Loading...
Plans BU P2018 - 00002 OFFICE COPY #) Aar 01 00 00 GENERAL DATA AND SCRAPING,USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. e. PROTECT WORK OF OTHER TRADES. GENERAL REQUIREMENTS \� MICHAEL /14 1. ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH THE LATEST EDITION OF THE OREGON f. PROVIDE"WET PAINT"SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. L WIRE THWANG , ' - STRUCTURAL SPECIALTY CODE AND ALL OTHER STATE OR LOCAL CODE REQUIREMENTS THAT APPLY. - C7 2. VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AND AT THE EXISTING BUILDING AND 12 00 00 FURNISHINGS TENANT IMPROVEMENT for -' NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK. 1. CLEAN/REFURBISH EXISTING BUILDING STANDARD BLINDS AT ALL EXTERIOR GLASS. t 3. CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL EXISTING PORTLAND,OREGON Q CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL.SUBMITTAL OF A PROPOSAL SHALL BE CONSIDERED 21 00 00 FIRE SUPPRESSION : DESIGN I BUILD 5851 CONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE,AND NO FURTHER COMPENSATION SHALL BE DUE 1. PROVIDE SPRINKLERS THROUGHOUT SPACE AS REQUIRED BY CODE. SPRINKLER HEADS SHALL BE THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO PERFORM SUCH INSPECTION. CENTERED IN 2 X 2 CEILING TILE.LAYOUT OF SPRINKLERS BY CONTRACTOR. SPRINKLER LAYOUT IN ALL HARD SPEC OFFICE �F o F o�`` 4. BY SUBMITTING A PROPOSAL,CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE CEILING AREAS(GYPSUM BOARD/PLASTER)TO BE REVIEWED AND APPROVED BY ARCHITECT PRIOR TO EXAMINED THE SITE AND INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY TO COMPLETE THE WORK INSTALLATION. __[[II.. �] DESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE LIMITED TO 2. IN NEW CEILING GRID SYSTEMS OVER 144 SF PROVIDE FLEXIBLE HEADS FOR MINIMUM SEISMIC MOVEMENT. PROJ ECT #1 7430 ALL MATERIALS AND INSTALLATION,DISPOSAL OF EXCESS MATERIALS(USEABLE FINISH MATERIALS SHALL BE NO"OOPS RINGS ALLOWED". LEFT IN THE TENANT SPACE AS DIRECTED BY PACTRUST),CLEANING AND ALL PREPARATION OF SUBSTRATE SURFACES PRIOR TO INSTALLATION,AS WELL AS FINAL CLEAN UP. 26 00 00 ELECTRICAL: DESIGN I BUILD 5. IT IS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN EXISTING BUILDING GENERAL \ / 0 STANDARDS FOR ALL EXISTING PRODUCTS AND SYSTEMS. UPON DISCOVERY OF A DISCREPANCY TO THIS 1. ALL ELECTRICAL FEEDS TO OUTLETS,SWITCHES,ETC. MUST BE VERTICAL DROPS FROM ABOVE EXCEPT FOR PROJECT NARRATIVE INTENTION,THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY. HORIZONTAL RUNS UNDER WINDOWS AND RECEPTACLES ON THE SAME STUD. Z 6. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. 2. ALL ELECTRICAL FEEDS TO OUTLETS AND DATA BELOW WINDOW SILLS TO BE ROUTED THROUGH BUILDING PROJECT CONSISTS OF A MINOR ALTERATIONS TO EXISTING 11,056 SF SPEC Q 7. COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPET"WALK-OFF MATS"TO PROTECT EXISTING SHELL WALLS. DO NOT FEED FROM PERPENDICULAR INTERIOR PARTITIONS. SPACE. WORK INCLUDES REMOVAL OF GYP. BD. ON METAL STUDS WALLS, CARPETS. 3. ALL NEW ELECTRICAL DEVICES TO BE WHITE REPLACING FLUORESCENT LIGHT FIXTURES WITH LED IN OFFICE AREA, NEW 8. KEEP THE AREA OF WORK FREE OF GARBAGE AND DEBRIS ON A DAILY BASIS INCLUDING DOCK ACCESS 4. REPLACE ALL NON-WHITE EXISTING ELECTRICAL FIXTURES TO WHITE CARPET, NEW PAINT, AND ALTERATION OF EXTERIOR SUITE ENTRY. AREAS AND COMMON AREA. FLOORS TO BE SWEPT OR VACUUMED DAILY. 9. PROVIDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS INCLUDING BUT NOT LIMITED TO 5. PROVIDE LABELS AT EACH ELECTRICAL RECEPTACLE IDENTIFYING CORRESPONDING PANEL AND BREAKER. Q VV COMMON CORRIDORS AND STAIRS,BUILDING ENTRANCES,SUITE ENTRANCES,ETC. THE CONTRACTOR WILL 6. PROVIDE TYPEWRITTEN UPDATED SCHEDULE AT PANEL TO IDENTIFY CIRCUIT BREAKERS. O R K INCLUDED BUT UNDER BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING IMPROVEMENTS DUE TO CONSTRUCTION 7. ELECTRICAL CONTRACTOR TO PROVIDE EMERGENCY LIGHTING IN EXIT PATH SHOWN ON PLAN EQUAL TO ACTIVITIES. 1-FOOT CANDLE. SEPARATE PERMITpt--�� z 0 10.PROVIDE TEMPORARY SANITARY FACILITIES. CONSTRUCTION WORKERS SHALL NOT USE BUILDING RE I RESTROOM FACILITIES. 8. EXIT LIGHTS:RUUD LIGHTING"PLASTIC LED EXIT SIGN"MODEL EXPBURWH RED LETTERS,WHITE HOUSING, , !i jj�`"LI CO WITH BATTERY BACKUP. FIRE PROTECTION SPRINKLERINGVE I1.STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DESIGNATED AT 9. LOW VOLTAGE SYSTEMS(TELECOMMUNICATION AND DATA)BY FUTURE TENANT. Q } PRE-CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY OTHER JAN 1 COMMON BUILDING AREA BE USED FOR STORAGE. 10.LIGHTING ENERGY MANAGEMENT IS REQUIRED IN BUILDING AREAS 5,000 SF AND LARGER. T� V ZOIE 12.ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. 11.00CUPANCY CONTROL DEVICES SHALL BE LEVITON OR WATT STOP. SHEET INDEX CI r f OF 1 i(-�('n W Y 13.CONFIRM SIZES OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF STRUCTURAL,MECHANICAL, 12.TEST ALL LIGHTING CONTROL SYSTEMS TO ENSURE THAT CONTROL DEVICES,COMPONENTS,EQUIPMENT B ILDINO a ELECTRICAL AND PLUMBING WORK PRIOR TO FRAMING OR CUTTING FOR INSTALLATION. AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND A-1 PROJECT INFORMATION, VICINITY MAP, GENERAL NOTE DIVISIo f CC < CV SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE A-2 FLOOR PLAN - DEMO, FLOOR PLAN - NEW AND NOTES o r O is 14.LEAVE THE PROJECT CLEAN AND READY FOR OCCUPANCY. IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. - O O Lf) Q�tn I {fff;;; /� it - �I�y1 e'FTII7�IN(` NEW AND NOTES CO l\ 15.CLEAN ADJACENT EXTERIOR AREA,I.E.WALKS,EXTERIOR GLASS,ETC. 13.REQUIRLD IN DIVISION 15,PROVIDE MONITORING OF HVAC EQUIPMENT PER CODE. O U I L LJ I la I N V� V I/'1 I 0CC O r 16.FILL ALL PAPER AND SOAP DISPENSERS IN RESTROOMS AND BREAK AREAS. OFFICE LIGHTING BUILDING OWNER: PACIFIC REALTY ASSOCIATES, L.P. - W O (i V 17.CLEAN ALL SUPPLY AND RETURN DIFFUSERS AT PROJECT COMPLETION. (co-ordinate with DIV 15) 1. OFFICE LIGHT FIXTURES: LITHONIA LED FIXTURE.2BLT2 40L ADP MVOLT EZI LP835. 15350 SW SEQUOIA PKWY #300 W �0 � 18.PROVIDE"AS-BUILT'DRAWINGS OF THE WORK AT THE CONCLUSION OF CONSTRUCTION,"AS-BUILT" 2. REST ROOM-WALL MOUNTED LIGHT FIXTURE-PEERLESS CERRA WALL LED,CRW7L HI 4FT R4 MVOLT EZB PORTLAND, ORE 97224 Q >z DRAWINGS MAY BE IN THE FORM OF TWO COPIES OF CONSTRUCTION DOCUMENTS MARKED-UP WITH RED LP835 C210 SCEP 1 U7 Q C j R PEN.DELIVER RECORD DRAWINGS TO THE ARCHITECT. COMPLETE OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED FOR ALL MECHANICAL,ELECTRICAL AND PLUMBING EQUIPMENT.PACTRUST MAY HOLD 3. RECESSED LED DOWN LIGHT: LITHONIA LDN6 35/10 LO6 AR LD MVOLT TRW (503) 624-6300 (PHONE) U O(- CONTRACTOR'S FINAL PAYMENT UNTIL"AS-BUILT"DRAWINGS AND 0&M MANUALS HAVE BEEN RECEIVED 4. OFFICE EGRESS LIGHTING:ISOLITE MINI GENIE SERIES LED VERSION LMIGN NM SQ-CEILING AND WALL AND APPROVED. MOUNT. SEE PLAN FOR EGRESS PATH.USE OF ISOLITE INVERTER AS ALTERNATE TO BATTERY IS (503) 624-7755 (FAX) (Y)0 i O 19.IT IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDE A COMPLETE, ACCEPTABLE. 5 In O i LL r LL FUNCTIONING PROJECT INCLUDING ALL GENERAL,MECHANICAL AND ELECTRICAL CONSTRUCTION REQUIRED 5. LIGHT SWITCHES:ACUITY CONTROLS PRE SET ALL PRIVATE OFFICE AND CONFERENCE ROOM SWITCHES TO BLDG. #: PBC BLDG. D (pbc194) TO FULFILL THAT INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED,REGARDLESS OF "VACANCY"AND TO TURN ON AT LAST DIM LEVEL. WHETHER OR NOT SHOWN ON THE DRAWINGS. CURRENTLY SPRINKLERED TO ORDINARY HAZARD 20.ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE NOTED"N.I.C.". a. STANDARD WALL SWITCH WITH OCCUPANCY SENSOR-USE WSD 21,'ALIGN"AS USED IN THESE DOCUMENTS,MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE SAME b. WALL SWITCH WITH OCCUPANCY SENSOR AND DIMMING-USE WSXD CONST. TYPE.: TYPE III-B (SPRINKLERED) >1 PLANE,EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. c. WALL SWITCH WITH DIMMING AND CEILING MOUNTED OCCUPANCY SENSOR-USE SPOD 11 22.D0 NOT DISASSEMBLE SETS OF CONSTRUCTION DRAWINGS.DRAWINGS ARE INTERRELATED. WAREHOUSE LIGHTING TENANT INFORMATION a 23.SUBMIT SAMPLES OR DRAW DOWNS FOR ALL FINISHES REQUESTED TO THE ARCHITECT OF RECORD WITHIN 1. GROUP RE-LAMP EXISTING FLUORESCENT LIGHTS THROUGHOUT U.N.O TWO WEEKS OF PROJECT AWARD.PRODUCTS INSTALLED WITHOUT APPROVED SAMPLES ARE SUBJECT TO 0) IIIW REPLACEMENT AT CONTRACTOR COST.AN APPROVED SUBMITTAL DOES NOT CHANGE THE CONTRACTUAL REQUIREMENT TO PROVIDE THE SPECIFIED ITEMS UNLESS SPECIFICALLY NOTED AS A SUBSTITUTION BY THE HVAC DESIGN STANDARDS TENANT: VACANCY - SPEC OFFICE AND WAREHOUSE U n CONTRACTOR AND SPECIFICALLY APPROVED BY THE ARCHITECT AS SUCH.REPLACE SUCH PRODUCTS AS .Qa. LL DIRECTED AT CONTRACTOR'S COST. 1. THERMOSTAT: ALL EXISTING G MERCURY TYPE 8000 TOUCH SCREEN EE REPLACED. NEW 003 WHERE POSSIBLEO BE OCCUPANCY: B - 5,347 SF HONEYWELL COMMERCIAL GRADE VISIONPRO TOUCH MODEL TB8220U1003 WHERE 'h O 24.SUBMIT COMPLETE SHOP DRAWINGS FOR MILLWORK,SPECIAL SYSTEMS,MECHANICAL,ELECTRICAL AND APPROVED SUBSTITUTE: TOTAL-LINE SIGNATURE COMMERCIAL THERMOSTAT MODEL NO.P374-2800 -7 DAY S-1 - 5,709 SF PLUMBING SYSTEMS(INCLUDING FIRE PROTECTION SYSTEMS). SUBMIT A MINIMUM OF TWO COPIES OF ALL PROGRAMMABLE WITH LOCKOUT FUNCTION-AUTO CHANGEOVER ONLY. MOUNT AT ADA HEIGHT(MAYf 1 SHOP DRAWINGS FOR REVIEW AND APPROVAL TO THE ARCHITECT OF RECORD.ARCHITECT WILL RETAIN ONE REQUIRE CHANGING HEIGHT AT"REPLACEMENT"LOCATIONS). CONTRACTOR SHALL PROGRAM REMODEL AREA: 11,056 SF TOTAL V (13 11 COPY AND ONE COPY WILL BE RETURNED TO THE CONTRACTOR. THERMOSTATS AND BALANCE SYSTEM. t 25.THE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION SYSTEMS CONTRACTOR.ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEERIm LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. COORDINATE 0 f n INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER HEADS SHALL BE - Y• CENTERED IN CEILING TILE(OR 2 x 2 MODULE OF A SECOND LOOK II TYPE OF CEILING TILE WHERE a APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE-APPROVED IN WRITING BY THE ARCHITECT PRIOR TO INSTALLATION. z a 26,COORDINATE ALL CONSTRUCTION SEQUENCING WITH PACTRUST AND SCHEDULE ALL SERVICE INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS TO MINIMIZE INCONVENIENCE TO CURRENT TENANTS. J 5 0 GENERAL 1. REMOVE ALL EXISTING VCT,SHEET VINYL,ETC.IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PRIOR CO TO INSTALLATION OF NEW FLOORING. IL 01 23 00 ADD ALTERNATE PRICING REQUIRED 1. DESCRIBE ALTERNATES HERE AREA OF WORK > Q 07 00 00 THERMAL& MOISTURE PROTECTION - 60 ® U +) (6) (e) ( U �a) 10 Q1)1. REPLACE ALL MISSING AND DAMAGED ROOF AND WALL INSULATION AND PROVIDE PERFORATED WHITE 1 _.. i BAYS AT 25-0'=25a-0"NOMINAL SCRIM(FS-25)OVER THE INSULATION AT THE WAREHOUSE CEILING. Y" - - --- '1 2. PROVIDE NEW ROOF INSULATION TO MATCH EXISTING AT ABANDONED MECHANICAL UNITS. L) 08 10 00 DOORS AND WINDOWS '�i, r '' ':ail f(a r ,,r 1. RE-USE EXISTING DOORS AND FRAMES WHERE POSSIBLE n:.,, Ss• I 2. PATCH AND REPAIR ALL HOLES OR DAMAGE TO EXISTING STORE FRONT WINDOWS AND DOORS.TOUCH UP ' v •!,` FINISH FOR AS NEW LOOK. I I 4 , s :r C 3. TOUCH UP ALL EXISTING INTERIOR DOORS AND FRAMES FOR AS NEW LOOK. S :40 - V-�' 4. OVERHEAD DOORS;WAYNE DALTON THERMOSPAN 125,EXTERIOR WHITE/STUCCO. FLUSH STEEL INSULATED, ra-filiIsTr* its; 1-0 n 2"THICK;STANDARD LIFT OPERATING STYLE WITH TRACK AND HARDWARE. OPERATION;PULL ROPE FOR IN I' u J DOORS TO 10'TALL,CHAIN HOIST FOR TALLER DOORS. « • I /1 5. TUNE UP EXISTING OVERHEAD DOORS FOR SMOOTH OPERATION. WORK INCLUDES: �)b "- 7 I ' \ , a ADJUST OVERHEAD SPRING TENSION TO MEET MANUFACTURERS SPECIFICATIONS. 6 ` ^, 1 1 - -- --- - ---- b. REPLACE TOP AND BOTTOM DOOR SEALS AS NEEDED. trW?? - v' " T 0 c. REPLACE BENT TRACKS AND PANEL SECTIONS. r LIPO ED B , .... b s4, , , d. REPLACE ROLLERS AND HINGES AS NEEDED. ., aCC REPLACE ROPES AS NEEDED. K: , „ hmti,4_ t ' U I 1LiJ f, LUBRICATE ROLLERS r-'+> •••--4-----‘k,.. 1 09 00 00 FINISHES U �_" "/�P@i, El��-"en,1 LU Z GENERAL �' 1. CLEAN,SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS. w W CV 2. SUBMIT SAMPLES OR DRAW DOWNS FOR THE FOLLOWING: rn W N- a. FLOOR COVERINGS,BASE AND TRANSITION STRIPS v J z - O b. PAINTU) 0 fr 3. PROVIDE A TRANSITION STRIP WHERE EVER TWO DIFFERENT FLOOR MATERIALS MEET 1 BUILDING PLAN _ • T CO CzV O 4 .PROVIDE SCHLUTER METAL TRIM AT ALL EXPOSED EDGES OF TILE(EXCEPT AT BULLNOSED EDGE)OF TILE GZr-V (CERAMIC,QUARRY OR PORCELAIN) A-1 SCALE 1" =30' O UJ z 09 53 00 SUSPENDED ACOUSTICAL CEILING W CC � F.- 1. COMPLY WITH CURRENT SEISMIC REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE. CODE SUMMARY Q' O r W 2. FOLLOW MANUFACTURERS PRINTED INSTRUCTIONS FOR THE DELIVERY AND INSTALLATION OF CEILING p., Q (D O SYSTEM,INCLUDING GRID,PANELS,AND HANGARS AND ACCESSORIES. C/] f1 r 0.. 3. USE ALL PRODUCTS FROM ARMSTRONG WORLD INDUSTRIES,INC. ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE 7-� 4. CO-ORDINATE CEILING WORK WITH INSTALLERS OF RELATED WORK INCLUDING BUT NOT LIMITED TO WITH STATE AND LOCAL CODE REQUIREMENTS THAT APPLY, REVISION • INSULATION,GYPSUM BOARD,LIGHT FIXTURES,MECHANICAL SYSTEMS,ELECTRICAL SYSTEMS AND FIRE PROJECT LOCATION INCLUDING BUT NOT LIMITED TO: SPRINKLERS • 2014 OREGON STRUCTURAL SPECIALTY CODE 5. PRODUCTS: • 2014 OREGON MECHANICAL SPECIALTY CODE (OMSC) 1 a. TILES-ARMSTRONG FINE FISSURED#1732,24 x 24 x 5/8"W/ANGLED TEGULAR EDGE SW 72ND AVENUE • 2014 OREGON PLUMBING SPECIALTY CODE (OPSC) b. ACCESSORIES-MANUFACTURERS'STANDARD \/ IIIMIMIMII Is I"""""" 'j • 2014 OREGON ELECTRICAL SPECIALTY CODE (OESC) 2. ��`` 6. ALL TILE CUTS SHALL BE DONE WITH RAZOR SHARP KNIVES. CUT/TRIM TILE EDGE TO CREATE TEGULAR EDGE -��r One • 2014 OREGON FIRE CODE (OFC)ASCE-7-10 3' CONDITION SO THAT CEILING TILES LAY FLAT. I_ y `i 0 1 • ICC/ANSI A117.1-2009 4 r D �- 7. IN EXISTING SPACES REPLACE ALL TILE. 1 I I I • j • 2014 OREGON ENERGY EFFICIENCY SPECIALTY CODE 8. BENT OR DAMAGED T-BARS TO BE REPLACED. S �� UH#IFV OIHNHI-0 r 5. 9. REPAIR HOLES IN GRID FROM REMOVED WALLS. USE OF ARMSTRONG"BP ES-04"EXPANSION SLEEVE jai ACCEPTABLE. SAA (}H#II{ �IHIHfIfl uc1!? ic :.REPINGISSING GRID SEGMENTS IN AREASWHEREREMOVED2X4 LIGHT FIXTURES ARE BEIG REMOVED. 9 410 I _. . 6. 09 91 23 PAINTING OOH � -;� 7. INTERIOR: FS G= ilir) OFFICE COPY 8. 1. WALLS: -<)- re.404•••14mN ■�� a. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER'S 6200 OR Q Ti- 1 f' '- . O CITY OP TIGARD 4480 WITH A TIGHT ROLLER STIPPLE FINISH. RESTROOM FINISHES TO BE MILLER'S S/G LATEX ENAMEL. _I J DRAWN BY: 2. DOORS AND FRAMES: o I M.. ff-- - REYI FOR CODE COMPLIANCEa. EXISTING HOLLOW METAL-SAND,FILL IMPERFECTIONS WITH RONDO,SAND AND PRIME PATCHES WITH % '1111 1111' f - IC p' M.W.N. ALKYD PRIMER,AND FINISH WITH SEMI-GLOSS OIL ENAMEL. o i � _I Approved: 1 G\(�� .. I a I IS b. WOOD-STAIN,SEAL AS REQUIRED,AND VARNISH WITH SATIN VARNISH. Q� � 1 OTC: DATE: 12/26/17 3. CEILINGS: • + - Pcrmit#: ,8 /'9e) /?� A PERMIT/CONST a. ACHIEEXISTVNG GYP BOARD/PLASTER-SAND,SPACKLE ALL E UNIFORM COVERAGE WITH MILLER'S 6200 OR 4480ERFECTIONS,SPOT PRIME AND FINISH TO oJQ� J 1 Address: I Fj I As- .S tAJ 7a n " /a 4. GENERAL NOTES: PACTRUST _ BUSINESS • p Suite#: a. KEEP ALL HARDWARE,HINGES,AND DOOR KNOBS CLEAN OF ALL PAINT SPLATTERS,DRIPS,OR ROLLER - U U S I N ESS . g , . Date: -f p� i SPRAY CENTER I: II:I'` 11 O* m �l . , :; i - , . -, _ ;i.: b. ALL SURFACES TO BE SANDED BETWEEN COATS,PRIOR TO INSTALLATION OF NEXT COAT. c DURING AT ES PROGRESS OF WORK, K K,KEEP JOB SITE CLEAN OF ALL PAINT MATERIALS,RUBBISH,CANS,AND RAGS TO TBC I Yx II • d. UPON COMPLETION OF WORK,CLEAN ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING 2 LOCATION MAP . z� A-1 SCALE 1" = 250' BUILDING DEPARTMENT USE • I rn S�� � A�c ---N) I I IoI. A 0 _J— d J \ r� v 0 0 � � S 'KINK o WIRE MICHAETLHWANyG iA W b9� S*UNK o o TANS 121 TRANS 121 - • pes A6 WA t % PORTLAND,OREGON( j CO / 5851 •1/4T A I Hp • II I I I I I I = PROJECT #1743C -G 3 r CD z I c o Q = WAREHOUSE WAREHOUSE f- 120 I e- 120 I -Q- 0 z o I o • II Z I co • W CC (V o I o I O'8 82 • 'I C OCC m r` Wo �� 3-PHASE 0 3-PHASE z OUTLET - - - - OUTLET - CD Q 220 V/50 H2 - I EV Vi50 HZ ( , O I 6316 EXISTING - - EXISTING lJ Q-- C? M C6 . I J C� (lb T� 1 — O _c c:i x 4� „ -,. I , )VCT fN1 CPT-1 r SERVER -2 • SERVER C (E)SAN.SEWER - _ DOMESTIC WATER 1 19 - - - - _ - - - - - - - - - - - I - - ► - (E)SAN.SEINER _ - _ - - - _ _ - - - - - _ _ -I _ - - ` OVERHEAD - ' I OFFICE °OOVERHE DMESTIC ATER 119 OFFICE ` (E)CT (N1 CPT-1 ! - 102 (h I 0 102 _ rc LAV HALL -cI - • 1 LAV HALL I 01 16 W 1i7 114 i 117 114 M CbT Q CI II I i I - OFFICE e ] - OFFICE c 103 ► L V!I �I 103 ► Yrail fmi 1- ir 0 VU �l// zo N t LAV © To L/r'V © Q C 1 ♦Q nr r 115 _ 115 t 0L / _ OPEN OFFICE I OFFICE tl / _ OPEN OFFICE OFFICE U j U O I CT _CPT-1 101 _ - 104 101 104 m HALL FEs `� HALL 110 0ri , I (E)VCT (N)CPT-1 110, 0 0 ENTRY u—� �� oU o U 1� o O L ENTRY y = J o 0 Q U Li 1) OFFICE OFFICE BREAK 5 OFFICE OFFICE OFFICE OFFICE OFFICEC 0 105 ► BREAK 0 OFFICE OFFICE OFFICE OFFICE 3 0- OFFICE = 105 U 112 1111 109 108 O. 107 106 10. 112 111 109 108 ► 1 41 107 106 \ n 17,,_,_ _____,ToN 0 H / C 3 R 0 1 i \\.......: 4 - 0 HH n ` o 0 oy P (Eb /, R n h� n n \ n n _ u 11 J 1 L 11 4 , B 0 n 1_ In I I C1 FLOOR PLAN - DEMO � CONSTRUCTION LEGEND - DEMO 2 FLOOR PLAN - NEW GENERAL NOTES - NEW -- CONSTRUCTION- LEGEND --- _� SCALE 1/8" = 1' - 0" Z A-2 SCALE 1/8"= 1' - 0" GZ o 1 EXISTING To REMAIN I I EXISTING TO REMAIN COT SHALL BE THE CONTRACTOR'S AND/OR THE 1( Jl D EXISTING TO BE REMOVED SUBCONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DUPLEX RECEPTACLE CC DUPLEX RECEPTACLE DIMENSIONS, DETAILS, AND JOB SITE CONDITIONS FOURPLEX RECEPTACLE T� UJ PRIOR TO PROCEEDING WITH THE WORK, AND REPORT gh FOURPLEX RECEPTACLE ANY DISCREPANCIES TO THE ARCHITECT BEFORE °pg) DEDICATED OUTLET I z GENERAL NOTES - DEMO STARTING CONSTRUCTION. ,{{��, ,�{. v DEDICATED OUTLET (WT EXISTING ELECTRICAL TO REMAIN V 2 A. IT SHALL BE THE CONTRACTOR'S AND/OR THE y EXISTING ELECTRICAL TO REMAIN B. REFER TO SHEET A-1 FOR GENERAL PROJECT 1 FLOOR MONUMENT W/SERVICES SHOWN T W • > N ® SUBCONTRACTOR'S RESPONSIBILITY TO VERIFY ALL SPECIFICATIONS. v, z Q 6- DIMENSIONS, DETAILS, AND JOB SITE CONDITIONS ® FLUSH MOUNT FLOOR MONUMENT 0 PRIOR TO PROCEEDING WITH THE WORK, AND REPORT w/POWER AND DATA O THERMOSTAT Cl)Tz O FINISH SCHEDULE SPECIAL OUTLET D7 N © ELECTRICAL PANEL Q TEL/DATA MUD RING WITH PULL STRING (n z ANY DISCREPANCIES TO THE ARCHITECT BEFORE U h- 0 STARTING CONSTRUCTION. Q POWERWORSTATIONS 1 CIRCUIT FOR EACH CLG. © ELECTRICAL PANEL O D w < 5 WORK STATIONS MIN. WALLS [,ry m � w Q B. REFER TO SHEET A-1 FOR GENERAL PROJECT RM# NAME FLOOR BASE CEILING REMARKS RM# w WLO (- SPECIFICATIONS. =r DEMO NORTH EAST SOUTH WEST HT. O POWER dU LC C. REMOVE ALL FIRE HORNS AND STROBES. ' DEMO CPT-1 / ® FLUSH MOUNT FLOOR MONUMENT W/(4)POWER Ca!] LLn 0 0 <; DEMO 100 ENTRY WOC RF GYP BD / PT-1 - GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" WOM 4' x 6' 100 OUTLETS AND(4)DATA CONNECTIONS EA D. REMOVE ALL EXISTING CARPET. PATCH AND PREP REVISION FLOOR FOR NEW CARPET. ( ) DEMO 101 OPEN OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD - PT-2 _ GYP BD / PT-1 SAT 9'-0" -- 101 E. REMOVE WALLS AS INDICATED IN THEIR ENTIRETY, 102 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 102 1 INCLUDING ALL ELECTRICAL AND DATA CONNECTIONS. 103 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 103 2 PATCH AND PAINT ALL CONNECTION POINTS FROM 104 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 104 REMOVED WALL. 3. 105 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 105 F. REMOVE ALL INTERIOR WINDOW SHADES AT OFFICES. 106 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 106 4. SPECIFICALLY OFFICE 105. PATCH AND PAINT ANY107 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 107 5' DAMAGE. 108 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 108 6. 109 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 109 7. 110 HALL CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 110 8. 111 OFFICE CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 111 FINISH MATERIALS 112 BREAK VCT (ETR) RC (ETR) GYP BD / PT-1 _ GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" 112 DRAWN BY: ALL FINISHES MUST BE SUBMITTED TO ARCHITECT PRIOR TO INSTALLATION 113 CLOSET CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 8'-6" 113 M.W.N. BROADLOOM CARPET: 114 HALL CPT-1 RF GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 SAT 9'-0" -- 114 DATE: 12/19/17 CPT-1 MOHAWK GROUP PTR-BROADLOOM BC375/BQ375-859 FOUND OBJECT, DIRECT GLUE 115 LAV CT (ETR) CT (ETR) GYP BD / PT-1 GYP BD / PT-1 . GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 9'-0" CLEAN AND SEAL GROUT 115 PERM IT/CONST USE MOHAWK BRAND NUBROADLOK PREMIUM ADHESIVE ONLY 116 TOILET CT (ETR) CT (ETR) GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 9'_0" TILE-2 WAINSCOT (ETR), 116 WALK OFF CARPET CLEAN AND SEAL GROUT WOC GROUP TUFF STUFF II-STEP UP II-983 IRON ORE, DIRECT GLUE USE MOHAWK M700 ADHESIVE. (M95.0 IN HIGH MOISTURE AREAS) (ETR) (ETR)117 LAV CT CT GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD/ PT-1 9'-0" CLEAN AND SEAL GROUT 117 USE MOH BASE TILE-2 WAINSCOT (ETR), RF FLEXCO 4" FLAT RUBBER BASE, 071 BLACK/BROWN,AT ALL CARPET AREAS. 118 TOILET CT (ETR) CT (ETR) GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 GYP BD / PT-1 9'-0 CLEAN AND SEAL GROUT 118 RC FLEXCO 4" COVE RUBBER BASE, 071 BLACK/BROWN,AT ALL HARD SURFACES. A . 2 119 SERVER VCT (ETR) RC (ETR) GYP BD / PT-1 GYP BD / PT-1 GYP BD/ PT-1 GYP BD / PT-1 SAT 9'-0" -- 119 PAINT: PT-1 MILLER 110-4 ACRO PURE ULTRA-LOW VOC 0017 LUNA MOON, SATIN LATEX. 120 WAREHOUSE CONC RB (ETR) GYP BD / PT-3 GYP BD / PT-3 GYP BD / PT-3 GYP BD / PT-3 O.T.S. 18'-0" 120 PT-3 MILLER 8180 PERFORMANCE FLAT- MIX IXX79W(WAREHOUSE WALLS) (ETR) 121 SPRINK CONC -- -- -- -- O.T.S. 18'-0" -- 121 c\GED 4 , �J MICHAEL m m W WIRE IGTHWANG vil y .mm•• ••••1 i-.- _i_ 7/ J --i __IJ______01 61 ..-- I g I Ir CPA c j J = 78 OF Qi%‘" rai PROJECT #1743C a I I I I I I I i = Q 3 - _ I I o 0 = z 00 I 0 lii I _ t 6 [C ]) [ ir..„;l )) ( 3 1 {{ ) i {L 1 II = CC Q N O0 ac COI 'ct 1 = CD J c�c+� L L0d 0_L< 1IIllllllul, II1111I - . - - - II - I - , - -- - - �� llllllllm,, - t.�„raft,. • a • = al r V mmi �l �^ f I� 71 F i )( N _ j- F 0 • r 1 • ii • 11 . , ---i • 1 i ii, . • i , W ■■IIS■■■■■■■■■■■,; ■■■■[■■■ ■■■■■■■■■O■■■■■■■■!! ■a■e . r D a 0 44) • . o IliiitrAiliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii • • bd • U uCu "In N ri , ail r X1111_ LI ri illinl!ll : 4-., ..00 Al _ : .0.. . . 7: 1>‘ . 7 • ...., . a luau ,uiuu ,, iuim � 11111111■■■ 1I■l 1,11 I ■111111 11111111111111�•)1111 ® : z I 14 a rural 11■M sIAI�� .■p� .1■ a ■I�■p. Il„„rii■ii I!i 'J! _ o�-0 r1 iir ��� 1 1' 1111111111111111111111111.11111111111/111 �, I �� W _1■■1[111111111 ij1111/■■NIIL.1 � I v 0!IIIIIMIIIIIHIIIIIUIIJIIIIIUIIV/ !� 1 misLola► i- t u - t ° ° t n n • it n t if 1 _- - l _ n l II__ n __. �l.— ___ CO _.._. CONSTRUCTION LEGEND CONSTRUCTION r 0 CEILING PLAN - DEMO CEILING DEMO KEYED NOTES - DEMO CEILING PLAN - NEW CEILING NEW CO A-3 SCALE 1/8' = 1' - 0” Sz O A 3 SCALE 1/8" = 1' - 0" z CC r® IIS- 2 X 4 FLUOR.FIXTURE DEMO 1 REMOVE EXISTING LIGHT SOFFIT,ASSOCIATED FRAMING AND CC 2 X 2 LED.FIXTURE ,— H k-_ �J PARABOLIC LENS LIGHT FIXTURES. ® LITHONIA 2BLT,CURVED LENS I W h JIf 1I 2 X 4 FLUOR.FIXTURE DEMO - - • (EXISTING)RECESSED LED LIGHT - ,a„..1.- U lI_I( PARABOLIC LENS/STEADY BURN BALLAST V (1) • RETROFIT(E)FIXTURES WITH LED KITS Cl) W N 3 1 (E)2 X 4 FLUOR.WAREHOUSE FIXTURE /� A V 1 W Q GENE RAL NOTES - N E N V , I REST ROOM-WALL MOUNTED LIGHT FIXTURE-PEERLESS ! Q GENERAL NOTES - DEMO ) I TO REMAIN,RELAMP. r I WiiI (E)2 X 4 FLUOR.WAREHOUSE FIXTURE n (N)SUPPLY DIFFUSER 1 - - D z O A. IT SHALL BE THE CONTRACTORS AND/OR THE SUBCONTRACTORS I� '""I WI STEADY BURN BALLAST TO REMAIN. A. IT SHALL BE THE CONTRACTOR'S AND/OR THE SUBCONTRACTORS - CO C\I RESPONSIBILITY TO VERIFY ALL DIMENSIONS,DETAILS,AND JOB SITE - RESPONSIBILITY TO VERIFY ALL DIMENSIONS,DETAILS,AND JOB SITE ,I (N)RETURN DUCT f CONDITIONS PRIOR TO PROCEEDING WITH THE WORK,AND REPORT ANY (E)RECESSED CAN LIGHT TO BE CONDITIONS PRIOR TO PROCEEDING WITH THE WORK,AND REPORT ANY a! C 1/V r- " z DISCREPANCIES TO THE ARCHITECT BEFORE STARTING CONSTRUCTION. . RETROFITTED WITH LED KIT, DISCREPANCIES TO THE ARCHITECT BEFORE STARTING CONSTRUCTION. TO THERMOSTAT 0 M W > cic B. REFER TO SHEET Al- FOR GENERAL PROJECT SPECIFICATIONS. r B. REFER TO SHEET Al- FOR GENERAL PROJECT SPECIFICATIONS.. W W SUPPLY DIFFUSER-DEMO _ ® EXHAUST FAN C.) H CO H- C. REFER TO SHEET 42 FOR NEW FLOOR PLAN INFORMATION. C. NEW 2x2 LED LIGHTS IN LOCATIONS INDICATED ON PLAN.KEEP EXISTING Q,' nU r SWITCHING LOCATIONS: _ i i < co O RETURN GRILL-DEMO - 2X2 Ca D. REMOVE ALL FIRE HORNS AND STROBES. L RJ r - TILE SPRINKLER HEAD D. ADJUST FIRE SPRINKLERS AS NECESSARY TO ACCOMMODATE THE NEW LIGHT - - E. REMOVE ALL TROFFER LIGHTS. FIXTURE LAYOUT. IN Al - REVISION F. REMOVE ALL(E)SAT TILES. REPLACE 2'GRID SEGMENTS IN AREAS WHERE 2'X LSA SUPPLY DIFFUSER-(E)TO REMAIN E ADJUST HVAC SUPPLY AND RETURN DIFFUSER LOCATIONS PER PLAN. B EXIT SIGN(LED RED) 4'EXISTING LIGHT FIXTURES HAVE BEEN REMOVED. - - - rRETURN GRILL-(E)TO REMAIN F. TUNE UP EXISTING GRID.PAINT WHITE. CEILING OCCUPANCY SENSOR 1 . L RJ • G. CLEAN AND REFURBISH EXISTING HVAC SUPPLY AND RETURN GRILLS. W) JUNCTION BOX ABOVE CEILING FOR SYSTEMS FURNITURE 2• H. NEW CEILING TILES THROUGHOUT. 3. ;re RECESSED,CEILING MOUNTED EMERGENCY EXIT LIGHT 4. GYP BD CEILING 5. 6. '? 4. INDICATES COMMON PATH OF TRAVEL REQUIREING 7 EMERGENCY LIGHTING EQUAL TO 1-FOOT CANDLE FOR A MINIMUM DURATION OF 90 MINUTES. 2 X 2 SUSPENDED CEILING SYSTEM: ATTACHED EDGE SEISMIC EXPANSION JOINTS DRAWN BY: //7/1///4' M.W.N. UNATTACHED EDGE / GRID MAIN DATE: 12/26/17 PERMIT/CONST