Loading...
Report (34) wow(• • FIRE SAFETY SYSTEMS AQUASAFETM FLOW TEST VERIFICATION AquaSAFE' Flow Test Verification Form Alliance Important:Installing contractor must submit this Member ID: 1 _ completed form.Failure to do so nullifies the Company Name: _ 116 1,P� U I system warranty.E-mail or fax completed form n n.� to the Uponor Fire Safety Design Department Contact: at technicalservices@uponor.com or 952.997.1731. Phone cO) L/c 3996 For questions,contact Uponor Technical Services at 888.594.7726 or technical.services@uponor.com. Fax: G� _ - Color of test orifice used: &Itre Job Name: PIY«- leIrgp-p Static pressure(not flowing)reading at incoming Project Number: I� water supply into home or at main shutoff: _ 9. Job Address: i,;Lf3 5t) ( bid C� Residual pressure(flowing)reading at incoming water City: supply into home or at main shutoff: LC) State,ZIP: Cl? C3.A What time of day was the flow test taken? 9:c/o For designs not provided by Uponor, complete the following information. Flow test method used? itff3ucket J Flow Meter Designer's Name: _I t PAICkFlow test gpm: (8 _ Company9c- �J� How many gallons q{water did the design predict �— as required? ) Phone. Did the test meet or exceed design flow? Yes 3 No Fax: 9 -- —— Which sprinkler did you flow?Number: Is the warning sign permanently attached close to the main shutoff valve? ]Yes No Location of head: 1.41.441+44 Was this system required by code?ji Yes 3 No Date left in service with all valves open: 10, Test Witnessed and Verified by: Name Sig atur- Occupation Dat Fr o - Additional Explanations and Notes LL Uponor,Inc. Tel:800321.4739 5925 148th Street West Fax:952.997.1731 Apple Valley,MN 55124 USA Web:www.uponor-usa.com