Report (22) 33 -v DESIGN= FIELD REPORT Page 1 of 2 GDI Project Polygon-129-03 Prepared By: Kyle Hanson Project Name: River Terrace East Date: 2/14/18 Location: ; SW Scholls Ferry&Roy Rogers,Bvrtn. Report#: 201 Arrival: 1045 Departure; 1245 Weather Sunny, 50s Permit#: TBD Site Visit Requested By: Spencer(NEI); Ken(Polygon) Met With(on site): Keywest crew, NEI Crew, Spencer(phone), Ken(phone) Purpose. J Observe wall backfill and lots 2426, 66, 173-175 Outstanding Issues: 9 Proof roll road and curb base rock and repair as needed before paving FR-58(12/06) Decommission temporary storm and sewer lines through Tract E FR-177 soft fill from slope cut in lots 153, 154 and 155 Wall 21 &Wall N of Snowdale St. Upon arrival, I observed Keywest had compacted previously observed non-compacted backfill for Lock+Load wall 21 (see site plan and FR200). Crew were not backfilling during our site visit. I was informed that backfill material was 3:"minus crushed rock sourced for Baker(Farmington).Compaction efforts were completed utilizing a large walk behind plate compactor next to the wall and a small smooth drum roller for wall fill. Using a Troxler 3430 nuclear density gauge, I tested the density of the granular backfill and compared the results against a lab produced proctor (ASTM D1557)value of 127.2pcf at 13.6 percent optimum moisture content.Areas tested met or exceeded our compaction recommendations of 95%compaction of maximum dry density value. I also observed subgrade for an additional wall to be located north of Snowdale St. (see site plan). NEI crew informed me that 6"to 1' of crushed rock base would be placed over the subgrade,which appeared to consist of brown sandy silt. I used a%Z"diameter steel foundation probe to evaluate the consistency of the subgrade material and observed probe penetrations indicated generally medium-stiff to stiff subgrade conditions today. Lots 24-26(at SW Beach Plum)&Lot 66 I observed subgrade for lots 24-26 where shown on the attached site plan. The subgrade appeared to consist of brown sandy silt,which was covered by approximately 2 inches of granular base. I used a W diameter steel foundation probe to evaluate the consistency of the subgrade material (through the granular base);observed probe penetrations indicated generally medium-stiff to stiff subgrade conditions today. I also observed lot 66(see site plan);crew informed me that approximately 6"to 1'of 3/4"-0 crushed rock from Tigard Sand&Gravel had been placed over subgrade. Probe penetrations with a W'diameter steel foundation probe indicated generally stiff subgrade conditions today through the granular base. Pin resistances of the 1 foot thick backfill were observed. The number of one-handed blows required to drive a 34"diameter steel foundation probe 1 foot into the crushed rock indicated dense base conditions today. Lots 173-175 NEI crew were not available to pothole/smooth surface spots for density testing. We recommend density testing of the backfill material (see FR199)at the material surface and in contractor prepared potholes of approx. 2' in depth. Conclusion Based on observations,density testing, probing,and pin resistance, it is our opinion that the lots and wall backfill/subgrade observed today,where indicated on the attached site plans, have been/are being prepared in general accordance with our geotechnical recommendations. 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com .0 ' [ ..DESIGNk FIELD REPORT Page 2 of 2 Distribution: Attachments:Site Plan/Map(3); NDGD(1) Reviewed by: This report presents opinions formed as a result of our observation of acdvides relating to geotsthnic l en¢newfng or erw*on nenral services.We rely on the contractor to comply with the plans and specifications throughout duration of the project irrespective of the presence of our representate.air wodc does not indude supervision or direction of the=tractor,the contractor's employees or agents,Our firm Is not responsible for sloe safety.This field report is a DRAFT representation of outfield recommendations.The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the'Reviewed 81'section.. Signature: 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com