Report (96) ccA • Otak fi� Letter of Transmittal Transmitted By: Date: June 12, 2018 Project No.: 18167-001-003-001 ❑ Mail Project: Tigard Self Storage ❑ Courier To: City of Tigard Building DepartmentRECEIVED Hours: Casefile No. CUP 2017-00004 ❑ Will Call Address: City of Tigard Public Works—Engineering JUN 12 2018 ■ Hand Deliver 13125 SW Hall Blvd. I � �, Tigard, OR 97223 TIGARD BUILDING DIVISION We Are Sending You: Transmitted: • Plans/Drawings ■ For Approval ❑ Specifications ❑ As Requested ❑ Samples ❑ For Your Use ■ Other ❑ For Comment Copies: Description: 2 Full Size 22x34 Tigard Storage Facility"Permit Submittal—June 11, 2018"per sheet index 1 City of Tigard Plumbing Permit Application—Site Utilities form (signed) 1 Memorandum— Otak Responses for Commencing Site Work for#CUP2017-0004 Conditions of Approval dated June 11, 2018 1 Geotechnical Engineering Report—SW Atlanta Street Storage Building Tigard, Oregon dated June 11, 2018 Remarks: From: Kyle Childers, PE 503-415-2408 kyle.childers@otak.com cc: Jeb Koener,A.Q. Properties, LLC(w/out enclosures) Project files I:\project\18100\18167\admin\corresp\18167 tigard utility permit submittal 2018-06-12.doc 808 SW Third Avenue, Suite 300, Portland, OR 97204 • Phone (503)287-6825 Fax(503)415-2304 otak.com 4 Otak %AIL if RECLEVtiD Memorandum JUN 12 2018 To: City of Tigard From: Kyle Childers, PE CITY OF TIGARD Copies: Project File BUILDING DIVISION Date: June 11, 2018 Otak Responses to Requirements for Commencing Site Work- Subject: Land Use Hearing Final Order#CUP2017-00004 Conditions of Approval for the Tigard Self Storage Facility Project Project No.: 18167 The following are Otak responses to the conditions of approval requirements prior to commencing site work. These responses are based in initial permit submittal to the City of Tigard and may be updated during permit review process. PRIOR TO COMMENCING ANY SITE WORK: Community Development Department Conditions of Approval: 1. Prior to site work, the project arborist shall perform a site inspection for tree protection measures, document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the city manager or designee within one week of the site inspection. Response: No trees will be protected during construction, so no tree protection measures will be in place to be inspected. 2. The project arborist shall perform semimonthly(twice monthly) site inspections for tree protection measures during periods of active site development and construction, document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the project planner within one week of the site inspection Response: No trees will be protected during construction, so no tree protection measures will be in place to be inspected. 3. Prior to site work, the applicant shall submit to the city, the applicant shall provide a tree establishment bond for all trees to be planted in accordance with the approved urban forestry plan. The total bond amount shall be equivalent to the city's average cost to plant and maintain a tree per the applicable standards in the Urban Forestry Manual for a period of one years after planting multiplied by the total number of trees to be planted and maintained. The bond shall be for the 10 newly planted trees. Response: Prior to site work, applicant will pay the establishment bond of$465 per tree ($4,650) per the Tigard Master Fee Schedule. 4. Prior site work, the applicant shall submit to the city the current Inventory Data Collection fee for urban forestry plan implementation. The fee shall be for the 10 newly planted trees. Response: Prior to site work, applicant will pay the Inventory Data Collection Fee of$156 plus$28 for each additional tree ($408) per the Tigard Master Fee Schedule. l:Iproject1181001181671adminlcorresplconditions of approvall18167 final decision cup 2017-00004 otakresponses.docx.doc 808 SW Third Avenue,Suite 300 Portland, OR 97204 ■ Phone(503)287-6825 Fax(503)415-2304 otak.com r • City of Tigard—Final Order#CUP2017-00004 Page 2 of 6 Otak Responses to Conditions of Approval June 11, 2018 5. Prior to site work, the applicant shall pay a fee in lieu into the urban forestry fund for four street trees. Response: Prior to site work, applicant will pay the fee in liew of$566 per tree ($2,264) per the Tigard Master Fee Schedule. 6. Prior to site work, the landscape plan shall be revised to show the tree (Elm)in the L-1 buffer, to be 3.5-inch caliper at planting. Response: Prior to site work, the tree (Big Leaf Maple)will be shown to be 3.5 inch caliper at planting. Engineering Department Conditions of Approval: 7. Improvements associated with public infrastructures including street and right of way dedication, utilities, grading, water quality and quantity facilities, streetlights, easements, easement locations, and utility connection for future utility extensions shall be designed in accordance with the following codes and standards: • City of Tigard Public Improvement Design Standards • Clean Water Services(CWS) Design and Construction Standards • Tigard Community Development Codes, Municipal Codes • Fire Codes • Other applicable Utility District, County, State, and Federal Codes and Standard Guidelines Response: Public Facility Improvements (PFI) Plans for the widening of SW Atlanta Street have been prepared in conformance with the applicable code and standard requirements. PFI plans have been submitted to the City of Tigard on 6/12/2018 for review and approval. 8. Improvements associated with public infrastructures including street and right of way dedication, utilities, grading, water quality and quantity facilities, streetlights, easements, easement locations, and utility connection for future utility extensions are subject to the City Engineer's review, modification, and approval. Response: Noted. Public Facility Improvements (PFI) Plans for the widening of SW Atlanta Street have been submitted to the City of Tigard on 6/12/2018 for review and approval by the City Engineer. 9. Prior to commencing site improvements, a Public Facility Improvement(PFI) Permit is required for this project to cover all public infrastructure work including storm water quality and detention facilities and any other work in the public right-of-way. Four(4)sets of detailed public improvement plans shall be submitted for review to the Engineering Department. An Engineering cost estimate of improvements associated with public infrastructures including but not limited to street,street grading, utilities,stormwater quality and water quantity facilities, sanitary sewer, streetlights, and franchise utilities shall be required at the time of PFI Permit submittal. Engineering cost estimate of water improvement shall be listed as a separate line item from the total cost estimate. NOTE:these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public Facility Improvement permit plans shall conform to City of Tigard Public Improvement Design Standards, which are available at City Hall and the City's web page (www.tigard-or.gov). Response: Six(6)sets of PFI plans for the permitting of the SW Atlanta Street Improvements have been submitted to the City of Tigard for review and approval. The PFI submittal includes an opinion of probable construction costs for the public improvements. The water improvements costs have been provided separate from the overall project cost. 10. Prior to commencing of site improvements, submittal of the exact legal name, address and telephone number of the individual or corporate entity who will be designated as the `Permittee" and who will provide the financial assurance for the public improvements. For example, specify if the entity is a corporation, limited partnership, LLC, etc. Also specify the state within which the entity is incorporated and provide the name of 1:1project1181001181671adminlcorresplconditions of approvall18167 final decision cup 2017-00004_otakresponses.docx.doc City of Tigard—Final Order#CUP2017-00004 Page 3 of 6 Otak Responses to Conditions of Approval June 11, 2018 the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. Response: The exact legal name, address, and telephone number of the entity designated as the "Permitee", and who will provide the financial assurance for the public improvements has been provided on the PFI application and on the cover sheet of the improvement plans. 11. Prior to commencing of site improvements, the applicant shall submit plans showing the following items to Engineering for review and approval: SW Atlanta Street along the proposed development frontage shall be shown to have: • 30-foot right of way dedication from centerline • 18-pavement improvement from centerline • Pavement and road rock section meeting the City of Tigard Standards • Curb and gutter • 7-foot concrete sidewalk • 5-foot planter • Driveway approach meeting the City of Tigard Standards • Street trees in the planter strip spaced per TDC requirements • Streetlights as recommended from the approved photometric analysis • Traffic signs meeting the MUTCD and the City of Tigard Standards • Storm drainage meeting CWS and City of Tigard Standards • Street and sidewalk barricades Response: Refer to plan sheet C0.01 of the PFI permit plans which provides a cross section for the widening improvements of SW Atlanta Street. Sheet C3.00 provides plan and profile for the roadway improvements consistent with the requirements above. The 30-ft right-of-way dedication has been completed, refer to document number 2018-035430. SW Atlanta Street along the frontage of Tax Lot 1S136CD01601 shall be shown to have: • 18-pavement improvement from centerline • Pavement and road rock section meeting the City of Tigard Standards • Curb and gutter • 7-foot concrete sidewalk • 5-foot planter • Driveway approach meeting the City of Tigard Standards • Street trees in the planter strip spaced per TDC requirements • Streetlights as recommended from the approved photometric analysis • Traffic signs meeting the MUTCD and the City of Tigard Standards • Storm drainage meeting CWS and City of Tigard Standards Response: Refer to plan sheet C0.01 of the PFI permit plans which provides a cross section for the widening improvements of SW Atlanta Street. Sheet C3.00 provides plan and profile for the roadway improvements consistent with the requirements above. SW Atlanta Street along the unimproved portion east of the existing driveway approach at Tax Lot 1S136CD02000 shall be shown to have: • 16-pavement improvement from centerline • Pavement and road rock section meeting the City of Tigard Standards • Curb and gutter • Storm drainage I:Iproject1181001181671adminlcorresplconditions of approval118167 final decision_cup 2017-00004 otakresponses.docx.doc jgr City of Tigard—Final Order#CUP2017-00004 Page 4 of 6 Otak Responses to Conditions of Approval June 11, 2018 Response: Refer to plan sheet C0.01 of the PFI permit plans which provides a cross section for the widening improvements of SW Atlanta Street. Sheet C3.00 provides plan and profile for the roadway improvements consistent with the requirements above. 12. Prior to commencing of site improvements, the applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. The purpose of this plan is for parking and traffic control during the public improvement construction phase. All construction vehicle parking shall be provided onsite. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets. Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of site improvements or buildings proposed by this application, and shall include the vehicles of all suppliers and employees associated with the project. Response: A general note prohibiting construction vehicle parking on public roadways has been added to the City of Tigard General Notes shown on Sheet C0.01. Refer to General Note 37. Sheet EC30 also designates a potential construction vehicle parking area. 13. Prior to commencing of site improvements, the applicant shall provide Engineering Division a photometric analysis along SW Atlanta Street for the review and approval. Photometric analysis will follow the recommended values and requirements per ANSI/IESNA. New streetlights are required based on the photometric analysis;the applicant shall submit plans showing the location of streetlights to Engineering Division for review and approval. Type and color of pole and light fixture shall also be included on the plan for review and approval. Response: Refer to Sheet E-2.0 showing photometric analysis along SW Atlanta Street. Sheet E-2.0 was included in the PFI permit submittal dated 6/12/2018. 14. Prior to commencing site improvements, submit a final storm drainage report as part of the PFI permit indicating on how run-off from new impervious areas shall be collected, treated and detained to Engineering Division for review and approval. The storm drainage report shall be prepared and include a maintenance plan in accordance with CWS Design and Construction Standards and the City of Tigard Design Guidelines. Response:A final storm drainage report demonstrating how run-off from the new impervious areas are collected, treated, and detained in conformance with the CWS Design and City of Tigard Design and Construction Standards. 15. Prior to commencing of site improvements, submit site plans as part of the PFI permit indicating how run-off from new areas will be collected, treated and detained to Engineering Division for review and approval. Response: Public utility plans showing location of storm water improvements for the conveyance, collection and treatment of storm water run-off have been submitted with the PFI permit application. Refer to Sheet C4.00 for plan and profile of public storm drain improvements. 16. Prior to commencing of site improvements, the applicant shall obtain a CWS Stormwater Connection Authorization prior to issuance of the City of Tigard PFI Permit. Plans shall be submitted to the City of Tigard for review. The city will forward plans to CWS after preliminary review. Response: The public and site utility plans showing the storm drain improvements have been submitted to the City of Tigard for review and approval. Upon City preliminary review and approval, the City will submit permit plans to CWS to obtain a Stormwater Connection Authorization. 17. Prior to commencing of site improvements, the applicant shall submit site plans as part of the PFI Permit showing the location of the proposed sanitary sewer main and lateral and connections to Engineering for review and approval. Plans also shall include any existing and proposed public sanitary sewer easements.All l:project1181001181671adminlcorresplconditions ofapproval118167 final decision cup 2017-00004 otakresponses.docx.doc I e City of Tigard—Final Order#CUP2017-00004 Page 5 of 6 Otak Responses to Conditions of Approval June 11, 2018 public sanitary sewer facilities and easements shall be designed and constructed in accordance with the City of Tigard and CWS Design and Construction Standards. Response: The public and site utility plans showing the sewer improvements have been submitted to the City of Tigard for review and approval. Public sewer improvements have been designed in accordance with City of Tigard, and CWS Design and Construction Standards. Refer to sheets C4.00, C4.01, and C4.10 for the sanitary sewer design. 18. Prior to commencing of site improvements, the applicant shall submit as part of the PFI Permit site plans showing the location of proposed water improvements including but not limited to the location of the tap, water meter, double check and fire vaults and any associated facilities to Engineering Division for review and approval. Response: The public and site utility plans showing the water improvements have been submitted to the City of Tigard as part of the PFI Permit application for review. Public water improvements have been designed in accordance with Tualatin Valley Water District Standards. Refer to sheets C4.00, C4.01, and C4.10 for the water design. 19. Prior to commencing of site improvements, an erosion control plan shall be provided as part of the Public Facility Improvement permit drawings. The plan shall conform to the "CWS Erosion Prevention and Sediment Control Design and Planning Manual"(current edition) and submitted to City of Tigard with the PFI permit plans. Response: An erosion control plan has been prepared in conformance with CWS Erosion Prevention and Sediment Control Design and Planning Manual. Refer to sheets EC0.0 through EC3.0 for reference. Erosion control plans were included in the PFI permit plans submitted to the City of Tigard on 6/12/2018. 20. Prior to commencing of site improvements, a final grading plan shall be submitted showing the existing and proposed contours. The plan shall detail the provisions for surface drainage, and show that they will be graded to ensure that surface drainage is directed to the street or a public storm drainage system approved by the Engineering Division. Response:A final site grading plan showing existing and proposed contours has been provided. Refer to sheet C2.00 Site Grading. 21. The design engineer shall indicate, on the grading plan, which area will have natural slopes between 10 percent and 20 percent, as well as area that will have natural slopes in excess of 20 percent. This information will be necessary in determining if special grading inspections and/or permits will be necessary when the lots develop. Response: The site does not contain natural slopes in excess of 10%and this condition is not applicable. 22. A Geotechnical Report prepared by HGSI, dated June 12 2017 was submitted. The applicant shall incorporate the recommendations of the report into their design. Response: A new geotechnical report prepared by GeoEngineers, Inc. has been prepared for the Tigard Storage Facility Site. Grading and site design has been prepared in conformance with the recommendations contained in the geotechnical report prepared by GeoEngineers, Inc. 23. The final construction plans shall be signed by the geotechnical engineer to ensure that they have reviewed and approved the plans. The geotechnical engineer shall also sign the as-built grading plan at the end of the project. 1:1project1181001181671adminlcorresplconditions of approval118167 final decision cup 2017-00004 otakresponses.docx.doc 40 1 City of Tigard—Final Order#CUP2017-00004 Page 6 of 6 Otak Responses to Conditions of Approval June 11, 2018 Response: Signatures on the site grading plan will be obtained upon City of Tigard approval of the Site Works and PFI Permit Plans. 24. The applicant shall obtain a 1200-CN General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. Response:A 1200-CN Erosion Control plan has been included in the PFI submittal package for review and approval by the City of Tigard and CWS. Refer to sheet ECOO to EC30. 25. Prior to commencing site improvements, the applicant shall submit to Engineering evidence that Tualatin Valley Water District has been reviewed and approved the proposed public water facilities. Response:A separate submittal package will be submitted to Tualatin Valley Water District • l:Iproject1181001181671adminlcorresplconditions ofapprovall18167 final decision cup 2017-00004_otakresponses.docx.doc