Loading...
Specifications P1557r. oi, - o og.5� 7G7'/ SIN G- Tr s7' GREEN MOUNThIN structural engineering Memorandum May 29,2019 To: Amilian Avgi, Riverside Homes From: Corina Muntean, P.E Re: Plan 2885 at Lot 40, Lot 32, Lot 31, Lot 30 and Lot 12 I understand that the garage shear wall does not meet the 3.5:1 ratio that is noted on detail 11 on S2 or permit drawings.We recommend that the inside of the pier be sheathed and nailed as shear wall type D. If you have any questions, don't hesitate to ask. Q4�p PRope t4GN' tcs>d 49 78PE �y tr � OREGOk Q4.��A !EXPIRES 1'z• N '20 greenmountainse.com-info@greenmountainse.com-4857 NW Lake Pd..Suite 260,Camas,WA 98607