Loading...
Permit (11) CITY OF TIGARD MASTER PERMIT 114 a ' COMMUNITY DEVELOPMENT Permit#: MST2019-00026 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/21/2019 T f z ,,,,,•R I� g Parcel: 1S125DB00500 Jurisdiction: Tigard Site address: 9285 SW 70TH AVE Subdivision: SHADY DELL Lot: 5 Project: HIMAN Project Description: Adding Supports to existing foundation. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $18,000.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0 Drains: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Drywell-Trench Drain: 0 Other Fixtures: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Fum<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add9 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Other: N Other Description: Ecompasing: N BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: ALT SF VB R-3 0 Owner: Contractor: OTT,JENNIE CONCRETE LIFTING SOLUTIONS LLC Required Items and Reports(Conditions) HIMAN,HILARY MARTIN PO BOX 4614 9285 SW 70TH AVE TUALATIN,OR 161279 TIGARD,OR 97223 PHONE: PHONE: 503-595-5110 FAX: Total Fees: $622.54 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, •r if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow •- . ---•ed by the Oregon Utility Notification -hte. •:e rules are set forth in OAR 952-001-0010 thro •• •.R 952-001-0090. • ••- •• •• - . of the rules or• ect questions to OUNC by calling 503. r• .190 or 1.80.332.234x4. Issued By: ..../_._ —Lt —. i 01111111111111111.111111r- Permittee Signa . / Call' • .• .4176 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Residential FOR 01.1'1( I_ t 'NE()NEI CI of Tigard ,-- t 1; ceived PermitNo.: }�' .gip;;_ `_�� 1 it `.7 g P ' y ."° V.r"F teB , )� ST !/1✓• 13125 SW Hall Blvd.,Tigard,OR 97223 "`" •'•IanReview hif ' Phone: 503.718.2439 Fax: 503.598.1960 Date/B - �� • er Permit: 1'1 c A R D Inspection Line: 503.639.4175 F 1:1_:,5 a 2 0 19 Date Ready/By: H See Page 2 for Internet: www.tigard-or.gov Notified/Metho rillyrjSupplemental Information i # a-: da 8 a° TYPE'OF'wo UJLD1 NG DivisloN REQUIR.EDDATA.1_-AND2-F Y DWL,LIN ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ®Other:repair equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ �� • w ® 1-and 2-family dwelling 0 Commercial/industrial h�.c Jc %f ❑Accessory building 0 Multi-family Number of bedrooms: ElMaster builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:9285 SW 70th Ave. New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name F mdatinn upp r4 0.,./r1c+'V Covered porch area: square feet Cross street/directions to job site:SW 70th South of Taylors Ferry Rd. Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-ISE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:1S125DB00500 R23087 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF J work indicated on this application. ADD SUPPORTS TO EXISTING FOUNDATION Valuation: $ Existing building area: square feet New building area: square feet ® PROPERTY OWNER 0 TENANT Number of stories: Name:Himan i A 14,07 ut. ✓z, u 6 Type of construction: Address:9285 SW 70th Ave. Occupancy groups: City/State/ZIP:Tigard,OR 97223 Existing: Phone:( ) Fax:( ) New: 0`APPI #CANT ❑i;CONTACT PERSON BUILDING P'ERItF'FEES* Business name:Zarosinski Engineering and Design,Inc. fPlepscir�jerte cher Structural plan review fee(or deposit): Contact name:Dean P.Zarosinski PE FLS plan review fee(if applicable): Address:1400 NW 15th Circle1 1`_ City/State/ZIP:Vancouver,WA 98685 Total fees due upon application: Phone:(360)513-2746 Fax::( ) Amount received: E-mail:dpzski@hotmail.com PHOTOVOLTAIC SOLAR PANEL-SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:Concrete Lifting Solutions,LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:P.O.Box 4614 Solar Installation Specialty Code checklist. City/State/ZIP:Tualatin,OR 97062 Permit Fee(includes plan review $180.00 and administrative fees): Phone:(503)595-5110 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:161279 Y[444,Z O Total fee due upon application: $201.60 Authorized signature: — , This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Dean P.Zarosinski PE Date:2/7/19 *Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)