Loading...
PFI2018-00239 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00239 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/12/2018 Parcel: SEG631 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job M2521663 Project Description: SEG631, associated with 11130 SW Tigard St. Install underground service to Dirksen Nature Park. Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX Applicant: SAMUEL MORLAND 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-464-7777 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: n Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00239 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI—Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City ®f Tigard SEP 10 2018 'a PUBLIC WORKS —ENGINEERING Cln- Cr- T'4 ARD PLAN NING,,Et\'X I N E E R I N G w Public Faces Improvement PFI) Permit TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE 1—Franchise Utility Work Check one: V Utilities ❑ Sidewalk/driveway approach ❑ Street improvements performed by NWN, PGE Detailed description: and/or utility agency. Install underground service to Dirksen Nature Park ❑ TYPE 2—Sidewalk/Driveway/Sewer PGE Job M2521663 Work performed for the purpose of: • Sidewalk installation or repair. • Driveway approach installation Property address/location(s): 11130 SW TIGARD ST and/or repair Tigard, OR 97223 3 � • Sanitary sewer lateral installation and/or main line tap A licant. Portland General Electric El TYPE 3—Full scale Development pp Work performed with Land use Address: 10800 SW Avery St Tualatin, OR 97062 approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-464-7777 Email: preregcoord@pgn.com ° Subdivisions or Partitions Contact name: Samuel Morland Phone: 503-672-5405 ° Street widening • Mainline installation for Sanitary Contractor: Hillcrest Construction sewer, Storm sewer, Tigard water and/or Tigard Water Service Area CCB#: 198075 Expiration: Address: 13200 SW Mcloughlin Blvd SUBMIT COMPLETED APPLICATION TO: City/state: Milwaukie OR Zip: 972222 City of Tigard Phone: 503-307-6449 Email: Planning/Engineering 13125 SW Hall Blvd. Contact name: Kyle Phone: 503-307-6449 Tigard,OR 97223 Applications for"minor work in right-of-way" Engineer. N/A only may be emailed to: g roMTerrnits awtiga�gov Address: FOR STAFF USE ONLY City/state: Zip: Phone: Email: Case No.: ?�N O Contact name: llpphcation submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ 9,319.03 Additional fees: $ (within the public right-of-way) Application accepted By: t-. Date:. to Is work related to a LAND-USE DECISION? ❑ Yes Ga'No If so,please specify (MLP,SDR, SUB, etc.) case #: Bbl:Application reviewed: Date: Is work related to a BUILDING PERMIT? ❑ Yes 9f No Applican (no�ti£ied: o ``� If so,please specify(EUILDING PERMIT)case#: By: Date: I:\ENG\PermitApplications\pfi_applica tion Rev.10/16/2017 City ofI'igard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 °, www.tigard-or.gov • 503-718-2421 Page 1 of4 APPLICANTS NOTE: Person specified as "Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL.CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject ro er . • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and sub)ect to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of4 DEVELOPMENT ENGINEERING FEES FOR STAFEUSE ONLY Public Facility Improvement(PFI)Permit: DETAILED APPLICATION FEE REQUIREMENTS Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5% (less$300.00 minimum submittal fee) Sketch Engineer's estimate X 2%Plan Review (including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements EJ, Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer;etc.) • Weep hole repair 0 Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan.(Electrical,Phone,Gas, Storm;Sanitary,Water,Signage,Street Lights;etc) ❑. Details Mote: A cash/bond assurance maybe ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of4 SAMPLE SKETCH: Edge of P avemerit I I —� Ditch s StreetlighiI .�._.•.-.—■ ®i■l.­r ■� e 1 1 0 T� r pos dl''Sewer I e. ! ►- I ,� Existing�,House . ® I Existing I >® e D riveWa a I I 0, of • � IO' o' ! = 1 I EcistingShogp; Powerpole 1 I� 5 frope4 Line " � I,;,,. ° Fire Hydrant(FH) .I I I I Scale: 1"=30' I I I I I I ° I I � I ° I I I MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable): North arrow Property lines &dimension Slope of property Street &street name(s) Existing building, structures Utility &street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC]FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 ■ www.tlgard-or.gov • 503-718-2421 • Page 4 of4 Page 84 2011 Edition State®inairyane Closa�ire wath Flagg';iigr D1agraM 320' Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads(less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing(see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 September 2016 2011 Edition Page 85 Stateo"nary Lane Closure vuith. . ag,gring D:1agrain Y� • � I C cc O Rf W C 0. aU O o z a� cm cm CO W a I 3 LU a Q • c •• DO m I U I I • r ,,. o�� I U m 1 t m • D I I E fi H < E o . m � I • CL I • • co cm 0 4 '1w I -L w I rn c j11 rm/ � 1 m mWo CD VU 1 V a ~ ———————————————— I ao Sign Spacing and Buffer Lengths(feet) c Posted ',':5 akin'Between Si ns ` Buffer t W C Speed 20 50 Z it 0 25 100 100 100 75 I O 30 1 100 350 350 350 150 p Y 45 180003 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 1 1 1365 September 2016 Chapter 5 Page 52 2011 Edition Bicycle ainc9 Pedestraan i4ccomim®dation`®iagraes The following practices and details address the accommodation of bicycles and pedestrians within work zones. The following detail drawings should be incorporated, where appropriate, into the traffic control plan for any short term work. 1. See Section 1.6— Bicycle and Pedestrian Considerations for additional guidance. 2. Stay alert for pedestrians and bicycle traffic and accommodate safe passage for them, as needed. 3. The work space should be protected from bicycle and pedestrian intrusion by using barricades or closely-spaced channelizing devices. 4. Maintain access to transit stops or clearly close a transit stop using barricades or channelizing devices. bicycle Accornrr�o�c9at'on ' ,, �� _...__..a.4 �'agrarri 5 66 Bicycle Accommodation Principles: 1. If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a "(Bicycle) ON ROADWAY" sign (CW11-1) or the Bicycle symbol (W11-1) sign with an"ON ROADWAY" (OBW1-5) rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer)strip, or share the width needed between the shoulder and the sidewalk, as available. 3. Signs are to remain in place until the surface is restored and the width made available for bicycle use. See Diagram 5-6 for typical bicycle s signing placement. Sign Spacing and Buffer Lengths(feet) Posted SpaangBetween S+gru;�. `"Bffe�" ace' 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 S00 S00 S00 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 53 �rcycle Accorr�sno'd`atio'n :. . _ _ b--rare 5'6 I I I NOTES: • Bicycles on Roadway(CW11-1)sign should not interrupt standard sequences. For example: I o BE PREPARED TO STOP/Fla er Symbol mbol y o LANE CLOSED AHEAD/Lane Ends I Symbol • Bicycles on Roadway sign typically follows ROAD I WORK AHEAD sign and used as general warning. I I I I I I I I I A I I I I I I I I I I I I I I A I I I I I I I� I I • I I I I I I I ' I I ON I 1 ROADWAY I I I I I C I I I I ROAD I� WORK AHEAD September 2016 Chapter 5 Page 54 2011 Edition Pedestrian/�ccomr odati®r Deagramm See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work zones. Pedestrian Accommodation Principles: 1. If the work impacts the sidewalk or pedestrian facility, provide a safe, accessible path, where practical, in accordance with the requirements of the ADA. 2. If not practical to match the width of the existing pedestrian facilities, maintain a 4-ft minimum width. 3. Unless a reasonably safe route can be provided through the work space, pedestrians should be appropriately directed with advance signing to cross the road. Do not divert pedestrians into travel lanes. 4. Install pedestrian closure or detour signing on Type II barricades. Make every practical effort to satisfy the following: • If work closes a sidewalk or sidewalk ramp, close sidewalks at a point where an alternate crossing point or route can be provided. Minimize the amount of out-of-direction travel for pedestrians. • Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE" (R9-11a)signing to direct pedestrians to an alternate facility. • Where there are business destinations between the nearest crosswalk and the work area, close the sidewalk at the business access nearest the work area, where practical using the SIDEWALK CLOSED sign. Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the nearest crosswalk prior to the closure. Chapter 5 September 2016 Page 56 2011 Edition Pec9estd h,,'�4r my rro®da 11 uagra :5=� For work near an intersection, close crosswalks and/or sidewalks as necessary when safe passage cannot be maintained. SIDEWALK cLOBED USE OTHER SIDE 24x12 Type°W1° (Mount on B(II)LR) ROAD WORK AHEAD (Optional) SIDEWALK CLOSED SIDEWALK CLOSED CROSS HERE f® USE oTHEa BIDESIDEWALK 24x12 24x12 CLOSED Type°W1° Type°W1" (Mount on B(II)LR) 24x12 (Mount on B(II)LR) Type°W1° (Mount on B(II)LR) B�wALIccLosm AHEAD • CROBB HERE • 24x18 Type°Wi° • (Mount on B(II)R) ROAD WORK AHEAD (Optional) Chapter 5 September 2016 Page 54 2011 Edition Pe'tlestrian' ►4co ®da$i®m®oagra � ' See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work zones. Pedestrian Accommodation Principles: 1. If the work impacts the sidewalk or pedestrian facility, provide a safe, accessible path, where practical, in accordance with the requirements of the ADA. 2. If not practical to match the width of the existing pedestrian facilities, maintain a 4-ft minimum width. 3. Unless a reasonably safe route can be provided through the work space, pedestrians should be appropriately directed with advance signing to cross the road. Do not divert pedestrians into travel lanes. 4. Install pedestrian closure or detour signing on Type II barricades. Make every practical effort to satisfy the following: • If work closes a sidewalk or sidewalk ramp, close sidewalks at a point where an alternate crossing point or route can be provided. Minimize the amount of out-of-direction travel for pedestrians. • Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE" (R9-11 a)signing to direct pedestrians to an alternate facility. • Where there are business destinations between the nearest crosswalk and the work area, close the sidewalk at the business access nearest the work area,where practical using the SIDEWALK CLOSED sign. Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the nearest crosswalk prior to the closure. Chapter 5 September 2016 2011 Edition Page 55 rhe 8estrlan, Accornr� ®c0atl®� IIAa flock 3 rt t Dea jraon5 7 The sidewalk should be closed at the nearest intersection on each side of the work area when a safe, ADA-compliant path through the work area is not available. SIDEWALK cx:osED 81DEWALK cLosED or AHEAD CROSS HERE CROSS HERE 24x12 Type"W1° 24x18 .....(Mount on B(II)L) Type'W1' SIDEWALK CLOSED 24x12 Type°W1" (Mount on B(II)LR) (2 Regd.) e SIOEINALK CLOSED SIDEWALK CLOSED Or AHEAD CROSS HERE ♦- CR088HERE 24x12 24x18 Type°W1' Type WV1 (Mount on B(II)R) September 2016 Chapter 5 Page 56 2011 Edition Ped' troan.4cc®rim®� ti®r , In ersectior� ti aagram 5 For work near an intersection, close crosswalks and/or sidewalks as necessary when safe passage cannot be maintained. SIDEWALK= O USE OTHER SIDE 24x12 Type°W1° (Mount on B(II)LR) ROAD WORK AHEAD 77 (Optional) SIDEWALK CLOSED 10 SIDEWALK CLOSED CROSS HERE USE OTHER SIDE SIDEWALK 24x12 24x12 CLOSED Type"W1° Type'WI" 24x12 (Mount on B(II)LR) (Mount on B(II)LR) Type°W1° (Mount on B(IOLR) • slDEwauc Ct.DeEn AHEAD � CROSS HERE 24x18 Type ffW1" (Mount on B(II)R) ROAD WORK AHEAD (Optional) Chapter 5 September 2016 Y L- a g COMMERCIAL LEGEND A 410 AL TX 10755 10805 = / J Z -- a_q f• ; Q 10587 .. �W � NEW PGE FACILITIES TO BE INSTALLED J N (UNLESS OTHERWISE SPECIFIED) J Q `. ;' ! 504-PGE PAD VAULT,WITH 55-2125P-PGE TOP N - - o Q �� _ � � PROVIDED & INSTALLED BY CUSTOMER - 504-PGE SWITCH VAULT,WITH 55-332P-PGE TOP A 15 47 SON TIGARD ST 143 40 T PROVIDED & INSTALLED BY CUSTOMER 143407 AB 4_CU _143 T PGE TO INSTALL " WAY LATERAL TAP - B 6 AL-TX --- --- _- - __--- -- N2 ACSR 46890 587L CUTOUT 0 SINZE�FU ANG AS -------- ----— -----40'.q- NOTED 40'-4 — 71( .,,�. - ----------�----— 1950 40'-4 RIN I INSTALL 1-#2 AL-EPR JKT PRIMARY IN 1-2"PVC CONDUIT 19541�1 ®�® m o PROVIDED & INSTALLED BY CUSTOMER 504-PGE VAULT INSTALL CONDUIT NEAR THE 6T �L�5870 ".55-332P-0GE DIAMOND PLATE DOOR ---_--- INSTALL & AL-TX SECONDARY IN 1-3"PVC CONDUIT 6- EDGES OF CONCRETE PATHWAY !I INSTALL 2r POLE CONDUIT PROVIDED & INSTALLED BY CUSTOMER .�./.�. NOTES: --/-- UNIT orl EXISTING 12p CONSTRUCTION NOTES: CMDEV ....... /�C-t-44/ate. TA T L ro BE I�I�I�I�I�/`I;I I�� ♦ SET AT LOCATIONS II APPROVED BY PGE. I BRACKETS, 1-142 CAO F6T & --- — 1. CUSTOMER IS RESPONSIBLE FOR ALL TRENCH,CONDUIT,VAULTS,PADS AND I 2.TOP of tlO TO - G�AT ANAL ---- 300' I®�® ' Y '..►GHTNING ARRESTER ROAD CROSSINGS. APPROVED BY PGE, ,�m��' 2. A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS 2"TO 48• 3 DO NOT CROSS o' a JUNCTION F CONDUBOXES A [5 PUEL STRPNGS TCALLISE VS INCLUDING COORDINA ON ATTI500 03 ��ALLATION VPVC AULTS. TO®®® EXIST 2 TO SCHEDULE A PGE STANDBY CREW. 4r q INSTALL 500 LB `R ®®® B 3. ALL CONDUIT TO BE INSTALLED WITH 30 INCHES (MIN COVER AT TOP OF CONDUIT ® �� 1�►G EACH PVC. V I-144 ®® FROM FINAL GRADE. 4. ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL GRADE, ® ® PVC CONDUIT WITH NYLON PULL STRINGS (MIN.500 LBS.TEST) .PGE Tn DETERMINE O p 144 THE SIZE AND NUMBER OF CONDUITS REQUIRED.MAINTAIN 12 VERTICAL INCHES AND • y� - 2" 4 INCH&SMALLER TO BNCHESE 36 INCH RADIUCE S.ALL BENDS MUS BEEN GAS AND OTHER F FACTORY UTILITIES. r� ` CONDUIT ALL ELBOWS LARGER THAN 4 INCH TO BE 60 INCH RADIUS.RIGID STEEL OR PGE 314"MINUS 56� �� 2`TO PL-5870 ® r APPROVED.FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 151 FEET OR LONGER, CRUSHED ROCK ® 1 OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES IN BENDS.PVC SCHEDULE 6"DEEP(MIN) � �1 F II� 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS.THE MAXIMUM TOTAL �'+ �p BENDS IN ANY CONDUIT RUN IS 270 DEGREES. 'ls 1J U-341) 1`� 5. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE (HIGH DENSITY POLYETHYLENE) DUCT CON ECTIION PCHEDULE ROD CT)PVC AS AH A N MECHANICAL VE TO HDPE DUCT.HDPE SHALLL MEET MECHANICAL REQUIREFMbENTS OF PGE FOR SPECIFICATION LC20515 (REASONS THE DUCT ALAOVAILABLE ON RE�7QUEST FROM PGE PROJECT MANAGEHDP PPE IS EQUIRED AFTER N TALLAT SPECIFICATION TH PGE INSPECTOR PRESENTL BE BLACK WITH THREE . TESUALLYT SPACE 6 BUILDING TRANSFORMERS OR OVERHANG AND 4 FEETB(F SET (MIN ANY FIRE HYDRANT TABLE PD-143 PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. 250'9 INSTALL:tlSTALL: 7. TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE FINAL GRADE.CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL A O 25KVA AND TO EXTEND 1 INCH ABOVE THE PAD. PADMOUNT TRANSFORMER 8. STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED p TO VEHICLES. 720OV, 120/240V, 1 0, 3W V 9. ALL SWITCH VAULTS TO BE SET AT FINAL GRADE WITH 6 INCH GRAVEL BASE AND 0 CONDUITS ALIGNED TO ENTER THE VAULT END LOWER KNOCKOUTS(TERM-A DUCTS) . (SEE DETAILS ON SKETCH) 10.PGE TO BE NOTIFIED AND INSPECT ALL CONDUIT,VAULT AND PAD INSTALLATIONS A 25 504-PGE PAD VAULT BEFORE BACKFILIALL NEW VAULT&PAD LOCATIONS TO BE FIELD VERIFIED WITH PGE AND CUSTOMER REPRESENTATIVE. 55-2125 PGE UD / 111.REFER TO PGE ELECTRICAL SERVICE REQUIREMENTS BOOK FOR FURTHER DETAILS 6• Boed side 2Y' '� &SPECIFIC REQUIREMENTS.LINK TO I AmN PnRTI Aunr_FmFRAj rnuniFam= NOTES: ��-Typical 7 3. AT TS TO BE ,{ 12.DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD /i UNDERGROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO 10 APPROVED BY PGE,F U0 TO , 12GENn THE CUSTOMER. E Primary RE�AT RNNAL 0 48• 36" .tiY M V�Seemda Cable 13.THE POINT OF DELIVERY AND DIVISION OF OWNERSHIP BETWEEN THE CUSTOMER AND GRADE. 3'TO METER * TO'�Q Dont PGE WILL BE AT THE LINE SIDE OF THE NEW CUSTOMER PROVIDED SWITCH GEAR. APPROVED BY PGE. 120240V PD-143 1D � I ® PGE CONSTRUCTION DRAWING •s VAULTS. p 42- m 2ooAMP AS-BUILT VERIFICATION & NESC VIOLATIONS CORRECTED 4.INSTALL SW LB 0 Q 8eleel B&CMI <1% VD TEST PULL_ �p ,,:, `` Undisturbed o 'N�'Pry p• -s ° 'ea"h This document accurately represents FIELD Construction. <1% FLKR 11,210A AFC PD-143 '� p p p Joint Use wee Vo Foreman. Date: OtL&W BOOK r TO vr-144 General Foreman: Date: Signature only required for field construction changes. SDPMfNG REVIEW: ASBUILT BY DESIGNER: RIGHT-OF-WAY PERMIT NOTICE: DATE: g1�g SCALE: NTS ACCOUNT, 1070001 AWO: 1000004599 OB NO.M2521663 A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY ANY DEVIATION FROM THIS DESIGN MUST TITLE WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED. ONLY PGE APPROVED BE APPROVED BY PGE PROJECT MANAGER CITY OF TIGARD CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL CIRCUIT Elx17 AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. CONTACT SERVICE COORDINATOR TIGARD-13361 THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS FOR TRENCH AND CONDUIT INSPECTION PRIOR BEFORE WORK IS TO BEGIN. A COPY OF THE PERMIT MUST BE ON SITE. TO BACKFILL PGE WILL NOT INSTALL WIRE �/-�J UNTIL TRENCH IS 100%BACKFILLED. PGE E LOCATION SERVICE COORDINATOR 11130 SW TIGARD ST,TIGARD 503-323-6700 OR 800-542-8818(SALEMJ PGE F C�LlTIES T �' SCALE I CALL 811 BEFORE YOU DIG rw .. DESCRIPTION ATTENTION: = PROVIDE 100A 120240 1P UG SVC TO DIRKSEN NATURE PARK THIS DRAWING IS A GRAPHICAL REPRESENTATION OF PORTLAND GENERAL OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER COUNTY ECTION(S) WORK WITH SHEET ELECTRIC FACILITIES IN THE FIELD. THIS MAP ILLUSTRATES ELECTRICAL THOSE RULES ARE SET FORTH IN OAR 952-001-0010 CONNECTIVITY, TYPES AND NUMBERS OF CONDUCTORS AND PLACEMENT OF I THROUGH 952-001-0090.YOU MAY OBTAIN COPES OF BEAVERTON WAS NGT OSI CI134D 1 OF i THE RULES BY CALLING THE OREGON UTILITY LINE CREW CEMER DESIGN BY PHONE (503) DRAWN BY EQUIPMENT WITHIN THE DISTRIBUTION SYSTEM. IT IS RECOMMENDED THAT NOTIFICATION CENTER ADMINISTRATION @ (503-232-1987) . 2213 SW 153RD DR SAM MORLAND 672-5405 CESAR DEL R AR► THE USER NOT RELY ON THIS DIAGRAM FOR GEOGRAPHICAL LOCATIONS TO REQUEST UTILITY LOCATES CALL THE OREGON Know1,ars below. BEAVERTON,OR 97006 OS O UTILITY NOTIFICATION CENTER,811 AT LEAST Call before di 2 BUSINESS DAYS PRIOR TO EXCAVATION. 9• ©PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED