Loading...
Plans (72) SCALE PAGE 2 ,.H 1 n o_S 1/16"=1'-0" • 2-09�o, PLOT PLAN . •OZ i p0\ , �! 0//� 250 ' •�' •OOl 260 �i o06 nzimu > Q 1 °08 280 '4 CD 30 m: 00� 2g0. ', 0 o'4w ,.70. P/L 56' 6 000mw�P _�; N oo 'EN , O -II 5' co Et CL Q a- ® I_ n � � � w POINT LOAD CALCULATION PER ARRAY rn m z co o �? _� `— _I O LLJ' U U U ITEM #OR WEIGHT TOTAL WEIGHT ® a _1 0 Q LIN FT PER(lbs) (lbs) � MODULES 24 42.5 lbs 1020 lbs w W 2Y Y 1 _1 1- w RAILS 180' 0.5 lbs 90 lbs i i p w c dam- CO o O > > N LO RACKING PARTS 42 0.5 lbs 21 lbs ® 11 , 2 z U ) ti co co TILT LEGS 0 3.5 lbs 0 lbs �� c MICRO INVERTERS /POWEROPTIMIZER 0 1.2 lbs 0 lbs ® ® ® ® ® +� ® ® ® ® TOTAL WEIGHT 1131 lbs I CO Et n C9 MODULE DIMENSIONS(LxW) 65.75" x 39.97" = 18.3sq.ft 1 o m > o WEIGHT PER MOUNT 1131 / 42 = 26.9 lbs/Mount I z Q lii• N WEIGHT PER SQ FT 1131 / 438 sq.ft.= 2.6 lbs/sq.ft. 1Ac INV. e. C' Z ti F" U - - ----- 'PGE MSP W 0, } O WIND UPLIFT CALCULATION ((M x P)-.6x W)< L x ExQ I w o d N GARAGE W=Module and racking weight 1131 lbs �~— p - ao fY D q 14652 < 34440 o SII < r•-•• O O a_ M=Total Modules area 438.00 sq.ft. 24 MODULES P=Wind pressure 35 psf u) ROOF TILT @ 18° ~ O Q Lu L=5/16"dia.Lag screw 328.0 lbs/in I - AZIMUTH @ 180° E=Lag screw embedment 2.5 Inch Q 00 U co Q=Quantity of lag screws 42 u_ LI o j N o w O F- — bt �� O >- z f z ? N; ,_°- _- ~_ NOTES: z = CD a w o -WORKING CLEARANCE FOR MAIN SERVICE PANEL AND AC DISCONNECT EXCEEDS 3' U 0 z 0 -CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS WHEN PREPARING ROOF FOR ANCHOR W LL cc _ 0 POINT LOCATIONS. BUILDING STRUCTURE INTEGRITY IS THE RESPONSIBILITY OF THE INSTALLER. 12078 SW TURNAGAIN DR. U 0 J -ADJUSTMENTS MAY BE REQUIRED DUE TO EXISTING ROOF LAYOUT. d d o O - -- -ROOF ACCESS POINTS SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF U 00 01:c8 ¢ co.4- GROUND GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS,AND LOCATED AT STRONG U) U_ W POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT Q Z 0 2 CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS,WIRES OR SIGNS. z M W O I- w m -PV EQUIPMENT,SYSTEMS AND ALL ASSOCIATED WIRING AND INTERCONNECTION SHALL ONLY BE > NII XI w Q o INSTALLED BY QUALIFIED PERSONS.(NEC 690.4 E) `" -PHOTOVOLTAIC PERMITTED SHALL BE IDENTIFIED AND GROUPED.THE MEANS OR 1 OF 0'2 4' 10' 20' 30' 40'IDENTIFICATIONS6ALE- • IA SHALLBE BY SEPARATE COLOR CODING,MARKING TAPE, GING 0 DYNAMIC POWER OTHER APPROVED MEANS.(NEC 690.4 B) INNOVATION LLC DISCLAIMER: If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission. In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. SCALE PAGE 3 1/8"=1'-0 ,.N i n0 s ROOF PLAN t ��O 0OZ Q 50 /� 26D > w o � ?90 24 MODULES 0 "O'0 ��0;°° ROOF TILT @ 18° a 47 _,5,_„-itOFloor size: 2,714 sgft AZIMUTH @ 180° as Array size: 438 sqft o 0 M rY II.- LI- a) LEGEND % Area: Array size Ih o w J-BOX ON ROOF/ X1 0 0 m Z d V UNDER ARRAY Q O Floor size NJ o o Q % Area: 16.2 co VENT CHIMNEY �� -I W W 2 Y Y Y SKYLIGHT The percentage of the o w w. AIR CONDITION UNIT A,Ci roof covered is less thanI_I, 2 > co N- Lo - fn ti Cfl CD DORMER VENT 25% il Et INVERTER INV. I 0 r AC DISCONNECT AC c ico 0 CI y LOAD CENTER `° It co ce m SUB PANEL SUB 3-0, „ I� II in 0 co PERFORMANCE METER ,PMI I C> 0 > O W. MAIN ELECTREICAL PANEL IMSP I- ❑ , - — r z Q W N ',. EMT CONDUIT..- _._.._ 0 t d Z N m ct W 11 a) O N– PV PANEL DIMENSIONS y ' ) 1-, O Q N– N.T.S � — _� Cl)dN O) O I"' " aN � o2X4@24O.C. a 65.75" ENGINEERED TRUSS 48"0 C MAX 0 M PER MANUFACTURE AND -I O0 Qf2 pjT'/COUNTY REQUIR v1., Z � W r SOLAR STANDARD ROOF ATTACHMENT IYP. Vy' O I— RAIL SEE DATA SHEET Ii II i w Q Cr) Y Z J L _ > W 0 _AC INV. YO 0 Z N a}- o" 1 0 NI U2 Z 2 c CO W wo_ g �I SPG EM S P c2 o ° w" l I }CI.O �__ W W �' = U -END MOUNTING MID.MOUNTING �~ U O J O CLIP,TYP. CLIP,TYP. O Q [ 7 f7 1I W O p Z w xt �� PORTRAIT PANELS DETAIL LAYOUT-NOT TO SCALE U 5 Q In Q U v _ 2 W �/ w UI w� - Lo LA_ Z E J N h >- pIIw C3 IW FU ' oc'JWO X HU 12078 SW TURNAGAIN DR. 0' 2' 5' 10' 15' 20' SCALE: DYNAMIC POWER vs°=1' o° 1 INNOVATION LLC _ DISCLAIMER:If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission.In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. • SCALE PAGE 4 N.T.S. ELECTRICAL DIAGRAM ELECTRICAL NOTES: E16.ONLY COPPER(CU)CONDUCTORS SHALL BE USED.CONDUCTORS SHALL BE STRANDED OR SOLID WITH PROPERLY RATED CONNECTORS. ',. El.ALL EQUIPMENT IS LISTED FOR USE. E17.DISCONNECT SHALL BE WIRED SO NO BLADES ARE ENERGIZED. E2.MAXIMUM VOLTAGE DOES NOT EXCEED 600VDC. E18.ALL MODULES AND RACKING SHALL BE GROUNDED USING 2703 UL LISTED RAIL INTEGRATED GROUNDING SYSTEM,OR WITH TIN PLATED DIRECT BURIAL O E3.ANY EQUIPMENT OR ELECTRICAL MATERIALS USED FOR THIS INSTALLATION SHALL BE NEW AND LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY. RATED LAY IN LUGS USING STAINLESS STEEL HARDWARE,STAR WASHERS,AND THREAD FORMING BOLTS OR WEEBS. N E4.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OR JUNCTION BOXES/COMBINER BOXES PER APPROPRIATE JURISDICTIONAL REQUIREMENTS. as E5.ALL PV ARRAYS SHALL BE EQUIPPED WITH DC GROUND FAULT PROTECTION. r•-- E6. E6.ANY AC COMPONENT SHALL MEET OR EXCEED THE AVAILABLE FAULT CURRENT CALCULATED AT THAT COMPONENT. 2 0 E7.ALL MODULES AND ANY RELATED ROOF MOUNTED METALLIC EQUIPMENT SHALL BE PROPERLY GROUNDED. 2 STRINGS OF 12 PANELS IN SERIES - E8.DC EQUIPMENT SHALL BE 600VDC RATED MINIMUM(SOLAR EDGE INVERTERS 500VDC RATED MINIMUM). 0 �` Q a- r -+ . -I c� U U U C7 E9.MARKINGS SHALL BE PROVIDED TO INDICATE THAT ALL CONTACTS OF THE DISCONNECT EQUIPMENT MIGHT BE ENERGIZED. 1#6 CU AWG BARE GROUND WIRE.NEC 250 DC E M D H H LLI BONDING MODULES&RAILS m z C- U E1 O.INVERTER(S)SHALL CONTAIN A GROUND FAULT DETECTION AND INTERRUPTION DEVICE. O 0 0 El 1.THE POINT OF CONNECTION COMPLIES WITH APPLICABLE NEC. �. Dc lDC- J IX N' Q Q U E12.BACKFED SOLAR BREAKER(S)SHALL BE INSTALLED AT THE OPPOSITE END OF THE CIRCUIT OR FURTHEST AWAY FROM THE MAIN BREAKER. -1I Qi , E13.ALL EQUIPMENT SHALL BE GROUNDED,INCLUDING BONDING JUMPERS WHERE NECESSARY ACROSS RAIL SPLICE PLATES TO BOND INDIVIDUAL PIECES OF RAIL THAT ARE CONNECTED AS AN EXPANSION SPLICE. W IA W Y Y Y E14.ALL WIRE,VOLTAGES,AMPERAGES AND EQUIPMENT IS SIZED ACCORDING TO TEMPERATURE DERATING AND LOCATION. Q W I 0'71- CO O E15.ALL METALLIC RACEWAYS AND EQUIPMENT SHALL BE BONDED AND ELECTRICALLY CONTINUOUS. 0 > >- d, L r (4)#10 CU PV-WIRE NEC 300.6- - -= .._,--_7--- a. UNGROUNDED r p '.. INVERTER 0 CD C FRONIUS ob U, PRIMO 7.6-1 240V N- m MAX. EFFIC. 96.9% o U' > O NEC 705.12(D)(2)(3)(c) 1A Z < W N 1A 200A x 120%= 240A L 600VDC 0 C.7 .. d '1"(N)60A 240V NON-FUSIBLE - EGC INTEGRATED D_ Q N m TO UTILITY GRID 31.7A x 125%+200A =239.6A AC DISCONNECT LOCKABLE, DC DISCONNECT Z I- U 120/240V 240A a 240A KNIFE BLADE,OUTSIDE NEXT --- I + w - W Q' } O m a ""e SINGLE PHASEii TO THE METER ®e ® <“, "ama° J U MAIN NEMA 3R 6.3&NEC690.17 F p Q ELECTRICAL PANEL L1 L2 N GEC�I p' CI - c0 0 d I# BI-DIRECTIONAL /iI (E)200AMP 120/240V -,' UTILITY METER 1,�,, (E)200AMP MCB CC > ti Q o0 Z ,��� , _ (N)40A 2 POLE BREAKER Ill 1 !, 0_ Q N o V ® ®I SHALL BE INSTALLED - a ,1:, :4 La AT OPPOSITE END OF 1 1 ° _-- MAIN CIRCUIT BREAKER -\ ® �, S® E ® I 0 � ;® : -I o J of I- D Y MOUNTS AND EQUIPMENT INTERIOR/EXTERIOR EMT AC CONDUIT ; CO uJ ENCLOSURES BONDED _L (2)#8 THHN/USE-2 CONDUCTORS O >- } a TO MAIN PANEL GROUND EXTERIOR/INTERIOR EMT AC CONDUIT (1)#8 THHN/USE-2 NEUTRAL Z O N I F}- (E)UFER GND (2)#8 THHN/USE-2 CONDUCTORS (1)#6 BARE COPPER GROUND Z = U uJ o (1)#8 THHN/USE-2 NEUTRAL - 0 (0 D- 0,U (1)#6 BA17 RE COPPER GROUND W LL Y 0 U UOL co J OQpa? 0 W O p z LU PTC RATING IS: 279.7W ARRAY RATING CEC 690.8 A 1,B 1 EACH MAIN PANEL PV-CB SIZE=40A CALCULATIONS FOR CURRENT CARRYING _c ( )O( )O CALCULATIONS FOR CURRENT CARRYING CONDUCTORS: cU (n O> U Z CD UJ CD CONDUCTORS: AC REQUIRED CONDUCTOR AMPACITY FROM. G > W () DC REQUIRED CONDUCTOR AMPACITY INVERTER TO LOAD CENTER - Q Lo D Z 24 x 279.7 x 0.969 /1000= 6.505 KW-AC(CEC) VOC:483.00 VDC ISC=9.93 x 1.25 x 1.25= 15.52A 31.7A x 1.25 = 39.63A Z M W p U! w op 24 x 279.7 /1000= 6.713 KW-DC(PTC) VMP:396.60 VDC INVERTER DC MAX.INPUT CURRENT=18.0A 9.93 x 1.25 x 1.25 = 15.52A 31.7A x 1.25 = 39.63A 0 N I I W I-C0 CL X ISC:19.86 ADC voc=40.3 x 1.13 x 12 = 545.8V/DC AWG#10 DERATED AMPACITY: AWG#8 DERATED AMPACITY: W (o VOLTAGE DROP%CALCULATION IMP:18.76 ADC INVERTER MAX.INPUT VOLTAGE= 600 V/DC 40 X 0.58 X 0.8 = 18.6A 55 X 0.87 X 1.0 = 47.9A p VD=75' x 2 x 1.24 x 9.38/1000= 1.74V 18.56A a 15.52A` 47.85A a 39.63A DYNAMIC P O W E R %=1.74V/ 240V= 0.0073 0.73% THEREFORE DC WIRE SIZE IS VALID THEREFORE AC WIRE SIZE IS VALID INNOVATION LLC DISCLAIMER:If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission.In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. N.T.S. PAGE 5 RAFTER SIDE VIEW > S S.F�ANGE S`TE SN�NG` WOOD N 5116"18X1_114 COMPO `NC, 112" GDX `Y ti BO�� 6"18 F�PNGE N SNPPNRPS N EY•SN`SI�C' o 511 / P 'O FO `' PSH1NG / HF- W NES Nva 1' m z cn a v SCK GHPN PNCK \ l‘\ U- ui U U 5<o SN S�PND PRD SN //////// ///// -FOOT i �� ///// _1 H W Y Y RPL SNPPNRPGKI- /////"1„./// 1 - 5/16”x 3-1/2" SS LAG BOLT @ 48" O.C. MAX. o w o ///////// ��OVER EXISTING SHT'G. AND z // / ROOF RAFTER AS SHOWN A t- _ = MINIMUM 2-1/2" PENETRATION — cC O 00 Lo 0 -4"-6"PARALLEL TO ROOF m ED TRUSS 3 �,, w 0 00 ENG`NEER Z < cl--0 2X4@24�� OC /5•4 / �- a Zw CC p_ H v >- ~ Z `— / /_,.,- /ice W I— Q Q N p r f9 D Z / 4 ----- a p N I— O Q SOLAR PANEL \2x4@24,, JPORTRAITZwOil ' ~ R. 50 >'Z CNWLL9 O.C. ENGINEERED TRUSS o a o o J- 1 rim M 4t U O LO ¢ zrn I -. (/) LLI U in.1- U > p 2 0 WW I--c) 0Ncnd Xw HU CO DYNAMIC POWER INNOVATION LLC DISCLAIMER: If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission.In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. N.T.S. PAGE 6 MODULES SHEET %%%%%% , Electrical Specifications SILFAB SLA Monocrystalline > s:�� O \`•..\ Test Conditions STC NOCT � Module Power(Pmax) Wp 310 234 N < ==� _ SLAM Maximum power voltage(Vpmax) V 33.05 29.7 -� Maximum power current(Ipmax) A 9.38 7.88 2, Open circuit voltage(Voc) _ V_ 40.25 __ 37.2 Ifi L Short circuit current(1st) A 9.93 8.14 0 Monocrystalline Module efficiency 19.0 17.9 SOLAR Maximum system voltage(VDC) V 1000 M a Series fuse rating A 15 < k ----. ----. Los Ari i neapolis .. — .----- J c/) 0 0 0 Power Tolerance Wp -0/+5 U) D I— I— W BAAttlk4c..-11101' JUST TIER 1 4 Measurement conditions:STC 1000 W/m2•AM 1.5•Temperature 25°C•NOR 800 W/r a•AM 1.5•Measurement uncertainty s 3% m — Cl) a 0 ARRA -IN- DNV BANKABLE �l� _. •Sun simulator calibration reference modules from Fraunhofer Institute.Electrical characteristics may vary by t5%and power by-0/.SW. < 0 Z TAM TIME T� $$$ 1000 HIGH Temperature Ratings SILFAB SLA Monocrystalline , J W'-U 0 U �� Temperature Coefficient Isc %/K 0.03 L1_ — 0 0 Q Temperature Coefficient Voc %/K -0.30CI) Temperature Coefficient Pmax _ 96/K -0.38 w W M Y Y 100%MAXIMUM POWER DENSITY NO c) °c _ 45 J I— W3lOWp Silfab's SLAM ultra-high-efficiency Operating temperature °C 40/+85 p W O co Lo modules are optimized for both Residential 0 > > and Commercial projects where maximum Mechanical Properties and Components SILFAB SLA Monocrystalline 2 Z power density is preferred. Module weight(±1 kg) kg 19 X r O Cell o Maximum surface load(w nd snow)* mm N/m2 1650x00 x 38 100%NORTH AMERICAN Q'. QUALITY MATTERS Hail impact resistance e 25 mm at 83 km/h 0_ Cells 60-Si monocrystalline-3 or 4 busbar-156.75 x 156.75 mm r` D Silfab's fully-automated manufacturing facility — ----- — — ---.__� —._._ CO Monocrystalline precisionengineering applied Glass 3.2 mm high transmittance,tempered,antireflective coating m 0 ensures en ineerin is a lied at cfl PV every stage.Superior reliability and performance Backsheet Multilayer polyester-based PV Module combine to produce one of the highest Frame — Anodized Al —_ '� Bypass diodes 3 diodes-45V/12A IP67/IP68 M CO quality modules with the lowest defect rate 0 ' Cables and connectors(See installation manual) 1200 mm o 5.7 mm(4 mm2),MC4 compatible > O in the industry. w Z p Warranties SILFAB SLA Monocrystalline - NORTH AMERICAN Module product warranty _ _ 12 years I < N } 1 CUSTOMIZED SERVICE — — zsyears 0 Z H U of doyear z Silfab's 10046 North American based team 97%enw X co >- o �� Linear power performance guarantee Z 90%end of 12th year a •J 0 E I EC u I (Fig) LcIvJ. Fraunhofer leverages justin time manufacturing to deliver _ _ _ 82%end of 25'^year I— o Z .--,-,, unparalleled service,on-time delivery and ' •• H _Q (A flexible project solutions. Certifications SILFAB SLA Monocrystalline a L 0U) 0a. N ULC ORD C1703,UL 1703,IEC 61215,IEC 61730,IEC 61701,CEC listed 4, Oz Product --- 5 ti < 0 Z UL Fire Rating:Type 2(Type 1 on request) 8 a. Q O 0 C) a. Factory —_. ISO 9001:20080 r I— 0 < 3 AWarning:Read the installation and User Manual before _ handling,installing and operating modules. MAI - e „' ENSURES MAXIMUM EFFICIENCY 44 PPM DEFECT RATE* pq Third-party generated pan files from PV Evolution Labs available a"°" 0 o 60 of the highest efficiency,premium quality monocrystalline Total automation ensures strict quality control during each -1 c J for download at:www.silfab.ca/downloads cells result in a maximum power rating of 310Wp. step of the process at our certified ISO manufacturing facility. I : = Z W *As of December 31,2016 Eli Pallet Count:up to 25 per pallet 1012 _0 I- ADVANCED PERFORMANCE WARRANTY i Container Count:900 Mounting Slot E I— D 25-year linear power performance guarantee to 82% LIGHT AND DURABLE II l 0i w Over-engineered to weather low load beating structures up 0 >- > a ENHANCED PRODUCT WARRANTY to 5400 Pa.Light-weight frame exclusively designed with .10 Z C U' 12-year product/workmanship warranty wide-ranging racking compatibility and durability. € Z I ti co d w U BUILT BY INDUSTRY EXPERTS PID RESISTANT u - w LL 4 Profile w. With over 35 years of industry experience,Silfab's technical Proven in accordance to IEC 62804-1 U 0 t.- i:0›- J team are pioneers in PV technology and are dedicated to an O •a oQ innovative approach that provides superior manufacturing AVAILABLE IN ppE y ` ° {rill n 0 MO z! w processes including:infra-red cell sorting,glass washing, All Black Si Ifa b\\�� [ 0 0 tL') < z rn 0automated soldering and meticulous cell alignment. 41. SOLAR 0 id CC cwiin '. "O� WM Women a.aA., z Q LIQ Z -J co POSITIVE TOLERANCE Russell Pacific o Q Silfab Solar Inc. ! °"`"'° ° 6 Z 00 LU 0 U w m 0/+SW Allpositivemoduleensures ,Q `r":. �V r• 240CourtneyparkDriveEast•Mississauga,OntarioCanadaLST255 > O = 2 W QU ( ) sorting p Q` .. 0Nf) 0_ xw le0 maximum performance Proud Partner �/AI•n� Tel+1 905-255-2501•Fax+1 905-696-0267 I I E to info@silfab.ca••www.silfab.ca DYNAMIC POWER INNOVATION LLC DISCLAIMER.If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission.In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. N.T.S. PAGE 7 MODULES FIRE RATING Silfab Solar Inc. o 240 Courtneypark Drive East N • �• .Nz` Mississauga,Ontario,Canada L5T 2Y3 Tel:+1-905-255-2501 ' • :_�ti a ��"� Fax:+1-905-696-0267 S i Ifa b Web:www.silfab.ca SOLAR Email:info®silfab.ca o 2 1 Q d 2 i- W I-- U)Silfab Modules Qualify for Buy America Act- BAA m z a U LL.Q O Iii • U U U Silfab Solar Inc.'s premium quality,high efficiency solar PV modules[manufactured in Ontario Canada] _1 IXN 0 a Q qualify as"American"goods that meet the requirements of the Trade Agreements Act(TAA)making it (n possible for our partners to contract business with US government agencies and educational institutions Y Y Y purchasing with government funds. D W Imo.. O M u7 OW .— O TAA compliance applies to Silfab Solar modules SLA&SLG certifying that these products qualify as being g Z �' cf) r` cfl cfl substantially transformed in an approved country deeming them acceptable under the American g r Recovery and Reinvestment Act(ARRA)of 2009 and the Buy America Act(BAA)of 1933. Et CL Silfab Solar Inc.products sold and marketed in the United States are compliant with the Trade D co Agreement Act(TAA)of 2012 having been manufactured and substantially transformed under the North co 0 American Free Trade Agreement countries. U _ , fY CO co 0 View the complete TAA designated country listing based on the Federal Acquisition Regulation(FAR) o Lo > o https://www.fastenal.com/content/documents/2013/02/TAA CountryList.pdf. To directly access this z Z •LLI• p • clause of FAR,please click here: Federal Acquisition Regulation(FAR)52.225-5,Trade Agreements- Oz Q N } https://www.acquisition.gov/sites/default/files/current/far/html/52 223 226.htrnl. a W Z rn H _o For details regarding North American Free Trade agreement(NAFTA)and the Buy America Act(BAA) >- I— O0 Z please refer to TM FAR 52.225-11-http://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol2/pdf/CFR- ‘- 1-- H 0 d N 2010-title48-vol2-sec52-225-11.pdf it > Q U Z a_ < 000O. For details regarding ARRA project value and international agreements please refer to a r l= 0 < http://wwwl.eere.energy.gov/recovery/pdfs/buv american desk guide.pdf o P') J ,— Z W P >- a Z �= a W 0N H Zrnc0 f U9 O ZU =WurY UO v CO O < c9 0 O O It z w c o la y/ U � CO Z M W O U wm Silfab Solar Is a Company ofSlfab Group >– LI.I H Exea t ve[Ace b 0 rieste 33,30121 Padova,Italy Tei: 39(0,49 9431304 fax+39 j 0,40 9439435 Web:www.silfab.eu-_.�a0 info@silfab.eu 0 N U r1_ x W (- U co A0001 Rev.C DYNAMIC POWER INNOVATION LLC DISCLAIMER:If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission.In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. N.T.S. PAGE 8 INVERTER SHEET > /Perfect Welding/Solar Energy/Perfect Charging TECHNICAL DATA FRONIUS PRIMO o F%-0/7iL./5INPUT DA* PRIMO 3.8-1 PRIMO 5.0-1 PRIMO 6,0.1 PRIMO 7.6-1 PRIMO 8.2.1 CV 'a- 1-2,.,„„„„,„1,,,: Rtr., .,ul IV ix,wcci lkWp) tU (..0 OA -0 7.S kW 4.0 9.3 kw cosi 11.7 kw 0.6 12-7 kW t SHIFTING THE LIMITS Max.usablerttynt current(biPPr liM1'Fr 2) 18A/18 A 18A/18A 18A/18 A 18A/18 A 18A/18A r-- I.,' s.DC 1 (6 A c FRONIUS PRIMO Max. vas nevwtcurrent(1.25lmaxl(MPPT i/MPIr2) 22.5A!22.5A G 0 O1 nil $U, 6(10 V c ',. Max.input v6bage 600 V CY-) IY /The future of residential solar is here-Introducing the new Fronius Primo. :mut',ham 4 200 V 420 V 420 A 420 a Admissahle conductor size DC AWG 14-AWG 6 �_'^I ch 0 0 1 10 \III\ :.0..R.1„,fie 2511 15,1 6 240 400 V 240 400 0 2211 1.011 V 270 -10,0 A' t+J HW Numberof MITT 2 m (n U i__,; � •„ T 4 11,1111110 1 i J OUTPUT DATA PRIMO 3.8.1 PRIMO 5.0-1 PRIMO 6.0-1 PRIMO 7.6-1 PRIMO 8.2-1 J N ❑ ❑ Q -..}..-- *__.._. s. . t _M__ \ ',. s ___ tit 6I • I.,,t 1 - 240\' SS110 K' ,0110 tA' h11110\A' Ili 110 VA' 's 2(10 W . 208 V 3800 W 5000 W 6000 W 7600 W' 7900 W (n (1 U PCbntri /SnapiNveI lWFiatd rSgmrNles 1 Smart Grid /Arc F It CIcull *".0 Al ec replacement p ores nwunllng system intei face Design Ready Irate ptimt r: V 11i 111 ?08 V 1,-3 A '41 A 28.8.\ t I.5 A _34:2 A J H LU ' 208 V 18.3 A 24.0 A 2ft.A A 36.5 A 38.0 A � LU Lu, ,5,.,4110 I'1,AC Make: a,• 2406 20A 30 A ?54 40A 45'1 ❑ LLJ O co CD 208 V 25 A 30 A 40A 50A SOA 0 > >. d- N L N- Lf) u Z /With power categories titransformerless Fronius Primo is the compact ( O ti CD CO ”lfle . guoxa single-phase inverter for residential applications.The sleek is equipped with he SnapINvetehinge mounting 1 'le I,+n a,eAC AA1 N system which allows for lightweight,secure and convenient installation.The Fronius Primo has several integrated c.id connect h,n 208/240V 1. features that set it apart from competitors including dual powerpoint trackers,high system voltage,a wide input I.1"1""` ()111 .. Total hams r-:d stortion •5 0% ❑ voltage range,Wi-Fi*and SunSpec Modbus interface,and Fronius'online and mobile monitoring platform Fronius Power factor I 5 up,.. It551 Imllcap co Solar.web.The Fronius Primo also works seamlessly with the Fronius Rapid Shutdown Box for a reliable NEC 2014 co. co 0 solution**and offers a Revenue Grade Metering option completely integrated. INPUT DATA PRIMO 10,5-1 PRIMO 11.4-1 PRIMO 12.5-1 PRIMO 15.0-1 Ur TECHNICAL DATA FRONIUS PRIMO I, ,d 1ivi Ikwpl 001_0k'. 9.1 1 kVv Ho1,.011, A., 1-.0kw CO M Max usable inaut current(MPPT l;Ml'Pf 2) x._ 33.0A/18.0A to 0 1,1.,1 loss.U(.1,I 01,1 ' 51 r1 z o GENERAL DATA FRONIUS PRIMO 3.8-8.2 FRONIUS PRIMO 10.0-15.0 Max.array sh:teircuitcurrent(1.251max)(MPPT 1!MI'PT2) 41.3A/22.5A LLI L••.Li CV rr r l - 911 A' 61111 6 0 Q Iden r ,151 �u I O (� Weight f 82.5 II... Max Inputs ge nn 600 V 2 < I Dego, II I '51.0104\ V i,n11 1.p Ioe„ 4100, 421,\' .1'-.V 1406' LL ZN Night time consumption ,I W AWG 14-AWG 6 copper direct,AWG 6 aluminum direct(AWG 10 copper or AWG 8 aluminium for overcurrent protective devices d u..l LL o >- O mu Inve , I T ansh rrl,',, Admissible v,nductor size DC up to 60A,front 61 to 100A minimum AWG 8 lot copper or AWG 6 aluminium has m In;used)AWG 4-AWG 2 copper or aln- ❑ Cooling lop,ogv Variable speed tin ,— annum with optional input combiner I— 0 z 1”-.I.,11...,11 1 and nu don1,101,111.311011 ‘— \11'1'A 11,::::- yr 2/5 '1;0 6 2.5) 1.40\' 260 1St 5' 120 480\' F- U 1 n 6 led fn,tring Cine hinders 4-and 4♦for MPPT I/ losing requrled on MITT 2 : U (N Ambient o peratmg t nee tore•range 40- 1317F(40 555C) -40-140-F(,40 60C) LL 0 CA ❑ 11 N, ,1„ ,11\1111 IrNy I ,oil II It II 100`0L L.L 4x DC.and 4x IX::screw terminals for copper(solid/Itranded/ 4x IX:+I,2x 14 42 and 6x DG screw terminals for copper(solid/ > N- < 0 Z DC connection terminals y fine stranded or aluminum(solid stranded stranded tine stranded or aluminum solid st oiled C] a a 1 1 / 1 ( / ) OUTPUT DATA PRIMO 10.0.1 PRIMO 11.4-1 PRIMO 12.5-1 PRIMO 15.0-i a_ Q _0 0 0_ A( ,n1 t .,1. S ,len,n,Is 12 (,A\A e. ❑ T H 0 Q Revenue.Grade Meteruto iiimmill O SI C121 accuracy) .evmffsaAl • 11 + 1406 'n1 50 1(10016 12',0015 15000 5 21)0 V 9995 W 11400 W 12500 W _ (II 1X11 2010,II LI 15 dor Ion,trot,AIC1 and isolation 11L 1741201 (11.19'1:,dor imutions:AFCI,RCMU and- 1,111011 \I r.,T.1111111 ,.iulp„t n rrenl 210\' 4 I i.0 47 5.A -,.'..I A 62.50 monitoring),IEEE 1547_003,IEEE 1547.12003,ANSI/IEEE mmtitormgl,IEEE 1547 2003,IEEE 1547.1-2003,ANSI,IEEE Certificates and compliance with standards 062.41,FCC Part 15 A&B NEC Article 690,C22.2 No.107.1-01 C62.41,FCC Part 15 A&B,NEC Article 690-2014,C22.2 No. 208 V 18.1 A 54.8 A 60.1 A 24111111M U (September 2001),U1.1699B Issue 2-2013,CSA TIL M-07 Issue 1 107.1-01(September 2001),UL16998 Issue 2-2013,CSA TIL I,,,r, u,„1 I,(CPD:AC break,. ,.,, 2,11 6 ��:1�\ tin 6 7u A 80 A J O -2013 M-07 Issue 1-2013 208 V 70 A 70 A 80 A 90 A J 1— \1.I. — Vi.1..1511:wic ,'.7 Z Lu CCC Effidenrl 9(0% 96.5% 0 H AsrPROTECTIVE DEVICES STANDARD WITH ALL PRIMO MODELS Awe,111 AWG 2, I f- (-olid/stranded,lino t-ndrsh(AWU 10:11:tor AWG 8 atm iln n n for oxer m p nn.r d des ices I- D _ Admissable conductor size AC up to 60A,front fd to 100A minimum AWG 8 for copper or AWG 6 aluminiun,has to be used),AWG 6 AWG 2 cnpper(snhd/ < (/) Y - V(1 4,2014 561 Rend 1',•, stranded)MultiContautWiringable with AWG 12 > _ U)Z W Ground Fault Protection with Isolation Monitor `t Grid connect n '' Nallirr - - Z08/Z4U V 0 ›- Interrupter Yes } I t rrul ter .. I n qct.m, 13,60 Z C) N �'I it D(.I,.r ,•rt 0.s .... U Total hat mon c on s 2.5% Z = 1— Cfl Il WZ o DC reverse prim y prosection Yes OUPower a too lenswe.,) 01 nut;cap. Et U a) 1w LCc..)= _ :. INTERFACES STANDARD WITH ALL PRIMO MODELS /Perfes,W„(ding/Snhu Energy/Perfecitl ging in ci cc. o, 17? auh Wi-Fit/Ed net/serial .\ ,. ,1,„e h,, 1..,Sio II,.1L I'r•. •,: .1 I.! WE NAVE THREE DIVISIONS AND ONE PASSION:SHIFTING THE LIMITS OF POSSIBILITY. C US SUfl. O CL 0-C 0 t, Z � -ii I t./ouExternal t r t l r lay s tl Is /Whether 4d ng t h ology,phowvoltaics or battery charging technology our goal is clearly defined:to be the innovation leader.With around —o t t 1 na cr— _U 0 in 3,300 empI y worldwide,we shift the limits of whats possible our civ I lriver 900 grantedpatems is tesnmm,p to this WhilemI progress C/) 0 w V 1158 IA socket) P44 1,,1 1 owl, I L 11 6,I.1[P.M t to innovate in lea d bounds.lust as we've always done.The responsible used um resources form.the basis of our corporate policy. W E U 2 epbr' h. In an Ia n In I M r Fronius USA LLC < CC Z 2[ 145 k:q Fronius Solar NM,muriate protocol I-- J I11.rlo,I,,r aid\oebser.er Imhd,•d r,inner,a6,.,1.,,.w,em,n.n on.,,,,,,er ri>.tna rano global wnnr,.and reRn<n,ai,.t,ten le6wtw.,.w,.3me,ar.en, ,as .r w,arx 6797 Fronius Drive z co w O U w 6j }' 0 = 2 w 0 'The term Wi-Fi®is a registered trademark of the WiFi Alliance. Portage,IN 46368 USA 0 111 (./) CL >< EW U ^Fronius Primas 10.0-15.0 kW requires an external disconnect button for code compliance. pv-support-usa@fronius.com www.fronius-usa.`om DYNAMIC POWER INNOVATION LLC DISCLAIMER: If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission. In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them, SCALE PAGE 9 N.T.S. RAILS SHEET .,r Simple S - 100 • Quick assembly and clean aesthetic finish0-- RI -- S N v • One wrench fits every bolt in the system • Low profile installation on any roof r ROOT VQ �, \ - SYSTEV ,, � o Adaptable o _ r co Et - • Compatible with virtually all 60 and 72 cell modulesJ O U U U • Unique"snap-in"channel nuts can be installed anywhere U) D I— I- W mZ toaU on the rail < O LLI U U U • Rail channels provide improved wire management u_ Ni' 0 0 < CO WU 2Y Y - Strong -JCC I- ocf) in The SnapNrack line of solar mounting 'Z. . o w N- O • Excellent seismic,wind,and snow-loading protection O > } .cf` u7 Systems is designed to reduce total Vertical and horizontal adjustments ensuresuperior fit Z C ti CO ad`U g r installation costs.The system features Rain-tight metal flashing waterproofing technical innovations proven on more ain-tigh mea as ing ensures wa erproo ing than 100MW of solar projects to simplify � v. Innovative Universal End Clamps 1- D . ._ (0 0 installation and reduce costs. tr f • One size fits any standard L frame module c U • Clean look-nothing extends beyond module frames �. fY co Pitched Roof Arrays Simplified `-- 0- ` • Less waste-rail lengths match most modules ,' z > o di The SnapNrack Series 100 Roof Mount System is an photovoltaic(PV)module 2 Q N } . . efficient,visually appealing,photovo I a Z N f— rb installation system.Series 100 was developed in the `!,� W ? IV_ U Uo field by a team of veteran solar engineers and installers. ` = fY C) I- O r- SnapNrack Series 100 Technical Data pat-"—ding w - N Their goal was to ensure a quick,efficient installation. v d N Series 100 has been tested on megawatts of real-world _ 03 CC D Roof System In 4 Simple Steps: o j N- Q 0 z residential and commercial installations.Industry Materials •6000 Series aluminum a1 < 000a_ z leading installation times are achieved with unique 1)Identify Site Conditions(Array Tilt,Building • Stainless steelp E 0 < Snap-in fasteners and fully adjustable components that Height,Roof Type,Wind and Snow Loads) •Galvanized steel make installation of roof mounted solar arrays easy Material Finish •Clear and black anodized aluminum 2)Determine Footing Span from Engineering U co while achieving lower installation costs. Installation •Quick and efficient mounting o Tables(download at www.snapnrack.com) -_I r- •Adjustable hardware to ensure clean and level finish z w • Up to 3"of height adjustability at roof connection 3)Choose color(Clear or Black)and roof •Worry-free waterproof flashing 0 I— attachment type • Waterproof full-metal flashing at each roof penetration Calcs.&Certifications •Wind speeds p to 150 MPH and snow loads for 1a201n lu s O C } 4)Place Order withyour distributor.Purchase a- • Works on virtually all composition and tile roofs Grounding Washer,Electrical Equipment Bond(WEEB) y g z o N material for a single project or order in bulk c) Warranty •10 Year material and worksmanship(download full details at snapnrack.com) z I (c:' a CO o " Single wrench size for all system hardware for additional savings e U rn r o Z 0 ILI -Rail&Module Clamps w u- IY 9 Y o • Configures easily as low profile or tilt(0-60 Degrees) Roof Attachments U O 1 J Sn �c�ckTM 2 • Rail channels provide excellent wire management -Array Accessories a n- p o w U O in Q CO PV Mounting Systems Q Z o a, �[ I-I J— �� rock (877) 732-2860 www.SnapNrack.com Z r, w X w i5 m >- O w oN (nEL U Patent Pending } Denting Systems using Printed on recycled paper ug soy based Inks '... 2012 by Snapback PV Mounting System.At rights reserved. , DYNAMIC POWER INNOVATION LLC DISCLAIMER: If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission. In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. _ ___ _ _ __ ®♦ONIINE CERTIFICATIONS DIRECTORY N.T.S. PAGE 10 A P R A /K U 2703 QIMS.E359313 RAIL FIRE CERTIFICATE Mounting Systems,Mounting Devices,,Clamping Devices and Ground Lugs for • HRF CASSHICATJONUse with Photovoltaic Modules and Panels _ sage exmm --.__________.- -- ------------ . ._...___-----._.-_ _...._._�_- '. O Mounting Systems,Mounting Devices,Clamping Devices and Ground Lugs for N • • Use with Photovoltaic Modules and Panels 6 February 2015 S*J UNSUTMOU4 OSA SMAPlBtACK 5359313 o _2 las fxro Ln ch fI _ _ _ Suite and J fl ch U 0 0 San tusflb As of January 1st,2015 many jurisdictions are 5U04 AS 93401 USA SeveselOated 00 .2 H I- w m Z U U U Ltvsstgatad far 'System Fire Catep now enforcing codes based upon updates to Q o Cat for atealBcsl CNsrSlcsttsn the International Building Code (IBC)and UL 114. Sending leading (A.SorC) Tested InGembinatfonNOM J Ct MI NI Q Q Q Standards 1703 (modules) and 2703 (mounting PlLetarottakmeui4Mgsystem CO systems). The language included in the 2012 IBC Sanas And N IL Listed PV Modules: 0 W Lu 3S0 ,Y Y REG Solar AS REC214,REC21S,RE£220,REC22S,REC230, J W requires that the combinationi� of roof mounted _ REG239.REC2W,R6£�s;REc25o,REG25s,REG260 RE£29s, co CO 71- o solar modules and racking components is to RSC270,all rolle6t4 by PE,PE{9L�:).PE-US,PE-'usCetx),PE 42 0r o > .. PEQI. >- d- i,- Ln be considered a system (IBC Section 1509.7.2). Hyundai/teary 1 tr Ltd: Z e7, ti co co Additionally, it requires that this system shall HAS-Mxat4MG Serle,..HiS•M210MG,HIS-M2L3MG,Has•M215MG, A meet or exceed the fire classification of the roof H2:2BMG8MS H230t4G(k4G,M233r453MG,H2.35MG5MG,Has MZ28MG,MFS-M230s1G,H!5-14233r45,HL5-11235MG,HIS-4123614G, IY assembl Has-M240MG,HlS-M243MG,HIS-m2.15,40,His-H2410.40,H - y p, M250MG,HIS-?t253HG,HIS-142594G,HJS•M253HG,HIS-M260MG, a. 1115-1.4263140.1115-1429940,111541268140,HiS-M22014G; HaS-SsMG Series-HS-S220M0.1-14-5223/4G.1-14-5223/4G.HiS•S225MG, 0) O as HiS-5228616,Ha-523040.415-523340,His-5235140,HIS- CO The objective is to ensure that the PV system S238M0.H4-5240MG,HI5-5243146,415-5245146,1115-5248MG, ( I HiS-S250MG,HiS•5253MG,HIS-5255MG,HIS-5258MG,HIS- o Ur does not adversely affect the fire rating of the roof. Roof surface fire ratings are classified either A, 5260143,Hr5-5263MG,MMI IS-52691G, S-526&•16,HIS-52706N3, N. MS-527314G,HIS-52794G: �' m B, or C; Class A being the most resistant to the spread of flame. anmaywfollowedb7 suffix ar54.n. 0 ❑ > o Rofcf444)I rgSF Ltd: xxxM-x4/00 Selivi )C200M-24184. ELI Z o Since the physical characteristics of the PV module(material, thickness of glass, etc)also 10o5M-24/x, 1 24/Bb.1G215M-24,0b.1Cx2014-24,x,, Z •Q ili N 3..22514-24/8b,703014-24.150 3G23514-24/60 IC24014-24/114, potentially affect how a fire will act, modules are now tested and assigned a "type" based upon seal Aad N 3G3..24514.24,80,X25014-24i8b,3G255M•24/Stt,K260M-24/80, 0 d- 265M-24/80,3C220M-24!80. 0_ N Q Cr > m these characteristics and spread of flame test results. There are 15 total module types, Types 1, 100 Sunnis Inc-MVX-23S-60,5•7O1,HVR-240.60-5.7(11,MV5-245.60- Lii LL W ›- U 5-201,MVX-250,40-5-201.,MVX-255-60-5-701,MVR-260-60-5-701. 2 and 3 represent differences in the module composition and Types 4 -15 are the same module M,x-265-60.5.711: -_I D iY o r MVX-23$-60.5-781,MVX.240-AA-5.761,MVX-245.60.5-7Bt,I - >-• I o z T- compositions as Types 1 - 3 with differing fire test performance. 252.6x.5.7111,MYx•x55-645.3$1,MVX-290.645.281.revX-295- U I- d 60-5-7814 PT 2 80.4.500,a✓Pr•usa44.800,OPT-260-60-4-800,OPT- -3 0 ( p N SnapNrack Series 100 has been Certified for a Class A fire rating with Type 1 and Type 2 26540-4-e46.oarOPT-220-60-443M 007-27S-03.4-800;oPT-25060-4 eeo.oPr•25s 644 e114,OPT-260.60-4-860,OPT- 0co Ce 5 < U Z modules, in accordance with the standards set forth in UL1703/2703 and IBC 2012. In order to o N 0 O Q maintain this classification, the SnapNrack mounting system must be installed per the UL-approved Il.2 ., "x'24,`ni3� �3 Pi( ,YL240P: ; las 644o aPr•27e so a•eso,ovens 644 eea. a U d YL24SP-296.YL250P-290,YL255P-290.C1.260P-2443 1 Installation Manual. Because the test was conducted with the modules at 5 inches from the roof R.RRXA-290Sea1es-Y1.220d-294.YL2254-291),n2304-9e. surface(worst case scenario), there is no restriction to the standoff height. YL235A-290,YL24aA-290,yL45A-290,Y42soa-290 YLz55A-2270. Trina Solar Ltd-TSM-2156406,TS14-220PA05,ISM•225PA05,7514- J O 230PAOS,TSM-235PA0S,TSM•240PA05.TSM-24SPAOS.TSM- Attachment 1 is the SnapNrack AIMS File which is accessed through the UL Online Certification 250PA05,T514•25SPAOS,T541-2606405; Z TS14•21SPA05.05,TSM•220PAOS.09.1511.225PA05.05,ISM- O H 2305A05.05,TSM-235PA06.05,TSM-2406406,05.1S14-2480405.05, Directory, or available here: SnapNrack QIMS File. TSM-250PA05.0S,TSM•25SPAOS.05,TSM-290P400,05; TSM-215P40S.08,TSM-220PAOSM < � S,TSM 225PAOS.08.TSM- Y --- SMRs And ti - 230PAOS.08,TSM-235PA05,08„7534.2406405.08.TSM•245PAo5,08,. > CO The full SnapNrack Series 100 UL Test Report is available by sending requests to 204 TSM-2500405,0w 8,TSM -29 >0PA05.0e: Z } a9gertq;a�srtaprtraCk.c4rrt. TSM 2LSPo05,TSM 224PDA5,7511-223409).TSM 2306005,TSM O > 2356005.TSM-2406005.TSM O-2456005.TSM-25oe00S,TSM- Z N 255PDOS,TSf4-260P0051 Z I U w c, TSM-21SP005.08,T551.2.201,005.08,1544-22.5P005.08,TSM- ti CD 0_ Z,- 30P005.06,TS14-235PO05.OS,TSM-2406005.09,TSM-245PBo5.08, rt 0 TSM-2505005.08.T514-255P0135,08,TSM-2606805,48. W it ce 9 I i U WTI.Lited PV Modules: U 0 Lj fl 0_ a0m0 Ha1W1a SotaiOne:Models 1151W'6-PB-2.230Q.H5L6006-PS-2- p- � 4:k235g.45(9(66PB-2-240Q.r454.606-1.15-2r454.606-1.15-2-245Q.HSL90P6-S-2- 0 w 2OQHSLCF6P9 2.255Q.MSL60P6•P9-329OQ,HSL6fPd-68-2• 0 OO Qz cm IN Y265Q.11516046-68-2-2740: W rackHSLdOP6-PB-4.230Q,45(6066-PB-4-23Q,4516046-PB-4-240Q, Q U t 6 45664-P -4'23Q.n560P6-P8.4-25OQ,H5L60P5-PB-4.255Q, (n Ct Z oU Fc _ HSL60P6-P9-4-290Q.F45LSOM-P8-4-265Q,4516069-PS-4-270Q; Z M W o U 1 w Do ,."t _ may be followed by 66644460 suffixes. > p I I W F-U SOcar is r ,!,.1.1 1 q'i 1..J F+,., i w)` Soars Inc-0P1XRX-644-Y1Y; a c (/) a. x W, o Yd+e10 XXX may be numbers 240 to 270 In in4 enema of 5; *Nese WY may be 100; . OPtXXX-60,4-5W; (877) 732-2860 www.SnapNrack.com where XXX may be numbers 235 To 295Mincrernentsof5: DYNAMIC POWER where 1NY tray be 160. T,ta,,�f.'rt...11.0,,,4 CV,f,lunttyl g:4 P,Gt,vt,s+v Arty'te'C�'L�4u t» . <3. .e,.a.,o.ot 41.0 tr. ,assa .,. ,=,..oxi,+ey larol„u F „ 1 ,, f.,,1,. ,ar „,. . ,,.t ,,,..,I+G, f S.1010f�,e:<I le. , f( H Type I and Type 2 P9 Mod es INNOVATION L L C loo t 203 by S,30,,,<,1 PV V10,,,r4,ng System AN rt9Fts resa...ad DISCLAIMER: If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission.In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. N.T.S. PAGE 11 ATTACHMENT SHEET > r- O gi S � RI =S100 -- LASH -- D L FOOT SIT a 2 c, co cc a a -- -- -. -I6 0 0 00 043, U) D I- Lit a o (f) 0_ v ai 0 0 0 Flashed L Foot Kit Assembled(.1'spacer soli separately) Flashed L Foot Kit Parts(Y'spacer sold separtely) C/) in II II W Y Y o W 0 co O The SnapNrack line of solar mounting Flashed L Foot Kit Assembly Flashed L Foot Kit Dimensions 0 >> ., - r- LU systems is designed to reduce total N: C° ., WOMACK 00.10EL KIT installation costs.The system features i +uwarcKwMPH.FOOT,tea Ct 4 technical innovations proven on more10tPsn, ,U. a than 200MW of solar projects to simplify . 4 5114 21,X 0 0 � " svrriaancCOW4 anw4111 CO installation and reduce costs. U, C) d m Flashed L Foot Simplified 0 > o0 SnapNrack Series 100 Flashed L Foot Kit is an innovative o a v I a N solution to provide a long lasting watertight seal over EL W _U.o the life of the system.The Flashed L Foot provides a •» :„.. _J D o Z single fastener flashed to an attachment composition + U ~ a N Flashed L Foot in 3 Simple Steps: • 1� w o_ coD C shingle roof with no required cutting of shingles.The L O > a U Z 1)Locate the rafter and drill the pilot hole , a < 000o_ ew*«xc1IWO- M Foot is engineered for maximum adjustability for a clean ”" CI .- 1— 0 < level installation. 2)Prep and attach the base 3)Set the flashing and attach the L Foot SnapNrack Flashed L Foot Technical Data Patent°°nd- o o • 1"slotted bolt connection Materials • 6000 Series Aluminum L Foot&Base _1 r • Stainless Steel Hardware Zo H • • 1"spacers available for increased adjustability Galvanized Steel Flashing Material Finish • Clear and black anodized aluminum Q � I Y • Clear or Black anodized aluminum components Place order through your SnapNrack > 1() W Weight • 0.16 lbs ° >- a available with black flashing) distributor,which can be found at Design Uplight Load • 200 lbs Uplift Z > d r›- (both Z 2 d wo • No Cutting of shingles www.snapnrack.com/contact Design Ultimate Load • 1,000 lbs Uplift — U IZ (0 O W- j:tWarranty • 10 Year material and worksmanship LLU LL cc _ 0 5 O � to SncipNrack o a o� O p� o , Z w Q � � Za) SnapNracicPV QOzg " F W www.SnapNrack.com >-(877)732-2860 o I I w H o 0Patent Pending PV tntinf 's n3 X w u) 0 Printed on recycled paper using soy based inks ' &i 2013 by SnapNrack PV Mounting System.All rights reserved. ' DYNAMIC POWER INNOVATION LLC DISCLAIMER:If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission.In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them. N.T.S. PAGE 12 WARNING WARNING W` ' ING PHOTOVOLTAIC SYSTEM ELECTRICAL SHOCK HAZZARD INVERTER OUTPUT POWER TI I HIS BUILDING IS WARNING LABELS • OPEN-CIRCUIT VOLTAGE 545.$Vdc THE DC CONDUCTORS OF THIS CONNECTIONS(S), ALSO SU- ED BY THE PHOTOVOLTAIC SYSTEM ARE DO NOT RELOCATE THIS PHOTOVOLT iC SOLAR SYSTEM MAX. OPERATING VOLTAGE 600 Vdc UNGROUNDED AND MAYBE ENERGIZED OVERCURRENT DEVICE DO NOT TO"'. TERMINALS OPERATING CURRENT 18.76 Amps N AT ALL"J" BOXES,COMB. BOX, DISCONNECTS PLACED ON MAIN PANEL PLACED :y. AIN PANEL DEVICE WHERE ENERGIZED, UNGROUNDED SHORT CIRCUIT CURRENT 19.86Amps CIRCUITS MAYBE EXPOSED DURING SERVICE (Art. 690.35 (F)) illiaelli PLACED ON EACH DC DISCONNECT INVERTER o CD co cC � D H F- W PHOTOVOLTAIC AC DISCONNECT co Z C%) 0 0 W 0 0 0 WARNING MAXIMUM OPERATING CURRENT 39.63A J o Q THIS EQUIPMENT FED BY MULTIPLE SOURCES. MAXIMUM AC OPERATING VOLTAGE 240 V CR c/) 0 0 < TOTAL RATING OF ALL OVERCURRENT DEVICE, Ali w w Y Y Y SHALL NOT EXCEED AMPACTIY OF BUSBAR. PHOTOVOLTAIC PLACED ON MAIN ELECTRICAL PANEL 690.54 D CC W' 1-- O CO LO PLACED ON MAIN PANEL NEC 705.12(D)(2)(3)(E) SYSTEMZ C DC DISCONNEC • r u' N- 6 (.6 fy PLACED ON INVERTER 0 NEC-690.14(C)(2) 0 f CD 0 PHOTOVOLTAIC SYSTEM ti m • EQUIPPED WITH w 0 > o RAPID SHUTDOWN o CD 0- CAUTION N CEC 690.56 (C) d Q m N H PLACED ON INVERTER SOLAR ELECTRIC SYSTEM Co I 1 CTED w cK 0) >- o PLACED ON MAIN ELECTRICAL NEWARNING �, F- O Z - ELECTRICAL SHOCK HAZZARD wl N IF A GROUNDED FAULT IS INDICATED, o' j ° a rR z \ WARNING/\ NORMALLY GROUNDED CONDUCTORS < N 0 0 o_ WARNING MAY BE UNGROUNDED AND ENERGIZED a ~ 0 < DUAL POWER SUPPLY NDICATOR PHOTOVOLTAIC POWER STRING INVERTERS ONLYNEAR GROUND-FAULT I(Art. 690.5(C)) o SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SERVICES PLACED ON INTERIOR AND EXTERIOR DC CONDUIT, z0 w PLACED ON MAIN ELECTRICAL PANEL RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES, 0 I — JUNCTION BOXES,AND DISCONN ING < u) 2 SHALL BE PLACED ON INTERIOR AND EXTERIOR DC >0 >- z a CONDUIT, RACEWAYS, ENCLOSURES AND CABLE z O N ASSEMBLIES EVERY 10 FEET(304'' M),WITHIN 1 z I 11 Z FOOT OF TURNS OR BENDS AND ` IT 1 OOT o i w W E_ABOVE AND BELOW PENET- • fi c) 0 WALLS ROOF/CEILING ASSEMBLIES, e' B- -IERS0 Q ' . PV SOLAR BREAKERa 0- o o w DO NOT RELOCATE THIS 0 0 E Q Z m OVERCURRENT DEVICE CAUTION: AC SOLAR VOLTAGE Q z w U 1- J- ON ALL AC CONDUITS RACEWAY p N 1 1 X Lu Hw a U PLACED ON BREAKER DYNAMIC POWER • WARNING LABELS INNOVATION LLC .. White letters on red background and non-bold arial or similar font. Marking shall be of reflective, weather resistant material suitable for the environment. DISCLAIMER: If any Errors,Discrepancies or Omissions appear in these drawings,specifications or other contract documents;The Owner or General Contractor shall notify the Designer,in writing,of such error or omission. In the event that the Owner or General Contractor falls to give such notice,before construction and/or fabrication of the work,the Owner or General Contractor will be held responsible to the result of any errors,discrepancies or omissions and the cost of rectifying them.