Loading...
PFI2019-00049 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT It COMMUNITY DEVELOPMENT Permit#: PFI2019-00049 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 02/11/2019 TIGARD Parcel: SEG2019 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: SEG 2019/2071 /2045. Unjacketed cable replacement. PGE Job M2495699 Owner: FEES Description Date Amount PFI Permit Fee 02/11/2019 $575.50 PHONE: Contractor: POTELCO INC 14103 STEWART RD SUMNER,WA 98390 PHONE: 253-863-0484 FAX: Applicant: JACK DWYER 10800 SW AVERY STREET TUALTIN, OR 97062 PHONE: 503-612-2935 Total $575.50 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00049 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard FEB 0 4 2019 in PUBLIC WORKS —ENGINEERING CITY OF TIGARD s PLANNING/ENGINEERING - Public Facility Improvement (PFI) Permit TIGARD TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) 1–Franchise Utility Work Check one: VUtilities ❑Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE Detailed description: Unjacketed Cable Replacement and/or utility agency. ❑ TYPE 2–Sidewalk/Driveway/Sewer Work performed for the purpose of: PGE Job M2495699 • Sidewalk installation or repair. Property address/location(s): Work starts at 8845 SW REILING ST • Driveway approach installation and/or repair &f&2ot012011 2045 TIGARD, OR, 97224 • Sanitary sewer lateral installation and/or main line tap Applicant: PGE [Submitted by Amy Sweany] LI TYPE 3–Bull scale Development pp Work performed with Land use Address: 10800 SW Avery Street approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-612-2935 Email: prereqcoord@pgn.com • Subdivisions or Partitions Contact name: Jack Dwyer Phone: 503-863-7067 • Street widening • Mainline installation for Sanitary Contractor: Potelco Inc sewer, Storm sewer,Tigard water and/or Tigard Water Service Area CCB#: 76668 Expiration: 6/1/19 Address: 14103 Stewart Rd SUBMIT COMPLETED APPLICATION TO: City/state: Sumner WA Zip: 98390 City of Tigard 503-863-7067 ack.d er otelco.net Planning/Engineering Phone: Email: 1 wy @P 13125 SW Hall Blvd. Contact name: Jack Dwyer Phone: 503-863-7067 Tigard,OR 97223 Applications for"minor work in right-of-way" only may be emailed to: Engineer: N/A rowpermitsCa,tigard-or.gov Address: FOR Si AIFlSl: ON l.\ City/state: Zip: ` p� Phone: Email: Case No.:' l° ��-1 Contact name: Application submittal fee(.007%of Engineer's Estimate) $ 11 �© Estimated value of work is required(if over$5,000):$ Additional fees: $ 3:771r L j (within the public right-of-way) Application accepted: By: Al-- Date. __A tA Is work related to a LAND-USE DECISION? ❑ Yes iNo If so,please specify (MLP,SDR,SUB, etc.) case #: /.7'19,By: Date: Is work related to a BUILDING PERMIT? ❑ Yes i/No Applicant notified: If so,please specify(BUILDING PERMIT)case#: By: 4SL Date: 27 7-11 I:\ENG\PermitApplications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Vinh D Digitally signed by Vinh D Nguyen,PE Nguyen, PE Date:2019.01.16 Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL APPLICATION FEE REQUIREMENTS Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch (including information below) Engineer's estimate X 2%Plan Review ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of SAMPLE SKETCH: ? \\- " \- " i Edge of1avemerit Ditch — •`--Ibedbcf, 14 4 Streetlight . _-------.— .—14..1.—r—.— 1 rte. :,. 7 Drain '' I .t p � o III � I T—MTV 4 Teirce v7e�'ni-- a.) WI I i i � ' Existing House A I Existing 1 '-'1 i Driveway icii0 C 1 , I ' -h• o •� r 1�) o1 a a I I Existing Shop I _ 1 Powerpole i I : I o ■ Q 1 ip-'-"-"-' I doper Line I ■ 0 I Fire Hydrant(FH) I I I I I Scale: •I"=3O' I i I I I ■ 1 I I I I . I I MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable): North arrow Property lines & dimension Slope of property Street &street name(s) Existing building, structures Utility& street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of mpOn -a * D Op = - DD m 0 A) Z 11 + ©ooT PERMIT Z 0,IQ T oA N O�' y 3 4 y rn * OWNER: PRO/ECU/0B NUMBER: 5 m Fj m pA ft? CM' 3 Z N N o w PGE(Wilsonville LCC) M 2495699 0 = 0. N D to i N PROJECT NUMBER JLOCATION: OT(/STATE_ =y ,' M p F. =; C Z 8639 SW Reling St Tigard,OR E. 0• C) 44 i g e PRIME CONTRACTOR: O Cn L ° PGE O D _ O. = IP1+An H CONTACT NAMEJIM[IINBER: EMAIL ▪ r O 0 = n Z Deshawn Williams/503-718.6301 deshawn.vwIiiams opgn.com y 0 Hoo'+,.- h PREPARED CV: TRAFFIC CONTROL CONTRACTOR 0 =g a C Borden Potelco Inc. 3 FRo 110 ImickirELCco INC r cp r r 3 r L C r . n . o n pzm f V 4$• -A no in= 6E21 T. p�0 G.-1+.osc-.i.1--1+.ost-...4.-y+.DS e--•I 0 ® s PAIS IIeH MS I. r r 350'+J--*.-350 �� '+1- 1355+!•—iw / ". ....".'t .=Ni vs ► Q om noa gymtfr 0 r r .xv oA yZ� ym ms21 O G 2 m rZr m ss r EV GZ r m J 73 O c N T* -,o _ g + C su ox O o = in O B www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK AHEAD ONE LANE (Optional) ROAD4 4 *74 AHEAD B BE PREPARED TO STOP41> B A (Optional) ONE LANE ROAD BE AHEAD 100 ft.Max. PREPARED ROAD 0 WORK 0 TO STOP AREA I A B B C • Buffer o •_ 0 0 0 0 O ® 0 0 O O ®110; C, 100 ft.Max. { A I C C B B C ROAD 0 BE WORK PREPARED 0 100 ft.Max. AHEA. TO STOP 0 ONE LANE ROAD AHEAD 0 (Optional) A 41> B BE • PREPARED TO STOP B (Optional) • ONE LANE 4ROAD AHEAD C ROAD WORK AHEAD www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space ERRATA: 20 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 Updated:February 12, 40 150 2016 45 180 By:ODOT Traffic-Raodway 50 500 500 500 210 - Section 55 250 Signs Spacing and Buffer Lengths (feet) Supplement Posted Spacing Between Signs "Buffer" Speed A B C Space 60 285 65 700 700 700 325 70 365 N Cl) U1 U1 .A W W N N-0 y CU 01 01 01 W co Single Flagger Operation 0` Cl.Q (Optional) for Low Volumes BE (Optional) 0 (n W CO -0 PREPARED ONE LANE A) (ADT < 4 0 0) TO STOP ROAD AHEAD E Q (31 O n'a n 0 0 0 (13 FLAGGER BPREPARED ONE LANE �..- `°E. CU z TirA H a 1 B 1 c 1* TO STOP ROAD Oo a AHEAD O Cu 0 �D 1 mile ♦m Cn W lill> O 0 O W i41111 E max. CD CD ° ° ° 0 O � - ROAD cn D ~ K K RID ® °° WORK O o can o n 3 o C l3 BA AHEAD Cl) O O 0 y (a uffor Protection Vehicle mui N wrrMA(both Optional) `Y ,y, BE See Chapter 4 O PREPARED _, _a-1. -, CO to aONE LANE TO STOP 01 j (J1 N O J w AHEAD 000 O(n0 (n0c) 0r•+` 0 , A B B C 3 (Optional) lit :. :. :. :. —n MINIM CO ♦. I'll 1 mile max. .1 CO l 000 0 0 0 —Q— 0 0 CO IIMI 0° Ill 1 00o a° o ° 0 C B B Alt 7 "I\ / / \ \ Buffer Protection Vehicle ROAD w/TMA(both Optional) WORK See Chapter 4 0 AHEAD la)BE ONE LANE ROAD PREPARED Two Flagger Operation fiU AHEAD TO STOP 3 W (Optional) © 5. cu o�5 D 0 3 www.invarion.com Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT) with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3 — Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340 — Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the "Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. xnit ..�.. 3064 cKLA D-0.4 40,4 LEGEND Rr. 9"201 � CHE 1980 L A7532781 0 1S 1— .t{'V 1-4 PO-77 K 200r - S�FFMO VE ABd v:IOYTAC',LII,tS_IN57ALL FACILITIES 2014 U - YAPpLE LN ti ` ■ INS TALL ADDITIONAL FACILITIES/MODIFY FACILITIES ai B 1 C PD-80 VT-65 VT-211 3 1 WORK LOCA710Nd 8865 P0-7865 LLI q P0436 Open B 2 ALJ - gd 1 • SURVEY GRID BOUNDARY 4 14856 8804 Vi-87 - 35-Unknown � .. r1 8860 ASO 23680 t Po-sa 0406 +i J 7- 2006? A � CONDUCTORS WL 4 VT-679(NEW 577): PD-79 93 , y �O I A 50 24819 PO-es83 INSTALL ARCD 01 AL EPR JKT-D PRIMARY Install: 3E-Unknown 3 ELBOW KIT-JKTD CABLE-#2AL PDe 148M ---' c-A CONDUIT SU39669-VAULT CONC.56 x84"x 7T OD UV-577 14.7 2006 01 y 558400 ASP AI 4L EPR JKT-D PRIMARY SU39640-CONC.DBL NON-SLIP VLT LID 56"x84"x12"575)577-Lida4.1c I-a-[Lwow B 25 72533 PD 62 WL 8 VT-67: P0-63 P0-81 N INSTALL AS 02 AL EPR JKTD PRIMARY LATERAL TAP UNIT-4 POS-2 PHASEe (6)ELBOW KIT-JKTD CABLE-#2AL Install: \---- 90438 � I S ALL BB 0 ELBOW KIT-JKTD CABLE-#2AL 14906 , =,:i, INSTALL BB f7 AL EPR JKT•O PRIMARY (2)DUST COVER Removr: BSO 63254 C2 1-128 COCONDUIT 3065 INSTALL CD 02 AL EPR JOT-D PRIMARY 90430 ELBOW KIT-JKTD CABLE-#2AL 50-3 14'CONDUIT 20'4 t9�T 14911 1992 CD ±14', O EXISTING 2•SPARE CONDUIT 2014 taR25 PD-70 Po_72 14920 4 WL 10 PD-7860: 1 PD-e4 WL 5 PD-7859: 7 1200 A 4;•n S EXIST1NG e•SPARE CONDUIT Install / 14920 Install: 5340 ABANDON PRIMARY CABLE ELBOW KIT-JKTD CABLE-#2AL �•-Llnkn vn 4 (2)ELBOW KIT-JKTD CABLE-#2AL A 25 77101 'GROUND ABANDONED CABLE PER LC22035-7 • RPM,., X4944 2006 Remove: PD-212ABC 2AL ELBOW KIT-JKTD CABLE-#2AL a, 60.63 (2)ELBOW KIT-JKTD CABLE-#2AL yr 210 EQUIPMENT '" . PD-71 14941 14936 INSTALL SUS9669-VAULT CONC.50Y44"K 72.OD UM577 90426 C21-11A VT-66 WL3 PD-7857: -9039440•CONC.DBLNON-SL1P VLT LID 56"KRA•r12^0701577-La 20'-Unknown 9 Install' t> INST.SMALL FAULT INDICATOR(S)VAR TRIP OVA 2007 8905 ELBOW KIT-JKTD CABLE-#2AL INSTALL FUSE XV 6 VT437 Remove: A9S0,•.P0-7863 8985 8805 i r 03795s 8740 8775 8765 {2)ELBOW KIT-JKTD CABLE#2AL AAzS 6665 90414 Y 90412 80410 8755 23707 8845 20'4 m$ 1965 374 304WL 6 PD-7658: POLES i _- -2026 s -6p1S Install: r—POLE CLASS(t,2,3,4,H1,H2,5) to A 50 23690 r B z PD-7659 o,A -- ELBOW KIT-JKTD CABLE-#2AL 8530 s• SW 1 Al 90116";',PD-7860 wrl ''1 J -:t Open :' (2)ELBOW KIT-JKTD CABLE-#2AL ` POLE HEIGHT RfIUNG ST 2o•-Unknown'r 8 a f•' .vT-079 l DURk�M Afy4 n s 2N- a ' *40—-a 2 AL 180 r I 8745 264 NORTHM�-'-----_-2010-rs..,A2 PL''' `m • ( I 30'-Nona s 4 s 2015 8740 n 90424 15025 870090406 PD-5 V1-107 LANDSCAPING NOTES 20'-Unknown ...... X01 8735 2007 20,4 4 ��i4siori 9 RELATED JOBS. 2D07 4, PRE-LANDSCAPING: 8840 19M M2495695 DURHAM NORTH M WL3 PD•7857: M N PD-4 REMOVE BUSH 1511.1 11050 m265 15055 8730 ' V -I �, 30•-None Q 2015 �Z, 1�,, a 8 75 6882 F 4,' BSO 30352 VT-105 NOTES: 15044PD- 57 PD-7858 `� 15085 a 3 78 20040 a 8721, 1.MUST MAINTAIN 5 FT.HORIZONTAL SEPARATION FROM 90422 80420 15060 260 WATER MAINS AND 1 FT.VERTICAL SEPARATION BELOW. 20'4 2041x s 4 a O P0.3 3d64b1R 1995 1985 5 2017 m SEE WL1&WL2 DIAGRAM yr 11026 7 2.MAINTAIN 1 FT.SEPARATION FROM CITY OF TIGARD • • A 50 23661 ¢ 9715 .81 CATCH BASINS. A 2 A ON SHEET 2 VT-256 PDaesz �' 15115 3.USE 45'/90"BENDS,FOR OPEN BOTTOM VAULTS. C] 10110 CD PO-7861 1200 A 257 FIELD CUT BEND ABOVE GRADE TO PROVIDE SLACK FOR A 50 23705 50' \m 5465 so-2 SWITCHING.(PULL TENSIONS ASSUME 990'BEND). '.13, 75'1,, 1`,il)l` 15080 ROW ?� 2016 4.REPLACE GROUND RODS IF EXCESSIVE CORROSION IS =„ 1 407 1 8895 8705 0375 DISCOVERED DURING CONSTRUCTION. 45'3 3120 C21-11D 4 I ROW 15140 I 8700 3-1421007 1978 454 s20�040 1 1" 1 e. I 49 m 1486 PD-1019 5.GROUND ABANDONED CABLE PER LC22035-7. 142 65 T 1978 1985 1 2 I 4B� 45•-2 3068 ABC 795 MC 143 foo T ' I 1996 r 1999 X12 C2 1-12C 6.CHECK COORDINATION OF STREET LIGHT FUSING. i N 4/0 AAC ABC 795 AAC 1 /Asn VT-300 8746 3 N:1-43AAC I An 795 MC '• 142657 7 3 g 81555082 Cr I 1�'1ta2�ooT I 600A N+roA%1c zzo3 , 20250 0 A1525825 2 30'- ownswROSSST 6.'<77 30,4 189 20 4 1-- - -I 7264 390919 A 4 i , 1961 19 8, ——1421007 7 15135 �.-—-. a7a� R,r, DEVL4710N FROM THIS DESIGN MUST 8735 _ ,. APPROVED BY THE PGE PROJECT MANAGE C 25115995 294 C 25 66292 4- 8439 20281 4425 15179 85 PO-156 , 1998• g3 -1: 2AHIN . 421 4 fwr1tll -C 2ALU �. BY THE ORfGON UTILITY NOTIf7UTION CENTEF. ..._ 1998 1st "" 19% 11 �� THOSE RULES ARE SET FORTH IN OAR 951.001.0010 • A a 1998 PD-1023 THROUGH 952-001-0090 P00 MAY OBTAIN COPIES OF • 185 8443 SAFETY THE RULES BY CALLING THE OREGON UTILITY "� Z ma a FIRST NOTIFICAilOH CENTER AOMICA ES'CZ/117r/ CAL lSD2-231-1981) _O 15224 1999 WL 1 PL-1457: \ / TO REQUEST UTILITY LOCATES CAC!THE OREGON Know rYhR11 bCIO1N. 5586 8572 , P0-1024 P0.1025 \ / UTILITY NOTIFICATION CENTER,817 AT LEAST Call before IOU dlg. Install: 15222 8450 1 BUSINESS DAYS PRIOR TO EXCAVATION (3)142 Cl0 F100T LIG TAP ► 120,4 998 NOTE:REMOVE(2)SOUTH SIDE WL 7 PL-1486: RISERS FEEDING C PHASE. SPLICE• Remnvc: 3420 8407 PGE CONSTRUCTION DRAWING V 4-IN PVC CONDUIT UNIT 1998 10 3 Remove: EXTEND INTO VT 300 142 CIO F100T UG TAPAS-GUILT VER/ICA7fON d NESC 5 •=1 .4 -`' (4)143 CIO F100T UG TAP 87 ::® PRC5 24N PVC CONDUIT UNIT Foreman• pate 86 20-4♦ (4)2-IN PVC CONDUIT UNIT General Foremen: Date 20.4 159A 81 4 1998 /tri �. 20'4 15230 A 1535571,' �� 14932 1495: (Srpaenrr,any', ed b.848 consnoaon chrrges) t SW LODI LN p SDPM•ENG REVIEW: IAS8UILT BY DESIGNER: P0.158iii /ar Op 2-4 2�4 98 1998 / DATE -SCALE AOCDUNT AWO OR NO 1998 PD 159 20-4 r 1D/312018 1 in=80 ft 1 tD7oo01 7000007834 �M2495699 14896—1d91� 17/7LE C 2566315 J • • 8574 15242 I UNJACKETED CABLE REPLACEMENT-DURHAM NORTH N-2,302 FT 4 V C 50 55115 WL 2 VT-300(NEW 577): st•"L�_ N. CIRCUIT 017 Rx602 / DURHAM-SATTLER 1 17 x 22 . 3 es Install: PGE LOCATION 204 y SU39669-VAULT CONC.56"x84"x 72'OD UV-577 95 8639 SW REILING ST,TIGARD,OR,97224 711998 SU39640-CONC.DBL NON-SLIP VLT LID 56"x84"x12"5751577-Lid 14874 20'4 ` 7ESCRIP 7644 20-4 LATERAL TAP UNIT-4 POS-3 PHASE 1992 INSTALL(8)SPANS 2AL;(2)577 VAULTS SHEET . 1998 '-_ 7d 75 77 • COUNTY SECTIONS WORK WRH 24 , -120-4 (5)ELBOW KIT-JKTD CABLE-#2AL WASHINGTON'C2111A,C2111D 1M2495695 1 OF 4 -'I7----SSA 2 AL 180 Feet C 75 10294 1998 1998 1 2 '`,:, (7)DUST CAP 1444- NIL -DESIGN Br PHONE DRAWN BY 111111111998 PD-173 • ' • 7 1`,: I B 50 3124014852 — N rxKrtA DESHAWN WILLIAMS 503-718-6301 1/ISP BOOMER 1 '• i m 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED 1-LINE DIAGRAM _- - ---, 3 14 11 I P0. 9 f -_�'n � .��^T�"rte � -p°'T° �2 'r i ::,...:61,, ,,loss Po-). r>o.l ssoessas� �_Po a,Po-767. y�' vias e r A 76 32 C21-11A Pal: 0- PD-68 PaT D0.^ PD 6! g� m A'w MN PD-01 �o B N T20i - P.-6,-:,,, 3 -21 t P0.- 53W f � PL-300 200 A pp-g030 P0-02 , 3 21 < so:{2,{ Po-63 \/—��A P0.) ----_ _ YT < V766 _ 9 ■. VT67- '1-11"1111't {r- -227 J// PD-706] Aw ,tel 'fC7-6 K VT-22 f 1" WL1&WL2 DIAGRAM K A < i OPos yr-tol 7'x' Nt WIRKAREA P" 'ti m' m^ <; TO VT-679 ,.tos A 00 25541P0-9040 - •711i02 900 -.VT-300 I voa .148 ABC 2 AL NEW tet' 5772 A{o 23441,laa, A S 2 y5'51°� -� TO P A{0 • R3Ta + m 5665 ABC 795AAC'1OP �bB ABC 795AAC. 200" N4/OAAC N4/OAAC 1,1520 / P1.-700{ A��_PL-1519 P1-1518 I� PL-3120 m 1 $NMI 9 PL-1607 PL�9 Pl - P 11,4571PL-0140 O'N PD-437 , 7284 R,ae7 son LPP A P0-432 LJ A ^-430 -.;;y� C76 tON6 0.156 C2S U.. PD-03 r'- -157 PD 02] PD-434 FL Pw3 a�--- C21-11D $ Po-,oz4 A26{7 PQ 169 Li PtN42 IP C21-12C •0.1 n A{0IOM7 Vi-,19 V7-100 VT-18)vT C-102 c 2{{T2M I' 1 _50 1 -3010 PD-.460 e I A.D-659 I A W M. PD4{7 ,PPa92 C 50 12{N F0 4 P0.21110 55 110 220 Feet 5, Pose PO-455 PD 4r— +_ 0 PD+66 Deo.,, PD 17 ANY DEVIATION FROM THIS DESIGN MUST I �PDI00 F', N BE APPROVED BY THE PGE PROJECT MANAGER, AnFNnoN: CALL 811 BEFORE YOU 009 OREGON UW REQUIRES 7rg TO FOLLO W RULES ADOPTED THINK 0Y iMf OREGON UTILITYRTH If ICAT10N CENTER. 811 THOSE RULES ARE SET FORTH IN OAR 951-001-0010 SAFETY THE RULfS aY CALU-N0G90NE OREGON UTI NCOPIES OF • \IRST/ NOTIFICATION CENTER ADMINISTRATION @(501-232-19871 TO REQUEST UTILITY LOCATES CALL THE OREGON 14100.011ui. 004 UTILITY NOTIFICATION CENTER,811 AT LEAST can before YOU dig 2 BUSINESS DAYS PRIOR TO EXCAVATION POI CONSTRUCTION DRAWING AS-BUILT VERIFICATION d NESC VIOLATIONS CORRECTED Foreman Deft: General Foreman Dee (G,aaaa moi''pun dMr RSMcanNncrcn cMnpn/ SOPAAENG REVIEW JASBUILT BY DESIGNER. DATE SCALE ACCOUNT WO .108 NO 10/2/2018 1 in•50 R 1070001 IA 1000007834 M2495699 T17LE UNJACKETED CABLE REPLACEMENT-DURHAM NORTH N-2,302FT \ i7RCUR 511E DURHAM-SATTLER 117 K 22 LOCATION E,, 8629 SW REILING ST.TIGARD,OR.97224 N. DESCROTION INSTALL(8)SPANS 2 AL,(2)577 VAULTS '4'E'COUNTY 'SECTIONS WORK W?H WASHINGTON' C2111D,C2111A IM2495695 !20F4 •l....( DESIGN BY PROVE DRAWN BY LnaclU.Mary DESHAWN WILLIAMS 503-718-6301 HEIDI BOOMER sr sac.Ain nKraK,.,.ar nrro 0 PORTLAND GENERA/ELECTRIC CO,-ALL motifs RESERVED LEGEND S6 - 10#2 EPR in 2"HDPE CONDUIT NOTES ,s WL2 VT-300 (TOP NEW) WL6 PD-7858 - - 20#2 EPR in 4" HDPE CONDUIT sFT:OW EXISTING PAD APPROVED BY PCE. N 43.50- - 30#2 EPR in 4"HDPE CONDUIT 2 aP a LSD TO w/42x42 OPT': �B[q A$pE[T AT i1NAL ...5 1W TRANSFORMER PAO — LEGEND BBYR PCE. "A••�N�CS O R ITRz50-It35 *BOTTOM VA'.I PVC BEIMEEN°� \/\ e"DEEP(YIN) �/ ANgAD-PSE VAUL �1` jj11.IS' ��Nryry77EL5�TfypopUpo /DPENING IN PAD MTANO IN EACIHLLPVC •� I• PROW'a PAo✓ NOTES: \% ,.. t 4o a „ARM 1. MUST MAINTAIN 5 FT. HORIZONTAL SEPARATION FROM 9 -uln WATER MAINS AND 1 FT. VERTICAL SEPARATION BELOW. • • 2. MAINTAIN 1 FT. SEPARATION FROM CITY OF TIGARD � • s 1 CATCH BASINS. ,,��/, j� = 3. USE 45'/90'BENDS, FOR OPEN BOTTOM VAULTS. 61$�� .-e.. I---- T '•-•IB•upouuM FIELD CUT BEND ABOVE GRADE TO PROVIDE SLACK �'.\A 11 alae FOR SWITCHING. (PULL TENSIONS ASSUME 90'BEND). �O P� �, SINGLE-PHASE 4. REPLACE GROUND RODS IF EXCESSIVE CORROSION IS 'SO 577-PGE TO PD-7859 TRANSFORMER PAD- DISCOVERED DURING CONSTRUCTION. SWITCH VAULTCONDUIT CONFIGURATION -- 5. GROUND ABANDONED CABLE PER LC22035.7. 6. CHECK COORDINATION OF STREET LIGHT FUSING. WL3 PD-7857 WL8 VT-67' (TOP NEW) EXISTING PAC EXISTING VAL w/42,42 OPEN NOTES • 11-� 42-A50" BOTTOM VAUI' N qT w} . y'a"MINUS CRUSHED ROIX ;ANS..ORYER PAD APPR //4250-3+25 e-0,,(MIN) ,/ TRANSPAD-PGE 7� VITT AiTyqppO��[P T,VI' 2,25" APPROVED BY PGE. ,/OPEMNG IN P. 1 D0 NOT CROS FRONT OF PAD �{/ �(P}YAv[N.„.5�SAES�i EyN%pAp� 'i ,/? hO N FACH PVL O,-D„ • • tlY-Y I- .,=11-_e- L MINRNM .y.-2. ,L,,, SINGLE-PHASE TRANSFORMER PAD- CONDUIT CONFIGURATION WL4 VT-679 WL10 PD-7860 '547110 VAUL15 T D� (TDP VEND A5PROVF`b°Bv�aN TO TO EXISTING PAD 2_TOP°F U0 To P1 Vr N I %Z..... W/42,42 OPEN SET�Ar FNAL _._ ,J..S..3". 3p " nNUs MS..Rant �M35a-2727 BOTTOM VAULT APPA1RlEG BY PCE ___ -- S�a0l.- e"DEEP Dow) 'RAN 2,2,ft 1 DD NOT CROSS ______--_ �\\ PVC BETREEN --______ \�{1 2V/YAUIMRNL�7TSµ,M��55pppp ___--ill' \1' > I+".IS" (HMNISIEST R1LL� jr• .. ,�DPENMG N PAD STRING N EACH PK. *414 1I I, /i„60 ]dl. 1' e° ' CALL 811 BEFORE YOU DIG Tp ATTENTION: • VT OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED it}� 6' THINK BY THE OREGON UTILITY NOTIFICATION CENTER. � e �i I- T f-.Je.MINIMUM THOSE RULES ARE SET FORTH IN OAR 952-001-0010 SAFETY THROUGH 952-001-0090. YOU MAY OBTAIN COPIES OF _� '(Ci. I III \j/ SINGLE-PHASE THE RULES BY CALLING THE OREGON UTILITY QOM 11,111 r �� 577-PGE TO VT-679 TRANSFORMER PAD- FIRST! NOTIFICATION CENTER ADMINISTRATION (503-232-1987) SNITCH VAULT CONDUIT CONFIGURATION ' REQUEST UTILITY:JCATES.CALL THE OREGON Know what's below UTILITY NOTIFICATION CENTER,811 AT LEAST 2 BUSINESS DAYS PRIOR TO EXCAVATION. Call before you dig. (TOP NEN) WL5 PD-7859 PGE CONSTRUCTION DRAWING I43.soEXISTING PAD SDPM/ENG REVIEW j AS-BUILT BY DESIGNER: N `s'”MINUS CRUSHED ROCK °I'Ie AOTTOM ,TRANSFORMER PAD WOPEN /42x42 /"I' PAS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED e"DEEP(YIN) //' TRANSPAD-PGE 21. 5_ This document accurately represents FIELD construction. /OPENNG N PAD AD FRONT OF P. Foreman: Date: GF: Date: DATE 10/02/2018 SCALE.NTS 'ACCOUNT 1070001 IAWO. 1000007834 IJOBNO.M2495699 TITLE UNJACKETED CABLE REPLACEMENT-DURHAM NORTH N-2,302FT Lo--j B'MINIMUM N. CIRCUIT SIZE. WDURHAM-SATTLER 17X22 SINGLE-PHASE p LOCATION v TO PD-7858 TRANSFORMER PAD- r / 8629 SW REILING ST,TIGARD,OR,97224 TO VT-679 CONDUIT CONFIGURATION ` DESCRIPTION INSTALL(8)SPANS 2 AL,(2)577 VAULTS - 'COUNTY: SECTION(S). WORK WITH. SHEET WILSONVILLE WASHINGTON C2111D,C2111A M2495695 20P4 LINE CENTER DESIGN BY PHONE DRAWN BY: 9480SWBOECKMANRD.DESHAWN WILLIAMS 503-718-6301 HEIDI BOOMER WILSONVILLE,OR 97070' 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED VT-67 LEGEND VT-679 PD-7860 PD-7859 ------ 10#2 EPR in 2" HDPE CONDUIT ! ! - 20#2 EPR in 4" HDPE CONDUIT 11....---------- _ (( - -- �--'i i 30#2 EPR in 4" HDPE CONDUIT I� IP-2 )( !) NOTES; IP-1—\ 1. MUST MAINTAIN 5 FT. HORIZONTAL SEPARATION FROM PD-7858 WATER MAINS AND 1 FT. VERTICAL SEPARATION BELOW. 2. MAINTAIN 1 FT. SEPARATION FROM CITY OF TIGARD CATCH BASINS. 3. USE FIELD 457 90'CUT BENDNDS, FOR ABOVE GRADENTOOTTOM PROVIDEA ULTS. PD-7857 SLACK TRENCH-FOOT TABLE FOR SWITCHING. (PULL TENSIONS ASSUME 90'BEND). 4. REPLACE GROUND RODS IF EXCESSIVE CORROSION IS DISCOVERED DURING CONSTRUCTION. CONDUIT 5. GROUND ABANDONED CABLE PER LC22035.7. LOCATION SIZE QTY LENGTH LENGTH 6. CHECK COORDINATION OF STREET LIGHT FUSING. (in) DESIGN ACTUAL d—VT-300 FROM To (ft) (ft) p1-1A87 VT-300 4 1 15 L—— VT-300 IPI 4 1 264 IPI pd-7857 2 1 8 PL-1487 IPI. VT-679 2,4 2 182 VT-679 IP2 2 1 124 IP2 pd-7849 2 2 51 IP2 pd-7858 2 1 296 VT-679 VT-67 2 1 164 VT-679 pd-78W 2 1 230 Rood Side 24' t Field Side Spot LEGEND 30' ' Tpic°1 Min Trench 0 Gas Utilities TRANSFORMER LOADING Total �h `° ® hep�a./ TrenchMae:7a. t PHASE SIZE CON KW NEW? oTetco/CATV B 75 B 756882(12 Customers) 26.46KW No �U' [ I Select BockfH B 5o B 5023676(6 Customers) 19.54 KW No in,22'Min ! 'Earth'Undisturbed 1 Nin 24- B 50 B 5030352(11 Customers) 37.15 KW No Joint Use Mo mine Trench A 50 A5023690(7Customers) 19.96 KW No C 25 C 25 65995(8 Customers) 26.1410V No C 25 C 2566292(10 Customers) 2111 KW No ATTENTION CALL 811 BEFORE YOU DIG OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED THINK BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 8:11 , SAFETY THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF _ THE RULES BY CALLING THE OREGON UTILITY _`\ FIRST! NOTIFICATION CENTER ADMINISTRATION@(503-232-1987) I,)REQUEST UTILITY LOCATES,CALL THE OREGON Know what's below PRIMARY CABLE&CONDUIT TABLE UTILITY NOTIFICATION CENTER.811 AT LEAST Call beforeou dig. 1-'RIISIIIE.SS PAYS PRIOP TO FYCAVATION Y CONDUIT PRIMARY CABLES ASBUILT INFORMATION PGE CONSTRUCTION DRAWING LOCATION SDPM/ENG REVIEW: I AS-BUILT BY DESIGNER: SIZE QTY LENGTH LENGTH PULL PULL CABLE LENGTH LENGTH Foreman-Complete (in) DESIGN ACTUAL REV DESIGN ACTUAL AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED FROM TO (ft) (ft) (Ibs) (Ibs) Size&Type (ft) (ft) NOTES This dreument accurately,nresents FIEL D ron,f,c6c, p1-1487 VT-300 4 1 is s 7 N2 AL 76 Foreman: Date: VT-300 VT-679 4 1 440 155 155 N2 AL 484 GF: Date: n „ 155 155 N2 AL 467 DATE 10/02/2018 SCALE.NTS I ACCOUNT.1070001 1 AWO 1000007834 I JOB NO M2495699 VT-679 pd-7857 2 1 195 41 29 N2 AL 214 VT-679 pd-7859 2 1 180 33 22 112 AL 198 TITLE UNJACKETED CABLE REPLACEMENT-DURHAM NORTH N-2,302FT pd-7859 pd-7858 2 1 357 58 68 #2 AL 392 ill \ CIRCUIT SIZE VT-679 VT-67 2 1 164 19 23 62 AL 180 DURHAM-SATTLER 17X22 / VT-679 pd-7860 2 1 265 51 31 N2 AL 291 PGE LOCA8629 TIOSN W REILING ST,TIGARD,OR,97224 DESCRIPTION INSTALL(8)SPANS 2 AL,(2)577 VAULTS COUNTY SECTION(SI. WORK WITH. SHEET WASHINGTON C2111D,C2111A M2495695 WILSONVILLE 40F4 Total 1ph 1601 * 2226 LINE CENTER DESIGN BY PHONE DRAWN BY 9480 SW BOECKMAN RD DESHAWN WILLIAMS 503-718-6301 HEIDI BOOMER 30 1.5 I 76 WILSONVILLE,OR 97070 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED