Loading...
Plans i SYSTEM CM iGWPR F1SJio DMSION 15-MECHANICAL DESIGN .:/ �AL . MI CONSLtTANrS NC. ,j ip 15-1 SCOPE - AR at M ME;I 9 too m rm 2. SPLIT SYSTEM HEAT PUMPS AND COILS:CARRIER,TRANE OR APPROVED EQUAL. 5. AIR DISTRIBUTION SYSTEM: 633-240-0217° rGOic zb°'ma / 0k 15-2 CODE A. DESCRIPTION:MATCHED HORIZONTAL CASED FURNACE COIL AND OUTDOOR DX CONTACT:BRUCE MOM 13�°j 15-3 DRAWINGS AND SPECS. HEAT PUMP UNIT AS SCHEDULED. 15-4 SUBMITTALS B. MOUNT COILS IN.DUCT SYSTEMS AS SHOWN ON DRAWINGS PROPERLY LEVELED a. BALANCE AND RECORDLUAIR VOLUMES AT SUPPLY,ADJUST RETURN AND EXHAUST -:....y:�".at.,�._, 15-5 SUPPORTS GRILLES WHERE VOLUMES ARE NOTED AND SUPPLY GRILLES FOR PRODUCJI: t C I" WIRES 12/31/17 TO ASSURE COMPLETE DRAINAGE OF CONDENSATE.PROVIDE AIR TIGHT SEALS PROPER DIRECTION AND THROW. i ROpL'CTiq;: 7,, i 15-6 GUARANTEE - - ON INLETS AND OUTLETS.PROVIDE TRAPPED CONDENSATE AND OVERFLOW b. MARK FINAL POSITION OF ALL BALANCING DAMPERS WITH PERMANENT MARKER. UUALCONT,CLL t.7.-1 PROJ.No.16210 15-7 MECHANICAL IDENTIFICATION- CONDENSATE DRAINS PIPIED TO FLOOR DRAIN. c. PROVIDE BALANCE LOG WITH DRAWING OF THE FINAL MECHANICAL SYSTEM p1D:R: �/� 15-8 PLUMBING C. MOUNT ROOFTOP UNITS ON ROOF CURB IN ACCORDANCE WITH THE INSTALLATION.REFERENCE ALL I-IVAC OUTLETS AND EQUIPMENT NOTED IN THE 15-9 HVAC EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.FLASH AND COUNTERFLASH CURB. BALANCE LOG.TO THE DRAWING. 15-10 DUCTWORK - ANCHOR UNIT TO CURB AND CURB TO ROOF.PROVIDE REFRIGERANT LINE SETS O. ADJUSTSF-1A AND.SF-1B SUPPLY AND MINIMUM OUTSIDE AIR CFM WITH ONLY 15-11 DIFFUSERS AND GRILLES BETWEEN COILS AND HEAT PUMPS. PROPERLY SEAL ROOF PENETRATIONS. ONE FM RUNNING AT A TIME. U 15-12 SYSTEM BALANCE D. CONTROLS:CONNECT TO OWNER FURNISHED DDC CONTROL SYSTEM 15-13 CONTROLS PROVIDED IN ANOTHER CONTRACT.COOUNG SETPOINT TO BE ONE DEGREELU H 8. ROOM PRESSURE ADJUSTMENT: HIGHER THAN SF-1 SYSTEM COOLING SETPOINT AND HEATING TO BE 1 DEGREE _ 15-1 SCOPE LOWER THAN SF-1 SYSTEM HEATING SETPOINT. WITH ALL.FANS RUNNING TEST AND ADJUST SYSTEMS TO PROVIDE A POSITIVE 0 1. PIANS AND SPECIFICATIONS COVER FURNISHING OF ALL LA80R,MATERIALS, _ PRESSURE N THE VIVARIUM OF APPROXIMATELY 0.05"WG IN RELATIONSHIP TO CC 15-10 DUCTWORK ADJACENTSPACES. TEST AND RECORD PRESSURES WITH SYSTEM SET TO p EQUIPMENT,TOOLS AND APPARATUS NECESSARY FOR AND REASONABLY INCIDENTAL MINIMUM OSA AND ALSO AT FULL OSA ECONOMIZER.VERIFY THAT VIVARIUM STAYS TO THE CONSTRUCTION OF HEATING,VENTILATING,AIR CONDITIONING AND 1. GENERAL:ALL DUCTWORK TO BE CONSTRUCTED TO THE LATEST ASHRAE ANDZ co PLUMBING SYSTEMS AS INDICATED ON THE DRAWINGS AND/OR SPECIFIED.PROVIDE POSITIVE AT ALL TIMES.PROVIDE DOCUMENTATION OF PRESSURE TESTS.IN - 1k PROVIDE ESCUTEON PROVIDE TURNING VANES IN ALL 9D DEGREE ELBOWS. REPORT. A^< } ALL MISCELLANEOUS ITEMS REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEMS. PROVIDE ESCUTEON PLATES WHERE ALL DUCTWORK PASSES THROUGH FINISHED •il ,,'a a , O `1z HVAC AND PLUMBING WORK IS LIMITED TO THE SYSTEMS RELATINGTO THE CEILINGS AND WALLS. 1 ' VIVARIUMS AND MISCELLANEOUS HOODS AS SHOWN ON THESE DOCUMENTS. - 15.13 CONTROLS:PROVIDED IN ANOTHER CONTRACT. I,mA x §*a_ CO a,7' 2. CONTRACTOR DESIGN/BUILD WORK FOR THE OFFICE AREAS IS UNDER ANOTHER 2. PROVIDE A VOLUME DAMPER ON ALL BRANCH DUCTS TO DIFFUSERS AND EXHAUST < QCsi CONTRACT. - - CONNECTIONS.' i Om 0.�1 3. ROOF COORDINATION:ALL FLASHING OF ROOF PENETRATIONS AND EQUIPMENT �¢ �r,10, CURBS IS TO.BE ACCOMPLISHED BY THE ROOFING CONTRACTOR.COORDINATE 3. RECTANGULAR AND ROUND DUCTWORK TO BE CONSTRUCTED OF.GALVANIZED a. 3., .� go � REQUIREMENTS WITH THE ROOFING CONTRACTOR PRIOR TO CURBFABRICATION OR STEEL.SUPPLY AIR DUCTWORK TO BE CONSTRUCTED FOR+2'WATER COLUMN, j - - co rNc ROOF PENETRATION. RETURN AIR DUCTWORK TO BE CONSTRUCTED FOR-1"WATER'COLUMN,EXHAUST z 3 z CO AIR DUCTWORK TO BE CONSTRUCTED FOR-1'WATER COLUMN.SEAL ALL DUCT p W c%1 to 15-2 CODE a� r 3 i .k' + 7. �p f < o O o JOIM'SANDSFAMS. M 11f _ �'. N 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST RULES AND Q 2 2 X 5. SUPPORT DUCTWORK PER UMC AND SMACNA.PROVIDE SEISMIC BRACING AND v "•k y REGULATIONS OF STATE OR LOCAL CODES AND ORDINANCES.OBTAIN AND PAY FOR �;•1 1$T <77 n x E" ra - a u- REQUIRED PERMITS,LICENSES,CODE INSPECTIONS,ETC. SUPPORT PER SMACNA"SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL I^ `� D! `6 ,,,t v, -5 c", ,a'..t It .. SYSTEMS",SEISMIC HAZARD LEVEL(SHL)B. 15-3 DRAWINGS AND SPECIFICATIONS 6. INTERNALLY LINE RECTANGULAR SUPPLY AND RETURN AIR DUCTWORK WHERE SHOWN OR NOTED ON THE DRAWINGS WITH SCHULLER LINACOUSTIC OR EQUAL 1. DRAWINGS AND SPECIFICATIONS NOTE THE GENERAL LOCATION MD - MAT-FACED OR DUAL DENSITY ACOUSTICAL DUCT BLANKET WITH A MINIMUM R-VALUE CHARACTERISTICS OF NEW EQUIPMENT AND INSTALLATIONS.PROVIDE ALL MINOR =5.. EXTERNALLY INSULATE ALL OTHER SUPPLY AIR DUCTWORK WITH SCHULLER N DUCT AND PIPE FITTINGS,OFFSETS AND OTHER MISCELLANEOUS ITEMS NOT - - c1 INDICATED BUT REQUIRED FORCOMPLETE OPERATING SYSTEMS. MICROLITE OR EQUAL FIBERGLASS DUCT INSULATION WITH FSKL JACKET AND A a MINIMUM INSTALLED R-VALUE OF 5. RETURN AIR AND EXHAUST DUCTWORK . UNINSULATED UNLESS SHOWN OR NOTED OTHERWISE. 15-4 S5OBMITTALS 1k 1. PROVIDE FOUR SETS OF TECHNICAL LITERATURE AND CUT SHEETS FOR ALL 15-11 DIFFUSERS AND GRILLES - - EQUIPMENT TO BE PROVIDED.INCLUDE THE SUBMITTAL INFORMATION IN A THREE - 1. GENERAL:.PROVIDE TITUS OR APPROVED EQUAL GRILLE.TITUS SERIES AND MODEL HOLE,LOOSE LEAF RING BINDER WITH MAJOR TOPIC TABS AND AN NDEX.ALL NUMBERS USED AS A BASIS FOR SELECTION. co EQUIPMENT IS TO BE APPROVED BY THE OWNERS'REPRESENTATIVE PRIOR TO - Nk INSTALLATION. 2. SUPPLY DIFFUSER-CEILING MOUNT:MODEL HMS LOUVERED FACE OF NECK SIZE (7 2. AT JOB COMPLETION PROVIDE FOUR COMPLETE SETS OF O&M DATA FOR ALL SHOWN ON THE DRAWINGS,STANDARD FINISH WITH FRAME FOR FLUSH MOUNTING OZ MECHANICAL EQUIPMENT PROVIDED. IN STANDARD 24"X24"LAY-IN T-BAR.CEILING.PROVIDE GASKET WHERE GRILLE. '; '-'V - J MEETS CEILING GRID IN VIVARIUMS. i,.,�g g 7,.� 1 a}- a Hca D 15-5 SUPPORTS - shall be or1 1_ - 4 CEILING RETURN GRILLES:TITUS MODEL 80 X"x X"EGGCRATE WITH FRAME 1. SUPPORTS FOR ALL APPARATUS AND PIPING TO BE FURNISHED FEL ASHRAE, SUITABLE FOR TEE BAR MOUNTING AND STANDARD FINISH. SMACNA AND AS REQUIRED BY THE MANUFACTURERS OF THE EQUPMENT,LOCAL 4 JURISTICTION AND APPLICABLE CODES. PROVIDE SEISMIC BR ACNG AND SUPPORT 5. INSTALL GRILLES AND DIFFUSERS WHERE SHOWN ON THE DRAWINGS AND IN PER SMACNA"SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL ACCORDANCE WITH.MANUFACTURER'S INSTRUCTIONS. SYSTEMS",SEISMIC HAZARD LEVEL(SHL)B. 15-$ GUARANTEE 6. INSTALL PLUMB AND TRUE WITH ROOM DIMENSIONS AND ACCURATELY CENTERED ON PROJECTIONS AS SHOWN ON ARCHITECTURAL REFLECTED CEILING PLANS. -I. FURNISH WRITTEN GUARANTEE.TO THE OWNER,EFFECTIVE FOR A PERIOD OF ONE 15-12 -SYSTEM BALANCE YEAR AFTER DATE OF JOB ACCEPTANCE,COVERING ALL DEFECTS IN MATERIALS AND WORKMANSHIP.THE CONTRACTOR SHALL AGREE TO REMEDY ANY DEFECTS 1. CONDUCT THE SYSTEMS BALANCE WORK IN ACCORDANCE WITH STANDARD BY REPLACEMENT OF DEFECTIVE PART WITHOUT ADDITIONAL COST TO THE OWNER PROCEDURES AND RECOGNIZED PRACTICES OUTLINED BY ASHRAE AND SMACNA. OFFICE ^�� DURING THE PERIOD OF THEGUARANTEE. RECORD ALL ACTUAL EQUIPMENT NAMEPLATE AND OPERATING DATA AT THE SITE. O6 15-7 MECHANICAL IDENTIFICATION TEST AND BALANCE TO BE PERFORMED BY AN INDEPENDENT AIR BALANCE COMPANY CERTIFIED BY THE AABC OR THE NEBB. '[, OF T 1. EQUIPMENT IDENTIFICATION:EQUIPMENT IDENTIFICATION TAGS SHALL BE 2. TEST AND BALANCE FIRM TO BE APPROVED PRIOR TO BID BY THE OWNERS' �.T A. d THREE-PLY,WHITE CENTER,BLACK FACE PLASTIC PLATES WITH 12"HIGH LETTERS REPRESENTATIVE. ¢; FOR MAJOR AND 1/4"HIGH LETTERS FOR MINOR EQUIPMENT. - j'`T���"�'/L%U j EX C S. _( 'a,),;,y 5.3;`s 1 v.;.,_ (/1 Z i 2. PROVIDE EACH PIECE OF EQUIPMENT WITH A MANUFACTURER'S STANDARD 3. SUPPLY FANS-AIR HANDLING UNIT J V J NAMEPLATE RATING MANUFACTURER'S NAME,MODEL NUMBER,CAPACITIES AND a. ASSURE THAT AIR FILTERS ARE CLEAN PRIOR TO BEGINNING AIR BALANCE - U 0- CHARACTERISTICS. WORK 3.. IN ADDITION,PROVIDE EACH PIECE OF EQUIPMENT WITH A PLASTIC TAG INDICATING b. ADJUST VARIABLE FREQUENCY DRIVES TO OBTAIN FAN SPEED REQUIRED FOR OTC��`�"� O rn ITS DESIGNATION ON THIS PROJECT(SUCH AS RTU-1,)AND THE AREA SERVED. AIR VOLUMES.SPEED SHALL.BE SET TO THE MINIMUM TO PROVIDE REQUIRED [ MOUNT THIS TAG WITH SCREWS,WHERE POSSIBLE,IN A CLEARLY VISIBLE AIR VOLUME AT FURTHEST RUN WITHOUT EXCESSIVE STATIC PRESSURE. D O CO LOCATION. C. ADJUST MINIMUM OUTSIDE AIR VOLUME TO THAT SHOWN ON THE PLANS. - - fi ¢y O 15-8 PLUMBING ADJUST MINIMUM WITH ALL OF EXHAUST FANS RUNNING. Penn It,#� /� Cf O •O O. INCLUDE THE FOLLOWING IN THE LOGS: " m Pj S+ (�N� la,. �. O U U TYPE L HARD DRAWN COPPER CONDENSATE DRAIN PIPINGPROMTHE COOLING COIL 1. OUTSIDE AIR AND RETURN AIR DAMPER LEAKAGE. `�..Z / W 1-11‘-' U 0 I- 2. ACTUAL MOTOR VOLTAGE,AMPERAGE,RPM AND OVERLOAD HEATER SIZES, ALS dre S S♦ ^��` y O LL:f- TO THE FLOOR DRAIN AS SHOWN ON DRAWINGS,PROVIDE CLEANOUTS IN PIPING AS AS WELL AS NAMEPLATE DATA. - • •����C C �/ S ♦!1 ; a r W Q U o cC APPLICABLE TO INSTALLATION. 3. AIR VOLUMES AND PRESSURE DROPS THROUGH COOLING COILS AND - {+ • ^O y d a BYPASS DAMPER Jul to it: s 15-9 HVAC EQUIPMENT 4. PERMANENTLY MARK FINAL DAMPER POSITION SETTING ON DAMPER_ - REVISION I. GAS.FURNACE:CARRIER,TRANE OR APPROVED EQUAL.80%EFFICIENT NATURAL 5.. AIR LING. Date: RATURES AT COOLING COIL DISCHARGE ON FULL HEATING AND By: Tate=. COOLING. - 1•ADD.#1 1,, GAS FURNACE WITH CONSTANT VOLUME FAN,TWO STAGE GAS HEAT AND 2",30% B. CYCLE CONTROLS FOR EACH UNIT TO VERIFY PROPER SEQUENCING AND PLEATED FILTERS IN FILTER RACK. MANUFACTURER'S STANDARDFACTORY FINISH. OPERATION OF AIR HANDLING LIMT,ECONOMIZER AND ASSOCIATED HEAT PUMP 2.ADD.#2 11/14/17 A. SUSPEND GAS FURNACE AND COOLING COIL FROM STRUCTURE ON VIBRATION UNITS. ISOLATORS IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 3. PROVIDE FLEXIBLE CONNECTIONS ON INLET AND OUTLET DUCT CONNECTIONS. 4. EXHAUST FANS: 4. B. ROUTE DOUBLE WALL GAS"B"VENT UP THROUGH ROOF WITH GAS VENT CAP, A. MAKE ADJUSTMENTS AND RECORD DATA IN SAME MANNER AS FOR SUPPLY 5 ROOF JACK AND STORM COLLAR. FANS. C. PROVIDE MATCHED.DX COOLING COIL.SEE BELOW. B. ADJUST BELT OR SPEED CONTRTOLLER ON EXHAUST FANS TO OBTAIN FAN 6. D. GAS FURNACE TO BE CONNECTED TO EMERGENCY POWER SYSTEM. SPEED REQUIRED FOR AIR VOLUMES.SPEED SHALL BE SET TO THE MINIMUM COORDINATE WITH ELECTRICAL CONTRACTOR: REQUIRED TO PROVIDE AIR VOLUME WITHOUT EXCESSIVE STATIC PRESSURE. 7• E. CONTROLS:CONNECT TO OWNER FURNISHED DDC CONTROL SYSTEM C. INCLUDE THE FOLLOWING IN THE.LOGS: 8. PROVIDED IN ANOTHER CONTRACT.FAN TO RUN CONTINUOUSLY.FIRST STAGE 1. INDMDUAL EXHAUST CFM WITH OUTSIDE AIR ON MINIMUM AND WITH ALL OF HEATING TO BE TWO DEGREES LOWER THAN SF-1 SYSTEM HEATING EXHAUST SYSTEMS RUNNING. SETPOINT. - 2. ACTUAL MOTOR VOLTAGE,AMPERAGE,RPM AND OVERLOAD HEATER DRAWN BY: F. PROVIDE A CARBON MONOXIDE SENSOR TO SHUT FURNACE DOWN ON SIZES,AS WELL AS NAMEPLATE DATA- - IBILIMI DETECTION OF CABON MONOXIDE. - - -. 11/1/17 PERMIT MOJO G PROFf S1. �Y�p�M,. oust.ssio CONSULTANTS Fe it - __. Illb 333 SE SEC=a PA SUM 100 1 PORTLAND303-201-0227 FAX 310-CC140 ° ' r ,9_` I ROOF EQUIPMENT SCHEDULE CONTACT:BRUCE MYfRS ��Rr C.aWS PROD 40ft.: ',LA.• WIRES 12/31/17 ITEM DESCRIPTION ELECTRICAL PRODUCTION: 0J6LCCHlR. - •_ I PROD:No.16210 30224 ,-18x14 36236 I GF-1 TWO STAGE 80%EFFICIENT GAS FURNACE HORIZONTAL SUSPENDED. 115 V.1 PH.. EIATN "IEER: � I 0 90 MBH MAX INPUT; 58/88 MBH OUTPUT. 1600 VIA AT 0.5'SP. 80%AFUE. POWERGENCY I BASIS OF DESIGN: CARRIER MODEL 58 CTA-090-16 I- CC-OF DX COOUNG COIL 5 TON NOMINAL CAPACITY,1600 CFM,HORIZONTAL CONFIGURATION. HVAC LEGx✓E N D LU E,40 DUCT CONNECT `-"�"_I .BASIS OF DESIGN: CARRIER MODEL CNPHP6024ALA AND DAMPER I/TO INTAKE MANUAL BYPASS CAMPER. OPEN TO ROOM \� OO PLENUM/ 24x24 APPROX.16TH x 20"w HP-GF AIR COOLED HEAT PUMP: 4 TON NOMINAL CAPACITY,WITH PURON REFRIGERANT, 25.2 MCA �-� AIR FLOW DIRECTION. 100 CFM MOTORIZED 40 MOCP SUPPLY OR OSA DUCT SECTION U - I DAMPERS 1 ik ,i 0 COORDINATE WITH COIL DIMENSIONS. BASIS OF DESIGN: CARRIER MODEL 25HCE. 14 SEER: 208/230V,1 PH ® CE3 ROUND,RECTANGULAR Q OO SET FOR 2500 CFM. CO E e� RETURN OR EXHAUST DUCT SECTION (-�HFP-1A - \y 0 1E - OF-1A BELT DRIVE CABINET FAN, 6500 CFM®2.0"ESP CAPACITY. WITH VARIABLE FREQUENCY 5 HP ®. ROUND,RECTANGULAR S Z �� CC-7A �lC©7O 011 QE ;�. 0 DRIVE. INITIALLY SET VED SPEED TO PROVIDE 4200 CFM. PROVIDE LEAD LAG CONTROL. 208 VOLT BUTTERFLY VOLUME DAMPER- 0 ®. x ® PROVIDE INTERNAL LINING ON FAN CABINET AND INTERNAL.VIBRATION ISOLATION. 3 PHASE DOUBLE UNE,SINGLE LINE �1 I` 18x46 MINIMUM OSA 800 CFM. INITIAL SETTING FOR 600 GEM. (PHASE 1) Z N RAD FLEXIBLE DUCT Q QN 0 HEP-113 -may B : CC-7B 1 BASIS OF DESIGN: GREENHECK MODEL BOF-180. _ r---. DOUBLE UNE,SINGLE LINE _. 56 cow \137 O : 0 111 /1 HOUSEKEEPING 5 BELT DRIVE CABINET FAN,6500 CFM 0 2.0"ESP CAPACITY.WITH VARIABLE FREQUENCY 5 HP •♦♦ ♦ �� 101. -I�I 0 i PAD. 208 VOLT .-e♦e.�♦ l 1 -INTERNALLY LINED DUCT j W D' V z -- 0 DRIVE. INITIALLY SET VED SPEED TO PROVIDE 4200 CFM: PROVIDE LEAD LAG CONTROL. 3 PHASE �O NN -- - ----- - ----- PROVIDE INTERNAL LINING ON FAN CABINET AND INTERNAL VIBRATION ISOLATION. RETURN/EXHAUST GRILLE Z 3Z �_�_ MANUAL DAMPERS -ANGLE IRON THREE 24x2414 FILTERS. MINIMUM OSA 800 CFM. INITIAL SETTING FOR 600 CPM.(PHASE 1) FOR FILTER CHANGES. STANDS IN SLIDE OUT FILTER RACK ~ Re NORMALLY OPEN FLEXIBLE DUCT CONNECTORS BASIS OF DESIGN: GREENHECK MODEL BCF--180. y SUPPLY AIR DIFFUSER CC 0� N0 BOTH ENDS II WITH THROW DIRECTIONS - cQ CL SECTION CC-1A DX COOLING.COIL. 5 TON NOMINAL CAPACITY, 2000 DFM, HORIZONTAL.CONFIGURATION. L F_2 dLL A SECTION 0 BASIS OF DESIGN: CARRIER MODEL CNPHP6124A. f-l' SPIN-IN WITH VOLUME DAMPER { ELBOW WITH TURNING VANES M1.0 CC-18 DX COOLING COIL: 5.TON NOMINAL CAPACITY, 2000 CFM,HORIZONTAL CONFIGURATION. 1/4'-1'-0" 0 BASIS OF DESIGN: CARRIER MODEL CNPHP6124A. EO1 iF 21 ELBOW DOWN WITH TURNING VANES HP-1A AIR COOLED HEAT PUMP: 5 TON NOMINAL CAPACITY,WITH PURON.REFRIGERANT. 2 STAGE. 34.5 MCA 0 BASIS OF DESIGN: CARRIER MODEL 25HPA6. 15 SEER. 50 40CP NI + ® ( ELBOW UP WITH TURNING VANES 'S 208 V, 1 PH, HP-1B AIR COOLED HEAT PUMP: 5 TON NOMINAL CAPACITY, WITH PURON REFRIGERANT: 2 STAGE. 345 MCA SHEETMETAL HOOD FOR - -SEAL OPENING WITH 0 BASIS OF DESIGN: CARRIER MODEL 25HPA6. 15 SEER. - 50 4OCP 46 REFRIGERANT,CONTROLS EXPANDING FOAM 206 V,1 PH. AND ELECTRICAL HEP-IA HEPA FILTER PACKS. PACKAGED SIDE ACCESS FILTER BANKS WITH FOUR 24x24112 FLUE VENT,ROOF JACK 0 VEE STYLE HIGH CAPACITY ABSOLUTE HFPA FILTERS AND FOUR 24124x2 30%PRE-FILTERS. ABBREVIATIONS AND STORM COLIAR -,r-Th98.88%FILTER EFFICIENCY AT 0.3 MICRON. COORDINATE ALL ROOF PENETRATIONS /,- \/ 11P_SE OASIS OF DESIGN: CAMFIL/FARR MAGNA-PACK WITH FILTRA 2000 FILTERS. 8 ROUND DUCT DIAMETER.INCHES Z AND CURBS WITH LANDLORD'S /METAL CAPPED HFP-1B HEPA FILTER PACKS. PACKAGED SIDE ACCESS FILTER BANKS WITH FOUR 24x24x12 12 x 8 RECTANGULAR DUCT SIZE,INCHES 0 ROOFING CONTRACTOR © .�/ CURB OE VEE STYLE HIGH CAPACITY ABSOLUTE HEPA FILTERS AND FOUR 24124x2 30%PRE-FILTERS. CE CEILING EXHAUST GRILLE m 99.99%FILTER EFFICIENCY AT 0.3 MICRON. BASIS OF DESIGN: CAMFIL/FARR MAGNA-PACK WITH FILTRA 2000 FILTERS. CR CEIUNG RETURN GRILLE 4"B VENT-.. CS CEIUNG SUPPLY DIFFUSER VEKTOR-H ROOFTOP UPBLAST EXHAUST FAN, 2000 CFM 0 1.0'SP. XXXX RPM. 1-1/2 HP EF EXHAUST FAN Q / FUME STEEL CONSTRUCTION WITH CURB AND BYPASS DAMPER IN INLET 230 V. 1 PH. EXHAUST 425 LBS, SERVES INNOVENT RACKS GE GAS FURNACE HS HIGH SUPPLY DIFFUSER PROVIDE SPRING ISOLATED HANGERS PRI SEISMIC RESTRAINTS. FAN 0 BASIS OF DESIGN: C,REENHECK VEKTOR-H-12. FLEX HR HIGH RETURN GRILLE FILTERSd d CONNECT. - - LR LOW RETURN GRILLE HMD-1 PACKAGED STEAM HUMIDIFIER. 9 HW, 22 A. ___-_, *��4S4 27 LBS/HR OUTPUT.. 9-KW, 16"DISPERSION TUBE. 208 V. 3 PH. HE HIGH EXHAUST GRILLE GASS1- •4 j4 j44.. INTERNALLY LINED BASIS OF DESIGN: ARMSTRONG HUMIDICLEAN MODEL 6100 WITH 0-1.5 DISPERSION TUBE. RTU ROOFTOP UNIT FURNACE -G" •�����. SUPPLY DUCT 04�4♦��4 HP HEAT PUMP FLEX OSA OUTSIDE AIR CONNECT. CO.� 1 - - - - DAD OUTSIDE AIR DAMPER O TRAP ANDORRA N� \ � RAD RETURN AIR DAMPER c0 ROUTE CONDENSATE TO ^ EAD EXHAUST AIR DAMPER CONDENSATE OVERFLOW FLOOR DRAIN: BALANCING N O TE J ZZ CUT-OFF SWITCH OBD OPPOSED BLADE DAMPER YYY5 IN CONDENSATE PAN GALVANIZED CONDENSATE BIM BACKDRAFT DAMPER W PAN UNDER EQUIPMENT MECHANICAL CONTRACTOR TO VERIFY THAT ALL PRE-FILTERS ARE NEW OR CLEAN AND REPLACE IF NECESSARY O a a PRIOR TO BALANCING. CHECK CONDITION OF HEPA FILTERS AND INFORM TENANT IF REPLACEMENT IS NEEDED. AUD AUTOMATIC DAMPER CC U'Il r B V A cJ FURNACE D E TA I INCREASE SPEED AT VARIABLE ARRANGEMENT. DRIVESFOR EXISTING SF-TA AND SF-18 TO PROVIDE 6800 CFM EACH. VED VARIABLE FREQUENCY DRIVE CC D FANS ARE LEAD/LAG ARRANGEMENT. /_V a d O M1.0 NO SCALE INCREASE MINIMUM OUTSIDE AIR FR* 1350 CFM TO 1800 LL,OR AS REQUIRED TO MAINTAIN 0.05"POSITIVE ¢u PRESSURE IN THE VIVARIUMS AND 0.02 ••♦. �� _ O U 00 0)Zu. . INCREASE EXHAUST AIR VOLUME AT VEKTOR FAN FROM 1160 TO c . SYMBOLS U1 W LL.�. ADJUST BYPASS DAMPER AT ROOF FIRST. ADJUST DRIVES IF NE Y. - 0 O O T ROOM THERMOSTAT ;IC >-. - r CONNECT T0.EXISTING SUPPLY ROOF _ _ // O ROOM HUMIDISTAT- © CONNECT TO EXISTING REVISION Q EXISTING TO REMAIN '1.ADD.#1 11/10/17 '� I 1/ SEAL PENETRATIONS SEAL PENETRATIONS - AIR TIGHT SEALED BOX.CONSTRUCTION AIR TIGHT ® RELOCATE EXISTING 2.ADD.#2 11/14/17 GASKET SEAL AT 60 ♦ - 3. DIFFUSERS CEILING _ -��\�\ 34. _ PENETRATIONS 5. �{ -. TEE BAR CEILING DAMPER FLEX DUCTS I - © - VENTILATION RATES - 2014 OMSC TABLE 403.3 6. VIVARIUM#1 ..VIVARIUM d9 BY TENANT ___ _ ROOMS AREA ZONE PEOPLE AREA OCCUPANT BREATHING TABLE 6-2 ZONE TABLE 6-3. MINIMUM. CORRECTED ZONE PRIMARY SERVED OSA EXHAUST - 7 / POPULATION OUTDOOR AIR OUTDOOR AIR DENSITY ZONE OSA ZONE AIR. OUTDOOR SYSTEM OUTDOOR AIR OUTDOOR AIR PRIMARY OSA BY UNIT SUPPUED CFM 8. BID-BUBBLE- RATE CFM/PP RATE CFM/SQFT #/1000 SOFT FLOW RATE DISTR. AIR ZONE VENT INTAKE FLOW INTAKE FLOW AIRFLOW FRACTION r -- - (Pz♦Rp+Az♦Ra) tr.LCTIVENESS VO2_ EFFICIENCY (CFM) (GEM) Vpz/(Vot) DRAWN BY: L I E%H -OCC.CATEGORY/(Az) (Pz) (Rp) (Ra) (Vb2(CFM)) (EA) (Vbz/Ez) (Ev) Vot=(Vbz/Ez) (Ev/Vot) Vpz Zp=(Voz/Vpz) FkM DOUBLE RACK FANS VIVARIUM(125)/MED.PROC.RMS/660 SOFT QI 13 15 0.00 20 195 . 1.0 195 1.00 195 195 4200 0.02 SF-1 1100 590 VIVARIUM 02(130)/MED.PROC.RM/335 SF Q 7 15 000 20 105 1.0 105 1.00 105 105 2600 0.03. SF-1 - 660 430 PERMIT/ 7 ♦VMEMMEMMWO -_ MECH(-)/STORAGE/195 San0.1 0 0.12 0 23 1.0 23 1.00 23 23 - 0.00 SF-1 40 200 TOTAL SF-11 323 323 . 323 6800 SF-1 1800 1220 1600♦ C VIVARIUM DIAGRAM OI NET OCCUPIABLE SPACE LESS BID-BUBBLES •1935 CFM EXHAUST INCLUDING CEILING PLENUMS M J , 0 M1.0 NO SCALE - - I I 0 7 Q) HOFS ` 1 CONSULTANTS il„ 1 °I!�SYSTEM ,0 � -.-I- CONSULT Ni`11�7 NC. ' . .__ 60 RIGID DUCT DOWN THROUGH COU TILE. Al g BEWO NO ERRE 10■ � 1"�F1' C�RDIN TE EXACT LOCAnIXJ WITH MI ANO MOON 97214 ft PROVIDE BALANCING DAMPER BELOW as I NG. �' FM 21■-02W ! Y f3 ig0x /M AIR B NCE SETTING-OF 55 CFM uu 'rACI(S.'-ERATINC. CONTACT:BRUCE UYD<s- S ��1 FLEX DU T THROUGH BUBBLE AND L% 0 FAN qRY C.BA �" �1� IIIII ill. BY 0TH S. COORDINATE NTH TEN LL. O� I Ilk .....-:ay�::AI _ E%PoRE$12/31/17 ® �M�r�S�N� I TYPICAL OF SIX LOCATIONS _ �� n��� _.- CTAY: LA1 I PROJ.No.16210 IXLtd..CONTRCI. 4T M�\�I�1 vIIII zlxzo DOWN _�_ .B�1 REMOVE EXISTING ROOFTOP HVAC UNIT I .-111119.-11M-All I I AND ALL ASSOCIARBD DUCTWORK. • REMOVE ROOF CURB AND REROOF AREA 200 PER PACTRUST STANDARDS. C =1� {ice•. SEAL ANY EXISTING DUCT PENETRATIONS - 0 '�_, SEAL • -ATION THROUGH VIVARIUM WALL. W REROUTE EXISTING GAS PIPING TO NEW GF-1. I PROVID DA Q' AIR TIGH'. -_ 1 Alg ACCESSP LE IIIE77i ',,' I REIN,`ROW�r _ �Y 0 1, 011 40�TA I. 'CAL, 11121 .._ cc Q p ■ �l . P_ EXISTING z �� I 1 11 i\_/ 1 RNOFTOP 11 ' I \ �I. I„ CONNECT NEW 10x8 DUC. TO 11 r'—UNIT O r$ I1 l ■ I I I EXISTING 16x16 DUCT. IIVERIFY LOCATION CO Y ��'_... ''w 1 a■1■1■1lm 01■1■1■�N000� L-_-1 Q 0 W �I� I�I �Q°�1 e �_.E.m. .EXISTING VECTOR EXHAUST FAN ON •:T6.. I O� Q� �� �_V'��,' I I ADJUST BYPASS DAMPERTED EXHAUST,a� 0 PROVID TOTAL O¢ 1.-- I.®� - ��.1®.� —' PROVIDE DRIVE CHANGEMF NECE i.� z �0 o.0 (■W-I 1.30 I=JIT `� 1 CO CO co Z L �,at CC co co ( , • t���•_ �I 60-4 "b," I ©80 OPEN - Q VO Y �11�_'�� "a..� /� ® ABavE WOME n ani 1 '.'�'ABOVEtCEI�1I CONECT TO �AI'�.��11��1 •1 CEILINGilliii La��l�i,� I/ EXIS NG 60 l BENIN if 1 60 CAP'Er 01 -. j e L��h '■I lb isp—.0 141 LOCATE ALL BALA LNG DAMPE-" •11 r1` . ACCESSIBLY MOVE OILET ROD - POST PR ►®7II�I■������II PLATFORM. �$ I N ® IN TH, NO•+ I■�I�I 1 L J) 8x8 100 ■�7 CO. _ m — I CON CT TO 120- ' , _C���-II ill 11 EXIS NG 100 - i., E�1 CAPP r WCT w 4k ris�--,--fir■. ° ►.!!� 1 !WW1 CE EXISTING 1 II..1111111.111== ='.—. QE 100 206 ISO/s00.•• •>•■, w UNOFiOP mime •_�_ � -�'■ 'I 0 (3 t-_-I �i ln.�l __:_ -- -.MAINTAL 0.02" VEST ! I T�1A3 U' PDSITI- PRESSURE lj \ Z �� III IN THIS 'QOM. lap '126 \ / I CAPP 7. 1492• DUC1. 'I - CSI L---J _� ROUTE DUCT=FLOW HARD LID ,I I I)(STING m 1 .. -�I �� C' II N 'NOFTOP \/������, O •AL ARD D PEN=TRA11 2 NIT P+ 1I i MIN 1 • ^, �► Q V I,1 6- - ,�t-0._ -'III �1•" 60 - r PROVIDE WORK RELATED, ' PROVIDE WORK RELATED, I G--- ABOVE - I TO FUME HOOD PER 1 TO FUME HOOD PER I ,., _TRATIONS CEILING 1 ADDENDUM#2 DATED 1 ADDENDUM#2 DATED 1 11/14/17 ON SHEET I 11/14/17 ON SHEET I Ir ----Ire ROOFTOP - �-4 I MAINTAIN 0.05" I AZ NOTE#14. I A2. NOTE#19. I 1 /� �\ I UNIT CS POSITIVE PRESSURE I WORK TO BE INSTALLED I WORK TO BE INSTALLED I —T 11 TYPICAL OF IN THIS ROOM. I. PER FORTHCOMING 1 PER FORTHCOMING 1 1 - 14x24 /I I. VIVARIUM#1 t-:4_� l TENANT SPECIFICATIONS, t TENANT SPECIFICATIONS i *24 ( 140 ••••ma mp mInt am gm ma.► I I d 1 r 11 11281 140 �/. L_--_ J 1 , ,' -.�_CONNECT TO EXISTING GAS •O - f40 . UNE SERVING ® 180 ROOFTOP UNITS CO 1 VERIFY SIZING. r¢ 22x24 I - _ , •..11111/1111110111k - 90 MBH. WCC ..r. CO Wi 40 RIGID DUCT AND VD _u_ -_ ,f ••® 200. U D:C‘Ia 1. © TYPICAL Q 140 I 1 IW"O F.Y. 21 1� / 1....--T O)FTOF (L O 0 VEPIFY LJCA'ION O 0 z W p, — , coaa 1O a NG ZQ i ' „ I 20 ©9 __ ,, 140 - -_ -- 40 RL: s T ANO ./v�, O I. TYPI.�L � © NOM REVISION D __ ___ I 20 I .Uj ALL NEW SUPPLY DUCTWORK DOWNSTREAM OF HEPA FILTERS 1.ADD.#1 11/'10/17 TO BE CONSTRUCTED,INSTALLED AND PROTECTED DURING Q SF-IA CONNECT. 18x14 INTO OE © • © • /'��� CONSTRUCTIONS PER SURGICAL ROOM STANDARDS. 2.ADD.#2 11/14/17 30x24 SF-18 TOP OF FAN INTAKE FOUR sl'16 , ' - 3. (STACKED) PLENUM. LOW' 'N ERMOSTATS 4-II 0 40 O - Q SEAL ALL WALL PENETRATIONS INTO VIVARIUM#3 AIR TIGHT. CC-1A GRI ` 48x46 BYPASS DAMP:; ! �iI j HIGH REUE GRIL I 4 \r=EW CARBON I. _ __.�. _-_ • 5. NFP-1A CC-1B al 641111014=- {F ■ ..s • • • _ _�" ,,- I HFP-1B - •...w.a.- -_-__ SENSOR r>, ...., 6. j vi©i`— �— 1_.� _ . _._ 7. MEM RAD c-- Ri0i; ORA (INSIDE DUCT) S3 j 8. \ / �Q�...���. ♦:3Sw� 36x36 UP TO \ / NO#44 r:44',!.'1,4 11 RELIEF CAP OE Fi O#44 ''��y,1 r4 1 I,� I SF-1A& - X V..�4O4 i s�.�! s.. 36x36 UP TO RC-1 I SF-1B / \ ,•.•y.•4•4 100��i ,I�i OSA CAP I w SPEND FROM STRUCTURE 80 DRAWN BY: VFD'S I / \ �64�;p MI -.4-�`I RC-1 r-� IT51 r\ Ian s .�_ 175 LBS. 41121 'J 1 r 11/1/17 E`IGHTI2x2'x12" SUPPLY M HMD-1 30 • EAD. CC-GF III m��������^ i ...IN PLENUM _ OPEN PERMff r. PROVIDE WORK RELATED, ""'ACK " , �� 18x14 ,� .,� GF-1 „ 200 �I - VINVA�RIUM#1 IS TO REMAIN IN OPERATION DURING CONSTRUCTION TO WASHER/DRYER-PER UNITS(STACKED) I� I (�O /, i�1 EXISITNG HVAC SUPPLY SYSTEMS ARE TO REMAIN OPERATING ADDENDUM j2 DATED `-""� �� I 1 G ' AND CLEAN DURING CONSTRUCTION. ANY REQUIRED SHUTDOWNS I- ------ / �WINN' i -i J �I -.Ad-- 1 MUST BE COORDINATED WITH THE TENANT. 11/14/17 ON SHEETI \� - 3/4"GAS _ A2. NOTE#20. 3/4"CONDENSATE. ri-, pir I,- \' © 72x42 GALV_, I WORK TO BE INSTALLED SPILL TO FLOOR DRAIN / / •■R 100 UP TO PER NFORTHCOMING SHIP/RECV I 1 /I )- - /I '1 / 4"GAS FL HOOD II EF-3 N - M 2 1 IENANLSPECIFICATIONS' LI iJ V.-,mus ,I 1. WAREHOUSE ' m MECHANICAL FLOOR PLAN. • .,- rI 11301 - . R■q. 11 1 O \V 11-1.--71 .- ON ROOFO I: HP-GF 29 �_� SCALE vas a r-0' ON 1 'OOF - ON ROOF