Loading...
Plans (86) ' A ■ B ■ C . D ■ E ■ F • G ■ H GENERAL NOTES SHEET LIST TABLE NEW PV SYSTEM : 9 . 150 kWpSHEETNUMBERSHEETTITLE1.1.1 1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL T-001 COVER PAGE GRE E N LIGI-IT ELECTRICCODE(NEC)ARTICLE 690.ALL MANUFACTURERS'S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED M O L I N A R I ITAVA R E S R E S I D E N C E G-001 NOTES SOLAR & ROOFING ■ a BY THE AUTHORITY HAVING JURISDICTION'S(AHJ)APPLICABLE CODES. A-101 SITEPLAN 1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION A-102 ELECTRICAL PLAN CONTRACTOR 1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS 13209 SW WOODSHIRE LN A-103 SOLAR ATTACHMENT PLAN INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC 690.41(B) TIGARD OR 97223 OFFICE COPY E-601 LINE DIAGRAM GREENLIGHT SOLAR&ROOFING 2 1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE E-602 DESIGN TABLES INVERERS,OR AND SOURCE PCHOTOVOLTAIC COMBINER BOXESREQARE IDENTIFIEDBYECAND ASSESSORS #: 2S104DC08400 LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4: E-603 PLACARDS PHONE: 360-836-8902 PV MODULES:UL1703,IEC61730,AND IEC61215,AND NFPA 70 CLASS C FIRE S-501 ASSEMBLY DETAILS ADDRESS:6115 E 18TH STREET,SUITE B INVERTERS:UL 1741 CERTIFIED,IEEE 1547,929,519 VANCOUVER,WA 98661 COMBINER BOX(ES):UL 1703 OR UL 1741 ACCESSORY i "" • 4 . ' R-001 RESOURCE DOCUMENT ■ 1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP t .4 ,. ♦ 4L. .1:` LIC.NO.: CCB 2113331 GREENSL853KD COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED R-002 RESOURCE DOCUMENT HIT,NO.: ACCORDING TO NEC 690.7. R-003 • RESOURCE DOCUMENT ELE,NO.: 1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND ___ � �"""" a UNAUTHORIZED USE OF THIS SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC ' R-004 RESOURCE DOCUMENT DRAWING SET WTHNRTON PERMISSION FROM CONTACTOR IS IN POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION , " R-005 tENT VIOLATION OF U.S COPYRIGHT LAWS AND WLL BE SUBJECT TO CIVIL 3 PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS DAMAGES AND PROSECUTIONS. FROM LISTING OR LABELING[NEC 110.3]. ;: 1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. �> • - MAY 2 2 NEW PV SYSTEM: 9.150 kWp IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT.ALL PLAQUES AND �# ��� SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. � CITY OF 1s(AHD �UILDJNG DIVISION, MOLINARIITAVARES '�� 1.2.1 SCOPBE P •CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND ■' '. E SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING13209 SW WOODSHIRE LN ONSITE REQUIREMENTS TO DESIGN,SPECIFY,AND INSTALL THE EXTERIOR NAME:OWNER ARTHURIDAYANA MOLINARIITAVARES TIGARD, OR 97223 ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN 4 Approved plans 01 AERIAL PHOTO APN: 2S104DC08400 THIS DOCUMENT. PROJECT MANAGER NAME: MASON KIEMELE 1.3.1 WORK INCLUDES: shall be on job site. NOT TO SCALE LIABILITY PHONE: 360-977-8753 ENGINEER OF RECORD 1.3.2 PV ROOF ATTACHMENTS-IRONRIDGE FLASHFOOT2 The City of Tigard and its 1.3.3 PV RACKING SYSTEM INSTALLATION-IRONRIDGE XR10 employees Shall not be CONTRACTOR 1.3.4 PV MODULE AND INVERTER INSTALLATION MISSION SOLAR MSE305SQ8T/ NAME: GREENLIGHT SOLAR&ROOFING APSYC600 \. responsible for discrepancies PHONE: 360-836-8902 • 1.3.5 PV EQUIPMENT GROUNDING CITY OF TIGARD \ which may appear herein. 1 1.3.6 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX REVIEWED FORidODE COMPLIANCE " . AUTHORITIES HAVING JURISDICTION 1.3.7 PV LOAD CENTERS(IF INCLUDED) \ \ BUILDING: WASHINGTON COUNTY 1.3.8 PV METERING/MONITORING(IF INCLUDED) Approved: [ ] " VALIDITY OF PERMIT ZONING: WASHINGTON COUNTY 1.3.9 PV DISCONNECTS OTC: [ UTILITY: PORTLAND GENERAL ELECTRIC 1.3.10 PV GROUNDING ELECTRODE&BONDING TO(E)GEC THE ISSUANCE OF A PERMIT \q OD BASED ON CONSTRUCTION 5 1,3.11 PV FINAL COMMISSIONING Permit#: S��0 \ d DESIGN SPECIFICATIONS PAPER SIZE:11"x 17"(ANSI B) 1.3.12 (E)ELECTRICAL EQUIPMENT RETROFIT FOR PV Address: \--62.1)' G wpbs ��t-O- DOCUMENTS AND OTHER OCCUPANCY: II 1.3.13 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODEDATA SHALL NOT PREVENT CONSTRUCTION: SINGLE-FAMILY COVER PAGE Suite #: THE CODE OFFICIAL FROM ZONING: RESIDENTIAL SCOPE OF WORK By: l^/ Date: 5/ (�} - REQUIRING THE CORRECTION GROUND SNOW LOAD: 10 PSF DATE: 5.16,2019 SYSTEM SIZE: STC:30 X 305W=9.150KW - - OF ERRORS.ORSC 105.4 WIND EXPOSURE: B PTC:30 X 281.1W=8.427KWSW WOODSHIRE LANE WIND SPEED: 110 MPH DESIGN BY:K.T. • (30)MISSION SOLAR MSE305SQ8T (15)APS YC600 APPLICABLE CODES&STANDARDS CHECKED BY: M.M. OSSC 17 ORSC 6 ATTACHMENT TYPE: IRONRIDGE FLASHFOOT2 OFFICE COPY P LAT MAP N ELECTS ELECTRICAL: NEC 20107 OESC 2017017 REVISIONS 02 !W E FIRE: OFC 2017 NOT TO SCALE MSP UPGRADE: NO T-001 .00 s A B NC ND NE F G • H (SHEET 1) . A ■ B ■ C • D ■ E ■ F ■ G • H 2.1.1 SITE NOTES: 4.5.1 GROUNDING NOTES: 2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA 2.5.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, REGULATIONS. AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR 1 2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS SUCH USE. A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 2.5.3 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND GREENLIGHT 2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MINIMUM NEC TABLE 250.122. SOLAR & ROOFING MECHANICAL,OR BUILDING ROOF VENTS. 2,5.4 METAL PARTS OF MODULE FRAMES,MODULE RACKING,AND ENCLOSURES ■ ■ 2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 2.5.5 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 110.26. 690.45 AND MICROINVERTER MANUFACTORERS'INSTRUCTIONS. CONTRACTOR 2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN 2.5.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF 2 INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT GREENLIGHTSOLAR&ROOFING BUILDING OR STRUCTURE. THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 2.2.1 EQUIPMENT LOCATIONS: 2.5.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH PHONE: 360-836-8902 2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING ADDRESS:6115E 18TH STREET,SUITE B 110.26. CONDUCTOR TO ANOTHER MODULE. VANCOUVERWA 98661 2.2.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR 2.5.8 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED ■ EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) GREEN OR MARKED GREEN IF#4 AWG OR LARGER[NEC 250.119] ■ LIC.NO.: CCB 2113331 GREENSL853KD AND NEC TABLES 310.15(B)(2)(A)AND 310.15(B)(3)(C). 2.5.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC HIC.NO.: 2.2.4 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR ELE.NO.: ACCORDING TO NEC 690.34. INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO UNAUTHORIZED USE OF THIS DRAWING SET WTHOUT WRITTEN 2.2.5 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER NEC 250,NEC 690.47 AND AHJ. PERMISSION FROM CONTRACTOR IS IN IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.5.10 GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(6)(1)AND(2)TO VIOLATION OF U.S COPYRIGHT LAWS AND WILLBESUBJECT TOCIVIL 3 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL REDUCE FIRE HAZARDS DAMAGES AND PROSECUTIONS. ACCORDING TO NEC APPLICABLE CODES. 2.2.7 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR 2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: NEW PV SYSTEM: 9.150 kWp OUTDOOR USAGE WHEN APPROPRIATE. 2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH MOLINARIITAVARES IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO 2.3.1 STRUCTURAL NOTES: THE TERMINALS MARKED"LINE SIDE"(TYPICALLY THE UPPER TERMINALS). 2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO 2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE RESIDENCE iii CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A LOCKABLE,AND BEA VISIBLE-BREAK SWITCH ■ DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A 2.6.4 PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY 13209 SW WOODSHIRE LN ACCORDING TO RAI MANUFACTURER'S INSTRUCTIONS. RESPONDERS IN ACCORDANCE WITH 690.12(A)THROUGH(D). TIGARD, OR 97223 2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. 2.6.5 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, APN: 2S104DC08400 IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL AND 240. 4 REQUIREMENTS. 2.6.6 MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR 2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). ENGINEER OF RECORD SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED 2.6.7 IF REQUIRED BY AHJ,SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION CONTRACTOR. ACCORDING TO NEC 690.11 AND UL1699B. 2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.7.1 INTERCONNECTION NOTES: ii ii WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE 2.7.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 ■ STAGGERED AMONGST THE ROOF FRAMING MEMBERS. (B)] 2.7.3 THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY 2.4.1 WIRING&CONDUIT NOTES: NOT EXCEED 120%OF BUSBAR RATING[NEC 705.12(D)(2)(3)]. 2.4.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. 2.7.4 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE 5 PAPER SIZE:11"x 17"(ANSI B) 2.4.3 CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE 2.4.4 VOLTAGE DROP LIMITED TO 1.5%. END OF THE BUS FROM THE UTILITY SOURCE OCPD[NEC 705.12(6)(2)(3)]. NOTES 2.4.5 DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING 2.7.5 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/SUITABLE RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF WIRING CLIPS. BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE DATE: 5.16.2019 2.4.6 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: EXCLUDED ACCORDING TO NEC 705.12(B)(2)(3)(C). DESIGN BY:K.T. ■ PHASE A OR L1-BLACK 2.7.6 FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 ■ PHASE B OR L2-RED,OR OTHER CONVENTION IF THREE PHASE (B)(2)(1) CHECKED BY: M.M. PHASE C OR L3-BLUE,YELLOW,ORANGE**,OR OTHER CONVENTION 2.7.7 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH NEUTRAL-WHITE OR GREY SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 REVISIONS 6 IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE 2.7.8 BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT TO BE MARKED ORANGE[NEC 110.15]. FROM ADDITIONAL FASTENING[NEC 705.12(B)(5)]. G-001 .00 A ■ B ■ C ■ D ■ E ■ F ■ G ■ H (SHEET 2) 1 A - B • C • D . E ■ F ■ G ■ H GENERAL NOTES 4IPRW 1 1. FIELD VERIFY ALL MEASUREMENTS 2. ITEMS BELOW MAY NOT BE ON THIS PAGE G RE E N LI G HT ------- PROPERTY LINE SOLAR & ROOFING ■ ■ CONTRACTOR ___ .._ ----\ GREENLIGHT SOLAR&ROOFING 2 \ PHONE: 360-836-8902 \ \ ADDRESS:6115E 18TH STREET,SUITE B ■ \ \ VANCOUVER,WA 98661 ■ LIC.NO.: CCB 2113331 GREENSL853KD HIC.NO.: ELE.NO.: \ RIZED USE OF THIS \ DRAWINGG SET WITHOUT WRITTEN \ PERMISSION FROM CONTRACTOR IS IN 3 VIOLATION OF U.S.COPYRIGHT LAWS \ AND EL SUBJECTTO CIVIL DAMAGES ANDPROSE PROSECUTIONS. NEW PV SYSTEM: 9.150 kWp MOLINARIITAVARES 51'-0" ■ I I • RESIDENCE 1 __ _ 1 6'-11" 13209 SW WOODSHIRE LN METER - �; TIGARD, OR 97223 PV METER 7'-5" ,, AC DISCONNECT �i� • a APN: 2S104DC08400 4 AC LOAD CENTER rani b P .. 111' III 0 1 1 ENGINEER OF RECORD II ' 't � „ 1 \._ - , ■ 25'-9" il AREA OF WORK - - ENTRANCE -------------- 5 SW WOODSHIRE LANE PAPER SIZE:11"x 17 (ANSI B) SITE PLAN DATE: 5.16.2019 DESIGN BY:K.T. ■ ■ CHECKED BY: M.M. 6 01 SITE PLAN N REVISIONS W E 1132"=1'0" 0 16' 32' A'101 .00 s A m B • C • D • E • F • G ■ H (SHEET 3) A • B • C ■ D • E • F ■ G • H GENERAL NOTES ,a,,, ,1i/,1b,. i 1. FIELD VERIFY ALL MEASUREMENTS 1 2. ITEMS BELOW MAY NOT BE ON THIS PAGE GREENLIGHT SOLAR & ROOFING ■ ■ A MODULE STRINGING 1' FIRE ACCESS PATH 18" FIRE ACCESS PATH MODULE STRINGING CONTRACTOR (N)(1)JUNCTION BOX 18' FIRE ACCESS PATH O MODULE STRINGING GREENLIGHT SOLAR&ROOFING 2 // FIRE CLEARANCE PHONE: 360-836-8902 ARRAY 4-5.185 kW O ADDRESS:636101-58E36; 115E 18TH STREET,SUITE B x17 (N)MODULES ARRAY 1-0.915 kW TOTAL SQ.FT.OF ROOF: VANCOUVER,WA 98661 I ] OO ❑ ❑ / 1x3](N)MODULES 572.73 SQ.FT./1434.72 SQ.FT.=40% TILT:40 DEGREES ❑ ❑ 4 O �/ TILT:40 DEGREES ROOF PITCH:10:12 ■ LIC.NO.: COB 2113331 GREENSL853KD ■ AZIMUTH:270 DEGREES O OO O O ❑ ROOF PITCH:10:12 HIC,NO.: B B B B O AZIMUTH:90 DEGREES ELE.NO.: ��/Mk UNAUTHORIZEDTUSE OF THIS DRAWING SET WITHOUT WRITTEN O O -II��1/ VIOLATION OF U.S.COPYRM IGHT LAWS CTOR IS N OC � O O AND IMLL BE SUBJECT TO CIVIL 3 _0 0 O O_ .� PERMISSION��•• DAMAGES AND PROSECUTIONS. EXTERIOR PV EQUIPMENT C O // A B _ -e# A (E)(1)METER 0 G � � O NEW PV SYSTEM: 9.150 kWp _0® (N)(1)PV METER _ ARRAY 2-1.220 kW MOLINARIITAVARES (N)(1)AC DISCONNECT //\01 O -,5_,:i O ! [x4](N)MODULES s (N)(1)AC LOAD CENTER O /// fJ TILT:40 DEGREES 0 ROOF PITCH:10:12 i RESIDENCE ■ INTERIOR PV EQUIPMENT i AZIMUTH:90 DEGREES (E)(1)MAIN ELECTRICAL PANEL ! 0 I 132 T SW WOODSHIRE LN OR 97223 /// / i 3' FIRE ACCESS PATH APN: 2S104DC08400 4 18" FIRE ACCESS PATH 1' FIRE ACCESS PATH ENGINEER OF RECORD 18" FIRE ACCESS PATH ARRAY 3-1.830 kW [x6](N)MODULES IIIITILT:40 DEGREES ROOF PITCH:10:12 AZIMUTH:180 DEGREES PAPER SIZE:11"x 17"(ANSI B) 5 ELECTRICAL PLAN 39.33" DATE: 5.16.2019 I I DESIGN BY:K.T. ■ f MODULE: ■ CHECKED BY: M.M. ELECTRICAL PLAN N MISSION SOLAR 65.53" MSE305SQ8T REVISIONS 6 01 W E 3132°=1 _o ° 10's° 1 305 WATTS i !S 1 A-102.00 A ■ B ■ C • D • E • F m G • H (SHEET 4) A . B . C in D ■ E ■ F ■ G . H GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS 1 2. ITEMS BELOW MAY NOT BE ON THIS PAGE GREENLIGHT ROOF ATT. TYP. @48" MAX. ■ SOLAR & ROOFING ■ _ _ _ _ ROOF TRUSSES 2"X6" TRUSS @24" 0.C. CONTRACTOR TOTAL SQ.FT.OF ROOF: GREENLIGHT SOLAR&ROOFING 2 572.73 SQ.FT./1434.72 SQ.FT. 40% PHONE: 360-836-8902 ADDRESS:6115 E 18TH STREET,SUITE B __ VANCOUVER,WA 98661 m o-; `r~ __ II• LIC.NO.: CCB 211333/GREENSL853KD ■ ❑ ❑ ------- HIC.NO.: ---- - - - Q-- ELE.NO.: __ . __ _,_� UNAUTHORIZED USE OF THIS 4.-4 --o-- o-•-es-- __ DRAWING SET WITHOUTWRITTEN --r PERMISSION FROM CONTRACTOR IS IN ❑ ❑ VIOLATION OF U SCOPYRIGHT LAWS AND W LL BE SUBJECT TO CIVIL -_o--- - I I DAMAGES AND PROSECUTIONS. 3 •-.o-tee..•- I I STANDOFF SOLAR MODULES ATTACHED __ t-4-1 " bilTOROOFSURFACE(SEESHEETS-501FORNEW PV SYSTEM: 9.150 kWp IIIMOUNTINGDETAILS)____� _._ �o_--__ sI I I 11 MOLINARIITAVARES --_ I 1 I I I - -0--� I I I I I I -- a--P-'I 1 I T I 1 ROOF MATERIAL IS ASPHALT SHINGLEe� -4i -----I I I1 1 1 -- J---*-- ■ :�_a_o_.__ ; 1 ; ; ; I _ RESIDENCE 1 I -° --- - 13209 SW WOODSHIRE LN — TIGARD, OR 97223 APN: 2S104DC08400 1 1 I 1 1 m -->-- I I 1 1 1 4 11 I 1 I I - I I I 1 I I ---I 1 1 1 1 1 ENGINEER OF RECORD 1 1 1 1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 1 1 ■ PAPER SIZE:11"x 17"(ANSI B) 5 SOLAR ATTACHMENT PLAN 39.3311 DATE: 5.16.2019 H— I DESIGN BY:K.T. ■ t MODULE: ■ CHECKED BY: M.M. N MISSION SOLAR SOLAR ATTACHMENT PLAN W E 65.53" REVISIONS 6 01MSE305SQ8T 3/32"=1' 0 _" 10'8" s 305 WATTS A-103.00 � (SHEET 5) A m B m C m D ■ E ■ F G H A . B . C ■ D ■ E • F • G • H CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS - ° AMP. TERMINAL H VOLTAGE DROP ID TYPICAL CONDUCTOR CONDUIT CURRENT CARRYING CONDUCTORS OCPD EGC TEMP.CORR.FACTOR CONDUIT FILL FACTOR CONT.CURRENT MAX.CURRENT(125/0) BASE AMP. DERATED AMP. TERM.TEMP.RATING @ LENGT IN CONDUIT 01 3 12 AWG THWN-2,COPPER FREE AIR 2 N/A 12 AWG THWN-2,COPPER 0.71(55.3°C) 1 11.4A 14.25A 30A 21.3A 75°C 25A 3 FT. 0.045% 1 01 1 10 AWG THWN-2,COPPER 0.75"DIA EMT 6 15A 10 AWG THWN-2,COPPER 0.76(55°C) 0,8 11.4A 14.25A 40A 24.32A 75°C 35A 20 FT. 0.19% 02 1 8 AWG THWN-2,COPPER 0.75"DIA EMT 2 N/A 8 AWG THWN-2,COPPER 0.96(33°C) 1 34.2A 42.75A 55A 52.8A 75°C 50A 10 FT. 0.18% GREEN LIGHT 03 1 8 AWG THWN-2,COPPER 0.75"DIA EMT 2 N/A 8 AWG THWN-2,COPPER 0.96(33°C) 1 34.2A 42.75A 55A 52.8A 75°C 50A 10 FT. 0.18% SOLAR & ROOFING r04 1 8 AWG THWN-2,COPPER 0.75"DIA EMT 2 45A 8 AWG THWN-2,COPPER 0.96(33°C) 1 34.2A 42.75A 55A 52.8A 75°C 50A 30 FT. 0.54% II 1. SYSTEM DESIGN CALCULATIONS REPORT(NON-CODE) OA MODULE STRINGING 1.1.PV SOURCE CIRCUIT VOLTAGE RANGE TEST CONTRACTOR THIS TEST CONFIRMS THAT THE VOLTAGE OF THE PV SOURCE CIRCUIT WILL ALWAYS REMAIN WITHIN THE DC INPUT VOLTAGE O MODULE STRINGING WINDOW OF THE SYSTEM'S INVERTER,MICROINVERTERS,OR POWER OPTIMIZERS. GREENLGHT SOLAR&ROOFING 2 1.1.1.(32)MSE305SQ8T(305W)IN SERIES OC MODULE STRINGING SECTION PROPERTIES VALIDATION TESTS DESCRIPTION (32)MSE305SQ8T IN SERIES THE MINIMUM VMP MUST EXCEED THE PASS PHONE: 360-836-8902 MINIMUM INPUT VOLTAGE OF THE ADDRESS:6115 E 18TH STREET,SUITE B CONNECTED DEVICE YC600 CONNECTED DEVICE VANCOUVER,WA 98661 CONNECTED DEVICE TYPE MICROINVERTER 28,29V>16V=TRUE DESIGN LOW TEMP. -12°C • DESIGN HIGH TEMP. 33.3°C THE MAXIMUM VOC MUST NOT EXCEED PASS • LIC.NO.: CCB 211333/GREENSL853KD MODULE MSE305SQ8T(305W) THE MAX INPUT VOLTAGE OF THE TO UTILITY HIC.NO.: MODULE VMP 33.14V CONNECTED DEVICEELE,NO.: MODULE VOC 40.1V 44.24V<55V=TRUE MAIN SERVICE PANEL GRID (UG) MICROINVERTER MIN.INPUT 16V UNAUTHORIZED USE OF THIS VOLTAGE 240/120 V 10, 3WDRAWING SET WITHOUT WRITTEN MICROINVERTER MAX.INPUT 55V A A A PERMISSION FROM CONTRACTOR IS IN MOUNTING METHOD FLUSH ROOF MOUNT MAIN BUSS: 200A VIOLATION OF U.S COPYRIGHT LAWS TEMP.COEFFICIENT VOC -0.112V/C AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. VOLTAGE LOSS DUE TO 0.0 L2 3 DEGRADATION LOSS DUE TE N NEW PV SYSTEM: 9.150 kWp VOLTAGEEDERA E 0.0 (15)APS PV SYSTEM IS NEC 690.12 TOLERANCEDERATE INVERTER MIN.VOLTAGE 0.0 INCREASE DUE TO HIGH YC600 RAPID SHUTDOWN COMPLIANT Li TEMPERATURES MOLINARIITAVARES MICROINVETER JUNCTION BOX SEE SHEETS R-003 • Calculations A.STRING VOC AT LOW 44.24V A 01 02 ii RESIDENCE TEMPERATURE THE MODULE VOC(40.1V)WILL INCREASE TO 44.24V AT .•. _ L1N L2 (E) 13209 SW WOODSHIRE LN THE DESIGN LOW TEMPERATURE(-12°C) 10717717 . UT ILITY TIGARD, OR 97223 • • (-12°C-25°C)X-0.112V/C+40.1V=44.24V WHITE 0 0 THE TOTAL VOC FOR THE STRING IS44.24V IN BRANCH RED --.9----° • • • METER APN: 2S104DC08400 44.24V X 1=44.24V J BLACK ' �.9 • • 4 B.STRING VMP AT HIGH 28.29V 15A • GROUND TEMPERATURE o1 ROD ESTIMATED CELL TEMPERATURE EQUALS THE DESIGN HIGH O • ENGINEER OF RECORD TEMPERATURE(33.3°C)PLUS 35°C(THE ESTIMATED __ ___ _ ___..- ' ' DIFFERENCE BETWEEN AMBIENT TEMPERATURES AND THE CELL TEMPERATURE FOR A ROOF MOUNT WITH TILT). 10 777 • • o 33.3°C+35°C=68.3°C WHITE - - (E) GROUNDING THE MODULE VMP(33.14V)WILL DROP TO 28.29V AT THE IN BRANCH RED s..._.... • N DESIGN HIGH TEMPERATURE(33.3°C). J BLACK -� • ELECTRODE AC DISCONNECT PV METER (E) (68.3°C-25°C)X-0.112VIC+33.14V=28.29V 15A THE TOTAL VMP FOR THE STRING IS 28.29V. 60A • MAIN 28.29v x 1=28.29v 01 CD • • • N 200A .J • CC613 ) 10 _ 03 04 05 1 \ / ( CB4 ) 0-(M.--► TO (E))+ ��/'^�r--�e-......., WHITE ° Y 11 o Y 45A °-O °-►, LOADS PAPER SIZE:11"x 17"(ANSI B) 5 IN BRANCH RED � o °-°, c a/o o L2 ° J BLACK �L ��o L1 LINE DIAGRAM 15A ° G J--- _ � J_ DATE: 5.162019 L_-_J L__J •• • (30) MISSION SOLAR 60A LOAD CENTER EQUIPMENT LEFT EQUIPMENT RIGHT DESIGN BY:K.T. MSE305SQ8T 120/240V, 10, 3W LINE IS (N) NEW I LINE IS (E) EXISTING CHECKED BY: MM. UNLESS OTHERWISE NOTED. REVISIONS 6 E-601 .00 A mB mC • D • E • F • G ■ H (SHEET6) • • A • B • C • D • E • F • G • H 1 GREENLIGHT SOLAR & ROOFING ■ SYSTEM SUMMARY MODULES le BRANCH#1 BRANCH#2 BRANCH#3 REF. QTY. MAKE AND MODEL PMAX PTC ISC IMP VOC VMP _ TEMP.COEFF.OF VOC FUSE RATING INVERTERS PER BRANCH 5 5 5 PM1-30 30 MISSION SOLAR MSE305SQ8K 305W 280.9W 9.723A 9.238A 39.96V 33.02V -0.112V/°C(-0.28%/°C) 20A MAX AC CURRENT 11.4A 11.4A 11.4A CONTRACTOR MAX AC OUTPUT POWER 3,000W 3,000W 3,000W INVERTERS 9,150W OCPD MAX OUTPUT MAX INPUT CEC WEIGHTED ARRAY STC POWER REF.QTY. MAKE AND MODEL AC VOLTAGE GROUND RATING RATED POWER CURRENT CURRENT MAX INPUT VOLTAGE EFFICIENCY GREENLIGHT SOLAR&ROOFING 2 ARRAY PTC POWER 8,427W MAX AC CURRENT 34.2A 11-15 15 APS YC600 240V FLOATING 20A 548W 2.28A 2X12A 55V 96,5% MAX AC POWER 9,000W DERATED(CEC)AC POWER 8,132W DISCONNECTS OCPDS PHONE: 360-836-8902 REF. QTY. MAKE AND MODEL RATED CURRENT MAX RATED VOLTAGE REF. QTY. RATED CURRENT MAX VOLTAGE ADDRESS:6115 E 18TH STREET,SUITE B DESIGN TEMPERATURES SW1 1 SQUARE D DU222RB OR EQUIV. 60A 240VAC CB1-3 3 15A 240VAC VANCOUVER,WA 98661 ASHRAE EXTREME LOW -10°C(14.0°F),SOURCE:AURORA STATE(45.25°;-122.77°) CB4 1 45A 240VAC ■ ASHRAE 2%HIGH 33°C(91.4°F),SOURCE:AURORA STATE(45.25°;-122.77°) • LIC.NO.: CCB 2113331 GREENSL853KD HIC.NO.: ELE.NO.: UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S.COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. 3 NEW PV SYSTEM: 9.150 kWp MOLINARIITAVARES ■ • RESIDENCE 13209 SW WOODSHIRE LN TIGARD, OR 97223 APN: 2S104DC08400 4 ENGINEER OF RECORD ■ ■ PAPER SIZE.11"x 17"(ANSI B) 5 DESIGN TABLES DATE: 5.16.2019 DESIGN BY:K.T. ■ ■ CHECKED BY: M.M. REVISIONS 6 E-602.00 A ■ B • C • D • E • F • G • H (SHEET 7) A ■ B • C ■ D • E • F • G • H 0 !CAUTION ! 0 ..,. .. , . :. , 1 POWER TO THIS BUILDING IS ALSO SUPPLIED GREENLIGHT FROM ROOF MOUNTED SOLAR ARRAYS WITH SOLAR & ROOFING SAFETY DISCONNECTS AS SHOWN: CONTRACTOR PV ARRAY _ � GREENLIGHT SOLAR&ROOFING 2 ! WARNING ! Num ' PHONE: 360-836-8902 0 ELECTRIC SHOCK HAZARD 0 ADDRESS:6115 E 18TH STREET,SUITE B_ TERMINALS ON BOTH LINE AND LOAD SIDES - - ■ VANCOUVER,WA 98661 MAY BE ENERGIZED IN THE OPEN POSITION,' BACK ■■■ FRONT ■ TURN RAPID SHUTDOWN -.4&,. ■■� _ • LIC.NO.: CCB 211333/GREENSL853KD LABEL 3 SWICH TO THE"OFF" � HIC.NO,: AT EACH DISCONNECTING MEANS FOR POSITION TO SHUTDOWN ���mJr— ` ELE.NO.: Am-- � , PV ARRAY UNAUTHORIZED USE OF THIS PHOTOVOLTAIC EQUIPMENT PV SYSTEM AND REDUCE DRAWING SET WITHOUT WRITTEN [NEC 690.13 AND 690.15] SHOCK HAZARD IN ARRAY . PERMISSION FROM CONTRACTOR IS IN w VIOLATION OF U S.COPYRIGHT LAWS MAIN DISTRIBUTION AND WLL BE SUBJECT TO CIVIL 3 LABEL 1Z UTILITY DISCONNECT DAMAGES AND PROSECUTIONS. RAPID 690 [NEC690.56(C)(1)(A)].SHUTDOWN SYSTEM DIRECTORY NEW PV SYSTEM: 9.150 kWp [N PERMANENT PLAQUE OR I I I INTERACTIVE PHOTOVOLTAIC SYSTEM DIRECTORY PROVIDING O ° MOLINARIITAVARES ! WARNING . CAUTION . THE LOCATION OF THE O 0 0 0 CONNECTED 0 SERVICE DUAL POWER SOURCES. PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC SYSTEM DISCONNECT LOCATED DISCONNECTING MEANSRESIDENCE • SECOND SOURCE IS PV SYSTEM CIRCUIT IS BACKFED WEST SIDE OF THE HOUSE AND THE PHOTOVOLTAIC Alit SYSTEM DISCONNECTING LABEL 6 LABEL 7 PLAQUEMEANS IF NOT IN THE 13209 SW WOODSHIRE LN AT POINT OF INTERCONNECTION;LABEL,SUCH AS LABEL 5 OR LABEL 6 MUST IDENTIFY SAME LOCATION TIGARD, OR 97223 PHOTOVOLTAIC SYSTEM [NEC 690.56(B)] APN: 2S104DC08400 [NEC 705.12(6)(4)] WHERE THE PV SYSTEMS 4 PHOTOVOLTAIC m� ..,a�.. . ` .. PHOTOVOLTAIC SYST ARE REMOTELY LOCATED FROM EACH OTHER,A O INTERACTIVE PHOTOVOLTAIC SYSTEM o o AC DISCONNECT 0 EQUIPPED WITH RAPT o DIRECTORY IN ENGINEER OF RECORD CONNECTED ACCORDANCE WITH 705.10 OPERATING CURRENT: 34.2A AC SHUTDOWN SHALL BE PROVIDED AT OPERATING VOLTAGE 240 V AC EACH PV SYSTEM LABEL 8 LABEL 5 LABEL 10 DISCONNECTING MEANS. AT UTILITY METER AT POINT OF INTERCONNECTION,MARKED AT RAPID SHUTDOWN SWITCH PV SYSTEM EQUIPMENT ■ ■ [NEC 690.56(B)] AT DISCONNECTING MEANS [NEC 690.56(C)]. AND DISCONNECTING [NEC 690.54] LETTERS AT LEAST 3/8 INCH;WHITE ON RED MEANS SHALL NOT BE BACKGROUND;REFLECTIVE INSTALLED IN BATHROOMS [IFC 605.11.1.1] [NEC 690.4(D),(E)] �. .n ._. ! WARNING ! 5 o ARNING: PHOTOVOLTAIC o o PHOTOVOLTAIC o o POWER SOURCE OUTPUT 0 PAPER SIZE II"x17"(ANSI B) POWER SOURCE AC DISCONNECT CONNECTION-DO NOT RELOCATE PLACARDS THIS OVERCURRENT DEVISE I LABEL11 LABEL12 LABEL13 AT EXPOSED RACEWAYS,CABLE TRAYS,AND OTHER WIRING AT EACH AC DISCONNECTING MEANS AT POINT OF INTERCONNECTION DATE: 5.16.2019 METHODS;SPACED AT MAXIMUM 10 FT SECTION OR WHERE [NEC 690.13(B)] OVERCURRENT DEVICE DESIGN BY:K.T. ■ SEPARATED BY ENCLOSURES,WALLS,PARTITIONS,CEILINGS, LABELING NOTES [NEC 705.12(B)(2)(3)(B)] ■ OR FLOORS. 1.1 LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRICAL CODE,INTERNATIONAL FIRE CODE 605.11,OSHA CHECKED BY: M.M. [NEC 690.31(G)] STANDARD 1910.145,ANSI Z535 LETTERS AT LEAST 3/8 INCH;WHITE ON RED BACKGROUND; 1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. REVISIONS 6 REFLECTIVE 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. [IFC 605.11.1.1] 1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8"AND PERMANENTLY AFFIXED. 1.5 ALERTING WORDS TO BE COLOR CODED. "DANGER"WILL HAVE RED BACKGROUND;"WARNING"WILL HAVE ORANGE E-603.00 BACKGROUND;"CAUTION"WILL HAVE YELLOW BACKGROUND.[ANSI Z535] A • B • C • D • E • F • G • H (SHEET8) • . A is B a C N D ■ E ■ F ■ G ■ H D4 20 GENERAL NOTES 1 - / -50 ----Ilk- D5 LS-501 1. FIELD VERIFY ALL MEASUREMENTS GREENLIGHT o©o ', 0, _i___- / _ ................................. .:.................. ...... ..... ............. SOLAR & ROOFING 0 TH, T ®0 000 0 CONTRACTOR ®°® o //: 4 / 0 GREENLIGHT SOLAR&ROOFING 2 01, 111MIIMIIIMINIUM=IIMIIM L RACKING DETAI (LONGITUDINAL) PHONE: 360-836-8902 8' 8' D2 NOT TO SCALE 0 SHEET KEYNOTES ADDRESS.6115E 18TH STREET,SUITE B 1. ROOF MATERIAL:ASPHALT SHINGLE VANCOUVER,WA 98661 2. ROOF STRUCTURE:TRUSS ■ -,c- 3. ATTACHMENT TYPE:IRONRIDGE FLASHFOOT2 i LIC.NO.: CCB 2113331 GREENSL853KD 4. MODULE MANUFACTURER:MISSION SOLAR HIC.NO.: 5. MODULE MODEL:MSE305SQ8T ELE.NO.. RACKING DETAIL (TRANSVERSE) 6 MODULE LENGTH 65.53" UNAUTHORIZEDWISETWITH UTTHIS WRI D 1 7. MODULE LENGTH: :65.5 DRAWING WITHOUT WRITTEN 8. MODULE WEIGHT:40.1 LBS, PERMISSION FROM CONTRACTOR IS IN NOT TO SCALE 9. SEE SHEET A-103 FOR DIMENSION(S) VIOLATION OF U.S.COPYRIGHT LAWS 10. MIN.FIRE OFFSET:1'FROM RIDGE,3'FROM AND WLLBE SUBJECT TO CIVIL 3 ONE SIDE,18"FROM HIPSNALLEYS DAMAGES AND PROSECUTIONS. 10 0 11. TRUSS SPACING:24 IN.O.C. NEW PV SYSTEM: 9.150 kWp 12. TRUSS SIZE:2X6 NOMINAL 13. LAG BOLT DIAMETER:3/8 IN. , III i i i i 1 1 1 1 i 1 14. LAG BOLT EMBEDMENT:4IN. r 1 I I 1 I I I I I I I I I I I I I a 15. TOTAL BOF OLT ATTACHMENTS:99 MOLINARIITAVARES 10 I I 1111111111111 I 16. TOTAL AREA:536.94 SQ.FT. I I I I I I o 17. TOTAL WEIGHT:1433.32 LBS. ■ _ I I I I I I I I I I I I 1 RESIDENCE 1 1 1 1 1 cc 18. WEIGHT PER ATTACHMENT:14.48 LBS. 19. DISTRIBUTED LOAD:2.67 PSF. I I I 'I I I I I , 20. MAX.HORIZONTAL STANDOFF:481N. 13209 SW WOODSHIRE LN 21. MAX.VERTICAL STANDOFF: O I 1 I 1 I p1 22. SCAPE:26 IN.,PORTRAIT:32 IN. LAD STANDOFFSTAGGERIING:YES TIGARD, OR 97223 IIIII IIIIIAPN: 2S104DC08400 23. RAIL MANUFACTURER(OR EQUIV.): 4 I I I I .1 I I c IRONRIDGE 24. RAIL MODEL(OR EQUIVALENT):XR10 I I 6 , , . , , , , , I I 25. RAIL WEIGHT:0.436PLF. ENGINEER OF RECORD 1 I 1 I I 1 I 1 1 1 1 I 1 I 1 I 26. MAX.TRUSS SPAN:6 FT. III I I I I I I 1 1 I 1 I 1 1 1 I 1 I 1 I 1 I 1 I I I I I I I 27. MODULE CLEARANCE:3 IN.MIN.,6IN.MAX. 0 ■ 11 RACKING DETAIL (TOP) D3NOT TO SCALE 5 ,.- •♦••♦••�♦���I,������������� PAPER SIZE:11"x 17"(ANSI B) Tal . -11MIIMIIMIIMI .. MIIIIIMINIEASSEMBLY DETAILS �, DATE: 5.16.2019 "`�`�r _�`t_�`R` I1 DESIGN BY:K.T. ■ ■ CHECKED BY: M.M. 6 DETAIL (TRANSVERSE) (LONGITUDINAL)DETAIL REVISIONS D4NOT TO SCALE D5 NOT TO SCALE S-501 .00 A • B • C • D N E • F • G • H (SHEETS) • A • B • C a D ■ E ■ F ■ G • H 1 GREENLIGHT PERC 60 CLASS LEADING 300-310W SOLAR & ROOFING ■ rENTIA a'CIA .: • 0• ELECTRICAL SPECIFICATIONS CERTIFICATIONS&TESTS _ High Power PERC Rooftop Module Electrical Parameters at Standard Test Conditions(STC) ° All-black PERC with 5 bulbar technology Module Type MSE300SQ8T MSE3O5SQ8T MSE310SQ8T IEC CONTRACTOR Power Output Pmax Wp 300 305 310 61215/61730/61701 i. Module Efficiency % 18.05 18.35 18.65 LA. SOLAR&ROOFING 2 Tolerance 0-+3% 0-+3% 0-+3% UL 1703 listed -_ _ CERTIFIED RELIABILITY Short-Circuit Current k A 9.571 9.664 9.760 >Tested to UL1703&IEC standards Circuit Voltage Voc V 40.08 40.10 40.12 /11I '4--- Open c �I. us PHONE: 360-836-8902 >PID Resistant j limo O PowerGuord CEC Rated Current Imp A 9.058 9.202 9.345 ADDRESS:6115 E 18TH STREET,SUITE B Rated Voltage Vmp V 33.12 33.14 33.17 SUPERIOR AESTHETICS VANCOUVER,WA98661 1 >All-black design coupled-with outstanding power output Fuse Rating 15 20 20 ■ >Ideal for residential&commercial applications ■ LIC.NO.: CCB 211333 I GREENSL853KD HIC.NO.: TEMPERATURE COEFFICIENTS ELE.NO.: EXTREME WEATHER RESILIENCE 46.09°C MSE305SQ8T:30SWP,60CELL SOLAR MODULE UNAUTHORIZED USE OF THIS Normal Operating Cell Temperature(NOCT) DRAWING SET WITHOUT WRITTEN —�� >5631 Pa snow load(117 psf)tested load to UL1703 CURRENT-VOLTAGE CURVE >185 mph wind rating° Temperature Coefficient of Pmax -0.377%/°C PERMISSION FROM CONTRACTOR IS IN 12 Temperature Coefficient of Voc -0.280%/°C Cells Temp-25"C VIOLATION OF U.S.COPYRIGHT LAWS Incident Irrd.=1,000 w/m AND WILL BE SUBJECT TO CIVIL 3 BAA COMPLIANT FOR GOVERNMENT PROJECTS Temperature Coefficientotisc 0.039%/°C m — 308.1 w DAMAGES AND PROSECUTIONS. >Buy American Act American Recovery&Reinvestment Act a Incident d.=800 W/m 2-.1.W NEW PV SYSTEM: 9.150 kWp OPERATING CONDITIONS a 8 6 Incident Ir d-600 W/m 1 w Maximum System Voltage 1,000VDC t MO LI NARIITAVARES M Operating Temperature Range -40°C(-40°F)to+85°C(185°Fj v a Incident trrd aoo w/m 12 *r MODULES i t Maximum Series Fuse Rating Irrd-too w/m 1t Incident.-. n ■ 'IF,Ade 4.4igie LA E ncml:EO o 25-YEAR 12 Fire Safety Classification Class C 2 5e ,,,� • RESIDENCE IN THE USA J Front&Back Load(UL standard) 5631Pa(117 psf)Tested to 0 0 o 11 1 00 or.sARO NenUsPARTS 1111703 standard LINEAR WARRANTY PRODUCT WARRANTY 13209 SW WOODSHIRE LN Hail Safety Impact Velocity 25mm at 23 m/s Voltage(VI Current-voltage characteristics with dependence on irradiance TIGARD, OR 97223 100% ' __, , MECHANICAL DATA and module temperature 300_ ®Mission Solar Energy Warranty APN: 2S104DC08400 t`. 90.7%; Solar Cells P-type Mono-crystalline Silicon (156.75mm) 4 90% CLASS LEADING POWER OUTPUT w. Cell orientation 60 cells(6x10).Sbusbar BASIC DESIGN(UNITS:mm) i 80.2% 1664mm x 999mm x 40mm ENGINEER OF RECORD Module dimension - 0° 80% (65.53 in.x 39.33 in.x 1.58 in.) --°9900 O -.' ssa s- Weight 18.2 kg(40.1 Ib) "� - L 18 o i r-, f T 292 00 18 ( 5 0 70% Front Glass -HII Hole 3.2mm(0.126 in.)tempered, 1 10 15 20 25 Low-iron,Anti-reflective coating �° 932 00 / r 8 '00 MAXIMUM EFFICIENCY YEARS Frame Anodized aluminum alloy Azu 1 ii �I Mounting Ho Hole' le l ■ I Encapsulant Ethylene vinyl acetate(EVA) • I I I 1-Box Protection lass IP67 with 3bypass-diodes I I_I I 1 Hole ng 0 N / , CERTIFICATIONSII i. Hae Cables PV wire,lm(39.37 in.),4mm�/12 AWG I EC 61215/IEC 61730/IEC 61701 UL 1703 POSITIVE POWER TOLERANCE Connector MC4 l� saz 00 � Latriii.', c BL us PowerGuard CEC 1500' """" SHIPPING INFORMATION -it PAPER SIZE:11"x 17"(ANSI e) LISTED 5 �za, �'' n� American Quality t - High-Power, 'As there am different certification requirements in different markets.please contact your local Container FT Paf1e15 305 W 1600 - 999� Mission Solar Energy is headquartered in San Antonio.TX with module Mission Solar Energy sales representative for the specific certificates applicable to the products in RESOURCE DOCUMENT facilities onsite.We produce American quality poducts ensuring the the region in which the products are to be used. 53 Double stack 36 936 285.48 kW highest power output and reliability to our customers.Our product line '185 mph wind rating based upon installation at 30°or less fixed tilt mount Front View Back View 40' Double stack 28 728 222.04 kW is well suited for residential,commercial and utility applications.Every Mission Solar Energy product is certified and surpasses industry Panels Weight Height Width Length DATE: 5.16.2019 standard regulations,proving excellent performance over the long-term. •� PallcZb ;,105165 45.50" 45.50" 67.00" r. ■ MISSION SOLAR MISSION SOLAR 0� DESIGN BY:K T. ENERGY all ' ■ www.missionsolar,com I info@missionsolar.com ENERGY '1Nss'•,, r Y i., s;c NEIN BraunfelAve..San Antonio m .Texas78235 CHECKED BY: M.M, u _,on Solar Energy reserves the right to make spec fication charges w thou' otic0 Io amiss cr sola cum.www- s onsolar corn REVISIONS 6 R-001 .00 ■ (SHEET 10) A in B . C • D • E li F ■ G H • A • B • C M D ■ E ■ F ■ G • H 4 1 , , U GREEN LIGHT • APsystems YC600 Microinverter Datasheet ■ SOLAR & ROOFING 0 4 APsystems INPUT DATA (DC) CONTRACTOR • ALTENERGY POWER Leading the Industry in Module Compatibility 60&72 Cell PV Modules Solar Microinverter Technology MPPT Voltage Range 22-45V GREENLIGHT SOLAR&ROOFING 2 Operation Voltage Range 16-55V Maximum Input Voltage 55V Startup Voltage 20 V ,_._, F_. .a�_ Maximum Input current 12A x 2 PHONE 360-836-8902 s Maximum Total PV Array Short Circuit Current 15A ADDRESS:6115 E 18TH STREET,SUITE B I -:. Maximum Inverter Backfeed Current to the Array OA VANCOUVER,WA 98661 I 1OUTPUT DATA (AC) 240V 208V ■ LIC.NO.: CCB 211333/GREENSL853KO MI c ro i nve rte r Maximum Continuous Output Power 548VA 548VA HIC.NO.: ELE.NO.: Peak Output Power 600VA I 600VA 240V 208V UNAUTHORIZED USE OF THIS • • Dual-module rnicroinverter with independent MPPT Nominal Output Voltage DRAVNGSET V1THOUTWRITTEN Utility-interactive with Reactive Power Control(RPC) Nominal Output Current 2.28A i 2.63A PERMISSION FROM CONTRACTOR IS IN 60Hz 60Hz VIOLATION OF U.S.COPYRIGHT LAWS CA Rule 21 compliant Nominal Output Frequency AND BILL BE SUBJECT TO CIVIL Adjustable Output Voltage Range 211V-264V 183-229V DAMAGES AND PROSECUTIONS. 3 t. Continuous power of 274VA per channel,300VA peak Adjustable Output Frequency Range 59.3-60.5Hz 59.3-60.5Hz -t: • Accommodates modules from 250-365W+ Power Factor >0.99 1 >0.99 NEW PV SYSTEM: 9.150 kWp • Wide MPPT voltage range(22V-45V) <3% <3% Total Harmonic Distortion • Meets NEC 2014/2017 690.12 Rapid Shutdown requirements Maximum Units per Branch 7(14 PV modules) 1 6(12 PV modules) MO LI NARIITAVARES • ZigBee communication&free monitoring EFFICIENCY • RESIDENCE Peak Efficiency 96.7% il DIMENSIONS CEC Weighted Efficiency 96.5% With its groundbreaking design and features,the YC600 is the Nominal MPPT Efficiency 99.5% 10.2" 1.2" 13209 SW WOODSH I RE LN pinnacle of microinverter technology. A single-phase, smart Night Power Consumption 60mW grid-compliant microinverter,the YC600 serves two modules TIGARD, OR 97223 j i with dual,independent MPPT.Zigbee wireless communication MECHANICAL DATA APN: 2S104DC08400 over a mesh network offers faster data speeds than PLC and a Operating Ambient Temperature Range -40°F to+149°F(-40°C to+65°C) r 1 -40°F to+185°F(-40°C to+85°C) Storage Temperature Range 4 wider MPPT voltage range results in a greater energy harvest 10.24"x Z4"x 1.24" Dimensions(WxHxD)inches for homeowners.• ENGINEER OF RECORD Dimensions(WxHxD)mm 260mm x 188mm x 31.5mm 'v, I t� c Weight 7.1 lbs(3.22kg) A true utility-interactive microinverter with Reactive Power AC BUS Maximum Current 20A Control (RPC) technology, the YC600 meets CA Rule 21 Enclosure Rating NEMA 6(IP67) 2 1 _al___ __so y requirements and is inherently NEC 2014/2017 Rapid Cooling Natural Convection-No Fans NShutdown compliant.The unit also builds on the successful 0 APsystems line of multi-module microinverters, simplifying FEATURES & COMPLIANCE WIRING SCHEMATIC installation and reducing logistics costs. Communication ZigBee Transformer Design High Frequency Transformers,Galvanic Isolation Monitoring Via EMA•"Online Portal S■■■■■■: imam' ■■■■■■■ S■■■■■MSSMMEEMN SMNEMME mum ■■■■■■■ ■■■■■■■S S■■■■■■S S■■■■■■■ ummum Emissions&Immunity(EMC)Compliance FCC PART 15,ANSI C63.4,ICES-003 MSMMM■■N i■S■■MM■ ■SE■■■■■ I•■■■■■■■ ■■■■■■■S ■■■■■■■■ ■■■MM■t ■■■■■■■■ ■■■■■■■S S■■■■■■ ■■■■■■■■ \■■■■■■S Safety&Grid Connection Compliance UL 1741,UL 1741 SA,IEEE1547,CSA C22.2 No.107.1-01, I NEC 2017 690.12 PAPER SIZE:11"x 17"(ANSI B) S■■■■■■• sammon ■■■■■■■■ SEEEEN■■ ■■■■■■■N ■■■■■■■ SMENENMS IIENNNNNE SNENNEEN NNEMSMEM ■■NEEM■■ SEEN■■■■ 'Depending on the local regulations. RESOURCE DOCUMENT SNNMEN: SE■MMMMS SES■■EE/ S■■■■■■S SIEMENS' S■■■■■■■ "APsystems online Energy Management Analysis(EMA)platform ■■■■■■■• S■■■■■■■ ■■■■■■■■ ■■■■■■■■ S■■■■■■■ ■■■■■■■■ ■■■■N■NIIII ■.■■■■■S ■■S■■■M •-■■■■■■ S■■■■■/" n.N■■■■■ u!Er-L_ .'■■ Mr—L-1 'gin gi��—�--1 _gm Specifications subject to change without notice-please ensure you are using the _111 „ �� - " „ 8.17:�i All Rights Reserved .1 .1 .1 ., .1 most recent version found at APsystems.com DATE: 5.16.2019 ØAPsystems DESIGN BY:KT. 600 Ericksen Ave NE,Suite 200,Seattle,WA 98110 I 844.666.7035 APsystems.com S 1 `_ . ALTENERGY POWER S CHECKED BY: M.M. In d 1111 REVISIONS 6 R-002.00 A M B ■ C • D E E • F • G M H (SHEET11) A . B ■ C ■ D • E ■ F ■ G • H 1 GREENLIGHT 0.4 SOLAR & ROOFING APy terns Products i€ w t4 Order Resources Partners ■ CONTRACTOR 2 Solar electric PV systems with APsystems microinverters have one utility-interactive inverter directly GREENLIGHTSOLAR&ROOFING connected with two solar modules (YC600), converting low-voltage DC to utility grid-compliant AC. When PHONE: 360-836-8902 ADDRESS:6115 E 18TH STREET,SUITE B the utility grid is available and the sun is shining, each microinverter verifies that the utility grid is VANCOUVER,WA98661 operating within the IEEE 1547 requirements. Only then does it export AC power into the electric service • LIC.NO.: CCB 2113331GREENSL853KD HIC.NO.: ELE.NO.: for use by loads onsite or export power to the utility grid for others to use. UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S.COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL 3 When the utility grid has a failure, or the PV system AC circuits are disconnected from the utility service DAMAGES AND PROSECUTIONS NEW PV SYSTEM: 9.150 kWp via an AC breaker, AC disconnect, or removal of the solar or main utility service meter, the microinverters MOLINARIITAVARES stop producing AC power in fewer than six AC cycles. ■ ' RESIDENCE APsystems microinverters are not capable of operating as an AC voltage source. This means that without 13209 SW WOODSHIRE LN an AC utility source, APsystems microinverters are not able to energize connected wiring and no AC TIGARD, OR 97223 APN: 2S104DC08400 4 voltage or current can be injected into the inverter output circuits or the grid. When the AC utility source is removed from the inverter output circuits via any means, such as an AC breaker, AC disconnect or ENGINEER OF RECORD removal of the solar or main utility service meter, this equipment performs the rapid shutdown function • per 690.12. With an APsystems microinverter system, this shutdown occurs well within the 690.12- ■ required 10 seconds, and there are no other conductors energized more than 1 .5 m (5 ft) in length inside a building or more PAPER SIZE:11"x 17"(ANSI B) 5 than 3 m (10 ft) from a PV array. RESOURCE DOCUMENT DATE: 5,16.2019 ■ DESIGN BY:K.T. ■ CHECKED BY: M.M. REVISIONS 6 R-003.00 A ■ B • C • D • E • F • G • H (SHEET 12) A m B • C IN D • E • F • G • H 441111101146,. 1 Tech Brief GREENLIGHT SOLAR & ROOFING ■ /j IRONRIDGE XR Rail Family /Al. IRONRIDGE XR10 Rail ■ CONTRACTOR Solar Is Not Always Sunny 2 Over their lifetime, solar panels experience countless GREENLIGHT SOLAR&ROOFING extreme weather events. Not just the worst storms in years, ' but the worst storms in 40 years. High winds capable of -I ripping panels from a roof,and snowfalls weighing 4 - * _ PHONE: 360-836-8902 enough to buckle a panel frame. ,' '� "• ' 1 + { ADDRESS:6115E 18TH STREET,SUITE B ��( f r f 4 } See Descri.tion/Length VANCOUVER,WA98661 XR Rails are the structural backbone preventing " ✓ 7 .., ■ these results.They resist uplift, protect 1f • LIC.NO.: CCB 2113331 GREENSL853KD against buckling and safely and efficiently R; 1 + HIC. transfer loads into the building structure. 1 ELE NO.: ELE.NO.: Their superior spanning capability UNAUTHORIZED USE oFTHIS requires fewer roof attachments, . . DRAWwGSET WTHOUTWRITTEN PERMISSION FROM CONTRACTOR IS IN reducing the number Of roof - VIOLATION OF U.S.COPYRIGHT LAWS penetrations and the amount �,,, AN VIOLATION OF U.S. C CTO CIVIL OPYRIGHT 3 of installation time. ` DAMAGES AND PROSECUTIONS . ' `' NEW PV SYSTEM: 9.150 kWp ». MOLINARIITAVARES ■ ■ RESIDENCE .62 13209 SW WOODSHIRE LN ‘' 46 TIGARD, OR 97223 APN: 2S104DC08400 I Force-Stabilizing Curve T Rail Section Properties 4 Sloped roofs generate both vertical and lateral " Property Value forces on mounting rails which can cause them I 1.67 1Total Cross-Sectional Area 0.363 int to bend and twist.The curved shape of XR Rails 3 ENGINEER OF RECORD �, 1.75 Section Modulus(X-axis) 0.136 in is specially designed to increase strength in both 1.33 I directions while resisting the twisting.This unique 1 Moment of Inertia(X-axis) 0.124 in4 feature ensures greater security during extreme ._1_114 4 weather and a longer system lifetime. Moment of Inertia(Y-axis) 0.032 in ,,,,i , 58 Torsional Constant 0.076 in3 ■ , J ' Polar Moment of Inertia 0.033 in4 1.00— II Clear Part Black Part Description/Len Length Material Weight 5 Compatible with Flat&Pitched Roofs Corrosion-Resistant Materials Number Number P 9 9 PAPER SIZE.11"x 17(ANSI B) XR Rails are IronRidge offers All XR Rails are made of marine-grade i XR-10-132A XR-10-132B XR 10, Rail 132"(11 Feet) 4.67 lbs. compatible with arange oftittleg aluminum alloy,then protected with an 6000-Series RESOURCE DOCUMENT XR-10-168A XR-10-1688 XR10, Rail 168" (14 Feet) 5.95 lbs. �I ' FlashFoot and options for flat anodized finish.Anodizing prevents surface Aluminum ' 1 ' ' other pitched roof f roof mounting and structural corrosion,while also providing XR-10-204A XR-10-204B XR 10, Rail 204" (17 Feet) 7.22 lbs. attachments. applications. a more attractive appearance. vl.0 DATE: 5.16.2019 DESIGN BY:K.T. ■ ■ CHECKED BY: M.M. REVISIONS 6 R-004.00 A • B al C IN D • E • F • G ■ H (SHEET 13) A ■ B ■ C ■ D ■ E IN F ■ G ■ H 1 Tech Brief Tech Brief GREENLIGHT SOLAR & ROOFING ■ Installation Features ■ //r. IRONRIDGE Flash Foot2 CONTRACTOR The Strongest Attachment in Solar B A Alignment Markers GREENLIGHT SOLAR&ROOFING 2 IronRidge FlashFoot2 raises the bar in solar roof Ai ,"-7',.protection.The unique water seal design is both Quickly align the flashing with chalk lines to find pilot holes. elevated and encapsulated,delivering redundant layers f PHONE: 360-836-8902 of protection against water intrusion. In addition,the twist on Cap perfectly aligns the rail attachment with the C ADDRESS.6115 E 18TH STREET,SUITE B I lag bolt to maximize mechanical strength. „ B Rounded Corners VANCOUVER,WA 98661 ■ Makes it easier to handle and insert under the roof shingles. i LIC.NO.: CCB 211333/GREENSL853KD i HIC.NO.: ELE.NO.: -., UNAUTHORIZED USE OF THIS f� C Reinforcement Ribs DRAWING SET IMTHOUTWRITTEN A ( PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S.COPYRIGHT LAWS Twist-On Cap ` Help to stiffen the flashing and prevent any bending or AND WLL BE SUBJECT TO CIVIL 3 FlashFoot2's unique Cap design encapsulates crinkling during installation. DAMAGES AND PROSECUTIONS. the lag bolt and locks into place with a simple Three-Tier Water Seal twist.The Cap helps FlashFoot2 deliver FlashFoot2's seal architecture utilizes three NEW PV SYSTEM: 9.150 kWp superior structural strength,by aligning layers of protection.An elevated platform the rail and lag bolt in a concentric divertsmwater away,while a stack rugged inh. MOLI NARIITAVARES load path. �: components raises the seal an entire inch. The seal is then fully-encapuslated by thexo : Cap.FlashFoot2 is the first solar attachment to pass the TAS-100 Wind-Driven Rain Test. ■ I YC n`} Benefits of Concentric Loading 200i�.shF RESIDENCE Traditional solar attachments have a A ,000 13209 SW WOODSHIRE LN horizontal offset between the rail and lag U •aoo '---,s Leading Competitor TIGARD, OR 97223 bolt,which introduces leverage on the lag Q wo '� bolt and decreases uplift capacity. �' APN: 2S104DC08400 400 i Low-Cost Competitor 4 r ,; FlashFoot2 is the only product to align the D 200 rail and lag bolt.This concentric loading ENGINEER OF RECORD design results in a stronger attachment for o 1 2 3 3 -_ the system. Rail-to-Lag Offset(in) III • Testing & Certification Structural Certification Designed and Certified for Compliance with the International Building Code&ASCE/SEI-7. Single Socket Size IR 5 A custom-design lag bolt allows Water Seal Ratings PAPER SIZE:11"x 17"(ANSI B) you to install FlashFoot2 with Water Sealing Tested to UL 441 Section 27"Rain Test"and TAS 100-95"Wind Driven Rain Test"by Intertek. the same 7/ socket size RESOURCE DOCUMENT used on otherr Flush Mount ._. Ratings applicable for composition shingle roofs having slopes between 2:12 and 12:12. System components. Water-Shedding Design UL 2703 An elevated platform diverts water DATE: 5.16.2019 away from the water seal. Conforms to UL 2703 Mechanical and Bonding Requirements.See Flush Mount Install Manual for full ratings. DESIGN BY:K.T. ■ ■ CHECKED BY: M.M. 2016 IronRidge,Inc.All rights resery-•'n REVISIONS 6 R-005.00 A NB NC D NE liF mG N H (SHEET 14)