ �tis,L _ // ' t S1 Remarks: NOTE: Documents for deferred submittal items shall be submitted to the registered design professional m 1 responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: _ Fees Due Yes ❑ No Fee Description: Amount D e: Deferred Submittal Fee: (a.o O — , Additional fee based on valuation: $ "; g , trj ' ' L Other: eirzln,li.w, '{rs� $ .-v: «'` Total Fees Due: $ 3 i $ . -g I -} Special Instructions: Reprint Permit(per PE): ❑ Yes �[� No ❑ Done Applicant Notified: / Date: 4../t n Initials: 6 The fee for processing and viewing deferred plan submittal shall be an amount equal to 65%of the uilding based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in addition to the project plan review fee based on the total project value. l:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07 Site Address: )y 6E0 s w 9 -7 Building Division T I G A R D Deferred Submittal Transmittal Letter TO: /67274._ DATE RECEIVED: DEPT: BUILDING DIVISIION FROM: C r.S ,�✓�t�1 L— COMPANY: �c',�e (,✓�I��M<� PHONE: Cp3, C1 S, CZ>S7 By: "1/4.— RE: lyC'S© Sw l7` �vinae, 1 9- 0c» (Site Address) (P it/Case Number) Tv,/c.) Vtj ty ;dd le Sc.Ano j (Project name o subdivision name and lot number) Valuation of Deferred Submittal: $ 06, 0 ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM: Copies: Description: d . Remarks: NOTE: Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the ceferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Duel® Yes ❑ No Fee Description: Amount Due: Deferred Submittal Fee: � Nor Additional fee based on valuation: $ p'l Other: Total Fees Due: (.1,a,,ii v.* $ U Special J '-7 Instructions: Reprint Permit (per PE): ❑ Yes No ❑ Done Applicant Notified: ::- Date: ur//3 psi) Initials: 71 The fee for processing a reviewing deferred plan submittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee. This fee is in addition to the project plan review fee based on the total project value. I:Building Tomb\TransmittalLetter-DefrdSubmtl.doc 04/04/07 Site Address: t L �,}c n w 97 ` ' ...S-t Building Division "! : TIGARD Deferred Submittal Transmittal Letter TO: DATE RECEIVED: DEPT: BUILDING DIVISION �l , MAY 1 8 2020 FROM: Chris Olenyik CITY OF TIGARD COMPANY: Triplett Wellman PHONE: ( ) 1/5 00,5'7 By. CD RE: f � 45�, • g ' 7 rivp l-) ) 9 - f i70,1S6 (Site Address) (PtmuuCase Number) ; ! /ul: dd ! em r 0 (Project name o4 subdivision name and lot number) Valuation of Deferred Submittal: $ 10,000 ATTACHED IS THE FOLLOWING DEFERRED SUBM TTAL ITEM: Copies: Description: Seismic bracing for mechanical and plumbjxlq Remarks: NOTE:Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: $7,fr7 f0, Initials: 7774 Fees Due: ' Yes ❑ No Fee Description: Amount Due: Deferred Submittal Fee: S ._ Additional fee based on valuation: S Other: S Total Fees Due: $ Special Instructions: Reprint Permit (per PE): ❑ Yes No ❑ Done Applicant Notified: Date: 4, e/ir) Initials: j The fee for processing a reviewing deferred plan submittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in addition to the project plan review fee based on the total project value. (:Building`.Forms'TransmittalLener•DefrdSubmtl.doc 0404.07 Site Address: 14 GSo w 9`7 Ste" Building Division TIGARD Deferred Submittal Transmittal Letter TO: _ DATE RECEIVED: DEPT: BUILDING DIVISION HECEIVED CL PI 11. MAR.A'I' 2020 FROM: !! t CITY OF TIGARD COMPANY: 1 . ,r. I 2�l r��, vl BUILDING DIVIS a B/$PHONE: ) S rc-) 1V7 RE: ) 46SO Sw 97111 ST R ,p n 19 - no0�5� (Site Address) (P it/ Case Number) 71,0 o.1 ., 11 .d CIl e S (Project name or subdivision name and lot number) Valuation of Deferred Submittal: $ / ,ti 1 C'c. ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM: Copies: Description: 5es ►,- c,.-..-...-..-._ , �h�-r_c _e_ -rax_..._c r.•..�-.. Ce;_l_-i_nSS---- Remarks: NOTE: Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: ,c3- ) 2. . c3,0 Initials: Fees Due' ❑ Yes ❑ No Fee Description: Amount Due. Deferred Submittal Fee: $ Additional fee based on valuation: $ Other: $ Total Fees Due: $ , I,031,oa Special f-.Tsk!)_.._.._..Cttw-a ..-..-. • Instructions: ( (Il} . 1 - 0 Reprint Permit(per PE): ❑ Yes [z No I Done Applicant Notified: Date: l 3%,,i Initials: The fee for processing a reviewing deferred pl sub ittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in addition to the project plan review fee based on the total project value. (:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07