Loading...
Permit (246) CITY OF TIGARD MASTER PERMIT III ■ COMMUNITY DEVELOPMENT Permit#: MST2018-00197 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/09/2018 T I r lt.r: 9 Parcel: 2S104BD05000 Jurisdiction: Tigard Site address: 13763 SW ROSY CT Subdivision: ROSE MEADOWS Lot: 9 Project: DAYAL Project Description: Foundation repair. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $6,000.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Other Fixtures: 0 Drywell-Trench Drain: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add!500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Other: N Other Description: Ecompasing: N BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: ALT SF VB R-3 0 Owner: Contractor: DAYAL,NIMESH R&JAISHREE G BOWTIE LLC Required Items and Reports(Conditions) 13763 SW ROSY CT 11575 SW PACIFIC HWY STE 139 TIGARD,OR 97223 TIGARD,OR 97223 PHONE: PHONE: 503-201-1107 FAX: Total Fees: $292.98 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in *AR 952-001-0010 through OAR 952-001-0090. You m obtain a co• of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. / i Issued By: L# Permittee Signa ure. Call 503.639.4175 by 7:00 a.m.for the next available inspec"• •. -. -arrill � This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial k.-, . , City of Tigard Received _ Date/By: 2 t d 3/j-YennYttC71 w/7.7 14 11 13125 SW Hall Blvd.,Tigard,OR 913? Plan Review --, A, ,a For III Phone: 503-718-2439 Fax: 503-5W-4460, ' Date/By: //-1 ettr Related Permit: Inspection Line: 503-639-4175 Date Ready/By: Anis I 0 See Page 2 for TIGARD Internet: www.tigard-or.gov a'‘`..71 .,'*. -: 7 Notified/Method: aietIi r it'W I Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the work indicated on this application. CATEGORY OF CONSTRUCTION Al e_et 4,7 Z--`1-and 2-family dwelling 0 Commercial/industrial Valuation: $ 0 0 Accessory building 0 Multi-family Number of bedrooms: Number --- -- 0 Master builder 0 Other: of bathrooms: — JOB SITE INFORMATION AND LOCATION Total number of floors: ----'— Job site address: /3.-7 ., - -,, i , -) ,Piti 44,..;i c- I New dwelling area: ----- square feet City/State/ZIP: C7Z.--y) 1,,--‘ ,,K___ "'"- ?2 2_,3 Garage/carport area: ------ square feet Suite/bldg./apt.#: Project name: . eit-2, Covered porch area: ,------ square feet Cross street/directions to job site: Deck area: --- square feet Other structure area: ------- square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ Existing building area: square feet New building area: square feet 0 PROPERTY OWNER 0 TENANT Number of stories: Name: f\if I/a t5 t-i 1--)74-1,4 t--- Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Phone:( ) Fax:( ) New: APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: `34--xii--74.5- /.....1___C, Structural plan review fee(or deposit): Contact name: FLS plan review fee(if applicable): Address: Total fees due upon application: City/State/ZIP: Amount received: Phone:( ) Fax::( ) E-mail: iLler-i-1 -c-i-i—c- , 63 0/. '"' PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: )Li.)' 1 I &------- Z.—/-- Submit two(2)sets of roof plan with connection details 1 and fire department access,along with the 2010 Oregon Address: // 5--- -7 <-7,, `5J <h--i, f6-.-‘ frkiL-/ kjs7 Solar Installation Specialty Code checklist. Permit fee(includes plan review City/State/ZIP: .776„..-79-a.A) 424_ (-7-'- .22, 3 / $180.00 and administrative fees): Phone:95)67, 2 V3 q Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.: 7 c) Z ' 3 Total fee due upon application: $201.60 Authorized signature: z.,------- -- ,.-e This permit application expires if a permit is not obtained i within 180 days after it has been accepted as complete. Print name: A. ,/'—'-'- - -C.- -ZDate:7 `—` t . Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. ADDITIONAL INFORMATION AS FOLLOWS: A. Fire Department Building Survey with (1) additional full set of architecture drawings. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal #of Plans (Includes new,additions and alterations) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 114 Transmittal Letter I i c,A R n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Mir j' DATE �VED: DEPT: BUILDING DIVISION iltE V Lt2( JUL 9 2018 2;141 FROM : CITY OF OGARD 311ILDING Dit.$IS;(Jigs COMPANY: r-60..0(-0, �� /___L_C--- PHONE: 4?)3 . c/ , 2 S 3 By / 1 RE: ) 37& 3 ,L,,,/ /iS cyCir ,07i7-?v i -110 /12 (Site Address) (Permit Number) 77 /7 - e2Y2,3 (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. ..9 Engineer's calculations. Other(explain): REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑No Fee Description: Amount Due: $ $ $ $ Special Instructions: Reprint Permit(per PE): ❑Yes ❑No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions_061316.doc City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 13763 SW ROSY CT, TIGARD, OR, 97223 July 16, 2018 at 11 :25:23 AM Record Type: Record ID: Residential - Master Permit MST2018-00197 Inspection Type: Inspector: 299 Final inspection David Young Result: PASS - NoCofO Comments: Foundation repair complete per approved plans. Violation Summary: Inspector Contractor