Loading...
04/04/2011 - Packet , II Completeness TIGARD Review for Boards, Commissions and Committee Records CITY OF TIGARD PLANNING COMMISSION Name of Board, Commission or Committee April 4,2011 Date of Meeting Signature Doreen Laughlin 11/6/14 Date " City of Tigard sd TIGARD 14 Planning Commission Agenda MEETING DATE: April 4, 2011; 7:00 p.m. MEETING LOCATION: City of Tigard—Town Hall 13125 SW Hall Blvd.,Tigard, OR 97223 1. CALL TO ORDER 7:00 p.m. 2. ROLL CALL 7:00 p.m. 3. COMMUNICATIONS 7:02 p.m. 4. CONSIDER MINUTES 7:05 p.m. 5. PUBLIC HEARING— 7:05 p.m. COMPREHENSIVE PLAN AMENDMENT (CPA) 2011-00002 -TIGARD COMPREHENSIVE PLAN AMENDMENT TO ADOPT THE TIGARD 2011 ECONOMIC OPPORTUNITIES ANALYSIS REQUEST: To adopt the Tigard 2011 Economic Opportunities Analysis as a component of Tigard Comprehensive Plan Goal 9: Economic Development; to amend the current Tigard Comprehensive Plan Goal 9: Economic Development goals, policies, and recommended action measures; and to amend Tigard Comprehensive Plan Glossary. The complete text of the proposed amendment can be viewed on the City's website at http://www.tigard-or.gov/code_amendments. LOCATION: Citywide 6. WORK SESSION—8:05 p.m. PLANNING COMMISSION GOALS AND WORKPLAN 7. OTHER BUSINESS 9:05 p.m. 8. ADJOURNMENT 9:10 p.m. PLANNING COMMISSION AGENDA—APRIL 4, 2011 City of Tigard I 13125 SW Hall Blvd.,Tigard,OR 97223 I 503-639-4171 I www.tigard-or.gov I Page 1 of 1 PLEASE PLACE UNDER CITY OF TIGARD LOGO IN THE LEGAL NOTICE SECTION OF TIGARD TIMES, THE FOLLOWING: PUBLIC HEARING ITEM: The following will be considered by the Tigard Planning Commission on Monday April 4, 2011 at 7:00 PM and the Tigard City Council on Tuesday, May 10,2011 at 7:30 PM at the Tigard Civic Center-Town Hall, 13125 SW Hall Blvd., Tigard, Oregon. Public oral or written testimony is invited. The public hearing on this matter will be held under Title 18 and rules of procedure adopted by the Council and available at City Hall or the rules of procedure set forth in Section 18.390.060.E. The Planning Commission's review is for the purpose of making a recommendation to the City Council on the request. The Council will then hold a public hearing on the request prior to making a decision. Further information may be obtained from the City of Tigard Planning Division (Staff contact: Darren Wyss) at 13125 SW Hall Blvd.,Tigard, Oregon 97223 or by calling 503-718-2442. COMPREHENSIVE PLAN AMENDMENT (CPA) 2011-00002 - TIGARD COMPREHENSIVE PLAN AMENDMENT TO ADOPT THE TIGARD 2011 ECONOMIC OPPORTUNITIES ANALYSIS — REQUEST: To adopt the Tigard 2011 Economic Opportunities Analysis as a component of Tigard Comprehensive Plan Goal 9: Economic Development; to amend the current Tigard Comprehensive Plan Goal 9: Economic Development goals, policies, and recommended action measures; and to amend Tigard Comprehensive Plan Glossary. The complete text of the proposed amendment can be viewed on the City's website at http://www.tigard- or.gov/code_ amendments. LOCATION: Citywide. ZONE: All City Zoning Districts. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.380 and 18.390; Comprehensive Plan Goals 1, 2, 5, 6, 7, 8, 9, 10, 11 ,12, 13, 14, and Special Planning Area: Downtown; Oregon Administrative Rule 660, Division 9; and Statewide Planning Goals 1,2, 5, 6, 7, 8, 9, 10, 11, 12, 13, and 14. (THERE IS NO MAP TO BE PUBLISHED WITH THIS NEWSPAPER PUBLICATION. THANK YOU) TT PUBLISH DATE: March 17,2011 \ ' , ; h605S[Lake Road,Portland,0R87222° P0Box%O00 Portland UKS726V2109 Phone:503-6840360Rm:503-020-3433 E-mail: |o8a|s@commnonxpopom.uom AFFIDAVIT OF PUBLICATION State of Oregon, County of Washington, SS puBLic HEARING ITEM: |. Charlotte Allsop, being the first duly uwonn, The following will be considered by the depose and say that I am the Accounting - Ti.ard Planinin. Commis ion on Monday Manager of The Times (serving Tigard, April 4 2011 at 7:00 PM and the Tigard Tualatin & Shenxmod), a newspaper of _- - City Council on Tuesday May 10 2011 at general oircu|adon, published at Beaverton, . 7:30 PM at the Tigard Civic Center -Town in the aforesaid county and a(ate, as defined : _ B Hall, 13125 SW Hall Blvd.,Tigard,Oregon. by ORS 193.010 and 193.020. that -- ' Public oral or written testimony is invited, TIGARD The public hearing on this matter will be held City ofTigard Notice ofPublic HeorinQ/CPA2O11-OOOO2 the rules of procedure set forth in Section TT11529 18,390.060.E, The Planning Commission's reyiew is for the PurPose of making a recommendation to the City Council on A copy of which is hereto annexed, was the request.-The Council will then hold a public hearing on the published in the entire issue of said request prior to making a decision. Further information may be obtained from the City of Tigard newspaper for Planning Division(Staff contact: Darren Wyss)at 13125 SW 1 Hall Blvd.,Tigard,Oregon 97223 oi-by calling 503-718-2442. week in the following issue: March 17, 2010 COMPREHENSIVE PLAN AMENDMENT (CPA)2011-00002, -TIGARD COMPREHENSIVE PLAN AMENDMENTi V7 jil i (- OU.td-t_f) C' 17tCk-' -14 TO ADOPT THE TIGARD 2011 ECONOMIC OPPORTUNITIES ANALYSIS- Charlotte Allsop (Accounting Manager) REQUEST: To adopt the Tigard 2011 Economic Opportunities Analysis as a component of Tigard Comprehensive Plan Goal 9: Economic Development; to amend the current Tigard cribed and sworn to before me thisComprehensive Plan Goal 9: Economic Development goals, 'March 17, 2010. policies, and recommended action measures; and to amend I\ Tigard Comprehensive Plan Glossary. The complete text of V,,,,,,,, - the proposed amendment can be viewed on the City's website PUB��CF�iRORE(�ON [W‘N.Wii‘,) -, \\,-- , -, Citywide. ZONE: Ail Ci1Y Zoning Districts- Al'PLICABI'E 9TA 'Y �o - m�y� J. �(��� REVIEW CRITERIA: Community Development Code commission expires � ~, ��\� Chapters 18.380 and 18.390; Comprehensive Plan Goals 1, �� ��� I y°� �» \ Acct#10003001 .- Downtown; Oregon Administrative Rule 660, r;iivisicin 9; and n: Doreen Laughlin City of Tigard 14. Publish 03/17/2011 TT11529 13125 SW Hall Blvd Tigard, OR 97223 Size: 2 x 5.75 Amount Due: $96.03° *PIease remit to addressabove IN ._-. City of Tigard TIGA RD Memorandum To: President Dave Walsh and Planning Commission Members From: Darren Wyss, Senior Planner Re: CPA2011-00002 Public Hearing Date: March 28, 2011 On Monday,April 4, 2011, the Planning Commission will hold a public hearing on the Tigard 2011 Economic Opportunities Analysis (CPA2011-00002). The EOA is required as part of the City's State Periodic Review work program and was developed in accordance with OAR 660, Division 9, which is administered by the Oregon Department of Land Conservation and Development. CPA2011-00002 will: 1. Adopt the Tigard 2011 Economic Opportunities Analysis as a component of Tigard Comprehensive Plan Goal 9: Economic Development; 2. Amend the current Tigard Comprehensive Plan Goal 9: Economic Development goals, policies, and recommended action measures; and 3. Amend Tigard Comprehensive Plan Glossary. The Commission acted as the advisory committee during the development of the EOA; reviewing and providing direction during a series of seven meetings. The Commission will now make its recommendation to City Council as required by the legislative process. The staff report and findings, as well as the completed Tigard 2011 EOA and associated amendments to Tigard Comprehensive Plan Goal 9 and Glossary are attached. As always,if you have any questions, please feel free to contact me at darren@tigard-or.gov or 503-718-2442. Agenda Item: Hearing Date: April 4,2011 Time: 7:00 PM STAFF REPORT TO THE PLANNING COMMISSION : NI FOR THE CITY OF TIGARD, OREGON 120 DAYS = N/A SECTION I. APPLICATION SUMMARY FILE NAME: TIGARD 2011 ECONOMIC OPPORTUNITIES ANALYSIS ADOPTION FILE NO.: Comprehensive Plan Amendment(CPA) CPA2011-00002 PROPOSAL: To adopt the Tigard 2011 Economic Opportunities Analysis as a component of Tigard Comprehensive Plan Goal 9: Economic Development; to amend the current Tigard Comprehensive Plan Goal 9: Economic Development goals, policies, and recommended action measures; and to amend Tigard Comprehensive Plan Glossary. APPLICANT: City of Tigard OWNER: N/A 13125 SW Hall Boulevard Tigard, OR 97223 LOCATION: Citywide ZONING DESIGNATION: All City zoning districts COMP PLAN: All City comprehensive plan designations APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.380 and 18.390; Comprehensive Plan Goals 1, 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, and Special Planning Area: Downtown;Metro Urban Growth Management Functional Plan Title 4; Oregon Administrative Rule 660,Division 9;and Statewide Planning Goals 1,2, 5,6,7,8, 9,10,11, 12,13,and 14. SECTION II. STAFF RECOMMENDATION Staff recommends the Planning Commission finds this request to meet the necessary approval criteria and RECOMMENDS the Tigard City Council amends the Tigard Comprehensive Plan as determined through the public hearing process. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 1 OF 17 SECTION III. BACKGROUND INFORMATION Project History The City of Tigard is in State Periodic Review. One of the required Periodic Review work tasks is to conduct an economic opportunities analysis. The City received grant funds from the Oregon Department of Land Conservation and Development for technical consultant assistance to complete this task. The Tigard 2011 Economic Opportunities Analysis (Tigard 2011 BOA)was developed in compliance with OAR 660 Division 9 (Statewide Planning Goal 9: Economic Development) and is a technical study that compares projected demand for land for industrial and other employment uses to the existing supply of such land. The purpose of the Tigard 2011 BOA is to improve opportunities for Tigard to attract and maintain the type and quality of employment desired by its citizens,grow its economy, and maintain its quality of life. Goal 9 emphasizes the preservation and protection of vacant land for industrial and employment uses. This will happen by adopting policies that ensure an adequate supply of industrial and other employment lands within the City of Tigard. The Tigard Planning Commission acted as the advisory committee for the project, reviewing each task during the process to complete the Tigard 2011 BOA. The six tasks reviewed by the Planning Commission included: 1. Economic Development Vision and Goals 2. Economic Trends Analysis 3. Site Suitability Analysis (Land Demand) 4. Inventory of Suitable Sites (Land Supply) 5.Assessment of Potential (Reconciliation of Demand and Supply) 6. Implementation Policies and Action Measures The tasks included examining key demographic and employment opportunities and trends to assess Tigard's economic development potential,projecting employment growth, and determining short- and long term demand for employment land. This demand is compared to an inventory of suitable commercial and industrial properties (supply) to assess the sufficiency of immediate and longer- term (20-year) supply of commercial and industrial employment land in the City's Urban Planning Area (UPA). The document meets the state requirements for an economic opportunities analysis and acts as a resource for staff, decision makers, and the public. It identifies the preferred land need scenario that will accommodate the type of economic development activity projected and wanted by the community. One important task in the development of the Tigard 2011 BOA was to consider land use planning efforts already completed and the City's expectations for redevelopment of its centers and corridors. This allowed the process to build upon previously adopted plans to ensure consistency and continuity. The Tigard 2011 BOA serves as a component of the Tigard Comprehensive Plan Goal 9. It identifies the amount of needed employment and industrial land for the next 20 years and recommends goals and policies to preserve this land. These goals and policies will help to guide future decisions so it was important to ensure the goals and policies were coordinated with the entire Comp Plan. As part of the process, existing Goal 9 language, which was revised and adopted in March 2008, proved to be very comprehensive and only minor changes were recommended. In general, all goals STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 2 OF 17 and policies contained within the Tigard Comprehensive Plan are intended to be supportive of one another. Proposal Description The primary intent of the amendment is to ensure the City's Comprehensive Plan remains a viable tool for decision-makers. By adopting the amendment, the City will ensure it is in compliance with applicable laws, rules, regulations, plans, and programs. As importantly, the update will also ensure that Goal 9 of the Comprehensive Plan reflects current community conditions and values. SECTION IV. SUMMARY OF REPORT Applicable criteria, Commission findings and conclusions • Tigard Community Development Code o Chapter 18.380 o Chapter 18.390 •Applicable Comprehensive Plan Policies o Chapter 1: Citizen Involvement o Chapter 2: Land Use Planning o Chapter 5: Natural Resources and Historic Areas o Chapter 6: Environmental Quality o Chapter 7: Hazards o Chapter 8: Parks, Recreation,Trails, and Open Space o Chapter 9: Economic Development o Chapter 10: Housing o Chapter 11: Public Facilities and Services o Chapter 12: Transportation o Chapter 13: Energy Conservation o Chapter 14: Urbanization o Special Planning Area: Downtown • Metro Urban Growth Management Functional Plan Title 4 • Oregon Administrative Rule 660,Division 9 • Statewide Planning Goals o Goals 1,2, 5, 6, 7, 8, 9, 10, 11, 12, 13,and 14. City Department and outside agency comments SECTION V. APPLICABLE CRITERIA AND COMMISSION FINDINGS CITY OF TIGARD COMMUNITY DEVELOPMENT CODE (TITLE 18) Chapter 18.380: Zoning Map and Text Amendments Chapter 18.380.020 Legislative Amendments to the Title and Map A. Legislative amendments. Legislative zoning map and text amendments shall be undertaken by means of a Type IV procedure, as governed by Section 18.309.060G Findings: The amendment to the Tigard Comprehensive Plan establishes policies to be applied generally throughout the City of Tigard; and therefore, the application is being processed as a Type IV procedure,Legislative Amendment, as governed by Section 18.390.060G. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 3 OF 17 Chapter 18.390: Decision-Making Procedures Chapter 18.390.020. Description of Decision-Making Procedures B.4. Type IV Procedure. Type IV procedures apply to legislative matters. Legislative matters involve the creation, revision, or large-scale implementation of public policy. Type IV matters are considered initially by the Planning Commission with final decisions made by the City Council. Findings: The amendment to the Tigard Comprehensive Plan establishes policies to be applied generally throughout the City of Tigard. Therefore was reviewed under the Type IV procedure as detailed in Section 18.390.060.G. In accordance with this section, the amendment was initially considered by the Planning Commission with City Council making the final decision. Chapter 18.390.060.G. Decision-making considerations. The recommendation by the Commission and the decision by the Council shall be based on consideration of the following factors: 1. The Statewide Planning Goals and Guidelines adopted under Oregon Revised Statutes Chapter 197; 2. Any federal or state statutes or regulations found applicable; 3. Any applicable Metro regulations; 4. Any applicable comprehensive plan policies; and 5. Any applicable provisions of the City's implementing ordinances. Findings: The Commission reviewed applicable Statewide Planning Goals, Metro Urban Growth Management Functional Plan, Oregon Administrative Rule 660, Division 9, the Tigard Community Development Code, and the Tigard Comprehensive Plan. As indicated pursuant to the Commission's findings and conclusions found within this staff report the amendment is consistent with this criterion. CONCLUSION: Based on the analysis above, the Commission finds that the proposed amendment satisfies the applicable review criteria within the Tigard Community Development Code. CITY OF TIGARD COMPREHENSIVE PLAN POLICIES: General Findings Finding: The City's Comprehensive Plan was adopted by the Tigard City Council in 1983, and acknowledged as being in conformance with the Statewide Planning Goals by the Land Conservation and Development Department (LCDC) on October 11, 1984. LCDC re- acknowledged the plan's compliance with the statewide planning goals through the Periodic Review process. Finding: The Commission finds that the following Comprehensive Plan goals and policies apply to the amendment and the amendment satisfies the applicable goals and policies for the reasons stated below. During the course of public hearings, the Community Development Department and the Planning Commission provided all interested parties opportunities to identify, either orally or in writing, any other Comprehensive Plan goals or policies that might apply to the amendment. No additional provisions were identified. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 4 OF 17 Chapter 1: Citizen Involvement Goal 1.1 Provide citizens, affected agencies, and other jurisdictions the opportunity to participate in all phases of the planning process. Policy 2. The City shall define and publicize an appropriate role for citizens in each phase of the land use planning process. Findings: The proposal has complied with all notification requirements pursuant to Chapter 18.390.060 of the Tigard Community Development Code. This staff report was also available seven days in advance of the hearing pursuant to Chapter 18.390.070.E.b of the Tigard Community Development Code. Information was distributed throughout the process via Cityscape articles and public meetings with the Tigard Planning Commission acting as the advisory committee. Involvement opportunities included a series of seven public meetings held by the advisory committee and submitting written or oral comments at the meetings. Outreach methods also included updates to City boards and commissions. As part of the Comprehensive Plan Amendment process, public notice of the Planning Commission and City Council public hearings was sent to the interested party list and published in the March 17, 2011 issue of The Times. The notice invited public input and included the phone number of a contact person to answer questions. The notice also included the address of the City's webpage where the entire draft of the proposed amendment could be viewed. Policy 3. The City shall establish special citizen advisory boards and committees to provide input to the City Council, Planning Commission, and City staff. Findings: The Tigard Planning Commission acted as the advisory committee for the Tigard 2011 Economic Opportunities Analysis. The advisory committee helped guide the completion of the project by reviewing work products and providing advice and feedback to ensure the community's needs and aspirations were being captured in the update. The committee met seven times in public settings from July 2010 to March 2011. Policy 5. The opportunities for citizen involvement provided by the City shall be appropriate to the scale of the planning effort and shall involve a broad cross-section of the community. Findings: As outlined above, the community was given multiple venues to get information and get involved. This included a number of articles in the Cityscape newsletter that is delivered to every household in Tigard. Staff also made a good faith effort to ensure a diversity of representation on the advisory committee and the opportunity for citizen input at the advisory committee meetings. Goa11.2 Ensure all citizens have access to: A. opportunities to communicate directly to the City; and B. information on issues in an understandable form. Policy 1. The City shall ensure pertinent information is readily accessible to the community and presented in such a manner that even technical information is easy to understand. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 5 OF 17 Findings: Information regarding the topics included in this Comprehensive Plan Amendment was available in multiple locations in an understandable format for the duration of the process. This included paper and electronic copies that were available in the permit center and also on the website. Policy 2. The City shall utilize such communication methods as mailings,posters, newsletters, the internet, and any other available media to promote citizen involvement and continue to evaluate the effectiveness of methods used. Findings: Information was distributed throughout the process via the City's website, Cityscape articles, and a series of seven public meetings held by the advisory committee. Outreach methods also included updates to City boards and commissions. Policy 5. The City shall seek citizen participation and input through collaboration with community organizations, interest groups, and individuals in addition to City sponsored boards and committees. Findings: Outreach methods included updates to City boards and commissions and a survey of community organizations, interest groups, and individuals with economic development backgrounds. The survey results can be found in Appendix I of the EOA. Chapter 2: Land Use Planning Goal 2.1 Maintain an up-to-date Comprehensive Plan, implementing regulations and action plans as the legislative basis of Tigard's land use planning program. Policy 1: The City's land use program shall establish a clear policy direction, comply with state and regional requirements, and serve its citizens' own interests. Findings: The amendment refines the general policy direction related to Tigard Comprehensive Plan Goal 9: Economic Development for the community. The policy statements are clear and serve the interests of the citizens. The development of the Tigard 2011 Economic Opportunities Analysis was required as a component of State Periodic Review and complies with Oregon Administrative Rule 660,Division 9,which governs the development of these studies in the state. Policy 2: The City's land use regulations, related plans, and implementing actions shall be consistent with and implement its Comprehensive Plan. Findings: The amendment refines the general policy direction related to Tigard Comprehensive Plan Goal 9: Economic Development for the community. The Tigard 2011 Economic Opportunities Analysis compares projected demand to current supply of vacant employment and industrial lands to ensure the City's policies and implementing actions are sufficient to preserve the needed 20-year supply of these vacant lands.The development of the Tigard 2011 EOA used current Tigard Comprehensive Plan policies and land use designations as part of the analysis of future vacant land needs as required by state law. The amendment is consistent with this policy. Policy 3. The City shall coordinate the adoption, amendment, and implementation of its land use program with other potentially affected jurisdictions and agencies. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 6 OF 17 Findings: The City sent out request for comments on the proposed amendment to all potentially affected jurisdictions and agencies. All were given 14 days to respond. Any comments that were received are addressed in Section VII: Outside Agency Comments of this Staff Report. Additionally,Metro and the Department of Land Conservation and Development staff provided input throughout the development of the Tigard 2011 EOA. Policy 5. The City shall promote intense urban level development in Metro-designated Centers and Corridors, and employment and industrial areas. Findings: The Tigard 2011 EOA identified and acknowledged the City's desire for, and the potential for redevelopment of these areas. Assumptions made about redevelopment and refill potential were based on City policy and Metro guidance to determine the amount of vacant employment and industrial lands needed for the next 20-years. The amendment is consistent with the policy. Policy 20. The City shall periodically review and if necessary update its Comprehensive Plan and regulatory maps and implementing measures to ensure they are current and responsive to community needs, provide reliable information, and conform to applicable state law, administrative rules, and regional requirements. Findings: The amendment is an update to Goal 9 of the Tigard Comprehensive Plan as required by State Periodic Review. The amendment adopts the Tigard 2011 EOA, which used the most reliable, up-to-date information to determine the 20-year vacant employment and industrial land needs. The Tigard 2011 EOA ensures compliance with Oregon Administrative Rule 660-009, which governs economic development planning in the state and requires this analysis. Findings of conformance to applicable state and regional requirements can be found in Section V of this Staff Report. Chapter 5: Natural Resources and Historic Areas Goal 5.1 Protect natural resources and the environmental and ecological functions they provide and, to the extent feasible, restore natural resources to create naturally functioning systems and high levels of biodiversity. Findings: As discussed in the findings made for Statewide Planning Goal 5, the amendment does not alter the City's acknowledged Goal 5 inventories or land use programs. No changes will occur to current Natural Resource protections as the result of adopting the Tigard 2011 EOA. The amendment does not conflict with goals and policies of this chapter of the Tigard Comprehensive Plan. Chapter 6: Environmental Quality Goal 6.1 Reduce air pollution and improve air quality in the community and region. Policy 3: The City shall promote land use patterns, which reduce dependency on the automobile, are compatible with existing neighborhoods, and increase opportunities for walking, biking, and /or public transit. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 7 OF 17 Findings: The amendment is consistent with this policy as the Tigard 2011 EOA identifies the redevelopment of centers and corridors as an important economic development activity to ensure a 20-year supply of vacant employment and industrial lands. This redevelopment will result in more intense urban land uses that reduce the dependency on the automobile and increase opportunities for walking, biking, and public transit. The Tigard 2011 EOA analysis shows no rezoning of property is needed under the land efficient need scenario, thus avoiding potential conflict with existing neighborhoods. Chapter 7: Hazards Goal 7.2 Protect people and property from flood, landslide, earthquake,wildfire, and severe weather hazards. Findings: The adoption of the Tigard 2011 EOA has no impact on City policies or programs related to hazards. The development of the Tigard 2011 EOA used the City's buildable lands inventory to identify vacant employment and industrial lands. The buildable lands inventory excludes sensitive lands, including the 100-year floodplain. The amendment is consistent with the policy. Chapter 8: Parks, Recreation,Trails, and Open Space Findings: The adoption of the Tigard 2011 EOA has no impact on City policies or programs related to parks, recreation, trails, or open space. However, Goal 9 acknowledges the benefits of these community amenities in attracting economic development. The amendment is consistent with this policy. Chapter 9: Economic Development Goal 9.1 Develop and maintain a strong, diversified, and sustainable local economy. Findings: The City is under State Periodic Review and required to complete an economic opportunities analysis. The development of the Tigard 2011 EOA complies with OAR 660, Division 9. It also used existing Tigard Comprehensive Plan policies, which were revised and adopted on March 6, 2008, as guidance during the process to complete the EOA. The amendment adopts the Tigard 2011 EOA, which compared the 20-year projected demand for employment and industrial land to the existing supply. The EOA found that the land efficient need scenario would provide the necessary 20-year supply of vacant employment and industrial lands. An adequate supply of land will support the development of the local economy. The EOA also recommended the addition of a policy to update the buildable land supply to monitor short and long-term supply as required by Statewide Planning Goal 9. Goal 9.2 Make Tigard a center and incubator for innovative businesses, including those that focus on environmental sustainability. Findings: The amendment adopts the Tigard 2011 EOA, which compared the 20-year projected demand for employment and industrial land to the existing supply. The EOA found that the land efficient need scenario would provide the necessary 20-year supply of vacant employment and STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 8 OF 17 industrial lands. An adequate supply of land supports this goal. The EOA also recommended the addition of a policy to encourage businesses that are economically and environmentally sustainable,which supports this goal. Goal 9.3 Make Tigard a prosperous and desirable place to live and do business. Findings: The amendment adopts the Tigard 2011 EOA, which compared the 20-year projected demand for employment and industrial land to the existing supply. The EOA found that the land efficient need scenario would provide the necessary 20-year supply of vacant employment and industrial lands. An adequate supply of land supports this goal. The EOA also recommended the addition of a policy to encourage neighborhood commercial uses for economic opportunity, efficient land use patterns, multi-modal transportation and neighborhood vitality,which supports this goal. Chapter 10: Housing Goal 10.1 Provide opportunities for a variety of housing types to meet the diverse housing needs of current and future City residents. Policy 2: The City's land use program shall be consistent with applicable state and federal laws. Findings: The amendment establishes the general policy direction related to Tigard Comprehensive Plan Goal 9: Economic Development for the community. The development of the Tigard 2011 Economic Opportunities Analysis was completed as a requirement of State Periodic Review and complies with Oregon Administrative Rule 660, Division 9, which governs the development of these studies in the state. Policy 5: The City shall provide for high and medium density housing in the areas such as town centers (Downtown), regional centers (Washington Square), and along transit corridors where employment opportunities, commercial services, transit, and other public services necessary to support higher population densities are either present for planned for in the future. Findings: The amendment is consistent with this policy as the Tigard 2011 EOA identifies the redevelopment of centers and corridors, for housing and employment, as an important economic development activity to ensure a 20-year supply of vacant employment and industrial lands. This redevelopment will result in more intense urban land uses that reduce the dependency on the automobile and increase opportunities for walking, biking, and public transit. The Tigard 2011 EOA analysis shows no rezoning of property is needed to accomplish this policy. Chapter 11: Public Facilities and Services Goal 11.2 Secure a reliable, high quality,water supply to meet the existing and future needs of the community. Findings: The amendment adopts the Tigard 2011 EOA, which compared the 20-year projected demand for employment and industrial land to the existing supply. The EOA found that the land efficient need scenario would provide the necessary 20-year supply of vacant employment and STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 9 OF 17 industrial lands. The EOA also analyzed the capacity of the water supply and determined it was sufficient to accommodate short-term land needs and 20-year projected employment growth as required by Statewide Planning Goal 9. Goal 11.3 Develop and maintain a wastewater collection system that meets the existing and future needs of the community. Findings: The amendment adopts the Tigard 2011 EOA, which compared the 20-year projected demand for employment and industrial land to the existing supply. The EOA found that the land efficient need scenario would provide the necessary 20-year supply of vacant employment and industrial lands. The EOA also analyzed the capacity of the wastewater system and determined it was sufficient to accommodate short-term land needs and 20-year projected employment growth as required by Statewide Planning Goal 9. Chapter 12: Transportation Goal 12.1 Develop mutually supportive land use and transportation plans to enhance the livability of the community. Goal 12.2 Develop and maintain a transportation system for the efficient movement of people and goods. Goal 12.3 Provide and accessible, multi-modal transportation system that meets the mobility needs of the community. Findings: The amendment is consistent with these goals as the Tigard 2011 EOA identifies the redevelopment of centers and corridors, for housing and employment, as an important economic development activity to ensure a 20-year supply of vacant employment and industrial lands. This redevelopment will result in more intense urban land uses that reduce the dependency on the automobile and increase opportunities for walking,biking, and public transit. Chapter 13: Energy Conservation Goal 13.1 Reduce energy consumption. Policy 1: The City shall promote the reduction of energy consumption associated with vehicle miles traveled through: A. land use patterns that reduce dependency on the automobile; B. public transit that is reliable, connected, and efficient; and C. bicycle and pedestrian infrastructure that is safe and well connected. Findings: The amendment is consistent with this policy as the Tigard 2011 EOA identifies the redevelopment of centers and corridors, for housing and employment, as an important economic development activity to ensure a 20-year supply of vacant employment and industrial lands. This redevelopment will result in more intense urban land uses that reduce the dependency on the automobile and increase opportunities for walking,biking, and public transit. Chapter 14: Urbanization STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 10 OF 17 Goal 14.1 Provide and/or coordinate the full range of urban level services to lands and citizens within the Tigard City Limits. Policy 6: The City shall, as needed, coordinate and/or participate in planning activities or development decisions within the Tigard Urban Services Area. Findings: The amendment adopts the Tigard 2011 EOA, which compared the 20-year projected demand for employment and industrial land to the existing supply. The EOA found that the land efficient need scenario would provide the necessary 20-year supply of vacant employment and industrial lands within the Tigard Urban Planning Area, which is coincident with the Tigard Urban Services Area. Goal 14.2 Promote Tigard citizens' interests in urban growth boundary expansion and other regional and state growth management decisions. Policy 6: The City shall maintain the low-density residential character of its existing single family residential neighborhoods and accommodate more intense urban land uses in its regional and town centers and within major transportation corridors to be consistent with Statewide Planning Goals and the Metro Framework Plan. Findings: The amendment is consistent with this policy as the Tigard 2011 EOA identifies the redevelopment of centers and corridors, for housing and employment, as an important economic development activity to ensure a 20-year supply of vacant employment and industrial lands without the need for any rezoning at this time. This redevelopment will help maintain the low- density residential character of single family neighborhoods. Special Planning Area: Downtown Goal 15.1 The City will promote the creation of a vibrant and active urban village at the heart of the community that is pedestrian oriented, accessible by many modes of transportation, recognizes natural resources as an asset, and features a combination of uses that enables people to live,work,play, and shop in an environment that is uniquely Tigard. Findings: The amendment is consistent with this goal as the Tigard 2011 EOA identifies the redevelopment of centers (including Downtown) and corridors, for housing and employment, as an important economic development activity to ensure a 20-year supply of vacant employment and industrial lands. This redevelopment will result in more intense urban land uses that reduce the dependency on the automobile and increase opportunities for walking, biking, and public transit. CONCLUSION: Based on the analysis above, the Commission finds that the proposed amendment satisfies the applicable goals and policies contained in the City of Tigard Comprehensive Plan. METRO URBAN GROWTH MANAGEMENT FUNCTIONAL PLAN TITLE 4 Findings: The Regional Framework Plan calls for a strong regional economy. To improve the economy, Title 4 seeks to provide and protect a supply of sites for employment by limiting the STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 11 OF 17 types and scale of non-industrial uses in Regionally Significant Industrial Areas (RSIAs), Industrial and Employment Areas. Title 4 also seeks to provide the benefits of "clustering" to those industries that operate more productively and efficiently in proximity to one another than in dispersed locations. Title 4 further seeks to protect the capacity and efficiency of the region's transportation system for the movement of goods and services and to encourage the location of other types of employment in Centers, Corridors,Main Streets and Station Communities. Metro staff has confirmed that the City of Tigard is in compliance with Title 4. The development of the Tigard 2011 Economic Opportunities Analysis involved discussions with Metro staff and Oregon Department of Land Conservation and Development staff. They were provided the opportunity to review and comment on all work leading up to the document proposed for adoption. The purpose of the collaboration was to ensure consistency and compliance with state and regional requirements. This amendment (CPA2011-00002) adopts the Tigard 2011 Economic Opportunities Analysis, which was completed following the rules outlined in OAR 660, Division 9. The amendment sets policy related to a 20-year supply of land and does not affect compliance with Title 4. The amendment is consistent Title 4. CONCLUSION: Based on the analysis above, the Commission finds that the proposed amendment is consistent with the Metro Urban Growth Management Functional Plan Title 4. OREGON ADMINISTRATIVE RULE 660,DIVISION 9 Findings: The Land Conservation and Development Commission adopted Oregon Administrative Rule 660, Division 9 to implement Statewide Planning Goal 9 and "to provide an adequate land supply for economic development and employment growth in Oregon." The City of Tigard is currently in State Periodic Review, and Section 10 requires the review and amendment of comprehensive plans and land use regulations during periodic review. The City was required to complete an economic opportunities analysis as part of its periodic review work program to ensure compliance with this rule. The development of the Tigard 2011 Economic Opportunities Analysis complied with the rules outlined in Section 30, which requires multi-jurisdiction coordination. This was accomplished through collaboration with the Oregon Department of Land Conservation and Development and Metro, to ensure consistency with policies and regulations associated with Division 9 and the Metro Urban Growth Management Functional Plan Title 4. Both organizations were given the opportunity to review work products throughout the process. They were also afforded the opportunity for a final review with other affected jurisdictions/organizations. In addition, the Tigard 2011 EOA followed the rules set forth in Sections 15, 20, and 25. Section 15 outlines the necessary elements of an economic opportunities analysis. The Tigard 2011 EOA contains all necessary elements. Section 20 outlines the required and recommended policies to address in the comprehensive plan. The Tigard Comprehensive Plan, the Tigard 2011 EOA and associated amendments comply with Section 20. Section 25 requires measures adequate to implement policies. The Tigard 2011 EOA addressed all necessary elements of Section 25 and is in compliance with Division 9. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 12 OF 17 CONCLUSION: Based on the analysis above, the Commission finds that the proposed amendment satisfies the requirements of Oregon Administrative Rule 660,Division 9. THE STATEWIDE PLANNING GOALS AND GUIDELINES ADOPTED UNDER OREGON REVISED STATUTES CHAPTER 197 Statewide Planning Goal 1—Citizen Involvement: This goal outlines the citizen involvement requirement for adoption of Comprehensive Plans and changes to the Comprehensive Plan and implementing documents. Findings: This goal was met through an extensive public involvement process. Information was distributed throughout the process via the City's website, Cityscape articles, and a series of seven public meetings with the Tigard Planning Commission, who acted as the advisory committee. Outreach methods also included updates to City boards and commissions. As part of the Comprehensive Plan Amendment process, public notice of the Planning Commission and City Council public hearings was sent to the interested parties list and published in the March 17, 2011 issue of The Times (in accordance with Tigard Development Code Chapter 18.390). The notice invited public input and included the phone number of a contact person to answer questions. The notice also included the address of the City's webpage where the entire draft of the text changes could be viewed. Statewide Planning Goal 2—Land Use Planning: This goal outlines the land use planning process and policy framework. The Comprehensive Plan was acknowledged by DLCD as being consistent with the statewide planning goals. Findings: The amendment to the Tigard Comprehensive Plan is being undertaken to update the City's acknowledged Comprehensive Plan in a manner consistent with current conditions and citizen values. The amendment to the Tigard Comprehensive Plan is being processed as a Type IV procedure, which requires any applicable statewide planning goals, federal or state statutes or regulations, Metro regulations, comprehensive plan policies, and City's implementing ordinances, be addressed as part of the decision-making process. The amendment is included as a periodic review work program task. The City of Tigard was notified of commencement of periodic review in May 2008 and had its work program approved in April 2010. All noticing requirements have been met. All applicable review criteria have been addressed within this staff report; therefore, the requirements of Goal 2 have been met. Statewide Planning Goal 5—Natural Resources This goal requires the inventory and protection of natural resources, open spaces, historic areas and sites. Findings: The City is currently in compliance with the State's Goal 5 program and Metro's Title 13: Nature in Neighborhoods program, which implements Goal 5. The amendment does not alter the City's acknowledged Goal 5 inventories or land use programs. No changes will occur to current natural resource protections. As a result, the amendment to the Tigard Comprehensive Plan is in compliance with Goal 5 process requirements. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 13 OF 17 Statewide Planning Goal 6:Air, Water, and Land Resources Quality To maintain and improve the quality of the air,water, and land resources of the state. Findings: The City is currently in compliance with Metro's Title 3: Water Quality and Flood Management program, which implements Goal 6. The amendment does not alter the City's acknowledged land use programs regarding water quality and flood management protections. As a result, the amendment to the Tigard Comprehensive Plan is in compliance with Goal 6. Statewide Planning Goal 7—Areas Subject to Natural Hazards To protect people and property from natural hazards. Findings: The City is currently in compliance with Metro's Title 3: Water Quality and Flood Management program, which implements Goal 7. The amendment does not alter the City's acknowledged land use programs regarding water quality and flood management protections. The City is currently a participant in the National Flood Insurance Program administered by the Federal Emergency Management Agency. The amendment does not alter the City's participation. As a result, the amendment to the Tigard Comprehensive Plan is in compliance with Goal 7. Statewide Planning Goal 8—Recreational Needs This goal requires the satisfaction of the recreational needs of the citizens of the state and visitors and,where appropriate, to provide for the siting of necessary recreational facilities including destination resorts. Findings: The City is currently in compliance with Statewide Planning Goal 8. The amendment does not alter the City's acknowledged Goal 8 policies or land use programs. As a result, the amendment to the Tigard Comprehensive Plan is in compliance with Goal 8. Statewide Planning Goal 9:Economic Development To provide adequate opportunities throughout the state for a variety of economic activities vital to the health,welfare, and prosperity of Oregon's citizens. Findings: The City is currently in compliance with Goal 9 and Metro's Title 4: Industrial and Other Employment Areas through its acknowledged Comprehensive Plan. This amendment is required as part of State Periodic Review and OAR 660, Division 9. The amendment adopts the Tigard 2011 EOA,which was completed following the rules outlined in Division 9 and compares projected demand to current supply of vacant employment and industrial lands to ensure the City's policies and implementing actions are sufficient to preserve the needed 20-year supply of these vacant lands. The Department of Land Conservation and Development, who administers Division 9, was consulted throughout the process and were requested to submit comments. Any comments can be found in the Outside Agency Comments section. The adoption of the Tigard 2011 EOA and the amendment to the Tigard Comprehensive Plan maintains the City's compliance with Goal 9. Statewide Planning Goal 10:Housing To provide adequate housing for the needs of the community, region and state. Findings: The City is currently in compliance with Goal 10 and the Metropolitan Housing Rule (OAR 660-007/Division 7), and Metro's Title 1: Requirements for Housing and Employment Accommodation, and Title 7: Affordable Housing. The adoption of the Tigard 2011 EOA does not alter the City's compliance with Goal 10. The amendment compares projected demand to current supply of vacant employment and industrial lands to ensure the City's policies and STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 14 OF 17 implementing actions are sufficient to preserve the needed 20-year supply of these vacant lands. The amendment to the Comprehensive Plan is in compliance with Goal 10. Statewide Planning Goal 11:Public Facilities and Services To plan and develop a timely, orderly and efficient arrangement of public facilities and services to serve as a framework for urban and rural development. Findings: The City is currently in compliance with Goal 11 through its acknowledged Comprehensive Plan. This includes an adopted Public Facility Plan as required by Oregon Revised Statute 197.712 and Oregon Administrative Rule 660-011. The amendment does not alter the City's acknowledged Goal 11 policies or plans. As a result, the amendment to the Tigard Comprehensive Plan is in compliance with Goal 11. Statewide Planning Goal 12: Transportation To provide and encourage a safe, convenient, and economic transportation system. Findings: The City is currently in compliance with Goal 12 and Metro's Regional Transportation Plan through its acknowledged Comprehensive Plan and Transportation System Plan as required by Oregon Administrative Rule 660-012 (Transportation Planning Rule). The amendment adopts the Tigard 2011 EOA and does not alter Goal 12 plans or policies. As a result, the amendment to the Tigard Comprehensive Plan is in compliance with Goal 12. Statewide Planning Goal 13:Energy Conservation Land and uses developed on the land shall be managed and controlled so as to maximize the conservation of all forms of energy, based on sound economic principles. Findings: The City is currently in compliance with Goal 13 through its acknowledged Comprehensive Plan. The adoption of the Tigard 2011 EOA does not alter the City's compliance with Goal 13. As a result, the amendment to the Tigard Comprehensive Plan is in compliance with Goal 13. Statewide Planning Goal 14: Urbanization To provide for an orderly and efficient transition form rural to urban land use, to accommodate urban population and urban employment inside urban growth boundaries, to ensure efficient use of land, and to provide for livable communities. Findings: The City is currently in compliance with Goal 14 and Metro's Title 11: Planning for New Urban Areas through its acknowledged Comprehensive Plan and land use regulations. The City also has a signed Urban Planning Area Agreement and Urban Services Agreement as required by ORS 195.065 and ORS 197. This amendment is required as part of State Periodic Review and OAR 660, Division 9. The amendment adopts the Tigard 2011 EOA, which was completed following the rules outlined in Division 9 and compares projected demand to current supply of vacant employment and industrial lands to ensure the City's policies and implementing actions are sufficient to preserve the needed 20-year supply of these vacant lands. The adoption of the Tigard 2011 EOA does not alter the City's compliance with Goal 14. The amendment is consistent with this goal. CONCLUSION: Based on the analysis above, the Commission finds that the proposed amendment is consistent with the applicable Statewide Planning Goals. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 15 OF 17 SECTION VI. ADDITIONAL CITY STAFF COMMENTS The City of Tigard's Current Planning Division, Administrative Department, Public Works Department, and Police Department has had an opportunity to review this proposal and have no objections. CONCLUSION: Based on no comment from City staff, staff finds the proposed amendment does not interfere with the best interests of the City. SECTION VII. OUTSIDE AGENCY COMMENTS The following agencies/jurisdictions had an opportunity to review this proposal and did not respond: City of Beaverton City of Durham City of King City City of Lake Oswego City of Portland City of Tualatin Clean Water Services Metro Land Use and Planning Oregon Department of Transportation, Region 1 Oregon Department of Transportation, Region 1, District 2A Tualatin Hill Parks and Recreation District Tualatin Valley Fire & Rescue Washington County, Department of Land Use and Transportation Tualatin Valley Water District had an opportunity to review this proposal and has no objections. Oregon Department of Land Conservation and Development had an opportunity to review this proposal and submitted comments that can be found as Exhibit B. CONCLUSION: Based on responses from outside agencies listed above, the Commission fords the proposed amendment meets all requirements of these agencies and is consistent with the best interests of the City. SECTION VIII. CONCLUSION The proposed changes comply with the applicable Statewide Planning Goals, applicable regional, state and federal regulations, the Tigard Comprehensive Plan, and applicable provisions of the City's implementing ordinances. Therefore, Staff recommends that the Planning Commission recommend approval of the Comprehensive Plan Amendment to the Tigard City Council as determined through the public hearing process. STAFF REPORT TO THE PLANNING COMMISSION CPA 2011-00002 EOA PAGE 16 OF 17 ATTACHMENT EXHIBIT A: PROPOSED AMENDMENT TO THE TIGARD COMPREHENSIVE PLAN. March 28, 2011 PREPARED BY: Darren Wyss' DATE Senior Planner 4-7 101.4-04/,( ' e7)--LtiveMarch 28, 2011 APPROVED BY: Ron Bunch DATE Community Development Director STAFF RLPOR'I`"1'O"I IE PLANNING COMMISSION CPA 2011-00002 LOA PAGE 17 OF 17 City of Tigard 2011 Economic Opportunities Analysis Staff Recommended Draft Prepared By Cogan Owens Cogan, LLC FCS GROUP ACKNOWLEDGEMENTS Tigard City Council Craig Dirksen,Mayor Gretchen Buehner, Council President Marland Henderson Nick Wilson Mark Woodard Tigard Planning Commission/Advisory Committee David Walsh,President Tom Anderson,Vice President Margaret Doherty Stuart Hasman Matthew Muldoon Karen Ryan Jason Rogers Donald Schmidt Richard Shavey Cogan Owens Cogan, LLC Kirstin Greene,AICP,Managing Principal Steve Faust,AICP, Senior Planner Ellie Fiore,AICP, Senior Planner FCS Group Todd Chase,AICP, Senior Economist City of Tigard Staff Ron Bunch, Community Development Director Susan Hartnett,AICP,Assistant Community Development Director Craig Prosser, City Manager Darren Wyss, Senior Planner and Project Manager Sean Farrelly,Redevelopment Project Manager TABLE OF CONTENTS Executive Summary—i Introduction— 1 Economic Development Vision and Goals— 1 Economic Trends Analysis—2 Business Clusters Analysis—9 Targeted Business Clusters— 12 Site Suitability Analysis (Land Demand) — 13 Inventory of Suitable Sites (Land Supply) — 16 Short-Term Land Supply Determination— 18 Assessment of Potential (Reconciliation of Demand and Supply) — 19 Short-Term Land Need Determination— 19 Long-Term Land Need Determination— 19 Planning Market, Cost and Risk Factors-21 Implementation Policies and Action Measures—22 Policies—22 Recommended Action Measures—23 Appendices A. Office Leasing Activity Summary,Mid-Year Report—26 B. Industrial Leasing Activity,Mid-Year 2010 Report—27 C. Analysis of Employment and Space Needs—28 D. Analysis of Retail Inflow/Outflow—32 E. Summary of Tigard Employment Zones and Regulations—33 F. Typical Site Requirements for Development Types—37 G. Buildable Land Inventory—38 H. Redevelopment Land Inventory—39 I. Summary of Stakeholder Interviews—40 J. Map of Buildable Lands and Redevelopment/Refill Potential—44 Executive Summary The City of Tigard has conducted an Economic Opportunities Analysis (EOA) as required by its Periodic Review work program to update its Comprehensive Plan. The City received grant funds from the Department of Land Conservation and Development (DLCD) for technical consultant assistance to complete this task. The EOA was developed in compliance with OAR 660 Division 9 (Statewide Planning Goal 9: Economic Development). The EOA is in-part a technically-based study that compares projected demand for land for industrial and other employment uses to the existing supply of such land. At the same time,it provides economic development policies and actions consistent with emerging economic opportunities, market trends, and local vision Vision and Goals In March 2008, as part of a robust public process, the City of Tigard updated the Economic Development chapter of its Comprehensive Plan. The chapter included the City's vision and goals for economic development to read: Vision The City shall have a strong and resilient local economy with a diverse portfolio of economic activity: retail,professional service and industrial jobs. Goals 1. Develop and maintain a strong, diversified and sustainable local economy. 2. Make Tigard a center and incubator for innovative businesses including those that focus on environmental sustainability. 3. Make Tigard a prosperous and desirable place to live and do business. Demographic and Employment Trends Tigard has been increasing in population at a slower rate (1.3%) than Washington County, but above Oregon and national growth rates. Tigard population is estimated to be 47,460 as of 2009, up from 42,260 residents in 2,000. Tigard currently is relatively"jobs rich"with a positive ratio of 2.3 jobs per household,which is well above the tri-county Metro regional average of 1.5 jobs per household. This is understandable given Tigard's concentration of regional employment centers,including Washington Square Mall, the "Tigard Triangle" employment area near the confluence of I-5/Hwy. 217, and pockets of industrial uses along the Hwy. 217 corridor. Tigard also is home to a number of large retail employers at Washington Square Mall as well as several large high-tech manufacturing, construction contractors,professional,business operations, and state and local government operations. Regional commercial and industrial real estate brokers see Tigard as a well-defined submarket within the suburban Metro region. Tigard's office market is especially competitive within the inner southwest portion of the region.Additionally,various efforts are underway to make the Downtown Tigard area a more viable place to live and work. Target Industries In line with Tigard's vision and goals, and in consultation with the City Planning Commission, the consultant team and City staff recommend that the City focus on retaining and attracting a mix of existing and emerging business clusters that pay above average wages. This includes existing, established clusters such as: • Durable goods manufacturing (includes metals and machinery) • Education (private and non-profits) EOA—Staff Recommended Draft • Financial services • Information (including software development) • Professional and technical services • Wholesale trade They also recommend that the City focus on emerging clusters,including health care and advanced technology (i.e.,green energy) manufacturing and research operations. Tigard's Land Demand and Supply The consulting team prepared a range of land need forecasts including: efficient, medium, and high land needs scenarios. These scenarios all take into account the Metro employment forecasts, but assume varying levels of industrial development and redevelopment. As summarized in the table below, the land efficient need scenario assumes 48 acres of net new industrial vacant land demand,which is just below the estimated vacant industrial land supply of 50 acres. If the City chooses to pursue a more aggressive economic growth strategy that is consistent with the moderate or high land need scenario,the City would need to identify another 14 to 30 acres of vacant industrial land area to meet the level of industrial demand associated with adding another 1,059 to 1,324 industrial jobs. 20-Year Industrial Demand Forecast and Vacant Land Supply, Tigard USB Efficient Land Moderate Land High Land Land Demand and Supply Need Need Need Scenario Scenario Scenario Demand for Vacant Industrial 48 64 80 Land Supply of Vacant Industrial 50 50 50 Land Land Surplus or (Deficit) 2 (30) Existing Forecast of Preliminary Parcel Distribution, Unconstrained Parcel Size Surplus Efficient Land Need Forecast 1 Supply (tax Demand (tax lots) lots) (tax lots) 1/ Less than 1 acre 12 10 2 1 to 5 acres 5 5 0 5 t 10 acres 0 0 0 10 to 20 acres 2 2 0 20+ acres 0 0 0 Total 19 17 2 Notes: 'Tax lot demand forecast expected to meet or exceed supply in 20 years. Source: Based on findings included in demand and supply analysis. As shown in the table below, the land efficient needs scenario assumes 78 acres of net new commercial and mixed-use vacant land demand,which is just below the estimated vacant land supply of 86 acres. As with the industrial land needs, an economic growth strategy that is consistent with the moderate or EOA—Staff Recommended Draft ii high land needs scenario would require the City to identify an additional 19 to 45 acres of vacant commercial and mixed-use land to meet the demand. Reconciliation of Long-term Land Demand and Supply Commercial and Mixed Use 20-Year Land Use Forecast (gross buildable acres), Tigard USB Efficient Land Medium High Land Land Demand and Supply Need Scenario Land Need Need Scenario Scenario Demand for Vacant Commercial 78 105 131 Land Commercial Demand 51 68 85 Mixed-Use Demand 27 36 45 Supply of Vacant Commercial 86 86 86 Land Commercial Zoned Supply 46 46 46 Mixed-Use Zoned Supply 40 40 40 Land Surplus or (Deficit) 8 (19) (45) Preliminary Parcel Distribution, Existing Supply Forecast of Surplus Efficient Need Forecast (tax lots) Demand (tax lots) (tax lots) Less Than 1 acre 89 30 59 1 to 5 acres 14 14 0 5to 10 acres 3 3 0 10 to 20 acres 0 0 0 20+ acres 0 0 0 Total 106 47 59 Source: FCS GROUP, based on findings included in demand and supply analysis. Recommendations In accordance with the proposed vision and goals, the consulting team and City staff recommends the City pursue the "efficient land need scenario". The implications of this recommendation are that the City will focus a significant portion of future employment growth and high-density housing development in its Metro-designated Town Center (Downtown); Regional Center (Washington Square); High Capacity Transit Corridor (Hwy 99W); and the Tigard Triangle. More detailed information on employment trends and projections, and land needs and supply is found throughout the remainder of the document. EOA—Staff Recommended Draft INTRODUCTION The City of Tigard has conducted an Economic Opportunities Analysis (EOA) as required by its Periodic Review work program. The City received grant funds from the Department of Land Conservation and Development (DLCD) for technical consultant assistance to complete this task. The EOA was developed in compliance with OAR 660 Division 9 (Statewide Planning Goal 9: Economic Development) and is a technical study that compares projected demand for land for industrial and other employment uses to the existing supply of such land. The purpose of the EOA is to improve opportunities for Tigard to attract and maintain the type and quality of employment desired by its citizens,grow its economy, and maintain its quality of life. Goal 9 emphasizes the preservation and protection of vacant land for industrial and employment uses. This will happen by adopting policies that ensure an adequate supply of industrial and other employment lands within the City of Tigard. The Tigard Planning Commission acted as the advisory committee for the project,reviewing each task during the process to complete the EOA. The anticipated outcomes of the project are: 1. An understanding of the characteristics of Tigard's employment lands and their adequacy to accommodate future economic activity; 2. Updated economic development policies and action measures as a basis to plan for a supply of appropriately zoned land necessary for existing businesses to expand and to accommodate future economic activities. The six tasks reviewed by the Planning Commission included: 1. Economic Development Vision and Goals 2. Economic Trends Analysis 3. Site Suitability Analysis (Land Demand) 4. Inventory of Suitable Sites (Land Supply) 5. Assessment of Potential (Reconciliation of Demand and Supply) 6. Implementation Policies and Action Measures The process and findings of these tasks are outlined in detail throughout the remainder of the EOA. This includes examining key demographic and employment opportunities and trends to assess Tigard's economic development potential, projecting employment growth, and determining short- and long- term demand for employment land. This demand is compared to an inventory of suitable commercial and industrial properties (supply) to assess the sufficiency of immediate and longer term (20-year) supply of commercial and industrial employment land in the City's Urban Planning Area (UPA). Finally, economic development policies and action measures are recommended for inclusion in the Tigard Comprehensive Plan. ECONOMIC DEVELOPMENT VISION AND GOALS In March 2008, as part of a robust public process, the City of Tigard updated the Economic Development chapter of its Comprehensive Plan. The chapter included the City's vision and goals for economic development: EOA—Staff Recommended Draft 1 Vision The City shall have a strong and resilient local economy with a diverse portfolio of economic activity: retail,professional service and industrial jobs. Goals 1. Develop and maintain a strong, diversified and sustainable local economy. 2. Make Tigard a center and incubator for innovative businesses including those that focus on environmental sustainability. 3. Make Tigard a prosperous and desirable place to live and do business. Community Economic Development Objectives Community Economic Development Objectives were developed through interviews with City staff and a review of Tigard's economic development vision,goals and recommended action measures. These objectives were refined based on comments from the Planning Commission and the results of interviews with key stakeholders,including state and regional agencies, the Chamber of Commerce, Tigard Central Business District Association, and local employers and developers. • Encourage businesses that provide family-wage jobs to start-up, expand, or locate in Tigard. • Develop industry clusters, and preserve jobs, through the retention, expansion, and recruitment of industries that already have a presence in Tigard. • Promote well-designed and efficient development and redevelopment of vacant and underutilized industrial and commercial lands. • Ensure the City's land use and other regulatory practices are flexible and adaptive and that adequate public facilities and infrastructure exist to support a diverse and stable economic base. • Focus significant employment growth in Tigard's designated centers and corridors and support the development of efficient regional multi-modal transportation systems. • Limit the development of retail and service uses in Tigard's designated industrial areas to preserve the potential of these lands for industrial jobs. Support neighborhood commercial uses to meet smart growth goals. • Encourage businesses that are environmentally and economically sustainable. ECONOMIC TRENDS ANALYSIS The consultant team conducted an economic overview for the City of Tigard,including a review of national, state, regional, county, and local economic trend data and real estate market analysis of office, commercial retail,industrial, and public government space development for the Tigard Urban Service Boundary. The analysis focuses on the expected level of demand for new commercial,industrial, and public development and related gross buildable land needs over the next 20 years (2011-2031). Both the U.S. and Oregon economies are currently mired in the aftermath of a national economic recession that began in December 2007. The current economic slowdown is now the longest on record since the Great Depression;however, some economic expansion is beginning to occur. According to the U.S. Bureau of Economic Analysis, real Gross Domestic Product (GDP is the measure of value of all goods and services in the U.S.) increased at an annual rate of 3.7 percent during the first quarter of 2010, and increased by 2.4 percent during the second quarter of 2010. EOA—Staff Recommended Draft 2 Consumers are still very cautious as unemployment rates remain high and high levels of home foreclosures continue. Oregon posted a year-over-year overall job loss of 16,000 jobs between June 2009 and June 2010. At the same time, the state's unemployment rate decreased to 10.5 percent in June 2010, compared to 11.6 percent in June 2009. It should be noted that Oregon's employment levels have declined over the past year in spite of the drop in unemployment rate. This trend likely reflects a decline in the number of people who are actively seeking employment. The U.S. and Oregon economies are now poised for a slow economic recovery. The July 2010 survey of the National Association of Business Economists reported expectations of slow growth in GDP during the second half of 2010 in the U.S. as industry demand,profit margins, employment, capital spending and credit conditions improve. Despite job losses,population levels continue to increase in both Oregon and Tigard due to population migration patterns,increases in immigrant population levels and natural population increases. As indicated in Table 1, according to the Portland State University Population Research Center, the population in Tigard increased to 47,460 residents in 2009,up from 42,260 residents in 2000. The average annual growth rate (AAGR) for population in Tigard was 1.3% between 2000 and 2009,which was below the level of population growth recorded for Washington County,but above the Oregon and national growth rates. Table 1. Population Trends, 2000 to 2009 Annual 7o 2000 2009 Change 2000-2009 Tigard 42,260 47,460 1 .3% Washington County 449,250 527,140 1 .8% Oregon 3,421 ,399 3,823,465 1 .2% USA 282,171 ,957 307,006,550 0.9% Source: Portland State University, Population Research Center. Metro (the regional government) has prepared forecasts for households and employment for all local jurisdictions in the Metro Urban Growth Planning Area. The most recently adopted Metro growth forecasts are referred to as the Metroscope Generation 2.3 model, and include a forecast period from 2005 to 2030. FCS GROUP extrapolated the Metro forecasts to year 2035 using Metro's forecasted growth rate from the 2005-2030. While Metro is currently in the process of preparing updated growth forecasts for the region, the Metroscope Generation 2.3 forecasts are being used for this EOA since they are the only set of officially adopted forecasts at this time.As indicated in Table 2, the 2005 to 2035 forecasts anticipate that Tigard will add approximately 3,185 households and 24,167 jobs over the 25-year period. The extrapolated 2035 Metro job forecasts shown in Table 2 are provided for informational purpose only. In light of the recent national economic recession that caused severe declines in Oregon employment (from 2007 through 2010),Metro's 2030 job forecast for Tigard is assumed to be achieved by year 2035 under the "medium forecast" scenario used in the Tigard EOA. As noted in Table 2, the Metro job growth forecasts reflect the fact that Tigard currently is relatively "jobs rich"with a positive ratio of 2.3 jobs per household,which is well above the tri-county Metro regional average of 1.5 jobs per household. This is no surprise given Tigard's concentration of regional employment centers,including Washington Square Mall, the "Tigard Triangle" employment area near the confluence of I-5/Hwy. 217, and pockets of industrial uses along the Hwy. 217 corridor. EOA—Staff Recommended Draft 3 Table 2. Metro Growth Forecasts for Households and Employment, 2005 to 2035 Households Projected Projected. Avg. Change Annual Change 2005 2030 2035 2005-2035 Pr)) Tigard 17,724 20,341 20,909 3,185 0.6% Clackamas County 140,415 241,821 269,594 129,179 2.2% Multnomah County 288,926 372,913 392,439 103,513 1.0% Washington County 189,925 272,998 293,545 103,620 1.5% Total 3 County 336,312 Region 619,266 887,732 955,578 1.5% Employment* Projected. Change Avg. Annual 2005 2030 2035 2005-2035 Change (%) Tigard 41,308 60,637 65,475 24,167 1.5% Clackamas County 145,581 251,286 280,273 134,692 2.2% Multnomah County 493,671 705,721 758,005 264,334 1.4% Washington County 269,660 450,970 499,820 230,160 2.1% Total 3 County 629,186 Region 908,912 1,407,977 1,538,098 1.8% Projected. Projected Tigard Jobs Per Household Ratio Tigard Capture of Capture of 2005 2030 2035 Region HHs Region Jobs Tigard 2.3 3.0 3.1 0.9% 3.8% Clackamas County 1 .0 1 .0 1 .0 N/A N/A Multnomah County 1 .7 1 .9 1 .9 N/A N/A Washington County 1 .4 1 .7 1 .7 N/A N/A Total 3 County Region 1.5 1.6 1.6 N/A N/A Source:Metro adopted housing and employment growth forecasts, 2007;Metroscope Gen.2.3;extrapolated to 2035 by FCS GROUP. *The extrapolated 2035 Metro job forecasts shown in Table 2 are provided for informational purpose only. In light of the recent national economic recession that caused severe declines in Oregon employment(from 2007 through 2010), Metro's 2030 job forecast for Tigard is assumed to be achieved by year 2035 under the "medium forecast"scenario used in the Tigard EOA. Washington Square Mall already functions as a regional commercial center that draws shoppers and patrons from over a 30-mile radius. With 1,458,734 square feet (s f) of retail and entertainment space, the mall has five anchor stores including JC Penny,Macy's, Nordstrom, Sears, and Dick's Sporting Goods and 170 specialty stores. The mall added 28 new stores and restaurants in 2005, along with a new multi-level parking structure. In addition to large retail employers,Tigard is also home to several large high-tech manufacturing, construction contractors, professional, business operations and state and local government operations. Table 3 provides a list of Tigard employers with more than 250 jobs per establishment. EOA-Staff Recommended Draft Table 3. Large Employers in Tigard with More Than 250 Employees, 2008 Firm Name Specialty Employment Range Retail/Gen. Nordstrom Merchandise 500 - 999 Tigard-Tualatin School District Local Government 500 - 999 AEROTEK, Inc. Temp. Emp. Agency 250 - 499 City of Tigard Local Government 250 - 499 COSTCO Corp. Retail. Merchandise 250 - 499 Health Insurance Health Net Health Plan of Oregon Carrier 250 - 499 JC Penny Retail Merchandise 250 - 499 MACYS Retail Merchandise 250 - 499 Performance Contracting, Inc. Industrial Contractors 250 - 499 PERS Headquarters Pension Fund Mgmt. 250 - 499 Remedy Intelligent Staffing, Inc. Temp. Emp. Agency 250 - 499 Aero. & Tech. Part 250 - 499 Rockwell Collins Aerospace Mfg. STARPLEX Corp. Temp. Emp. Agency 250 - 499 Bldg. Interior Western Patricians, Inc. Contractors 250 - 499 Source: Oregon Employment Department. According to regional commercial and industrial real estate brokers,Tigard is a well-defined submarket within the suburban Metro region. Tigard's office market is especially competitive within the inner southwest portion of the region,with businesses considering locations among several areas including Tigard; 217 Corridor/Beaverton; Kruse Way; Barbur Blvd/Capitol Hwy;Tualatin and Wilsonville. Recent office leasing market statistics indicate that office vacancy rates in the Metro region have been increasing since 2008 as many businesses have shed jobs and scaled back on required space needs. As indicated in Appendix A, negative absorption levels have been occurring during the first six months of the year,particularly in Class A Office space,where Tigard experienced a net loss of 13,097 sf during the first half of this year. As of July 1, 2010 Tigard had total Class A vacancy rates of 151,900 sf and another 66,000 sf in vacant Class B and C space. Tigard's Class B inventory has experienced positive absorption this year,with 12,800 sf of net absorption. Since July 2010,Tigard has recorded several positive lease transactions,which rank among the largest in the region, such as Bridgewell Resources (32,088 gsf); Comsys into the Lincoln Center; State Farm Mutual Insurance (23,712 gsf) into Fanno Creek Place; and CAN Insurance (17,843 gsf) into the Pacific Parkway Center. Industrial leasing activity and vacancy rates were also significantly impacted by the recent economic recession. As indicated in Appendix B, Tigard had approximately 170,000 sf of vacant flex space (13.4%vacancy rate), and 339,000 sf of vacant warehouse space (7.7%vacancy rate) as of July 1, 2010. EOA—Staff Recommended Draft Overall industrial lease rates in the Tigard submarket averaged $7.68 per sf/year, and were among the highest in the Metro suburbs. The City of Tigard and the Oregon Department of Transportation (ODOT) are taking steps to enhance the Downtown Tigard area to make it a more viable place to live and work. At a cost of$12 million,intersection improvements along Pacific Highway at Hall Blvd. and Greenburg Rd. are being paid for by ODOT,Washington County and the City of Tigard. This project is slated for completion by Spring 2011 and will include a third through-lane on the highway, turn lanes on side streets, an extended median,wider sidewalks,new bike lanes,improved pedestrian crossings, and wider corners for truck turning movements. This effort will also enhance access into and from Downtown Tigard. Tigard's recently completed Downtown Plan is setting the regulatory stage and establishing a new vision for renovating downtown. The vision is intended to be a 50-year look at how the downtown could change into a "mixed-use urban village"with a wide range of housing and commercial opportunities that optimize natural features, such as Fanno Creek and Fanno Creek Park, transportation facilities, such as Pacific Hwy. and the Westside Express Commuter Rail system, and even light rail or bus rapid transit service to/from Portland. To estimate future development potential for Tigard employment, FCS GROUP evaluated the 10-year employment growth forecasts prepared by the Oregon Employment Department for the Metro Tri- County region, and Metro growth forecasts for Tigard. As shown in Figure 1,the 10-year job growth forecasts for the Metro Tri-County Region portend a positive trend towards job growth for all industry sectors, except federal government and the manufacturing sector. The sectors that are expected to grow the fastest in the Tri-County Metro Region include: educational and health services;professional and business services;leisure and hospitality;local government; retail; and wholesale trade. EOA—Staff Recommended Draft 6 Figure 1 Non-Farm Employment, Tri-County Metro Region, 2008-2018 Forecast Local government 8,040 State govern ment 1,890 Federal government (270) I Other services 2,210 Leisure and hospitality 10,590 Educational and health services 23,910 Professional and business services 19,780 Financial activities 2,730 Information I 800 Transportation,warehousing, and utilities • 1,520 Retail trade 6,670 Wholesale trade 4,960 Manufacturing (2,270) Construction • 1,090 Natural resources and mining 1,190 Source: Oregon Employment Department includes Multnomah, Washington and Clackamas Counties. To estimate future development potential for Tigard, FCS GROUP evaluated the 10-year employment growth forecasts prepared by the Oregon Employment Department as well as the extrapolated employment growth forecasts from Metro. In light of the recent national economic recession that caused severe declines in Oregon employment (from 2007 through 2010),Metro's 2030 job forecast for Tigard is assumed to be achieved by year 2035 under the "medium forecast" scenario. As indicated in Appendix C, the 20-year job growth forecasts for Tigard indicate a more positive trend towards job growth for all industry sectors. According to Metro (and FCS GROUP interpretation of Metro data), the general sectors that are expected to grow the fastest in Tigard over the next 20 years include: services (+10,092 jobs); retail (+3,810 jobs),industrial/other (+1,324 jobs), and government (+882 jobs). The job growth projections indicate that Tigard should expect to experience significant redevelopment opportunities over the next 20-years. A range in employment forecasts is provided to take into account current weak market conditions and national economic expectations that expect lower-rates of job growth over the next several years. As indicated in Table 4, there is a great level of uncertainty EOA—Staff Recommended Draft 7 regarding potential job growth for Tigard in light of weak regional and national employment growth predictions. Table 4. Forecasted 20-Year Employment Growth and Building Space Needs in Tigard Employment Growth Forecast Slow Moderate High Retail Trades 2,286 3,048 3,810 Services 6,055 8,073 10,092 Industrial/Other* 794 1,059 1 ,324 Government* 529 706 882 Total 9,665 12,886 16,108 Notes: See supporting analysis in Appendix C. *Metro employment growth forecasts for "Other" were allocated to 60% industrial/other and 40% government by FCS GROUP based on local observations and assumptions. Tigard is expected to add between 9,665 and 16,108 new jobs over the next 20 years. As indicated in Table 5, this amount of employment growth translates into approximately 4.2 to 7.1 million of new or renovated building square footage (floor area). Table 5. Forecasted 20-Year Total Building Space Needs in Tigard for Employment Employment Type Slow Moderate High Office 1,499,000 1 ,998,000 2,497,000 Institutional 170,000 227,000 285,000 Flex/Business Park 451 ,000 602,000 752,000 General Industrial 257,000 342,000 428,000 Warehouse 374,000 499,000 624,000 Retail 1 ,498,000 1 ,997,000 2,497,000 Total 4,249,000 5,665,000 7,083,000 Notes: See supporting analysis in Appendix C. Source: FCS GROUP. A large portion of this demand will need to be met by redevelopment and utilization of vacant buildings since large vacant undeveloped tracts of land are becoming increasingly scarce. It is estimated that redevelopment and utilization of vacant buildings is expected to accommodate 70% of the retail space demand, 50% of the service/office demand, 40% of the industrial demand, and 40% of the government facilities demand. Table 6 shows the expected level of redevelopment and refill in the Tigard USB over the next 20 years. As the existing vacant land supply in Tigard gets developed, the level of redevelopment activity is expected to rise. Prime redevelopment locations in Tigard include Downtown and the Tigard Triangle, and future planned high capacity transit stations along Pacific Hwy. The City's Downtown Plan envisions 2,500 dwelling units and over one million square feet of commercial office and retail space being added over the next few decades. EOA—Staff Recommended Draft 8 Table 6. Redevelopment and Refill Assumptions (2011 to 2031) Tigard USB Employment Type Slow Moderate High Office 1,004,000 1 ,339,000 1 ,673,000 Institutional 114,000 152,000 191 ,000 Flex/Business Park 203,000 271 ,000 338,000 General Industrial 116,000 154,000 193,000 Warehouse 168,000 225,000 281 ,000 Retail 899,000 1 ,198,000 1,498,000 Total 2,504,000 3,339,000 4,174,000 Source: FCS GROUP; derived from Appendix C, based primarily on Metro 2009-2035 Urban Growth Report (December 2009 draft) and local assumptions. After accounting for the levels of redevelopment activity identified in Table 6, the amount of vacant land demand in Tigard for employment uses over the next 20-years is expected to range from 126 to 210 acres. Preliminary estimates for vacant lands needs in Tigard by general building type are provided in Table 7, and supporting assumptions are reflected in Appendix D and Appendix E. Table 7. Vacant Land Needs by General Land Use Zoning Classification (2011 to 2031) Tigard USB (gross buildable acres) Land Use Zoning Classification Slow Moderate High Commercial 51 68 85 Mixed Use 27 36 45 Industrial 48 64 80 Total 126 168 210 Source: FCS GROUP; derived from Appendix C, based primarily on Metro 2009- 2035 Urban Growth Report (December 2009 draft) and local assumptions. To help validate these assumptions, FCS GROUP conducted an additional analysis of retail sales inflow/outflow within Tigard. The retail analysis provided in Appendix D indicates that the amount of local retail trade in Tigard over the next 20 years could support an additional 1.4 million square feet of redevelopment or new development activity, even if current levels of retail sales inflow were cut by 50%. Hence,it appears that the "slow" or"land efficient"vacant land demand scenario is the best match with respect to the retail market potential for the Tigard USB. The actual amount and timing of new development will vary from year to year. The wide range in development forecasts reflects current uncertainty regarding the region's ability to retain and attract major employers, the City's desire to stimulate redevelopment in downtown, and limited ability to accommodate new commercial and industrial development on vacant lands. EOA—Staff Recommended Draft Business Clusters Analysis It is a widely accepted theory among economic development professionals that"business clusters" are the primary force driving local economic currents and business location decisions. Clusters of business activity go well beyond mere concentrations of industry or employment types. They represent unique competitive market advantages with regard to employment,work force, creativity, entrepreneurship, business costs, and supporting natural resources. The clusters analysis prepared by FCS Group is intended to identify potential employment sectors that are most compatible with local economic policy objectives. The process entailed: 1. Obtaining Employment Security (ES202) wage and salary employment data from the Oregon Employment Department (OED) for the Tigard Urban Service Boundary (USB),Washington County,Multnomah County and Clackamas County (tri-county region) for the year 2008. 2. Conducting a location-quotient (LQ) analysis to evaluate business and industrial clusters in the Tigard UGB relative to the tri-county region. 3. Evaluating business clusters within the Tigard UGB with regard to the LQ, projected growth rates, economic size of each cluster, and average wage rates. 4. Classifying each business cluster with regard to one of four classifications,including: I. STARS: Businesses with large LQ (propensity to locate in the Tigard USB) and higher than average projected growth rate compared to the tri-county region. II. EMERGING: Businesses with small LQ and high average growth rate (possible pent up demand or competitive market disadvantage relative to other locations). III. MATURE: Businesses with large LQ but lower than average growth rate. IV. CHALLENGED: Businesses with small LQ and lower than average growth rate. The business cluster analysis summarized in Figure 2 identifies the business sectors within the Tigard USB by their LQ, size and growth potential. Each sector has been analyzed by their North American Industrial Classification System (NAICS) code. This code is used by the federal government to classify types of businesses for tax accounting and economic research purposes. The data was derived from the OED ES202 wage and salary employment statistics for the year ending in 2008. EOA—Staff Recommended Draft 10 Figure 2 Existing Business Clusters in Tigard USB, 2008 27% Emerging: (High Growth/ alth Care Stars 26% Small Cluster) LOf.&Tech. (High Growth/ - Large Cluster) Services 23% 21% • 19% Educational Services 17% Prof.Admin.& Wast mt. 15% 't.Enfe'tainrnent F.od&Drinkln &Rt5. PIO 13% •rae 11% TS O 9% vernment Miscer ices etail Trade Average 10-year Job Growth=10% 7% w nformation 5% O O 41 Lodging Tra ort.& 4111 3% W Warehousing ivanc al •O Activities tv 1% V d O uction -1% d Computer fg. O..Nondurable 3% oods Mfg. Metals Mfg. -5% -7% -9% -11% -13% Transport Equip. -15% hallenged: fl Nits. Mature: (Low Growth/ (Low Growth/ -17% Small Cluster) Large Cluster) Note:X-axis denotes the Location Quotient (LQ) average set at 1. All sectors to right of the yellow line have an LQ greater than 1; all sectors to the left of the yellow line have an LQ less than 1. Source: Oregon Employment Department; data compiled by FCS GROUP. The clusters analysis classifies the existing business sectors in the Tigard USB into four general categories: Industry Sectors with Large LQ/High Growth Potential ("Stars") • Educational Services (private or non-profit) • Professional and Technical Services • Professional Administration and Waste Management Services • Wholesale Trade EOA—Staff Recommended Draft 11 Industry Sectors with Small LQ/High Growth Potential ("Emerging") • Health Care and Social Services • Food Service and Drinking Places • Arts, Entertainment and Recreation Industry Sectors with Large LQ/Low Growth Potential ("Mature") • Retail Trade • Information Services • Financial Activities and Services • Construction • Nondurable Goods Manufacturing Industry Sectors with Small LQ/Low Growth Potential ("Challenged") • Transportation, and Warehousing • Miscellaneous Services • Metals Manufacturing • Computer Parts and Equipment Manufacturing • Lodging • Transportation Equipment Manufacturing • Government In addition to evaluating existing local business clusters, the City may also consider the expected regional growth in business sectors and emerging clusters.According to the Oregon Employment Department, the job sectors with the highest potential for new growth in the greater Portland metropolitan region include: • Business administration and waste management • Finance and insurance • Health care • Hotel/motel accommodations and food services • Professional • Retail trade • Scientific and technical service (computer science, engineering) • State and local government • Transportation and utilities (warehousing, distribution and energy research,private utilities) • Wholesale trade' While manufacturing of durable goods does not make the list of the top growth sectors, there are certain subsectors within manufacturing that are growing faster than others. The manufacturing sectors with the greatest net new job growth potential in the greater Portland metropolitan region include: computer-related parts manufacturing, transportation equipment, other miscellaneous durable goods (such as solar panels), and miscellaneous non-durable goods (such as apparel research and design). 1 These emerging business clusters are documented in the Regional Wired Workforce Innovation and Regional Economic Development, Global Development Strategy, prepared by FCS GROUP et al, 2008. EOA—Staff Recommended Draft The greater Portland metropolitan region is now considered an epicenter within the United States for sustainable technology.According to Global Insight, the greater Portland metropolitan region employs 6,700 people in "green jobs"which is more than Denver,Austin, Seattle and San Jose. The number of workers in green jobs (such as solar panel manufacturing,wind energy, bio energy research and manufacturing) is expected to increase to 53,000 over the next two decades. Portland General Electric and Pacific Power are ranked in the top three among the nation's top utility companies for Green Energy sales, and the greater Portland region has more LEED-certified buildings than any other U.S. metropolitan area. With the Portland metropolitan region, recent federal and state tax policies have helped spur major investments in green technology and energy by firms such as: SolarWorld, SunEdison,Vestas and Portland General Electric—creating a major new industrial cluster in clean technology. Additional investments in advanced manufacturing are being made by Intel, Flir Systems (producer of night vision and thermal imaging systems), Precision Castparts (maker of parts used in Vestas wind turbines,Boeing aircraft and other products), Genentech, and other firms. These are examples of manufacturing companies that are finding success within the greater Portland metropolitan region, even in challenging economic times. Focused marketing and business recruitment efforts are being made by the State of Oregon and regional economic development stakeholders to attract certain established and emerging business clusters. The business and industry clusters that are currently being targeted by the Oregon Business Development Department, Portland Business Alliance and the Portland Development Commission include advanced manufacturing, clean technology (with sustainability sub-clusters in green building, solar&wind power), active wear/outdoor gear, and software. Targeted Business Clusters According to its Community Economic Development Objectives, the City of Tigard may target businesses that generally offer above average wages and provide health care and retirement benefits that support families. According to the U.S. Bureau of Labor Statistics, the occupations that had the fastest growth and highest pay over the past 10 years nationally included: computer systems analysts, registered nurses, computer support specialists, teachers, social workers, college faculty, computer programmers, engineering sciences, police officers, securities and financial services, physicians, advertising,marketing, management analysts, electrical engineers,paralegals,writers/editors, commercial artists, medical and health service managers. It is interesting to note that almost two-thirds of the jobs filled in these fast growing occupations required some level of on-the-job training in addition to high school and a college degree.2 In light of these findings, the consultant team and City staff recommend that Tigard focus on retaining and attracting a mix of existing and emerging business clusters that pay above average wages. This includes existing, established clusters, such as durable goods manufacturing (includes metals and machinery), education (private and non-profits), financial services,information (including software development), professional and technical services, and wholesale trade. They also recommend that the City focus on emerging clusters,including health care and advanced technology (i.e.,green energy) manufacturing and research operations. As indicated in Table 8, these recommended business clusters (with the exception of educational services) pay above average wage rates. 2 Based on findings contained in publications provided by JIST Works, including the Occupational Outlook Handbook, 2008-2009; and America's Fastest Growing Jobs by Michael Farr. EOA—Staff Recommended Draft 13 Table 8. Summary of Existing Businesses in Tigard USB, 2008 Number Average Average of Entities Employment Annual Pay Total Private 2,914 41 ,032 $43,542 Natural resources and mining 6 21 $38,742 Construction 272 3,329 $56,080 Manufacturing 117 2,743 $54,300 Durable goods 53 1 ,814 $58,229 Metals and machinery manufacturing 36 897 $51 ,425 Computer and electronic product mfg. 15 774 $65,308 Transportation equipment manufacturing 2 143 $62,594 Nondurable goods 64 929 $46,628 Trade, transportation, and utilities 704 11 ,375 $36,742 Wholesale trade 333 2,987 $64,284 Retail trade 329 7,621 $25,407 Transportation, warehousing, and utilities 42 767 $42,114 Information 69 1 ,206 $66,469 Financial services 405 5,037 $58,459 Professional and business services 638 8,146 $45,971 Professional and technical services _ 449 3,858 $62,851 Administrative and waste services 189 4,288 $30,784 Educational and health services 269 5,037 $38,133 Educational services 55 2,912 $36,384 Health care and social assistance 214 2,125 $40,531 Leisure and hospitality 204 3,018 $16,579 Arts, entertainment, and recreation 23 184 $16,241 Accommodations and food services 181 2,834 $16,601 Accommodations 10 131 $20,072 Food services and drinking places 171 2,703 $16,433 Other services 230 1,120 $36,618 Government 5 390 $49,275 Total 2,919 41 ,422 $43,596 Notes: Shading indicates targeted business cluster. Source: Oregon Employment Department, 2008. Average payroll reflects Washington and Multnomah counties. SITE SUITABILITY ANALYSIS (LAND DEMAND) The majority of the targeted businesses that consider expanding or relocating into Tigard will consist of small business operations (less than 50 employees) that can locate within existing professional office or EOA-Staff Recommended Draft p 4 industrial buildings, or within new office or flex/industrial buildings that are developed on vacant sites of less than five acres in size. It is also likely that there will be larger potential business and high-tech industrial operations that consider Tigard as a potential location for new campus-style developments. Certain opportunities may emerge as regional businesses expand and desire to remain within the tri-county region. Other opportunities may occur as global and national businesses desire to establish a presence in the Pacific Northwest. In any event,it is likely that Tigard could attract three to four large professional service, health care, education, and/or high tech industrial businesses over the next 20 years. As indicated in Table 9,Tigard is already home to 41 large private business operations (with between 70-250 employees). Tigard could continue to retain and attract large businesses if adequate sites are available. These types of large private operations usually require surplus adjacent land areas to accommodate future business expansion. Table 9. Existing Private Businesses by Size Class, Tigard USB, 2008 Total Large Small/Medium Sector Establishments Establishments Establishments Number Jobs Number Jobs Number Jobs Natural resources and mining 6 21 -- -- 6 21 Construction 272 3,329 4 571 268 2,758 Manufacturing 117 2,743 10 1,300 107 1,443 Durable goods 53 1,814 10 1,300 43 514 Nondurable goods 64 929 -- -- 64 929 Trade, transport., utilities & 704 11,375 20 3,997 684 7,378 communications Wholesale trade 333 2,987 1 125 332 2,862 Retail trade 329 7,621 16 3,517 313 4,104 Transport., warehousing and 42 767 3 355 39 412 communications Information 69 1,206 2 376 67 830 Financial, professional & tech. 1,043 13,183 4 1,426 1,039 11,757 services Educational and health services 269 5,037 -- -- 269 5,037 Educational services 55 2,912 -- -- 55 2,912 Health care and social 214 2,125 214 2,125 assistance Leisure and hospitality 204 3,018 -- -- 204 3,018 Arts, entertainment, and 23 184 23 184 recreation Accommodations and food 181 2,834 181 2,834 services Other services 230 1,120 1 99 229 1,021 Total 2,914 41,032 41 7,769 2,873 33,263 Notes: green shading indicates targeted business cluster. Source:Oregon Employment Department,2008. Note:large establishments are those with at least 70 employees. EOA-Staff Recommended Draft The consultant/staff team recommends that Tigard provide a variety of small, medium and large vacant sites that meet the targeted business and industrial requirements. As indicated in Table 10, the existing businesses within Tigard can generally be grouped into three general land use categories: industrial, commercial and office. Table 10. Existing Private Businesses by Size Class and General Land Use or Building Type, Tigard USB, 2008 Primary Land Total Entities Large Entities4 Small/Medium Use/Building Type Entities Firms Jobs Firms Jobs Firms Jobs Industrial 1 770 9,847 18 2,351 752 7,496 Commercial 2 763 11 ,759 17 3,616 746 8,143 Office 3 1,381 19,426 6 1,802 1,375 17,624 Total 2,914 41 ,032 41 7,769 2,873 33,263 Notes: I Reflects natural resources, construction, manufacturing, wholesale trade, transportation, warehousing, utilities, and communications sectors. 2 Reflects retail trades, lodging, accommodations, and misc. service sectors. 3 Reflects information, financial, professional and technical service, health care and educational service sectors. 4 Large establishments reflect establishments with at least 70 employees. Source:Oregon Employment Department, 2008. Compiled by FCS GROUP. Most small and medium business establishments prefer to lease space in office or commercial buildings, and/or could locate into redevelopment sites in downtown or in selected redevelopment locations (e.g., near planned high capacity transit stations or within the Tigard Triangle). No special vacant land requirements are identified for future small or medium businesses. However, the City should pursue more proactive redevelopment strategies to accommodate small and medium sized businesses. Larger business establishments that are included within the targeted business clusters will likely have minimum site size and infrastructure service requirements. Typical site requirements for the larger targeted business sectors are described in Table 11 and described in more detail in Appendix F. Based on the site requirements described in Table 11 and Appendix F, the recommended targeted business clusters will need sites ranging from one to twenty-five acres,with a majority of the need falling in the five to ten-acre range. EOA—Staff Recommended Draft 16 Table 11. Typical Site Size Requirements for Tar•eted Business Types Small Users Medium Users Large Users Less than 50 jobs 50 to 70 jobs 70 to 200+jobs per business per business per business Industrial Building tenants or 4 to 6 acres per user 6 to 20 acres per • Advanced Technology infill user Manufacturing redevelopment Prefers industrial or . Metals/Machinery Prefers industrial or Manufacturing sites in established business park business park ▪ Wholesale Trade industrial locations settings campus settings Office Building tenants or 2 to 4 acres per • Education infill 1 to 2 acres per user user* • Professional and redevelopment Technology. Services sites in town Prefers town center, Prefers business . Information center, regional corridors or transit park campus . Financial Services center, or transit station areas setting with transit • Health Care* station areas service Retail Not in Targeted Clusters Notes:Assumes site development requirements shown in Appendix F. *Larger medical facility campus could require 15 to 30 acres. INVENTORY OF SUITABLE SITES (LAND SUPPLY) Consistent with the employment land demand forecast, the buildable land inventory (BLI) for the Tigard EOA documents industrial and commercial inventory that currently exists within the Tigard Urban Planning Area (UPA). This analysis documents existing land use inventories and compares industrial and commercial land use needs required for addressing the slow,moderate and high growth forecast scenarios. Employment Land Inventory The Tigard EOA includes a recent buildable land inventory completed by the City of Tigard Planning staff using Geographic Information Systems (GIS) data that is consistent with the current Draft 2009- 2035 Urban Growth Report (accepted by Metro Council in December 2009). The City's BLI included an analysis of existing vacant and partially vacant (sub-dividable) tax lots by current zoning classification and deducted all significant environmental constraints to estimate buildable land area within the Tigard USB. The land supply analysis focused on the land use classifications that support employment uses,including commercial,mixed-use, and industrial zones. The City has 10 commercial zones to account for a wide variety of uses ranging from retail to medical centers to mixed use centers. Tigard has three zones which accommodate industrial uses. Please refer to Appendix E for a detailed description of the allowed, conditional, and permitted uses within each of the City's zone classifications. The buildable land area for each tax lot was derived by analyzing GIS data pertaining to environmental features that would constrain the amount of potential site development on vacant and partially vacant areas. For purposes of this analysis, the environmental constraints were calculated for each site using EOA—Staff Recommended Draft 17 estimates for land area that is constrained by the following: Metro Title 3 designation (waterways, wetlands,riparian buffers, 100 year floodplain). The vacant and partially vacant land inventory for the Tigard UPA includes 125 tax lots with a total buildable land area of 136.1 acres, as indicated in Table 12. Tigard's vacant land supply primarily consists of small (less than one acre) tax lots and tax lots between one and five acres in size. As indicated in Table 12,the tax lots of less than five acres in size comprise 79.3 acres or nearly sixty percent of the total vacant land supply. The larger tax lots include three lots of five to ten acres (22.1 acres total), and two contiguous tax lots more than ten acres in size (34.7 acres total). Please refer to Appendix G for additional detail. Table 12. Distribution of Vacant and Part Vacant Lands by General Land Use Zone Classification, Tigard USB Vacant and Partially Vacant Property < 1 acre 1 to 5 acres 5 to 10 acres > 10 acres Total Lots Acres Lots Acres Lots Acres Lots Acres Lots Acres Commercial 26 9.5 8 20.2 2 16.4 0 0 36 46.1 Mixed Use 63 25.3 6 8.9 1 5.7 0 0.0 70 39.9 Industrial 12 4.2 5 11 .2 0 0.0 2 34.7 19 50.1 Total 101 39.0 19 40.3 3 22.1 2 34.7 125 136.1 Source: City of Tigard. As mentioned in the Site Suitability Analysis, the recommended targeted business clusters will need sites ranging from one to twenty-five acres to expand or locate within the Tigard UPA,with a majority of the need falling in the five to ten-acre range. The City appears to have a range of sites available to accommodate the targeted business clusters. However redevelopment sites may be needed to accommodate development needing five to ten-acre parcels. In light of the importance of redevelopment to the City's ability to grow and diversify its economic base, the City and consultant team also evaluated the relative level of high, medium and low redevelopment potential for each developed tax lot in the Tigard UPA. While this is not a stated requirement within OAR 660, Division 9,it is considered an important factor in deciding which land use growth scenario to target. The analysis of redevelopment opportunities is based on the ratio of assessed improvement value to land value for each tax lot using 2010 Washington County Assessor data. The results provided in Table 13 indicate that there are significant amounts of high and moderate redevelopment potential within the Tigard USB. The redevelopment analysis identifies 169 tax lots with a total of 115.6 acres as having"high" redevelopment potential, and 180 tax lots with 166.6 acres as having"moderate" redevelopment potential. EOA—Staff Recommended Draft 18 Table 13. Analysis of Redevelopment Tax Lots by General Land Use Zone Classification, Tigard USB City of Tigard Redevelopable Potential (Improvement to Land Value)* High (< 0.33) Moderate Low (> 1.00) (0.33 to 1.00) Lots Acres Lots Acres Lots Acres Commercial 19 7.2 31 17.8 199 299.8 Mixed Use 132 81 .4 124 89.9 232 344.3 Industrial 18 27.0 25 58.8 146 437.9 Total 169 115.6 180 166.6 577 1,082.0 Notes: 1 Improvement to Land Value calculated from Washington County Tax Assessor data (Sept 2010). 2 196 Properties contained a zero Improvement or Land Value and are not represented here. Source: City of Tigard. Short-Term Land Supply Determination In addition to the long-term land supply, OAR 660-009-0005 also requires the identification of a short- term supply of land meaning"suitable land that is ready for construction within one year of an application of a building permit or request for a service extension." OAR 660-009-0025 also requires that cities must provide "at least 25 percent of the total land supply within the urban growth boundary designated for industrial and other employment uses as short-term supply." In Tigard's case, all of the land supply currently included within the Tigard UPA is deemed by the City to be within the short-term supply category. Hence, there are existing roads,water, sewer, and other infrastructure facilities that are sized appropriately to handle some level of new development on the remaining vacant tax lots. One issue the City has been dealing with is that of highway capacity. This will continue to be an issue until a regional solution is found. This constraint was the cause of a maximum floor-to-area ratio of 0.4 being applied to the Tigard Triangle when a portion of it was rezoned to mixed-use employment. This severely limits the ability to maximize the development potential of available sites. It also causes proposed developments to provide mitigating measures when it is determined the increased vehicle trips will not meet ODOT performance measures. This can be financially constraining to a project if additional lanes,medians, or intersection improvements are required to be paid for by the development. Additionally, the Transportation Planning Rule (OAR 660-12-0600) and related ODOT performance standards for the state highways have presented a barrier to Tigard achieving its aspirations. This includes amending existing zoning to allow higher density developments that are consistent with the Region 2040 land use designations. The TPR requires an amendment to an adopted plan not cause an affected roadway to fail to meet performance standards, or if the forecast roadway operations are already failing to meet performance standards, the plan amendment must not further degrade performance. This is a known issue in Downtown,Washington Square Regional Center, along Pacific Highway, and in the Tigard Triangle, and may also arise in other areas near state highways or freeway interchanges. These issues are being addressed at the state and regional levels and could be somewhat mitigated as the City,Metro, and ODOT work to develop alternative performance standards through a corridor EOA—Staff Recommended Draft 19 refinement plan for Pacific Highway. The Pacific Highway corridor is also being studied for potential high-capacity transit service in the future. The presence of high-capacity transit could also alleviate some of the issues associated with ODOT performance measures by allowing new development to allocate additional trips to transit and reduce automobile trip demand. Strategies to promote transit- oriented development and address ODOT capacity issues are recommended as part of the implementation plan policies for the Tigard EOA. ASSESSMENT OF POTENTIAL (RECONCILIATION OF DEMAND AND SUPPLY) Short-Term Land Need Determination Commercial and industrial properties appear to clearly meet the statutory requirements for short-term land supply, as all of the long-term land supply can be classified as short-term as well as long-term supply. Industrial and commercial properties appear to be well served with adequate infrastructure, and there is an abundant supply of vacant industrial, office and retail building floor area being actively marketed in the Tigard USB today. Long-Term Land Need Determination Consistent with EOA documentation requirements, the economic trends analysis of land needs scenarios and the business clusters analysis indicates that the Tigard UPA can add approximately 794 net new industrial jobs without needing to add additional industrial-zoned land over the next 20 years. In light of current downward trends in industrial business activity, the land efficient need scenario appears to be most consistent with regional growth forecasts and anticipated market realities. Industrial Land Need and Parcel Requirements As indicated in Table 13,the land efficient need scenario assumes 48 acres of net new industrial vacant land demand,which is just below the estimated vacant industrial land supply of 50 acres. If the City opts to pursue a more aggressive economic growth strategy that is consistent with the moderate or high land need scenario, the City would need to identify another 14 to 30 acres of vacant industrial land area to meet the level of industrial demand associated with adding another 1,059 to 1,324 industrial jobs. In light of the City's rather limited remaining vacant industrial land supply of tax lots in excess of five acres, the consultant/staff team recommends that the City adopt economic goals and objectives that preserve the remaining large contiguous industrial sites for large industrial employment users. A preliminary expected forecast of demand by parcel size is also provided in Table 14, and assumes that virtually all of the remaining vacant industrial land supply within the Tigard UPA will be absorbed over the next 20 years. EOA—Staff Recommended Draft 20 Table 14. 20-Year Industrial Demand Forecast and Vacant Land Supply, Tigard USB Efficient Land Moderate Land High Land Land Demand and Supply Need Need Scenario Need Scenario Scenario Demand for Vacant Industrial 48 64 80 Land Supply of Vacant Industrial Land 50 50 50 Land Surplus or (Deficit) 2 (14) (30) Existing Forecast of Preliminary Parcel Distribution, Unconstrained Parcel Size Surplus Efficient Land Need Forecast 1 Supply (tax Demand (tax lots) lots) (tax lots) '/ Less than 1 acre 12 10 2 1 to 5 acres 5 5 0 5 to 10 acres 0 0 0 10 to 20 acres 2 2 0 20+ acres 0 0 0 Total 19 17 2 Notes: 'Tax lot demand forecast expected to meet or exceed supply in 20 years. Source: Based on findings included in demand and supply analysis. Commercial Land Need and Parcel Requirements As indicated in Table 15, the land efficient needs scenario assumes 78 acres of net new commercial and mixed-use vacant land demand,which is just below the estimated vacant land supply of 86 acres. As with the industrial land needs, an economic growth strategy that is consistent with the moderate or high land needs scenario would require the City to identify an additional 19 to 45 acres of vacant commercial and mixed-use land to meet the demand. . In light of the City's rather limited remaining vacant commercial and mixed-use land supply of lots in excess of five acres, the consultant/staff team recommends that the City adopt economic goals and objectives that preserve the remaining large contiguous commercial sites for strategic commercial retail and office employment users, and allow housing in these areas, only as part of a mixed-use development. A preliminary expected forecast of demand by parcel size is also provided in Table 15, and assumes that virtually all of the remaining vacant commercial land supply over one acre in size within the Tigard UPA will be absorbed over the next 20 years. The City also anticipates the development of high-capacity transit along the Pacific Highway corridor. The region has made a commitment to high-capacity transit and this corridor is the next to be studied. Any development of high-capacity transit would trigger the City to identify station areas to accept higher, transit supportive mixed-use densities. The logical locations for station areas would more than likely result in the rezoning of general commercial lands to mixed-use zoning. As both commercial and mixed-use zoned lands are included in this analysis, any rezoning would not decrease the amount of vacant or partially vacant land available. The range of allowed uses, from retail to multi-story office buildings,would not be affected. EOA—Staff Recommended Draft 21 Table 15. Reconciliation of Long-term Land Demand and Supply Commercial and Mixed Use 20-Year Land Use Forecast (gross buildable acres), Tigard USB Low Land Need Medium High Land Land Demand and Supply Land Need Need Scenario Scenario Scenario Demand for Vacant Commercial 78 105 131 Land Commercial Demand 51 68 85 Mixed-Use Demand 27 36 45 Supply of Vacant Commercial 86 86 86 Land Commercial Zoned Supply 46 46 46 Mixed-Use Zoned Supply 40 40 40 Land Surplus or (Deficit) 8 (19) (45) Preliminary Parcel Distribution, Existing Supply Forecast of Surplus Efficient Need Forecast (tax lots) Demand (tax lots) (tax lots) Less Than 1 acre 89 30 59 1 to 5 acres 14 14 0 5to 10 acres 3 3 0 10 to 20 acres 0 0 0 20+ acres 0 0 0 Total 106 47 59 Source: FCS GROUP, based on findings included in demand and supply analysis. Planning, Market, Cost and Risk Factors Consistent with EOA documentation requirements, the economic trends analysis, stakeholder interviews and business clusters analyses indicate that the Tigard USB is uniquely positioned within the greater Portland metropolitan region to experience continued success in retaining and attracting businesses and economic development. Risk of Losing Large Commercial and Industrial Sites As Tigard's vacant land supply of large parcels (more than five acres) becomes diminished, the City could risk losing economic growth potential if remaining larger industrial and commercial sites allow non-employment uses that displace prospective business opportunities. While the current short-term employment market is sluggish at best, the future long-term job growth trends bode well for Tigard if it preserves large commercial and industrial zoned parcels for intended business activity. These risks can be mitigated in part by adopting new economic development objectives that preserve large commercial and industrial areas for desired commercial and industrial business activities. Risk of Not Adequately Preparing for Targeted Area Redevelopment As Tigard's population and employment levels increase with time, and vacant land diminishes, the City will need to rely more upon redevelopment areas, and productivity increases from existing developed lands and businesses to achieve long-term economic strength and diversity. New economic EOA—Staff Recommended Draft 2. development objectives should be formulated to enable the City to leverage desired redevelopment in targeted locations such as downtown, and within planned transit-station communities. Risk of Expanding the USB in the Future Beyond the 20-year forecast time horizon the City should consider the need to grow into urban reserve locations,if the City's investment in infrastructure extensions yields a favorable return to its residents and businesses. An Urban Planning Area expansion is not necessary at this time to accommodate industrial and other employment land needs for the next 20 years, unless the City opts to pursue the moderate or high land needs scenario to accommodate additional commercial and industrial job growth. Planning and Permitting Risks The City should review its land use development code to ensure that it preserves sites for their intended use,yet is flexible enough to accommodate a full diversity of commercial and light industrial uses consistent with public safety,public facilities, and positive urban design characteristics. The ability to provide a streamlined and predictable permitting process can be a challenge as the City relies more on smaller infill and redevelopment sites to accommodate business growth. Non-Local Regulatory Risks The City is dependent upon ODOT to achieve higher trip caps in targeted redevelopment areas. As the City and Metro pursue high capacity transit facilities and assessed service levels,these regulatory risks may be addressed by assuming higher non-vehicle mode shares that result in reduced traffic impacts from new development. Most of the risk factors described above may be addressed by the City of Tigard. Others will require partnerships with regional and state regulatory agencies, such as Metro,Washington County and ODOT. The City can take a leadership position by providing a local planning and permitting environment that is favorable to business investment and more proactive economic marketing to raise awareness of Tigard's strengths as a preferred location for over 2,900 existing business establishments. IMPLEMENTATION POLICIES AND ACTION MEASURES OAR 660-009-0020 stipulates that comprehensive plans must provide community economic development objectives, a commitment to providing a competitive short-term land supply, and identification and provision of adequate sites and public facilities to serve economic development demand. Since the City of Tigard updated the economic development chapter of its Comprehensive Plan in 2008, the document contains a fairly complete set of economic development goals,policies and action measures. The following is a list of topics and recommended policy updates to comply with state statutes and/or implement the City's economic goals. Policies Community Economic Development Objectives (CEDOs) The majority of these objectives are already embedded in existing policies. Two new policies are recommended: 'The City shall encourage neighborhood commercial uses that support economic opportunities, multi-modal transportation options, neighborhood vitality, and the goals of efficient land use patterns." EOA—Staff Recommended Draft 23 "The City shall encourage businesses that are environmentally and economically sustainable." Commitment to Provide Adequate Sites and Facilities and Commitment to Provide a Short-Term Land Supply of Land The commitment to provide adequate public facilities is embedded in existing Policy 9.1.4 of the Comprehensive Plan. One new policy is recommended to describe the commitment to provide adequate sites and a short-term land supply: 'The City shall monitor and update its Buildable Lands Inventory to ensure adequate short and long-term supplies of buildable employment land." Provide for Prime Industrial Land Development on Large Lots Existing Policy 9.1.7 addresses the need to protect prime industrial land but does not address the need for large lots. It is recommended the policy be revised as follows: "The City shall limit the development of retail and service land uses in Metro-designated industrial areas, and especially on lots of 10 or more acres, to preserve the potential of these lands for industrial jobs." Promote Targeted Redevelopment in Downtown and other areas This issue is addressed by several existing policies and recommended action measures, but most directly by Policy 9.3.1: "The City shall focus a significant portion of future employment growth and high- density housing development in its Metro-designated Town Center (Downtown); Regional Center (Washington Square); High Capacity Transit Corridor (Hwy 99W); and the Tigard Triangle." No new language is proposed. Recommended Action Measures Assist property owners with the Oregon Industrial Site Certification Process A new recommended action measure is suggested: "Assistproperty owners with the Oregon Industrial Site Certification Process to help preserve and market the City's inventory of industrial lands." Economic Development Marketing and Incentives Directed Towards Strategic Clusters This issue is addressed indirectly by several recommended action measures,but could benefit from more concise language. A new recommended action measure is suggested: `Explore an economic development marketing and incentives program targeting strategic business clusters." Work with ODOT to address mobility standards Capacity issues on state highways (particularly Pacific Highway, Hwy. 217, and Interstate 5) impact economic development opportunities through trip caps,limited floor-to-area ratios, and required road improvements that are expensive. The conversation is just getting started at the regional level.A new recommended action measure is suggested: "Work with state and regional partners to develop alternative mobility standards that will benefit the community and its economic development Oorts." EOA—Staff Recommended Draft 24 Monitor Local and Regional Economic Development Initiatives This request from the Planning Commission led to a suggested new recommended action measure: `Monitor local and regional economic development initiatives to assess their effectiveness related to cost and outcome." Metro Designated Centers and Corridors Based on a resolution passed by the Tigard City Council,Metro recently amended its Growth Concept Map expanding the Tigard Town Center Boundary to include the entire Tigard Urban Renewal District and the Tigard Triangle. The City is required to adopt this change into its Comprehensive Plan. Staff recommends adopting a definition that will refer to the Metro Growth Concept Map, thus eliminating the need to amend the Tigard Comprehensive Plan each time the Metro Growth Concept Map is amended. EOA—Staff Recommended Draft 25 APPENDIX A - OFFICE LEASING ACTIVITY SUMMARY, MID-YEAR REPORT OFFICE Leasing Activity,Mid-Year 2010(as of June 30,2010) Class A Market Statistics Mid-Year 2010 Existing Inventory Vacancy YTD Net YTD Under Const Quoted Market #Builds Total RBA Total SF Vac% Absorbtion Deliveries _ SF Rates Central Business District 41 11,389,435 1,412,066 12.4% (135,590) 368,800 62,200 $24.42 Suburban 141 17,234,745 2,225,626 12.9% (130,126) - - $23.74 Tigard 6 509,087 151,931 29.8% (13,097) - - $23.93 217 Corridor/Beaverton 12 1,142,430 303,750 26.6% (15,550) - - $21.77 Kruse Way 19 1,961,855 495,615 25.3% (26,228) - - $26.05 Barbur Blvd/Capitol Hwy - - - - - - $0.00 Tulalatin 4 361,270 154,503 42.8% 5,604 - - $24.31 Wilsonville 4 325,501 55,071 16.9% - - - $24.77 Total 182 28,624,180 3,637,692 12.7%• � (265,716) 368,800 62,200 $24.01 Class B Market Statistics Mid-Year 2010 Existing Inventory i Vacancy YTD Net YTD Under Const Quoted Market #Builds_ Total RBA Total SF Vac%_Absorbtion Deliveries SF Rates Central Business District 130 9,423,902 927,523 9.8% 61,787 - - $20.18 Suburban 1,155 30,095,314 4,345,461 14.4% (62,639) 14,000 268,854 $17.82 Tigard 83 1,979,955 277,469 14.0% 12,806 - - $20.88 217 Corridor/Beaverton 72 1,719,571 314,759 18.3% 5,148 - - $16.40 Kruse Way 26 728,262 93,241 12.8% (14,059) - - $20.76 Barbur Blvd/Capitol Hwy 42 890,672 121,398 13.6% 2,337 - - $16.79 Tulalatin 30 704,815 105,798 15.0% (7,289) - - $19.36 Wilsonville 17 622,051 30• ,169 4.8% (10• ,369) - - $16.71 • •Total 1,285 39,519,216 5,272,984 13.3%P (852) 14,000 268,854 $18.38 Class C Market Statistics Mid-Year 2010 Existing Inventory Vacancy YTD Net YTD Under Const Quoted Market #Builds Total RBA_ Total SF Vac% Absorbtion Deliveries SF Rates Central Business District 177 4,093,913 489,486 12.0% 11,201 - - $17.49 Suburban 2,815 18,283,763 129,081 0.7% 68,665 - - $14.36 Tigard 97 662,182 66,493 10.0% (3,199) - - $15.60 217 Corridor/Beaverton 82 609,431 70,635 11.6% 1,202 - - $14.50 Kruse Way 19 133,044 2,452 1.8% - - - $18.00 Barbur Blvd/Capitol Hwy 120 846,865 99,822 11.8% (5,090) - - $15.60 Tulalatin 20 119,561 29,278 24.5% (5,598) - - $14.73 Wilsonville 21 103,496 2,681 2.6% 5,609 - - $17.21 Total 2,992 22,377,676 618,567 2.8% 79,866 - - $14.93 Class B and C Market Statistics Mid-Year 2010 Existing Inventory Vacancy YTD Net YTD Under Const Quoted Market #Builds Total RBA Total SF Vac% Absorbtion Deliveries SF Rates Central Business District 307 13,517,815 1,417,009 10.5% 72,988 - - $19.37 Suburban 3,970 48,379,077 4,474,542 9.2% 6,026 14,000 268,854 $16.51 Tigard 180 2,642,137 343,962 13.0% 9,607 - - $19.56 217 Corridor/Beaverton 154 2,329,002 385,394 16.5% 6,350 - - $15.90 Kruse Way 45 861,306 95,693 11.1% (14,059) - - $20.33 Barbur Blvd/Capitol Hwy 162 1,737,537 221,220 12.7% (2,753) - - $16.21 Tulalatin 50 824,376 135,076 16.4% (12,887) - - $18.69 Wilsonville 38 725,547 32,850 4.5% (4,760) - - $16.78 Total 4,277 61,896,892 5,891,551 9.5% 79,014 14,000 268,854 $17.14 Quoted Rates for Class B and C table are weighted average of individual B and C markets according to the total RBA inventory Source:CoStar Office Report Mid-Year 2010;Capacity Commercial Group. EOA-Staff Recommended Draft Y a'r APPENDIX B: INDUSTRIAL LEASING ACTIVITY, MID-YEAR 2010 REPORT Flex Building Market Statistics Mid-Year 2010 Existing Inventory Vacancy YTD Net YTD Under Const Quoted Market #Builds Total RBA Total SF Vac% Absorbtion Deliveries SF Rates Central Business District 3 45,000 10,000 22.2% - - - $16.50 Suburban 741 18,956,577 2,268,793 12.0% (336,814) 70,020 - $10.23 Tigard 50 1,277,751 170,855 13.4% (12,799) - - $12.30 217 Corridor/Beaverton 87 2,204,502 419,258 19.0% (69,237) - - $11.77 Kruse Way 2 88,928 - 0.0% - - - $0.00 Barbur Blvd/Capitol Hwy 7 53,681 6,771 12.6% 5,100 - - $10.35 Tulalatin 14 430,840 23,229 5.4% (2,531) - - $7.54 Wilsonville 29 1,661,734 201,334 12.1% (18,316) 7,020 - $9.31 r. Total 744 19,001,577 2,278,793 1 12.0% (336,814) 70,020 - $10.24 Warehouse Building Market Statistics Mid-Year 2010 Existing Inventory Vacancy YTD Net YTD Under Const Quoted Market #Builds Total RBA Total SF Vac% Absorbtion Deliveries SF Rates Central Business District 41 1,616,833 141,090 8.7% (1,843) - - $5.78 Suburban 4,694 167,214,476 13,813,643 8.3% 91,337 119,723 415,000 $5.55 Tigard 119 4,394,617 339,683 7.7% 57,333 - - $6.38 217 Corridor/Beaverton 75 3,332,391 471,805 14.2% 31,770 - - $6.30 Kruse Way 13 301,069 3,378 1.1% 10,240 - - $7.20 Barbur Blvd/Capitol Hwy 17 209,963 5,000 2.4% 8,000 - - $6.16 Tulalatin 221 8,453,141 675,494 8.0% (39,805) - - $5.20 Wilsonville 83 6,155,906 1,268,475 20.6% 47,351 - - $5.95 Total 4,735 168,831,309 13,954,733 1' 8.3% 89,494 119,723 415,000 $5.55 Total Industrial Market Statistics Mid-Year 2010 Existing Inventory Vacancy YTD Net YTD Under Const Quoted Market #Builds Total RBA Total SF Vac% Absorbtion Deliveries SF Rates Central Business District 44 1,661,833 151,090 1 9.1% (1,843) - - $7.16 Suburban 5,435 186,171,053 16,082,436 ' 8.6% (245,477) 189,743 415,000 $6.19 ir Tigard 169 5,672,368 510,538 9.0% 44,534 - - $7.68 217 Corridor/Beaverton 162 5,536,893 891,063 ▪ 16.1% (37,467) - $8.07 Kruse Way 15 389,997 3,378 ▪ 0.9% 10,240 - - $7.20 Barbur Blvd/Capitol Hwy 24 263,644 11,771 ▪ 4.5% 13,100 - - $8.01 Tulalatin 235 8,883,981 698,723 ' 7.9% (42,336) - - $5.29 Wilsonville 112 7,817,640 1,469,809 ▪ 18.8% 29,035 7,020 - $6.72 Total 5,479 187,832,886 16,233,526 1 8.6% (247,320) 189,743 415,000 $6.20 Source:CoStar Office Report Mid-Year 2010;Capacity Commercial Group. EOA-Staff Recommended Draft APPENDIX C: ANALYSIS OF EMPLOYMENT AND SPACE NEEDS Projected Tigard Employment, Medium Forecast Scenario, 2005-2035 Change 2005 Proj. 2035 Jobs Retail Trades 9,854 14,426 4,572 46% Services 11,372 23,482 12,110 106% Industrial/Other* 12,049 13,637 1,588 13% Government* 8,033 9,092 1,059 13% Total 41,308 60,637 19,329 47% Source:Metro adopted housing and employment growth forecasts, 2007;Metroscope Gen. 2.3. Assumes allocation of"Other"jobs at 60%industrial, and 40%government. In light of the recent national economic recession that caused severe declines in Oregon employment from 2007 through 2010, Metro's 2030 job forecast for Tigard is assumed to be achieved by year 2035 under the "medium forecast"scenario. Projected Tigard Net New Average Annual Employment Forecast(1 Year Forecast) Low Medium High Retail Trades 114 152 191 Services 303 404 505 Industrial/Other* 40 53 66 Government* 26 35 44 Total 483 644 805 Projected Tigard Net New 20-Year Employment Forecast Low Medium High Retail Trades 2,286 3,048 3,810 Services 6,055 8,073 10,092 Industrial/Other* 794 1,059 1,324 Government* 529 706 882 Total 9,665 12,886 16,108 EOA—Staff Recommended Draft APPENDIX C: ANALYSIS OF EMPLOYMENT AND SPACE NEEDS (CONTINUED) Job Sectors and Building Type Assumptions Flex/Bus. Gen. Employment Sectors Office Institutional Park Industrial Warehouse Retail Total Retail Trades 5% 1% 6% 0% 12% 76% 100% Services 72% 1% 5% 1% 1% 20% 100% Industrial/Other 8% 0% 50% 40% 2% 0% 100% Government 43% 37% 5% 0% 0% 15% 100% Source: Metro Draft 2009-2030 Urban Growth Report;modified to reflect local observations. Proj. Tigard Net New 20-Year Employment Forecast by Building Type, Low Flex/Bus. Gen. Office Institutional Park Industrial Warehouse Retail Total Retail Trades 114 23 137 - 274 1,737 2,286 Services 4,360 61 303 61 61 1,211 6,055 Industrial/Other` 64 - 397 318 16 - 794 Government` 228 196 26 - - 79 529 Total 4,765 279 863 378 351 3,028 9,665 Proj. Tigard Net New 20-Year Employment Forecast by Building Type, Medium Flex/Bus. Gen. Office Institutional Park Industrial Warehouse Retail Total Retail Trades 152 30 183 - 366 2,316 3,048 Services 5,813 81 404 81 81 1,615 8,073 Industrial/Other" 85 - 529 424 21 - 1,059 Government` 304 261 35 - - 106 706 Total 6,353 372 1,151 504 468 4,037 12,886 Proj. Tigard Net New 20-Year Employment Forecast by Building Type, High Flex/Bus. Gen. Office Institutional Park Industrial Warehouse Retail Total Retail Trades 191 38 229 - 457 2,896 3,810 Services 7,266 101 505 101 101 2,018 10,092 Industrial/Other* 106 - 662 529 26 - 1,324 Government* 379 326 44 - - 132 882 Total 7,942 465 1,439 630 585 5,046 16,108 Source:FCS GROUP based on Metro Draft 2009-2030 Urban Growth Report; modified to reflect local observations. EOA—Staff Recommended Draft APPENDIX C: ANALYSIS OF EMPLOYMENT AND SPACE NEEDS (CONTINUED) Building Type to Land Needs Assumptions* Flex/Bus. Gen. Office Institutional Park Industrial Warehouse Retail Refill/Redevelopment Rate 1 67% 67% 45% 45% 45% 60% Jobs Needing Vacant Land Rate 2 33% 33% 55% 55% 55% 40% Building SF Per Job 2 370 630 550_ 700 1,100 510 Floor-Area-Ratio 2 _ 0.50_ 0.50 0.31 _ 0.30 0.30_ 0.30 Public Facility Net:Gross Adjustment 3 1.10 1.05 1.10 1.05 1.05 1.10 Work at Home Adjustment' 0.15 0.03 0.05 0.03 0.03 0.03 assumptions are intended to reflect a long-term average over 20 years, some"ramp up"is expected to attain these density levels. 1/Adjusts for building refill&vacancy allowances. 2/Building density derived from Metro UGR assumptions. 3/Allowances take into account land dedicated to public/utility easements. 4/Allowance based on national statistics by US Dept. of Labor, Bureau of of Labor Statistics, Technical information: "Work at Home i Source:assumptions are generally consistent with the Metro Draft 2009-2030 Urban Growth Report;modified to reflect local observatio Proj.Tigard Net New 20-Year Redevelopment Building Space Needs(Floor Area) Flex/Bus. Gen. Office Institutional Park Industrial Warehouse Retail Total Low 1,004,000 114,000 203,000 116,000 168,000 899,000 2,504,000 Medium 1,339,000 152,000 271,000 154,000 225,000 1,198,000 3,339,000 High 1,673,000 191,000 338,000 193,000 281,000 1,498,000 4,174,000 Proj.Tigard Net New 20-Year Building Floor Area on Vacant Lands(Floor Area) Flex/Bus. Gen. Office Institutional Park Industrial Warehouse Retail Total Low 495,000 56,000 248,000 141,000 206,000 599,000 1,745,000 Medium 659,000 75,000 331,000 188,000 274,000 799,000 2,326,000 High 824,000 94,000 414,000 235,000 343,000 999,000 2,909,000 Proj.Tigard 20-Year Vacant Lands(gross buildable acres) Flex/Bus. Gen. Office Institutional Park Industrial Warehouse Retail Total Low 25 3 20 11 17 50 126 Medium 33_ 4 27 15 22 67 168 High 42 5 34 19 28 84 210 EOA-Staff Recommended Draft 3,th APPENDIX C: ANALYSIS OF EMPLOYMENT AND SPACE NEEDS (CONTINUED) Land Use Assignment Assumptions Flex/Bus. Gen. Local Zoning Classification Office Institutional Park Industrial Warehouse Retail Commercial 50% 60% 20% 10% 10% 60% Mixed Use 40% 20% 5% 5% 0% 30% Industrial 10% 20% 75% 85% 90% 10% Total 100% 100% 100% 100% 100%_ 100% Assumptions by FCS GROUP and Tigard based on local observations. Proj.Tigard 20-Year Vacant Land Needs Forecast by Zoning Classification, Low Flex/Bus. Gen. Land Use Classification _ Office Institutional Park Industrial Warehouse Retail Total Commercial 13 2 4 1 2 30 51 Mixed Use 10 1 1 1 - 15 27 Industrial 3 1 15 10 15 5 48 Total 25 3 20 11 17 50 126 Proj.Tigard 20-Year Vacant Land Needs Forecast by Zoning Classification, Medium Flex/Bus. Gen. Land Use Classification Office Institutional Park Industrial Warehouse Retail Total Commercial 17_ 2 5_ 2 2_ 40 68 Mixed Use _ 13 1 1 1 - 20 36 Industrial 3 1 20 13 20 7 64 Total 33 4 27 15 22 67 168 Proj.Tigard 20-Year Vacant Land Needs Forecast by Zoning Classification, High Flex/Bus. Gen. Land Use Classification Office Institutional Park Industrial Warehouse Retail Total Commercial 21 3 7 2 3 50 85 Mixed Use 17 1 2 1 - 25 45 Industrial 4 1 25 16 25 8 80 Total 42 5 34 19 28 84 210 Summary of 20-Year Vacant Land Demand Forecast by Zoning Classification,Tigard USB(with current zoning regulations) Land Use Classification Low Medium High Commercial 51 68 85 Mixed Use 27 36 ' 45 Industrial 48 64' 80 Total 126 168 210 Assumptions by FCS GROUP based on Dec. 2009 Metro 2009-2035 Urban Growth Report assumptions and local observations. EOA—Staff Recommended Draft ,1 APPENDIX D: ANALYSIS OF RETAIL INFLOW/OUTFLOW Analysis of Retail Development Potential Tigard Area 2010 to 2030 Est.2010 Population in City 48,100 Proj.2030 Population in Qty 62,278 Analysis of Effective Buying Income(EBI) Est.2010 Per Capita Income 1/ $33,000 Proj.2030 Per Capita Income 1/ $36,462 Est.2010 Aggregate EBI(000) $1,587,300 Roj.2030 Aggregate EBI(000) $2,270,749 Change in Aggregate EBI(000) $683,449 Future 2030 Supportable Retail Development Analysis of Existing&Future Retail Sales Potential 2010 2030 Retail Retail Distributi Buying Buying Total on of Power Power Change Sales Sales Support Supportable Local from from in Retail Attributed Attibuted able Sq.Ft.of New Income by Local Local Buying to Local to Retail Retail Retail Store Residents Residents Power Residents Inflow Sales Development Store Group Group 2/ (000)2/ (000)2/ (000) (000) (000)4/ (000) 5/ Food Stores 8.3% $131,746 $188,472 $56,726 $51,054 $12,763 $63,817 236,000 Eating&Drinking 5.0% $79,365 $113,537 $34,172 $30,755 $13,181 $43,936 162,000 Gen.Merchandise 5.5% $87,302 $124,891 $37,590 $33,831 $27,680 $61,510 227,000 Furniture,Fixtures&Appliances 2.2% $34,921 $49,956 $15,036 $13,532 $11,072 $24,604 91,000 Automotive Services 9.6% $152,381 $217,992 $65,611 $52,489 $42,945 $95,434 352,000 Other/tvisc. 11.3% $179,365 $256,595 $77,230 $54,061 $23,169 $77,230 285,000 Total 41.9% $665,079 $951,444 $286,365 $235,722 $130,810 $366,532 1,353,000 Notes: 1/Derived from US Census estimates;assumes.05%annual real income growth. 2/Store group sales allocations from U.S.Bureau of Economic Analysis,Consumer Expendure Survey,Western United States. 3/Based upon employment estimates:assumes 500 sq.ft.per job,5%vacancy allowance,and avg.sales of$275/sq.ft. 4/Future retail inflow assumed to account for 30%to 45%of total retail sales. 5/Building area assumes$285/per sq.ft.annual sales,and 5%vacancy allowance. Source:analysis by FCS GROUP. EOA-Staff Recommended Draft 32 APPENDIX E: SUMMARY OF TIGARD EMPLOYMENT ZONES AND REGULATIONS The following is an overview of regulations related employment lands and zones for the City of Tigard. A general description of each zone is provided along with common and specific development standards when applicable. A summary table highlights specific regulations, such as building height, lot size, setbacks, landscaping and lot coverage. COMMERCIAL ZONES Neighborhood Commercial District (C-N) Provide convenience goods and services (those purchased frequently) within a small cluster of stores adjacent to residential neighborhoods. A limited number of other uses such as restaurants, gas stations and medical centers are permitted conditionally. Community Commercial District (C-C) Provide convenience shopping facilities to meet regular needs of nearby (1.5 miles) residential neighborhoods. Typically range in size from 30,000-100,000 sf on 2 to 8-acre sites. Separated from other commercial zones by at least one half-mile. Housing is permitted on the second floor at densities not to exceed 12 units/net acre. Limited other uses are allowed conditionally. Mandatory site development review. General Commercial District (C-G) Accommodate a full range of retail, office and civic uses with a City-wide and even regional trade area. Residential uses limited to single family residences on same site as permitted use. A wide range of uses are permitted conditionally. Professional Administrative Commercial District (C-P) Accommodate civic and business/professional services and compatible support services in close proximity to residential areas and major transportation facilities. Within the Tigard Triangle and Bull Mountain Road District, residential uses at a minimum density of 32 units/net acre are permitted in conjunction with commercial development. Heliports, medical centers, religious institutions and utilities are permitted conditionally. Developments are intended to serve as a buffer between residential areas and more intensive commercial and industrial areas. Mixed Use-Central Business District (MU-CBD) Provide a pedestrian friendly urban village in Downtown Tigard. A wide variety of commercial, civic, employment, mixed-use, multi-family and attached single family residences are permitted. All uses are allowed in all areas. Specific Development Standards (18.610): Four sub-areas (see MU-CBD Development Standards Matrix) have different setback and height limits in order to create a feeling of distinct districts within the larger zone. • Pacific Hwy. and Hall Boulevard Corridor: designed to create a "pulse-point" along the Pacific Hwy. corridor. Regional retail draw and potential future high capacity transit. • Main Street- Center Street: pedestrian-oriented with smaller scale development. • Scoffins Street- Commercial Street: higher density residential and employment base of civic, office and commercial uses. EOA—Staff Recommended Draft 3 • Fanno - Burnham Street: medium scale residential or mixed use development. Mixed Use Employment (MUE) Designed to apply to a majority of land within the Tigard Triangle, it permits a wide range of uses including major retail goods and services, business/professional offices, civic uses and housing (multi-family at a max density of 25 units/acre. A wide range of uses are permitted conditionally. Acknowledges a majority of trips by automobile, but supports alternative modes of transportation to the greatest extent possible and encourages a mix of uses. Includes special design standards for Tigard Triangle (18.620). Mixed Use Employment Districts (MUE-1 and MUE-2) Apply to areas where employment uses such as office, research and development and light manufacturing are concentrated. Commercial and retail support uses are allowed but limited, and residential uses are permitted when compatible with employment character of the area. MUE-1 example is Lincoln Center (high density). MUE-2 example is Nimbus area (more moderate densities). Mixed Use Commercial District (MUC) Includes land around Washington Square Mall and immediately west of Highway 217. Primary uses include office buildings, retail, and service areas. Also permits mixedOuse developments and housing at 50 units/acre. Large buildings encouraged with parking under behind or to sides. Includes special design standards for Washington Square Regional Center (18.630). Mixed Use Commercial (MUC-1) Applies to portion of the Durham Quarry site. Subject to IGA agreement between Tigard and Tualatin. Permits a wide range of uses including commercial lodging, general retail, offices and housing at min density of 25 units/acre and max of 50 units/acre. Includes special design standards for Durham Quarry (18.640). Mixed Use Residential Districts (MUR) Applies to predominantly residential areas where mixed-uses are permitted when compatible with residential use. INDUSTRIAL/INSTITUTIONAL ZONES Industrial Park District (I-P) Provides appropriate locations for combining light manufacturing, office and small- scale commercial uses (restaurants, personal services and fitness centers) in a campus- like setting. Only those uses with no off-site impacts are permitted. Mandatory site development review and specific design standards (18.530). Light Industrial District (1-L) Provides appropriate locations for general industrial uses, including manufacturing and production, research and development, warehousing and freight movement and wholesale sales activities with few, if any, nuisance characteristics. EOA—Staff Recommended Draft Heavy Industrial District (I-H) Provides appropriate locations for intensive industrial uses including I-L uses as well as railroad yards and waste-related activities. Uses include those which involve the use of raw materials, require significant outdoor storage and generate heavy truck and/or rail traffic. Properties are carefully located to minimize impacts on established residential, commercial and light industrial areas. EOA—Staff Recommended Draft 35 COMMERCIAL DEVELOPMENT STANDARDS MUE R-25 STANDARD CN CC151 GG CP MU- CG MF DU* MUC—1 MUC MUE 1 MUE 2 MUR 1 MUR 2 CBD** [0081 [17][8] [17][18I [1711.] [17][]°] Minimum Lot Size 5,000 sq 5,000 sqft None 6,000 sqft None None - None None None None None None -Detached unit ft - - - - - 1,480 sq ft - - - - - - - - - - - -Boarding,lodging, - - - - - - 6,100 sq - rooming house - Minimum Lot Width 50 ft 50 ft 50 ft 50 ft None 50 ft None None None None None None None Minimum Setbacks -Front yard 20 ft 0/20 ft[n] Oft[0I] Oft[11] ❑ Oft["] 20 ft V O ft[I'] 0 ell O ti l] O ft['l] lo ft[21] -Side facing street on 20 ft - - - ❑ - 20 ft V 0 ft[I'] 0 ft[21] 0 ft[21] 5 el] 10 ft[21] corner&through lots[r] -Side yard 0/20 ft[°] 0/20 ft[°] 0/20 ft[°] 0/20 ft[°] ❑ 0/20 ft 10 ft V 0 0 ft[2°] 0 ft[20] 0 ft["] 0 ft["] -Side or rear yard abutting - - - - - [°] 30 ft V ft[1s][a°] more restrictive zoning - - district -Rear yard 0/20 ft[°] 0/20 ft[°] 0/20 ft[°] 0/20 ft[] ❑ 20 ft V 0 ft[2a] 0 ft["] 0 0 -Distance between front - - - - - 0/2011, 20ft V [I0[2°] N/A Na ft[20][22] ft[z°][2a] of garage&property ft N/A N/A - line abutting a public or N/A private street. Minimum Building Height N/A N/A N/A N/A ❑ N/A N/A N/A 2 stories 2 stories None 2 stories None Maximum Building Height 35 ft 35 ft 45.ft 45 ft ❑ 45 ft 45 ft 70 ft 200 ft 200 ft 60 ft 75 ft 45 ft Maximum Site Coverage[2] 85% 80% 85% 85% ❑ 85% 80%[IO 90% 85% 85% 85% 80% 80% Minimum Landscape 15% 20% 15% 15% ❑ 15% 20% 10% 15% 15% 15% 20% 20% Requirement Minimum FAR[2] N/A N/A N/A N/A ❑ N/A N/A N/A 1.25 1.25 0.6 0.6 0.3 Minimum Residential N/A N/A N/A N/A ❑ N/A N/A N/A 50 50 25 50 25 Density[41[sl[a] unit/acre unit/acre unit/acre unit/acre unit/acre Maximum Residential N/A N/A N/A N/A ❑ N/A N/A N/A None None 50 None 50 Density[41[s][a][71 unit/acre unit/acre * Multiple-family dwelling unit. **See Table 18.610.1 and Map 18.610.A for development standards. V=See 18.640.050.B. ❑=See Table 18.610.1 and Map 18.610.A for development standards. [1] The provisions of Chapter 18.795(Vision Clearance)must be satisfied. [2] Includes all buildings and impervious surfaces. [3] Applies to all nonresidential building development and mixed use development which includes a residential component.In mixed use development,residential floor area is included in the calculations of floor area ratio to determine conformance with minimum FAR. [4] Notwithstanding the requirements of Section 18.715.020,minimum and maximum density shall be determined for residential only projects using the number of residential units per acre shown in the above table.The provisions for density transfer described in Section 18.715.030.B apply,using the minimum and maximum density shown in the above table.Any mixed-use or commercial only development does not have a minimum density requirement. [5] For purposes of determining floor area ratio and residential densities,the net development area shall be uses to establish the lot area,determined per Section 18.715.020.A. [6] Adjustments to minimum density in the Washington Square Regional center area subject to the standards set forth in Section 18.630.020.E. [7] The maximum density requirements for developments that include or abut designated Water Resources Overlay district Riparian setbacks per Chapter 18.797 are described in Section 18.630.020.D. [8] No setback shall be required except 20 feet shall be required where the zone abuts a residential zoning district. [9] See Section 18.520.050.8 for site and building design standards. [10]No front yard setback shall be required,except a 20-foot front yard setback shall apply within 50 feet of a residential district. [11] There shall be no minimum front yard setback requirement;however,conditions in Chapters 18.745 and 18.795 must be met. [12] There are no setback requirements,except 30 feet where a commercial use within a district abuts a residential zoning district. [13] The maximum height of any building in the CBD zone within 100 feet of any residential zoning district shall not exceed 40 feet. [14] Where the side or rear yard of attached or multiple-family dwellings abut amore restrictive zoning district,such setbacks shall not be less than 35 feet. [15]Landscaped areas on existing developed property in the CBD sh all be retained.Buffering and screening requirements set forth in Chapter 18.745 shall be met for existing and new development. [16] Lot coverage includes all buildings and impervious surfaces. [17]Modifications to dimensional and minimum density requirements for developments that include or abut designated Water Resources Overlay District Riparian setbacks per Chapter 18.797 are described in Section 18.630.040.F. [18] The requirements contained in the Buffer Matrices in Tables 18.745.1 and 18.745.2 shall be used in calculating widths of buffering/screening and required improvements to be installed between proposed uses in the MUC,MUE and MUR zones within the Washington Square Regional Center(WSRC)and abutting zoning districts not included within the WSRC,or zoning districts within the WSRC which are not mixed-use.For MUC and MUE zones,the requirements for Commercial Zones apply.For MUR zones,the requirements for the Neighborhood Commercial Zone apply. [19] For Commercial and Mixed-use developments,the maximum front and street side yard setback is 10 feet.For Residential only developments,the maximum front and street side yard setback is 20 feet. [20] Side and rear yard setbacks shall be 20 feet when the zone abuts residential districts shown in Section 18.510.020 except R-25 and R-40. [21] The maximum setback is 20 feet. [22] The maximum setback is 10 feet. C-N-Neighborhood Commercial District MUC 1—Mixed Use Commercial C-C-Community Commercial District MUC—Mixed Use Commercial C-G-General Commercial District MUE 1—Mixed Use Employment/High Density C-P -Professional/Administrative Office Commercial MUE 2—Mixed Use Employment/Medium Density MU-CBD—Mixed Use Central Business District MUR 1—Mixed Use Residential/High Density MUR 2—Mixed Use Residential/Medium Density EOA—Staff Recommended Draft 36 MU-CBD Development Standards Matrix 1'2,3 STANDARD SUB-AREAS Main Street 99W/Hall Corridor Scoffins/Commercial Fanno/Burnham (MS) (99H) (SC) (FB) Front setback 0/5 ft. Minimum 0 ft. (5 ft for frontage on 0 ft. 0 ft. 99W) Maximum 10 ft. 25 ft. 20 ft. 20 ft. Side facing street on corner and through lots Minimum 0 ft. 0 ft. 0 ft. 0 ft. Maximum 10 ft. N/A N/A N/A Sideyard Minimum/maximum N/A N/A N/A N/A Rear setback Minimum 0 ft. 5 ft. 5 ft. 5 ft. Maximum N/A N/A N/A N/A Building height Minimum 20 ft. 20 ft. 20 ft. 20 ft. Maximum(stories/feet) 3 stories(45 ft.) 3 stories(45 ft.) 6 stories(80 ft.) 6 stories(80 ft.)7 Ground floor height minimum 15 ft. 15 ft. None None Site coverage maximum 100% 90% 90% 80% Minimum landscaping4 0%5 10% 10% 20% Minimum building frontage 50% 50% 50% 50% Residential density(units per acre) Minimum° 25 25 25 15 Maximum 50 50 506 506 This table does not apply to existing development.All new buildings in the district must meet these development standards, including projects using the Track 3 approval process. z For standards for development surrounding the future public plaza see Section 18.610.040,Special Requirements for Development Bordering Urban Plaza. 3 See also Section 18.610.045,Exceptions to Standards in the MU-CBD zone. 4 In the MU-CBD zone,required landscaping can be provided on roofs. 5 Landscaping/screening requirements for parking lots must be met. 6 Station Area Overlay permits a maximum of 80 units per acre(see Map 18.610A). 7 3 stories/45 feet within 200 feet of Fanno Creek Park boundary(see Map 610.A)or within 50 feet of low or medium density residential district. 8 Minimum density applies to residential-only development(not mixed use). EOA—Staff Recommended Draft 37 DEVELOPMENT STANDARDS IN INDUSTRIAL ZONES STANDARD I-P I-L I-H Minimum Lot Size None None None Minimum Lot Width 50 ft. 50 ft. 50 ft. Minimum Setbacks -Front yard 35 ft. 30 ft. 30 ft. -Side facing street on corner& through lots[1] 20 ft. 20 ft. 20 ft. -Side yard 0/50 ft. [3] 0/50 ft. [3] 0/50 ft. [3] -Rear yard 0/50 ft. [3][4] 0/50 ft. [3] 0/50 ft. [3] -Distance between front of garage &property line abutting a public or private street -- -- -- Maximum Height 45 ft. 45 ft. 45 ft. Maximum Site Coverage[2] 75%[5] 85% 85% Minimum Landscape Requirement 25%[6] 15% 15% [1]The provisions of Chapter 18.795(Vision Clearance)must be satisfied. [2]Includes all buildings and impervious surfaces. [3]No setback shall be required except 50 feet shall be required where the zone abuts a residential zoning district. [4]Development in industrial zones abutting the Rolling Hills neighborhood shall comply with Policy 11.5.1. [5]Maximum site coverage may be increased to 80%if the provisions of Section 18.530.050.B are satisfied. [6]Except that a reduction to 20%of the site maybe approved through the site development review process. I-P-Industrial Park District I-L-Light Industrial I-H-Heavy Industrial EOA—Staff Recommended Draft 38 APPENDIX F: TYPICAL SITE REQUIREMENTS FOR DEVELOPMENT TYPES Typical Criteria For Specific Development Sites c Campus E v Industrial/ D. > Heavy Hi-Tech Electronic and Call Center/ Commercial ✓ Industrial/ General Food Manufacturing Computer Warehouse/ Business Office Shopping O I Manufacturing Manufacturing Processing &Processing Assembly Distribution Services (Class A) Center Hotel La alT , v 5to25 5to10 5to10 10to25 5to25 10to25 3to5 1to5 5to10 3to5 z v La I, Interstate,state Interstate, Interstate, Interstate,state Interstate,state Interstate or Along arterial Arterial Arterial or state highway highway or state highway highway or highway or limited access Along or streets or street interstate CE principle or principle or principle principle principle four-lane arterial or in down town visibility, visibility or o arterial within arterial within arterial arterial within arterial within highway within streets centers and prefers downtown m within 1-30 La 1-10 miles 1-20 miles miles 1-15 miles 1-10 miles 1-15 miles transit areas transit areas centers J •Water flow>_ •Water flow •Water flow>_ •Water flow •Water flow °1 65,300 GPD •Water flow? >_4,600 GPD 3,500 GPD >_4,000 GPD >_10,000 GPD '5 •Water flow>_ •Water flow>_ •Water flow>_ •Water flow>_ v •Sewer flow>_ 74,300 GPD •Sewer flow •Sewer flow>_ •Sewer flow •Sewer flow 36,100 GPD 17,000 GPD 24,900 GPD 11,700 GPD 58,800 GPD •Sewer flow>_ >_4,600 GPD 3,500 GPD >_4,000 GPD >_10,000 GPD •Sewer flow>_ ••Sewer flow •>_ •Sewer flow>_ L •Sewer flow>_ •2.0MW 74,300 GPD • •0.5 MW •0.5 MW •0.5 MW •0.5 MW c 32,500 GPD 15,300 GPD 22,400 GPD 11,700 GPD Electricity •0.5 MW Electricity Electricity Electricity Electricity m • 1.0 MW •0.5 MW • 1.0 MW •0.5MW • Fiber-telecom Electricity • Broadband • Broadband • Broadband •Broadband T Electricity Electricity Electricity Electricity i and route •Fiber-telecom Internet Internet Internet Internet diversity access access access access NCDA-Net Contiguous Developable Acres Source:Compiled by FCS Group based on Business Oregon Industrial Site Certification requirements and industry standards. EOA—Staff Recommended Draft 3`; APPENDIX G: BUILDABLE LAND INVENTORY City of Tigard Buildable Lands Inventory (as of January 1, 2010) Vacant and Part-Vacant Property < 1 acre 1 to 5 acres 5 to 10 acres > 10 acres Total Lots Acres Lots Acres Lots Acres Lots Acres Lots Acres Commercial C-C 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 C-G 19 6.8 6 14.0 2 16.4 0 0.0 27 37.3 C-N 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 C-P 7 2.7 2 6.2 0 0.0 0 0.0 9 8.9 Mixed Use MU-CBD 3 1.1 0 0.0 0 0.0 0 0.0 3 1.1 MUC 3 1.4 1 1.3 0 0.0 0 0.0 4 2.8 MUE 35 13.9 4 6.1 0 0.0 0 0.0 39 19.9 MUE-1 10 3.8 1 1.5 1 5.7 0 0.0 12 11.0 MUE-2 1 1.2 0 0.0 0 0.0 0 0.0 1 1.2 MUR-1 9 3.2 0 0.0 0 0.0 0 0.0 9 3.2 MUR-2 2 0.8 0 0.0 0 0.0 0 0.0 2 0.8 Industrial I-H 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 I-L 7 2.2 2 4.5 0 0.0 0 0.0 9 6.7 I-P 5 2.0 3 6.7 0 0.0 2 34.7 10 43.4 Total 101 38.9 19 40.4 3 22.1 2 34.7 125 136.2 Summary of Vacant Land by General Land Use Zoning Classification Vacant and Part-Vacant Property < 1 acre 1 to 5 acres 5 to 10 acres > 10 acres Total Lots Acres Lots Acres Lots Acres Lots Acres Lots Acres Commercial 26 9.5 8 20.2 2 16.4 0 0 36 46.1 Mixed Use 63 25.3 6 8.9 1 5.7 0 0.0 70 39.9 Industrial 12 4.2 5 11.2 0 0.0 2 34.7 19 50.1 Total 101 38.9 19 40.4 3 22.1 2 34.7 125 136.2 Source: City of Tigard. EOA-Staff Recommended Draft - APPENDIX H: REDEVELOPMENT LAND INVENTORY City of Tigard Redevelopable Potential (Improvement to Land Value)l High (< 0.33) Moderate Low (> 1.00) (0.33 to 1.00) Lots Acres Lots Acres Lots Acres C-C 0 0.0 0 0.0 4 8.5 C-G 8 3.4 13 6.8 158 255.0 C-N 0 0.0 1 0.2 2 2.8 C-P 11 3.8 17 10.9 35 33.6 MU-CBD 24 10.5 50 38.4 86 59.0 MUC 7 12.6 11 24.2 35 155.0 MUE 70 40.5 22 12.3 59 61 .8 MUE-1 15 11.5 10 6.9 24 30.9 MUE-2 0 0.0 0 0.0 6 29.4 MUR-1 10 3.9 23 5.6 16 5.3 MUR-2 6 2.4 8 2.6 6 3.0 I-H 2 3.4 4 5.5 9 41 .3 I-L 3 11.0 8 25.1 61 203.5 I-P 13 12.5 13 28.2 76 193.1 Total 169 115.6 180 166.6 , 577 1,082.0 Summary of Redevelopable Potential City of Tigard Redevelopable Potential (Improvement to Land Value)2 High (< 0.33) Moderate Low (> 1.00) (0.33 to 1.00) Lots Acres Lots Acres Lots Acres Commercial 19 7.2 31 17.8 199 299.8 Mixed Use 132 81.4 124 89.9 232 344.3 Industrial 18 27.0 25 58.8 146 437.9 Total 169 115.6 180 166.6 577 1082.0 Notes: I Improvement to Land Value calculated from Washington County Tax Assessor data (Sept 2010). 2 196 Properties contained a zero Improvement or Land Value and are not represented here. Source: City of Tigard. EOA-Staff Recommended Draft 39 APPENDIX I: SUMMARY OF STAKEHOLDER INTERVIEWS In support of the City of Tigard's statewide planning Goal 9 Economic Opportunity Analysis, consulting staff interviewed twelve business leaders, employers and economic experts to gather perspectives on the City's current position and future economic opportunities. Summary of interview responses are included after each question, shown in italics. The list of respondents is included at the end of the summary. 1. What is Tigard's primary market advantage within the state and region with regard to attracting population and jobs? What do you feel are its greatest assets? Stakeholders consistently reported that Tigard's location is its primary asset, particularly its proximity to 1-5 and other major transportation corridors such as Highway 217 and Highway 99W. Other factors frequently cited included Tigard's position relative to Portland, an educated, affluent population, and open spaces. Four respondents mentioned that the size of Tigard and its suburban setting are attractive. Other named assets include the variety of housing options, diversity of office and industrial buildings and availability of land. 2. I'm going to read you a list of seven (7) items. From the list, please identify Tigard's primary strengths as a place to do business. The list below is organized in order of frequency of response, shown in parentheses. • Proximity to 1-5 and other transportation corridors (1 1) • Quality of life (10) • Available, skilled workforce (10) • Adequate public infrastructure (transportation, utilities, etc.) (5) • Access to local markets and customers (5) • General business climate (4) • Interaction with firms in the same and/or related industries (2) 3. (Optional- for employers) Do you have plans to maintain or expand your business in Tigard? If not, will you relocate within the region or elsewhere? Why or why not? Most employers who were interviewed said they plan to maintain their current location but are unlikely to expand. Two others said they hope to expand as the economy improves. Reasons for not moving include preferred location, access, and property ownership. One employer said a recent employee survey showed that most of their employees live near the business. One business owner said they may relocate when the current lease expires and relocate to a more thriving business district. 4. What geographic area(s) do you think best define(s) Tigard's competitive market region for commercial office, retail and industrial development? EOA—Staff Recommended Draft Most interviewees responded to this question by identifying areas in the City that are thriving or successful employment districts. Four respondents felt that the Tigard Triangle is a particularly competitive market area within the city, especially for industrial and retail uses. One person felt strongly that the Triangle was not as competitive as the Hunziker area. Washington Square and the surrounding area were cited twice as being competitive for retail. Other areas mentioned by one person included Oregon Business Park, PacCorp and the area between Highway 99W and Scholls Ferry Road. 5. The City is interested in redevelopment in its downtown and along the Highway 99W corridor, developing a mixed-use district in the triangle south of Highway 99W and north of Highway 217, and adding more neighborhood commercial uses to meet local needs. Do you agree with these priorities? Why or why not? Are there other areas or corridors the City should focus on? Most respondents agreed with these priorities, though several cautioned against development that would compound existing transportation problems (particularly along Highway 99W). There was support for revitalizing downtown by adding new businesses and destinations; including mixed uses, parks and housing that contribute to a unique identity for the City. There was also a good deal of support expressed for improving the Triangle by adding services and diversifying the types of businesses there with available land. Other ideas for focused efforts included the Tiedeman/Greenburg area, the area north of Highway 99W and in the Oak Street or Locust Street areas by Washington Square. 6. What can Tigard do locally to complement the regional and state economy? Several respondents felt that improvements to the transportation network are important to support the Tigard economy. This included improving conditions for vehicle traffic, providing access to alternative transportation facilities such as bike lanes and light rail, and working with regional agencies (e.g., JPACT) to solve transportation problems. Two respondents suggested that the City needs an economic development department and/or active business recruitment by the mayor, city manager and economic development staff. Other ideas included lower taxes, incentives to start a business or re-locate in Tigard, and grants for small businesses. Two respondents recommended continuing to improve upon the current level of service and responsiveness of City building and planning staff. One suggested retaining large industrial tracts to attract potential employers. 7. What types of land and/or economic development actions or incentives are most needed in the City to nurture job growth and private investment? Respondents' most common suggestion was for the City to improve infrastructure- particularly transportation. Others suggested lowering taxes and strategically reducing system development charges (SDCs) for small businesses or other potential employers. Another suggested using enterprise zones or urban renewal areas to capture future tax revenues. Two others emphasized the importance of diversifying local businesses and professional services, particularly downtown. EOA—Staff Recommended Draft 8. What actions should be taken by the City to create a more balanced and sustainable community? Interview respondents had several ideas about how to create a balanced and sustainable community. These include diversifying the types of business in the city, adding more transportation options and creating mixed-use districts. Two people said that the City needs to focus its efforts and build a distinct identity and greater sense of community, including supporting local business and adding more commercial services to residential areas. Others suggested creating affordable housing and mixed-use districts near commuter rail and future light rail. Two respondents noted that they thought the City is doing well with its current efforts. 9. Along those lines, the City wishes to better balance jobs and housing. What types of housing do you think are most needed? While three interviewees responded that the current mix of housing is adequate, others suggested the need for a more diverse housing stock. Specific needs include moderate to low-income housing in or near downtown and commercial services, second-floor residential, condominiums and small lot or zero lot line homes. A few respondents suggested siting mixed-income housing near transit routes. 10. What business clusters exist or should exist in Tigard? What can the City do to build and strengthen these clusters? Most interview respondents said that Tigard does not have business clusters other than some collection of general services and industry. One identified a cluster of finance and professional services. Several felt that Tigard has a good diversity of businesses and does not need to build clusters. Others suggested that the City could encourage clusters by recruiting a large company so that supporting organizations follow, or by acquiring and consolidating large parcels to sell to a major employer. One respondent recommended the City find a niche such as specialty medical, technical or manufacturing that does not compete with existing retail establishments including Washington Square. 1 1 . What opportunities and challenges are there to expanding the traded sector in Tigard? What goods and services could be produced locally rather than imported, and what could be exported? Most respondents did not have an answer for this question. One suggested that all services are imported and another suggested polling the manufacturing sector to identify existing goods and services offered in Tigard. Another interviewee pointed out that there is a great deal of vacant Class A and B office and industrial space, which is both a challenge and an opportunity for the City to attract new industry and business. 12.Are there certain goods or services that you think are missing in the City of Tigard today? EOA—Staff Recommended Draft Goods and services that interviewees said were missing from Tigard include downtown grocery and retail, upscale restaurants and neighborhood commercial services. Others suggested that Tigard needs light rail or bus rapid transit as well as more parks and trails. One recommended that Tigard develop a unique identity based on neighborhood and housing design in order to compete with the large surrounding retail and cited Sierra Madre, CA as a successful example. 13. Is there anything else you'd like to add? Interview respondents offered the following closing comments: • One person stated that he is frustrated with the lack of economic development activity on the part of the City. • Tigard has the opportunity to be a good example for a small city. Improve transportation options and get people off the freeways while maintaining mobility in and between towns. • The City needs to be efficient to support businesses. Be prepared for the economic upturn. Keep an eye on the planning department and have a contingency plan to respond to an increase in business activity (e.g., hire contractors or new staff). • Be sure to "over-communicate" this and other City projects. Explore and use a variety of communication media, including mail and social media. • It is great that the City is doing this type of outreach and planning. • Tigard's city council members toured Vancouver, BC a few years ago to look at urban planning and transportation issues. The trip, hosted by Metro, was very beneficial in generating ideas on how to meet these challenges. List of Interviewees 1. Kirsten Alvares, Gerber Legendary Blades 2. Jonae Armstrong, Washington Square 3. Mark Ellsworth, Economic Revitalization Team 4. Donald Fox, Fox Chiropractic Clinic 5. Mike Marr, Tigard Central Business District 6. Debi Mollahan, Tigard Area Chamber of Commerce 7. Bonnie Nakashimada, George Fox University 8. Jonathan Schlueter, Westside Economic Alliance 9. George Specht, Specht Properties 10. Eric Sporre, PACTrust/Oregon Business Park 11. Mike Stevensen, B&B Printing 12. Eric Turner, GVA/Kidder Matthews EOA—Staff Recommended Draft ... o d MI inns 7• amu`v m,. 7,-,, \ k j .7 p •,-at _. ... ee i =us 41� 4�I%.ria :A W®. Appendix J: .":12-..?„nn ..®® u amu. �� I4 ,,�Rla■ 1 �o 11 DIV-LI IJ_i um 1�1 11111,. A r ; 1 OD. _9 1 1 .:neon '1 r'..:7eL'�1 1��Oli Pi l 'P=, y- �. n � :. ,. ${$ zII Buildable Lands ... �� 1 .:imivaIll nm.•�7 YgQi rt G _ �`� ;, - WashingtonS ua e ,4r-7- �1�,�■WI 11`x''I " aUle L E 1- _ - - a e. 11 a. • ; q i� ti Li4 1 130 - � ' and , �: i �e..e : „ z 1• • Regional Center ,11 01 .Akermiaz- �'_: _ . g ..... •-L ,.:: ,, Redevelopment/ �`a ": '= A mg ;;:.�e�'� Al �_=:,e ma ^� � I I Refill Potential _40E2a►:,, ,i� • .e1 a•.11 ant•'• •4 ..-•I::GG:A: 's L.�_"Bj:..�l 7,--.1,..3:. .,:..,,-r�_ s u... ..1,...; �. a 0.11,♦4 a f. .41 • 1-1 Lff1 111111 ,,!_q,-' .. 1111 -, City of Tigard y� e ■l=_�� O . Q - a 4,14 LA _ s __t „ rT Oregon -141.1111 .11.141 ,,et i3 .,, far ,�' __Jr � ' � . _ .e y r. - City Limits Ye P I : J 1�3 1, #e/y• �AOyyo rj�rL A : 1 I ® 'ir 1 � �.. _., a-,� .:,, �:�fZoning .IA at tnA \�a e _ 3.. !' , ��' ili .<s ■�•�i ■/ • Taxlot Boundary uu nr �' ..,a iro l L e.' rim 4 _ , . . - Mie _'- c, _ ':- �. - '' o.�.2..�� e j s,. .Q wl .r- �n� NNE ®Wetland r'-, =..3 'S ti 1114• n - mol -..� - .0I. Water 44%. p 11 -- 11!.:.13:7::::t.:6 Stream Corndor f5' ,� d 1 ' � fe 100 yr Floodplain 3 I1 - fU� ; Tigard-*IlI Buildable Lands ,� ~� h�=la, • 1 I , :4: 9, 4 e. F<.5 ® D Ti ntOdW . 17 , ,__:::% :jls - 1 m Commercial err m ' X11 =jir...4^/4�' 1' �� g , (� �.• •RE M''. Industrial 'r �r, 11111 H ••a _. �� ,� �` `-1 �t��1i� • i 1 'MI T . d Mixed Use EI ✓� \ ,1a mA 111.61 �� - Residential ;, ,� 'ILnom .' p ® �� �< :r: a:h1t lopPotential ''�a-�' f '� d� as ®�.� nl .3, nSr��<SQ��i .•�`�-r ® \ .. L� 1 L \ _)` High i1 IL 1 II;a�r ®� • , r1la �' Moderate ; II ® _ I_ ., : - RiVill '� , , _Low �p�� ��pI ,,,til _ Government Owned Land ... , • .man- R-25■ - condo, ® ® TM1e inventory msen,ed is based ov spoofs essumpaons I.:I ILIJ ISI II�,$�'�j14 � �� � .-a.s � s N•, andwas forma aced overs four yearpenod TM1e,nventory 111 . II - I>�,1Ai.— 14 , k • 1. J.-I'', should not be considered an exhaustive list of what ishs not Pacific Corridor y 11611 ...a ' •A- Jabefor developmelusion does ct mean a anovbased w �r . 1.----.—,---,_CT 1— 1 111 LI : on,he evadable date Inclusion does no,mean a property will i i� Or 1• ❑ IN WI -L... ■i, develop or confers mandate to dos,as exclusion does not Wm eV■ 4n............. , .,' . Pol �� prevent aProPertY from developing in the futureFor Purposes r. of thus inventory,buildable lands were identified as pro N 9 p outside of Title 3 lauds that are: Party y vent undeveloped, that dP els I_ 1 If'.111� a �� et I Full t.undevelo 1 Fl. RO ds. iri.i.ei � � 2.Partially vacant:developed pnva,aly owner Parcels F ® a ®� �>I1.m. wImvaaremmareefmapacel a rte t rliliqi ie ill ? btl\/ r a Avi �i e ��III ; � t —�_�' 1 � i WjrII '! ' !'1IIIh ?-doee i� ' UIM SIM ! P'I,,.....,,:::;:,:r"..„,,,,_ 'Illi II;;44, :! r,__ a � i ® J •• l eb 11 'SII � —a`-iir, ate - .... �J .• ee...•,00 e- I t r I; -an rii:`\.ii'I E.. 1, ( at'WO -'- ,7/.I/ rs.__.rr.N r ,,,,,, «1201 ., 1,, 1 Economic Development Economic activity is the lifeblood of any community,providing jobs, creating wealth, and generating tax revenue. Tigard's economy is intertwined with the economy of the region, the nation, and the world. Goal 9: Economic Development 'To provide adequate opportunities throughout the state for a variety of economic activities vital to the health, welfare, and pro.OeriO of Oregon's citizens." Tigard's location at the crossroads of several transportation routes has proven to be a major advantage. Other advantages include the relatively high educational attainment level of its citizens; and its proximity to the high technology centers in Washington County and major educational institutions such as Portland State University and Portland Community College. A recent study found that Tigard was a "hub for innovation" for a city its size due to the comparatively high percentage of patents granted to individuals and small business. Tigard residents envision a future economy that builds on these strengths. Tigard shall have a strong and resilient local economy with a diverse portfolio of economic activity: retail, professional service, and industrial jobs. The local economy shall provide for goods and services for local resident and business needs but also have the goal of expanding the "traded sector."This sector sells goods and services outside the region to the broader state, national and international markets and/or produces goods and services that normally would have to be imported to the community. These businesses bring income into the community or region and keep local income from going elsewhere. Tigard's future economy may include activities whose characteristics are not foreseeable at this time such as live-work arrangements;light manufacturing combined with research and development; creative crafts and arts such as film, advertising, communications, etc. Therefore the City's land use and other regulatory practices shall be flexible and adaptive so as not to preclude desirable economic development opportunities. Tigard is sometimes perceived as a bedroom community for nearby cities. This is not accurate. Tigard businesses provided 38,628 41,422 full and part time jobs in 20089§ (State of Oregon Employment Department). This number is greater than the number of Tigard residents over the age of 16 in the workforce: 25,537 (O.E.D, 2006). Seventy percent of Tigard residents work outside the City, so thousands of workers from throughout the region are regularly commuteing to Tigard jobs (2000 Census). The City shall seek to expand the opportunities for residents to work closer to where they live. This will require promoting a mix of high quality housing opportunities for households with varying incomes. Quality of life factors shall be promoted to attract economic investments and a skilled work force. Among these factors are an attractive and well-maintained community;high levels of public safety; accessible and responsive local government; availability of a variety of housing, good public schools; access to nature,high quality parks,leisure and recreation activities, safe CPA 2011-00002 1 City of Tigard Comp Plan Goal 9 Planning Commission Hearing and convenient multi-modal transportation opportunities, and smoothly running essential infrastructure. State and Regional Policies: The Department of Land Conservation and Development (DLCD) and Metro have developed policies that address economic opportunities,which are based on Statewide Planning Goal 9. A major emphasis of the Goal 9 policies is to preserve and protect land for industrial and employment uses. Metro has sought to implement this on a regional basis. Title 4 of the Metro Urban Growth Management Functional Plan identifies Industrial and Other Employment Areas that are important to the region. Goal 9 also requires cities to complete an Economic Opportunities Analysis as part of State Periodic Review. The Tigard 2011 Economic Opportunities Analysis (EOA) was adopted in May 2011. The EOA analysis showed that the land efficient need strategy is appropriate to supply adequate vacant land to accommodate projected employment and industrial uses over the next 20 years. This required no rezoning of property at the time. The land efficient need strategy is based on findings that Tigard has a limited supply of litle available vacant industrial and employment : -: .: , : - . -- .. -- - -:. development. Thclands; the City is currently;,everely limited in its ability to expand its boundaries to increase its industrial/employment land base;;the City has a good supply of properties that meet the definition of"high redevelopment potential"; the City's strategy is to redevelop Downtown Tigard, the Tigard Triangle, the Washington Square Regional Center, and the Pacific Highway Corridor; and the City has an opportunity to jump-start redevelopment with the arrival of high capacity transit.;,o the only way to designate new industrial land would be to re zone existing land. This is unlikely to happen at a large scale. Alternately, the City could encourage industrial type uses that arc not as land intensive. Tigard can ensure a strong economy with these desired characteristics by working on a formal economic development program. In the near term the Downtown Urban Renewal District has the potential to redevelop and attract additional employment and economic activity. Key Findings • Tigard is home to a wide range of economic activity. • Tigard does not have a formal city-wide economic development strategy. • Tigard's location at the crossroads of important transportation corridors I-5,Hwy 217, and Hwy 99W is a major advantage in attracting economic activity. • Approximately 31% of Tigard's land area is zoned for commercial,industrial, and mixed use purposes. These properties represent about 31% of the total assessed property value. • The major commercial and mixed-use areas of the City are Washington Square, Tigard Triangle,Downtown Tigard, and the Hwy 99W corridor. Industrially zoned properties are generally located along the freight rail line,in between Fanno Creek and I-5. CPA 2011-00002 2 City of Tigard Comp Plan Goal 9 Planning Commission Hearing • In 2005,Tigard public and private sectors provided 38,628 full and part time jobs. {This docs not include self employed workers.) • In 2005, 3,124 businesses paid the Tigard business tax. About half of these businesses employ four people or fewer. • In Tigard, there are more jobs than people in the workforce living within the City boundaries. Seventy percent of residents commute outside the City; therefore,Tigard is a net attractor of commuters. • In Tigard, the Wholesale Trade sector has the largest amount of sales. The Retail sector has the largest annual aggregate payroll and largest number of workers. •—The Tigard 2011 EOA identified existing and emerging business clusters that pay above average wages and could be accommodated by current conditions. Financial Activities, Retail, and Construction arc employment sectors with high Location Quotients (propensity to locate) in Tigard. • Metro has designated approximately 1,100 acres of Industrial and Commercially zoned properties in Tigard as Title 4 Industrial and Employment Areas. Tigard will have to amend its code to limit the development of retail and service uses for some I P zone properties. • There has been no large-scale encroachment of retail/office uses in industrial areas in Tigard. • In 1997 Metro assigned Tigard a capacity of 17,801 new jobs by the year 2017. Between 1997 and 2004,Tigard added approximately 3,800 jobs. • Tigard's supply of industrially zoned land will likely be inadequate to meet the forecasted 2024 job demand in this arca. It appears that there is an adequate supply of commercial land. • Tigard has little vacant industrial land available to attract new large scale industrial development. • The Tigard 2011 EOA found the supply of vacant industrial/employment lands could accommodate the 20-year needs of the efficient land growth scenario. • A recent study found that Tigard was a "hub for innovation."A study of patents and communities by the research firm iPiQ found that in 2005,Tigard had a high percentage of patents granted to individuals and small business (29). The study attributed this to Tigard's lower rents and taxes attracting professionals from Portland and Beaverton. Goal 9.1 Develop and maintain a strong, diversified, and sustainable local economy. Policies 1. The City shall establish strategies to retain and encourage the growth of existing businesses. 2. The City shall actively encourage businesses that provide family-wage jobs to start up, expand or locate in Tigard. 3. The City's land use and other regulatory practices shall be flexible and adaptive to promote desirable economic development opportunities,provided that required infrastructure is made available. CPA 2011-00002 3 City of Tigard Comp Plan Goal 9 Planning Commission Hearing 4. The City shall address the public facility needs of business and economic development through identifying and programming needed public facilities and services within the Public Facility and Community Investment Capital Improvement Plans. 5. The City shall promote well-designed and efficient development and redevelopment of vacant and underutilized industrial and commercial lands. 6. The City shall promote actions that result in greater,more efficient, utilization of its Metro-designated Employment and Industrial Areas. 7. The City shall limit the development of retail and service land uses in Metro- designated industrial areas, especially on lots of 10 or more acres,to preserve the potential of these lands for industrial jobs. 8. The City shall participate and represent Tigard's interests in economic development activities and organizations at the regional, state and federal levels. 9. The City shall strongly represent its interests at the regional, state and federal levels to acquire transportation funding,including truck and rail freight movement needed to support existing business activity, attract new business, and improve general transportation mobility throughout the community. 10. The City shall strongly support, as essential to the region's economic future, the development of efficient regional multi-modal transportation systems throughout the Portland Metropolitan area. 11. The City shall develop economic clusters by encouraging the retention, expansion and recruitment of industries that already have a presence in Tigard. 12. The City shall assure economic development promotes other community qualities, such as livability and environmental quality that are necessary for a sustainable economic future. 12.13. The City shall monitor and update its buildable lands inventory to ensure adequate short and long-term supplies of buildable employment land. Recommended Action Measures i. Develop a formal City of Tigard economic development program and strategy to implement the community's economic development goals and policies and consider the creation of an economic development director position to develop and implement the program. ii. Develop and periodically update Comprehensive Economic Opportunities Analyses and other employment and economic development studies to determine the status of Tigard's economy including strengths, deficiencies, and CPA 2011-00002 4 City of Tigard Comp Plan Goal 9 Planning Commission Hearing trends. iii. Coordinate economic development activities with Metro,Washington County, Greenlight Greater Portland,Portland Regional Partners for Business, the Westside Economic Affiance, state agencies and other entities. iv. Investigate the potential of an "Economic Gardening"program in Tigard that provides information,infrastructure, and connections to local businesses with the potential for growth. v. Improve data collection on local economic trends by gathering up-to-date and accurate information from local, regional, state, and federal sources. vi. Support redevelopment of existing vacant and underutilized industrial and commercial lands rather than designating additional lands for these purposes. vii. Research strategies to inventory, assess, clean-up, and redevelop brownfields. viii.In view of the limits imposed on Tigard's ability to expand its city limits by surrounding jurisdictions, develop strategies to increase employment growth through more intense and efficient use of existing lands. ix. Maintain updated land use inventories and associated characteristics of commercial,industrial, and other employment related land uses to assist in economic development planning and coordination with other jurisdictions/agencies. x. Consider implementing additional Urban Renewal Districts where feasible. xi. Develop a comprehensive "Area Plan" for the Tigard Triangle to promote its full development. xii. Increase opportunities for higher density housing and employment development in the Downtown Urban Renewal District,Washington Square Regional Center, Tigard Triangle, and designated Corridors to enable more intense housing and employment uses to be located in close proximity to transit and other urban uses. xiii.Prioritize support for businesses identified as being able to develop into regional industry clusters. xiv.Improve media contacts and develop a branding/ marketing effort to promote Tigard as a place to live and do business. xv. Assist property owners with the Oregon Industrial Site Certification process to help preserve and market the City's inventory of industrial lands. xvi.Work with state and regional partners to develop alternative mobility standards that will benefit the community and its economic development efforts. xiv.xvii.Explore an economic development marketing and incentives program CPA 2011-00002 5 City of Tigard Comp Plan Goal 9 Planning Commission Hearing targeting strategic business clusters. Goal 9.2 Make Tigard a center and incubator for innovative businesses, including those that focus on environmental sustainability. Policies 1. The City shall institute appropriate land use regulations to accommodate a contemporary mix of economic activities. 2. The City shall periodically review and update its policies, land use regulations, and other efforts to ensure the City's land use program is responsive to changes in the economic structure, and is adaptable to businesses changing development needs. 3_ The City shall engage with state and regional economic development organizations and agencies to sustain and expand its current economic activities and be prepared for future economic trends. 3,4.The City shall encourage businesses that are environmentally and economically sustainable. Recommended Action Measures i. Develop a strategy to increase the number of knowledge based and traded sector jobs that pay higher than national average wages. ii. Investigate ways to support local innovative businesses and economic_activities, as evidenced by the relatively high number of patents granted to individuals and small business in Tigard. iii. Investigate the potential for a business incubator or innovation center that fosters the start-up of new innovative businesses and connects regional economic partners, businesses,higher education and venture capitalists. iv. Improve connections with major universities to promote research connections, and access to innovative business practices. v. Promote Downtown Tigard as a place for innovative and emerging business to expand or relocate. vi. Encourage programs that promote sustainable business practices (e.g., recycling, green building or other sustainable design features, the use of green or alternative energy, commute trip reduction programs). vii. Monitor local and regional economic development initiatives to assess their effectiveness related to cost and outcome. CPA 2011-00002 6 City of Tigard Comp Plan Goal 9 Planning Commission Hearing Goal 9.3 Make Tigard a prosperous and desirable place to live and do business. Policies 1. The City shall focus a significant portion of future employment growth and high- density housing development in its Metro-designated Town Center (Downtown); Regional Center (Washington Square); and High Capacity Transit Corridor (Hwy 99W); and the Tigard Triangle. 2. The City shall adopt land use regulations and standards to ensure a well-designed and attractive urban environment that supports/protects public and private sector investments. 3. The City shall commit to improving and maintaining the quality of community life (pubic safety, education, transportation, community design,housing,parks and recreation, etc.) to promote a vibrant and sustainable economy. 4_The City shall allow opportunities for home based businesses that are compatible with existing and planned residential living environments. 45.The City shall encourage neighborhood commercial uses that support economic opportunities, multi-modal transportation options,neighborhood vitality, and the goals of efficient land use patterns. Recommended Action Measures i. Consider instituting design regulations to ensure that new commercial, mixed- use, and industrial development are well designed and make an aesthetic contribution to the community. ii. Increase Tigard's supply of open space and recreational opportunities as an amenity to attract new businesses and their employees. iii. Promote Tigard's cultural, historic, recreational, educational, and environmental assets as important marketing tools for the City's business areas and neighborhoods. iv. Support environmental conservation and wildlife enhancement activities for their contribution to the local economy as quality of life amenities for residents, business owners, and their employees. v. Investigate ways to improve the appearance and function of Hwy 99W and other transportation corridors. vi. Develop high quality work force housing to increase the opportunity for employees who work in Tigard to also live in the community. CPA 2011-00002 7 City of Tigard Comp Plan Goal 9 Planning Commission Hearing vii. Streamline the City processes required to start or expand a business by techniques such as online permits and business tax applications. viii. Develop long-term and active working relationships between business organizations (such as the Tigard Area Chamber of Commerce), community groups,public agencies, and elected leadership. ix. Produce a "Doing Business in Tigard" packet for businesses. x. Support catalyst projects outlined in the Tigard Downtown Improvement Plan and make public investments in infrastructure such as streets, sidewalks, and public areas to leverage desirable development in the Downtown Urban Renewal District. xi. Attract new businesses and retain existing ones that will assist in creating an Urban Village in the Downtown Urban Renewal District. xii. Institute new land use regulations,including design regulations, to ensure high quality development in the Downtown. xiii.xii. Work with Work Systems, Inc.,Tigard-Tualatin School District, and Portland Community College on ensuring business employment needs and trends are in line with educational curriculums. xiv.xiii.Consider joining an international "Sister Cities"program to develop reciprocal cultural, educational, municipal, business,professional, and technical exchanges and projects with foreign cities. xv.xiv. Monitor emerging wireless and high-speed internet technologies to ensure competitively priced access for Tigard residents and businesses. xvi.xv. Recognize and promote community events as having potential for positive economic impacts and as important for community identity. CPA 2011-00002 8 City of Tigard Comp Plan Goal 9 Planning Commission Hearing Glossary Metro-designated Employment Area—a Metro design-type,whose boundary is defined on the Metro 2040 Growth Concept Map, that mixes various types of employment and some residential development,with limited retail commercial uses primarily to serve the needs of people working or living in the immediate area. Metro-designated Corridor or High Capacity Transit Corridor—a Metro design-type, whose boundary is defined on the Metro 2040 Growth Concept Map, that are located along major transportation routes and feature increased densities, a high-quality pedestrian environment, and convenient access to transit. Metro-designated Industrial Area—a Metro design-type,whose boundary is defined on the Metro Employment and Industrial Areas Map, that is set aside primarily for industrial activities with limited supporting uses. Metro-designated Regional Center or Washington Square Regional Center—a Metro design-type,whose boundary is defined on the Metro 2040 Growth Concept Map, that focuses on compact development, redevelopment and high-quality transit service, multimodal street networks, and act as major nodes along regional through-routes. Metro-designated Town Center or Tigard Town Center—a Metro design-type,whose boundary is defined on the Metro 2040 Growth Concept Map, that provides local shopping, employment, and services with compact development and transit service. Tigard Triangle—area of Tigard bounded by Pacific Highway, Interstate 5, and Highway 217. Downtown Urban Renewal District—an area encompassing Downtown Tigard and defined in the City Center Urban Renewal Plan. CPA 2011-00002 9 City of Tigard Comp Plan Goal 9 Planning Commission Hearing 14 '1 City of Tigard TIGARD Memorandum To: President Dave Walsh and Members of the Planning Commission From: Susan Hartnett,AICP Assistant Community Development Director Re: Commission 2011 Work Plan and Goal Setting Date: March 22, 2011 At the April 4, 2011 meeting, the Commission will establish its 2011 work plan and goals. The outcome of this work will be shared at a joint meeting with the City Council on May 17,2011. In preparation for this effort, I am providing material you may find helpful. Attached are: • Tigard Planning Commission Work Program Matrix,updated on March 1, 2011 • Community Development Department Work Plans addressing 2011 City Council Goals • 2011 City Council Goals Work Plan by City Department • 2011 City Council Goals The first two documents are probably most relevant to establishing the Commission's work plan and goals. The first is an update of the matrix developed last year at the Commission's request,which provides information about the project specific activities expected to come before the Commission over the next 12-18 months. The second contains detailed department work plans addressing the 2011 City Council Goals. These work plans were developed for the first time this year and provide another source of information. The third provides an overview of all City departments'responses to the 2011 City Council goals. President Walsh has expressed an interest in establishing some Commission goals related to the growth and development of the Commission members and the Commission as a body. The Oregon Chapter of the American Planning Association has information on their website about training and other resources for Planning Commissions. You may find it helpful to consider some of the options listed at www.oregonapa.org/tools-commissioners. Finally,given that the City's budget runs on a fiscal year (July 1 to June 30), the Commission may want to consider shifting the period of time covered by the annual goals and work plan to coincide with the fiscal year. I look forward to your discussion and to continuing to implement,with the Commission's great assistance, an exciting and challenging planning program. Tigard Planning Commission Work Program Matrix March 1, 2011 Project/Activity Type of Item Timeframe Staff Contacts) Funding/ Schedule Associated Projects City Council Goals Comments/Status Staffing Drivers Al- TRANSPORATION PLANS AND STUDIES CCAC recommended the plan Briefing March 21,2011 in 4th Quarter 2010 Tigard 2035 Transportation General Fund System Plan 2.Implement Downtown and Additional property owner Downtown Circulation Town Center Redevelopment outreach needed and code Plan Workshops 3` Quarter 2011 Sean Farrelly Urban Renewal CCAC review Downtown Urban Renewal Opportunities language needs development in Funds Greenway Trail System Master b.Advance Ash Street Crossing order to implement plan Public Hearings 4h Quarter 2011 Plan Ash St.crossing investigations being led by Public Works. 1.Implement Comprehensive Plan 1"Quarter 2011 Tigard HCT Land Use Plan a.Show substantial progress on d Funding new Tigard Triangle Master Plan 2" Quarter 2011 I-5/99W Refinement Plan c.Participate in the Southwest SW Corridor Plan Briefings d Judith Gray General Fund Project Corridor Stud 3` Quarter 2011 Partners SW Corridor Transit Alternatives y 4d'Quarter 2011 Analysis d.Work with state and regional partners to modify the Transportation Planning Rule Presentation March 7,2011 Westside Trail Master Plan Greenway Trail System Development 10/11, Duane Roberts Grant contract Master PlanJoint Presentation TGM Grant expires Tigard Street Trail 1.Implement Comprehensive Plan Steve Martin 6/30/11 to Commission& April 19,2011 Tigard 2035 Transportation Council System Plan Street Circulation Study& Presentation 2nd Quarter 2012 Judith Gray General Fund Requested in TSP Update 1.Implement Comprehensive Plan Connectivity Inventory FY 12 budget Page 1 Tigard Planning Commission Work Program Matrix March 1, 2011 Project/Activity Type of Item Timeframe Staff Contact(s) Funding/ Schedule Associated Projects City Council Goals Comments/Status Staffing Drivers A LAND USE PLANS AND STUDIES 2"d Quarter 2011 1.Implement Comprehensive Plan Briefings a Interstate 5/99W Refinement 3` Quarter 2011 Plan a.Show substantial progress on HighCapacity Tigard Sean FarrellGrant contract y TGM Grant SW Corridor Transit Alternatives new Tigard Triangle Master Plan gP Workshops 2"d Q uarter 2011 expires c.Participate in the Southwest Transit Land Use PlanJudith Gray General Fund Analysis Corridor Study 1/30/2012 Tigard Triangle Master Plan d.Work with state and regional Public Hearings 1st Quarter 2012 Downtown Urban Renewal partners to modify the Transportation Planning Rule 2nd Quarter 2010 4th Quarter 2010 Tigard 2035 Transportation Briefing System Plan 1s`Quarter 2011 3rd Pacific Hwy High Capacity Urban Forestry Code Quarter 2011 CouncilPacific Land Use Plan 1.Implement Comprehensive Plan Delayed 6 months to allow Revisions Todd Prager General Fund approved more time for deliberations by timeline Downtown Urban Renewal b.Update Tree Code the UFCR CAC and staff. Workshop 1s`Quarter 2012 Tigard Pathways Master Plan Regulatory Improvement Public Hearing ls`Quarter 2012 Regulatory Improvement 2"d Quarter 2011 Briefing Susan Hartnett Urban ForestryCode Revisions (Land Use Procedures& 1s`Quarter 2012 Decision Making; Gary General Fund Staff Tigard Triangle 1.Implement Comprehensive Plan Temporary Uses; 3`d Quarter 2011 Pagenstecher Availability Nonconforming Situations; Hearing John Floyd Master Plan Signs) 2 Quarter 2012 HCT Visioning 3rd Quarter 2011 1.Implement Comprehensive Plan TiTigard Triangle Exercise ga.Show substantial progress on Susan Hartnett General Fund Regulatory Reform Master Plan Project Scope and a new Tigard Triangle Master Plan Schedule Briefing 2" Quarter 2012 Agreements 1.Implement Comprehensive Plan Urbanization Issues; P P 3 Quarter 2011 General Fund with Planning for Urban Briefing Susan Hartnett Public Facility Plan .e.Work with partners on Growth Areas 63&64 1a`Quarter 2012 Grants needed Washington County urbanization issues. Page 2 Tigard Planning Commission Work Program Matrix March 1, 2011 Project/Activity Type of Item Timeframe Staff Contact(s) Funding/ Schedule Staffing Drivers Associated Projects CityCouncil Goals Comments/Status OTHER MAJOR PLANS AND STUDIES Workshops 1"Quarter 2011 Grant contract Economic Opportunities Periodic Included as Periodic Review Analysis Darren Wyss Review Grant expires Work Task 1.Implement Comprehensive Plan 5/31/2011 Public Hearing 2"d Quarter 2011 3`d Quarter 2011 Briefings 4th Quarter 2011 1°`Quarter 2012 Must be Included as Periodic Review Public Facility Plan 2nd Quarter 2012 Darren Wyss General Fund completed by Work Task 1.Implement Comprehensive Plan Workshops Spring 2013 3rd Quarter 2012 P g Public Hearing 4d'Quarter 2012 2nd Quarter 2011 Briefings 3`d Quarter 2011 Periodic Review Housing Must be Included as Periodic Review Review/Population Workshop 4th Quarter 2011 Darren Wyss General Fund completed by Work Task 1.Implement Comprehensive Plan Projections Spring 2013 Public Hearing 4th Quarter 2011 OTHER DUTIES Land Use Decisions Hearings As Needed Various Fees State&City Regulations NA 1.Implement Comprehensive Plan HCT Land Use Plan Tigard Committee for 4.Advance methods of Workshop As Needed Marissa Daniels General Fund Upcoming Urban Forestry Code Revisions Citizen Involvement Projects communication Land Use Decisions Page 3 2011 COUNCIL GOALS WORK PLAN Council Goal 1: Implement the Comprehensive Plan a. Show substantial progress on new Tigard Triangle Master Plan Description of Work Product: This project will be built on the foundation created by the Pacific Hwy/99W High Capacity Transit (HCT) Land Use Plan. It is envisioned that Tigard Triangle Master Plan will follow the HCT Land Use Plan process. It will also be informed by related planning efforts. It is possible that the a Master Plan can be completed four to five years in the future when there is more certainty about the type and location of HCT alignment and station areas. However,it is possible to establish the foundation of a Triangle Master and take both interim and incremental actions to support future decisions. Another important consideration is that implementation of a Triangle Master Plan is dependent on resolution of TPR constraints. Absent legislation changing the TPR and the provision of HCT, this will partly depend on completion of alternative mobility standards which will be done as part of the SW Corridor Plan. This task will start in 2011 and be completed in 2013. The following progress on a new Tigard Triangle Master Plan will occur in 2011: 1. City adoption of the Tigard Economic Opportunities Analysis (EOA)1 2. City adoption of Metro Town Center designation for the Tigard Triangle2 3. Proposed designations of High Capacity Transit (HCT) Station Community Areas within and in the vicinity of the Tigard Triangle3; 4. Non-HCT transportation improvements (alternative mobility standards) to support HCT Station Community Areas and other future development in the Tigard Triangle; 5. Recommendations for interim and long term land use designations4; 6. Development of a Tigard Triangle funding mechanism for street improvements such as an area specific System Development Charge (SDC). Following completion of the above, a draft written report will be prepared. Staff then will work with the Planning Commission to develop a more detailed Master Plan scope of work,process and schedule based on findings derived from the HCT Land Use Planning effort and other studies. A written report accompanied by the scope of work outlining the next steps will be prepared for Council's consideration. The EOA will provide important data pertaining to the Triangle and other employment lands in Tigard such as land use and site characteristics,public facilities transportation information and market context. 2 A Town Center designation for the Tigard Triangle is important because it portends a greater probability of transportation funding; bestows flexibility in the application of the Transportation Planning Rule(TPR),and supports findings for the application urban land uses.Metro has agreed that Tigard can include a large portion of the Tigard Triangle in its town Center Designation. Nevertheless,for this to be"official"the City needs to legislatively adopt Comprehensive Plan amendments to identify locations of the Metro Design Types. The exact location of Station Community Areas will not be known until the actual alignment of HCT is determined. However,it will be possible from a land use perspective to determine in general where station community land use types could be best located. This leads to the ability to propose a range of possible land use designations. 4 The Triangle HCT Land Use Plan leads the required Federal planning efforts for the corridor.The Alternatives Analysis (AA); Environmental Impact Analysis (EIA),and Locally Preferred Alignment(LPA)will determine the type and location of future transit. However,it is possible to propose interim land uses for the area. 1 2011 COUNCIL GOALS WORK PLAN Timeline of significant events Action/Event Timing Tigard Triangle Town Center designation (Council Adoption) Spring/Summer 2011 EOA Adoption by Council Spring/Summer 2011 Preliminary Designations of High Capacity Transit (HCT) Station Areas (Report) Fall/Winter 2011 Plan for other transportation improvements to support HCT Station Community Areas and other Tigard Triangle Development(Report) Fall/Winter 2011 Recommendations for interim and long term land use designations (Report) Fall/Winter 2011 Development of a Tigard Triangle funding mechanism for street improvements (Council Consideration) Fall/Winter 2011 Planning Commission scoping for full Master Plan Project(Report) to proceed in 20125 Winter 2011/Spring 2012 City Council Receipt of Planning Commission Scoping Recommendation and Report Summer 2012 Alternative Mobility Standards Spring 2013 Lead Department: Community Development Staff Lead: Ron Bunch, Community Development Director Partners: Internal Stakeholders External Stakeholders Planning Commission ODOT City Council Metro City Attorney Tri-Met City Admin&Other Depts. Businesses and Property Owners Tigard Transportation Advisory Committee Department of Land Conservation and Development(LCDC); Development Interests;Real Estate&Property Management Firms Coordination With/Impacts on Other Projects/Priorities Projects/Priorities Reason for Coordination Impact This regional planning effort will develop important land use Data&policy applicability; Metro/SW Corridor and transportation data, findings and policies applicable to the synergism of land use& Transportation Plan Tigard Triangle Plan. transportation policy A redeveloped and economically vital Tigard Triangle can provide economic and housing opportunities in close proximity Identity, Quality of Life to one another and in close proximity to transit and other viable and access to jobs,goods Community Sustainability transportation modes. and services The Planning effort's data collection and analysis are directly Data and Policy applicable to the Tigard Triangle.Also important is that the Applicability;Synergism Pacific Hwy/99W HCT HCT Land Use Plan will identify possible station communities of Land Use and Land Use Plan in the Tigard Triangle Transportation Policy 5 At the completion of the initial process,staff and the Planning Commission will develop a scope for subsequent phases of a Tigard Triangle Master Plan up to completion. 2 2011 COUNCIL GOALS WORK PLAN Projects/Priorities Reason for Coordination Impact Urbanization Policy From a policy position the Downtown and Tigard Triangle are areas where Tigard plans to focus future jobs and household Policy Coordination& Economic Development growth. Implementation Transit and modes modal improvements are important so this Changes to the area to develop as a higher density urban Town Center. Transportation Planning However,changes to the TPR are needed to allow this to Policy Coordination& Rule (TPR) happen. Implementation This project and the associated efforts involves significant Communication with public involvement and which implements Council's stakeholders and the Communication Communication goal broader community A mixed use,higher density urban Town Center served by (+) Reduce Traffic transit would significantly reduce traffic congestion and future Policy Coordination& Congestion transportation costs. Implementation Impacts of "Show Substantial Progress on New Tigard Triangle Master Plan" on other work programs To be meaningful,a Tigard Triangle Master Plan must be coordinated with the HCT Land Use Plan and other the Southwest Corridor Planning efforts. It cannot proceed by itself and be meaningful. At this time there are inadequate staff resources to focus solely on this project,and at least initially,it must be part of other efforts. If staff had to engage in a "stand-alone"project now(to develop a Tigard Triangle Land Use and Transportation Master Plan) other work programs and their schedules would be negatively affected. Furthermore, such an effort would be not be useful because future Alternative Mobility Standards,HCT Station Area locations,Alternatives Analysis,and Alignment HCT decisions are primary factors that must be considered. Resources required: 0.5 FTE (This is in addition to required administrative and Management staff time and staff working on processing land development applications, other Council Goals,Development Code Reform, Comprehensive Plan Periodic Review;Downtown Urban Renewal Code Enforcement Restructuring; Tigard Trails Master Plan, etc.) 3 2011 COUNCIL GOALS WORK PLAN Council Goal 1: Implement the Comprehensive Plan b. Update the Tree Code Description of Work Product: The work product for this task will consist of proposed amendments to the City's Municipal and Development Codes. Code amendments addressing the following will be brought to Council for its consideration: 1. Management of hazard trees. (Draft hazard tree code provisions have been completed.) 2. Planting,maintenance and removal of street trees in non-development situations 3. Preservation of Tree Groves using flexible and incentive based regulations 4. Tree Plan Requirements (inventory;protection;planting;mitigation, etc.) 5. Tree Permit Requirements in 1) development situations and 2) when development is not involved Timeline of significant events: Action/Event N Timing Draft Street Tree Code Provisions Winter 2011 Draft Tree Plan Code Provisions Winter 2011 Proposal for Tree Grove Preservation Program Winter/ Spring 2011 Draft Tree Permit Requirements—Development and Non-Development Situations Spring/ Summer 2011 Review of Proposed Code Changes and Community Input Summer/Fall/Winter 2011 Planning Commission Workshops and Hearings Winter 2012 City Council Workshops, Public Hearings and Adoption Spring 2012 Lead Department: Community Development Staff Lead: Todd Prager,Associate Planner /Arborist Partners: Internal Stakeholders _ External Stakeholders Metro Department of Land Conservation&Development (DLCD) ODOT Planning Commission OR State Dept. of Forestry City Council Clean Water Services (CWS) City Attorney Tualatin Riverkeepers Public Works,Risk Management/City Admin, Citizens Finance&Information Technology Home Builders'Association Parks&Rec.Advisory Board (PRAB) Tree and Landscape Industry Tree Board Utilities 4 2011 COUNCIL GOALS WORK PLAN Coordination with/Impacts on other projects/priorities Projects / Priorities Reason for Coordination Impact Community dissatisfaction with Tigard's tree regulations has been expressed by citizens and developers for several years. This effort is in response to improve Supports the need to City's urban forest resources and provide clear and objective Desire to Update Tigard's Code Reform regulations for the Development Industry Community Development Code Urban forest resources are important to environmental Supports the City's sustainability and community aesthetics.A healthy urban sustainability and livability Community Sustainability& forest supports Tigard's aspirations to be prosperous, objectives and contributes to Livability livable and attractive City. Tigard as `A Place to Call Home." The Tualatin River Basins must meet DEQ mandated This project supports local, water quality requirements. The presence of trees and regional and state water quality Water Quality Objectives other vegetation assists in achieving this objective. objectives. Tigard's vision of the Downtown is a high-amenity Town Center. "Extending the Green" of Fanno Creek Revised tree regulations and an Downtown and Pacific through the Downtown is a stated urban design active urban forest program Hwy. Corridor objective. Tigard also desires to improve the could significantly enhance the Redevelopment appearance and environmental character of Hwy 99. City's urban design quality This project and the associated efforts involves Communication with significant public involvement and which implements Stakeholders and broader Communication Council's Communication Goal community Impacts of "Updating the Tree Code"on other work programs This project is citizen involvement intensive. Past efforts to reform the City's tree regulations did not succeed because of contention between the development community and citizens. Consequently,Community Development has invested a significant amount of citizen and community involvement/communication time into the project. Every effort is being made to work out issues before the proposed code amendments enter the public hearing process. Resources required: 2.0 FTE plus consulting assistance (This is in addition to required administrative and management staff time and staff processing land development applications, working on other Council Goals,Development Code Reform, Comprehensive Plan Periodic Review;Code Enforcement Restructuring Tigard Trails Master Plan) 5 2011 COUNCIL GOALS WORK PLAN Council Goal 1: Implement the Comprehensive Plan c. Participate in the Southwest Corridor Study Description of Work Product: There are several land use and transportation planning activities ongoing and planned in the Southwest Metro Area, defined as the area encompassing the Pacific Hwy/I-5 corridor from downtown Portland to south Tigard. Tigard,in partnership with Metro, ODOT and Tri-Met is engaged in a High Capacity Transit Land Use Plan that will identify up to ten future HCT Station Community Areas within the Tigard Pacific Hwy 99W/Corridor. Tigard's planning effort will be followed by similar projects undertaken by Portland and Tualatin, also in partnership with the above agencies. Also,Metro and ODOT will be coordinating another planning effort, the Interstate 5/Pacific Highway 99W Corridor Refinement Plan that will evaluate how traffic management and emphasis on different transportation modes,including HCT,will improve mobility within the Corridor. The Corridor Refinement Plan will result in alternative mobility standards that will provide some relief to the Transportation Planning Rule's (TPR) constraints. Several other federally required HCT focused planning efforts will be undertaken prior to when an HCT system will be built. These will occur in future years. The main task for Tigard staff in 2011 will be the Pacific Hwy 99W HCT Land Use Plan and to represent the City's interests in other Corridor Refinement planning efforts. This work program will focus on the Tigard HCT Land Use Plan, because it has been scoped and funded, but significant staff resources will also be focused on the broader corridor planning efforts as above. However, at this time the schedules and scopes of these projects not yet been established in detail. The work product of the Tigard HCT Land Use Plan will consist of designating up to 10 station areas along the Pacific Hwy 99W corridor in places that are best suited to support HCT. This will inform the future alignment of HCT and provide guidance in making future HCT supportive land use changes and investments in other types of transportation infrastructure. This project is the foundation for a detailed Tigard Triangle Master Plan to be completed in the future. Timeline of significant events: Action/Event Timing Project Kickoff And Stakeholder Interviews _ Winter/Spring 2011 Existing Conditions Inventory and Analysis Spring/Summer 2011 Project Design Work Shop Summer 2011 Station Area Plans and Land Use Proposals Fall/Winter 2011 Community Open House, Planning Commission and City Council Workshops Winter 2011 Presentation of Legislative Options, such as Amended Comprehensive Plan Policies;Land Winter 2011/ Spring Use Designations;Amendments to the Transportation System Plan,etc. 2012 Corridor Refinement Plan Completion,review by agencies and affected jurisdictions and consideration for adoption by Metro Spring 2013 Lead Department: Community Development Staff Lead: Sean Farrelly, Redevelopment Manager,Judith Gray, Sr. Transportation Planner,Ron Bunch, CD Director 6 2011 COUNCIL GOALS WORK PLAN Partners: (Other departments/agencies,who will be kept informed) Internal Stakeholders External Stakeholders Planning Commission Portland and adjacent cities City Council ODOT City Attorney Metro Public Works/Engineering,City Administration Tri-Met Tigard Transportation Advisory Committee (TTAC) Washington Co. and local residents City Center Advisory Committee (CCAC) Business and development interests Coordination with/Impacts on other projects/priorities Projects / Priorities Reason for Coordination Impact This regional planning effort will provide important Data and policy applicability; Tigard Triangle Master transportation related data,findings and policies applicable to synergism of land use& Plan the Triangle Master Plan. transportation policy Community A redeveloped and economically vital Pacific Hwy corridor Community identity,quality Sustainability based on HCT access will create both a more livable of life and access to jobs, community and also reduce environmental impacts. goods and services Urbanization Policy High capacity transit provides the means to transform the Economic Pacific Highway Corridor into a more efficient,vibrant and Policy coordination& Development economically resilient urban form. implementation Changes to the Addressing the transportation capacity requirements of the Transportation TPR is important to achieving a desired urban form. HCT and Policy coordination& Planning Rule (TPR) alternative mobility standards are the primary means to do this. implementation The provision of HCT in the Pacific Hwy/99W Corridor and other travel modes is the primary means by which the area can Synergism of land use and achieve higher density,and a more economically sustainable transportation,policy Urbanization Issues urban form. implementation This project and the associated efforts involves significant Coordination/communication public involvement and communication with stakeholders, with stakeholders and the Communication which implements Council's Communication Goal community Impact of "Participate in the Southwest Corridor Plan" on other work programs This project is Community Development's (CD) highest priority. It is essential for the city to meet its commitments to its regional partners and to the funding agencies;with plans to commit at least 1.75 FTE to this effort prior to establishment of 2011 Council goals. CD cannot decrease its commitment to this project. If necessary,work on other department priorities, (Code Compliance Reorganization and Regulatory Reform)would be curtailed entirely to ensure this project is completed. Given the project's high profile,CD has invested substantial staff resources to ensure a robust citizen involvement effort for the project. As with any project involving significant stakeholder engagement and intergovernmental cooperation,there is exists a degree of uncertainty regarding schedules and outcomes. There are many stakeholder interests to be addressed and it is common for planning efforts of this scale to be delayed,or the scope to be broadened,to accommodate changing stakeholder needs. City Council and the City Manager have an important role in the SW Corridor Plan,providing input to state and regional decision-makers and to represent the City's interests in the political arena. Resources required: 1.75 FTE Total. 1.50 FTE for the HCT Land Use Plan with consulting assistance, 0.25 FTE to coordinate and represent Tigard's interest in other SW Corridor venues. (This is in addition to required administrative &management staff time spent working on Council Goals,Development Code Reform, Downtown Redevelopment, Comp Plan Periodic Review;Code Enforcement Restructuring Tigard Trails Master Plan.) 7 2011 COUNCIL GOALS WORK PLAN Council Goal 1: Implement Comprehensive Plan d. Work with state and regional partners to modify the (state) Transportation Planning Rule (TPR). Description of Work Product: There are three parts to this task and it's important that this issue be addressed in all three of these venues in a balanced manner. Over-reliance on one is not likely to achieve the desired results. 1. Represent Tigard's interests at regional and statewide venues,including the legislature. This work includes development of a joint position on amending the TPR with other elected City and County officials and agency staff and appointees such as Metro and LCDC. 2. Evaluate those parts of Tigard where new development will be impacted by the TPR. Develop a local strategy and be able to tell Tigard's story. 3. Work on existing initiatives that will lessen a portion of some of the requirements of the TPR. This includes developing specific ways to mitigate traffic impacts such as improvements to the local road system, and alternative travel modes; expanding the Town Center designation to include the Tigard Triangle8;representing Tigard's interest in the Pacific Hwy 99W/ I-5 Multi-Modal Corridor Refinement Plan (alternative mobility standards);implementing Southwest Corridor High Capacity Transit10, etc. Timeline of significant events: Action/Event I Timing 1 Evaluate how Tigard will be impacted by the TPR and prepare local strategy Winter/Spring 2011 Expand the Town Center designation to include the Tigard Triangle Spring 2011 Represent Tigard's interests at regional and statewide venues Winter to Fall 2011 Represent Tigard's interests during the Pacific Hwy 99W/I-5 Multi-Modal Corridor Refinement Plan Fall 2011 and throughout 2013 Implement Southwest Corridor High Capacity Transit Ongoing Lead Department: Community Development Staff Lead: Susan Hartnett,Asst. CD Director and Judith Gray, Sr. Transportation Planner 6 It is important to note that the Oregon Highway Plan (OHP)also has standards that impact land uses on properties that utilize state highways. The OHP also will be evaluated to determine how it impacts the Tigard Triangle and other areas in the City. It is obvious that Tigard is affected by the TPR,but it is unknown to what extent. It is important to develop a local strategy as well as participate in the regional and state process to change the TPR's requirements. Tigard as a local jurisdiction needs to be well aware the TPR's impacts and be able to speak to them. 8 Metro Town Center Design Type Designations are not subject to as stringent TPR requirements as areas not non-Design Type areas. 9 The purpose of this planning effort is to evaluate how improvements to all transportation modes in the corridor can increase enhance the capacity of the transportation system. More transportation system capacity gained through multi-modal improvements means a greater opportunity to create more dense urban environments conducive to higher levels of economic activity. 10In the long run High Capacity Transit(HCT)through Tigard would significantly increase road capacity by taking cars off the roads. HCT would provide the basis to develop higher intensity urban environments within the Tigard Triangle, Downtown Tigard,and with the Pacific Highway Corridor. 8 2011 COUNCIL GOALS WORK PLAN Partners: Internal Stakeholders External Stakeholders Planning Commission Other Metro area jurisdictions City Council Department of Land Conservation and Development (DLCD) City Attorney League of Oregon Cities (LOC) Public Works/Engineering Metro City Administration Tri-Met Tigard Transportation Advisory Committee Residents,Business&Development Interests ODOT and the Oregon Transportation Commission State legislators Coordination With/Impacts on Other Projects/Priorities Projects / Priorities Reason for Coordination Impact Resolution of Tigard's concerns with the TPR would make it Triangle Master Plan The Transportation Planning Rule in its current easier for Tigard to achieve its Downtown Urban Renewal form would have significant negative impacts on the (and Metro's) urban growth future urban development of these areas. objectives Amendment of the TPR to make it possible to develop mixed use The current TPR promotes low density inefficient higher density urban development development and sprawl. This urban form is would promote important Community Sustainability inconsistent with Tigard's and the Region's sustainability and urbanization Urbanization Policy sustainability objectives. goals. The HCT Land Use Plan the other planning efforts Alternative modes are key to associated with the Southwest Corridor Study will lessening the restrictions of the result in the implementation of several alternative TPR to make it possible to travel modes and improvements to the area's promote the development of transportation system that will substantially increase higher intensity urban housing Southwest Corridor Study the capacity of the state highways. and employment land uses Impacts of"Working with state and regional partners to modify the state TPR" on other work programs A significant part of this project involves political action that will require senior management and elected officials to engage with their peers from other agencies and jurisdictions. Staff can research,analyze and present proposals,but involvement of elected officials will be necessary. Resources required: 0.25 FTE (This is in addition to required administrative and management staff time and staff working on processing land development applications, other Council Goals,Development Code Reform, Comprehensive Plan Periodic Review;Code Enforcement Restructuring;Tigard Trails Master Plan, etc. 9 2011 COUNCIL GOALS WORK PLAN Council Goal 1: Implement Comprehensive Plan e. Work with partners on urbanization policy issues Description of Work Product: The Tigard Comprehensive Plan is specific that the City does not support unincorporated urban development. Consistent with this position Council has directed staff to implement the Comprehensive Plan as it pertains to future urbanization of lands within Metro Urban Growth Areas 63 and 64 and the adjacent urban reserve area. Washington County has completed, and approved by resolution an Urbanization Concept Plan for this area. A much more detailed Community Plan, addressing infrastructure financing;governance and land use is required before urbanization can occur. This is an expensive and staff intensive effort City staff has been working with Washington County and other partners to come to determine the governance and service provider for this area. It is expected that a resolution can come by the end of summer 2011. If Tigard is the governance provider, then it must plan to complete the Metro required planning work before urbanization can occur. Timeline of significant events: Action/Event Timing 1. Washington Co./Tigard Agreement on Means to Initiate Annexation of Lands in Summer 2011 Urban Growth Areas 63 and 64 If the above is accomplished,then (following direction from Council) the work plan will tbd be revised. The timeline for development of a Community Plan may extend into 2014. Lead Department: Community Development with City Administration Staff Lead: Ron Bunch, Community Development Director and Susan Hartnett,Assistant CD Director Partners: Internal Stakeholders External Stakeholders Planning Commission Washington County City Council Beaverton and King City City Attorney Metro Public Works/Engineering and City Admin Development Interests Coordination with/impact on other projects/priorities This project involves direct engagement of three parties with subsequent cooperation by property owners. At this time coordination with other projects is not necessary to achieve the above limited goals. Extensive coordination will be required in doing future work associated with the required Community Plan. However this will addressed if the City is successful in its annexation efforts. It is important to note that if Tigard is successful in annexing this area, the subsequent Community Plan work will occupy at least 2.5 FTE in addition to substantial consulting resources for a period of at least 18 months. Resources required: .2 FTE plus consulting assistance for part one of the above timeline of significant events. Pis is in addition to required administrative and management staff time and staff working on processing land development applications, other Council Goals,Development Code Reform, Comprehensive Plan Periodic Review;Code Enforcement Restructuring Tigard Trails Master Plan) 10 2011 COUNCIL GOALS WORK PLAN Council Goal 2 Implement Downtown and Town Center Redevelopment Opportunities a. Develop Strategy and Materials to Attract Developers and Tenants Description of Work Product: The strategy to attract developers and tenants to the downtown has two parts. They are: 1) continue to make improvements to the area's public infrastructure and physical amenities; and 2) promote development of a broad based downtown organization and retail marketing plan and market the Downtown to prospective investors and tenants. The first part of this goal has been ongoing for some time. It includes projects such as Burnham Street reconstruction;Main Street green street retrofit; facade grant program etc. Part two relates directly to Council's 2011 goal. The following actions will be taken to implement this goal: • Hold developers' forum11 to assess Downtown Redevelopment opportunities with stakeholders; • Develop socio-economic (statistically based) Downtown/Triangle marketing materials and broadly distribute them; • Prepare an assessment / inventory of land in the Downtown whose owners would reconsider redevelopment • Work with Downtown businesses,property owners and consultants to develop a retail marketing plan and Downtown Organization proposal12; • Develop a Downtown/promotion marketing web page; • Develop a strategy to inform a broad spectrum of developers and investors of the Downtown's and Tigard Triangle's redevelopment and market potential.13 • Work with property owners and developers on development opportunity studies to facilitate development Timeline of significant events: Action/Event Timing Hold developer's forum to assess Downtown Redevelopment opportunities Summer 2011 Retail marketing plan and Downtown Organization proposal Summer/Fall 2011 Develop socio-economic (statistically based) Town Center marketing materials Fall 2011 An assessment of land whose owners would consider redevelopment Fall 2011 Develop a Downtown/promotion marketing web page Winter 2011/2012 A strategy to inform a broad spectrum of developers and investors of the Downtown's Winter 2011/2012 redevelopment and market potential. Implementation is ongoing Work with property owners and developers on development opportunity studies Implementation is ongoing Lead Department: Community Development/Redevelopment 11 This task is dependent on the availability of 2010 Census information. Also it will utilize propriety information acquired through investment/marketing and real estate consulting firms. 12A viable downtown organization comprised of stakeholders to go beyond local businesses to provide leadership and management of the downtown is an important element to attract future investors. 13 This task will follow completion of the socio-economic marketing materials. 11 2011 COUNCIL GOALS WORK PLAN Staff Lead: Sean Farrelly, Redevelopment Manager; Ron Bunch, CD Director Partners: (Other departments/agencies,who will be kept informed) Internal Stakeholders External Stakeholders City Center Advisory Commission Metro Planning Commission Department of Land-ODOT City Council/CCDA Chamber of Commerce/Business and Property City Attorney Owners Public Works/Engineering Citizens Parks and Recreation Advisory Board Portland Regional Partners City Administration West Side Economic Development Affiance Transportation Advisory Board (TTAC) Real Estate and Development Interests Coordination with/impact on other projects/priorities: Projects /Priorities —^ Reason for Coordination Impact The Triangle and Downtown are part of Tigard's Tigard Triangle Master Plan Metro Town Center Designation.Data collection, It will be much more efficient to Explore 99W Urban Renewal analysis and marketing materials will be done for market both areas to prospective District both. developers This effort will address the City's goals to enhance its sustainability Redevelopment of the Downtown will create and develop efficient& Community Sustainability needed housing and close to home retail, service economically sustainable urban Urbanization and entertainment opportunities form The Planning effort's data collection and analysis Development of Downtown and are applicable to the Downtown. The prospect of Tigard Triangle will support the Pacific Hwy/99W HCT Land future of transit to the Downtown will be a City's High Capacity Transit Use Plan significant location decision for investors aspirations. Impacts of "Developing Strategies and Materials to Attract Developers and Tenants"on other work programs This task represents another program element for Downtown Redevelopment and cannot be accommodated with existing resources, especially since the Redevelopment Manger and Community Development Director are both engaged in the Pacific Highway/ 99W HCT Land Use Plan. At least.5 FTE will have to be dedicated to this program. At present it is proposed to reallocate existing CD staff resources to make this happen. Resources required: .8 FTE (This is in addition to required administrative and management staff time and staff working on other Council Goals, existing Downtown projects, Development Code Reform, Comprehensive Plan Periodic Review;Code Enforcement Restructuring;Tigard Trails Master Plan, etc.) 12 2011 COUNCIL GOALS WORK PLAN Note:The$10,000 in consulting services is not included in the proposed FY 2011-2012 budget and will need to be added in order to fully implement this workplan. Project costs for 2011 are as follows: 2°d Quarter $9,208 in-house staff 3rd Quarter $19,208 in-house staff($9,208) and consultants ($10,000) 4th Quarter $9,208 in-house staff Total $37,624 25 2011 COUNCIL GOALS WORK PLAN Council 5-Year Goal: Explore (Pacific Highway) 99W Urban Renewal District Description of Work Product: This work product is dependent on the findings of the Pacific Hwy / 99W High Capacity Transit (HCT) Land Use Plan. In order to assess where an urban renewal district is most feasible in the area,it is necessary to know where Station Area Communities are to be sited. Ideally, the alignment HCT should also be known. However, this will not be possible for the next few years;until several federally required studies are done. Therefore staff will address this goal by developing an urban renewal scenario based on information that is developed through the HCT land Use Plan. This work is intended to provide an understanding of the feasibility of an urban renewal district in the area including the best prospects of building tax increment revenues to help construct public facilities and take other actions to promote high quality urban development in the corridor. The work will provide the starting point to more comprehensively investigate urban renewal as information is developed in the future. The work product will be a written report to Council in association with the Draft Highway HCT land use plan. Council may or may not decide to give staff further direction at that time. Timeline of significant events: Action/Event Timing Evaluate HCT land use plan findings and other information and prepare a Winter- Fall 2011 written report regarding the prospect of urban renewal within the Pacific Highway Corridor Present report for Council review and direction Winter/Spring 2012 Lead Department: Community Development Staff Lead: Ron Bunch, Community Development Director Partners: Internal Stakeholders External Stakeholders City Council The involvement of external stakeholders should occur if City Attorney Council decides to further investigate the formation of an Public Works/Engineering Urban Renewal District City Admin Finance and Information Technology Services Coordination with/Impacts on other projects/priorities: Projects / Priorities Reason for Coordination Im*act Triangle Master Plan SW Corridor Plan (HCT Land Use Plan) These two plans will provide the data and other technical SW Corridor Plan information to develop an Urban Renewal District Policy Coordination and Scenario Synergy of effort Impacts of `Exploring an Urban Renewal District" on other work programs This work is specialized and will require an investment of time of the Community Development Director and Urban Renewal Manager. It is important to keep the work product within the bounds of a"scenario"in order for 26 2011 COUNCIL GOALS WORK PLAN there not be impacts on other goals and tasks staff is engaged.The initial effort can also be compared to an in- depth scoping exercise that provides decision-makers with needed information regarding whether or not to proceed further. Resources required: .2 FTE plus minor consulting time (This is in addition to required administrative and management staff time and staff working on processing land development applications, other Council Goals,Development Code Reform, Downtown Redevelopment; Comprehensive Plan Periodic Review;Code Enforcement Restructuring; Tigard Trails Master Plan, etc.) 27 2011 Council Goals Work Plan City Management TIGARD Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • Adapt and use various communication tools as technology and • March 1 — April 30: Individual • Development of • 1.8 FTE — Graphic 4a. public receptivity changes. department training on Logo and communication plans for Design Communication Design standards. council goals can be • Develop and file communication plans for each City Council goal incorporated into • 0.4 FTE — Cityscape is a part Of designed to reach stakeholders using tools appropriate to the • March 30: project/program work layout and edits everyone's job level of interest and desired involvement. Communication/Outreach plans plans. for 2011 City Council goals • 0.9 FTE — Website Staff Lead: • Identify and provide training and coaching for employees as received by Council. • Training on Logo and design & maintenance Liz Newton needed on information resources, community outreach, writing Design Standards will be (both internal and for a target audience and communication plans. • Monthly: Meet Cityscape tailored to individual external sites) deadlines. department's needs. • Adhere to city's Logo&Design standards. • Recognize citizens' preference of Cityscape as preferred source of information and use it as a primary communication tool. • Respond to information requests within 1 business day with either an accurate response or date response will be provided. • Employee survey to measure employee engagement & impact 1st Quarter: Conduct Employee • Staff time will be allocated • Continued staff 4b. Support of the values Survey, develop Action Plan in consideration with support from HR efforts to change other goals and objectives • Incorporate results into improved efforts to integrate the values 2nd Quarter: Finish Action Plan, for HR. • Additional resources organizational implement changes based on survey required dependent culture • Support the City Values Team in their activities and efforts • Most of the services on survey results 3rd Quarter: Conduct Behavioral provided by Human Staff Lead: • Conduct additional Behavioral Interviewing workshops for hiring Interviewing workshops Resources already Sandy Zodrow managers incorporate the city values 4th Quarter: Evaluate strategies & make appropriate changes • City Council finalized the city's legislative priorities for the 2011 • February 23rd — Sen. Burdick & • Review of legislation may • 0.2 FTE - monitor 6b. Work with Oregon Legislative Session on November 9,2011. Rep. Doherty host Town Hall in require quick turn-around legislation partners on long- Tigard City Hall. which could delay work on • Mayor will meet with legislators monthly throughout the session. other scheduled priorities. • 0.1 FTE - meet with range solutions • Monthly during session — Mayor, legislators monthly. to statewide • Staff will support legislators' events connecting elected officials City Manager and Asst. City structural with citizens. Manager meet with Sen. Burdick problems and Rep.Doherty. • Staff will monitor legislation and provide testimony in support or in opposition to legislation that impacts Tigard. • Weekly during session—legislative Staff Lead: tracking report. Liz Newton Total Resources: 3.4 FTE 2011 Council Goals Work Plan -■ Community Development TIGARD Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • City adoption of Economic Opportunities Analysis Spring/Summer 2011: Tigard Triangle Town • Coordinate with the HCT Land Use • 0.5 FTE & 1a. Show Center designation; EOA Adoption Plan and other the Southwest consulting substantial • City adoption of Metro Town Center designation for by Council Corridor Planning efforts. It cannot assistance the Tigard Triangle proceed by itself and be meaningful. progress on new Fall/Winter 2011: Preliminary Designations Tigard Triangle . Proposed designations of High Capacity Transit(HCT) of High Capacity Transit(HCT)Station Areas; • Inadequate staff resources are Master Plan Station Community Areas within and in the vicinity of plan for other transportation improvements available to focus solely on this the Tigard Triangle to support HCT Station Community Areas project Staff Lead: and other Tigard Triangle Development; Judith Gray • Non-HCT transportation improvements to support recommendations for interim and long term • If staff had to engage in a stand- Darren Wyss HCT Station Community Areas and other future land use designations: development of a alone" project now to develop a development in the Tigard Triangle Tigard Triangle funding mechanism for street Tigard Triangle Land Use and improvements Transportation other work • Recommendations for interim and long term land use programs and their schedules would designations Winter 2011/Spring 2012: Planning be negatively affected. Commission scoping for full Master Plan • Development of a Tigard Triangle funding mechanism Project to proceed in 2012 • Furthermore, such an effort would for street improvements such as an area specific be not be useful because future, System Development Charge. Summer 2012: Council receipt of Planning Alternative Mobility Standards, HCT Commission Scoping Recommendation and Station Area locations, Alternatives • Develop a detailed Master Plan scope of work, Report Analysis, and Alignment HCT process and schedule based on findings from the HCT decisions are primary factors that Land Use Planning effort and other studies. Spring 2013:Alternative Mobility Standards must be considered. Code amendments addressing the following will be Winter 2011: Draft Street Tree Code • Project is citizen involvement • 2.0 FTE & lb. Update Tree brought to Council for its consideration: Provisions; draft Tree Plan Code Provisions intensive. consulting Code assistance • Management of hazard trees(completed) Winter/Spring 2011: Proposal for Tree Grove • Past efforts did not succeed due to • Planting, maintenance and removal of street trees Preservation contention between development Staff Lead: in non-development situations community and citizens. Todd Prager • Preservation of Tree Groves using flexible and Spring/Summer 2011: Draft Tree Permit incentive based regulations Requirements — Development & Non- • CD has invested a significant • Tree Plan Requirements (inventory; protection; Development Situations amount of citizen and community planting;mitigation,etc.) involvement / communication time • Tree Permit Requirements in 1) development Summer/Fall/Winter 2011: Review Proposed into the project. situations and 2) when development is not Code Changes and Community Input involved • Every effort is being made to work Winter 2012: Planning Commission out issues before the proposed code Workshops and Hearings amendments enter the public hearing process. Spring 2012: Council Workshops, Public Hearings and Adoption 1 2011 Council Goals Work Plan _■ Community Development TIGARD Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • Tigard, in partnership with Metro, ODOT and Tri- Winter/Spring 2011: Project Kickoff And ' • Project is CD's highest priority. • 1.50 FTE for 1c. Participate Met is engaged in a High Capacity Transit Land Use Stakeholder Interviews HCT Land Use in the Plan that will identify up to ten future HCT Station • City needs to meet its commitments Plan with Community Areas Spring/Summer 2011: Existing Conditions to regional partners and to funding consulting Southwest Inventory and Analysis agencies assistance Corridor Study • Metro and ODOT will be coordinating another planning effort, the Interstate 5 / Pacific Highway Summer 2011:Project Design Work Shop • If necessary on other priorities,such • 0.25 FTE - Staff Lead: 99W Corridor Refinement Plan that will evaluate as Code Compliance Reorganization coordinate and Sean Farrelly how traffic management and emphasis on different Fall / Winter 2011: Station Area Plans and and Regulatory Reform, would be represent Judith Gray transportation modes, including HCT, will improve Land Use Proposals curtailed to ensure project is Tigard's mobility within the Corridor. completed. Interest in Winter 2011: Community Open House, other SW • The Corridor Refinement Plan will result in Planning Commission and City Council • CD has invested substantial staff Corridor alternative mobility standards that will provide Workshops resources in ensuring a robust some relieve to the Transportation Planning Rule's citizen involvement effort. (TPR)constraints. Winter 2011/Spring 2012: Presentation of Legislative Options, such as Amended • Tigard's elected officials have a role • The main task for Tigard staff in 2011 will be the Comprehensive Plan Policies; Land Use to provide input to state and Pacific Highway 99W HCT Land Use Plan and to Designations; Amendments to the regional decision-makers and to represent the City's interests in other Corridor Transportation System Plan,etc. represent the City's interests in the Refinement planning efforts. political arena. Spring 2013: Corridor Refinement Plan • Significant staff resources will be focused on the Completion, review by agencies and affected broader corridor planning efforts as above. jurisdictions and consideration for adoption by Metro • There are three parts and it's important that this Winter/Spring 2011: Evaluate how Tigard will • A significant part of this project • 0.25 FTE 1d. Work with issue be addressed in all three of these venues in a be impacted by TPR & prepare local strategy involves political action that will state and balanced manner. require senior management and Spring 2011: Expand the Town Center elected officials to engage with their regional partners • Represent Tigard's interests at regional and designation to include the Tigard Triangle peers from other agencies and to modify the statewide venues, including development of a joint jurisdictions. (state) position on amending the TPR with other elected Winter to Fall 2011: Represent Tigard's Transportation City and County officials and agency staff and interests at regional and statewide venues • Staff can research, analyze and Planning appointees such as Metro and LCDC. present proposals, but involvement Rule Fall 2011 to 2013: Represent Tigard's of elected officials will be necessary. • Evaluate parts of Tigard where new development interests during the Pacific Hwy 99W/I-5 will be impacted by the TPR. Develop a local Multi-Modal Corridor Refinement Plan Fall Staff Lead: strategy and be able to tell Tigard's story. Ron Bunch Ongoing: Implement Southwest Corridor High Capacity Transit 1 2 2011 Council Goals Work Plan _■ Community Development TIGARD Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • Work on existing initiatives that will lessen a portion Goal ld. Modify of TPR requirements including developing specific TPR cont. ways to mitigate traffic impacts; expanding the Town Center designation to include the Tigard Triangle; representing Tigard's interest in the Pacific Hwy 99W/ 1-5 Multi-Modal Corridor Refinement Plan); implementing Southwest Corridor High Capacity Transit. • City does not support unincorporated urban Summer 2011: Washington County / Tigard • Coordination with other projects is • 0.2 FTE le. Work with development. Consistent with this position Council Agreement on Means to Initiate Annexation not necessary to achieve the above partners on has directed staff to implement the Comprehensive of Lands in Urban Growth Areas 63 & 64 limited goals. Extensive Plan as it pertains to future urbanization of lands coordination will be required in urbanization within Metro Urban Growth Areas 63 and 64 and the 2011 and Beyond: If the above is doing future work. policy issues adjacent urban reserve area. Washington County has accomplished then following direction from completed and approved by resolution an Council the work plan will be revised. The Staff Lead: Urbanization Concept Plan for this area. timeline will likely extend into 2014 Ron Bunch • A more detailed Community Plan, addressing infrastructure financing; governance and land use is required before urbanization can occur. City staff has been working with Washington County and others on an agreement on ways that Tigard can become the governance and service provider. • If the City is then in a position to annex the area,then it must plan to complete the Metro required planning work before urbanization can occur. • This Council Goal should be reassessed at that time to take into account the commitment necessary to begin annexation, develop the required Community Plan and extend infrastructure. 3 2011 Council Goals Work Plan Community Development TICARD Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • Hold developers' forum to assess Downtown Summer 2011: Hold developer's forum to • This goal represents another • 0.8 FTE 2. Implement Redevelopment opportunities with stakeholders; assess Downtown Redevelopment program element for Downtown Downtown and opportunities; retail marketing plan and Redevelopment and cannot be • Develop socio-economic (statistically based) Downtown Organization proposal accommodated with existing Town Center Downtown/Triangle marketing materials and broadly resources, especially since the Redevelopment distribute them; Fall 2011: Develop socio-economic Town Redevelopment Manager and Opportunities: Center marketing materials; assessment of Community Development Director Develop • Prepare an assessment / inventory of land in the land whose owners would consider are both engaged in the Pacific strategy and Downtown whose owners would reconsider redevelopment Highway/99W HCT Land Use Plan. redevelopment materials to Winter 2011:Make Progress on Tigard St Trail • At least 0.5 FTE will have to be attract • Work with Downtown businesses, property owners dedicated to this program. developers and and consultants to develop a retail marketing plan Winter 2011/12:Complete planning&design tenants and Downtown Organization proposal; of Main St.Green St. Retrofit;acquire suitable property in the Downtown for public open • Develop a Downtown/promotion web page; space; High Capacity Station Areas designated Staff Lead: in the Downtown and Triangle; develop a Sean Farrelly • Develop a strategy to inform a broad spectrum of Downtown/promotion marketing web page developers and investors of the Downtown's and inform a broad spectrum of developers and Tigard Triangle's redevelopment and market investors of the Downtown's redevelopment potential. and market potential. • Work with property owners and developers on development opportunity studies. • This work product is dependent on the findings of the Winter/Fall 2011: Evaluate HCT land use plan • Triangle Master Plan • 0.2 FTE Five Year Goal: Pacific Hwy / 99W High Capacity Transit (HCT) Land findings and other relevant information and • Southwest Corridor Plan Explore(Pacific Use Plan. In this instance, the basis of an urban assemble relevant information pertaining to renewal district would be prospect of building tax the formation of urban renewal district. Highway)99W increment to help construct public facilities needed Urban Renewal to promote station community development. District Winter/Spring 2012: Prepare and present • The work product will be a written report to Council report for Council review and direction Staff Lead: in association with the Draft Highway HCT land use plan evaluating the potential for a successful urban Ron Bunch renewal district prior to or in association with the Development of HCT. Council may or may not decide to give staff further direction at that time. Total Resources: 5.7 FTE 4 2011 Council Goals Work Plan Finance and Information Services TIGA .t Council Goal Description of Work Product I Timeline I Impact on Other Priorities I Resources • In the 1st half of the calendar year, develop 2nd Quarter • Budget Committee and Council •0.5 FTE Senior 6. Hold the and adopt a budget for FY 2011-2012 with • Proposed Budget published may need to make choices Management line on the same number of FTE and no dollar growth in • Budget Committee Meetings to create the between funding core service Analyst materials and services compared to the budget Approved Budget levels and funding projects General Fund of FY 2010-2011. • Council Hearing to pass the Adopted Budget associated with Council priorities. • 0.2 FTE Finance Budget Director • In the 2nd half of the calendar year, minimize 3rd Quarter • There are not new or additional Staff Lead: growth in the General Fund budget where • Adopted Budget Document published resources to expand department • Unspecified time Toby LaFrance increases in expenditures come with revenues • Budget Committee Workshop with Council appropriations to meet Council from Finance and provide quarterly reports to the Budget including preliminary fiscal year end for FY2010- priorities. Operations staff Committee to ensure that actual expenditures 2011 comply with the adopted budget. 4th Quarter • Budget Committee Workshop with Council including preliminary quarterly report on first quarter of FY2011-2012. • City has practices in place such as including a Fall 2012: Review best practices from the • The Long-Term Financial Strategy • 0.2 FTE Finance Five-Year forecast as part of the budget decision making Government Finance Officers Association, discuss document should assist Council Director Goal:Develop process. with Budget Committee and Council to guide with the ability to finance the Five- emphasis of document and policy/practice checklist. Year and Long-Term Goals of • 0.2 FTE Senior Long-Term i • Strengthen documented strategies and Council. Management Financial policies. Spring 2013: Review major revenue sources and Analyst Strategy opportunities for existing and potential revenues. • Discussion with Council resulting in updated • 0.2 FTE Assistant Staff Lead: financial policies and a Strategic Finance Plan Fall 2013: Complete a forecast of service demand Finance Director for Tigard that integrates existing master and a survey of existing master plans. Use results to Toby La France plans, operations, and revenue create a needs analysis. • 0.2 FTE analysis/opportunities into a single document. Accounting Spring 2014: Combine results of revenue analysis Supervisor and needs analysis to create a gap analysis. Work with Budget Committee and Council on strategies to • 0.1 FTE of the address existing base services and revenues. Business Managers in Fall 2015: Based on results of prior steps, go to Police and Public Council to adopt Financial Strategies document. Works. Total Resources: 1.6 FTE 2011 Council Goals Work Plan Public Works '` Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • Range of alternatives for developing a railroad • 2nd Quarter: Initiate project and • The Ash Avenue portion of this • In-house staff time 2b.Advance Ash crossing at Ash Ave.and eliminating a crossing identify a range of alternatives for project should be coordinated with estimated at 0.5 FTE Avenue Railroad at either Tiedeman Ave.or North Dakota St. each site other downtown CIP projects and which will cost planning processes. $55,250. Crossing • Council selects a preferred alternative for the • 3rd Quarter: Develop conceptual road new crossing and identifies the crossing that alignment and layouts • The North Dakota/Tiedeman • Outside consultants 5-Year Goal: will be eliminated. portion of the project should be will complete: traffic Obtain Crossing • 4th Quarter: Evaluate impacts to coordinated with other CIP impact analysis for in Downtown • Design and construction of the preferred traffic, property owners, projects in the area. $30,000; wetlands and alternatives will be scheduled as funding is neighborhoods, and cost. Finalize environmental analysis secured, with the goal of completing the report, Council selects preferred • Coordinated with Council Goal No. for$20,000. Staff Lead: projects within five years. alternatives 6,"Financial Stability." Mike McCarthy _ • Program management (management, • 15t Quarter: Phase 2 acquisition • Community Development • Approximately $8 3. Complete scheduling,cost control,and coordination) process; predesign on development Department (for consistency with million of unallocated Plan for projects begin; purchase of Potso Dog city plans,land use) project categories into • Public information and involvement strategy Park completed. which the Parkland and implementation • Funding partners PRAB/Council decisions Acquisition • 2nd Quarter: Summer Creek master I will be included as • Real property acquisition and appraisal plan development begins; predesign • Regulatory agencies developed. Staff Lead: packages completed; phase 2 Steve Martin • Environmental investigations and acquisition analysis; Purchase of • In-house staff time is Brian Rager contamination surveys Sunrise and Summer Creek II I estimated at 1.5 FTE, completed which will cost • Landscape architecture(for park development $165,750. projects); • 3rd Quarter: Phase 2 acquisition list announced, endorsed by Council; • Outside consultants Design of improvement packages cost depends on begins;phase 3 acquisition analysis acquisition and improvement projects • 4th Quarter: Acquisition activities that have yet to be commence; predesign on determined. development projects begins; Phase 3 improvements projects budgeted. 1 2011 Council Goals Work Plan Public Works '` Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • New 38-million-gallon-per-day river intake 15t Quarter: Value planning report; WTP • Coordinated with Council Goal • In-house staff time is 5. Continued pump station with initial of 32 mgd, with request for proposals issues and contract No.6,"Financial Stability." estimated at 1.1 FTE future expansion to capacity of 38 mgd. award; SCADA (computer system that which will cost Coordination monitors the water system) request for • BPS project should be $121,550. with Lake • Approximately 14,000 feet of new raw proposals issued; pipelines request for coordinated with other CIP Oswego on (untreated) water transmission piping proposals issued projects in the area,if any. • Payments to managing Water connecting the RIPS structure to Lake partner Lake Oswego Partnership Oswego's Water Treatment Plant. 2nd Quarter: Design of WTP and SCADA are estimated at proceeds; Pipelines design contract $5,926,960. • Approximately 35,000 feet of new finished awarded; Initial revenue bond sale Staff Lead: (treated) water transmission piping preparatory work completed • Bond issuance Dennis connecting the WTP to the existing terminal expenses are Koellermeier reservoir,Waluga Resersoir. 3rd Quarter: Request for proposal for estimated at$100,000. RIPS, WR, and BPS issued, contracts • New 3.5 million gallon water reservoir at awarded; Tigard initial revenue bond Waluga Park. sale;environmental permitting continues • Replacement of Tigard's existing Bonita pump 4th Quarter: Land use applications in station(BPS). Gladstone, West Linn, Lake Oswego; Design continues on WTP, SCADA, pipelines,RIPS,WR,and BPS. • Identify existing sustainability efforts 2"d Quarter: Data collection; project • Interaction with other City • In-house staff time is 6c. Evaluate the definition and management; initial departments will be needed estimated at 0.25 FTE • Research options available and funding Council work session held during data collection. which will cost City's Internal mechanism $27,625. Sustainability 3rd Quarter:Research and analysis • If the Council decides to pursue Efforts • Alternatives developed,data evaluated,rate sustainability in future budget • Consulting work of return determined,projects prioritized 4th Quarter: Draft summary report years, extensive interaction and estimated at$10,000. published; Council action a preliminary coordination among all City 5-Year Goal: sustainability plan departments would be necessary. Develop Sustainability • Coordinated with Council Goal Plan No.6,"Financial Stability." Staff Lead: Michelle Wright 2 2011 Council Goals Work Plan Public Works '` Council Goal Description of Work Product Timeline Impact on Other Priorities Resources • Develop a new public works yard and 15` Quarter: Develop the FY 2012 • Coordinated with the Council • In-house staff time is Five Year Goal: facility and decommission the old public Property Management budget with the Goal No. 6, "Financial Stability" estimated at 0.2 FTE, Start works yard on Ash Ave. highest priority facility maintenance and and with the "long-term financial or$22,100. repairs included; Continue to investigate strategy" goal in the five-year Implementing • Relocate the Police to an intermediate potential sites that could accommodate outlook. • Outside consulting Plan for City location at the current Public Works a Public Works facility. services may be Facility Needs Building;or needed to develop 2nd Quarter: Collaborate with other funding mechanisms. Staff Lead: • If a funding source and a site become departments on funding mechanisms. The anticipated cost Steve Martin available, the best solution would be to for these services is construct a new Police facility. 3rd Quarter: Update Council on potential $50,000. sites for a relocated public works facility. In order to implement these first major steps, land and substantial funding are 4th Quarter: Update Council on potential required. Meanwhile,existing City facilities funding mechanisms. continue to require annual maintenance and repairs. Total Resources: 3.55 FTE 3 2011 Tigard City Council Goals On December 30, 2010, the City Council met to set its goals for 2011. These goals represent those items that the Council feels deserve special attention in the months ahead. The City will accomplish much more than what is listed here,but we identify these to be of particular importance to our residents. 1. Implement Comprehensive Plan a. Show substantial progress on new Tigard Triangle Master Plan. b. Update Tree Code. c. Participate in the Southwest Corridor Study. d. Work with state and regional partners to modify the Transportation Planning Rule. e. Work with partners on urbanization policy issues. 2. Implement Downtown and Town Center Redevelopment Opportunities a. Develop strategy and materials to attract developers and tenants. b. Advance Ash Avenue Railroad Crossing. 3. Complete Plans for Parkland Acquisition 4. Advance Methods of Communication a. Communication is a part of everyone's job. b. Support efforts to change organizational culture. 5. Continue Coordination with Lake Oswego on Water Partnership. 6. Financial Stability a. Hold the line on the General Fund Budget. b. Work with partners on long-range solutions to statewide structural problems. c. Evaluate the City's internal sustainability efforts. Five-Year Council Goals • Obtain Ash Avenue railroad crossing in downtown • Explore 99W Urban Renewal District • Continue to support the Legislature in addressing the financial needs of state and local governments in Oregon • Develop long-term financial strategy • Start implementing plan for City facility needs • Develop Sustainability Plan Long Term Goals • Continue pursuing opportunities to reduce traffic congestion • Continue implementing Downtown Urban Renewal Plan • Continue to monitor the Tigard/Lake Oswego Water Partnership Tigard City Council Long Range Objectives • Basic city services provided to citizens are cost effective and are delivered without interruption. • Tigard's interests in regional and statewide issues are coordinated with appropriate agencies and jurisdictions. • Tigard citizens are involved in the community and participate effectively. • Programs and activities are available in the community to meet the needs of a diverse population. • External and internal city assets are well managed and utilized. CITY OF TIGARD PLANNING COMMISSION Meeting Minutes April 4, 2011 CALL TO ORDER President Walsh called the meeting to order at 7:05 p.m. The meeting was held in the Tigard Civic Center,Town Hall, at 13125 SW Hall Blvd. ROLL CALL Present: President Walsh Vice President Anderson Commissioner Doherty Commissioner Rogers Commissioner Shavey Absent: Commissioner Muldoon; Commissioner Hasman; Commissioner Ryan; Commissioner Schmidt Staff Present: Susan Hartnett, Assistant Community Development Director; Darren Wyss, Senior Planner; and Doreen Laughlin, Confidential Executive Assistant Also Present: City Council Liaison Marc Woodard COMMUNICATIONS—Commissioner Shavey reported he'd gone to a meeting on Tuesday night regarding downtown. He said it was a good meeting with 30 or 40 people there. He gave a brief overview of the agenda of that meeting. President Walsh spoke about the positive changes that he'd seen and experienced on Pacific Highway lately. He wanted to go on record that he would like to commend the excellent work of the Tigard staff—particularly Engineering and Public Works - on that project. He said the improvements are remarkable and that everyone who drives it is benefiting from it. The rest of the commissioners agreed and wanted to be included in commending staff on their fine work. CONSIDER MEETING MINUTES March 21 Meeting Minutes: President Walsh asked if there were any additions, deletions, or corrections to the March 21 minutes; there being none,Walsh declared the minutes approved as submitted. L\LRPLN\Planing Commission\2011PC Packets\0.0.11PH-EOM PC Goals and WkpinVITC Minutes 4411 doc Page 1 of 6 PUBLIC HEARING OPENED: (CPA) 2011-00002-TIGARD COMPREHENSIVE PLAN AMENDMENT TO ADOPT THE TIGARD 2011 ECONOMIC OPPORTUNITIES ANALYSIS REQUEST: To adopt the Tigard 2011 Economic Opportunities Analysis as a component of Tigard Comprehensive Plan Goal 9: Economic Development; to amend the current Tigard Comprehensive Plan Goal 9: Economic Development goals, policies, and recommended action measures; and to amend Tigard Comprehensive Plan Glossary.The complete text of the proposed amendment can be viewed on the City's website at http://www.tigard-or.gov/code_ amendments, LOCATION: Citywide STAFF REPORT Darren Wyss, Senior Planner, went over the staff report (the staff report is available to the public one week before the hearing.) He then presented a PowerPoint presentation (Exhibit A). Wyss entered into the record a letter dated 4/4/11 (Exhibit B) in which ODOT had 4 issues. Wyss explained how the city had addressed, and is addressing, these issues: • Issue 1: Map Reference m Changes to map reference in Glossary (See replacement page 9 — (Exhibit C) which Wyss entered into the record. • Issue 2: Adoption requirements • ODOT does not feel we're following proper adoption requirements; however, we've been following Metro's guidance on this and have spoken to them. They said it was up to them (Metro) to determine whether we've appropriately adopted it into our Comprehensive Plan. We have been following Metro's guidelines so we believe we're doing the appropriate thing. It's up to Metro to make that decision—not ODOT. • Issue 3: Plan of Actions/Investments/Land Use Regulations • Issue 4: Need for Transportation Actions — spelled out in the Metro Functional Plan ▪ The City of Tigard is fully cognizant of the need to do these things but the adoption of the expanded Triangle boundaries through this glossary is just the first step towards setting the foundation—we're doing those actions as part of the Tigard Triangle planning process and also the High Capacity Land Use Planning process that is currently beginning at this point in time. We feel there is no issue moving forward with the amendment as proposed and if Metro decides that this wasn't the appropriate way to do it we'll address that in the future. I:\LRPLN\P]anning Commission\2©11 PC Packets\4.4.11 PH-HOA;PC Goats and.%'kphi\TPC Minutes 4411.doc Page 2 of 6 QUESTIONS FROM THE COMMISSIONERS So we'll just move forward being aware of this? Is that what you're saying? The purpose of this is to adopt the Economic Opportunity Analysis — so regardless of whether this definition adopts the expanded boundary into our Comprehensive Plan—it has no bearing as to whether or not the EOA is getting adopted. So the glossary can be changed at a future time —which would,in essence, change that boundary? Yes. Or if they required us to actually bring a map forward and adopt the map, then we could do that. STAFF RECOMMENDATION Staff recommends the Planning Commission finds this request to meet the necessary approval criteria and RECOMMENDS the Tigard City Council amends the Tigard Comprehensive Plan as determined through the public hearing process. TESTIMONY IN FAVOR - None TESTIMONY IN OPPOSITION—None CLOSED PUBLIC HEARING At this point, President Walsh opened the meeting up for deliberations. DELIBERATIONS None MOTION The following motion was made by Commissioner Doherty, seconded by Commissioner Shavey: "I move for approval and adoption of the findings and conditions of approval contained in the staff report of the 2011 Economic Opportunities Analysis that staff recommended for draft application CPA2011-00002- along with the replacement page 9 glossary." The motion was approved unanimously. At this point,Wyss explained that the next step would be to draft the transmittal memo and distribute it to the Planning Commission for their review. The resulting memo will be passed along to Council. He reminded them that Commissioner Shavey had volunteered to attend the Council hearing and say a few words in support. I:\LRPLN\Planning Commission\2011 PC Packet/\44-11 PH-EOA;PC Goals and Wkpin\TPC Minutes 44-11 doc Page 3 of 6 WORK SESSION—PLANNING COMMISSION GOALS AND WORKPLAN Susan Hartnett,Assistant Community Development Director, updated the commissioners on the PC Matrix which was the tool developed for the Planning Commission last year. The primary purpose of that Matrix is to give the Commissioners an idea of when important projects will be coming before them and in what type of situation,workshop versus public hearing - that kind of thing. There was a lengthy discussion on the Planning Commissioners ideas for their 2011 goals and work plan. Hartnett summed up the discus sion at the end and reviewed the main points below: • Intercity/interregional outreach and better understanding agendas for adjoining cities and regional organizations —and perhaps attending some meetings. Hartnett will figure out how to frame that as a goal statement. • Technical growth/education/knowledge expansion... a goal related to that. She has a list of about five different topic areas but will probably make a statement about trying to incorporate maybe one major event a year and a couple of minor events. The thinking being Sheila Martin's discussion on Economic Development as being a fairly major event. Judith Gray's presentation on [PR would be considered a "minor" event. That's kind of the scale in terms of what would be put into a goal statement. • Not only will there be goal statements but also "goal objectives." Hartnett believes it's helpful to have an objective by which you can measure your progress. So if we say we want to do some educational activities and say— one major and three minor events —we can check them off as we do them. The idea is to have them be measureable. • The last two have to do with supporting the broader city goals — some of which are found in the Council goals and some of which are found in the Planning Commission's charge as a hearing body and a decision making body on quasi-judicial items. • Some sort of measurable objective on the Tigard Triangle. The Commission agreed that was a good synopsis of the ideas that had been brought forward. At this point Hartnett reminded the Commissioners that there is a joint Planning Commission /Council meeting scheduled for Tuesday, May 17th. It would be their annual opportunity to get together with Council and talk about the Planning Commission's goals... the Council goals... what's happening—what's working and what's not- that kind of thing. President Walsh asked the Planning Commission Secretary that, if at all possible, some time could be budgeted during the May 2nd Planning Commission meeting to get their heads together about this - basically a short period of time to plan for that upcoming joint meeting. I:\LRPLN\Plate Commission\2011 PC PacketA4-4-11 PH-GOA;PC Goals and Wkpin\TPC atnutes 44-11 doc Page 4 of 6 Laughlin advised them that two hours was already scheduled for that evening but that they could put aside some time in there to have that discussion. The question was asked if there will be a May 16th Planning Commission meeting. Laughlin answered that yes, there is a public hearing and a workshop as well scheduled for that night - so the Commissioners will have two meetings in a row that week. Monday, the 16th, is the regular Planning Commission meeting and Tuesday the 17th, is the joint PC/Council meeting. She said she tried to make it so that the 16th was a free night for the commissioners but, due to the public hearing, that couldn't be done. HIGH CAPACITY TRANSIT (HCT) / TIGARD TRIANGLE Hartnett took some time to talk about the High Capacity Transit / Tigard Triangle activities. She reminded the commissioners that last year she had promised that staff would put together some sort of Tigard Triangle Visioning exercise—and that she wanted to see it happen in conjunction with the HCT Land Use Plan. She said getting going on that plan got delayed quite a long time outside of their control —however, it is up and running now. Some of the main timelines she spoke about are below: • A Design Workshop is scheduled for May 25th to talk about the full range of typologies—what would a neighborhood, downtown, office oriented area, Hwy 99 redevelopment type of thing - look like—what would the characteristics be? • Consultants and the HCT Team will come to the Planning Commission's regularly scheduled meeting on June 6th. It will be a workshop style of setting. The commissioners will not be behind the dais but everyone will sit around a large table, and the consultants and HCT team will walk them through the typologies they've come up with. Are there fatal flaws? They will zero in on typologies that might apply to the Tigard Triangle. • After the workshop, the consultants will develop an alternatives technical memo saying if you have this typology and this location—how will they function? • After the memo - sometime in July, there will be a 4 to 6 hour event scheduled for a visioning exercise regarding the typologies. OTHER BUSINESS Susan Hartnett announced to the commissioners that the Planning Commission Secretary, Doreen Laughlin, had been promoted to the position of Confidential Executive Assistant for the Community Development Department. She will be working directly for CD Director, Ron Bunch. At Doreen's request, she will continue to support the Planning Commission as long as she is able to handle it along with her other work. If/when the economy (and development) picks up to the point of being very busy again, she may need to pass the PC support baton along to the new (yet to be hired) Senior Administrative Assistant. But for IALIIPLN\Planning Commissioo\2011 PC Packets 4-4-11 PH-eon;PC Goals and Wkpm\TPC Minutes 4-4-114°c Page 5 of 6 now, she plans to continue with the group. Everyone congratulated her and wished her well in her new position. ADJOURNMENT President Walsh adjourned the meeting at 8:25 p.m. Doreen Laughlin, Planning Commi: on Secretary , „zb,/ ATTEST: rv. .entWalsh I:\LRPLN\Planning Commission\2011 PC Paekes,\4-4-11 PH-eon;PC Goals and WfepmArec Minutes 4-4-11.doe Page 6 of 6 City of Tigard Economic Opportunities Analysis Planning Commission Public Hearing April 4, 2011 Economic Opportunities Analysis • Required by OAR 660, Division 9 • Tigard Periodic Review Requirement • Technical Study • Compares projected 20-year industrial and T r GARD employment land demand to existing supply • N',nsure adequate supply of land for industrial and employment uses EOA Process City of Tigard- Economic Opportunities Analysis Task 1:Preparation Task 2:Trends Analysis • Community Economic MP • Forecast Job Growth by Sector Development Objectives(CEDO's) • Identify Employment Clusters that Align with CEDO's 1 Task 6:Implementation Task 3:Site Suitability Analysis(Demand) • Floor Space Needed to • Recommendation on Accommodate Growth it+ Policies and Strategies • Vacant Land Needs 1 Task 5:Assessment of Potential Task 4:Inventory of Suitable Sites (Supply) • Reconciliation of Demand vs. • Buildoble Lands Analysis Supply • Growth Scenario • Redevelopment Potential Task 1: CEDOs 1 . Encourage family-wage jobs 2. Develop existing industry clusters 3. Promote efficient development of employment lands 4. Ensure flexible and adaptive regulatory practices T I GARD 5. Focus growth in designated centers and corridors 6. Limit retail and service uses in industrial areas; support neighborhood commercial areas 7. Encourage businesses that are environmentally and economically sustainable Task 2: Trends Analysis • Forecast job growth by sector • What type of growth is probable for Metro region? • h growth wantT�RD • What type of gowt do we in Tigard? • Family-wage employment • Targeted clusters Task 3: Site Suitability Analysis (Demand) • Project land needs based on forecast job growth • Analyzed three "land need" scenarios • Floor space needed to accommodate 11119 growth T r GARD • General job sector by building type • Redevelopment/vacant building assumptions • Vacant land needs Task 4: Inventory of Suitable Sites (Supply) • Buildable lands analysis • Supply of vacant industrial, commercial, and mixed-use zoned properties • Redevelopment potential • Based on improvement to land ratio T I GARD • High, moderate, and low potential • Check capacity to accommodate cluster needs Task 4: Inventory of Suitable Sites (Supply) r I I ® AIV . , Buildable Lands • Inventory Washington _t Jan 1,2010 ■ u+ ■ \ . Regional L •� 3' • y, Weii City of Tigard r. © Oregon )r,, A, .1.1111 _ L,, ,Iqjil Alit P tilk in 0.41h, i Dery rmn. ; ' F,:. I a i F. ...„ , ,. i. ..r • iavbt Bvur.tlery I ,.\ ®Werlard ' lii !ling Stream Corridor ■ `� (� _ •.t �� - I. 1 Y00 Yr Floorlplarn I� II 1 � ... - - Do'+t il r�D Tigard @uudaMelandtt ." „1 b / Tigard `I ■ a�•r.l ...., wad we !1 # ' •. ii..\-4' , ..+ G� ■ \�` L ss Inan CI 0 33 mai Ezi141 .1110 r J!4 r , 1 Pacific Highay ® HCT Corridor irL il ' '° gym Task 5: Assessment of Potential • Reconciliation of demand vs. supply • Analyzed three "land need" scenarios • "Land efficient" scenario is appropriate , 19 TIGARD • Requires no rezoning of vacant property • Consistent with current conditions and identified City "vision" Task 5: Assessment of Potential • City has a limited supply of vacant industrial & employment lands • City is limited in ability to expand boundaries • Good supply of "high redevelopment potential" • Redevelopment Vision • Downtown, Triangle, 99W Corridor, WSRC • Future opportunity with HCT TIGARD Task 6: Implementation Recommendations • Review existing Comp Plan language • Two types of recommendation: • Implement the 1 ,OA (policies) • C K,D O s . . • State requirements T I GARD • Commission suggestions • Address future economic development activities (recommended action measures) ODOT Comment Letter • Issue 1 : Map reference • Changes to map reference in Glossary (see Handout) • Issue 2: Adoption requirements • Followed Metro guidance • Issue 3: Plan of Actions/Investments/Land Use Regulations • Issue 4: Transportation Actions • Foundation for Triangle Plan & HCT Land Use Plan EOA Next Steps • May 10th — City Council Public Hearing • May 31St — Grant Contract Ends • June 30th — Submit Periodic Review Work Task . T I GARD -,, Department of Transportation i *-'6, .6 $ ' - ' - -1 I „wit ! 1 v Region 1 Headquarters 123 NW Flanders Street 0--k,Z.:10.404 \ I l ' ,,;,1,_if , Alir Portland,Oregon 97209 (503)731.8200 J01111 A Eitzhaber,MI),Govemo. FAX (503)731.8531 April 4, 2011 EXHIBIT B City of Tigard Planning Commission City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 SUBJECT: CPA 2011-00002 The Oregon Department of Transportation (ODOT) has reviewed the proposed language adopting the Tigard 2011 Economic Opportunities Analysis and amending the Comprehensive Plan Glossary.We understand that it is the City's intent to amend the Tigard Town Center boundary to.include the Tigard Triangle area(defined in the CP Glossary as the area of Tigard bounded by Pacific Hwy OR 99W, 1-5, and OR 217), but this is not clear from the package provided to the Planning Commission for its April 4, 2011 meeting. No map has been provided showing revised Town Center boundaries and there is no description of a proposed action adopting or amending the Town Center boundary or other 2040 design type boundaries. Issue 1: The proposed Glossary definitions reference incorrect map boundaries The proposed Glossary definitions reference boundaries"defined on the Metro 2040 Growth Concept Plan". However, the Metro 2040 Growth Concept Plan Map only depicts general locations of 2040 Centers. The Planning Commission and City Council should be aware that Metro does not adopt or designate specific 2040 Growth Concept Center boundaries, but depicts locally adopted boundaries on the Urban Growth Management Functional Plan (UGMFP) Title 6 Centers, Corridors, Station Communities, and Main Streets Map, as well as in its State of the Centers Report and other publications. Issue 2: The City of Tigard did not follow requirements set forth in UGMFP Title 6, section 3.07.620.B.4, and did not provide notice to ODOT of a proposed boundary action While the City's intended Town Center boundary is currently shown on the Centers, Corridors, Station Communities, and Main Streets Map, that boundary is not based on adoption by City Council following notice to ODOT, and therefore is not valid in our opinion. The UGMFP Title 6, section 3,07.620.B.4 specifically requires that"Center boundaries be adopted and may be revised by the City Council... following notice of the proposed boundary action,,to the Oregon Department of Transportation and Metro in the manner set forth in subsection A of section 3.07.820 of this chapter". The City's request to Metro in December of 2010 to show the Tigard Triangle area as part of the Town Center did not follow this process as there was no City Council adoption and no notice was provided to ODOT. The proposed adoption at this time of amendments to the Comprehensive Plan Glossary- referencing a different Metro map-does not constitute adoption by City Council of a proposed boundary action. Issue 3: The proposal lacks a Plan of Actions and Investments and land use regulations for the Town Center area, per Section 3.07 It is not clear what the City's intent is in revising its Town Center boundaries to include the Tigard Triangle. If the City wishes to be eligible for regional investments, lower mobility standards, and lower trip generation rates, as set forth in the UGMFP Title 6, the Planning Commission and City Council should be made aware that adoptionnfTownCenberboundaden |snctsuffioienthogain such eligibility. In addition to adoption of a Center boundary, Section 3.07.620 requires performance of an Assessment and adoption of a Plan of Actions and Investments to enhance the Center in order to be eligible for regional investments. In addition to adoption of a boVDdery. Section 3,07.630.A requires adoption of land use regulations to allow the mix and intensity of uses specified in subsection B of section 3.07'020 of the UGMFP ird be |i | apply Table 7 of the Oregon Highway Plan (OHP). Table 7 designates Pacific Highway 99W in Tigard (from I- 5 to Tualatin Road) as an Area of Special Concern with a V/C standard of.95, so the Town Center V/C standards of 1,1 and .99 do not apply to OR 99W. It is the intent of ODOT, Metro, and the City of Tigard . _imobilitystandards along OR 99W as part of the Southwest Corridor Transportation Refinement Plan, which would replace both the Area of Special Concern and the Town Center V/C standards, Alternative mobility standards will be designed to allow adoption of higher densities and intensities of land uses supportive of High Capacity Transit in the corridor. ODOT is supporting this effort through its TGM grants for the Tigard HCT Land Use Plan and the SW Corridor Refinement Plan, as well as with significant additional resources. Issue 4: The proposal lacks transportation actions to support the reduced trip generation rate assumptions for a Town Center. Finally, section 3.87.630 B applies to eligibility for trip reduction credits as part of Plan Amendments subject to the Transportation Planning rule (TPR) section -0000. In addition to adopting boundaries and land use re | U to allow the i ho mix andintensity of land uses, the City must adot a number of transportation actions that support the reduced trip generation rate assumptions, including local and arterial street design and oonneoUvity, bicycle and pedestrian improvements, TSM and TDM, and a parking management program. Summary In summary, the proposed Comprehensive Plan Amendment does not constitute adoption of Center boundaries. More importantly, the City will need to adopt land use and transportation provisions in addition to Center boundaries in order to be eligible for regional investments, lower mobility standards, and lower trip generation rates. ODOT is supportive of the City's vision for its future and looks forward to continuing to work with the City on these critical additional steps. 0 / Lidwien Rahman Principal Planner Oregon Department of Transportation €, { f V Vyt ( 'i • Glossary EXHIBIT Metro-desi'hated Em:•lo. meat Area—a Metro desi• - •e whose bounda is defined on the Metro Title 4 Industrial and Other Emilio ment Areas Ma• that mixes various •es of employment and some residential development,with limited retail commercial uses primarily to serve the needs of people working or living in the immediate area. Metro-designated Corridor or High Capacity Transit Corridor—a Metro design-type, whose boundary is defined on the Metro Title 6, Centers, Corridors, Station Communities and Main Streets Ma• that are located alone ma-or trans•ortation routes and feature increased densities, a high-quality pedestrian environment, and convenient access to transit. Metro-designated Industrial Area-a Metro design-type,whose boundary is defined on the Metro Title 4, Industrial and Other Employment Areas Map, that is set aside primarily for industrial activities with limited supporting uses. Metro-deli•naied Re Tonal Center or Washin.ton S•uare Re•ional Center—a Metro design-type,whose boundary is defined on the Metro Title 6,Centers, Corridors, Station Communities and Main Streets Map, that focuses on compact development,redevelopment and high-quality transit service,multimodal street networks, and act as major nodes along regional through-routes. Metro-designated Town Center or Tigard Town Center—a Metro design-type,whose boundary is defined on the Metro Title 6, Centers, Corridors, Station Communities and Main Streets Map, that provides local shopping,employment, and services with compact development and transit service. Tigard Triangle—area of Tigard bounded by Pacific Highway, Interstate 5, and Highway 217. Downtown Urban Renewal District—an area encompassing Downtown Tigard and defined in the City Center Urban Renewal Plan. CPA 2011-00002 9 City of Tigard Comp Plan Goal 9 Planning Commission Hearing _up" PLEASE SIGN IN HERE Tigard Planning t mission Agenda Item # Page of Date of Hearing (I Case Number(s) ?°moi ° 1� —0'000 ` c Case Name 1-\\4,�t, t�e��-� � �- -tP�-r �`,, f� _to 0 -( 4 1-1-\,,,a,( Location Ci `c' -2-, If you would like to speak on this item, please CLEARLY PRINT your name, address, and zip code below: Proponent (FOR the proposal): Opponent (AGAINST the proposal): Name: Name: Address: Address: City, State, Zip: City, State, Zip: Name: Name: Address: Address: City, State, Zip: City, State, Zip: Name: Name: Address: Address: City, State, Zip: City, State, Zip: Name: Name: Address: Address: City, State, Zip: City, State, Zip: Name: Name: Address: Address: City, State, Zip: City, State, Zip: