Loading...
Plans (9) OFFICE COPY ,---„, CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE , .A.pproved: j OTC: I I BR1GHTWATERS Permit#: C Address: lao 4- 3 \,,, 1 c, 8 1 AT REDHAWK ,-- Suite#:: By -J \ Date: -4......,- 13:-..15 ***D * tM*D tit CHMt * t t affilDt * MID * **4MEiit ID it ME6t )51 1 * 88/84 97/101 1811X 19/133 52/148 161/1 5D(11 98/102 2{hil 1V/13 130/134 cp 151/147 1'DI :. W2/166 87/83 1"c 56 ' _erh. i 1/4"85- 126/122 131/135 0 150/146 163/167 ..„6. 8682 ,i i,w UZI A t 100/104 13/121 132/136 149/145 0.1, 164/168 lir 80/76 a MI I I Nt. /173 LI ri 170/174 Tilia 14,._e_limil at ' n in/175 4Nth Jill. I j ,.. jai * IMF* INF ' i it: 72,. * ii MB u 106-105 119115 14 11 149139 138 137 1177781/118281 112 111 110109 1291 ° 18 11 144143 142 141 71/67 • ri .03n4 4...„,..„ 4.- * 4.., Li 180/184 70/6657/61 12/1811 69/65 I 58/62 191/187 I -0 MEND sum II tU 56/52 59/63 alit—it-itOtir 0 ce 55/51 E 60/64 *,* ie *dr 189/185 i-ILDit E it 54/59 41/45 * C3200/19611 it RI 53/49 42146 * 199/195 I f_ it43/I9 CMs 0 * GM 198/191 I.M 40/36 I r 44/48 E3 197/ lig 0 39/35 • WHOM C_Ii...i 2E8/204'1 38/34 rh 2:/: it ..Nrit* 12113 I til 37/33 it, CMED Miffs 206/202 27/31 * 24/7A U 28/32 *AL !Olt r_ 00 2C6/201 it ID , • 22/18 ' '186 1* C) 21/17 otimk * IIIII 7J 1:=1 0 4_____!".'_104_,.r I r., ..„, 4- . )1:13D e5ei IP .e,!.h! it g 51 r PZ, PI -2E; 14/ 0 ill crv:31 is ii;iiq 1 4 " i ill it j" it am HIL51- * SW 108th Avenue BLDG. 16194 16100-16194 SW 108th AVENUE PROPOSAL AND CONTRACT CONSTRUCTION DIVISION PO Box 17196 LICENSED BONDED INSURED PORTLAND OR.97217 OR CCB # 102676/WACCB #JRJOHI*050DB" PHONE(503)240-3388/FAX(503)240-3424 WWW.JRJOHNSONINC.COM J.R. JOHNSON, INC_ PREPARED FOR: JPM SCOPE: TARGETED SIDING REPAIRS ATTN: DOUG PRINGLE PROPERTY: BRIGHTWATERS AT REDHAWK PREPARED BY: DEL STARR PROPOSAL DATE: 02/02/18 J.R.JOHNSON INC. PROPOSES TO PROVIDE ALL LABOR AND MATERIALS TO COMPLETE THE WORK DESCRIBED BELOW. SCOPE OF WORK: TARGETED SIDING REPAIRS-THE FOLLOWING SCOPE OF WORK WILL BE COMPLETED AT SELECTED LOCATIONS PER ATTACHED -LOCATION/QUANTITY BREAKOUT" DATED 01/29/2018. THE LOCATIONS AND AMOUNT OF SIDING TO BE REPLACED IS BASED ON AN ON-SITE VISUAL INSPECTION OF THE ENTIRE PROPERTY CONDUCTED FROM THE GROUND LEVEL WITH THE OWNER AND MAY NOT BE ADEQUATE TO REPLACE EVERY FAILING PIECE OF SIDING ON THE PROPERTY_ THE LINE ITEM FOR ADDING ADDITIONAL SIDING IS BASED ON LOCATIONS REQUESTED BY OWNER VIA EMAIL ON 01/15/2018 AND SPECIFIED IN THE"ADDITIONAL LOCATIONS/QUANTITY BREAKOUT" DATED 01/29/2018- • REMOVE AND REPLACE LP LAP SIDING AT SELECTED LOCATIONS. • NEW SIDING QUOTED AS"PREVAIL"FIBER CEMENT SIDING. • WINDOWS IN AFFECTED AREAS TO BE FLASHED IN PLACE TUCKING FLAT STOCK METAL BEHIND THE SILL FLANGE OF THE WINDOW, APPLYING (1) LAYER OF 25MIL SELF- ADHERED MEMBRANE FLASHING (SAMF) ON THE JAMB/HEAD FLANGES OF THE WINDOW, AND THEN INSTALLING A PIECE OF PROPERLY SLOPED AND END-DAMMED 26GA. METAL FLASHING ON TOP OF THE WINDOW. ALL METAL AND SAMF PRODUCTS TO BE PROPERLY INTEGRATED INTO THE EXISTING/NEW WEATHER RESISTIVE BARRIER (WRB). TO BE CONSISTENT WITH THE EXISTING ARCHITECTURAL DESIGN OF THE PROPERTY, SIDING WILL BE BUTTED UP TO THE WINDOWS AND A FILLET STYLE SEALANT JOINT WILL BE INSTALLED. THIS TYPE OF SEALANT TREATMENT IS NOT INDUSTRY STANDARD AND IS PRONE TO FAILURE. WINDOWS NOT FULLY EXPOSED BECAUSE EXISTING SIDING IS SCHEDULED TO REMAIN IN PLACE MAY NOT BE FULLY TREATED. • AT AREAS WHERE WALLS ARE FULLY EXPOSED DURING SIDING REMOVAL, THE EXISTING WRB WILL BE REPLACED WITH NEW TYVEK DRAINWRAP WRB. AT LOCATIONS WHERE NOT ALL OF THE SIDING IS BEING REPLACED, NEW WRB WILL BE PROPERLY INTEGRATED WITH THE EXISTING_ WE ARE ASSUMING THE EXISTING WRB IS IN ADEQUATE CONDITION FOR THIS MEANS OF INTEGRATION. • AT LOCATIONS WHERE SIDING IS BEING REPLACED ON BOTH SIDES OF AN OUTSIDE CORNER,THE EXISTING WOOD TRIM WILL BE REPLACED WITH FIBER CEMENT TRIM. AT LOCATIONS WHERE SIDING IS ONLY BE INSTALLED ON (1) SIDE OF AN OUTSIDE CORNER OR NOT ALL OF THE SIDING IS BEING REPLACED,THE EXISTING TRIM WILL BE RESET IN A LIKE FOR LIKE MANNER. IF THE EXISTING WOOD TRIM IS NOT SALVAGEABLE, THEN NEW CEDAR TRIM WILL BE INSTALLED IN ITS PLACE_ NO SEALANT WILL BE INSTALLED WHERE CORNER TRIMS ARE INSTALLED ON TOP OF THE SIDING. • AT LOCATIONS WHERE RADIUSED WOOD GABLE VENTS ARE FULLY EXPOSED DURING SIDING REMOVAL, EXISTING WOOD VENTS WILL BE REPLACED WITH NEW VINYL GABLE VENTS SIMILAR TO MATCH THOSE INSTALLED DURING RECENT REPAIRS. EXISTING SQUARE GABLE VENTS WITH FLANGES WILL BE FLASHED IN PLACE IN A SIMILAR FASHION AS THE WINDOWS. • AT LOCATIONS WHERE ELECTRIC METERS ARE FULLY EXPOSED DURING SIDING REMOVAL, METERS WILL BE PROPERLY TREATED IN PLACE WITH SAMF AND METAL FLASHINGS, INCLUDING PROPERLY DIMENSIONED, SLOPED, AND END-DAMMED METAL HOODS TO FULLY CAP THE METER. • AT LOCATIONS WHERE EXHAUST HOODS ARE FULLY EXPOSED DURING SIDING REMOVAL, PENETRATIONS WILL BE TREATED WITH QUICKFLASH PANELS, SAME, FIBER CEMENT BLOCKS, BLOCK HEAD FLASHING, AND NEW HOODS CONNECTED TO THE EXISTING DUCTING. AT LOCATIONS WHERE THERE ARE NON-HOODED EXHAUST PENETRATIONS (LE. AT SCREENED LOCATIONS), THE SAME TREATMENT MAY BE COMPLETED IF THERE IS DUCTING BEHIND THE SCREENS. IF NOT,THE PENETRATION MAY BE TREATED TO MATCH THE EXISTING CONDITION. M:\BIDS AND PICTURES\JPM\BRIGHTWATER AT REDHAWK\2017\BRIGHTWATERS 2017GLOBALSIDINGREPAIRS 063017\BRIGHTWATER TARGETEDSIDING REV020218 DOC PROPOSAL AND CONTRACT J_R_ JOHNSON, INC. • AT LOCATIONS WHERE LIGHTS, RECEPTACLES,AND/OR J-BOXES ARE FULLY EXPOSED DURING SIDING REMOVAL, PENETRATIONS WILL BE TREATED WITH QUICKFLASH PANELS,SAME, FIBER CEMENT BLOCKS,AND BLOCK HEAD FLASHING. • AT LOCATIONS WHERE GUTTERS TERMINATE AT BUILDING WALLS FULLY EXPOSED DURING SIDING REMOVAL,"NEW METAL DIVERTER FLASHINGS WILL BE INSTALLED TO DIRECT WATER INTO THE GUTTER. GUTTERS HAVING LESS THAN 1" CLEARANCE FROM THE SIDE WALL WILL BE CUT BACK OR REMOVED AND RESET TO ACHIEVE THE PROPER CLEARANCE. • AT MIDDLE RAKE WALL LOCATIONS WHERE SIDING IS REMOVED DOWN BELOW THE HEIGHT OF THE SPAN WALL CAP, NEW SOLDERED FLASHING SADDLES WILL BE INSTALLED. • AT SPAN WALL LOCATIONS WHERE SIDING IS SCHEDULED TO BE REPLACED, THE TOP OF THE WALL WILL BE TREATED WITH NEW HITEMP SAME, SLOPED TO DRAIN, AND CAPPED WITH NEW 26GA. METAL. V%EPA ,YTIFIED NAT-31325-1 . . ---_ • , ,• ''‘ ,,I.4 . •. •• • .iZ A," ' . . 'N., ..,.., • • KA > ' ,* • 1 t I , ,:• . ,-", I , , .,, , _ , A. .., ,. r - _ , ,,, ,''s• ...::"...,-; - - — I 1 il..,N, .. ,.-• -,1! .......i."---,,•-, /—....:--,......•-..1--1------ ' ..-k.,,,- :!----1--"'-',.. ' ..." ..}.......4. • „.• L.....* , 4 ••"'” * .""‘777., '... --- •.:_ $ — -' ----1 -T -- ‘ _ ... .., .. ,.....4,1 .7.-.. 7.2i ..-_-_---,4 E-3. _.; ii,--- ,..--- ..4. --41-jj:„. r----• i I '1?--gt".4 ---. ••••• - •---- * ' . •.....,..t. ri .......----- - , t. .. .. :.-..-.-...-.:.z....-..... -......:.....4 al , r_ 0.14 — - _ • ,......,:i , )- 0-. im 1, ,,i,„2 a ,..-. ...-' ••,, iv-4 - r- 4 0.0"1•fog* „....\ ,- - BIS ••--t • .... t . -' . ,t.it-- , .,....-• -r....-.. ni r 1- piiiiii --: ; •,...-1- --i tiE n H--,_ i- - silo-Ms r.:- v8 7-A USW Eh f — i ........... r- , es. la w.,wee0 P.... II ""...-=...... . ' ... 11,11 'Li '41 1101.: — - J N , -4- -----j . r — , 1 dkv..A p---4, WI _ • ..,---------. • ... •-• ....4 , — . _...- :0'1 ......... ...... _ _ — r ____ Mott fitoe4boski • ‘a * \\ -,No ‘ .1.61 J..... ld ,...0 s ,.. ‘ t•A *clk--,- Svor.1 w \\ -,:,- -,,,a#0, ., E.,...*sr, 'I'Ovre ser..,.... k,..)4,.. t‘ ...... .--"- * at 4 4 .k ,---------......----4 _ ... / •1 • , , " ,,......'-'1„,,, ' ) 4 1 , i 444+44 40 ile in 1111.11.111 ',. , li , I...7. sivr as ; 1.11110_,111 , 3 Old 11,1110 , 4 1,. 11.111151111, ' : 4 Pet*.. ,.. ' f, * UM IS ', till ...7....."72.....4,' 614:111 PI I* 1 \ t' $ 8 .145,44 144 444444.. r ,rt,f,.1.,irv---ir r44 t 1114 44,111 4 , ; r, , , , , ' . ''' I 1 ' , i. '", • ': i , k4111111 , , • t « 1 ' , ... 1 , 4 "*.‘. ' *T T-.'*** 1'T 1 •O''' I.... 10 <1. . , f -.4; 1 4 , , eictlg .7.'3 at 4 , • --1- / ' - - .."" '1, i 111441111 ‘ disdag .41 uses ........; , tlisprzs 1 i 1 rut ,, *---- ' lie A , i .8 4r . —1 ..) j i71,%.: D ,,, . \ i !1 i „trots-11A ..... 4,......... , iissen III i =IONS New ! l III"a si . ... .. , .. . r A i i 1... 1.1 i 1 di, 41.-404, U ...-1 ....1 • ../ .1 , 1111 ,...00. --i i 5 ...,0 . i • ---_• 1 . . , — 6) 1 :::: a•i•• . . , ‘,149 ielf t 4 *or t. t . 0 ("J .... I l ' ........- 4 t i t . = i• ll ' 1 ) "t IP , . k " i i i ittf."7,...11 I i ' Who f 0 ! , 1111•111 _. Ili ‘,1.1'1 4.....-.....ual S' 4 ', , ., owe ; ? t *4 ilms,..----;:i, ii. . 4, .....,:, , .It f IP' 1. ' i - '--- 8. i - ._ ...- 44. - A - - • I „ . • , .. .------4-4- . ;: .... 4'o4 it.e.410.;.44 41.4 L * irf Titi,T1-7-T*411! IT, 11 , ; , 4,8 , el I, „ t 1‘34.-1i ...i.ii. tii .4 4.4 t riTT I lin iiiii In ' i 1 ;41 4 4.1 a 6. CX 0- .-44 t i • 4.1.11.4 : 1 1 ' , ' a ; '•5 4 -4 4 oi• l' ' ", Se.es • 1 .47i. is ;. I 4, ( t . dift No IR I ) i • ' i 4: ' •a. im„ . . - t; T. , •a am g7.-z-.... , , . . , •' - ... e. 1 0.4 '• iit A .,‘ 0. "4"... ''''''''''''' . A. -* * ... ,,, .... , K.Si. -... ..- .. 4 '.1 Brghtwaters at Redhawk Page 1 Quantity/Location breakout Targeted siding replacement 01/29/2018 Description Takeoff Quantity Notes Bldg. 16106 1/5 front window wall 180.00 sqft 1/5 entry wing wall 42.00 sqft 5 front gable window wall ' 98.00 sqft 5 entry rake wall 161.00 sqft 1 Lower 10'x4'section already fiber cement 2/6 front window wall 180.00 sqft 2/6 front middle wing wall 24.00 sqft 7 front gable window wall 98.00 sqft 7 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 7 front window wall 90.00 sqft I Lower 1/2 of wall already fiber cement 4/8 front window wall 180.00 sqft 8 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 5/6 three quarter chimney 168.00 sqft Front face already fiber cement 7/8 three quarter chimney 168.00 sqft Front face already fiber cement Bldg. 16108 9/13 front window wall 163.00 sqft Lower 3 courses already fiber cement 10/14 front window wall 163.00 sqft Lower 3 courses already fiber cement 14 entry rake wall 161.00 sqft !Lower 10'x4'section already fiber cement 14 middle rake wall 600.00 sqft Lower sections at front&rear already fiber cement 14/15 middle rake span wall 60.00 sqft 14 rear gable window wall 98.00 sqft 15 middle rake wall 600.00 sqft I Lower sections at front&rear already fiber cement 15 rear gable window wall 98.00 sqft 11/15 entry wing wall 42.00 sqft 11/15 front middle wing wall 24.00 sqft 16 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 12/16 entry wing wall 42.00 sqft 16 rear gable window wall 98.00 sqft 12/16 east end wall 704.00 sqft 1 Top 17'of wall;lower section of wall already fiber cement 15/16 full chimney 224.00 sqft 13 rear gable window wall 98.00 sqft 13/14 full chimney 224.00 sqft Bldg. 16112 17/21 west end wall 320.00 sqft Very top section only(40'x8');most of wall already fiber cement 17/21 entry wing wall 42.00 sqft 1 Description TakeoffQuantity; Notes 21 entry rake wall 161.00 sqft ;Lower 10'x4'section already fiber cement 18/22 entry wing wall 42.00 sqft 18122 front middle wing wall 48.00 sqft I Both sides of wall to get new siding 22 middle rake wall 808.00 sqft I Lower sections at front&rear already fiber cement 22/23 middle rake span wall 60.00 sqft 23 front gable window wall 98.00 sqft 23 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 23 rear gable window wall 98.00 sqft 20/24 east end wall 600.00 sqft 'From where wall necks down up to roof;lower section already fiber cement 24 rear gable window wall 98.00 sqft 23/24 full chiimney 224.00 sqft 23/24 storage closet wall 101.00 sqft 19 rear middle wing wall 48.00 sqft 18 rear middle wing wall 48.00 sqft 22 rear gable window wall 35.00 sqft From bottom of gable vent to roof only;lower section already fiber cement 21/22 full chimney 224.00 sqft , 17/18 storage closet wall 101.00 sqft 21 rear gable window wall 98.00 sqft Bldg. 16114 29 entry rake wall 161.00 sqft 1 Lower 10'x4'section already fiber cement 26 front middle wing wall 24.00 sqft 31 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 31 front gable window wall 98.00 sqft 32 entry rake wall 161.00 sqft 1 Lower 10'x4'section already fiber cement 32 front gable window wall 98.00 sqft 28 entry wing wall 42.00 sqft 31/32 three quarter chimney 168.00 sqft Front face already fiber cement 29/30 three quarter chimney 168.00 sqft Front face already fiber cement 29/30 storage closet wall 77.00 sqft 7 courses already fiber cement Bldg. 16116 33/37 west end wall 1,172.00 sqft i Lower section of wall(from meter head down to grade)already fiber cement 34 front window wall 90.00 sqft (Lower 12 courses only;top half already fiber cement 34 front middle wing wall 24.00 sqft 38 middle rake wall 600.00 sqft !Lower sections at front&rear already fiber cement 38/39 middle rake span wall 60.00 sqft 38 rear gable window wall 98.00 sqft 35/39 entry wing wall 35.00 sqft 7 courses already fiber cement 39 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 39 rear gable window wall 98.00 sqft 36/40 east end wall 1,172.00 sqft Lower section of wall(from meter head down to grade)already fiber cement Desgription Takeoff Quaff+ Sates 40 rear gable window wall 98.00 sqft 39/40 full chimney 224.00 sqft 37/38 full chimney 224.00 sqft 37 rear gable window wall 98.00 sqft 35 rear middle wing wall 48.00 sqft 34 rear middle wing wall 48.00 sqft Bldg. 16120 41/45 east end wall 1,068.00 sqft Includes 9'section at bottom of wall and 15'section at top of wall;center section of wall already fiber cement 41/45 front window wall 180.00 sqft 41/45 entry wing wall 42.00 sqft 45 front gable window wall 98.00 sqft 45 entry rake wall 105.00 sqft I Rake portion above upper roof only: lower sections already fiber cement 42/46 front window wall 180.00 sqft 42/46 entry wing wall 42.00 sqft 46 front gable window wall 98.00 sqft 46 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 42 front middle wing wall 18.00 sqft ,5 courses already fiber cement 43/47 front window wall 180.00 sqft 43/47 front middle wing wall 24.00 sqft 43/47 entry wing wall 42.00 sqft 47 front gable window wall 98.00 sqft 47 entry rake wall 161.00 sqft 1 Lower 10'x4'section already fiber cement 48 entry rake wall 161.00 sqft j Lower 10'x4'section already fiber cement 44/48 west end wall 1,120.00 sqft !Lower 9'of wall already fiber cement 47/48 three quarter chimney 168.00 sqft i Front face already fiber cement 45/46 three quarter chimney - 168.00 sqft I Front face already fiber cement Bldg. 16124 54 front gable window wall 35.00 sqft i From bottom of gable vent to roof only; lower section already fiber cement 50 front middle wing wall 24.00 sqft 56 front gable window wall 98.00 sqft 56 rear gable window wall 98.00 sqft 52/56 east end wall 1,172.00 sqft I Lower section of wall(from meter head down to grade)already fiber cement 55/56 full chimney 224.00 sqft 55 rear gable window wall 1 98.00 sqft 51 rear middle wing wall 48.00 sqft 50 rear middle wing wall 48.00 sqft 54 rear gable window wall 98.00 sqft 53 rear gable window wall 98.00 sqft 53/54 full chimney 224.00 sqft Bldg. 16128 Desctiption TakeoffQuantfty 57/61 east end wall 320.00 sqft Top 8'of wall only;rest of wall already fiber cement 61 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 61 front gable window wall 98.00 sqft 62 entry rake wall 161.00 sqft 1 Lower 10'x4'section already fiber cement 62 front gable window wall 98.00 sqft 63 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 63 front gable window wall 98.00 sqft 64 entry rake wall 161.00 sqft !Lower 10'x4'section already fiber cement 64 front gable window wall 98.00 sqft 60/64 west end wall 1,588.00 sqft 63/64 three quarter chimney 168.00 sqft iFront face already fiber cement 61/62 three quarter chimney 168.00 sqft j Front face already fiber cement Bldg. 16132 66/70 front window wall 163.00 sqft Lower 3 courses already fiber cement 66/70 entry wing wall 42.00 sqft 66170 front middle wing wall 24.00 sqft 70 middle rake wall 600.00 sqft Lower sections at front&rear already fiber cement 71 middle rake wall 600.00 sqft Lower sections at front&rear already fiber cement 70/71 middle rake span wall 60.00 sqft 70 rear middle wing wall 48.00 sqft 71 rear middle wing wall 48.00 sqft 71 rear gable window wall 98.00 sqft 67/71 entry wing wall 42.00 sqft 67/71 front middle wing wall 24.00 sqft 68/72 east end wall 1,172.00 sqft Lower section of wall(from meter head down to grade)already fiber cement 72 rear gable window wall 98.00 sqft 71/72 full chimney 224.00 sqft 71/72 storage closet wall 101.00 sqft 70 rear gable window wall 98.00 sqft 69 rear gable window wall 98.00 sqft 69/70 full chimney 224.00 sqft 69/70 storage closet wall 1 101.00 sqft Bldg. 16136 73/77 front window wall 163.00 sqft Lower 3 courses already fiber cement 73/77 entry wing wall 42.00 sqft 77 front gable window wall 98.00 sqft 74/78 front window wall 163.00 sqft Lower 3 courses already fiber cement 74/78 entry wing wall 42.00 sqft 74/78 front middle wing wall 24.00 sqft 79 front window wall 108.00 sqft 1 From top of lower window to roof only L sc 1ptiO `a Qu t ' 75179 entry wing wall 42.00 sqft 80 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 79/80 entry rake span wall 48.00 sqft 80 rear gable window wall 98.00 sqft 76/80 east end wall 1,588.00 sqft 79/80 full chimney 224.00 sqft 79 middle rake wall 808.00 sqft ,Lower sections at front&rear already fiber cement 78 middle rake wall I 808.00 sqft Lower sections at front&rear already fiber cement 78/79 middle rake span wall 60.00 sqft 78 rear gable window wall 98.00 sqft 77 rear gable window wall 98.00 sqft 77/78 full chimney 224.00 sqft 77/78 storage closet wall 101.00 sqft Bldg. 16138 81/85 entry wing wall 42.00 sqft 86 front window wall 108.00 sqft I From top of lower window to roof only 87 front window wall 108.00 sqft From top of lower window to roof only 87 rear gable window wall 98.00 sqft 84/88 front window wall 163.00 sqft Lower 3 courses already fiber cement 84/88 storage closet wall 101.00 sqft 84/88 east end wall 1,408.00 sqft I Bottom 6 courses already fiber cement 87/88 full chimney 224.00 sqft 88 rear gable window wall 98.00 sqft 86 middle rake wall 808.00 sqft Lower sections at front&rear already fiber cement 86 middle rake span wall 60.00 sqft 83 rear middle wing wall 40.00 sqft 86 rear gable window wall 98.00 sqft 81/85 storage closet wall 101.00 sqft Bldg. 16140 93 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 93 rear gable window wall 98.00 sqft • 90/94 front window wall 163.00 sqft I Lower 3 courses already fiber cement 90/94 entry wing wall 35.00 sqft 5 courses already fiber cement 94 front gable window wall 98.00 sqft 94 rear gable window wall 98.00 sqft 91/95 front window wall 163.00 sqft [Lower 3 courses already fiber cement 95 front gable window wall 98.00 sqft 95 middle rake wall I 600.00 sqft !Lower sections at front&rear already fiber cement 96 front gable window wall i 98.00 sqft 96 front window wall 108.00 sqft From top of lower window to roof only Description Takeoff Quante 'Notes 92/96 south end wall 756.00 sqft I Upper portion of wall only;lower portion already fiber cement 93/94 full chimney 224.00 sqft Bldg. 16142 97/101 east end wall 1,328.00 sqft [Lower 5'already fiber cement 102 middle rake wall 696.00 sqft I Lower sections of siding at both front and rear already fiber cement. 103 entry rake wall 201.00 sqft 103 rear gable window wall 98.00 sqft 100/104 west end wall 1,588.00 sqft 104 rear gable window wall 98.00 sqft 103/104 full chimney 224.00 sqft 103/104 storage closet wall 58.00 sqft ;10 courses at top and 6 courses in middle of wall only; remainder of wall already fiber cement 99 rear middle wing wall 40.00 sqft 101/102 full chimney 224.00 sqft Bldg. 16146 j 105/109 south end wall 1,016.00 sqft Lower 11'of wall already fiber cement 109 entry rake wall 201.00 sqft 109 front gable window wall '• 98.00 sqft 110 entry rake wall 201.00 sqft 110 front gable window wall 98.00 sqft 111 entry rake wall 201.00 sqft 111 front gable window wall 98.00 sqft 112 entry rake wall 201.00 sqft 112 front gable window wall 98.00 sqft 108/112 north end wall 1,468.00 sqft 1Bottom 4 courses already fiber cement 111/112 three quarter chimney 168.00 sqft I Front face already fiber cement 109/110 three quarter chimney 168.00 sqft ',Front face already fiber cement Bldg. 16150 117 entry rake wall 201.00 sqft 117 front gable window wall 98.00 sqft 118 entry rake wall 201.00 sqft 118 front gable window wall 98.00 sqft 118 middle rake wall 1,040.00 sqft 118 middle rake span wall 60.00 sqft 119 entry rake wall 201.00 sqft 119 middle rake wall 500.00 sqft lUpper section of wall from span wall up to eave already fiber cement 119 front gable window wall 98.00 sqft 120 entry rake wall 201.00 sqft 120 front gable window wall 98.00 sqft 116/120 north end wall 1,588.00 sqft 119/120 three quarter chimney 168.00 sqft Front face already fiber cement Des oiriptiOrt Titkedi Quantity. 119/120 storage closet wall 101.00 sqft 117/118 three quarter chimney 168.00 sqft 1 Front face already fiber cement 117/118 storage closet wall 60.00 sqft 1Bottom 11 courses already fiber cement Bldg. 16156 124/128 east end wall 1,224.00 sqft Lower section of wall(from meter head down to grade)already fiber cement 124/128 front window wall 163.00 sqft Lower 3 courses already fiber cement 128 front gable window wall 98.00 sqft 128 entry rake wall 161.00 sqft ;Lower 10'x4'section already fiber cement 127 front gable window wall 98.00 sqft 127 middle rake wall 600.00 sqft 1 Lower sections at front&rear already fiber cement 126 front window wall 90.00 sqft 1 Lower half already compete 126 front gable window wall 98.00 sqft 121/125 front window wall 180.00 sqft 121/125 west end wall 1,588.00 sqft 125/126 full chimney 224.00 sqft Bldg. 16158 132/136 west end wall 1,224.00 sqft 'Lower section of wall(from meter head down to grade)already fiber cement 129/133 east end wall 1,432.00 sqft Lower 3'already fiber cement 133 entry rake wall 161.00 sqft 1 Lower 10'x4'section already fiber cement 134 middle rake wall 600.00 sqft Lower sections at front&rear already fiber cement 135 entry rake wall 161.00 sqft 1 Lower 10'x4'section already fiber cement 135 middle rake wall 880.00 sqft 1 Front lower section to span wall already fiber cement. 134 rear gable window wall 98.00 sqft 136 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 135/136 full chimney 224.00 sqft 135/136 storage closet wall 87.00 sqft 14 crses already fiber cement 130 rear middle wing wall 40.00 sqft BIdg.16160 137/141 south end wall 704.00 sqft Bottom 17'of wall already fiber cement 141 entry rake wall 201.00 sqft 141 front gable window wall 98.00 sqft 142 entry rake wall 201.00 sqft 142 front gable window wall 98.00 sqft 142 middle rake wall 600.00 sqft Lower sections at front&rear already fiber cement 142/143 middle rake span wall 60.00 sqft 143 entry rake wall 201.00 sqft 143 front gable window wall 98.00 sqft 143 middle rake wall 1,040.00 sqft 144 entry rake wall 201.00 sqft 144 front gable window wall ! 98.00 sqft Description Takeoff Quantky Notes 140/144 north end wall 1,432.00 sqft Lower 3'already fiber cement 143/144 three quarter chimney 168.00 sqft 143/144 storage closet wall 84.00 sqft I Lower 5 courses already fiber cement 141/142 three quarter chimney 168.00 sqft 141/142 storage closet wall 101.00 sqft 139 rear middle wing wall 48.00 sqft Bldg. 16164 1451149 west end wall 1,276.00 sqft Lower section of wall(from meter head down to grade)already fiber cement 145/149 front window wall 163.00 sqft 1 Lower 3 courses already fiber cement 145/149 entry wing wall 42.00 sqft 1461150 front window wall 163.00 sqft Lower 3 courses already fiber cement 146/150 front middle wing wall 12.00 sqft 7 pcs already fiber cement 150 front gable window wall 98.00 sqft 150 middle rake wall 600.00 sqft j Lower sections at front&rear already fiber cement 151 front gable window wall 98.00 sqft 151 middle rake wall 600.00 sqft I Lower sections at front&rear already fiber cement 150/151 middle rake span wall 60.00 sqft 151 rear gable window wall 98.00 sqft 1471151 front window wall 163.00 sqft Lower 3 courses already fiber cement 148/152 front window wall 163.00 sqft Lower 3 courses already fiber cement 152 front gable window wall 98.00 sqft 152 entry rake wall 201.00 sqft 152 rear gable window wall 98.00 sqft 148/152 east end wall 967.00 sqft Lower section of wall(from several courses above meter head down to grade)already fiber cement 151/152 full chimney 224.00 sqft Bldg. 16166 153/157 front window wall 180.00 sqft 157 front gable window wall 98.00 sqft 157 rear gable window wall 98.00 sqft 158 entry rake wall 201.00 sqft 158 front gable window wall 98.00 sqft 158 rear gable window wall 98.00 sqft 154/158 front window wall 163.00 sqft Lower 3 courses already fiber cement 159 middle rake wall 600.00 sqft Lower sections of front&rear already fiber cement 159 front gable window wall 180.00 sqft 156/160 south end wall 1,588.00 sqft 160 rear gable window wall 98.00 sqft 159/160 full chimney 224.00 sqft 159/160 storage closet wall 101.00 sqft 159 rear gable window wall 98.00 sqft Deseriptian "Takeoff Quantity Nates 157/158 full chimney 224.00 sqft Bldg. 16170 161/165 east end wall 1,588.00 sqft 165 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 165 front gable window wall 98.00 sqft 166 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 166 front gable window wall 98.00 sqft 165/166 entry rake span wall 52.00 sqft 167 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 167/168 entry rake span wall 52.00 sqft 167 front gable window wall 98.00 sqft 168 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 168 front gable window wall 98.00 sqft 164/168 west end wall 320.00 sqft Very top section only(40'x8');most of wall already fiber cement 167/168 full chimney 224.00 sqft 167/168 storage closet wall 101.00 sqft 165/166 storage closet wall 101.00 sqft 166 rear gable window wall 98.00 sqft Bldg. 16174 173 front gable window wall 98.00 sqft 173 entry rake wall 161.00 sqft !Lower 10'x4'section already fiber cement 174 front gable window wall 98.00 sqft 174 middle rake wall 600.00 sqft Lower sections at front&rear already fiber cement 175 middle rake wall 600.00 sqft j Lower sections at front&rear already fiber cement 174/175 middle span wall 60.00 sqft 175 front gable window wall 98.00 sqft 176 west end wall 1,224.00 sqft I Lower 13 courses of siding already fiber cement. 175/176 storage closet wall 101.00 sqft 173/174 full chimney 224.00 sqft Bldg. 16178 177/181 east end wall 1,588.00 sqft 183/184 three quarter chimney 168.00 sqft I Front face already fiber cement 182 rear gable window wall 98.00 sqft 181/182 three quarter chimney 168.00 sqft 177/178 storage closet wall 101.00 sqft I Front face already fiber cement 181 rear gable window wall 98.00 sqft Bldg. 16182 185/189 front window wall 163.00 sqft I Lower 3 courses already fiber cement 189 front gable window wall 98.00 sqft Desc1ription Takeoff Quer y t+l 1861190 front window wall 163.00 sqft Lower 3 courses already fiber cement 190 front gable window wall 56.00 sqft 1Lower half of wall already fiber cement 191 middle rake wall 600.00 sqft Lower sections at front 8,rear already fiber cement 187/191 front window wall 163.00 sqft 1 Lower 3 courses already fiber cement 1871191 entry wing wall 36.00 sqft j Lower 5 courses already fiber cement 191 front gable window wall 98.00 sqft 188/192 front window wall 163.00 sqft Lower 3 courses already fiber cement 192 front gable window wall 98.00 sqft 192 entry rake wall 201.00 sqft 192 east end wall 1,588.00 sqft 189 rear gable window wall 98.00 sqft 190 rear gable window wall 98.00 sqft 191/192 full chimney 224.00 sqft 1851189 west end wall ! 1,172.00 sqft !Siding from lower exhaust vent line to grade already fiber cement Bldg. 16184 1931197 west end wall 1,120.00 sqft I Bottom 9'of wall already fiber cement 1931197 front window wall 163.00 sqft 1Lower 3,courses already fiber cement 197 front gable window wall 98.00 sqft 194/198 front window wall 163.00 sqft 'Lower 3 courses already fiber cement 194/198 entry wing wall 42.00 sqft 198 front gable window wall 98.00 sqft 198 middle rake wall 1,040.00 sqft 199/199 middle span wall 60.00 sqft 195/199 front window wall 163.00 sqft 'Lower 3 courses already fiber cement 199 front gable window wall 98.00 sqft 196/200 front window wall 163.00 sqft 'Lower 3 courses already fiber cement 200 front gable window wall 56.00 sqft I Lower half of wall already fiber cement 196/200 east end wall 1,172.00 sqft 1Siding from lower exhaust vent line to grade already fiber cement 199/200 full chimney 224.00 sqft 197/198 full chimney 224.00 sqft 197 rear gable window wall 98.00 sqft 198 rear gable window wall 98.00 sqft Bldg. 16186 201/205 front window wall 156.00 sqft 'Lower 5 courses already fiber cement 201/205 entry wing wall 42.00 sqft 205 front gable window wall 98.00 sqft 206 entry rake wall 201.00 sqft 206 front gable window wall 98.00 sqft 202/206 front window wall 180.00 sqft 203/207 front window wall 180.00 sqft Descjiptiori Takes /leant* Notes 207 front gable window wall 98.00 sqft 208 front gable window wall 98.00 sqft 204/208 front window wall 105.00 sqft Lower section from mid-way up 1st level window already fiber cement 204/208 east end wall 1,588.00 sqft 206 middle rake wall 820.00 sqft ,Lower sections at front already fiber cement 207 middle rake wall 600.00 sqft Lower sections of front&rear already fiber cement 206/207 middle span wall 60.00 sqft , Bldg. 16190 216 front gable window wall 98.00 sqft 211/215 front window wall 180.00 sqft 214 entry rake wall 201.00 sqft 213/214 three quarter chimney 168.00 sqft iFront face already fiber cement 215/216 three quarter chimney , 168.00 sqft Front face already fiber cement Bldg. 16194 224 front gable window wall 98.00 sqft 218/222 front window wall 180.00 sqft 217/221 front window wall 180.00 sqft 217/221 south end wall 1,100.00 sqft Lower section of wall(from base of wall to 5 courses above the electrical meter)already fiber cement 221/222 three quater chimney 168.00 sqft Front face already fiber cement Garages 133-136 front 14.00 sqft 12 misc.pieces 133-136 left end 315.00 sqft Full wall 137-140 front 126.00 sqft ;Entire front elevation with the exception of the garage opening trims 137-140 left end 278.00 sqft Bottom 2' of wall already fiber cement 137-140 rear 70.00 sqft I Lower 3 courses of siding along entire elevation 137-140 right end 315.00 sqft (Full wall 145-148 left end 189.00 sqft Bottom 6' of wall already fiber cement 145-148 rear 70.00 sqft !Lower 3 courses of siding along entire elevation 153-156 right end 56.00 sqft 1 Section of wall below gable vent already fiber cement 167-170 left end 252.00 sqft j Bottom 3'of wall already fiber cement 167-170 right end 315.00 sqft Full wall 17-20 left end 231.00 sqft 1Bottom 4' of wall already fiber cement 17-20 right end 210.00 sqft I Bottom 5' of wall already fiber cement 175-178 left end 315.00 sqft Full wall 175-178 rear 70.00 sqft I Lower 3 courses of siding along entire elevation 175-178 right end 315.00 sqft !Full wall 183-186 left end 231.00 sqft Bottom 4' of wall already fiber cement 183-186 right end 252.00 sqft !Bottom 3'of wall already fiber cement 193-196 left end 252.00 sqft 1 Bottom 3'of wall already fiber cement 193-196 rear 49.00 sqft 7pieces at bottom of wall only Description Takeoff Quanthir iota 193-196 right end 231.00 sqft Bottom 4' of wall already fiber cement 201-204 left end 252.00 sqft 1Bottom 3'of wall already fiber cement 201-204 right end 189.00 sqft (Bottom 6' of wall already fiber cement 209-212 left end 189.00 sqft !Bottom 6' of wall already fiber cement 209-212 rear 14.00 sqft 12 pieces at bottom of wall only 21-24 left end 49.00 sqft ISection of wall below gable vent already fiber cement 213-216 right end 49.00 sqft Section of wall below gable vent already fiber cement 221-224 left end 315.00 sqft ',Full wall 41-44 front 35.00 sqft 124 short pieces 41-44 rear 14.00 sqft 1,2 misc.pieces 41-44 right end 7.00 sqft 1 misc.piece 49-52 right end 98.00 sqft I Lower 2/3 of wall already fiber cement 59-62 left end 315.00 sqft I Full wall 59-62 rear 70.00 sqft Lower 3 courses of siding along entire elevation 59-62 right end 315.00 sqft Full wall 63-66 left end 315.00 sqft I Full wall 63-66 rear 120.00 sqft 'Lower 5 courses of siding along entire elevation 73-76 left end 315.00 sqft Full wall 73-76 right end 252.00 sqft j Bottom 3'of wall already fiber cement 81-84 left end 210.00 sqft Bottom 5' of wall already fiber cement 85-88 left end 98.00 sqft Lower 213 of wall already fiber cement 85-88 R 70.00 sqft I Lower 3 courses of siding along entire elevation Brightwaters at Redhawk Page 1 Quantity/Location breakout: Additional locations Additional siding locations 01/29/18 Desiription ITa'ket4i Bldg. 16106 8 front gable window wall 98.00 sqft Bldg. 16108 13 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 15 entry rake wal 161.00 sqft Lower 10'x4'section already fiber cement Bldg. 16112 22 front gable window wall 35.00 sqft !From bottom of gable vent to roof only;lower section already fiber cement Bldg. 16116 37 entry rake wall 201.00 sqft Bldg. 16120 41/42 storage closet wall 81.00 sqft 2 courses at base of wall and 4 courses at mid wall already fiber cement Bldg. 16124 53 entry rake wall 62.00 sqft Lower wall from roof diverter down already fiber cement Bldg. 16132 70 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 72 entry rake wall 62.00 sqft Lower wall from roof diverter down already fiber cement Bldg. 16136 79 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 74 rear middle wing wall 40.00 sqft 75 rear middle wing wall 40.00 sqft Bldg. 16138 85 entry rake wall 201.00 sqft 86 entry rake wall 201.00 sqft 81185 west end wall 95.00 sqft ;Top 7 courses and gable vent only;rest of wall already fiber cement —1 Bldg. 16140 94 entry rake wall 201.00 sqft 95 entry rake wall 201.00 sqft 95 rear gable window wall 98.00 sqft 96 rear gable window wall 98.00 sqft Bldg. 16156 125 entry rake wall 201.00 sqft 126 entry rake wall 201.00 sqft 127 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 123/127 front window wall ! 180.00 sqft Destkiption Takeoff Quiint*' Notes 126 middle rake wall 540.00 sqft 'From 3 courses above span wall to peak; lower sections already fiber cement 127/128 full chimney I 224.00 sqft Bldg. 16158 134 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement 133/134 full chimney 224.00 sqft 133/134 storage closet wall 101.00 sqft I Bldg. 16164 149 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 150 entry rake wall 161.00 sqft 1Lower 10'x4'section already fiber cement 151 entry rake wall 201.00 sqft Bldg. 16166 160 front gable window wall 98.00 sqft 160 entry rake wall 161.00 sqft Lower 10'x4'section already fiber cement Bldg. 16174 176 front gable window wall 98.00 sqft 174 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 175 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 176 entry rake wall 161.00 sqft I Lower 10'x4'section already fiber cement 169/173 east end wall 1,263.00 sqft From(1)course above meter to peak;lower section already fiber cement Bldg. 16178 183 middle rake wall 696.00 sqft Front: 4 courses below span wall to peak; Rear: span wall to peak;lower sections aready fiber cement 181 entry rake wall 62.00 sqft I Lower wall from roof diverter down already fiber cement 182 entry rake wall 62.00 sqft Lower wall from roof diverter down already fiber cement 183 entry rake wall 62.00 sqft I Lower wall from roof diverter down already fiber cement 184 entry rake wall 62.00 sqft Lower wall from roof diverter down already fiber cement 180/184 west end wall 1,588.00 sqft Bldg. 16182 189 entry rake wall 201.00 sqft 190 entry rake wall 201.00 sqft 191 entry rake wall 201.00 sqft 190 middle rake wall 600.00 sqft Lower sections at front&rear already fiber cement Bldg. 16184 197 entry rake wall 201.00 sqft 198 entry rake wall 201.00 sqft 199 entry rake wall 201.00 sqft 200 entry rake wall 201.00 sqft 199 middle rake wall 696.00 sqft I Front: 4 courses below span wall to peak;Rear: span wall to peak; lower sections aready fiber cement 199 rear gable window wall 98.00 sqft 200 rear gable window wall 98.00 sqft Bldg. 16186 tl'1 5 205 entry rake wall 201.00 sqft 207 entry rake wall 201.00 sqft 208 entry rake wall 201.00 sqft Bldg. 16190 213 entry rake wall 201.00 sqft 213 south end wall 111.00 sqft Top 9 courses and gable vent only; rest of wall already fiber cement 212!216 north end wall 1,513.00 sqft Bottom 3 courses already fiber cement Bldg. 16194 221 front gable window wall 98.00 sqft 222 front gable window wall 98.00 sqft 223 front gable window wall 98.00 sqft 223/224 three quarter chiimney 168.00 sqft HardiePlank® r Lo LapS /iSiding '_. ,. . . , JamesHardie ! . ..., ,,, ,_, ,I,_,) EFFECTIVE MAY 2016 — INSTALLATION REQUIREMENTS- PRIMED&COLORPLUS° PRODUCTS Visit www.hardieinstallation.com for the most recent version. SELECT CEDARMILL°•SMOOTH•CUSTOM COLONIAL' SMOOTH•CUSTOM COLONIAL"ROUGHSAWN CUSTOM BEADED CEDARMILL°•CUSTOM BEADED SMOOTH•STRAIGHT-EDGE SHINGLE PLANK IMPORTANT:FAILURE TO INSTALL AND FINISH THIS PRODUCT IN ACCORDANCE WITH APPLICABLE BUILDING CODES AND JAMES HARDIE WRITTEN APPLICATION INSTRUCTIONS MAY LEAD TO PERSONAL INJURY,AFFECT SYSTEM PERFORMANCE,VIOLATE LOCAL BUILDING CODES,AND VOID THE PRODUCT ONLY WARRANTY BEFORE INSTALLATION,CONFIRM THAT YOU ARE USING THE CORRECT HARDIEZONETM PRODUCT INSTRUCTIONS. INSTALLATION OF HZ100 PRODUCTS OUTSIDE AN HZ10®LOCATION WILL VOID YOUR WARRANTY. TO DETERMINE WHICH HARDIEZONETM APPLIES TO YOUR LOCATION,VISIT WWW.HARDIEZONE.COM OR CALL 1-866-942-7343(866 9HARDIE) STORAGE& HANDLING: © CUTTING INSTRUCTIONS Store flat and keep dry and covered prior OUTDOORS INDOORS to installation.Installing siding wet or 1.Position cutting station so that wind will blow dust away from user 1.Cut only using score and snap,or shears(manual,electric or pneumatic). saturated may result in shrinkage at butt and others in working area. 2.Position cutting station in well-ventilated area 2.Use one of the following methods: joints.Carry planks on edge. Protect a Best i.Score and snap edges and corners from breakage.James ii.Shears(manual,electric or pneumatic) -NEVER use a power saw indoors Hardie is not responsible for damage b.Better: i.Dust reducing circular saw equipped with a -NEVER use a circular saw blade that does not carry the HardieBlade saw blade trademark caused by improper storage and handling HardieBlade®saw blade and HEPA vacuum extraction -NEVER dry sweep—Use wet suppression or NEPA Vacuum of the product. c.Good: i.Dust reducing circular saw with a HardieBlade saw blade (only use for ON to moderate cutting) r Important Note:For maximum protection(lowest respirable dust production),James Hardie recommends always using"Best'-level cutting methods where feasible. NIOSH-approved respirators can be used in conjunction with above cutting practices to further reduce dust exposures.Additional exposure information is available 1 at www.jameshardie.com to help you determine the most appropriate cutting method for your job requirements.If concern still exists about exposure levels or you do not comply with the above practices,you should always consult a qualified industrial hygienist or contact James Hardie for further information. soo831 oa GENERAL REQUIREMENTS: • HardiePlank®lap siding can be installed over braced wood or steel studs spaced a maximum of 24 in.o.c.or directly to minimum 7/16 in.thick OSB sheathing.See general fastening requirements.Irregularities in framing and sheathing can mirror through the finished application. • Information on installing James Hardie products over foam can be located in JH Tech Bulletin 19 at www.jamehardie.com • A water-resistive barrier is required in accordance with local building code requirements.The water-resistive barrier must be appropriately installed with penetration and junction flashing in accordance with local building code requirements.James Hardie will assume no responsibility for water infiltration. James Hardie does manufacture HardieWrap®Weather Barrier,a non-woven non-perforated housewrap',which complies with building code requirements. • When installing James Hardie products all clearance details in figs.3-14 must be followed. • Adjacent finished grade must slope away from the building in accordance with local building codes- typically a minimum of 6 in.in the first 10 ft.. Figure 1 Double Wall Single Wall • Do not use HardiePlank lap siding in fascia or trim applications. Construction Construction • Do not install James Hardie products,such that they may remain in contact with standing water. water-resistive barrier let-in bracing • HardiePlank lap siding may be installed on flat vertical wall applications only. plywood or 24 in.o.c.max. OSB sheathing • For larger projects,including commercial and multi-family projects,where the span of the wall is significant in length,the designer and/or architect should take into consideration the coefficient of thermal expansion and moisture movement of the product in their design. C1( 1.1°1111r4°1 These values can be found in the Technical Bulletin"Expansion Characteristics of James Hardie®Siding Products"at www.JamesHardie.com. I • DO NOT use stain,oil/alkyd base paint,or powder coating on James Hardie®Products. II/P 11111111141441 INSTALLATION: JOINT TREATMENT Figure 2 Nail line(If nail O One or more of the following joint treatment options g line is not / Iare required by code(as referenced 2009 IRC stud present place R703.10.2) 1°Iu 1111111 fastener A.Joint Flashing(James Hardie recommended) between 3/4 "°' ° water- in.&1°from I B.Caulking*(Caulking is not recommended t e top of plank) Nail 3/8 in.from for ColorPlus for aesthetic reasons as the bar edge of plank Caulking and ColorPlus will weather 1 °° �/ ° joint o ° water-resistive differently.For the same reason, flashing / °° do not caulk nail heads on °° °o o° barrier HardieZone • o o •°o o° fastener ColorPlus products.) HardiePlankasiding ° C."H" jointer cover o°°° a° Install a 1 1/4 in.starter strip to install planks in °o• 0 o ensure a consistent plank angle moderate contact at butt joints leave appropriate gap between planks and trim,then caulk.*** Note:Field painting over caulking may produce a sheen difference when compared to the field painted PrimePlus. *Refer to Caulking section in these instructions. 'For additional information on HardieWrap®Weather Barrier,consult James Hardie at 1-866-4Hardie or www.hardiewrap.com WARNING:AVOID BREATHING SILICA DUST James Hardie®products contain respirable crystalline silica,which is known to the State of California to cause cancer and is considered by IARC and NIOSH to be a cause of cancer from some occupational sources. Breathing excessive amounts of respirable silica dust can also cause a disabling and potentially fatal lung disease called silicosis,and has been linked with other diseases. Some studies suggest smoking may increase these risks. During installation or handling:(1)work in outdoor areas with ample ventilation;(2)use fiber cement shears for cutting or,where not feasible,use a HardieBlade®saw blade and dust-reducing circular saw attached to a HEPA vacuum;(3)warn others in the immediate area;(4)wear a properly-fitted,NIOSH-approved dust mask or respirator(e.g.N-95)in accordance with applicable government regulations and manufacturer instructions to further limit respirable silica exposures. During clean-up,use HEPA vacuums or wet cleanup methods-never dry sweep. For further information,refer to our installation instructions and Material Safety Data Sheet available at www.jameshardie.com or by calling 1-800-9HARDIE(1-800-942-7343). FAILURE TO ADHERE TO OUR WARNINGS,MSDS,AND INSTALLATION INSTRUCTIONS MAY LEAD TO SERIOUS PERSONAL INJURY OR DEATH. 50050005 HS11119-P1/4 05/16 y >O GENERAL FASTENING REQUIREMENTS PNEUMATIC FASTENING Fasteners must be corrosion resistant,galvanized,or stainless steel. James Hardie products can be hand nailed or fastened with a pneumatic tool. Electro-galvanized are acceptable but may exhibit premature corrosion. Pneumatic fastening is highly recommended. Set air pressure so that the James Hardie recommends the use of quality,hot-dipped galvanized nails. fastener is driven snug with the surface of the siding.A flush mount James Hardie is not responsible for the corrosion resistance of fasteners. attachment on the pneumatic tool is recommended. This will help control the Stainless steel fasteners are recommended when installing James Hardie® depth the nail is driven.If setting the nail depth proves difficult,choose a products near the ocean,large bodies of water,or in very humid climates. setting that under drives the nail. (Drive under driven nails snug with a smooth faced hammer-Does not apply for installation to steel framing). Manufacturers of ACQ and CA preservative-treated wood recommend spacer materials or other physical barriers to prevent direct contact of ACQ or CA „.„. preservative-treated wood and aluminum products.Fasteners used to attach K . I countersunk, \� HardieTrim Tabs to preservative-treated wood shall be of hot dipped fill&add nail zinc-coated galvanized steel or stainless steel and in accordance to 2009 IRC snug flush DO NOT DO NOT 8317.3 or 2009 IBC 2304.9.5. Figure A Figure B under drive nails staple • Consult applicable product evaluation or listing for correct fasteners type and placement to achieve specified design wind loads. PAINTING • NOTE:Published wind loads may not be applicable to all areas where Local DO NOT use stain,oil/alkyd base paint,or powder coating on James Hardie® Building Codes have specific jurisdiction.Consult James Hardie Technical Products.James Hardie products must be painted within 180 days for primed Services if you are unsure of applicable compliance documentation. product and 90 days for unprimed.100%acrylic topcoats are recommended. • Drive fasteners perpendicular to siding and framing. Do not paint when wet.For application rates refer to paint manufacturers • Fastener heads should fit snug against siding(no air space).(fig.A) specifications.Back-rolling is recommended if the siding is sprayed. • Do not over-drive nail heads or drive nails at an angle. CUT EDGE TREATMENT • If nail is countersunk,fill nail hole and add a nail.(fig.B) • For wood framing,under driven nails should be hit flush to the plank with a Caulk,paint or prime all field cut edges.James Hardie touch-up kits are hammer(For steel framing,remove and replace nail). required to touch-up ColorPlus products. • NOTE:Whenever a structural member is present,HardiePlank should be fastened with even spacing to the structural member.The tables allowing CAULKING direct to OSB or plywood should only be used when traditional framing is For best results use an Elastomeric Joint Sealant complying with ASTM C920 not available. Grade NS,Class 25 or higher or a Latex Joint Sealant complying with ASTM • Do not use aluminum fasteners,staples,or clipped head nails. C834.Caulking/Sealant must be applied in accordance with the caulking/sealant manufacturer's written instructions.Note:OSI Quad as well as some other caulking manufacturers do not allow tooling. COLORPLUS®TECHNOLOGY CAULKING,TOUCH-UP&LAMINATE •Care should be taken when handling and cutting James Hardie®ColorPlus®products.During installation use a wet soft cloth or soft brush to gently wipe off any residue or construction dust left on the product,then rinse with a garden hose. •Touch up nicks,scrapes and nail heads using the ColorPlus®Technology touch-up applicator.Touch-up should be used sparingly. If large areas require touch-up,replace the damaged area with new HardiePlank®lap siding with ColorPlus Technology. •Laminate sheet must be removed immediately after installation of each course. •Terminate non-factory cut edges into trim where possible,and caulk.Color matched caulks are available from your ColorPlus®product dealer. •Treat all other non-factory cut edges using the ColorPlus Technology edge coaters,available from your ColorPlus product dealer. Note:James Hardie does not warrant the usage of third party touch-up or paints used as touch-up on James Hardie ColorPlus products. Problems with appearance or performance arising from use of third party touch-up paints or paints used as touch-up that are not James Hardie touch-up will not be covered under the James Hardie ColorPlus Limited Finish Warranty. PAINTING JAMES HARDIE®SIDING AND TRIM PRODUCTS WITH COLORPLUS®TECHNOLOGY When repainting ColorPlus products,James Hardie recommends the following regarding surface preparation and topcoat application: •Ensure the surface is clean,dry,and free of any dust,dirt,or mildew •Repriming is normally not necessary •100%acrylic topcoats are recommended •DO NOT use stain,oil/alkyd base paint,or powder coating on James Hardie®Products. •Apply finish coat in accordance with paint manufacturers written instructions regarding coverage,application methods,and application temperature •DO NOT caulk nail heads when using ColorPlus products,refer to the ColorPlus touch-up section HS11119-P3/4 05/16 y to® COVERAGE CHART/ESTIMATING GUIDE Number of 12 ft.planks,does not include waste COVERAGE AREA LESS OPENINGS HARDIEPLANK®LAP SIDING WIDTH SQ 51/4 61/4 71/4 71/2 8 81/4 91/4 91/2 12 (1 SQ=100 sq.ft.) (exposure) 4 5 6 61/4 6 3/4 7 8 81/4 10 3/4 1 25 20 17 16 15 14 13 13 9 2 50 40 33 32 30 29 25 25 19 3 75 60 50 48 44 43 38 38 28 4 100 80 67 64 59 57 50 50 37 5 125 100 83 80 74 71 63 63 47 6 150 120 100 96 89 86 75 75 56 7 175 140 117 112 104 100 88 88 65 8 200 160 133 128 119 114 100 100 74 9 225 180 150 144 133 129 113 113 84 10 250 200 167 160 148 143 125 125 93 11 275 220 183 176 163 157 138 138 102 12 300 240 200 192 178 171 150 150 112 13 325 260 217 208 193 186 163 163 121 14 350 280 233 224 207 200 175 175 130 15 375 300 250 240 222 214 188 188 140 16 400 320 267 256 237 229 200 200 149 17 425 340 283 272 252 243 213 213 158 18 450 360 300 288 267 257 225 225 167 19 475 380 317 304 281 271 238 238 177 20 500 400 333 320 296 286 250 250 186 This coverage chart is meant as a guide.Actual usage is subject to variables such as building design.James Hardie does not assume responsibility for over or under ordering of product. RECOGNITION:In accordance with ICC-ES Evaluation Report ESR-2290,HardiePlank®lap siding is recognized as a suitable alternate to that specified in:the 2006,2009,&2012 International Residential Code for One- and Two-Family Dwellings,and the 2006,2009,&2012 International Building Code,.HardiePlank lap siding is also recognized for application in the following:City of Los Angeles Research Report No.24862,State of Florida listing FL#889,Dade County,Florida NOA No.02-0729.02,U.S.Dept of HUD Materials Release 1263c,Texas Department of Insurance Product Evaluation EC-23,City of New York MEA 223-93-M,and California DSA PA-019.These documents should also be consulted for additional information concerning the suitability of this product for specific applications. 0 2016 James Hardie Building Products.All rights reserved. Additional Installation Information, TM,SM,and 0 denote trademarks or registered trademarks of SJames Hardie Technology Limited.®is a registered trademark Warranties,and Warnings are available atwJamesHardie of James Hardie Technology Limited. ww,jameshardle.COm Panelfast is a registered trademark of ET&F Fastening Systems,Inc. HS11119-P4/4 05/16 JamesHardie ® R a rd eTri m /fir >o® Boa rd _ EFFECTIVE MAY 2015 INSTALLATION REQUIREMENTS-4/4,5/4,BATTENS,PRIMED&COLORPLUS® PRODUCTS Visit www.iameshardie.com for the most recent version. These instructions are to be used for HardieTrim®HZ10®Boards ONLY and arei NOT VALID in the following states:AK,UT,ID,CO,WY,MT.These instructions are also NOT valid in portions of WA,OR,CA,NV,AZ,NM.Enter your zip code at www.hardiezone.com to find out what zone applies to your location. IMPORTANT:FAILURE TO INSTALL AND FINISH THIS PRODUCT IN ACCORDANCE WITH APPLICABLE BUILDING CODES AND JAMES HARDIE WRITTEN APPLICATION INSTRUCTIONS MAY LEAD TO PERSONAL INJURY,AFFECT SYSTEM PERFORMANCE,VIOLATE LOCAL BUILDING CODES, AND VOID THE PRODUCT ONLY WARRANTY.BEFORE INSTALLATION,CONFIRM THAT YOU ARE USING THE CORRECT HARDIEZONE INSTRUCTIONS.INSTALLATION OF HZ10 PRODUCTS OUTSIDE AN HZ10 LOCATION WILL VOID YOUR WARRANTY. TO DETERMINE WHICH HARDIEZONE APPLIES TO YOUR LOCATION, VISIT WWW.HARDIEZONE.COM OR CALL 1-866-942-7343(866 9HARDIE) STORAGE& HANDLING: © CUTTING INSTRUCTIONS Store flat and keep dry and covered prior to installation.Installing James Hardie siding OUTDOORS INDOORS wet or saturated mayresult in 1.Position cutting station so that wind will blow dust away from user NEVER use a power saw indoors product and others in working area. -NEVER use a circular saw blade that does not carry the HardieBlade shrinkage at butt joints.Carry product on edge. 2.Use one of the following methods: saw blade trademark Protect edges and corners from breakage. a.Better: i.Dust reducing circular saw equipped with a -NEVER dry sweep—Use wet suppression or HEPA Vacuum James Hardie is not responsible for damage HardieBlade den saw blade and HEPA vacuum extraction P 9 b.Good: i.Dust reducing circular saw with a HardieBlade saw blade caused by improper storage and handling of (only use for low to moderate cutting) the product. 7-_' NIOSH-approved respirators can be used in conjunction with above cutting practices to further reduce dust exposures.Additional exposure information is available at www.jameshardie.com to help you determine the most appropriate cutting method for your job requirements.If concern still exists about exposure levels or you do not comply with the above practices,you should always consult a qualified industrial hygienist or contact James Hardie for further information. sooa31 05 HardieTrim® boards are decorative non-load bearing trim products. Do not use HardieTrim boards to replace any structural component. TABLE OF CONTENTS: GENERAL REQUIREMENTS Page 1 Figure 1 FLASHING/CLEARANCE REQUIREMENTS Page 2 FASTENING Page 3 HardieTrim Face Nailing Requirements Page 3 Boards / ' INSTALLATION Page 4-8 swizz , Trimming Corners Page 4 t; HardieTrim . Openings Page 4 Boards Band Boards Page 4 Frieze Page 4 water ve Batten Boards Page 5 arri barrier r barrier Fascia Page 6 HardieTrim Tabs Page 7-8 FINISHING Page 9 HardieTrim Crown Moulding HardiePlank Lap Siding ■ GENERAL REQUIREMENTS • Wood or steel must be provided for attaching HardieTrim boards. • Follow all applicable codes when installing HardieTrim boards. • DO NOT install HardieTrim boards,such that they may remain in contact with standing water. • DO NOT use stain,oil/alkyd base paint,or powder coating on James Hardie Products. WARNING:AVOID BREATHING SILICA DUST James Hardie products contain respirable crystalline silica,which is known to the State of California to cause cancer and is considered by IARC and NIOSH to be a cause of cancer from some occupational sources. Breathing excessive amounts of respirable silica dust can also cause a disabling and potentially fatal lung disease called silicosis,and has been linked with other diseases. Some studies suggest smoking may increase these risks. During installation or handling:(1)work in outdoor areas with ample ventilation;(2)use fiber cement shears for cutting or,where not feasible,use a HardieBlade saw blade and dust-reducing circular saw attached to a HEPA vacuum;(3)warn others in the immediate area;(4)wear a properly-fitted,NIOSH-approved dust mask or respirator(e.g.N-95)in accordance with applicable government regulations and manufacturer instructions to further limit respirable silica exposures. During clean-up,use HEPA vacuums or wet cleanup methods-never dry sweep. For further information,refer to our installation instructions and Material Safety Data Sheet available at www.jameshardie.com or by calling 1-800-9HARDIE(1-800-942-7343). FAILURE TO ADHERE TO OUR WARNINGS,MSDS,AND INSTALLATION INSTRUCTIONS MAY LEAD TO SERIOUS PERSONAL INJURY OR DEATH. SO050905 TR1502_P1/9 03/15 FASTENING ,ii/ 1e General Fastening Requirements Pneumatic Fastening Fasteners must be corrosion resistant,galvanized,or stainless steel. James Hardie products can be hand nailed or fastened with a pneumatic tool. Electro-galvanized are acceptable but may exhibit premature corrosion. Pneumatic fastening is highly recommended.Set air pressure so that the James Hardie recommends the use of quality,hot-dipped galvanized fastener is driven snug with the surface of the trim.A flush mount attachment nails. James Hardie is not responsible for the corrosion resistance of on the pneumatic tool is recommended.This will help control the depth the fasteners. Stainless steel fasteners are recommended when installing nail is driven.If setting the nail depth proves difficult,choose a setting that James Hardie products near the ocean,large bodies of water,or in very under drives the nail. (Drive under driven nails snug with a smooth faced humid climates. hammer-Does not apply for installation to steel framing). Manufacturers of ACQ and CA preservative-treated wood recommend spacer materials or other physical barriers to prevent direct contact of Flush Snug Flush ACQ or CA preservative-treated wood and aluminum products. / aFasteners used to attach HardieTrim Tabs to preservative-treated wood 'I. `Le 4,.k. ,�� Ni,� shall be of hot dipped zinc-coated galvanized steel or stainless steel do not over do not INAM NOT ST and in accordance to 2009 IRC R317.3 or 2009 IBC 2304.9.5." Figure A Figure B drive siding under Finish Nail Siding Nail nails drive nails • Face Nailing Requirements Use 2 in.minimum 16 ga.finish nails to attach HardieTrim boards to wood frame construction.ET&F or equivalent fasteners or screws may be used to attach HardieTrim boards to steel frame construction. Fastening instructions are similar for all applications.When using finish nails,position nails no closer than 1/2 in.from the edges of the trim and for all other fasteners no closer than 3/4 in.Fasteners must be no closer than 1 in.from ends of trim and spaced a maximum of 16 in.0.C. Ensure trim is adequately fastened. James Hardie recommends using stainless steel finish nails when installing HardieTrim products. Minimum fastener guide for finish nailing: Pre-built corner Site Built Corners Other areas(e.g.window trim,and band boards) 1 nail every 16 in.to attach boards 4 in. together+1 nail every 16 in.each board 6 in. 1 nail every 16 in.to attach boards 2 nails every 16 in. 2 nails every 16 in. together+2 nails every 16 in.each board 8 in. - 3 nails every 16 in. 3 nails every 16 in. 12 in. - 4 nails every 16 in. 3 nails every 16 in. plywood or water-resistive OSB sheathing barrier Use a 2 in.finish nail to fasten trim together. Longer finish nails may bend. 1 in.from r �nd I ---11 ,� 16in O - Niiii I . ri / ng o°a °� ° ° Vertical trim may be installed Figure 11 with a 1/4 in.min.clearance*. Leave a minimum 1/8 in.gap between the siding and trim,then caulk. *Follow all applicable codes when installing HardieTrim boards TR1502_P3/9 03/15 INSTALLATION ff/ 10 Figure 12 Figure 13 • Trimming s WhenriminstiallingCornercorners or other vertical trim,position corner corner boards on the wall and attach(figure 12). ��- studsiih, studs Pre-Built Corners f� ..._..--.....1111I Alternatively,corners can be pre built off the wall using 2 ;i ' I__ in.finishing nails.Each side of the pre-built corner must TA be secured to the wall(figure 13). NI um Finish nail ! i om■ 2 t 2 in.Finish nail ■Trim application for windows, Figure 14 doors&other openings Flashing over trim is required per code for c, _ , water- all installation methods.(figure 14) 10 ° resistive ±� barrier do not •• caulk along HardieTrim top edge board r' siding flashing over trim Butt to Siding Trim the opening prior to the 1..._ installation of the siding. Position trim boards on the wall and secure.Allow proper fastener 16 in.max. spacing at edges and ends. _ Butt to Siding .__________, Horizontal Flashing NOTE:Follow your window/door manufacturer's installationleave a minimum 1/8 in.gap between instructions for caulking guidance between window and trim. siding and trim,then caulk. • Band Board ■ Frieze Boards For band board applications,a flashing water resistive barrier HardieTrim boards can be used as frieze board.(figure 16) is required over the trim.(figure 15) Figure 15 I '4---lap siding Figure 16 \I lanam sheathing iliklumi I II 1/4 in.gap blocking/support if required I HardieTrim frieze board I �` flashing HardieTrim f—HardieTrim board frieze board 11 , caulk if required 16r f-- HardiePlank fir lap siding Butt-to Siding Shim behind trim Trim Over Siding TR1502_P4/9 03/15 INSTALLATION (cont.) ■ HardieTrim'""Tabs Fastener Requirements For Corners,Band Boards,Windows,and Door Applications: HardieTrim boards may be installed with HardieTrimTM Flat Tabs and HardieTrimTM Corner Tabs which provide concealed fastening.Only HardieTrim Flat and Corner Tabs can be used with HardieTrim boards to create a concealed fastening. Step 1: Attach HardieTrim Flat Tabs to the back side of the trim using four,18 ga.1/2 in.L x 1/4 in.W narrow crown corrosion resistant staples,equally spaced in one row,positioned no closer than 1/2 in.from trim edges using a pneumatic staple gun.(figures 21,22) Step 2: For wood frame construction,attach the trim to the building with minimum 2,6d siding nails fastened through the HardieTrim Flat Tabs(figure 23).ET&F or equivalent fasteners may be used to attach the HardieTrim Flat Tabs to steel frame construction. Fastener spacing will vary based on application. Refer to fastener table on page 9. Refer to specific sections in these instructions for required fastener spacing by application(window,band board,etc.) For Fascia,Rake,and Frieze board Applications: HardieTrim tabs cannot be used in fascia,rake,or frieze board applications.Follow Face nailing fastening specifications. Installation of HardieTrim tabs in Coastal Regions: James Hardie requires that stainless steel staples&fasteners be used when installing HardieTrim Tabs in coastal regions. Installation of HardieTrim Tabs over Pressure Treated Lumber:HardieTrim tabs shall not come in direct contact with ACO or CA preservative-treated wood.Refer to the General Fastening section of this document for further information. HardieTrim boards with ColorPlus Technology:Remove the laminate sheet as soon as possible after attaching the trim to the building. Min 2 in Min 1 l/2 in. IF� Fasten 4 staples minimum 1/4 in.from trim edge Figure 23 Figure 21 F. Back view Fasten HardieTrim Flat Tab to 16 in.O.C.max--. HardieTrim Flat Tabs minimum 7/16 in. OSB with min 2,6d e siding nails 5711 Figure 22 Front view I) Trim Application for Windows,Doors&Other Openings Trim the opening prior to the installation of the siding.Place a Flat Tab at the end of each trim board and one tab every 16 in.OC.Attach the trim boards and Flat Tabs around the opening as shown in figure 24.Use 16 ga.galvanized 2 in.long finish nails to ensure proper fastening if needed. Figure 24 Flush HardieTrim Flat and Corner Tabs HardieTrim i\Flat and Corner Tabs © Siding nail Do not Only use staples to 0 attaches tab under fasten HardieTrim Flat and to the wall, drive nails. Corner Tabs to the trim boards. NOTE: Follow your window/door manufacturers installation instructions for caulking guidance between window and trim. TR1502_P7/9 03/15 NINSTALLATION (cont.) 10 Trimming Corners When using HardieTrim tabs prebuild outside corners off the wall. • Attach HardieTrim Corner Tabs to the back side of the trim using eight(8)-18 ga.1/2 in.L x 1/4 in.W narrow crown corrosion resistant staples using a pneumatic stapler.Ensure the HardieTrim Corner Tabs are fastened tight and straight to the trim boards.(figure 25) • For wood frame construction,attach trim to building using min.6d siding nails fastened through the HardieTrim Corner Tabs attached to minimum 7/16 in.OSB`.(figure 26) • Attach a HardieTrim Corner Tab 1 in.from each ends and every 20 in.O.C. • TIP:Creating a jig for the work station is recommended to ensure corners are fastened securely and straight.(figure 27) Figure 25 Figure 26 Figure 27 ,�\' Corner studs Fasten 2 in.x 4 in. L7111411L111 ./ Corner Tabs ® timber blocks to a work bench i..t.,.......,,„4 Use a stdples per pieceof trim to fasten the '' L-shaped tab to the pre-built corner.Use �� 1111111111 , the nail line on the tabs as a guide. Corner TabrammiErmilmimilimimim lea Siding nail ,HardieTrim® Fasten 2 in.x:in.stud to the timber•ocks Band Board Terminate ends of the Band Board into Trim or Siding or miter cut the edges of the trim at the corners of the building.Place a HardieTrim Flat Tab at the end of each trim board and one tab every stud at a maximum of 16 in.O.C. The HardieTrim Flat Tabs should be attached to the trim in an alternating pattern to the top and bottom of the band board(figures 21,22). Use 16 ga.galvanized 2 in.long finish nails to ensure proper fastening if needed. Trim Tab Fastener Table Framing g Material Fastener Tab is nailed into Fastener trim) Max Tabs on center)er (tab to framing) (tab to (inches center) Wood Stud One 6d corrosion resistant siding nail (minimum G=0.42) installed through center of tab into framing Four 18 ga.X 1/2 in. Minimum APA rated Two 4d ring shank corrosion resistant long X 1/4 in.wide siding nails equally spaced installed corrosion resistant 16 Flat Tab 7/16 in.OSB through tab into framing crown staples,equally spaced in one row Minimum 20 One No.8 X 1 in.long X 0.323 in.head gauge steel diameter screw(corrosion resistant) installed through flange into framing Wood Stud On each flange,Install one 6d (minimum G=0.42) corrosion resistant siding nail through tab into framing For each pof trim, On each flange,Install two 4d ring1 2 ur iece ga.n. Corner Tab Minimum APA rated 1// FoX 2 in.long X 1/4 in. 7/16 in.OSB shank corrosion resistant siding nails wide corrosion through tab into framing resistant crown staples, 20 equally space in two On each flange,Install one No.8 X 1 in. rows Minimum 20 long X 0.323 in.head diameter screw gauge steel (corrosion resistant)through tab into framing TR1502_P8/9 03/15 FINISHING AF-0-7&., is Cut Edge Treatment Caulk,paint or prime all field cut edges.James Hardie touch-up kits are required to touch-up ColorPlus products. • Caulking For best results use an Elastomeric Joint Sealant complying with ASTM C920 Grade NS,Class 25 or higher or a Latex Joint Sealant complying with ASTM C834.Caulking/Sealant must be applied in accordance with the caulking/sealant manufacturer's written instructions.For best results use an Elastomeric Joint Sealant complying with ASTM C920 Grade NS,Class 25 or higher or a Latex Joint Sealant complying with ASTM C834. Caulking/Sealant must be applied in accordance with the caulking/sealant manufacturer's written instructions. • Painting DO NOT use stain,oil/alkyd base paint,or powder coating on James Hardie Products.James Hardie products must be painted within 180 days for primed product and 90 days for unprimed.100%acrylic topcoats are recommended.Do not paint when wet. For application rates refer to paint manufacturers specifications.Back-rolling is recommended if the siding is sprayed. • ColorPlus Technology Caulking,Touch-up&Laminate •Care should be taken when handling and cutting James Hardie ColorPlus products.During installation use a wet soft cloth or soft brush to gently wipe off any residue or construction dust left on the product,then rinse with a garden hose. •A finish nail is required for installing 4/4 and 5/4 HardieTrim boards. •Touch up nicks,scrapes and nail heads using the ColorPlus Technology touch-up applicator.Touch-up should be used sparingly. If large areas require touch-up,replace the damaged area with new HardieTrim board with ColorPlus Technology. •Laminate sheet must be removed immediately after installation.Nail head touch-up can be done before or after removal of the laminate sheet when using finish nails.The preferred method is to touch-up while the laminate sheet is in place.Remove the laminate sheet before paint dries. •Terminate non-factory cut edges into trim where possible,and caulk.Color matched caulks are available from your ColorPlus product dealer. •Treat all other non-factory cut edges using the ColorPlus Technology edge coaters,available from your ColorPlus product dealer. Note:James Hardie does not warrant the usage of third party touch-up or paints used as touch-up on James Hardie ColorPlus products. Problems with appearance or performance arising from use of third party touch-up paints or paints used as touch-up that are not James Hardie touch-up,will not be covered under the James Hardie ColorPlus Limited Finish Warranty. ■ Painting James Hardie Siding and Trim Products with ColorPlus Technology When repainting ColorPlus products,James Hardie recommends the following regarding surface preparation and topcoat application: •Ensure the surface is clean,dry,and free of any dust,dirt,or mildew •Repriming is normally not necessary •100%acrylic topcoats are recommended •DO NOT use stain,oil/alkyd base paint,or powder coating on James Hardie Products. •Apply finish coat in accordance with paint manufacturers written instructions regarding coverage,application methods,and application temperature •DO NOT caulk nail heads when using ColorPlus products,refer to the ColorPlus touch-up section RECOGNITION:HardieTrim boards may be installed as an equal alternative to conventional trim permitted for use in;2006,2009,&2012 International Building Code,Section 1402.1,and the 2006,2009,&2012 International Residence Code for One-and Two-Family-Dwellings,Section R703.1. ©2015 James Hardie Building Products. All rights reserved. TM,SM,and©denote trademarks or registered trademarks of Additional Installation Information, James Hardie Technology Limited.[N+,]is a registered trademark Warranties,and Warnings are available at Si JamesHardie of James Hardie Technology Limited. www.jameshardie.com TR1502_P9/9 03/15 DuPont- T ek® DrainWr ,M Y� ap PHYSICAL PROPERTIES DATA SHEET PROPERTIES DUPONT"TYVEK® METHOD DRAINWRAP"' Air Penetration Resistance ASTM E2178 (cfm/ft2@1.57 psf) .004 Gurley Hill (TAPPI T-460) (sec/100cc) >300 ASTM E1677 Type 1 Drainage ICC-ES AC 24 Section 6.11 Pass ASTM E2273 >98% ICC-ES AC 235 Section 4.5 Pass Water Vapor Transmission ASTM E96-00 Method A (g/m2-24 hrs) 250 (perms) 36 Method B (g/m2-24 hrs) 350 (perms) 50 Water Penetration Resistance ATTCC 127 (cm) 210 Basis Weight TAPPI T-410 (oz/yd2) 2.1 Breaking Strength ASTM D882 (lbs/in) 30/30 Tear Resistance(Trapezoid) ASTM D1117 (lbs) 7/9 Surface Burning Characteristics ASTM E84 Flame Spread Index 5 Class A Smoke 25 Developed Index Class A Ultra Violet Light Exposure(UV) 120 days(4 months) These values represent roll averages.Individual roll results may differ due to normal manufacturing variations. For more information about DuPont-Tyvek®Weatherization System products, please call 1-800-44-Tyvek or visit us at www.Construction.Tyvek.corn DuPont- WARNING:DuPont-Tyvek®is combustible and should be protected from a flame and other high Tyve I® heat sources.If the temperature of DuPont'Tyvek®reaches 750°F(400°C),it will burn and the fire may spread and fall away from the point of ignition. DrainWrap- Copyright 0 2016 E I.du Pont de Nemours and Company All rights reserved The DuPont Oval Logo,DuPont-,,Tyvek`°'and Drain Wrap"are registered trademarks or trademarks of E I.du Pont de Nemours and Company or its affiliates.K-05009-1 9/16 Dupont-, Tyvek® Wrap Caps Performance in the Details: DuPont T yvek® Wrap Caps APPLICATION Recommended for fastening DuPont' Tyvek®family of products, DuPont"Tyvek®Wrap Caps increase holding power and reduce tears. FEATURES/BENEFITS . The 1-inch plastic cap DuPont"Tyvek®Wrap Caps,whether applied by increases holding power hand or pneumatically with the new Plasti- and reduces tears,and Tackerm Pro pneumatic cap nailing system by features a triple-feather seal National Nail Corporation and Hitachi Power that provides an effective Tools,are the quality alternative fastening inso .. db. air barrier. solution for the Tyvek®family of products. ... „--• The one-inch diameter high density polyethylene cap is engineered to distribute maximum holding power to the perimeter of the cap, reducing jobsite blow-offs,and the patented triple-feather seal provides an effective barrier to air infiltration. Wrap Caps are made of a nonconductive material that acts as a thermal barrier, resisting heat transfer, and siding nails easily penetrate the cap. Save time, money and provide a premium installation with Wrap Caps for all your DuPont"Tyvek®installations. TECHNICAL DATA Cap Diameter-1-inch Cap material—High-density polyethylene with UV inhibitors Cap Color—White Nail shank style/Diameter/Finish • 1-inch hand drive—ring shank/.105/electro galvanized • 1-1/2 inch hand drive—spiral shank/.110/bright • 2-inch hand drive—spiral shank/.110/bright • 1-1/4 inch collated—ring shank/.083/electro-galvanized • 2-inch collated—ring shank/.083/electro-galvanized STOCK SIZES/PRODUCTS 1-inch Wrap Caps bulk pack 2000 ct. box 1-1/2 inch Wrap Caps bulk pack 2000 ct. box �ji P t OA' 2-inch Wrap Caps bulk pack 2000 ct. box UU 1-1/4 inch Wrap Caps ProPacr^ collated 2800 ct.box The miracles of science" 2-inch Wrap Caps ProPacm collated 2800 ct.box