Loading...
Report (23) GEOa ESIGN= FIELD REPORT Page 1 of 1 GD1 Project: Polygon-129-03 Prepared By: f Jessica Pence Project Name: River.Terrace East Date: j 1/25/19 Location: SW Scholis Ferry&Roy Rogers, Bvrtn. Report#: 1277 Arrival: 1130 Departure: 1145 Weather: Clear, 50's Permit#: TBD Site Visit Requested By Angela(Polygon) Met With (on site): Sam (Polygon), NEI Crew Purpose: Observation of Lot 119Retaining Wall Outstanding Issues: . .______. . . y ''.;tom • • • : : • *RESOLVED* FR275 (1/21/19) -soft subgrade ets 154 &155 I observed crew had placed backfill at the toe of the retaining wall on lot 119 for wall embedment(see site plan). I observed crew appeared to have backfilled against the toe of the retaining wall that had previously been observed to not have embedment. Backfill appeared to consist of%"-0 crushed rock and approx. 6"thick on the south end of the retaining wall, and backfill appeared to consist of brown silt for the north end of the retaining wall. NEI crew informed me compaction of the backfill was achieved via jumping jack. Using a%2"diameter steel foundation probe, I evaluated the relative consistency of the wall embedment. Probe resistance indicated generally dense crushed rock, and medium stiff to stiff silt backfill. NEI crew informed me they re-compacted the crushed rock retaining wall backfill utilizing a jumping jack.The wall backfill appeared to consist of%"-0 crushed rock, and visually appeared to be well keyed and firm underfoot. Pin resistance (number of blows to drive a 3"diameter steel pin 12" using a 6Ib sledge) indicated generally dense wall backfill conditions. Based on our observations, it is our opinion the retaining wall embedment and wall backfill observed today, as indicated on the attached site plan, has been prepared in general accordance with our geotechnical recommendations. Distribution: Attachments:Site Plan (1) Reviewed by: This report presents opinions fofi ed as a result of our observation of activities relating to geotechnical engineerin• %onmental services. We - on the contractor to comply , the plans and specifications throughout theduration of the project irrespective of the presence of our representative. Our work does not • de supervision o •irection of the contractor,the con •is employees or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations,to • and prelim'- recommendations.The report • ly be considered final upon review of the GeoDesign project manager,as Indicated by initials in the"Reviewed By"section. Signature: � )► ( �� 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com