Loading...
Permit (93) CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2018-00159 Date Issued: 05/23/2018 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113BA00400 Jurisdiction: Tigard Site address: 7632 SW DURHAM RD 300 Project: Spec Space Subdivision: None Lot: None Project Description: Landlord work:Demolition and new cabinetry,ceiling tiles,and light fixtures. Contractor: COMMERCIAL CONTRACTORS INC Owner: PORTLAND SW CENTER LLC 1265 SOUTH 35TH PLACE BY FELTON PROPERTIES INC RIDGEFIELD,WA 98642 ATTN: FELTON, MATT 520 SW 6TH AVE, STE 610 PORTLAND, OR 97204 PHONE: 503-227-4440 PHONE: FAX: 503-227-6644 FEES Specifics: Date Amount Description Type of Use: COM DC Provision Review,COM TI-Ping 05/23/2018 $91.00 Class of Work: ALT Type of Const: IIB 12%State Surcharge-Building 05/23/2018 $25.27 Occupancy Grp: B Occupancy Load: 91 Plan Review 05/23/2018 $136.88 Dwelling Units: 0 Plan Review-Fire Life Safety 05/23/2018 $84.24 Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 05/23/2018 $8.00 Bedrooms: 0 Bathrooms: 0 11x17) Value: $8,750 Permit Fee-Additions,Alterations, 05/23/2018 $210.59 Demolition Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $555.98 Required Items and Reports(Conditions) Required: Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the r d by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a c of the rules or direr tions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ermittee Signature: kg) tor •er Call 5 .63 . 75 by 7:00 a.m.for the next available inspec ion date. This permit card shall be kept in a conspicuous place on the job site until completion o he project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE ONLY City of Tigard RECEIVE '..eceiveda ;` Permit No.:` , - R r r 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review inlyiNMI Phone: 503.718.2439 Fax: 503.598.1960 MAY 2 3 2018 DateB : Other Permit T I G A R D Inspection Line: 503.639.4175 Date Ready/By: la See Page 2 for Internet: www.tigard-or.gov crry�OF ryGAR Notified/Method: `') • �, ?= Supplemental Information lJIL'Q1i�tN DINiSlON �" TYPE of '::: QUIe>�n DAt 'A AND ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the work CATEGORY O1P' CONSTRUCTION indicated on t h isappt Catton. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ CIAccessory building ❑Multi-family Number of bedrooms: ❑Master builder CIOther: Number of bathrooms: JOB SITE.T�tFORMATION 4ND IATION Total number of floors: Job site address:Bridgeport Center-7632 SW Durham Rd. New dwelling area: square feet City/State/ZIP:Tigard,OR Garage/carport area: square feet Suite/bldg./apt.no.:300 Project name:Vacancy Space Prep Covered porch area: square feet Cross street/directions to job site:Project located South of SW Durham Rd, Deck area: square feet and North of SW Upper Boones Ferry Rd Other structure area: square feet REQUIRED RATA COMMERCIAL.IISE C 4/__CT LJST" Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all DESCR IION Ul' WORD materials, onlabor,overhead,and theprofit for the work indicated this application.Work to include demolition,new cabinetry and plumbing,new ceiling tiles Valuation: $$8,750 and light fixtures Existing building area: 9,099 square feet New building area: 9,099 square feet ►® PROPERTY O { I NANT Number of stories: 3 Name:Felton Properties Type of construction: II-B Address:520 SW 6th Avenue Suite 610 Occupancy groups: City/State/ZIP:Portland,OR 97204 Existing: B Phone:(503)285-5389 Fax:( ) New: B ®®® APPLICANT ❑<CONTAC'!` PERSO FEES $LIII:II(WO P IIT . : T Business name:Mackenzie (P aejertot seki4UIt} Structural plan review fee(or deposit): Contact name:Kelly Battaglia FLS plan review fee(if applicable): Address:1515 SE Water Ave Suite 100 Total fees due upon application: City/State/ZIP:Portland,OR 97214 Amount received: Phone:(503)224-9560 Fax::(503)228-1285 E-mail:kbattaglia@mcknze.comCommercial PROTOVOLTAII SOLAR Pte.SY TI. JHEES °; C9k�lTRACTOR of residential roof-top mounted PhotoVoltaic Solar t Panel System. Business name:Commercial Contractors,Inc Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:5573 S.1"Circle Solar Installation Specialty Code checklist. City/State/ZIP:Ridgefield,WA 98642 Permit fee(includes plan review and administrative fees): $180.00 Phone:(503)227-4440 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:123729 Total fee due upon application: $201.60 Authorized signature: / This permit application expires if a permit is not obtained /1W 1111111111110- within 180 days after it has been accepted as complete. Print name:Kelly Battaglia Date:03/15/2018 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(I 1/02/COM/WEB) :r III II City of Tigard • BUILDING DIVISION ■ Over-The-Counter (OTC) Building & Fire Protection System Permit T,( h Appointment Checklist Permit Record#: o'biA9ed-a)tsai Contact Name: kE(,e y 041-71-4GL/hi' Phone #: 1/4...q;13-.2.24/- 954,0 Business Name: /L/4-C fly/Z/6- Appt. Date/Time: �a2,3 ,/e-- /47 fp,pp 45, Site Address: 74?A Sid w!-fH.ri Bldg/Suite #: Project Name: 3."-C- �P,9-C8 New Tenant? ❑ Yes ❑ No 441-eif7✓ Project Description: /n/TEn.i p/L 4 6-"pL TWA', ,V ) 69-/3/ATE-772-y /4.1.e/Y.!:4/N& /Y�cJ Cr7 t-,n/G— 77e.-6-K Z-16-61--f" / t 4ZS . Existing Use: i C.-E.- New Use: © Cg' MMD Required: ❑ Yes ,'No Related Record#: APPIACATION gpEcwic INFORMATION GENERAL INFORMATION Class of Work: lAri Occupancy Group: of Construction: 2- Type of Use: Occupancy Load: q� Oregon Specialty Code: Zd l 4.,,1 SPECIFICS Number of Stories: Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback—Left Sideyard Setback—Front Sideyard Setback—Right Sideyard Setback—Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: 11. Fire Alarms: Smoke Detectors: Sprinkler Type: J Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ r; 7,5-1, . FEES DUE . $ I DC Prov Rvw,COM TI—Ping $ as J O• . q Permit Fee—Add,Alt,Demo DC Provision Review Fee for COM TI(effective 7/1/2017) $ ZS ,a.1 12%State Surcharge Project Valuation $ J_ , g$ Plan Review,Structural Up to$4,999 $0.00 $ �, 4. Plan Review,Fire Life Safety $5,000-$74,999 $91.00 $ Info Proc/Arch,Lg(over 11x17$2.00) $75,000-$149,999 $226.00 $ Info Proc/Arch,Sm(up to 11x17$0.50) $150,000 and over $361.00 $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: Building Staff: $ •i : Date/Time: $ - 65, 4": T• 'AL FEES DUE I:\Building\Forms\OTC_BUP_FPS_070117.docx Dianna Howse From: Dianna Howse Sent: Thursday, May 10, 2018 10:45 AM To: 'Kelly Battaglia' Cc: Branden Taggart; Lindsey Carpenter;#Building Permit Technicians Subject: RE: OTC Appointment Request Hi Kelly, Your OTC appointment has been scheduled for 5/23/18 at 10:00 am. See you soon! Dianna L. Howse Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct I 503-718-2439 Permits From: Kelly Battaglia <KBattaglia@mcknze.com> Sent:Thursday, May 10, 2018 8:00 AM To: Dianna Howse<Dianna@tigard-or.gov> Cc: Branden Taggart<brandent@tigard-or.gov>; Lindsey Carpenter<LCarpenter@mcknze.com>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: OTC Appointment Request Hello Dianne, We will take the appointment on 5/23. Thank you! Kelly Battaglia Interiors I LEED Green Associate M CKENZI E . DESIGN DRIVEN I CLIENT FOCUSED Architecture Interiors • Engineering • Planning P 503.224.9560 W mcknze_.cor1_ C vcard RiverEast Center 1515 SE Water Ave, Suite 100 Portland OR 97214 This email is confidential, may be legally privileged, and is intended solely for the addressee. If you are not the intended recipient, access is prohibited. As email can be altered, its integrity is not guaranteed. 1 From: Dianna Howse<Dianna@tigard-or.gov> Sent:Wednesday, May 09, 2018 5:21 PM To: Kelly Battaglia <KBattaglia@mcknze.com> Cc: Branden Taggart<brandent(a@tigard-or.gov>; Lindsey Carpenter<LCarpenter@mcknze.com>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: OTC Appointment Request Hello Kelly, The next available OTC appointments are 5/23 and 5/29 at 10:00 am. Here is a list of the permit fees for a project valuation of$8,750: Vaal c 9,7 C r .TWA 5547.00 sou Qttaiditi k9111 F995 oak 's 543„t 17-A., 1 Each $91,0 r, , « + s 1r” ?� 1 E $210,59 Piih Review- L afely 1 Each 24 Flagat Each 1 $' 12%Stale Surcharee ButhIna Each 525 27. Add $2.00 per page for pages over 11x17, and $0.50 per page for pages up to 11x17. Thank you and please let me know which date works for your team. Dianna L. Howse Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct I 503-718-2439 Permits From: Kelly Battaglia <KBattaglia@mcknze.com> Sent:Wednesday, May 9, 2018 11:40 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Cc: Dianna Howse<Dianna@tigard-or.gov>; Branden Taggart<brandent@tigard-or.gov>; Lindsey Carpenter <LCarpenter@mcknze.com> Subject:OTC Appointment Request Hello, We'd like to schedule an OTC appointment as soon as available. The project is a Vacancy Space Prep for Bridgeport Center, 7632 SW Durham Rd, Suite 300. The existing use of space is vacant office and the new use of space will be vacant office. The scope of work includes minor demolition, new cabinetry and plumbing, new ceiling tiles and light fixtures. The valuation is$8,750, can you please provide the permit fee amount? Kelly Battaglia Interiors I LEED Green Associate 2 ° N��N �� u�° N�rN�~ �.� °�� � 0�� �~"N��.�� 0�� �� mnm ��. N N�~ ~ DESIGN DRIVEN , a,Ewrpmcmssm Architecture • Interiors • Engineering • Planning P 503.224.9360VnmcKoze.comCxcacd RiverEast Center 15z5SEWater Ave, Suite 100 Portland OR 97214 This email is confidential, may be legally privileged, and is intended solely for the addressee. If you are not the intended recipient, access is prohibited. As email can be altered, its integrity is not guaranteed, DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, email may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 3 Frontl DSTS Subject: Kelly Battaglia, Mackenzie, 503-224-9560, 7632 SW Durham Rd, Ste 300, Spec Space Location: CR 3 Permit Center Start: Wed 5/23/2018 10:00 AM End: Wed 5/23/2018 11:00 AM Recurrence: (none) Organizer: CR_-_3_Permit_Center Call Handling Mode 2: 2 Project Name: Spec Space Existing Use: office New Use: office Scope of work: interior demolition, new cabinetry and plumbing, new ceiling tiles and light fixtures. Project Valuation: $8.750 1 City of Tigard a COMMUNITY DEVELOPMENT DEPARTMENT 11111 ■ T1caRo Building Permit Review — Commercial - No Land Use Building Permit #: Qttioair ez iE cf Site Address: - 6 Z S w 0JrilaM KJ, Suite/Bldg#: 300 Project Name: Srz( S ttc2. (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review i (, ( 1 ( 1 Proposal: LAitri r V211-41;111'^ of &bie.2Tr� au/ ioluMU 't1jnu.) (��`;'y 411es 04 II 1' i--urt9. Fr"' VAl� ^ $; -Sc1 Existing Business Activity: Spa. siar.t ProposedopBusiness Activity: Sr SPatt Li�d/Verify site address/suite#exists and active in permit systtee . 112/6ver Terrace Ne. hborhood: ❑ Yes Ig No la Zoning: l 4 ermitted Use: LU Yes ❑ No CI Spec Space snflrm no land use required. Li Iusiness License: Exists: ❑ Yes IJ No,applicant notified to obtain business license Notes: Approved by Planning: Lp,41. Date: 5.-Z,3"/f Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: El Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: . ' - , Site Plans: # . Building Plans: # Building Permit#: [4 er building ermit#above. Workflow Routing: planning Workflow Sign-off: ,off for Planning(include notes from planning review) Route Application Documents: g-ii'lg: original permit application, site plans,building plans,engineer and }�-� beam calculations and trust details,if applicable,etc. Notes: e/1 �-- �' /, By Permit Technician: „ _ � Vie: s/ Yl I:\Building\Forms\BldgPermitRvwCOM NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: O SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes 0 N/A Tigard Trans SDC: 0 Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Fonns\BldgPernutRvw_COM_NoLandUse 070915.docx