Loading...
PFI2018-00190 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT • COMMUNITY DEVELOPMENT Permit#: PF12018-00190 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 07/30/2018 Parcel: SEG2624 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to Willowbrook Subdivision on 113th Avenue. Bore/trench to provide lighting for 29-lot subdivision Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: AMY SWEANY 10800 SW AVERY ST TUALATIN, OR 97062 PHONE. 503-612-2935 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: _ --t- -- �� Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00190 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI—Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI—Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI—Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. Call Ken Fisher at 503 816 6146 or Kenny@tigard-or.gov PFI—Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI—Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard JUL 19 2018 PUBLIC WORKS — ENGINEERING O �r T11GAR.? Public FacilityImprovement (P-Fo IN eftNU TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) d TYPE 1—Franchise Utility Work Check one: Y Utilities ❑ Sidewalk/driveway approach ❑ Street improvements performed by NWN, PGL Detailed description: Bore/trench to provide lighting for 29 lot subdivision and/or utility agency. El TYPE 2—Sidewalk/Driveway/Sewer Bore/trench t0 DYOVIdP_ power for subdlVlSlOn_ Work performed for the purpose of: PGE Jobs M2199099, M2517168 • Sidewalk installation or repair. Property address/loc • Driveway approach installation ation(s): SW 113th Avenue, South of Durham Rd and/or repair 02� (See Job Cover for scope/location) • Sanitary sewer lateral installation Tigard, OR 97224 and/or main line tap Applicant: Portland General Electric[Submitted by Amy Sweany] ❑ TYPE 3—Full scale Development Pp Work performed with Land use Address: 10800 SW Avery Street approval which includes any of City/state: Tigard, OR Zip: 97062 the following: Phone: 503-612-2935 Email: preregcoord@pgn.com • Subdivisions or Partitions Jeremy Sampson,Jason Morin 503-672-5530,503-728-7274 - Street widening Contact name: Phone: • Mainline installation for Sanitanv Contractor: Revcon, Inc. sewer, Storm sewer, Tigard water and/or Tigard Water Service Area 160417 Expiration: 6/23/2020 Address: 16655 SW Ivy Glenn St SUBMIT COMPLETED APPLICATION TO: City/state: Beaverton, OR Zip: 97007 City of Tigard 503-848-7300 Planning/Engineering Phone: Email: 13125 SW Hall Blvd. Contact name: Phone: Tigard,OR 97223 ;applications for"minor work in right-of-way" N/A only may be emailed to: Engineer: rowpermitsktigard-or.gov Address: City/state: Zip: Phone: Email: Case No.: I.2ol o1?� Contact name: Application submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ 56,468.06 Additional fees: $ (within the public right-of-way) -application accepted: Is work related to a LAND-USE DECISION? ❑ Yes 9 No By: AwX Date: he If so,please specify (MLP,SDR,SUB, etc.) case #: Application reviewed: ` By:_g t KS Date: Is work related to a BUILDING PERMIT? ❑ Yes l'No Applicant notified: If so,please specify(BUILDING PERMIT)case#: By: Date: I:\ENG\PermitApplications\pfi—application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • ,vww.tigard-or.gov • 503-718-2421 Page 1 of4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee" and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. franchised Utilities are not required to obtain the owners signature on the application BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • The above request does not violate ani,recorded deed restrictions that may be attached to or imposed upon the subject prope • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Steve Hursh 7/19/2018 Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • \\vw.tigard-or.gov 503-718-2421 • Page 2 of DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY Public Facility Improvement(PFI) Permit: DETAILED SUBMITTAL APPLICATION FEE REQUIREMENTS Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch Engineer's estimate X 2%Plan Review (including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site:address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (G sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance maybe ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineers Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of SAMPLE SKETCH: SSVr�� Edge of Pavement p yT Ditch "` Streethgtit I ■-■—■-■-■ r!■i lean Drain I �Tre^ , r 4 Tc1"So w�e rT a Existing House Existing I >-i Driveway 01 QL L:� i I TI o� I a 0I ■ Existing Shap I I � I Powerpole I = I .' C:) o I �a: g 5' I I fl �operty L ni e i � Fire Hydrant(FH) I I � I IScale: •I =30' I I � I + I ' I I I I I MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property Street &street name(s) Existing building, structures Utility &street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/Vv'apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT Cit-%, ofTigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 - w wtigard-or.gov - 503-718-2421 - Page 4 of PD1D1 m I WOODSPRING APARTMENTS 3Q LIGHTING LEGEND ©'I I N 3-143 I B 100 5532 (UNLESS OTHERWISE SPECIFIED) ABL;I A'J I� PD 2i - -- ______INSTALL i-L9 AL-TX ST LT CIRCUIT IN 1-3"SCH40 PVC ABC 2 AL- 9326 - CONDUIT,PROVIDED E INSTAUEO BY CUSTOMER VT9323VT 0322 453 ---' ---- 1968 --____INSTALL 1-19 AL-TX ST LT CIRCLE IN I-Y"TOME PVC CONDUIT,PRONGED 6 INSTALLED BY CVSTOMER INSTALL F-MIO CU-TX ST LT CIRCUIT IN F-Y SCH40 PVC 4666 14 25 T CONDUIT,PROVIDED 6 INSTALLED BY CUSTOMER 40'4 4576 4575 B 2 AL 19]2 40'-4 40'4 C 10 36263 _ Q CUSTOMER INSTALLED 1730 SECONDARY VAULT 1 1972 - -- 1972 23b 7 4 404 O CUSTOMER INSTALLED 7324 STREETLIGHT JUNCTION BOX 20 19� INSTALL 47W LED CREE LIGHT 9 10 ON 30 2-PIECE BRONZE FIBERGLASS POLE(25'MTG HGT) 6 6 ;__--..-- r°. .82 PD 6' 100 62789 ® WITH B"MAST ARM SET 2'FP FC CONNECT 240 VOLTS 5 __-----_—. VTJ 4 'T iQydT, A —AN 2ACSR 115137 n:01 c• T %a 57' } INSTALL 47W IED CATE LIGHT 19 45T4 j® t 3 ON 30'2-PIECE BRONZE FIBERGLASS POLE(25'M7G HGT) 3 WITH W MAST ARM,SET 2'FP FC CONNECT 240 VOLTS 17 I 1 IN57ALl 47W LED BRONZE CREE LIGHT C2 1•158 40A = .����. f � I 21 1 1963 R Q1 IBC •` 1 B I I u 2 22 23 2 27 WT7H 6'MAS1 ARM ON EXISTING PGE POLE ��+ ..... �9H ..r�r vru 4 25 26 CONNECT 240 VOLTS 3 n to r vT:m2 - _ -.. Ito, _ PD e< i i N~ r-- /P �� Rood BEd. 21" � ,' yr LS i,Fiitisa_ -OF_ �^19 1- A :V n ` I i � �;�,C2 13 rr ^ - z nw so it FLA /�.�.` -- _ I �1p•��� 28 _ 1,. �l K 96 1 N 1 4T _` _9 A'S0 ` LEGEND !1 A 50 VT IT - - LBO' -VF N�,* A5 ' 24Y L' ,\ O PGE rim able Ft In A 25 / eF 76" tN • Inside DY t _LIN 14 4090 6108 ~ Mie C•Var Inside Dn<L A 7S 1 AN2ACSR Traaoh o Teleo/CATV rD er I- RS,I Kw �� 15 18 1953 4G 4 61094 29 I -- (026 'M 114T 1970 40'4 W. B,cmB C 25 80174 1970 I I 13 � ��Ndec1 BaeWl vt Io5 ` Ip b U diah rbed �. 1 l�• Earth faint Use Trench WIO Gar DTE: E 70 PROVIDE BOTTOM PIECE OF POLE FOR CUSTOMER 70 INSTALL AT THE SAME TIME AS THE CONDUIT INSTALL 30AMP FUSES BJ SECONDARY PEDESTALSOR SECONDARY -.` AULTS(WHICHEVER IS ST LT POINT OF ATTACHMENT)FOR EACH TREET LIGHT PER PGE TAD CONSTRUCTION STANDARD LC11550 ANY DEVIATION FROM THIS DESIGN MUST 4 BE APPROVED BY PGE PROJECT MANAGER S p0 9 °p CONSTRUCTION NOTES: SLCST y' 1972 25 72734 CUyySTOMER TO PROVIDE ALL TRENCHINGE BACKFI LING,CO�NDUIIf,ELBOWS.JUNCTION 481NCFiES DEEP AN0301 CHITS WIDE.MEAREDFRO SPINAL GRADE BE 2+A PGE STANDBY CREW B REQUIRED FOR ENTIFACOPENNJG ALLCU.I NERGIZEO VAULTS ECTON OR INS OFFCONDUITSTION XAND PVILL SIRI�4(3S.CALL SERVICE COORDINATION AT 603-322"700ALlATKXI TO SCHEDULE A PGE STANDDBBVY CREW. 3+ALL PGE CONDUCTORkADE PVCS TO BE INSTALLED M GRAY.(SC�IE1EDUlE 40.ELECTRRJIL PGE d DETERMINECONDU SIZE AND NUMBERRTIZ gJDURS REOUIREOST GAN$NAI OTHER unVERci SHALL ELDBOY✓S 41NCHT6 SMALLER TO g NCH RADIUS. N 12 RIGID STEEL OR PGE PROVED FIBERGLASS BENDS ARE REWIRED FOR RUNS O 151 FEET OR LONGER OR FOR ANV LENGTH RUN WTTH MORE THAN 180 DEGREES IN BENDS PVC SCHE(SULE 10 BENDS ARE ACCEPT�IBLE FOR RUNS O 150 FEET OR LESS THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IB 270 DEGBEEB.P1l BENDS MUST BE FACTORY MADE.REFER TO LETTER OF RESPONS lfY FOR FURTHER DETAILS. �� 4. ALL CONCRETE FOOTINGS NEED TO BE&STALLED WITH TOP O BASE FLUSH TD CURB I SIDEWALK. 5.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS.ALL CROSSIIIGS MUST EXTEND FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 4 INCHES DEEP, MEASURED FROM FINAL GRADE. 6 DIRECTI NAL BORING REEOU11tEMENTSTBLACN HDPE(HIGH DENSITY POLYETHYLENq DUCT OR SCHDULE 40 FNC WITH A MECHANICAL CONNECTKMI(CERTA-NOK OR LRCS MECHANICAL. CONNECTION PgppUCT7 AS AN ALTERNATIVE TOHOPEDUCT.HDPE$HALL MEET THE JUNCTION BOX INSTALLATIONS REQUIRMANAGED FOR SAFE YPRFASONgETME OUC0FT15gHALL BEBLACK WWILE ON EMETryHTOUEST FROM POE THREE EQUALLY SPACE PROJECT FOR STREET LIGHTING HOPEP EISREQUIREDAMRIN$TALLATIOECINw1T1PGEENSPECTORPRESENRElTESTOF CONTACT PGE FOR APPROVED MANUFACTURERS Four GRADE IF HARD 6LwFACE I FLM" 7 TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP S 2 iiCNE3 ABOVE FINAL GRADE.CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL FlNAL(TIDE IF SOFT SWFAIf AND TO EXTEND 1 INCH ABOVE THE PAD. /7124-r1C DEEP DR 8 ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET( FROM ANY COMBUSTIBLE s'*Mi,'�uN•- 1nG1Pr1s•DEEv BULgNG,WALL OR OVERHANG A�pplpp 4 FEET(1.� FR ANY FIRE HYDRANT ' POE APPROVED PGE T SMSFO ERS MUST BE V9ITHIN 5 FEET OF A DRIVEABLE AREA 1 JUNCTION BOX ALWAYS MNNTA 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. 2 PIECE FIBERGLASS(COMPOSITE)POLE DETERMNED BY PGE a.RADRNB BJBENV 9 STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED r,n 5hhp I ro°s.rb..s�M, h TO VEHICLES. 1'PVC SCH 4B ELECTRICAL GRADc 10,AS NEEDED-FRONT LOT PUBLIC UTILITY EASEMENT(P.U.EJ TO BE B FEET(MIN, T TO OPTIONAL ST LT POLE 10 FEET(PREFERRED) y, 4 11,CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE BTART NG MAIN POWER TAA TRENCHING FOR A PRECONSTRUCTK)N CONFERENCE.INCLUDED IN THIS CONFERENCE m,A c,ad. WILL BE EXCAVATOR,POE,TELCO,CATV.AND GAS. SCR 3'wC SCH 40 �SCH 4p GREY FNC FACTORY BENDS Sr NeNt I ELECLRICAI GHPD� (STEEL ORPGEAPPROVED BERG-SS 12 CUSTOMER TRENCH AND ELBOW CONFIGURAT S,ALLCONDUIT,VAULT AND PAD N,anHdMPq 1 (OETkPMiuED SyPGF � R 150 prt 16o DEGREES INSTALLATIONS MUST BE INSPECTED EtY PGE PRR TD BACKFILLING.WHEN YOU ARE sn.a Al..w L.°.r beh GROUNDING STREET LIGHTS ON DISTRIBUTION POLES READY FOR PGE TO INSPECT(AFTELO UP NIBWDA TF CALL503-736-TO r 6`OF COMPACTS OR 503463-4348'SALEM qRE� ALLOW UP TO 2 WORKRJG DAY FOR INSPECTION TO OCCUR ><^"' •a.N..F:•d,G.oe. TOP VIEW 3N•MINUS B a?d_ REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS. k Ma WIND ROD l FatB UWOER SPLIICCE BOX 13,DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT NONSTANDARD UNDER GROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER. BRACKET `aa:* PGE CONSTRUCTION DRAWING v, NEWLED ��°ju' oln,03 ARV coNwrto�lHL sowcF mx DATE: COUNT: AWG: •NO. STREETLIGHT - � CONTACT SERVICE COORDINATOR 7/NlO18 �NTS 1070001 1000004600 M2517168 TDa IRFNCH AND COff INVf CTION RI10s PER LC 11580 TO 64LWAl.PGE WILL NOT WSTALL MW IEEE THE 2017 NESC REQUIRES IHAI MAST ARMS BE EFFECTIVELY BONDED UNTIL TRENCH 15 molt BACKNILLED. ` Mission Homos LLGt'fry DI Tigard/113th Avo Subdivision w,wP�,•.t `� IF THE CLEARANCE BETWEEN THE BRACKET AND COMMUNICATION SERVICE COORDINATOR 1-d r COMPANY ATTACHMENT POINT IS LESS THAN 40 INCHES. CIRCUIT 312E 503-323-6700 OR 80 542-OSIS(SALEM) KING CRY-SUMMERFIELD 77,22 TO BOND A MAST ARM FOR NEW INSTALLATIONS AND RETROFITS' CONNECT A 6-AWG COPPER NEUTRAL JUMPER CONDUCTOR FROM CALL 811 BEFORE YOU DIG P E LLDGiION BOTTOM PIECE POLE INSTALLATION THE POLE GROUND WIRE,IF THE GROUND WIRE DOES ATTENTION: SW 113TH AVE,TIGARD NOT EXIST THE THE SERVICE NEUTRAL USING AN ALUMINUM- RECON LAW REQUIRES YOU 70 FOLLOW RULES ADOPTED I°.v.d w-,,,,n..•.".�,,.n.d.�eo<+uI TO COPPER PARLLEL GROVE CLAMP Td THE MAST ARM THIN[ THE OREGON UTILITY NOTIFICATION CENTER. DExRRNON USING A 2 INCH GROUNDING CLAMP. HOSE RULES ARE SET FORTH IN OAR 952-001-0010 , ( M10 BRONZE FIBERGLASS POLES nge.ol.a e1 wY cenAran me..bn SAFETY INsrAu X1 PPT A-47w LED CREE LIGHTS,ro)B'MA AND 3G'23' THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF CgMry S) WOtlt W97FI SHEET 7 �I.a 7_rm,sR.�M,°,..ol.�,.,., LEPHONE OR CABLE FIRSTI HE RULES BY CALLING THE OREGON UTILITY aFwrFRTON WASH14GTON C21-15A M?199099 t OFI COMPANY ATTACHMENT NOTIFICATION CENTER ADMINISTRATION @ (503-232-N87) u,E qEW[ENtBL 1GN M, PRONE f3D3) pMWN er TO REQUEST UTILITY LOCATES CALL THE OREGON 11TILITY NOTIFICATION CENTER 811 A7 1fA57 � YAwY1 below. W3 sw°m 011 Joson MorM 728-727< UWE WHITNEY 2 BUSINESS DAYS PRIOR TO EXCAVATION. (•AIL b•for•you dW «Amt ®POR..GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED 1.8.O'Brien's Irish Pub T SwOurham Rd SW Durham Rd Marshalls Po A ti a A ' a O � t 0 SW 113th Ave, Dollar Tigard,OR 97224 Thee �S1 Chateau In a SW Titan In r SW Royal Villa Dr SW Bretton Ct 3 SW Kent St Q t f �Or SW gqe-ood Ln �0 3 0 n � S W,�Uatat,n DS s v WR CHECKLIST YES COMMENT HOLEDIGGER ❑ BOOM BACKHOE PGE TRENCH VAC TRUCK Safety LOCATES STAKING THINK FLAGGING SAFETY TREE TRIM FIRST! LANDSCAPE EASEMENT PERMITS X- City of Tigard TRAFFIC PLAN X CUTSHEET UG CIR. VER. TRANS SHUTDOWN CUST SHUTDOWN DOOR HANGER CONTACT COMPANY PHONE CELL DATE TIME PGE CONSTRUCTION DRAWING Ma M2199099 DESCRIPTION Service To 29 Lot Subdivision TITLE Mission Homes LLC PGE LOCATION SW 113th Ave,Tigard, OR 97234 DATE CREATEDBY Jeremy Sampson 6/7/2018 ®PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED Rev.01 ............ ........ -............I. . .......................... . _ __ _ ... __ ................ SUBDIVISION LEGEND ry W1000SPRING APARTMENTS itq 3-14305T 81005632 NEW PGE FACILITIES TO BE INSTALLED (UNLESS OTHERWISE SPECIFIED) -29 1IT-11ILT lIT" T11 ABC .] Vr.9323'-; ABC 2 VT-9 TO K�All,11 IAI LITERAL TAP 322 19" VT-9323 () FAULT RIMATUR A���r X11 I--VALILT QR OVOAP A IN�TA I M PY 1-11- 4868 142 25 T 4$T-4 4576 8 2 --------NSTML-A-PR A I PILMAKY PVC COAROJI I �.�VIOPO A PI.T.I -1-It for 40r-4 C 1036263 --------INTTAU.1-A4---.-IN--C.- 1972 PROVIDED&METALLED BY WSTONER 4a-4 0, 14 25 T 20 Is" 10 6 -D-92 PD 10062789 ".A-A 0.1-1..1-l-P �_�*1 4 VT L -A 15 13799 14216 T AN 2 ACS 19 6 4974 Do W17H SLrqT W : 1901 115, 49.3 4573 17 I c Af 19511 25KVA 50KVA C2 1-15B 4V4 21 -A o 22 1200.01 Ig 23 24 25 27 200AMP 200AMP �Nm is "$ RUN cM. per us ------ r 81 26 I%VD LONGEST RUN LONGE 51 2 78-Ull LONGEST RUN 755VUIR LONGEST RUN po 86 8,139A OC SHORTEST RUN 1.5-AFC SHORTEST MAN pc,&, r) 3 ck 7-13A VT 13 zz A 50 D� W 97 A 50 85 V,9 26 12 A 50 -M 75� 55 VT 9 2 PD 05 rl.51-�l ."o• 2390 AN 2 ACSR 26_ VT A l514 4Cr4 6108 P,88 15 16 1963 40r.4 142 6 T 1970 W4 20D. C 25$0174 -------- Tr CONSTRUCTION NOTES: A RSDEV r:=Z-10 m I Qp 7302➢ 4(Y-4 R VW TOS T c JB 25 72734 1 k7E� TA14e:l. 1,III _M __ P! 0 — M. A. ALL PGE H1730-18 CARSON BOX TIER 15 1-M R. CONTACT PGE FOR APPROVED MANUFACTURERS 'IT 1---ASMII-ERALAM-IME-71-E-1- FINAL GRADE IF HARD SURFACE(FLUSH) ET%' FINAL GRADE IF SOFT SURFACE M RR I I-1-AAY-I-LE 4 DP YPLU CIWAIT D EAMANOW(PW!T.-PUT INCH 81 AA.4 VAULT WITH 3'7R.W-OLICTS VT-80 THINK R�1FNM TAEER SAFETY 1. MT-- -A-. D 4IVIO-4- 11.-RA-1--l-A-8- It-.-1 lit.-.T -I PGE FACILIVES NOT DRAWN TO SCALE POLYMER COVER VT 504-PGE VAULT THIS DRAWING IS A GRAPNKAL REMSENTATION OF PORTLAND GENERAL ARKED TELECTRIC 5��-Pof!X� N, ELECTRIC FACALITIES IN THE FIELD THIS MAP ILLUSTRATES E C'&L C ONNECTIVITY,TYPES AND NUMWRS OF CONDUCTORS AND PLACEMENT O� C=.r 2TC-1 sml!�l'Eft EQUIPMENT-TNIN THE DISTPJBUDOW 5 M IT 15 RECOMMENDED THAT THE USER NOT RELY ON THIS DIAGRAM FOR GEOGRAJAHKAL LOCATIONS 19MMI 9 I'VE C STRUCT N DRAW .1-, -- IS I-MTm,o, Av- TOP VI 4414 1% FF 0- A- I- S -Y DEVIATIONLIFROM THIS DESGN LIST N", MISSION HOMES STREET SIDE TOP VIEW Y'LA -0%-1 BE APPROVED y PGE PROJECT IA4ANAMGER I AT AT, =0 �I'XCEZ'A" I - - I Rlrnc - 71.. " TRENCH DETAIL W CALL BIT BEFORE YOU Or- PG 7-- ALL SECONDARY VAULTS T BE INSTALLED ON PROPERTY LINES WITHIN THE UTILITY EASEMENT AND AT FINAL GRADE.ALTERNATE LOCATIONS MUST BE �m--- IN All rGh" Fll-L c:I 50 aiH9 MO APPROVED BY PGE AND WILL BE NOTED ON THE SKETCH THE COST FO =17 Nmm:OwcN, RELOCATION OR ADJUSTMENT 01`A SECONDARY VAULT WILL BE THE 0 C- RE PONSIBILM OF THE BUILDER OR DEVELOPER REQUESTING THE MOVE. PRE-CONSTRUCTION MEETING,TRENCH AND CONDUIT INSPECTION .,.T.rc-,,,,; PGE APPROVALS OF INSTALLATION WILL BE BASED ON FINAL GRADE AND WoM.,-IxARFSAPfTC,-lIO-NMFf- -I 11 (NC E-AAANJIGERYTO CRITERIA SET BY THE DEVELOPER AND HIS OR HER AGENT, PPE P FI-RI-11� "Hs. �'IT- 1-1 1-1 ba- ELD WNST��I)Al-LBlItk-TCCA NIL LOCATION iiu�n:ova CON bom