Loading...
Plans (22) M EC2019 -00127 /17Ec (7 U( ) i/1‘77 MECHANICAL SYMBOLS LIST ARCHITECT OF RECORD: qIs W C \(. . Rcl CEILING SUPPLY VD VOLUME DAMPER # � AIR DIFFUSER (SAD) VOLUME DAMPER ~ D1 W/REMOTE OPERATOR I CEILING SUPPLY 1� �'�45 i 1�! F1 AIR DIFFUSER WITH SAD TYPE OF AIR DEVICE ® BLANK OFF SECTION 100 AIR QUANTITY(CFM) TRICARICQ CEILING RETURN AIR GRILLE (RET) Z x Y X, INCHES, SIDE OF DUCT SHOWING Tricarico Architecture and Design PC 502 Valley Road Wayne, NJ 07470 I EXHAUST FAN © MOTORIZED DAMPER T (973) 692-0222 F (973) 692-0223 LINEAR SUPPLY/RETURNwww.tricarico.com — FD — FIRE DAMPER I I DIFFUSER (LENGTH PER (E)EF-1 PLANS) — SD — SMOKE DAMPER O O OR DUCT MOUNTED — FSD — FIRE/SMOKE DAMPER ENGINEER OF RECORD: DIFFUSER - WALL TRANSFER 2 SMOKE DETECTOR ( GRILLE(TG) P SUPPLY PHOTOELECTRIC ;RECEIVED (E) T THERMOSTAT r • (5) - l 21I SMOKE DETECTOR l RETURN - IONIZATION MAR 5 2019 150 O5 TEMPERATURE SENSOR CITY OF TIGARD (E) TOILET O /COZ\ CARBON DIOXIDE (E) EXISTING RLIILDING DIVISION EXHAUST DUCT 9 (R) RELOCATE DON SENSOR ON PENN CONSULTING ENGINEER - - 1301SOLANA BLVD. THRU DECK (CO) CARBON SENSOR MONOXIDE (N) NEW BLDG. 1 1 SUITE 1420 W ce ES E,TX 76262 (R) ____0_ EXISTING DUCT TO i!!!10-- FIELD CONNECTION O 817.410.2$58 I F$17.251.8431 / REMAIN -cNg T �E)—1 < U DOOR UNDER CUT NEW DUCTWORK DATE ISSUED O - SUPPLY AIR FLOW 8"0 (N)SAD-2 (N)SAD-2 Moan NEW FLEX DUCT RETURN AIR FLOW 10/12/2018 90%CLIENT REVIEW (N)SAD-1.X3 {.N)RET 1 (N)S5D-2 0 r 300 -_,„ 0 300 0 11/01/2018 LL &CLIENT REVIEW 100 / 350 / 10"93 ►! 2i ° ° ° ° VD1 ° J 0 I ° • SYMBOL LIST SHOWN IS FOR GENERAL REFERENCE ONLY.THE PRESENCE OF A SYMBOL 11/14/2018 LL &CLIENT REVIEW (4) (N)RET-1_ J o `` O ! r VD1 o DOES NOT IMPLY ITS USE ON THIS PROJECT. REFER TO DRAWINGS FOR SPECIFIC SYMBOLS USED. ° d 0 ��©12 m (R)EDH-1 \ Q T � ° KEY NOTES 0 0 O�V6,V-1 2 p\a \,,, o (R) 6 ° VD 1 0 w (E)VAV-1 0 1 (E)10"0 � C . © . - • oO 0 o EXISTING VAV UNIT TO REMAIN. BALANCE TO CFM SHOWN. CLEAN AND REFURBISH UNIT AND ALL (E)14"� (E)16"0 (E)20X 18 ACCESSORIES TO "LIKE NEW"CONDITION. REPAIR/REPLACE ACCESSORIES AS REQUIRED FOR A COMPLETE VD1 `� 0 �Q u 0 0 oVD1 1 O OPERATIONAL SYSTEM. PROVIDE WRITTEN REPORT TO ARCHITECT/ENGINEER WITH REPAIR/REPLACE Jo VB1 �� VD110 w \ r %i ce► N)SAD-2 RECOMMENDATIONS. CONTRACTOR TO VERIFY DIGITAL CONTROLS FOR VAV BOX. REPLACE PNEUMATIC J �_....) --10"0 o o co_ �'� 010 0 12"0_ N)SAD-2 o y�% o �ii 03pp CONTROL WITH DIGITAL CONTROLS AS REQUIRED PER LANDLORD REQUIREMENTS. (N `RET-1 0 (N)SAD-23 ON)RLT-b (}SAD-2) 0 0 0 0 0 400 0y 0 0 0 350 350 EXISTING SUPPLY AIR DUCT TO REMAIN. DIFFUSERS, DUCT BRANCH LINES,AND OPENING NOT INDICATED (N)RET-1 0 FOR REUSE SHALL BE REMOVED. G.C. TO CAP AND SEAL OPENINGS AS REQUIRED. DUCTWORK SHALL BE \ / INTERNALLY CLEANED, PATCHED & REPAIRED AS REQUIRED TO ENSURE DUCTWORK IS AIRTIGHT. NOTIFY ARCHITECT/ENGINEER IMMEDIATELY WITH ANY DISCREPANCIES PRIOR TO BID. ANY USE OR REUSE OF ORIGINAL OR ALTERED DESIGN MATERIALS BY THE CLIENT,AGENTS OF THE CLIENT OR OTHER PARTIES 0 EXISTING DIFFUSER/REGISTER TO REMAIN. BALANCE TO CFM SHOWN. PROVIDE NEW OPPOSED BLADE WITHOUT THE REVIEW AND WRITTEN APPROVAL OF THE DESIGN DAMPER IF REQUIRED FOR PROPER BALANCING. PROFESSIONAL SHALL BE AT THE SOLE RISK OF THE OTHERS. FURTHERMORE THE CLIENT AGREES TO DEFEND,INDEMNIFY AND O4 NEW DIFFUSER/GRILLE TO MATCH EXISTING STYLE IN BOH. VERIFY MODEL/STYLE IN FIELD. HOLD THE DESIGN PROFESSIONAL HARMLESS FROM ALL CLAIMS, INJURIES,DAMAGES,LOSSES,EXPENSES AND ATTORNEY'S FEES —07 ARISING OUT OF MODIFICATION OR REUSE OF THESE MATERIALS. / S 2X72 MALL DUCT \I!"" © 20'-6" AFF LANDLORD GENERAL NOTE: 0 EXISTING EXHAUST FAN TO REMAIN. CONTRACTOR TO CLEAN & REFURBISH TO"LIKE-NEW"CONDITION. THE GENERAL CONTRACTOR AND/OR ALL SUB-CONTRACTORS WORKING FROM THESE PLANS AND SPECIFICATIONS ARE NOT TO W CONTRACTOR TO VERIFY DIGITAL CONTROLS FOR VAV BOX. REPLACE PNEUMATICEXISTING THERMOSTAT TO BE RELOCATED. MOUNT AT 4'-0"AFF. ENSURE THERMOSTAT IN GOOD WORKING SCALE SUCH INFORMATION BUT TO CONTACT THE ARCHITECT OR H6 ORDER. REPLACE IF REQUIRED. COORDINATE WITH LANDLORD &LANDLORD'S EXISTING BAS. IS REPRESENTATIVEOREGARDING CORRECT, IF SUCH CONTROL WITH DIGITAL CONTROLS AS REQUIRED PER LANDLORD REQUIREMENTS. MEASUREMENTS DO APPEARNOTCORRECT,ADD UP PROPERLY ® EXISTING EDH TO BE RELOCATED. MAINTAIN MANUFACTURER RECOMMENDED CLEARANCE. CLEAN AND OR SCALE CORRECTLY TO THE INDICATED SIZE. REFURBISH UNIT AND ALL ACCESSORIES TO "LIKE-NEW'CONDITION. THE GENERAL CONTRACTOR IS RESPONSIBLE AT THE BEGINNING OF THE PROJECT ( CONTRACTOR TO INSTALL PHOTOELECTRIC TYPE SMOKE DETECTOR IN MAIN SUPPLY DUCT. CONNECT TO CO TO MEASURE THE SPACE WHILE REVIEWING THE ARCHITECT'S DRAWINGS TO VERIFY LANDLORD SYSTEM. SMOKE DETECTOR TO BE PROVIDED BY ELECTRICAL CONTRACTOR INSTALLED BY THAT THE INFORMATION CONTAINED IN THE MECHANICAL DOCUMENTS, ON WHICH MECHANICAL CONTRACTOR WIRING BY ELECTRICAL CONTRACTOR. MECHANICAL FLOOR PLAN HE/SHE QUOTED TO THE CLIENT,ARE COMPATIBLE WITH THE WORK TO BE EXISTING THERMOSTAT TO REMAIN. ENSURE THERMOSTAT IN GOOD WORKING ORDER. REPLACE IF SCALE: 1/8" = 1'-0" PERFORMED AND THAT ALL SPACES ARE SUFFICIENT IN SIZE FOR THE WORK TO BE C 9> REQUIRED. SET THERMOSTAT TO 72°F DURING WINTER MODE. PROJECT: COMPLETED INCLUDING WIDTHS, LENGTHS, HEIGHTS, ETC. MECHANICAL GENERAL NOTES Casper 1. ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH ALL NATIONAL, 16. COORDINATE INSTALLATION, DEFLECTION SETTING, ETC. FOR DIFFUSERS, GRILLES, REGISTERS, IN FIELD. �� � � ®� LOCATION: STATE, & LOCAL CODES AND REGULATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT ALL HVAC WORK IS PROVIDED AND INSTALLED IN STRICT ACCORDANCE WITH SEISMIC REQUIREMENTS, 17. AN ANDNDEPENDENT BALANCE THEESTING HVAC SYSDTEMS.NCING AGENCY SYSTEMS SHALL EBEFIED BY THE BALANGED TO AABC PLUSALMBE EUENGAGEDDOFDESIGN WASHINGTON SQUARE 2. THE CONTRACTOR SHALL PREPARE AND FILE ALL REQUIRED PLANS AND PERMITS WITH THE LOCAL BUILDING REQUIREMENTS. THE CONTRACTOR SHALL PLACE ALL SYSTEMS AND EQUIPMENT INTO FULL OPERATION 9685 S.W. WASHINGTON SQ. RD. DEPARTMENT AND SHALL PAY ALL FILING FEES AS REQUIRED. THE CONTRACTOR SHALL OBTAIN ALL FOR TESTING AND BALANCING. ONE COPY OF THE FINAL TEST AND BALANCE REPORT WITH THE AABC AUTHORITIES AND SHALL PAY ALL WORK PERMITS, INSPECTIONS, AND WRITE-OFFS AS REQUIRED TO NATIONAL PERFORMANCE GUARANTY SHALL BE SENT DIRECTLY TO THE ENGINEER OF RECORD. SUITE CO7 EXECUTE THIS WORK IN A MANNER IN CONFORMANCE WITH THE CODES AND AUTHORITIES HAVING JURISDICTION. 18. SUBSTITUTIONS FOR DIFFUSERS / GRILLES SHALL BE SUBMITTED TO ARCHITECT FOR APPROVAL / REVIEW PORTLAND, OR 97223 PRIOR TO PURCHASE. 3. CONTRACTOR SHALL COMPLY WITH ALL LANDLORD AND CLIENT DESIGN CRITERIA REQUIREMENTS. 19. CONTRACTOR SHALL PROVIDE NEW FILTERS FOR HVAC UNITS BEFORE TURNING ON FOR THE FIRST TIME DESIGNER: CASPER 4. GENERAL CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH LANDLORD'S ON-SITE AFTER CONSTRUCTION IS COMPLETED. HVAC EQUIPMENT SHALL NOT RUN DURING CONSTRUCTION UNLESS OPERATIONS MANAGER. FILTERS ARE INSTALLED. DRAWN BY: MJ CHECKED BY: DP 5. DO NOT SCALE FROM THESE DRAWINGS. 20. VERIFY EXACT SIZES OF ALL EXISTING DESIGN COMPONENTS INDICATED FOR REUSE IN FIELD AND CONTACT ENGINEER/ARCHITECT WITH ANY DISCREPANCIES PRIOR TO BID. DATE: 11/01/2018 6. THE CONTRACTOR SHALL PERFORM ALL TESTS AND ARRANGE FOR ALL INSPECTIONS FOR WORK UNDER PROJECT NO: 180292 THEIR CONTRACT AS REQUIRED BY LAW AND SHALL SUPPLY ALL CERTIFICATES OF INSURANCE AS 21. ALL ACCESS DOORS REQUIRED IN GENERAL CONSTRUCTION ARE TO BE PROVIDED AND INSTALLED BY THE REQUIRED BY THE LAW AND THE OWNER. GENERAL CONTRACTOR. IT IS THE RESPONSIBILITY OF THE HVAC CONTRACTOR TO IDENTIFY SIZE, TYPE AND THESE DRAWINGS WERE LOCATION OF SUCH DOORS FOR PROPER ACCESS TO ALL CONCEALED HVAC EQUIPMENT, VALVES AND COMPLETED UNDER THE DIRECT DP 7. ALL REMOVALS PERFORMED UNDER THIS CONTRACT SHALL INCLUDE REMOVAL OF ALL DEBRIS AND OTHER RELATED EQUIPMENT. THE HVAC CONTRACTOR SHALL IDENTIFY THESE REQUIREMENTS ON A SUPERVISION OF: DISPOWORKSANYUNUSEDEXISTING AL T AN RMECHANICAL PRIATE SITE. COORDINATE IOCALEQUkPMEN WITH T ANDASSOCIATEDDUCTWORK, DIFFUSERS,TAWINGS FOR SE ,DEMOTION COORDINATED SHOP DRAWING PRIOR TO SYSTEM FABRICATION AND INSTALLATION. DON PENN CONTROLS, OT OTHERWISE E NOTED BY THE REMOVED CONSTRUIN THEIR ON DOCUMENTS.AND SHALL NOT BE ABANDONED IN PLACE 22. FLEXIBLE DUCTWORK FROM HARD DUCT TO CEILING DIFFUSERS SHALL BE LIMITED IN LENGTH TO 5 FEET.UNLECONSULTING ENGINEER 23. CONTRACTOR TO COMPLY WITH BUILDING / LANDLORD CRITERIA, DESIGN CRITERIA, STANDARD PRACTICES 8. THE FINISH AND COLOR OF THE AIR DEVICES, AND ALL OTHER EXPOSED HVAC EQUIPMENT SHALL BE AND LOCAL CODE/ ORDINANCE REQUIREMENTS WHEN COMMENCING WORK. THESE REQUIREMENTS SHALL COORDINATED WITH THE ARCHITECT. SUPERSEDE ANY AND ALL INFORMATION ON THE DRAWINGS UNLESS AGREEMENT TO THE CONTRARY DURING THE BID PROCESS WHEREAS THE CLIENT WILL BE EXCLUDED FROM INCURRING ANY ADDITIONAL 9. CONTRACTOR SHALL ENSURE ABOVE CEILING IS TO BE A RETURN PLENUM. CONSTRUCTION MATERIALS COSTS. THE GENERAL CONTRACTOR SHALL OVERSEE THE EXECUTION AND COMPLETION OF THESE ITEMS ABOVE CEILING SHALL BE NONCOMBUSTIBLE, OR HAVE A MAXIMUM 25 FLAME SPREAD AND 50 SMOKE ALSO AT NO ADDITIONAL COST TO THE CLIENT. ANY DISCREPANCIES OR INCONSISTENCIES CONCERNING DEVELOPMENT FINISH RATING. WIRING SHALL BE LABELED PLENUM RATED TYPE PER NFPA 70. THESE REQUIREMENTS AFTER THE PROJECT IS AWARDED SHALL BE BROUGHT TO THE ATTENTION OF THE DRAWING NAME: CONTRACTOR THE LOCATED IN RETURN AIRIDE Y2" 3M PLENUM FIRE PLENUM ABOVE CEILING. WRAP 5A+ (OR EQUAL) ON ALL EXISTING PVC PIPING BUILDDESIGINGN/SCOPEF WORK TO CONFORM TO THE PRECEDING WNER AND TENANT FOR APPROVAL REQUIREMENTS R TO COMMENCING ORK. ANY AT THIS JUNCTURE WILLES THEN HN MECHANICAL BE AT THE TENANT'S EXPENSE. 10, THE FINAL LOCATION OF AIR DEVICES MUST BE COORDINATED WITH THE REFLECTED CEILING PLAN AND ALL NOTES & PLAN OTHER MECHANICAL, ELECTRICAL, SPRINKLER, AND ARCHITECTURAL. 24. SINCE CODES VARY ACROSS REGIONS, IT IS THE GENERAL AND SUBCONTRACTOR'S RESPONSIBILITY TO REVIEW THE CONSTRUCTION DRAWINGS DURING BIDDING AND INCLUDE IN THEIR BID ANY ALTERNATE CODE 11. DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEET STEEL IN STRICT COMPLIANCE WITH THE RELATED RECOMMENDATIONS / DETAILS OR SPECIFICATIONS. IF THERE ARE ANY PROPOSED ALTERATION LATEST EDITION OF THE ASHRAE, NFPA, AND SMACNA GUIDE RECOMMENDATIONS. SIZES AS SHOWN EQUIPMENT / INSTALLATION CHANGES, THEN THE COSTS FOR THESE CHANGES ARE TO BE EQUAL TO OR DRAWING NO: INDICATE INSIDE CLEAR DIMENSIONS OF THE AIR PASSAGE. GREATER IN VALUE TO THE ITEMS AND QUANTITIES MENTIONED IN THE ORIGINAL CONSTRUCTION DRAWINGS AND THE CHANGES SHALL BE SUBMITTED TO THE ARCHITECT / ENGINEER FOR REVIEW AND 12. ALL INTERIOR & EXTERIOR SUPPLY, OUTSIDE AIR, AND RETURN DUCTWORK SHALL BE INSULATED PER THE APPROVAL. CONTRACTORS WHO DO NOT ADHERE TO THIS REQUIREMENT WILL BE RESPONSIBLE FOR NA 1 0 1 MECHANICAL GENERAL SPECIFICATIONS & APPLICABLE CODES. INTERIOR EXPOSED DUCTWORK SHALL BE INCURRING THE ADDED COSTS REQUIRED FOR THE DESIGN TO COMPLY WITH LOCAL CODE. INTERNALLY INSULATED TO PREVENT CONDENSATION. 25. THE CONTRACTOR, IN REGARDS TO ANY SAWCUTTING, COREDRILLING OR ANY PENETRATING OF A 13. DUCT SIZES MUST BE VERIFIED FOR CLEARANCES AT THE JOB SITE PRIOR TO FABRICATION. ALL DEVIATIONS CONCRETE SLAB, FLOOR AND/OR ROOF, IS REQUIRED TO SURVEY DURING BIDDING TO DETERMINE ANY FROM ORIGINAL CONTRACT DRAWINGS SHALL BE REVIEWED BY THE ENGINEER DURING THE SHOP DRAWING ISSUES, INCLUDING BUT NOT LIMITED TO, NECESSITY OF X-RAYING OF A CONCRETE SLAB, WHERE SUCH PROCESS. MATERIAL BEING PENETRATED IS NOT PROJECTED AND/OR ROUTED INTO A SPACE(S) THAT CREATES A ,TC) PROF NON-CODE COMPLIANT CONDITION, THE NEED FOR WEATHERSTRIPPING, WATERPROOFING OR OTHER �>C I Pdf FS�j 14. PROVIDE ELBOWS OR TEES WITH TURNING VANES FOR ALL CHANGES OF DUCT DIRECTION. PROVIDE CONDITION AND TO NOTIFY THE OWNER IF A PROBLEM(S) MAY EXIST AND TO INCLUDE COSTS TO SOLVE THE F� F,P O-/- SPLITTER DAMPERS WITH LOCKING QUADRANTS IN ALL TEES. ISSUE UNCOVERED, IN ADDITION TO, NOTIFYING THE ARCHITECT OF RECORD REGARDING SUCH ISSUE(S). t):„._ -r 15. PROVIDE MANUAL BALANCING DAMPERS AS REQUIRED TO PROPERLY BALANCE EACH INDIVIDUAL AIR 26. GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL CHANGES TO APPLICATIONS NOT CONSISTENT WITH 11/14/18 DISTRIBUTION SYSTEM. IF THE LOCATION OF THE BALANCING DAMPER IS NOT DEFINED ON THE DRAWINGS, CONTRACT DOCUMENTS IN ALL CASES, INCLUDING "SELF-CERTIFICATION"BY THE ARCHITECT. a OREGON THE FOLLOWING MINIMUM STANDARDS SHALL GOVERN. ALL SUPPLY, RETURN, AND EXHAUST MAIN BRANCHES FROM TRUNKS, EACH SPLIT AND ALL SUB-BRANCHES FROM MAINS SHALL INCORPORATE �q��7/21 J 9QR`' BALANCING DAMPERS. CABLE OPERATED MANUAL BALANCING DAMPERS SHALL BE PROVIDED IN AREAS ,)A M�S WITH INACCESSIBLE OR HIGH CEILINGS. THE CABLE OPERATED DAMPER SHALL BE OUTSIDE OF THE AIRSTREAM. THE CONTRACTOR SHALL COORDINATE THE TYPE AND LOCATION OF THE REMOTE ACCESS POINT WITH THE ARCHITECT/OWNER. EXP. 12/31/18