Loading...
Permit (37) IN CITY OF TIGARD SITE WORK PERMIT ' COMMUNITY DEVELOPMENT Permit#: SIT2017-00026 TWARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/07/2017 Parcel: 1 S136CD00100 Jurisdiction: Site address: 11701 SW PACIFIC HWY Project: Starbucks Subdivision: None Lot: None Project Description: Modifying existing parking spaces for TI. Contractor: EDWARDS CONSTRUCTION GROUP Owner: PACIFIC CROSSROADS PROPERTIES IN 2501 NE 129TH ST BY WYSE INVESTMENT SERVICES CO TIGARD, OR 98686 1501 SW TAYLOR ST STE 100 PORTLAND, OR 97205 PHONE: 360-597-4297 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 11/29/2017 $285.12 Plan Review 10/04/2017 $185.33 Type of Use: COM 12%State Surcharge-Building 11/29/2017 $34.21 Class of Work: ALT Erosion Control w/Development 11/29/2017 $80.70 Project Valuation: $20,000.00 Info Process/Archiving-Sm$0.50(up to 11/29/2017 $1.50 11x17) Site Specifics: Excavation Volume: cu.yd. Fill Volume: cu.yd. Impervious Surface: sq.ft. Engineered Fill: Soil Report Required: Paving: Grading: Yes Landscaping: Yes Site Prep: Yes Storn Drains: Retaining Wall: Fire Underground: No Accessible Parking: Yes Fence: Total $586.86 Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work i not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law_ requires y,ej u to foil a rules"adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-0,61-0090 of may/`obtain a copy of the rules or direct questions to OUNC by calling 50.. . 1.::0. .'3�t4. / ; / /1 I %f / Issued By: ‘.......ev....0„,.....0€.4_ C_ Permittee Signature: i l j / yif ,0/ J /-i r rf dat ,''' Call 503.639.4175 by7:00 a.m.for the next available inspei This permit card shall be kept in a conspicuous place on the job site until completion Of the project. Approved plans are required on the job site at the time of each inspection. wilding Permit Anplicat__io_>I, Site Work FOR OFFICE USE ONLY City of Tigard Received 13125 SW Hall Blvd.,Tigard,OR 97223 ,-w } a . 10'te/B : L j",, �L Permit No.: " 1141 Phone: 503.718.2439 Fax: 503.598.1960 ' iJ1. -�+�/ 'f 3 ,. a Review 11 G A R D Inspection Line: 503.639.4175 ''< s bate/B : � �© her Permit: Internet: www.tigard-or.gov Date Ready/By: sd f3" auris: S See Page 2 for N.tified/Method: 7 ,i ' "i Supplemental Information ` : '' TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. !: Addition/alteration/replacement ❑O ;I , � j - Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the work indicated on this application. CATEGORY OF CONSTRUCTION ❑ 1-and 2-family dwelling P2 Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: o Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 6, S W ' - t c , "7 ? New dwelling area: square feet Suite/bldg./apt.no.: Garage/carport area: square feet Project name: --- 5�`�r I'c 5 1 Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet Subdivision: „RE QT)IR 13 DATA COMMERC1AL-USECIIECIWST Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the ,x .e v DESCRJP'nEy .1-WORK work indicated on this a..lication. I j Valuation: $ ZO, iJ C.lt'� Existing building area: square feet PR(PLtiTX'A�VNEIt New building area: square feet �.. � TEN � •, ' ,4 Number of stories: Os Address: Type of construction: ‘, City/State/ZIP: Occupancy groups: Phone:( ) Existing: Fax:( ) c,kZ °--t * ' n l .. r New: Business name. r . * •t444* *******' * `� All contractors and subcontractors are required to be • Contact name: C_ei e. /(01-4-04--`_ 4 licensed with the Oregon Construction Contractors Board Address: Z,%G'C c_L,L3 S v under ORS 701 and maybe required to be licensed in the City/State/ZIP: e —F C _ � jurisdiction in which work is being � e� � � performed.If the L )�'(, applicant is exempt from licensing,the following reasons Phone:Kc',) �3 i - 9(,sFax::( ) apply: 11:152"121EMERMIN.111111111111111111.e.4 *, CONTRACTOR or Address: — , 4 6 . , i .."7'BUILDING PEFEES,"# ' , PERMIT 4 , ,lease Ye Cr to:ee scheplule .,ti , City/State/ZII': Structural plan review fee(or deposit): FLS plan review fee(if applicable): Phone:( ) Fax:( ) • Total fees due upon application: FriNIFSI MIN Authorized signature: % / Amount received: liZBEIMIW- �� This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Date:1 i✓5 * Fee methodology set by Tri-County Building Industry I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 Service Board. 440-4613 T(11/02/COM/WEB) City of Tigard: Site Work Permit Checklist Page 2-Supplemental Information Commercial Multi Family and One- and Two-Family Dwellings: No permit is required if fill is less than 50 Ya ds(5 be constructed on tlleck loads)�fill,or less than 3 feet deep and it must be engineered fill.will If not be supporting a structure. If a building will must apply for a sensitive lands review fill is in a flood plain, drainage way, or wetland,the applicantpp Y (SLR). Please complete all items below,unless otherwise noted. cu.yds. Excavation Volume: Grading Volume: cu.yds. (Soils report required for>5,000 cu.yds.) Fill Volume: (Fill exceeding 12"in depth shall be compacted to cu.yds. 90%of maximum densit ) ❑ Rock Retaining structure? (Check one) ❑ CMU ❑ Concrete ❑ Other: *Total new impervious area including all buildings, s .ft. sidewalks,and .avin t. _ Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Su, ittal Requirements"attached. The followin:must accoman this a•plication: ADA)and Lighting ❑ Site Plan with Vicinity Map showing ADA � Plan*Parking(including compliance CI *Landscaping Plan ElGrading Plan and details n Soils Resort(if re•uired El Erosion Control Plan and details ❑ Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee TYPE OF SUBMITTAL : #of Plans ion: $51.09 .erntit (New,Additions or Required.at $.00 to$500.00 $51.09 minimumr the first rinit fee0 and Submittal . $500.01 to$2,000.00 Alterations)" $2.69 for each additional$100 or fraction 3 thereof,to and includin:$2,000.00. Commercial $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and $10.76 for each additional$1,000 or 3 fraction thereof,to and including Multi-Family R-1 Occupancy $25,000.00. One-&Two-Family Dwelling 3 $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. \Building\Permits\SIT-PermitApp.doc 08/02/2016 2 INICity of Tigard " COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With Land Use Ain Building Permit #: 5:17-0c17—c` 2 Site Address: //?-t)/ �. h i Suite/Bldg#: Project Name: -- elc (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Propo al: 77/ i7Of4) l A )/ X�.ni)a — JMp rb-�rx a/Z� A Verify site address/suite#exists and active in permit syste . 11 e''ver Terrace Neighborhood: ,�j,� ❑ Yes No I1 and Use Case#: ✓VI/1 00I - -'C(30 9 /1yt` / 1� �( 201 / rCJ Pla Match Approved Land Use: �/ 1YJ Site Plan0 Landscape ,a�� Plan I�'rF-'Iiier: A"lrban Forestry Plan 0, levation Plan Building Height: Maximum Height /x--- Actual �ctual Height G l/S n ❑ onditions Met: ElPrior to Submittal ElPrior to Permit Issuance 1,101 Business Licen . Exists: Yes Cl No,applicant notified to obtain business license '"i Wublic Facilities Improvement(PFI) Permit: Required: ElYes,applicant was notified VJ No Applied Fo : Ely Notes: 4 es ❑ No,stop intake .iris Approved by Planning: By i Date: O Revisions (after B9ilding Submittal only) Re 'ewer Revision 1: Approved El Not Approved Gefa _ Date Revision 2: ID Approved E3pprNot A � �� / Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /19/11//.7 gir Site Plans: # 3 Building Plans: # Building Permit#: r building pet..#above. Workflow Routing: Plannin Workflow Sign-off �� g ngtneertrig L' rermtt Coordinator �g LP'Si -off for Planning(include notes from planning review) Route Application Documents: [ g Wig: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: AIM --- Pate: tof5ji7 I:\BuildingWorms\BldgPermitRvw COM WithLandUse 060116.docx Engineering Review Slope at building pad: .270 ©AFI Permit#: N (A IQ Conditions"Met"prior to issuance of building permit liaasements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) 0'Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes [tr&o Assess Water Quantity Fee in-lieu: ❑ Yes lNo LIDA Facility on lot: El Yes [r-No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering:ng: \( t ).4LL Date: /v-! i -/7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: El Approved ❑ Not Approved I•im® Permit Coordinator Review kkf 2 ttl L� El Conditions"Met"prior to issuance of building permit 1 W Approved,NOT Released:/,J I G1 at aft" `r �iivate: 1Z/'��f�— Notes: X444 a No MIA O'N'1- O � -f-- It IVr(fl � 1 Revisions (after Building Submittal on y) t, pn or--o������ Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: Irj DC Fees Entered: Wash Co Trans Dev Tax: El Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A � : OK to Issue Permit Approved by Permit Coordinator: ate: ti.4. yeA,4&• • itql (-7 I:\I3uildingTorms\BldgPermitRvw_COM_W ithLandUse_070915.docx Branden Taggart From: Branden Taggart Sent: Tuesday, December 05, 2017 6:52 PM To: 'hbecker@gpdgroup.corn'; 'zac@fasterpermits.com' Cc: #Building Permit Technicians Subject: Permits for Starbucks: 11701 SW Pacific Hwy: BUP2017-00266, SIT2017-00026 Attachments: Branden Taggart.vcf Hello Haley and Zac, The building permit and site work permit for Starbucks located at 11701 SW Pacific Hwy are ready to issue. I am notifying you both because each of these permits were applied for separately; however, our plans examiner combined the site work permit plans with the building permit plans and approved them this way. This means that we will need to have someone pick up all of the plans together at the same time. The fees for each permit have already been paid, but we are missing contractor information, which is needed prior to permit issuance. Upon permit issuance, we have (3) separate site copy plans to pick up for inspections: (1) rolled approved set of plans for the building permit and site work permit, (1) approved set of building permit revisions, and (1) approved set of 11"x 17"site work plans. The plans can be picked up between the hours of 8:00 a.m. and 4:30 p.m., Monday through Thursday. We are closed on Fridays. Zac, after reviewing the site work permit, I was trying to determine if the erosion control fee was necessary considering the scope of work appears to be mostly limited to parking modifications. Can you confirm the square footage of the soil that will be disturbed? We apologize for any inconvenience. Please let us know if you have any questions. Thank you, Brandin Taggart IN ,a City of Tigard s Permit Technician Community Development 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandentr tigard-or,gov 1 Albert Shields From: Albert Shields Sent: Wednesday, November 15, 2017 6:39 PM To: 'zac@fasterpermits.com' Subject: 51T2017-00026, Starbucks Zac, one of the Conditions of Approval for Starbuck's land use permit, MMD2017-00026 was that the applicant submit an approval letter from Pride Disposal. We have not received such a letter. Accordingly, I am putting this application on hold as Approved (for plan review) but Not Released. Plan Review will continue but we can not issue the permit until the letter is received. Please forward the required letter. Albert Shields Permit Coordinator City of Tigard A I bert(2),tigard-or.gov 503-718-2426 Branden Taggart From: Branden Taggart Sent: Wednesday, December 06, 2017 8:54 AM To: 'Zac Horton' Cc: hbecker@gpdgroup.com;#Building Permit Technicians; Conner, Tom; Darwish, Rafia Subject: RE: Permits for Starbucks: 11701 SW Pacific Hwy: BUP2017-00266, SIT2017-00026 Attachments: Branden Taggart.vcf Great. Thank you, Zac. The erosion control fee is necessary then. Thanks, Branden Taggart q City of Tigard i * �.. Permit Technician Community Development TIC A ft 0 13125 SW Hall Blvd Tigard, OR 97223 (503)ns-2449 bra ndent@tigard-or,gov From: Zac Horton [mailto:zac@fasterpermits.com] Sent: Wednesday, December 06, 2017 8:38 AM To: Branden Taggart<brandent@tigard-or.gov> Cc: hbecker@gpdgroup.com; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Conner,Tom <tconner@gpdgroup.com>; Darwish, Rafia <rdarwish@gpdgroup.com> Subject: Re: Permits for Starbucks: 11701 SW Pacific Hwy: BUP2017-00266, SIT2017-00026 Branden, The civil engineer reports that the overall disturbance is 3,600 SF. Best Regards. ZAC HORTON I Project Manager FASTER PERMITS zac ( fasterpermits.corn 503- 438-9654 1 phone/text 20db SW 1st Ave Suite 420 Portland OR 97201 On Tue, Dec 5, 2017 at 6:52 PM, Branden Taggart <brandent@tigard-or.gov> wrote: Hello Haley and Zac, The building permit and site work permit for Starbucks located at 11701 SW Pacific Hwy are ready to issue. I am notifying you both because each of these permits were applied for separately; however, our plans examiner combined the site work permit plans with the building permit plans and approved them this way. This means that we will need to have someone pick up all of the plans together at the same time. The fees for each permit have already been paid, but we are missing contractor information, which is needed prior to permit issuance. Upon permit issuance, we have (3) separate site copy plans to pick up for inspections: (1) rolled approved set of plans for the building permit and site work permit, (1) approved set of building permit revisions, and (1) approved set of 11" x 17" site work plans. The plans can be picked up between the hours of 8:00 a.m. and 4:30 p.m., Monday through Thursday. We are closed on Fridays. f a Zac, after reviewing the site work permit, I was trying to determine if the erosion control fee was necessary considering the scope of work appears to be mostly limited to parking modifications. Can you confirm the square footage of the soil that will be disturbed? We apologize for any inconvenience. Please let us know if you have any questions. Thank you, Branden Taggart a City of Tigard 1111 i 11 Permit Technician HlD� Community Development 13125 SW Hatt Blvd Tigard„ OR 97223 (503)715-2449' brandent©ti rd-or.gov i 2 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 11701 SW PACIFIC HWY, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Site Work SIT2017-00026 Inspection Type: Inspector: 499 Final inspection Jeff Grove Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor