Loading...
Plans (31) BUP2O17 - 00151 OFFICE COPY . CITY OP TIGARD REVIEWED FOR CODE COMP A proucd: I 1� �h c \ rcrniit #: 1 •f? / )/ 7-COMMON AREA UPGRADES _ A' l IN/11 M SL1iIC ##: 3_ Gdlin e.r.e.e_r..1444 By: Date: c.,_ j3_.); Architecture a Interiors 3 LINCOLN CE ED Planning m Engineering JUN1 � 2011 10220 BW GREENBURG RD c=° J . ELEVATOR LOBB\f fI OF TIGARD C ILI?ING& SII ' Portland, OR TIGARD OREGON 53.224.9560 Vancouver,WA 360.695.7879 Seattle,WA 206.749.9993 www.mcknze.com GENERAL NOTES INDEX OF DRAWINGS MACKENZIE. A. THE DRAWINGS LOCATE PRODUCTS, SURFACES, AND MATERIALS AND THE NOTES CONVEY DESIGN DRIVEN I CLIENT FOWSED G0.O1 TITLE SHEET, SITE PLAN, KEY PLANS, DRAWING INDEX AND NOTES ! DESIGN INTENT. THE PROJECT INTENT IS TO PROVIDE FOR A COMPLETE, WORKING SYSTEM. A1.10 PARTIAL SECOND AND TYPICAL FLOOR PLANS, DEMO RCP'S, RCP'S, AND NOTES Client B. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE LATEST ADOPTED BUILDING CODE A5.20 DETAILS AND SCHEDULES EDITION, AND TO CONDITIONS AND SPECIFICATIONS OF ALL GOVERNING AUTHORITIES., C. VERIFY AND CONFIRM ALL CONDITIONS, DIMENSIONS, AND LAYOUT INFORMATION PRIOR TO __._____. _ __J SW Locum StreetSTART OF CONSTRUCTION. NOTIFY MACKENZIE OF ANY DISCREPANCIES PRIOR TO START OF ,f a (In ,: : 3 - ii �- '" WORK. ANY CORRECTION WORK REQUIRED AS A RESULT OF NOT REPORTING SUCH SCOPE OF WORK SHORE T E I N I , DISCREPANCIES SHALL BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. /1;6: �' y _ F'' M`iitnil; p1T4i"Li 1D. CONTRACTOR AND SUBCONTRACTORS SHALL CAREFULLY EXAMINE THE SITE AND THE}; ; > ,r THE SCOPE OF WORK FOR THE PROJECT INCLUDES INTERIOR COMMON AREA UPGRADES ` _', � - - ,,. F a , CONSTRUCTION DOCUMENTS OF THE ENTIRE WORK. INCONSISTENCIES IN THE PLANS OR FOR AN APPROXIMATELY 290 SQUARE FOOT ELEVATOR LOBBY AREA ON THE SECOND I O �I 1 : SPECIFICATIONS SHALL BE CALLED TO THE ATTENTION OF MACKENZIE. �� _ 4 - - n -. 'i :.:. is k•• - STR,, ,,„E,,PARKING ' �• w � ��.��-�—= - � �,1� ,�' � L,�, �;r , _ THROUGH SIXTH FLOORS (TOTAL OF FIVE FLOORS). WORK TO INCLUDE DEMOLITION, °- '• ° 8 t - f ii'5 f ! 3 I ' ` ;'1 E. REFER TO ENLARGED PLANS WHERE INDICATED FOR ADDITIONAL INFORMATION. ENLARGED NEW CEILING AND LIGHT FIXTURES. ',bi- r . cp o , �' . ! } , ' ' ,• PLANS TAKE PRECEDENCE OVER OF SMALLER SCALE, AND DETAILS TAKE PRECEDENCE c APLANSS L C 1 ,Stti; � '--, --�,� - . 1 OVER PLANS. IN THE CASE OF A CONFLICT, THE HIGHEST COST OPTION SHOULD BE PRICED. I J =-- `:x cTS� 4i ' II C,7-1-1H-44-1);A' �� F. DETAIL REFERENCES SHALL BE APPLIED TO ALL INSTANCES WHERE THE SAME CONDITIONS Project ° '= :, = '` sr. ,', OCCUR, UNLESS NOTED OTHERWISE. LANDLORD APPROVAL: �� r .----,- -,k„< - t -� ;,. , G. THE TERMS "ABOVE FINISH FLOOR" (AFF) AND FINISH FLOOR ELEVATION" (FFE) REFER TO ,,�. � !! � t 7:T f=°', ; // FINAL FINISHED FLOOR ELEVATION, WHETHER BUILT—UP SLAB, COMPOSITE DECK, OR RAISED ELEVATOR LOBBY r' . �._,• 40 rya et,/ (€ m � :EELI? ACCESS FLOOR. . • ,, ': '� _ 71:: H. DO NOT SCALE DRAWINGS. DESIGN/CODE DATA COMMON AREA " ` ° < ` s` W� . _ ! ,. =' I. CUTTING AND DRILLING OF STRUCTURAL MEMBERS NOT DETAILED REQUIRES THE WRITTEN / -0, � � PERMISSION OF THE STRUCTURAL ENGINEER OF RECORD. GOVERNING CODE: 2014 OSSC Iii-a. :-..":40:V61:616'4,44: J. SAVE AND RECYCLE DEMOLITION DEBRIS AS APPLICABLE, ALL DEMOLISHED OR REMOVED 3 LINCOLN IOCCUPANCY: e ;_ 6. ti� p EXISTING MATERIAL SHALL BE LEGALLY DISPOSED. COORDINATE WITH CITY OF LAKE OSWEGO 10220 SW GREENBURG RI n `'a;` • 1 REQUIREMENTS FOR RECYCLING/RE—USE OF DEMOLITION DEBRIS. CONSTRUCTION TYPE TYPE I—B p, OREGON ,i :t C �' �� ,is; i 15' .. K. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THEIR WORK. THE COMMON AREA (APPROX.). APPROX. 290 S.F. PER FLOOR (5 FLOORS TOTAL) r I " CONTRACTOR WILL COORDINATE CLEAN UP OF ALL AREAS AFFECTED BY DUST OR ANY I i MATERIALS, BOTH DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT, ALL EXITS .ARE EXISTING AND MEET EGRESS REQUIREMENTS, PER SECTION 1005-2014 OSSC '._: _ � � �- - /may, i , ,�� ki '' _ s,>7ucrii>1EOPARKWG 1 1- STRUCTURED PARKING = INCLUDING THE INSIDE OF ALL WINDOWS AS NECESSARY SO THAT THE SPACE IS READY FOR ALL EXITS ARE EXISTING AND WILL HAVE APPROPRIATE EXIT SIGNAGE \` • � OCCUPANCY BY TENANT. , :`, , ; , : 1 AREA OF WORK BUILDING IS FULLY SPRINKLED AND HAS NEPA SMOKE DETECTION �'J ; L. ALL DESIGN-BUILD ITEMS, SYSTEMS AND ELEMENTS ARE TO BE SUBMITTED FOR REVIEW AND '�' PAUL D. KI NCS J —__________==.=„) WITH ON SITE EMERGENCY GENERATOR FOR FIRE, LIFE/SAFETY BACKUP POWER _ APPROVED BY MACKENZIE. swoak,Sir-e- ,- _ __ �_ .- M. EXISTING MATERIAL NOTED TO BE RETURNED TO THE OWNER SHALL BE SAFELY STORED AND �.' ,� 7 � PROTECTED UNTIL IT IS REMOVED FROM THE SITE BY THE OWNER. CONTRACTOR SHALL ] © . ' -- COORDINATE WITH THE OWNER. DEFERRED SUBMITTAL AORTLAND, ORt 6N C 1 SITE PLAN 2014 OSSC SECTION 107.3.4.2 (by separate permit) / 4 FIRE SPRINKLER ' OF Og G0.11 NTS FIRE ALARM NORTH MECHANICAL 1 ELECTRICAL O MACKENZIE 2Oi7 EXIT ILLUMINATION ALL RIGHTS RESERVED o 0 ' a 42- a a11-11 ■ ■ ■ ■ ■ ■ ■ ■ • THESE DRAWINGS ARE THE PROPERTY OF MACKENZIE AND ARE NOT TO BE NOTE: DESIGN BUILDERS FOR M.E.P. AND FR ARE FULLY RESPONSIBLE FOR THE DESIGN USED OR REPRODUCED IN ANY MANNER, -.13.---\-) L. • OF THESE SYSTEMS/COMPONENTS. THESE SYSTEMS/COMPONENTS SHOWN ON DOCUMENTS WITHOUT PRIOR WRITTEN PERMISSION I 3 ARE SCHEMATIC ONLY: THEY ARE NOT INTENDED TO REPRESENT FINAL/CODE COMPLIANT REVISIONS: DESIGN. PROVIDE DESIGN DOCUMENT SUBMITTAL TO ARCHITECT OF RECORD FOR REVIEW z _ 1 0 ■ PRIOR TO SUBMITTAL REVISIONS REVISION DELTA ® 1 ' II- r-----7 �o THIS CLOSING DATE w w SHEET ,,,,,,r4 iiiiiiiiim II o p R- VALUATION E '�� I '!I # � 4 rJ _ 11111 M- �, ii114-* - ■ VALUATION OF WORK = $55,000,.tr.: -.-. -.?-1MIV iii ie . a, a Mai 6k 4 p i IN opm _. ..... A.„,,,..„:„.., ►1par.. ��� MASTER LEGEND 1 E '; ..fir.- yam. ' = ■ p �. -=• -=- ■ �` �!tal6! ! ! EXISTING WALL TO REMAIN I GG �_ Kg1M11 r 1•1 Er. III T , , , EXISTING 1 HOUR RATED WALL TO REMAIN ® EXISTING DEMISING WALL TO REMAIN SHEET TITLE: € , 1 , Ir - W EXISTING SPRINKLER HEAD TO REMAIN TITLE SHEET, SITE PLAN, KEY EXISTING GYPSUM BOARD CEILING TO RECEIVE NEW FINISH PLANS,, DRAWING a . xii..,/, p• :•z '`. NEW GYPSUM BOARD CEILING, SEE DETAIL 2/A5.20 INDEX AND NOTES -----------------'- DEMOLISHED SUSPENDED LIGHT FIXTURE °°°°°°°-- -- DEMOLISHED 4.0pie\ ...j � �_ - ■ DEMOLISHED SLOT LIGHT FIXTURE AREA OF WORK •-- — — NEW LED TAPE LIGHTING, L-1 i . AREA OF WORK ` wV 290 SF FLOORS 3-6: DRAWN BY: CLM, KMJ iii � - 290 SF EACH — NEW COVE LIGHT FIXTURE, ALTERNATE o NEW RECESSED LED CAN LIGHT FIXTURE, L-2 CHECKED BY: SBH, PDK :5; DEMOLISHED SPEAKER SHEET: .,:s.D. DEMOLISHED SMOKE DETECTOR TO BE RELOCATED ddillii)411ofiN 2 SECOND FLOOR KEY PLANPi /'� 2 TYPICAL FLOOR KEY PLANr3 s i Fs DEMOLISHED FIRE STROBE TO BE RELOCATED GO.01 GO.. SECOND FLOOR NTS , FLOORS 3-6 NTS O KEY NOTE FOR REFERENCE OFFICE COPY JOB NO. TRUE PLAN TRUE PLAN 215095217 NORTH NORTH NORTH NORTH EXIT REQUIRED EXIT i E PERMIT SET: 06/08/17 21 5085211\4_DRAWINGS\ARCHITECTURAL\17-G0.01.OWG CAK 06/08/17 11:31 1:96.00 .i.,--,1' ,.51. l NOTES -v..) • A. ALL EXISTING CONDITIONS TO REMAIN, EXCEPT NOTED BELOW. ...--Lf GENERAL + ' ' Q a } '�' ©+ B. DIMENSIONS REFLECT FACE OF FINISH TO FACE OF FINISH, UNLESS - ..,,: a `' NOTED OTHERWISE. hi,e _ C. PATCH REPAIR EXISTING FINISH AS REQUIRED FOR NEW WORK. IMI M -. _^_,:;4 _. :;, D. PAINT ALL GYP CEILINGS, SOFFITS, AND HEADERS AT AREA OF WORK I - - 4 t+4 j 4 ':'Y " P-2, UNLESS NOTED OTHERWISE. [ }: [ 4 .."'':: • .�.•" E [ E. NO VOC PAINT SYSTEMS TO BE UTILIZED, TO INCLUDE PRIMERS AS Architecture ® Interiors % '- �'` _1, 1 Ai ""` WELL AS FINISH PRODUCTS. �� 1 ' �r` Planning of Engineering ----, f . r' " ';g:r:L \ F. CENTER ALL NEW OR RELOCATED CEILING EQUIPMENT IN CENTER OF i, CEILING TILE. • D '..: G. COORDINATE LIGHT OUTPUT, DISTRIBUTION OF LIGHT WASH AND i� - '� i EXACT LOCATION OF FIXTURE ��yo ,.r;S; • f 1P INSTALLATIONS WITH LIGHTING o- a- I i `• - i ., .�• • ` (503)459-8073.REPRESETATIVE DIANA DOUGLAS AT HARRY L. STEARNS :F • .,..-.,• H. FINAL LIGHTING LAYOUT TO BE PROVIDED BY ELECTRICAL Portland,OR � A– t I 3 . _ �'� 8.; •,.,'.: •:`' ,.,." - 1 - `_L., 503.224.9560 .,. µ_. i `; , •;.. k i . • •.:�••• ::. ..-:' ; '. ONTRACTOR AND IS DEPENDANT ON OREGON ENERGY CODE MINN ,,:',"•' ' ':•;• �•:::',.,_• • CO� , ALLOWANCES AND EXISTING BUILDING INFRASTRUCTURE IN CEILING. Vancouver,WA O - MEM NIL.— ippHIIIIIIIIIIMI : :. , ::,;. : . �. c 360.695.7879 ; .•,-. ELECTRICAL CONTRACTOR TO REVIEW ALL REQUIRED LIGHTING LEVELS MEM AND DISTRIBUTION AND NOTIFY ARCHITEC Amos `;:: �: :` � eT ND LIGHTING Seattle,WA milii �fi '` :_ ' �' REPRESENTATIVE OF ANY CONCERNS OF FOOTCANDLES OR FIXTURE 206.749.9993 V :: ,• s PLACEMENT LOCATION WITHIN ANY AREA OF THE SPACE. FINAL1' I PLACEMENT/LOCATION mcknze.com a LAYOUT TO BE REVIEWED AND PROVIDED BY JURISDICTION THROUGH i=Q'� / I. IF ACCESS DEFERRED SUBMITTISAL. REQUIRED, PROVIDE LOCATION TO ARCHITECT MACKENZIE. II r 4 0 + + + : FOR APPROVAL PRIOR TO INSTALL. DESIGN DRIVEN I CLIENT FOCUSED ` '�' C) `�' `� J. ELECTRICAL, DATA AND SWITCHING LOCATIONS INDICATED ARE ' ' lio = SHOWN TO CONVEY GENERAL INTENT ONLY. COORDINATE Client 1;11 ® 1 ® 1 ELECTRICAL/DATA SWITCHING REQUIREMENTS WITH LANDLORD AND i PROVIDE DRAWINGS BY DEFERRED SUBMITTAL. K. ALL DIMENSIONS SHOWN AS PLUS/MINUS (±) ARE FOR GENERAL -.--) 7 LAYOUT AND REFERENCE ONLY. VERIFY AND CONFIRM ALL '• 3. 0 a + a a 1 DIMENSIONS AND CONDITIONS PRIOR TO START OF WORK. NOTIFY SHORE STEIN ARCHITECT/ENGINEER OF ANY DISCREPANCIES PRIOR TO START OF WORK. / / o / o KEYNOTES 1 1 0 0 1. PAINT WALLS WHERE INDICATED P-1. EXISTING DOOR AND FRAME Project FINISHES TO REMAIN. ooIiir 2. REMOVE EXISTING GYPSUM BOARD DETAILS. PREP AND RESURFACE ELEVATOR LOBBY AREA TO RECEIVE NEW FLAT FINISH, P-2. o + o + 3. REMOVE SPEAKER, SMOKE DETECTOR AND FIRESTROBE AND COMMON AREA MAINTAIN FOR FUTURE REUSE. PROVIDE NEW WHITE EQUIPMENT, UPGRADES 0 o WHERE NEW DEVICES ARE REQUIRED. PROVIDE FINAL LOCATION OUTSIDE AREA OF WORK IF FEASIBLE. CONFIRM FINAL 0 o SPECIFICATION WITH LANDLORD. 3 UNCOLN 4. REMOVE EXISTING COVE LIGHTING. 10220 SW GREENBURG RD 0 0 5. NEW LED TAPE LIGHT FIXTURE, L-1 AT EXISTING OR NEW DROPPED TIGARD, OREGON SOFFIT. 1 I 6. NEW RECESSED LED CAN LIGHT FIXTURE, L-2. r 0 7. NEW RAISED GYPSUM BOARD CEILING. GENERAL CONTRACTOR TO 1�� CONFIRM MAXIMUM ACHIEVABLE HEIGHT FOR NEW INSET. �$ �LC,�, COORDINATE FINAL HEIGHT WITH ARCHITECT AND LANDLORD. _ `1f 8. INFILL CEILING WITH NEW GYPSUM BOARD TO MATCH ADJACENT '' ' . .L I. 1,§4,NG, ' CEILING HEIGHT AND FINISH. c� 4�� PARTIAL - ,� \k,AR AL FLOOR PLAN 2 PARTIAL SECOND FLOOR DEMO RCP 3 PARTIAL SECOND FLOOR RCP A1.10 SECOND FLOOR 1/8"=1'-0" A1.10 SECOND FLOOR 1/8"=1'-0" A1.10 SECOND FLOOR 1/8"=1'-0" t*)PoRTLNp, OREGONNORTH ` r % O 0 F 1 1 © MACKENZIE 2017 ALL RIGHTS RESERVED THESE DRAWINGS ARE THE PROPERTY • OF MACKENZIE AND ARE NOT TO BE USED OR REPRODUCED IN ANY MANNER, WITHOUT PRIOR WRITTEN PERMISSION 1 1 REVISIONS: z 0 iA REVISIONS REVISION DELTA r 5.1..1 THIS CLOSING DATE w w SHEET cr(21 + r t,,, — Ali , , R � r 0 . ,, , .- 1-.- - r- f PI' FS i i 1, I a bill p _ / lair-411 7 , :-;...::: „.: .. .. ,. .!, _ CD _ _ , ' II. I . . r ,._,r_i__, I I _ ._. _. _ .... I _.-1r `,y ' , I , [ .... ....„ .. ,,, ...• .. .. .... . mom € —I_ SHEET TITLE: ,--. ._ I 0 �I. s 1 .; __ X11 : PARTIAL SECOND ;.—vi-. 3. _. �a..�_o.. �_,® -,fir:: ��, _ �II . FLOOR AND 1 s; Hum. l :.:: ill`� °- _ �■�14,■��i - • a tg).::.::,.,::,;.• I �''� ■■� ■■moi TYPICAL FLOOR �. �� �, - • „, _I PLANS, DEMO RCP'S, 01 .. -1, 1 _ = p RCP'S, AND NOTES 1 mum _ _ 0 MINN MINIM! I 9'-5"± AFF 9 �) I i _ MN=iiill `. .= �. DRAWN BY: CLM, r1MEL M KMJ `' 443 _ ``- + > .� a /� �- .I �- ii FP A , CHECKED BY: SBH, PDK 411114 Mr, 1 1 FS FS FS ' , » FS 1 4 FF Ea SHEET: . 1111,Thr-L__I Ill I 1 ® � ,{'"�F ',""e. r.. .:,:.� •-. �. ,.F .,v � ,,.:,, nN.f���'”-.;;fn.< x •,y„r�.�w.w ...�,. ..,.1, .- ..,>. �:.' r.. � ,. a ,_ .,, r. A1 .1O , , 4 PARTIAL TYPICAL FLOOR PLAN 5 PARTIAL TYPICAL FLOOR DEMO RCP COIAL TYPICAL FLOOR RCP JOB No. 2150952.17 4 A1.10 TYPICAL, FLOORS 3-6 1/8"=1'-0" A1.10 TYPICAL, FLOORS 3-6 1/8"=1'-0" A1.10 TYPICAL, FLOORS 3-6 1/8"=1'–O" ' NORTH = PERMIT SET: 06/08/17 215095211\4_DRAWINGS\ARCHITECTURAL\17—A1.10.DWG KMJ 06/08/17 14:50 1:96.00 5/8" GYPSUM BOARD OVER 350S162-33 METAL STUD; SPACING PER WALL STUD MI M EXISTING STUD TO STRUCTURE VERIFY ill(( Architecture a Interiors Planning a Engineering S350S162-33 BRACE SEE CLG PLANTO STRUCTURE8'—O" oc / Portland,OR 503.224.9560 Vancouver,WA (3) #10 SMS AT ; + !.' 360.695.7879 EACH BRACE Seattle,WA • 206.749.9993 LIGHT PER 1 \ www.mcknze.com ELECTRICAL ..:.. ... . ....:- PLAN +++ c MACKENZI Ee 5—#10 SMS AT • V . , " -., •`•1 1 CLG AS OCCURSAL \ DESIGN DRIVEN I CLIENT FOCUSED i SEE CLG PLAN Y EACH CONNECTION I Client ALIGN SOFFIT ; (2) #10 SMS ® EA STUD FRAMING WITH WALL j , STUDS PROVIDED #10 SMS TOP AND BOTTOM ® EA STUD SHORE STE IN 1 CEILING TRANSITION U 1 1&5.2 1 1/2"=1'-0" o cn TRACK BLOCKING W/ 1 1/2" FLANGES. 10000.101p t , SIZE & GAGE TO MATCH METAL STUD Project CEILING JOISTS. LOCATE IN EVERY 6TH SPACE FOR STUDS @ 16" oc & ELEVATOR LOBBY • EACH END OF WALL. , COMMON NOTE: CEILING JOIST MAX SPANS UPGRADES AREA 6005137-33 METAL STUD CEILING JOIST © 16" oc MAX SPAN 17'-6" F 3 UNCOLN W/ 200U50-54 U—CHANNEL AT MIDSPAN 362S125-18 METAL STUD CEILING JOIST 10220 SW GREENBURG RD TIGARD, OREGON @ 16" oc MAX SPAN 7-9" , 3625137-33 METAL STUD CEILING JOIST 4sik , @ 16" oc MAX SPAN 10'-8" 4011) 4142 *1;‘*'‘ METAL STUD CEILING JOIST10 �' I. KIS04.4 ! /'� trj SEE MAX SPAN NOTE ABOVE � ` !/� F�`/ U—CHANNEL l741w 1-11-3= • AS REQ'D �' 00/1. 11i'. 9POR i• D, i'EGON SOl 41.4 F I 4 I 41 k"%4 \I'illIII'°-4 4 LI°"44: #10 SMS AS SHOWN, © MACKENZIE 2017 1°'11 SEE SPECS ALL RIGHTS RESERVED THESE DRAWINGS ARE THE PROPERTY GYP BD SEE OF MACKENZIE AND ARE NOT TO BE USED OR REPRODUCED IN ANY MANNER, REFLECTED CEILING WITHOUT PRIOR WRITTEN PERMISSION / PLANS FOR HEIGHTS ' AFF REVISIONS: a. z 2 CEILING JOIST FRAMING >_J REVISIONS REVISION DELTA ww THIS CLOSING DATE cc o SHEET 5.2 METAL STUDS WITH MIDSPAN SUPPORT AND BLOCKING NTS z U I � I I I I I I 1 LIGHTING SCHEDULE . I I SHEET TITLE: L-1 — VOLT LIGHTING GROUP, DETAILS AND LEDHESIVE HIGH OUTPUT PH35K *INCLUDE REMOTE DRIVER SCHEDULES L-2 — JUNO LIGHTING GROUP, INDY 4" LED SILENT CEILING DOWNLIGHT, HYPERBOLIC OPEN APERTURE, L4 SERIES, WHITE FINISH L-3 — ALTERNATE COVE LIGHT FIXTURE SCHEDULE OF INTERIOR FINISHES P-1: NEW ACCENT WALL PAINT, TBD DRAWN BY: CLM, KMJ EGGSHELL FINISH AT ACCENT WALL PAINT. CHECKED BY: SBH, PDK I 1 SHEET: P-2: NEW GENERAL CEILING PAINT, TBD FLAT FINISH AT AT GYP. CEILINGSA5 ■20 I , JOB NO. 2150952.17 I , PERMIT SET: 06/08/17 215095211\4_DRAWINGS\ARCHITECTURAL\17-A5.20.DWG KMJ 06/08/17 14:51 1:96.00