Loading...
Report (101) — JUL_ 3 0 Z018 To Allyson Armstrong Community Development Plans Examiner/Building Inspector I CITY CE1K3ARD a. Provide detail for 1 hour wall. Placement on D3.0 sheet 2. Provide detail for beam pockets in foundation stem wall. I don't see how you can get 1.5" minimum rebar coverage with a 6"stem wall. Either no beam pockets or an 8" stem wall will be required with beam pockets. R404.1.4.2 Refer to sheet D6.0 I'm calling out 8" stem wall 3. Portal frame footing does not meet the minimum footing size requirement for a two story structure. R602.10.3.3 D7.0Add min measurement to detail 4. Provide braced wall panel info for rear right corner. Minimum braced wall panel length and location see figure R602.10.1.4.1. Can start a maximum of 8'from corner. Corner return requirements can be found in section R602.10.4.4(3). D3.0 moved the windows and door placement. 5. Plan needs to call out that continuous sheathing method is to be used in seismic D1 category. Noted on plans D3.0—D4.0 6. Heating will be required for upper level as well. I only see one cadet heater called out on the main level. We are using cadet heaters in all second floor bedrooms and stairwell 7. Bath fans will be required to be a minimum of 80cfm per code. Updated fan note 8. Provide floor joist size, span and direction info for upper level. Revised floor joist D3.0, I do show floor joists on cross section detail A/D4.0 9. Provide beam check for garage header. 10. Minimum garage slab thickness shall be 3.5" R506 Noted on D6.0