Loading...
Permit (79) CITY OF TIGARD BUILDING PERMIT 1,1 ai COMMUNITY DEVELOPMENT Permit#: BUP2018-00231 13125 SW Hall Blvd.,Ti Date Issued: 10/29/2018 Tft�R. and OR 97223 503.718.2439 9 Parcel: 1S136DC03200 Jurisdiction: Tigard Site address: 11740 SW 72ND AVE Project: 72nd Avenue Apartments Subdivision: 72ND AVE APARTMENTS Lot: 8 Project Description: A new 47,310 sq.ft.,(38)unit,five story,mixed-use building with commercial uses and parking on ground floor. Contractor: KEYWAY CORP Owner: 72ND AVENUE PROPERTY LLC 7275 SW HERMOSO WAY BY CASSINELLI, RICHARD TIGARD, OR 97223 11720 SW 72ND AVE TIGARD, OR 97223 PHONE: 503-684-5100 PHONE: 503-545-5217 FAX: 503-684-5500 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: IA Permit Fee-COM-New Construction 10/29/2018 $18,944.53 Occupancy Grp: R-2 Occupancy Load: 281 12%State Surcharge-Building 10/29/2018 $2,273.34 Dwelling Units: 38 Plan Review 08/27/2018 $12,313.94 Stories: 5 Height: 57 ft DC Provision Review,COM New-Bldg 10/29/2018 $194.00 Plan Review-Fire Life Safety 10/29/2018 $7,577.81 Bedrooms: 40 Bathrooms: 42 Info Process/Archiving-Lg$2.00(over 10/29/2018 $168.00 Value: $4,138,064 11x17) Info Process/Archiving-Sm$0.50(up to 10/29/2018 $250.50 11x17) Floor Areas: Metro Const.Excise Tax 10/29/2018 $4,965.68 Total Area: 47310 Tig-Tual School CET-Non Residential 10/29/2018 $30,751.50 Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $77,439.30 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Yes Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain - -_:. - -- -s or direct questions to OUNC by calling 503. . 987 or 1.800.332.2344. Issued By: Per -ignature: i/j a'3.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Applicatie Commercial FOR OFFICE LSE O\LI Cita'Of Tigard Received 21V� 21 L1� Date/By: i y /JJ_ Permit No.: /JP2 Ji Jrn3�r13125 SW Hall Blvd.,Tigard,OR 972 Plan Review s Phone: 503.718.2439 Fax: 503.598.1960 y 1-0-02-it Other Permit: .*— •' DateB : ��� ���� i� ki I I t,A R U Inspection Line: 503.639.4175 g tReady/By: t J y� y TIGARD Date �1 ]or s: I El See Page 2 for Internet: www.tigard-or.gov Notified/Method:,6 Jr� y, Supplemental Information fil TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING '` ®New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 0 Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. 0 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building ®Multi-family Number of bedrooms: 0 Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:11740 SW 72ND Avenue New dwelling area: square feet City/State/ZIP:Tigard,OR 97223-8613 Garage/carport area: square feet '..Suite/bldg./apt.no.: Project name:72°'Avenue Apartments Covered porch area: square feet Cross street/directions to job site:Located on SW 72'Avenue between Deck area: square feet Located in Tigard Triangle,between Clinton and Baylor Street Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST s Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the l DESCRIPTION OF WORK work indicated on this application. Construction of a new mixed use 5-story building,4-story of apartments over Valuation: $4,138,064.00 N < one story of commercial space and parking garage.Design is Type V-A,fully Existing building area: 3577 square feet sprinkled,R-1 occupancy,wood framed over concrete podium. New building area: 47310 square feet o4 PROPERTY OWNER 0 TENANT Number of stories: 5 Name:Richard Cassinelli Type of construction: V-A over I-A Address:4804 NW Bethany Boulevard,Suite 1-2 Occupancy groups: City/State/ZIP:Portland,OR 97229 Existing: R3 Phone:(503)545-5217 Fax:( ) New: M,B,S2,R2 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name:Hill Architects (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:Lloyd Hill Address:1750 Blankenship Road,Suite 400 FLS plan review fee(if applicable): City/State/ZIP:West Linn,OR 97068 Total fees due •upon application rat 3/ 94/- Phone:(503)305-8033 Fax::(503)305-8034 Amount received: E-mail:lloyd.hill@hillarchitects.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:KeyWay Corp. Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:7275 SW Hermoso Way Solar Installation Specially Code checklist. City/State/ZIP:Tigard,OR 97223-8613 Permit fee(includes plan review and administrative fees): $180.00 Phone:(503)684-5100 Fax:(503)684-5500 State surcharge(12%of permit fee): $21.60 CCB lie.: )7513_ d` dae .a - , i _ Total fee due upon application: $201.60 Authorized si natur /Oh 2. �f �t g This permit application expires if a permit is not obtained / CZ within 180 days after it has been accepted as complete. Print nam• — �/ .moi / Date: d /AP * Fee methodology set by Tri-County Building Industry / Service Board. I:\Building\Permits\BUP-COM PennitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) ;I _ ' Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 _ ' Building Division Plan Submittal Requirements I I G.ARD Commercial& Multi-Family-New,Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. 0 map&tax lot# 0 project name 0 site address 0 suite number 0 zoning 0 applicant name 0 phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey,and full set of architecture drawings. 1:ABuilding\Permits\BUP-COM PermitApp.doc 03/03/2011 Building Division Plan Submittal Requirement Matrix 1 I G.ARD Commercial& Multi-Family-New,Additions or Alterations S kr 3 r Via* 1'4 Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington County,and Tualatin Valley Fire &Rescue),if applicable. 1:ABuilding\Permits\BUP-COMPermitApp.doc 03/03/2011 Albert Shields From: Albert Shields Sent: Wednesday, September 12, 2018 4:06 PM To: Richard Cassinelli (rec65@me.com) Cc: 'Robert Leger' Subject: 72nd Ave.Apartments, BUP2018-00231 Richard, I understand from Engineering that things are coming together regarding the PFI permit but, since that Condition of Approval is still "Not Met" I need to code your building permit, BUP2018-00231 as "Approved (for Plan Review) but Not Released." Plan Review is proceeding but as far as issuance is concerned the permit will be on Hold until the remaining Conditions have been met. That is the same status as the site permit, SIT2018-00019 is in already, waiting for the same Conditions to be met. When they are, both permits will be released pending Plan Review approval. Please let me know if you have any questions. Albert Shields i City of Tigard III ■ COMMUNITY DEVELOPMENT DEPARTMENT ■ TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: eti g, 0/Y-0(:) 751 Site Address: //7-4// ,c4 AJ nve Suite/Bldg#: Project Name: 32/4 0# i j g 74 (Name of commercial business occup g the space. If vacant,enter Spec Space.) p ) Planning Review Proposal: s's4 MiltP Gfge /7 c k4( sr ci iot0( Oor C erify IId site address/suite# exists and active in permit system. 0 er Terrace Neighborhood: ❑ Yes No D nd Use Case#: 06/6 &0 ? Plan atch Approved Land Use: / Site Plan k.111 it,ndscape Plan 0 Ker: kban Forestry Plan 1I. Elevation Plan Building Height: Maximum Height J7 ZE____ Dde.2 Actual Height sin=e S 1/1411 ditions Met: ❑ Prior to Submittal ID Prior to Permit Issuance Business Licen ,t1sts: Yes ❑ No,applicant notified to obtain business license blic Facilities mprovement(PFI) Permit: Required: Yes,applicant was notified El No Applied For: Yes ❑ No,sto intake Notes: elytG� 't7X g --��/ba./lp7p (Leak Approved by Planning: ---z� 2 �r Date: ...2/ �_ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: i Site Plans: # Building Plans: ## Building Permit#: I45r building permit#above. Workflow Routing: E-Planninggineering mit Coordinator l - i din Workflow Si off: g :�- L��S�i -off for Planning(include notes from planning review) Route Application Documents: [ uilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: !' 11111111111110 �� te: �1 a // I:\Building\Forms\BldgPermitRvw COM_WithLandUse 060116.docx Engineering Review d Slope at beeriuilding pad: PFI Permit#: 1 ( (�t 8 ' 0015 3 dConditions "Met"prior to issuance of building permit dEasements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) IA Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: El Yes Ef No Assess Water Quantity Fee in-lieu: El Yes 2 No LIDA Facility on lot: C?' Yes ❑ No 0 NOT Approved by Engineering: Date Notes: Approved by Engineering: 044446j14Q,- Date: 9 -9 /8 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review El Conditions "Met"prior to issuance of building permit / �j� Approved,NOT Released: C .`jw. ,yam &coe ti' fJ Date: '/''y('r Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: Yes El N/A Tigard Trans SDC: y Yes ❑ N/A Parks SDC: EYes ❑ N/A OK to Issue Permit �j/ Approved by Permit Coordinator: / �� Date: /9-617) I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 070915.docx FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Ns " Transmittal Letter r c;,\H n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: / OkL DATE RECEIVED: DEPT: BUILDING DIVISION RC EIVED FROM: l 1 7.JE- OCT 2 2 2018 COMPANY: l//t Aga-// /FG TS Ui-I Y N DGARD PHONE: 503 -3 03" - 803 3 BY. RE: JI y0 -S(^) .72Np AUENOE TiG/lnA og, 4.(-) OZa1X00Z3 (Site Address) (Permit Number) 72 / vEnj116 ApAtTMEA/TS (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: V) Z Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Z Floor/roof framing. Basement and retaining walls. Z Beam calculations. Engineer's calculations. Other(explain): REMARKS: SvgNt iTTI n1 G IzEv is/otos peg- -Th S ZEOv CST.T. 77/F iot lt,(,)ii✓C A n-& /Air DiDe8(Z SOTS) - AIZcrI,TFc.7v/ZAt Dile-gw(NGS, S7uCTute-AL b .iAle,S , v;L OAISr"TL-- Ditflw/fvC S , NDScAp6 DKAw'NUS r (rEr>plE(- D/cAw/N 63 , (;4 c/1/ Mc,gL reroler, Lir uIfi♦ 7ro1,6 S'71.)DY1 ATL xT /lAL CALLS , &EoiaiErr_ PCS/6W Sv73M,i-r, L - FOR OFFICE USE ONLY Routed to Permit Technician: Date: PO- �j " ) 0 Initials:1j Fees Due: [ Yes 90 No Fee Description: Amount Due: SM- 0 $ Special Instructions: Reprint Permit(per PE): ❑ Yes I k No [ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions 061316.doc