Loading...
Permit (39) CITY OF TIGARD BUILDING PERMIT .1111 14 COMMUNITY DEVELOPMENT Permit#: BUP2019 00145 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/18/2019 TIGARD Parcel: 2S 101 AC00800 Jurisdiction: Tigard Site address: 7148 SW GONZAGA ST 280 Project: The Adrienne Subdivision: BEVELAND NO.2 Lot: 14 Project Description: Converting a second floor B occupancy unit to an R-2 residential unit. Contractor: PAXTON CONSTRUCTION Owner: ROGERS, ROY R 17310 SE MAIN 13690 SW TWELVE OAKS CT PORLAND, OR 97233 TIGARD, OR 97224 PHONE: 503-756-6886 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 06/18/2019 $1,090.89 Demolition Occupancy Grp: R-2 Occupancy Load: 2 12%State Surcharge-Building 06/18/2019 $130.91 Dwelling Units: 0 Plan Review 06/12/2019 $709.08 Stories: 0 Height: 0 ft Parks SDC Improvement 06/18/2019 $2,975.00 Bedrooms: 0 Bathrooms: 0 Parks SDC Reimbursement 06/18/2019 $738.00 Value: $98,000 Parks SDC Neighborhood 06/18/2019 $1,371.00 Plan Review-Fire Life Safety 06/18/2019 $436.36 Info Process/Archiving-Lg$2.00(over 06/18/2019 $2.00 Floor Areas: 11x17) Total Area: 1025 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $7,453.24 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtair_22s,epro lirequestions to OUNC by calling 503.232.1987 or 1.800.332.2344. AioIssued By: �a ag y._� �rmittee Signature: . C: x..4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Building Permit Application Commercial City of Tigard Received // } y RECEIVED DateBy: C.r /� /uj , PermitNo.i.9. i'�j i,h� 13125 SW Hall Blvd.,Tigard,OR Plan Review �" I Phone: 503-718-2439 Fax: 503-598- q ^, 1 �� Related Permit: Inspection Line: 503-639-4175 } �j LU�9 Date Re l T I G A R D p v Date Ready/By: � funs: ® ¢Page 2 for Internet: www.tigard-or.gos _ , r ediMetho. /7 /�'/ CITY OF TIGAR� G,�� / Supplemental Information , ,.,.�,-m.,,,,, /'�';mgr. -u.; ew,,ire,..ua.,„� ■ New constr;ction - • Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all © Addition/alteration/replacement • equipment,materials,labor,overhead,and the profit for the work indicated on this application. 0 1-and 2-family Valuation: $ - Commercial/industrial © Number of bedrooms:Accessory building • Number of bathrooms:Master builder 0 Total number of floors: Job site address: • •• St. New dwelling area: square feet Tigard,OR 97223 Garage/carport area: square feet Suite/' •= '' 280 Project name: Adrienne • • Covered porch area: square feet Cross street/directions to Is Deck area: square feet Other structure area: square feet Subdi • Permit fees*are based on the value of the work performed. parcelTax Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the work indicated on this application. Change 2nd floor B occupancy unit to R-2 residential unit. Valuation: $ 98,000 Existing building area: 1025 square feet New building area: 1025 square feet 27./1/;;;;;;;;; ";;;/.:;;;Lif•/:',5/;/.-"--,;ze,,,c;14-/.; .:,/,,,,,r,,,,,,,7.,!,,,, f:rr,„s,,;:.;.,/T„,ri,/j,,, -,i:;:;:.,::ji<y_,xir,...,:-T;;?.,;p,,,..iy./w,,, ,/f7,4 Number of stories: Name: ARR LLC Type of construction: Address: "'3 SW • ' Occupancy groups: City/State/ZIP: Portland,OR 97225 Existing:B New: 'R-2 l � fr Business name: Scott Edwards Architecture ���/'fir f.r. ��`�/.<s;,,. <6 , � 9 l Structural plan review fee(or deposit): •ntact name: Nathan Junkert-Project Manager FLS plan review fee(if applicable): Address: 2709 SE Ankeny or • •. Total fees due upon application: /-26?,-Lir Ph one: 1 Amount received: E-mail: njunkert@seallp.com Commercial and residential prescriptive installation of roof-top mounted Photovoltaic Solar Panel System. Business name: •n Construction LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 1 SE Main StreetSolar Installation Specialty Code checklist. Portland, •• 97233 Permit fee(includes plan review $180.00 M3-756-6886 and administrative fees): State surcharge(12%of permit fee): $21.60 Total fee due upon application: $201.60 Authorized signature: / This permit application expires if a permit is not obtained V (z./ within 180 days after it has been accepted as complete. Date: 6/ .*ii * Fee methodology set by Tri-County Building Industry I Print name: A/4 ittet4,1 r ,,i/i krytI:\Building\Permits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) III City of Tigard ■ COMMUNITY DEVELOPMENT DEPARTMENT T 1 c A R D Building Permit Review — Commercial - No Land U s e Building Permit #: 0/162!%?—(-k)1/c-- Site Site Address: 7/217- 5& 6,01/2c rca ..1 Suite/Bldg#: Project Name: iA Al,�,`eiye.e (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review r < / / Proposal: 6ue)'�Pr.3ov � , a P ,,44,,r7ere ,'a/S 4 ..t A, ves"c/ i '�f 0( Existing Business Activity: 1,L1,2 c-e Proposed Business Activity: ®' erify site address/suite#exists and active in permit system. ❑ River Terrace Neighborhood: 0 Yes .0 0 r2rZoning: ,.permitted Use: Yes 0 No 0 Spec Space onfirm no land use required. ❑ Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license Notes: Approved by Planning: / 4 Date: p//a//g Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 06."/Gd/iq Site Plans: # Building Plans: # Building Permit#: r building permit# above. Workflow Routing: —t‹nningermit Coordinator Workflow Sign-off: [ n-off for Planning(include notes from planning review) Route Application Documents: N--1 lding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ;c7-z..T„f2 J Date: 62/41/44 I:\Building\Forms\BldgPermitRvw_COM_NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) ) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant Revision Notice 3: Date Sent to Applicant: DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes VN/A Tigard Trans SDC: ❑ Yes P'1\--11A Parks SDC: 1CJ Yes ❑ N/A OK to Issue Permit Approved by Permit Coordinator: Date: 3 A? I:\Building\Forms\B1dgPermitRvw_COM NoLandUse_070915.docx