Loading...
Report (162) IBJ 00353 1H17 a Boise Cascade Single 11-7/8" BCI® 5000-1.7 DF Upper LevellFloor JoistslJl(i184) Dry 12 spans I No cantilevers 10/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS I Repetitive I Glued &nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J1(i184) Address: Mission Meadows Lot 2 Specifier: PDG City, State, zip: , Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 ris Misc: SEP 142017 CITY OF Tl }°` �. FA.if! "'�l (`F ,ss, 1,2 L 10-10-08 J BO R1 17-09-10 B2 Total Horizontal Product Length=28-08-02 Reaction Summary(Down /Uplift) (1 s) Bearing Live Dead Snow Wind Roof Live B0, 2-3/4" 269/ 113 39/0 B1, 3-1/2" 976/0 244/0 B2, 4-3/8" 414/ 16 99/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 28-08-02 53 13 n/a Controls Summary Value /o Allowable Duration _ Case Location Pos. Moment 1,822 ft-lbs 57.9% 100% 3 20-10-06 Neg. Moment -1,858 ft-lbs 59% 100% 1 10-10-08 Neg. Moment -1,858 ft-lbs 59% 100% 1 10-10-08 End Reaction 513 lbs 36% 100% 3 28-08-02 Int. Reaction 1,220 lbs 54.2% 100% 1 10-10-08 End Shear 489 lbs 30.1% 100% 3 28-03-12 Cont. Shear 680 lbs 41.9% 100% 1 11-00-04 Uplift -74 lbs n/a 100% 3 00-00-00 Total Load Defl. L/696 (0.302") 51.7% n/a 3 20-01-12 Live Load Defl. L/852 (0.247") 56.3% n/a 6 20-01-12 Total Neg. Defl. L/999 (-0.045") n/a n/a 3 06-08-02 Max Defl. 0.302" 30.2% n/a 3 20-01-12 Span/Depth 17.7 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Din.(L x W) Value _ Support Member Material BO WaIVPlate 2-3/4"x2" 307 lbs 13.2% 24.7% Unspecified B1 WaIVPlate 3-1/2"x2" 1,220 lbs 41% 54.2% Unspecified B2 WaIVPlate 4-3/8"x 2" 513 lbs 13.8% 36% Unspecified Cautions Uplift of-74 lbs found at span 1 - Left. Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Composite El value based on 3/4"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 2 ®BoiseCass.dE Single 11-7/8" BCI®5000-1.7 DF Upper Level\Floor Joists\J1(i184) • Dry 12 spans I No cantilevers 10/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS I Repetitive I Glued&nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J1(i184 Address: - Specifier: PDG City, State, Zip:, Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: Disclosure Completeness and accuracy of input must be verified by anyone who would rely on output as evidence of suitability for particular application.Output here based on building code-accepted design properties and analysis methods. Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,A1STM, ALLJOIST®,BC RIM BOARDTM,BCI®, BOISE GLULAMTM,SIMPLE FRAMING SYSTEM®,VERSA-LAM®VERSA-RIM PLUS®,VERSA-RIM, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 *Boise Cascade Single 11-7/8" BCI® 5000-1.7 DF Upper LevellFloor Joists1J5(i221) Dry 12 spans I No cantilevers 1 0/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS I Repetitive I Glued&nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J5(i221) Address: - Specifier: PDG City, State, Zip: , Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: 0 BO 08-02-00 U 09-07-04 B1 B2 Total Horizontal Product Length=17-09-04 Reaction Summary(Down /Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live BO 198/36 41 /0 B1, 5-1/2" 574/0 143/0 B2, 2-3/4" 230/ 19 53/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf. Lin. (Ib/ft) L 00-00-00 17-09-04 53 13 n/a Controls Summary Value /o Allowable Duration Case Location Pos.Moment 554 ft-lbs 17.6% 100% 3 13-06-05 Neg. Moment -582 ft-lbs 18.5% 100% 1 08-02-00 Neg. Moment -582 ft-lbs 18.5% 100% 1 08-02-00 End Reaction 283 lbs 22.7% 100% 3 17-09-04 Int. Reaction 717 lbs 28.4% 100% 1 08-02-00 End Shear 268 lbs 16.5% 100% 3 17-06-08 Cont. Shear 361 lbs 22.2% 100% 1 08-04-12 Total Load Defl. L/999 (0.035") n/a n/a 3 13-00-15 Live Load Defl. L/999 (0.029") n/a n/a 6 13-00-15 Total Neg. Defl. L/999 (-0.004") n/a n/a 3 05-07-01 Max Defl. 0.035" n/a n/a 3 13-00-15 Span/Depth 9.5 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Din.(L x W) Value Support Member Material BO Hanger 2"x 2" 239 lbs n/a 22.4% IUS 2.06/11.88 B1 Beam 5-1/2" x2" 717 lbs 8.7% 28.4% Unspecified B2 WaIVPlate 2-3/4" x2" 283 lbs 12.1% 22.7% Unspecified Cautions Hanger IUS 2.06/11.88 requires(10) 10d face nails, (2) joist nails. Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary(1") Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Hanger Manufacturer: Simpson Strong-Tie, Inc. Composite El value based on 3/4"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 2 ®BoiseCasc.d Single 11-7/8" BCI®5000-t7 DF Upper Level\Floor Joists\J50221) Dry 12 spans I No cantilevers j 0/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS I Repetitive I Glued&nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J5(i22' Address: - Specifier: PDG City,State, Zip:, Designer Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: Disclosure Completeness and accuracy of input must be verified by anyone who would rely on output as evidence of suitability for particular application.Output here based on building code-accepted design properties and analysis methods. Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,AJSTM ALLJOIST®,BC RIM BOARD TM,BCI®, BOISE GLULAMTM,SIMPLE FRAMING SYSTEM®,VERSA-LAMB,VERSA-RIM PLUS®,VERSA-RIM®, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 IS Boise Cascade Single 11-7/8" BCI® 60-2.0 DF Upper Level\Fioor Joists\J8(i203) Y/ I Dry 12 spans 1 No cantilevers 10/12 slope September 8, 2016 11:31:06 BC CALC®Design Report = 16 OCS I Repetitive I Glued &nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J8(i203) Address: - Specifier: PDG City, State, Zip: , Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: 0 12-00-12 U 21-07-02 BO B1 B2 Total Horizontal Product Length=33-07-14 Reaction Summary(Down /Uplift) (lbs Bearing Live Dead Snow Wind Roof Live BO 297/ 155 36/0 B1, 3-1/2" 1,171 /0 293/0 B2, 4-3/8" 497/ 15 120/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf. Lin. (Ib/ft) L 00-00-00 33-07-14 53 13 n/a Controls Summary _ Value %Allowable Duration Case Location Pos. Moment 2,674 ft-lbs 42.9% 100% 3 24-06-08 Neg. Moment -2,724 ft-lbs 43.7% 100% 1 12-00-12 Neg. Moment -2,724 ft-lbs 43.7% 100% 1 12-00-12 End Reaction 617 lbs 43.3% 100% 3 33-07-14 Int. Reaction 1,464 lbs 53.2% 100% 1 12-00-12 End Shear 593 lbs 35.4% 100% 3 33-03-08 Cont. Shear 828 lbs 49.4% 100% 1 12-02-08 Uplift -119 lbs n/a 100% 3 00-00-00 Total Load Defl. L/606 (0.422") 59.4% n/a 3 23-04-03 Live Load Defl. L/744 (0.344") 64.5% n/a 6 23-04-03 Total Neg. Defl. L/999 (-0.059") n/a n/a 3 07-03-02 Max Defl. 0.422" 42.2% n/a 3 23-04-03 Span/Depth 21.5 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(I_x W) Value Support Member Material BO Hanger 2"x2-5/16" 3331bs 34.3% 23.1% IUS2.37/11.88 BO Hanger Uplift 2"x2-5/16" 119 lbs 50.7% n/a IUS2.37/11.88 B1 Beam 3-1/2" x2-5/16" 1,464 lbs 24.1% 53.2% Unspecified B2 WaIVPlate 4-3/8" x2-5/16" 617 lbs 14.4% 43.3% Unspecified Cautions Uplift of-119 lbs found at span 1 - Left. Web stiffeners required at bearing BO. Hanger IUS2.37/11.88 requires (10) 10dx1.5 face nails, (2) 10dx1.5 joist nails. Notes Page 1 of 2 ®BoisecascBde Single 11-7/8" BCI®60-2.0 DF Upper Level\Floor JoistsL.180203) • Dry 12 spans I No cantilevers 1 0/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS I Repetitive I Glued&nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J8(i20: Address: - Specifier: PDG City,State, Zip: , Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified (L/480) Live load deflection criteria. Completeness and accuracy of input Design meets arbitrary(1") Maximum total load deflection criteria. must be verified byanyone who would Calculations assume Member is Fully Braced. rely on output as evidence of suitability Hanger Manufacturer: Simpson Strong-Tie, Inc. for particular application.Output here Composite El value based on 3/4"thick OSB sheathing glued and nailed to member. based on building code-accepted design Design based on Dry Service Condition. properties and analysis methods. Deflections less than 1/8"were ignored in the results. Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,AJSTM ALLJOIST®,BC RIM BOARD TM,BCI®, BOISE GLULAMTM,SIMPLE FRAMING SYSTEM®,VERSA-LAM®,VERSA-RIM PLUS®,VERSA-RIM®, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 F a Boise Cascade Single 11-7/8" BCI®60-2.0 DF Upper LevellFloor Joists\J12(i269) Dry 12 spans I No cantilevers 10/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS 1 Repetitive I Glued &nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J12(i269; Address: - Specifier: PDG City, State, Zip: , Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: 0 07-01-00 . i BO B1 21-07-02 B2 Total Horizontal Product Length=28-08-02 Reaction Summary(Down /Uplift) (bs) Bearing Live Dead Snow Wind Roof Live B0, 2-3/4" 183/306 0/31 B1, 3-1/2" 1,171 /0 293/0 B2, 4-3/8" 485/3 120/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 28-08-02 53 13 n/a Controls Summary %Allowable Value /o Allowable Duration Case Location Pos. Moment 2,564 ft-lbs 41.1% 100% 3 19-06-12 Neg. Moment -2,734 ft-lbs 43.9% 100% 1 07-01-00 Neg. Moment -2,734 ft-lbs 43.9% 100% 1 07-01-00 End Reaction 605 lbs 42.4% 100% 3 28-08-02 Int. Reaction 1,464 lbs 53.2% 100% 1 07-01-00 End Shear 581 lbs 34.7% 100% 3 28-03-12 Cont. Shear 828 lbs 49.5% 100% 1 07-02-12 Uplift -336 lbs n/a 100% 3 00-00-00 Total Load Defl. L/643 (0.397") 56% n/a 3 18-08-00 Live Load Defl. L/800 (0.319") 60% n/a 6 18-08-00 Total Neg. Defl. L/999 (-0.025") n/a n/a 3 04-02-01 Max Defl. 0.397" 39.7% n/a 3 18-08-00 Span/Depth 21.5 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Din.(L x W) Value Support Member Material BO WaIVPlate 2-3/4"x2-5/16" 337 lbs 12.5% 25.3% Unspecified B1 WaIVPlate 3-1/2" x2-5/16" 1,464 lbs 42.6% 53.2% Unspecified B2 WaIVPlate 4-3/8" x2-5/16" 605 lbs 14.1% 42.4% Unspecified Cautions Uplift of-336 lbs found at span 1 - Left. Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary(1") Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Composite El value based on 3/4"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 2 ®BDiseCascBdE Single 11-7/8" BCI®60-2.0 DF Upper Level\Floor Joists\J12(i269) Dry 12 spans I No cantilevers 1 0/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS I Repetitive I Glued&nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J12(i2f Address: - Specifier: PDG City,State, Zip:, Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: Disclosure Completeness and accuracy of input must be verified by anyone who would rely on output as evidence of suitability for particular application.Output here based on building code-accepted design properties and analysis methods. Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,AIST"", ALLJOIST®,BC RIM BOARD TM,BCI®, BOISE GLULAMTM,SIMPLE FRAMING SYSTEM®,VERSA-LAM®,VERSA-RIM PLUS®,VERSA-RIM, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 *BoiseCascede Single 11-7/8" BCI®90-2.0 DF Upper LevellFloor Joists1J13(i176) Dry 12 spans I Left cantilever 10/12 slope September 8, 2016 11:31:06 BC CALC®Design Report = 16 OCS I Repetitive I Glued&nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J13(i176; Address: - Specifier: PDG City, State, Zip: , Designer: Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: \i/ 0 00-09-02 — - i B1 21-07-02 B2 Total Horizontal Product Length=22-04-04 Reaction Summary(Down /Uplift) (lbs Bearing Live Dead Snow Wind Roof Live B1, 3-1/2" 591 /0 148/0 B2, 4-3/8" 584/ 1 146/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf. Lin. (lb/ft) L 00-09-02 22-04-04 53 13 n/a 1 FC1 Floor Material Conc. Pt. (lbs) L 00-00-04 00-00-04 23 6 n/a Controls Summary Value %Allowable Duration Case Location Pos. Moment 3,776 ft-lbs 39.5% 100% 3 11-05-10 Neg. Moment -21 ft-lbs 0.2% 100% 1 00-09-02 Neg. Moment -21 ft-lbs 0.2% 100% 1 00-09-02 End Reaction 730 lbs 40.5% 100% 3 22-04-04 Int. Reaction 739 lbs 20% 100% 1 00-09-02 End Shear 705 lbs 32.8% 100% 3 21-11-14 Cont. Shear 701 lbs 32.6% 100% 1 00-10-14 Total Load Defl. L/549 (0.466") 65.6% n/a 3 11-05-10 Live Load Defl. L/685 (0.373") 70% n/a 6 11-05-10 Total Neg. Defl. 2xL/1,998 (-0.048") n/a n/a 3 00-00-00 Max Defl. 0.466" 46.6% n/a 3 11-05-10 Cant. Max Defl. -0.048" n/a n/a 3 00-00-00 Span/Depth 21.5 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dire.(L X W) Value Support Member Material B1 WaIVPlate 3-1/2" x3-1/2" 739 lbs 14.2% 21.9% Unspecified B2 WaIVPlate 4-3/8"x3-1/2" 730 lbs 11.2% 40.5% Unspecified Cautions Design assumes Top and Bottom flanges to be restrained Notes Page 1 of 2 (roi Boise Cascade Single 11-7/8" BCI®90-2.0 DF Upper Level\Floor Joists\J13(i176) Dry 12 spans 1 Left cantilever 10/12 slope September 8, 2016 11:31:06 BC CALC®Design Report 16 OCS I Repetitive 1Glued&nailed construction Build 4340 File Name: 16-1784.mmdl Job Name: MISSION HOMES 3154 C Description: Designs\Floor Joists\Upper Level\Floor Joists\J13(i1 Address: - Specifier: PDG City,State, Zip: , Designer Customer: PROBUILD FOREST GROVE Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: Design meets User specified (L/360)Total load deflection criteria. Disclosure Design meets User specified (L/480) Live load deflection criteria. Completeness and accuracy of input Design meets arbitrary(1") Maximum total load deflection criteria. must be verified by anyone who would Design meets arbitrary(1")Cantilever Maximum total load deflection criteria. rely on output as evidence of suitability Calculations assume Member is Fully Braced. for particular application.Output here Composite El value based on 3/4"thick OSB sheathing glued and nailed to member. based on building code-accepted design Design based on Dry Service Condition. properties and analysis methods. Deflections less than 1/8"were ignored in the results. Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,AJSTM ALLJOIST®,BC RIM BOARD TM,BCI®, BOISE GLULAMTM,SIMPLE FRAMING SYSTEM®,VERSA-LAM®,VERSA-RIM PLUS®,VERSA-RIM®, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2